Definitions
Certification Fire pump equipment must be listed and certified
by a 3rd party. The certification must be based on
a scheme which includes continual surveillance
of the manufacturing plant where the fire pumps
are manufactured and assembled. Where fire
pumps are assembled at a different plant to where
they are manufactured then the assembly plant
must also be included within the certification and
surveillance scheme.
QCD Fire pump equipment relied upon for satisfaction
Approved of fire safety requirements and regulations must
be submitted to the QCD for review and
approval. On approval a QCD certificate for the
fire pump will be issued to the submitting party.
1.0 Fire pumps must be provided for all buildings and structures where Application
fire fighting systems are required and installed to ensure adequate
flows of water at the minimum required pressures are maintained
for the duration of the fire fighting operations.
2.0 All fire pumps installations must be designed to operate under the
conditions of loss of primary power source and mechanical failure.
A fire pump installation comprising a duty electric motor driven
pump with a standby diesel engine driven pump is deemed to
satisfy this requirement.
All fire pump configurations are subject to review and specific
approval from the QCD is required.
3.0 All equipment comprising the fire pump set including but not
limited to pump, motor, engine, controller, pressure relief valves,
suction valves, discharge valves, check valves, pipe supports and
hangar, etc., must be listed for their intended use by a 3rd party
certification body acceptable to the QCD.
All equipment associated with pump installations must be
submitted for QCD approval.
Current acceptable 3rd party certifiers are:
Underwriters Laboratories, (UL)
FM Global
LPCB
QCDFSS-6.7_Fire Pumps_Arabic Version of Rev A.doc Page 1 of 4
CIVIL DEFENCE DEPARTMENT 09-Sep-09
MINISTRY OF INTERIOR, QATAR
VdS
Other 3rd party certifiers not listed above may be submitted for
consideration. Complete credentials and accreditation in English
must be included in any submission for review by the QCD.
4.0 All fire pumps must be capable of providing at least 150% of the
required minimum fire fighting water flow at not less than 65% of
the minimum pressure required.
5.0 A listed approved flow meter must be provided for each fire pump Flow meter
installation. The flow meter must be installed in accordance with
the manufacturer's recommendations and within the listing
limitations.
The measurable flow range of the meter must be at least 200% of
the minimum required flow.
The flow meter must be installed such that its indicator/dial/gauge
can be easily seen and read without the aid of step ladders,
scaffolding or other lifting equipment.
The flow meter must be a permanent installation and must not be
removed after initial testing and setting into operation of the
system.
6.0 A performance curve showing the pumps delivery flows and Pumps
pressure together with the system demand curve must be provided performance
for each installation. The intersection must be the design delivery curves
of the pump system.
7.0 Fire pumps must be enclosed in their own dedicated pump room. Fire pump room
The fire pumps' room enclosure must have a 2 hour fire resistance
rating.
8.0 Where located within a building, a separate and dedicated Ventilation
ventilation system must be provided for the fire pump room.
The ventilation system must draw fresh air directly from outside
the building.
Exhaust fans must be rated for hot gasses at 250ºC for 2 hours.
Power supplies for the exhaust fans must be from the Class 1
central emergency generator through fire rated cables having a
minimum 2 hour fire resistance rating.
9.0 Safe direct access from outside the building must be provided for Access
the fire pump room. The location of the fire pump room must be
agreed with the QCD at DC1 stage.
ﻣﻨﺤﻨﻴﺎت أداء • ﻳﺠﺐ ﻋﻤﻞ دراﺳﺔ اﻟﺤﺴﺎﺑﺎت اﻟﻬﻴﺪروﻟﻴﻜﻴﺔ ﻟﻜﻞ ﺗﺮآﻴﺐ ﺗﻈﻬﺮ ﻣﻨﺤﻨﻰ أداء اﻟﻤﻀﺨﺎت ﻣﻦ ﺣﻴﺚ اﻟﺘﺪﻓﻖ و 7
ﻣﻀﺨﺎت اﻟﻀﻐﻂ ﻣﺘﻮاﻓﻘ ًﺎ ﻣﻊ ﻣﻌﻄﻴﺎت ﻣﻨﺤﻨﻰ ﻧﻈﺎم اﻻﻃﻔﺎء.
اﻟﺤﺮﻳﻖ • و ﻳﺠﺐ أن ﻳﻜﻮن هﺬا اﻟﺘﻮاﻓﻖ هﻮ ﺗﺼﻤﻴﻢ أداء ﻧﻈﺎم اﻟﻤﻀﺨﺎت.
ﻏﺮﻓﺔ ﻳﺠﺐ أن ﺗﻜﻮن ﻣﺠﻤﻮﻋﺔ اﻟﻤﻀﺨﺎت و ﻣﻠﺤﻘﺎﺗﻬﺎ ﺿﻤﻦ ﻏﺮﻓﺔ ﺧﺎﺻﺔ ﺗﺴﻤﻰ ﻏﺮﻓﺔ ﻣﻀﺨﺎت اﻟﺤﺮﻳﻖ و ﻳﺠﺐ أن 8
ﻣﻀﺨﺎت ﺗﻜﻮن هﺬﻩ اﻟﻐﺮﻓﺔ ﻣﻘﺎوﻣﺔ ﻟﻠﺤﺮﻳﻖ ﻟﻤﺪة ﺳﺎﻋﺘﻴﻦ.
اﻟﺤﺮﻳﻖ
ﻋﻨﺪ ﺗﻤﻮﺿﻊ ﻏﺮﻓﺔ اﻟﻤﻀﺨﺎت داﺧﻞ اﻟﻤﺒﻨﻰ ،ﻳﺠﺐ ﺗﺄﻣﻴﻦ ﻧﻈﺎم ﺗﻬﻮﻳﺔ ﻣﻨﻔﺼﻞ ﻟﻬﺬﻩ اﻟﻐﺮﻓﺔ. • 9
ﻳﺠﺐ أن ﻳﺆﻣﻦ ﻧﻈﺎم اﻟﺘﻬﻮﻳﺔ هﻮا ًء ﻧﻘﻴ ًﺎ ﻣﺒﺎﺷﺮة ﻣﻦ ﺧﺎرج اﻟﻤﺒﻨﻰ. •
اﻟﺘﻬﻮﻳﺔ ﻳﺠﺐ ﺗﺄﻣﻴﻦ ﻣﺮاوح ﺷﻔﻂ ﻣﻘﺎوﻣﺔ ﻟﻠﻐﺎزات اﻟﺤﺎرة ﺑﺪرﺟﺔ 250درﺟﺔ ﻣﺌﻮﻳﺔ و ﻟﻤﺪة ﺳﺎﻋﺘﻴﻦ. •
ﻳﺠﺐ رﺑﻂ هﺬﻩ اﻟﻤﺮاوح ﺑﻜﻬﺮﺑﺎء ﻣﻦ ﻣﻮﻟﺪ اﻟﻜﻬﺮﺑﺎء اﻻﺣﺘﻴﺎﻃﻲ اﻟﻤﺮآﺰي ﻣﻦ اﻟﺼﻨﻒ اﻷول و ذﻟﻚ •
ﺑﻜﺎﺑﻼت ﻣﻘﺎوﻣﺔ ﻟﻠﺤﺮﻳﻖ ﻟﻤﺪة ﻻ ﺗﻘﻞ ﻋﻦ ﺳﺎﻋﺘﻴﻦ.
ﻳﺠﺐ ﺗﺄﻣﻴﻦ ﻣﺪﺧﻞ ﺁﻣﻦ و ﻣﺒﺎﺷﺮ ﻣﻦ ﺧﺎرج اﻟﻤﺒﻨﻰ ﻟﻐﺮﻓﺔ ﻣﻀﺨﺎت اﻟﺤﺮﻳﻖ. • 10
اﻟﻤﺪﺧﻞ ﻳﺠﺐ أن ﻳﻜﻮن ﻣﻜﺎن ﻏﺮﻓﺔ ﻣﻀﺨﺎت اﻟﺤﺮﻳﻖ ﻣﻌﻠﻮﻣ ًﺎ و ﻣﻮاﻓﻘ ًﺎ ﻋﻠﻴﻪ ﻣﻦ ﻗﺒﻞ اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎع اﻟﻤﺪﻧﻲ •
ﻋﻨﺪ ﻣﺮﺣﻠﺔ .DC1
ﻳﺠﺐ ﺿﻤﺎن ﺗﻮﻓﻴﺮ ﻗﻄﻊ ﻏﻴﺎر ﻟﺠﻤﻴﻊ ﻣﻀﺨﺎت اﻟﺤﺮﻳﻖ و ﻣﻠﺤﻘﺎﺗﻬﺎ و ﻟﻤﺪة ﻻ ﺗﻘﻞ ﻋﻦ ﺧﻤﺲ ﺳﻨﻮات • 11
اﻟﺼﻴﺎﻧﺔ و اﺑﺘﺪا ًء ﻣﻦ ﺗﺎرﻳﺦ ﺗﺴﻠﻴﻢ اﻟﻤﺸﺮوع.
اﻟﺘﺸﻐﻴﻞ ﻳﺠﺐ ﻋﻤﻞ ﻋﻘﺪ ﺻﻴﺎﻧﺔ ﻟﻤﻀﺨﺎت اﻟﺤﺮﻳﻖ و ﻣﻠﺤﻘﺎﺗﻬﺎ و ﻟﻤﺪة ﻻ ﺗﻘﻞ ﻋﻦ ﺧﻤﺴﺔ ﺳﻨﻮات و ذﻟﻚ ﻣﻊ •
ﺷﺮآﺎت ﻣﺘﺨﺼﺼﺔ و ﻣﻌﺘﻤﺪة ﻣﻦ اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎع اﻟﻤﺪﻧﻲ.