Vous êtes sur la page 1sur 17

SHEET LIST

GENERAL NOTES LIST OF ABBREVIATIONS


REVISION
SHEET NUMBER SHEET NAME DRAWN BY CHECKED BY IFC '0' Rev Block REVISION NO. REVISION DESCRIPTION DATE ABOVE FINISH FLOOR AFF LAMINATED VENEER LUMBER LVL
THE STRUCTURAL DOCUMENT (DRAWINGS & SPECIFICATIONS) - MUST NOT BE USED WITHOUT THE CONSTRUCTION FOUNDATION ADDITIONAL ADDNL LIGHT LT
0.0 STRUCTURAL GENERAL
DOCUMENT OF OTHER DISCIPLINES. COORDINATION BETWEEN STRUCTURAL DOCUMENT AND OTHER DISCIPLINE'S ALTERNATE ALT LIVE LOAD LL
DOCUMENT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND THE SUBCONTRACTOR RESPONSIBLE FOR THE 13. AT THE COMMENCEMENT OF INSTALLATION, THE EQUIPMENT GOVERNING THE ALIGNMENT OF THE BORED PILE, SHALL S0.0 GENERAL NOTES AND ABBREVIATIONS DS DS 0
ANCHOR, ANCHORAGE ANCH LOCATION LOC
WORK. BE MADE VERTICAL TO A TOLERANCE OF WITHIN 1 TO 100. THE MAXIMUM PERMITTED DEVIATION OF THE FINISHED PILE 1.0 STRUCTURAL FOUNDATION
ANCHOR ROD AR LONG LG
FROM THE VERTICAL IS 1 IN 75, BUT NOT EXCEEDING 75MM MEASURED AT PILE CUT-OFF LEVEL. S1.1 FOUNDATION PLAN DS DS 0 APPROXIMATE APPROX LONG LEG HORIZONTAL LLH
EXISTING CONDITIONS SHOWN ON THE STRUCTURAL DOCUMENT ARE CONCEPTUAL & MUST BE VERIFIED IN THE FIELD BY 14. UNLESS NOTED OTHERWISE, MINIMUM COVER TO ALL PILE REINFORCEMENT (INCLUDING LINKS) SHALL BE 75MM. S1.2 FOUNDATION DETAILS DS DS ARCHITECT ARCH LONG LEG VERTICAL LLV
GENERAL CONTRACTOR PRIOR TO DETAILING, FABRICATION, & CONSTRUCTION OF RELATED WORK. 15. THE CONTRACTOR SHALL PRODUCE A PILE SCHEDULE GIVING PILE PLATFORM LEVEL AND TOE LEVEL FOR EACH PILE, WITH S1.3 FOUNDATION DETAILS DS DS 0 LONG SLOTTED HOLES LSH
LEVELS RELATIVE TO ORDNANCE DATUM. 2.0 STRUCTURAL FRAMING PLANS LOW POINT LP
ALL ITEMS REQUIRED BY OTHER DISCIPLINE'S WORK & IMPACTING THE STRUCTURAL WORK SUCH AS CASTING OF 16. THE CONTRACTOR SHALL SUBMIT A COMPLETE METHOD STATEMENT FOR THE INSTALLATION OF THE BORED PILING, BACK TO BACK BB
S2.1 GROUND FLOOR FRAMING PLAN DS DS 0
ANCHORS, SLEEVES, CONDUITS, OPENINGS, SUPPORTS FOR & BRACING FOR NON-STRUCTURAL COMPONENT SHALL BE INCLUDING CONCRETE MATERIAL MIXES, SLURRY MATERIAL, SHOP DRAWINGS, MILL CERTIFICATES AND STEP BY STEP BALANCE BAL
S2.2 FIRST FLOOR FRAMING PLAN DS DS 0
IDENTIFIED BY SUBCONTRACTORS RESPONSIBLE FOR SUCH WORK & SUBMITTED WITH DETAILS FOR STRUCTURAL INSTALLATION AND MONITORING PROCEDURE IN ACCORDANCE WITH THE PILING SPECIFICATION FOR ENGINEER'S BEAM BM
ENGINEER'S APPROVAL. APPROVAL. S2.3 SECOND FLOOR FRAMING PLAN DS DS 0 MANUFACTURER MFR
BEARING BRG
17. THE CONTRACTOR SHALL SUBMIT ON DAILY BASIS, INSTALLATION LOGS AND LOCATION SURVEY FOR EACH PILE CAST. S2.4 THIRD FLOOR FRAMING PLAN DS DS 0 MASONRY MAS
BENT BT
THE SEOR IS NOT RESPONSIBLE FOR MEANS, METHODS, AND SEQUENCE OF WORK. ALL TEMPORARY BRACING, SHORING, 18. THE CONTRACTOR SHALL NOT VARY THE PILE DIAMETER SHOWN ON THE DRAWING WITHOUT WRITTEN APPROVAL OF S2.5 FOURTH FLOOR FRAMING PLAN DS DS 0 MAXIMUM MAX
BETWEEN BTWN
COMPLIANCE WITH OSHA REGULATIONS & SOILS REPORT AND GENERAL STABILITY OF INDIVIDUAL STRUCTURAL THE ENGINEER AND ONLY IF IT CAN BE DEMONSTRATED THAT THE DIAMETERS SHOWN ARE INSUFFICIENT. MECHANICAL MECH
S2.6 ROOF FRAMING PLAN DS DS 0 BLOCKING BLKG
COMPONENT DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 19. REFER TO SITE INVESTIGATION REPORT FOR CLASS OF CONCRETE BELOW GROUND. CONCRETE TO BE AT MINIMUM MEZZANINE MEZZ
3.0 STRUCTURAL DETAILS BOTTOM OF B/
DESIGNED TO SULPHATE CLASS DS-4 TO CONTAIN SULPHATE RESISTING CEMENT WITH A MINIMUM CEMENT CONTENT MIDDLE MID
S3.1 DETAILS DS DS BOTTOM BOT
WHERE SPECIFIC DETAILS ARE NOT IDENTIFIED ON THE STRUCTURAL PLANS, REFER TO TYPICAL DETAILS AND UTILIZE OF 400KG/M. MINIMUM MIN
BOTTOM OF CONCRETE B/C
S3.2 DETAILS DS DS MISCELLANEOUS MISC
INDUSTRY STANDARD PRACTICE AS IDENTIFIED IN SPECIFIED CODES, REGULATIONS, AND STANDARDS. 20. REFER TO ASPIRE CONSULTING ENGINEERS PILE SPECIFICATION FOR FURTHER DESIGN AND CONSTRUCTION BOTTOM OF METAL DECK B/MD
REQUIREMENTS. 4.0 STRUCTURALS COLUMNS ANDS WALLS
BOTTOM OF PIER B/P
S4.1 COLUMN SCHEDULE DS DS
BOTTOM OF WALL B/W
6.0 STRUCTURAL ELEVATIONS BRICKLEDGE BL NEAR FACE NF
S6.1 ELEVATION DS DS 0 BRIDGING BRDG NEAR SIDE NS
S6.2 ELEVATION 2 DS DS 0 BUILDING BLDG NEW (N)
NOT IN CONTRACT NIC
S6.3 SECTIONS DS DS 0
NOT TO SCALE NTS
S6.4 3D VIEW DS DS 0

CANTILEVER CANT
SPECIFIC NOTES CENTER CTR OUTSIDE FACE O.F.
CENTER TO CENTER CC ON CENTER OC
DESIGN CRITERIA CENTERLINE CL OPENING OPNG
CLEAR CLR OPPOSITE OPP
1. EUROPEAN STANDARDS, UK COLUMN, COLUMNS COL OPPOSITE HAND OPPHD
EUROCODE 1, EUROCODE 3 CONCRETE CONC ORDINARY CONCENTRICALLY
CONCRETE MASONRY UNIT CMU BRACED FRAME OCBF
CONNECT CONN ORDINARY MOMENT FRAME OMF

CONSTRUCTION
PRELIMINARY
GRAVITY LOADS CONNECTION CONX OUT TO OUT OO
CONSTRUCTION CONST OUTSIDE DIAMETER OD

NOT FOR
1. GENERAL LOADS U.O.N CONSTRUCTION JOINT CJ
PERMANENT LOADS - CONTROL JOINT CJ
TOTAL AREA LOADS - 2 KN/m2 CONTINUE, CONTINUOUS CONT
EXTERIOR WALL LOADS - 9.9 KN/m POWDER ACTUATED FASTENER PAF
CONTRACTOR CONTR
INTERIOR WALL LOADS - 9.9 KN/m PIER CAP, PILE CAP PC
COORDINATE COORD
IMPOSED LOADS PLATE PL
OFFICE AREA - 3 KN/m2 PLUMBING PLMB
STORAGE AREA - 10 KN/m2 PLYWOOD PLYWD
SNOW 0.3 KN/m2 POINT PT
DEAD LOAD DL
POUND PER SQUARE FOOT PSF
DEGREE DEG
LATERAL LOAD POUND PER SQUARE INCH PSI
DIAGONAL DIAG
WIND LOADS PER EN1991 PRECAST P/C
DIAMETER DIA
A. WIND SPEED: 22 m/s PRECAST PREFABRICATED PREFAB
DOWEL DWL

DATE
B. SITE ELEVATION: 7.97m DOWN DN
C. TERRAIN CATEGORY : TOWN TERRAIN DRAWING DWG
QUANTITY QTY

EACH EA RADIUS RAD


EACH END EE REFER, REFERENCE REF
EACH FACE EF REINFORCING OR REINFORCEMENT REINF

REVISIONS
EACH SIDE ES REQUIRED REQD
EACH WAY EW ROOF TOP UNIT RTU
ECCENTRICALLY BRACED FRAME EBF

ISSUE
CONCRETE
EDGE OF SLAB EOS
ELECTRICAL ELEC SCHEDULE SCHED
1. DETAILING, FABRICATION AND REINFORCING STEEL -- PER CRSI MANUAL
ELEVATION EL SECTION SECT
OF STANDARD PRACTICE.
ELEVATOR ELEV SHEAR WALL SW
2. REINFORCING STEEL -- ASTM A615, GRADE 60.
EMBEDMENT EMBED, EMB SHEET SHT
3. MINIMUM 28 DAY CONCRETE STRENGTH -- 30/32MPa, UNLESS NOTED OTHERWISE.
ENGINEER ENG SHEET METAL SHTMTL
4. LAP FOR CONTINUOUS REINFORCING BARS -- 60 DIAMETERS, BUT NOT LESS
EQUAL EQ SIMILAR SIM
THAN 6m, UNLESS NOTED OTHERWISE.
EXISTING EXIST OR (E) SLAB ON GRADE SOG
LAP TOP REINFORCEMENT AT MID-SPAN.
EXPANSION EXP SLIP CRITICAL SC
LAP BOTTOM REINFORCING AT SUPPORT.

NO.
EXPANSION JOINT EJ SPACE SPA
LAP WELDED WIRE FABRIC ONE SPACING OF CROSS WIRES PLUS 2".
EXTERIOR EXT SPECIFICATIONS SPEC
5. CORNER BARS -- MATCH HORIZONTAL REINFORCEMENT. SEE DETAIL.
ESTIRRUPS EST. SPECIAL SP
7. OPENINGS IN CONCRETE WALLS -- 2-H15 TRIMMER BARS AT JAMBS AND 2-N15
SPECIAL CONCENTRICALLY
HEADER BARS AT TOP AND BOTTOM. EXTEND BARS A MINIMUM OF 6m PAST
BRACED FRAME SCBF
EACH CORNER OF OPENING OR HOOK IF EXTENSION IS NOT POSSIBLE.
SPECIAL MOMENT FRAME SMF
8. SLAB OPENINGS -- 2-H15 BARS ON EACH SIDE. EXTEND BARS A MINIMUM OF 2'-0"
FABRICATOR FAB SQUARE SQ
PAST EACH CORNER OF OPENING OR HOOK IF EXTENSION IS NOT POSSIBLE.
FACE OF BRICK F.O.B. STAINLESS STEEL SS
9. MINIMUM CONCRETE COVER FOR REINFORCING BARS:
FAR FACE FF STANDARD STD
SLABS (EXCEPT SLABS ON GRADE) . . . .25mm
FAR SIDE FS STEEL STL

PROJECT NAME
BEAMS AND COLUMNS . . . . . . . . . . . . . . .37mm TO TIES OR STIRRUPS
FIELD VERIFY FV STIFFENER STIFF
WALLS . . . . . . . . . . . . . . . . . . . . . . . . . . . .37mm EXTERIOR FACE, 28mm INTERIOR FACE
FINISH, FINISHED FIN STRUCTURAL STRUC
CONCRETE CAST AGAINST EARTH . . . . .76mm

PROJECT ADDRESS
FINISH FLOOR ELEVATION FFE SYMMETRICAL SYM
JOIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25mm
FIRE TREATED F.T.
10. REINFORCING BAR LENGTHS WITH STANDARD HOOKS DO NOT INCLUDE THE
FLANGE FLG
LENGTH OF THE HOOK.
FLOOR FLR
11. BLOCKING, SLEEVES, BOLTS, AND ANCHORS REQUIRED TO BE SET IN CONCRETE
FLOOR DRAIN FD
OR TO BE ATTACHED TO STEEL -- PER ARCHITECTURAL AND MECHANICAL DRAWINGS.
FOOTING FTG THICK, THICKNESS THK OR T
FOUNDATION FDN THREAD, THREADED THD
TIE BEAM TB
TO BE REMOVED TBR
TOP OF T/
GALVANIZED GALV TOP & BOTTOM T&B
GAUGE GA TOP OF CONCRETE T/C
GIRDER TRUSS GT TOP OF FOOTING T/F
FOUNDATION GLUE-LAMINATED BEAM GLB TOP OF MASONRY T/M
GRADE GR TOP OF PIER, PILASTER T/P
1. GEOTECHNICAL INVESTIGATION --- GRADE BEAM GB TOP OF PIER CAP, PILE CAP T/PC
2. SOIL BEARING PRESSURE --- 2000 PSF. TOP OF STEEL T/S
3. BACK FILL --- DO NOT PLACE AGAINST ANY WALL UNTIL ALL SUPPORTING ELEMENTS ARE POURED AND CURED FOR 48 TOP OF SLAB T/SL
HOURS, INCLUDING SLABS ON GRADE. HEADED HD TOP OF WALL T/W
4. REINFORCED CONCRETE BORED CAST-IN-PLACE PILES OF CIRCULAR CONFIGURATION SHALL BE DESIGNED AND HEIGHT HT TREAD T OR TR
INSTALLED BY THE CONTRACTOR. PILE WORKING LOADS SHALL BE ARRIVED AT AS SHOWN BELOW THE PILES SHALL BE HOLLOW CLAY TILE HCT TYPICAL TYP
DESIGNED GEOTECHNICALLY AND STRUCTURALLY TO RESIST THE COMBINED EFFECT OF THE VERTICAL AND HORIZONTAL HOOK HK
LOAD. HORIZONTAL HORIZ, HOR
UNLESS NOTED OTHERWISE UNO
5. CUT-OFFS BELOW GROUND LEVEL. THIS TOLERANCE SHALL ENSURE THAT PILE HEADS ARE CAST TO A LEVEL ABOVE THE
SPECIFIED CUT-OFF SO THAT, AFTER TRIMMING, A SOUND CONCRETE CONNECTION WITH THE PILE CAN BE MADE IN

09/21/15
As indicated
DS
DS
ACCORDANCE WITH THE SPECIFIED STRENGTH AND DURABILITY REQUIREMENTS. VERTICAL BRACE VB

SHEET INFORMATION
INFORMATION INFO
6. THE CONTRACTOR SHALL MAKE REFERENCE TO THE SOIL INVESTIGATION FACTUAL REPORT IN HIS CALCULATIONS. ANY VERTICAL, VERTICALLY VT OR VERT
INSIDE DIAMETER ID
FURTHER INVESTIGATION NECESSARY TO SUBSTANTIATE THE DESIGN IS AT CONTRACTOR'S EXPENSE. VERIFY IN FIELD VIF
INSIDE FACE I.F.
7. CONCRETE SHALL BE IN ACCORDANCE WITH THE SPECIFICATION FOR CAST IN PLACE CONCRETE FOR PILING WORKS. VARIES VAR
INTERIOR INT
DURABILITY REQUIREMENTS SHALL COMPLY WITH THE SPECIFICATION FOR CONCRETE-SEVERE EXPOSURE.
INTERMEDIATE MOMENT FRAMEIMF
8. SPLICE BARS BY LAPPING A MINIMUM OF 50 DIAMETERS. MECHANICAL SPLICES MAY BE USED AFTER DEMONSTRATING
WELDED WIRE REINFORCING WWR
TO THE ENGINEER THAT THE SPLICE CAN DEVELOP 1.25 X THE SPECIFIED YIELD STRENGTH OF THE BAR.
WITH W/

Job Number:
9. MINIMUM STEEL PROJECTION OF LONGITUDINAL REINFORCEMENT ABOVE CUT OFF LEVEL SHALL BE 50 BAR DIAMETERS

Checked By:
JOINT JT WOOD WD
U.N.O.
WORKING POINT WP

Drawn By:
10. THE PILING CONTRACTOR SHALL INSTALL THE PILES FROM THE PILE WORKING PLATFORM LEVEL. THE PILES ARE TO BE JOIST SUBSTITUTE JS
JOIST JST WATERSTOP, WATERSEAL WS
CONCRETED FROM PILE TOE LEVEL TO THE LEVEL SHOWN IN THE TYPICAL PILE DETAIL.
11. PROVIDE PLASTIC SLEEVES TO BARS ABOVE CUT OFF LEVEL FOR EASY REMOVAL.

Scale:
Date:
12. SET OUT OF THE MAIN GRID LINES SHALL BE CARRIED OUT BY THE CONTRACTOR. THE INSTALLATION OF PILES AT KNEE BRACE KB X-BRACING X-BR
POSITIONS AS REQUIRED BY THE ENGINEER SHALL BE ACCURATE TO 75 MM HORIZONTALLY IN ANY DIRECTION. AN
ADDITIONAL TOLERANCE SHALL BE REQUIRED FOR A PILE CUT-OFFS BELOW GROUND LEVEL. THIS TOLERANCE SHALL
ENSURE THAT PILE HEADS ARE CAST TO A LEVEL ABOVE THE SPECIFIED CUT-OFF SO THAT, AFTER TRIMMING, A SOUND
CONCRETE CONNECTION WITH THE PILE CAN BE MADE IN ACCORDANCE WITH THE SPECIFIED STRENGTH AND
DURABILITY REQUIREMENTS.
Sheet Name:
GENERAL
NOTES AND
DETAILS AND NOTES SHOWN ON TYPICAL ABBREVIATIONS
DETAIL SHEETS ARE TO BE USED UNLESS
NOTED OTHERWISE ON OTHER SHEETS. Sheet No:

S0.0
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8
52.25
2.85 5.00 5.15 13.13 7.03 4.75 11.56 2.79
0.38
0.47 0.45 0.55 0.45 0.49 0.45 0.45 0.45 0.59 0.45 0.58 0.45 0.47 0.45 0.45 0.38 0.45 0.45 0.49 0.45 0.51

PILE 500mm DIA.


E

0.80
PILE 500mm DIA.

0.57
0.62
DEAD=100KN DEAD=100KN DEAD=100KN DEAD=100KN DEAD=100KN DEAD=100KN 6 DEAD=100KN
LIVE= 50KN LIVE= 50KN LIVE= 50KN PILE 300mm DIA. LIVE= 50KN PILE 300mm DIA. LIVE= 50KN LIVE= 50KN S1.2 LIVE= 50KN
B800X500C30
5 Sim

0.45
PILE 500mm DIA. PILE 500mm DIA. PILE 500mm DIA. PILE 500mm DIA. PILE 500mm DIA. 1 PILE 500mm DIA.
S1.2
S1.2

4.41
0.45
6.21

Retaining wall DEAD=100KN

PILE 300mm DIA.


0.80 3.20 2.50 2.65 2.50 10.63 2.50 4.78 2.00 2.50 2.50 9.71 2.85 0.80
LIVE= 50KN
0.50 1.50 0.50
11 UC305x305x118
UC356x356x177

0.58
S1.2 UC356x356x177
UC356x356x177
PC-5
0.63
PILE 500mm DIA.

2.50
PC3
D PC-5 PC-5 PC-5

CONSTRUCTION
DEAD=400KN 1

PRELIMINARY
UC356x356x177
LIVE= 300KN

0.45
S1.3 UC356x356x177 DEAD=1150KN

NOT FOR
DEAD=2250KN DEAD=1250KN DEAD=1400KN
DEAD=1100KN LIVE= 1250KN
DEAD=2000KN -3350 LIVE= 1020KN LIVE= 650KN LIVE= 1550KN
LIVE= 1300KN

PILE 300mm DIA.


LIVE= 1320KN 9
B800X500C30

6
0.45

12
5.10

2.85
10 S1.2
S1.3 S1.2
S1.2 UC356x368x129 B800X500C30
UC305x305x118 -3350 UC305x305x97
21.11

UC305x305x118 Slab on grade


DEAD=300KN UC305x305x118
PILE 500mm DIA.
0.53

PILE 500mm DIA.


LIVE= 250KN

2.00
PC3 PC3
C PC-4 PC-4 PC-5

0.52
with 6.5mm@150mm
electrowelded mesh each DEAD=500KN
DEAD=950KN direction LIVE= 600KN
DEAD=1000KN Slab on grade

DATE
DEAD=1450KN LIVE= 500KN
LIVE= 1100KN 3 DEAD=1220KN
LIVE= 1000KN DEAD=1500KN

PILE 300mm DIA.


PILE 300mm DIA.

S1.3 -5150 LIVE= 820KN 2.15 LIVE= 1620KN


2.50

with 6.5mm@150mm
0.45

1.90
PC4-ELEV PC4-ELEV

PILE 500mm DIA.


1.70

0.45
electrowelded mesh each 2
5.55

3.55
direction DEAD=600KN
2 DEAD=600KN S6.2
DOUBLE MESH LIVE= 200KN
S1.3 LIVE= 200KN
30mm CLEAR COVER 2.35

REVISIONS
2.95
UC356x368x129
UC356x368x129 Sim
PILE 300mm DIA.

UC305x305x97
0.64

1
DEAD=200KN S1.2

ISSUE
LIVE= 200KN

2.00
PC3 PC3
B PC-4 PC-4 -3350 PC-5

0.55
PILE 300mm DIA.

UC356x368x129 DEAD=400KN
DEAD=1050KN LIVE= 500KN
DEAD=950KN
UC356x368x129 DEAD=1520KN DEAD=1520KN LIVE= 550KN DEAD=1220KN 1
0.45

LIVE= 950KN
LIVE= 950KN LIVE= 850KN LIVE= 1700KN
4.26

0.45
2.71 S1.2

DEAD=300KN DEAD=300KN DEAD=450KN DEAD=50KN PILE 300mm DIA. DEAD=500KN PILE 300mm DIA. DEAD=350KN DEAD=400KN PILE 300mm DIA. DEAD=300KN

NO.
LIVE= 300KN LIVE= 250KN LIVE= 250KN LIVE= 10KN LIVE= 250KN LIVE= 150KN LIVE= 300KN LIVE= 250KN

0.56
0.48

0.80

A
0.47 0.45 0.55 0.45 0.49 0.45 0.45 0.45 0.59 0.45 0.58 0.45 0.43 0.45 0.45 0.45 0.43

1 1 PILE 500mm DIA.

PROJECT NAME
PILE 500mm DIA. PILE 500mm DIA. PILE 500mm DIA. S6.1 PILE 500mm DIA. PILE 500mm DIA. PILE 500mm DIA. S6.2

PROJECT ADDRESS
BASEMENT
1 : 100

PILE CAP SCHEDULE


FOOTING SIZE REINFORCING
EA. WAY TOP
& BOTTOM

09/21/15
As indicated
DS
DS
SHEET INFORMATION
FOUNDATION PLAN LEGEND MARK LENGTH WIDTH THICKNESS (U.N.O.) COMMENTS
PC1 800 1200 800 1 X 400mm PILE 1000KN BEARING CAPACITY
SW LOCATION OF SHEAR WALL.
PC2 800 1800 800 2 X 400mm PILE 1000KN BEARING CAPACITY EACH
VB-X LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS. PC3 1800 2000 689 3 X 400mm PILE 1000KN BEARING CAPACITY EACH
FOUNDATION PLAN NOTES: PC4-ELEV 4 X 400mm PILE 1000KN BEARING CAPACITY EACH
C-X COLUMN TYPE PC-4 2000 2000 800 4 X 400mm PILE 1000KN BEARING CAPACITY EACH

Job Number:
Checked By:
1. FINISHED FLOOR SLAB ELEVATION = -3.15m.
PC-5 2500 2500 800 5 X 400mm PILE 1000KN BEARING CAPACITY EACH
2. SEE SHEET S1.X FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS.

Drawn By:
F-X FOOTING TYPE PILE 300mm DIA.
3. SEE SHEET S1.X FOR FOOTING SCHEDULE FOR FOOTING SIZE AND REINFORCING.
4. SEE SHEET S1.X FOR TYPICAL FOUNDATION DETAILS. PILE 400mm DIA.
DP-X DRILLED PIER TYPE

Scale:
4. SEE SHEET S1.X FOR DRILLED PIER SCHEDULE FOR DRILLED PIER SIZE AND REINFORCING. PILE 500mm DIA.

Date:
5. SEE SHEET S1.X FOR COLUMN SCHEDULE FOR COLUMNS, BASE PLATES AND ANCHOR BOLTS.
PC-X PILE CAP TYPE
5. TOP OF FOOTINGS ARE NOTED THUS (XX'-X") ON PLAN.
6. TOP OF INTERIOR FOOTING (T/F) ELELVATION = SEE PLAN.
XXXKN DEAD/ LIVE LOAD IN KILONEWTONS ON FOOTING
7. TOP OF EXTERIOR FOOTING (T/F) ELEVATION = SEE PLAN.
8.
9.
TOP OF DRILLED PIER (T/DP) ELEVATION = SEE PLAN.
TOP OF PILASTER (T/P) ELEVATION = SEE PLAN. TYPICAL PILASTER SIZE IS X"xX" U.N.O.,
CAPACITY DESIGN OF 400mm PILE TO BE 1100KN Sheet Name:
SEE DETAIL X ON S1.X FOR REINFORCING.
10.
11.
TOP OF PIER CAP (T/PC) ELEVATION = SEE PLAN.
COLUMN FOOTINGS ARE CENTERED EACH WAY ON COLUMN CENTERS (U.N.O.) FOUNDATION
12. FOR OVER EXCAVATION, BACK FILL, AND COMPACTION UNDER SLABS ON GRADE, SEE
CIVIL DRAWINGS AND SPECS. PLAN
13. PLUMBING SHOWN FOR REFERENCE ONLY - SEE PLUMBING DRAWINGS. FOUNDATION PLAN LEGEND N
NOT TO SCALE
0 8' 16' 24' Sheet No:
W E
SCALE: 1/8" = 1'-0"
S
S1.1
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
400 mm

GROUND
0
2

0.50
Pile stirrups to
S1.2 Pile bars to be 1 continue 120mm to
embeded with 0.40 1.20 0.40
B500X500C30 S1.2 the cap beam
beam

100 mm 250 mm GROUND 400 mm 400 mm

120 mm
0
400mm PILE 1000KN
min. bearing Capacity
the piles shall be designed
geotechnically and structurally to
0.15

425 mm

0.40
resist the combined effect of the

500 mm
vertical load provided and

600 mm
horizontal ground load.
Diameter may be increased based
on geotech design.

1200 mm
PILE RETAINING WALL
PILE 300mm DIA.
H16 @200

75 mm
2.65
15 -H16

2.00

1.20
600 mm
@200

BASE PLATE

800 mm
SLAB ON 150 mm 300 mm 150 mm 300 mm 150 mm PILE 300mm DIA.

0.40
GROUND 200mm PILE 300mm DIA.

BASEMENT
-3150 NOTES:
0.20

CONSTRUCTION
400mm PILE 1000KN min.

PRELIMINARY
Breaking out of pile to expose reinforcement above cut off level. Clean 2.00 bearing Capacity
3 pile and exposed reinforcement and remove all

NOT FOR
S1.2 laitance.
DOUBLE MESH
Retaining piles and bearing piles design by others
A252
30mm CLEAR B800X500C30
COVER PILE CONTINUES TO
DEEP RECOMENDE BY
PILE DESIGNER

RETAINING WALL RETAINING PILES WITH BEAM CONNECTION PILE CAP PC-1 PILE CAP PC-4
1 1 : 25 4 1 : 10 7 1 : 25 10 1 : 25

DATE
2.50
0.50 1.50 0.50

800 mm 400mm PILE 1000KN min.


bearing Capacity

REVISIONS
500 mm

0.50

ISSUE
400 mm
900 mm

750 mm
51 mm 373 mm 76 mm

H10 @300 L= 2.4m 450 mm 450 mm

1800 mm

1000 mm

2.50
1.50
GROUND
51 mm

the piles shall be designed Allow concrete from


0 geotechnically and structurally to retaining wall to

NO.
resist the combined effect of the extend to half

750 mm
vertical load provided and horizontal thickness of piles

900 mm
0.22 H12 @100 ground load.
Diameter may be increased based on
398 mm

geotech design.

400 mm
3 -H25

250 mm
150 mm

100 mm

BASE PLATE
1

PROJECT NAME
3 -H25

500 mm
S1.3

0.50

PROJECT ADDRESS
51 mm

H16 @200 H16 dowels @600 OC vertically


note: Allow deck to embedded into pilewall with Hilti Pile wall to be cleaned back to half
CONCRETE WALL 200mm 400 mm 400 mm
support on beam, Hy diameter of pile and pile to be
provide temporary 200-A power washed.
shoring while casting PILE RETAINING WALL BEHIND min Embedment 225mm 500 mm 750 mm 750 mm 500 mm
beam

400mm PILE 1000KN min.


bearing Capacity
B500X500C30 TYPICAL PILE RETAINING WALL PILE CAP PC-2 PILE CAP PC-5
2 1 : 10 5 1 : 20 8 1 : 25 11 1 : 25

EXPANSION JOINT BETWEEN WALL


AND SLAB 0.50 1.00 0.50

SLAB ON
ELECTROWELDED MESH 6.0mm@150mm

12/11/19
As indicated
DS
DS
SHEET INFORMATION
GROUND 200mm
H16 dowels @300 OC vertically embedded TOP & BOTTOM
BASEMENT Wall reinforcement not into pile with Hilti Hy OVERLAPS 150mm

0.40
-3150 shown for calrity 200-A
min Embedment 225mm
238 mm

1.00
1.07

Job Number:
Checked By:
0.67
BASEMENT

Drawn By:
4 -H25 CONT.
1.00

-3150

200 mm
H16 @200

Scale:
VAPOUR BARRIER

Date:
386 mm

0.33
GRAVEL 150mm 2 -H25 CONT.

0.80
0.73

150 mm
3 -H12 @150 Remaining part of the pile may be Pile wall to be cleaned back
to half diameter of pile and pile to
Sheet Name:
0.40

demoled to the edge of the wall


4 -H25 CONT. (as per Contractor indications) be
or can be filled with concrete as power washed.

4-H20 DOWEL@PILE
76 mm 420 mm
per owner request.
FOUNDATION
EMBEDED LENGHT 220mm 0.40 1.20 0.40
TOTAL LENGHT 400mm DETAILS
VAPOR BARRIER
400mm PILE 1000KN
min. bearing Capacity COMPACTED GRAVEL
ALLOW CONCRETE TO CAST
BETWEEN PILES
Sheet No:

3
B800X500C30
1 : 10 6
RETAINING WALL TO 500mm PILE
1 : 20 9
PILE CAP PC-3
1 : 25 12
SLAB ON GROUND
1 : 10 S1.2
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
75 mm VAR VAR 75 mm
X - THE SIDE OF BASE PLATE X IS
800 mm 900 mm 850 mm

75 mm
OBTAINED BY ADDING 150mm FROM
THE COLUMN.
A - THE MAXIMUM SIZE OF FILLET
WELD IS OBTAINED BY SUBTRACTING
200 mm 2150 mm 200 mm 2.0mm FROM THICKNESS OF THINNER

VAR
X
MEMBER TO BE JOINTED
EXPANSION JOINT
SHEAR WALL EXPANSION JOINT

75 mm
SLAB ON
GROUND 200mm BASEMENT
-3150 A
X
S355
A
TOP VIEW
SLAB ON
GROUND 200mm COMPACTED GRANULAR FILL
SLAB ON
GROUND 200mm
BASEMENT
200 mm

-3150 H10 @200 COLUMN AS SHOWN


@direction

2.00
H10 @200
@direction @face BASE PLATE t=32mm
H16 @200 H10 @200
@face
@direction H10 @200 M24 BOLT
H16 @200
800 mm

@direction

425 mm 32 mm
@face
@face
H16 @200
COMPACTED GRANULAR FILL
H16 @200 LEVELING PLATE t=
8mm
H16 @200
H16 @200
H16 @200 GROUT MAX 25mm

MIN. EMBEDED
50mm P.C.C H16 @200

600 mm
PILES AS PER LATERAL VIEW FRONTAL VIEW

0.80

CONSTRUCTION
DESIGN H16 @200

PRELIMINARY
PILES AS PER
DESIGN
BASE PLATE

NOT FOR
PILES
REINFORCEMENT
H16 @200 5 1 : 20
PILES
REINFORCEMENT 50mm P.C.C H16 @200

PILES AS PER DESIGN

PILES AS PER DESIGN

DATE
PILE CAP REINFORCEMENT ELEVATOR PIT
1 1 : 25
3 1 : 25

REVISIONS
m
ISOLATION JOINT

ISSUE
0
80
NON-SHRINK CONC. ALL
AROUND

CONSTRUCTION OR
CONTRACTION JOINT

80

NO.
0
m
m
300 mm 2350 mm 300 mm

PROJECT NAME
1000 mm 900 mm 1050 mm 1A 1
CONSTRUCTIONS JOINTS AT SLAB ON GROUND

PROJECT ADDRESS
6 1 : 20
SAW JOINT
300 mm

2 -H16 SLAB ON NORMAL 2 -H16 H12 @200


GROUND
200 mm

DOUBLE MESH A252


30mm CLEAR COVER GROUND 200mm CONCRETE C30/33 0
305 mm

120 mm
380 mm
3
S1.3

H12 DOWEL @ 150mm


2500 mm

1900 mm

1700 mm

305 mm OVERTHICKNESS 150mm GREASED

PC4-ELEV COMPACTED
GRAVEL
MIN. B500X500C30
GROUND
200 mm 2150 mm 200 mm PILE RETAINING WALL

PILE 300mm DIA.

76 mm144 mm 144 mm 144 mm 144 mm76 mm


0
2 - M20mm 6.8 ANCHORS
L=400mm WITH HOOK
-5150

12/16/19
As indicated
DS
DS
200 mm

SHEET INFORMATION
2 - M20mm 6.8 ANCHORS
300 mm

L=400mm WITH HOOK


400mm PILE

728 mm
BASE PLATE 22mm
400 mm 2150 mm 400 mm

Job Number:
Checked By:
Drawn By:
2 - M20mm 6.8 ANCHORS
2950 mm L=400mm WITH HOOK

Scale:
Date:
PLATE INTO 100mm POCKET IN
RETAINING WALL
80 mm 249 mm 80 mm
409 mm Sheet Name:

FOUNDATION
ELEVATOR PIT SLAB ON GROUND - ELEV +0.0 7 STEEL BEAM TO CONCRETE CAP CONNECTION DETAILS
2 1 : 25
4 1 : 20 S2.1 1 : 10

Sheet No:

S1.3
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8

2.85 5.00 5.15 20.16 4.75 11.56 2.79

B500X500C30
E 7
S1.3 1
11
1 S6.2
S3.2
UB406X140X39 (6) UB356X127X33 (6) UB533X210X101 (15) c S6.1
= 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (13)

UB533X210X101 (3)
UB457X152X52 (3)

UB457X191X74 (3)

UB533X210X82 (3)

UB533X210X82 (3)
UB457X191X74 (3)
UB254X102X22 3

1.90

1.90

6.21
DEAD=350KN
LIVE= 100KN
UB406X140X39 (6) UB356X127X33 (6) UB533X210X101 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (13)

UB254X102X22 (3)UB254X102X22 (3)


UB254X102X22 (6)
B300X300C28 120mm Concrete UB254X102X22 (3)
NORMAL Weight
11
2.16

2.16
2.90 on 60mm
Composite deck S3.2
8
UB406X140X39 (6) UB356X127X33 (6) UB533X210X122 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (30)

CONSTRUCTION
D S1.2

PRELIMINARY
UB254X102X22 (3)
B300X300C28

NOT FOR
7
2.58

2.57
S1.2 0

UB457X191X67 (3)

UB533X210X82 (3)
UB457X191X67 (3)

UB457X191X67 (3)

UB457X191X67 (3)

UB533X210X122 (3)
UB406X140X39 (6) UB356X127X33 (6) UB533X210X101 (15) c = 30 UB406X140X39 (8)

5.10
UB610X229X101 (30)

UB254X102X22 (3)
UB356X127X33 (6)
B300X300C28
10 UB356X127X33 (3)
2.52

2.52
2.20

B500X500C30
DEAD=200KN

1.75
S3.2
B500X500C30

LIVE= 70KN
UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)
UB254X102X22 (3)

UB533X210X101 (15) c = 30 UB610X229X125 (16) c = 20


C 0
120mm Concrete

DATE
1.75

UB254X102X22 (3) B200X400C30 UB254X102X22 (3) Light Weight on UB254X102X22 (3) B200X400C30 UB254X102X22 (3) 10

2.80
Slab on grade 60mm Composite S3.2
UB406X140X39 (6)
UB254X102X22 (3)

UB533X210X101 (3)
SHEAR WALL e= deck SHEAR WALL e=
UB457X152X52 (3)

UB457X152X52 (3)

UB457X191X67 (3)

UB406X140X39 (3)
SLAB ON 200mm C30/33 200mm C30/33
GROUND 200mm
2
1.76

UB406X140X39 (8)

5.55
UB533X210X101 (15) c = 30 UB610X229X125 (16) c = 20
with 6.5mm@150mm S6.2

REVISIONS
electrowelded mesh UB406X140X39 (6)
each direction
120mm Concrete

2.75
1.33

UB356X127X33 UB356X127X33
UB254X102X22 (3)UB127X76X13

UB127X76X13
Light Weight on

ISSUE
UB457X152X52 (6) 0
60mm Composite
deck
UB356X127X33 (6) UB533X210X101 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X125 (16) c = 20
B

UB254X102X22 (3)
2.40

2.16

UB356X127X33 (3)
UB406X140X46 (3)

UB406X140X46 (3)

UB406X140X46 (3)

UB457X191X67 (3)
4
S1.3 UB406X140X39 (6)
UB356X127X33 (6) UB406X140X39 (8)

4.26
UB533X210X101 (15) c = 30 UB356X127X33 (6) UB610X229X125 (16) c = 20 1
UB254X102X22 (3)

UB254X102X22 (3)

NO.
S1.2

4
A B500X500C30 S1.2

PROJECT NAME

PROJECT ADDRESS
GROUND
1 : 100

FRAMING PLAN LEGEND


INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB

11/15/19
As indicated
DS
DS
SHEET INFORMATION
WITH A193 MESH
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x


1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH, ADD FIBEr
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

Job Number:
Checked By:
Drawn By:
FRAMING PLAN NOTES: INDICATES 200mm SLAB ON GROUND

Scale:
Date:
1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS
2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS. INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF
3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS BEAM
4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS.
5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK = INDICATES SPAN OF DECK / CONCRETE SLAB
120mm TOTAL. REINFORCE SLAB WITH A193 MESH Sheet Name:
6. TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm LOCATION OF SHEAR WALL.
7. REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS.
SW
GROUND
8. REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS. LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS.
VB-X
9. FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE
COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION. COLUMN TYPE
FLOOR
C-X
N FRAMING PLAN
W E Sheet No:
FRAMING PLAN - TYPICAL FLOOR LEGEND
NOT TO SCALE S
S2.1
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8
52.25
2.85 5.00 5.15 13.13 7.03 4.75 11.56 2.79

E
1
1 S6.2
S6.1
4
UC254x254x73 S3.1
UB356X127X33 (3)

UB356X127X33 (3)
6.21

UB254X102X22 (6)
UC305x305x97
UB457X152X52 (3)

UB533X210X92 (3)
UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (13) UB254X102X22 (6)

UB533X210X92 (3)
UB533X210X92 (3)

UB533X210X92 (3)
UB457X191X74 (3)
UB533X210X82 (3)

UB254X102X22 (3)UB254X102X22 (3)

CONSTRUCTION
UB254X102X22 (6)

PRELIMINARY
UC305x305x118 UC356x356x177 UC356x356x177 UC356x356x177 UC305x305x118 UC356x356x177

NOT FOR
UB457X191X67 (3)

UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (13)
D UB254X102X22 (6)

UB457X152X52 (3)
3750 UC356x356x177

UB457X191X67 (3)
UB457X191X67 (3)

UB533X210X82 (3)
UB356X127X33 (3)

UB533X210X82 (3)

UB533X210X82 (3)

UB533X210X82
UB406X140X39 (6) UB406X140X39 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6)
5.10

UB254X102X22 UB610X229X101 (13)


UB254X102X22 (3)

UC254x254x73 UC305x305x97 UC305x305x118 UC305x305x118 UC305x305x118 UC305x305x97 UC356x368x129 UB356X127X33 (6) UC356x356x177

DATE
21.11

UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)


UB254X102X22 (3)

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30


C

18.01
B200X400C30 B200X400C30
3750

REVISIONS
UB356X127X33 (3)

UB406X140X39 (6) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3)
UB457X152X52 (3)

UB457X152X52 (3)

UB457X191X67 (3)

UB406X140X39 (3)

UB533X210X82 (3)

UB533X210X82 (3)
UB254X102X22 (3)

UB406X140X39 (8) 2
5.55

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30

ISSUE
S6.2
UB406X140X39 (6)

UB356X127X33 UC356x368x129 UC356x368x129 UB356X127X33 (6) UC356x368x129 UC356x356x177


UB127X76X13

UB127X76X13
UC305x305x118
UB457X152X52 (6)
UB356X127X33 UB356X127X33 (6) UB356X127X33 (6)
UB533X210X82 (15) c = 30 UB406X140X39 (8) UB610X229X125 (16) c = 30
B
UB254X102X22 (3)

UB254X102X22 (3)
UB356X127X33 (6)

UB406X140X46 (3)

NO.
UC356x368x129 UC305x305x97

UB356X127X33 (3)
UB406X140X46 (3)

UB406X140X46 (3)

UB406X140X46 (3)

UB457X191X67 (3)

UB457X191X67 (3)
UB127X76X13 UB406X140X39 (6)
UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)
4.26

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30


UB254X102X22 (3)

UB254X102X22 (3)
UC305x305x118 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97

PROJECT NAME
UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X125 (16) c = 30
A UB356X127X33

PROJECT ADDRESS
51.30

1ST FLOOR
1 : 100
FRAMING PLAN LEGEND

09/21/15
As indicated
DS
DS
SHEET INFORMATION
INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x

Job Number:
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB

Checked By:
WITH A193 MESH, ADD FIBEr

Drawn By:
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

Scale:
FRAMING PLAN NOTES:

Date:
INDICATES 200mm SLAB ON GROUND

1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS


2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS.
INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF
3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS
BEAM
4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS. Sheet Name:
5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK =
INDICATES SPAN OF DECK / CONCRETE SLAB
120mm TOTAL. REINFORCE SLAB WITH A193 MESH
6.
7.
TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm
REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS. SW
LOCATION OF SHEAR WALL. FIRST FLOOR
8.
9.
REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS.
FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE VB-X
LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS. FRAMING PLAN
COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION.
COLUMN TYPE
C-X N
Sheet No:
W E
FRAMING PLAN - TYPICAL FLOOR LEGEND
NOT TO SCALE
S
S2.2
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8

52.25

E
1 1
S6.1 S6.2

0.37 2.81
3.00 3.00 3.50 3.00

UB356X127X33 (3)
UB356X127X33 (3)
6.21

UB254X102X22 (3)

0.60

0.60

0.60

UB533X210X92 (3)
UC254x254x73 UC305x305x97

UB457X191X67 (3)
UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 UB356X127X33 (6) UB610X229X101 (13) UB254X102X22 (3)

UB533X210X92 (3)
UB533X210X82 (3)

UB533X210X92 (3)

UB533X210X92 (3)
UB457X191X74 (3)

UB254X102X22 (3)UB254X102X22 (3)


2.16
UB254X102X22 (3) UC305x305x118 UC356x356x177 UC356x356x177 UC356x356x177 UC305x305x118 UC356x356x177 UC356x356x177
UB457X191X67 (3)

UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 UB356X127X33 (6) UB610X229X101 (13)
D UB254X102X22 (3)

UB457X152X52 (3)
7050

2.58
UB457X191X67 (3)

UB457X191X67 (3)

UB533X210X82 (3)
UB457X191X67 (3)

UB533X210X82 (3)

UB533X210X82 (3)

UB533X210X82 (3)
UB406X140X39 (6) UB406X140X39 (6) UB533X210X82 (15) c = 30 UB406X140X39 UB356X127X33 (6)
5.10

UB254X102X22 (3) UB610X229X101 (13)

CONSTRUCTION
UB254X102X22 (3)

PRELIMINARY
UB356X127X33 (3)

2.52

NOT FOR
UC254x254x73 UC305x305x97 UC305x305x118 UC305x305x118 UC305x305x118 UC305x305x97 UC356x368x129 UC356x356x177

UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 UB356X127X33 (6)


UB254X102X22 (3)

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30


C

60mm Composite
120mm Concrete

60mm Composite
120mm Concrete
Light Weight on

Light Weight on
1
1.75

18.01
B200X400C30 S4.1 B200X400C30

deck

deck
2.80
UB356X127X33 (3)

UB406X140X39 (6) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3)
UB254X102X22 (3)

UB457X152X52 (3)

UB457X191X67 (3)

UB406X140X39 (3)

UB533X210X82 (3)
UB457X191X67

UB533X210X82
2
1.76

UB406X140X39
5.55

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30


S6.2
UB406X140X39 (6)

DATE
UC305x305x118

2.75
1.33

UB356X127X33 UB356X127X33
UB127X76X13

UB254X102X22UB254X102X22 UB127X76X13
UC356x368x129 UC356x368x129 UC356x368x129 UC305x305x97 UC356x368x129 UC356x356x177
UB457X152X52 (6)
0.86

UB356X127X33 (3) UB356X127X33 (6) UB356X127X33 (6)


UB533X210X82 (15) c = 30 UB406X140X39 UB610X229X125 (16) c = 30
B

(3)
UB254X102X22 (3)
2.48

REVISIONS
UB356X127X33 (3)

UB406X140X46 (3)

2.16

UB356X127X33 (3)
UB406X140X46 (3)

UB406X140X46 (3)

UB457X191X67 (3)
UB406X140X46

UB457X191X67
UB127X76X13 (3) UB406X140X39 (6)
5.37

ISSUE
UB356X127X33 (6) UB406X140X39 UB356X127X33 (6)
4.26

UB533X210X82 (15) c = 30 UB610X229X125 (16) c = 30


UB254X102X22 (3)
2.48

2.10
UC305x305x118 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97

UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 UB356X127X33 (6) UB610X229X125 (16) c = 30
A UB356X127X33 (3)

NO.
2.85 5.00 5.15 20.16 4.75 11.56 2.79

PROJECT NAME
2ND FLOOR

PROJECT ADDRESS
1 : 100

FRAMING PLAN LEGEND


INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH

09/21/15
As indicated
DS
DS
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

SHEET INFORMATION
INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH, ADD FIBEr
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

Job Number:
Checked By:
INDICATES 200mm SLAB ON GROUND

Drawn By:
FRAMING PLAN NOTES: INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF

Scale:
Date:
BEAM
1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS
2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS. INDICATES SPAN OF DECK / CONCRETE SLAB
3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS
4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS. LOCATION OF SHEAR WALL.
5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK =
SW
Sheet Name:
120mm TOTAL. REINFORCE SLAB WITH A193 MESH LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS.
6. TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm
VB-X
SECOND
7. REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS. COLUMN TYPE
C-X
8.
9.
REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS.
FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE
FLOOR
COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION.
FRAMING PLAN - TYPICAL FLOOR LEGEND N FRAMING PLAN
NOT TO SCALE
Sheet No:
W E

S S2.3
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8
52.25
2.85 5.00 5.15 13.13 7.03 4.75 11.56 2.79

E
1 1
S6.1 S6.2

0.37 2.82
3.00 3.00

UB356X127X33 (3)
UB356X127X33 (3)
6.21

UB254X102X22 (3)

0.60

0.60

UB533X210X92 (3)
UC254x254x73 UC305x305x97

UB457X191X67 (3)
UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6) UB610X229X101 (16) UB254X102X22 (3)

UB533X210X92 (3)
UB533X210X82 (3)

UB533X210X92 (3)

UB533X210X92 (3)
UB457X191X74 (3)
UC305x305x118 UC356x356x177 UC356x356x177 UC356x356x177 UC305x305x118 UC356x356x177 UC356x356x177
UB457X191X67 (3)

UB406X140X39 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB457X152X52 (6) UB610X229X101 (16)
D UB254X102X22 (3)

CONSTRUCTION
PRELIMINARY
UB457X152X52 (3)
UC203x203x46
10350
*

NOT FOR
UB457X191X67 (3)

UB457X191X67 (3)

UB533X210X92 (3)
UB533X210X82 (3)

UB533X210X82 (3)

UB533X210X82 (3)

UB533X210X82 (3)
UC254x254x73 UC203x203x46
UB406X140X39 (6) UB406X140X39 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6)
*
5.10

UB254X102X22 (3) UB610X229X101 (16)

UB254X102X22 (3)
UB356X127X33 (3)
UC305x305x97 UC305x305x118 UC305x305x118 UC305x305x118 UC305x305x97 UC356x368x129 UC356x356x177
21.11

UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)


UB254X102X22 (3)

UB533X210X82 (15) c = 30 UB610X229X125 (40) c = 30


C
UC254x254x73
*

18.01
B200X400C30 B200X400C30

DATE
UB356X127X33 (3)

UB406X140X39 (6) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3)
UB457X152X52 (3)

UB457X191X67 (3)

UB457X191X67 (3)

UB406X140X39 (3)

UB533X210X92 (3)

UB533X210X82 (3)
UB254X102X22

UB406X140X39 (8) 2
5.55

5.55
UB533X210X82 (15) c = 30 UB610X229X125 (40) c = 30
S6.2
UB406X140X39 (6) UC254x254x73
*

REVISIONS
UC305x305x118
1.49 UB356X127X33 UB356X127X33
UB254X102X22 UB127X76X13

UB254X102X22 UB127X76X13
UC356x368x129 UC356x368x129 UC356x368x129 UC305x305x97 UC356x368x129 UC356x356x177
UB457X152X52 (6)

ISSUE
0.86

UB356X127X33 (3) UB356X127X33 (6) UB457X152X52 (6)


UB533X210X82 (15) c = 30 UB406X140X39 (8) UB610X229X125 (40) c = 30
B
(3)

(3)
UC203x203x46
*
UB356X127X33 (6)

UB406X140X46 (6)

UB356X127X33 (3)
UB406X140X46 (3)

UB406X140X46 (3)

UB406X140X46 (3)

UB457X191X67 (3)

UB457X191X67 (3)
UB127X76X13 (3) UB406X140X39 (6)
5.37

UB406X140X39 (3)

UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)


4.26

UB533X210X82 (15) c = 30 UB610X229X125 (40) c = 30


UB254X102X22 (3)

UB254X102X22 (3)

NO.
UC305x305x118 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97 UC305x305x97

UB457X191X67 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB457X152X52 (6) UB610X229X125 (40) c = 30
A
UB406X140X39 (3)

UB356X127X33 (3)
1.32

UC203x203x46
UB254X102X22 (6) *

PROJECT NAME
4.24
0.90

PROJECT ADDRESS
3RD FLOOR
1 : 100

FRAMING PLAN LEGEND


INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

09/21/15
As indicated
DS
DS
INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x

SHEET INFORMATION
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH, ADD FIBEr
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

INDICATES 200mm SLAB ON GROUND

Job Number:
Checked By:
FRAMING PLAN NOTES:

Drawn By:
INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF
BEAM
1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS

Scale:
2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS.

Date:
INDICATES SPAN OF DECK / CONCRETE SLAB
3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS
4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS.
LOCATION OF SHEAR WALL.
5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK = SW
120mm TOTAL. REINFORCE SLAB WITH A193 MESH
LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS.
VB-X
6.
7.
TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm
REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS.
Sheet Name:
COLUMN TYPE
8. REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS. C-X
9. FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE
COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION.
THIRD FLOOR
FRAMING PLAN - TYPICAL FLOOR LEGEND N
FRAMING PLAN
NOT TO SCALE
W E
Sheet No:
S
S2.4
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6 7 8
37.90

2.85 5.00 5.15 13.13 7.03 4.75

E
1 1
S6.1 S6.2

0.37 2.81
3.00
3.00 2.47
UB356X127X33 (3)
6.21

UB254X102X22 (3)

UB356X127X33 (3) UB254X102X22 (3)


0.60

0.60
UB356X127X33 (3)

UC203x203x46 UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 (8) UB254X102X22 (3)


UB533X210X82 (15) c = 30

UB533X210X92 (3)
UB533X210X101 (3)

UB533X210X92 (3)

UB457X191X67 (3)

CONSTRUCTION
PRELIMINARY
UB254X102X22 (3) UC305x305x97 UC305x305x97 UC356x356x177 UC356x356x177 UC305x305x97

NOT FOR
UB457X191X67 (3)

UB406X140X39 (6) UB356X127X33 (6) UB533X210X101 (15) c = 30 UB406X140X39 (8) UB254X102X22 (3)
D UC203x203x46

13650
UB457X191X67 (3)

UB457X191X67 (3)

UB457X191X67 (3)
UB533X210X82 (3)

UB533X210X82 (3)
UC203x203x46 UC203x203x46
UB406X140X39 (6) UB406X140X39 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB356X127X33 (6)
5.10

UB254X102X22 (3) UB254X102X22 (3)

UB533X210X82 (3)
UB356X127X33 (3)

2.48
UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73
21.11

DATE
1.49
UB406X140X39 (6) UB356X127X33 (6) UB406X140X39 (8) UB356X127X33 (6)
(3)

UB533X210X82 (15) c = 30
C
UB254X102X22

1.30
UB356X127X33 (3)
B200X400C30 B200X400C30

UB254X102X22 (3)

17.41
UB356X127X33 (3)

UB406X140X39 (6) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3) UB254X102X22 (3)
(3)

REVISIONS
UB356X127X33 (3)

UB457X152X52 (3)

UB457X152X52 (3)

UB457X191X67 (3)

UB406X140X39 (3)
UB254X102X22

UB127X76X13 (3) UB406X140X39 (8) 2


5.55

UB533X210X82 (15) c = 30
S6.2

ISSUE
UB406X140X39 (6) UC254x254x73
UB127X76X13 (3) UC254x254x73
UB356X127X33 UB254X102X22

UB127X76X13
UB127X76X13

UB457X152X52 (6) UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC203x203x46


10.17

UB356X127X33 (3)
UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB254X102X22
B
UB254X102X22 (3)
UB406X140X46 (3)
UB356X127X33 (3)

UB406X140X46 (3)

UB406X140X46 (3)

UB406X140X46 (3)

UB356X127X33 (3)

UB254X102X22 (3)

NO.
UB406X140X39 (6)
UB356X127X33 (6) UB406X140X39 (8) UB254X102X22 (3)
4.26

UB406X140X39 (3)

UB533X210X82 (15) c = 30
UB254X102X22 (3)

UB127X76X13 (3)
UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC203x203x46

UB457X191X67 (6) UB356X127X33 (6) UB533X210X82 (15) c = 30 UB406X140X39 (8) UB254X102X22

PROJECT NAME
A
UB406X140X39

UB356X127X33 (3)

PROJECT ADDRESS
1.32

UB254X102X22 (6)

4.24 0.91
34.42

4TH FLOOR
1 : 100

FRAMING PLAN LEGEND


INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH

09/21/15
As indicated
DS
DS
SHEET INFORMATION
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x


1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH, ADD FIBEr
RECOMENDED ComFlor 60/1.2/S350 decking C30/33

Job Number:
Checked By:
INDICATES 200mm SLAB ON GROUND

Drawn By:
FRAMING PLAN NOTES:

Scale:
1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF

Date:
2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS. BEAM
3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS
4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS. INDICATES SPAN OF DECK / CONCRETE SLAB
5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK =
120mm TOTAL. REINFORCE SLAB WITH A193 MESH
SW
LOCATION OF SHEAR WALL. Sheet Name:
6. TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm
7. REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS. LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS.
VB-X
8.
9.
REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS.
FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE COLUMN TYPE
FOURTH FLOOR
C-X
COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION.
N FRAMING PLAN
FRAMING PLAN - TYPICAL FLOOR LEGEND
NOT TO SCALE W E Sheet No:

S
S2.5
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1A 1 2 3 4 5 6
FRAMING PLAN LEGEND
37.90 INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x
1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH
2.85 5.00 5.15 20.16 4.75 RECOMENDED ComFlor 60/1.2/S350 decking C30/33

INDICATES 60mm NORMAL WEIGHT CONCRETE SLAB C30/33 ON 60mm x


1.2mm. COMPOSITE CELLULAR DECK = 120mm TOTAL. REINFORCE SLAB
WITH A193 MESH, ADD FIBEr
0.37 2.81 RECOMENDED ComFlor 60/1.2/S350 decking C30/33

3.00 3.00
UB254X102X22 (3)

UB127X76X13 (5) INDICATES 200mm SLAB ON GROUND

0.60

0.60
UB356X127X33 (3)
UC203x203x46 UB305X102X25 (6) UB254X102X22 (6) UB406X140X39 (8) UB127X76X13 (3)
UB457X191X67 (15) c = 30

UB406X140X46 (3)
UB406X140X46 (3)
UB356X127X33 (3)

UB356X127X33 (3)

UB254X102X22 (3) UB254X102X22 (3)


INDICATES MOMENT CONNECTION. DESIGN FOR MOMENT CAPACITY OF
2.86

BEAM
UC305x305x97 UC305x305x97 UC356x356x177 UC356x356x177 UC305x305x97 UC203x203x46
INDICATES SPAN OF DECK / CONCRETE SLAB
UB254X102X22 (3)

UB127X76X13 (5) UB305X102X25 (6) UB254X102X22 (6) UB457X191X67 (15) c = 30 UB406X140X39 (8) UB127X76X13 (3)
D SW
LOCATION OF SHEAR WALL.

LOCATION OF VERTICAL BRACING. SEE SHEET S1.X FOR ELEVATIONS.


17550 VB-X
UB356X127X33 (3)

UB356X127X33 (3)

UB356X127X33 (3)
UB406X140X46 (3)

UB406X140X46 (3)
UC203x203x46 UC203x203x46 COLUMN TYPE

CONSTRUCTION
C-X

PRELIMINARY
UB305X102X25 (6) UB254X102X22 (6) UB457X191X67 (15) c = 30 UB406X140X39 (8)
5.10

UB127X76X13 (5)

NOT FOR
UB533X210X82 (3)
UB254X102X22 (3)
UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 FRAMING PLAN - TYPICAL FLOOR LEGEND
1.49
NOT TO SCALE
UB356X127X33 (6) UB254X102X22 (6) UB457X152X52 (8) UB356X127X33 (3)
UB457X191X67 (3) UB457X191X67 (3)

UB533X210X101 (15) c = 30
C UC203x203x46 3.18 UC203x203x46
* *

UB457X152X52 (5)

UB457X152X52 (5)
3.58 4.72 UC203x203x46
UB254X102X22 (4) B200X400C30 UC203x203x46
* UC203x203x46
* B200X400C30 *

17.41
UC203x203x46
*
UB305X102X25 (3)

UB305X102X25 (6) UB254X102X22 (3) UB254X102X22 (3) UB356X127X33 (6) UB254X102X22 (4)
UB254X102X22 (3) UB254X102X22 (3)
UB254X102X22 (3)

UB457X152X52 (7)

UB457X191X74 (7)

UB457X152X52 (3)

UB406X140X46 (7)

UB457X152X52
UC203x203x46
*
14.90

DATE
UB457X152X52 (8) 2
5.55

UB533X210X101 (15) c = 30
S6.2

UB457X152X52 (5)

UB457X152X52 (5)
UB305X102X25 (6) UC203x203x46
UC203x203x46 UC203x203x46
* * UC203x203x46

UB127X76X13 (3)
UB127X76X13 (3)

UB254X102X22 (4) UB356X127X33 (3) UB356X127X33 (6) UB254X102X22 (3)


UC203x203x46
* UB356X127X33 (6) UC254x254x73 UB254X102X22 (4)
10.17

UC203x203x46 UC254x254x73
* *

REVISIONS
UB254X102X22 (3) UC203x203x46
B UC254x254x73
UB254X102X22 (6) UB533X210X101 (15) c = 30 * UB254X102X22 (3)
FRAMING PLAN NOTES:
UC254x254x73 UB457X152X52 (8) UC254x254x73
UB254X102X22 (3)

UB356X127X33 (3)

ISSUE
UC254x254x73 UC203x203x46 1. FINISHED FLOOR ELEVATION SEE STRUCTURAL ELEVATIONS SHEETS
UB356X127X33 (3)

UB356X127X33 (3)

UB356X127X33 (3)

UB356X127X33 (3)

UB254X102X22 (3)
2. SEE SHEET S0.0 FOR GENERAL NOTES, ABBREVIATIONS, AND SPECIAL INSPECTIONS.
UB254X102X22 (3) UB305X102X25 (6) 3. SEE SHEET S4.1 FOR COLUMN SCHEDULE FOR COLUMNS
UB254X102X22 (6) UB457X152X52 (8) UB254X102X22 (3)
4.26

UB406X140X39 (3)

UB457X191X67 (15) c = 30 4. SEE SHEET S1.X FOR TYPICAL STEEL DETAILS.


5. INDICATES 60mm LIGHT WEIGHT CONCRETE SLAB C30/33 ON 60mm x 1.2mm. COMPOSITE CELLULAR DECK =
120mm TOTAL. REINFORCE SLAB WITH A193 MESH
UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC254x254x73 UC203x203x46 6. TOP OF STEEL (T/S) ELEVATION = FINISH FLOOR - 120mm
7. REFER TO ARCHITECTURAL DRAWINGS FOR EXPOSED STEEL AND DECK AREAS.
UB356X127X33 (6) UB254X102X22 (6) UB457X152X52 (8) UB254X102X22 (3) 8. REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATIONS OF FLOOR OPENINGS.
UB457X191X67 (15) c = 30
A
UB406X140X39 (3)

9. FRAMING FOR ALL EQUIPMENT SUPPORTS AND PENETRATIONS THRU FLOORS TO BE

NO.
UB254X102X22 (3) COORDINATED WITH EQUIPMENT SHOP DRAWINGS PRIOR TO FABRICATION.
1.32

UB254X102X22 (6) 120mm Concrete


Light Weight on 1
60mm Composite S6.1
4.24 0.91 deck
34.42

PROJECT NAME

PROJECT ADDRESS
ROOF
1 : 100

1A 1 2 3 4 5 6

5.00 5.15 20.16 4.75

11/15/19
As indicated
DS
DS
SHEET INFORMATION
C UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46
UB254X102X22 (4) UB254X102X22 (6) UB254X102X22 (6) UB254X102X22 (4) UC203x203x46
UB254X102X22 (6)
19800 19800
UB254X102X22 (3)

UB254X102X22 (3)

UB254X102X22 (3)
UB127X76X13 (3)

UB127X76X13 (3)

UB127X76X13 (3)

UB127X76X13 (3)
2

Job Number:
UB254X102X22 (4) UB254X102X22 (6) UB254X102X22 (6) UB254X102X22 (4) UB127X76X13 (6)

Checked By:
3.10

3.10

S6.2

Drawn By:
UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46
UC203x203x46
UB254X102X22 (4) UB254X102X22 (6) UB254X102X22 (6) UB254X102X22 (4) UB254X102X22 (6)

Scale:
Date:
3.58 5.15 4.72 UC203x203x46

B 3.18 4.75

Sheet Name:

ROOF
1
S6.1 FRAMING PLAN
N
UPPER ROOF
1 : 100 Sheet No:
W E

S S2.6
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1/2 THE NUMBER OF STUDS SHOWN ON PLAN [ ] 1/2 THE NUMBER OF STUDS SHOWN ON PLAN [ ]

15 mm
300 mm 300 mm 300 mm
pitch
1/2 STUD STUD SPACING 1/2 STUD 1/2 STUD STUD SPACING 1/2 STUD

60 mm
SPA. SPA. SPA. SPA.

Depth
120 mm Trough 200 mm
MAX.
600 mm Restrain straps @
600mm OC
Cover width

2H12 CONT. EDGE


ComFlor 60 or equivalent
Yield Zinc Coating Maximun Minimun
GAUGE
(N/mm2) mass (g/m2) Lenght (mm) Lenght (mm) POUR STOP
C 60
1.6mm FOR 100mm CANT.
1 mm 350 Z 275 12000 800 2.0mm FOR 200mm CANT.
C.L. BEAM SPAN

TYPICAL STUD LAYOUT PATTERN


DECK WELDING
AREA
PERPENDICULAR WELDING PARALLEL WELDING AT
AT SUPPORT SEAM ATTACHMENT SUPPORT

FLOOR LOW NO. 1-2-3-4 BUTTON PUNCH AT 1000mm CC 300mm CC

1. FASTEN DECK TO EACH SUPPORT WITH 20mm DIA. PUDDLE WELDS


SEE NOTE #3 SEE NOTE #3 2. BUTT DECKING OVER SUPPORTS.
3. SHEAR STUDS REPLACE PUDDLE WELD WITH ONE TO ONE BASIS

SD-STEEL DECK DETAIL SD-TYPICAL EDGE DETAIL


2 5

25 mm CLEAR
TO W.W.F.
0.145" DIA. HILTI DNI 2 STUDS MAX. PER FLUTE 0.145" DIA. HILTI DNI
1 : 10 1 : 10

CONSTRUCTION
POWDER DRIVEN FASTERS OF DECK (NOTE 7 AND 8) POWDER DRIVEN

PRELIMINARY
AT 12" CC
5/8 12 FASTENERS AT 12" CC

NOT FOR
CONFIRM SIZE OF OPENING REQ'D w/ (2) 15mm Ø x 100mm EXPANSION
MECH CONTRACTOR ANCHORS, (2) PER ANGLE.
GROUT TOP COURSE SOLID
& EXTEND VERT BARS TO
SLAB REINF. SEE
LAY BARS 3/4" FIN. FLR. TOP OF WALL
PLAN.
CLEAR OFF DECK

51 mm CLR
32mm MIN. 32mm MIN.

SEE PLAN SEE PLAN


38 mm MIN. 38 mm MIN.
CUT METAL DECK AFTER
CONCRETE HAS CURED L6x4x1/4 x 150mm

DATE
(LLV) EACH SIDE
SEE WALL REINF.
SCHED.
SECTION A-A
EXTEND 2 H16 BARS
NOTE: MINIMUM DIMENSIONS APPLY TO BOTH BREAK DECK AS REQ'D. TO CENTER FIREPROOF SEE 600mm BEYOND BEAM

REVISIONS
PERPENDICULAR AND PARALLEL CONDITIONS STUDS. USE GAGE FILLER BY DECK SPECS. C.L. OF BM. CL OF BM
SUPPLIER. DECK SPAN
GROUT TOP COURSE SOLID & (2) 15mm Ø x 100mm
BARS 20mm CLEAR OFF DECK

ISSUE
EXTEND VERT BARS TO TOP OF WALL EXPANSION ANCHORS EACH
SIDE.
PERPENDICULAR PARALLEL #4 TOP TYP.
FOR 'X' = 0.3m TO 1.2m USE
NOTES: H14@300mm OC
A A FOR 'X' = 1.2m TO 1.5m USE
1. UB533X210X101 (38) c=30 (XX) INDICATES NUMBER OF END WELDED STUDS EQUALLY SPACES ON TOP H14@120mm OC TYP PROVIDE PLATE 6.35 x 180mm
FLANGE OF BEAM. c=XX INDICATES CAMBER AT THE C.L. BEAM SPAN. COMPOSITE BEAM IS DESIGNED UNSHORED. x PLATE LENGTH AS REQ'D TO
FACILITATE ATTACHMENT TO
L6x4x1/4 x 150mm (LLV)

NO.
FOR 'X' = 1.2m TO 1.5m EXTEND BARS X X NEAREST TWO FLUTES AT
EACH SIDE
2. WELDING OF STEEL DECK AT EACH SUPPORT WITH 100mm DIA. PUDDLE WELDS PER SHEET. STUD TO ADJACENT BEAM TYP. 1200mm OC
IF 'X' < 450mm THIS BAR CAN BE
WELDING THROUGH DECKING CAN BE CONSIDERED AS ONE PUDDLE WELD.
OMITTED
DO NOT PRIME TOP FLANGE OF STEEL BEAMS. * SIDE LAPS TO BE CRIMPED OR
SCREWED AT 100mm CC MAX. EXTEND H16 BARS 600mm H16 BARS AT ALL SIDES OF OPENING. SEE
PAST OPENING PLAN FOR QUANTITY.
3. DECK SUPPORT AT CONCRETE WALL OR COLUMN AT DECK BEARING, USE 4x3x3/8" ANGLE (LLH) FASTENED TO CONCRETE WITH
12mm DIA. HILTI KWIK BOLT II AT 450mm CC W/ 100mm EMBEDMENT. AT DECK EDGE, USE
3x3x 14 GA. ANGLE FASTENED TO CONCRETE WITH 3.2mm DIA. POWDER ACTIVATED
FASTENER AT 300mm CC.
SD-TYPICAL SLAB OPENINGS CMU_CMU SUPPORT AT FLOOR

PROJECT NAME
4. DECK SUPPORT AT STEEL COL. USE 3 1/2x3 1/2x 16 GA. ANGLE WELDED AT PERIMETER OF STEEL COLUMN.
3 1 : 20
6 1 : 20

PROJECT ADDRESS
5. CONTINUITY OF DECK MINIMUM 2 SPAN CONTINUOUS - UNSHORED.

6. BEARING OF DECK MINIMUM 75mm AT ENDS BEARING ON CONCRETE AND 50mm ON STEEL.

7. TWO ROWS OF STUDS SEE DETAIL OF STUDS FOR BEAMS PERPENDICULAR TO DECK RIBS. PLACE STUDS
IN RIBS ON "RIB SPACING MODULE". USE TWO ROWS OF STUDS IF REQUIRED AND
INCREASE NUMBER OF STUDS AS REQUIRED.

8. SPACING OF STUDS MINIMUM SPACING FOR STUDS IN 115mm CC; MAXIMUM SPACING IS 800mm CC. PROVIDE
2 ROWS OF STUDS IF MINIMUM SPACING CANNOT BE MET. DO NOT PLACE STUDS
ON CANTILEVER SPAN OF BEAM.

9. DEFLECTION OF DECK SLAB MAKE ALLOWANCE IN CONCRETE VOLUME TO ACCOMMODATE DEFLECTION OF


L4x4x1/4 x 600mm w/ (2) 5/8" Ø x 4"
DECK ASSEMBLY DUE TO WEIGHT OF WET CONCRETE.
EXP ANCHORS INTO DECK RIB
SEE ARCH. FOR LOCATION
10. MINIMUM BEAM SIZE FOR UB254 BEAMS OR LOWER, STUDS SHALL BE WELDED DIRECTLY 1/4" PLATE EA.
OVER THE BEAM WEB. 697 mm END
2 H13 CONTINUES AT GROUT TOP COURSE SOLID &
EDGE EXTEND VERT. BARS TO TOP OF
11. COMPOSITE STUD SIZES ALL COMPOSITE STUDS ARE 19mm DIA. USE 65mm STUDS FOR 40mm DECK, 75 STUDS H16@150mm OC L=1700mm WALL FIN FLR.
583 mm
FOR 50mm DECK, AND 100mm STUDS FOR 60mm DECK. 2.5mm POUR CANTILEVER DIRECTION
STOP

120 mm
5/8" Ø x 7" ANCHOR BOLT IN

12/21/19
As indicated
DS
DS
SHEET INFORMATION
GROUTED CELL. FINGER 1
TIGHTEN NUT TO ALLOW VERT. 2 3/4" Ø BOLT
SLIP
(2) L3x3x1/4 w/ 1/4" SPACER PLs AT 1/3
SD_COMPOSITE SLAB CONSTRUCTION PTS. LOCAT AT EA. 8x4
1
102 mm

76 mm SLOTTED
HOLE IN ANGLE
1 : 10 WWF FABRIC MESH AS REQ.
TYP

Job Number:
2

Checked By:
Drawn By:
4X4X5/16" ANGLE AT MIN. 3 STUDS AT CANTILIVER BOND BM.
EDGES
TYP

Scale:
Date:
SEE WALL REINF.
SCHED.
L8x4x1/2 x 0'-4" (LLV) @ EA. END OF BM. & 4'-0"
NOTE: OC MAX BETWEN REVERSE DIRECTION OF HORIZ
LEG TO FALL UNDER BEAM FLANGE
Sheet Name:
SEE ARCH. DWGS. FOR LOCATIONS WHERE
CMU OCCURS

DETAILS
CONCRETE CANTILEVER CMU_CMU SUPPORT UNDER PARALELL BEAM
4 1 : 10
7 1 : 20
Sheet No:

S3.1
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
25 mm CLR.
GRIND SMOOTH SEE PLAN FOR GRIND SMOOTH SEE PLAN FOR

H/2
ALL OPENINGS LOCATION ALL OPENINGS LOCATION
50 mm

50 mm
H/6
50 mm 50 mm

D/2
GIRDER
ELEV. SEE SCHED.

D/2
TYP.

483 mm

BEAM

BEAM

BEAM

BEAM

BEAM

BEAM
1/4

H/2
W W/2W/2 W
SEE SCHEDULE FOR SIZE
SEE SCHEDULE FOR SIZE 1 1/2" RADIUS
TOP VIEW
GIRDER GIRDER
ROUND OPENING RECTANGULAR OPENING

GIRDER
GIRDER
8mm
GIRDER S355
SEE PLAN FOR 8mm
LOCATION

SCHEMATIC PLAN DEFINING BEAMS & GIRDERS GRIND SMOOTH


ALL OPENINGS
24" + OPENING SIZE
PLATE ONE EAC H SIDE
SEE SCHEDULE BEAM WEB OPENING SCHEDULE
ERECTION L AND BOLTS AS REQ'D. OPENING SIZE 100 mm VAR 100 mm COLUMN ABOVE
MIN. NUMBER OF ROWS OF BOLTS CL. ELEV OF
TO BE DESIGNED BY FABRICATOR MARK PLATE SIZE REMARKS
PER SCHEDULE Ø H W OPENING
ELEV. WIDENER t=12mm
1/4 MIN. SEE SCHED.
2 L's 5/16 MIN. THICKNESS 8 - M24 BOLTS
(TYPICAL)
SEE SCHEDULE FOR SIZE
3/16 2-6 STIFFENER t=12mm

FIELD CUT OPENING


COLUMN
GIRDER
1/4 MIN. 1. PRIOR TO FIELD CUTTING ANY OPENINGS OBTAIN THE STRUCTURAL ENGINEERS APPROVAL
S355
BEAM / GIRDER SHOP WELDING FIELD WELDING TO 2. HOLES TO BE NO LARGER THAN 6" Ø AND LOCATION WITHIN MIDDLE 1/2 OF THE BEAM DEPTH
3. ALWAYS TRY TO ACCOMODATE HOLES ON THE THIRD OF THE SPAN WITHING THE MIDDLE 1/2 OF
OPTION SUPPORT
THE BEAM DEPTH.
LATERAL VIEW FRONTAL VIEW
PROVIDE ERECTION ANGLES FOR GIRDERS FRAMING INTO COLUMNS AS REQUIRED 4. GRIND SMOOTH ALL OPENINGS
SHOP WELD OR BOLT ANGLES AS REQUIRED TO OBTAIN NECESSARY CLEARANCE FOR FIELD BOLTING. 5. ADD TOP AND BOTTOM STIFFENERS
BEAM WEB TO BE FILLED WITH MAX. NUMBER OF BOLTS ALLOWED BASED ON DIAMETER AND SPACING PER AISC.

ST_STEEL WEB OPENINGS TRANSFER BEAM


BEAM SIZE
MIN. NO. OF MIN. SIZE OF A325-N 3 1 : 20
6 1 : 20
ROWS OF BOLTS T.C. BOLTS

CONSTRUCTION
PRELIMINARY
UB 200-254 2 19mm Ø

NOT FOR
UB 305-356 3 19mm Ø
UB 406 4 19mm Ø ADD 3 H 12 @ 100mm L=2000mm BOTH SIDE OF COLUMNS
UB 457 5 19mm Ø COLUMN STIFFENER
4 X M24 BOLTS
t=12mm BOTH SIDES
UB 533 6 19mm Ø FILLER PLATE
UB 610 7 19mm Ø 4 X M24 BOLTS END PLATE 1
UB 686 8 19mm Ø 6 M24 BOLTS
WIDENER t=12mm
UB 762 9 19mm Ø END PLATE 2
4 X M24 BOLTS 4 M24 BOLTS
UB 838 10 19mm Ø
UB 914 10 19mm Ø 4 X M24 BOLTS
SPLICER PLATE t=16mm
ADD 3 H 12 @ 100mm L=2000mm BOTH SIDE OF COLUMNS 4 X M24 BOLTS
COLUMN STIFFENER
NOTE: BASE PLATE t=16mm
t=12mm BOTH SIDES

DATE
DETAILS ABOVE, BOLT SIZES, MIN. OF BOLTS, ETC., ARE ALL CONCEPTUAL. TOP VIEW
8mm TOP VIEW
S355
ALL BEAM AND GIRDER CONNECTIONS SHALL BE DESIGNED AND SEALED BY FABRICATORS REGISTERED ENGINEER 8mm
S355
AND SUBMITTED TO STRUCTURAL ENGINEER OF RECORD (SEOR) FOR APPROVAL. 8mm
CENTRAL CANTILEVER S355
COLUMN STIFFENER 8mm
BEAM

LOCATE SPLICE 1m FROM FLOOR BELOW


SEALED CALCULATIONS SHALL BE SUBMITTED WITH SHOP DRAWINGS BEFORE REVIEW BY SEOR WILL TAKE PLACE.

REVISIONS
t=12mm BOTH SIDES COLUMN ABOVE
CONCRETE DECK AS
CONNECTIONS SHALL BE DESIGNED PER ALLOWABLE STRESS DESIGN CRITERIA AND SHALL MEET THE FOLLOWING CANTILEVER BEAM
SHOWN FILLER PLATE
MIN. LOAD CAPACITIES PER LATEST EDITION OF AISC's "MANUAL OF STEEL CONSTRUCTION": WIDENER t=12mm

ISSUE
356 mm

70 mm
4 X M24 BOLTS 4 X M24 BOLTS 6 M24 BOLTS
- COMPOSITE BEAMS: USE 75% OF ALLOWABLE BEAM CAPACITY PER UNIFORM
LOAD / SPAN TABLE. ADD. 2 SHEAR STUD
4 M24 BOLTS

120 mm 393 mm 120 mm


4 X M24 BOLTS
- NON-COMPOSITE BEAMS: USE 50% OF ALLOWABLE BEAM CAPACITY PER
BASE PLATE t=16mm
UNIFORM LOAD / SPAN TABLE. 4 X M24 BOLTS
END PLATE 2 SPLICER PLATE t=16mm

773 mm
VAR
CENTRAL BEAM END PLATE 1
SIDE BEAM SIDE BEAM 6 M24 BOLTS
70 mm

NO.
LATERAL BEAM CANTILEVER BEAM
ST - BEAM TO COL CONN SCHEDULE 4 X M24 BOLTS

1 25 mm
4 X M24 BOLTS COLUMN BELOW

70 mm
1 : 20
127 mm

95 mm
4 X M24 BOLTS 4 X M24 BOLTS

70 mm
50 mm
100 mm WIDENER t=12mm
120 mm LATERAL VIEW FRONTAL VIEW
LATERAL BEAM COLUMN STIFFENER
CONNECTION NOT t=12mm BOTH SIDES
VAR

PROJECT NAME
64 mm SHOWN FOR CLARITY
MIN. NUMBER OF 96 mm
50 mm 50 mm
38 mm

ROWLS OF BOLTS PER

PROJECT ADDRESS
SCHEDULE 80 mm 80 mm
SHEAR PLATE AND BOLTS LATERAL VIEW
PER SCHED.
FRONTAL VIEW
CANTILEVER COLUMN SPLICE
4 7
76 mm

1 : 20 1 : 20
TYP
38 mm

A 44 mm A
COPE ONE SIDE OF BEAM
FLANGE ONLY ADD 3 H 12 @ 100mm L=2000mm BOTH SIDE OF COLUMNS
COLUMN STIFFENER
155 mm

t=12mm BOTH SIDES 3 X M24 BOLTS


INTERIOR CONDITION SPANDREL CONDITION
310 mm

BEAM WEB TO BE FILLED WITH MAX. NUMBER OF BOLTS ALLOWED BASED ON Ø AND SPACING PER AISC. 3 X M24 BOLTS

CLEAR COVER
3 X M24 BOLTS

25 mm
PLATE t=12mm
155 mm

LIGHTWEIGHT ELECTRO-
MIN. NO. OF MIN. SIZE OF A325- MIN. MIN. PLATE CONCRETE WELDED MESH
BEAM SIZE 912 mm
ROWS OF N T.C. BOLTS PLATE WELD "A" 3 X M24 BOLTS
C30/33 A-193
BOLTS THICKNESS ADD 3 H 12 @ 100mm L=2000mm BOTH SIDE OF COLUMNS COLUMN STIFFENER
2 BOLTS SPACED t=12mm BOTH SIDES
UB 127 19mm Ø 8 mm 6 mm
HORIZONTALLY
TOP VIEW
UB 203-254 2 19mm Ø 8 mm 6 mm 8mm
UB 305-356 3 19mm Ø 8 mm 6 mm S355
8mm
UB 406 4 19mm Ø 10 mm 8 mm COLUMN STIFFENER
CENTRAL CANTILEVER

AS NOTED
12/22/19

DS
DS
UB 457 5 19mm Ø 10 mm 8 mm t=12mm BOTH SIDES
BEAM

THICKNES

SHEET INFORMATION
120 mm
CONCRETE DECK AS
UB 533 6 19mm Ø 10 mm 8 mm CANTILEVER BEAM
SHOWN 356 mm
UB 610 7 19mm Ø 16 mm 10 mm 80 mm VAR 80 mm PLATE t=12mm
155 mm 155 mm
70 mm

UB 686 8 19mm Ø 16 mm 10 mm 50 mm 80 mm 492 mm 80 mm 50 mm 6 X M24 BOLTS


6 X M24 BOLTS
107 mm 96 mm 107 mm
NOTE: ADD. 2 SHEAR STUD
SD-STEEL DECK
120 mm 393 mm 120 mm

4 X M24 BOLTS
10

Job Number:
DETAILS ABOVE, BOLT SIZES, MIN. OF BOLTS, ETC., ARE ALL CONCEPTUAL. 1 : 10

Checked By:
4 X M24 BOLTS

Drawn By:
ALL BEAM AND GIRDER CONNECTIONS SHALL BE DESIGNED AND SEALED BY FABRICATORS REGISTERED ENGINEER END PLATE 2
773 mm
VAR

AND SUBMITTED TO STRUCTURAL ENGINEER OF RECORD (SEOR) FOR APPROVAL. CENTRAL BEAM END PLATE 1

Scale:
SIDE BEAM SIDE BEAM
70 mm

Date:
CLEAR COVER
SEALED CALCULATIONS SHALL BE SUBMITTED WITH SHOP DRAWINGS BEFORE REVIEW BY SEOR WILL TAKE PLACE. LATERAL BEAM CANTILEVER BEAM
4 X M24 BOLTS

30 mm
25 mm

CONNECTIONS SHALL BE DESIGNED PER ALLOWABLE STRESS DESIGN CRITERIA AND SHALL MEET THE FOLLOWING MIN. 4 X M24 BOLTS VEHICULAR NORMAL ELECTRO-
70 mm

LOAD CAPACITIES PER LATEST EDITION OF AISC's "MANUAL OF STEEL CONSTRUCTION": TRAFFIC CONCRETE WELDED MESH
127 mm

95 mm

4 X M24 BOLTS 4 X M24 BOLTS


70 mm

COATING (TC-1) C30/33 A-252


Sheet Name:
50 mm

- COMPOSITE BEAMS: USE 75% OF ALLOWABLE BEAM CAPACITY PER 100 mm WIDENER t=12mm
UNIFORM LOAD / SPAN TABLE.
120 mm
- NON-COMPOSITE BEAMS: USE 50% OF ALLOWABLE BEAM CAPACITY PER COLUMN STIFFENER
UNIFORM LOAD / SPAN TABLE. S355 t=12mm BOTH SIDES
VAR
DETAILS
96 mm
50 mm 50 mm
THICKNES
120 mm
80 mm 80 mm

LATERAL VIEW FRONTAL VIEW Sheet No:


ST_BEAM TO GIRDER CONN SCHEDULE
2 1 : 20

5
CANTILEVER END COLUMN 11
SD-STEEL DECK PARKING
1 : 10
S3.2
1 : 20 of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
UPPER ROOF UPPER ROOF

UC203x203x46

UC203x203x46
19800 19800

ROOF ROOF

17550 17550

UC356x356x177

UC356x356x177
UC254x254x73

UC254x254x73

UC254x254x73

UC254x254x73

UC203x203x46

UC254x254x73

UC305x305x97

UC305x305x97

UC305x305x97
UC254x254x73

UC203x203x46
UC203x203x46

UC254x254x73
4TH FLOOR 4TH FLOOR

13650 13650

3RD FLOOR 3RD FLOOR

10350 10350

2ND FLOOR 2ND FLOOR


UC305x305x118

UC305x305x118
UC305x305x97

UC254x254x73
7050 7050

UC356x356x177
UC305x305x97

CONSTRUCTION
UC356x368x129

UC305x305x118

UC356x356x177

UC356x356x177

UC305x305x118

PRELIMINARY
UC356x356x177
UC305x305x97

UC356x368x129
UC356x368x129

UC356x356x177

NOT FOR
1ST FLOOR 1ST FLOOR

3750 3750

GROUND GROUND

DATE
0 0

BASEMENT BASEMENT

REVISIONS
-3150 -3150

ISSUE
NO.
Column Locations B(1.3)-1(1.4),
B(1.3)-2, B(1.3)-3,
B(1.3)-3(4.7),
B(1.3)-5,
B(1.3)-5(-3.2),
A-2, A-3, A-4, A-5, A-5(2.4), B-5(2.4),
A-1, B(0.7)-1 A-6, A-8, D(1.5)-8 C(-1.2)-1(1.4), B-2, B-3, B-4 B-5, C-5 B-6 B(1.2)-6 B-8, C-8 C(2.3)-1A, D(1.5)-1A C-2, C-3, C-4 C-6 D-1 D-2 D-3 D-4 D-5 D-5(2.4) D-6, D-7
C-1 C(2.3)-6
C(-1.2)-2, C(-1.2)-3,

PROJECT NAME
C(-1.2)-3(4.7),
C(-1.2)-5,

PROJECT ADDRESS
C(-1.2)-5(-3.2),
C(-1.2)-6

COLUMN SCHEDULE
NOT TO SCALE

800 mm 900 mm 850 mm

BEAM REINFORCEMENT 2H16


T&B ESTIRRUPS @ 150mm
200 mm

12/21/19
As indicated
DS
DS
SHEET INFORMATION
H10 @200
4 H16
EST. H8 @ 4 H16
200mm EST. H8 @200mm

Job Number:
Checked By:
200 mm 2150 mm 200 mm

Drawn By:
1700 mm

Scale:
Date:
H10 @200 4 H16 H10 @200
EST. H8 @
200mm
4 H16
EST. H8 @200mm H10 @200
Sheet Name:
200 mm

COLUMN
SCHEDULE
ELEVATOR DETAIL
1 1 : 25
Sheet No:

S4.1
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1
A B S6.3 C D E
UPPER ROOF
19800

UC203x203x46
2.25
ROOF
17550
3.90

UC356x356x177
UC254x254x73

UC254x254x73

UC254x254x73

6.08
UB406X140X46 4TH FLOOR
13650

CONSTRUCTION
PRELIMINARY
NOT FOR
3.30

DATE
3RD FLOOR
10350

REVISIONS
3.30

ISSUE
2ND FLOOR
7050

NO.
3.30

PROJECT NAME
UC305x305x97

UC356x368x129

UC305x305x118

UC356x356x177

PROJECT ADDRESS
14.50

0.60
1ST FLOOR
3750
3.75

11/15/19
1 : 50
DS
DS
SHEET INFORMATION
GROUND
0

Job Number:
Checked By:
3 Retaining wall

Drawn By:
S1.3
3.15

Scale:
Date:
Retaining wall

Sheet Name:
BASEMENT
-3150

ELEVATION

Sheet No:

1
Section 1 S6.1
of
1 : 50
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
A B 1
2
C D E 5 6
S6.2
S6.3 UPPER ROOF
UPPER ROOF 19800
19800

2.25
ROOF
ROOF 17550

0.52
17550

0.64

3.38
3.26
4TH FLOOR
4TH FLOOR 13650

0.52

CONSTRUCTION
13650

PRELIMINARY
0.64

NOT FOR
2.78
2.66

DATE
3RD FLOOR
3RD FLOOR 10350

0.52
10350
0.56
0.73

0.71

REVISIONS

ISSUE
2.78
2.74

2.59
2.57

2ND FLOOR
2ND FLOOR 7050

0.52

NO.
7050
0.56

0.71
0.71

PROJECT NAME
2.78
2.74

2.59
2.59

PROJECT ADDRESS
B200X400C30 1ST FLOOR
1ST FLOOR 3750

0.52
3750
0.56

0.71
0.71

3.23
3.19

3.04
3.04

11/29/19
1 : 50
DS
DS
SHEET INFORMATION
B200X400C30 GROUND
GROUND 0

0.52
0
0.56

0.72
0.71

Job Number:
Checked By:
Drawn By:
2.63

Scale:
2.59

Date:
2.44

2.43

BASEMENT
Sheet Name:
BASEMENT -3150
-3150

ELEVATION 2

Sheet No:
Section 2
1 1 : 50

2
ELEVATOR CORE
1 : 50
S6.2
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
1
1 S6.2
1A 1 2 3 S6.1 7 8
4 5 6
UPPER ROOF
19800
2.25

ROOF

0.64
17550
3.90

3.26
4TH FLOOR

0.64
13650
3.30

2.66

CONSTRUCTION
PRELIMINARY
3RD FLOOR

NOT FOR
0.64
10350

0.71
3.30

2.66

2.59
2ND FLOOR

0.64
7050

0.71
3.30

DATE
2.66

2.59
4
S3.1

1ST FLOOR

0.64
3750

0.71

REVISIONS
3.75

3.04
3.11

ISSUE
GROUND
0.64 0

0.71
3.15

2.51

2.44
12

NO.
S1.2
BASEMENT
-3150

PROJECT NAME

PROJECT ADDRESS
Section 3
1 1 : 100

11/29/19
1 : 100
DS
DS
SHEET INFORMATION

Job Number:
Checked By:
Drawn By:
Scale:
Date:
Sheet Name:

SECTIONS

Sheet No:

S6.3
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1
CONSTRUCTION
PRELIMINARY
NOT FOR

DATE
REVISIONS

ISSUE
NO.
PROJECT NAME

PROJECT ADDRESS
11/15/19

DS
DS
SHEET INFORMATION

Job Number:
Checked By:
Drawn By:
Scale:
Date:
Sheet Name:

3D VIEW

Sheet No:
STRUCTURE 3D VIEW
NOT TO SCALE S6.4
of
TICK MARKS ON THE BINDING MARGIN AND UPPER MARGIN ARE @ 1" CENTERS. IF THE TICK MARKS ARE NOT @ 1" CENTERS, THIS SHEET HAS BEEN REPRODUCED AT A SCALE OTHER THAN 1:1

Vous aimerez peut-être aussi