ANALYSIS FOR IDENTIFICATION SIGN BOARD (VILLAGE BOARD)

Sr. No. Description Unit Qty. Plan


Rate Cost
(In Rs.) (In Rs.)

24.68 Place Identification Sign Board 900x600mm Rectangular


Place Identification sign board 900x600mm rectangular as per IRC 67-2001 with retro 1 Nos.
reflective high intesity grade sheeting fixed over 2mm thick aluminium sheet with
25x25x3mm angle iron frame supported on a mild steel angle iron post 75x75x6mm
firmly fixed to ground but without cost froundation concrete and excavation complete as
per technical clause 801 of MORT&H specifications

1 Materials
(i). MS angle iron
Vertical support 75x75x6mm
1x2.85= 2.85 mtr @ 6.80 Kg per mtr = 19.38 kg
Vertical support Base 75x75x6mm
2x0.20 = 0.40 mtr @ 6.80 kg per mtr = 2.72 kg
Board Frame 25x25x3mm
2x(0.90+0.60) = 3.00 mtr. @ 1.10 kg per mtr = 3.80 kg
Total = 25.40 kg
Add 5% wastage = 1.27 kg
Total = 26.67 kg or 0.267 Qtl Qtl 0.267 3650 974.55
(ii). 2mm thick aluminium sheet painted with heat treatment process including etching
treatment.
0.90x0.60 = 0.54 Sqm
Add 5% wastage = 0.027 Sqm
Total = 0.567 Sqm Sqm 0.567 3000 1701.00
(iii). Retro reflective sheeting of high intensity grade including cutting of word matter
with computer plotter and design and layout of board.
Board Base
0.90x0.60 = 0.54 Sqm
Border
2x(0.90+0.60)x0.075 = 0.225 Sqm
Place Name
0.90x0.60x20% = 0.108 sqm
Total = 0.873 sqm
Add 5% wastage = 0.044 sqm
Total = 0.912 sqm Sqm 0.912 5000 4560.00
(iv). Readymixed Paint of approved quality

file:///conversion/tmp/scratch/457470276.xls
Sr. No. Description Unit Qty.
Rate Cost
(In Rs.) (In Rs.)

Vertical support 75x75x6mm


2.85x4x0.075 = 0.855 sqm
Board Frame 25x25x3mm
2x(0.90+0.60)x4x0.025 = 0.30 sqm
Total 1.155 sqm
Taking 0.125 litre per sqm
Qty of paint = 0.144 litre Ltr. 0.144 250 36.00
(v). Red Oxide Primer of approved quality
Vertical support 75x75x6mm
2.85x4x0.075 = 0.855 sqm
Board Frame 25x25x3mm
2x(0.90+0.60)x4x0.025 = 0.30 sqm
Total 1.155 sqm
Taking 0.0625 litre per sqm
Qty of primer = 0.072 litre Ltr. 0.072 200 14.40
Total 7285.95
Add contractor's profit @ 10% i.e. 728.60
8014.55
Add labour cess @ 1% 80.15
Cost for 1 Nos. 8094.69
2 Labour
Taking output 4 Nos.
(i). Mate Day 0.10 240 24.00
(ii). Mazdoors Day 2.00 240 480.00
(iii). Blacksmith Day 1.00 280 280.00
(iv). Painter Day 0.50 300 150.00
Total 934.00
Sundries such as traffic management during construction, watch and ward, minor T&P, 14.01
water charges etc. @ 1.5%
Add contractor's profit @ 21.5% 200.81
1148.82
Add labour cess @ 1% 11.49
Labour for 4 Nos. 1160.31
Labour for 1 Nos. 290.08

Cost for 1 Nos.

Say Rs. 8384.80

file:///conversion/tmp/scratch/457470276.xls
Plan
Total
(In Rs.)

file:///conversion/tmp/scratch/457470276.xls
Total
(In Rs.)

8094.69

290.08

8384.77

file:///conversion/tmp/scratch/457470276.xls
ANALYSIS FOR CAUTIONARY/ INFORMATION SIGN BOARD
Sr. Description Unit Qty. Plan
No.
Rate Cost Total
(In Rs.) (In Rs.) (In Rs.)

1 Cautionary Sign Board 600x600x600mm Triangular


Cautionary board 600x600x600mm triangular as per IRC 67-2001 with retro reflective 1 Nos.
high intesity grade sheeting fixed over 2mm thick aluminium sheet with 25x25x3mm
angle iron frame supported on a mild steel angle iron post 75x75x6mm firmly fixed to
ground but without cost of definition plate, foundation concrete and excavation
complete as per technical clause 801 of MORT&H specifications.

2 Materials
(i). MS angle iron
Vertical support 75x75x6mm
1x2.85= 2.85 mtr @ 6.80 Kg per mtr = 19.38 kg
Vertical support Base 75x75x6mm
2x0.20 = 0.40 mtr @ 6.80 kg per mtr = 2.72 kg
Board Frame 25x25x3mm
3x0.60 = 1.80 mtr. @ 1.10 kg per mtr = 1.98 kg
Total = 24.08 kg
Add 5% wastage = 1.20 kg
Total = 25.28 kg or 0.253 Qtl Qtl 0.253 3650 923.45
(ii). 2mm thick aluminium sheet painted with heat treatment process including etching
treatment.
0.50x0.52x0.60 = 0.156 Sqm
Add 5% wastage = 0.008 Sqm
Total = 0.164 Sqm Sqm 0.164 3000 492.00
(iii). Retro reflective sheeting of high intensity grade including cutting of word matter
with computer plotter and design and layout of board.
Board Base
0.50x0.52x0.60 = 0.156 Sqm
Border
3x0.60x0.045 = 0.081 Sqm
Cautionary Sign
0.50x0.52x0.60x20% = 0.031 sqm
Total = 0.268 sqm
Add 5% wastage = 0.013 sqm
Total = 0.281 sqm Sqm 0.281 5000 1405.00
(iv). Readymixed Paint of approved quality

file:///conversion/tmp/scratch/457470276.xls
Sr. Description Unit Qty.
No.
Rate Cost Total
(In Rs.) (In Rs.) (In Rs.)

Vertical support 75x75x6mm


2.85x4x0.075 = 0.855 sqm
Board Frame 25x25x3mm
3x0.60x4x0.025 = 0.18 sqm
Total 1.035 sqm
Taking 0.125 litre per sqm
Qty of paint = 0.129 litre Ltr. 0.129 250 32.25
(v). Red Oxide Primer of approved quality
Vertical support 75x75x6mm
2.85x4x0.075 = 0.855 sqm
Board Frame 25x25x3mm
3x0.60x4x0.025 = 0.18 sqm
Total 1.035 sqm
Taking 0.0625 litre per sqm
Qty of primer = 0.065 litre Ltr. 0.065 200 13.00
Total 2865.70
Add contractor's profit @ 10% i.e. on Rs.2865.70 286.57
3152.27
Add labour cess @ 1% 31.52
Cost for 1 Nos. 3183.79 3183.79
3 Labour
Taking output 4 Nos.
(i). Mate Day 0.10 240 24.00
(ii). Mazdoors Day 2.00 240 480.00
(iii). Blacksmith Day 1.00 280 280.00
(iv). Painter Day 0.50 300 150.00
Total 934.00
Sundries such as traffic management during construction, watch and ward, minor T&P, 14.01
water charges etc. @ 1.5%
Add contractor's profit @ 21.5% 200.81
1148.82
Add labour cess @ 1% 11.49
Labour for 4 Nos. 1160.31
Labour for 1 Nos. 290.08 290.08

Cost for 1 Nos. 3473.87

Say Rs. 3473.90

file:///conversion/tmp/scratch/457470276.xls
Sr. Description Unit Qty.
No.
Rate Cost Total
(In Rs.) (In Rs.) (In Rs.)

E.E.(P-II), Kaithal