JOB TITLE / AIM: Jsa for cutting, grinding and welding at Check post 1 barrier
JSA DATE: 18/01/07 JSA NO./ REVISION: 00
SUPERVISOR/ JSA LEADER: Muhammad Ramzan SCRIBE: Abdullah Khan
PARTICIPANTS: Tufail
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Equipment
2. Cutting, grinding and welding job
3. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

 Signage’s indicating Men at work shall be erected for upcoming Traffic

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
site that the E &P Personnel got inspected the
equipment. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.

Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site.
Workers starting the job without Permit All the work to be done under BHPB OPS Hot
work permit.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves. Ensure trolley are
secured with stable support
2 Welding, grinding and cutting Cutting/Grinding /Welding slugs  All the work to be done as per BHPB doc .PA-
HSEC-02-010-003-WI
 Fire blanket shall be used.
 DCP fire extinguisher shall be placed where
welding activity is performed.
 A firewatcher shall be deputed.

Ignition sources  Energised electric rod holder shall never be


left un attended, the welding rod must
always be removed and the power shut off.
 Welding earth leads shall be attached
immediately adjacent to the material being
welded (i.e. to prevent stray sparks in other
locations.
.
 Hot welding rods shall be discarded into a
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
designated container

Defective welding cables  Welding cables and gas hoses shall be


inspected for cuts, breaks, leaks or
insulation damage
 Flash back arrestors shall be fitted to
oxygen and acetylene lines.
 Oxygen – acetylene cylinders shall be
shutoff while un attended.
Pressurized gas cylinders shall be stored kept at a
safe distance from the welding activity.
Personnel struck by sparks, steel buffer wire or  Double eye protection with hat mounted face shield
shattering grinding disc, electric shock shall be worn at all times.
 Frequently check condition of grinding disc
Ensure electrical equipment has current test &
tagging.

Accidental activation of grinder injuring the  Grinders shall be placed disc down on
grinder operator ground when not in use.
Ensure that grinder is disconnected from power
source prior to changing /adjusting discs

Electrocution  Full PPE to be worn by welder including


leather welding gloves and welding
helmets.
Ensure that welding unit is fitted with RCD and
signed by DEL E&P and approved by BHPB
operations.
3 Demobilization Unsecured area Proper house keeping shall be done prior to