PDS PROJECT CREATION METHOD

1) Decide project Name.e.g. TECHNIP,GSI,NTPC,EIL etc.

2) Create project directory e.g. d:\<project name>\project by using file manager/windows explorer

3) Copy the pds.cmd from d:\win32app\ingr\pd_shell to your ‘ project’ folder.


4) Share your project folder & temp folder with Everyone,Administrator & Network with full
control by using file manager or windows explorer.

5) Go to START > PROGRAM > PD_SHELL > PDS Configure. & modify path for the project
file.Browse (d:\<project name>\project\pds.cmd) double click on pds.cmd select modify
( d:\<project name>\project )& give m/c. name and press ‘continue’ & then select ‘OK’

6) Go to the START > PROGRAM > RIS 05.05 > RIS Schema Manager. And create blank
schema file.Select Schema file it will show schema file. Select Locate Schema File select local
& Enter schema file Name (e.g. j:\<project name>\project\schemas ) and press apply the
messege will appear “schema file located successfully” then select ‘Checksum’ and press
apply the same messege will appear. Then select‘Cancel’ and then Close.

7) Go to the START > PROGRAM > Oracle Enterprise Manager > Security Manager key-in
Username: SYSTEM & Password : MANAGER.(system/manager) Create oracle database user
select ‘create’(+ ) key-in following information Oracle User-pd_project,Password-
pd_project,confirm password-pd_project and Tabelspaces:Default-User data,Temporary-
Temporary data Go to the Roles/Privileges select CONNECT,DBA,RESOURCES and press
‘Create’. Click on ‘Create like’ and create following remaining database users.1)pd_project
(Common) 2)pid_project (2D) 3) pidm_project 2D) 4) in_project(2D) 5) inr_project(2D)
6)dd_project(3D) 7) ra_project(3D). 8) ru_project(3D)

8) Go to START > PROGRAM > PD_SHELL > Express Project Creation User Level : select
New User. Select No for Do you want to load 3D sample data from product? Select Piping &
Equipment(for 3D) P & ID , INSTRUMENTATION (for 2D) and ACCEPT the form. Then
Express Project Creation (Define Project Data) form will appear. Define Project Number,
Project Name, Company Name, Job Number, Plant Name, Project clash result file / site project
ID & ACCEPT the form. Define Sytem Unit : Model system of units- Metric NPD System
of units (Pipes & fittings size basis)-English. Plant coordinate system monument : Do you
want to specify a plant monument? Say No.

9) Create Database Schemas: Select Create New Schemas. Keep only tick on P&ID MASTER
Schema(Optional). Create Project Control Schema Form will appear key-in following
information Database User: pd_project, Password : pd_project select Get Client
Address. Key-in following data:- OS Type: WINDOWS NT Database Type:oracle
Database Name:orcl DBMS Location: c:\orant OS Username:administrator and
select ‘Apply’. Similarly create remaining schemas.

10) Server Names & Drive Letters form will appear key-in following information: file service for
project:m\c. name, Drive Letters:Project data:d, Model data:d, Drawing data:d, 3D
Reference data:d, Design Review Workstation:m/c. Name, Design Review Data:d, Then
accept the form.Immediately Express Project Creation Process will start.