QUERIES:
1. PLEASE CLARIFY PURPOSE OF BUFFER VESSEL.
2. CLEANING METHOD? PROVIDE DETAILS...LIKE SCRAPPING AFTER OPENING
H H
THE EQUIPMENT...HIGH PRESSURE JET...ETC.
Condenser Drawing provided is 3. CUREENT PROCESS DETAILS – DOWNSTREAM OF THE REACTOR
Feed Monomer Tank – Is it
showing Utility as CHW. 4. REACTOR OUTLET (FOR MONOMER STRIPPING SYSTEM)
common for EA / BA / Styrene?
Understand that this drawing is
How many “New Feed Monomer - WHAT IS THE SOLID CONTENT?
for Secondary Condenser?
Tank”? - RESIDUAL MONOMER CONTENT AT THE OUTLET OF REACTOR
How many condensers
G downstream of Distillation - DESIRED MONOMER CONTENT OF THE PRODUCT. G
Column? - WHAT IS THE GLASS TRANSITION TEMPERATURE?
PRIMARY
5. SCRUBBER SYSTEM – TYPE OF SOLVENT USED AT PRESENT.
CONDENSER SCRUBBER
6. TYPE & NUMBER OF UTILITES FOR THE GAP ANALYSIS:
FEED CATALYST
TANK STEAM – YES – MAX POSSIBLE PRESSURE?
MONOMER
TANK SECONDARY COOLING WATER – YES
F CONDENSER F
CHILLED WATER - ?, BRINE - ?, NITROGEN - ?, THERMIC FLUID - ?,
COMPRESSED AIR - ?
OFF-GAS FROM
OTHER FOUR (4)
NOS. OF REACTOR
SYSTEM DESIGN OF SYSTEM DOWNSTREAM ON REACTOR (COLUMN, CONDENSERS,
REFLUX
SCRUBBER) TO BE DONE FOR EA / BA OR ST RXN SYSTEM?
E DRUM E
DISTILLATION
COLUMN DESIGN OF MONOMER STRIPPING SYSTEM TO BE DONE FOR EA / BA / ST RXN
SYSTEM?
ANY TRIAL DONE BY CLIENT FOR MONOMER STRIPPING PROCESS?
REACTOR
D PROCESS DELIVERABLES REQUIRED? D
(1) DESIGN BASIS, HEAT & MASS BALANCE
(2) DATA SHEETS – PROCESS & INSTRUMENTS
(3) LINE HYDRAULICS
(4) PFD, P&ID SCHEMATICS & REVIEW
PRESENT
C DOWNSTREAM C
SETUP FOR 1 NO. SYSTEM?
OF REACTOR
SYSTEM

B B

UFLEX – POLYMER UPGRADATION & REVAMP

A PROJECT UNDERSTANDING SHEET A