Académique Documents
Professionnel Documents
Culture Documents
ITEM DESCRIPCION METRADO METRADO % DE TOTAL SEM. TOTAL SALDO METRADO METRADO % DE TOTAL SEM. TOTAL SALDO
UND METRADO PU (S/.) TOTAL (S/.) % ACUM. PU (S/.) % ACUM. PU (S/.)
TOTAL ACTUAL AVANCE (S/.) ACUM. (S/.) ACTUAL (S/.) TOTAL ACTUAL AVANCE (S/.) ACUM. (S/.) ACTUAL (S/.)
I. DRYWALL
01 Levantar pared en tragaluz 6to piso UND 1.00 677.97 677.97 1.00 0.00 0.00% 100.00% 677.97 0.00 677.97 0.00 1.00 0.00 0.00% 100.00% 677.97 0.00 677.97 0.00
02 Reducir tamaño de tragaluz en baño ext. UND 2.00 245.76 491.53 2.00 0.00 0.00% 100.00% 245.76 0.00 491.53 0.00 2.00 0.00 0.00% 100.00% 245.76 0.00 491.53 0.00
03 Vigas grande para mampara UND 7.00 194.92 1,364.41 7.00 4.04 57.76% 100.00% 194.92 788.14 1364.41 0.00 7.00 0.00 0.00% 100.00% 194.92 0.00 1364.41 0.00
04 Vigas pequeña doble estructura para mampara UND 3.00 144.07 432.20 3.00 3.00 100.00% 100.00% 144.07 432.20 432.20 0.00 3.00 0.00 0.00% 100.00% 144.07 0.00 432.20 0.00
05 Cubrir junta de dilatación con vecino. UND 1.00 194.92 194.92 1.00 0.00 0.00% 0.00% 194.92 0.00 0.00 194.92 1.00 0.00 0.00% 0.00% 194.92 0.00 0.00 194.92
06 Viga pequeña para mampara en lavanderia UND 1.00 144.07 144.07 1.00 0.00 0.00% 0.00% 144.07 0.00 0.00 144.07 1.00 1.00 100.00% 100.00% 144.07 144.07 144.07 0.00
07 Estructura en baño compartido del 201 UND 1.00 228.81 228.81 1.00 0.00 0.00% 0.00% 228.81 0.00 0.00 228.81 1.00 1.00 100.00% 100.00% 228.81 228.81 228.81 0.00
08 Estructura en baño compartido del 202 UND 1.00 25.42 25.42 1.00 0.00 0.00% 0.00% 25.42 0.00 0.00 25.42 1.00 1.00 100.00% 100.00% 25.42 25.42 25.42 0.00
PRESUPUESTO VALORIZACION 07
I. DRYWALL
CUBRIR INODORO SUSPENDIDO 1 CARA 301,401 UND 2.00 155.00 310.00 2.00 0.00 0.00% 100.00% 155.00 0.00 310.00 0.00
CUBRIR INODORO SUSPENDIDO AMBAS CARAS 301,401 UND 2.00 180.00 360.00 2.00 0.00 0.00% 100.00% 180.00 0.00 360.00 0.00
MURO DOBLE ESTRUCTURA MAS DINTEL DPTO 301 UND 1.00 280.00 280.00 1.00 0.00 0.00% 100.00% 280.00 0.00 280.00 0.00
MURO DPTO 302 MAS DINTEL PUERTA UND 1.00 180.00 180.00 1.00 0.00 0.00% 100.00% 180.00 0.00 180.00 0.00
BAJAR DINTEL DE VENTANA BAÑO COMPARTIDO 302, 402 UND 2.00 40.00 80.00 2.00 0.00 0.00% 100.00% 40.00 0.00 80.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 501 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
CUBRIR INODORO SUSPENDIDO AMBAS CARAS 502 UND 1.00 180.00 180.00 1.00 0.00 0.00% 100.00% 180.00 0.00 180.00 0.00
CUBRIR DE PISO A TECHO INODORO SUSPENDIDO 202 UND 1.00 240.00 240.00 1.00 0.00 0.00% 100.00% 240.00 0.00 240.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 601 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
CUBRIR INODORO SUSPENDIDO AMBAS CARAS 602 UND 1.00 180.00 180.00 1.00 0.00 0.00% 100.00% 180.00 0.00 180.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 701 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
CUBRIR INODORO SUSPENDIDO AMBAS CARAS 702 UND 1.00 180.00 180.00 1.00 0.00 0.00% 100.00% 180.00 0.00 180.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 801 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
CUBRIR INODORO SUSPENDIDO AMBAS CARAS 802 UND 1.00 180.00 180.00 1.00 0.00 0.00% 100.00% 180.00 0.00 180.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 901 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
CUBRIR INODORO SUSPENDIDO 1 CARA 1001 UND 1.00 155.00 155.00 1.00 0.00 0.00% 100.00% 155.00 0.00 155.00 0.00
levantar pared en tragaluz 6to piso UND 1.00 800.00 800.00 1.00 1.00 100.00% 100.00% 800.00 800.00 800.00 0.00
reducir tamaño de tragaluz en baño ext. UND 2.00 290.00 580.00 2.00 2.00 100.00% 100.00% 290.00 580.00 580.00 0.00
vigas grande para mampara UND 7.00 230.00 1,610.00 7.00 7.00 100.00% 100.00% 230.00 1610.00 1610.00 0.00
vigas pequeña doble estructura para mampara UND 3.00 170.00 510.00 3.00 3.00 100.00% 100.00% 170.00 510.00 510.00 0.00
cubrir junta de dilatación con vecino. UND 1.00 230.00 230.00 1.00 0.00 0.00% 0.00% 230.00 0.00 0.00 230.00