Presentation on
Construction of Kalyani Expressway
Muragacha Ch. 4+565 Km to Kampa Ch. 35+340 Km
(Phase -II )
Contractor : Dineshchandra R. Agrawal Infracon Pvt. Ltd
1
Start Point and End Point of Project Road
Start Point of Project- Muragacha (Ch. 4+565 KMP)
Kalyani
Barajaguli (NH-34)
Kanchrapara
NH-34/Airport
Nivedita Setu/NH-2
Muragacha More
Chainage-4+565KM Chainage-35+340 KM
Start point of Project Road at Belgharia End point of Project Road at
Expressway near Hotel Moon Light Package-III intersection near
Mathurabill Khal
Importance of Project Road
To facilitate the alternate routs for Sodepur, Panihati, Khardah, To facilitate the alternate routs to the
Titagarh, Barrackpore, Ichapur, Garulia, Shyamnagar, Bhatpara, congested
Kakinada, Naihati, Halishahar & Kanchrapara by avoiding BT NH-34 (Birati To Barajaguli) through
Road and Ghoshpara road for Kalyani Bound traffic and other Airport, Birati, Doltals
municipalities traffic. Madhyamgram, Barasat and level
crossings for North Bound Traffic
Project Description
• Two Segments
1. Segment C : Muragacha (Ch 4+565) to Kampa Jn (Ch
34+000):
2. Segment D: Kampa Jn (34+000) to Package-III interchange
(Ch 34+434) to connecting ramp of elevated Kampa Bypass
of Package-III
Project Brief
Length of Project 30.244Km
Contract / Phase Phase-II
Bid Project Cost 1224 Cr.
5
Salient Features
1 Widening to 6 lane
2 Widening to 4 lane
3 Service Road
4 Slip Road
5 Nos of VUPs 5
6 Nos of LVUPs 7
7 Nos of PUPs 5
8 Fly over 1
9 Reconstruction of RCC Culvert 23
10 Widening of Existing Culverts 35
11 New Culvert 9
12 Major Junctions improvement 5
13 Minor Junctions improvement 17
14 Bus shelters 56
15 Toilet facilities 5
16 Toll Plaza 1
17 Truck Lay-By 1
18 Traffic Aid post 1
6
Photograph of Existing Road
7
Typical Cross Section
8
9
Intersection Improvement
10
List Of VUP
Proposed Vent Size
Proposal Chainage Lateral Vertical Location
Clearance Clearance
(m) (m)
VUP/1 5+140 48.96 5.5 Muragacha More
VUP/2 13+895 48.96 5.5 Wireless More
VUP/3 25+359 24.0 5.5 Panpur More
11
VUP/1-Muragacha More (Ch 5.140)
Shodepur
Kampa
Belgharia Expressway
Madhyamgram
12
VUP/2- Wireless More (Ch- 13+895)
Barrackpore
Kampa
Belgharia Exp
Barasat
13
VUP/3- Panpur More (Ch 25+359)
Kakinada
Kampa
Wireless More
NH-34
Kampa
Kakinada
NH-34
14
Wireless More
15
VUP-4- Saheb Colony More Ch 28+303
16
17
VUP-5- Shilpayan Ch 30+379
Industrial Area
KAMPA
Industrial Area
WIRELESS MORE 18
19
List of LVUP s
Proposed Vent Size
Proposal Chainage Lateral Vertical Location
Clearance (m) Clearance (m)
LVUP/1 6+725 12.0 3.5 Deshapriya Nagar
LVUP/2 9+144 24.0 3.5 Rahera Bazar & Doperia
Xavier Institution and Bus
LVUP/3 12+141 16.0 3.5
Terminus
LVUP/4 14+875 12.0 3.5 DAV School
Crossing with Shyamnagar-
LVUP/5 20+066 12.0 3.5 Ghoshpara Rd and
Kadamtala-Basudevpur Rd
LVUP/6 29+313 12.0 3.5 Rajendrapur More
LVUP/7 32+212 12.0 3.5 Panchmatha More
20
Ch. – 06+725
Ch. – 12+141 21
Ch. – 14+875 Ch. – 20+066
25
Ch. – 10+213 Ch. – 10+900
Ch. – 21+140
Ch. – 18+205
26
27
Proposed Way Side Amenities
28
Location of Truck Terminus and Its
approximate Capacity
30
Segment D :Kampa to Ramp of
interface of elevated Kampa Bypass
• DPR for this portion being undertaken by RITES.
• As per preliminary alignment scheme the details of
structures are as follows:
1. 6 Lane Flyover at Kampa Junction along BK
Expressway Length 680 meters
2. Connecting Ramp at 2nd Level. Length 640 m
3. Right Turning ramp at 3rd level Length =860m.
32