Ia) Objective:
There were 2 phases of this Project. The 1st phase was to migrate from Single Instance QUATINS, PERFATTR,
MFUNMCY and EPFQNTS databases on SET-II RAC Setup and 2nd phase was to migrate Single Instance DEDUP,
MKTDB, APPSDB and PRUICICI databases on SET-I RAC Setup.
Ib) Background:
Based on the initial discussion and the final proposal submitted by Clover Infotech, this document outlines all the
activities carried out at ICICI Prudential Mutual Fund, Goregoan
Verifying and sorting out the installation pre-requisites for Oracle 10g
3. CIPL / ICICI Pru Completed
RAC
4. Installation of Oracle 10g CRS on both the cluster nodes CIPL Completed
11. Configured the Listener and Tnsnames files for RAC Databases. CIPL Completed
Failover testing of reporting session done for the foll. scenarios - Node
13. reboot, OS cluster shutdown, Heartbeat network disconnectivity and CIPL Completed
Public network disconnectivity
Verifying and sorting out the installation pre-requisites for Oracle 10g
3. CIPL / ICICI Pru Completed
RAC
4. Installation of Oracle 10g CRS on both the cluster nodes CIPL Completed
Creation of Different ASM Diskgroup for Datafiles and Redolog files for
9. CIPL Completed
each databases.
11. Configured the Listener and Tnsnames files for RAC Databases. CIPL Completed
Failover testing of reporting session done for the foll. scenarios - Node
13. reboot, OS cluster shutdown, Heartbeat network disconnectivity and CIPL Completed
Public network disconnectivity
SET-II
Phase Include (Clusterware, Oracle Installation, DB Creation, UAT Release, Prod. Go-Live):
18th October, 2010 TO 30th October, 2010
SET-I
Phase Include (Clusterware, Oracle Installation, DB Creation, UAT Release, Prod. Go-Live):
25th October, 2010 TO 20th November, 2010
DR Setup : 22nd November, 2010 - 23rd November, 2010
AUTHORIZED SIGNATORY