Vous êtes sur la page 1sur 5

PETROSYNC’S WELL ENGINERRING SERIES

WELL COMPLETION
AND WORKOVER
Learn the Modern Techniques in Completion Design and Installation
17 May 2016—20 May 2016
Bandung, Indonesia

Supported By
WELL | WELL COMPLETION & WORKOVER

Course Overview
Once a well has been drilled, the decision must be made: Will this well
become a producer or be plugged and abandoned as a dry hole? Should
the operator decide to move forward with developing the well,
completion operations must be undertaken.
Our Well Completion and Workover course is develop to provide detailed in-depth technical
and practical level knowledge of well completion and workover operation in order to improve
the productivity of the well.

Course Design Focuses on Practical Application


The course focuses on the practical applications of various techniques and methodologies in
well completion --- from the selection of completion type, perforating strategies, fluid
selection, and installation of production heads.

Includes Specific Completion Design Project and Case Studies


Both success/failure case histories of different situation of well completion installations in
different operating environment will be provided in order to maximize your learning benefits.
A Completion design project will be completed by you and present within the 4 days course.
You will also learn the well control and well workover techniques will also be covered to
complement the insurance of well longevity of the installation. This course provides a good
link to how the techniques in well completion would ensure better well performance and
production later in the life of the well.

How Does This Course Benefits You?


Able to Plan Effective Operation
Plan effective operation by gaining practical methods to design, plan and install safe and
efficient well completion and workover.

Improve the Well Productivity


Improve the productivity of the well by integrate the importance of completion process to
future production in order to maximize the success and minimize the failure

Improve Effectiveness and Efficiency Work Performance


Improve the effectiveness and efficiency of “frac packs” operation by learning the way how to
conduct the operation smoothly in a correct techniques.

Improve the Effectiveness of the Operation


Improve the effectiveness of sand control operation by learning the emerging techniques for
several critical situation.

Sand Control Solution


Expandable sand screen alternative to fracture-packing
sand control. Darcy Proves New Sand Control Technology with Second
Successful Installation
Hydraulic Screens enable more efficient completion of sand
plagued wells

general@petrosync.com | +65 6451 4500 | www.petrosync.com

2
WELL | WELL COMPLETION & WORKOVER

PetroSync Distinguished Instructor

Practical & Consulting


 Over 25 years of engineering, operations, and management
experience in Completion, Workover & Well Services, and
Drilling
 Leads major completion and workover projects with
companies such as Shell Canada, KNOC, KPO etc in North
America, Europe, Africa, Central Asia, & Far East Asia
Training
 Provided intensive trainings in well completion and
Michael Etuhoko workovers with different oil and gas companies. Some of
President & Founder of these training are “Well Completion & Intervention Training
Protekz Inc Canada (Level 1&2)” for KPO, “Sub-Sea Workover Operations
Training” for KNOC, and “Deep Water Sand Control” for Total
E&P International.
Awards
 BG Chief Executive Innovation Award, London, UK - “Open
Hole Multistage Fracturing Completion with Swelling Packers
and Sliding Sleeves in Carbonate Reservoir” – (2012)

Who Needs This Program


 The course is designed for, but not limited to Completion Engineers, Workover Engineers,
Production Engineers, and those who are involved with well completions, workovers, well
interventions, and production.
Job Titles Include:
 Completion Engineer
 Workover Engineer
 Well Services / Intervention Engineer
 Production Engineer
 Drilling Engineer
 Well Site Engineer

Course Schedule

08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch


09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)

PetroSync Quality Assurance


All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best PetroSync Inhouse Solutions
courses with the best industry expert. PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com

general@petrosync.com | +65 6451 4500 | www.petrosync.com

3
WELL | WELL COMPLETION & WORKOVER

Course Agenda — 4 Days


DAY 1 DAY 2
Well Performance Well Completion Equipments, Components, & Installation
 Safety Alert Artificial Lift Methods
 Introduction to Completion Design Tubing Stress Analysis
 Starter Quiz & Review  Purpose of Stress Analysis
 Introduction to Completion Design Project  Safety Factors and Design Factors
 Reservoir Completion: Inflow Performance  Load Cases
 Reservoir Completion: Perforations  Completion Equipment and Connections
 Reservoir Completion: Well Stimulation / Hydraulic Completion Components (Features & Usage)
Fracturing  Completion Philosophy
 Reservoir Completion: Sand Control  Completion Components
Christmas Tree, Tubing Hangers, Tubing, Down Hole
Practical Exercise: Completion Design Project (work out Safety Valve, Packers, Tail Pipes, Expansion Devices,
this in a group) Nipples, Mandrels, Gauges, Etc.
Practical Exercise: Completion design project (work out
this project in a group) (CONTINUE)

DAY 3
Modern Well Completion & Intro to Well Intervention Emerging Techniques
Completion Operation Base Preparation  Fiber Optics: Distributed Temperature System (DTS),

 Equipment Purchasing and Factory Acceptance Pressure/ temperature (P/T), etc


 Service Contract  Intervention less packers (Hydrostatic packers, swelling

 Equipment Preparation packers, etc)


 Technical Program  In-situ self-generating weak acid

Rig Preparation and Completion Installation Process  Expandable tubulars

 Operation Planning  Expandable Sand Screens (ESS)

 Equipment Shipping  Sand Control in High angle and long interval: Alternate

 Equipment Reception path technology (SHUTS, CAPS, etc)


 Pre-Job Meeting  Formation Isolation Valves (FIV)

 Casing Cleaning Operation  Intelligent & Smart Well Completion: Interval Control

 Running in hole the completion equipment Valves (ICV)


 Well Clean-Up  Underbalanced Drilling & Completion

 Reporting  Cased Hole Circulation Drilling & completion

 After-Action Review  Multistage Fracturing


Practical Exercise: Completion design project (CONTINUE)

DAY 4
Well control & Well Workover
Well Control:
 Well control Equipment
 Blowout Preventer System Requirements You Might Also Be Interested In:
 Choke Manifold
 Circulating System
Sand Control Completion Practices
 Kicks and its causes
 Well Killing Operation
TBC | Bandung, Indonesia
 Forward circulation Formation Damage Prevention & Treatment
 Reverse circulation 11-14 July 2016 | Bandung, Indonesia
 Bull heading
 Lubricate and Bleed IWCF Well Intervention Pressure Control
 Class exercises on well control TBC | Bandung, Indonesia
Workover Operations:
 Workover definition and description
 Workover Types:
Register For This Course Now!
 Safety Workover (SWO)
 Long term suspension (LTS) Kindly fill up your particulars in the
 Plug and Abandonment (P&A) registration form placed at the end of this
 Production enhancement (PE) brochure, and send it to us or email to
Workover Feasibility Studies registration@petrosync.com
Group presentation /
General Review of the Well completion Design Project general@petrosync.com | +65 6451 4500 | www.petrosync.com

4
COURSE DETAILS COURSE CONSULTANT
Title : Well Completion and Workover Name : Cay Aagen
Date : 17-20 May 2016 Email : registration@petrosync.com
Location : Bandung, Indonesia Phone : +65 6415 4500
Fax : +65 6415 4322
INVESTMENT PACKAGES (Please Circle)
TERMS AND CONDITIONS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS DISCLAIMER
Please note that trainers and topics were confirmed at
Standard Price 16 May 2016 USD 3,595 the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
Early Bird Offer 18 April 2016 USD 3,395 the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
Group Discount substitutions or alterations will be updated on our web
16 May 2016 10% off page as soon as possible.
(3 or more Delegates)
DATA PROTECTION
Group Discount is based on Standard Price The information you provide will be safeguarded by
*To enjoy the promotion & discount offer, payment must be made before dateline PetroSync that may be used to keep you informed of
* For 7 or more delegates, please inquire for more attractive package. relevant products and services. As an international
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other group we may transfer your data on a global basis for
promotional offers. the purpose indicated above. If you do not want us to
* Important: Please note that registration without payment will incur a SGD 200 administration fee. share your information with other reputable
companies, please tick this box
DELEGATES DETAILS
CANCELLATION POLICY
1st Delegate Name: Mr Mrs Ms Dr Others You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
Direct Line Number: Email:
any cancellation received in writing not less than
Job Title: Department: fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
Head of Department: administration fee and any related bank or credit card
charges.
2nd Delegate Name: Mr Mrs Ms Dr Others Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
Direct Line Number: Email:
course, are liable to pay the full course fee and no
Job Title: Department: refunds will be granted.
In the event that PetroSync cancels or postpones an
Head of Department: event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
3rd Delegate Name: Mr Mrs Ms Dr Others receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
Direct Line Number: Email: PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
Job Title: Department: postponement.
Head of Department: PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
INVOICE DETAILS assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
Attention Invoice to: of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
Direct Line Number: Fax: or any other reason beyond management control.
Company: Industry:

Address: Postcode: CERTIFICATE OF ATTENDANCE


Country: Email:
70% attendance is required for PetroSync’s Certificate
Please note: of Attendance
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
DETAILS
PAYMENT METHOD Please accept our apologies for mail or email that is
By Credit Card: incorrectly addressed.
Please debit my credit card: Visa MasterCard AMEX Security Code: Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
Card Number: Expiry Date:
accordingly.
Name Printed on Card:
CHARGES & FEE(S)
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details: - For Payment by Direct Telegraphic Transfer, client
Account Name: PetroSync Global Pte Ltd has to bear both local and oversea bank charges.
Bank Name: DBS Bank Ltd - For credit card payment, there is additional 4%
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288 credit card processing fee.
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.

Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.

Vous aimerez peut-être aussi