1)

24.6

2)

12% to 18%

1 and 3

5) What is not true about moment frame buildings?

6). General conditions and home office overhead are


examples of what type of costs?

7) density of traffic is fond to be 230 vehicles per mile speed of vehicles is measured to be 60 mph. What is
the flow or volume of traffic?
a) 7500 veh/hr
Page 1 of 3
b) 13800 veh/hr
c) 18400 veh/hr
d) 29670 veh/hr

8) The purpose of curing is


a) To ensure that there is enough water in the concrete during dehydration
b) To ensure that this water is retained so theat the chemical reaction continues until the concrete has
thoroughly hardened and strength is developed
c) To ensure that there is enough water in the concrete during dehydration & to ensure that the chemical
reaction continues until the concrete has thoroughly handened and strength is developed

9) The advantage in using plywood is that the

10) Which of these is a reason to start a project

11) The resultant of the active earth pressures on a 5 meter-high wall retaining sand with unit weight and
friction angle of 19 kN/m3 and 30 degrees is:

12) The critical path in a project network is the:

13) A doubly reinforced beam is used when:

14) For a plain cartoon steel, all of the following are true except:

15) The forward pass in project network calculations determines the


a) Earliest itmes an activity can begin
b) Earliest times an activity can be finished
c) The longest time that the project can take
d) Critical path of the project
e) Only A and B are correct

16) The maximum vertical shearing stress due to VQ/lb in teh beam with a rectangular cross section
a) Occurs where the normal stress is maximum
b) Occurs at the neutral axis
17) Soil samples extracted form the standard penetration test (SPT) cna be used in
a) Liquid limit test
b) Sieve analysis
c) Hydrometer test
d) All of the above
18) Whichoneofthefollowingisatypicaldrydensityfornormalweightconcrete?
a) 1850kg/m³
b) 1950kg/m³

Page 2 of 3
c) 1300kg/m³
d) 2250kg/m³

19) The main activity in project scope definition


a)Setupthemeetingonproject
b)Analyzethecurrentbudgetplan
c)Meetwithteammembers
d)Selectteammembers
e)Define the work break down structure