Vous êtes sur la page 1sur 1

DRAWING KEY:

U=0,157
Reinforced concrete W1a EXTERIOR WALL OFFICE BUILDING W/m2K
PERETE EXTERIOR - CLADIREA DE BIROURI
Calcium silicate block Silka WALL PAINT VOPSEA INTERIOARA <0,1 cm

Sandwich panel INTERIOR PLASTER 1,5 cm


TENCUIALA INTERIOARA
G-K board
AERATED CONCRETE BLOCKS 30 cm
PASARELA TRANSPORT MARFA DEPOZIT HIGH-BAY Hydrant BCA

PRODUCT DELIVERY BRIDGE HIGHBAY WAREHOUSE EXIT Emergency exit PE FOIL


FOLIE PE
Fire compartment : C3 COMPARTIMENT: C3 Main entrance STONE WOOL (Λ= 0,035 W/mK) ON SECONDARY STEEL VATA MINERALA (Λ= 0,035 W/mK) INTRE
ZONA TEHNICA STRUCTURA
20 cm
Building type: production / deposit TIPUL CLADIRII: PRODUCTIE/DEPOZITARE Entrance 0,2 mm
TEHNICAL AREA Height regime: P+1 REGIM INALTIME: P+1 CLADIRE SOCIALA - CLADIRE TEHNICA ZONA LIVRARE
WIND BARRIER FOLIE DE DIFUZIE
EI 120 Fire resistance value SUBSTRUCTURE/ VENTILATION SUBSTRUCTURA/FATADA VENTILATA 2 cm
Built area: Ac=530mp ARIA CONSTRUITA: Ac=530mp
Total Built area: Acd=530+750 = 1280mp ARIA CONSTUITA DESFASURATA: Acd=530+750 = 1280mp
SOCIAL - TECHNICAL MARSHALLING Fire rated wall RAINSCREEN STEEL PANEL PANOURI DE FATADA DIN OŢEL 2,5 cm

Volume : V=2120+3000= 5120mc VOLUMUL: V=2120+3000= 5120mc Designed floor level W2a EXTERIOR WALL ON SUB-CONSTRUCTION PERETE EXTERIORA PE SUBSTRUCTURA U=0,22 W/m2K
RANK OF RESISTANCE TO FIRE: II GRADUL DE REZISTENTA LA FOC: II +6,00 Designed level of parapet wall SANDWICH PANEL - MINERAL WOOL CORE (Λ= 0,044 W/mK) ON PANOU SANDWICH - VATA MINERALA (Λ= 0,044 20 cm
FIRE DANGER CATEGORY: C CATEGORIA DE PERICOL DE INCENDIU: C +6,00 leb Lower edge of the beam SUB-CONSTRUCTION* W/mK) PE SUBSTRUCTURA
FIRE LOAD DENSITY : qi <840 MJ /mp DENSITATEA SARCINII TERMICE: qi < 840 MJ/mp A *for refrigeration eng.: panels perforated from inside
3144 1293 265,5 Section line
6620 1180 FOUNDATION WALL
Axis name W2f EXTERIOR WALL - TECHNICAL BUILDING PERETE EXTERIOR - CLADIRE TEHNICA

G
51 34 197,5 3510 35 659,5 30 605 30 770 30 605 30 22 53 1210 30 60 40 20 7620 20 40 245,5 20 PANOU SANDWICH -VATA MINERALA - PE
SANDWICH PANEL - MINERAL WOOL CORE ON SUB-CONSTRUCTION 20 cm
SUBSTRUCTURA METALICA
67,5 231,5 38 265,5 Room tag:
46 692 635 800 672 570 469 201 115 43 7574 83
- Building name shortcut AERATED CONCRETE BLOCKS (Λ= 0,16 W/mK) /reinforced concrete wall 30 cm
BCA (Λ= 0,16 W/mK)/ PERETE BETON ARMAT
Grila ventilatie - Room no. 1,5 cm
future expansion
BAK B.0.18 INTERIOR PLASTER
Scara acces acoperis ventilation grill with revision openning 800x2000 Birou livrare
TENCUIALA INTERIOARA
Delivery check - Room name WALL PAINT VOPSEA INTERIOARA <0,1 cm
entrance to the roof: ladder with safecage

B
Grila admisie aer Viitoare extindere #####m2
- Room net floor area [m²]
substructure according to the construction ventilation inlet 1200x1200mm; for the future expansion coloana condens de la sistemul de refrigerare (NH3) - conf. proiect instalatii coloana condens de la sistemul de refrigerare (NH3) - conf. proiect instalatii
Scara tehnica - acces pe acoperis - Height of room
W2i WALL ON SUB-CONSTRUCTION - HIGHBAY WAREHOUSE PERETE PE SUBSTRUCTURA HIGH-BAY U=0,09 W/m2K
condensate drainage from NH3 air-coolers acc. to PIS and PF condensate drainage from NH3 air-coolers acc. to PIS and PF SANDWICH PANELS WITH FOAM CORE (Λ= 0,018 W/mK) ON STEEL PANOU SANDWICH PIR (Λ= 0,018 W/mK) PE
execution design bottom edge 1,0m over finished 20 cm

E2
technical staircase - access to roof SUBSTRUCTURE SUBSTRUCTURA METALICA

E1
Locatia si numarul coloanelor pentru condens se vor recalcula in conformitate cu Locatia si numarul coloanelor pentru condens se vor recalcula in conformitate cu W1 Building partition layers designation
burlan pluviala burlan pluviala floor level; acc. to PF specificatiile sistemului de refrigerare - in faza PT - DDE specificatiile sistemului de refrigerare - in faza PT - DDE
downspout ø90 downspout ø90 .
Rafturi "Cantilevers" Location and number of condensate drainage pipes should be recalculated in accordance Location and number of condensate drainage pipes should be recalculated in accordance Door with air intake I1a INTERIOR WALL PERETE INTERIOR
R1 R2 R3 R4 R5 R6 R7 1 2 3' 3 H1 CANTILEVER PLACES acc. to PL; with Refrigeration technology designer during execution design phase with Refrigeration technology designer during execution design phase H2 WALL PAINT VOPSEA INTERIOARA <0,1 cm
Internal / external door TENCUIALA INTERIOARA SCLIVISITA / PE BAZA DE
W2i W2i W2i A 180
220 90/220 door opening clear width and height INSIDE PLASTER CEMENT LIME/GYPSUM IPSOS 1,5 cm

20 40

20 40

20 40

20 40
W2f W2f A door material A-aluminium S-steel W-wood 25 cm - 30

87
AERATED CONCRETE BLOCKS BCA cm
height is measured from the floor finishing level

HB
23
TENCUIALA INTERIOARA SCLIVISITA / PE BAZA DE

38
W 90
RC

INSIDE PLASTER CEMENT LIME/GYPSUM 1,5 cm

33
220
IPSOS

K
AL AL+B
Internal / external window
Compresoare refrigerare WALL PAINT VOPSEA INTERIOARA <0,1 cm

180
110
180
110
150/145 window opening clear width and height

GOL AER VENTILAT /

hp=85
150
compressors acc to PF; hp=90 hp=90 A 145
height is measured from the floor finishing level

VENTILATED VOID
Fundatie, ancoraj, antivibratoare conf. DDE INTERIOR WALL - SOCIAL & TECHNICAL B./MARSHALING & HIGHBAY PERETE INTERIOR - SOCIAL SI TEHNIC / LIVRARE
B- windows with blinds

13x17,2
I1b WAREHOUSE MARFA SI HIGH-BAY
foundation, anchoring, anti-vibration insulation acc. to PF

27
WALL PAINT VOPSEA INTERIOARA <0,1 cm
Internal / external gate
350/450 gate opening clear width and height INSIDE PLASTER TENCUIALA INTERIOARA 1,5 cm

13x17,2
615,5
350
AERATED CONCRETE BLOCKS (Λ= 0,16 W/mK)/REINFORCED CONCRETE BCA (Λ= 0,16 W/mK) / PERETE BETON ARMAT

E E
S
30 cm

27
450
height is measured from the floor finishing level

632,5
S gate kind HSC-high speed door P-sectional S-steel ETICS SYSTEM - MINERAL WOOL BOARD ETICS SISTEM- VATA MINERALA BORD 10 cm
RB

NON VENTILATED VOID GOL NEVENTILAT 45 cm

682,5

774

680
Internal sliding gate I1c INTERIOR WALL - HIGHBAY WAREHOUSE/MARSHALING PERETE INTERIOR - HIGH-BAY / ZONA LIVRARE

W2i SANDWICH PANELS WITH FOAM CORE (Λ= 0,018 W/mK) ON STEEL PANOU SANDWICH PIR (Λ= 0,018 W/mK) PE
W2f I1b 1% 3% Slope angle tangent by % SUB-CONSTR. SUBSTRUCTURA METALICA 20 cm
Spalator pentru ochi
NON VENTILATED VOID GOL NEVENTILAT 100 cm

20
Emergency eyewash and safety shower station 53 530 50 630 3010 92 20 20 40 120 Stairs:
AERATED CONCRETE BLOCKS (Λ= 0,16 W/mK)/REINFORCED CONCRETE BCA (Λ= 0,16 W/mK) / PERETE BETON ARMAT 25 cm
Direction up
rezerva pentru extindere 245,5 20
Rigola liniara Height of step in cm I1d INTERIOR WALL - EXPANSION JOINT PERETE INTERIOR - ROST DE DILATARE
reserve for extension scurgere
linear drainage Usa frigorifica First step WALL PAINT <0,1 cm
RA

PAF (ANTIFIREWALL) + ANTIEX REI180


12x14,75 VOPSEA INTERIOARA
drain deep freeze door 100(90)

130
35

30 15 35
S 210(200) Depth of step in cm INSIDE PLASTER 1,5 cm
TENCUIALA INTERIOARA
No. of stairs in flight

J
ZONA TEHNICA REFRIGERARE AERATED CONCRETE BLOCKS (Λ= 0,16 W/mK)/REINFORCED CONCRETE
REFRIGERATION MACHINERY
W2a scurgere 30 cm

0
BCA (Λ= 0,16 W/mK) / PERETE BETON ARMAT
drain Ramp: NON VENTILATED VOID GOL NEVENTILAT
Slope apex AERATED CONCRETE BLOCKS (Λ= 0,16 W/mK)/REINFORCED CONCRETE BCA (Λ= 0,16 W/mK) / PERETE BETON ARMAT 30 cm

(resistant to explosure)
HBW 0.21 Slope angle tangent by %
Camera tehnica - refrigerare INSIDE PLASTER 1,5 cm
TENCUIALA INTERIOARA

C0/A1 - REI 180


PERICOL DE EXPOZIE
ceiling

240,5
Refrigeration engineering 250 5%

300
P Slope downward direction WALL PAINT VOPSEA INTERIOARA <0,1 cm
182.20m2 300 height
: 40,26
5m (av Slope bottom

explosive hazard
I2a INTERIOR WALL
E2

E1
erage) W2i PERETE INTERIOR
CATEGORIA DE PERICOL DE INCENDIU - E
HIGHBAY WAREHOUSE
Linear drainage WALL PAINT/ GRESS TILES VOPSEA INTERIOARA / PLACAJ CERAMIC 0,1-1,5 cm
DEPOZIT HIGH-BAY

W2a rezerva pentru extindere I1b CLASA DE PERICULOZITATE - P1,P2,P3A 2 x PLASTER BOARD 2 x PLACA GIPSCARTON 2,5 cm

589
Retaining wall

51,5
reserve for extension qi= 0 MJ/mp

2477,5 21742257
22202280
STONE WOOL ON STUDS 10 cm

2300
VATA MINERALA IN STRUCTURA

2220

2220

2340
Wheel guides

Naprowadzacz Hormann WBM

Naprowadzacz Hormann WBM


2 x PLASTER BOARD 2 x PLACA GIPSCARTON 2,5 cm
S 130 (120)
PRODUCTION BUILDING acc. to drawings:

260
VALOAREA qi ESTE CALCULATA AVAND IN VEDERE ART. 2.1.3. DIN STAS 10903/2-79

809,5
130
technical walkway to 1st level conveyor acc. to PL;

807
260 (250) 0,1-1,5 cm
FLOOR LAYOUT and LI_BAK_AP_TD_01

WALL PAINT/ GRESS TILES VOPSEA INTERIOARA / PLACAJ CERAMIC


Pasarela tehnica (materialele combustibile se afla intr-o stare in care aprinderea lor nu este posibila) Drain
LI_PAS_AP_TD_01 PASTRY GROUND

Panou SW- vata minerala CATEGORIA DE PERICOL


BAKERY GROUND FLOOR LAYOUT

Sandwich panel - mineral wool core th. 20cm; DE INCENDIU A Drain with water valve
Pressure Relief 55,0m² (5% m²
m³ of volume) qi<840MJ/mp

1100
Lockers 40x50
pentru decompresie - supraf. 5% din volum incapere -24°C
PRODUCTION BUILDING (PASTRY AND BAKERY)

Balustrada internal partition for clean

A W2a
HBW
Depozit HighBay
0.29 Usa frigorifica
deep freeze door 100(90)
railing and diry clothes

HPL WC Cabinets NUMBER


TABEL SUPRAFETE/AERAS LIST
ROOM NAME
DENUMIRE AREA/

1746,5
INCAPERE

130
S 210(200) SUPR.
Highbay warehouse

448,5
1691.64m2 scurgere 0.01 Staircase/ Entrence hall Hol acces+scara 29,37
drain 0.01A Elevator shaft Lift 3,53
Sanitary equipement
Rigola liniara toilet / urinal / basin 0.02 Corridor Coridor 43,90
linear drainage ANTIEX C0/A1 - REI180 (resistant to explosure) 0.02A Sluice Hol tampon 4,92

25

25
W2a 0.03 Shift manager Bioru sef de tura 20,14

280,5
W2i Canteen equipement
I1a I1b basin / sink 0.04 First aid Prim ajutor 9,66
HBW 0.21A
Camera control-refrigerare 20 1243 30 0.05 Women's toilet WC Femei 7,26

240,5

240,5
Refrigeration Control Panels 130 (120) RISC MIJLOCIU DE INCEDIU 0.06 Men's toilet WC Barbati 7,22

260
130
29.05m2 S 260 Office rooms equipement
(220+30) qi<420MJ/mp 0.07 Trucker area Zona soferi 27,73
Tubulatura evacuare aer Pasarela tehnica desk / table / closet
technical walkway to 1st level conveyor acc. to PL; Usa frigorifica 0.08 Logistics office Birou logistic 16,65
exhaust riser acc. to PIV
C0/A1 - REI 180 deep freeze door 100(90) 0.09 Cleaning room Camera curatenie 2,89

130
S 210(200)

94,5
25

25

25
Pasarela tehnica
I

Canteen equipment 0.10 Canteen Loc de luat masa 19,97


C0/A1/A2s1d0 - REI 180 I1a I1a technical walkway under pallet-lock acc. to PL; min. clear hight 2,20m basin / sink / microwave/
HBW 0.19 refridgerator / cabinets 0.11 women's drying room Vestiar femei 13,37
W2i

264,5
Post Trafo 0.12 Men's drying room Vestiar barbati 17,42
TRAFO 0°C
S 180 (160) LV Scara tehnica Designed room temperature 0.13 HBW control Control Highbay 33,14

260
180
TR

269,5
13.75m2 260 (250)
RISC MIJLOCIU DE INCEDIU Unitate A.C.
Zona Tampon technical staircase access to conveyors acc. to PL;
A A/C 20-22 ° C
0.14 Spare Parts Depozit Piese de 67,18
pallet-lock acc. to PL
qi<420MJ/mp
air condicionning unit acc. to PIV CB1 schimb

344,5
PAF (ANTIFIREWALL) + ANTIEX REI180
53 520 20 670 3010 90 905 120 7680 6595 11201180 120 20
0.15 Forklift sluice Incapere tampon 40,30

75,5
I1b Doormat 0.16 Battery charging Incarcare baterii 65,01
HBW 0.20

20
Usa frigorifica

12x14,75
15 Tablou electric tensiune joasa 0.17 Corridor Coridor 8,04
C0/A1/A2s1d0 - REI 180

215 (200) S
deep freeze door

35
HBW 0.18 LV Room 0.18 Medium voltage Tablou electric - 13,96

120 (90)

HA
Tablou electric medie tensiune 48.55m2 Linear drainage
750

725
260 160(140) medie tensiune
160

(resistant to explosure)
S 260
MV Room (250) MVS LVF

20

20

40 20
0.19 TRAFO Post Trafo 13,94

C0/A1/A2s1d0 - REI 180


14.04m2 Parapet detasabil Pallets convoyer for prevision
270

270
RISC MIJLOCIU DE INCEDIU

40
gol cu aer ventilat

C0/A1 - REI 180


qi<420MJ/mp of pallets acc. PL 0.20 Low voltage Tablou electric - 49,15

100

100

100
Removable handrails ventilated void W2i W2i W2i
RISC MIJLOCIU DE INCEDIU Direction of pallets joasa tensiune
Canal cabluri W2f qi<420MJ/mp C0/A1 EI45-C Burlan pluviale

137,5
convoyer move 0.21 Refrigeration engineering Camera tehnica - 181,19

GOL AER VENTILAT /


133,5

212(200)
25

25

25
(90)
Cable duct; 700x600mm acc. to PE and PC downspout Ø110

VENTILATED VOID
C0/A1/A2s1d0 - REI 180 Unitate A.C. C0/A1 EI45-C C0/A1 EI45-C refrigerare
C0/A1/A2s1d0 C0/A1/A2s1d0 - REI 90

265
150
I1c C0/A1 EI45-C
C0/A1/A2s1d0 - REI 90 Reinforced membrane service walkway

S 114
air condicionning unitacc. to PIV 4x14,75 I1c I1c

MB
20

20
- REI 90 0.21A Refrigeration Control Panels Camera 29,79
53 520 20 670 30 Burlan pluviale Burlan pluviale Burlan pluviale Burlan pluviale Burlan pluviale control-refrigerare
HBW 0.17 30

-
downspout Ø110 downspout Ø110 downspout Ø110 downspout Ø110 downspout Ø110 Service platform acc. to
usa frigorifica EI45-C Grila ventilatie / oblon EI45-C
150,5

150,5
Coridor 130 (120) S 130 (120) 0.22 Sluice ±0,00 Zona tampon 27,42
260
130

S 260 Tubulaturi ventilatii execution design


Corridor (220+30) 220 (220)
vent and aircondition riser acc. to PIV
LVL1 fire safety door ventilation openings 1500x1500mm, 0.23 Loading 1 Andocare 1 14,95
7.83m2 bottom edge 0.7m and 5,05m over floor level, fire flap External ladder with
W2i Pavaj conform PD protective basket 0.24 Loading 2 Andocare 2 14,95
H

25

25

25
Canal cabluri Pavement acc. to PR 0.25 Loading 3 Andocare 3 14,95
Cable duct with revision flap ANTIEX - C0/A1 - REI 180 (resistant to explosure) I1a
Rost de Turnare/ Rost de
I1a 0.26 Loading 4 Andocare 4 14,95
ZONA LIVRARE + DEPOZIT HIGHBAY Turnare SINUS JOINT
188

protection pipe 8xDVK160; acc. to PE and PC Profil rost (sinusoidal) de dilatare

PAF(ANTIFIREWALL) + ANTIEX REI180


CATEGORIA DE PERICOL 0.27 Loading 5 - multitruck Andocare 5 18,46
W2a
20 DE INCENDIU B 1243 30
I1b
MARSHALLING AREA + HIGHBAY Rost taiat/ Slashed joint expansion joint acc. to PC
qi<420MJ/mp Zona incarcare baterii 0.28 Marshalling area Zona livrare 820,06
Tubulatura ventilatie Grila ventilatie / oblon EI45-C COMPARTIMENT: C5 Rost polistiren/ Polystyrene joint
ventilation duct acc. to PIV Battery Chargers area with hood; hood acc. to PIV Green elements out of scope of General Contractor 0.29 Highbay warehouse Depozit Highbay 1668,78
ventilation openings 1500x1500mm, TIPUL CLADIRII: PRODUCTIE/DEPOZITARE
bottom edge 0.7m and 5,05m REGIM INALTIME: P
Rigola liniara NUMAR MUNCITORI = 28 pers/tura - 2 ture/zi S. constr. birouri Highbay = 315 m2

(resistant to explosure)
PERICOL DE EXPOZIE HBW 0.16 ARIA CONSTRUITA: Ac=2760mp
16°C Incarcare baterii over floor level, fire flap
linear drainage S 220 (200)
CLADIRE TEHNICA

220
260
550

525

525

525
260 (250) explosive hazard ARIA CONSTUITA DESFASURATA: Acd=2760mp WORKERS = 28pers / shift - 2 shifts/day S. constr. zona tehnica = 530 m2

C0/A1 - REI 180


Battery charging
Pasarela mentenanta
TECHNICAL

Spalator pentru ochi 65.02m2 VOLUMUL: V=76706mc


Panou SW- vata minerala
Emergency eyewash and safety shower station Maintenance pass through - Walk Over Plates acc. to PL GRADUL DE REZISTENTA LA FOC: II
S. constr. Livrare+Highbay = 2760 m2
PF scope
Sandwich panel - mineral wool core th. 20cm; Tubulatura ventilatie scurgere Usa sectionala EI90-C
usa rapida frigorifica EI45-C
CATEGORIA DE PERICOL DE INCENDIU: E S. utila totala = 3320.25 m2
ACCORDING TO:
D pentru decompresie - supraf. 5% din volum incapere
Pressure Relief 13,2m² (5% m²
m³ of volume)
ventilation duct acc. to PIV drain sectional gate - fire safety door
deep-freeze rapid action, fire safety door acc. to PL
DENSITATEA SARCINII TERMICE: qi= 15 MJ/mp

Fire compartment : C5
G.C.
PIV
PC
GENERAL CONTRACTOR
PROJECT'S VENTILATION INSTALATION DOCUMENTATION
PROJECT'S CONSTRUCTION DOCUMENTATION
Tubulatura ventilatie CATEGORIA DE PERICOL DE INCENDIU - E
C0/A1/A2s1d0 - ANTIEX REI 180 (resistant to explosure) C0/A1 EI90-C Building type: production / deposit PIS PROJECT'S SANITARY INSTALATION DOCUMENTATION
ventilation duct acc. to PIV CLASA DE PERICULOZITATE - P1, P2, P3A Height regime: P (ground) PE PROJECT'S ELECTRIC INSTALATION DOCUMENTATION
G

25

25

25
qi= 51 MJ/mp Built area: Ac=2760mp PIT PROJECT'S TELETECHNIC INSTALATION DOCUMENTATION

290
240
I1a I1a C0/A1 EI90-C Banda transportoare paleti VALOAREA qi ESTE CALCULATA AVAND IN VEDERE ART. 2.1.3. DIN STAS 10903/2-79 PR

PAF(ANTIFIREWALL) + ANTIEX REI180


I1b Total Built area: Acd=2760mp PROJECT'S ROAD DOCUMENTATION
pallets convoyer for prevision of pallets acc. PL tab. 2.1.5. P118/99 - nu se include in CAT C daca ambalajele si paletele nu depasesc 105MJ/mp
6435,5

Volume : V=76706mc PF PROJECT'S INSTALLATION OF FREEZ DOCUMENTATION


HBW 0.14

P
Control Paleti RANK OF RESISTANCE TO FIRE: II PL PROJECT'S LOGISTICS DOCUMENTATION
Depozit - Piese de schimb Rafturi
643,5

Spare Parts contour check acc. to PL FIRE DANGER CATEGORY: E ADDITIONAL REMARKS:
W2f Spare parts racks; OUT OF SCOPE
D
C0/A1/A2s1d0 - REI 180

67.20m2 Bara protectie din lemn FIRE LOAD DENSITY : qi ≈ 15MJ/mp 1. Pressure relief valves should be provided in the freeze areas - their number, location and parameters should be

(resistant to explosure)
422,5

422,5

wooden bumper 0,2m high


450

recalculated in scope of G.C. acc. to supplier's guidelines.Floor heating in Marshaling space should be related
Tubulatura evacuare fum 53 728,5 Tubulaturi ventilatii 25 456,5 30 70 30 3685 20 25 with gate opening sensors to prevent from icing formation in the forklift operation area when the door/gates are

C0/A1 - REI 180


vent riser acc. to PIV being opened
Smoke exhaust duct EIS120 CATEGORIA DE PERICOL DE INCENDIU - C
2. High speed doors in Marshaling area shall be fitted with sensors to ensure that they are safely opened for an

2395
CLASA DE PERICULOZITATE - P1, P2, P3A
approaching forklift and safely locked after he drives through - for both sides of speed doors, from the side of
ZONA LIVRARE MARSHALLING

2290

2290

2290
qi < 840 MJ/mp

2205
Marshaling and from docking house area. The door should be kept open for the shortest possible time.
Pardoseala incalzita 3. Loading docks 1- 4 (0.23, 0.24, 0.25, 0.26) - dock leveller for articulated trucks with semi-trailers - refrigerator
F

30

30

type. Minimal working range for loading level from 1,1 to 1,5m over ramp. Docking house system allows docking
922,5

Rigola liniara HBW 0.15 floor heating


linear drainage Incapere tampon while trailer doors are closed. Parameters should be recalculated in scope of G.C. acc. to supplier's guidelines.
Forklift sluice Usa frigorifica Soclu demontabil Leveller suitable for low temperature (-24°C).
Usa sectionala EI90-C 42.12m2 deep freeze door dismountable plinth 4. Loading dock 5 - multitruck (0.27) - dock leveller for articulated trucks with semi-trailers - refrigerator type and
Grila admisie aer, 50cm deasupra pardoselii 220 (200)
220

S 260 (250)
260

sectional gate - fire safety door


C0/A1 EI90-C

also smaller types of refrigeration trucks. Minimal working range for loading level from 0,65 to 1,5m over ramp.
Air intake acc. to PIV; vent grill e.g. 1200x1000mm, 50cm above floor 290 290
wall openning 1300x1100mm Usa EI90-C P 290 290 P 290 P Docking house system allows docking while trailer doors are closed. Parameters should be recalculated in
290 Profil rost de dilatare scope of G.C. acc. to supplier's guidelines. Leveller suitable for low temperature (-24°C).
C0/A1 EI90-C
fire safety gate FUTURE MIXED W2i
Scurgere Usa EI90-C permanently open, closing sinusoidal expansion joint 5. Heating cables power and heating temperature must not affect the remaining layers of thermal, moisture and
470

470

Pardoseala conf. PD
500

Pavement acc. to PR drain fire safety door in the event of fire PALLETS AREA vapour barrier of insulation. Cables mounting system in scope of G.C. acc. to supplier's guidelines, must not
DRYER

W2f Usa EI90-C affect the remaining layers of moisture and vapour barrier of insulation.
Pres intrare - aluminiu Usa frigorifica
Uscator de maini fire safety door HBW 0.28 6. Sealings and flashings for refrigerated buildings must be finally assembled after the end of frozenning process
ALU system doormat deep freeze door
Compresor aer Zona livrare and in accordance to guidlines of the contractor for freezing technology. The vapour-barrier layers of refrigerated
306,5

hand dryer Uscator de maini 100(90) 130 (90)


Rigola liniara 100(90) S 210(200) Marshalling area buildings must be an airtight, continuous coating in all joints of building elements. Any openings through building
compressed air S 230(220) hand dryer 220 (200) S Profil rost (sinusoidal) de dilatare Profil rost de dilatare
linear drainage C0/A1 EI90-C C0/A1 EI90-C 834.76m2 elements must be sealed with vapour barrier solutions.
PAF+ANTIEX C0/A1 REI180 PAF+ANTIEX C0/A1 REI180 sinusoidal expansion joint acc. to PC sinusoidal expansion joint acc. to PC
Pavaj conf. PD 7. The project must be considered in accordance with all legal permits, in particular:
E E'

Pardoseala incalzita
3010 30

301030

301030

Usa rapida - Building permit = D.T.A.C. ( Documentatie Tehnica pentru obtinerea Autorizatiei de Construire ),
Pavement acc. to PR
40

floor heating Usa rapida Supapa de eliberare a presiunii Usa rapida


High speed doors - Fire permit = AVIZ de securitate la incendiu
Usa rapida -24°C High speed doors pressure relief velve High speed doors
23

180 I1d I1d Pardoseala incalzita 8. For refrigerated buildings the construction of layers in building partitions, their joints and sealings must prevent
I1d C0/A1 EI90-C High speed doors floor heating
HBW 0.01 Usa sectionala (frigorifica) Usa rapida from condensation inside and on the internal surface of these partitions. They also must be calculated for
130 (120) 130 (120) 160 (120) HBW 0.02A Usa sectionala (frigorifica) Usa sectionala (frigorifica)
Hol acces + casa scarii AL 170 (140)
235
210
170

220 (200) S
130

S 210 (200) High speed doors


197,5

S 210 (200) deep-freeze sectional gate possibility of displacement of structures in relation to each other and thermal expansion of used materials.
AL 210 (180) 235 (220) Hol tampon deep-freeze sectional gate
210

200

Staircase/ Entrence hall deep-freeze sectional gate


C 235 (220) Sluice Usa sectionala (frigorifica)
C 9. Expansion joints for floor slabs to be revised in execution design according to final logistic project showing final
268

14.58m2 Pardoseala incalzita Usa sectionala (frigorifica) Pardoseala incalzita


4.92m2 deep-freeze sectional gate locations and parameters of logistics elements. Forklift working areas and their communication paths must be
15 44,5
1,5

Etichetare Profil rost (sinusoidal) de dilatare floor heating deep-freeze sectional gate floor heating
Usa cu deschidere automata pentru admisie aer ( desfumare casa scarii) 540 Profil rost (sinusoidal) de dilatare provided with sinus type expansion joints to insure possibility of safe movement.
100 (90)15

I-Point/ manual labeling sinusoidal expansion joint Profil rost (sinusoidal) de dilatare Profil rost (sinusoidal) de dilatare
(220)

aeration opening for smoke exhaust system 152 I2a 236 152 30 175 15 450 30 Infoliator paleti sinusoidal expansion joint Profil rost (sinusoidal) de dilatare 10. Possibility of removing the smoke extraction shall be consulted with the competent fire department present at
I2a sinusoidal expansion joint sinusoidal expansion joint
Perdea de aer I1b the final acceptance of the building.
W 230

half-automatic pallet strecher Supapa de eliberare a presiunii Pardoseala incalzita sinusoidal expansion joint
20

I1a
GOL AER VENTILAT /

air curtain acc. to PIS pressure relief velve 11. Locations and size of all shafts, roof, slab and wall perforations are indicative. The GC is responsible for the
W2i
VENTILATED VOID

floor heating
670

640

USA PLINA SAU CU GEAM ARMAT 55 172 196 HBW 0.03 collision coordination before erection. All costs must be included in bid.
Pardoseala incalzita
PAF (ANTIFIREWALL)
8x17,42

Birou sef tura Pardoseala incalzita


180

Door with armed glass (laminated) floor heating


28

Shift manager
60

floor heating 1. Supapele de eliberare a presiunii trebuie să fie prevăzute în zonele cu temperaturi negative - numărul, locația și
din 60

Usa sectionala (frigorifica)


19.91m2
future expansion
-R

C0/A1 - REI 180

HBW 0.01A
lan - R

parametrii acestora trebuie să fie recalculate, in scopul G.C. conf. cu recomandările furnizorului.
442,5
g

LIFT deep-freeze sectional gate


ir / te

W1a I2a
sta es

Elevator shaft 130 2. Încălzirea prin pardoseală în spațiul de livrare marfa trebuie să fie corelata cu senzorii de deschidere a porților pentru
513

s / pod

C0/A1/A2s1d0 - REI 150

RISC MIC DE INCEDIU

MA
20

3.53m2 a împiedica formarea înghețului în zona de operare a stivuitorului atunci când se deschid ușile / porțile
bim ri /

qi<420MJ/mp
b / sca

52,5
290

290

290

290

290

290
240

240

240

240

240

240
3. Ușile rapide din zona de livrare marfa trebuie să fie dotate cu senzori pentru a se asigura deschiderea în siguranță
25 20

25 20

20
sla zi /

Grila ventilatie
ling grin

25

25

25
pentru un stivuitor care se apropie și că se inchida în siguranță după ce trece stivuitorul - senzorii se vor amplasa

30
152

152

Ascensor, 1000 kg / 13 personane


cei ca /

ventilation grill with revision openning 600x2000 pentru ambele părți ale ușii rapide, pe partea zonei de livrare marfa și in zona casei de andocare. Ușa trebuie
P

P
Elevator; 1000 kg / 13 persons W2i W2i W2i W2i W2i W2i trepte exterioare conf. PD ( proiect drumuri)
pla

C0/A1/A2s1d0 - REI 150 I2a Usa rapida


menținută deschisă pentru cel mai scurt timp posibil.
terrain stairs acc. to PR
D

4. Casele de andocare 1-4 (0,23, 0,24, 0,25, 0,26) - platforme destinate pentru camioane articulate cu semiremorci - tip
12,5
30

30

High speed doors


I1a frigorific. Inaltimea minim de lucru pentru nivelul de încărcare de la 1,1 până la 1,5 m peste rampă. Sistemul de
HBW 0.04 HBW 0.22 andocare permite andocarea camioanului în timp ce ușile auto sunt închise. Parametrii ar trebui să fie recalculati de
370

100 (90)
100
230

390

390

390

390
Zona tampon

345

345

345
100 (90) 230 (220) W Prim ajutor

340
230
100

412
365

W 230 catre G.C. in conformitate cu recomandările furnizorului. Rampele de compensare trebuie sa fie adecvate pentru

432
387
(220) 0°C Sluice ±0,00 Usa sectionala Usa sectionala Usa sectionala Usa sectionala
213,5

First aid
hp=90

110
AL

180 9.61m2 18.50m2 sectional gate 320x360 sectional gate 320x360 sectional gate 320x360 sectional gate 320x360 temperaturi scăzute.
W2i Usa sectionala
I2a RISC MIC DE INCEDIU W2i W2i W2i W2i W2i 5. Casa de andocare 5 - multitruck (0.27) - platforma destinata pentru camioane articulate cu semiremorci - tip frigorific
HBW 0.02 I2a 0°C 0°C 0°C 0°C sectional gate 320x360
125

qi<420MJ/mp Balustrada și, de asemenea pentru tipuri de camioane/dube frigorifice mai mici . Inaltimea minima de lucru pentru nivelul de
Coridor
hp=90

110
12,5

0°C încărcare de la 0,65 până la 1,5 m peste rampă. Sistemul de andocare permite andocarea în timp ce ușile auto sunt
AL

handrail hight 1,10m

2.0%
Corridor 180
43.90m2 închise. Parametrii ar trebui să fie recalculati de catre G.C. a in conformitate cu recomandările furnizorului .Rampele
20

20

20

20

20
RISC MIC DE INCEDIU RISC MIC DE INCEDIU
300

300

300

300
300

300

300

300
440
180

555

100 (90) qi<420MJ/mp Scurgere Vaporizator ( refrigerare) de compensare trebuie sa fie adecvate pentru temperaturi scăzute.
600

qi<420MJ/mp
230
100

W 230 (220)
597

90 (80)

20

20
168,5

290
240

W 230

300
300
drain Air cooler acc. to PF; 6. Etanșările si "flashingurile" pentru clădirile cu rol frigorific trebuie asamblate în cele din urmă după terminarea
hp=90

110 (220)
AL

P
180 procesului de congelare a incaperilor și în conformitate cu ghidurile contractorului pentru tehnologia de congelare.
CLADIRE SOCIALA

located under roof construction


SOCIAL - OFFICE

I2a HBW 0.05


P

Vaporizator ( refrigerare) Supapa de eliberare a presiunii Vaporizator ( refrigerare) Supapa de eliberare a presiunii Vaporizator ( refrigerare) Supapa de eliberare a presiunii Vaporizator ( refrigerare) amplasat sub acoperis Barierele de vapori motate in clădirile cu rol frigorific trebuie să fie etanșe si continue la toate îmbinările elementelor

P
Vaporizator ( refrigerare)
WC Femei
125

20

130

Air cooler acc. to PF; pressure relief velve Air cooler acc. to PF; pressure relief velve Air cooler acc. to PF; pressure relief velve Air cooler acc. to PF;
583,5

W1a Women's toilet Air cooler acc. to PF; Burlan pluviale de construcție. Orice deschideri prin elemente de construcție trebuie sigilate cu barieră de vapori.
hp=90

110

2.0%
HBW 0.13
AL

180 I2a 7.22m2 located under roof construction located under roof construction located under roof construction located under roof construction 7. Proiectul trebuie să fie în conformitate cu legislatia din domeniou, în special cu:
Camera control Highbay located under roof construction downspout Ø160 amplasat sub acoperis amplasat sub acoperis amplasat sub acoperis amplasat sub acoperis
HBW control RISC MIC DE INCEDIU - D.T.A.C. (Documentația Tehnică pentru Obținerea Autorizației de Construire), - 24° C 5° C
163

100 (90) qi<420MJ/mp 90 (80) 130 179 240 121 132 72 300 72 180 72 300 72 132 72 300 72 176 72 300 72 132 72 300 72 138 30 - AVIZ de securitate la incendiu
100
230

30.80m2 I2a W 230 (220) W 230 (220)


543

290 300 300 300 300 300 300 8. Pentru clădirile cu rol frigorific, pereții despărțitori ai clădirilor, îmbinările și etanșările acestora trebuie să împiedice
I2a 0-4° C 20° C
15

HBW 0.06 condensarea în interiorul și pe suprafața interioară a acestor pereți despărțitori. Ele trebuie, de asemenea, calculate
C

HANGERS FOR SHOES AND


25

WC Barbati
220

Bordura conf. proiect drumuri pentru a permite ( fara a aparea degradari ) eventuale deplasari a structuri de rezistenta și a dilatarii termice a
15

WORK CLOTHES Usa sectionala


Naprowadzacz Hormann

Naprowadzacz Hormann

Naprowadzacz Hormann

Naprowadzacz Hormann
Men's toilet
Naprowadzacz Hormann

Naprowadzacz Hormann

Naprowadzacz Hormann

Naprowadzacz Hormann
WBM

WBM

WBM

WBM
W1a 16° C NOT CONTROLLED
Kerb acc. to PR materialelor utilizate.
WBM

WBM

WBM

WBM
LVL2 7.17m2 sectional gate

Naprowadzacz Hormann WBM


RISC MIC DE INCEDIU
158,5

9. Rosturile de dilatație ale plăcilor de pardoseală să fie revizuite în proiectarea execuției conform proiectului logistic

Naprowadzacz Hormann WBM


qi<420MJ/mp Grila ventilatie
RISC MIC DE INCEDIU 90 (80) final care prezintă locațiile și parametrii finali ai elementelor logistice. Suprafețele unde se lucreaza cu stivuitoare și 20° C 20-26° C min. 8° C
230 (220) W I2a vent. riser acc. to PIV
qi<420MJ/mp HBW 0.23 HBW 0.24 HBW 0.25 HBW 0.26 HBW 0.27 căile lor de comunicare trebuie să fie prevăzute cu rosturi de dilatare de tip sinusoidal pentru a asigura posibilitatea

1767,5
357

100 (90)
hp=90

110
100
230

W 230 Andocare 1 Andocare 2 Andocare 3 Andocare 4 Andocare 5


315

deplasarii în condiții de siguranță.


15

TEMPERATURE ZONING PLAN


AL

180 (220)
HBW 0.12 Loading 1 Loading 2 Loading 3 Loading 4 Loading 5 - multitruck
(220)

10. Posibilitatea de îndepărtare a intreg sistemului desfumare pentru incaperile de depozitare ( depozitul de piese de
100 (90)

Vestiar barbati 14.95m2 14.95m2 14.95m2 14.95m2 16.64m2 schimb ) ( in conditiile incadrarii lui in Categoria "E" - pericol de incendiu) trebuie consultată cu departamentul de
W 230

hp=90

Men's drying room Ghene ventilatie 110


AL

pompieri competent ce va fi prezent la recepția finală a clădirii.


hp=90

110 I2a 180


330

19.89m2
180

AL

157,5
600

180 I2a I2a vent. riser acc. to PIV


11. Locațiile și mărimea tuturor golurilor din acoperișuri, plăcilor și pereților sunt orientative. GC este responsabil pentru
20

"L" TYPE LOCKERS


683

220
180

HBW 0.07
12,5

12,5

coordonarea coliziunilor înainte de montaj ( construire) . Toate costurile trebuie incluse în ofertă.
Zona soferi
hp=90

RISC MIC DE INCEDIU 110


AL
hp=90

110 180 Trucker area


AL

qi<420MJ/mp
454

180 100 (90) 27.58m2 Rigola liniara


100
230

W 230 (220) REMARKS:


HBW 0.11
Parapet auto linear drainage acc. to PD, PIS
237,5

245,5

Vestiar Femei 1. The site is located in the seismic area described by the ground acceleration ag=0,20g and corner period Tc=0,7 s,
W1a RISC MIC DE INCEDIU 120 (90) energy-absorbing barrier
120
180

women's drying room I2a according to P100-1/2013.


qi<420MJ/mp 235 (220) AL Balustrada pe parapet
13.67m2 "L" TYPE LOCKERS 2. Tender design documentation contains information for tender purpose only. It can not be used to conduct execution
138,5

HANGERS FOR SHOES AND handrail on construction of barrier; Parapet auto works. Before execution, drawings must be multidisciplinary recoordinated.
220

230 (220) W

WORK CLOTHES W1a hight 1,10m over walkway platform


8

energy-absorbing barrier 3. This documentation is protected by International Copyright Law. It is forbidden to distribute this study and the parts
B

15

100 (90)

I2a
100
15

thereof outside the scope of distribution specified in the agreement with the designer, to store this study in database
12,5

I2a systems without the author's permission, to transfer this study in any form, including electronic copies, photocopies and
100 (90) 132 81,5 98,5 132 81,5 94,5 136 138 30
100

675 444 444 444 444 440


230

W 230 (220) reproductions, and to introduce any changes to this study without the consent of the author.
INCAPERI CU RISC MIC DE INCEDIU

hp=90

100 (90) 110 650 20 132 20 404 20 180 20 404 20 132 20 404 20 176 20 404 20 136 440 168
100
230

4. Building systems and materials trade names used in the project are not mandatory. It is acceptable to use equivalent
230 (220) W
AL
227,5
hp=90

HBW 0.10 110 180


AL

180 solutions and technology. Prior to committing to alternative solution GC is required to submit data sheets, drawings and
2.0%

Loc de luat masa 55 555 15 190 0 450 55 Parapet auto Perete de sprijin
CARE COMPUN O GRUPARE

documents for relevant replacements confirming solution equivalency and request and obtain DESIGNER's and
GROUP OF ROOMS < 400m²

250
220

Canteen
180

143

energy-absorbing barrier retaining wall


CU ARIA DE MAX. 400MP.

19.47m2 RISC MIC DE INCEDIU CLIENT's approval.


418

hp=90

110
440

330
180
AL
hp=90

110 qi<420MJ/mp 180 Parapet auto Balustrada 5. As far as fire safety is concerned it is mandatory to follow Romanian Fire Regulations (They are followed the "Fire
AL

12,5

180 I2a RISC MIC DE INCEDIU


qi<420MJ/mp energy-absorbing barrier 1,10m hight safetyNorms for buildingsP118-99"), but protection is to be no lower than marked on the drawings. All expansion joints
railing
262

and connections in walls made of different technologies in the fire separation area must be sealed using approved
W 100 (90) HBW 0.08
100
230

HBW 0.09
hp=90

230(220) 110 Birou Logistica solutions. It is recommended to pay attention to the connection of non-bearing walls to the ceiling above.
AL
170

Camera curatenie I2a 180


W1a I1d I2a I1d Logistics office 6. All dimensions are to be verified in Execution Design and on site by the General Contractor prior to ordering
120

Cleaning room Grila ventilatie


157

167,5 16.49m2 elements that are to be mounted.


W1a
60

2.85m2 vent. riser acc. to PIV 7. Brick and reinforced concrete walls joints or brick walls disjointed with each other must be sealed with flexible mass such
64,5
A

30

30

30

e.g. acrylic.
15

8. Openings in reinforced concrete elements (floors, walls) must be made according to the Structural Execution Design
drawings. Only openings of 100mm diameter or less may be done by drilling, all remaining openings are to be prepared N
210
230

INCUBATOR BUILDING: acc. to in formwork.


CLADIRE INCUBATOR + BIROURI DIN HIGHBAY Conexiune cu cladirea incubator
LI_INC_AP_TD_01 'INCUBATOR
hp=90

9. Penetrations and openings in the walls and ceilings of the fire separation must be sealed to the EI resistance of the
180
connection to office/ social building
AL
AL

110
INCUBATOR BUILDING + OFFICE IN HB OFFICE GROUND FLOOR LAYOUT' partition, higher or equal to EI60.
10. All technological and installation openings in structural elements are to be adjusted and coordinated by GC in Execution GENERAL REMARK:
Fire compartment : C6
220 Design, after the selection of supplier, according to manufacturer specifications of relevant equipment . These drawing is for Refrigeration Functional Tender purposes only.
Building type: CIVIL
hp=90

180
AL

11. Door and window openings are given in gross size (rough openings), installation openings in architectural drawings are
AL

115
60 60

110
Height regime: P+1 Drawing shows only the functional layout of the building. Detailed solutions will be defined in further design stages.
-R -R

given in rough size and located by geometric axis. Please refer to discipline designs for net dimensions.
Please do not consider the drawing as a final version.
ts e ing

Built area: Ac=233mp+315mp= 548mp 12. The project defines the windows openings dimensions according to following rules:
de nd
po / la

Total Built area: Acd=466mp+630mp=1096mp · above the line: horizontal dimension of the rough opening GENERAL DESIGNER
hp=90

180
ri / stair

220 INWESTOR
AL

Volume : V=1922mc+2600mc= 3696mc · below the line: the vertical dimension of the rough opening
AL

110
sc /

115
zi / ms

RANK OF RESISTANCE TO FIRE: II · below the opening: sill finishing level height to the floor finishing near the wall.
rin / bi
a

529,5
b

FIRE RISK: SMALL FIRE RISK 630 160 7735


ca sla

In case of doubt, ask the designer to clarify the project purpose on the building site. ul. Skarbowców 23a, bud. A1
pla iling

40 570 235 670 40 127,5 1200 1200 1200 82,5 3882 43 53 - 025 Wrocław
g

hp=90

180
FIRE LOAD DENSITY : qi < 420MJ/mp 13. Before placing an order for door and window joinery, the GC is required to verify opening dimensions on site and assure
/

ce

Poland
AL

110
235 (220) 1320 3810 3965 doors and windows of required net clear width and height can be mounted. If any discrepancy is discovered between the tel: +48 (0) 71 786 41 12
www.metroplan.com.pl
project and the actual state, the GC is required to notify the CLIENT and Metroplan.
AL

160 (130)
COMPARTIMENT: C6 14. Before placing an order for building materials, finishing and equipment, which are to be used for construction, the GC is
DESIGN TEAM BUILDING QUALIFICATIONS NO. SIGNATURE
TIPUL CLADIRII: CIVILA required to request and obtain CLIENT's approval.
REGIM INALTIME: P+1 15. Supporting structures for technical equipment must be prepared strictly according to the device manufacturer MAIN DESIGNER:
ARIA CONSTRUITA: Ac=233mp+315mp= 548mp guidelines.
arch. SWERHUN-BIENIEK Aleksandra -
210 (180)
(220)

hp=90

180
16. The space between the electrical meter boxes and the ceiling on the ground floor level should be enclosed in the
AL

ARCHITECTURE
110
ARIA CONSTUITA DESFASURATA: Acd=466mp+630mp=1096mp
plasterboard system.
AL 235

VERIFING DESIGNER:
VOLUMUL: V=1922mc+2600mc= 3696mc
17. The openings of ventilation ducts should be extended 5 cm on each side. The angle iron must be attached to the steel arch. DROGA Barbara -
GRADUL DE REZISTENTA LA FOC: II 220 220
ceilings to protect the opening.
hp=90

180
W

AL

100.5
RISCUL DE INCENDIU: RISC MIC DE INCEDIU
AL

115 110
18. GC is required to deliver immovable equipment and fixed furniture of kitchenette and lockers in lockers rooms. Movable DESIGNER:
DENSITATEA SARCINII TERMICE: qi<420MJ/mp equipment, like office furniture, is outside the scope of GC contract. arch. HRISULIDIS Kostas -
1 2 3 4 5 6 7 H2 19. Locations and size of all shafts and roof perforations are indicative. The GC is responsible for the collision coordination
DATE
hp=90

180
220 in all disciplines before erection. All costs must be included in bid.
AL

PROJECT
AL

115 110
20. All openings, sizes and dimensions of technological equipment and ductwork are indicative only. Buffers for
3.8%

technological installations are to be prepared. Coordination between technological, TB installations and structural NEW PLANT AND WAREHOUSE FOR CONTROLLED TEMPERATURE
elements is solely in General Contractors scope of Executive Design and responsibility and subject to Investors PRODUCTS IN THE REGION OF TULCEA, ROMANIA 06.2019
hp=90

220 180
AL

110 approval. All costs related are to be included in tender bid.


W

100.5
21. During execution openings and sillings for technological instalations are to be made acc. to technology supplier
guidelines. And where located in fire partitions acc. to relevant Romanian fire protection regulations. CLIENT LIDAS SRL
22. Lightning protection acc. to electrical documentation. Mineri, Brailei Street 28; 827211 Tulcea, Romania
B

DRAWING SCALE
23. Service paths and walkways on the roof is to be provided to all roof mounted equipment acc. to specification in
Performance Description Part C. Prior to construction GC is required to present pathway layout and request CLIENTS DRAWING HIGH-BAY
approval
hp=90

180
220
GROUND FLOOR LAYOUT 1:100
AL

110
W

100.5 24. Location , safety barriers, bumpers and safety bollards is indicative. Exact location should protect all TBA equipment
and building components which might be exposed to mechanical damage during building use. STAGE REFRIGERATION FUNCTIONAL TENDER
220 25. The rain water roof drainage and catchment areas dimensions and size, are to be adjusted according to the relevant
hp=90

180
AL

instalation Execution Design. The position and dimensioning of inlets and other relevant equipment are to be adjusted
AL

115 110
in GC Execution Design after the selection of supplier, according to manufacturers specifications. INVESTMENT ADDRESS COM. FRECATEI , DRAWING NO.
INTRAVILAN SAT CATALOI,
26. Architectural drawings are to be considered together with descriptions and other branch designs. JUDETUL TULCEA , T44, A705,L659,A703
NR. CADASTRAL 35121, 35122, 35123
LI_HBY_AP_TD_01r
hp=90

220 180
AL
AL

115 110

Vous aimerez peut-être aussi