Vous êtes sur la page 1sur 239

Seeh Al-Sarya Engineering LLC.

Line Walk Punch-List


CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2012-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1193287

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME DHIYA NORTH # 5 (2" GASLINE)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Cletus Ferrao Name: Mr.Sadiq Hussain

Position QA/QC Engineer PositionQA/QC Engineer

Signature Signatur
Date Date
017460

" GASLINE)

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2012-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1191766

WADI ASWAD NORTH EAST-02 (PAR


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 01)

Date SAS
Sl no# Description Category Status CONSTRUCTION
Closed SIGNATURE

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Cletus Ferrao Name: Mr.Sadiq Hussain

Position QA/QC Engineer PositionQA/QC Engineer

Signature Signatur
Date Date
017460

EAST-02 (PART-

SAS QC
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM INSTRUMENT AIR (TP/SPR/AI/01) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 1" CS union to be changed

2 Spray paint touch up to be done

3 Test limit and red line markup to be done and P& ID drawings
to be updated

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1145752

4" GAS HEADER LINE,TIE IN SPO


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME MODIFICATION TP 11,14

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized entry A


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure recorder. A

11 Marker plate to be clamp tie in side TP 11,14 B

12 Extra pipe and wooden pieces remove from line B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

,TIE IN SPOOL
1,14

OXY QC
Signature
1196883 SWL-CA-2011-24000017460

1203745

4'GAS HEADER LINE,TIE IN SPOOL-HEBAH SOUTH 3


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680

REHAM-5, 4" WATER INJECTION


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME (PART-5)SAS-1050

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Sleeper to be install from Jt BR 1 to BR 22 A

12 Extra pipe,sleeper and wooden pieces remove from line

13 Marker plate to be Clamp for Well pad side

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

INJECTION LINE

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203936

JAHLAH WEST-07, 4"WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE (SAS-1062)PAR

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Sleeper to be install from jt 68 to 80

12 Pipe is not rest on sleeper near J56

13 Marker plate to be clamp near Well pad side

14 Extra pipe and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

WATER
S-1062)PART-2

OXY QC
Signature
1203936

SWL-CA-2011-24000017460

1203745
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1208458

SAQR-6 , 4" FLOWLINE RE-ROUTING


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME SAQR MANIFOLD

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized A


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure A


recorder.

11 PS-01 & PS-02 supports to be installed B

12 Additional sleeper is required near JT-01 B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr MITHUN.R.S Name: Mr.MOINUL SYED
Position QA/QC inspector Position QA/QC Engineer
Signature Signature
Date Date
017460

E RE-ROUTING AT

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201212

10 SLOT SOUTH MANIFOLD(SAS


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1053A)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

11 Slot 2,spl 2&slot 8,spl2&slot9 ,spl2 alignment to be done

12 After hydrotest 10 Nos ,4"600 # check valve to reinstalled


to valve direction

13 Test header -1,outside skid,PS-18,PS 19 to be install

14 Transportation coating damage Paint touch up to be done


for all manifold spools

15 15 Nos 2" 600" DBB to be install after hydrotest

16 Guide angle to be welded and shim plate to be provided


for slot2,spl1

17 Manifold number stencil to be displayed both side of


manifold

18 Manifold grating to clamped and gap to be rectified

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

IFOLD(SAS

OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT


Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1145752

4" GAS HEADER LINE,TIE IN SPO


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME MODIFICATION TP 11,14

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized entry A


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure recorder. A

11 Marker plate to be clamp tie in side TP 11,14 B

12 Extra pipe and wooden pieces remove from line B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

,TIE IN SPOOL
1,14

OXY QC
Signature
1196883 SWL-CA-2011-24000017460

1203745

4'GAS HEADER LINE,TIE IN SPOOL-HEBAH SOUTH 3


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1145752

4" GAS HEADER LINE,TIE IN SPO


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME MODIFICATION TP 6,7,8,9,10

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized entry A


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure recorder. A

11 Marker plate to be clamp tie in side TP 6 ,7,8,9,10 B

12 Extra pipe and wooden pieces remove from line B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

,TIE IN SPOOL
7,8,9,10

OXY QC
Signature
1196883 SWL-CA-2011-24000017460

1203745

4'GAS HEADER LINE,TIE IN SPOOL-HEBAH SOUTH 3


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYA WEST-13,4" TIE IN


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME MODIFICATION(SAS-1024)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Tie in spool to be internal coated after hydrotest

12 Valves ZS Number to be reflected in ISO Drawing

13 Tie in spool to be Reinstated and bolt torquing to be done

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

IE IN
1024)

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1145752


4" GAS HEADER LINE,TIE IN SPO
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME HEBAH SOUTH-3,TP 3&4,TP5,T
MODIFICATION
SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized entry A


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure recorder. A

11 T-Support to be installed at TP 3& TP04 Modification B

12 Marker plate to be clamp tie in side B

13 Extra pipe and wooden pieces remove from line B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

,TIE IN SPOOL
3&4,TP5,TP13

OXY QC
Signature
1196883 SWL-CA-2011-24000017460

1203745

4'GAS HEADER LINE,TIE IN SPOOL-HEBAH SOUTH 3


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1196883

WADI ASWAD-3, 4" FLOW LINE


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1064)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints A

2 Hydro-test package A

3 The flange ratings are as per the ISO drawing. A

4 Bolt size identification and torquing(After final installtion) B

5 Saddles, shoes, shims, supports are installed / erected N/A

6 Barricade the Locations and restrict any unauthorized entry A


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are A


installed for hydro-test

8 Visual check of pipe Line Routing / Laying A

9 Provision of Launcher and Receiver in the position A

10 Calibration Certicates for the Gauges & Pressure recorder. A

11 Sleeper to be install near jt 32,90,164 B

12 Pipe is not rest on sleeper near B


116,133,138,168,181,192,193

13 Marker plate to be clamp tie in side and RDX1,2 B

14 Joint coating to be done from j160 to 165 B

15 Extra pipe and wooden pieces remove from line B

16 Backfilling to be done for RDX1 B

17 T-Support to be installed near Tie in side spool B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

LOW LINE (SAS-

OXY QC
Signature
1196883 SWL-CA-2011-24000017460

1203745
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203745

JALAL-64, 4"WATER INJECTION


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME (SAS-1057)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Sleeper to be install from jt 35 to 55A,near jt 22

12 Pipe is not rest on sleeper near JBR25

13 Marker plate to be clamp tie in side and well pad side

14 Joint coating to be done from j10 to 14

15 Extra pipe and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

INJECTION LINE

OXY QC
Signature
SWL-CA-2011-24000017460

1203745
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM WELL HEAD PRODUCTION (TP/SPR/PH/02) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 Stud & Bolts as per requirement

2 Gasket verification

3 Test Limit bolt torquing to be done

4 Paint touch up to be done

5 Test limit and red line markup to be done and updated in


P& ID drawings

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM PROCESS GAS (TP/SPR/PG/03) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 Stud & Bolts as per requirement

2 Gasket verification

3 Test Limit bolt torquing to be done

4 Paint touch up to be done

5 Test limit and red line markup to be done and updated in


P& ID drawings

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM PROCESS LIQUID (TP/SPR/PL/04) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 Stud & Bolts as per requirement

2 Gasket verification

3 Test Limit bolt torquing to be done

4 Paint touch up to be done

5 Test limit and red line markup to be done and updated in


P& ID drawings

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM PROCESS GAS (TP/SPR/PG/05) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 Stud & Bolts as per requirement

2 Gasket verification

3 Test Limit bolt torquing to be done

4 Paint touch up to be done

5 Test limit and red line markup to be done and updated in


P& ID drawings

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 200937

WADILATHAM TESTING
SYSTEM VENT LINE (TP/SPR/VL/06) PROJECT NAME FACILITIES (V-9090)

Sl no# Description Category Status Date Closed

1 Stud & Bolts as per requirement

2 Gasket verification

3 Test Limit bolt torquing to be done

4 Paint touch up to be done

5 Test limit and red line markup to be done and updated in


P& ID drawings

Prepared By: Approved By:


Name: Sajan George Name: Mr.Sadiq Hussain

Position QC-Inspector Position QC-Engineer

Signature Signature

Date Date
2011-24000017460

HAM TESTING
S (V-9090)

Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1189938

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME WADI ASWAD NORTH 12

Sl no# Description Category Status Date Closed

1 Sleeper to be provided near J58 to J57 B

2 Marker plate to be clamped near well pad and Tie in side B

3 Wadi crossing 2nd coat to be done A

4 J19 and J23 near sleeper alignment to be done B

5 Pipe is not touch with sleeper near J12,14,15,40 B

6 House keeping to be done B

Prepared By:
Name: Selva kumar

Position QA/QC Engineer

Signature

Date
2011-24000017460

WAD NORTH 12

Signature
Seeh Al-Sarya Engineering LLC.
LINE WALK PUNCH LIST
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO.

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. SAS 1002

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME WADI ASWAD 4

Sl no# Description Category Status Date Closed

1 Marker plate to be install near RDX1,RDX2,RDX3,Tie in side B


and manifold

2 sleeper to be provided near joint no. 42,52,139,197,302 to B


309,319 to 313

3 Pipe is not rest on sleeper near jt no 8,24,37,99 ,137,167 B

4 Weld joints are on sleeper near jt no-17,166,141,117 to be B


move

5 house keeping-pipes and wooden pieces B

6 Sand dune to clear near jt 15 E to 15G,75 TO 77 A

7 Back filling to be done for RDX1,2,3 B

Prepared By:
Name: Selva kumar

Position QA/QC Engineer

Signature

Date
WAD 4

Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1200267

KHAMILAH TO NASYIAH 4" FLOW


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE ,PART A & B(SAS-1034)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

AH 4" FLOW
-1034)

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1204096

JALAL EAST-29, 4" WATERINJEC


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE (SAS-1063)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Joint coating to be done from J10 to BR15,20A TO


22,J73,74

12 Marker plate to be clamp near tie in side

13 Sleeper to be install from jt no BR74C TO BR 88

14 Extra pipes,sleeeper and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

ATERINJECTION

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1204096

JALAL EAST-29, 2" GAS LINE (SA


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1063)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Sand dune to be remove from J27A to 28

12 Sleeper to be install from jt no 39 to 47

13 Backfilling to be done for RDX1

14 Marker plate to be clamp well pad,tie in and roadcrossing1

15 Extra pipes,sleeeper and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

AS LINE (SAS-

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680


REHAM-5, 2" GAS LINE AND TIE
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME SPOOL AND 4 " TIE IN SPOOL(SA
1050)
SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Pipe is not rest on sleeper near jt 81,92,143,154

12 Backfilling to be done for wadi crossing and road crossing

13 Marker plate to be clamp well pad,tie in and roadcrossing

14 Extra pipes,sleeeper and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

NE AND TIE IN
N SPOOL(SAS-

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680

REHAM-5,4" FLOW LINE (PART


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1050

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Pipe is not rest on sleeper near jt no-1006,1018

12 Extra pipe,sleeper and wooden pieces remove from line

13 Marker plate to be Clamp for Manifoldside

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

LINE (PART6)SAS-

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680

REHAM-5, 4" WATER INJECTION


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME (PART-4)SAS-1050

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Joint coating to be done for jt 985 to 990F,936 TO 946

12 Backfilling to be done for RDX-02

13 Marker plate to be Clamp for RDX2

14 Pipe is not rest on sleeper near jt 691,693,728,827,977A

15 Extra pipe,sleeper and wooden pieces from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

INJECTION LINE

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680

REHAM-5, 4" WATER INJECTION


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME (PART-3)SAS-1050

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Joint coating to be done for jt BR349 to BR355

12 Backfilling to be done for RDX-01

13 Marker plate to be Clamp for RDX1

14 Pipe is not rest on sleeper near jt


581,628,669,414,423,417,360,674,667,615,579

15 Extra pipe,sleeper and wooden pieces from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

INJECTION LINE

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1203680

REHAM-5, 4" FLOW LINE (PART


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1)SAS-1050

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

LINE (PART-

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYYA WEST -13, 6"WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE (PART-5)SAS-1

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

"WATER
RT-5)SAS-1024

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYYA WEST -13, 6"WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE (PART-4)SAS-1

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

"WATER
RT-4)SAS-1024

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYYA WEST -13, 6"WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE (PART-1)SAS-1

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

"WATER
RT-1)SAS-1024

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYYA WEST -13, 6"WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE (PART-3)SAS-1

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

"WATER
RT-3)SAS-1024

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202332

DHIYYA WEST -13,4 " WATER


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME INJECTION LINE FROM WELL PA
(SAS-1024)
SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

" WATER
M WELL PAD

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201710

NASIYAH FAR EAST 2(SAS 1017)


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 4

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.


Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

(SAS 1017) PART

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201710

NASIYAH FAR EAST 2(SAS 1017)


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 3

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

(SAS 1017) PART

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201710

NASIYAH FAR EAST 2(SAS 1017)


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 2

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

(SAS 1017) PART

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201710

NASIYAH FAR EAST 2(SAS 1017) PA


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

(SAS 1017) PART

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1204096

JALAL EAST-29, 4" WATERINJEC


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE (SAS-1063)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

11 Joint coating to be done from J10 to BR15,20A TO


22,J73,74

12 Marker plate to be clamp near tie in side

13 Sleeper to be install from jt no BR74C TO BR 88

14 Extra pipes,sleeeper and wooden pieces remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

ATERINJECTION

OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201658

TIE IN FROM EXISTING WADIASWA


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME NORTH-8 TO WADIASWAD
NORTHMANIFOLD(SAS 1013)
SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

11 Marker plate to clamp near RAMP-1,Tie in side and


Manifold side

12 Extra pipe and wooden pieces to be remove

13 Pipe is not rest sleeper near jt 393

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

G WADIASWAD
WAD
AS 1013)
OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT
Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1200326

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JADWAL 32,4 " FLOW LINE (PART -2

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

LINE (PART -2)

OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT


Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1196355

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,4" FLOW LINE

Date SAS
Sl no# Description Category Status Closed CONSTRUCTIONSI
GNATURE

1 1/2" plug to be install in therdolet after hydrotest near man B

2 Sand duneto be remove from jt 99 to 105,jt 119 to 121,jt 135 to150, A

J222 TO 230,J233 TO J235

3 Marker plate to be provided near well pad area and B


Manifold

4 Pipe is not rest on sleeper near jt no 70A,91C,92 B

5 Jt 75 in sleeper to be move B

6 Near jt 37 pipe touch with existing line to be move B

7 Backfilling to be done near road croosing B

8 House keeping to be done B


Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By:
Name: Selva kumar
Position QA/QC Engineer
Signature
Date
00017460

SWL-CA-2011-24000017460

W LINE

SAS QC
Signature

Sand duneto be remove from jt 99 to 105,jt 119 to 121,jt 135 to150,j222 to j230,j233 to j235
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1196355

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,4" FLOW LINE

Date SAS
Sl no# Description Category Status Closed CONSTRUCTIONSI
GNATURE

1 1/2" plug to be install in therdolet after hydrotest B

2 Line to be straight from J12 to J15 B

3 Field joint paint touch up to be completed after hydrotest B

4 House keeping to be done B

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By:
Name: Selva kumar
Position QA/QC Engineer
Signature
Date
00017460

SWL-CA-2011-24000017460

W LINE

SAS QC
Signature
Seeh Al-Sarya Engineering LLC.
CHECK LIST FOR WATER INJECTION HOOK UP
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-240000174

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO.

SYSTEM WATER INJECTION HOOK UP PROJECT NAME

SAS SAS QC
Sl no# Description Checked ok CONSTRUCTION Signature
Signature

1 Valve installation and direction of flow as per


drawing(check valve)

2 Strainer installation and direction of flow as per


drawing

3 Flow meter installation and direction of flow

4 Flange rating & Gasket installation and position


as per drawing

5 Elbow &Choke valve position as per


drawing(Yes/No)
Choke valve insulation washer installation and
6
Lock nut

7 DBB valve handle sleeve is installed

8 Pipe support installation

9 Bolt torquing as per procedure

Prepared By:
Name: Selva kumar
Position QA/QC Engineer
Signature
Date
-2011-24000017460

REMARK
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1197835

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 36,HOOK UP

SAS QC
Sl no# Description Category Status Date Closed Signature

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.SADIQ HUSSAIN
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1196355

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,2" GAS LINE

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1140896

8",4",3",2" WATER DISPOSAL


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE(DISCHARGE ) AREA 800,A
BARAKAH(OM-55060865)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

SPOSAL
REA 800,AL
0865)

OXY QC
Signature
SWL-CA-2011-24000017460

8" ,4",3",2" WATER DISPOSAL LINE(DISCHARGE) AREA 800,AL


BARAKAH

SALMA#10 WATER INJECTION EXTENSION LINE


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1197531

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL EAST-24,4" FLOW LINE

SAS QC
Sl no# Description Category Status Date Closed Signature

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

OW LINE

OXY QC
Signature
SWL-CA-2011-24000017460

SALMA#10 WATER INJECTION EXTENSION LINE


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1198481

BADAR 16 WATER INJECTION FL


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized entry


at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460

JECTION FLOW

OXY QC
Signature
SWL-CA-2011-24000017460

1198481

SALMA#10 WATER INJECTION EXTENSION LINE


Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1164190

SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME MASROUQ FOREAST -01

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Saddiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

01

OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1205403

JADWAL 35,4 " FLOWLINE AND 2" G


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME LINE (SAS 1101)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

11 Marker plate to clamped near well padside and tie in side

12 Extra pipe and sleeper to be to be remove from line

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mithun thilakraj Name: Mr.Moinul Hassan/Sadiq hussain
Position QC inspector PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

LINE AND 2" GAS

OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT


Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1201212

10 SLOT SOUTH MANIFOLD(SAS


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1053A)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

11 Slot 2,spl 2&slot 8,spl2&slot9 ,spl2 alignment to be done

12 After hydrotest 10 Nos ,4"600 # check valve to reinstalled


to valve direction

13 Test header -1,outside skid,PS-18,PS 19 to be install

14 Transportation coating damage Paint touch up to be done


for all manifold spools

15 15 Nos 2" 600" DBB to be install after hydrotest

16 Guide angle to be welded and shim plate to be provided


for slot2,spl1

17 Manifold number stencil to be displayed both side of


manifold

18 Manifold grating to clamped

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

IFOLD(SAS

OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT


Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460

CONTRACTOR SEEH AL-SARYA ENGINEERING L.L.C PROJECT NO. 1202014

JABIAH SOUTH-3,4 " FLOW LINE (S


SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME 1073)

SAS QC
Sl no# Description Category Status Date Closed Signature

1 NDT completion of weld joints

2 Hydro-test package

3 The flange ratings are as per the ISO drawing.

4 Bolt size identification and torquing(After final installtion)

5 Saddles, shoes, shims, supports are installed / erected

6 Barricade the Locations and restrict any unauthorized


entry at the time of hydro-testing.

7 All temporary Supports, blind/caps/plugs/gaskets are


installed for hydro-test

8 Visual check of pipe Line Routing / Laying

9 Provision of Launcher and Receiver in the position

10 Calibration Certicates for the Gauges & Pressure


recorder.

11 All Coated pipe field joints painting to be done

12 Extra sleeeper to be to be remove from line

13 Pipe is not rest sleeper near jt 1167 to 1169

Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460

SWL-CA-2011-24000017460

FLOW LINE (SAS

OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT


Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD

Vous aimerez peut-être aussi