CCECC-KEC (JV)

DELHI METRO RAIL CORORATION

Client :-DMRC Doc no: CCECC-KEC JV/DMRC/DC-01/CL/02


Contract :- CCECC-KEC (JV) Rev-0

Project:DC-01
FABRICATION RECORD
LOCATION /
PILE NO.
STRUCTURE

PREPARED BY
(SITE ENGG.)
REINFORCEMENT DETAIL

REINFT. DRAWING
NO.

CAGE SECTION UNIT AS PER DWG. FABRICATED

Cage Length M

Cage Diameter M

Spacers & Cover blocks Spacing as Per MS mm

Cover block uniform thickness

Main Bars

Diameter / Spacing Check( as per Drawing/BBS)

Helical bars

Diameter / Spacing Check ( as per Drawing)

Position of splices check

All Spacers & Cover blocks Check

All Welds & Laps Check

Lifting Hook & Lifting Point check


REMARKS

Page 1 of 1
CCECC-KEC (JV) DMRC

Page 1 of 1
DMRC/DC-01/CL/02

Page 1 of 1
Page 1 of 1
CCECC-KEC (JV)
DELHI METRO RAIL CORPORATION

Doc no: CCECC-KEC JV/DMRC/DC-0


Client DMRC
Contractor : CCECC-KEC (JV) Date:
Project Name :-DC-01
BORING RECORD
Location / Structure Pile No.
Pile Type
Pile Co-ordinates
Northing: Easting:
Type of Boring Pile Dia (mm)
Type of Equipment Liner Thickness (mm)
PILE BORING DETAILS STRATA DETAILS
DESCRIPTION UNIT AS BUILT DEPTH (M) SOIL DESCR
GROUND LEVEL M
CUTOFF LEVEL M
LINER TOP LEVEL M
FOUNDING LEVEL M
LENGTH OF CASING / LINER M 5
VERTICALITY OF LINER CHECKED
Required Depth of Pile as Per Approved
Drawing

Achived Depth of Pile

YES/ NO

ELEVATION 10
START FINISHED
FROM (M) TO (M) ACTIVITY DATE
TIME TIME

15

20

25

30

35
40

REMARKS:

CCECC-KEC (JV) DMRC


V/DMRC/DC-01/CL/03

RATA DETAILS
SOIL DESCRIPTION
CCECC-KEC (JV)
DELHI METRO RAIL CORPORATION LIMITED
BAR BENDING SCHEDULE
Project: DC-01
Location: KESHOPUR NORTH PRITAMPURA METRO Drawing No : Report No. :
Structure / Member : Date : Page :
Total Length
Dia of Cut Length No. Per No. Of Total
Location Bar mark Shape of Bar
Bar Bar (mm) Member Member Number 8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm 36mm

Total Length (m)

Unit Weight (kg/m)


Dia wise total Weight (kg)
Total Weight (MT)

CCECC-KEC Representative DMRC


CCECC-KEC (JV)
DC–01 Part Design and Construction of Elevated Viaduct, Ramp, Siding Line and Ten Stations of
Janakpuri West to R.K. Ashram Corridor of DELHI METRO RAIL PROJECT, PHASE - 4
PILE CONCRETE POUR RECORD
Doc no: CCECC-KEC JV/DMRC/DC-01/CL/05
Date (i) Pile Dia. Grdae of Concrete

Location (ii) Final Sounding from Casing Concrete Temp:5-320C

Pile No. (iii) Total volume Slump:150-175

(iv) Theoretical Pour Volume


Discharge Time Concrete Volume
Delivery TM at Slump Temp. in 0C Ambi. Temp 0 Test Cube
Batch time TM No Remarks (O )
Ticket No. Site(Time) Start Finish (mm) C Ref.
Load (m ) Total(m )
3 3

Remarks

CCECC-KEC Representative
CCECC-KEC (JV)
DELHI METRO RAIL
CORPORATION

PROJECT: DELHI METRO RAIL PROJECT - DC-01

CLIENT: DELHI METRO RAIL LIMITED

CONTRACTOR: CCECC-KEC JV
Doc no: CCECC-KEC JV/DMRC/DC-01/CL/06

Name of section:

Location/Structure:

No. Date:

Tremie Chart
A. Fixing of Tremie Pipe

Pile No : Date:

Dia. Of Pile : Final Sounding :

Depth of Pile from COL : Cut Off Level :

Hard/Soft Rock Level : Founding Level :

Concrete top level : Set No :

A.Fixing

S.No. Cumulative Lowering length Tremie length Lowering


CCECC-KEC JV DMRC
V/DMRC/DC-01/CL/06

ie length Lowering
DMRC
CCECC-KEC (JV)
DELHI METRO RAIL CORPORATION

PROJECT : DELHI METRO RAIL PROJECT - DC-01

CLIENT : DELHI METRO RAIL LIMITED

CONTRACTOR : CCECC-KEC JV
Doc no: CCECC-KEC JV/DMRC/DC-01/CL/07

Name of section:

Location/Structure:

No. Date:
Tremie Chart-Removel
Tremie Chart

Tremie Removel Chart


Concrete Total Tremie
Theoritical Theoritical Actual Tremie Cumulative
Length in Remark
Per batch Cumulative built up Sounding Sounding removed length
Concrete
CCECC-KEC JV