Curriculum Vitae

Tarek Abulail
Senior Construction Services / Structural Design Engineer
Key Projects

NORTH WEST RAIL LINK – NORWEST STATION – CPB – CIVMEC

CASLE HILL / SHOWGROUNDS STATIONS – KENNY CONSTRUCTIONS.

Design and revise the construction sequence methodology of the


station structures to minimise building time.

Design multiple formwork systems to mobilise all site activities,


Profile including 10.2m high single sided wall precast retaining wall, OTE
precast slab shoring and 11m high single sided CIS walls jumping
Combining our extensive knowledge of formwork.
buildings construction industry and our
professional experience of - Australian Based - Analysis and design of Mezzanine slab level structural stability
formwork / temporary works design, enables during erection of precast elements.
us to provide safe and economic solutions to
execute and complete any structure with Design of shoring system for slab supporting 10Ton capacity mobile
minimising site on going coast requirements crane to be mobilised over the suspended slab and shoring during
and reasonably shortens project’s completion erection of precast elements.
time.
Design and review of precast elements lifting points
Key Attributes
Pre-pour onsite inspections and certification of as-built.
Structural Engineering
WestConnex and Northconnex – Thiess, John Holland, Dragados.
Formwork/Falseworks (Temporary Works)
Design tunnel formwork with UNI-SPAN group using ULMA
Experienced in the following software: formwork system MK structure.

Microstran, TEDDS-TEKLA, Limcon, STK, Design 14.0m high single sided formwork system using ULMA
SAP2000, ETABS, SAFE-FEM, Robot formwork system MK structure.
Structural Analysis Professional, Concise,
IDEA StatiCa, Prokon, Oasys-ADC, Client continuous changing requirements were a challenge to meet
AutoCAD, AutoCAD Mechanical. at the tendering stage, which we met successfully.

Software used MICROSTRAN, SAP2000, ETABS, Robot Structural,


LIMCON, TEDDS TEKLA, IDEA StatiCa and AutoCAD.
Qualifications
ICHTHYS ONSHORE LNG FACILITIES – Lainge O’Rourke
BSc. Civil Engineering
Design single sided formwork for the circular LNG tanks, reused at
BE (Civil) MEI Aust the top ring beam supported by climbing system and access to
Curriculum Vitae

reach 40.0m high above the ground. RAK Sewerage System – Phase 1 – Jog Union Engineering – Dubai
UAE
Design for minimum 12.0m long sections
to utilize safe carnage use. As site engineer for the main pumping station duties were as listed
below:
Software used MICROSTRAN, SAP2000,
AutoCAD Overseeing excavation works supported with dewatering system

The Victorian Desalination Plant – Thiess Mobilization and demobilization for all site activities from
Degremont excavations to the last finishing activity (key handling).

Design walls and climbing formwork After finishing the pumping station, I was transferred as project
system for the main pumping station engineer responsible for the following duties:
supported with structural calculations.
Managing site layout and logistics.
This was my first Job at PERI Australia and
was delivered and progressed on time Supply, monitoring and installation of 1500mm, 900mm and
without any delay. 200mm diameter pipes.

Software used MICROSTRAN, AutoCAD Supervise dry and wet house connections and generate weekly
report.
Dubai Sports Complex and Burj-Views
Towers – Binladin Contracting Group – Faris Bagaeen Archetics – Amman - Jordan
Dubai UAE
As site engineer for constructing different buildings my duties were
As structural engineer duties were as to supervise contractors and subcontractors’ activities and ensure
listed below: the specifications and site safety concerns and project duration.

Redesign RC slabs and columns using CSI Previous Employment


SAFE and CSI COLUMN software.
Prepare workshop drawing supported
with relevant calculations. Present SEDAUS Director
Redesign shear walls using ETABS and
Lindsay Dynan Senior Structural Design
SAP2000 to ensure seismic and wind loads 2017- 2018
Consulting Engineers Engineer - Casual
design adequacy.
Senior Structural Design
2016-2017 ADG Engineers
Engineer
Provide appropriate solutions for
Director-Parallel own
engineering problems, safety
Sydney Engineering business in formwork
requirements and environmental 2013- Date
Designs (Australia) design mainly UNI-SPAN
concerns, especially for the mistakes were SEDAUS and NOVATEC products.
done by site personnel.
Novatec Formwork Senior Formwork Design
2011-2013
Systems (Australia) Engineer
Verifying main subcontractors’ claims and
carrying out final work measurements. 2010-2011 PERI (Australia) Design Engineer

Undertaking duties as architectural Binladin Contracting


2006-2009 Structural Engineer
precast subcontractor coordinator. Group (Dubai)
Jog Union Engineering
2004-2006 Site Engineer
Managing cost of formwork rental and (Dubai)
purchase. Faris Bagaeen Archetics
2001-2004 Site Engineer
(Amman)