Vous êtes sur la page 1sur 3

CH G TEST REPORT FOR VACCUM / SF6 GAS CIRCUIT

BREAKER
O LTE

R O U
P DOC. NO. : VEPL/T&CF/CB/009/Rev : 0
VOLTECH ENGINEERS PVT.
V
JOB REF NO : VEPL/TR/ /
LTD. DATE : Page No
Excellent Electrical Service

CLIENT : M/s.
PROJECT : Sheet No 1 of 3

1. Date of Erection : Date of Energization (or) :


Last Calibration :
2. Equipment Details :

LOA No :
Make :
Type :
Rated Volts :
Rated Current :
Making Capacity :
Breaking Capacity :
Operating Duty :
Sl. No. :
Mfg Year :

3. Location & Feeder Name :

4. General Inspection :

5. Insulation Resistance Test : (Using ____________________ Megger) Date :

Make : Range : Sl. No. Calib due Date :

Make : Range : Sl. No. Calib due Date :

Ref R ph Y ph B ph
Pole to Earth (CB Closed)
Across Contact (CB Open)
Control Cables with LT Megger

6. Contact Resistance Test : (Values in Micro Ohms) (Using Equipments Details)

Make : Range : Sl. No. Calib due Date :

R ph Y ph B ph

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
CH G TEST REPORT FOR VACCUM / SF6 GAS CIRCUIT
BREAKER
O LTE

R O U
P DOC. NO. : VEPL/T&CF/CB/009/Rev : 0
VOLTECH ENGINEERS PVT.
V
JOB REF NO : VEPL/TR/ /
LTD. DATE : Page No
Excellent Electrical Service

CLIENT : M/s.
PROJECT : Sheet No 2 of 3

7. Pick up Voltage of Operating Coil : (Using Equipments Details)

Make : Range : Sl. No. Calib due Date :

Closing Coil (70% of Rated Volts)


Tripping Coil (50% of Rated Volts)

8. High Voltage Test : (Using Equipments Details)

Make : Range : Sl. No. Calib due Date :

Test Voltage____________________ Duration ________________

Voltage Applied Leakage Current Measured Result


Between in Micro Amps
R ph + Y + B + E
Y ph + B + R + E
B ph + R + Y + E

9. Breaker Operating Time at Rated Pressure and Rated Coil Voltage Test : (Using Equipments Details)

Make : Range : Sl. No. Calib due Date :

R ph Y ph B ph
Closing
Tripping
Close – Open

10. Operational checks :

a. Manual
Close
Open
b. Electrical
Close
Open
Protection Tripping
Anti Pumping Function
SF6 Gas Pressure Low

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
CH G TEST REPORT FOR VACCUM / SF6 GAS CIRCUIT
BREAKER
O LTE

R O U
P DOC. NO. : VEPL/T&CF/CB/009/Rev : 0
VOLTECH ENGINEERS PVT.
V
JOB REF NO : VEPL/TR/ /
LTD. DATE : Page No
Excellent Electrical Service

CLIENT : M/s.
PROJECT : Sheet No 3 of 3

11. Functional Checks:

Emergency Trip
ON-OFF Indication
Spring charge Limit Switch
CB Aux. contacts
Auto Trip Indication
Trip circuit healthy
Sf6 gas pressure indication
Interchangeability of CB
Aux Switch operation (__________No+_________No)
Operation Counter
Heater / Heater Switch / Thermostat
Illumination lamp

12. Remarks :

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date

Vous aimerez peut-être aussi