7. SCHEDULE OF QUANTITIES
************
SECTION-1
------------------
TENDER NOTICE
Sealed tenders on item wise rate basis are invited from reputed Furnishing
contractors having past experience in having executed similar works for leading
nationalized banks\financial institutions , govt. undertakings and reputed
autonomous institutions etc. for providing interior furnishing of Bank’s proposed
new branch at THINDAL BRANCH
Earnest Money Deposit: By way of DD\BC favoring Bank of Baroda, and payable
at Coimbatore.
Tender documents can be obtained from Bank’s address given above against
payment of tender fee in above manner or the tender documents can be
downloaded from Bank’s website www.bankofbaroda.com-tenders. For detailed
information please refer to bank’s tender notice on above website.
Tenders submitted without Tender Fee\ earnest money deposit by Demand way
of Draft/Pay order will not be considered. Incomplete Tender and any correction
in the tender by the contractor will disqualify the Tenderer. All the tender sheets
should be signed and sealed by the Tenderer or else the tender will be
disqualified.
The tender form completed in all respects (sealed) should reach Bank of Baroda,
Regional Office, IIIrd Floor, No.82, Bank Road, Coimbatore – 641 018, India
(Phone: 0422 – 2301264/1203) latest by 15/11/2010 before 4 P.M The technical
bids of the Tender shall be opened on the same day at 4.30 p.m. in the presence
of the intending bidders at the Bank’s above given address.
The Bank reserve the right to reject any or all the tenders without assigning any
reason whatsoever.
For further information and prequalification criteria and down loading the tender
documents please refer to bank’s tender notice on website
www.bankofbaroda.com-tenders
SECTION 2
TENDER FORM
From
Dear Sirs,
I/we hereby confirm having gone through the tender notice, prequalification
criteria, specifications of materials, drawings etc. as per details of work specified
in the tender documents\bill of quantities.
I/we have gone through all the terms and conditions of the contract. If this tender
is accepted us\me hereby agree to abide by and fulfill all the terms and
conditions of this agreement.
1.
2.
SECTION-3
( INSTRUCTION TO TENDERERS)
2.2 The tenderers are required to examine the enclosed general plan
and tender form and conditions mentioned in the tender.
2.3 The tenderer should quote the rates in figures and words.The amount for
each item should be worked out and the requisite totals shall be given. The
total amount shall be written both in figures and words.
2.4 The rates quoted in this tender shall be measured finished works and shall
include charges including cost of materials, transportation, Labour, freight
charges ,taxes etc... complete.
2.6 The successful tenderer shall execute an agreement with the Bank of
Baroda , a specimen of which is given in this tender document. EMD is
refunded to the tenderer after the issue of the certificate of actual completion
of work by the Architect.
2.7 The work is to be completed within 20 working days from the date of signing
the agreement with the Bank
2.8 The successful tenderer shall give all necessary personal attention to the
work during the progress of work and also until the expiry date of "Defects
Liability Period" which is twelve months.
2.9 The employer or Architect reserves the right to reject any portion of work or
materials which is found unsatisfactory and not up to the standard.
2.10 A retention amount of 5% will be retained from each running bill and final
bill and shall be paid to the successful tenderer 5 percent after six months
from date of completion and duly certified by the bank and balance 5 percent
after 12 months from the date of completion of the work duly certified by the
architects.
2.11 TDS as per applicable rates shall be deducted from each running bill.
2.12. The rates quoted shall be inclusive of all taxes, VAT etc. income tax will be
retained from each running bill
2.13. The successful tenderer shall have to pay a sum of Rs.1000.00 (Rupees
one thousand only ) per day of delay of work as liquidity damages for first
seven days and thereafter at Rs.2000 per day up to 10 days. In case of
delay beyond 10 days the Bank reserves the right to get the work executed
by any other party and claim the cost from the contractor.
SECTION-4
1. DEFINITIONS
b) THE CONTRACT mean the notice inviting the tender, the tenderer’s
acceptance there of and the formal agreement executed between the. The
D.G.M.,BANK OF BARODA, Regional Office, Bank Road, Coimbatore.
c) And the contractor together and the documents referred to there including
these conditions with appendices and any special conditions, the detail
specifications and design working drawing. All these documents taken
together shall be deemed to form one contract and shall compliment to one
another.
d) THE SITE shall mean the site of contract work allotted by the employer for the
contractor's use.
e) THE WORK shall mean the work to be executed in accordance with the
contract and shall include all extra or additional, altered or substitute works as
required for performance of the contract.
f) THE ARCHITECT shall mean the consultant appointed by The The D.G.M
(BOB) Regional Office, Bank Road, Coimbatore. who shall direct & supervise
and be in-charge of the work is M/s.DEARCH ARCHITECTS (P)LTD, AP – 720,
1ST FLOOR, ‘H’ BLOCK, 1ST STREET, 12TH MAIN ROAD, ANNA NAGAR,
CHENNAI – 600 040.
NOTE: The employer and the Architect are mentioned in the agreement and
shall include their legal representative, assigners or successors. They are
treated throughout the contract document as if each were of the singular
number.
2. SCOPE OF CONTRACT:
The contractor shall carry out and complete the works in every respects in
accordance with this contract and in accordance with the directions and to the
satisfaction of the employer. The employer may in his absolute desecration from
time to time issue further drawings or written instructions, details, directions &
explanations which are hereafter collectively referred to as "Employer's
Instructions"
The contractor should provide all the items necessary for the proper execution of
work according to the specifications given. There should not be any discrepancy
therein. In all drawings figured dimensions shall be read of and followed in
preference to scaling off. The employer shall not charge the contractor for his
own unrented space or for electricity. The contractor shall supply, fix and
maintain at his own cost, all the necessary facility including lighting by night as
well as day for the proper execution of work.
7. REMOVAL OF WORKMEN:
The contractor shall on request of the employer remove from work any person
who may in the opinion of the employer be unsuitable or incompetent.
The employer and his representative shall at all reasonable time have free
access to the site and to the factory's and for places where materials are
prepared or constructed.
The entire work in the contract shall be executed by the contract and shall not
transfer assign or underlet the contract or any partner without the written consent
of the employer.
The employer shall, during the progress of work have power to order in writing
the removal of work or material which is not inaccordence with the specifications
and instructions given. In case of default on part of the contractor, the employer
shall have the power and employ and pay the other person to carryout the same
and all expenses incurred by the employer shall be born by the contractor or
deducted from the contractor's amount. The employer shall, the right to remove
or change the items as mentioned in the schedule of quantity.
The final bill by the contractor should be submitted within 20 days of virtual
completion of work. No further claims shall be made by the contractor after the
submission of final bill. The Earnest Money Deposit shall be paid after the
Defects Liability Period.
An amount of Rs.1000/-/ day from contract value will be deducted for every
additional day or part of the delay of work taken by the contractor for the
satisfactory completion of the work. If the delay occur due to a reason beyond his
control the contractor, should immediately apply for an extension to the
employer. A limited extension of time may be given by the employer in writing
after getting the opinion of the architect.
LIST OF APPROVED MATERIALS
1. HARD WOOD: All wood must be well seasoned, free from knots, other
defects, decay and defects due to handling and
transportation. Wherever necessary, provide with anti –
termite treatment. CHERU TEAK/MAHOGANY
8. FITTINGS/HARDWARE: EBCO
4 Painting :
a Acrylic emulsion for walls ( Banking hall, Mgr cabin)
Providing and applying Acrylic emulsion paints after removing the
damaged plaster, replastering with 12mm thk cement mortar
wherever required, finished with P.O.P to make the necessary
smoothness ,scraping, levelling & preparing the surface. Then apply
two coats of Primer of approved make to be applied finished with
two or more coats of acrylic emulsion paints .The work to be
completed as per approval and direction of the Architect. 2500 Sft
TOTAL :
QUOTATION FOR THE ELECTRICAL WORKS OF
BANK OF BARODA, THINDAL BRANCH.
Sl.No Description Of Work Qty Unit Rate Amount
1 MAIN DB(8WAY TPN VERTICAL DB)
Three Phase, Vertical Type Distribution board
with nuetral bar,earth bar,cables ties,top and
bottom removable gland plate and with necessary
adopter boxes if any.The DB should be IP 42 metallic
double door with provisioin of MCB&ELCB etc as
required including cuting of wall and plastering the
same with neat finish.It comprising as flolows:-
Incomer : 100A TPN MCCB
Outgoings:
63A TP MCB -2Nos
32/25/20A SP MCBs- 12Nos 1 Set
2 Supply&Installation&Commisioing of the following
LIGHTING DB(6WAY TPN PHASE SEGRIGATED DB)
Three Phase, Phase Segrigated Distribution board
with nuetral bar,earth bar,cables ties,top and
bottom removable gland plate and with necessary
adopter boxes if any.The DB should be IP 42 metallic
double door with provisioin of MCB&ELCB etc as
required including cuting of wall and plastering the
same with neat finish.It comprising as flolows:-
( Make:MDS/Hager)
Incomer : 40A TPN MCB
Outgoings:
40A DP MCB -3Nos
10/6A SP MCBs- 18Nos 1 Set
3 C DB(12WAY SPN DB)
12 Way SPN Distribution board
with nuetral bar,earth bar,cables ties,top and
bottom removable gland plate and with necessary
adopter boxes if any.The DB should be IP 42 metallic
double door with provisioin of MCB&ELCB etc as
required including cuting of wall and plastering the
same with neat finish.It comprising as flolows:-
( Make:MDS/Hager)
Incomer : 40ADP MCB
Sl.No Description Of Work Qty Unit Rate Amount
Outgoings: 10A SP MCBs- 10Nos 2 Set
4 Supply&Installation of the following with the necessary
enclosure and adopter boxes if necessary,
a) 63A TPN MCB 1 Set
b) 63A DP MCB 1 Set
C) 40 A DP MCB 2 Set
5 Supply&Installation of 32A Metal Clad Socket with
top in a specified company manufactured box with
suitable rating MCB for connecting A/C points 5 Set
6 Supply&Installation of 63A 4Pole Changover switch with enclosure 1 Set
C LT CABLES
i) Supply&Laying of the following cables in built up
trenches, on wall, or in the ground as per the case may be,
with proper clamping with necessary fixing materials etc.
Installing testing & commisioing of 1100V grede UG
cable as per IS 7098/1554 ( Finolex/ Universal)
1 3.5Corex35Sqmm Aluminium Armored cable 20 Mtr
2 3.5Corex25Sqmm Aluminium Armored cable 15 Mtr
ii) End Termination of the above cables with proper Glands
and Lugs
1 3.5Corex35Sqmm Aluminium Armored cable 2 Set
2 3.5Corex25Sqmm Aluminium Armored cable 2 Set
D WIRING
1 Light/Fan point wiring with 3 of 1.5 sqmm Finolex FRLS PVC
insulated copper conductor to be laid in 2mm suitable
PVC conduit with Bend,Couplings, etc.. And fixing with
clamps screws etc.All conduits to be laid above the
false ceiling/partition/concealed in the wall
etc. Wiring to be connected with supply&Fixing of
6A Modular type switch(MK/ROMA) with suitable Modular
plate and metal Box
a) One light Controlled by One Switch 13 Pts
b) Two Lights Controlled by one Switch 8 Pts
c) 6A Switch box Sockets in the switch board itself 7 Pts
d) Exhaust Fan points 2 Pts
f) Ceiling fan with regulator 4 Pts
2 Supply&Wiring with Flame Retardant Insulated PVC Copper
wire as per grade IS 994 for Circuits,Computer point,Power points
Within 2mm thk PVc conduits with necessary accessories and with
Sl.No Description Of Work Qty Unit Rate Amount
proper clamps and to be concealed below the falce ceiling
It comprises as follows:-
a) 3Runs of 2.5Sqmm copper wire in PVC conduit for
circuit mains 300 Mtr
a) 3Runs of 2.5Sqmm copper wire in PVC conduit for
Power points 200 Mtr
a) 3Runs of 2.5Sqmm copper wire in PVC conduit for
computer points 250 Mtr
d) 2Runs of 4Sqmm copper wire+2.5Sqmm copper
wire in PVC conduit for AC wiring 45 Mtr
e) 2Runs of 6Sqmm copper wire+2.5Sqmm copper
wire in PVC conduit 30 Mtr
f) 4Runs of 6Sqmm copper wire+2.5Sqmm copper
wire in PVC conduit 15 Mtr
E POWER POINT OUTLETS
2.1 Supply&Installation of 3 Nos of 6A Sockets controlled by
2Nos 5A Switches with front plate with enclosure and other
accessories etc..(MK /ROMA) 10 Set
2.2 Supply&Installation of 1Nos of 6A Socket controlled by
1No 6A Switch with front plate with enclosure and other
accessories etc..(MK /ROMA) 12 Set
2.3 Supply&Installation of 1Nos of 16A Socket controlled by
1No 16A Switch with front plate with enclosure and other
accessories etc..(MK /ROMA) 2 Set
F LIGHTING FIXTURES
1 Supply, Fixing & Commisioning of recess mounted direct - in
direct downlight luminaire with paralite P5 louvers
WCP 64236 2 x 36W CFL ( Make: Wipro ) 13 Set
2 Supply, Fixing & Commisioning of Recess mounting
type 2x18W CFL downlighter fitting with Lamps and other
fixing accessories.,(FBH 225/118) 4 Set
3 Supply&Fixing of Patti type 40Watts light Fiitings 10 Set
(TMC 300/136HPF)
4 Supply&Fixing of exhaust fan 2 Set
5 Supply, Fixing & Commisioning of 48" ceiling fan
with necessary Down Rods and with all
fixing accessories.,(Crompton) 5 Set
6 Supply&Fixing of Wall mounting Fan 1 Set
Sl.No Description Of Work Qty Unit Rate Amount
G EARTHING
1 Providing dedicated earthing with 600x600x3.15
mm copper plate along with 50mm dia.10feet
long G.I pipe with other accessories in the earth
filled with necessary salt,charcoal,etc. It should
be covered with G.I Manhole cover with necessary
civil works.etc.. 1 Set
2 Supply & Laying of 10 Sqmm PVC Insulated Multi
strand copper conductor laid in 25mm dia PVC pipe for
Dedicated earth leads from the earth electrodes to
the UPSsystem 30 Mtr
3 Providing general earthing with 50mm dia.10feet
long G.I pipe with other accessories in the earth
filled with necessary salt,charcoal,etc. It should
be covered with G.I Manhole cover with necessary
civil works.etc.. 1 Set
4 Supply&Laying of 8SWG copper wire 40 Mtr
G. TELECOMMUNICATION CABLING
1 Supply&Laying of 2pair telephone cable in the 2mm Thk suitable
PVC conduit for all telephone points(delton) 175 Mtr
2 Supply & Fixing of RJ 11 Telephone Sockets 5 Set
3 Supply&Installation of 50Pair KRONE Box with Enclosure 1 Set
H. DATA CABLING
1 Supply&Laying of E CAT 6 Data communication cable
in suitable PVC conduit with necessary accessories
from HUB to all LAN Points 275 Mtr
2 Supply&Installation of RJ 45 Female Jack (I/O) with
Faceplate and Box for connecting LAN POINTS 9 Set
3 Supply of 3Ft Mounting Cord 10 Set
4 Supply of 7Ft Mounting Cord 10 Set
Total :
QUOTATION FOR THE AIRCON WORKS OF
BANK OF BARODA, THINDAL BRANCH.
Total