Vous êtes sur la page 1sur 7

NIOEC-SP-10-13 (0)

DOCUMENT CODE NO. OF SHEETS: 4


PLAN/PRJ/SUB UNIT PHASE DISCIPLANE DOCUMENT. TYPE SERIAL NO. REV. NO. DATE
NIOEC 000 EG CE SP 1013 A0 JULY 2005

NATIONAL IRANIAN OIL REFINING & DISTRIBUTION COMPANY


NATIONAL IRANIAN OIL ENGINEERING
& CONSTRUCTION COMPANY

NIOEC SPECIFICATION

FOR
WATER RESOURCES AND DISITRIBUTION SYSTEMS

FIRST EDITION

JULY, 2005

THIS SPECIFICATION IS THE PROPERTY OF NATIONAL IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY. IT IS CONFIDENTIAL AND ALL RIGHTS
RESERVED TO THE OWNER. NEITHER WHOLE NOR ANY PART OF THIS DOCUMENT MAY BE DISCLOSED TO ANY THIRD PARTY, REPRODUCTED, STORED
IN ANY RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE PRIOR WRITTEN CONSENT OF THE NATIONAL
IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY.
MARCH, 2005 NIOEC-SP-10-13( 0 )
MARCH, 2005 NIOEC-SP-10-13( 0 )

REVISION INDEX
REV. REV. REV. REV.
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
PAGE PAGE PAGE PAGE
1 26 51 76
2 27 52 77
3 28 53 78
4 29 54 79
5 30 55 80
6 31 56 81
7 32 57 82
8 33 58 83
9 34 59 84
10 35 60 85
11 36 61 86
12 37 62 87
13 38 63 88
14 39 64 89
15 40 65 90
16 41 66 91
17 42 67 92
18 43 68 93
19 44 69 94
20 45 70 95
21 46 71 96
22 47 72 97
23 48 73 98
24 49 74 99
25 50 75 100

NOTES:

1) THIS SHEET IS A RECORD OF ALL REVISIONS TO THIS SPECIFICATION.


2) REMARKS RELATED TO EACH REVISION SHOW A BRIEF DESCRIPTION. THESE REMARKS SHALL BE
INTERPRETED IN CONJUNCTION WITH THE REVISED TEXT MARKED BY REVISION NUMBERS.
3) WHEN APPROVED EACH REVISION SHALL BE CONSIDERED AS A PART OF THE ORIGINAL DOCUMENT.
4) NUMBER OF PAGES EXCLUDES THIS SHEET AND THE COVER SHEET.

1
0 JULY,2005 Z.CHETMIRI S.M.J.SEYEDI M.R.FARZAM M.A.A.SAJEDI
REV. DATE PREPARED CHECKED APPROVED AUTHORIZED

1
MARCH, 2005 NIOEC-SP-10-13( 0 )

CONTENTS: PAGE NO.

0. INTRODUCTION.......................................................................................................................... 3
1. SCOPE ............................................................................................................................................ 3
2. REFERENCES............................................................................................................................... 3
2.1. EQUIVALENT TO IPS STANDARD ..................................................................................... 4
3. UNITS ............................................................................................................................................. 4
4. DEFINITIONS AND TERMINOLOGY ..................................................................................... 4
5. ADDENDUM / MODIFICATIONS TO IPS-E-CE-340............................................................. 5

2
MARCH, 2005 NIOEC-SP-10-13( 0 )

0. INTRODUCTION

To satisfy the requirements of this NIOEC specification, Iranian Petroleum Standard


IPS-E-CE-340 with the modifications as specified here in after shall be strictly followed.
Article 1 through 4 of this document replace entirely the related articles in the referenced IPS
standard.

1. SCOPE

NIOEC specifications cover the general requirements for detailed engineering procurements,
testing inspection & construction of refinery/oil plant, distribution depots, pump stations and
pipe lines.

This NIOEC Specification prescribes the water resources and provides recommendations for
preliminary planning and engineering of central water supply systems ( intake facilities plus
distribution network ) serving the potable and non-potable water needs of a community.
More cover it sets out the quality requirements of potable and non-potable ( irrigation ) water
and design criteria for designing and sizing of water intake facilities, distribution systems,
service reservoirs ( including high level tanks) and pumping stations for residential areas in
methods that are technically and economically viable and acceptable.

2. REFERENCES

Throughout this Specification the following dated and undated standards/codes are referred
to these referenced documents shall, to the extent specified herein form a part of this
Specification.
For undated references, the latest edition of the referenced document (including any
supplements and amendments) applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the cited date, shall mutually
be agreed upon by NIOEC and the Vender / Contractor.

DIN (DEUTCHES INSTITUT FUR NORMUNG e. v.)

DIN 2000 Nov: 1973 “Central Drinking water supply”


DIN 2001 Feb: 1983 “ Private and Individual water supply”
DIN 2425 Oct: 1983 “ Plans for public supplies, water Engineering and Long Distance Pipe

IPS (IRANIAN PETROLEUM STANDARD)

IPS-E-CE-340 “ Engineering standard for water Resources and Distribution System.”


IPS-E-TP-760 “ Engineering standard for corrosion consideration in Design.”
IPS-E-TP-350 “ Engineering standard for Linings.”
IPS-C-TP-820 “ Engineering standard for Electrochemical Protection (Catholic &
Anodic) ”
IPS-C-TP-742 “ Construction standard for corrosion consideration During Fabrication
and Installation. ”
IPS-C-TP-352 “ Construction standard for Lining”

3
MARCH, 2005 NIOEC-SP-10-13( 0 )

NIOEC-SP (NIOEC SPECIFICATIONS)

NIOEC-SP-00-10 “ NIOEC Specification for Units ”


NIOEC-SP-50-17 “ NIOEC Specification for coating ”
NIOEC-SP-30-04 “ NIOEC Specification for work to be Done and Materials to be used in
Masonary Buildings”

NIOEC-SD (NIOEC STANDARD DRAWINGS)

NIOEC-SD-1036-1/1-A2 “ NIOEC Standard Drawing for Septic Tank ”


NIOEC-SD-1035-1/4 ~ 4/4 -A3 “ NIOEC Standard Drawing for 30m3 Elevated Water tank”

2.1. EQUIVALENT TO IPS STANDARD

Substitute the following IPS Standards as referred to throughout IPS-E-CE-340 to relevant


NIOES' s Specifications as follows:

IPS Standard Relevant NIOEC Specification

IPS-E-CE-400 NIOEC-SP-10-13

IPS-M-CE-345 NIOEC-SP-30-04

IPS-E-TP-270 NIOEC-SP-50-17

IPS-C-TP-274 NIOEC-SP-50-17

IPS-D-CE-190&191 NIOEC-SD-1036-1/1-A2
IPS-D-CE-412 NIOEC-SD-1035-1/4 ~ 4/4 -A3

3. UNITS

International system of unites (SI) shall be used in accordance with NIOEC-SP-00-10, unless
otherwise specified.

4. DEFINITIONS AND TERMINOLOGY

- Ghant
Man made ( dug ) underground tunnel with moderate slope that collects the percolated
groundwater of a catchment area and with gradual decrease of its depth comes out to the
surface of earth as a spring at appropriate point for potable and or non-potable use of
mankind. The tunnel is dug through vertical walls approximately 100 meters apart, as
required, that act also as venting shafts for periodic inspection and maintenance of the "
Ghanat ."

- Contaminant
Any physical, chemical, biological, or radiological substance or matter in water.

4
MARCH, 2005 NIOEC-SP-10-13( 0 )

- Maximum Contaminant Level ( MCL )


The maximum permissible level of a contaminant in water which is delivered to the free
flowing outlet of the ultimate user of a public water system.

- Distillation
A process of evaporation and condensation used for the preparation of water of high
purity.

- Turbidity
Reduction of transparency of a liquid caused by the presence of undeserved matter.

- Drawdown
Drawdown at any instant is the difference between the static water level and the pumping
water level. Drawdown affects the yield of well.

- Well Yield
The volume of water discharged from a well per unit time. It is commonly expressed in
litres per second or per minute, or cubic meters per minute, hour or day.

5. ADDENDUM / MODIFICATIONS TO IPS-E-CE-340

This addendum revises the below listed articles of the referenced standard as follows:

Article 11.5.3 Fire Hydrants

Delete the end paragraph: For std. Drawing refer to IPS-D-CE 180 and 181