West Bengal Highway Development

Corporation Limited

Presentation on
Construction of Kalyani Expressway
Muragacha Ch. 4+565 Km to Kampa Ch. 35+340 Km
(Phase -II )
Contractor : Dineshchandra R. Agrawal Infracon Pvt. Ltd

1
Start Point and End Point of Project Road
Start Point of Project- Muragacha (Ch. 4+565 KMP)

End Point of Project- Mathurabill (Ch. 35+340 KMP).

Dumdum Kalyani Expressway

Kalyani
Barajaguli (NH-34)
Kanchrapara
NH-34/Airport

Nivedita Setu/NH-2
Muragacha More

Chainage-4+565KM Chainage-35+340 KM
Start point of Project Road at Belgharia End point of Project Road at
Expressway near Hotel Moon Light Package-III intersection near
Mathurabill Khal
Importance of Project Road
To facilitate the alternate routs for Sodepur, Panihati, Khardah, To facilitate the alternate routs to the
Titagarh, Barrackpore, Ichapur, Garulia, Shyamnagar, Bhatpara, congested
Kakinada, Naihati, Halishahar & Kanchrapara by avoiding BT NH-34 (Birati To Barajaguli) through
Road and Ghoshpara road for Kalyani Bound traffic and other Airport, Birati, Doltals
municipalities traffic. Madhyamgram, Barasat and level
crossings for North Bound Traffic
Project Description
• Two Segments
1. Segment C : Muragacha (Ch 4+565) to Kampa Jn (Ch
34+000):
2. Segment D: Kampa Jn (34+000) to Package-III interchange
(Ch 34+434) to connecting ramp of elevated Kampa Bypass
of Package-III
Project Brief
Length of Project 30.244Km
Contract / Phase Phase-II
Bid Project Cost 1224 Cr.

Authority West Bengal Highway Development Corporation Limited

Authority Engineer Yet to be appointed


EPC Contractor Dineshchandra R. Agrawal Infracon Pvt. Ltd.
Design Consultant ASC Infratech
Safety Consultant Yet to be appointed
Date of LOA 23rd Oct-19
Date of Agreement 20.12.2019
Appointed Date Yet to be decalred
Construction Period 912 days (30 months)
Maintenance Period 5 years

5
Salient Features
1 Widening to 6 lane
2 Widening to 4 lane
3 Service Road
4 Slip Road
5 Nos of VUPs 5
6 Nos of LVUPs 7
7 Nos of PUPs 5
8 Fly over 1
9 Reconstruction of RCC Culvert 23
10 Widening of Existing Culverts 35
11 New Culvert 9
12 Major Junctions improvement 5
13 Minor Junctions improvement 17
14 Bus shelters 56
15 Toilet facilities 5
16 Toll Plaza 1
17 Truck Lay-By 1
18 Traffic Aid post 1
6
Photograph of Existing Road

7
Typical Cross Section

8
9
Intersection Improvement

10
List Of VUP
Proposed Vent Size
Proposal Chainage Lateral Vertical Location
Clearance Clearance
(m) (m)
VUP/1 5+140 48.96 5.5 Muragacha More
VUP/2 13+895 48.96 5.5 Wireless More
VUP/3 25+359 24.0 5.5 Panpur More

VUP/4 28+303 24.0 5.5 Saheb Colony More


2 lane (Divided)
Road to LHS- W.B.
VUP/5 30+379 16.0 5.5
Shilpayan Dev. Co.
Ltd

11
VUP/1-Muragacha More (Ch 5.140)

Shodepur

Kampa

Belgharia Expressway
Madhyamgram
12
VUP/2- Wireless More (Ch- 13+895)

Barrackpore

Kampa

Belgharia Exp

Barasat
13
VUP/3- Panpur More (Ch 25+359)

Kakinada

Kampa

Wireless More

NH-34
Kampa
Kakinada

NH-34

14
Wireless More
15
VUP-4- Saheb Colony More Ch 28+303

16
17
VUP-5- Shilpayan Ch 30+379

Industrial Area

KAMPA

Industrial Area

WIRELESS MORE 18
19
List of LVUP s
Proposed Vent Size
Proposal Chainage Lateral Vertical Location
Clearance (m) Clearance (m)
LVUP/1 6+725 12.0 3.5 Deshapriya Nagar
LVUP/2 9+144 24.0 3.5 Rahera Bazar & Doperia
Xavier Institution and Bus
LVUP/3 12+141 16.0 3.5
Terminus
LVUP/4 14+875 12.0 3.5 DAV School
Crossing with Shyamnagar-
LVUP/5 20+066 12.0 3.5 Ghoshpara Rd and
Kadamtala-Basudevpur Rd
LVUP/6 29+313 12.0 3.5 Rajendrapur More
LVUP/7 32+212 12.0 3.5 Panchmatha More

20
Ch. – 06+725

Ch. – 12+141 21
Ch. – 14+875 Ch. – 20+066

Ch. – 29+313 Ch. – 32+212 22


23
24
List Of PUPs
Proposed Vent Size
Vertical
Proposal Chainage Lateral Location
Clearance
Clearance (m)
(m)
At a crossing (LHS- Titagarh RHS-
PUP/2 10+213 10.5 3.0
Nilganj)
At a crossing (LHS- Titagarh RHS-
PUP/3 10+900 10.5 3.0
Darbhanga)
PUP/5 18+205 10.5 3.0 Raghunathpur More

PUP/6 21+140 10.5 3.0 Purba Rauta Sishu Sikhsha Kendra

PUP/7 26+850 10.5 3.0 Near Maradona High School

25
Ch. – 10+213 Ch. – 10+900

Ch. – 21+140
Ch. – 18+205
26
27
Proposed Way Side Amenities

SL. No. Chainage (Km) Side Remarks

1 5+141 Left Toilet (Use & pay)

2 13+900 Right Toilet (Use & pay)

3 25+400 Right Toilet (Use & pay)


5 28+351 Left Toilet (Use & pay)

6 32+260 Right Toilet (Use & pay)

28
Location of Truck Terminus and Its
approximate Capacity

Location of Proposed Truck Terminus


(Ch-16+350 to Ch-16+600)
(Capacity 200 Approx)
29
Location Of Toll Plazas (Ch: 24+075)

MURAGACHA MORE KAMPA MORE

30
Segment D :Kampa to Ramp of
interface of elevated Kampa Bypass
• DPR for this portion being undertaken by RITES.
• As per preliminary alignment scheme the details of
structures are as follows:
1. 6 Lane Flyover at Kampa Junction along BK
Expressway Length 680 meters
2. Connecting Ramp at 2nd Level. Length 640 m