Survey DWDM UNIFIED

SITE NAME/ID : PAITON / 1643

CITY : PROBOLINGGO

AREA : EAST JAVA

SITE TYPE : SHELTER

ADDRESS : Blok Matikan Ds.Sumber Rejo Kec.Paiton


Kab.Probolinggo

XL HUAWEI
Approved by, Approved by,
PT. Huawei Tech. Investment
o Kec.Paiton
1. GENERAL INFORMATION
Project Name XL DWDM UNIFIED 2019
Site Name PAITON City PROBOLINGGO
Site ID 1643 Longitude 113.549575
Street Address JL.PB.SUDIRMAN(JALAN GENTENGAN GG.V)DESA PULO LOR,KEC.JOMBANG,JOMBANG,EASTJ
Site Type SHELTER Owner XL
Shelter Type
List of Surveyor:
No. Name Company E-mail
1 Gunoto PT. MKU
2 Eko Budi PT. MKU
3
List of Customer PIC:
No. Name Company E-mail
1 KHOLIK XL
2
3
List of Proposed Equipments:
Cabinet Dimension
No. Equipment Type Quantity (W x D x H) mm

H:2200 x W : 300 x L:
1 600

-
Total
1. GENERAL INFORMATION
XL DWDM UNIFIED 2019
AREA East Java
Latitude -7.71808056
GG.V)DESA PULO LOR,KEC.JOMBANG,JOMBANG,EASTJAVA
Date of Survey 21-12-2019

E-mail Cell Phone


+62 823-0205-7608
+62 823-3234-5837

E-mail Cell Phone


+62 81939521616

Power MCB x Pcs


(Watt) (AC / DC)

63 X 2 (DC)

-
0
2. ENVIRONMENT INSPECTION FORM
Site Name PAITON City PROBOLINGGO
Area East Java Site Type SHELTER

Inspection Items Status Remark


Equipment Room
There is an available equipment room for this ●Yes □No □N/A Yes
project
The existing room is ready in space ●Yes □No □N/A Yes
The existing room is ready in decoration ●Yes □No □N/A Yes
The existing room is ready in air conditioner ●Yes □No □N/A Yes
The existing room is ready in cable tray ●Yes □No □N/A Yes
Power System
The main AC power (for rectifier & UPS) is available ●Yes □No □N/A Yes
The main AC breaker(for rectifier & UPS) is enough ●Yes □No □N/A Yes
The branch AC power (for equipment) is available ●Yes □No □N/A Yes
The branch AC breaker(for equipment) is enough ●Yes □No □N/A Yes
The rectifier is available and enough in capacity ●Yes □No □N/A Yes
The rectifier fuse is available and enough in ●Yes □No □N/A Yes
capacity
The DCPDB/PDF is available and enough in capacity □Yes □No ●N/A N/A
The DCPDB MCB is available and enough in □Yes □No ●N/A N/A
capacity
The grounding bus bar is available ●Yes □No □N/A Yes
Transmission & Signal
The ODF/OTB is available and enough in capacity □Yes □No ●N/A N/A
The DDF/DSX is available and enough in capacity □Yes □No ●N/A N/A
The MDF is available and enough in capacity □Yes □No ●N/A N/A
The LAN/IP is available and enough ports □Yes □No ●N/A N/A
The CLOCK is available and enough ports □Yes □No ●N/A N/A
Note: “N/A” means “not involved”.
Remarks
3. SURVEY DATA
Site Name PAITON City PROBOLINGGO
Area East Java Site Type SHELTER

No. ITEM Length/Qty Remarks Provide By


NYAF 25mm^2 From OSN to
1 Black (include 10m/2 Huawei
DCDU
Vinyl & scun)

NYAF 25mm^2 From OSN to


2 Blue (include 10m/2 Huawei
DCDU
Vinyl & scun)

NYAF 25mm^2 Frm OSN to


Yellow
3 15m Indoor Huawei
Green(include Grounding
Vinyl & scun)

double
4 DCPDB 0 Huawei
source and
output design

5 Breaker 63A 63A/2 propose to Huawei


rectifier
NYAF 50mm^2
6 Black (include 0 Recti - DCPDB Huawei
Vinyl & scun)
NYAF 50mm^2
7 Blue (include 0 Recti - DCPDB Huawei
Vinyl & scun)

Patch cord LC-SC LC-FC/UPC 20m For OSN service


8 Huawei
(Single length) to ODF

Optical Conduit Patch cord


9 20m Huawei
Indoor protection

10 Cable LAN 20m To router Huawei


4. PLN POWER CALCULATION
Site Name PAITON AREA East Java
CITY PROBOLINGGO SITE TYPE SHELTER
Site ID 1643 SITE OWNER XL

KWH UNIT ATS


IDPEL
Phase 1 / 3 Phase 3
PLN MCCB Capacity (Each Phase) Ampere 96
PLN Capacity VA 63360
R Current Load (Measured) Ampere 69
S Current Load (Measured) Ampere 102
T Current Load (Measured) Ampere 47.4
N Current Load (Measured) Ampere 8.3
TOTAL LOAD PLN VA 49874
R-N Voltage Volt 230.9
S-N Voltage Volt 231.5
T-N Voltage Volt 229.7
N - PE Voltage Volt 0.003
GENSET UNIT GENSET 1
Brand HIMOINSA
Type (Silent / Non Silent ) Non Silent
Genset Room (Canopy / Room) Canopy
kVA Capacity VA 33500
Quantity unit 1
Condition

ACPDB UNIT ACPDB 1

Phase 1 / 3 Phase 3
ACPDB MCB Capacity Ampere 90
R Current Load (Measured) Ampere 28.9
S Current Load (Measured) Ampere 11.8
T Current Load (Measured) Ampere 45.5

PLN & GENSET Calculation


Existing Load VA 49874
Battery Charging VA
PLN Utilization before add new load % 79%
Genset Utilization before add new % 149%
load
New Proposed Equipment VA 1633
Additional Air Condition ( if any
changes from previous Cooling VA 3730
capacity or running sequence)
Additional New Rectifier VA 0
Total AC Power Requirement VA 5363
PLN Power Availability VA 63360
Remain Power PLN VA 8124
Remain Power Genset VA 0
PLN Utilization after add new load % 87%
Genset Utilization after add new load % 0
RESULT
PLN
THRESHOLD PLN % 80%
STATUS OK/UPGRADE UGRADE PLN
UPGRADE TO kVA
GENSET
THRESHOLD GENSET % 80%
STATUS OK/UPGRADE OK
UPGRADE TO kVA
REMARKS

Need upgrade MCB ACPDB from 63A to 100A


4. PLN POWER CALCULATION

KWH2 KWH3 KWH4 REMARKS


513570571152

GENSET 2 GENSET 3 REMARKS

ACPDB 2 ACPDB 3 REMARKS

PLN & GENSET Calculation


RESULT
PLN

GENSET

REMARKS
4A COOLING CALCULATION
Site Name PAITON AREA Ea
CITY PROBOLINGGO SITE TYPE SH
Site ID SITE OWNER
AC SPLIT
AC SPLIT UNIT AC SPLIT 1 AC SPLIT 2 AC SPLIT 3 AC SPLIT 4 AC SPLIT 5
Location / Room / Shelter
MEREK LG Daikin
CAPACITY PK 2 2
TEMPERATURE INSIDE °C 24 24
QUANTITY Pcs 1 1
TOTAL LOAD PLN VA 1865 1865 0
CAPACITY COOLING BTUH 18000 9000 0
COOLING CALCULATION
EQUIPMENT Watt
LAMP Watt 80
BTUH 272.96
COOLING EXISTING % 1%
UTILIZATION
Watt 1632.5
NEW LOAD
BTUH 5,570.09
COOLING EXISTING + NEW % 22%
LOAD UTILIZATION RESULT
THRESHOLD COOLING % 80%
STATUS COOLING OK/ADD OK
REMAIN CAPACITY COOLING BTUH 12,156.95
CAPACITY PK
QUANTITY Unit

REMARKS
OLING CALCULATION
East Java
SHELTER

AC SPLIT 6 Load

3730
27000
OLING CALCULATION

RESULT

REMARKS
4. DC POWER SUPPLY 1
Site Name PAITON City

Area PROBOLINGGO Site Type

Rectifier UNIT PowerSuppy 1 PowerSuppy 2


Brand EATON EATON
Model APR48 APR48
Current Load Ampere 32 12
Total Rectifier Module Slots Slot 6 6
Capacity per Rectifier Module Watt 3000 3000
Qty of Rectifier Module Installed Pcs 5 3
Each Module Capacity Ampere 32 12
Current Max Output Ampere 275 165
Rectifier Effective 12 7
Qty of Idle Rectifier Module Slots Slot 1 3
Total Circuit Breaker Slots Slot 19 18
Qty of Circuit Breaker Installed Pcs 17 14
Qty of Occupied Circuit Breaker Pcs 17 13
Qty of Idle Circuit Breaker Pcs 0 1
Qty of Idle Circuit Breaker Slots Slot 17 14
Battery UNIT Battery 1 Battery 2
Brand POWERFIT POWERFIT
Model FT110-12 FT110-12
Ah per Bank Ah 105 105
Qty of Banks Banks 3 2
Total Ah Ah 315 210
Remarks
Existing DC Power Calculation Rectifier 1
Existing Current Load 1744
Total Battery Charging 1859
Total DC Load 3603
Rectifier DC Avalibility 15000
Rectifier Usage 24
Remaining Power 11398
Result OK
New Upgrade DC Power Calculation Rectifier 1
Existing Current Load 1744
Total Battery Charging 1859
Total Load of Proposed Equipment 0
Watt
Watt
Watt
Total DC Load 3603
Rectifier DC Avalibility 15000
Rectifier Usage 24
Remaining Power 11398
Result OK

Result
Note: Power Supply connect from Rectifier 1
DC POWER SUPPLY 1
Pontianak

CKD

Watt
Watt BWS1600G
Watt
Watt
%
Watt
Watt
Watt
Watt

Watt
Watt
%
Watt
7. LOCATION PHOTOS 1
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1.Main Entrance 2 . View Row inside

3 . View Row inside 4 . View Row inside

5. View Row inside 6 . View Row inside


6. INTERIOR PHOTOS
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1 . Main Entrance View 2 . View Row inside

3 . View Row inside 4 . View Row inside

5 . View Row inside 6 . View Row inside


8. DC POWER PHOTOS 1
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1 . Rectifier Eaton (for Main Power) 2 . Module Rectifier Eaton

3 . Current Load 4. DC Breakers


5 . Battery 6. Battery Capacity
8. DC POWER PHOTOS 2
Site Name PAITON City PROBOLINGGO

Area EAST JAVA Site Type SHELTER

N/A N/A

1 . Rectifier 1 EATON (For stand by Power) 2 . Module Rectifier eaton

N/A N/A

3 . Current Load 4. DC Breakers

N/A N/A
N/A N/A

5 . Battery 6. Battery Capacity


8. EXISTING EQUIPMENT PHOTOS
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1. Existing Equipment 2. Existing Equipment

3. Existing Equipment Rack internal view 4. Existing Equipment Rack internal view

5. Existing Equipment Rack internal view 6. Existing Equipment Rack internal view
10. EXISTING EQUIPMENT PHOTOS-2
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

N/A

1. Existing Ground bar 2. Existing OTB Optical

N/A

3. Existing OTB Optical 4. Existing T-Line

N/A

5. Fiber tray for Huawei WDM-Client OTB/router 6. External alarm DDF


10. PROPOSED EQUIPMENT PHOTOS
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

PDU 1 MCB 63A


1. Proposed OSN 2. Proposed MCB 63A for OSN

N/A

PDU 2 MCB 63A


3. Proposed MCB 63A for OSN 4. Proposed Hole Grounding Bus Bar
11. AC POWER
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1. View ACPDB 2. View R-N / R

3. View S-N / S 4. View T-N / T


12. OTHERS
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1. KWH 2. View R-N / R Load Current (Ampere)

3. View S-N / S Load Current (Ampere) 4. View T-N / T Load Current (Ampere)
3. View R-N / R (Voltage) 4. View T-N / S (Voltage)

3. View S-N / T (Voltage) ID Pelanggan


12. OTHERS
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER

1. AC indoor 2. AC indoor

3. AC Model 4. AC Model

N/A N/A
3. Thermometer 4. AC Outdoor
12. PROPOSED FLOOR PLAN
Site Name PAITON

Area EAST JAVA

Show the shelter all item diagram and propose install place
OR PLAN
City PROBOLINGGO
Site Type SHELTER

Vous aimerez peut-être aussi