SAUDI ARAMCO TYPICAL INSPECTION PLAN
External FBE Coating & Repairs of Field Welded Joints SATIP-H-002-02 30-Nov-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD CONTRACT SAUDI
OR ARAMCO

1.0 DOCUMENT REVIEW

Review Procedure - Field Applied


1.1 External FBE Coating and Repair SAIC-H-2009 SAIC-H-2009 RH RH The procedure shall be approved by RSA (CSD)
Procedure

Review Qualifications - Coating


1.2 Personnel Certification SAIC-H-2010 SAIC-H-2010 H R

2.0 MATERIAL RECEIVING

SAIC-H-2011* SAIC-H-2011
Recv Insp of FBE Coating Materials for SA shall inspect the first batch of delivered paints
2.1 H W
Over-the-Ditch Ext Field Girth Welds & abrasives, and random inspection thereafter.
SAIC-H-2011* SAIC-H-2011
2.2 Storage & Handling (Paint, Abrasives) H S

2.3 Equip Insp & Performance Verification SAIC-H-2013 SAIC-H-2013 H W Use SATR-H-2004

3.0 APPLICATION

Pre-Cleaning, Surface Prep Inspection,


3.1 Chloride* Content Testing & SAIC-H-2014 SAIC-H-2014 H H*
Contamination Prevention

In-Process Inspection of FBE coating


Use SATR-H-2005
3.2 Application on Ext Field Girth Welds SAIC-H-2015 SAIC-H-2015 H W
[Includes Repair / Patch-up coating]

3.3 Curing Testing SAIC-H-2015 SAIC-H-2015 H W Use SATR-H-2009

3.4 Adhesion Testing SAIC-H-2015 SAIC-H-2015 H W Use SATR-H-2010

3.5 Holiday Testing SAIC-H-2016 SAIC-H-2016 H H Use SATR-H-2008

3.6 Final Inspection Prior to backfill* SAIC-H-2018* SAIC-H-2018* H H Complete all required Testing*

GENERAL NOTES
1 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:QA/QC organization shall be notified of timing of Insp or test in advance. However, insp or test shall be performed as scheduled if QA/QC organization representative is not
2
present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without QA/QC organization representative in
3
attendance.
4 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.00 30-Sep-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
External FBE Coating & Repairs of Field Welded Joints SATIP-H-002-02 30-Nov-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD CONTRACT SAUDI
OR ARAMCO

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017)

Saudi Aramco: Company General Use


Rev. 2017.09.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017)

Saudi Aramco: Company General Use


Rev. 2017.09.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use

Vous aimerez peut-être aussi