Vous êtes sur la page 1sur 966

& Statistics Department

Planning, Programme Monitoring


ECONOMIC SURVEY OF KARNATAKA
2019-20

ECONOMIC SURVEY OF KARNATAKA


2019-20
M.S. Building,
Planning, Dr. B.R. Ambedkar Veedhi,
Programme Monitoring Bengaluru - 560 001
and Statistics Department website: http://planning.karnataka.gov.in
http://des.karnataka.gov.in

Department of Printing, Stationery and Publications, Bengaluru


ECONOMIC SURVEY OF KARNATAKA
2019-20

MARCH-2020

Planning, Programme Monitoring and Statistics Department


This publication is also available in Kannada
First Edition : 1978-79

42nd Edition : 2019-20


PREFACE

The Economic Survey is published every year by the State Government with an
objective of assessing and evaluating the performance of the State across sectors
and to identify specific gaps and challenges for initiating appropriate action. The
document highlights the macro-economic profile of the State and provides basic
information and data on economic policies and development programmes being
implemented by the Government.

I trust this document will be of relevance to policy makers in different fields,


current and prospective investors both domestic & foreign and entrepreneurs,
researchers, academicians, students and citizens interested in the subject.

We have made concerted efforts to check the accuracy and relevance of the data
and information presented in the document. Our endeavor is to enhance the
analysis of issues and performance. A new chapter "Sustainable Development
Goals", is incorporated as 17th Chapter, which represents the initiatives taken by
the Government to achieve Sustainable Development Goals.

I would like to acknowledge and thank Dr. C.H.Vasundhara Devi, Director,


Sri K.Parappaswamy, Additional Director(I/c), Sri C.Kempaiah, Senior Consultant
and Sri D.Chandrashekaraiah, Joint Director, Directorate of Economics and
Statistics for their tireless and excellent work, to bring out 2019-20 Economic
Survey Report in a timely manner.

The preparation of the Economic Survey has also been supported by inputs from all
nodal officers of the department, at State level.

I would also like to appreciate the substantial contribution of domain expert


Prof. Chaya K.Degaonkar who have greatly enhanced the quality of the final
document.

Last, but certainly not the least, I take this opportunity to thank the officers of the
line departments who have provided data and the information on new initiatives
and challenges. I hope this report will be used to the optimum, as all in the
previous years and spur economic growth in the days to come.

Dr. Shalini Rajneesh I.A.S.,


Additional Chief Secretary
to the Government,
Planning, Programme Monitoring &
Statistics Department.
CONTENTS
Sl. Page
Title
No No
CHAPTER 1: STATE OF KARNATAKA'S ECONOMY - AN OVERVIEW 1 - 31
1.1 General Overview …… 1
1.2 State Economy …… 1
1.3 Fiscal Development and State Finances …… 3
1.4 Investment and Exports …… 4
1.5 Rural Development …… 5
1.6 Urban Development …… 7
1.7 Agriculture and Allied Sectors and Food Security …… 9
1.8 Natural Resources and Environment …… 12
1.9 Industry …… 15
1.10 Employment and Labour Welfare …… 16
1.11 Economic Infrastructure …… 17
1.12 Human Development …… 20
1.13 Gender and Social Equity …… 23
1.14 Balanced Regional Development …… 27
1.15 Evaluation of Government Programmes / Schemes …… 29
1.16 Skill Development Entrepreneurship and Livelihood …… 29
1.17 Sustainable Development Goals …… 30
CHAPTER 2: STATE INCOME AND PRICES 33 - 52
2.1 State Economy …… 33
2.2 Prices …… 43
CHAPTER 3: FISCAL DEVELOPMENT AND STATE FINANCES 53 - 87
3.1 Fiscal Consolidation …… 53
3.2 Karnataka Vis-A-Vis-Other States …… 54
3.3 State Finances …… 54
3.4 Budgetary Developments in 2019-20 …… 57
3.5 Capital Formation by Government …… 70
3.6 Investment Under Plan: State Budgetary Support (SBS) for Plan …… 70
3.7 Schemes In 2019-20 Budget …… 76
3.8 District Sector Outlays for the Year 2019-20 …… 76
3.9 Externally Aided Projects …… 76
3.10 Current Fiscal Challenges and Way Forward …… 76
CHAPTER 4: INVESTMENT AND EXPORTS 89 - 123
4.1 Investment in Karnataka …… 89
4.2 Exports of Karnataka …… 119
CHAPTER 5: RURAL DEVELOPMENT 125 - 139
5.1 Introduction …… 125
5.2 Rural Development Programmes …… 125
5.3 Rural Infrastructure …… 129
5.4 Wage Employment Programmes …… 134
5.5 Rural Governance …… 135
5.6 Decentralized Planning …… 138

i
Sl. Page
Title
No No
CHAPTER 6: URBAN DEVELOPMENT 141 - 174
6.1 Trends in Urbanisation …… 141
6.2 Urban Housing …… 142
6.3 Urban Slums Development …… 146
6.4 Urban Infrastructure …… 149
6.5 Urban Environment …… 155
6.6 Development of Bengaluru Metropolitan Region …… 162
6.7 Other Schemes for Urban Development …… 165
6.8 Urban Planning …… 168
6.9 Financing Urban Development …… 170
6.10 Municipal Finance and ULBs in Karnataka …… 171
6.11 Urban Governance …… 173
CHAPTER 7: AGRICULTURAL AND ALLIED SECTORS AND FOOD SECURITY 175 - 309
7.1 Agriculture …… 175
7.2 Monsoon in 2019 …… 175
7.3 Agricultural Production-Performance and Prospects …… 176
7.4 Land Utilization and Operational Holdings …… 178
7.5 Cropping Pattern …… 178
7.6 Distribution of Inputs …… 180
Programme and Schemes Implemented by the State Government Centrally
7.7 …… 183
Sponsored Schemes
7.8 Major Programmes …… 195
7.9 Karnataka Agriculture Price Commission …… 200
7.10 Outcome of Various Development Programmes …… 203
7.11 Watershed Development Department …… 204
7.12 Agricultural Marketing …… 210
7.13 Horticulture …… 217
7.14 Animal Husbandry …… 252
7.15 Fisheries …… 283
7.16 Food Security Through Public Distribution System …… 296
CHAPTER 8: NATURAL RESOURCES AND ENVIRONMENT 311 - 405
8.1 Forests …… 311
8.2 Water Resources …… 362
8.3 Mining Sector …… 390
8.4 Climate Change and Mitigation Measures …… 399
CHAPTER 9: INDUSTRY 407 - 477
9.1 Introduction …… 407
9.2 Trends in Industrial Production …… 407
9.3 Industrial Growth by Use-Based Classification …… 409
9.4 Industrial Growth by Two Digit Industrial Classification …… 411
9.5 Organised Manufacturing Sector …… 411
9.6 Micro, Small & Medium Enterprises …… 413
9.7 Selected Industrial Sectors …… 418
9.8 Status of Public Enterprises in Karnataka …… 444
9.9 Industrial Policy Initiatives and Industrial Investment …… 458
9.10 Karnataka Tourism …… 471

ii
Sl. Page
Title
No No
CHAPTER 10: EMPLOYMENT AND LABOUR WELFARE 479 - 510
10.1 Introduction …… 479
10.2 Key Labour Market Indicators …… 479
10.3 Employment in Public and Private Sectors …… 488
10.4 Employment Exchange Statistics …… 489
10.5 Placements and Vacancies …… 489
10.6 Wage Employment Programmes …… 491
10.7 Wage Employment Generation under Major Programmes …… 492
10.8 Government Initiatives - Social Security Schemes …… 497
10.9 Karnataka Labour Welfare Board …… 504
10.10 Progress of Various Labour Laws Enacted in Karnataka …… 506
10.11 Industrial Relations …… 508
10.12 Outcomes and Challenges …… 510
CHAPTER 11: ECONOMIC INFRASTRUCTURE 511-593
11.1 Power Sector …… 511
11.2 Roads, Transport, Infrastructure and Communications …… 534
11.3 Banking and Finance Including Cooperatives …… 567
CHAPTER 12: HUMAN DEVELOPMENT 595-707
12.1 Education …… 595
12.2 Health and Family Welfare …… 633
12.3 Human and Gender Development …… 692
CHAPTER 13: GENDER AND SOCIAL EQUITY 709-780
13.1 Women and Child Development …… 709
13.2 Welfare Programmes for Scheduled Castes …… 728
13.3 Welfare Programmes for Scheduled Tribes …… 737
13.4 Developmental Programmes for the Welfare of Backward Classes …… 747
13.5 Developmental Programmes for the Welfare of Minorities …… 757
13.6 Programmes for the Empowerment of Differently Abled & Senior Citizens …… 768
CHAPTER 14: BALANCED REGIONAL DEVELOPMENT 781-802
14.1 Special Development Plan …… 781
14.2 Area Development Boards …… 789
14.3 Karnataka Legislators Local Area Development Scheme (KLLADS) …… 796
14.4 Member of Parliament Local Area Development Scheme (MPLADS) …… 798
14.5 Article 371J Special Status for Kalyana (Hyderabad)-Karnataka Region …… 799
CHAPTER 15: EVALUATION OF GOVERNMENT PROGRAMMES/SCHEMES 803-816
15.1 Introduction …… 803
15.2 Salient Features of Karnataka Evaluation Policy & Authority 2011 …… 803
15.3 Functions of the Karnataka Evaluation Authority …… 803
15.4 Progress of KEA since inception …… 804
15.5 Ongoing Studies in KEA 2019-20 …… 804
15.6 Financial Progress Achieved …… 804
15.7 Calendar of Activities for 2018-19 …… 804
15.8 New Initiatives …… 804
15.9 Impact of evaluation- Action taken on recommendations …… 815
15.10 Future Plans …… 816

iii
Sl. Page
Title
No No
CHAPTER 16: SKILL DEVELOPMENT, ENTREPRENEURSHIP AND
817-835
LIVELIHOOD
16.1 Enhancing Skill Empowering Youth …… 817
16.2 Chief Minister’s Kaushalya Karnataka Yojane …… 819
16.3 Karnataka Apprenticeship Scheme …… 821
16.4 Centres of Excellence …… 821
16.5 “SANJEEVINI” – Karnataka State Rural Livelihood Promotion Society …… 821
16.6 Deendayal Anthyodaya Yojana -National Urban Livelihoods Mission – (DAY- NULM) …… 826
16.7 Centre for Entrepreneurship Development of Karnataka (CEDOK) …… 827
16.8 Government Tool Room and Training Centre (GTTC) …… 830
16.9 Karnataka German Multi Skill Development Centre (KGMSDC) …… 832
16.10 Karnataka Vocational Training and Skill Development Corporation Ltd …… 833
16.11 Financial & Physical Target for 2019-20 of KSDC …… 834
16.12 Concise report on Training Section of Department of Employment and Training …… 834
CHAPTER 17: SUSTAINABLE DEVELOPMENT GOALS 837-845
17.1 Sustainable Development Goals(SDGs) 2030 …… 837
GEO-SPATIAL MAPS …… M1 – M9
STATISTICAL APPENDIX …… A1 – A83

iv
KARNATAKA AT A GLANCE
Sl. No. Item Units 1961 1971 1981 1991 2001 2011

1 Geographical Area '000 Sq.Km. 192 192 192 192 192 192
Administrative Setup
2 Revenue Divisions No. 4 4 4 4 4 4
3 Districts -do- 19 19 19 20 27 30
4 Taluks -do- 175 175 175 175 175 176
5 Inhabited Villages -do- 26377 26826 27028 27066 27481 27397
6 Uninhabited Villages -do- 2972 2707 2362 2127 1925 1943
7 Towns -do- 231 245 245 250 270 347
Population as per Census 1961 1971 1981 1991 2001 2011
8 Total (in 000s) 23587 29299 37136 44977 52851 61095
9 Males -do- 12041 14972 18923 22952 26899 30967
10 Females -do- 11546 14327 18213 22025 25952 30128
11 Rural -do- 18320 22177 26406 31069 34889 37469
12 Urban -do- 5267 7122 10730 13908 17962 23626
13 Scheduled Castes -do- 3117 3850 5595 7369 8564 10475
14 Scheduled Tribes -do- 192 231 1825 1916 3464 4249
15 Density of Population Per Sq.Km. 123 153 194 235 276 319
16 Literacy Rate Percentage 29.80a 36.83a 46.21b 56.04b 66.60b 75.36b
17 Sex Ratio Females per
1000 males 959 957 963 960 965 973
18 Urban Population Percentage 22.33 24.3 28.89 30.92 33.99 38.67
State Income -
at Current Prices 1970-71 1980-81 1990-91 2000-01 2018-19 2019-20
19 State Income Rs.Crore 2016 5587 20551 96348 1544399 1699115
20 Primary Sector -do- 1063 2573 7626 31473 162856 174920
21 Secondary Sector -do- 418 1160 4734 18684 319292 338443
22 Tertiary Sector -do- 535 1854 8191 46191 901430 1005191
23 Percapita Income Rupees 696 1520 4598 18344 212477 231246
Agriculture 1980-81 1990-91 2000-01 2010-11 2016-17 2017-18
24 Net Area Sown '000 Ha. 9899 10381 10410 10523 9855 9895
25 Gross Cropped Area -do- 10660 11759 12284 13062 11779 11994
26 Gross Irrigated Area -do- 1676 2598 3271 4279 3548 3639
27 Gross Irrigated Area
to Gross Cropped Area Percentage 15.72 22.09 26.63 32.76 30.12 30.34
Area under Principal Crops 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19
28 Rice '000 Ha. 1114 1173 1483 1539 993 1199
29 Wheat -do- 322 198 266 255 193 158
30 Jowar -do- 1991 2155 1782 1244 1088 994
31 Bajra -do- 564 425 462 309 231 194
32 All Cereals -do- 5573 5415 5757 5446 4624 4528
33 All Pulses -do- 1531 1621 2047 2791 3024 3570
34 Total Foodgrains -do- 7104 7036 7804 8237 7648 8098
35 Sugarcane
Harvested Area -do- NA NA NA 437 400 496
36 Cotton -do- 1012 596 552 547 547 718
37 Groundnut -do- 790 1212 1063 846 564 541

v
KARNATAKA AT A GLANCE
Production of Principal Crops 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19
38 Rice '000 tonnes 2258 2428 3847 4474 2907 3458
39 Wheat -do- 174 123 250 300 219 163
40 Jowar -do- 1506 1282 1547 1346 1264 931
41 Bajra -do- 192 203 342 292 367 177
42 All Cereals -do- 5714 5705 10004 12257 11960 9200
43 All Pulses -do- 488 539 956 1533 2212 1846
44 Total Foodgrains -do- 6202 6244 10960 13790 14172 11046
45 Sugarcane -do- 12127 20750 42924 42277 37461 42411

46 CottonC -do- 597 640 855 1150 1844 1400


47 Groundnut -do- 475 816 1081 600 637 397
Agricultural Census 1980-81 1990-91 2000-01 2005-06 2010-11 2015-16
48 No. of Operational
Holdings in ''000s 4309 5776 7029 7581 7832 8681
49 Area of Operational
Holdings in ''000s ha. 11746 12321 12307 12385 12161 11805

50 Average size of
Operational Holdings in. Ha. 2.73 2.13 1.74 1.63 1.55 1.36
Live Stock Census 1977 1983 1990 1997 2007 2012
51 Total Livestock '000s 21800 24680 24968 30688 32883 27702d
52 Total Poultry -do- 9696 12096 15694 21399 42433 53442
Forest 1970-71 1980-81 1990-91 2000-01 2017-18 2018-19

53 Forest Area '000 Ha. 3621 3838 3872 3828 4338 4342
Factories 1981 1991 2001 2009 2017-18 2018-19
54 Working Factories No. 4985 7768 9440 11983 17040 15993
55 Employees -do- 434202 777900 903895 1079681 1786485 1667591

56 Employees per lakh


population -do- 1169 1730 1710 1785 2924 2730
Industrial 2007-08 2008-09 2009-10 2010-11 2017-18 e 2018-19 e
Project investments - Rs.3.00 crore to Rs.50.00 crore
57 Projects Approved No. 727 310 359 439 336 156
58 Investments Rs.in.Crore 10267 5182 7750 6880 23537 12121
59 Employments No. 349015 135623 115932 110505 203489 72427
Project investments - above Rs.50.00 crore
60 Projects Approved No. 108 50 110 186 15 5
61 Investments Rs.in.Crore 160523 105266 288549 187186 30119 4388
62 Employments No. 1996504 410842 284934 580161 67616 51959
Electricity $ 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19
63 Total Generation in Mus 6389 12431 21985 47112 64830 * 76145
64 Total Consumption -do- 5189 12182 17860 37202 54273 73738
65 Industrial Consumption -do- 3864 5429 4882 8425 9764 10580
66 Agricultural Consumption -do- 384 4486 7350 12802 19946 22642
67 Domestic Consumption -do- 696 1803 3909 7893 12478 12979
(Q1)
Banking 1980-81 1990-91 2000-01 2010-11 2017-18 2019-20(Q1)
68 Scheduled Commercial
Banks No. 2823 4245 4758 6291 10032 10238
69 Deposits Rs. Crore 2042 9665 55592 349009 799946 959437
70 Advances -do- 1524 7985 32984 253121 542359 650802

vi
KARNATAKA AT A GLANCE
f f f g g g
Education 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19
71 Primary Schools No. 35143 40208 50340 59428 62007 62328

72 Enrolment '000s 4974 6922 8581 7425 8365 8576

73 High Schools No. 2381 5020 8928 13447 15666 15949

74 Enrolment '000s 713 1334 1955 2604 1760 1800


Health 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19

75 Hospitals (Govt.) No. 233 293 297 382 414 414


76 Beds per lakh
population
(Govt. Hospitals) -do- 94 103 103 103 107 108
Demographic Status 1980 1990 2000 2010 2016 2017
77 Birth Rate '000s 28.3 26.9 22.0 19.2 17.6 17.4

78 Death Rate '000s 9.1 9.0 7.8 7.1 6.7 6.5


79 Infant Mortality Per 1000
Rate Live Births 69 77 57 38 24 25
Transport 1980-81 1990-91 2000-01 2010-11 2017-18 2018-19
80 Railway Route Length Kms. 2825 3090 3041 3244 3499 3540

81 Total Road Length -do- 109551 130924 154204 222431 269115 273568
82 Motor Vehicles '000s 400 1433 3691 9930 19385 21073
Co-operation 1990-91 2000-01 2010-11 2016-17 2017-18 2018-19
83 Primary Agricultural
Credit Co-Operative
Societies No. 4350 4388 4914 5463 5573 5694
84 Membership '000s 4469 5245 8992 6117 6400 7650
85 Total No. of
Co-operative Socities No. 25083 29930 35502 41402 42543 43608
86 Total Membership '000s 11800 16167 21534 24821 22885 22971
Local bodies 2012-13 2013-14 2014-15 2015-16 2017-18 2018-19
87 Zilla Parishat/Panchayat No. 30 30 30 30 30 30
88 Taluk Panchyats -do- 176 176 176 176 176 225
89 Gram Panchayats -do- 5627 5631 6019 6019 6022 6021
90 Municipalities and
Corporations -do- 219 220 220 274 279 281

Source:
1. Statistical Abstract of Karnataka 1967-68, 1970-71, 1973-74, 1983-84, 1993-94, 2000-05, 2005-11,
2015-16, 2016-17
2. Karnataka at a Glance: 1961-62, 1970-71, 1980-81, 1990-91, 2000-01,2009-10, 2011-12, 2012-13,
2013-14, 2014-15 & 2015-16. 2016-17, 2017-18 & 2018-19
3. 2011 Population Census
a. Population aged 5 years and above
b. Population aged 7 years and above
c. Bales of 170 Kgs. In lint form
d. Excludes number of Dogs, Rabbits and Elephants.
e. Project investments - Rs.15 to 500 crores and above Rs 500 crores from 2016-17
f. 1-7th Statndard Primary and 8-10 Secondary Schools
g. 1 to 8 Standard Primary and 9 to 10 Standard Secondary Schools.
$. Including HKRECS. (Hukeri Rural Electrical Co-operative Societies)
* Of the total power generated from wind energy, open axis and losses occurred due to transmission in
sub-centres have all been excluded.

vii
KARNATAKA COMPARED WITH INDIA
Sl. No. Item Unit Karnataka India
Population as per 2011 Census:
1 Total '000s 61095 1210570
2 Males -do- 30967 623122
3 Females -do- 30128 587448
4 Rural Population -do- 37469 833463
5 Percentage of Rural Population to total population 61.33 68.85
6 Urban Population '000s 23626 377106
7 Percentage of Urban Population to total population 38.67 31.15
8 Sex Ratio Females per 1000 Males 973 943
9 2001-2011 Decadal Growth of Population Percent 15.60 17.70
10 Literacy Rate Percent 75.36 73.00
11 Population of SC/ST (2011 population Census) '000s 14724 305659
12 Total Workers (2011 Census) -do- 27873 481743
13 Geographical Area (2011Census) Lakh Sq.Kms. 1.92 32.87
14 Net Area sown 2014-15 '000 ha. 10044 140130
15 Gross Cropped Area 2014-15 -do- 12247 198360
16 Gross Irrigated 2014-15 -do- 4186 96457
17 % of Gross Irrigated Area to Gross Cropped Area 34.18 48.63
Area under Principal Crops (2017-18) :
18 Rice '000 ha. 993 43790
19 Maize -do- 1307 9470
20 Jowar -do- 1088 4960
21 Wheat -do- 193 29580
22 Bajra -do- 231 7380
23 Total Food Grains -do- 7648 127560
24 Total Pulses -do- 3024 29990
25 Sugarcane -do- 400 4730
26 Cotton -do- 547 12430
27 Groundnut -do- 564 4910
28 Total Livestock - 2012 * '000s 27702 512057
29 Forest Area -2019 Sq.Kms. 43428 712249
State/Nation Income at Current Prices-2019-20
30 Gross Income Rs.Crore 1699115 20442233
31 Net Income -do- 1550297 18313040
32 Gross per capita Income Rs. 253444 150927
33 Net Per capita Income -do- 231246 135050
*:Excluding the population of Dogs, Rabbits and Elephants.

viii
STATE OF KARNATAKA'S CHAPTER 1
ECONOMY - AN OVERVIEW

1.1 GENERAL OVERVIEW The Economic Survey 2019-20 presents an


overview of major trends in State Income and
Karnataka State is on the mission to promote
Prices, Fiscal Development & State Finances,
faster and inclusive growth. This is evident from
Investment and Exports, Rural Development ,
the achievements in various key economic and
Urban Development, Agriculture and Allied
social sectors, through inclusive programmes
Sectors, Natural Resources, Industry,
and policies. The Economic survey 2019-20 is a
Employment, Economic Infrastructure, Human
snap shot of these achievements and the
Development, Gender and Social Equity,
progress made in attainment of sustainable
Balanced Regional Development, Evaluation of
development goals. Karnataka, India's seventh
Government Programmes & Policies, Skill
largest State in terms of geographical area
Development and Sustainable Development
(191791 sq. km) is a home to 6.11 crore people
Goalsetc. The chapter-wise executive summary
(2011 Census) accounting for 5.05% of India's
of the Economic Survey is presented below.
population. The Projected population of
Karnataka for 2020 is 7.07 Crores. The 1.2 STATE ECONOMY
achievements in some demographic goals have
been noticeable in Karnataka. The State's (I) State Income
population has grown by 15.7% during the last The Advance estimates of Gross State Domestic
decade, and its population density has risen Product (GSDP) of Karnataka for the year 2019-
from 276 in 2001 to 319 in 2011, indicating an 20 highlights that at constant (2011-12) prices
increase of about 15.6% the GSDP is likely to attain a level of
Birth rate in the State has declined to 17.4 in Rs. 12,01,031 crores with a growth of 6.8%. The
2017 from 18.8 in the year 2011 and the death sectoral growth rate of Agriculture, Industry and
rate has declined to a lower rate of 6.5 in 2017 Services are expected to grow at 3.9%, 4.8% and
from 7.1 in 2011. The consequent demographic 7.9% respectively.
changes are expected to open up new The GSVA growth rate of agriculture sector has
opportunities as well as challenges for the State. increased to 3.9% in 2019-20 compared to
The sex ratio has increased from 965 in 2001 to (-)1.6% in 2018-19. The rise in agriculture sector
973 in 2011. The Child sex ratio declined from in 2019-20 is on account of increase in foodgrain
960 in 1991 to 946 in 2001 but has slightly production from 128 lakh tonnes to 136 lakh
increased to 948 in 2011. tonnes, oilseeds production from 51 lakh tonnes
Karnataka State has 133.57 lakh households as to 56 lakh tonnes when compared to 2018-19.
per 2011 census as against 104.02 lakh Similarly, in livestock sector, milk production is
households in 2001 census. The number of anticipated to increase from 79 lakh tonnes to 88
households has registered a decadal growth rate lakh tonnes, egg production from 54 lakh
of 28.41%. Karnataka has 14.91% (19.65 lakh) numbers to 59 lakh numbers and meat
female headed households where as the national production from 1.1 lakh tonnes to 1.27 lakh
average is 10.9%. The labour Force Participation tonnes. Fish production has also boosted in
Rate is 45.62% and of the total workers in the 2019-20 (marine fish 3.6 to 4 lakh tonnes, inland
State, 83.94% are main workers and 16.06% are fish 1.9 to 2.5 lakh tonnes) compared to
marginal workers. 2018-19.

The literacy rate of the State is 75.4 percent in The industry sector (comprising mining &
2011 which is above the National Average of 73.0 quarrying, manufacturing, construction and
percent. Female literacy rate which was 56.87 electricity, gas & water supply) is expected to
percent in 2001 has been increased to 68.1 grow by 4.8% in 2019-20 against a growth of
percent in 2011 which is above the National 5.6 % during 2018-19.
Average of 64.6 percent. Karnataka is India's 7th Service sector is expected to grow by 7.9% during
most urbanised state with 38.7 percent of 2019-20 compared to growth of 9.8% during
population living in urban areas. 2018-19. Service sector is a major contributor of

1
2 Economic Survey of Karnataka 2019-20

overall GSDP of the state as the share of private 121.8 in November 2018). Group-Wise changes
corporate sector to this sector is significantly in WPI are as follows, Primary Articles' group has
higher compared to other sectors. In 2019-20, increased by 5.74% with weight of 22.62%, Fuel
Other services sector (Education, Health and group has decreased by 1.46% with a weight of
other remaining services) with 11.2%, Real 13.15% and manufactured products group has
Estate, Professional Services & Ownership of also decreased by 0.59% with a weight of 64.23%
Dwellings with 8.6%, Public Administration with during the first eight months of 2019-20. WPI of
8.0%, Trade and Repair Services with 6.5% all commodities during November 2018 was
growth are the major contributors of service 121.8 has been increased to 122.3 during
sector to achieve the overall state economy November 2019 registering an increase of 0.41%.
growth rate. While preparing the Advance
Similarly Wholesale Price Index of Karnataka for
estimates of service sectors, All India growth rate
33 Agricultural commodities (Base Year: 1981-
is adopted. Hence, the service sector growth has
82=100) has increased from 1262 in April 2019
reduced compared to previous year.
to 1338 in November 2019 with an increase of
The First Advance Estimates of All India Gross 6.02% during 2019-20. During the same period
Domestic Product (GDP) at constant (2011-12) of the previous year the index was increased by
prices for the year 2019-20 is expected to grow at 9.04% (from 1217 in April 2018 to 1327 in
5.0%. The sectoral growth rate of Agriculture, November 2018), WPI of Karnataka during
Industry and Services at all India are anticipated November 2018 was 1327 has been increased to
to grow at 2.8%, 2.5% and 6.9% respectively. 1338 during November 2019 registering an
increase of 0.83%.
(ii) Per capita Income
All India Consumer Price Index for Industrial
Per Capita State Income (i.e. per capita NSDP) of Workers (CPI-IW) (Base Year: 2001=100)
Karnataka at current prices is estimated to be increased by 5.1% during first eight months
Rs.2,31,246 showing a rise of 8.8% during 2019- during 2019-20, (from 312 in April 2019 to 328
20, as against Rs.2,12,477 in 2018-19.The Per in November 2019). During the corresponding
Capita National Income is expected to reach Rs. period of previous year the increase was 4.86%
1,35,050 during 2019-20 from Rs.1,26,521 (from 288 in April 2018 to 302 in November
during 2018-19 with an increase of 6.7%. The 2018). The rate of inflation with regard to CPI
level of per capita state income at constant was 8.61% during November 2019 (328 during
(2011-12) prices is also expected to rise from November 2019 over 302 during November
Rs.1,53,276 during 2018-19 to Rs.1,61,931 for 2018), whereas the inflation during November
the year 2019-20 with the growth rate of 5.6%. 2018 was 4.86% (302 during November 2018
(iii) Sectoral Composition of Gross State over 288 during November 2017).
Domestic Product During 2019-20, among 5 central series centres
A marginal decrease is evident in the (Bengaluru, Belagavi, Madikeri, Hubballi-
composition of GSDP of agriculture and industry Dharwad, Mysuru) the CPI of Hubballi-Dharwad
sector from 11.18% and 23.67% in 2018-19 to and Madikeri centres has increased by 6.75%
10.97% and 22.84% in 2019-20 respectively. and 4.58% respectively during November 2019
Meanwhile, a marginal increase in the compared to April 2019.
composition of the service sector from 65.15% to Among 11 State series centres, Harihara and
66.19% is apparent. The contribution of 'Real Ballari centres increased by 5.71% and 5.4%
estate, Professional Services & Ownership of respectively. During 2019-20, the general Index
Dwellings' is highest with (35.31%) in 2019-20 of Harihara centre is increased from 840 in April
followed by 'Manufacturing (15.32%)', 'Trade to 888 in November 2019 showing an increase of
and Repair Services (9.51%)' and 'Crops 5.71% and from April to November 8 months'
(7.44%)'. average is 865 points showing an increase of
(iv) Prices 8.66% compared to corresponding period of
pervious year (796).
The all India Wholesale Price Index (Base Year:
2011-12=100) of all commodities has moved up During 2019-20, the Consumer Price Index for
from 121.1 in April 2019 to 122.3 in November Agriculture Labourers (CPI-AL) in Karnataka
2019, with an increase of 0.99% during 2019-20. (general index) (Base Year: 1986-87=100) has
During the same period in the previous year the increased by 6.44% in November 2019 over April
increase was 3.84% (from 117.3 in April 2018 to 2019 as against an increase of 7.3% at all India
level.
Economic Survey of Karnataka 2019-20 3

Urban Retail Price Index (URPI) (Base Year: the revenue receipts (62.50%) when compared to
1970=100) during 2019-20, has increased to all States (51.10%) in 2018-19 (BE).
3971 in November 2019 from 3348 in April 2019
with an increase of 18.6%. (d) Per-Capita Development Expenditure: The
per capita development expenditure in
Rural Retail Price Index (RRPI) (Base Year: Karnataka during 2016-17, 2017-18 (RE) and
1970=100) during 2019-20, has increased to 2018-19 (BE) was Rs.18864, Rs.20578 and
5402 in November 2019 from 4843 in April 2019 Rs.23179 respectively as compared to all State's
with an increase of 11.54%. average of Rs.14181, Rs.15687 and Rs.17171
The high percentage of committed revenue
1.3 FISCAL DEVELOPMENT AND STATE
expenditure to revenue receipts (84%) in
FINANCES
2018-19 (RE) reveals that the State has limited
(a) Fiscal Consolidation: Karnataka's relative flexibility in allocation of its resources for new
fiscal performance with reference to 'All States' is schemes. Hence the need of the hour is
considerably sound. The State's fiscal expenditure rationalization/ re-calibration.
consolidation efforts have continued to be
(e) Current Fiscal Challenges and Way
effective with all the fiscal indicators contained
Forward: Despite the State's broad successes in
within the stipulated limits of the Karnataka
its fiscal consolidation efforts, the State
Fiscal Responsibility Act, 2002 (KFRA). The
government faces several fiscal challenges
broad fiscal indicators continue to perform well
arising from limited upside potential for resource
and have largely been within the fiscal rules
mobilization relative to GSDP, rigidities in the
prescribed. Driven by various fiscal
form of committed expenditure, and weak
consolidation measures, Karnataka while
linkages between expenditure and development
enhancing its revenues has managed its
outcomes.
expenditure well. In 2019-20, the State has
estimated (i) revenue surplus of Rs.257.97 crore, (f) Capital Outlay: Capital outlay as percent of
(ii) Fiscal Deficit at 2.65% of GSDP and (iii) Total GSDP in expenditure front has slightly increased
liabilities at 20.60% of GSDP. Other important from 2.38% in 2018-19(RE) to 2.52% in 2019-20
expenditure indicators such as proportion of (BE). However, this poses a great challenge and
State tax revenue in the revenue expenditure is a matter of concern for Karnataka due to the
and non-development expenditure in aggregate infrastructure inadequacies prevailing in the
disbursements place Karnataka in a better State.
position.
(g) Low Non-tax Revenue: Non-tax revenue as a
(b) State Finances: The State's revenue receipts percentage of revenue receipts is declining over
have increased to181862.96 crore in 2019-20 the past several years. The ratio of Non-tax
(BE) from 165896.96 crore in 2018-19 (RE), revenue to GSDP has been negligible mainly on
9.62% increase in 2019-20 (BE) over 2018-19 account of low and declining cost recoveries,
(RE). The growth in Revenue receipts is primarily poor performance of Public Enterprises and
due to the growth of tax revenue. The per capita uneconomic pricing of implicit subsidies and
State's own tax revenue has increased from lack of regular and periodic monitoring by the
Rs.15611 in 2018-19 (RE) to Rs.17220 in Administrative Departments.
2019-20 (BE). The tax revenue is expected to
increase from Rs.106312.41 crore in 2018-19 (h) Removal of Distinction between Plan and
(RE) to Rs.118992.98 crore in 2019-20 (BE), Nonplan: It is expected that with the removal of
thus indicating a growth rate of 11.92%. The this distinction, a direct link between spending
State continues to have an overall revenue and outcome could be established which will be
surplus, albeit at reduced levels. As a result, in useful in assessing the efficiency of public
2019-20 (BE), Development Expenditure expenditure. The Union Government removed
increased by about 7.01% compared to 2018-19 this distinction in Government Expenditure
(RE). from the Financial Year 2017-18 onwards. For
the reason cited above, the State Government
(c) The State's own Tax Revenue: The State's has also removed this distinction in the
own tax revenues (SOTR) increased from Government Budget from the Financial Year
Rs.70180 crore in 2014-15 to Rs.118993 crore 2017-18.
during 2019-20 (BE). The ratio of non-tax
revenue to total receipts has not been increasing (i) Comprehensive Decision Support System:
over the years. Karnataka is in better position This system would capture information on the
with respect to proportion of State tax revenue in progress of the State Government's Schemes
directly from the implementation points and
4 Economic Survey of Karnataka 2019-20

enable the Government to formulate provides one of the biggest and fast expanding
comprehensive District and Block Plans. markets in the Country.
(j) Gender Budget: Gender based budgeting (b) Foreign Direct Investment Inflow in
helps to prioritize and orient public expenditure KARNATAKA (US $ MILLION): Biotechnology
to reflect the concerns of women. The State is one and Information Technology Services has been
of the pioneers in Gender Budget Initiatives and authorized as the Single Window Clearance
preparing Gender Budget documents since Agency for investments related to IT sector under
2007-08. The Gender Budget document the i4 Policy. All projects below Rs.100 Cr are
indicates the quantum of allocations made approved by State Level Single Window
through schemes intended for welfare and Clearance Committee (SLSWCC) and above
empowerment of women. The Gender Budget Rs.100 Cr. by State High Level Clearance
Allocation (BE) for the year 2019-20 is at Committee (SHLCC).
Rs.111012.86 crore which is 47.41 percent of
Karnataka accounts for a significant share in the
total budget. All government programmes/
total FDI that flows into India. The State had
Schemes wherein women beneficiaries are at
15.1% share in the total FDI taking place in India
least thirty percent have been classified into
in 2018-19. Karnataka attracted FDI of US$
categories A and B. Category-A covers schemes
42320 from 2000 to 2019 (up to Sep 2019)
which benefit women 100 percent. There are 66
constituting 9.5 % of the all India FDI.
schemes under this category in 2019-20 and
allocation under these schemes is at Rs.5222.46 (c) Investment in Information Technology:
crore which is about 4.70% of the total Gender Bengaluru was the first city in India to set up a
Budget. Category-B covers schemes, where in Satellite Earth Station for high speed
women beneficiaries are 30-99 percent. There communication services to facilitate software
are 816 schemes under this category in 2019-20 exports in 1992. The State made a giant leap in
and allocation for these schemes is at the Information Technology sector by
Rs.105790.39 crore which is about 95.30% of establishing the Country's first extended facility
the Gender Budget. of the International gateway and network
operations centre at the Software Technology
(k) Goods and Service Tax (GST): GST has been
Park of India (STPI) in the Electronic City.
introduced in the State in 2017-18. GST is
Karnataka is home to over 5500+ IT/ITES
expected to have positive impact on economic
companies, 750 MNCs contributing to over 58
activities in the long run. Awareness and
billion USD (Rs. 58 lakh Crores) of exports,
capacity amongst tax payers as well as within
giving direct employment to over 12 lakh
Government is extremely critical for smooth
professionals and creating over 31 lakhs indirect
transition. The State has taken steps to ensure
jobs. The industry contributes to over 25% of the
that the nuances of GST are comprehensively
State's GDP. The share of Karnataka in
explained to all the stake holders. A Central Help
Information Technology exports is nearly 40% of
Desk has been established in the Office of the
the country's exports of 155 billion USD.
Commercial Tax Department at headquarters
which will address all the issues relating to GST (d) Investment in Biotechnology: Karnataka,
on all working days both online and offline. the Biotech Capital of India, is home to one of the
earliest and most thriving biotech ecosystems in
1.4 INVESTMENT AND EXPORTS
India. The major hubs for Biotechnology include
(a) Investment: Karnataka's vast and diversified Bengaluru, Mysuru, Hubballi - Dharwad,
resource base has emerged as a reputed Tumakuru and Mangaluru, with new potential
investment destination for investors worldwide. hubs under development, across the State. The
The State was the first to enact the Industrial support for industry and startups comes from
Facilitation Act to help investors. Karnataka has the strong and evolving biotech research base in
a single window which acts as a one-stop-shop Karnataka, comprising of many nationally and
for investments in the State. The specific internationally renowned Research Institutions,
advantages for Karnataka include i) Good law Companies and startups. Karnataka is the
and order situation prevailing in Karnataka preferred destination for biopharma and
which is conducive to foreign direct investments. bioservices industry, including clinical trials,
ii) Abundant availability of highly skilled contract research and manufacturing activities.
manpower. iii) Karnataka ranks among the top 5 Karnataka is also strong on bioagriculture, bio-
industrially developed States in India. iv)The energy, medical devices and bioinformatics.
State provides excellent logistic support and Currently, Karnataka's Biotech industry
connectivity to the investors and v) The State comprises of 400 small, medium and large sized
Economic Survey of Karnataka 2019-20 5

companies and over 270 Start-ups, together petrochemicals and engineering commodities
forming 60% of the biotech companies in India. from Southern Region. Karnataka exports as a
The number continues to grow with most of the percentage of GSDP has a fairly large share and
well-known companies continuing to choose has also increased significantly over the period.
Karnataka as destination for their operations. In The share of exports in GSDP which was 7.36%
2016- 17, the biotech export revenues accounted in 1993-94, has grown to 28.90 during 2018-19.
for US $ 4.91 billion, while the domestic
Karnataka's exports amounted to about
revenues accounted for US $ 1.88 billion.
Rs.659425.33 crore in 2018-19 which
Amongst the biotech market segments in
constituted about 17.04% of the Country's
Karnataka, Biopharma is the largest segment,
exports in that year. The share of merchandise
contributing 65%, followed by Bioservices (16%),
exports in the National exports constitutes
Bioagri (13%), Bioindustrail (3%) and
around 5.30% and software / service exports
Bioinformatics (3%). Karnataka holds about 2%
around 39% for the year 2018-19.
market share of the global biotech industry, 9%
market share in Asia, while in India it commands 1.5 RURAL DEVELOPMENT
an impressive 35% market share. The biotech
industry in Karnataka provides direct and (i) Rural Development: Development of rural
indirect employment to an estimated 19000 areas has a bearing on improving agricultural
people with men constituting 69% of the production and related economic activities,
workforce and women 31%. Karnataka accounts availability of natural and financial resources
for 54% of India's biotech workforce. and their development, improvement of service
delivery thereby paving the way for improved
e) Karnataka Start Up policy 2015-2020 : The human development. The vision of rural
Karnataka Government's efforts to facilitate development is to provide sustainable and
entrepreneurship in the state can be traced back inclusive growth along with empowerment of
to 2015, when “Karnataka Startup Policy 2015- Panchayat Raj Institutions. The State has to its
2020” was launched with a vision to stimulate credit entrusting major responsibilities and
the growth of 20,000 tech startups by 2020. The devolving all the 29 functions to the panchayats
state government launched several startup- as enlisted under the Eleventh Schedule of the
focused funds that have a corpus of $47.3 Mn Constitution.
(INR 300 Cr). Over 9000 people have registered
on the Startup Karnataka Portal as Startups, (ii) Decentralisation: Karnataka State
Mentors, Incubators, Investors, Institutes etc comprises of 6021 Gram Panchayats, 177 Taluk
and more than 1200 startups have been certified Panchayats and 30 Zilla Panchayats. In recent
by Karnataka Startup Cell so far, of which years, the Karnataka Government has been
around 359 companies have been funded under taking a proactive stance to strengthen the
Idea2PoC/ Elevate Grant In Aid Seed Funding. decentralized governance and planning process
and to that effect has introduced many
(f) Exports of Karnataka: Karnataka has a long administrative innovations. 'Activity mapping', a
tradition of overseas trade. Historically, first of its kind in the country, has evolved a
Karnataka has been a major exporter of detailed range of activities for all the three
commodities like coffee, spices, silk, cashew Panchayats. The decentralized planning process
nuts, handicrafts and agarbathies. In the last begins with the determination of annual plan
two decades, the State has emerged as a major size at the state level, and allocation of funds to
player in the export of electronic and computer the district sector.
software, engineering goods, readymade
garments, petrochemicals, gems and jewellery, The Karnataka Panchayath Raj (second
agro and food processing products, chemicals, amendment) Act, 2015 has been amended in
minerals and ores, marine products, etc. December 2015. The salient features of the new
Karnataka has carved out a niche for itself in the amendment are insertions of new sections 309A
global marketplace as the knowledge and to 309 H of the Principal Act. Section 309(4) and
technology capital of the Country. The State has 309-A to 309-H where in it is clearly mentioned
made rapid and spectacular strides in the new the strategy to follow in preparing the
economy. Information technology, biotechnology development plan from the grass root level
and research and development institutions have Janavasti Sabha. Section 310B has been
enhanced Karnataka's achievements at national inserted to constitute Karnataka state
and global levels. Karnataka accounts for more Decentralised Planning and Development
than one third of electronics and computer Committee, headed by Hon'ble Chief Minister of
software exports from the country. It is also a Karnataka to formulate development plans and
leader in exports of readymade garments, annual economic review to be presented along
with the budget document.
6 Economic Survey of Karnataka 2019-20

The district sector outlay for the year 2019-20 is of this programme. During 2019-20 an
Rs 39135.19 crores, which is 16.71% of the total allocation of Rs. 1397.59 crore has been
state plan allocation. The District sector plan allocated for rural connectivity and maintenance
size which was at Rs.37675.97 crore during the of roads and 5312.12 kms of road length has
year 2018-19 rose to Rs.39135.19 crore in 2019- been connected and maintained by incurring an
2020, which constitutes 3.87% increase. Sectors expenditure of Rs. 664.57crore up to end of
like education, Other Rural Development November 2019.
Programmes, Medical and Public Health
Under Mukhya Mantri Gramina Raste
including Family welfare, welfare of Scheduled
Abhivruddi Yojane, an amount of Rs.27513.56
Castes Scheduled Tribes & other Backward
lakhs have been provided in the budget for 2019-
Classes and Nutrition have been the priority
20. The funds provided will be utilised for
sectors of panchayats, receiving better allocation
maintenance of rural roads.
compared to other sectors. There is a perceptible
increase in the allocation made to these sectors (iii) Rural Housing: Housing is an important
across the plan years. basic need for every household. Government of
To increase the resources of Grama Panchayats, Karnataka is providing housing for the needy
the tax levying coverage area and criteria has under many of its own schemes and through the
been revised. Building and land tax has been centrally sponsored schemes. During the last
levied based on their market value in Grama 3 years about 8.19 lakhs houses have been
Panchayat limit. Provision has been made for constructed under different housing
Grama Panchayats to levy taxes on mobile tower, programmes in rural areas. For site less families
wind power electricity generating plants and of Economically Weaker Section, 2.12 lakhs sites
solar energy electricity generating plants in have been distributed in rural areas from 2000-
Grama Panchayat area. 01 to 2018-19.During 2019-20, 89,684 houses
were constructed under the above programmes
(a) MGNREGA: Karnataka State is implementing upto end of November 2019.
MGNREGA at the Grama Panchayat (GP) level.
During 2019-20, an amount of Rs.3755.10 (iv) Rural Water Supply: As on 2019, the
crores has been released as against the drinking water infrastructure of the State
allocation of Rs.1816.00 crores, of which comprises 64,170 bore wells fitted with hand
Rs.3723.81 crores has been utilized to generate pumps, 39,157 piped water supply schemes and
812.40 lakh mandays upto Nov 2019. 19.47 51,120 Mini water supply schemes. Under Rural
lakhs households have been provided water Scenario in Karnataka there are 59,774
employment as against the demand of 21.92 rural habitations in the state. Totally 6152
lakh during the current year. 8.37 lakh works habitations covered under Multi village water
have been undertaken of which 2.30 lakh works supply schemes upto end of March 2019, of
are completed and the remaining 6.07 lakhs which 2667 quality affected habitations were
works are under progress. covered. During 2019-20 (upto Nov 2019) 53
Multi level villages schemes have been taken up
(b)Rural Roads: Improvement of Rural roads and targeting 1769 habitations, of which 470 are
their maintenance is being taken up under water quality-affected habitations
Pradhan Manthri Gram Sadak Yojane (PMGSY),
Namma Grama Namma Raste Yojane (NGNRY), (a) Jaladhare
Chief minister Gram Sadak Yojane & RIDF The State Government is implementing
schemes. “Jaladhare” project in a phased manner at an
PMGSY was launched with an objective to estimated cost of Rs.53,000 Crore over a period
provide rural connectivity by way of all weather of 7 years to provide safe and sustainable pure
roads to eligible habitations having a population drinking water at the rate of 85 LPCD for the
of 500 and above. Under this programme, Rs 191 rural areas, by drawing water from rivers or
crore has been allocated and Rs. 62.13 crore has reservoirs.
been spent for maintenance of 1302.60 kms of Four Districts viz., Mandya, Vijayapura, Kolar
road length as on November 2019. and Raichur has been selected in Phase I of the
Namma Grama Namma Raste Yojane was Jaladhare project. The Preliminary reports of
launched with an objective to provide rural Vijayapura and Mandya districts have been
connectivity as per PMGSY guidelines. Under prepared with an estimated cost of Rs.2604
this programme, Rs 6567.50 crore has been crores and 1609 crores respectively. Also,
spent and 14070.84 kms of road length has been external assistance to the tune of Rs. 2600
asphalted up to November 2019 since inception crores has been sought from Asian
Infrastructure Investment Bank.
Economic Survey of Karnataka 2019-20 7

(b) Jalamrutha Project (I) Urban Housing: Housing is a basic


requirement of human beings. Growth of Urban
The Department of Rural Development and cities had led to growing demand for housing. To
Panchayat Raj has launched the innovative meet the growing demand the State Government
“Jalamrutha” project as “Water Year-2019”, has been pro-active in its housing policies.
spreading the water conservation movement Further, housing for the poor and down-trodden
across the state of Karnataka. This project is a assumes greater importance both in rural and
community driven participatory program for urban areas in the State. The State has
implementation of the four Pillar campaign, viz increased the budgetary allocation over time
Water literacy, Rejuvenation of Traditional water along with formulation of facilitating policies and
bodies, water conservation and Greenery Under guidelines.
Jalamrutha project. An amount of Rs.6904.53
lakhs has been allocated and Rs.3012.38 lakhs Karnataka is one of the few states, which have
has been released in 2019-20. Totally 1362 their own housing programmes for the EWS both
tanks have been considered for rehabilitation in rural and urban areas apart from the centrally
and development, of which 183 are Minor sponsored housing schemes. The Karnataka
Irrigation Tanks and 1179 tanks are Zilla Housing Board (KHB) caters to housing needs of
Panchayat tanks in 20 districts covering 116 low income, middle income and high-income
taluks. groups. Karnataka Housing Board has
constructed 1,21,113houses and 77,793 sites
(v) Rural Sanitation: Swachha Bharat Mission were developed upto 2018-19.
(SBM)
During 2019-20 under Vajpayee housing
Karnataka has been the forerunner in putting scheme 5705 houses have been completed(upto
forth concerted efforts to implement total November 2019). During 2019-20 Under
sanitation in the rural parts of the State. To Devarajurs Housing Scheme and Dr.B.R.
accelerate and achieve universal sanitation Ambedkar Nivasa Yojane 233 and 3005 houses
coverage and to put focus on safe sanitation have been constructed upto November 2019 as
“Swachh Bharat Mission” was launched on 2nd the against the target of 500, 7000 houses
October 2014. respectively.
The objectives of the SBM (Grammena) is to bring (ii) Water Supply: The Karnataka Urban Water
improvement in the general quality of life in rural Supply and Drainage Board is responsible for
areas by promoting, cleanliness, hygiene and providing Water Supply and Sewerage schemes
eliminating open defecation. Ensure every in 276 urban areas of Karnataka except Bruhath
Family, Schools and Anganwad is in rural areas Bengaluru Mahanagara Palike. The Board has
to have access to toilet facilities. implemented assured safe drinking Water
During 2019-20, Rs.740.00 crores has been Supply Scheme to 231 urban areas from surface
allocated of which, Rs 259.89 crores has been source.
spent upto Nov 2019.Under this programme, The Board is implementing 5 schemes at
about 1.80 lakh individual house hold Latrines, 1) Malur, 2) Bangarpet, 3) Gajendragad, 4)
122 Community Sanitary Complexes, 488 Naregal, 5) Anekalfor shifting the source of water
latrines in Schools and 1978 latrines in from ground water to assured surface source of
Anganawadi's have been constructed up to end water. All these schemes will be completed by
of November 2019. December 2020. 100 water supply schemes are
1.6 URBAN DEVELOPMENT completed as against the target of 155 from 2009
to 2019-20 (upto Nov 2019) with an expenditure
Urbanization is an outcome of economic of Rs.2529.47 crores.
development and structural change. As per
Census 2011, in Karnataka 38.67% (i.e.2.36 (iii) Sanitation (Including Sewerage and
crore) out of total population of 6.11 crores Drainage): The Government of India vision for
reside in urban areas. The State has witnessed urban sanitation is set forth as: “All Indian cities
an increase of 4.68 per cent in the proportion of and towns become totally sanitized, healthy and
urban population during the last decade. The liveable and ensure and sustain good public
growth rate of urban population is 31.27% health and environmental outcomes for all their
between 2001 and 2011, as compared to28.85% citizens etc. with a special focus on hygienic and
in the previous decade. The percentage of Urban affordable sanitation facilities for the urban poor
population in the State is above national average and women”. As per the NSUP 2008, Karnataka
in all the census and the gap is increasing over State has proposed the State Sanitation Policy.
the years. During the year 2019-20 there are 49 on-going
8 Economic Survey of Karnataka 2019-20

under ground drainage Schemes with budget (vi) Bruhath Bengaluru Mahanagara Palike
allocation of Rs.520.18 crores. It is proposed to (BBMP): The Bengaluru Mahanagara Palike
commission 11 schemes during 2019-20 of (Bengaluru City Corporation) was established in
which Nargund UGD Scheme is commissioned 1949 by merging two separate municipalities,
and remaining projects are under progress. 3.94 which were in charge of the administration of the
lakhs Individual households' toilets have been “City Area” and the Cantonment Area of the city.
constructed as on November 2019 and 4463 BBMP has taken up many infrastructure
toilets are under constructions. 262 urban local projects to improve the infrastructure of the city.
bodies are certified as open defecation free Flyovers, Underpasses, Grade separators, Signal
wards. free roads, road widening has smoothened the
traffic flow of the city. During the year 2019-20
(iv) Urban Land Transport: The State Urban
for Bengaluru development a sum of Rs.2300
Transport Fund has been leveraged to promote
crores has been sanctioned of which Rs.1019.97
DULT's mandate. It includes assistance provided
crores has been spent for the development of the
for introduction of Public Transport System in
city up to end of November 2019.
cities of Karnataka, assistance for construction
of Transit Infrastructure in cities, implemen- (vii) Bengaluru Metro Rail Corporation
tation of Cycle Tracks in the neighbourhoods of Limited (BMRCL): Metro rail is a vital
Bengaluru, passenger information for TTMCs in component of the transformation of the urban
Bengaluru etc. Since 2011-12 up till November transport scenario in India. With urban
2019 an amount of Rs.441.57 Crores was population continuously growing, there is a need
earmarked as against which Rs.322.68 Crores for green solutions. Mass Rapid Transit Systems
has been released for implementation. During are fast, safe and comfortable to travel. This
the year 2019-20, 49 ongoing projects are in alone will encourage people to switch over from
progress, 03 of new projects for providing personalized vehicles to public transport.
assistance are approved. An amount of Rs. 23.39
crores is utilized by various urban transport The Project is being implemented through a
projects as against the allocation of Rs.77.39 Special Purpose Vehicle (SPV) Bengaluru Metro
crores. Rail Corporation Limited (BMRCL), with an equal
share holding owned by Government of India and
(v) Solid Waste Management: Municipal Solid Government of Karnataka. Bengaluru Metro Rail
Waste Management is one of the basic functions Project Phase-2A from Silk Board to K.R. Puram
of the Municipalities. Rapid urbanization, 19.5 Km length has been approved of
heterogeneous nature of waste, lack of Rs.5446.73 crore. Bengaluru Metro Rail Project
awareness among the public and various other Phase-2B: Nagawara Metro Station to
stake holders, lack of appropriate infrastruc- Kempegowda International Airport Bengaluru,
ture, disintegrated & unscientific approach of having a length of 38 Kms is approved by the
waste management has made the waste Government of Karnataka for Rs.9934.58 Crore.
management into an unmanageable situation. Approval for revision of the scope, route
There are totally 281 Urban Local Bodies (276 alignment, estimated cost and financing plan is
ULBs in the State 4 notified area including under process. For Bengaluru Metro Rail Project
BBMP) of which, 217 ULBs generates 5020 tons Phase-3, during 2019-20 a feasibility study for
of municipal solid waste and it is estimated that 105 kms new metro lines has been proposed and
61 new ULBs generates about 480 tons of MSW is under process.
every day. All the ULBs are responsible for (viii) Bengaluru Development Authority
development of necessary infrastructure for (BDA): Bengaluru Development Authority has
collection, storage, segre-gation, transportation, under taken the formation of a new layouts viz.
processing and disposal of municipal solid Nada Prabhu Kempegowda Layout which is in
wastes. progress. Allotment of 5000 sites of various
Steps have been taken for disposal of Solid Waste dimensions has been made to the public in
Management in ULBs. 100% door to door waste Nadaprabhu Kempegowda Layout and revenue
collection is implemented in 6550 wards out of of Rs.921.77 crore has been received. For
6635 wards. 100% segregation of waste at providing major infrastructure works in
source is implemented in 3442 wards out of Bengaluru metropolitan area, BDA has spent
6635 wards. 4981 tons of Municipal Solid Waste Rs.2986.94 crores.
is processed daily. Detailed Project Reports (ix) Smart City Mission: The Government of
(DPRs) on Integrated Municipal Solid Waste India has launched Smart City Mission on 25th
Management of 219 ULBs have been approved June 2015 and has issued guidelines regarding
by High Power Committee. implementation of the Scheme. The mission will
Economic Survey of Karnataka 2019-20 9

cover 100 cities and its duration will be five of the Central and State Government for
years(from 2015-16 to 2019-2020) with an enhancing production and productivity by
objective to provide a fillip to the development of ensuring timely supply of vital inputs i.e. seeds,
new and innovative Smart Solutions that directly fertilizers, plant protection chemicals, farm
impact the needs of cities, to ensure availability equipments along with effective transfer of
of funding for practice research of direct technology through demonstrations to achieve
relevance to the outcomes desired under the maximum output and thus enhancing the
Missions, to make available a large body of pilot- overall welfare of the farming community.
tested and proven Smart Solutions that can be
During the current year, a new Central Sector
adopted by cities as per their specific needs, to
Scheme, namely “Pradhan Mantri Kisan
promote a culture of innovation within the urban
Samman Nidhi (PM-KISAN)” was initiated for
sector. 7 cities viz,.Belagavi, Davanagere,
augmenting the income of farmers by providing
Hubblli-Dharwad, Shimoga, Mangaluru,
income support to all landholder farmers. Under
Tumakuru and Bengaluru are selected from the
the scheme, each eligible farmer family is
state. Under smart cities Rs. 2303Crore (Rs.
provided with the financial assistance of
1325 Crore from GoI and Rs. 978 Crore from
Rs.6000/- in three instalments of Rs.2000/-
GoK) has been released to 7 cities and Rs. 413.52
each. So far, 47.37 lakh farmers have benefitted
crore has been spent up to November 2019.
from the scheme. State Government on its part,
(x) Atal Mission for Rejuvenation and Urban has also provided additional assistance of
Transformation (AMRUT): The Central Rs.4000/- in two instalments of Rs.2000/- each
Government launched this scheme during July under PM-KISAN-KARNATAKA scheme.
2015. Under the scheme, 26 towns and Badami In addition to the on-going programmes, four
city under HRIDAY have been selected. A total of new programmes were initiated during the
401 works amounting to Rs.4952.87 crore were current year, namely, i) Zero Budget Natural
approved, of which 171 works amounting to Farming – low input, low-risk, climate-resilient
Rs.350.49 crore were completed upto November farming practice in harmony with nature ii) Raita
2019. Siri – encouragement for farmers to grow Nutri-
(xi) Nagarothana (Municipality) Phase – 3 cereals iii) Subsidy for setting up processing,
Project: This project is implemented in 267 grading, value addition, packing, labelling and
ULBs with an allocation of Rs. 2890 crore. branding of organic and zero budget natural
Drinking Water Supply works; road farming products and iv) Organic Farming
improvement works, road side drains, footpath Adoption and Certification
and traffic Management works, Storm water (i) Monsoon: As 2/3 of the cultivated area in the
drain improvement works and Construction of State is under rainfed cultivation, the failure of
office building, Community and Public toilets, monsoon leaves a significant impact on
Modern bus stand and Market Complex have agricultural production. The cumulative rainfall
been prioritized. An expenditure of Rs.1040.24 during the southwest monsoon period from 1st
crore has been incurred against the released June to 30th September was 977 mm as against
amount of Rs.1275.79 crore by completing 1679 a normal of 839 mm, but the failure of rains
works as against 3481 approved works as on during June-July and floods during August -
November 2019. September hampered sowing of Kharif crops.
1.7 AGRICULTURE AND ALLIED SECTORS Rainfall during Northeast monsoon period (1st
AND FOOD SECURITY October to 31st December) was 288 mm as
1.7.1 Agriculture against a normal of 188 mm, Rabi sowing was
also hampered due to excess rains during
The agriculture sector plays an important role in October and excess soil moisture in many
the overall growth of Karnataka's economy northern parts. State Government declared 103
despite a fall in its share in the state domestic taluks during August and 62 taluks during
product. It also continues to be the highest October as flood-affected taluks, while 49 taluks
employment generating sector and source of raw were declared as drought-affected taluks.
material for various industries. The State has the
vision to accomplish productivity enhancement, (ii) Agricultural Area and Production:
cost reduction for sustainable agriculture to Bountiful rains during monsoon season have
ensure increased income, farmers' welfare and improved the prospects of crop production
food security with an emphasis on small and during the current year compared to the
marginal farmers. The Agriculture Department previous year and the agriculture sector is likely
implements various schemes and programmes to achieve a growth rate of 3 to 4% over the
10 Economic Survey of Karnataka 2019-20

previous year. Advance Estimates of agricultural lakh quintal seeds were distributed to 13.86 lakh
production based on area coverage under farmers and Rs.103.89 crore subsidy amount
various Kharif and Rabi crops and likely was utilized. During Rabi and Summer 2.60 lakh
coverage during summer indicate food grain quintals seeds have been distributed to 4.22
production of 119.40 lakh tonnes against lakh farmers by utilizing Rs.61.23 crore subsidy
targetted the production of 138.67 lakh tonnes amount up to end of December 2019.
(102.03 lakh tonnes Cereals and 17.37 lakh
tonnes of Pulses against the target of 117.22 and (v) Watershed Development: The total
21.45 lakh tonnes, respectively). Oilseeds geographical area of State is 190.50 lakh
production is estimated to be 10.73 lakh tonnes hectares, out of which 129.70 lakh hectares area
against the target of 14.71 lakh tonnes. is available for watershed interventions. So for
Production of cotton is likely to be 14.75 lakh 69.85 lakh hectares rainfed area is brought
bales against the target of 16.58 lakh bales. The under watershed interventions. The remaining
shortfall in the targetted production can be area of 59.85 lakh hectares is planned for
attributed to the failure of rains during June- scientific watershed interventions in a phased
July and floods during August and October manner. Karnataka State watershed
2019. development approach/ interventions have been
widely acknowledged for its effective
(iii) Land Utilization and Operational implementation, community participation and
Holdings: As per the land utilization statistics use of scientific tools. Scientific implementation
for 2017-18, out of the total 190.50 lakh of soil and water conservation programmes in
hectares geographical area of the State, the net the watershed area has resulted in several
cropped area was 98.95 lakh hectares benefits such as reduction in soil erosion,
accounting to 51.94% of the total geographical improvement in the groundwater table,
area. Gross cropped area was 119.94 lakh improvement in crop productivity, crop
hectares including 20.98 lakh hectares area diversification, enhanced availability of fodder,
sown more than once, this works out to 121% fuel, drinking water for domestic animals and
cropping intensity. water for protective irrigation during critical crop
growth period.
Agriculture Census of 2015-16 shows 86.81
lakh farm holdings are operating 118.05 lakh (vi) Agricultural Marketing: The State has 162
hectares. Small and marginal holdings account Agricultural Produce Market Committees
for 80% of total holdings and operate 44% of the (APMC's) to facilitate and regulate the marketing
total operated area, while semi-medium, of agricultural commodities. The APMCs are
medium and large holdings account for 20% of managed by an elected Managing Committees.
the total holdings and their operational land The department aims to develop and regulate
holding is 56% out of the total operational area. participative, transparent and scientific
The average size of operational holding is 1.36 agricultural marketing system with adequate
hectares. The declining size of land holdings is infrastructure and user-friendly e-initiatives in
making a large number of farm families the state.
economically unviable.
An online trading system is now introduced in
(iv) Distribution of Inputs: For Kharif 2019, the 160 markets so far. Up to the end of December-
State Government had projected the 2019, totally 50.94 lakh farmers have registered
requirement of 22.75 lakh tonnes of different their names so far, for participating at Unified
grades of fertilizers. The State received 20.32 Marketing Platform. Through online platform,
Lakh tonnes of different grades of fertilizers by 6.68 Crore MTs of Agricultural Commodities
the end of Kharif 2019. For Rabi/ summer 2019- worth Rs.1,67,220 Crores have been transacted
20, the State Government had projected the up to December 2019.
requirement of 21.67 lakh tonnes of different
1.7.2 Horticulture
grades of fertilizers and the State has received so
far, 8.93 lakh tonnes of different grades of Horticulture has proved to be the best
fertilizers up to 20th January 2020. The State diversification option for agricultural land use in
Government operated the Buffer Stocking of Karnataka, because of assured and the
Fertilizers to overcome the scarcity of fertilizers remunerative returns to the farmers. Karnataka
at critical times. is the first State in the country to establish a
separate Horticulture Department. It has
The State Government provides Certified /
contributed more than one third share to the
Quality seeds to the farmers at subsidized rates
economy of agriculture and allied sectors. In
under State sectors Seeds Supply and other
2017-18, Horticulture crop covers an area of
investments Scheme. During Kharif 2019, 4.33
Economic Survey of Karnataka 2019-20 11

20.63 lakh hectares and the annual production Karnataka majority of the population is
is 185.20 lakh Metric Tons. The average dependent on Agriculture, animal husbandry
productivity of horticultural crops in the State is and dairy activities. To provide health care to the
8.98 Metric Tons per hectare. The annual value animals and for improvement and development
of Horticultural products produced in the State of breeds of animals, various programmes are
is Rs.44,879 crore which constitutes 32.45% of implemented successfully by the Department of
the total income from entire agriculture sector. Animal Husbandry and Veterinary Services
The share of Horticultural produces in total through its institutional network.
GSDP of the state is 3.39%.
During 2018-19, the share of Animal Husbandry
4.15 lakh hectares fruits, 4.83 lakh hectares in Gross State Domestic Product (GSDP) of
vegetables, 2.21 lakh hectares spice crops, 9.10 Agriculture and Allied activities was 20.07 per
lakh hectares garden plantation, 0.31 lakh cent. As per the 19th Livestock Census, the
commercial flowers, 0.01 lakh hectares share of Karnataka in all India livestock and
medicinal plants and 0.02 lakh hectares poultry population was5.41 per centand 7.33
aromatic crops are covered out of 20.63 lakh per cent respectively. The density of live stock in
hectares cultivated during 2017-18 the state was estimated at 151.21 per sq.km and
47468 per lakh human population.
Since inception till 2019-20 (up to November-
2019), an area of 6.57 lakh hectares has been The Karnataka Co-operative Milk Federation has
brought under Micro Irrigation by providing been formed on Co-operative basis which has
subsidy of Rs.2575.86 crores for 5.82 lakh three tier systems-Milk cooperative societies at
farmers who have installed Drip/ Sprinkler for primary level, Cooperative unions at district level
Horticulture. and Federation at state level. The organization
has the responsibility of providing remunerative
In order to enrich theoretical, practical and
price and market to the rural milk producers of
creative knowledge among the rural youth, a
the state and supplying quality milk and milk
horticulture training Institute was established in
products to the consumers.
the year 1995-96 in Lalbagh Bengaluru.
Currently, there are 11 training centers The Federation has 25 dairy processing plants
functioning. Every year about 400- 450 Farmer's with a capacity of 66.10 lakh liters / day.
children are being trained in this center. Organization has 44 milk chilling centers and
1639 B.M.C units and also 6 milk product
The State Government is implementing National
dairies which manufacture 188 MT milk powder
Horticulture Mission effectively as a
every day. The Karnataka Milk Federation has
subcomponent of Mission for Integrated
5 cattle feed plants which produces 45000 MT's
Development of Horticulture (MIDH). Several
of cattle feed / month, this plants have secured
initiatives are undertaken under NHM and other
quality mark certification for quality production
Programmes to boost the growth in this sector.
and supply of cattle feed to producers. At
The major initiatives include 1) Area expansion
present, 14602 dairy co-operative societies are
programme2) Providing micro irrigation under
functioning, within the limit of 14 district milk
PradhanaMantriKrishiSinchayiYojane3)
unions with 25.20 lakh farmers are enrolled as
Horticulture extension and training 4) Disease
members, out of which, 8.78 lakh farmers are
and pest management5) Rashtriya Krishi Vikas
active members. Large number of women are the
Yojane (RKVY) 6) Comprehensive Horticulture
beneficiaries which has contributed to their
Development 7) Assistance to Horticulture
empowerment. During 2019-20, an amount of
Boards and Corporations8) Biotechnology 9)
Rs. 267127.00 (Including RKVY allocation) lakh
Apiculture 10) Karnataka watershed
has been allocated for the Animal Husbandry
development project (Sujala-III) 11) Krishi
and Veterinary department to take up the
Bhagya Yojane (KBY) 12) Sub Mission
programmes.
Agricultural Mechanization (SMAM) 13) National
Ayush Mission. Action has been initiated to establish Gokul
Gram as per the guidelines of Rashtriya Gokul
During 2019-20, an amount of Rs. 133613.72
Mission (RGM) to conserve and propogate local
lakh has been allocated for the various
indigenous breed, Amritmahal Breed at
programmes of the departmental activities.
Lingadahally in Chikkamagalur District. Rs
1.7.3 Animal Husbandry and Dairy 310.00 lakh has been released to develop
Development infrastructure facilities at the Lingadahally
centre.
The Livestock sector plays vital role in
development of rural economy of the State. In
12 Economic Survey of Karnataka 2019-20

1.7.4 Fisheries identify ineligible ration cards with active


participation of general public. Department
Fisheries Sector contributes to production of
introduces Intra and Inter-state portability, so
quality animal protein required for human being
that any beneficiary can avail their entitlement
besides provides more employment
in any Fair Price shop in the state as well as
opportunities. The vast marine, brackish water
outside the state.
and inland freshwater resources are the source
of fish production in the State. PDS is operated under the joint responsibility of
the Central and the State Governments. The
Karnataka State has 320 Km long coastline
Central Government, through Food Corporation
along with 27000 Sq. km continental shelf area,
of India has assumed the responsibility for
5.65 lakh hectares of various inland water
procurement, storage, transportation and bulk
resources and has vast scope for fisheries
allocation of food grains to the State
development. The brackish water area of 8000
Governments. Food and Civil Supplies
hectares also provides good scope for
Department implements Targeted Public
shrimp/fish culture. There are about 9.61 lakh
Distribution System. The Padithara Khatari
fishermen in the state of which 3.28 lakh
Scheme, guarantees the availability of food
fishermen in marine and 6.33 lakh fishermen are
grains from the first of every month.
in inland who are involved in various fisheries
AHARAVANI” Toll free No. 1967 and 1800 425
activities. Karnataka is in 4th position in marine
9339 facility has been provided to receive
fish production and 11th position in inland fish
complaints with regard to the distribution of food
production when compared to fish production in
grains under Annabhagya scheme.
the country. During 2019-20 upto the end
Computerization and Digitization of records has
November 2019, 5108 Lakh fish seeds have been
ensured transparency in the system.
produced. The total fish production during
Annabhagya Adalat has been introduced from
2018-19 is 5.87 lakhs metric tones. During
01.06.2014 to address the public grievances.
2019-20, an amount of Rs. 28296.14 lakh has
The Department of Food and Civil Supplies has a
been allocated for the various programmes of the
digitized database of all ration cards. In order to
departmental activities.
curb irregularities in the Fair Price Shops,
1.7.5 Food and Nutrition Electronic Weighing-cum point of Sale Machines
(E-POS) having special features were installed in
To attain the sustainable development goal of 3877 fair price shops in the State.
Zero hunger (SDG-2) it is essential to ensure food
and nutrition security. The Public Distribution The Department has introduced Mukhya Mantri
System (PDS) is evolved as a system of Anila Bhagya scheme to make the state kerosene
management of scarcity and for distribution of free and to provide safe fuel to the households.
food grains at affordable prices in Karnataka. Presently, a target of 10 lakh beneficiaries has
There are 19885 Fair Price Shops (FPS) covering been fixed for the scheme. As on 14-11-2019
the revenue villages. Annabhagya is a major about 3.25 lakh applications have been received,
scheme introduced combined with National of which action has been taken to distribute
Food Security Act -2013 (NFSA) to accomplish 96,753 gas stoves to the beneficiaries upto the
the objective of hunger free State. From the Year November-2019. Punarbelaku scheme is being
2017-18, each member of priority implemented to the rural ration card holders by
household(PHH) is being distributed 7 kgs food giving rechargeable LED bulb costing Rs.300.
grains and Anthyaodaya Anna Yojane (AAY) The State efforts have thus contributed
households are given 35 kgs food grains at free of significantly to provide food and nutrition
cost. There are 1.31 crore PDS card holders in security for the poor in the State.
the State (upto November 2019) which
1.8 NATURAL RESOURCES AND
constitutes 3.93 crore beneficiaries under Public
ENVIRONMENT
Distribution System.
Many measures have been introduced to 1.8.1 Forest, Ecology and Environment
improve access, convenience, efficiency and Karnataka's geographical area of 191,791 sq.
transparency under the scheme. For the first km. constitutes 5.83% of India's geographical
time in the country, state government has area. Forest accounts for the second largest land
introduced innovative schemes such as the free use after agriculture. The total area under
SMS system to the card holders to know the forests in the state is 42200.44 sq. km. Thus,
entitlement of quantity of food articles and the about 22 % of the State's geographical area is
amount to be paid to Fair Price Shops (FPS). A under forest.
reward scheme has also been introduced to
Economic Survey of Karnataka 2019-20 13

The forest vegetation is classified into seven Climate Change, with an objective to increase
types based on gradients of rainfall, length of dry forest cover in five million hectares of forest area
season and temperature. About 16.70% of and improvement of forest cover quality in five
forests are wet evergreen, 13.56% is semi- million hectares of forest (Totally ten million
evergreen, 24.20% is moist deciduous and hectares) and reducing of 43 million tonnes of
24.34% is dry deciduous. Thorn forests form CO2 sinking by 2020. In the year 2019-20 a
11.93%, plantations form 8.24% and broad- budget provision of Rs.1000.00 lakh has been
leaved hill forests form 1.03%. made in the state for implementing the scheme
Forest cover in Karnataka is 19.58% to total under National Afforestation Programme and
geographical area of the state (as per forest Green India Mission.
survey of India), where as in southern states Karnataka State Pollution Control Board
Kerala has highest property of forest cover to its
total area and Karnataka is being in third The Karnataka State Pollution Control Board
position. has been established in 1974, under the Water
(Prevention and Control of Pollution) Act,1974. It
The state has 5 national parks, 33 wildlife is a statutory body vested with the duties of
sanctuaries, 14 conservation reserves and 1 implementing the provisions of both the Water
community reserve. During the year 2019-20 and the Air Acts for control of pollution.
(upto November 2019) the number of visitors to
national park and wildlife sanctuaries are There are 263 industries under the 17 category
656196, out of which 4370 are foreigners and of highly polluting industries in the state, of
651826 are Indians. which 205 are in operation. The waste water
generated from these industries are treated and
The state has realized revenue to the tune of Rs. disposed as per the norms of the board. The
13174.37 lakhs during 2019-20 (upto November policy of the board is to ensure that, the
2019) from marketing of forest produce such as industrial effluents are treated to the standards
timber, firewood, sandal wood, bamboo, canes prescribed by the KSPCB and to use the treated
and other non-timber forest produce. effluent for Secondary purposes, within the
The department is also undertaken develop- industry as far as possible and for irrigation/
mental activities like afforestation and social gardening/green-beltdevelopment and cons-
forestry. Afforestation programmes are being truction purpose. The Board has established “Air
undertaken periodically. During 2018-19, area Care Cell” to monitor the online emission/
to an extent of 44494 hectares has been effluent Parameters/on continuous basis and
afforested by planting 279.9 lakh seedlings. send alerts to the industries, in case of
Under the farm forestry 247.9 lakh seedlings exceedances, by the way of issuing directions
were distributed to farmers and general public and refusing the consent.
for planting in private lands. In 2019-20 upto the The Karnataka State Pollution Control Board is
end of November 2019, 41,426 hectares have monitoring the quality of water sources in the
been covered by planting 282.9 lakh seedlings. State. Water samples from lakes, rivers, ponds,
337.9 lakh seedlings have been distributed to bore wells, open wells and sea are analysed for
farmers and general public for planting in private monitoring the water quality. CPCB has
lands. specified water quality criteria depending on the
Karnataka state has an area of about 4000 Km designated best use and activities in the river
National Highways, 21000 Km State Highways and classified it as five categories namely, Class
and 38000 Km District Roads. Under various A,B,C,D & E. The Board has analysed 90,394
afforestation programmes, about 15000 Km of samples from the discharge of organizations
Road side planting has been taken up by the (including industries) and other waste water
forest department since 1980. In the year 2019- generating units identified. The same are being
20 Rs. 2506.23 lakh has been allocated for monitored with inspection and sample analysis.
raising of 207.37 Kms plantation, raising of In order to control pollution of water bodies
monsoon plantation, maintenance of 3425.86 KSPCB has accorded consent to 11 Common
Kms plantation and taking up of 665 ha. Effluent Treatment Plants (CETP) in the State at
advance works. An amount of Rs.1074.18 lakh different places for treatment of effluents
has been spent upto the end of November 2019 generated from homogeneous type of industries
as against the total allocation. in the small scale sector. Presently 10 Common
Effluent Treatment Plants's(CETP) are in
The Central Government project, the Green India operation.
National Campaign, is being implemented by the
Ministry of Environment and Forest through the The Karnataka State Pollution Control Board is
monitoring the air quality in the State, in
14 Economic Survey of Karnataka 2019-20

accordance with the provisions of the Air The net irrigated area has increased
(Prevention and Control of Pollution) Act,1981. considerably from 13.62 lakh hectares in 1980-
Karnataka State Pollution Control Board is 81 to 31.55 lakh hectares in 2017-18. Similarly,
monitoring the ambientair qualityof Bengaluru Gross Irrigated area which was 16.76 lakh
city at 20 stations, 13 stations under the hectares in 1980-81, has increased to 36.39 lakh
National Ambient Air Quality Monitoring hectares in 2017-18. The gross irrigated area as
Programme (NAMP) and 07 stations under the percentage of total cultivated area has almost
Continuous Ambient Air Quality Monitoring doubled from 16% in 1980-81 to 30.34% in
programme (CAAQM). Monitoring is done twice- 2017-18.
a-week for 24 hours at 13 Stations under NAMP
Projects having atchkat between 40 hectares to
and 24hours through-out the year at 7 stations
2000 hectares are under the jurisdiction of the
under CAAQM. According to revised National
Minor Irrigation Department. These include
Ambient Air Qualities Standards, Six
Tanks, Pickup, Bhandaras, Barrages and lift
parameters are monitored using manuals
Irrigation Schemes. 826885 hectares of
equipment. In Karnataka, 4 Cities viz.,
cultivable command area come under its
Bengaluru, Davangere, Kalburgi and Hubli-
jurisdiction.
Dharwad has been identified by CPCB as Non-
attainment cities, based on PM10 exceedence. Among all irrigation sources, tube wells/bore
Action Plan has been approved by CPCB and is wells accounted for the highest proportion
under implementation. The continuous (44.82%) of the net irrigated area followed by
ambientair quality monitoring data is online and canals (29.95%) and dug wells (9.16%). The
can be viewed in CPCB website, SAMEER app share of tanks, which were historically a major
and in KSPCB website. source of irrigation, has accounted for only
about 3.99% and other sources 12.08% of the
Apart from this, the Department is also
net irrigated area.
monitoring Noise quality through National
Ambient Noise Monitoring programme (NANM) 1.8.3 Mines
and also managing hazardous waste, plastic
waste, e-waste, bio-medical waste and solid- Karnataka State is rich in mineral resources that
waste through various management activities. are found in the State cover of 1.92 lakh sq. kms.
Karnataka has more than 40,000sq. kms. of
Karnataka Bio-diversity Board (KBB) green stone belt which are a treasure trove of
several mineral deposits and also indicates the
Karnataka Bio-diversity Board was established
occurrence of polymetallic deposits, diamond
with an objectives to Implement Biological
and gold. During the year 2019-20, upto
Diversity Act, 2002, Karnataka Biological
November 2019the Department of Mines and
Diversity Rules, 2005 , Conservation of
Geology has granted 141 Quarry leases for
Biological Diversity and Promotion of in-situ and
building stone and other minor minerals. For
ex-situ conservation of biological resources.
Ornamental Granite 15 Quarry leases were
The Karnataka Biodiversity Board celebrated granted and has realized revenues of Rs.2277.61
International Day for Biological Diversity 2019 crores upto November 2019.
on 22/05/2019 at Aranya Bhawan,
Karnataka State Sand Policy 2011
Malleshwaram, Bengaluru with the theme “Our
Biodiversity, Our Food, Our Health.” Padma In view of the geographic setting and
Sri. Saalumarada Thimmakka inaugurated the administration of state, Government has
function to celebrate the International Day for brought Sand policy in 2011. On 12th August
Biological Diversity 2019. 2016, Government of Karnataka has brought an
amendment to KMMCR 1994. As per the
1.8.2 Water Resources amendment rule 2016, the responsibility of sand
Irrigation is an important source of raising being brought back to the Department of Mines
productivity in agriculture sector. Expansion of & Geology. Sand blocks of appropriate size will
both the groundwater and surface water be granted through auction for the private people
resources has helped to increase the cultivated for sand extraction. Leases for sand extraction
area under irrigation in the State over time. The will be given for period of five years.
cumulative Irrigation Potential under major, There are 512 notified sand blocks in the state,
medium and minor Irrigation in the State has out of which 18 sand blocks reserved for
been increased considerably from 38.82 lakh Government works. Presently, 342 sand blocks
hectares in 2014-15 to 41.17 lakh hectares in has been disposed through tender cum
2018-19. The anticipated irrigation potential for e-auction, out of which for 236 sand blocks
2019-20 is 41.71 lakh hectares.
Economic Survey of Karnataka 2019-20 15

quarrying leases has been granted and 44 sand registered factories in 2016-17 in the country.
mining licenses have been issued in Patta land. The contribution of registered factories of
Temporary permits has been given to remove the Karnataka stood at 5.68% of total fixed capital,
sand in 38 sand bars in the river streams of CRZ 6.90% of total output and 7.11% of Gross Value
areas (Coastal Regulation Zone) to traditional Added (GVA) in the same year.
sand removal manner as per Ministry of
Environmental, Forest and Climatic changes (c) MSME :In 2018-19, 69278 MSME Units have
office order 2011. In total, as mentioned from the been registered in the State with an investment
above sources, approximately 12 MMT of sand of Rs.14876.98 crores by providing employment
has been estimated for sand mining and same to 582943 persons. As compared to 2017-18,
quantity have been approved by environmental there is a 42.89% increase in the number of units
clearance (EC). By end of the November-2019, registered, 28.41% increase in investment and
2.73 MMT sand has been mined and supplied for 32.34% increase in number of persons employed
Public and Government construction works. A during 2018-19.
sum of Rs.99.00 crores has been collected in the (d) Sericulture: Sericulture is one of the major
way of Royalty/ additional periodical payment/ employment generating sectors in the State,
average additional periodical payment. particularly in rural Karnataka. The area under
1.9 INDUSTRY mulberry cultivation in the State was about 1.07
lakh hectares at the end of November 2019,
Karnataka has been driving force in the growth which is higher than the area under mulberry
of Indian industry, particularly in terms of high- cultivation in 2018-19. Out of 83.017metric tons
technology industries in the areas of electrical of cocoons production, 56.001 metric tons of
and electronics, information & communication cocoons marketed, 11.592 metric tons of raw silk
technology (ICT), biotechnology and, more produced and 13.595 lakh of employment has
recently, nanotechnology. The industrial been generated during 2019-20 (up to November
structure of Karnataka presents a blend of 2019). During 2018-19 the estimated mulberry
modern high-tech capital goods and knowledge silk production in Karnataka was 11592.308
intensive industries on the one hand and Mts. During 2018-19 the Karnataka Silk
traditional consumer goods industries on the Marketing Board Ltd has made a turnover of
other. Rs.383.61 lakhs as against the turnover of
Rs.401 lakhs in the previous year(2017-18).
(a) Trends in Industrial Production: The
During 2019-20(upto November 2019) the
general index of industrial production (IIP) of
turnover is Rs.346 lakhs.
Karnataka covering mining, manufacturing and
electricity sectors for 2018-19 stood at 201.3 . (e) Other Policy Initiatives: Mobile One has the
The overall organized industrial sector of unique distinction of being certified as India's
Karnataka has registered 4.03% growth in 2018- first and the world's largest multi-mode mobile
19 as compared to 2017-18. Within the governance platform. It is a unified mobile
organized industrial sector, Electricity sector platform for delivery of citizens' services both
shows the highest growth of 11.32% followed by from the Government and Private sector. These
the Mining sector 5.89% and Manufacturing anytime, anywhere, anyhow services will be
sector registered lowest growth of 3.01%. As a available 24x7x365 days at any location in India
result of this moderate growth of 4.03% was on any mobile device.
observed in General Index.
Keonics is actively involved in establishing IT
The compound average growth rate (CAGR) for Parks in Tier-II Cities in the State such as
this period for the entire organized industry was Hubballi, Kalburgi, Shivamogga, Mysuru and
about 5.11%, whereas it was 5.46% for Mangaluru.
manufacturing and 5.26% for electricity. A
decline of 1.22% was seen in the output of the Keonics is poised to play a vital role in the
State's mining sector. In 2018-19, with reference upcoming Information Technology Investment
to the use-based classification of industries Region (ITIR) project conceived and being
among the four broad groups, Consumer goods developed by the Government of India and
registered the highest growth of 3.13% followed Government of Karnataka near the international
by Basic goods at 3.08%, Intermediate goods at airport, Bengaluru with an initial investment of
3.01% & Capital goods at 2.69%. Rs. 1600 crore and an area spread over 2100
acres in the first phase. The Project is aimed at
(b) Annual Survey of Industries: The Annual housing IT SEZ, Electronic Hardware Park
Survey of Industries (ASI) statistics indicates among other ancillary industries with an
that Karnataka accounted for 5.68% of the total integrated township.
16 Economic Survey of Karnataka 2019-20

In order to recognize, motivate and appreciate comparable States. With regards to urban
the best performing Public Sector Enterprise, female group it is 22.8% which is third lowest
Department of Public Enterprises gives Annual among comparable States and it is more than the
'Chief Minister's Ratna Award' for the best all India rate of 20.4%.
performing Public Sector Enterprises every year.
For this year five companies, namely, Karnataka (b) Worker Population Ratio (WPR): WPR under
State Minerals Corporation Limited, Karnataka UPSS approach for Karnataka is 49.1% which is
Soaps and Detergent limited, Mangaluru more than all India average of 46.8%. This rate is
Electricity Supply Company Limited, Karnataka more in Andhra Pradesh (57.2%) followed by
Silk Industries Corporation, and Karnataka Tamil Nadu (51.0%) and Telangana (49.8%).
State Women Development Corporation have However, it is less in Kerala (41.2%) and Gujarat
been selected to receive the Chief Minister's (47.4%). The Highest WPR in Karnataka is 77.2%
Ratna Award. for rural male and for female it is 27.2%. Both are
more than the all India average of 72.0% and
(f)Tourism: Department of Tourism is looking 23.7% respectively. For urban male it is 69.2%
after the administration of Tourism Department and for urban female it is 21.2% for which the all
along with Promotional and Developmental India average is 69.3% and 18.2% respectively.
activities. It is supported by two other The state average for male and female worker
Government undertaking agencies namely, population ratios are 74.0% and 24.8% which
Karnataka State Tourism Development are higher than all India average.
Corporation Ltd (KSTDC) and Jungle Lodges and
Resorts ltd. Every district has a district Tourism (c) Unemployment: Under UPSS approach,
Promotional Council headed by the Deputy Unemployment Rate (UR) of Karnataka is 4.8%
Commissioners of the concerned Districts. for all persons both urban and rural put together
Department of Archeology, Museum and which is less compared to Unemployment Rate of
Heritage was also brought under ambit of, India (6.0%). This rate is lowest in Andhra
Department of Tourism to facilitate overall pradesh (4.5%) whereas it is highest in Kerala
Development of Heritage Tourism in the State. (11.4%). In Karnataka, the unemployment rate
Besides, “Atithi”-Home Stay scheme has been in the rural areas is 4.0% for males and 3.4% for
introduced in the State. Many families are females. Whereas in urban areas, it is 6.3% for
coming forward to offer their homes to tourists as males and for females it is 7.2%. At all India level,
Home Stays with excellent facilities to the for males in rural areas it is 5.7% and for females
tourists in the State. it is 3.8% and these are lower than all India
average of urban areas.
Under Tourism Infrastructure scheme 1017
various Infrastructural works sanctioned in the (d) Distribution of Workers According to Work
previous years have been continued as ongoing Conditions (UPSS Approach): The highest
works. In addition 249 new works were also numbers of persons are self-employed (47.8%).
sanctioned. A sum of Rs.63.60 crores have been This is followed by casual labourers with 26.8%
released for completion of ongoing works and to and wage earners with 25.4%. The State has
start new works. more number of casual workers than the
National average of 24.9% and wage earners of
1.10 EMPLOYMENT AND LABOUR WELFARE 22.8%. Among the total working force, self-
There is a close nexus between poverty and employed and casual labourers account for
unemployment. Therefore, employment 74.6%. This raises the concern about
generation becomes important in the context of sustainable livelihood opportunities for these
achieving the Sustainable Development Goal of workers.
eradicating poverty and hunger. In the policy (e) Employment Exchange Statistics
context the most critical factor that impinges on
labour supply is the Labour Force Participation The number of job seekers as per the live register
Rate (LFPR). figures of employment exchanges was 3.46 lakh
as on November-2019 compared to 3.43 lakh at
(a) Labour / Work force Participation: The the end of March-2019, an increase of 0.7
LFPR for persons aged 15 years and above percent. There is an increase of 5.8% in Post
according to UPSS status approach is 51.6% in Graduates, 3.3% in Matriculates' and
Karnataka, whereas this is 49.8% for India. It is Stenographers, and 1.8% in Graduates.
77.8% for males and the gender gap is 51.8
percent. Among comparable states, lowest rate is (f) State Government Initiatives
in Kerala and the highest rate is in Andhra The higher rates of Labour Force Participaton
Pradesh. This rate is 80.5% for males in rural Rate (LFPR) and low rates of unemployment are
Karnataka, which is the highest among the
Economic Survey of Karnataka 2019-20 17

due to significant interventions by Government energy sources of generation. There were a few
of Karnataka in capacity building and Self major Independent Private Power Producers
employment and wage employment (IPPs) in the State, who contributed 15721.67
programmes. The implementation of projects for MW to installed capacity during 2018-19.
promotion of social security for unorgonised
Karnataka's power sector has reduced its
workers, labour laws, and maintenance of
Transmission & Distribution losses from 22% (in
industrial relations and management of
2009-10) to 16.16% by 2018-19, which will
industrial safety have helped to promote labour
further be reduced to 15% by March 2020. The
welfare.
Aggregate Technical & Commercial losses during
1.11. ECONOMIC INFRASTRUCTURE 2009-10 was 23%, which was brought down to
15.27% in 2018-19.
1.11.1 Power Sector
To improve distribution of power, two Central
Karnataka State has been experiencing Sector Schemes are being implemented, viz.
conditions of power shortage because of the ever- Integrated Power Development Scheme and
growing demand for power influenced by the Deena Dayal Upadhyaya Gram Jyoti Yojana. In
rapid economic progress. The State Government the year 2018-19, agricultural sector accounted
has taken various initiatives to implement for the highest share of electricity consumed
projects in public as well as private sectors for with a share of 38.98% and domestic sector
adding new installed capacities for power occupied second position with a share of
generation and has also introduced power sector 22.14%. All the villages in the State have been
reforms. electrified.
The total installed generation capacity both in The cost of supply of free power to agricultural
the public sector and the private sector including sector & Bhagya Jyoti/Kuteera Jyoti
the state's share in the Central Generation connections has been provided by the State
Stations (CGS) up to November 2019 is 29884.50 Government through subsidy. The subsidy
MW, which is 11.33 % higher than that in the provided by the State Government during
same period of the previous year. The installed 2018-19 was Rs. 9250 crore and in 2019-20
capacity in the public sector is 12979 MW (Upto November 2019) it is Rs.7285.96 crore.
(43.43%) (including CGS allocation) and the The increasing subsidy burden has remained as
private sector's share is 16905.50 MW (56.57%). a challenge to the State.
It may be observed that out of the total installed
capacity of 29884.50 MW, the renewable energy Rural Energy: Based on the cattle population in
including mini hydel and cogeneration accounts the State, 6.80 lakh biogas plants can be
for 14761.20 MW with a share of 49.39%. The constructed, of which, up to November 2019,
contribution from wind power is the third 4.59 lakh biogas plants have been constructed.
highest at 4817.84 MW after coal thermal and Beneficiaries are selected at Grama Panchayat
solar power. level under 'New National Biogas and Organic
Manure Programme'. Biofuel activities are being
The addition to the installed capacity during implemented under 'The Karnataka Biofuel
2018-19 was 2705.54 MW, of which 1253.06 Policy-2009' through Karnataka State Biofuel
MW was under renewable energy. During Development Board.
2019-20 (up to Nov.2019), though the capacity
addition under renewable energy is 1183.83 To provide a big push to exploitation of solar
MW, the net addition to the total installed energy, the Government has published its Solar
capacity is 1143.83 MW because the CGS Policy for 2014-2021. Around 12,900 acres of
allocation is reduced. land has been obtained on lease basis from
farmers for establishing world's largest 2050 MW
The peak demand met during 2018-19 was capacity Solar Park in Pavagada Taluk of
12881 MW and in 2019-20, the anticipated peak Tumakuru District. In this Solar Park, 1950 MW
demand is around 13796 MW. The Generation of capacity projects have been commissioned up to
electricity during the current year is 33496.45 the end of November 2019. Action is being taken
MU up to November 2019. The total power for early commissioning of remaining 100 MW
generation in 2018-19 was 51184.31 MU as capacity projects.
against 43546.30 MU in 2017-18, which
constitutes 17.5% increase. The Hydro: Thermal The State is formulating effective demand and
mix in generation in public sector is in the ratio supply strategies to overcome the energy
of about 1:2. Karnataka has successfully shortage in the state. As per 'SDG India Index &
encouraged private sector investments in power Dashboard 2019-20', Karnataka is placed at 7th
generation from non-conventional or renewable position in the country in Sustainable
18 Economic Survey of Karnataka 2019-20

Development Goal 7: 'Ensure access to by 30% by the year 2020. PRAMC has taken up
affordable, reliable, sustainable and modern 110 black spots/ corridors/Accident prone
energy for all '. locations for rectification in 2019-20 action plan.
1.11.2 Roads, Transport, Infrastructure and Rural Roads: The total length of rural roads in
Communications Karnataka is 190862 kms. Improvement of
roads and their maintenance is being taken up
(a) Road Development under Pradhan Manthri Gram Sadak Yojana
Road transport has a vital role to play in the (PMGSY), Mukhya Manthri Grameena Rasthe
development of the state and therefore it is a Abhivruddhi Yojane (CMGSY) & RIDF schemes.
priority sector in the state. The average length of Under Mukhya Mantri Gramina Raste
the PWD roads (viz; NH, SH & MDR) per 100 sq. Abhivruddi Yojane, a sum of Rs.27513.56 lakhs
kms area is 40.07 Kms. All the National have been provided in the budget for 2019-20.
Highways and a large extent of State Highways The funds so provided have been allocated to
(99.50%) and 98.41% of Major District Roads are Zilla Panchayats as per Dr. D.M. Nanjundappa
covered with black top. The major road Committee report for maintenance of rural
Development –Projects and the progress made is roads.
as follows:
(b) Road Transport
Under SHDP-III, improvement of 2795 kms of Karnataka provides efficient public transport to
State Highways and 1520 kms Major District people of different income groups across the
Roads at an estimated amount of Rs. 3500 crore state as well as in neighbouring states. The Govt.
in 127 packages are being implemented. of Karnataka has bifurcated the Corporation into
Under SHDP-IV, in-principle approval has been four separate Corporations.
given for implementation of 7800 kms road (i) KSRTC: During 2019-20 (Up to Nov-19), the
development under 3 stages at an estimated Corporation has operated 8145 Schedules
amount of Rs. 10,000 crore. utilizing 8535 vehicles, operating 29.26 lakh
Under KSHIP-II, Proposal is to develop 834 kms kms/day earning gross revenue of Rs. 947.83
of roads under World Bank Assistance. As on lakh and carrying 29.65 lakh commuters daily
Nov 2019, a road length of 823 kms has been with workforce of 38880 employees. The
completed. Similarly, proposal was to develop percentage fleet utilization has increased to 93.0
616 kms of roads under Asian Development and it has inducted 162 new buses during the
Bank Assistance. As on Nov 2019, a road length current year.
of 614 kms has been completed at construction (ii) BMTC: During 2019-20 (Up to Nov-19), the
cost of Rs.1926 Crore. Corporation has operated 6191 schedules
utilizing 6447 vehicles. It has operated 11.38
Under KSHIP-III (ADB 2nd Loan), it is proposed
lakh kms per day and earns an average of
to develop 418 km of road under Asian
Rs. 5.13 crores of traffic revenue. For the
Development Bank Assistance at a project cost of
purpose of women safety 25 Pink Sarathi buses
Rs.5334 crore. The project is being initiated from
are purchased and operationalised under
December, 2019.
Nirbhaya scheme. A New bus station at Hoskote
Karnataka Road Development Corporation and a new Bus Depot at Byrathi are constructed
Limited (KRDCL) has constructed 686 bridges during 2019-20.
and developed 1561 kms road length. Further,
(iii) NWKRTC: During 2019-20 (up to Nov-
361 kms State Highway are being improved with
2019), the Corporation has a workforce of
World Bank co-finance (annuity) scheme at an
about23171 employees, it operated 4631
estimated cost of Rs 1095 crore.
schedules utilizing 4899 vehicles, operating
NABARD RIDF-24 (2018-19): 146 Road works 15.82 lakh Kms per day, earning gross revenue
for Rs.14283.75 lakhs & 7 bridge works for of Rs.493.80 lakh and carrying 22.46 lakh
Rs.740.00 lakhswere approved during 2018-19. passengers on an average daily.
Out of 146 road works, 22 works are competed, (iv) NEKRTC: During the year 2019-20 (up to
66 works are under progress, 54 works yet to be November-19), the Corporation operated 4256
started and 4 works dropped due to works taken schedules utilizing 4701 vehicles. It is operating
up by other Department. Out of 7 bridge works, 4 14.17 lakh kms, and earning daily gross revenue
works under progress & 3 works yet to be of Rs.4.91 Crore. It has introduced branded
started. smart bus services in Kalburgi, Bidar, Vijaypura,
Karnataka Road Safety Policy-2015 aims at the Yadgiri, Ballari, Koppal, Raichur, Hospet,
reduction of road accidents by 25% and fatalities Gangavaathi, Sindanur and Sedam.
Economic Survey of Karnataka 2019-20 19

Vehicle population: As on November 2019 out km at an estimated amount of Rs.620.20 crore


of 2.20 crore vehicles in the state, 20.82 lakh and an expenditure of Rs.245.58 has been
vehicles were transport vehicles. Out of 2.00 incurred during the year 2019-20 upto
Crore non-transport vehicles, 1.61 Crore November -2019.
vehicles were two wheelers. From April 2019 to
A Coastal Infrastructure Management Unit has
November 2019 a total of 10.21 lakh new
been established. A fully functional Coastal
vehicles have been registered.
Management Information System has been
D. Devaraj Urs Truck Terminals Ltd has developed for the first time in the State.
constructed Truck Terminal in Yeshwanthpura
(d) Railways
(Bengaluru), Mysuru and Dharwad. These Truck
Terminals are operational. The State Government with a view to increase the
rail density and increase the pace of
(c) Other Transport
implementation has agreed with Ministry of
(I) Ports and Inland Water Transport Railways for taking up new railway projects
on 50:50 cost-sharing basis. The Government
To provide better infrastructure facilities by of Karnataka has taken up Munirabad-
developing State minor ports with Private Mehbhoobnagar railway line project of 170 kms
investment, the State Government formulated at a revised estimated cost of Rs.1350.91 crores,
“Karnataka Minor Port Development Policy- and released Rs.534.12 crores to South Western
2014” and the process for development of Railway out of its share of 675.45 Crore.
Honnavar, Belekeri and Pavinakurve Ports on
PPP Mode has been initiated. For setting up of Kolar Coach factory in Kolar
district, MoU has been entered into between
The Karnataka Maritime Board has been railways and Government of Karnataka. Railway
established with effect from 19.03.2018 in order Board was reviewing the capacities of Rail Coach
to provide for the rapid development and Factories in India Project report is under
management of Ports & Inland Waterways and scrutiny by the Railways.
Coastal region of the state vide the Karnataka
Maritime Board Act 2015.Govt of India approved (e) Airport
the 4 State Projects to be taken up at Karwar and
Development of Small Airports: From the
Old Mangaluru Port.
allocation of Rs.150.53 crore, an amount of
(ii) Coastal Protection Works Rs.6.00 crore each was released for Kalaburagi
and Shivamogga Airport Development. The
During the year 2018-19 an amount of Rs.32.91
Operation of Kalaburagi Airport has been
crore has been spent and constructed 2540 m
commenced on 22-11-2019.
long rubble mound sea walls at severe eroding
areas of 3 coastal districts. Rs. 9.80 crore Regional Aviation Connection Plan: From the
budgetary allocation has been provided for the allocation of Rs.20.00 crore, Rs.11.66 crore has
year 2019-20 for construction of 900 m length of been released for VGF (Viability gap funding) and
long term coastal protection works. These works Fire Fighting Services and Security Equipments
are under progress. for the selected airports in the regional aviation
project.
(iii) Sustainable Coastal Protection &
Management Program (f) Bengaluru Metro Rail Corporation Limited
(BMRCL)
Sustainable Coastal Protection and Manage-
ment Plan with loan assistance from Asian Bengaluru Metro Rail Project Phase-1 was
Development Bank at an estimated cost of completed on 17.06.2017 and commercial
Rs.911 crore is being implemented. Under operations was started. Bengaluru Metro Rail
Tranche-1, coastal protection works were taken Project Phase-2 works are under progress. The
up at Ullal, Dakshina Kannada district for physical and financial progress as on November
construction of 8 inshore berms, 2 offshore reefs 2019 is 39% and 37% respectively. Phase-2
and 1300m of breakwater and an expenditure of works are programmed to complete in stages
Rs.246.11 Crore has been incurred up to from August-2020 and entire work is
November 2019. programmed to complete by June-2024.
Under Tranche-II, coastal protection works are (g) Telecommunications
being taken up at Someshwara in Dakshina
Kannada district, Yermal Thenka, Udyavara, The overall teledensity of the State (i.e. number
Kodi Kanyana, Kodi Bengre and Marvanthe in of telephone connections per 100 population) is
Udupi district for a coast length of about 54.00 109.64, which is higher than the national
20 Economic Survey of Karnataka 2019-20

average of 90.11. There is also a wide gap (a) Literacy: The literacy rate in Karnataka has
between rural and urban teledensity. The rural increased to 75.36 per cent in 2011 from 66.64
teledensity as on June -2019 stood at 61.69, per cent in 2001 exhibiting significant
while the urban teledensity was 181.71. The achievement. Urban male literacy rate has
number of landline connections has declined crossed 90 per cent, however, rural female
significantly. The decline in landlines can be literacy rate is yet to cross 60 per cent. The
partly attributed due to increased private literacy rank of the State was 9th among 16 major
participation in the mobile telephony sector and States (States with a population of more than
switchover to mobile phones. The trends in 100 lakh) during 2001 and the same is
postal services suggest that there is a sudden continued even in 2011.
decline in the total number of postoffices for the
year 2018-19. This may be due to merger of (b) School Education (Elementary and
postoffices in urban areas. Secondary): School education in Karnataka is
imparted through Lower Primary Schools (class I
1.11.3 Banking and Finance including Co- to V), Higher Primary Schools (class I to VII / VIII)
operatives and High Schools (VIII to X). The Education
Karnataka State has Two Regional Rural Banks Department participation in elementary
namely Karnataka Vikasa Gramina Bank and education is significant with 85.42 percent in the
Karnataka Gramina Bank operating in the State. lower and 59.24 percent in higher primary
The aggregate deposits of all the banks schools being managed by the Department.
(Commercial, RRBs, and Cooperative) stood at However, Department's participation is low in
Rs.981260 Crore and total outstanding secondary education with only 28.12 percent of
advances of all the Banks in the state stood at the high schools being managed by the
Rs.661527 Crore. The total number of all Government. While the Government schools are
branches as on March 2019 is 11140. The mainly located in rural areas, private schools are
agricultural advances as on March 2019 were to largely urban based. There are 62319
the tune of Rs.129913 crore, the advances to Elementary schools in the State, of which 24316
weaker section stood at Rs.95694 crore and the are LPS and 38003 are HPS during 2019-20. The
advances towards MSMEs (Micro, Small and State Rules under the RTE Act were notified in
Medium Enterprises) stood at Rs.119027 crore. 2011. Over the years, the enrolment has
NABARD's normative allocation to the State for increased marginally in the primary stage.
the Year 2019-20 was Rs.600 Crore towards Enrolment during 2019-20 in primary (class I to
implementation of RIDF works. The rate of V) and in upper primary (class VI to VIII) stage is
interest charged on loans to State Government is estimated to be 54.33 lakh and 31.24 lakh
3.9% with effect from 04th of October 2019. Till respectively. The number of SC / ST children in
31st December 2019 an aggregate amount of class I to VII in the State is 20.18 lakh. During
Rs.13197.70 Crore has been sanctioned by 2019-20, GER and NER at lower primary are
NABARD under RIDF tranches XVII to XXV. 103.80 and 96.40 respectively and at higher
primary stage, they are 99.60 and 79.16
Karnataka State Financial Corporation respectively. The dropout rate for LPS and HPS
(KSFC): During 2019-20 (upto November 2019) during the year2019-20 is 1.93% and 2.94%
it has extended financial assistance to 529 cases respectively. As against the sanctioned posts of
to an extent of Rs.475.14 crore, disbursed 3.16 lakh teachers, 2.82 lakh teachers are
Rs.496.22 crore and recovered Rs.443.61 crore. working in the LPSs and HPSs during 2019-20.
The average Pupil-Teacher Ratio is 1:26 at the
During 2019-20 (upto Nov. 2019), the Short
elementary stage.
Term, Medium Term, Long Term loans disbursed
by Cooperative Credit system in the State is With significant gains in primary education, the
Rs.8102.96 crore, Rs.325.12 crore and Rs.55.98 State has set in motion the planning process for
crore respectively which constitute 65.88%, universalisation of secondary education to
46.43% and 11.50% of the target fixed for achieve the target of 85% enrolment in 14-18 age
agricultural loans. group in classes 9 to 12. The State has a total of
16808 secondary schools of which 4726 schools
1.12 HUMAN DEVELOPMENT are run by the Department of Education, 300
1.12.1 Education schools by Social Welfare and Urban Local
Bodies, 3788 by aided managements, 7265 by
Karnataka has been a fast growing economy due private unaided managements and 729 by
to the large knowledge base of the society, which others. The concentration of the secondary
can certainly be attributed to significant schools in the private unaided sector may be one
achievements and reforms in education sector. of the reasons for the low access of children from
Economic Survey of Karnataka 2019-20 21

marginalized groups to higher education. Out of visible in nominal strength in other system.
8.78 lakh girls students enrolled in high schools Relatively, the turnout of Ayurvedic doctors
during 2019-20, 34.62 percent are enrolled in (GCIM) is quite significant. 4085 students are
Govt. High schools and 65.38 percent of them enrolled in 58 Ayurvedic colleges. Ayurvedic,
study in aided/unaided/other schools. As Homoeopathic and Unani Doctors serve in rural
against the total sanctioned posts of 106175 area in larger proportions. There are 323
teachers in the secondary schools, 38401 are Nursing Colleges recognized by Indian Nursing
working in Govt. schools, which constitutes Council with a turnout of 19415 Nurses
36%. (B.Sc.graduates) every year, making Karnataka
a nursery for nursing services not only for the
(c) Pre-University Education: As per the report
State but also for other regions of India, Gulf
of the Education Commission (1964-66), the
countries and Europe.
State has adopted the 10+2+3 pattern of
education since 1971-72. All colleges imparting (f) Mass Education: 04 literacy programmes are
PU education come under the purview of the being implemented during 2019-20,with the
Directorate. The PU-course provides for two objectives of providing basic literacy to rural and
languages and four electives, which are to be urban slums illiterates of 15+ 50 age groups with
selected from a wide range of subjects classified priority to women SCs, STs and minority groups
under three different subject combinations – and to increase the literacy rate of the state. The
Arts, Science and Commerce. The Government programme is implemented in the selected
participation is more in PU-education. It is Grama Panchayaths of 19 districts which are
observed that there is an attrition of around backward, more backward and most backward
11.50% between I and II years of PU-education. as per Dr. D.M. Nanjundappa's Committee
During 2019-20, 6.52 lakh students are enrolled Report, with a target of 1.89 lakhs non-literates.
for Pre-University Education.
(g) Karnataka State Higher Education Council
(d) Collegiate and Technical Education: The (KSHEC): Karnataka State Higher Education
Department of Collegiate Education oversees the Council was established in 2010 with an
administration of 430 Government First Grade objective of framing policies for higher education
Colleges and 319 Private aided colleges affiliated and to give suggestions to State Government,
to 14 State universities through its 6 regional Universities and other higher educational
offices located at Bengaluru, Mysuru, institutions regarding issues related to higher
Mangaluru, Shivamogga, Dharwad and education.
Kalaburagi. The number of students enrolled in
graduation in both government and aided 1.12.2 Health and Family Welfare
institutions during 2019-20 are 5.16 lakh. The Health is crucial to human development and
average strength in each government college is welfare. Better health provides an important
765 and each aided degree colleges is 585. The contribution to economic progress, as healthy
Male Female Ratio is 43:57 in favour of girls. This population lives longer and is more productive.
is a welcoming trend. Enrolment in Science As per SDG Goal-3 healthy lives is to be ensured
courses is also very poor. for all the ages. However, despite the progress in
In 2018-19 there were 530 institutes across the many health indicators, the State has a long way
State ranging from Degree to Diploma, Junior to go in achieving the desired health goals.
Technical Schools /Colleges. In order to provide (a) Health Infrastructure: The state has made
the Human Resources and enhance the teaching substantial progress in building credible health
efficiency of the staff, the teaching faculties have infrastructure at different levels. The state has a
been deputed to seek higher education and also wide institutional network providing health
improve their skills through short term training services both in urban and rural areas. There are
programmes. In order to strengthen Technical 15 district Hospitals, 11 other Hospitals and 36
Education, the Government of India with the Autonomous and Teaching Hospitals and 146
assistance of World Bank has introduced Taluk/General Hospitals in the state. As per the
Technical Education Quality Improvement norms required, there are 8871 sub-centers,
Programme (TEQIP) in three phases. 2359 primary health centers, and 206
(e) Medical Education community health centers catering to the health
needs of the rural population. Added to it there
There are 52 Medical Colleges (MBBS degree) in are Government, Government Aided, and Un-
the State with a summated intake capacity of aided AYUSH Medical Institutions functioning in
6753 students. 17 colleges are run by the the state.
Government. The Governments presence is
22 Economic Survey of Karnataka 2019-20

(b) Demographic indicators: The progress of which is responsive to the needs of the people.
the health indicators has been encouraging in The initiatives for reducing child and maternal
the State during the last few years. The Birth rate mortality, stabilizing population along with
and Death rate by Nov-2019 are 17.6 and 6.7 gender and demographic balance have been
respectively which are constant from 2017. MMR taken. The key features of the implementation of
has been reducedfrom178 in 2011 to 108 during the programme in Karnataka includes making
2019. Karnataka has performed relatively better public health delivery system fully functional
on population control. The Govt. of India had set and accountable to the community, working in a
a target of total fertility rate of 1.8 to be achieved mission mode, decentralized planning,
by 2019. This has already been achieved in 2013 delegation of powers, human resource
itself. IMR which was 35 per 1000 live births in management, community involvement, rigorous
2011 has been reduced to 25 in 2019. monitoring and evaluation against standards,
convergence of health related programmes and
(c) Family Welfare: The State offers an excellent flexible financing.
family welfare programme operating through the
existing health infrastructure. Around 69% (g) AYUSH (Ayuerveda, Yoga, Unani, Sidda,
target was achieved in sterilization in 2012-13 Homeopathy): Govt of Karnataka has taken
which decreased moderately to 42% by 2019-20 initiative in mainstreaming of AYUSH in National
(up to November 2019), whereas during same Health Care under NRHM in right earnest. The
period, the achievement of target in IUD AYUSH systems are time-tested methods to
decreased from 61% to 26%. The other tackle lifesty led is orders which are becoming a
significant positive achievement was major threat to health in present era. These
Institutional delivery for 2018-19 is more than systems plays a major role not only in preventing
99%. the diseases but in curative aspect too.662
Ayush dispensaries and 159 hospitals are
(d) Decrease in Malaria and Leprosy: The State providing medical services through Ayurveda
is witnessing the downward trend in Malaria Unani Homoeopathy Yoga & Nature Cure with a
incidence. An overall decrease of 35.5% in total total bed strength of 2534. So far 65 Ayush
malaria cases is achieved during 2019. The State hospitals have been upgraded under the
is heading towards complete elimination of National Ayush Mission. Apart from this one Hi-
malaria. Karnataka has achieved the goal of tech Panchakarma hospital with a bed strength
elimination of leprosy in the year 2005. The of 100 is rendering services at Mysuru.
prevalence rate of leprosy as on November 2019
is 0.31/10000 population. (f) SHUCHI Yojane : It was launched during
2013-14 with an objective to improve the school
(e) Major Health Programme Initiatives: The attendance among the girls by providing health
Department of Health and Family Welfare education on menstruation and menstrual
Services implements various national and state hygiene and the use and disposal of sanitary
health programmes of public health importance napkins. During the year 2019-20, (upto Nov-
and also provides comprehensive health care 2019) 28.06 lakh sanitary napkins are
services to the people of the State namely Janani distributed.
Suraksha Yojane, Arogya Kavacha, Arogya
Sahayavani-104, Nagu-Magu Dialysis Centres, 1.12.3 Human and Gender Development
Telemedicine, Rashtriya Bal Swasthya The seventeen sustainable Development Goals
Karyakram, Ayushman Bharat-Arogya strengthen the Human development approach
Karnataka, Janani Suraksha Vahini, ASHA, that concentrates on improving the lives of
Janani Shishu Suraksha Karyakrama. Jyothi people, their opportunities and choices. India
Sanjeevini Scheme for State Government ranks 129 out of 189 countries and is placed in
Employees, Rastriya Swasthya Bhima Yojane the medium human development in the latest
(RSBY) for secondary care. State also is pioneer Human Development Report 2019 by UNDP.
in introducing few innovative programmes like India's HDI value for 2018 is 0.647, as against
Bike Ambulances (First Response Unit), 0.427 in 1990. The comparison of Human
Vatsalya Vani. Development Index (HDI) in Karnataka with that
(f) National Health Mission: National Urban of the other major States in India over the period
Health Mission launched by Hon'ble Prime of three decades, shows that performance of
Minister in April 2005, has been renamed as Karnataka in human development has been
National Health Mission recently to cover both improved over the years. Karnataka HDI value
Urban and Rural pockets. It has strived to which was 0.346 in 1981 has improved to 0.611
achieve progress in providing universal access in 2012.
toequitable, affordable and quality healthcare
Economic Survey of Karnataka 2019-20 23

Karnataka has been in the forefront in is more or less same in the southern States of
publishing regularly the Human Development India. The percentage of SC women to total
Reports (HDRs) at different levels. The first and population is 8.53% (All India 8.08%) and the
the second State HDRs were brought out in 1999 percentage of ST women to total population is
and 2005 respectively. The third State HDR is 3.46% (All India 4.29%).
brought out in 2019. HDI is estimated using the Development of Women and Children is at the
Global Goal posts by UNDP (2014) based on core of the nation's human resource
2012 data. Bengaluru Urban stands first with development efforts. The Department formulates
HDI value 0.729 and Yadgir, Kalaburagi & policies and programmes and coordinates the
Haveri are the districts in the last 3 positions efforts of both governmental and non-
with HDI value 0.495, 0.534 & 0.539 governmental organizations to improve women
respectively. For the first time in the country, the and children. The department implements
District Human Development Reports(DHDRs) programmes in the areas of employment,
for all the 30 districts of the State were training for women, awareness generation and
simultaneously brought out in 2014. Based on gender sensitization. The Department has also
all the 30 DHDRs-2014 values of various HD- taken up various programmes with a view to
Indices for all the 30 districts, 176 taluks and ensure protection of Women and Children
219 ULBs in the State, a document titled, against negligence, abuse and exploitation and
“Human Development: Performance of Districts, to guarantee their basic Human Rights,
Taluks and Urban Local Bodies in Karnataka, including survival, development and full
2014 – A Snapshot” has also been brought out. participation in social, cultural, educational and
Further, Grama Panchayat Human other endeavours necessary for their individual
Development Index (GPHDI) was also computed advancement and well being. The programmes
for all the 5898 Gram Panchayats in 2015, in the are:
report titled, 'Human Development: Performance
of Gram Panchayats in Karnataka – 2015'. Santhwana : A scheme aimed at rehabilitation of
women who have been subjected to atrocities
Karnataka is steadily advancing towards
like rape, domestic violence, dowry, sexual
attaining gender equality- an agenda under
harassment, etc. At present 196 Santwana
SDG-5. However, there are certainly still many
centres are functioning through NGOs. During
areas like literacy, education, employment,
2019-20 budget of Rs. 1380.00 lakhs has been
political participation and violence against
earmarked out of which Rs. 546.75 lakhs has
women, etc., where the stark gender differences
been released to the districts for the
are still prevailing with significantly high level of
implementation of the scheme and an amount of
female disadvantage factors (FDF). They need to
Rs. 521.13 lakhs has been spent upto the end of
be addressed with greater focus to ensure gender
December2019.
equality. The Gender Inequality index is high in
the districts of North Karnataka. StreeShakthi: The StreeShakthi programme
launched in 2000-01, aims at empowering rural
The Third Gender Community or the Trans-
women through the formation of self help groups
genders' Community has been a most neglected
(SHGs). Upto December-2019 the groups had
section of the society. There is lack of adequate
saved Rs.6037.28 crore since inception. Bank
data about the population of the community;
loans have been availed by 145531 groups to the
their occupation, livelihood etc. Their issues are
extent of Rs. 8168.61 crore and there has been
very unique and of genuine concern and hence
internal loan circulation to the tune of Rs.
they must not be relegated to the backyard.
7141.43 crore which is used for taking up
Scheme like Maitri have been promoted for their
various income generating activities. Several
livelihood. The Karnataka Government has
programmes like revolving fund, financial
released the “Karnataka State Transgenders-
incentives, providing marketing facilities for the
Policy 2017” in December 2017 to provide
products produced by SHGs etc. are taken up by
Infrastructure, Health, Education Housing and
the department.
Livelihoods to transgender people in partnership
with various departments. However, still more Bhagyalakshmi: Bhagyalakshmi is a flaghip
concrete and concerted efforts are needed to programme implemented by Government of
ensure their development. Karnataka aimed at improving the sex ratio in
the State by encouraging the birth of girl child in
1.13 GENDER AND SOCIAL EQUITY
the BPL families. The programme also aims to
1.13.1 Women and Child Development eradicate social evils such as child labour,
female foeticide, child marriage and child
According to 2011 Census, women comprise
trafficking. Two girl children born in a BPL family
49.31% of the total state population. The pattern
24 Economic Survey of Karnataka 2019-20

are eligible to enroll under the scheme. A fixed (upto December 2019) 42.74 lakh person are
amount is deposited with the financial partner benefited.
namely, Life Insurance Corporation of India and
the maturity amount is paid to the girl child on Mathru Vandana Scheme: Government of India
completion of 18 years of age only after fulfilling has announced new scheme under Honorable
the conditions laid down under the scheme. Prime Minister's pan India Vision. From
Under this scheme 2583122 beneficiaries are 01.01.2017 an amount of Rs.5000 is transferred
covered from 2007-08 to 2018-19. During to beneficiaries account under direct beneficiary
2019-20 an amount of Rs.309.42 crores has transfer to pregnant & lactating mothers in 3
been earmarked to provide benefits to the instalments. This scheme is limited to only first
beneficiaries. Under the scheme for Child live birth. During 2019-20, 238034 beneficiaries
Tracking System, a software is being developed have availed the benefits with an expenditure of
with the assistance from NIC to track Rs. 15389.00 lakhs upto the end of December
Bhagyalakshmi beneficiaries till 18 years. All 2019.
information such as health, education and Mathrushree Scheme: To increase nutritional
migration pertaining to the beneficiaries are and health status of pregnant and lactating
tracked in the software. mothers, State Government have implemented
Gender Based Budget: Karnataka is one of the 3 various schemes. Women suffer from anemia,
States in India that has implemented gender usually an undernourished pregnant women
based budget. Finance Department also gives birth to a low birth weight baby. State
established a Gender Budget Cell (GBC) to Government has started a new scheme called
identify the quantum of resource allocation and 'Mathrushree', to increase nutritional and health
expenditure for women and proper translation of status of the BPL pregnant and lactating
policy commitments. The schemes are classified mothers. For 2019-20 an expenditure of
into Category-A and Category-B. Rs.6115.18 lakh has been incurred covering
4.15 lakh beneficiaries upto the end of December
r Category–A which presents women specific 2019.
budget provisions in which 100% budget
provisions are meant for women (59 PoshanAbiyan: The main objectives of Poshan
schemes). Abiyaan programme is to improve the nutritional
status of children, adolescent girls, pregnant
r Category-B which present women–specific and lactating mothers. The programme
budget provisions wherein atleast 30% envisages to bring down malnutrition, stunting
provisions are meant for women (333 among children and reduce the prevelance of
schemes). Anemia among young childrens adolescent girls
Under Category-A Rs.5222.46 crore and and women.
Category-B Rs.46887.63 crore has been
allocated for the year 2019-20 of which Integrated Child Protection Scheme (ICPS):
Rs.3386.59 crore and Rs. 9155.87 crore have ICPS was launched in 2010-11, with an objective
been incurred upto December-2019. of providing a safe and secure environment and
for comprehensive development of children who
Integrated Child Development Services are in need of care and protection and in conflict
(ICDS) Scheme: ICDS is a centrally sponsored with law. ICPS provides preventive and statutory
scheme, which provides a package of six services care and rehabilitation services to any
i.e., supplementary nutrition, immunization, vulnerable child in the society. Rs.7831.00 lakh
health check-up, referral services, nutrition and has been provided during 2019-20 and an
health education for mothers and non-formal amount of Rs.4789.64 lakh has been incurred
pre-school education for children between the up to end of the December 2019.
ages of 3-6 years. Supplementary nutrition is
Karnataka State Women Development Corpo-
provided to the beneficiaries under the ICDS
programme with revised feeding norms of 500 ration: Karnataka State Women Development
calories of energy and 12-15 gms of protein to 0- Corporation has been implementing various
6 years children, 600 calories of energy and 18- schemes such as Udyogini, Women Skill
20 gms of protein to pregnant women/lactating Training Programme, Devadasis Rehabilitation
mothers/ adolescents girls, 800 calories of Programme, Devdasi Pension Scheme, Housing
energy and 20-25 gms of protein to severely to Ex-Devadasis, Rehabilitation of Transgender
malnourished children as a supplement to their Scheme, Interest Subsidy Scheme to women
normal intake, as envisaged in the schematic Entreprenurs, Samrudhi Scheme, Dhanasree
guidelines. Supplementary nutrition is given for Scheme, Marketing Assistance Scheme for the
300 days in a year. During the year 2019-20 upliftment of the women.
Economic Survey of Karnataka 2019-20 25

1.13.2 Welfare Programmes for Scheduled Under the Karnataka Scheduled Castes Sub-
Castes, Scheduled Tribes, Backward Classes Plan for 2019-20, an amount of Rs. 21603 crores
and Minorities has been allocated, of which Rs.8684 crores has
been spent upto November 2019.
Sustainable Development Goal-10 puts forth an
agenda of reducing inequalities across people BRADCL is implementing several developmental
and land. The State is already proactive in schemes such as Self-Employment Scheme,
promoting “faster, sustainable and more Land Purchase Scheme, Gangakalyana Scheme
inclusive growth” and has committed itself to and Micro Credit Finance (Prerana) Scheme for
improve the capabilities and productive the economic development of Scheduled Caste
endowments among the economically households in the State. During 2019-20 (up to
disadvantaged and socially marginalized November 2019), 1196, 632, 2212 and 3287
sections of the State. Several multi-faceted and persons were benefitted under these schemes
multi-pronged programmes for welfare of SCs, respectively.
STs, BCs and minorities, implemented by BRADCL has adopted RTGS payments system to
concerned departments and development the beneficiary account directly in all the
corporations of the State are trying to bring them schemes in order to avoid delay and misuse of
in mainstream development process. scheme funds. Spandana, an issue based
(i) Welfare Programmes for Scheduled Castes tracking system software has been installed in
the office of the Managing Director to track the
The SC population has been increased from 0.86 day to day letters received by the public and the
crores during 2001 census to 1.05 crores in 2011 status of which is send to them through SMS
census that constitutes 17.15% of the total messages. Also a software has been developed to
population in the State. The State Government track the progress and energisation details of
has been implementing various programs in irrigation borewells & pump sets drilled under
social and economic domains through Gangakalyana Scheme.
Department of Scheduled Castes Welfare and
Dr. B.R. Ambedkar Development Corporation (ii) Welfare Programmes for Scheduled Tribes
Ltd. (BRADCL). The ST population has increased from 0.35
To promote education and literacy, a Pre-Matric crores during 2001 census to 0.42 crores in 2011
scholarship is provided from 1st to 8th Std. The census that constitutes 6.95% of the total
scholarship for 9th to 10th standard students is population in the State. The State Government
sanctioned by Central Government. The State has been implementing various programs in
has provided pre-metric scholarships to 7.27 social and economic domains through
lakh students in 2018-19 as compared to 9.39 Department of Scheduled Tribes Welfare and
lakh students in 2017-18 and 1.96 lakh Karnataka Maharshi Valmiki Scheduled Tribes
students have benefited from the scheme Development Corporation (KMVSTDC) for the
in2019-20 upto the end of November 2019. welfare of Scheduled Tribes.
Hostel facilities are being provided for Pre-matric To provide quality education to the meritorious
students studying from 5th to 10th standards. ST students studying at 5th standard and above
115818 students have benefited from the are given admission in reputed residential or
scheme in 2019-20 (upto November 2019) non-residential schools. All fees and
compared to 76824 students in 2018-19. maintenance charges are borne by the
Post-matric scholarship is sanctioned for department. 2073 students in the State were
children whose parents' household annual benefitted during 2018-19 while it was 1781
income is less than Rs. 2.50 lakh. Maintenance during 2017-18.
allowance of day scholars is credited directly to A pre-matric scholarship is provided from 1st to
the student's bank account. The State has 8th Std. as well as 9th to 10th Std. During 2019-
provided post-matric scholarships to 2.06 lakh 20 (upto November 2019), 195964 students are
students in 2018-19 as compared to 3.06 lakh benefited under this scheme.
students in 2017-18 and 21962 students have
benefited from the scheme in2019-20 upto the Financial assistance is being provided to ST
end of November 2019. 636 Government post- students whose family income is less than
matric hostels are accommodating 67017 Rs.2.50 lakh per anum and are pursuing post-
eligible students. To reward merit, scheme for matric education including professional
prize money to meritorious students is started. courses. This is a Central Sector Scheme (CSS).
20011 students have benefited from the scheme For continuation of the college education, a cash
in2019-20 (upto November 2019) compared to incentive scheme to ST students is being
42338 students in 2018-19. implemented since 2009-10. 14325 students
26 Economic Survey of Karnataka 2019-20

have been benefited from the scheme in 2019-20 are provided with free boarding, lodging and
(upto November 2019) compared to 27945 academic facilities in the hostels run by the
students in 2018-19. Department of Backward Classes Welfare. 1.73
lakh students in the State were benefited during
In an effort to promote overall development of
2018-19 while it was 1.70 lakh during 2017-18.
STs, the tribal sub-plan (TSP) has been
The students benefitted during 2019-20 upto the
implemented by the department. For 2019-20,
end of November 2019 were 1.60 lakh.
an amount of Rs. 8842 crores has been allocated
of which Rs. 4151 crores has been spent upto In order to encourage the poor backward classes
November 2019. students to avail higher education, fee
concession is sanctioned to the students whose
Integrated Tribal Development Project is
annual family income under Category-1 is
functioning in Mysuru, Chikkamagaluru,
Rs.2.50 lakh and other Catagories is Rs.1.00
Kodagu, Dakshina Kannada, Udupi and
lakh. 5.68 lakh students in the State were
Chamarajanagar districts. The grant-in-aid
benefited during 2018-19 while it was 6.30 lakh
under Article 275 (1) is also being provided to
during 2017-18.
take up such special development programmes
which are otherwise not included in the plan In order to encourage the students of backward
programmes. classes (with annual household income limit of
Rs.1,44,000) to study in foreign universities,
KMVSTDC is implementing several develop-
financial assistance is being provided for the
mental schemes such as Self-Employment
students to pursue higher studies like Post-
Scheme, Land Purchase Scheme, Gangakalyana
doctoral, Ph.D. and Master degrees in Foreign
Scheme, Micro Credit Scheme, Airawatha
universities with a allowance of Rs.3.5 lakh per
scheme & Samruddhi scheme for the economic
annum to an extent of Rs.10 Lakh for entire
development of Scheduled Tribe households in
course. During 2019-20 (upto November 2019),
the State. During 2019-20 (up to November
31 students have availed the benefits.
2019), 771, 349, 799, 2403, 418 and 135
persons were benefitted under these schemes The Department has also taken up different skill
respectively. development training programmes for
unemployed women under Tailoring Training &
(iii) Welfare Programmes For Backward Nursing Training Programmes. Scheme for
classes Nomadic Tribe / Semi Nomadic Tribe has been
The Department of Backward Classes Welfare, under implementation with a view to uplift the
D. Devaraj Urs Backward Classes Development socio-economic status of NT/SNTs in the State.
Corporation Ltd. (DBCDC) and Karnataka 106795 persons in the group were benefitted
Vishwakarma Communities Development during 2018-19 while it was 51454 during 2017-
Corporation Ltd. (KVCDC) have been 18. The persons benefitted during 2019-20 upto
implementing various development programmes the end of November 2019 were 38567.
for socio-economic welfare of the Backward DBCDC is implementing several developmental
Classes in the state. schemes such as Chaitanya Subsidy cum Soft
Pre-matric and Post-matric scholarships are Loan Scheme, D. Devaraj Urs Individual Loan
being sanctioned to the pre-matric and post- Scheme, Micro Credit Scheme, Arivu-Education
matric backward classes students whose annual Loan Scheme, Gangakalyana Scheme etc. for the
family income is not more than Rs. 44,500. economic development of Backward Classes in
During 2018-19, 24.83 lakh students were the State. During 2019-20 (up to November
benefitted as against 26.67 lakh students in 2019), 1020, 4951, 479, 4908 and 790 persons
2017-18. For meritorious students of BC whose were benefitted under these schemes
annual family income is less than Rupees One respectively.
lakh per annum for Category-1 and Rs. 44,500 in Similarly KVCDC is implementing several
case of other Categories, 133 Morarji Desai developmental schemes such as Financial
residential schools have been established in the assistance to traditional artisans (Pancha-
State. During 2018-19, 32781 students were vrutthi), Self-employment Scheme, Arivu-
benefitted while the students benefitted during Education Loan Scheme, Gangakalyana
2019-20 upto the end of November 2019 were Scheme, Micro Finance for Women through Self
38347. Help Groups etc. for the economic development
Students of backward classes with annual of Backward Classes in the State. During 2019-
family income for category-1 Rs.1.00 lakh and 20 (up to November 2019), 1045, 284, 297, 89
Category-2a, 2b, 3a and 3b is Rs.44,500, and 272 persons were benefitted under these
studying in pre matric and post matric courses schemes respectively.
Economic Survey of Karnataka 2019-20 27

(iv) Welfare Programmes for Minorities scheme NGO's are given grant to run special
schools and vocational training centres for
In order to promote the welfare of Minority
which Rs.469.12 lakhs expenditure is incurred
Communities, Government of Karnataka has
up to end of November 2019 and 901 persons
introduced various developmental Schemes
were benefitted.
through Department of Minorities Welfare and
Karnataka Minorities Development Corporation In order to encourage disabled students for
Ltd.(KMDCL) continuing their education, a Scholarship
scheme is implemented for disabled students
A cash incentive of Rs. 1000, Rs. 1500, Rs.2000
studying from 1st Std. to post Graduate
and Rs.3000 is being provided per annum to the
Courses. During 2019-20, Rs.177.73 lakhs
meritorious minority students staying in
expenditure is incurred up to November 2019
minority hostels/ residential schools studying in
and 8266 persons were benefitted. Similarly
SSLC, 2nd PUC, Final year Degree and Final year
Sadhane and Prathibhe, Grameena Punarvasthi
Post Graduate courses respectively. 10125
Yojane, Aadhara, etc., have also been
students were benefited in the State during
implemented for their safeguard.
2018-19.
Various Aids and Appliances are provided to the
Training programmes are conducted to enable
persons having 40% and above disability at free
unemployed boys/girls of minorities to take up
of cost up to a maximum of Rs. 10,000/-. From
self-employment activities from the Government
the year 2016-17 to 2019-20 (upto November
approved institutions.1340 beneficiaries were
2019) 12,445 Aids and Appliances are provided
covered during 2018-19. During 2019-20 upto
to disabled persons under this scheme.
November 2019, the beneficiaries covered are
230. Braille books required for the Visually Impaired
students are printed and supplied by the
For the upliftment of the religious minorities,
Government Braille Printing Press at Mysuru.
especially for economic upliftment, KMDCL is
During 2019-20, 5500 text books have been
implementing various development programmes
printed and supplied to Visually Impaired
like Subsidy Scheme for Self-Employment,
students up to the end of November 2019.
Shramashakti Scheme, Micro Loan and Micro
Subsidy Scheme, Ganga Kalyan Scheme, Arivu- 1.14 BALANCED REGIONAL DEVELOPMENT
Education Loan Scheme, Land Purchase
Scheme, Profession Encouragement Scheme etc. 1.14.1 Special Development Plan
45286 beneficiaries were covered under the The High Power Committee for Redressal of
above schemes during 2018-19. Regional Imbalances (HPCRRI), popularly
Thus the focus of the programmes is on known as Dr. D.M. Nanjundappa Committee,
education, skills and employment which are submitted its report in June 2002. The
critical factors in promoting empowerment of Committee estimated Comprehensive
these marginalized social groups and in Composite Development Index (CCDI) with
reducing inequalities. appropriate weights and identified 114 taluks as
backward taluks. These taluks were further
(v) Welfare Programmes for Differently classified into most backward, more backward
Abled & Senior Citizens and backward based on the value of CCDI. Out of
the 39 most backward taluks in the State, 26
As per 2011 Census, there are 13,24,205 various
taluks are in North Karnataka, of which 21 are in
categories of persons with disabilities in the
Kalaburagi Division and out of the total 61
State. The Government is providing assistance to
relatively developed taluks, 40 taluks are in
persons with disabilities in order to bring them to
South Karnataka.
the mainstream of the society. Disabled persons
whose family income is less than Rs.17000 in The HPCRRI recommended Eight Years Special
urban and Rs.12000 in rural areas per annum Development Plan to be implemented from
with disability percentage 40 and above are 2002-03 to 2009-10 with an outlay in annual
entitled for maintenance allowance of Rs.600 per plans Rs.15000 crores and Net Additional outlay
month and with disability percentage 75 and of Rs.16000 crores. The shares of different
above are entitled for maintenance allowance of divisions, based on CDI are, Kalaburagi 40%,
Rs.1400 per month. From 2019-20 this scheme Belagavi-20% Bengaluru 25% and Mysuru
is implemented by Revenue Department. During 15%.The Special Development Plan is being
2019-20 an amount of Rs.17.49 lakhs is implemented from 2007-08.The total allocation
incurred up to end of November 2019 and 25 made from 2007-08 to 2019-20 works out to
persons are benefitted under Medical Relief Rs.35506.39 crores. The amount released up to
Fund. During 2019-20 under district sector December 2019 was Rs.26696.33 crores which
28 Economic Survey of Karnataka 2019-20

constitutes 75.19% of the planned allocations. The Karavali Development Authority since its
The utilization is Rs.24519.68 crores, i.e. inception in 2008, up to November-2019 has
91.85% of the released amount. incurred an expenditure of Rs.62.51 crore
completing 231 works.
A Special Cell has been established in the
Planning Department to coordinate and monitor The Government is implementing Karnataka
the implementation process. A state level Legislator's Local Area Development Scheme
monitoring committee was constituted under the (KLLADS) since 2001-02. In order to
Chairpersonship of Additional Chief Secretary accommodate local aspirations and needs more
and Development Commissioner in December effectively, and to ensure responsive planning
2014. 39 Nodal Officers have been appointed to and delivery of services, the Government has
monitor the 39 Most Backward Taluks, The taken up schemes for asset creation,
Special Cell in Planning Department infrastructure development and employment
consolidates the financial and physical progress generation for the benefit of the poor and weaker
achieved under SDP in 114 backward taluks and sections, whose planning and execution can be
submits the progress to the Government and done at the Legislator's Constituency Level. For
High Power Committee. The programme is 2019-20, an allocation of Rs.600.00 crore has
implemented by 21 Departments of the State. been provided to Karnataka Legislators Local
Government has appointed Deputy Commiss- Area Development Scheme, out of which
ioners concerned as Nodal Officer and Chief Rs.150.00 crore was released and Rs.275.50
Executive Officer of Zilla Panchayat concerned crore expenditure was incurred including
as Additional Nodal Officer of the respective opening balance upto the end of November-
districts. Progress of the SDP is monitored 2019. As against 9615 approved works under
through Decision Supporting System (DSS). this programme 4466 works have been
completed upto Nov 2019. The progress of the
1.14.2 Area Development Programmes works are entered in the newly developed work
The State Government is proactive in addressing software called “Gandhi SakshiKayaka”.
the regional imbalances in development and has
The Member of Parliament Local Area
constituted two autonomous boards to focus on
Development Scheme (MPLADS) was started in
the overall development of certain areas in the
1993 by Central Government. Under this
state viz., Malnad area and Maidan
scheme, Central assistance is provided to States
(Bayaluseeme) area. The thrust is on
for expenditure incurred for the creation of
development of infrastructure viz., roads and
community assets based on recommendations of
bridges, rural and urban water supply schemes,
the Hon'ble Members of Parliament. Under the
minor irrigation soil conservation and social
scheme a sum of Rs.5.00 crore per annum per
sector works.In addition to these Area
Member of Parliament is released by GOI directly
Development Boards, the State has also
to the Deputy Commissioners of the Nodal
constituted the Karavali Development Authority
Districts for execution of the development works.
for preparation of need based Project Reports,
Under this programme, an amount of
Feasibility Reports for comprehensive
Rs.2650.75 crore was released and an
development of coastal regions. The Karavali
expenditure of Rs.2445.91 crores was incurred
Development Authority has taken up projects
since inception up to the December-2019.
such as construction of fish markets, bridges,
commercial complexes, pubic amenities etc. 1.14.3 Article 371J – Special Status for
from the financial year 2015-16. Kalyana-Karnataka Region
The Malnad Area Development Board since its The Article 371J has granted special status to six
inception in May 1993, up to November-2019 backward districts of Kalyana Karnataka region
has incurred an expenditure of Rs.671.98 crores namely, Bidar, Yadgir, Raichur, Koppalla,
completing 20243 works. During 2019-20, an Ballari and Kalaburagi. All the vital socio-
additional action plan for Rs.88.00crores was economic indicators relating to human
approved allocating one crore under per development of the region depict that the gaps in
legislator comes under the jurisdiction of the indices of the region vis-à-vis the State.
Malnad Area Development Board. Intensive efforts are required to bridge the
The Bayaluseeme Area Development Board since development gap and focus on education,
its inception in 1995, up to November-2019 has health, nutrition and skill development, along
incurred an expenditure of Rs.314.73 crore with development of farm and non-farm
completing 8511 works. activities. Formulation and effective implemen-
tation of development programmes tailored to
Economic Survey of Karnataka 2019-20 29

the needs of the region are required to meet the done through Universities. Guidelines are
challenges of this region. KKRDB has earmarked prepared to take up various studies through
70% of budget for bridging infrastructure gaps Universities. KEA also has provided support to
and 30% for institutional gaps in 2019-20. Planning department for establishing a
Sustainable Development Goals Coordination
r For effective implementation of the
Centre for localization of SDG goals and for
programme the Secretary KKRDB is
designing the strategy and action plans for
empowered to sanction works worth of
achieving SDGs by 2030 and has designed to
Rs.10.00 crore instead of Rs.5.00 crore.
develop knowledge partnership with Centre for
r The Hyderabad-Karnataka Region Open Data Research.
Development Board has been renamed as
“Kalyana-Karnataka Region Development KEA is now involved in preparation of Bruhat
Board” from 07.09.2019. Bengaluru Mahanagara Palike Human
Development report. KEA is also coordinating in
r An amount Rs.1500 crore has been Transformation of Raichur and Yadgir
budgeted for 2019-20 against which Aspirational Districts in Karnataka. KEA has
Rs.1004.25 crore has been released of supported the other Initiatives of NITI Aayog-
which an amount of Rs.818.41 crore is India Innovation Index, Ease of Doing Business
incurred as expenditure upto November Index, Ease of Living Index etc.
2019. As against 7108, approved works
3546 have been completed. The evaluation studies have helped the
Departments to make necessary corrections in
1.15 EVALUATION OF GOVERNMENT
guidelines, implementation procedures. A study
PROGRAMMES/SCHEMES
on Fodder situation has recommended for fodder
Karnataka was one of the first States in the security policy, a malnutrition study has
Country to evolve an Evaluation Policy in 2000. recommended for a Nutrition Policy, evaluation
Karnataka Evaluation Authority (KEA) was set of Bhagya-lakshmi scheme has suggested for
up in July 2011 and registered as a Society in change in guidelines.
September 2011. The vision of the Karnataka
KEA intends to take up in-house studies to build
Evaluation Policy of 2011 is to have a
the capacity of young research staff. It will also
transparent, effective and efficient Practice of
develop a real time data collection and
evaluation of Government's development
monitoring system for ensuring that field
policies and programmes for optimal use of
realities are captured in evaluation reports.
resources for maximizing the intended and
measurable outcomes and citizen satisfaction. It will initiate the process of preparation of
Output - Outcome analysis document for
KEA has completed 137 Evaluation Studies and
Central and different State Govt. Schemes and
the findings of these studies have helped the
support the Sustainable Development Goals
Departments to take up necessary corrections in
coordination Centre in designing the strategies,
the implementation mechanism to achieve
action plans and localization of SDGs to achieve
desired outcomes. At present 70 studies are in
the set targets of SDGs 2030.
progress. 40 Evaluation Consultant Organi-
zations are empaneled, and 13 independent 1.16 SKILL DEVELOPMENT,
assessors are on the panel for assessment of the ENTREPRENEURSHIP AND
evaluation reports and their grading. There are LIVELIHOOD
42 subject experts who assist KEA in technical
and evaluation matters. In accordance with the National Skill
Development Policy the State Government has
New Initiatives also approved a Skill Development Policy with an
Internship Programme is implemented in the objective of providing suitable skill training for
line departments, Corporations, Boards, Bodies, 25 lakhs job seekers by 2020-30 and to provide
Authorities of Government of Karnataka. KEA is them placement. A separate Department in the
the nodal agency for coordinating and name of department of Skill Development,
implementing the Internship Programme. KEA Entrepreneurship and Livelihood was
has established links with foreign universities established in 2016. Under this department the
for expert advice for evaluation studies following wings are functioning:

KEA is engaging with State Universities in r Industrial Training Institutes and Multi
Evaluation studies to enhance their capacities in Skill Development Centres
research and evaluation. Out of 50 evaluation r Karnataka Skill DevelopmentAuthority
studies to be taken up in coming year, 25 will be
30 Economic Survey of Karnataka 2019-20

r Commissionerate of Industrial Training and Government of India, through the Government of


Employment Karnataka.
r Centre for Entrepreneurship Development The basic challenges are that many programmes
of Karnataka (CEDoK) like awareness, training etc., are implemented in
r Government Tool Room & Training Centre PPP mode involving Self help groups and NGOs.
(GTTC) A suitable mechanism for the monitoring of
r Karnataka German Multi Skill Development these NGOs and Self help groups at district and
Corporation, taluk level is established. The cooperation of the
Banks in providing the required loans to the
r National Rural Livelihood Mission (NRLM) identified, trained entrepreneurs at appropriate
r National Urban Livelihood Mission (NULM) time has to be ensured to achieve the objective of
r Karnataka Skill Development Corporation the schemes. The shortages of faculties in all
wings also need urgent attention. The skill
The main objective of the skill department is to development mission in the State needs support
conduct surveys and identify the skill gaps and and cooperation from different stakeholders for
to train the youths in the respective trades and to capacity building of the youths to seek job
work as nodal department in providing jobs and opportunities in the global job markets and also
placements. In this direction these wings promote self employment for accomplishing the
carryout the instructions and implement the aspirations of youths and utilization of their
Government Orders. The implementation of the talents and capacities.
programmes is taken up with the budget share of
Central and State Governments. To accomplish 1.17 SUSTAINABLE DEVELOPMENT GOALS
the desired objectives of State skill policy, the (SDGs)
State established Karnataka Vocational Training
SDGs address the root causes of poverty and
and Skill Development Corporation (KVTSDC)
initiate efforts to make a positive change both for
under the companies Act'1956, with a target of
people and planet. Poverty eradication is at the
imparting skills and employment to 12.5 lakhs
heart of the 2030 Agenda and so is the
persons in the succeeding five years from
commitment “to leave no-one behind”. In
inception. KVTSDC and Skill Mission has been
nutshell it is the universal, inclusive and
proactively following the agenda of skill
indivisible Agenda which calls for action by all
development in the State. The skill development
participating countries to improve the lives of the
and entrepreneurship development programmes
people and the planet. While the SDG goals and
are undertaken under DeenDayal National Rural
targets set a global context, they have been
Livelihood Mission, DAY-NULM, SANJEEVINI-
designed in a way so that they can be adapted
KSRLPS, CEDOK etc. For dissemination,
locally to meet the specific challenges. SDGs
motivation and promotion of self employment
address multi dimensions of development viz;
Disha Guidance Cells are established in 16
Economic, Social and Environmental aspects of
districts. From 2008-09 to 2018-19 nearly
development.
176524 persons have been procured jobs
through melas. During the year 2019-20 for the Karnataka has been actively working towards
period upto November 35,808 persons have been spreading awareness about SDGs. This involves
trained in various skill trades. Under disaggregated data from the districts and district
Community Investment Fund an amount of specific targets are set to ensure the effective and
Rs.44.56 crore has been disbursed. During efficient implementation of SDGs by District
2019-20 nearly 338162 SHGs have been credit Planning Committees (DPC).
linked with banks, with loan amount of Rs.
2849.90 crore. To provide authentic The seventeen SDGs are:-
information, guidance training and recruitment Goal 1. End poverty in all its forms everywhere;
for overseas employment the State has Goal 2. End hunger, achieve food security and
established International Migration Centre improved nutrition and promote sustainable
–Karnataka. The skilled persons in the areas of agriculture; Goal 3. Ensure healthy lives and
construction, carpentry, Electrician trade etc., promote well-being for all at all ages; Goal 4.
can be sent to the needy nations where such Ensure inclusive and equitable quality
trades have more demand in countries like education and promote lifelong learning
France, Indonesia, Italy where the birth rate is opportunities for all; Goal 5. Achieve gender
very low and the population in working age group equality and empower all women and girls; Goal
is very less. For this, IMC-K wing is taking 6. Ensure availability and sustainable
initiatives to send suitable proposals to the management of water and sanitation for all;
Economic Survey of Karnataka 2019-20 31

Goal 7. Ensure access to affordable, reliable, implementation and revitalize the Global
sustainable and modern energy for all; Goal 8. Partnership for Sustainable Development. The
Promote sustained, inclusive and sustainable government is ensuring investments across all
economic growth, full and productive sectors towards achieving SDGs, through
employment and decent work for all; Goal 9. scheme and budget mapping. Mainstreaming
Build resilient infrastructure, promote inclusive Resource efficiency approach and convergence
and sustainable industrialization and foster strategy in the outcome based development
innovation; Goal 10. Reduce inequality within pathway would go a long way in achieving SDG
and among countries; Goal 11. Make cities and Targets by 2030
human settlements inclusive, safe, resilient and
The 16 Goal Committees have prepared
sustainable; Goal 12. Ensure sustainable
strategies and action plans to achieve SDGs by
consumption and production patterns; Goal 13.
2030. The Goal Committees have identified
Take urgent action to combat climate change
around 600 indicators in the State Indicator
and its impacts; Goal 14. Conserve and
Framework which contains 235 national
sustainably use the oceans, seas and marine
indicators. The Goal Committes have also done
resources for sustainable development; Goal 15.
scheme mapping for each of the SDGs and
Protect, restore and promote sustainable use of
projected year-wise budget requirement under
terrestrial ecosystems, sustainably manage
SDGs upto 2030.
forests, combat desertification, and halt and
reverse land degradation and halt biodiversity The State has formed the Monitoring and
loss; Goal 16. Promote peaceful and inclusive Coordination Committee and the State level
societies for sustainable development, provide Steering Committee for formulation of effective
access to justice for all and build effective, and efficient action plans for achieving the
accountable and inclusive institutions at all SDGs.
levels; Goal 17. Strengthen the means of
32 Economic Survey of Karnataka 2019-20
STATE INCOME AND PRICES CHAPTER 2

INTRODUCTION economic growth of the State. It gives an


Karnataka is a state of diverse cultures and overall picture of the state of the economy.
languages and the economic and social This would enable the policy makers,
scenario within the State, in many ways, administrators and planners for proper
mirrors the scenario prevalent in the formulation and appraisal of plans for
country itself. Located in the southern part balanced economic development. Analysis
of India, along its northern borders lie the of this indicator at aggregate and
states of Maharashtra and Goa; Andhra disaggregated levels leads to the insights of
Pradesh and Telangana to the east; Tamil patterns and sources of growth.
Nadu and Kerala to the south, while the The State Domestic Product is defined as the
Arabian Sea forms the western boundary. “aggregate of the economic value of all goods
Karnataka has an area of 1,91,791 sq. kms. and services produced within the
which constitutes 5.83 per cent of the total geographical boundaries of the State,
geographical area and population of counted without duplication, for a specified
6,10,95,297 accounts for 5.05 per cent of period of time” by convention: a financial
country's population in 2011. Karnataka is, year.
in terms of population, the ninth largest 2.1.2 Overview for 2019-20
state among India's 28 major states and 8
union territories. The state is becoming Karnataka has released the Advance
steadily urbanised. In terms of estimates of GSDP for the year 2019-20. The
urbanization, the state has witnessed an GSDP at current prices is estimated to
increase of 4.68 per cent in the proportion of attain Rs.16,99,115 crore at a growth rate of
urban population in the last decade. 61.33 10.0% and Rs.12,01,031 crore with an
per cent are rural residents and 38.67 per expected growth of 6.8% at constant
cent are urban residents. It has a larger (2011-12) prices.
proportion of its population living in urban 2.1.3 Comparison of Gross State
areas, than the average for the country as a Domestic Product and Gross Domestic
whole. Product
This chapter analyses Karnataka's In 2019-20, the GSDP of Karnataka is
economic growth in terms of changes in anticipated to grow at 6.8% whereas the
Aggregate and Per Capita State Income GDP at national level is 5.0% at constant
including stability of prices in the indices of (2011-12) prices. At current prices, the
wholesale as well as retail prices in the GSDP is anticipated to reach Rs.16,99,115
entire state. In addition, this chapter also crore with a growth of 10.0% and GDP is
provides an analysis of District Income likely to attain a level of Rs.2,04,42,233
Estimates along with related Inter-District crore with a growth rate of 7.5%.The share of
Variations. Karnataka's GSDP in All India GDP is 8.3%
2.1 STATE ECONOMY during 2019-20.
2.1.1 Gross State Domestic Product The GSDP and GDP at current and constant
(2011-12) prices from 2011-12 to 2019-20
Gross State Domestic Product (GSDP) is the are presented in Table 2.1 & 2.2.
most important indicator in measuring

33
34 Economic Survey of Karnataka 2019-20

Table 2.1: Annual Growth Rate of GSDP and GDP at Constant (2011-12) Prices
GSDP Growth Rateof GDP Grow th Rate of
Year (Rs. crore) GSDP (%) (Rs. crore) GDP (%)

2011-12 606010 8736329

2012-13 643033 6.1 9213017 5.5

2013-14 704466 9.6 9801370 6.4


2014-15 748429 6.2 10527674 7.4

2015-16 831330 11.1 11369494 8.0

2016-17 942221 13.3 12308193 8.3

2017-18 1043533 10.8 13175161 7.0

2018-19 1124423 7.8 13981426 6.1

2019-20 1201031 6.8 14778880 5.0*

Source: 1. Directorate of Economics and Statistics, Government of Karnataka.


2. Central Statistical Office, Government of India. * As per First Advance Estimates

Table 2.2: Annual Growth Rate of GSDP and GDP at Current Prices
GSDP Growth Rate of GDP Growth Rate of
Year
(Rs. crore) GSDP (%) (Rs. crore) GDP (%)

2011-12 606010 8736329

2012-13 695413 14.8 9944013 13.8

2013-14 816666 17.4 11233522 13.0

2014-15 913923 11.9 12467959 11.0

2015-16 1045168 14.4 13771875 10.5

2016-17 1209136 15.7 15391665 11.8

2017-18 1357579 12.3 17098304 11.1

2018-19 1544399 13.8 18971234 11.0

2019-20 1699115 10.0 20442233 7.5*

Source: 1. Directorate of Economics and Statistics, Government of Karnataka.


2. Central Statistical Office, Government of India.* As per First Advance Estimates

2.1.4 Comparison between Advance GSVA growth rate of agriculture sector has
Estimates of 2019-20 and First Revised increased to 3.9% in 2019-20 compared to
Estimates of 2018-19 (-)1.6% in 2018-19. The rise in agriculture
sector in 2019-20 is on account of increase
The Gross State Domestic Product of in foodgrain production from 128 lakh
Karnataka at constant (2011-12) prices for tonnes to 136 lakh tonnes, oilseeds
the year is anticipated to grow by 6.8%.The production from 51 lakh tonnes to 56 lakh
Economic Survey of Karnataka 2019-20 35

tonnes when compared to 2018-19. remaining services) with 11.2%,Real Estate,


Similarly, in livestock sector, milk Professional Services & Ownership of
production is anticipated to increase from Dwellings with 8.6%, Public Administration
79 lakh tonnes to 88 lakh tonnes, egg with 8.0%, Trade and Repair Services with
production from 54 lakh numbers to 59 lakh 6.5% growth are the major contributors of
numbers and meat production from 1.1 service sector to achieve the overall state
lakh tonnes to 1.27 lakh tonnes. Fish economy growth rate. While preparing the
production has also boosted in 2019-20 Advance estimates of service sectors, All
(marine fish 3.6 to 4 lakh tonnes, inland fish India growth rate is adopted due to
1.9 to 2.5 lakh tonnes) compared to 2018- inadequacy of data at the state level. Hence,
19. The industry sector (comprising mining the service sector growth has reduced
& quarrying, manufacturing, construction compared to previous year.
and electricity, gas & water supply) is
Whereas, the First Advance Estimates of All
expected to grow by 4.8% in 2019-20 against
India Gross Domestic Product (GDP) at
a growth of 5.6 % during 2018-19. Service
constant (2011-12) prices for the year
sector is expected to grow by 7.9% during
2019-20 is expected to grow at 5.0%. The
2019-20 compared to growth of 9.8% during
sectoral growth rate of Agriculture, Industry
2018-19. Service sector is a major
and Services at all India are anticipated to
contributor of overall GSDP of the state as
grow at 2.8%, 2.5% and 6.9% respectively.
the share of private corporate sector to this
The comparative table of sectoral Growth
sector is significantly higher compared to
Rates of GSDP for 2018-19 and 2019-20 are
other sectors. In 2019-20, Other services
presented in Table 2.3.
sector (Education, Health and other

Table 2.3: Sectoral Growth Rates of GSDP at Basic Constant (2011-12) Prices
Sl. 2018-19 2019-20
Sector
No. F.R.E. A.E.
1 Crops -5.6 1.3
2 Livestock 14.5 11.5
3 Forestry and Logging -2.3 -0.4
4 Fishing -12.0 13.1
Agriculture and Allied Sector -1.6 3.9
5 Mining and Quarrying -15.4 1.5
6 Manufacturing 6.4 5.6
7 Electricity, Gas, Water supply & Remediation Services 5.2 7.0
8 Construction 6.3 2.4
Industry Sector 5.6 4.8
9 Trade & Repair Services 7.1 6.5
10 Hotels and Restaurants 6.6 3.2
11 Railways 5.0 5.9
12 Road transport 7.6 5.2
13 Water transport 3.6 4.0
14 Air transport -27.0 6.3
15 Services incidental to transport 4.8 11.2
36 Economic Survey of Karnataka 2019-20

Table 2.3: Sectoral Growth Rates of GSDP at Basic Constant (2011-12) Prices

Sl. 2018-19 2019-20


Sector
No. F.R.E. A.E.
16 Storage 2.9 4.0
17 Communication 6.9 5.8
18 Financial Services 4.7 6.4
19 Real Estate, Professional Services & Ownership of Dwellings 10.8 8.6
a) Computer related Services 13.4 10.7
b) Real Estate &Other Professional Services 6.5 3.8
c) Ownership of Dwellings 3.9 3.9
20 Public Administration 19.8 8.0
21 Other services 13.8 11.2
Services Sector 9.8 7.9
Total GSVA at Basic Prices 7.5 6.7
Product Tax 9.0 7.1
Product Subsidies 5.2 4.5
Total GSDP at Market Prices 7.8 6.8
A.E.: Advance Estimates, F.R.E.: First Revised Estimates
Source: Directorate of Economics and Statistics, Government of Karnataka

2.1.5 Net State Domestic Product 2.1.6. Sectoral Composition of Gross


State Domestic Product
The estimates of Net State Domestic
Product (NSDP) are derived from the Gross The contribution of Agriculture and
State Domestic Product (GSDP) by Industry sector to the overall GSDP (from
deducting Consumption of Fixed Capital 11.18% to 10.97% and 23.67% to 22.84%,
(CFC) or Depreciation. For the year 2019-20 respectively) saw a marginal decrease in
at current prices, NSVA growth of 2019-20 against 2018-19. The services
agriculture & allied activities, industry and sector a largest component of GSDP saw a
service sectors are expected at 7.8%, 5.8% marginal increase from 65.15% in 2018-19
and 11.5% respectively which has lead the to 66.19% in 2019-20. The contribution of
NSDP to Rs.15,50,297 crore, showing a 'Real estate, Professional Services &
growth of 10.0% against 13.8% in 2018-19. Ownership of Dwellings' is highest with
Similarly at constant (2011-12) prices the (35.31%) in 2019-20 followed by
NSDP is estimated at Rs.10,85,599 crore 'Manufacturing (15.32%)', 'Trade and Repair
showing a growth of 6.8% (Table 2.4).The Services (9.51%)' and 'Crops (7.44%)'.
NSVA growth of Agriculture & allied The sectoral composition of GSDP in
activities, Industry and Service sectors are 2018-19 and 2019-20 at current prices is
expected to be 4.0%, 4.8% and 7.9% given in Table 2.5. The sectoral composition
respectively. of GSDP is shown in Figure 2.2 for primary,
Figure 2.1 shows the GSDP, NSDP and CFC secondary and tertiary sectors.
at current prices from 2011-12 to 2019-20. 2.1.7. Per Capita Income
The difference in GSDP and NSDP indicates
the extent of consumption of fixed capital or Per capita income is estimated by dividing
depreciation. NSDP at current prices with mid-financial
Economic Survey of Karnataka 2019-20 37

Table 2.4: NSDP at Current and Constant (2011-12) Prices

NSDP at Constant
NSDP at Current Prices
(2011-12) Prices
Sectors
2018-19 2019-20 2018-19 2019-20
F.R.E. A.E. F.R.E. A.E.

Agriculture 144929 156241 81773 85033

Industry 290754 307629 239337 250794

Services 812622 905865 558303 602389

NSVA at Basic Price 1248305 1369735 879413 938215

Product Tax 189193 211064 157348 168548

Product Subsidies 28372 30502 20247 21164

NSDP at Market Price 1409126 1550297 1016514 1085599

A.E.: Advance Estimates, F.R.E.: First Revised Estimates


Source: Directorate of Economics and Statistics, Government of Karnataka

Figure 2.1: GSDP, NSDP and CFC at current prices

1800000
148818
1600000 135273
1400000 119167

1200000 104971
Rs. Crores

94302
1000000
1550297

88141
1409126

800000 70097
1238412

59489
1104165

51058
950866

600000
825782
746569
635924
554952

400000

200000

0
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20

NSDP CFC GSDP


38 Economic Survey of Karnataka 2019-20

Table 2.5: Sectoral shares of GSDP at Current Prices

Sl. 2018-19 2019-20


Sector
No. F.R.E. A.E .

1 Crops 7.80 7.44

2 Livestock 2.25 2.39

3 Forestry and Loggi ng 0.78 0.75

4 Fishing 0.35 0.39

Agriculture and Allied Sector 11.18 10.97

5 Mining and Q uarrying 0.59 0.55

6 Manufacturing 15.88 15.32

7 El ectricity, Gas, Watersupply & Remediati on Services 1.42 1.46

8 Construction 5.78 5.51

Industry Sector 23.67 22.84

9 Trade & Repair Services 9.48 9.51

10 Hotels and Restaurants 1.53 1.49

11 Rai lways 0.22 0.22

12 Road Transport 3.75 3.64

13 Water Transport 0.02 0.02

14 Ai r Transport 0.12 0.12

15 Services Incidental to Transport 0.07 0.07

16 Storage 0.04 0.04

17 Communication 1.21 1.19

18 Financial Services 4.78 4.67

19 Real estate, Ownership of Dwellings& Professional Services 34.39 35.31

a) Computer related Services 23.51 24.49

b) Real Estate &Other Professional Services 5.10 4.99

c) Ownership of Dwellings 5.78 5.83

20 Public Administration 2.51 2.55

21 Other services 7.04 7.37

Services Sector 65.15 66.19

Total GSV A at Basic Prices 100.00 100.00

A.E.: Advance Estimates, F.R.E.: First Revised Estimates


Source: Directorate of Economics and Statistics, Government of Karnataka
Economic Survey of Karnataka 2019-20 39

year projected population (as on 1st Per capita Income of Karnataka and All India
October). Per Capita State Income (i.e. per from 2011-12 to 2019-20.
capita NSDP) of Karnataka at current prices
On comparison, the level of per capita state
is estimated to be Rs.2,31,246 showing a
income at constant (2011-12) prices is also
rise of 8.8% during 2019-20, as against
expected to rise from Rs.1,53,276 during
Rs.2,12,477 in 2018-19. Karnataka's per
2018-19 to Rs.1,61,931 for the year 2019-
capita income is higher by 58.4% over All
20 with the growth rate of 5.6%. Sector wise
India Per capita income of Rs. 1,35,050 in
details of GSDP and NSDP for the years
2019-20. Figure 2.3 provides comparison of

Figure 2.2: Sectoral composition of GSVA at Current Prices

70.00 65.15 66.19

60.00

50.00

40.00

30.00 23.08 22.29


20.00
11.77 11.52
10.00

0.00
2018-19 2019-20

Primary Secondary Tertiary

Figure 2.3: Comparison of Per Capita Income

PER CAPITA INCOME (Rs.)


250000
212477 231246

188765
200000
170133
148108
150000 130024
118829
102319 135050
90263
100000 115293 126521
104880
94797
86647
79118
50000 70983
63462

0
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Karnataka India
40 Economic Survey of Karnataka 2019-20

Table 2.6: Growth of NSDP at Market Price and Per Capita Income

NSDP at Current Prices Per Capita Income


Year
(Rs. Crore) (Rs.)

1960-61 692 296

1970-71 1,858 641

1980-81 5,587 1,520

1990-91 20,551 4,598

2000-01 96,348 18,344

2010-11 3,68,338 62,251

2011-12 5,54,952 90,263

2012-13 6,35,924 1,02,319

2013-14 7,46,569 1,18,829

2014-15 8,25,782 1,30,024

2015-16 9,50,866 1,48,108

2016-17 11,04,165 1,70,133

2017-18 (S.R.E.) 12,38,412 1,88,765

2018-19 (F.R.E.) 14,09,126 2,12,477

2019-20 (A.E.) 15,50,297 2,31,246

A.E.: Advance Estimates, F.R.E.: First Revised Estimates, S.R.E.: Second Revised Estimates
Source: Directorate of Economics and Statistics, Government of Karnataka

2011-12 to 2019-20, both at current and 2.1.10 District Income


constant (2011-12) prices are presented in
The estimates of Gross and Net District
Appendices 2.1 to 2.4.
Incomes at current and constant (2011-12)
2.1.8 Growth of NSDP and Per Capita prices including Per Capita Net District
Income Domestic Product at current prices for the
year 2017-18 for all the 30 districts in the
Table 2.6 presents the growth of Net State State are presented in Appendices 2.6
Domestic Product and Per Capita Income of and 2.7.
the state over the years. The time series data
from 1960-61 to 2019-20 is presented in These District income estimates are
Appendix 2.5. prepared on a provisional basis. The
database for the estimation is available for
2.1.9. Inter State Comparison Primary sector only. In respect of Secondary
The comparison of GSDP or State Income and Tertiary sectors, the State level
and per capita income of Karnataka for estimates are allocated to districts with
2018-19 with some important States (for appropriate available indicators and
which data is available in CSO website) workforce under each sector as revealed
alongside All India ranking is presented in during 6th Economic Census at the time of
Table 2.7. preparation of estimates. Because of data
limitations, it may not be very useful to
Economic Survey of Karnataka 2019-20 41

Table 2.7: Comparison of State Income and Per Capita Income

Sl. State I ncome in Per capita


State Rank Rank
No. Rs. Crore Income in Rs.

1 Andhra Pradesh 933402 4 164025 7

2 Bihar 557490 9 43822 14

3 Chattisgarh 311660 11 96887 9

4 153181 14 179188 6
Himachal Pradesh
5 Jharkhand 307581 12 76019 12

5 Karnataka 1544399 2 212477 2

6 Madhya Pradesh 809327 7 90998 11

7 Odisha 485376 10 93352 10

8 Rajasthan 929124 5 109105 8

9 Tamil Nadu 1664159 1 193750 5

10 Telangana 865688 6 205696 3

11 Uttar Pradesh 1542432 3 61351 13

12 Uttarkhand 245895 13 198738 4

13 Delhi 779652 8 365529 1

All India 20442233 - 135050

Source: 1. Karnataka: Directorate of Economics and Statistics, Government of Karnataka.


2. Rest of the States and all India: Central Statistical Office, Government of India.

analyse sector-wise district estimates The per capita income (in rupees) at current
between any two given points of time as prices for all 30 districts for the year
these estimates have not yet firmed up. 2017-18 is presented in Figure 2.4.
However, a brief description of the broader
District income is also a measure of the level
sector-wise district estimates is given in
and growth of economic development
Appendix 2.6.
prevailing in the district level. It is a useful
Bangalore Urban District stood first in the policy indicator to monitor the nature and
total District Income as well as per capita degree of inter-district variations as well as,
district income for the year 2017-18. disparities in the process of economic
Bengaluru Urban District contributes growth at the State level. A simple statistical
36.0% to GSDP at current Prices followed by indicator of inter-district variations in the
Dakshina Kannada (5.9%), Belagavi (4.5%). levels of district income is the coefficient of
variation. Figure 2.5 shows these computed
At constant (2011-12) prices, contribution
values across the four divisions and at the
of Belagavi district to the primary sector is
State level.
highest in 2017-18, due to a higher
contribution in crop sector. Bengaluru Figure 2.5 indicates the variations in gross
Urban District tops in secondary and district and per capita district income
tertiary sectors due to high concentration of among the revenue regions (divisions) of the
major industries and infrastructure State. The highest variation is evident with
facilities. respect to Bengaluru division, if Bengaluru
42 Economic Survey of Karnataka 2019-20

Figure 2.4: District wise Per Capita Income (in rupees) for the year 2017-18

Urban District is included. Excluding necessarily imply either a higher or a lower


Bengaluru Urban district, these inter- district economic growth or regional
district variations in district income and per disparity.
capita district income, get remarkably
reduced at the division and State levels. The It can be observed from Figure 2.6 that
growing inter-district variation is an Kalaburgi the revenue region (comprising
important indicator and a source of broader Ballari, Bidar, Kalaburgi, Koppal, Raichuru
inter-regional disparities in the process of and Yadagiri districts), stood lowest in the
State's economic development. However, a per capita income. Kalaburgi region's per
low coefficient of variation as such, does not capita income is less than half of the per
capita income of the Bengaluru region.
Economic Survey of Karnataka 2019-20 43

Figure 2.5: Inter-district variations of Gross District Income and Per Capita Income
by Divisions in Karnataka for 2017-18

250
Co-efficient of Variation

194 188
200

150

100

58 62
49 50 51
41 45
50 39 37
20 18 21

0
Bengaluru Bengaluru Mysuru Region Belagavi Region Kalaburagi State State (Excluding
Region Region excluding Region Bangalore Urban
Bengaluru Urban District)

District Income Per Capita Income

Figure 2.6: Division wise Per Capita Income

2.2 PRICES and in what quantities. They also indicate


the demand and supply of goods and
2.2.1 Introduction
services in the economy.
Price is one of the key indicators in the
2.2.2 Inflation
economic planning process. They provide an
economic mechanism by which goods and Inflation is an increase in the level of prices
services are distributed among the of goods and services over time. It is the
consumers. Changes in prices have a direct constant rise in the general level of prices
bearing on all sections of the society where a unit of currency buys less than it
irrespective of their level of living. Prices did in prior periods. It indicates the
determine what goods are to be produced purchasing power of a nation's currency.
44 Economic Survey of Karnataka 2019-20

In India commonly used inflation indices are All India Wholesale Price Index: This Index
the Wholesale Price Index (WPI) and the is released by the Office of Economic Advisor
Consumer Price Index (CPI). As the name (OEA), Department of Industrial Policy and
indicates the WPI measures Price at the Promotion, Ministry of Commerce and
wholesale level and CPI at the consumer Industry. The base year for this index is
level. Beyond the basics, the number and 2011-12=100. The index basket of the
types of items included in the WPI and CPI present 2011-12 series has a total of 697
basket differ and so does the weights given items including 117 items of Primary
to these items. Food has a larger weight in Articles,16 items for Fuel and Power and
CPI than WPI, the CPIs are therefore more 564 items for Manufactured Products. WPI
sensitive to changes in prices of food items. basket does not cover services.
Whereas the fuel group has a much higher
Wholesale Price Index is used to estimate
weight in WPI than CPIs.
inflation at the Wholesale transaction level.
2.2.3 Wholesale Price Index It is also used for estimating GDP by Central
Statistical Organization (CSO). This index is
Wholesale Price Index measures the average
released every month at the National as well
change in the prices of commodities for bulk
as State level.
sale at the level of early stage of
transactions. The index basket of the WPI The details of annual all India wholesale
covers commodities falling under the three price index from April to November for the
major groups namely Primary Articles, Fuel consecutive years 2017-18, 2018-19 and
and power and manufactured products. 2019-20 are presented in Appendix 2.8 and

During 2019-20, based on inflation rate of All India Wholesale Price Index (WPI) is
increased to 0.99% in 8 (April-November) months. During the corresponding period of
previous year inflation rate was increased by 3.84% only.
During 2019-20, based on inflation rate of All India level Consumer Price Index (CPI)
is increased to 5.12% in 8 (April-November) months. During the corresponding period of
previous year inflation rate was increased by 4.86%.

During 2018-19 and 2019-20 Wholesale price index analysis given below.
r During 2019-20, the Index of all commodities is increased from 121.1 in April to
122.3 in November 2019, showing an increase of 0.99%.
r During 2018-19, the index of all commodities is increased from 117.3 in April to
121.8 in November 2018, showing an increase of 3.84%.
r The Annual rate of inflation, based on monthly WPI, stood at 0.41% for the month of
November 2019 (over November 2018)
During 2019-20 (April-November) Group-Wise changes in WPI are as follows.
r Primary Articles (Weight 22.62), the index for this major group rose by 5.74% in
8 months.
r Fuel and Power (Weight 13.15), the index for this major group decreased by 1.46%
in 8 months.
r Manufactured Products (Weight 64.23), the index for this major group decreased
by 0.59% in 8 months.
Economic Survey of Karnataka 2019-20 45

group wise all-India Wholesale Price Index Marketing committees (APMCs) of


since 2000-01 are given in Appendix 2.9. Agricultural Marketing Department
The following Figure 2.7 shows group wise situated across the state, who compiles the
changes in WPI. prices of agricultural commodities (2) Sugar,
Directorate (3) Coffee, Tobacco and Spices
2.2.3.1. 33 Agricultural Commodities Board.
Wholesale Price Index of Karnataka
State: This index is useful to monitor the WPI numbers of agricultural commodities in
trends in prices at the first stage of Karnataka since 2000-01 are given in
commercial transaction and to estimate the Appendix 2.10 and group wise index
state internal products. The main source of numbers for 2017-18, 2018-19 and 2019-
primary data for the construction of this 20 are given in Appendix 2.11.The trend of
Index is (1)40 Agricultural Produce WPI for 33 agricultural commodities in

Figure: 2.7 Group wise changes in WPI

During 2018-19 and 2019-20 (April-November) 33 agricultural commodities Wholesale


Price index of Karnataka State analysis given below.
r During 2019-20, the Index of Wholesale price is increased from 1262 in April to 1338 in
November 2019, showing an increase of 6.02% in 8 months
r During 2018-19, the Index of Wholesale price is increased from 1217 in April to 1327 in
November 2018, showing an increase of 9.04% in 8 months
r In 2019, November index is 1338 and compared to 2018 November index (1327) the annual
Index increased to 0.83%.
During 2019-20 (April-November) the statistics of Group-wise WPI is as follows.
r During 2019, when compared to April to November, all commodities index is increased to
6.02% ,Condiments and Spices group increased by 68.43%, the index of Miscellaneous
group increased by 13.68%, Oil seeds group increased by 12.36%, Pulses group index
increased by 6.62% and Cereals group index increased by 1.74%, whereas Fibre group
index decreased by 25.38% and Gur and Sugar group index decreased by 3.73%.
r During April to November 2019, the prices of Cardamom, Onion,Bajra, Jowar and Tur are
increased by 132.85%, 79.23%,50.73%, 41.87% and 36.45% respectively.
46 Economic Survey of Karnataka 2019-20

Karnataka for the year 2018-19 and 2019- workers (CPI-IW), CPI for Agricultural
20 are shown in Figure. 2.8. Figure 2.9 Labourers (CPI-AL), CPI for Rural Labourers
shows the trends of Onion, Cardamom, (CPI-RL) and CPI for Rural and Urban
Jowar, Turdal and Bajrain Karnataka. (CPI–R& U).The first three indices are
constructed and released by the Labour
2.2.4 Consumer price Index Bureau, Shimla and the fourth by the
Consumer Price Index is a measure of Central Statistical Office (CSO), New Delhi.
change in retail prices of goods and services In Karnataka, the Directorate of Economics
consumed by defined population group in a & Statistics constructs and releases only
given area with reference to a base year. CPI-IW for 11 centres as state series every
month.
Presently the consumer price indices
compiled in India are CPI for Industrial

Figure 2.8 : Average Trend of WPI in Karnataka

Figure 2.9 : The trends of Onion, Cardamom, Jowar, Tur and Bajra in Karnataka
Economic Survey of Karnataka 2019-20 47

Consumer price index is widely considered of these centres based in Karnataka


as a Barometer of inflation, a tool for (Bengaluru, Belagavi, Hubbali-Dharwad,
monitoring price stability. Also the Dearness Madikeri and Mysuru). The base year for
allowance of Government employees and CPI-IW is 2001=100. Base year changing
wage contracts between labour and work is under progress. The trend of all
employer is based on this index. India CPI-IW of 2018-19 and 2019-20 is
shown in Figure 2.10.
2.2.4.1 Consumer Price Index for
Industrial Workers During 2019-20, among 5 centres
(Bengaluru, Belagavi, Madikeri, Hubballi-
The target group of CPI-IW is workers of Dharwad, Mysuru) the index of
factories, mining, plantations, motor Hubballi–Dharwad and Madikeri compared
transport, docks, railways & electricity. This to April 2019 in November 2019 increased
index is mainly used to determine the by 6.75% and 4.58% respectively.
dearness allowance for the employees in
both the public and private sectors. At the During 2019-20, the Index of Hubballi-
National level, CPI (IW) for Central series is Dharwad centre is moved from 326 in April
constructed for 78 selected industrially to 348 in November 2019, from April to
developed centres across the country, with 5 November 8 months' average is 340 points

During 2017-18, 2018-19 and 2019-20, All India level consumer price Index
for industrial workers analysis given below.
r All India level consumer price Index of November 2018 was 302 points,
corresponding period of this year the points moved to 328, annual inflation rate
increased by 8.6%. During 2018-19, index of November 2018 was 302 points,
corresponding period of previous year (November 2017) the index was 288 points,
and annual inflation rate was 4.86%.
r During 2019-20 April-November 8 months average index is 320 points, compared
to corresponding period of the previous year average index was 297 and inflation
rate increased by 7.74%. During 2018-19 April-November 8 months average index
was 297 points, compared to corresponding period of the previous year average
index was 283 and inflation rate increased by 4.95%.

Figure 2.10 : All India Consumer Price Index


48 Economic Survey of Karnataka 2019-20

and compared to corresponding period of November for the year 2017-18, 2018-19 &
the previous year average index is 316, 2019-20 in Karnataka and all India are
showing an increase of 7.59%. presented in Appendex 2.12.
The general index of Madikeri centre is 2.2.4.2 State Consumer price index for
moved from 306 in April to 320 in November Industrial workers
2019, from April to November 8 month's
average is 313 points, compared to In Karnataka, the Directorate of Economics
corresponding period of the previous year & Statics constructs CPI-IW for ll centres
average index is 303, and has increased viz. Ballari, Bhadravathi, Davanagere,
by 3.3%. Dandeli, Kalaburagi, Harihara, Hassan,
Mandya, Mangaluru, Raichur and
The General index details of Hubballi- Tumakuru. The base year for the State
Dharwad and Madikeri centres during series index is 1987-88=100.
2019-20 till November 2019 is depicted in
Figure 2.11. Food index details of Hubballi– During 2019-20, among the 11 State series
Dharwad and Madikeri centres is depicted centres, General index of Harihara and
in Figure 2.11(a). CPI-IW in April and Ballari centres increased by 5.71% and

Figure 2.11 : General Index of Hubballi-Dharwad and Madikeri centres

Figure 2.11(a) : Food Index of Hubballi-Dharwad and Madikeri Centres


Economic Survey of Karnataka 2019-20 49

5.4% respectively. During 2019-20, the 5.4% and from April to November 8 months'
general Index of Harihara centre is average is 856 points showing an increase of
increased from 840 in April to 888 in 7.53% compared to corresponding period of
November 2019 showing an increase of pervious year (796).
5.71% and from April to November 8
Ballari centre Food index increased from
months' average is 865 points showing
987 in April to 1050 in November 2019,
an increase of 8.66% compared to
showing an increase of 6.38% and 8 months
corresponding period of pervious year (796).
average index from April to November (1015
For Harihara centre, the Food index points in 2019) is showing an increase of
increased from 999 in April to 1083 in 7.6%. When compared with the
November 2019, showing an increase of corresponding period of previous year (943
8.4% and 8 months' average index from points in 2018).
April to November (1044 points in 2019) is
General indices of Harihara and Ballari
showing an increase of 11.06% When
centres are illustrated in the Figure 2.12.
compared with the corresponding period of
Similarly the Food Index of Ballari and
previous year (940 points in 2018).
Harihara Centres are depicted in Figure
During 2019-20, the general Index of Ballari 2.12(a). The details of the CPI-IW for all
Centre is increased from 834 in April to 879 India and Karnataka are presented in
in November 2019 showing an increase of Appendix 2.13, 2.13(a) and 2.13(b).

Figure 2.12 : General Index of Ballari and Harihara Centres

Figure 2.12(a) : Food Index of Ballari and Harihara Centres


50 Economic Survey of Karnataka 2019-20

2.2.4.3 Consumer Price Index for General Index during 2019-20 is illustrated
Agricultural Labourers in the Figure 2.13. CPI-AL in April
and November for the years 2017-18, 2018-
Consumer Price Index for Agricultural
19 and 2019-20 are presented in
Labourers (CPI-AL) for 20 States, including
Appendix 2.14. The CPI-AL at all India and
Karnataka, is being constructed every
Karnataka from 2000-01 are given in
month by the Labour Bureau, Shimla based
Appendix 2.15.
on the information obtaining from the Field
Operation Division of National Sample 2.2.5 Price Situation in Rural and Urban
Survey Office. This index is used for fixation Karnataka
and revision of minimum wages in
agriculture sector. The base year for this Directorate of Economics & Statistics,
index is 1986-87=100. Government of Karnataka, collects retail
prices of a basket of essential commodities
The general index of Karnataka is increased from selected centres in rural and urban
by 6.44% in November 2019 over April 2019 areas in order to assess the price situation in
as against an increase in index by 7.3% at all the State. Rural retail prices are collected
India level. every month and urban retail prices are
During 2019-20 (upto November 2019), in collected every week for the construction of
Karnataka, the average general index has monthly Rural Retail Price Index Numbers
increased to 1070 from 1028 during same and Urban Retail Price Index Numbers. For
period of 2018-19, thus showing an increase both these index numbers, the base year is
of 4.08%. At the all India level, the index was 1970=100. These index numbers are based
increased by 6.87%. on un-weighted diagram and focuses on
broad price trends in rural and urban areas,
to guide policy decisions.

Figure 2.13 : Consumer Price Index (Food and General Index) of Agricultural
Laborers
Economic Survey of Karnataka 2019-20 51

(a) Price Situation in Urban Areas Coconut Oil decreased by (-)5.08%. The
price trends of these commodities are
Every week, retail prices of 20 important
graphically illustrated in Figure. 2.14 and
commodities are collected from 20 urban
2.15.
centre's in the State in order to construct
Urban Retail Price Index (URPI). During During 2019-20 (up to November 2018), the
2019-20 the URPI which was 3348 in April average URPI (3582) increased by 6.76%
2019 rose to 3971 in November 2019 over the corresponding period of the
showing an increase of 18.6%. The rise in previous year (3355). Urban Retail Price
index is attributed to the increase in prices Index numbers in Karnataka are presented
of Onion (275 %), Potato (21.7%) and in Appendix 2.17.
Tur dal (16.25%). During this period

Figure 2.14 : The Price trends of Onion, Potato and Turdal

Figure 2.15 : The Price trends of Coconut Oil


52 Economic Survey of Karnataka 2019-20

(b) Price Situation in Rural Areas Onion (194.4%) Turdal (15.8%) Kerosene
(14.2%). The price of Coconut oil is
In State, for the construction of monthly
decreased by 5.2%. Price trends of these
Rural Retail Price Index (RRPI), the retail
commodities are shown in Figure. 2.16 and
prices of 29 essential commodities are
2.17. Upto November 2019, the average
collected from 352 villages every month.
RRPI was 5073 showing an increase of
During 2019-20, the index shows a
0.89% over the corresponding period of the
continuous increase from 4843 in April
previous year (5028). Rural Retail Price
2019 to 5402 in November 2019, thus
Index Numbers in Karnataka are given in
showing an over all increase of 11.54%. This
rise was mainly due to increase in prices of Appendix 2.16.

Figure 2.16 : The Price trends of Onion and Turdal

Figure 2.17 : The Price trends of Coconut oil and Tobacco


FISCAL DEVELOPMENT CHAPTER 3
AND STATE FINANCES

Driven by various fiscal consolidation Resources, Agriculture & Allied Services


measures, Karnataka has managed its and Health sectors are significant
expenditure well even while enhancing its components to the State's development
revenues. The State's fiscal deficit has expenditure.
decreased from 2.85% in 2018-19(RE) to
the level of 2.65% of GSDP in 2019-20(BE), 3.1 FISCAL CONSOLIDATION
while the capital expenditure (outside The State's fiscal consolidation efforts have
revenue account) has increased from continued to be effective with all the fiscal
Rs.35920.93 crore in 2018-19(RE) to indicators contained within the stipulated
Rs.40080.13 crore in 2019-20(BE). This limits of the Karnataka Fiscal Responsibility
indicates that entire borrowings are Act, 2002 (KFRA). The State has chosen on
invested under capital outlay. The State's its own volition to bring in fiscal discipline in
revenue receipts have increased to the management of its finances. The
Rs.181862.96 crore in 2019-20(BE) from Government has been maintaining revenue
Rs.165896.96 crore in 2018-19 (RE). The surplus since 2004-05, as mandated by the
State continues to have an overall revenue KFRA. State has always maintained fiscal
surplus, albeit at reduced levels. In 2019-20 prudence as one of its policy goals. Over the
(BE) development expenditure has last several years, the fiscal deficit could
increased to Rs.165826.18 crore compared also be maintained within 3% of GSDP as
to Rs.154957.43 crore in 2018-19(RE). mandated by the KFRA prompted by the
Nontax-revenues has increased from Government of India. Time trends in fiscal
Rs.7287.08 crore in 2018-19(RE) to and revenue deficits for the period 2014-15
Rs.8055.41 crore in 2019-20(BE). Social to 2019-20(BE) are presented in Figure 3.1.
Security & Social welfare, Education, Water

Figure 3.1: Revenue Deficit and Fiscal Deficit as a % to GSDP


% to GSDP

2018 -19 2019 -20


2014 -15 2015 -16 2016 -17 2017 -18
(RE) (BE)
Fiscal Deficit as a % of
2.86 2.6 2.57 2.37 2.85 2.65
GSDP
Revenue Deficit as a % of
-0.08 -0.24 -0.12 -0.34 -0.01 -0.02
GSDP

Source: Economic Survey 2018-19, Planning Department, GoK and Overview of Budget 2019-20, Finance
Department, GoK.

53
54 Economic Survey of Karnataka 2019-20

3.2 KARNATAKA VIS-A-VIS-OTHER 3.3 STATE FINANCES


STATES The State's fiscal consolidation efforts have
Over the years, the State's major fiscal been largely revenue led owing to the tax
indicators continue to compare well with the reforms and toning up of tax administration
'all states' average. This is reflected in the that have yielded buoyant revenue since
information on various fiscal indicators the enactment of the FRA. The State's
presented in Table 3.1. The State has revenue receipts have increased from
achieved revenue surplus consistently. Rs.104142.15 crore in 2014-15 to
Further, the State has capital outlay of Rs.181862.96 crore in 2019-20(BE) (Table
86.50% in the GFD as compared 110.54% of 3.2).
all States average in 2018-19(BE). The fact
On the expenditure front, capital outlay
that the almost entire fiscal deficit devoted
(outside the revenue account) as percent of
to Capital Expenditure is welcome as it
GSDP has increased from 2.86 % in 2014-15
helps sustain rapid growth. However, the
to 2.93 % in 2019-20(BE). However, this
State has a challenging task of restoring the
poses a great challenge and it is a matter of
surpluses achieved in the recent past to
concern for Karnataka due to the
enable higher infrastructure investments.
infrastructure inadequacies prevailing in
Other important expenditure indicators
the State. In this context, the Expenditure
such as proportion of State Tax Revenue in
Reforms Commission (ERC) constituted by
the Revenue Expenditure and Non-
the Government of Karnataka has
development Expenditure in Aggregate
recommended that capital outlay needs to
Disbursements place Karnataka in a better
be insulated from revenue adversities.
position compare to All States.
A comparative perspective of Karnataka's Revenue Receipts and Composition
fiscal deficit with other Southern states is The composition of revenue receipts during
presented in Figure 3.2. 2014-15 to 2019-20 (BE) accounts for the

Table 3.1: Major Fiscal Indicators of Karnataka


2014-15 2015-16 2016-17 2017-18 2018-19
(Accounts) (Accounts) (Accounts) (RE) (BE)
Fiscal
Indicators A ll A ll All All A ll
KAR KAR KAR KAR
States States States States KAR States

RD /GFD -2.71 13.97 - 9.34 1.28 -4.50 7.58 -1.08 11.87 -0.27 - 6.01

Capital
100.20 83.10 108.03 79.25 98.22 73.40 88.40 91.52 86.50 110.54
Outlay/ GFD

Non-devpt.
Expenditure/
Aggregate 22.50 28.00 22.40 26.70 19.10 26.20 19.60 27.20 21.30 27.70
Disburse-
ment

STR/RE 81.88 56.40 101.53 99.71 67.30 51.90 63.50 49.40 62.50 51.10

RD = Revenue Deficit, GFD = Gross Fiscal Deficit, STR =State Tax Revenue, RE = Revenue Expenditure
Source: Economic Survey 2018-19, Planning Department, GoK and RBI-Study of Budgets, 2017-18 and
2018-19, Statements-1 and 4.
Economic Survey of Karnataka 2019-20 55

Figure 3.2: Karnataka's Fiscal Deficit (as a % of GSDP) Compared with the Southern
States
% to GSDP

2014 -15 2015 -16 2016 -17 2017 -18(RE) 2018 -19(BE)
AP 6.00 3.30 3.70 2.90 2.60
Karnataka 2.86 2.60 2.57 2.70 2.89
Kerala 3.50 3.20 4.30 3.40 3.20
Telangana 1.80 3.30 5.50 3.20 3.50
Tamil Nadu 2.50 2.80 4.30 2.80 2.80

Source: Economic Survey 2017-18, Planning Department, GoK and RBI report on a Study of Budgets,
2017-18 and 2018-19

Table 3.2: Receipts and Expenditure of Karnataka (Rs.crore)


2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Items/ Years
(A/Cs) (A/Cs) (A/Cs) (A/Cs) (RE) (BE)
Revenue 104142.15 118817.31 133213.79 146999.65 165896.96 181862.96
receipts
Revenue
103614.29 117028.58 131920.75 142482.33 165702.89 181604.99
expenditure
Capital 21983.89 21985.42 32378.98 35380.85 43164.58 45696.84
receipts(net)
Capital
22603.25 24206.19 33524.00 39278.14 44330.93 46547.87
Disbursements
Capital outlay
(out side the
revenue 19622.30 20713.03 28150.43 30666.76 35920.93 40080.13
account)
% to GSDP
Revenue
15.20 16.14 11.92 11.09 10.98 11.45
receipts
Revenue
15.12 15.90 11.81 10.75 10.97 11.43
expenditure
Capital
3.21 2.99 2.90 2.67 2.86 2.88
receipts(net)
Capital
3.30 3.29 3.00 2.31 2.38 2.52
Disbursements
Capital outlay
(out side the 2.86 2.81 2.52 3.00 3.15 2.93
revenue
account)
Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Annual Financial Statement 2019-20
(iii) Medium Term Fiscal Plan (2019-23), Finance Department, GoK (iv) Volume I of Budget Documents
2019-20, Finance Department GoK
Note: (a) Capital Receipts (net) does not include (i) Miscellaneous Capital Receipts, (ii) Ways and Means and
Market Borrowings but include Contingency Fund (net) and Public Account (net).
(b) Capital Disbursement does not include Ways and Means and Market Borrowings.
56 Economic Survey of Karnataka 2019-20

State's remarkable performance in its own Liabilities


tax collections (Table 3.3). The State's own The total liabilities of the State Government
tax revenue constitutes the largest share. is increased slightly from Rs.285508.00
There is an increase in the share of central crore in 2018-19(RE) to Rs.327209.00
taxes from 2.14% of GSDP in 2014-15 to crore in 2019-20(BE). The total liabilities are
2.57% of GSDP in 2019-20 (BE). Share of however, within the limit of 25% of GSDP
grants from the central Government has (prescribed by the 13th Finance
increased from 1.09% of GSDP in 2018- Commission) (Figures 3.3 & 3.4).
19(RE) to1.14% of GSDP in 2019-20(BE).
Non-tax revenue is slightly decreased for the
same period and warrants attention.

Table 3.3: Composition of Revenue Receipts (% of GSDP)

2014-15 2015-16 2016-17 2017-18 2018-19 2019-20


Year
(A/Cs) (A/Cs) (A/Cs) (A/Cs) (RE) (BE)

State taxes 10.24 10.2 7 7 .42 7.12 7.57 7.55

Share of central
2.1 4 3.2 6 2 .57 2.42 2.57 2.57
taxes

Grants from
2.1 3 1.8 9 1 .41 1.17 1.09 1.14
centre

Non-Tax
Revenue 0.6 8 0.7 3 0 .52 0.49 0.58 0.52

Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Medium Term Fiscal Plan (2019-23),
Finance Department, GoK

Figure 3.3: Total Liabilities of State Government (Rs.crore)

327209
285508
246232
221320
183320
164279

2014 -15 2015 -16 2016 -17 2017 -18 2018 -19(RE) 2019 -20(BE)

Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Medium Term Fiscal Plan(2019-23),
Finance Department, GoK
Economic Survey of Karnataka 2019-20 57

Figure 3.4: Total Liabilities (as a % to GSDP)

23.98 19.81
% to GSDP

24.91 18.78 20.60


20.28

2014 -15 2015 -16 2016 -17 2017 -18 2018 -19(RE) 2019 -20(BE)

Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Medium Term Fiscal Plan(2019-23),
Finance Department, GoK

3.4 BUDGETARY DEVELOPMENTS IN The overall budgetary position of the State is


2019-20 reflected in Table 3.4.
3.4.1 Highlights Important budgetary indicators for the year
Owing to a recovery in the macro economic 2018-19(RE) and 2019-20(BE) are
situation, the State has been in a presented in Table 3.5. The per capita
position to enhance revenue collection. In State's own tax revenue has increased from
2019-20(BE), Receipts are expected Rs.15611.00 in 2018-19(RE) to
to be Rs.227639.80 crore comprising Rs.17220.00 in 2019-20(BE). Revenue from
Rs.181862.96 crore (79.89%) of revenue State's Own Tax is expected to increase from
receipts and Rs.45776.84 crore (20.10%) of Rs.106312.41crore in 2018-19(RE) to
capital receipts. As compared to 2018- Rs.118992.98 crore in 2019-20(BE),
19(RE), revenue receipts are expected to indicating a growth rate of 11.92%.
increase by 9.62% and capital receipts are On the expenditure front, it is interesting to
expected to increase by 5.87%, resulting in note that development expenditure has an
an overall anticipated increase of 8.85%. increase in per-capita terms implying an
The State budget for 2019-20 (BE) envisages enhanced per-head financial outlay that has
an expenditure of Rs.228152.86 crore accrued to the citizens of Karnataka.
comprising Rs.181604.99 crore (79.59%) of Development expenditure budgeted
revenue expenditure and Rs.46547.87 for 2019-20(BE) is of the order of
crore (20.40%) of capital expenditure. Rs.165826.18 crore against Rs.154957.43
Expenditure during the year 2019-20(BE) is crore in 2018-19 (RE), an increase of 7.01%.
expected to grow by 8.63% over the previous
year, with capital expenditure growing at a 3.4.2 Receipts
rate 5.00% and the revenue expenditure Aggregate receipts are likely to increase
growing at a rate of 9.60%. In addition, the considerably by about Rs.18503.35 crore in
State has managed to maintain a revenue 2019-20(BE) over 2018-19(RE). Revenue
surplus, however, a reduced magnitude. receipts are expected to increase by
58 Economic Survey of Karnataka 2019-20

Table 3.4: Overall Budgetary Position (Rs. crore)


%variation
Receipts and 2017-18 2018-19 2019-20
(2019-20 over
Disbursements (A/C) (RE) (BE)
2018-19)
A. Receipts
1 Revenue Receipts 146999.65 165896.96 181862.96 9.62
2 Capital Receipts 35384.55 43239.58 45776.84 5.87
Total A: (1+2) 182384.20 209136.54 227639.80 8.85
B. Disbursement
1 Revenue Expenditure 142482.33 165702.89 181604.99 9.60
2 Capital Expenditure 39278.14 44330.93 46547.87 5.00
Total B :(1+2) 181760.47 210033.82 228152.86 8.63
A/C: Accounts, R.E.: Revised Estimates, B.E.: Budget Estimates
Note (i) Ways and means and Market Borrowings have not been included in the Capital receipts and expenditure,
Sources: Annual Financial Statement 2019-20 and Volume I of Budget Documents 2019-20 Finance Department, GoK.

Table 3.5: Important Budgetary Indicators Karnataka


2018-19 2019-20
Sl. No. Indicator Unit
(RE) (BE)
1 Aggregate Receipts (Revenue + Capital) Rs. Crore 201936.54 227639.80
2 Revenue Receipts Rs. Crore 165896.96 181862.96
3 State's Own Tax Revenue Rs. Crore 106312.41 118992.98
4 Per Capita State's Own Tax Revenue Rupees 15611.00 17220.00
5 Sales Tax / VAT Collection Rs. Crore 13532.05 15149.00
Share of Sales Tax /VAT in the State's Own
6 % 12.73 12.73
Tax Revenue
Non-Tax Revenue including Grants from the
7 Rs. Crore 23369.25 23063.72
Centre
Share of Non-Tax Revenue in Revenue
8 % 14.09 12.68
Receipts
9 Debt Receipts Rs. Crore 46126.47 48600.79
Share of Debts Receipts in Aggregate
10 % 22.06 21.35
Receipts
11 Per Capita Receipts Rupees 24361.00 26281.00
12 Aggregate Expenditure (Revenue + Capital) Rs. Crore 210033.82 228152.86
13 Developmental Expenditure Rs. Crore 154957.43 165826.18
14 Per Capita Development Expenditure Rupees 22754.00 23963.00
Share of Developmental Expenditure in Total
15 % 73.78 72.68
Expenditure

R.E.: Revised Estimates, B.E.: Budget Estimates,


Per capita are calculated on projected population of 2018 and 2019,
Source: Annual Financial Statement 2019-20, Finance Department, GoK
Economic Survey of Karnataka 2019-20 59

Rs.15966.01 crore and capital receipts are 2018-19(RE). The share of State's own tax
expected to increase by Rs.2537.34 crore. revenue in the total revenue receipts is of the
Revenue receipts account for 79.89% of order 65.43% in 2019-20(BE).
aggregate receipts. Details of revenue and
a) Tax Revenues: Karnataka's Tax to
capital receipts are presented in Table 3.6.
GSDP ratio (tax effort), has been good
3.4.2.1 Revenue Receipts and compares well with other Indian
States. The State's own tax revenues
Revenue receipts comprise of four major
(SOTR) increased from Rs.70180.00
components viz. own tax revenue, nontax
crore in 2014-15 to Rs.118993.00 crore
revenue, devolution from GoI and GIA &
during 2019-20(BE) (Figure 3.5). The
contributions. The State's own tax revenue
tax effort has been declining in recent
in 2019-20(BE) is anticipated to increase
years (Figure 3.6).
11.93% and non tax revenue10.54% over

Figure 3.5: State's Own Tax Revenue (Rs.crore)

118993
106312
93376
82211
70180 75566

2015 -16 2016 -17 2017 -18 2018 -19(RE) 2019 -20(BE)
2014 -15

Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Medium Term Fiscal Plan (2019-23),
Finance Department, GoK

Figure 3.6: Tax Effort (Tax/GSDP)

10.27
10.24
7.42 7.55
7.12
% to GSDP

7.49

2014 -15 2015 -16 2016 -17 2017 -18 2018 -19(RE) 2019 -20(BE)

Source: (i) Economic Survey 2018-19, Planning Department, GoK (ii) Medium Term Fiscal Plan (2019-23),
Finance Department, GoK
60 Economic Survey of Karnataka 2019-20

Table 3.6: Revenue and Capital Receipts, Karnataka 2017-18 to 2019-20 (Rs.crore)

%
Variation
Category of Receipts 2017-18 2018-19 2019-20 2019-20 2017-18 2018-19 2019-20
(A\Cs) (RE) (BE) (A\Cs) (RE) (BE)
over
2018-19

I. Revenue Receipts % to total R evenue Receipts

A. State's Tax Revenue(1+2+3) 125 128.32 142527.70 158799.24 11.42 85.12 85.91 87.32

Taxes on Income and


1. Expendit ure 979.09 938.00 900.0 0 -4.05 0.67 0.57 0.4 9

Taxes on Propert y & Capital


2. 92397.25 105374.41 118092.98 12.07 62.86 63.52 64.94
Transactions of which

(a) Sales Tax / VAT 25093.16 13532.05 15149.00 11.95 17.07 8.16 8.3 3

(b) Taxes on v ehicles 62 08.57 665 6.42 7100.00 6.66 4.22 4.01 3.9 0

(c) State Excise 17948.51 19750.00 20950.00 6.08 12.21 11.90 11.52

(d) Taxes on Goods &


12 79.12 0.87 0.00 0.0 0
Pass engers

(e) GST Compensation 62 46.00 10800.00 17249.00 59.71 4.25 6.51 9.4 8

(f) Goods and Service Tax 24182.18 41649.95 42748.00 2.64 16.45 25.11 23.51

(g) Others 11439.71 12985.99 14896.98 14.72 7.78 7.83 8.1 9

State's Own Tax


Revenue(1+2) 93376.34 106312.41 118992.98 11.93 63.52 64.08 65.43

3. Tax Devolution from Centre 31751.98 36215.29 39806.26 9.92 21.60 21.83 21.89

B. Non-t ax Revenues 64 76.53 728 7.08 8055.41 10.54 4.41 4.39 4.4 3

Grant s - in - aid from


C. 15394.78 16082.17 15008.31 -6.68 10.47 9.69 8.2 5
Central Government

Total I: R evenue Receipts 146999.63 165896.95 181862.96 9.62 100 100 100
(A+B+C)
Economic Survey of Karnataka 2019-20 61

Table 3.6: Revenue and Capital Receipts, Karnataka 2017-18 to 2019-20 (Rs.crore)

%
Category of Receipts 2017-18 2018-19 Variation 2017-18 2018-19
2019-20 2019-20
2019-20
(BE) (BE)
(A\Cs) (RE) over (A\Cs) (RE)
2018-19

II. Capital Receipts % to total Capital Receipts

(i) Loans from Gov t. of India 1943.25 1195.47 1473.79 23.28 5.49 2.76 3.2 2

Internal Debt (Net of W &


(ii) 18428.61 37 513.83 41127 9.63 52.08 86.76 89.84
M&MB)

(iii) Public A/c (Ne t) 14872.06 4326.18 2901.47 -32.93 42.03 10.01 6.3 4

Recovery of Loans &


(iv) 136.93 129.1 194.66 50.78 0.39 0.30 0.4 3
Adv ances

(v) Contingency F und (Net) 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0

(v i) Misc. Capital Receipts 3.70 75.00 80.00 6.67 0.01 0.17 0.1 7

Total II: Capital Receipts


35384.55 43239.58 45776.92 5.87 100.00 100.00 100.00
(i) to (vi)

AGGREGATE RECEIPTS:
182384.18 209136.53 227639.88 8.85
I+II

CONSOLIDATED FUND OF
172262.14 212227.52 230738.42 8.72
RECEIPTS

Tot al Tax Revenue as per


68.61 68.15 69.76
cent of Aggregate Rec eipts

A/C: Accounts, RE: Revised Estimates. BE: Budget Estimates, W & M = Ways & Means, MB =Market
Borrowings

Composition of the revenue receipts, as b) The State's Share in Central Taxes:


described earlier, reveals that the State's The State's share in central taxes is
own tax revenue has performed very well anticipated to increase by Rs.3590.97
during the period under reference. Tax crore i.e. by 9.92% in 2019-20(BE) over
revenue mainly includes taxes on income & 2018-19(RE).
expenditure, entry tax, property and capital
transactions, VAT, sale of goods, c) Non - tax Revenues: Non-tax revenue
commodities & services, State excise, motor includes receipts from social, economic
vehicle taxes and the State's share in central and general services, interest and
taxes. The budgeted tax revenue is dividends. The budget for 2019-20(BE)
anticipated at Rs.158799.24 crore in which has revenue from the above three
2019-20(BE) as against Rs.142527.70 crore services is Rs.8055.41 crore as against
in 2018-19(RE). Goods and Service Tax is Rs.7287.08 crore in 2018-19(RE). This
the main source of tax revenue comprising is an important fiscal challenge faced by
about 35.92% of State's own tax revenue in the State which warrants necessary
2019-20(BE). GST Compensation is measures to recover user charges at
expected to increase by 59.71% in 2019- optimal levels. The ratio of non-tax
20(BE) over 2018-19(RE). revenue to total receipts has been
62 Economic Survey of Karnataka 2019-20

continuously very low over the years. 3.4.2.2 Capital Receipts


Further, the State has one of the lowest
Capital receipts include loans from
non-tax revenues to the GSDP ratios in
Government of India, internal debt
the country. It is around 1% mark for
(excluding ways & means, market loans),
the last five to six years. This is due to
public account(net), recoveries of loans &
low recovery of costs. In many
advances and contingency funds(net),
departments, the revision of user
miscellaneous Capital Receipts. Capital
charges, fees & fines and other such
receipts of Rs.45776.92 crore in 2019-
non-tax receipts have not taken place
20(BE) accounts for an increase of 5.87 %
for many years. Even with revision of
over 2018-19(RE) level. Loans from
rates and better collection mechanisms,
the Government of India accounts for
the increase in revenues from this
Rs. 1473.79 crore i.e. 3.22% of the capital
avenue may not be large due to existing
receipts with a growth rate of 23.28% over
low base. Expenditure Reform
2018-19(RE).
Commission has made a number of
recommendations to enhance revenues 3.4.3 Expenditure
from user charges.
Expenditure indicators (Table 3.7) reveal
d) Grants from Government of India that the State's total expenditure under
(excluding GST Compensation) Consolidated Fund has increased from
Slightly decreased from Rs.16082.17 Rs.128624.97 crore in 2014-15 to
crore in 2018-19(RE) to Rs.15008.31 Rs.234152.96 crore in 2019-20(BE). The
crore in 2019-20(BE) (about 6.68%). developmental expenditure has increased

Table 3.7: Expenditure Indicators in Karnataka (Rs. crore)


2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Particulars
(A/Cs) (A/Cs) (A/Cs) (A/Cs) (R E) (BE)
Revenue Receipts 104142.15 118817.31 133213.79 146999.65 165896.96 181862.96
Revenue Expenditure
103614.29 117028.58 131920.75 142482.33 165702.89 181604.99
(RE)
Development
88904.72 100440.70 123989.37 136285.14 154957.43 165826.19
Expenditure
Social Ser vices 43916.88 51948.07 63119.75 68506.90 80006.13 85726.41
Economic Services 44987.85 48492.63 60869.62 67778.24 74951.29 80099.77
General Services 28883.73 31790.69 32324.94 35461.89 45379.54 51482.48

Interest Payments 9403.98 10746.37 12033.00 13930.00 15596.00 19060.00


Wage Bill 19737.00 20475.00 21489.00 22818.00 31344.00 32988.00
Pensions 10118.00 11250.80 11295.00 11684.00 17503.00 19236.00

Capital
Expenditure(CE)
19622.30 20713.03 28150.43 30666.76 35920.93 40080.13
(outside the revenue
account)

Total Expenditure
123236.59 137741.61 160071.18 173149.09 201623.82 221685.12
(RE+CE)
Outstanding Debt 158553.00 175623.00 211071.00 233058.00 269799.00 308820.00
Total Consolidated
128624.97 142508.21 169425.80 186510.47 217450.99 234152.96
Fund

Source: Economic Survey 2018-19, Planning Department, GoK and Annual Financial Statement 2019-20,
Volume1 of 2019-20 Budget Documents, Finance Department, GoK
Economic Survey of Karnataka 2019-20 63

from Rs.88904.72 crore in 2014-15 to priorities of the Government by its various


Rs.165826.19 crore in 2019-20 (BE) while functions performed. The trends and
the Capital Expenditure (outside the composition of the functional categories of
revenue account) has increased from expenditure from 2014-15 reveal that the
Rs.19622.30 crore in 2014-15 to focus on social services covering the sectors
Rs.40080.13 crore in 2019-20 (BE). The such as education, health, housing, water
Outstanding Debt as a % GSDP has supply etc., has significantly increased from
significantly decreased from 23.14% in Rs.43916.88 crore in 2014-15 to
2014-15 to 19.44% in 2019-20(BE), Rs.85726.41 crore in 2019-20(BE). The
similarly the share of interest payments in expenditure on economic services has
GSDP has declined from 1.37 % to 1.20% for increased from Rs.44987.85 crore to
the same reference period (Table 3.8). Rs.80099.77 crore, Similarly the general
services has increased from Rs.28883.73
3.4.3.1 Functional Categories of crore to Rs.51482.48 crore during the same
Expenditure reference period. The increase in economic,
Services provided by the Government are social and general services is a welcome
categorized broadly under three functional development given the human development
categories-General, Social & Community and infrastructure concerns of the State.
and Economic services and reflect the

Table 3.8: Expenditure Indicators in Karnataka (% of GSDP)


2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Particulars
(A/Cs) (A/Cs) (A/Cs) (A/Cs) (RE) (BE)
Revenue Receipts 15.20 16.14 11.92 11.09 10.98 11.45

Revenue Expenditure
15.12 15.90 11.81 10.75 10.97 11.43
(RE)
Development
12.97 13.65 11.10 10.28 10.26 10.44
Expenditure
Social Services 6.41 7.06 5.65 5.17 5.30 5.40

Economic Services 6.57 6.59 5.45 5.11 4.96 5.04

General Services 4.22 4.32 2.89 2.68 3.00 3.24

Interest Payments 1.37 1.46 1.08 1.05 1.03 1.20

Wage Bill 2.88 2.78 1.92 1.72 2.08 2.08

Pensions 1.48 1.53 1.01 0.88 1.16 1.21

Capital Expenditure(CE)
(outside the revenue 2.86 2.81 2.52 2.31 2.38 2.52
account)

Total Expenditure
17.98 18.71 14.33 13.06 13.35 13.95
(RE+CE)

Outstanding Debt 23.14 23.86 18.89 17.58 17.86 19.44

Total Consolidated
18.77 19.36 15.16 14.07 14.40 14.74
Fund

Source: Economic Survey 2018-19, Planning Department, GoK and Annual Financial Statement 2019-20
Volume1 of 2019-20 Budget Documents, Finance Department, GoK, Medium Term Fiscal Plan(2019-23),
Finance Department, GoK.
64 Economic Survey of Karnataka 2019-20

3.4.3.2 Development Expenditure: An average of Rs.14181, Rs.15687 and


Inter-State Comparison Rs.17171. Karnataka has one of the highest
level of per capita development expenditure
The State has a larger size of per capita during the last three years compared to
development expenditure as compared to major States and All States Average, as can
the National average and that of many other
be seen in Table 3.9.
States. Development expenditure comprises
of spending incurred by the Government on 3.4.3.3 Expenditure Highlights: 2019-20
programs relating to the social and Sector wise break-up of development and
economic services which in turn, contribute non-development expenditures are
to the social and economic development of presented in Table 3.10 and the
the State. The per capita development corresponding revenue, capital and loan
expenditure in Karnataka during 2016- accounts are given in Appendix 3.4. The
17(A/Cs), 2017-18(RE) and 2018-19(BE) broad trends in development and non
was Rs.18864, Rs.20578 and Rs.23179 development expenditure are depicted in
respectively as compared to all State's
Figure 3.7.

Table 3.9: Per- Capita Development Expenditure in Selected States (Rupees)

2016-17 2017-18 2018-19


State
(A/Cs) (RE) (BE)

Andhra Pradesh 18984 21213 26106

Assam 11116 18880 18011

Bihar 7699 10253 10623

Gujarat 13665 16374 16900

Karnataka 18864 20578 23179

Kerala 16281 17185 19603

Madhya Pradesh 14637 14797 17035

Maharashtra 13596 16876 17662

Orissa 14720 17360 19146

Punjab 24162 13616 17035

Rajasthan 15538 17248 18339

Tamilnadu 17438 16208 17511

Telengana 24083 26797 34123

Total: All States 14181 15687 17171

Note: Per- capita development expenditure is calculated using the projected population of 2016,
2017 and 2018.
Source: RBI-A Study of Budget 2017-18 and 2018-19, Statement 11.
Economic Survey of Karnataka 2019-20 65

Figure 3.7: Development and Non Development Expenditure (as a % GSDP)


% to GSDP

2018 -19 2019 -20


2014 -15 2015 -16 2016 -17 2017 -18
(RE) (BE)
Development Exp 12.97 13.64 11.09 10.28 10.26 10.44
Non-Development Exp 5.45 5.54 3.71 3.79 4.13 4.30

Source: Economic Survey 2018-19, Planning Department, GoK and Annual Financial Statement 2019-20,
Volume I of Budget Documents 2019-20, Finance Department, GoK, Medium Term Fiscal Plan (2019-23),
Finance Department, GoK.

Table 3.10: Trends in Key Expenditure Components (Rs. crore)

Percent
Variation
2017-18 2018-19 2019-20
Category of Expenditure %* %* %* (2019-20
(A/Cs) (RE) (BE)
over
2018-19)

I D evelopmental Expenditure

Economic Services of
A 67778.24 49.73 74951.29 48.37 80099.77 48.30 6.87
which

Agriculture & Allied


1 19185.92 14.08 22622.15 14.60 24179.64 14.58 6.88
Services

2 Rural Development 5209.49 3.82 6917.80 4.46 7776.21 4.69 12.41

General Economic
3 5476.17 4.02 3923.33 2.53 3520.19 2.12 -10.28
Services

Water & Power


4 22479.83 16.49 25110.56 16.20 28902.73 17.43 15.10
Development

5 Industry and Minerals 2476.60 1.82 2881.63 1.86 2863.12 1.73 -0.64

Transport and
6 12348.04 9.06 13096.80 8.45 12479.10 7.53 -4.72
Communication

7 Others 602.19 0.44 399.02 0.26 378.78 0.23 -5.07

Social Services of
B 68506.89 50.27 80006.14 51.63 85726.41 51.70 7.15
which
66 Economic Survey of Karnataka 2019-20

Percent
Variation
Category
Table of
3.10: Trends 2017-18
in Key Expenditure 2018-19
Components 2019-20
%* %* %* (Rs. crore)
(2019-20
Expenditure (A/Cs) (R E) (BE)
over
2018-19)

Education,
8 Sports, Art and 22449.92 16.47 26276.45 16.96 27942.93 16.85 6.34
Culture
Medical &
Public Health,
9 Family Welfare, 13757.97 10.09 14923.84 9.63 15714.39 9.48 5.30
Water supply &
Sanitation
Social Security
& Welfare
10 17872.19 13.11 26303.09 16.97 28130.33 16.96 6.95
Including SC &
ST Welfare
Housing and
11 U rban 10364.67 7.61 8437.63 5.45 10054.29 6.06 19.16
Development
Information and
12 388.48 0.29 225.27 0.15 159.46 0.10 -29.21
Publicity

13 Others 3673.66 2.70 3839.86 2.48 3725.01 2.25 -2.99


Total
D evelopment 136285.13 100.00 154957.43 100.00 165826.18 100.00 7.01
Expd. (A+B)

II Non-Developmental Expenditure

Revenue
Expenditure
(a) 34484.43 68.72 44511.07 71.31 50491.62 73.96 13.44
under General
services
Organs of the
(i) 1150.81 2.29 2151.94 3.45 1825.57 2.67 -15.17
State
(ii) Fiscal Services 1170.19 2.33 1305.17 2.09 1645.55 2.41 26.08
Interest
payment &
(iii) 13929.58 27.76 15945.98 25.55 19410.31 28.43 21.73
servicing of
debts
Administrative
(iv) 6416.57 12.79 7470.10 11.97 8239.21 12.07 10.30
Services
Pension &
Miscellaneous
(v) 11817.28 23.55 17637.88 28.26 19370.98 28.38 9.83
General
Services
Compensation
& Assignment
(b) 6489.76 12.93 5911.73 9.47 6856.16 10.04 15.98
to Local Bodies
and PRIs
Capital
(c) 9203.63 18.34 11996.60 19.22 10918.99 15.99 -8.98
Expenditure
General
(i) 977.45 1.95 868.47 1.39 990.87 1.45 14.09
Services
Discharge of
(ii) Internal 7039.49 14.03 9667.24 15.49 8386.45 12.28 -13.25
Debt (Net)
Economic Survey of Karnataka 2019-20 67

Table 3.10: Trends in Key Expenditure Components (Rs. crore)

Percent
Variation
2017-18 2018-19 2019-20
Category of Expenditure %* %* %* (2019-20
(A/Cs) (RE) (BE)
over
2018-19)

Loans & Advances to


(iv) 4.52 0.01 19.60 0.03 23.76 0.03 21.22
Govt. Servants

Total non-
developm ent 50177.82 100.00 62419.40 100.00 68266.77 100.00 9.37
Expenditure
Aggregate
Expenditure 186462.95 217376.83 234092. 95 7.69
I + II
Developmental Exp as
73.09 71.29 70.84
% of total Exp

Per Capita
Development 20314.99 22741.37 23960.21 5.36
Expenditure(Rs)

II I. Ways &Means
47.50 74.17 60.00 -19.10
&Market Borrow ings

Consolidated Fund 186510.45 217451.00 234152. 95 7.68

R.E: Revised Estimates, B.E.: Budget Estimates


Note: Per capita is based on the projected population of 2017, 2018 and 2019
* Figures under developmental expenditure are percentages to the total developmental expenditure and
figures under non-developmental expenditure are percentages to the total non-developmental expenditure
Source: Annual Financial Statement 2019-20, Finance Department, GoK (ii) Volume I of Budget Documents
2019-20, Finance Department GoK

The share of developmental expenditure in 21.73%, Loans & Advances to Govt.


the total expenditure is 71.29% in 2018- servants increased by 21.22% etc.
19(RE) and is slightly decreased to 70.84%
in 2019-20(BE).The expenditure on social 3.4.3.4 Central Grants
services is anticipated to increase by 7.15% The three broad areas of Central Grants are:
from 2018-19(RE) to 2019-20(BE). (i) Grants for Centrally Sponsored Schemes
Expenditure on economic services is (ii) Finance Commission Grants (iii) Other
expected to increase by 6.87% for the same Transfers/Grants to State Legislatures. The
reference period. In 2019-20(BE), Water & details of Central Grants are presented in
Power development followed by Agriculture Table 3.11. (i) Grants for Centrally
and allied services have large share in the Sponsored Schemes (CSS) includes Grants
Economic Services, while in social services, for Externally Aided Projects/ Central Share
Social Security and welfare followed by of CSS /Grants under Article 275(1) of the
Education sector gets the largest share. constitution/Grants for Central Road Fund.
The non-development expenditure is (ii) Finance Commission Grants includes
expected to increase by 9.37% in 2019- Grants for Rural Local Bodies/Urban Local
20(BE) when compared to 2018-19(RE). Bodies/State Disaster Response Fund.
Expenditure under Fiscal Services
(iii) Other Transfers/Grants to State
increased by 26.08% followed by interest
Legislatures includes Contribution to
payment and servicing of debt increased by
68 Economic Survey of Karnataka 2019-20

Table 3.11: Details of Central Receipts, Karnataka (Rs. crore)

Sl. 2017-18 2018-19 2019-20


Items
No. (A/Cs) (RE) (BE)

1 1617.25 11857.86 1 0099.76


1 Centrally Sponsored Schemes
(7.90% ) (7 .15% ) (5.55% )

2 Finance Commi ssion Grants 2708.18 3 699.0 9 4908.55

Other Transfers/Grants to States with


3 7315.35 11325.22 1 7249.00
Legisl atures

21640.78 26882.17 32257.31


Total Central Receipts (1+2+3)
(14.72%) (16.20%) (17.74%)

4 Revenue Receipts 1 46999.65 165896.96 1 81862.96

The figures in bracket indicates % to revenue receipts


Sources: Details of Estimates of Revenue and Other Receipts 2019-20, Finance Department, GoK

National Disaster Response Fund/GST 3.4.3.5 Committed Expenditure


Compensation/VAT Compensation, The Committed expenditure on salaries, pens-
VAT Compensation was there only in ions, interest, subsidies, administrative
2017-18. expenditure, devolution to PRIs and ULBs,
The growth rate in revenue receipts in 2019- etc constitute about 84% of the total
20(BE) over 2018-19(RE) is 9.62%, whereas uncommitted revenue receipts i.e. total
the growth rate in total central receipts is revenue receipts less tied grants from
19.99% for the same reference period. Government of India, during the year
Similarly, the Central Receipts as a percent 2018-19(RE) (Figure 3.9). The graph below
of Revenue Receipts is increased from traces the trends in the share of committed
16.20% in 2018-19(RE) to 17.74% in 2019- expenditure to the uncommitted receipts. As
20(BE). is evident from the graph, approximately
84% of uncommitted revenue receipts in
Trends in the share of plan and non-plan 2018-19(RE) are committed. Hence, only
expenditure in the GSDP during 2012-13 to 16% of uncommitted revenue receipts were
2016-17 are presented in Figure 3.8. available for new initiatives and existing
Restricting the non-plan expenditure has capital expenditure commitment of the
been possible due to the austerity measures Government. With such limited fiscal space
adopted by the Government from time to available for manoeuvrability, containing
time such as restrictions on fresh the committed expenditure which is largely
recruitment, vehicle purchases, foreign revenue in nature vice-a-versa capital
tours and training, holding Government expenditure would be one of the key
functions in star hotels and total ban on challenges currently faced by the state.
travel in business class in flights. However,
the State government still has a fairly large 3.4.3.6 Economic Classification of
amount of expenditure locked up under Expenditure
“committed expenditure” category Under the guidelines from the Central
discussed below. Statistical Organization, the Directorate of
Economic Survey of Karnataka 2019-20 69

Figure 3.8: Plan and Non Plan Expenditure (as a Percent of GSDP)

2012 -13 2013 -14 2014 -15 2015 -16 2016 -17
Plan Expenditure 9.71 7.98 9.03 9.65 7.83
Nonplan Expenditure 11.81 10.40 10.23 10.53 7.55

Source: Economic Survey 2017-18, Planning Department, GoK, (ii) Overview of Budget 2018-19(July),
Finance Department, GoK (iii) Medium Term Fiscal Plan (2018-22) July, Finance Department, GoK.

Figure 3.9: Committed Expenditure as % of Uncommitted Revenue Receipts

86

83 84
percentage

79
81 77

2014 -15 2015 -16 2016 -17 2017 -18 2018 -19(BE) 2018 -19(RE)

Source: Economic Survey 2018-19, Planning Department, GoK, (ii) Medium Term Fiscal Plan (2019-23),
Finance Department, GoK.

Economics and Statistics classifies A summary of the total expenditure by


Government expenditure by economic economic classification for 2019-20(BE) in
categories in the annual budget. This is comparison with the preceding two years is
useful for analyzing the economic presented in Table 3.12. In 2019-20(BE), in
significance of the budgetary transactions of the final outlays, the Government's
the State Government. It throws light on the consumption is anticipated to increase by
extent of capital formation out of budgetary 3.85% over 2018-19(RE). The capital
resources, savings of the Government, formation has increased by 4.10%.
drawals of the Government on various Consumption expenditure forms 20.97% of
resources of the State's economy and the total expenditure during the current
contribution of the Government to State year. Transfer payments to the rest of the
income. economy are anticipated to go up by 15.27%
70 Economic Survey of Karnataka 2019-20

Table 3.12 : Economic Classification of Expenditure of


Karnataka State Budget 2019-20 (Rs.crore)
Percent
Variation
Sl. 2017-18 2018-19 2019-20
Description (2019-20
N o. (A/C) (RE) (BE)
over
2018-19)

1 Final Outlays 70092.49 78091.02 81181.83 3.96

Gove rnment consump tion


(a) 3813 5.73 4 5160 .02 4 6900 .83 3.85
Expenditure

(b) Gross C apital Formation 3187 2.64 3 3007 .42 3 4361 .93 4.10

(c) Acquis ition of Fixed As sets 84 .12 -76 .42 -80 .93 5.90

Transfer Pay ments to the Rest


2 88573.43 107814.71 124279.35 15.27
of the Economy

(a) Curre nt Transfers * 8698 3.43 10 6508 .62 12 2924 .76 15.41

(b) Capital Transfers 159 0.00 1306 .09 1354 .59 3.71

Financial Investments and


3 Lo ans to the res t o f the 16111.16 18103.34 18231.17 0.71
Economy

Total Expenditure (1+2+3) 174777.08 204009.07 223692.35 9.65

* Includes interest and subsidy also R.E.: Revised Estimates, B.E.: Budget Estimates
Source: An Economic-cum-Purpose Classification of the Karnataka Government Budget 2019-20
Directorate of Economics and Statistics, GoK.

during the current year. The share of departmental commercial undertakings and
transfer payments to the rest of the economy Rs. 31212.25 crore by the Government.
in total expenditure is 55.56%. Within
transfer payments, current transfers, which 3.6 INVESTMENT UNDER PLAN: STATE
include interest and subsidies, are a major BUDGETARY SUPPORT (SBS) FOR PLAN
component (98.91%). Financial investments Karnataka's Plan SBS has increased from
and loans to the rest of the economy that Rs.34201.00 crore to Rs.76779.18 crore
amounted to Rs.18103.34 crore in 2018- during the period 2012-13 to 2016-17
19(RE) has increased to 18231.17 crore in (Figure 3.10). The SBS for Plan as a
2019-20(BE)(an increase of 0.71%). percentage of the budget increased from
35.40% to 45.31% during the same period
3.5 CAPITAL FORMATION BY (Figure3.11). Relative to the GSDP, the
GOVERNMENT SBS for plan as a % GSDP has increased
Details of capital formation by the from 6.53% to 6.87% for the same reference
Government are presented in Table 3.13. period (Figure 3.12).
Gross capital formation by the Government
is expected to increase by 4.10% in 2019- a) Resources of the Budget (2017-18
20(BE) compared to 2018-19(RE). The value to 2019-20)
of assets anticipated to be created in 2019- The State's Budget has been growing
20(BE) is Rs. 34361.93 crore of which significantly. The budget size has been
Rs.3149.68 crore will be created by increased from 217450.99 crore in
Economic Survey of Karnataka 2019-20 71

Table 3.13: Capital Formation by the Government of Karnataka 2019-20 (Rs.crore)

Percent
Sl. 2017-18 2018-19 2019-20 Variation
Description
No. (A/C) (RE) (BE) (2019-20 over
2018-19)

Value of Assets
1 31872.68 33007.42 34361.93 4.10
Created

By Departmental
(a) Commercial 3823.03 3598.11 3149.68 -12.46
Undertakings

By Government
(b) 28049.65 29409.31 31212.25 6.13
Administration

Change in Stock in
2 -0.04 -- -- --
(a)&(b) above

Total: Gross Capital


31872.64 33007.42 34361.93 4.10
Formation

Source: An Economic-cum-Purpose Classification of the Karnataka Government Budget 2019-20, Directorate


of Economics and Statistics, Government of Karnataka.

Figure 3.10: State Budgetary Support for Plan (Rs.crore)

76779.18

60028.67
52551.39
39982.00
34201.00

2012 -13 2013 -14 2014 -15 2015 -16 2016 -17

Source: (i) Economic Survey 2017-18,Planning Department, GoK (ii) Budget Documents 2018-19(July)
Finance Department, GoK
72 Economic Survey of Karnataka 2019-20

Figure 3.11: Share of SBS of Plan in the Budget

45.31

40.86 42.12

35.40 36.13

2012 -13 2013 -14 2014 -15 2015 -16 2016 -17

Source: (i) Economic Survey 2017-18,Planning Department, GoK (ii) Budget Documents 2018-19(July),
Finance Department, GoK

Figure 3.12: Share of SBS of Plan to GSDP

8.16
7.67 6.87
6.53 6.65

2012 -13 2013 -14 2014 -15 2015 -16 2016 -17

Source: (i) Economic Survey 2017-18,Planning Department, GoK (ii) Budget Documents 2018-19(July)
Finance Department, GoK (iii) Medium Term Fiscal Plan(2018-22)July, Finance Department, GoK
Economic Survey of Karnataka 2019-20 73

2018-19(RE) to 234152.96 crore in 2019-20 Social and Economic Services. It is desirable


(BE), an increase of 7.68%. The State's own that the outlays should be enhanced for
Resources have increased at the rate of social and economic services, as they have a
9.49% and borrowings also got increased at direct impact on the socio-economic
the rate of 5.36% for the same reference indicators. The higher investment in socio-
period (Tables 3.14 and 3.15). economic sectors is expected to improve the
b) Inter-sectoral Outlays of the Budget overall development indicators of the State.
(2017-18 to 2019-20) Sectoral breakup of outlays and expenditure
by major sectors for the last three years is
The expenditure priorities of the State can presented in Table 3.16.
be evaluated by the outlays on General,

Table 3.14: Financial Resources of the Budget: 2017-18 to 2019-20 (Rs.crore)

Sl. No. Items 2017-18 (A/Cs) 2018-19 (RE) 2019-20 (BE)

147063.17 155767.57 170543.86


1 State Own Resources
(78.85) ( 71.63) (72.83)

2 State Borrowings 25121.87 46126.47 48600.79


(13.47) ( 21.21) (20.76)

14325.43 15556.95 15008.31


3 Central Assistance*
( 7.68) (7.15) (6.41)

Total 186510.47 217450.99 234152.96

Source: Budget Documents 2019-20, Finance Department, GoK.


Note: Figures in bracket indicate % to total.
* Includes grants under CSS and Finance Commission Grants only.

Table 3.15: Scheme of Financing of the Budget: 2017-18 to 2019-20 (Rs.crore)

S l. 2 0 17 -18 2 0 18 -19 2 01 9-2 0


S ectors
N o. (A/C s) ( RE ) (BE )

A. S tate Own R es ources

1 O wn Tax Re venue 93 376.0 0 10 6312 .00 118 993.0 0

2 N o nTax Re venue 6 477.0 0 7287 .00 8 055.0 0

3 De vol utio n fro m C en tre 31 752.0 0 3 6215 .00 39 806.0 0

4 N o npl an Gran ts 1 069.5 7 525 .05

5 M iscell an eo us Capital Rece ipts 3.70 75.0 0 80.00

Am oun t spen t in ex cess of


6 14 248.3 3 5223 .46 3 414.5 4
C o nso lidated F und of Receip ts

7 Lo an s & Advan ces 136.9 3 129 .10 194.6 7

R oun ding o ff e rro r s w hile


8 -0.3 6 0.9 6 0.65
c on ve rti ng lakhs to c ro res

To tal State O wn R esou rces


14 70 6 3. 17 15 5 76 7 .57 1 7 05 4 3. 86
( 1 to 8 )
74 Economic Survey of Karnataka 2019-20

Table 3.15: Scheme of Financing of the Budget: 2017-18 to 2019-20 (Rs.crore)

Sl. 2017-18 2018-19 2019-20


Sectors
No. (A/Cs) (RE) (BE)

B. Borrowings

9 Market Borrowings 22098.00 43731.00 46127.00

10 Negotiated Loans 1080.62 1200.00 1000.00

11 Loans for EAPs 1943.25 1195.47 1473.79

Total Borrowings (9 to 11) 25121.87 46126.47 48600.79

C. Central Grants 14325.43 15556.95 15008.31

Total Budget (A+B+C) 186510.47 217450.99 234152.96

Source: Budget Documents 2019-20 Finance Department, GoK

Table 3.16: Developmental Outlays by Major Sectors (Rs. crore)

% change in
2017-18 2018-19 2019-20
State Budget 2019-20
(A/Cs) (RE) (BE)
over 2018-19

1 2 3 4 5

I. Economic Services

Agriculture & Allied


1 Activities 15780.25 19752.38 24169.64 22.36
(Including Co-operation)

2 Rural Development 5209.49 6917.80 7776.21 12.41

3 Special Area Programme 506.38 306.48 303.73 -0.90

4 Irrigation and Flood Control 13064.27 15040.50 16633.13 10.59

5 Energy 9402.61 10070.06 12269.60 21.84

6 Industry and Minerals 1987.31 2455.27 2461.12 0.24

7 Transport 12348.04 13096.80 12479.09 -4.72

Science, Technology &


8 95.81 92.54 75.05 -18.90
Environment

9 General Economic Services 5474.17 3922.83 3519.70 -10.28


Total - I: Economic
63868.33 71654.66 79687.27 11.21
Services
Economic Survey of Karnataka 2019-20 75

Table 3.16: Developmental Outlays by Major Sectors (Rs. crore)

% change in
2017-18 2018-19 2019-20
State Budget 2019-20
(A/Cs) (RE) (BE)
over 2018-19

1 2 3 4 5

II. Social Services

Education, Sports, Art &


10 22449.93 26276.45 27942.93 6.34
Culture

11 Health 8116.94 9856.28 9693.12 -1.66

12 Water Supply, Housing and Urban Development

12a (a) Water Supply 5299.52 4717.56 4864.27 3.11

12b (b) Housing 4431.71 3190.65 2780.79 -12.85

12c (c) Urban Development 5106.69 4273.74 6368.28 49.01

13 Information and Publicity 388.48 225.27 159.46 -29.21

Welfare of SCs, STs, OBCs


14 11539.40 11541.17 11114.18 -3.70
& Minorities

15 Labour & Labour Welfare 566.56 643.09 655.81 1.98

Social Security &


16 7709.21 16912.76 19161.57 13.30
welfare(incl. Nutrition)

Relief on Account of
17 1245.09 795.38 556.37 -30.05
Natural Calamities

18 Other Social Services 441.20 205.29 316.24 54.05

19 Secretariat Social Services 34.39 40.26 46.17 14.68

Total - II: Social Services 67329.12 78677.90 83659.19 6.33

III. General Services 35461.89 45379.54 51482.48 13.45

Grant-in-aid and
IV. 6489.76 5911.73 6856.16 15.98
Contribution

V. Public Debt 8269.16 11182.70 9964.36 -10.89

VI. Loans and Advances 5092.22 4644.47 2503.47 -46.10

Total : State Budget 186510.48 217451.00 234152.93 7.68

Source: Annual Financial Statement 2019-20, Finance Department, GoK


76 Economic Survey of Karnataka 2019-20

3.7 SCHEMES IN 2019-20 BUDGET 3.10 CURRENT FISCAL CHALLENGES


AND WAY FORWARD
There are as many as 2235 schemes in
2019-20(BE) with an allocation of The challenge for the state would be to
Rs.234152.97 crore, out of these 90 ensure maintaining high tax effort to garner
schemes (4% of total schemes) each one has adequate resources to meet expenditure
an allocation of more than Rs.500.00 crore requirements of critical sectors of the
and the sum of allocation of these 90 economy while adhering to fiscal prudence
schemes is at Rs.153778.01 crore (65.67% norms. Some of the challenges including
of the Budget Size). For the remaining those identified earlier have continued to
schemes the allocation is at Rs. 80374.96 remain. These are as follows:
crore. This indicates that the rationalization 1. Tax Effort Plateau: Karnataka over the
of schemes is required so as to have focused years consistently achieved the highest
approach on the outcomes by avoiding thin own tax revenue to GSDP ratio (tax
spread of resources. Distribution of number effort) amongst all other States. Change
of schemes and their allocations in in the GSDP base and methodology has
2019-20(BE) across departments is affected this ratio. With increased tax
presented in Table 3.17. base in GST, the situation is expected to
3.8 DISTRICT SECTOR OUTLAYS FOR improve in mid-run.
THE YEAR 2019-20 2. Rising commitments on the Revenue
District sector plan outlays from 1996-97 to Expenditure Front: Though the size of
2019-20(BE) is given in Appendix 3.1. The the budget has gone up over the years, it
total outlay of the District Sector Schemes is characterized by a substantial
for the year 2019-20(BE) is Rs.39135.19 portion being in the nature of
crore, of which Rs.12262.56 crore for ZP committed expenditure. The committed
schemes which constitutes 31.33% of total expenditure in terms of salary, pension
district sector outlay. Similarly, an amount and interest payments are primarily in
of Rs.21123.96 crore is allocated for TP the revenue account. The narrowing
Schemes and Rs.5748.67 crore is allocated down of the revenue surplus gap is a
for GP Schemes which constitute around clear indicator of the strain on the
53.98% and 14.69% the total District Sector revenue budget.
Outlay respectively. District wise break-up The high percentage of committed
of the plan outlay is presented in revenue expenditure to revenue
Table 3.18. receipts reveals that the State has
3.9 EXTERNALLY AIDED PROJECTS limited flexibility in allocation of its
resources for new schemes. Revenue
There are eleven externally aided projects
surplus of only Rs.257.96 crore in
under implementation with assistance from
2019-20 (BE) leaves limited
the World Bank and other external agencies
maneuverability for the decision as on
during the year 2019-20(BE). Of these, three
the expenditure side. Hence the need of
are in Urban Development, four in Public
the hour is expenditure rationalization/
Works Department, two in Water Resources
re-calibration.
and one in Rural Development and
Panchayat Raj department(project has been 3. Capital Expenditure: Since revenue
dropped) and another Project, namely, surplus is expected to be under strain,
Sujala III is being implemented by both the capital expenditure would have to
Agriculture and Horticulture departments. be met out largely from Capital Receipts
Project-wise details are presented in include Non-debt Capital Receipts like
Table 3.19. revenue earned from sale of
government assets, recovery of loans &
Table 3.17: Number of Schemes in the Budget 2019-20
Economic Survey of Karnataka 2019-20
77
78
Table 3.17: Number of Schemes in the Budget 2019-20
Economic Survey of Karnataka 2019-20
Table 3.17: Number of Schemes in the Budget 2019-20 Economic Survey of Karnataka 2019-20

Source: Budget Documents2019-20,Finance Department, GoK


79
80 Economic Survey of Karnataka 2019-20

Table 3.18: District Outlay for the Year 2019-20(B.E) (Rs. lakh)

ZP TP GP
District % % % Total %
Schemes Schemes Schemes

Bangalore Urban 53177.88 4.34 89474.54 4.24 15.00 0.00 142667.42 3.65

Bangalore Rural 17929.50 1.46 37672.22 1.78 5.50 0.00 55607.22 1.42

Bagalkote 34472.91 2.81 76248.11 3.61 1.00 0.00 110722.02 2.83

Belgaum 79024.76 6.44 159190.01 7.54 76.00 0.01 238290.77 6.09

Bellary 38499.62 3.14 81333.84 3.85 35.00 0.01 119868.46 3.06

Bidar 33742.50 2.75 72238.49 3.42 54 0.01 106034.99 2.71

Bijapur 43541.74 3.55 92674.93 4.39 141.00 0.02 136357.67 3.48

Chamarajanagar 17847.19 1.46 34938.78 1.65 59.00 0.01 52844.97 1.35

Chikkaballapur 19413.30 1.58 48253.05 2.28 64.28 0.01 67730.63 1.73

Chickmagalore 26812.62 2.19 50630.66 2.40 48.00 0.01 77491.28 1.98

Chitradurga 38173.26 3.11 67213.60 3.18 36.00 0.01 105422.86 2.69

Dakshina
29936.19 2.44 53531.47 2.53 78.24 0.01 83545.90 2.13
Kannada

Davangere 36873.30 3.01 74248.19 3.51 35.00 0.01 111156.49 2.84

Dharwad 31205.25 2.54 55368.85 2.62 13.48 0.00 86587.58 2.21

Gadag 23405.22 1.91 41156.28 1.95 23.56 0.00 64585.06 1.65

Gulbarga 45258.71 3.69 101729.87 4.82 88.00 0.02 147076.58 3.76

Hassan 37139.49 3.03 73951.12 3.50 120.24 0.02 111210.85 2.84

Haveri 30979.67 2.53 61814.85 2.93 60.95 0.01 92855.47 2.37

Kodagu 13597.85 1.11 17899.06 0.85 56.00 0.01 31552.91 0.81

Kolar 23320.32 1.90 58333.27 2.76 20.00 0.00 81673.59 2.09

Koppal 22894.63 1.87 54621.26 2.59 40.00 0.01 77555.89 1.98

Mandya 29302.34 2.39 61386.26 2.91 114.00 0.02 90802.60 2.32

Mysore 43591.24 3.55 86495.79 4.09 125.00 0.02 130212.03 3.33

Raichur 29954.02 2.44 73198.73 3.47 64.00 0.01 103216.75 2.64

Ramanagar 18139.40 1.48 38275.11 1.81 38.00 0.01 56452.51 1.44


Economic Survey of Karnataka 2019-20 81

Table 3.18: District Outlay for the Year 2019-20(B.E) (Rs. lakh)
ZP TP GP
District % % % Total %
Schemes Schemes Schemes

Shimoga 35101.70 2.86 70649.71 3.34 53.75 0.01 105805.16 2.70

Tumkur 51972.94 4.24 104279.62 4.94 110.00 0.02 156362.56 4.00

Udupi 18730.02 1.53 33388.08 1.58 97.00 0.02 52215.10 1.33

Uttar Kannada 29774.48 2.43 65555.78 3.10 66.00 0.01 95396.26 2.44

Yadgir 18005.85 1.47 42494.88 2.01 52.00 0.01 60552.73 1.55

Lumpsum – ZP 254438.55 20.75 134150.04 6.35 573077.00 99.69 961665.59 24.57

Grand Total 1226256.45 2112396.45 574867.00 3913519.90

Source: Budget Documents of ZillaPanchayaths, 2019-20, Finance Department, GoK

Table 3.19: Externally Aided Projects under Implementation 2019-20 (Rs. crore)

Expenditure
Name of Year of
Name of the since Outlay
Sl the Project commen-
Project and inception for
No. aiding cost cement/
Department upto end of 2019-20
Agency Closing
30-11-2019

Water Resources
Department
(MMI)

Dam
Rehabilitation November
World
1 and Improvement 581.00 2014 to 465.29 100.10
Bank
Project (22 June 2020
Dams)

Karnataka
Integrated and
Asian July 2015
Sustainable
2a Developm 201.25 to Dec 221.75
Water Resource
ent Bank 2019
Management -
TR1
194.11
Karnataka
Integrated and
Asian
Sustainable 2019 to
2b Developm 885.00 18.55
Water Resource 2023
ent Bank
Management -
TR2
82 Economic Survey of Karnataka 2019-20

Table 3.19: Externally Aided Projects under Implementation 2019-20 (Rs. crore)

Expendit
Name of Year of ure since
Outlay
Sl Name of the Project the Project commence inception
for
No. and Department aiding cost -ment/ upto end
2019-20
Agency Closing of
30.11.2019

Agriculture and
Horticulture
April 2013
SUJALA III - World to
3a 417.09 284.74 39.26
Agriculture Bank December
2019
April 2013
SUJALA III - World to
3b 110.67 94.09 13.07
Horticulture Bank December
2019

Urban Development

Bangalore Water
June 2018
Supply and Sewerage
4 JICA 5550.00 to June 47.82 557.00
Project -Phase III
2029
(CWSSP Stage V)
August
Karnataka Urban
World 2016 to
5 Water Supply 1037.80 39.26 80.00
Bank November
Modernisation Project
2022
Karnataka integrated
May 2015
Urban Water Asian
to
6a Management Developm 1187.70 571.46
March
Investment Programme ent Bank
2020
(TR-1)
406.41
Karnataka integrated
Urban Water Asian Feb 2019
6b Management Developm 1000.14 to 92.72
Investment Programme ent Bank Sept 2023
(TR-2)

Public Works

July 2011
Karnataka State
World to
7 Highways Improvement 4522.50 3688.32 339.71
Bank December
Project Phase-II
2018

Karnataka State Asian Sept 2011


8 Highways Improvement Developm 2150.40 to Oct. 2610.14
Project Phase-II ent Bank 2018
780.00
Karnataka State
Asian Nov 2018
Highways Improvement
9 Developm 5334.00 to June 513.89
Project Phase-III 2nd
ent Bank 2024
Loan ADB
Economic Survey of Karnataka 2019-20 83

Table 3.19: Externally Aided Projects under Implementation 2019-20 (Rs. crore)

Ex pendit
Name of Year of ure since
Outlay
Sl Name of the Project the Project commence inception for
No. and Department aiding cost -ment/ upto end 2019-20
Agency Closing of
30-11 -2019

Sustainable Coastal
Asian Dec 2017
Protection and
10 Developm 606.50 to Sept 247.03 234.68
M anagement Project -
ent Bank 2020
TR2

Rural Developm ent


and Panchayat Raj

Karnataka Panchayath
11 Strengtheni ng Project - Project has been dropped 0.56
Gram Swaraj Phase II

TOTAL 23476.62 8895.06 2744.90

Source: Project Monitoring Unit, Finance Department, GoK

advances and Borrowings etc., This has fiscal stress. Therefore, it is important
resulted in increasing total liabilities. to build a midterm perspective on
By weeding out non-essential schemes, expenditure to keep it sustainable.
imposing sunset clauses in schemes
running for more than five years with no 5. Review of Public Resources: The
significant benefit, limiting non- State's revenue expenditure growth is
development revenue expenditure and characterized by a large portion of it
streamlining revenue collections, the being committed expenditure thereby
State would have to target to build up leaving little room for maneuverability
adequate revenue surplus for use in for furthering other capital investments
capital formation and productive to meet the growing needs of social and
expenditure. The major challenge economic infrastructure. The State has
before the State will be to continuously been increasingly relying on Public
focus on improving the outcomes of the Private Partnerships (PPPs) to fill these
expenditure so that the impact is visible investment gaps. However, these
in improvement of Sustainable infrastructure challenges remain large
Development Indicators for the State and require public investment to
and overall socio-economic growth. encourage private investment to
supplement. There is also increasing
4. Unfunded or Partially Funded demand on the public resources in the
Liabilities: At the macro level, light of statutory legislations like Right
Government of Karnataka has to Education, Food Security Act and
maintained the fiscal discipline Employment Guarantee measures.
mandated by the Legislature through These emerging concerns necessitate a
Karnataka Fiscal Responsibility Act. review of the public resources as a
However, in these years, the State has whole to assess their allocative and
also taken up several commitments technical efficiency.
which have the potential of creating
84 Economic Survey of Karnataka 2019-20

6. Reduction in Plan Grants Given by The following New Initiatives have been
the Central Government: Government Taken by the State
of India has reduced grants for
Centrally Sponsored Schemes. Many of a. Comprehensive Decision Support
these Schemes have ongoing System: The State is implementing a
commitments and hence they cannot be Comprehensive Integrated Decision
stopped all of a sudden. As a result, Support System in a time bound
additional burden has been put on the manner for the transparent resource
State to compensate for this reduction. allocation, better decentralized
monitoring and improved implementation
7. Low Non-tax Revenue: Non-Tax of all schemes and programmes. This
Revenue as a percentage of revenue system would capture information on
receipts is declining over the past the progress of the State Government's
several years. The ratio of Non-Tax schemes directly from the
Revenue to GSDP has been negligible implementation points and enable the
mainly on account of low and declining Government to formulate comprehensive
cost recoveries, poor performance of District and Block Plans. The system
Public Enterprises and uneconomic will ensure need based equitable
pricing of implicit subsidies. One of the distribution of resources to every Block
major reasons for the stagnation of and District and their better utilization
Non-Tax Revenue is lack of regular and through decentralized participatory
periodic monitoring by the monitoring.
Administrative Departments and the
non-revision of user charges b. Goods and Service Tax (GST): GST has
periodically. All the concerned been introduced in the State in
departments are instructed by the 2017-18. GST is expected to have
Committee constituted in this regard to positive impact on economic activities
take forward the measures to increase in the long run; in the medium term the
the nontax revenue. revenue realization compared to the
existing tax structure is expected to be
8. New Commitments: Increased negatively impacted. In addition to loss
expenditure requirements on account due to transitional problems, revenue
of the farm loan waiver scheme, loss because of the shift from origin
including co-operative as well as based taxation to destination based
commercial banks, large revenue taxation, subsuming of taxes like Entry
expenditure on account of 6th Pay Tax, that will only get partially
Commission award, Revision of UGC compensated and a relatively lower
and AICTE pay scales, increasing Revenue Neutral Rate. However, this
subsidies and push towards target loss is expected to be compensated by
based subsidy award including DBT the Central Government for the first five
have resulted in reduction in allocation years from the date of implementation
of other schemes. of GST. Awareness and capacity
amongst tax payers as well as within
9. Timing of Borrowing: It has been
Government is extremely critical for
observed that while monthly flow of
smooth transition. The State has taken
State's revenue receipts is more or less
steps to ensure that the nuances of GST
uniform throughout the year,
are comprehensively explained to all the
expenditure shows a clear surge in the
stake holders. A Central Help Desk has
last quarter of a financial year. Thus,
been established in the Office of the
cash flow requires borrowings to be
Commercial Tax Department at head
raised in the 3rd and 4th quarter only,
quarters which will address all the
which also reduce interest burden.
issues relating to GST on all working
days both online and offline. Under the
Economic Survey of Karnataka 2019-20 85

GST regime, Capacity Building are 816 schemes under this category in
Programmes for the Officers of the 2019-20 and allocation for these
Commercial Tax have been undertaken schemes is at Rs.105790.39 crore
towards the detection of frauds, to which is about 95.30% of the Gender
unearth avoidance of tax,to bring better Budget.
compliance on part of the taxpayers
under the new laws and also to e. Khajane II: It is an integrated Financial
maximise revenue. management System being
implemented by the Finance
c. Removal of Distinction between Plan Department Khajane -II and will enable
and Non-plan: The distinction between all Financial Transactions of the
Plan and Nonplan in the budgetary Government of Karnataka on a single
system was brought in when the plan platform in an online integrated
model of economic growth was adopted environment with other stake holder
in the country. It is expected that with systems.
the removal of this distinction a direct
f. Delegation of Fund Release Powers to
link between spending and outcome
could be established which will be Administrative Departments: With a
useful in assessing the efficiency of view to improve the pace of
public expenditure. The Union implementation of schemes and
Government removed this distinction in thereby improve expenditure, Finance
Government Expenditure from the Department has delegated powers of
Financial Year 2017-18 onwards. For release of funds to concerned
the reason cited above, the State Administrative Secretaries for the first
Government has also removed this three quarters of the Financial Year
distinction in the Government Budget upto 75 per cent of the budget
from the Financial Year 2017-18. provision. However, the analysis of
monthly expenditure for the past five
d. Gender Budget: Gender based years indicates that with almost 40%
budgeting helps to prioritize and orient expenditure happening in the last
public expenditure to reflect the quarter. It is therefore necessary to
concerns of women. The State is one of make efforts towards a more equitable
the pioneers in Gender Budget distribution of expenditure through the
Initiatives and preparing Gender year by timely approvals to the
Budget documents since 2007-08. The departmental action plans and planned
Gender Budget document indicates the approach towards implementation of
quantum of allocations made through schemes in the field. From 2015-16
schemes intended for welfare and onwards concerned administrative
empowerment of women. The Gender Secretaries are delegated to release of
Budget Allocation (BE) for the year funds even in the 4th quarter (upto the
2019-20 is at Rs.111012.86 crore revised estimates) also. This would
which is 47.41% of total budget. All improve the pace of expenditure
government programmes/ Schemes incurred by Departments.
wherein women beneficiaries are at
least thirty percent have been classified Way Forward
into categories A and B. Category-A g. Fiscal Management Review
covers schemes which benefit women Committee: Government has
100 percent. There are 66 schemes constituted Fiscal Management Review
under this category in 2019-20 and Committee under the Chief Secretary to
allocation under these schemes is at review the fiscal and debt position of the
Rs.5222.46 crore which is about 4.70 % state and advice the Finance Minister
of the total Gender Budget. Category-B on the remedial measures to be adopted
covers schemes, wherein women to ensure adherence to the parameters
beneficiaries are 30-99 percent. There stipulated in KFRA. The following are
86 Economic Survey of Karnataka 2019-20

some of the major recommendations of approval only and thereby avoid build
made by the committee; up of fiscal stress due to unfunded
expenditure commitments.
(i) Critically examine expenditure and
prioritiese them with a focus on capital (ix) Prioriritization needs to be done to use
expenditure in order to generate the available funds first for projects that
productive assets that will help the are nearing completion so that
economy to expand in the longer run. immediate benefits accrue to the public.
(ii) Critically assess the existing subsidies (x) In order to augment the revenues,
net from the point of their effectiveness continued efforts be made to improve
and to prune down non-merit subsidies own revenue receipts through
in a phased manner to keep increased efficiency in tax
expenditure under sustainable levels. administration as well as monitoring
and to make optimum use of central
(iii) The fund allocated under various
funds available under various schemes.
centrally sponsored schemes is being
routed directly to the implementing (xi) To rationalize existing Government
agencies instated of routing through the schemes so as to have focused
Consolidated Fund of the State which is approach on the outcomes by avoiding
the usual practice. This would thin spread of resources and
adversely impact the budget estimates multiplicity of similar schemes.
of the State as also the accounting of
(xii) In order to keep the non developmental
expenditure. Hence it was decided to
expenditure in check and make more &
take up the issue with Accountant
more resources available for
General and concerned Ministries in
developmental expenditure, regulation
Government of India so as to ensure
on creation of new posts, and filling up
that funds are routed through
vacancies in non-core spheres be
Consolidated Fund.
continued.
(iv) In order to have better budget estimates
(xiii)The Committee instructed that all the
it is decided to bring all Grant-In-Aid
tax collecting departments should be
Institutions under HRMS framework.
directed to increase efforts to meet the
(v) Continuous review and monitoring of targets.
tax efforts including enforcement to
(xiv) The 6th State Pay Commission has
reach the target set out in budget
made recommendations on
estimates.
rationalization of pay and allowances,
(vi) Follow up with departments for increasing the operating staff and
improving their non-tax revenues by reducing ministerial staff, merging
regular revision of fees, user charges of cadre and departments,
etc. redeployment of vacant posts. These
recommendations need to be
(vii) In order to maintain a correlation with
implemented in order to strengthen the
the actual expenditure needs of the
administration and streamline the
State, the budgetary borrowings have
expenditure.
been resorted to only in the 3rd and 4th
quarters of the FY 2015-16. FMRC (xv) To decongest the traffic in Cities, it is
appreciated the same practice and required to subsidise the Public
advised to continue the practice in Transport. This can be done by dis
future. incentivising used of private vehicles. It
was decided to explore the possibilities
(viii) Approvals for new initiatives and works
of imposing cess on registration of new
requiring implementation over multiple
vehicles and on consumption of diesel
years to be based on fiscal
and petrol which helps to subsidise
sustainability of the total expenditure
public Transport.
rather than expenditure during the year
Economic Survey of Karnataka 2019-20 87

h) 14th Finance Commission: (a) The The above two options under these
14th Finance Commission has flexibility provisions can be availed of by
recommended an increase in the share a State either separately, if any of the
of the Central devolution to the States above criteria is fulfilled, or
from 32% to 42%. State Government simultaneously if both the above stated
has made continued effort and a strong criteria are fulfilled. Thus, a State can
pitch for an increase in the share of the have a maximum fiscal deficit- GSDP
States and also an increase for limit of 3.5 per cent in any given year.
Karnataka within the divisible pool.
The flexibility in availing the additional limit
(b) Fiscal deficit of all state will be under either of the two options or both will
anchored to an annual limit of 3% of be available to a State only if there is no
GSDP.(i) The State will be eligible for revenue deficit in the year in which
flexibility of 0.25 percent over and above borrowing limits are to be fixed and the
this for any given year for which immediately preceding year.
borrowing limits are to be fixed if their
If a State is not able to fully utilize its
debt-GSDP ratio is less than or equal
sanctioned borrowing limit of 3 per cent of
to 25 percent in the preceding year.
GSDP in any particular year during the first
(ii) States will be further eligible for an
four years of award period, it will have the
additional borrowing limit of 0.25
option of availing this un-utilised borrowing
percent of GSDP in a given year for
amount only in the following year but within
which borrowing limits are to be fixed if
award period
the interest payments are less than or
equal to 10 percent of the revenue
receipts in the preceding year.
88 Economic Survey of Karnataka 2019-20
INVESTMENT AND EXPORTS CHAPTER 4

Promotion of private investment has been innovation and entrepreneurship in the


high on the agenda of Government of state of Karnataka.
Karnataka. The concerted efforts by the
State have resulted in a large-scale inflow of 4.1.1 Karnataka's Investment Climate
investments during the past few years. The Karnataka's vast and diversified resource
State has also developed a distinct policy base has emerged as a reputed investment
framework for guiding investments and set destination for investors worldwide. The
up dedicated institutions that streamline State was the first to enact the Industrial
the approval processes. Karnataka offers Facilitation Act to help investors. Karnataka
wide range of fiscal and financial incentives has a single window which acts as a one-
to investors even while nurturing the stop-shop for investments in the State. The
supporting infrastructure such as technical specific advantages for Karnataka include i)
institutions, laboratories and research Good law and order situation prevailing in
institutions. The State's information Karnataka which is conducive to foreign
technology and biotechnology sectors have direct investments ii) Abundant availability
attracted significant investments and of highly skilled manpower iii) Karnataka
contribute to significant exports from the ranks among the top 5 industrially
country in these sectors. Exports contribute developed States in India iv) The State
about 40% of the State's GSDP with provides excellent logistic support and
electronic, computer software and connectivity to the investors and v) The State
biotechnology contributing a major portion provides one of the biggest and fast
of the exports. Karnataka's economic expanding markets in the Country.
growth can be accelerated further with a
continued emphasis on promotion of private Karnataka's investor-friendly and respo-
investment and enhancement of industrial nsive administration has worked towards
competitiveness. easing administrative procedures and
implementing policy measures for faster
4.1. INVESTMENT IN KARNATAKA and smoother industrial growth. Some of
the significant measures are as follows:
Karnataka is a pioneer in introducing many
reform initiatives adopted in India and has (a) An investor-friendly responsive
been highly proactive in attracting private administration
investment. Lucrative policies incentivizing
(b) The State-level single window clearance
private domestic and foreign investments
committee and the State high level
are framed from time to time. These policies
clearance committee facilitate
along with an investment friendly climate in
clearance of proposals in a speedy
the State have helped the State attract large-
manner.
scale private investment, especially in
information and communication technology (c) Sector-specific industrial zones and
(ICT) and biotechnology sectors. KBITS, SEZs that match the natural resources
established under the Department of IT, BT and capabilities of a region with the
and S&T by the Government of Karnataka, industry requirements.
is specially meant for the promotion and
(d) Creation of World-class, ready-to-use
facilitation of investments in the State. On
infrastructure through investments in
26th April, 2018, KBITS was renamed as
power, roads, water, warehouse and
Karnataka Innovation and Technology
logistic facilities, connectivity through
Society (KITS) to enable, promote and drive
rails and ports etc.

89
90 Economic Survey of Karnataka 2019-20

(e) The State Government's packages of initiatives to enable a smooth transition


incentives and concession for new from the stage of receiving investment
industrial investments announced from proposals to the eventual implementation of
time to time the project. It acts as a secretariat for State
Level Single Window Clearance Committee
(f) Special focus on skill development to
(SLSWCC) for projects above Rs.15.00 Cr up
enhance generation of technical
to Rs.500.00 Cr and the State High Level
manpower
Clearance Committee (SHLCC) for projects
(g) Excellent telecommunication network above Rs.500.00 Cr.
and optical fibre connectivity
The abstract of the projects approved by
throughout the State
SLSWCC and SHLCC are shown in
(h) Exemption from State taxes for all Table 4.1 & 4.2:
purchases from domestic tariff area
FOREIGN DIRECT INVESTMENT
4.1.2 Investment flows into Karnataka INFLOW IN KARNATAKA (US $ MILLION)
Karnataka Udyog Mitra (KUM) is a single Karnataka Biotechnology and Information
contact point for all investors who are Technology Services has been authorized as
looking at setting up enterprises/business the Single Window Clearance Agency for
in Karnataka. As the nodal agency, its role investments related to IT sector under the i4
is to facilitate investments and execute Policy. All projects below Rs.100 Cr are

Table 4.1: Projects approved by State Level Single Window Clearance Committee
(SLSWCC) 2007-08 to 2019-20 (Nov-2019)
Approved Investments Employment
Year
Projects (Rs. In crores) (In Nos.)

2007-08 727 10266.92 349015

2008-09 310 5181.62 135623

2009-10 359 7749.88 115932

2010-11 439 6879.64 110505


2011-12 410 5328.50 65549

2012-13 675 9350.79 141821


2013-14 209 3558.21 43759

2014-15 72 1996.33 24248


2015-16 252 3,600.63 79960

2016-17 134 19572.04 95608

2017-18 336 23536.61 203489


2018-19 156 12,120.62 72,427

2019-20
30 1885.89 21768
(upto Nov.)

Total 4109 111,027.68 1459704


Source: Karnataka Udyog Mitra, Bangalore
Economic Survey of Karnataka 2019-20 91

Table 4.2 : Projects approved by State High Level Clearance Committee (SHLCC)
2006-07 to 2018-19:

Approved Investments Employment


Year
Projects (Rs. In crores) (In Nos.)

2006-07 66 92055.84 781966

2007-08 108 160522.82 1996504

2008-09 50 105266.20 410842

2009-10 110 288548.57 284934

2010-11 186 187185.70 580161

2011-12 60 34188.8 165165

2012-13 100 133109.77 1158001

2013-14 46 38733 127692

2014-15 36 52148.05 31819

2015-16 28 89,770.47 171324

2016-17 13 14226.39 60497

2017-18 15 30,119.05 67616

2018-19 5 4,387.77 51,959

Total 823 1230262.43 5888480

Source: Karnataka Udyog Mitra, Bangalore (Table 4.1 & 4.2)

approved by State Level Single Window growth drivers of Karnataka's economy.


Clearance Committee (SLSWCC) and above Information Technology Sector in
Rs.100 Cr. by State High Level Clearance Karnataka is primarily concentrated in
Committee (SHLCC). Bangalore. Lately, other parts of Karnataka
have also seen a growth in IT-related
Karnataka accounts for a significant share
activities.
in the total FDI that flows into India. The
statistics provided in TABLE 4.3 reveal that Bangalore was the first city in India to set up
the State had 15.1% share in the total FDI a Satellite Earth Station for high speed
taking place in India in 2018-19. Karnataka communication services to facilitate
attracted FDI of US$ 42320 from 2000 to software exports in 1992. The State made a
2019 (up to Sep 2019) constituting 9.5 % of giant leap in the Information Technology
the all India FDI as shown in Table 4.3. sector by establishing the Country's first
extended facility of the International
4.1.3 Investment in Information gateway and network operations centre at
Technology. the Software Technology Park of India (STPI)
The information technology (IT) sector in in the Electronic City. Karnataka is home to
Karnataka has become one of the primary over 5500+ IT/ITES companies, ~750 MNCs
92 Economic Survey of Karnataka 2019-20

Table 4.3 : Foreign Direct Investment Inflow In Karnataka (US $ Million)


Year Karnataka All India Percentage

2007-08 1581 23901 6.61

2008-09 2026 27331 7.41

2009-10 1029 25834 3.18


2010-11 1332 19427 6.86

2011-12 1533 35121 4.36

Total (2007-12) 7501 131614 5.70

2012-13 1023 22424 4.56

2013-14 1892 24299 7.78

2014-15 3444 30931 11.13

2015-16 4121 40001 10.30


2016-17 2132 43478 4.90

2017-18 8575 44857 19.11

2018-19 6721 44366 15.1

2019-20 ( Upto Sep-19) 4649 26096 17.8

April 2000 to Sep 2019 42320 44616 9.5

Source: Department of industrial Policy & Promotion ,GOI

contributing to over 58 billion USD (Rs. 58 research base in Karnataka, comprising of


lakh Crores) of exports, giving direct many nationally and internationally
employment to over 12 lakh professionals renowned Research Institutions,
and creating over 31 lakhs indirect jobs. The Companies and startups. Karnataka is the
industry contributes to over 25% of the preferred destination for biopharma and
State's GDP. The share of Karnataka in bioservices industry, including clinical
Information Technology exports is nearly trials, contract research and manufacturing
40% of the country's exports of 155 billion activities. Karnataka is also strong on bio-
USD. agriculture, bio-energy, medical devices and
bioinformatics.
4.1.4 Introduction and Investment in
Biotechnology Currently, Karnataka's Biotech industry
comprises of ~400 small, medium and large
Karnataka, the Biotech Capital of India, is
sized companies and over 270 Start-ups,
home to one of the earliest and most thriving
biotech ecosystems in India. The major together forming ~60% of the biotech
hubs for Biotechnology include Bengaluru, companies in India. The number continues
Mysuru, Hubballi - Dharwad, Tumakuru to grow with most of the well-known
and Mangaluru, with new potential hubs companies continuing to choose Karnataka
under development, across the State. The as destination for their operations. In 2016-
support for industry and startups comes 17, the biotech export revenues accounted
from the strong and evolving biotech for US $ 4.91 billion, while the domestic
Economic Survey of Karnataka 2019-20 93

revenues accounted for US $ 1.88 billion. Knowledge based industries at


Amongst the biotech market segments in concessional rates.
Karnataka, Biopharma is the largest r Allotment linked to employment
segment, contributing 65%, followed by generation for investments outside
Bioservices (16%), Bioagri (13%), Bangalore Urban and Rural Districts.
Bioindustrail (3%) and Bioinformatics (3%).
r Thrust to promote Tier 2/3 cities.
Promotion of private investment has been r Incentives available only for direct end
high on the agenda of Government of users.
Karnataka. The concerted efforts by the
State have resulted in a large-scale inflow of r Land will be allotted at the rate of 1 acre
investments during the past few years. The for every 1000 jobs created.
State has also developed a distinct policy r Start-up companies to be provided plug
framework for guiding investments and set and play space with internet at
up dedicated institutions that streamline concessional rates of Rs. 5-15/- per sq.
the approval processes. Karnataka offers ft. depending on location.
wide range of fiscal and financial incentives r Department of IT, BT and S&T to act as
to investors even while nurturing the Single Window Agency for clearance of
supporting infrastructure such as technical IT / ITeS / Start-ups / other Knowledge
institutions, laboratories and research based industries.
institutions. The State's information
r Exemption of Karnataka Industrial
technology and biotechnology sectors have
Employment (Standing Orders) Rules,
attracted significant investments and
1964 to IT / ITeS / Start-ups / other
contribute to significant exports from the
Knowledge based industries for a period
country in these sectors. Exports contribute
of 5 years.
about 40% of the State's GSDP with
electronic, computer software and r IT / ITeS / Start-ups / Animation / KPO
biotechnology contributing a major portion / Knowledge based industries to be
of the exports. Karnataka's economic treated at par with Public Utilities.
growth can be accelerated further with a r Reimbursement of PF/ESI of Rs.2000
continued emphasis on promotion of private Per month per employee for 2 years for
investment and enhancement of industrial all new employment created in Tier 2/3
competitiveness. Cities.
4.1.5 Karnataka i4 Policy (IT, ITES, r Industrial Power Tariff will be applicable
Innovation, Incentives Policy) to all IT / ITeS / BPO / Telecom / KPO /
Start-ups / Animation / KPO /
The Government has brought out IT Policy Knowledge based industries
i.e., Karnataka i4Policy (IT, ITeS, Innovation
Incentives Policy) where in several r Stamp Duty Exemption of 75% in
incentives are being offered to new IT / ITeS Mysore and Mangalore for IT / ITeS /
and other knowledge based sectors to set up Start-ups / other Knowledge based
their facility in Tier 2/3 Cities across industries in addition to other
Karnataka. locations.
r Skill development programme to train
4.1.5.1 Some of the highlights of the i4 unemployed youth in basic IT/BPO/
policy are as follows: ESDM/Telecom etc.
r Employment Linked Incentivisation of 4.1.6 Karnataka's Electronics Systems
Land Allotment (E-LILA) outside Design and Manufacturing Policy
Bangalore Urban and Rural Districts' 2017-22
Limits
The Government of Karnataka, through
r Land allotment for IT / ITeS, Animation-
KITS, has announced the new ESDM Policy
Computer Graphics Imagery (CGI) /
2017-22 on 1st December 2017, offering
94 Economic Survey of Karnataka 2019-20

ecosystem support and various incentives/ r Encouragement to Start-ups and


concessions to ESDM companies of the MSMEs: Strengthen the existing
State. Semiconductor venture fund for
Vision accelerated investments; promote
expansion and growth of KESDM
Develop Karnataka into a global ESDM hub industry through market development
and a hotbed of innovation through focused activities and support to local
interventions and encouragement to local companies.
companies in the sector.
r Enhancing Ease-of-doing Business:
Goals Simplify and streamline policies and
procedures to enhance overall
The policy aims to foster high growth for the experience of doing business in the
ESDM industry, which can be achieved by state; put in place mechanisms for
attaining the following goals: faster facilitation of incentives and
r Stimulate the growth of 2000 ESDM other policy benefits to attract
startups during the policy period. investments from global companies in
r Enhance value addition done in the sector.
Karnataka by 50%. Achievements under the KESDM 2013
r Create 20 Lacs new jobs in the ESDM Policy
industry by 2025, both direct and Forty eight companies are registered till date
indirect, thereby increasing the total under this Policy. Incentives to the tune of
workforce in the sector to ten times the Rs 8.99 crores have been disbursed till date
present number. to the registered KESDM Companies apart
r Effect a quantum jump in the overall from other concessions given to the
revenues of Karnataka's ESDM companies.
companies to USD 40 billion by 2025.
Brownfield ESDM Cluster at Mysore
r Significantly grow the ESDM exports
from the state to USD 16 billion by In Hebbal Hootagalli of Mysore 1.5 acres of
2025. KEONICS land have been identified for
setting up of Common Facilitation Centre
Strategies (CFC). This EMC is being established under
r Skill Development: Continue to focus the EMC Scheme of MeitY, Government of
on skill development and nurturing of India, supported by Government of
the talent pool by refining and Karnataka and private partners. CFC will
strengthening the existing initiatives; function as a service provider to assist the
introduce new, strategic interventions firms seeking services in
for focus sectors. r Innovating and developing new
r Quality Infrastructure: Create products
common infrastructure facilities and r Producing value added products
center of excellences (CoEs) in specific
r Enhance productivity
areas, to provide an impetus to local
industry; encourage new investments r Meeting international regulatory
and growth in tier-2 cities across the requirements
state. This facility will cater various testing,
r Ecosystem Support: Operationalize quality and regulatory needs of the industry.
PMA policy to encourage domestic It aims to provide services to entire
procurement; accelerate next genera- electronics industries comprising industries
tion technologies through pilot projects like Medical Devices, IT hardware products
and encouragement to grass-roots & sub-assemblies/components, power and
entrepreneurship and IP creation. energy products, Automotive Industries and
Economic Survey of Karnataka 2019-20 95

Aerospace. It will have state-of-the-art Incubation center has also identified the
facilities for the local ESDM industry to Electronic Design Automation (EDA)
enable them to move higher up the product software's required and reached out to the
value chain. The total project cost is Rs various EDA companies in order to partner
29.53 Crores. The construction of the with them who can in turn help the
building is in progress. incubates with access to the various
licensed software as a part of initial
Brownfield ESDM Cluster at Hubballi investment. The facilities in the incubation
The Brownfield ESDM Cluster is set up in center are being used and currently 5
Sandbox Startups (Foundation of Sandbox startups have been incubated.
Startups Initiatives), a thriving business
4.1.7 Karnataka Start Up policy 2015-
incubator, an initiative by Government of
2020
Karnataka in association with Deshpande
Foundation & IESA, in Hubballi in order to The Karnataka Government's efforts to
promote ESDM sector in the North facilitate entrepreneurship in the state can
Karnataka region to develop indigenous be traced back to 2015, when “Karnataka
products, by providing them office space Startup Policy 2015-2020” was launched
with plug-and-play facilities at subsidized with a vision to stimulate the growth of
rates. 20,000 tech startups by 2020. The state
government launched several startup-
Brownfield ESDM Cluster focuses on Proof
focused funds that have a corpus of $47.3
of concept level startups to MSME's, in
Mn (INR 300 Cr).
addition cluster will provide a plug-and-play
facility with suitable office environment To enable the Karnataka Startup
along with common instrumentation Ecosystem, a dedicated Council headed by
facilities for developing their prototypes. the Hon'ble Chief Minister and a Monitoring
ESDM cluster's major emphasis is to work & Review Committee Headed by the Chief
with the scalable startups and play critical Secretary have been constituted. A
role to create an ecosystem which is Karnataka Startup Cell has been set up to
conducive for the electronic and allied sector address the needs and demands of the
growth in the north Karnataka and rapidly expanding Startup Community and
surrounding areas. The facilities of the promote Karnataka's Startup Ecosystem.
cluster are being used by the Startups and
The state has launched a number of
MSME's.
initiatives, including corpus of funds and a
VLSI Incubation Centre at Hubballi Startup Cell in Karnataka Innovation
Technology Society, all geared towards
The VLSI incubation is being set up in
bolstering the state's startup ecosystem.
Bhoomaraddi College of Engineering and
Bengaluru is now the startup capital of India
Technology, Hubli/KLE Tech University,
and we take immense pride in the fact that
Vidyanagar, Hubli in association with IESA
Bengaluru fosters the youngest entrepre-
(India Electronic Semiconductor
neurs in the world and is also one of the
Association).
world's fastest growing startup ecosystem.
The VLSI/ESDM Incubation center works
Over 9000 people have registered on the
with the startups or incubatees who are
Startup Karnataka Portal as Startups,
interested to design semiconductor chips.
Mentors, Incubators, Investors, Institutes
The incubation center helps the incubatees
etc and more than 1200 startups have been
with the access to the IPs. It also helps the
certified by Karnataka Startup Cell so far, of
startups to create IPs in-house which can be
which around 359 companies have been
further used by Semi-Conductor Labs or
funded under Idea2PoC/ Elevate Grant In
any other fabs which want to invest in the
Aid Seed Funding.
incubation. This will create an IP
infrastructure enable & develop the entire Following highlights some of the key
indigenous IP ecosystem which can be Initiatives of the Startup Policy which are
further accessed by the various startups.
96 Economic Survey of Karnataka 2019-20

helping thousands of Startups in the State r Capacity Building Through Exposure


to receive Government Grants for their Visits and Workshops
Projects, avail incentives & benefits, avail 4.1.7.1 Incubation Infrastructure
incubation space etc.
Government of Karnataka has signed MoUs
Some of the highlights of the Startup with partners to set up incubators and
Policy are as follows facilitate startups with relevant
r Capacity Building through New Age infrastructure. The list of supported
Incubation Network incubators are given in Table 4.4.
r Technology Based Incubators: Seating Status in Partner Incubators
Fostering links between R&D and
Commercialization of Technologies The details of Incubators are given in
Table 4.5.
r IDEA2PoC Grant Fund: Taking ideas to
Proof of Concept 4.1.7.1.1 K-Tech Innovation Hub by
r Creating Incubation Infrastructure NASSCOM
r The Grand Challenges: Channelizing The Government of Karnataka in line with
Innovation for Social Impact its i4 policy has set up a K-Tech Innovation
Hub at NASSCOM Diamond District, Old
r Incentives and Concessions: GST
Airport Road, Domlur, Bengaluru. The
and ST, Patent and Marketing
facility has been fully set up and has been
Reimbursements
operational since 2013. K-Tech Innovation
r Enablement Through Karnataka Hub is housed in the premises of Diamond
Startup Cell and Portal District, Old Airport Road, Bengaluru. It is

Table 4.4 : Incubation Infrastructure

# Incubation Centre Govt. of Karnataka Scheme

K-Tech Innovation Hub managed GoK is paying 5 crores annually to NASSCOM for
1
by NASSCO M subsidized incubation of Rs. 4,000/- per seat
GoK is paying 1 crore annually to Mobile 10x Startup
K-Tech Innovation Hub managed Hub for rental and facility management expenditure.
2
by IAMAI The Startups can avail for subsidized incubation of
Rs. 4,000/- per seat
This is a GoK’s incubator for life sciences & BT
related startups. There are 28 suites in 50,000 sq.ft
area of built up space. The Startups can avail for
3 Bangalore Bio-innovation Centre
subsidized incubation suites at a rate of Rs.175 per
sq.ft. which includes access to the labs & other
amenities.

Table 4.5 : Seating Status in Partner Incubators

# Incubation Centre No of Startups Seating Capacity

1 K-Tech Innovation Hub by NASSCOM 263 350

2 K-Tech Innovation Hub by IAMAI 89 100

32-Suites-(35000 Sq.ft
3 Bangalore Bio innovation Center 45
Wet Lab Area)

Total 397
Economic Survey of Karnataka 2019-20 97

spread over an area of 36,000 sq. ft. and has Tech Innovation Hub at IAMAI has been
a seating capacity of 350 with a 100% power established in association with IAMAI to
backup, leased internet line, a vibrant strengthen the mobile app ecosystem in the
ambiance, Conference room with AV facility, State of Karnataka with the objective to train
over 10 meeting rooms, cafeteria and mobile application developers and incubate
housekeeping facilities. The facility offers them into entrepreneurship. The center is
subsidized incubation space which will help located in Diamond district, Domlur,
the Start-ups to make use of the ecosystem Bangalore. This incubation center spread
and in turn help the companies which are in over an area of about 10,000 sq. ft. provides
their nascent stages to attract angel early stage Apps startups and developers
investors, VC's and enterprises to play a highly affordable incubation space, training
major role in Bengaluru and helping more center, testing lab and design center.
such Start-ups to thrive and succeed. They
Mobile10X hub has a Testing Lab, Design
offer various services for e.g. providing
Lab, Capability Building and Co-working
physical workspace (Plug & Play), Support
Space.
Services (HR/Legal/Accounting etc.),
access to network of investors, mentors, and It also provides
industry experts etc., access to Startup Kits
etc. r Mentorship by industry experts and
domain specialists.
The facility includes – r Industry Connects
A. HacKaccellerator: A space for idea-
r Investor Connects
stage entities to test and build new
ideas and products. r Advanced tools for testing and
B. Start-up Warehouse: A dedicated implementation.
incubation space for Start-ups r Dedicated support for design,
C. Providing physical workspace (plug and development, testing
play) r Regular interactions, seminars and
workshops with peers and industry
Achievements leaders
r 263 Startups have been incubated till
Achievements
date
r 766 Startups have been virtually r 89 Startups are incubated at IAMAI
incubated in the period 2014-18 r IAMAI has partnered with Headspin for
r In the Virtual Program the following has setting up a Testing Lab, where devices
been achieved: are kept to test how apps are working on
r Provided 180+ hours of deep dive different networks on different phones
workshops on multiple topics r Startups incubated in IAMAI have
r Provided 25+ investor connects on a raised approx 20 Cr. funding
regular basis 4.1.7.1.3 K-Tech Innovation Hub by
r 60+ mentoring hours connecting expert Bangalore Bioinnovation Centre
mentor and startup one on one
K-Tech Innovation Hub by Bangalore
r 11 startups got acquired Bioinnovation Centre (BBC) is an initiative
r 10% startups recorded 5x increase in of Karnataka Innovation Technology Society
revenue. (KITS), Dept. of IT, BT and S&T, Government
r 20% startups doubled their revenue of Karnataka with a liberal funding support
r 50+ PoCs signed up between start-ups from Department of Biotechnology (DBT),
and corporates Government of India. It is located within
Bangalore Helix Biotechnology Park at
4.1.7.1.2 K-Tech Innovation Hub by Electronic City. The Centre is a world class
IAMAI Incubation Centre with Common
IAMAI is a not-for-profit industry body Instrumentation Facility in a 10 Acre
registered under the Societies Act, 1896. K- campus with total built up area of above
98 Economic Survey of Karnataka 2019-20

50,000 sq. ft. It provides mentoring support, r Terrablue has developed a device for
funding opportunities, branding support early detection of epilepsy as other
and networking support besides neurological disorders
laboratories and equipment. r Tojo Vikas has developed favoring
Achievements molecules through synthetic biology
r 45 Startups are incubated at BBC till 4.1.7.2 IDEA2PoC/ Elevate Grant in Aid
date Seed Funding Scheme
r 15 Patents has been filed so far and 40 Idea2PoC – a scheme to provide early stage
Patents are in pipeline funding to ideas or concepts which are yet to
establish the proof of concept in the real
r Generated employment for almost 150
world, up to INR 50 lakh for maximum of
people
2 years. Till date, 6 calls have taken place
r Incubates have raised approximately 50 and around 264 Startups/ Ideas have
Cr through Venture funding and other been selected for funding. The total
sources committed fund is Rs. 61.70 crores as
r Highlights of Startups incubated in K- shown in Table 4.5a.
Tech Innovation Hub by Bangalore
Bioinnovation Centre 4.1.7.3 Incentives and Concessions
r Pandorum is developing artificial r Incentives – Reimbursement of
cornea which can solve blindness patents, tax and marketing expenses for
problem in India Startups as shown in Table 4.6.
r Next big innovations lab are producing r Booster Kit – a power packed collection
3d bio-printed skin cells of software tools and services available
r Atrimed is developing therapeutic at a special price tailor made to cater to
solutions for skin diseases the needs of young startups as shown in
Table 4.7.
r Yostra has come up with a device to
detect peripheral neuropathy

Table 4.5a : IDEA2PoC/ Elevate Grant in Aid Seed Funding Scheme


C alls No. of Startups Amt. in Lakhs

Pitch to Gove rnment Tourism Challe nge 7 1 80

Call1 & Call2 Ide a2P oC 41 1 435

Ele vate 100 (All Sectors) 87 1 978

Ele vate Call2 (Agriculture, AVGC , Touris m and


42 6 33
Kannada & Culture)

Ele vate 2018 77 1 833

Assis te d Accele rate d Idea2Poc 10 1 11

Ele vate 2019 95 2 675

Total 359 8,845

Table 4.6 : Incentives

Incentive Type No. of Startups Amt. in Lakhs (approx.)

Patents, Marketing, Tax (GST) 30 46.13


Economic Survey of Karnataka 2019-20 99

Table 4.7 : Booster kit


Services Companies

Cloud Google, Amazon, Digital Ocean, Zoho

Legal IP ILP, IP EXCEL & Agrus

Banking & Finance Kotak & Yes Bank, HDFC, Axis Bank

Knowledge Partner TiE Bangalore

4.1.7.4 Capacity Building through One of the primary goals of the policy is to
Exposure Visits and Workshops “Facilitate generation of at least 25
Innovative Technology solutions with a
Exposure trip for Bio startups social impact in various sectors like Urban
5 Bio startups where supported to Development, Health Care, Food Security,
participate in 13th edition of BIO KOREA Clean Environment and Education for all
2018 Asia's premier Biotechnology event etc”. The Department intends to use the
held on May 9th – 11th , 2018 at COEX, vibrant start-up environment in the State to
Seoul, South Korea. drive technology based innovation to find
workable and scalable solutions to
Similarly 6 Bio startups were supported to challenges faced by it.
participate in BIO, International
convention, Boston, Massachusepps, USA The funding support offered by the
event held on June 4th – 7th, 2018. Department under this scheme is in the
form of grant‐ in‐ aid. The funding level is
4.1.7.5 Karnataka Unit for International uptoRs. 10 lakhs each, monitored and
Collaboration – Government of Karnataka nurtured over a six-month period under
has been setup at Department of IT, BT and Phase I. After the completion of six months,
S&T has partnered with other countries for one out of the selected innovations will be
different collaborative opportunities. shortlisted for further funding of upto Rs. 50
Department of IT, BT and S&T has set up a lakhs for a period of 12 –15 months for
system of Global Innovation Alliances (GIAs) Phase II.
for identifying mutual shared areas of
interest and developing allied expertise with The department has conducted 6
technology hubs of across the globe. This Challenges under Grand Challenge
system of strategic international innovation Karnataka so far, status of each is given in
partnerships has been conceptualized for Table 4.8.
curating existing relationships and for In total, 24 startups have been selected
fostering new ones with international to test and demonstrate their solutions/
institutions and partner countries. products in the first phase I for 6
4.1.7.6 The Grand Challenge months duration with funding of upto
Channelizing Innovation for Social Rs 10 lakhs. Out this 24 startups 9 have
Impact reached the Phase II for 12-15 months
duration for pilot implementation with
Grand Challenges - Karnataka is an funding upto Rs 50 lakhs. It may be
initiative of the Government of Karnataka, to noted that all these payments are milestone
scout for new technologies or innovations based and shall be released in tranches as
that can offer solutions to some of the defined in the Grant-in-Aid agreement. Total
persistent social issues pertaining to the committed fund under GCK both in Phase – I
state of Karnataka. Grand Challenges, & Phase –II is INR 5.6 crores.
Karnataka aims to channelize innovations
for social impact, and in the process support
the establishment and growth of Start-ups.
100 Economic Survey of Karnataka 2019-20

Table 4.8 : The Grand Challenge Channelizing Innovation for Social Impact
Number of
awardees Phase I
Challenge Challenge topic Phase II Status
selected under Status
Phase I funding
1 among the 3 awardees
Phase I is been selected for
Water & Sewage
Call 1 3 funding is Phase II for pilot
Management
completed implementation and
funding.
1 among the 5 awardees
Plant Disease & Phase I is been selected for
Call 2 Pest Infestation 5 funding is Phase II for pilot
Diagnostics completed implementation and
funding
1 among the 5 awardees
Effective Delivery Phase I is been selected for
Call 3 of Primary Health 5 funding is Phase II for pilot
Services completed implementation and
funding.
2 awardees is been
Phase I selected for Phase II for
Tackling
Call 4 4 funding is pilot implementation
Undernutrition
completed and funding. yet to sign
the agreement
Phase I 2 awardees have been
funding is yet selected for Phase II for
Traffic congestion to be pilot implementation
Call 5 3
at Bengaluru disbursed after and funding. yet to sign
satisfactory the agreement (Rs
UC 30lakhs +40 lakhs)
Phase I 2 awardees has been
funding is yet selected for Phase II for
Water to be pilot implementation
Call 6 4
conservation disbursed after and funding. yet to sign
satisfactory the agreement (Rs 25
UC lakhs+Rs 25 lakhs)

4.1.7.8 K-Tech Innovation Hub by IKP profit Science Park and Incubator which has
its operations in Hyderabad and Bangalore.
Government of Karnataka has set up K-Tech
Innovation Hub across the state in identified Common Instrumentation Facility's estab-
areas for e.g. Electronics, Mobile, Animation lished as on date as shown in Table 4.9.
and Gaming, Design engineering etc. These
facilities shall have necessary infrastructure 4.1.8 Centres of Excellence
for e.g. R&D labs, Common centre for Center of Excellence in various sectors has
prototyping, common testing/QA/QC labs, been set up to drive innovation and
Fab labs etc. entrepreneurship in the State of Karnataka
IKP Knowledge Park has been identified as 4.1.8.1 K-tech Centre of Excellence in
the Program Partner who is assisting KITS in Aerospace and Defence by Dassault
managing the K-Tech Innovation Hub as per Systems Pvt. Ltd.
the Government Order ITD 156 ADM 2016,
dated 19th December 2016. IKP is a Not-for- The Department of IT, BT of the Govt. of
Karnataka, has established Centre of
Economic Survey of Karnataka 2019-20 101

Table 4.9 : K-Tech Innovation Hub by IKP

Sl.No Name of the Centre

1. K-tech Innovation Hub-Belgavi

2. K-tech Innovation Hub- Jalahalli Metro Station, Bengaluru

3. K-tech Innovation Hub- Mangalore

4. K-tech Innovation Hub- Mysuru

Excellence in Aerospace and Defence with industries and creating cyber safe
the objective of skill development and environment in the State, in collaboration
providing in industry-ready manpower to with Industry and Academia.
the sector in Karnataka. The Centre of Major Objectives of CoE in Cyber Security
Excellence would provide high-end training
by the Government of Karnataka
and skill development in the Aerospace and
Defence space. 1) To provide a cyber-safe and conducive
environment for industry to prosper.
As per the Government order ITD 291 ADM
2016, Bangalore, dated 22nd Feb 2017 the 2) To provide impetus on the growth of
Total cost of the project was Rs.288.68 Cr. cyber security start-ups.
The contribution from Government of
3) To address the skill gap in cyber
Karnataka is Rs.33.46 Cr. Revised
security aligned with needs and
investment proposal was approved by Govt
requirements of the industry.
for total project cost of Rs 391.61 Cr with no
changes in Govt contribution on 28th Sept 4) Facilitate growth of cyber security
2017. ecosystem leading to opportunities for
employment.
4.1.8.2 K-Tech Center of Excellence in
Cyber Security by IISC 5) To create cyber security awareness
among citizens of the state
The CoE in Cyber Security was formed in
2017 by Govt of Karnataka, as part of the The Government by its G.O. ITD 148 ADM
Technology Innovation Strategy, to promote 2018 dated 30.10.2018 has nominated
the cyber-safe and conducive environment Indian Institute of Science (IISc) as the
for industry collaboration, address the skill Anchor Institution and KSCST as the
gaps, build awareness and facilitate Implementing Agency. As per this
innovation in this emerging technology field Government Order dated 30.10.2018, KITS
of Cyber Security. The center of Excellence shall transfer the required grants to KSCST
shall also facilitate standardization and best for setting up and operationalizing the CoE.
practices for information security across 4.1.8.3 K-Tech Centre of Excellence for
industry domains, foster innovation,
Data Science and Artificial Intelligence
research & development and conduct some
by NASSCOM
of the high-end-in-house-training programs
within Cyber Security Technologies. The K-Tech CoE – DSAI has been
established with a vision to put Karnataka
It was announced in the FY 2017-18 Budget
in the global map of top 3 destinations for
Para no 413 to set up “Centre Of Excellence
Data Science & Artificial Intelligence. This
in Cyber Security” keeping in mind the
will further strengthen the State's DS & AI
emerging technologies and to create
ecosystem and will provide a platform for AI
necessary technical resources, skill
and technology collaboration between
development, to promote cyber security
102 Economic Survey of Karnataka 2019-20

various stakeholders. As per a KPMG Global Startups leverage cutting edge technologies
Technology Innovation Report 2018, to build market ready product. The IoT
Bangalore is one of the TOP 10 global Startups Program, aims to build industry
innovation hubs and counted amongst the capable talent in an entrepreneurial
likes of Tokyo, London, Beijing, Tel Aviv, ecosystem by providing Incubation,
New York etc. Funding, Acceleration, Industry Connect
and Mentoring.
As part of the Government of Karnataka's
Innovate Karnataka programme, Shri K. J. To kick start the Government's 'Digital
George, Hon. Minister for Large & Medium India' initiative a Center of Excellence for IoT
Scale Industries. IT and BT , Science and at Bangalore was established in July 2016.
Technology, Government of Karnataka, Jointly formed by MeitY (Ministry of
inaugurated India's first Centre of Electronics and Information Technology),
Excellence for Data Science and Artificial ERNET, NASSCOM and supported by
Intelligence (CoE DS&AI) on 5th July, 2018, Government of Karnataka. Total Area: 9248
set up in association with NASSCOMM in sq.ft. at Corporate Tower, Central Atrium,
Diamond District, Bengaluru. Lower Ground Floor, DD3 No. 150, Diamond
District, HAL Airport Road, Bangalore.
4.1.8.4 K-tech Centre of Excellence on
IoT by NASSCOM The center after its establishment has
contributed to the community at large.
The K-Tech Center of Excellence for IoT Listed below are a few impact made by the
India, at Bangalore, is a Digital India institution as shown in Table 4.10.
Initiative to jump start the IoT ecosystem in
India taking advantage of India's IT 4.1.8.5 K-tech Centre of Excellence in
strengths and help country attain a Machine Intelligence & Robotics by IIIT-
leadership role in the convergent area of Bengaluru
hardware and software. The main objective
of the K-Tech CoE IoT is to help Indian IoT The Department of IT, BT and S & T in
association with IIIT-B has set up a K-Tech

Table 4.10 : K-tech Centre of Excellence on IoT by NASSCOM

# of Start-ups enrolled (including Graduated) 54

# Connected Pan India for market opportunities + mentoring 920

# Employment Generated (by Start-ups) 375

# IOT Researchers incubated 90

# Prototypes showcased* 54

# Papers presented in global conferences** 23

# IP's Applied (Granted) 56 (9)

# Societal Projects Executed 15

# Partners Signed up : Strategic/Co-create/ Innovation/


Infrastructure/Technology 16/2/3/5/4

# Events Organized (Participated) 48 (48)

# Showcase of eco system and startups to the Global and Domestic Governments,
VIP visitors, policy makers, investors, corporates, MNCs/GICs, innovation 270
adopters etc.
Economic Survey of Karnataka 2019-20 103

Centre of Excellence on The Machine comprising of five broad sub-sectors namely


Intelligence and Robotics (MINRO) at cost of BioAgri, BioPharma, BioIndustrial,
Rs. 34.70 Crores. BioServices and BioInformatics sectors is
spread across Bengaluru, Tumkuru,
MINRO Center's broad charter is to carry out
Mysuru, Hubballi – Dharwad, Mangaluru,
high quality research in the area of Machine
Udupi, and other districts. Beyond these,
Intelligence and Robotics. The research is
and especially amongst startups, the focus
expected to lead to ground breaking
is on MedTech that leverages engineering
innovations that benefit entire state of
and biotech skill-sets. The biotech industry
Karnataka.
in Karnataka provides direct and indirect
4.1.8.6 K-tech Semiconductor Fabless employment to an estimated ~19000 people
Centre of Excellence by IESA with men constituting 69% of the workforce
and women 31%. Karnataka accounts for
Government has set up a K-Tech 54% of India's biotech workforce. According
Semiconductor Fabless Centre of Excellence to Association for Biotech Led Enterprises
to provide Indian fabless semiconductor (ABLE) White Paper on India's
product companies easy access to Biotechnology Start-up Ecosystem,
(otherwise exorbitantly expensive) R&D Karnataka accounted for 18.5 percent of the
infrastructure for e.g. EDA Tools, Design IPs total new registrations with more than 190
(foundation IPs/ Core IPs), Foundry access – registered biotech startups in the State. The
foundry design kits, subsidized test chip number continues to grow with most of the
shuttles, Server Farm and other physical well-known companies continuing to choose
infrastructure, in order to enable them to Karnataka as destination for their
successfully do their design to all the way to operations. In 2017, the biotech exports
product prototypes. revenues of Karnataka stood at US$4.91
It is conceived as one stop shop for India's Billion, while the domestic revenues
fabless product companies and start-ups for accounted for US$1.88 Billion.
providing state-of-art infrastructure, The presence of premier institutes like IISc,
linkages to the stake holders of the eco- NCBS, JNCASR, RGUHS, CFTRI, DFRL,
system, networks to mentors, industry and UAS, UHS and others has contributed
financial institutions and solutions to ease significantly to a surge in R&D activities in
the business operations. the State, eventually translating into path-
This is in line with the budget breaking innovation. For the last 2 decades,
announcement of the FY 2018-19, para 369, the Government has made major
where it has been proposed to promote investments in infrastructure to support the
Hardware Equipment and Semi-Conductor expanding biotech-ecosystem and
Chip Design and Development through the systematically built up considerable
establishment of “Semiconductor Fabless resources and human capital by supporting
Accelerator Lab” (SFAL) in association with institutes like Institute of Agri
India Electronics and Semiconductor Biotechnology (IABT), Centre for Human
Association (IESA). The centre is already Genetics (CHG), Institute for Bioinformatics
operational in IESA Head Office, Old Airport and Applied Biotechnology (IBAB), and
Road, Bangalore. SFAL society has been Biotechnology Skill Enhancement Program
registered and the centre would be shifted to (earlier BTFS) that has allowed the
new premises. development of quality manpower in the
fields of genetics, molecular biology,
4.1.9 Investment in Biotechnology computational biology to provide
Karnataka, the Biotech Capital of India biotechnology companies a multi-
holds about 2% market share of the global disciplinary pool of talented work force and
biotech industry, 9% market share in Asia, has resulted in creating valuable
while in India it commands an impressive Intellectual Properties rights. The State
35% market share. The biotech industry continue to foster the development of
Bioeconomy by supporting R&D in key
104 Economic Survey of Karnataka 2019-20

emerging technology areas like Omics, Seragen Biotherapeutics is using stem cells
Synthetic Biology, MedTech, etc. and platelets to improve the health of
reproductive system.
1. K-Tech Innovation Hub by
Bangalore Bioinnovation Centre 2. Capacity Building through Exposure
Visits and Workshops
K-Tech Innovation Hub by Bangalore
Bioinnovation Centre (BBC) is an initiative Exposure trip for Bio startups
of Karnataka Innovation Technology Society
(KITS), Dept. of IT, BT and S&T, Government Six Bio-startups were supported to
of Karnataka with a funding support from participate in BIO International Convention,
Department of Biotechnology (DBT), Philadelphia, USA 3rd -6th June 2019.
Government of India. It is located within r Retisense Tech India Private Limited
Bangalore Helix Biotechnology Park at r Mocxa Health Private Limited
Electronic City. The Centre is a world class
Incubation Centre with Common r Denovo Biolabs Private Limited
Instrumentation Facility in a 10 Acre r VNIR Biotechnologies Private Limited
campus with total built up area of above r Atrimed Biotech LLP
50,000 sq. ft. It provides mentoring support,
funding opportunities, branding support r Sensivision Health Technologies Private
and networking support besides Limited
laboratories and equipment. MedTech Similarly nine Bio-startups were supported
facility has been added with the funding to participate in BIO Asia 2019 at
support of Biotechnology Industry Research Hyderabad, Telangana, 25th -27th Feb
Assistance Council (BIRAC). Also, State has 2019.
released Rs.3.0 crores for addition of 17,000 r Nourish Food Tech Private Limited .
SFT incubation space and same is expected
to be ready by the end of the fiscal year. r Tantrottolan Solutions LLP
r DiponEd Biointelligence Private Limited
Achievements
r Biodesign Innovation Labs Private
r 100 % occupancy within four years of its Limited
operation and currently 47 Startups
r Audicor Cardiometrics Private Limited
incubated
r Cottonsoil Healthcare Tech Private
r 20 Patents has been filed so far and 15
Limited
more are expected to be filed soon
r Nautilus Hearing Solutions Private
r Generated employment for almost 400
Limited
people
r Euprime Consulting Private Limited
r Incubates have raised approximately
200 crores through Venture funding r Haras Beverages Private Limited
and other sources 3.Technology Business Incubator
r Highlights of Startups incubated in K- Department of IT, BT and S&T, Govt. of
Tech Innovation Hub by Bangalore Karnataka under the Start-up Policy 2015-
Bioinnovation Centre 2020, has set up Technology Business
4BaseCare is developing genomics-based Incubators in collaboration with
accelerated cancer therapy Institutions with strong R&D focus to tap
innovations and technologies by utilizing
GaloreTx Pharmaceuticals is developing
the expertise and infrastructure already
small molecules for cancer therapeutics
available with the host institution.
Glowgene is developing therapeutic
products using genetic engineering Objective

Pandorum Technologies is developing r To achieve speedy commercialization of


artificial cornea and liver through 3D the Technologies developed by the host
bioprinting Institutions
Economic Survey of Karnataka 2019-20 105

r To promote and nurture novel Thought leaders, Technocrats, Researchers,


technology/innovation based startups. Innovators, Investors and Policy Makers
r To build a vibrant startup ecosystem, by from across the world. It will focus on the
establishing a network between latest ideas and innovations in IT, BT,
academia, financial institutions, Electronics, Animation & Gaming such as
industries and other institutions Internet of Things, Blockchain, Artificial
Intelligence, Robotics, Machine Intelligence,
The TBI set up are shown in Table 4.11. Cancer biology, Predictive Medicines, Gene
4. KITVEN Fund 3 (Biotech) Editing, Biomedical and Agri tech
Innovation and lot more. This years
KITVEN Fund – 3 (Biotech) has been Biotechnology sessions and events
registered with SEBI (Category 1- Alternate designed around the theme SmartBio is
Investment Fund) with target corpus of Rs. expected to have a large gathering of
50 Cr. Industry captains, Research Heads, Policy
Name of the subscribers, their committed makers and Startups from India and
amount is as under shown in Table 4.12. countries.
Status of Investments from the Fund are 6. Biotechnology Policy
shown in Table 4.13. Karnataka was one of the first Indian State
5. BENGALURU TECH. SUMMIT – 2019 to frame an industry-oriented biotechnology
policy and had come out with the
The Bengaluru Tech Summit -2019, the Millennium Biotech Policy in 2001 followed
flagship event of Government of Karnataka by revised Millennium Biotechnology Policy
to be held between 18th to 20th Nov 2019 at – II (2009 – 2014). Now, Karnataka
Bangalore Palace. The Bengaluru Tech Biotechnology Policy (2017 – 2022) has been
Summit is India's biggest technology event released wherein integration and adoption
has been a strategic platform for industries of new and emerging technologies as well as
and technologies worldwide to understand innovation to meet challenges that continue
and leverage the latest innovations and the to persist in the society have been given
impact they have on our businesses and impetus.
daily lives. The summit will bring together

Table 4.11: Technology Business Incubator

# Technology Business Incubator Niche Area

1 K-Tech TBI by IISc – CeNSE Nano Science & Engineering

2 K-Tech TBI by IISc – CPDM Product Design and Manufacturing

K-Tech TBI by Ramaiah University of IoT, Robotics and Intelligent Systems and
3
Applied Sciences (RUAS) Electronic System Development (ESDM)

K-Tech TBI by Centre for Cellular &


4 Life Science and Biotechnology
Molecular Platforms (C-CAMP)

BioPharma for Health, Biotechnology driven


5 K-Tech TBI by MAHE (BT)
Diagnostics and Biomedical Devices
106 Economic Survey of Karnataka 2019-20

Table 4.12 : KITVEN Fund 3 (Biotech)


Sl.
Name of the Subscriber Committed received
No.
Rs.18 Crs (i ncluding Rs.5 Crs from Agri
1. KITS
Department, GoK)
2. KSIIDC Rs. 5 Crs
SIDBI (Managers of Fund-of-Funds for Rs. 5 Crs or 10% of the committed corpus,
3.
Startups, Govt. of India) whichever is less
4. BIRAC, Govt of India Rs. 4 Crs

5. KSFC Rs. 5 Crs

Total Rs. 37 Crs

Table 4.13 : Status of Investment from the Fund

Sl.No Company name Amount Status

1 Pandorum Technologies Pvt Ltd Rs 2.5 Crs. Already invested

Innov4sight Health & Biomedical


2 Rs 3.0 Crs. Approved for Investment
Systems Pvt Ltd

Approved for Investment. Will


3 String Bio Pvt Ltd Rs 3.0 Crs. be invested after execution of
agreements with Company &
other i nvestors

4 Omix Labs Pvt Ltd Rs 3.0 Crs. In-principle approval received

5 Bioman Technology Rs.2.5 Crs. In-principle approval received

6 Vipragen Pvt Ltd Rs.2.0 Crs. In-principle approval received

7 Shilps Sciences Pvt Ltd Rs.3.0 Crs. In-principle approval received

8 Aindra Systems Pvt LTd Rs.2.5 Crs. In-principle approval received

7. Objectives of Karnataka c. Conduct coordinated and integrated


Biotechnology Policy – 2017-2022 R&D with an emphasis on facilitating
progress beyond the lab to address key
a. Simplify administrative and clearance prioritized societal issues
processes to create an enabling
environment for the public and private d. Invest in foundations of life sciences by
sectors to invest across the biotech creating technology platforms and
value chain. encourage more effective multi-
disciplinary collaborations to expand
b. Realign the academic and training the scale and scope of biotechnology
discourses to strengthen and retain and its impact on the society and
human capital to meet evolving economy.
industry requirements and contribute
to mitigating challenges.
Economic Survey of Karnataka 2019-20 107

e. Leverage IT and other technology under Elevate Idea2PoC program are


(ESDM / AVGC) capabilities of the State being monitored by the BBC. During the
to encourage development of Bio-IT FY2018-19, a total of Rs.1117.94 have
tools and solutions been released for operational purposes.
This apart BBC has been regularly
f. Institute funding mechanisms and
conducting boot camps, Investor meets,
mentorship programmes for biotech
entrepreneurship development
start-ups to stimulate innovations and
workshops and seminars for the benefit
discoveries that would benefit the
of incubatees and also other biotech
society and growth of the bio-economy
startups.
g. Extending financial incentives and
concessions for attracting investments B. Institute for Bioinformatics and
in the biotech sector. Applied Biotechnology (IBAB),
Bengaluru – IBAB is a non-profit
h. Foster the development of bio-economy autonomous institute set up by the
by supporting research and develop- Department of IT BT and S&T,
ment (R&D) in emerging technologies. Government of Karnataka. IBAB is
8. Achievements established to undertake research and
development in advanced areas of
I. Institutional Infrastructure and Biotechnology including Bioinformatics,
Promotion of Entrepreneurship: Cancer Biology, Synthetic Biology,
Setting up of Incubation and common Structural Biology and etc. also to
instrumentation facilities across produce skilled manpower in these
Karnataka to accelerate innovation and areas for the benefit of growing
supporting the infrastructure facility Biotechnology industry in the state.
for the institutes. These include IBAB while continuing to offer PG Dip.,
M.Sc and Doctoral programs in the
A. K-Tech Innovation hub by Bangalore areas of Bioinformatics & applied
Bioinnovation Centre (BBC) in Biotechnology has newly started PG
Bengaluru an Incubation Centre Diploma in Bioscience Policy Research
established in collaboration with DBT- in collaboration with Takshashila
GOI to promote entrepreneurship in all Institute, Bengaluru and PG Diploma in
domains of Biotechnology; K-Tech Big Data Biology in collaboration
Innovation Hub by BBC currently has with IIIT-B. IBAB is undertaken
47 incubatees and a state-of-the-art construction of additional area in
Common Instrumentation Facility to support of expanded academic and
benefit the Startups. MedTech facility R&D activities.
supported by Biotechnology Industry
Research Assistance Council (BIRAC) An amount of Rs.700 lakhs annual grant
has been established and SEED and Rs.2500 lakhs additional grant to be
funding program again supported by used as corpus fund for undertaking
BIRAC is expected to be operational expansion of academic and training
soon. BBC has been sanctioned with activities has been released. Two separate
matching grants of Rs.8.5 Crores projects supported by Government being
towards Rs.4.5 crores for MedTech implemented by IBAB are as follows:
facility supported by BIRAC and Rs.1.0 Synthetic Biology Group at IBAB
crore for SEED Fund provided again
BIRAC. An amount of Rs.3.0 crores is Earlier Government had approved
towards purchase of new high end establishment of Synthetic Biology Group
equipments. The civil work for building with total budget of 9.85 Crores for a period
additional space of 17000 Sq. Ft area is of 5 years. An amount of Rs. 286.25 lakhs
fast progressing and is expected to be has been released. Under this project three
ready for starting interior work during key projects have been initiated that are
end fiscal year. 37 BT startup selected creating a library of synthetic promoters and
108 Economic Survey of Karnataka 2019-20

genetic elements that will be used for were conducted and in the month of
developing a tuneable yeast expression November 2018, Joint workshop in
system with a broad dynamic range, collaboration with the European
generating yeast strains that produce a Bioinformatics Institute, Cambridge, UK
cocktail of gluten-digesting enzymes helpful was also conducted. An amount of Rs.100
for management of celiac disease, metabolic lakhs was released.
engineering of yeast for synthesis of high
value carotenoids using industrial waste C. CHG (Centre for Human Genetics)
starch. It is expected to lead to cost-effective Bengaluru. CHG is a non-profit
translational products. Also, started to autonomous centre engaged in
create a synthetic human cell line that seeks advanced research, teaching and
and destroys cancer cells is underway. For training in areas which lie at the
this, engineered receptors and intracellular interface of modern genetics and
pathways are being established in immune medicine. Besides research and
cells which allows high specificity and teaching, the Centre provides
avidity against head and neck cancers. A comprehensive clinical services,
project on using genome editing technology including genetic counseling to patients
on a mosquito cell line to identify host carrying a range of genetic disorders
factors in viral diseases such as Dengue has and inborn errors of metabolism. CHG
also been initiated. This will help in is affiliated to University of Mysore for
developing vector control strategies for awarding the M.Sc degree. GoK has
effective management of these diseases. provided an annual grant of Rs.500
Lakhs for FY2018-19. Government
A two-week workshop in Synthetic Biology approval for release of supplementary
in collaboration with Mittal Institute, grant of Rs.375 lakhs for FY2018-19. is
Harvard University and IISER, Pune, under obtained and the same to be released.
the Bharat Boston Biosciences Beginnings CHG is undertaking construction of
(B4) Program funded by the Department of additional floor and horizontal
Biotechnology (DBT), Government of India expansion to house Child Care Centre
was conducted by IBAB. The workshop from Corporate Social Responsibility
included lectures and hands-on training by (CSR) funds.
academic and industry experts from USA
and India on the state-of-art genome editing D. Institute for Agricultural Bio-
techniques and synthetic biology technology (IABT) in Dharwad:
applications in biotech industry. IBAB has Started in 2002 with seed funding from
also introduced a teaching unit on Genetic the Department of IT BT and S&T, GOK,
Engineering and Synthetic Biology in the IABT at University of Agricultural
MSc syllabus offered at IBAB under Sciences, Dharwad offers M.Sc and
Bangalore University. Six M.Sc students Ph.D. Degrees in Molecular Biology and
were trained during 2018 for their project other domains of Agriculture
work in synthetic biology Biotechnology. Also, IABT has also
established Incubation Centre and
Bio-IT Centre (earlier GANIT Labs) Common Instrumentation Facility for
Bio-IT Centre established at IBAB for supporting entrepreneurship in the
undertaking training and collaborative areas of Agri Biotechnology (see next
research in the area of Genomics by utilizing section)
the Next Generation Sequencing facilities at E. K-Tech Innovation hub by IABT,
the Centre at total project cost Rs.1433.52 UAS-D: The project was initiated on
Lakhs with Government support Rs.946.02 12th March 2015 in collaboration with
Lakhs over 5 years period. First installment University of Agricultural Sciences
of 300 Lakhs released. Monthly hands on (UAS) Dharwad to establish Agri
workshops on basics of Next Generation Incubation centre and common
Sequencing for the benefit of students, instrumentation facility (Agri-IC_CIF) to
research scholars and mid-level executives focus on promoting Agriculture
Economic Survey of Karnataka 2019-20 109

Biotechnology industry in the State. under the MoA and research on crop
The Incubation-cum-Common improvement, development of disease
Instrumentation Facility has been resistant varieties and field gene bank
established with a total budget of maintenance of Tomato, Banana,
Rs.6.49 Crores. The facility in 6400 Pomegranate and Garcinia Spp. is
Sq.ft area has 6 Bio-Suites and continuing. Newly developed tomato
currently three startup companies are hybrids are awaiting for multi-location
Incubated at the centre. Events and trials.
support programs are being conducted
regularly for the benefit of incubatees H. K-SAP Bio -50: K-SAP Bio : KSAP is an
and to promote entrepreneurship. integrated, comprehensive program
initiated by the Centre for Cellular and
F. K-Tech Innovation hub by CFTRI: A Molecular Platforms (C-CAMP) and is
Nutra-Phyto Incubation Centre and supported by the Department of IT, BT
Common Instrumentation Facility and S&T, Government of Karnataka at
(NPIC_CIF) was initiated in the campus total cost of Rs. 333.90 Lakhs targeting
of CFTRI, Mysuru on 21st October 2014 at 50 startups during the three year
for nurturing entrepreneurs in the area project period. Bangalore Bioinnovation
of nutraceuticals and functional foods Centre(BBC) has been identified as
for accelerated research, scale-up and Nodal implementing Agency and C-
efficacy studies all through a single CAMP as its implementing partner. The
point of access. The 8400 Sq. Ft area First instalment of Rs.111.30 Lakhs
facility established in the campus of has been released to BBC to initiate the
CFTRI, Mysuru at total project cost of work. The objective of K-SAP BIO50 is to
Rs. 5 Crores is now fully operational. It provide necessary impetus to life
has a total of 10 Bio-Suites and 6 are sciences startups early on in their
already occupied. The call for entrepreneurial journey by identifying
applications to fill the remaining gaps and providing the required
available Bio-suites are out and the mentorship, knowledge and network in
applications received will be screened a structured format to increase the
and selected by Project Management chances of success of biotech Startups.
Committee to fill the remaining Bio- It has on-to-one Mentoring Sessions,
suites. Events and support programs Assessment Mentoring Sessions,
are being conducted regularly for the Workshops, Training Programmes,
benefit of incubatees. Seminars, Networking Events,
International Partnering Meetings and
G. CBR (Centre for Biotechnology Ancillary Facilitation. K-SAP BIO 50
Research) in Bagalkot: Establishment launched on August 02, 2018 has 1st
of Centre for Biotechnology Research cohort of Thirteen (13) BT start-ups
was initiated in the campus of UHS, joining for the program. The
Bagalkot on 23rd November 2013 with a empanelling of Anchor Advisors,
total grants of Rs.8.5 Crores. Common evaluating requirements of each
instrumentation facility and incubation startup in cohort and identifying
space with a total area of 26,436.16 Sq. anchor Advisor, Introduction and
ft area has been developed and discussion with Startups on Anchor
equipped with many high-end types of Advisors, First Assessment Meetings
scientific instruments to undertake between Anchor Advisors and Startups
R&D. A separate incubation space of have been completed. Regular
5000 Sq.ft with 6 Bio Suites is also fortnightly Advisory Meetings-In
accommodated within the centre. The Progress. The call for selection of 2nd
incubation space presently houses 4 cohort has been announced and the
startups. Four research projects on process of screening and selection is
Tomato, Banana, Pomegranate and expected to be completed by the end of
Garcinia Spp. were also supported 3rd quarter.
110 Economic Survey of Karnataka 2019-20

I. K-Tech Centre for Excellence (COE) and networking events will also be held
by C-CAMP. A Centre of Excellence for for the incubatees. The centre will
Agri Innovation is established by Centre connect the incubatees with investors,
for Cellular & Molecular Platforms industry partners etc for scale-up,
(C-CAMP) in collaboration with the m a n u - f a c t u r i n g , a n d
University of Agricultural Sciences, commercialization of their technologies.
Bengaluru to promote deep-science/ Through this the COE at C-CAMP aims
technology driven entrepreneurship in to identify and support at least 8-10
the agri sector, leading to innovation, path-breaking innovations with
economic development and job creation national impact in the agriculture field
in the agricultural domain. C-CAMP is and facilitate the validation and
well-positioned to harness its vast deployment of these innovations.
expertise mentioned above in suppor-
The project taken up with total budget
ting innovation & entrepreneurship
outlay of Rs. 15.00 Crores for a period of
over the last few years and leverage its
5 years with Dept. of IT, BT and S&T and
relations with UAS-B to encourage &
Dept. of Agriculture sharing in 25:75
nurture promising innovations in the
ratio. An amount of Rs.3.00 Crores
Agri-sector. In addition to this core
allocated in FY 2018-19 from the Dept.
collaboration with UAS (B), C-CAMP will
of IT and BT is already released to
work with other state agriculture and
initiate the project.
horticulture universities in Bagalkot,
Dharwad, Raichur, Shivamogga, etc. as J. Bengalore Biotech Helix Park
well as incubation centres in Bengaluru (Industry Zone) Construction has
(Bangalore) like Bangalore Bio- started for building one lakh SFT area in
innovation Centre and other cities to the industrial zone of the Biotech park
build a hub-and-spoke model for and the built up area will be increased
promoting cutting-edge innovations in as per the project milestones.
Agriculture and Agri-related sectors
including Crop Production, Drought K. Support for Bio-statups under
issues, Pesticide issues, Dairy Idea2PoC Grants: Under the Idea2PoC
issues, etc. scheme of Startup Policy,130+ Biotech/
Agriculture/ Agritech/ MedTech
The activities planned include, National Startups have been benefited with over
Agri Immersion Program wherein 10-20
fellows will be identified and country- 9. Human Resource - Biotech Skill
wide field immersion undertaken. 100- Enhancement Programme (BISEP)
200 curated agri-pain points identified. The institutions enabled by the Department
5-10 well-curated agri problems of IT BT and S&T, namely, IBAB, IABT, CHG
considered will be considered for call for and CBR have programs institutionalized to
Grand Challenge Program. The Grand develop graduates with a high amount of
Challenges Program to identify key competency and skills required for the
problems in Indian agriculture and Biotech Industry.
bring about transformational change in
this sector by addressing these issues Apart from the above, the current
with science-driven innovation. 15-30 Karnataka Biotechnology Policy 2017 –
winners selected and each of them will 2022 emphasizes building on the success of
be funded to the tune of 25-50 lakhs, in BT Finishing Schools (BTFS) established
exchange for equity. The winners will be under Millennium Biotechnology Policy II by
incubated within the centre and will be optimizing the course structure and
provided with not only equipment & introducing additional initiatives to foster
infrastructure, but mentorship and R&D and entrepreneurship and ensure
handholding for a period of 18-24 availability of industry-ready and skilled
months. Several workshops, seminars manpower at different job levels.
Economic Survey of Karnataka 2019-20 111

The BTFS programme was revamped and hold discussion with key industry
and renamed in its second phase leaders, academicians and global
as Biotechnology Skill Enhancement innovators.
Programme (BiSEP)” and established in
collaboration with Life Science Sector Skill 4.1.10.1 KITS Skilling
Development Council (LSSSDC) and CSIR- ESDM
Indian Institute for Chemical Technology
(IICT) for designing the course curriculum KITS has been selected for rollout of skilling
and assessing students' skill sets. The programme in the ESDM sector by the
curriculum has been re-designed to Department of Electronics and Information
incorporate the latest industry trends and Technology, Government of India (GoI).
technological advances. The focus would be Karnataka has been selected as one among
on driving smart collaboration with the six states in the country to implement this
industry to align the skill sets of students to Government of India Scheme which is to the
industry requirements as well as focusing tune of Rs. 14.3 Crores per state under the
on developing talent in tier 2 and tier 3 cities. provision to provide skilling in ESDM sector
The number of host institutions has been to 15,000 youth per state. MoU's have been
expanded to include 18 institutions spread signed with (I) National Institute of
across 8 districts in the State with total Electronics and Information Technology,
budget of Rs. 44.17 Crores for five year GoI (II) Electronic Sector Council of India
period with Government of Karnataka and (III) Telecom Sector Skill Council of
contributing Rs.31.21 Crores and India.
Government of India contributing remaining For Skill Development in ESDM Sector,
Rs.12.96 Crores. The programme was Department of IT, BT and S & T, GoK has
launched in March 2018 and in the year been selected for the roll out purpose in
2018-19, a total of 340 students had joined addition to another six states. The policy
the programme and among them 300 envisions to skill 90,000 youth in the area of
students have successfully completed the the Electronics and Telecom by 2019. The
training with >60% of them placed in programs are designed for 8th standard
industry for jobs. Currently, 218 students pass onwards till graduation (non-
who have qualified in the online Karnataka engineering) from any stream, i.e. science,
Biotechnology Aptitude Test have joined the commerce, arts or any other. Scheme
program and their academic training has provides a career opportunity to the youth in
started. A total of 1800 students are the promising area of electronics and
expected to be trained in nine domains of telecommunication. The skills are imparted
Biotechnology during the program period of by GoI recognized private training providers
five years. by means of three comments (i) Theory (ii)
10. Networking Lab session (iii) Filed training. Trained
youth are evaluated and industry
KITS under the auspices of Department of recognized and accepted certificates are
IT, BT and S&T, Government of Karnataka issued by Project Monitoring units such as
facilitates conducting of Bengaluru TSSC (Telecom Sector Skill Council), ESSCI
Technology Summit each year to showcase (Electronics Sector Skill Council of India)
achievements of the state in the BT sector. GoI. The training comes free of cost to the
Besides this, KITS also plays a significant youth belonging to SC, ST and Economically
role in projecting the state and its potential Weaker Sections. Total of 80 approved
in National and International forums, and courses have been proposed.
via participation in key national and
international Biotechnology events such as The Allotted seats to Karnataka are 9941
World Food India, BioKorea, BIOtech Japan out of which 3482 candidates have been
and BIO International- USA. This provides certified and program has been rolled out in
an opportunity for Startups as well as 30 districts of the state. As per gazette
officials of the Department to meet, greet notification all the courses have to be as per
112 Economic Survey of Karnataka 2019-20

the National skills qualification frame work, from October 16th to 27th at Bangalore.
therefore the 59 courses rolled out earlier These “Chetana Scholars” were divided into
have been realigned to the NSQF and groups and sent to 05 top institutions. A
another 5 courses have been added to take total of 283 girl's toppers from Government
the total courses offered under the scheme Schools in Karnataka participated in the 10-
into 64 under this scheme. days orientation in these institutes. The Top
05 Institution which supported Chetana
Chetana Programme Winter School Program was Indian Institute
The Department of IT, BT and S&T, of Science, University of Agricultural
Government of Karnataka has one amongst Sciences, Jawaharlal Nehru Centre for
its mandate to nurture and mentor the local Advanced Scientific Research, Institute of
talent to empower them with high-end Bioinformatics and Applied Biotechnology
technology to provide wings to their dreams. and M S Ramaiah Institute of Management.
With this aim, the Department, has crafted a Chetana 2.0 Orientation camp for second
program titled "Chetana" to be which was batch was conducted during 5th, May 2017
launched in April 2016. This program is to 11th, May 2017 at Mysore Infosys
targeted at enabling Girls who have topped Campus for 349 girls. SAMSUNG sponsored
in Secondary School Examination from tablets and 4G-SIM card from BSNL were
Government Schools across Karnataka to given to CHETANA scholars. Various
educate, empower, mentor and support activities like group building exercises,
them. This, highly talented human resource sports events, Design thinking workshops,
from Karnataka was invited to a 5-day Movie show, nature walk, yoga, Interaction
residential camp and presented with a session with leaders from various domains
laptop/Tab each on their arrival. Various like science, technology, arts, medicine and
activities during the camp included training sports were conducted.
sessions to use the laptop, exposure to
state-of-the-art facility at Infosys and other Chetana 2.1 Winter School residential
industry campuses in Mysore/Mangaluru, program for 8 days i.e. from 15th to 22nd,
group building excises, sports events, December 2017 was organized in various
Design thinking workshops, Movie show, institutions in Bangalore like IISc, JNCASR,
nature walk, yoga, Interaction session with UAS, IBAB, MSRIM, BMCRI etc. The winter
leaders from various domains like science, school included technical lectures, lab
technology, arts, medicine, sports etc. session, Industry visit and day out plan for
Vidhan soudha
These "Chetana – Scholars" will be hand-
held for two years post-the camp. Specific Chetana 3.0 was conducted for 400 girl.
residential programs have been designed to Orientation camp for third batch during
impart "One Skill in each interaction" for 25th, May 2018 to 1st, June 2018 at
consecutive 2 years. Mangaluru Infosys Campus. SAMSUNG
sponsored tablets and 4G-SIM card from
In the first year of its inception, i.e. 2016 a Vodafone were given to CHETANA scholars.
total of 356 girls' toppers from Government Various activities like group building
Schools in Karnataka participated in the 5- exercises, sports events, Design thinking
day residential camp conducted at Infosys workshops, Movie show, nature walk, yoga,
campus in Mysore. Samsung generously Interaction session with leaders from
donated chrome books for the Chetana various domains like science, technology,
Scholars and also conducted the hands-on arts, medicine and sports were conducted.
session to use the laptops. Winter School residential program for 8
days i.e. from 15th to 22nd, December 2017
Chetana 1.2 Winter School Program was
was organized in various institutions in
conducted for the same Girls who have
Bangalore like IISc, JNCASR, UAS etc. The
topped in Secondary School Examination
winter school included technical lectures,
from Government Schools across
lab session and Industry visits
Karnataka. The program was conducted
Economic Survey of Karnataka 2019-20 113

Yuva Yuga Training Program r Archibus,


KITS is Implementing Yuva Yuga Training r NAASCOM Foundation
Program. Government of Karnataka has r BOSCH.
released an amount of Rs. 10.87 crores for 4.1.10.2. New Age Incubation Network
this project. It is proposed to train 1,10,000
(NAIN)
youth's in skill development.
With an aim to encourage spirit of
“YUVA YUGA” scheme is an industry-led innovation and entrepreneurship, the “New
program to encourage and promote skill Age Incubation Network” has been
development for youth throughout established in the districts of Bagalkot,
Karnataka. It helps youth to take up Ballari, Belgaum, Bidar, Bijapur,
industry designed quality skill training and Chikkaballapur, Dakshina Kannada,
become employable. The objective of this Davangere, Dharwad, Gulbarga, Hassan,
scheme is to: Mandya, Mysore, Ramanagara,
r Encourage and promote skill trained Shivamogga, Tumkur, Udupi and Uttara
youths Kannada. 30 Colleges in the State has been
r Increase the skill training capacity in selected for setting up of incubation centers
Karnataka in Karnataka. There is a state level steering
committee and a college level monitoring
r Mobilize youth to take up industry committee to supervise. The students and
designed quality skill training alumni shall be encouraged to identify local
r Increase productivity of the existing problems and propose technology based
workforce and align skill training with innovative solutions. Dedicated mentor
the actual needs of the State cloud from organizations like TIE – The
Under the Yuva Yuga Scheme, courses have Indus Entrepreneurs, NEN – National
been launched to elevate the skill sets Entrepreneur Network, NASSCOM has been
amongst the students from various established by the Department to guide
industries. The Yuva Yuga Skill Training these terms.
Scheme provides skills in line with the List of NAIN Colleges:
demands of the current industrial scenario.
The Scheme is focused on 5 sectors namely NAIN Phase –I
IT, Information Technology Enabled 1. Shivmogga - JNN College of
Services (ITeS), Electronics System Design Engineering.
and Manufacturing (ESDM), Telecom and
Animation Visual Effects Gaming & Comics 2. Gulbarga - PDA College of Engineering.
(AVGC) . 3. Dharwad - SDM College of Engg and
Yuva Yuga Scheme has successfully trained Technology.
26,518 youth so far and yuva yuga currently 4. Tumkur - Siddaganga Institute of
is focusing on Industry Re-skilling and Skill Technology.
up gradation of the youth through
Karnataka thereby addressing the skill gap 5. Udupi – NMAM Institute of Technology.
leading to job redundancy. 6. Mysore - National Institute of
Implementation Partners Engineering.

r KEONICS 7. Bijapur - BLDEA's VP Dr.PGH College of


Engineering and Technology.
r KITS( Previously ICT Society) – TP's
selected through RFP 8. Bagalkot - Basaveshwara Engineering
College.
Industry Partners
9. Belgaum - KLS Gogte Institute of
r NAASCOM (IT/ITES / SSC),
Technology.
r ORACLE,
114 Economic Survey of Karnataka 2019-20

NAIN Phase –II 11. Uttara Kannada - KLS VishwanthRao


1. Chikkaballapur - Sri Jagadguru Deashpande Rural Institute of
Chandrasekaranathaswamiji Institute Technology
of Technology 12. Hassan - Malnad college of engineering
2. Ramanagara - Ghousia College of Achievements of NAIN
Engineering
Ten teams from each college district have
3. Davangere - Bapuji Institute of been selected for funding of up to Rs.
Engineering and Technology
3.00 lakhs to develop their idea.
4. Shivamogga - Sir M.V. Government Arts
and Commerce College, Bhadravathi r In batch-1, 9 colleges are selected and
90 projects had been successfully
5. Vijaypura - College Of Agriculture, completed. It resulted in 61 working
Dharwad prototypes, 9 groups incorporated a
6. Mysore - SBRR Mahajana First Grade company and 2 groups have been
College awarded a patent.
7. Dakshina Kannada - Sahyadri College r In batch-2, 90 projects have been
of Engineering & Management selected for the same 9 colleges. It
resulted in 55 working prototypes, 8
8. Dakshina Kannada - Mangalore groups incorporated a company.
Institute of Technology and Engineering
r In batch-3, 103 project proposals have
9. Hassan - Government First Grade been approved for the same 9 colleges
College and 1 group incorporated a company.
10. M a n d y a - G o v e r n m e n t College Funding Pattern for each Institute as shown
(Autonomous) in Table 4.14.
NAIN Phase –III GAFX -2019 EVENT
1. Ballari - Ballari Institute of Technology KITS in association with ABAI organized
& Management AVGC Flagship Event titled GAFX-2019
2. Ballari - Rao Bahadur from 21st -23rd JUNE 2019 at Hotel Lalit
Y.Mahabaleshwarappa Engineering Ashok, Bengaluru.
college r Thousands of enthusiasts, including
3. Belagavi - KLE dr. M S Sheshgiri students, attended the inaugural event,
college of Engineering college workshops and master classes. Experts
and movie makers leveraging advanced
4. Bidar - Guru Nanak Dev Engineering techniques such as VFX.
College r There were sessions on the making of
5. Dakshina Kannada - P A College of KGF on 2nd Day by Udayaravi Hegde,
Engineering Managing Director, Unifimedia; making
of many movies such as Sir Ridley Scott
6. Dakshina Kannada - St. Joseph Seven, Kung Fu Dhamaka, Kalank,
Engineering College Jagga Jasoos and Krish Trish Balti Boy
7. Dakshina Kannada - Vivekananda were screened. Participants also
college of engineering & technology watched the best animation shorts films
from across the world.
8. Dakshina kannada - SDM Institute of
Technology, Ujire r Experts such as Chris Harlowe,
Catherine Branscome, Cristian Jezdic,
9. Mysore - Sri Jayachamarajendra Daniel Seddon, Angela Salt, Avneet
college of Engineering Kaur, Owen Hurley and Prasad Sutar
10. Mysore - Vidya Vikas Institute of spoke on topics a varied as story,
Engineering. & Technology physics of animation, cinematography,
Economic Survey of Karnataka 2019-20 115

Table 4.14 : Funding Pattern for each Institute

Sl No. Particulars Rs. In Lakhs

Operational Expenses grant (OPEX) towards Organizing


1 events, Meeting, Travel and others miscellaneous 10.00
expenses

Student Seed Fund @ Rs. 3.00 Lakhs per projects for 10


2 30.00
Projects in each Institution.
Total Grant 40.00

production design, high – end character Some of the other events under
creation, 3D character animation, game Bengaluru Tech Summit were
engine etc.
r IT Export Awards
r The event also had live competitions
such as 3D Character Animation, Clay r Biotech Thought leader's conclave
Sculpting, Digital Animation, 3D r Poster Presentations, Product
Modelling, 3D Game Art, Story Writing, launches/Demo
Traditional Painting, Digital Painting r Bengaluru Tech exchange
and Storyboarding
r Lab to Market,
BENGALURU TECH. SUMMIT – 2018 r Tech Tutorials
The Bengaluru Tech Summit -2018, the r B2B Meetings and Makers.
flagship event of Government of Karnataka
Bengaluru Tech Summit in association with
was held on the 29th ,30th Nov 2018 & 1st
IDRL also hosted the India's biggest and
Dec 2018. The Bengaluru Tech Summit is
most extravagant night Drone racing
India's biggest event and has evolved as a
competition, 28 teams participated in the
Premier ICT, Electronics and Biotechnology
event and the event was well received by the
Summit. The event was organized by the
audience. Bio Excellence Awards offers
Department of IT & BT.
individuals and companies with a platform
Powerful conferences have been main to showcase their contribution and value
component of the event and provided addition in the field of Life sciences and
comprehensive view of critical, technical, Biotechnology.
commercial, policy issues facing the
Startup & Innovation Zone provided an
industry. The International conferences
opportunity to more than 200 startups to
brought together top technology experts,
showcase the best of innovation from across
futurists, policy makers, research heads
the county and helped them to interact with
and industry captains from all over the
entrepreneurs, angel visitors, venture
globe.
capitalists, Mentors and accelerators. The
The focus of conferences was on Blockchain, Innovation zone had more than 40
AI, ML & Robotics, Intelligent Apps and innovators showcasing and demonstrating
analytics, Immersive Experiences(AR/VR), their prototypes from across the nation.
IOT, Telecom, Cyber Security, Bio Pharma,
Human Code Global Hackathon was the
Bio Agri, Bio Energy & Bio Fuels, Bio
world's most diverse hackathon “Human
Services, Bio Informatics, Investment &
Code” which hosted 4157 teams from 68
Finance and much more.
countries. The Hackathon is conducted by
116 Economic Survey of Karnataka 2019-20

inviting developers from across the globe to IP creators and local studios. This gave local
solve problems faced by humanity. The best studios the possibility to participate in cross
20 entries are awarded prize money of border initiatives with greater confidence
$20,800 and chance to visit Bengaluru and resources.
during the summit. The Bengaluru Tech
The summit brought together thought
Summit also hosted the Rural IT Quiz Finals
leaders, technocrats, researchers,
and Bio Quiz Finals which were a Grand
innovators, broadcasters, distributors,
success with participation from large
producers, investors and policy makers
number of participants from various schools
from different streams. It paved the way for
of which the Rural IT Quiz was conducted in
interdisciplinary dialogues and
6 states namely Chhattisgarh, Gujrat,
collaborations. This led to the emergence of
Madhya Pradesh, Rajasthan, Maharashtra
disruptive technologies, creative IPs, path
and Karnataka. The Bio quiz was conducted
breaking products and unique services.
in all the districts in Karnataka.
There were also various panel discussions
BENGALURU TECH. SUMMIT – 2019 on topics ranging from Successful co-
The Bengaluru Tech Summit 2019 have productions to 'The Tips and Tricks to
been finalized and is scheduled from 18th - Pitching' to 'Case study about developing,
20th November 2019 at Bengaluru Palace. marketing an IP'. There was also a master
panel with feedbacks and suggestions from
BENGALURU B2B SUMMIT-2018 international visitors.
The Government of Karnataka in These discussions were conceived keeping
partnership with ABAI, the trade in mind that most of the Indian studios have
association for the animation, visual effects, faced various difficulties in affording
gaming and comics sector announced a international market visits and are still not
unique summit, 'Bengaluru B2B AVGC very clear in their approach towards
th th
Summit' on 29 & 30 November,2018 in pitching the right content to the right
Bengaluru. people. This event gave them insights about
Bengaluru geared up for the B2B AVGC how the global AVGC industry works.
summit 2018 on 29th & 30th November and To sum it all up, this event was poised to
1st December, where all major buyers and become the biggest B2B AVGC event our
pitchers came together. The response from country has ever witnessed and it aimed to
the interested animation and gaming set a benchmark for the world to follow.
studios from across the country was
tremendous with applications pouring in for DAC PHASE II
original animation and gaming pitches. After successful implementation of Phase I
The B2B animation summit was a unique in the 7 colleges, Government is introducing
platform designed to connect IP owners and the project in 20 more colleges in the State.
developers; content creators and production Out of this 11 Colleges have were identified
houses interested in producing and co- in the DAC Phase2. Stage 1 during 2015-16
producing creative content. The summit and 9 new Art colleges were identified for
brought selected international and national implementation of DAC 2.0 Stage 2.0 during
studios, producers, broadcasters, the current financial year. The financial
distributors and financiers to participate in assistance to each college in phase II has
this 'buyer: seller' interface. The B2B been enhanced from Rs 5 lakh to Rs 7.5 lakh
summit was a 'mini market place' initiative and administrative fee for ABAI has been
aimed at promoting local IP creation and enhanced from Rs 2 lakh to Rs 2.5 lakh.
providing a platform that matched locally For the 9 New Colleges in the year 2017-18,
developed concepts with the needs of global The Government vide G.O. dated:
and local buyers. 17.03.2018 has given necessary approvals
Karnataka's new AVGC policy 2.0, launched to implement the DAC 2.0 Programme in 9
in August 2017, provided grants to startups, Fine Art Colleges and agreed release Rs.
10.00 lacs per each DAC.
Economic Survey of Karnataka 2019-20 117

The 9 New Colleges are as below 2. Attract investments in high-tech


1. Yogesh ChitrakalaMahavidyalaya, semiconductor manufacturing.
Bidar 3. Promote generation and use of green
2. Vani School of Art, Chikkanaya energy.
kanahalli, Tumkur Government of Karnataka / KITS (formerly
3. Post graduate studies and research in KBITS) has set up Karnataka Semi-
visual Art Gulbarga University. conductor Venture Capital Fund (KAR-
Kalburgi. SEMVEN Fund) for assisting Companies in
the Semiconductor sector. The total fund
4. KEN School of Art, Bengaluru.
size is Rs.92.95Cr. KITS has contributed
5. Sri. Siddheshwar Art Institute, Rs.25 Cr to the fund and the balance has
Vijayapur been mobilized from various other investing
6. Nirmala School of Art, Hassan banks, financial institutions and Govern-
7. Govt College of Fine Art, Dharwad ment of India (GoI).
8. Cava Mysuru The fund has become operational and the
Investment Committee has been setup.The
9. Chetana Lalitakala Mahavidyalaya,
investment committee of the fund has
Bengaluru
invested in companies with growth potential
Funds for the first year and second year for and had earlier sanctioned Rs. 32.65Cr to
implementation of the DAC 2.0 project in seven companies of which one of the
these 9 New colleges for the first year company has exited from the fund i.e
amounting to Rs. 90.00 lacs and second Graphene Semiconductor Services and the
year amounting to Rs.45.00 lacs has been fund has received Rs.8.00Cr against the
released to ABAI and the project is being investment of Rs.4.95Cr and this amount
implemented. has been redeemed to all the subscribers of
the funding proportion to their contribution.
IMPLEMENTATION OF DEPARTMENTAL
SCHEMES The details of the investment are shown in
(i) Karnataka Semiconductor Venture Table 4.15.
Capital Fund (KARSEMVEN Fund) (ii) KITVEN Fund-3 (Biotech)
Traditionally, Karnataka has been the In compliance with the Government of
favored destination for the technology sector Karnataka rules and regulations, an
in IT/ITES, biotechnology and semi- exclusive Bio Venture Capital fund of the
conductors. Bengaluru has been the size of Rs. 50.00 Cr has been registered with
preferred hub of the Government of India SEBI to partner with Government of
(GoI) defence labs. This coupled with the Karnataka and launched. This will offer
talent pool, access to engineering colleges equity based funding to the biotech
and attractiveness as an investment companies in need of mid – to late stage
destination for private sector companies, funding.
has created an ecosystem giving Karnataka
a national edge. The Fund proposes to invest in companies
catering to Biotechnology and such other
Bengaluru is the largest hub of allied sectors within the State of Karnataka.
semiconductor design companies, outside The investment in companies will be in the
the Bay Area in California. Nearly 70% of the nature of equity, preference capital
country's chip designers work here and (convertible/ redeemable), debentures OR
around 80% of the sector's revenues in combination of any of the above
design are from this city alone. instruments adhering to the guidelines
Government of Karnataka focuses on 3 key issued by the Securities & Exchange Board
activities. of India (SEBI) from time-to-time. The
typical investment horizon would be 3-5
1. Promote Karnataka as a semiconductor years although lower periods would also be
design hub. considered.
118 Economic Survey of Karnataka 2019-20

Table 4.15 : KARSEMVEN Fund


Sl.No Names of the companies Final committed amount

1. Prodigy Technolvations Pvt Ltd Rs.3.20 Cr


Rs. 4.00 Cr
2. Pinaka Aerospace solutions Pvt Ltd
Rs. 4.00 Cr
3. SenseGiz Technologies Pvt Ltd Rs. 3.00 Cr

4. Greendzine Technologies Pvt Ltd Rs. 3. 00 Cr

5. Remidio Innovative Systems Pvt Ltd Rs. 5.50 Cr

6. CNB Technologies Pvt Ltd Rs. 5.00 Cr

7. Aptener Mechatronics Pvt Ltd

8. Open Appliances Pvt Ltd

9. Bellatrix Aerospace

Total Rs. 32.65 Cr

The details of the investment are as shown policy, it was felt necessary to revisit and
in Table 4.16. frame a fresh policy for the KAVGC sector,
keeping in view the changing needs of the
Status of Investments from the Fund: industry and in view of the technological
(iii) KITVEN Fund-4 (AVGC) innovations happening in the sector.
AVGC Venture funds initiated by KITS, shall Accordingly, the Government Vide GO No.
be managed by Karnataka Asset ITD 13 PRM 2016 Bangalore dated
Management Company (KAMCO). The 28.7.2017 brought out the new KAVGC
objective of the fund is to invest in Start-ups, Policy 2.0.
Early stage, Small & Medium sized The new Policy aims to foster the AVGC
enterprises and such other enterprises industry to build sustainability, scale and
engaged in Animation, Visual Effects, critical mass, and support the development
Gaming and Comics (AVGC) sector and of creative in the State. To facilitate various
other related businesses by investing in objectives of the policy, a host of incentives
equity and equity linked instruments as per and concessions will be applicable for the
the guidelines of SEBI. industry throughout the policy period. The
Karnataka Animation Visual Gaming & registration fee of Rs.5000(+GST) towards
Comics (KAVGC) Policy 2017-22 the KAVGC registration should be paid in
favor of “KITS Processing Fee”. If the
Karnataka State, especially Bengaluru, is company is previously registered as
known world –wide for its IT prowess. The Karnataka IT –BT Company, there is no
media and entertainment sector has also registration fee charged.
benefited from the ecosystem of Bengaluru.
The Animation, Visual Effects, Gaming and Centre of Excellence in Animation, Visual
Comics (AVGC) sub-sector has particularly effects, gaming and Comics (AVGC)
thrived in Bengaluru on the technology The Centre of Excellence for AVGC provides
strengths and the availability of talent in the state of art facility that will provide the
city. Karnataka State is the first in the industry in Bengaluru and Karnataka a
country to announce a separate policy for holistic technological boost in all aspects of
AVGC sector in the year 2012 vide AVGC sector. Establishment of Centre of
Government Order dated 07.01.2012 read Excellence in AVGC sector will have AVGC
above. After completion of five years of the
Economic Survey of Karnataka 2019-20 119

Table 4.16 : KITVEN Fund-3 (Biotech)


Sl.
Company name Amount Status
No

1 Pandorum Technologies Pvt Ltd Rs 2.50 crore Already invested

Innov4sight Health & Biomedical


2 Systems Pvt Ltd Rs 3 crore Approved for Investment

3 String Bio Pvt Ltd Rs 3 crore Approved for Investment

4 Omix Labs Pvt Ltd Rs 3 crore In-principle approval

Post Production Lab and AVGC Finishing Association of Bengaluru Animation


School at a single location, which will Industry(ABAI) and has entered into
provide unique advantage as the Graduates Memorandum of Agreement between KBITS
of Finishing School will eventually move to and ABAI on 27th Jan 2018. ABAI has
the IP Creation, Innovation, R&D and initiated the necessary actions to implement
Incubation Centre. This co-location will help the project as per the MoA. ABAI has taken
in building the ecosystem and creation of premises measuring about 30,000 Sq.Ft at
Centre of Excellence in AVGC in real sense. Whitefield. All the interior works have been
completed. One imported equipment VICON
The CoE is envisaged to have a digital post-
motion capture equipment has been
production lab with technologies such as
procured and installed. ABAI is in the
motion capture, 2D and 3D animation and
process of procuring second batch of
high speed rendering. The CoE will also have
equipment's, workbenches etc in the second
a Finishing School for the AVGC sector,
tranche.
which will also be set up in collaboration
with industry associations. The AVGC Post 4.2 Exports of Karnataka
Production Lab will help industry from the
hurdles faced by the small and medium Karnataka has a long tradition of overseas
studios and freelance artists and the AVGC trade. Historically, Karnataka has been a
Finishing School shall ensure regular major exporter of commodities like coffee,
supply of highly skilled manpower in order spices, silk, cashew nuts, handicrafts and
to cater to the emerging sector of original IP agarbathies. In the last two decades, the
creation and sophisticated outsourced State has emerged as a major player in the
international projects coming into the export of electronic and computer software,
Indian AVGC industry. engineering goods, readymade garments,
petrochemicals, gems and jewellery, agro
Cabinet has approved for the establishment and food processing products, chemicals,
of Centre of Excellence in AVGC (comprising minerals and ores, marine products, etc.
of Post production lab and AVGC Finishing Karnataka has carved out a niche for itself in
School) and Government Order bearing No: the global marketplace as the knowledge
ITD 95 ADM 2017, Bengaluru dated and technology capital of the Country. The
27.01.2018, was issued. The total cost of State has made rapid and spectacular
this facility will be Rs.48.85 Cr, to be strides in the new economy. Information
released over a period of three years. technology, biotechnology and research and
In pursuance to this Government Order, to development institutions have enhanced
Establish Centre of Excellence in AVGC Karnataka's achievements at national and
sector Department had collaborated with global levels. Karnataka accounts for more
than one third of electronics and computer
software exports from the country. It is also
120 Economic Survey of Karnataka 2019-20

a leader in exports of readymade service exports around 39% for the year
garments, petrochemicals and engineering 2018-19.
commodities from Southern Region.
Commodities which have substantial
4.2.1 Export performance of Karnataka: increase in share of Karnataka's exports in
2018-19 as compared to 2017-18 are
Karnataka ranks 1st in software / service Petroleum products (80%), Manganese ore
exports and stands 4th in merchandise (30%), Automobile (20%), Spices (100%) and
exports in the national export basket. Agri Processed food (10%). The exports
Visvesvaraya Trade Promotion Centre where in it showed decline as compared to
(VTPC) under the aegis of Department of 2017-18 are Gems and Jewel (95%), this
Industries and Commerce of the was due to the ban imposed by GOI on 22
Government of Karnataka is the official carat and above gold medallion export.
institution for compilation and publication
of the export data by 19 commodities from The Share of Karnataka's exports in the
Director General of Commercial Intelligence State's GSDP from 2014-15 to 2018-19 is
and Statistics, Kolkata. depicted in Fig. 2.2. Higher export
performance is an important determinant of
Karnataka overall exports have not shown increasing degree of openness to export
any increase during 2018-19 as compared trade. Degree of openness is measured by
to the year 2017-18. Karnataka's exports in the ratio of value of exports to GDP at
terms of value in, 2016-17, 2017-18, 2018- National level and by the ratio of value of
19 and 2019-20 (April to November 2019) exports to GSDP at the State level. This is
are shown in Table 4.17. remarkably higher than that of all India (at
Karnataka's exports as a percentage of about 10%). Increasing degree of openness
GSDP has a fairly large share and has also to trade is an indicator of economic
increased significantly over the period. The globalization. From this viewpoint, the
share of exports in GSDP which was 7.36% levels of Karnataka's economic globalisation
in 1993-94, has grown to 28.90 during have been higher than at all India level.
2018-19. 4.2.2 Exports as percent to GSDP as
Karnataka's exports amounted to about Rs. shown in Figure 4.1.
659425.33 crore in 2018-19 which 1. Policy support for exports:
constituted about 17.04% of the Country's
exports in that year. The share of Foreign trade is in the Central List of the
merchandise exports in the National exports Indian Constitution. The Government of
constitutes around 5.30% and software / India is empowered to formulate all rules

Figure 4.1 :Exports as percent to GSDP


Economic Survey of Karnataka 2019-20 121

Table 4.17: Table showing Export Performance of Karnataka


(Value in Rs. Cr)
2019-20
No Commodity 2016-17 2017-18 2018-19
(Apr-Nov)
Electronics and Computer
1 419112.68 429342.77 544656.00 297203.00
Software
2 Readymade Garments 14546.27 15169.76 15935.10 7936.81

3 Petroleum 11590.95 14419.17 25035.80 9715.63

4 Engineering 33275.54 37718.25 33420.30 19235.88

5 Iron Ore and Mineral s 910.70 1734.28 2116.40 1068.52

6 Silk Product 379.08 303.92 320.60 145.20

7 Coffee 3284.48 3708.81 3131.80 1548.65

Basic Chemicals,
8 12910.05 14384.15 12296.90 6024.23
Pharmaceuticals &Cosmetics

Agriculture & Processed food


9 4211.37 4217.59 5032.90 2294.29
including seeds & beverages

10 Gems and Jewellery 35154.67 10235.83 570.30 185.87

11 Cashew & Cashew Kernels 1007.41 1215.31 850.30 357.84

12 Handicrafts 1114.69 1089.28 1448.40 608.18

13 Leather Products 370.92 521.81 562.00 283.07

14 Chemicals & Allied Products 518.72 548.19 694.75 369.84

15 Marine Products 1052.16 1211.18 1275.90 365.01

16 Plastic Goods 892.65 987.43 1368.00 599.00

17 Spices 318.42 329.79 724.80 200.00

18 Wool & Woolen Products 1.00 6.90 2.03 0.78

19 Others 8369.90 8635.91 9983.05 5564.48

Total 549021.66 545780.33 659425.33 353706.28


Source: DGCIS

and regulations for foreign trade applicable goods and services.


to the country as a whole. The role of the
The State is providing various incentives &
State Government is complementary by way
concessions to the MSME sector for
of providing supportive and special
technology upgradation / technology
promotional measures for promoting foreign
transfer to enhance their competitiveness
trade, especially with respect to exports of
122 Economic Survey of Karnataka 2019-20

and capabilities to compete in the each with KFDC contribution being Rs.
international market. The State 3.344 Crores.
Government has contemplated various
Construction of building and installation of
initiatives along with incentives and
plant and machinery is under progress.
concessions for the promotion of exports in
the New Industrial Policy 2014-19. 3. Promotional Activities Organized by
VTPC
2. Projects under implementation to
promote Exports In order to encourage growth and
development of exports from the State, the
1. Cashew Technology Development Government of Karnataka has established a
Centre at Kumta in Uttara Kannada dedicated nodal agency, Visvesvaraya Trade
District Promotion Centre (VTPC) for promotion of
During the year 2016-17, Government of International Trade. In addition to compiling
Karnataka has announced the project for of data on the State's exports, VTPC
establishment of Cashew Technology conducts various capacity building
Development Centre at Kumta in Uttara programmes and also provides services
Kannada District which is the part of across market intelligence, export
Karnataka's Budget. This project is being documentation, finance and other critical
implemented by the Department of areas to the exporting community. VTPC
Industries and Commerce with a total also conducts awareness programmes;
project cost of Rs.10.30 crore. export management programmes for both
prospective and existing exporters at
Government of India has approved the district/potential places. VTPC has
project under Trade Infrastructure for established Export Information Centers at
Export Scheme with its TIES share of Rs. Dharwad & Mysuru to facilitate exporters of
3.31 Cr and balance from Government of the State. The promotional activities of
Karnataka. VTPC for exports are as follow:
DC, Uttara Kannada has allocated 3 acres of r Export Awareness Programs.
Government land free of cost for this project r Export Training Programs.
and possession of the land has been taken
r Export Management Training
over by Joint Director, DC, Uttara
Programs.
Kannada.KIADB has undertaken the civil
construction work of the said project. r Seminars, Workshops & Conferences.
Building construction is under process. r Interaction and Open House Meetings.
r Participation in National/ International
2. Upgradation /Modernization of
Exhibitions & Trade Fairs.
infrastructure facility for Marine
products in Tadadi port, Kumta, Uttara r Financial Support to the all Artisans,
Kannada District SC, ST, Women Entrepreneurs of Micro
and Small enterprises, who participate
Hon'ble Chief Minister of Karnataka has in the Trade Fair and Exhibitions.
announced the upgradation/ r Conferring State Export Awards for
Mobernization of infrastructure facility for Export Excellence.
Marine products in Tadadi port, Kumta
r Market Development Assistance to
Taluk, Karwar District during his 2016-17
industries / exporters for their
Budget speech. Accordingly, Government of
Overseas Visits for business promotion.
Karnataka has proposed to develop the
infrastructure facility at Tadadi fishing r TIES Scheme.
harbour for promoting exports of Marine r WTO and IPR Relay Cell.
products under TIES scheme (for a total r Incubation Centre & Facilitation Cell.
project cost of Rs. 13.34 crores). r Assistance to the traders /exporters in
Government of India and Government of certification for the export/ import of
Karnataka's contribution is Rs. 5.00 Crores commodities.
Economic Survey of Karnataka 2019-20 123

r Conduct of Short-term courses in Marketing support to the Artisans/ Units/


association with IIFT, New Delhi. Industries engaged in the production of GI-
r Trade Point to provide live trade related products. A few key policy measures
enquiries, Global Directory Services & that have been announced include thrust to
Online Trading Facility. capacity building /skill development among
GI producers, support for new and
r Secretariat services for promotion of prospective GI fillings from the State beside
SEZs and EOUs in the State Authorized Users drive, Cluster Centric GI
4. Capacity Building programmes Scheme, Branding and Commercialization,
Market Development Assistance and
As part of capacity building initiatives VTPC
scheme for Product standardization &
in association with DGFT / DIC's /
Implementation of Quality Control, among
Chambers of Commerce / Industry
others.
Associations / Exim Bank, etc., VTPC
conducts Export Awareness Programs, 8. Global Exhibition on Services (GES)
Export Management Training Programs, 2019
Seminars / Workshops and Interaction
meetings at District / Taluk level on a The 5th edition of the Central Government's
regular basis. prestigious Global Exhibition on Service
2019 (GES) program was held at the Palace
Also, Export Management Training Ground, Bangalore this time from
Programs comprising of 95 participants in 26.11.2019 to 28.11.2019. The event was
association with KAPPEC in the month of hosted by the Government of Karnataka and
October & December 2019 was organized. was attended by 3,500 dignitaries from 74
5. State Excellence Export Awards countries.

63 Entrepreneurs are being conferred with The event had 4,448 B2B meetings, 392
State Export Excellence Award on 06-09- vendors showcasing their products and 668
2019 by Hon'ble Chief Minister of international customers from 74 countries
Karnataka, for their outstanding visiting the stalls. In the program
achievement in exports. Government of Karnataka unveiled Service
Export Strategy for the state which was
6. India International Trade Fair-2019 prepared to give thrust to service sectors
and identified 6 service sectors, for the
VTPC participated in India International
promotion of the service sector in
Trade Fair (IITF) being held at Pragati
Karnataka.
Maidan, New Delhi from 14th to 27th
November 2019 by establishing Karnataka 9. The Fiscal Package of Incentives &
Pavilion. The Theme of IITF 2019: 'Ease of Concessions extended to SEZ developers
Doing Business' was depicted in the event. and SEZ units includes
In this event products manufactured by 30 r Exemption from stamp duty and
units covering all Districts of the state, electricity duty.
MSMEs / Artisans / Women Entrepreneurs r Capital subsidy for common effluent
have been showcased and sold their treatment plant.
products. The Board of approval of SEZ constituted
7. Geographical Indications Policy under SEZ Act 2005 has granted formal
approvals for 75 SEZs in the State. SEZs
Government of Karnataka, vide G.O. No. CI numbering 35 are operational in the State
65 SSI 2018, Bangalore, dated 18/5/2019 with an investment of Rs.72,904 crores and
has come out with a Geographical Indication generating employment for 3,23,110
(GI) Policy which aims to protect the persons. Currently there are 457 SEZ units
traditional legacies of the State, assist and functioning in these SEZs. The value of
support infrastructure development exports from these SEZs during the year
required to strengthen the GI clusters in the 2018-19 accounted to Rs.97,812.00 crores.
State. It lays thrust towards providing
124 Economic Survey of Karnataka 2019-20
RURAL DEVELOPMENT CHAPTER 5

5.1 INTRODUCTION 5.2 RURAL DEVELOPMENT


Real India is still a rural India as 61 percent PROGRAMMES
of Karnataka's population and 69 percent of Development of rural areas has a bearing on
Indian population lives in rural area. With improving agricultural production and
economic development, the shift of labour related economic activities, availability of
from agriculture to other sectors has natural and financial resources and their
gathered momentum in last two decades. As development. The rural development
a consequence, though the contribution of programmes are implemented through
agriculture to GDP has come down to 14 Rural Development and Panchayat Raj
percent, yet, the share of agriculture in department towards promoting effective and
employment still remains significant at 54.6 inclusive rural development. The rural
percent in India, and it is 54.8 percent in development programmes focus on
Karnataka. Therefore, India and Karnataka providing quality life to the rural people
are still largely rural agrarian economies. through provision of housing, drinking
Therefore, the focused approach to promote water, sanitation, roads and connectivity
rural development is the real path to achieve and employment.
the desired goals in economic as well as a) Rural Housing
human development.
Housing is a basic and very important need
The proportion of rural population in total for every citizen. Housing not only provides
population is declining over the time period. social security to human beings but also
The decline is faster in Karnataka as provides status in the society. Housing has
compared to India. The decline in the evolved as a prime component over the
proportion of rural population is 4.58 period of time not only in providing shelter
percent between 2001-2011 for Karnataka, but also providing employment
and it is 3.30 percent for India. This is opportunities and in development of
evident form the following Table 5.1. locations. To meet the growing demand of

Table 5.1 : Trends in Rural Population- Karnataka and India - 1961-2011

Years Karnataka (%) India (%)

1961 77.7 82.03

1971 75.5 80.09

1981 71.10 76.69

1991 69.07 74.28

2001 66.01 72.19

2011 61.33 68.85

Source: Census of India 1961-2011

125
126 Economic Survey of Karnataka 2019-20

housing, the State Government has been r Smooth flow of funds to ensure that the
pro-active in its housing policies. Housing funds are reached to the ultimate
for the poor and down-trodden assumes beneficiaries in time
greater importance both in Rural and Urban r To encourage cost effective technology
areas in the State. Every successive in construction through District
Government has given greater attention to Nirmithi Kendras
the problem of housing scarcity and
increased the budgetary allocation over the r Strengthening of Nirmiti Kendras.
years. e) Socio Economic Caste Census
b) Budget Allocation 2019-20 As per the Socio Economic and caste
The State has provided Rs.2279.95 crores census conducted during 2011 40,61,572
for the implementation of different housing families are houseless families in rural
schemes. Against this allocation, areas. District wise details are given in
Rs.1417.81 crore has been released for Appendix 5.1.
implementation of different programmes in f) Basava Vasathi Yojane
rural areas and Rs.908.95 crore has been
spent for construction of 89,684 houses and Under this Scheme, the beneficiaries are
1328 house sites have been distributed till selected by Gram Panchayaths through
the end of November 2019. Gram Sabhas as per the Panchayat Raj
Amendment Act. Totally 26.22 lakh houses
c) Highlights of Scheme (including Rural Ambedkar) have been
r The Government sponsored EWS constructed from 2001-02 to 2018-19. Out
housing schemes such as Basava of the total target, 90% is reserved for
Vasathi Yojane , Pradhna Mantri Awas general and 10% for minority beneficiaries.
Yojane(G), Devraj Urs Housing Scheme During the last 3 years, 3,98,631 houses
Dr.B.R. Ambedkar Nivas Yojane . have been completed against the target of
r EWS housing improves the quality of 4,75,000 houses. For the year 2019-20, it is
living standard of poor beneficiary targeted to complete 50,000 houses, of
r Under various Government Sponsored which 52,702 (including Rural Ambedkar)
EWS housing Schemes so far 2273 houses have been constructed up to
lakhs direct and 1136 lakhs indirect November 2019. District wise progress is
employments have been generated. furnished at Appendix 5.2. The progress
from 2016-17 to 2019-20 (Upto Nov 2019) is
r Indirectly it is one of the basis for furnished in Table 5.2.
country's economic development.
g) Dr. B.R. Ambedkar Nivasa Yojane
d) Rajiv Gandhi Housing Corporation
Limited (RGHCL) This scheme is being implemented from
2015-16 in both Rural and Urban areas for
Rajiv Gandhi Housing Corporation Limited providing housing facility to the houseless
has been established as a nodal agency to families of Schedule Caste and Schedule
implement all the State and Central Tribe. Under this scheme, Government is
Government Sponsored housing schemes providing Rs.1.75 lakh and Rs.2.00 lakh as
for economically and socially weaker subsidy in rural and urban areas
sections of the Society both in rural and respectively. The income limit of every
urban areas. The main objectives are: beneficiary in Rural areas is Rs.32,000 and
r To provide housing to the Socially and Rs.87,600/- in urban areas. For the year
Economically Weaker sections of the 2019-20, 21,763 houses have been
society. completed in Rural areas as against the
target of 35,000 by incurring an expenditure
r Speedy implementation of scheme
of Rs. 245.56 crores up to the end of
r Transparency in implementation, November 2019. District wise break-up is
Economic Survey of Karnataka 2019-20 127

furnished at Appendix 5.3. Progress made target of 42,000 by incurring an expenditure


under the scheme from 2016-17 to 2019-20 of Rs.138.87 crores till November 2019.
(upto Nov 2019) is furnished in Table 5.3. Progress achieved from 2016-17 to 2019-20
(upto Nov 2019) is furnished in Table 5.4.
h) Indira Awas Yojana/Pradhna Mantri District wise break-up is furnished at
Awas Yojane (Gramin) Appendix 5.4.
This Centrally Sponsored Scheme was
introduced during 1989-90 for rural i) Devraj Urs Housing Scheme
houseless households who are below the This scheme was introduced for both urban
poverty line. 60% of the target is earmarked and rural in 2014 to provide shelter to the
for SCs/STs, 15% for minorities and people of special category i.e. Physically
remaining 25% for general category handicapped, leprosy cured persons, HIV
households. As per the unit cost of Rs.1.20 Affected families, devadasis, nomadic tribes,
lakh, subsidy from the Centre is Rs. 72,000 safai karmacharies, people affected by
and Rs. 48,000 is State share. communal riots, exploits, free bonded
For SC's/ST's the State Government is labourers, widows, orphans living on foot-
providing an additional subsidy of Rs. path, transgender etc. The beneficiaries are
30,000. Under this scheme, totally 11, selected in District level Committee headed
57,408 houses have been constructed from by the Deputy Commissioner. Under this
2004-05 to 2018-19. scheme, the unit cost per house for General
category is Rs 1.20 lakhs and Rs1.50 lakhs
During last 3 years 2,16,856 houses have for SC/ST beneficiaries.
been constructed against the target of
2,44,000. During the current year 12,935 During the last 3 years i.e from 2016-17 to
houses have been completed against the 2018-19, 36600 houses have been

Table 5.2
Target Achievement Expenditure
Year
(Numbers) (Numbers) (Rs. in Crores)
2016-17 145000 123535 1561.58

2017-18 170000 127971 1821.50

2018-19 160000 147125 1954.10

2019-20 (Upto Nov.) 50000 52702 491.37

Total 525000 451333 5828.55

Table 5.3
Target Achievement Expenditure
Year
(Numbers) (Numbers) (Rs. in Crores)

2016-17 48000 12813 564.69

2017-18 90000 95660 1549.56

2018-19 102000 58883 1018.25

2019-20 (Upto Nov.) 35000 21763 245.56

Total 275000 189119 3378.06


128 Economic Survey of Karnataka 2019-20

constructed as against the target of 41,448 .District wise break-up for sites distributed
houses and during the current year 2284 during the last 3 years is given at
houses have been constructed as against Appendix 5.6.
the target of 3500 by incurring an
expenditure of Rs.33.15 crores up to the end k) EWS Housing
of November 2019. District wise progress is Investments on Economically Weaker
furnished at Appendix 5.5. Progress of the Section, housing schemes have been
scheme from 2016-17 to 2019-20 (upto Nov increased year by year. From 2000-01 to
2019) is given in Table 5.5. 2019-20, the State has spent Rs. 32,090.00
crore, of which Rs.10,573.84 crore on
j) House Site
centrally sponsored and Rs. 21,516 crore on
For site-less families of Economically the State sponsored EWS housing.
Weaker Section in the State, the
During the last 5 years, i.e.2015-16 to 2019-
Government have distributed 2,12,185 sites
20 the Government has spent total
from 2000-01 to 2018-19 in rural areas. In
expenditure of Rs.47.26 crores under Rural
rural areas 30X40 sites are provided at free
House Sites and Rs.32.67 Crores spent
of cost and beneficiaries are selected
under Infrastructure works. Against the
through gram sabha. For the year 2019-20,
target of 30,000 house sites 19579 sites
it has been targeted to distribute 5,000
have been distributed from 2016-17 to
sites, of which 1328 sites have been
2019-20. Financial progress from 2015-16
distributed up to the end of November 2019

Table 5. 4
Target Achievement Expenditure
Year
(Numbers) (Numbers) (Rs. in Crores)

2016-17 115000 96030 1175.08

2017-18 85000 64690 888.64

2018-19 44000 56136 669.10

2019-20
42000 12935 138.87
(Upto Nov2019)

Total 286000 229791 2871.69

Table 5.5:

Target Achievement Expenditure


Year
(Numbers) (Numbers) (Rs. in Crores)

2016-17 14448 14183 223.25

2017-18 15000 15634 171.61

2018-19 12000 6783 90.56


2019-20
3500 2284 33.15
(upto Nov 2019
Total 44948 38884 518.57
Economic Survey of Karnataka 2019-20 129

to 2019-20 (upto Nov2019) under Rural r Maintenance of Burial Grounds and


House Site is given in Table 5.6. Crematory.
5.3 RURAL INFRASTRUCTURE During 2019-20, an amount of Rs 2504.13
crores has been released as against the
A) Karnataka Rural Infrastructure allocation of Rs 2507.88 crores towards
Development Ltd General Basic Grants. The expenditure
The Karnataka Land Army Corporation incurred is Rs 2504.13 at the end of
Limited has the objective of undertaking November 2019. The details of the funds
Civil construction of tanks, irrigation works, released and expenditure incurred under
low cost housing, Roads, culverts and 14th Finance Commission Grants from
buildings etc. in rural areas employing rural 2016-17 to 2019-20 are given in Table 5.7.
youth The works are executed directly at D) Suvarna Gramodhaya
Government scheduled rates without the
involvement of contractors. The Suvarna Gramodhaya scheme was
Organization is a designated agency of the introduced during 2006-07 for the
State Government for the purpose of comprehensive development of the villages.
departmental execution of works. The For the implementation of the scheme
subscribed share capital of the company is Rs.1.00 crore is set apart for each village
Rs.12.25 crores. having 4000 population and in case villages
where population is less then funds will be
During 2018-19, KRIDL has achieved fixed in conformity with the population.
highest turnover of Rs.3311.81 crores with a Accordingly 5613 villages have been
net profit of Rs.293.94 crores. The Agency selected of which 5413 villages haven
has achieved a progress of Rs.2379.92 crore developed by incurring an expenditure of
as against the target of Rs 3425 crores and Rs. 3267.00 crores. The development works
expected profit of Rs,150 crores upto end of of remaining 200 villages are in progress.
November-2019. During 2019-20 an amount of Rs.100.00
B) Fourteenth Finance Commission crores has been spent as against the
Grants allocation of Rs Rs.167.94 crores at the end
of November 2019.
14th Finance commission grants have
commenced from 2015-16 to 2019-20. The E) Chief Minister Grama Vikasa Yojane
grants are released in two installments Chief Minister Grama Vikasa Yojane has
annually to Gram Panchayaths. The Grants been taken up in 1000 villages at a total cost
provided would be used for of Rs.1000 crores at an estimated cost of
r Maintenance of Under Ground Rs.1.00 crore per village for completion in a
Drainages and Solid Waste period of two years from 2017-18. Approval
Management. has been accorded to 991 villages selected
by Legislative Assembly and Legislative
r Maintenance of Community Properties. Council members. An amount of Rs.432.87
r Maintenance of Street Lights, crores has been spent during 2017-18 and
Pavements and Roads. 2018-19. During 2019-20, an amount of

Table 5.6: (Rs.In Crores)


2019-20
Scheme 2015-16 2016-17 2017-18 2018-19 upto Nov Total
2019
Rural House
4.78 7.29 25.49 6.89 2.81 47.26
Sites

Infrastructure 11.93 2.27 7.83 8.83 1.81 32.67


130 Economic Survey of Karnataka 2019-20

Rs. 100.00 crores has been released against 51,120 Mini water supply schemes. Under
Rs. 232.06 crores allocated. Rural water Scenario in Karnataka there are
59,774 rural habitations in the state. Totally
5.3.1 Rural Water Supply
6152 habitations covered under Multi
1. National Rural Drinking Water village water supply schemes upto end of
Programme: (NRDWP) March 2019, of which 2667 quality affected
habitations were covered. During 2019-20
National Rural Drinking Water Supply (upto Nov 2019) 53 Multi level villages
programme is being implemented to provide schemes have been taken up targeting 1769
adequate (55 lpcd) and safe drinking water habitations, of which 470 are water quality-
to the rural population. Access to safe affected habitations. The financial progress
drinking water and sanitation is under NRDWP from 2015-16 to 2019-20
indispensable for a healthy life. (upto Nov. 2019) is furnished in Table 5.8
As on 2019, the drinking water
2. Water Quality Monitoring and
infrastructure of the State comprises
Surveillance Programme (WQM&SP)
64,170 bore wells fitted with hand pumps,
39,157 piped water supply schemes and The state has established 30 district-level &
49 Taluk level laboratories to monitor the

Table 5.7: Details of 14th Finance Commission Grants from 2016-17 to 2019-20
(Rs in Crores)
Particulars of FC
Year Allocation Amount released Expenditure
Grant

General area Basic


2016-17 Grants 1388.62 1368.20 1368.20

General Performance
2016-17 182.15 179.45 179.45
Grants
General area basic
2017-18 1604.42 1580.17 1580.17
Grants

2017-18 General Performance 206.13 204.07 204.07


Grants
General area basic
2018-19 1856.02 1841.52 1841.52
Grants
General area basic
2019-20 2507.88 2504.13 2504.13
Grants

Table 5.8 (Rs. In crore)


Year Target Achievement

2015-16 1569.35 1838.17

2016-17 1980.00 2497.87

2017-18 2200.00 2595.59

2018-19 2200.00 1143.25

2019-20
2795.58 1204.35
(up to Nov 19)
Economic Survey of Karnataka 2019-20 131

quality of drinking water in rural November 2019 and the remaining 821 are
Karnataka. Field water testing kits have under different stages of progress.
been distributed to all the 6,021 Gram
5. Jaladhare
Panchayaths to test the water during pre
and post-monsoon seasons. If the The State Government is implementing
chemical/biological parameters are beyond “Jaladhare” project in a phased manner at
the permissible limits in the water samples, an estimated cost of Rs 53,000 Crore over a
the values along with samples are sent to the period of 7 years to provide safe and
district/Taluk level laboratory for sustainable pure drinking water at the rate
confirmation. Training is also imparted of 85 LPCD for the rural areas, by drawing
to village water and sanitation committee water from rivers or reservoirs.
(VWSC) for testing water quality using
Four Districts viz., Mandya, Vijayapura,
the kits.
Kolar and Raichur has been selected in
In 2019-20 under the WQM&S programme, Phase I of the Jaladhare project. The
Rs 69.33 crore is allocated for NRDWP Preliminary reports of Vijayapura and
support activities like information, Mandya districts have been prepared with
education and communication and water an estimated cost of Rs.2604 crores and
quality monitoring & surveillance. Rs.11.43 1609 crores respectively. Also, external
crore has been spent for support activity assistance to the tune of Rs. 2600 crores has
programmes and for Water Quality been sought from Asian Infrastructure
Monitoring & Surveillance Programme an Investment Bank.
amount of Rs. 3.76 crores has been spent
upto Nov. 2019. 6. Jalamrutha Project
The Department of Rural Development and
3. Multi Village Scheme Project
Panchayat Raj (RDPR) has launched the
Drinking water supply schemes under Rajiv innovative “Jalamrutha” project as “Water
Gandhi National Drinking Water Mission Year-2019”, spreading the water
have been formulated in rural areas with conservation movement across the state of
surface water as source to tackle water Karnataka. This project is a community
quality problem. Habitations having driven participatory program for
chemical contamination like Arsenic, implementation of the four Pillar campaign,
Fluoride, TDS, Nitrate and Iron in drinking viz Water literacy, Rejuvenation of
water are provided safe drinking water after Traditional water bodies, water
treating the surface sources. conservation and Greenery. Keeping it as an
objective, Rejuvenation of the total no of
544 MVS schemes including KUWS&DB
14000 traditional water bodies, 37000
schemes costing Rs.12609.98 Crores are
lakes, 12000 multi-arched check Dams and
approved (under NRDWP, 13th Finance and
about 20000 water conservation works
Jal Nirmal) since inception. 470 schemes
under NRMS (Natural Resource Manage-
are completed with an expenditure of
ment Systems) is taken up in the coming two
Rs. 5841.13 crore. The remaining schemes
years.
are under progress with an estimated cost of
Rs 6001.48 Crores. An amount of Rs 98.00 crores is allocated for
the rehabilitation and development of
4. Purification Plants:
traditional water bodies conservation and
Water Purification plants are being installed Rs. 2 crores for Administrative expenditure
in rural habitations by Rural water supply in 2019-20. Works for 20 districts have been
department, through KRIDL, Co-operative approved under JALAMRUTHA scheme and
societies/institutions and also implemented the works are in progress and the approval
in ZP/TP/GP by utilizing MP/MLA/ZP/ of the remaining 10 districts works are in the
TP/GP/CSR Grants. Totally 18,497 Water process.
Purification Plants have been approved of
Under Jalamrutha project, an amount of
which 17,676 have been installed and
Rs. 6904.53 lakhs has been allocated and
17,519 are commissioned up to end of
132 Economic Survey of Karnataka 2019-20

Rs. 3012.38 lakhs has been released in project outlay of the district is earmarked for
2019-20. Totally 1362 tanks have been this purpose. The share of Centre and State
considered for rehabilitation and in this regard is 60:40 respectively. The
development, of which 183 are Minor Central Government has made a provision
Irrigation Tanks and 1179 tanks are Zilla for payment of Rs.7.00 lakhs to Rs.20.00
Panchayat tanks in 20 Districts covering lakhs to each Gram Panchayat depending
116 taluks. on the Household of the GP for management
of Solid and Liquid disposal. 155 works have
5.3.2 Rural Sanitation been taken up under Solid & Liquid Waste
1. Swachha Bharat Mission (SBM) Management
Karnataka has been the forerunner in Open Defecation Free (ODF)
putting forth concerted efforts to implement 30 Districts 176 Taluks 6021 Gram
total sanitation in the rural parts of the Panchayaths and 26935 Villages have been
State. To accelerate and achieve universal declared Open Defecation Free up to end of
sanitation coverage and to put focus on safe Nov-2019.
sanitation “Swachh Bharat Mission” was
launched on 2nd October 2014. As per the directions of the Ministry of
Drinking Water and Sanitation,(MDWS)
The objectives of the SBM(Grammena) is to Government of India, Left out Baseline
bring improvement in the general quality of (LOB) survey has been conducted during
life in rural areas by promoting, 2018-19 to find the households without
cleanliness, hygiene and eliminating open toilets in the rural area of the State. As per
defecation. Ensure every Family, Schools the Left out Baseline survey, there were 4.02
and Anganwadis in rural areas to have lakh rural households without toilets. The
access to toilet facilities. data has been updated in the IMIS portal.
Under the Swachh Bharat Mission both BPL
5.3.3 Rural Energy Programmes
and R-APL beneficiaries (APL beneficiaries
restricted to SCs/STs, small & marginal A) New National Biogas and Organic
farmers, landless laborers with homestead, Manure Programme (NBOMP)
physically handicapped and women headed
households) are eligible for an of incentive Biogas is a clean, non-polluting, smoke and
of Rs.12,000 of which Rs.7200 as Central soot-free fuel, containing methane gas
Share (60%) and Rs.4800 as State produced from cattle dung, human waste
Share(40%) and Rs.15000/- to SC & ST and other organic matter in a biogas plant
(Rs.3000/- from the grant of SCP and TSP) through a process called anaerobic
for construction of individual household digestion. The digested slurry can be used
toilet. as a good quality manure in agricultural
fields.
During 2019-20, Rs.740.00 crores has been
allocated and Rs 259.89 crores has been Objectives
spent (by utilizing opening balance funds) r To provide clean bio-gaseous fuel
against the release of Rs. 219.81crores. mainly for cooking purposes and also
Under this programme, about 1.80lakh for other applications for reducing use
Individual House Hold Latrines, 122 of LPG and other conventional fuels;
Community Sanitary Complexes, 488
r To meet ' lifeline energy' needs for
latrines in Schools and 1978 latrines in
cooking gas envisaged in ' Integrated
Anganawadi's have been constructed up to
Energy Policy;
end of November 2019.
r To provide bio-fertilizer/organic
2. Solid and Liquid Waste Management manure to reduce use of chemical
With a purpose to achieve total cleanliness fertilizers;
in rural areas, more importance is being r To improve sanitation in villages by
given for management of solid and liquid linking sanitary toilets with biogas
waste disposal for which 10% of the total plants;
Economic Survey of Karnataka 2019-20 133

r To mitigate Climate Change by Environment Protection, Rain Water


preventing black carbon and methane Harvesting, Improved Cook Stoves, Forestry
emissions. etc. During 2019-20, 342 Training / Skill
It is targeted to construct 7000 bio gas Development programmes were held
plants and 2326 have been constructed up covering 45669 participants. An amount of
to end of November 2019 by incurring an Rs. 214.87 lakhs has been spent up to end
expenditure of Rs. 291.69 lakhs as against November 2019 towards administrative and
the allocation of Rs. 1355.00 lakhs training expenses.
(including Central share of 840 lakhs) up to 5.3.4 Rural Communications
end of November 2019.
1) Pradhana Manthri Gram Sadak
Progress made under New National Biogas Yojana (PMGSY)
and Organic Manure Programme for the last
3 years and current year (upto Nov. 2019) is PMGSY was launched with an objective to
furnished in Table 5.9. provide rural connectivity by way of all
weather roads to eligible habitations having
B) The Karnataka State Bio-fuel Policy- a population of 500 and above. Under this
2009 programme, Rs 191 crore has been allocated
The Karnataka State Bio-fuel Policy has (including Maintenance of PMGSY Roads)
come into force from 1st March 2009. and Rs. 62.13 crore has been spent for
Karnataka Bio-fuel Policy is implemented maintenance of 1302.60 kms of road length
through Karnataka State Bio-fuel Develop- as on November 2019.
ment Board. An amount of Rs.400.00 lakh 2) Namma Grama Namma Raste Yojane
is provided in the budget during 2019-20 (NGNRY)
and Rs.200.00 lakhs has been released for
implementation of various activities. Namma Grama Namma Raste Yojane was
launched with an objective to provide rural
C) Institutional support for Rrural connectivity as per PMGSY guidelines.
Energy Development Under this programme, Rs 6567.50 crore
Mahatma Gandhi Institute of Rural Energy has been spent and 14070.84 kms of road
and development primarily providing length has been asphalted up to November
awareness / training for Grama Panchayat / 2019 since inception of this programme.
Taluk Panchayat / Zilla Panchayat elected During 2019-20 an allocation of
representatives, officers of RDPR & other Rs. 1397.59 crore has been allocated for
related departments, School & College rural connectivity and maintenance of roads
students, teachers, NGO, SHGs, General and 5312.12 kms of road length has been
Public etc., on renewable energy and related connected and maintained by incurring an
subjects such as Energy Conservation, expenditure of Rs. 664.57crore up to end of
November 2019.
Table 5.9:
Physical (Nos.) Financial (Rs. in lakhs)
Year
Target Achievement Target Achievement

2016-17 10000 5294 1344.00 1090.26

2017-18 8000 5423 1214.00 536.25

2018-19 8900 6408 1004.00 1020.02(*)


2019-20
7000 2326 1355.00 291.69
(Up to Nov 2019

Total 33900 19451 4917.00 2938.22


(*) The total expenditure includes Opening Balance for the year 2018-19.
134 Economic Survey of Karnataka 2019-20

3) Chief Minister Gram Sadak Yojane Employment Guarantee Act is being


implemented in all the districts with an
Under Mukhya Mantri Gramina Raste
objective to enhance livelihood security in
Abhivruddhi Yojane. An amount of Rs
rural areas by providing 100 days of
27513.56 lakhs have been provided in the
guaranteed wage employment in a financial
budget for 2019-20. The funds so provided
year to every household whose adult
have been allocated to Zilla panchayats for
members volunteered to do unskilled
maintenance of rural roads.
manual work as per demand, resulting in
5.3.5 NABARD evaluation of productive assets of prescribed
quality and durability, Strengthening the
RIDF NABARD-21 (2015-16): Under this livelihood resource base of the poor, Pro
programme, 102 works were completed as actively ensuring social inclusion and
against the approved works of 108. 6 works strengthening of PRIs.
are dropped as the same works are taken up
by the other departments In comparison with the erstwhile
employment programmes MGNREGS is
RIDF NABARD-22 (2016-17): Under RIDF
different, as it has been emerged under the
22, 110 Road works for Rs. 5220.50 lakhs,
Act. It has a separate salient features which
14 Bridge works for Rs 634.00lakhs and
are as follows:
194 Minor Irrigation works for Rs. 8520.05
lakhs were approved. 108 road works, 11 1. It is largest employment programmes.
bridge works are completed. 2 road works Its a bottom-up, people-centered,
and 3 bridge works are dropped as the same demand-driven, self-selecting, rights-
has been taken up by other department based design is distinct and
programmes. Under Minor Irrigation works, unprecedented
181 works are completed and 7 works are
2. The MGNREGA provides a legal
dropped. The remaining 6 works are under
guaranteed for wage employment.
progress.
RIDF NABARD-23 (2017-18): During 3. It is a demand based programme where
2017-18, 116 Road works for Rs.7292.80 work can be given to the wage seekers
lakhs & 5 bridge works for Rs.370.00 lakhs on demand.
were approved. 107 road works are 4. Legal provisions are made under the Act
completed and 2 works are under progress. to pay unemployment allowance and
7 road works were dropped as the same compensation allowance in case of
works are taken up by the other failure to provide work on demand and
departments. Out of 5 bridge works, 4 works delays in payment of wages for the
are completed, 1work is under progress. works undertaken.
RIDF NABARD-24 (2018-19): During 5. Funds will be shared between the GoI &
2018-19, 146 Road works for Rs 14283.75 GoK in the ratio of 90:10 Labour and
lakhs &7 bridge works for Rs 740.00 lakhs material ratio shall be maintained at
were approved. 22 road works are completed 60:40. labour portion is fully borne by
and 66 road works and 4 bridge works are Government of India & Material portion
under progress. Action has been initiated to is to be shared between GoI & GoK in
start the 54 road works and 3 bridge works. the ratio of 75:25
4 road works are dropped as the same has
been taken by the other departments. 6. For all the works taken by the GPs and
other implementing agencies, the cost
5.4 WAGE EMPLOYMENT PROGRAMMES of the material component including the
5.4.1 Mahatma Gandhi National wages of the skilled and semi-skilled
Rural Employment Guarantee Scheme works shall not exceed 40% at the
(MGNREGS) District level.

The Centrally Sponsored Scheme of During 2019-20, an amount of Rs 3755.10


Mahatma Gandhi National Rural crores has been released as against the
allocation of Rs. 1816.00 crores, of which Rs
Economic Survey of Karnataka 2019-20 135

3723.81 crores has been utilized (utilizing The federation will also facilitate bank
the opening balance amount) to generate linkage and identification of left out families
812.40 lakh mandays upto Nov 2019. 19.47 to be mobilized into SHGs and federations.
lakhs households have been provided As a part of rural livelihood programme
employment as against the demand of 21.92 Gram Panchayat level federation will take
lakh during the current year. 8.37 lakh up convergence activities with Gram
works have been undertaken of which 2.30 Panchayat.
lakh works are completed and the remaining
The progress achieved under NRLM through
6.07 lakhs works are under progress.
KSRLPS during 2019-20 under different
5.4.2 Karnataka State Rural Livelihood components is of Rs. 197.09 crore (utilizing
Promotional Society (KSRLPS) opening balance funds) as against the
allocation of Rs. 150.00 crore up to end of
The Government of India, Ministry of Rural November 2019.
Development has restructured SGSY as
“Aajeevika”- National Rural Livelihoods 5.5 RURAL GOVERNANCE
Mission (NRLM) and being implemented
5.5.1 Decentralized Planning as the
from 2010-2011. The State Government is
implementing this scheme in the phased Strategy
manner through Karnataka State Rural Accelerating rural development and ensure
Livelihoods Promotion Society which was benefits of development reach equitably to
established on 11.12.2011 and the society all for the evolution of an appropriate rural
was named as “Sanjeevini”. development planning strategy - a strategy
that strengthens various indicators of rural
Institution Building and Capacity
development as also brings a qualitative
Building
change in their reach to all sections of the
Mobilization of poor to form their 'own society. In order to achieve this objective, the
institutions' is the most important Government of India opted for a strategy of
prerequisite and the core investment for decentralized planning and entrusted the
large scale poverty reduction. NRLM would responsibility of planning and implementing
organize all poor households (women) in to rural development programs to the
aggregate institutions of the poor that decentralized government bodies like PRIs
provide them with voice, space and in rural areas and urban local bodies in
resources. These platforms 'of the poor' and urban areas. With the 73rd Constitutional
'for the poor' would partner with local self- Amendment 1993 the PRIs have acquired a
governments, public service providers, statutory status, become integral part of our
banks, private sector and other mainstream polity and more importantly, they have been
institutions to facilitate delivery of social recognized as 'institutions of self-
and economic services to the poor. Building government'. They have been given the
and sustaining institutions of the poor at important responsibilities of preparation
various levels would be for collective action, and implementation of Plans to ensure
greater solidarity, bargaining power, economic development in rural areas and to
economies of scale and larger linkages. ensure social justice in the distribution of
benefits of such development process.
The Gram Panchayat Level Federation will
Consequently, decentralized governance
select a local Community Resource Person
and planning have emerged as strategies for
(CRP), to carry the social mobilization and
initiating socio-economic transformation in
capacity building process. The federations
rural areas with the prime objective of
will then analyze training requirements and
developing rural infrastructure and
conduct training to the existing SHGs & new
improving the living conditions of the rural
SHGs formed. In addition, the GPLF will
people, especially the weaker sections.
facilitate preparation of MIP which will be
used to release Community Investment Gram Panchayaths has to prepare 5years
Fund (CIF) to the Self Help Groups. development plan on the basis of basic
needs of the people and other local
136 Economic Survey of Karnataka 2019-20

necessities. These vision plans has to The powers and functions of the Grama,
include priority basis schemes and this has Taluk and Zilla Panchayats have been listed
to be submitted to the Taluk Planning and in sections 58, 145 and 184 of KPR ACT,
development committee for consideration. 1993. As per the three schedules (I, II, III) the
Taluk Planning and development committee panchayats are authorised to carry out
has to examine development plan and functions such as preparation of annual
submit it to the District Planning Committee plans, annual budgets and sectoral
for further consideration. District planning schemes for promotion of agriculture,
committee after scrutinizing all these plan animal husbandry, rural housing, drinking
schemes submit consolidated report to the water, roads and bridges, rural
state decentralized planning and electrification, education, rural sanitation,
development committee which is headed by public health, women and child
the Honorable Chief Minister. development, social welfare, public
distribution system, maintenance of
5.5.2 Decentralised Planning in community assets, co-operative activities
Karnataka and promotion of libraries. Section 309 of
After effecting the 73rd Amendment to the 1993 Act provides for the preparation of
Constitution, Karnataka was the first State development plan by the grama panchayats,
to pass a new legislation in 1993, viz., The taluk panchayats and zilla panchayats.
Karnataka Panchayat Raj Act, 1993. The Act Further, Section 310 of the Act makes it
provides for a three-tier structure of mandatory for the state to constitute
Panchayati Raj with Zilla Panchayats (at the District Planning Committees (DPCs) in
district level) Taluk Panchayats (at the each district which are required to
Taluk level) and Gram Panchayats (at the consolidate the plans prepared by the
village level). The Bill for constituting panchayats and municipal bodies and to
panchayats, which was introduced on 1st prepare the draft district development plan
April 1993, came into force from May 18, of the district by taking into consideration
1993. In conformity with the Eleventh the needs of the spatial planning, physical
Schedule of the Constitution, the 1993 Act and natural resources and the level of
has entrusted a wide range of functions infrastructure development. Dr. D M
(Schedule I, II and III) to panchayats. To Nanjundappa's Report on Redressal of
carry out these functions, the Gram Regional Imbalances also recommended
Panchayats receive an annual grant of Rs. that DPCs in each district should do the
10 lakh per GP - for GPs with population of planning keeping 'taluk' as the primary unit
less than 8000 and for those with more than in the planning process.
8000 population an increment of Rs. 1 lakh The PRIs prepare the action plans as per the
for every 1000 population is provided. Rs. allocations, discuss them in the various
902.99 crore has been allocated to the Standing Committees and place them in the
grama panchayats during 2019-20. GPs general body meetings and seek guidance of
also have powers to levy tax on buildings the District Planning Committees after
and lands, levy water rate, tax on which the implementing officers start
entertainment, vehicles, advertisement and executing the plans/programmes. In the
hoarding and collect market fee, fee on bus preparation of plans the ward sabhas and
stands and on grazing cattle. Both the Taluk grama sabhas play a crucial role and their
and Zilla Panchayats are allowed to charge recommendations and suggestions do figure
fee on their property used by others and they in such action plans emphasising the fact
do not have powers to levy taxes. In addition, that the plans so prepared are the byproduct
both the Grama Panchayats and the Taluk of people's wishes and demands. Thus, the
Panchayats get proceeds from cess on land entire planning process can be termed as
revenue, surcharge on stamp duty levied by “Participatory planning processes”.
the State Government. Except for these, the
panchayats have to depend solely on the
resources transferred from the Government.
Economic Survey of Karnataka 2019-20 137

5.5.3 Initiatives to strengthen c). The committe while preparing the


Decentralised Planning Process consolidated plan, consult such
institutions and organizations as the
Karnataka comprises of 6,021 Gram Government may, by order, specify.
Panchayats, 177 Taluk Panchayats and 30
Zilla Panchayats. The State has its credit d). Soon after the process of consolidation
entrusting major responsibilities and and integration is completed, the
devolving all the 29 functions to the committee shall forward the
panchayats as enlisted under the Eleventh consolidated plan to the Government.
Schedule of the Constitution. In recent e). The committee shall also look after
years, the State Government has been formulation of policy matters related to
taking a proactive stance to strengthen the local development and regional
decentralised governance and planning development, co-ordination of districts
process and to that effect has introduced and state plans and designing policies
many administrative innovations. to strengthen local bodies.
The Karnataka Panchayath Raj (second
Other Activities carried out by the
amendment) Act, 2015 has been amended
Committee
in December 2015. The salient features of
the new amendment are insertions of new i) To formulate the plans from bottom to
sections 309A to 309 H of the Principal Act. top approach a detailed guidelines/
Section 309(4) and 309-A to 309-H where in circulars have been issued.
it is clearly mentioned the strategy to follow
ii) Holding of KDP meetings has been
in preparing the development plan from the
extended to GP level.
grass root level Janavasti Sabha. These
planning proposal has to be scrutinized at iii) 5 districts have been allocated to each
the gram panchayat level and also at expert member of the Karnataka State
G.P./T.P/Z.P development committees. Decentralised planning and
Vision plan has to be prepared at the Gram Development Committee to oversee the
Panchayat level on the basis of the necessity planning process.
and available Grants.
5.5.5 Activity Mapping
Section 310B has been inserted to
constitute Karnataka state Decentralised The State has evolved a detailed range of
Planning and Development Committee, 'Activity Mapping' for all the three
headed by Hon'ble Chief Minister of panchayats. Broadly, the activity mapping
Karnataka to formulate development plans visualizes both Zilla Panchayats and Taluk
and annual economic review to be presented Panchayats as planners, facilitators and
along with the budget document. owners of common executive machinery,
Grama Panchayats as the cutting edge of
5.5.4 The functions of the Karnataka local service provision, and Grama Sabha
State Decentralized Planning and and Ward Sabhas as instruments of
Development committee are downward accountability. The new activity
mapping framework devolving functions has
a). The Karnataka state decentralized to be accompanied by adequate devolution
planning and development committee of finances and functionaries. To translate
(KSDPDC) shall link the plans of this into reality, the Department of Rural
districts and other planning units to Development and Panchayat Raj in
provide for mutual consultation and coordination with other departments has
negotiations between them and also devolved certain functions, functionaries
provide the framework for integrating and finances to PRIs.
the sectoral and spatial aspects of
urban and rural plans. All the 29 subjects enumerated in part IX of
the constitutions have been transferred to
b). The process of consolidation and the PRI Institutions along with funds,
integration by the KSDPDC shall not functions and functionaries. Accordingly,
alter the plans prepared by the districts.
138 Economic Survey of Karnataka 2019-20

activity map is issued as per section 240 of budget provision has been made under
the KPR Act 1993. Role and responsibility in District Sector constitutes 17.24 & 16.71
implementing the schemes of these subjects percent respectively to the total budget.
are clearly mentioned in activity map.
Sector wise allocation made in decentralized
5.6 DECENTRALIZED PLANNING planning from 2017-18 to 2019-20 is
depicted in Table 5.10.
During 2017-18 an amount of Rs. 32794.34
crores was allocated to district sector plans It may be seen from the Table 5.10, sectors
which constitute 15.90 percent of the total like education (47%), Other Rural
budget. During 2018-19 and 2019-20, Development Programmes (16%), Medical

Table 5.10 (Rs. lakh)

Allocation
Sector
2017-18 2018-19 2019-20

Public Works 16760.00 19141.00 19230.00

General Education 1404503.00 1737673.00 1836801.91

Sports & youth services 4926.00 5714.00 5735.70

Art & Culture 240.00 374.00 430.50

Medical & Public Health 108131.00 146938.00 145898.62

Family welfare 46153.00 56256.00 56939.41

Water supply and Sanitation 162385.00 185009.00 78702.00

Housing 150675.00 100000.00 50000.00

Welfare of SCs , STs


290490.00 293750.00 315005.70
And other Backward lasses

Labour & Employment 1379.00 1578.00 1579.00

Social Security and Welfare 119549.00 102644.00 162711.00

Nutrition 156693.00 215042.00 215042.00

Crop Husbandry (including


30740.00 38346.00 36762.17
Horticulture)

Soil and Water Conservation 3356.00 3932.00 3480.00

Animal Husbandry 50156.00 61392.00 65804.38

Fisheries 2900.00 3384.00 3784.06

Forestry and Wild Life 14308.00 17391.00 20130.71

Co-operation 571.00 584.00 597.08


Special programmes for Rural
13754.00 10303.00 15111.00
Development
Rural Employment 178264.00 174000.00 181600.00

Contd....
Economic Survey of Karnataka 2019-20 139

Allocation
Sector
2017-18 2018-19 2019-20
Other Rural Development
Programmes 459181.00 525957.00 626302.00
(Includes Hill Area)
Minor Irrigation 2578.00 2750.00 3053.38

New and Renewable Energy 1764.00 821.00 515.00

Village & Small Industries


12197.00 13725.00 14266.89
(including Sericulture)

Industries 519.00 426.00 326.00

Roads & Bridges 43885.00 46844.00 50531.24

Other Scientific Research 218.00 233.00 218.50


Secretariat Economic Services 2603.00 2728.00 2179.65

Civil Supplies 16.00 11.00 11.00

Other General Economic


540.00 651.00 771.00
Services

Total 3279434.00 3767597.00 3913519.90

and Public Health including Family Welfare land tax has been levied based on their
(5%), welfare of Scheduled Castes, market value in Grama Panchayat limit.
Scheduled Tribes & OBC (8%), Nutrition Provision has been made for Grama
(5.5%) have been given the priority during Panchayats to levy taxes on mobile tower,
2019-20. wind power based electricity generating
Ø To increase the resources of Grama plants and solar energy based electricity
Panchayats, the tax levying coverage area generating plants in Grama Panchayat area
and criteria has been revised. Building and
140 Economic Survey of Karnataka 2019-20
URBAN DEVELOPMENT CHAPTER 6

INTRODUCTION development programmes for the


development of urban areas.
Urbanization is sine quo non of economic
development. The State today is in rapid 6.1 TRENDS IN URBANISATION
process of urbanization. It is expected to th
reach an urban population proportion of Karnataka is the 7 most urbanized State in
50% by 2026. Urbanization gives rise to India. As per 2011 Census, 38.6% (i.e. 2.35
various issues and problems like crore) of total population in the state reside
in urban areas. (Decennial trends in
r Urban poverty and Slums. urbanization is shown in Table.6.1). In
r Increased pressure on basic terms of urbanization, the State has
services/civic amenities of housing, witnessed an increase of 4.59 per cent in the
water supply, sanitation, electricity, proportion of urban population during the
r Increased demand for urban schooling period 2001 to 2011. For the first time since
and healthcare, independence, absolute increase in
population has been more in urban areas
r Environment pollution and than in rural areas. Karnataka's urban
degradation. population has grown by 31.27% between
r Solid waste management and 2001 and 2011, compared with 28.85% in
maintenance of roads - a big challenge the previous decade. The growth of urban
for the State Government. population between 2001 and 2011 is also
The Urban Development sector is higher as compared to 7.63% growth in the
responsible for overseeing all the aspects of rural population in the same period. The
development of urban areas in the State. percentage of Urban population in the State
The Urban Development Department is above national average in all the censuses
comprising 281 Urban Local Bodies, (BBMP, and the gap is increasing over the years. The
4 Notificed area commissioned and 276 intra State distribution of the urban
other ULBs) which implement various population indicates that among the
districts, Bengaluru is the most urbanized
Table 6.1: Trends in Urbanization in Karnataka and India (1951-2011)

Karnataka’s total % of Urban % of Urban


Year
Population (lakhs) Population in Karnataka Population in India

1951 194 22.95 17.29

1961 236 22.33 17.96

1971 293 24.31 19.91

1981 371 28.29 23.33

1991 448 30.91 25.71

2001 527 33.98 27.78

2011 611 38.67 31.15

Source: Census of India, 2011

141
142 Economic Survey of Karnataka 2019-20

district with 90.94 per cent of its population households are living in one- or two-room
residing in urban areas. This is followed by tenements in the northern districts of the
Dharwad (56.82 per cent), Dakshina State as the area is more backward.
Kannada (47.67 per cent), Mysuru (41.50
Karnataka is one of the few states, which
per cent) and Bellary (37.52 per cent)
have their own housing programmes for the
districts. The least-urbanised district in the
EWS both in rural and urban areas apart
State is Kodagu with 14.61 per cent,
from the centrally sponsored housing
preceded by Koppal (16.81 per cent),
schemes for the EWS. In addition, the
Mandya (17.08 per cent), Chamarajanagar
Karnataka Housing Board (KHB) caters to
(17.14 per cent) and Yadgir districts (18.79
housing needs of low income, middle income
per cent). District wise details are given in
and high-income groups. The Karnataka
Appendix 6.1
Slum Development Board(KSDB) is
6.2 URBAN HOUSING responsible for improvement of slums and
resettlement of slum dwellers.
Growth of Urban areas has led to growing
demand for housing. Keeping this in view, 6.2.1 Housing Demand Survey
housing is emerging as a prime component
The Socio Economic and Caste Censes
over the period of time not only in providing
conducted during 2011 has identified
shelter but also in providing employment
families living in Kaccha houses and rented
opportunities and in development of
houses as houseless. As per the census
locations. To meet the growing demand of
70,93,378 families are houseless families in
housing, the State has been pro-active in the
the state which includes both APL\BPL
implementation of its housing policies.
families. After the census, 23,69,965
Further, housing for the poor and down-
houses have been provided for the houseless
trodden assumes greater importance both
families uder various schemes.
in rural and urban areas of the State.
Allocation for the housing sector is being 6.2.2 Karnataka Housing Board
increased over the years along with
KHB is endeavoring to meet the rise in
formulation of facilitating policies and
housing demand by undertaking layout
guidelines.
formation, Construction of houses, land
According to Census 2011, about one-third development schemes under joint venture
of the households in the State live in one- scheme policy approved by Government of
room tenements; nearly 30 per cent live in Karnataka and KHB Act. At present KHB is
two-room tenements. It is observed that a implementing the schemes approved by the
significantly higher proportion of Government such as 100 housing scheme,

Table 6.2 : Urbanization within Karnataka - 2011

Top Five Districts Bottom Five Districts

Urban Urban
Sl.
District Population District Population
No.
in % in %

1 Bengaluru 91 Kodagu 15

2 Dharwad 57 Koppal 17

3 Dakshina Kannada 48 Mandya 17

4 Mysuru 41 Chamarajanagar 17

5 Bellary 38 Yadagiri 19

Source: Census of India, 2011


Economic Survey of Karnataka 2019-20 143

Suvarna Karnataka Housing Scheme and r 6 schemes are under implementation to


225 Housing Schemes approved during construct 484 houses and to develop
2010-11. The projects approved by the 6744 sites at the cost of Rs. 430.37
Government and Proposed projects are as crore
per demand driven. r The process of procuring the requisite
The Main Objective of the KHB are – land is under progress for the remaining
schemes.
1. Survey of Housing demands in urban
cities and Towns. 53 Housing Schemes

2. Acquisition of land (Government and 53 Housing schemes were approved at a


Private) for Housing schemes. project cost of Rs.7888.04 crore during
2012 to develop 130471 sites and to
3. Implementation of housing schemes as construct 6867 houses. 4 Schemes have
per demand, land and zonal rules as per been completed at a cost of Rs. 443.80 crore
transparency act. under which 120 houses and 5973 sites
4. Allotment of Site/Houses through have been constructed and developed. 2
lottery under KHB regulation act 1983. Schemes are under implementation at a
cost of Rs.346.00 crore to construct 60
100 HOUSING PROJECTS houses and to develop 3003
It is being implemented since 2002. 6067 Sites.Remaining schemes are under
houses have been constructed and 28368 formulation.
sites have been developed under 99 Board schemes
Schemes with an expenditure of Rs1027.32
crores. 528 houses and 2866 sites have been
constructed/developed under 44 Schemes
Suvarna Karnataka Programme at a cost of Rs. 215.19 Crore. From the
The Board has taken up 50 Housing above schemes, totally 1,21,113 houses
Schemes at various places under Suvarna were constructed and 77,793 sites were
Karnataka Scheme at a cost of Rs.1406.48 developed upto 2018-19 by the Karnataka
Crore. The Various stages of Housing Board. The physical and financial
implementation of the Programme are as progress and also Budget and Expenditure
follows. under the above schemes are furnished in
Table 6.3 and 6.4 respectively.
r 42 Schemes have been completed at a
cost of Rs. 1446.29 crore. Under which Deposit Contribution works:
2420 houses and 21348 sites have been Karnataka Housing Board has undertaken
constructed and developed. deposit contribution works and the
r 1 scheme at the cost of Rs. 6.07 Crore is Progress achieved under this programme up
under implementation to develop 287 to November 2019 is as detailed below.
sites and to construct 10 houses.
r 573 building projects have been
r 7 schemes are under formulation. completed, amounting to Rs.1236.14
225 Housing Schemes Crores
225 housing schemes were approved to r 199 building projects are under
develop 3,05,786 sites and to construct progress amounting to Rs.1744.74
1,31,051 houses during 2010-11. The Crores .
Progress under different schemes are as r 250 buildings Projects amounting to
detailed below. Rs. 1255.58 crores are under
formulation.
Under 38 schemes, 3317 houses have been
completed and 58,076 sites have been In line with the guidelines of Affordable
developed at a cost of Rs. 4354.56 crore. Housing Policy, KHB will take necessary
action to construct at least 50%
144 Economic Survey of Karnataka 2019-20

Table 6.3 Details of year wise allotment

Houses Sites Other


Grand
(CA/Com.
Year Total
EWS LIG MIG HIG TOTAL EWS LIG MIG HIG TOTAL Shops)

Upto
2013- 184 5765 4389 1026 116830 5315 18355 18687 9829 52186 1056 170072
14

2014-
0 122 235 85 442 650 2231 1546 670 5097 366 5905
15

2015-
158 217 28 403 806 1408 2028 1695 678 5809 54 6669
16

2016-
9 366 442 54 871 1552 1859 2317 794 6522 28 7421
17

2017-
14 396 921 119 1450 953 1343 1383 1133 4812 0 6262
18

2018-
0 182 337 32 551 293 1159 1199 406 3057 12 3620
19

2019-
20
(upto 3 113 44 3 163 5 131 116 58 310 0 473
Nov
2019

TOTAL 368 7161 6396 1722 121113 10176 27106 26943 13568 77793 1516 200422

Table 6.4 Details of Budget and Expenditure (Rs. In Lakhs)


Shopping
100HP SKPH 225 HP Board Sche me 53 HP
Complex
Year
Bud. Expd. Bud. Expd. Bud. Expd. Bud. Expd. Bud. Expd. Bud. Expd.

From
2006 90791.60 74586.32 182709.86 61024.06 194580.20 123739.88 54070.26 19606.01 4128.88 512.81 38464.60 5765.00
-2014

2014-
396.81 0.30 11008.75 4162.12 30262.23 26356.11 2241.52 1428.02 - - 8876.42 3139.32
15

2015-
573.67 196.18 1535.21 1486.00 24243.87 12317.00 648.85 822.07 - - 5450.89 2876.64
16

2016-
404.95 151.62 2009.19 1167.58 22049.37 7886.84 915.88 220.52 - - 12280.35 1352.48
17

2017-
583.00 494.82 2450.00 1688.14 25000.00 8111.00 1091.00 1035.00 - - 12540.00 314.18
18

2018-
2760.00 1056.32 1087.00 676.12 15887.00 7031.18 2500.00 1243.58 - - 8725.00 16.21
19

2019-
20
(upto 2655.09 - 1406.48 251.02 28372.88 7077.13 1299.82 276.03 - - 6554.19 623.11
No v-
2019)
Economic Survey of Karnataka 2019-20 145

houses/flats for EWS/LIG category in each target of 500 upto November 2019 by
of their housing schemes and Government incurring an expenditure of Rs. 2.32 crores.
land shoud be allotted on priority to KHB. District wise Houses constructed is
furnished at Appendix 6.3.
6.2.3 Vajpayee Urban Housing Scheme
6.2.5 Dr.B.R. Ambedkar Nivasa Yojane
This is State Sponsored scheme called
urban Ashraya implemented for urban poor The scheme is being implemented from
from the year 1991-92. The annual income 2015-16 for providing housing facility to the
of the beneficiary is Rs.87,500/-. The houseless families of Schedule Casts and
beneficiaries are selected by the Ashraya Schedule Tribes. Under this scheme Rs.1.75
Committee headed by the local MLA. This lakhs subsidy is being provided to Rural
Scheme has renamed the Urban Ashraya area and Rs.2.00 lakhs in urban areas. The
Scheme as Vajpayee Urban Housing income limit for the beneficiary is Rs.
Scheme. As per the guidelines 90% of the 32,000/- in case of Rural and Rs. 87,600/-
target is reserved for general and the in case of urban areas. In 2017-18 Series
remaining 10% for minority. For the year Houses will be provided based on the house
2017-18 the target was fixed only for on demand who have own site.
generally category. The unit cost per house
During last 3 years 27077 houses have been
is Rs.2.00lakhs, of which Rs.1.20 lakhs is
completed as against the target of 27000
provided as subsidy, Rs. 30,000/- is
houses. For the year 2019-20 as against the
beneficiary contribution and remaining
target of 7000, 3005 houses have been
Rs.50,000/- is bank loan.
completed at end of November 2019 by
During last 19 years i.e. 2000-01 to 2018- incurring an expenditure of Rs. 160.65
19, 2,12,448 houses have been constructed. crores. District wise break-up is furnished
The RGHCL has constructed 38,374 houses at Appendix 6.4.
as against the target of 78,000 houses from
2016-17 to 2018-19 and during 2019-20, 6.2.6 Pradhan Mantri Awas Yojana
5,705 houses have been completed Housing for All (PMAY-HFA):-
(including spill over works) as against the Under PMAY-HFA, a family can avail
target of 5,000. till November 2019 by housing under any of the following verticals
incurring an expenditure of Rs. 245.33 under this mission.
crores (by utilized the opeing balance
amount) as against the allocation of Rs. 125 1. In-situ” Slum Redevelopment using
crores. District wise houses cocstructed land as Resource
details is furnished at Appendix 6.2. 2. Credit-Linked Subsidy Scheme
6.2.4 Devraj Urs Housing Scheme: 3. Affordable Housing in Partnership
This Schemes as launched during 2014-15 (AHP)
to provide shelters to people is special 4. Beneficiary-led individual house
category i.e. Physically handicapped, construction or enhancement
leprosy cured persons, HIV Affected
families, devadasis, nomadic tribes, safai All 275 cities as per Census 2011 would be
karmacharies, people affected by communal covered under this Mission.
Riots, Exploits, free bonded labourers, Under Pradhan Mantri Avas Yojana, an
widows, orphans living on foot- path , amount of Rs.27,424.85 crores has been
transgender etc. The unit cost per house is approved for 1,831 projects for construction
Rs.1.20 lakhs for General category and of 5,34.619 houses, of which Central share
Rs.1.50 lakhs for SC/ST beneficiaries. is Rs.8,019.28 crore, State Government
The RGHCL has constructed 244 houses as share is Rs. 8,130.73 crore, Beneficiary
against the target of 552 houses from 2016- contribution is Rs. 10,186,85 crore and
17 to 2018-19. During the current year, 233 urban local bodies share is Rs. 1,086.73
houses have been completed as against the crore.
146 Economic Survey of Karnataka 2019-20

As against target of houses to the of cost. through Ashraya Committee. This


constructed 5,34,619 target 70.045 houses scheme was introduced by the Government
has been completed and 75.474 houses in the year 1992-93.
under various stages. The expenditure
1,35,912 sites have been distributed in
incurred was Rs. 1,710.93 crores.
urban areas form 2000-01 to 2018-19.
Chief Minister's One Lakh Bengaluru During 2019-20 (up to November 2019)
Housing Scheme 1203 sites have been target of 5000 house
sites. District wise house sites is furnished
This scheme was announced in the Budget at Appendix 6.5.
Speech of 2017-18. For this scheme the
government is providing government land at During last 5 years (i.e. 2015-16 to 2019-20)
free of cost. The unit cost includes subsidy the Government has spent a total amount of
amount provided from central Government Rs.127.81 Crores under Urban House Sites
under PMAY(U) Scheme of Rs.1.5 Lakhs. and Rs.32.69 Crores towards Infrastructure
State share of Rs.2.00 lakhs provided under works. The details are given in Table 6.5.
Dr.B.R. Ambedkar Nivas Yojana and
During last 3 years i.e. 2016-17 to 2018-19,
Rs.1.20 Lakhs provided under Vajapayee
the Company has constructed 88,840
Urban Housing Scheme for General and
houses under various housing schemes as
Minority beneficiaries. The balance amount
against the target of 1,57,068. Under house
through bank loan or beneficiary
sites scheme as against the target of
contribution whose annual income is not
10,000, 18,948 sites have been distributed.
more than Rs. 87600/- 30 % houses are
For the year 2019-20 it is targeted to
reserved for SCs, 10 % for STs, 10 % for
Complete 19,500 houses and as against this
minorities and 50 % for others. 50.000
19,488 houses have been constructed as at
applications have been received through
end of Novmber 2019. In case of house sites
online for 1st stage of which 33.143 houses
scheme as against the target of 5,000 sites
have been constructed.
1203 sites in urban area sites have been
6.2.7 Infrastructure distributed at the end of November 2019.
The Government is providing Rs.40 lakh per 6.3 URBAN SLUMS DEVELOPMENT
acre towards providing basic amenities like
The population living in urban slums in
Drainage, Road, Drinking Water, Electricity
Karnataka has increased from 14.02 lakh
etc for newly developed layouts from 2011-
(2001) to 32.91 lakh (2011) by 18.89 lakhs
12. For this Rs.3.00crore was provided in
increase in a decade. In other words, the
2019-20 budget, as against this Rs.6.08
slum population which was 7.8 % to the
crores is spent during current financial year
total urban population in 2001 census has
(up to November 2019).
been increased to 13.9 % during 2011
6.2.8 Urban Sites: census. Bengaluru district has 21.94 per
cent of the total slum population.
The Government is implementing the
Vajpayee Urban Site Scheme in urban areas As per 2011 Census, Bengaluru district is
for EWS site-less families in the state. In the followed by Bellary and Dharwad, which
urban areas 20 x 30 sites are provided at free have 6.09 per cent and 6.21 percent

Table 6.5: Infrastructure facilities under Urban sites (Rs.crores)

Scheme 2015-16 2016-17 2017-18 2018-19 2019-20** Total

Urban House Sites 21.09 15.79 54.34 35.15 1.44 127.81

Infrastructure 11.93 2.27 7.83 8.83 1.83 32.69

** Figures are shown up to Novmber 2019


Economic Survey of Karnataka 2019-20 147

respectively. Udupi, Dakshina Kannada and Among the 40 projects sanctioned to


Kodagu has less than 1 per cent of the Karnataka, 17 projects have been taken up
population in slums. for constructing19897 houses with an
The Karnataka Slum Development Board is estimated cost of Rs. 1030.55 crores.
implementing the following schemes, viz. Rs. 910.88 crores have been spent and
r Slum Improvement Programme (State) 18318 houses have been completed by the
end of November 2019. 1579 houses are
r Rajiv AwasYojana (RAY) under progress completed.
r Prime Minister Awas Yojana (HFA)
6.3.3 Housing For All :
6.3.1 Slum Improvement Programme
a) Prime Minister Awas Yojan Phase-1
Amount of Rs. 75.00 crores has been for –“Housing for All”:
2019-20 to provided basic amenities in the
slums, of which Rs.27.33 crores have been It is a centrally sponsored programme
utilized upto the end of November 2019. implemented in 15 Cities/ Towns and 94
Slum Areas in the State at the cost of
6.3.2 Rajiv Awas Yojane: Rs.882.19 crores to construct 16293
Government of India has introduced a new dwelling units along with Infrastructure
scheme called “Rajiv Awas Yojane” on the facilities under Phase-1.
lines of Indira Awas Yojana during 2009-10 At present, Rs.291.61 Crores has been
to make the country slum free by providing released from Central and State share and
infrastructure facilities to the slum dwellers. Rs.345.63 Crores has been utilized and
This scheme will be in force from the year 4142 houses are completed at the end of
2013-2022. In the first phase cities 10 City November 2019.The remaining of 12,565
Corporation cities and 30 other houses is in different stages of construction.
Cities/Towns were selected for the b) Prime Minister Awas Yojan Phase-2
construction of houses with basic –“Housing for All”:
infrastructure. As per revised guidelines of
the scheme, cities with more number of The Centrally sponsored programme PMAY-
slums, district headquarters, religious HFA (U) has been implemented in 08 Cities/
centres, historical cities, cities with cultural Towns of Slum Areas in the State at the cost
and tourism centers, cities having more of Rs.489.27 Crores to construct 9741 DUs
number of SC/ST's and minorities were along with Infra facilities under Phase-2.
selected. The main objective of the The Central and State share of Rs. 133.25
programme is to create dignified, healthy Crores has been released; of which
and productive living conditions for all slum Rs.153.55 crores (including OB) have been
dwellers. spent so far. The constructions of 5239
houses are in different stages of progress
and 2850 houses have been completed as on
Sites: end of November 2019.
Urban House Site
Financial year
Target Achievement

2016-17 10000 7251

2017-18 0 10181

2018-19 0 1516

2019-20** 0 1203

Total 10000 20151


** Figures are shown upto November 2019
148 Economic Survey of Karnataka 2019-20

c) Prime Minister Awas Yojan Phase-3 Towns of Slum Areas in the State at the cost
–“Housing for All”: of Rs.426.41Crs to construct 7717 Dwelling
Units along with Infra facilities under
In 2017-18 Budget the Hon'ble Chief Phase-4 & 5. Rs.88.76 Crores has been
Minister has announced to construct released as Central and State share of which
50,000 houses exclusively to slum dwellers. Rs.50.22 Crores has been utilized as on
The Centrally sponsored programme PMAY- November 2019. The construction of 4383
HFA (U) has been implemented in 84 Cities/ houses are in various stage of progress.
Towns of Slum Areas in the State at the cost Details are given in the Table 6.6
of Rs.2661.84 Crores to construct 49,368
Dwelling Units along with Infra facilities 6.3.4 Pourakarmikas Gruha Bhagya
under Phase-3. So far Rs.357.42 Crores has Yojane :
been released as Center and State share and
The Pourakarmika Gruha Bhagya Yojana
Rs.384.70 crores has been utilized by the
has been initiated for providing housing to
end of November 2019. The constructions of
the eligible permanent Pourakarmikas
21004 houses are in different stages of
throughout the State in the year 2014-15.
progress and 1072 houses have been
All the permanent Pourakarmikas including
completed as on end of November 2019.
loaders, helpers, UGD workers, sanitary
d) Prime Minister Awas Yojan HFA (U) supervisor, overseers, etc, are eligible to be
Phase-4 & 5: the beneficiaries under this scheme. In this
scheme houses are estimated to be
The Centrally sponsored programme PMAY- constructed at a cost of Rs.7.50 Lakhs per
HFA (U) has been implemented in 09 Cities/ Dwelling Unit(DU),of which 80% will be

Table 6.6: Details of progress and expenditure incurred under PMAY-HFA.


(Rs.in crores)

Phase
Programme Phase-1 Phase-2 Phase-3 Total
4&5

No. of Projects Sanctioned 20 10 99 9 138

Total Houses 16293 9741 49368 7717 83,119

Project Cost (in crores) 882.19 489.27 2661.84 426.41 4459.71

Central Share 244.39 146.11 740.52 115.75 1246.77

State Share 284.46 159.92 745.02 119.35 1308.75

ULB’s share 274.52 135.96 239.23 44.07 693.78

Beneficiary Contribution 78.82 47.28 937.07 147.24 1210.41

Work in Progress 12565 5239 21659 4383 43846

Completed Houses 4142 2850 1072 78 8142

Released Amount (GOI+GOK) 291.61 133.25 357.42 79.38 871.03

Expenditure 345.63 153.55 384.70 50.22 934.11


(GOI+GOK+Contribution)
Economic Survey of Karnataka 2019-20 149

contributed by the State Government, which Water Supply and Sewerage schemes in 276
comes to Rs.6.00 Lakh and the remaining urban areas of Karnataka except Bruhath
20% i.e. 1.50 Lakh is to be contributed by Bangalore Mahanagara Palike. The Board
the beneficiary or by PMAY-HFA scheme and has implemented assured safe drinking
other funds of ULBs. Since there is a paucity Water Supply Scheme to 231 urban areas
of the space for construction of the houses at from surface source. The Board is
many places, multi-storeyed buildings are implementing 5 schemes [1) Malur,
being put up. Pourakarmikas are also 2)Bangarpet, 3)Gajendragad, 4)Naregal,
constructing their own houses in the sites 5)Anekal ] for shifting the source of water
owned by them. from ground water to assured surface
source of water. All these schemes would be
A list of 4706 beneficiaries from various
completed by the year December 2020, after
ULBs were approved under this scheme.
which only 40 urban areas would be left with
1053 houses were completed and 1770
sub-surface water as source.The scheme
houses are under construction at different
wise Progress in Table 6.7 From 2009 to
levels the expenditure incurred upto
2019-20 (upto Nov. 2019). Under 100 water
November 2019.
supply schemes were completed as against
6.4 URBAN INFRASTRUCTURE the target of 155 schemes year.
Provision of infrastructure services is In most of the urban areas, the sewerage
fundamental service to ensure quality life of system is covered only in the core areas. The
people. Urban infrastructure covers newly developed areas are not provided with
following: Water supply (for drinking, Sewerage System. The Board aims to
industrial, commercial and public usages), provide UGD system to all urban areas in
Sanitation (including Sewerage and Karnataka where the population is more
Drainage),domestic energy, road and urban than 50,000 in a phased manner subject to
transport. availability of funds. It is proposed to
provide Faecal Sludge and Septage
6.4.1 Water Supply Management (FSSM) in Urban Local Bodies
The Karnataka Urban Water Supply and of Karnataka where the present population
Drainage Board is responsible for providing is less than 50,000.

Table 6.7: The progress of the urban water supply schemes

Financial
Physical
(Rs. In Crores)
Year
Target Achievement Target Achievement

2009-14 1397.98 1160.31 101 61

2014-15 176.00 305.43 13 7

2015-16 149.16 208.14 11 12

2016-17 197.53 213.85 11 8

2017-18 197.53 197.53 8 7

2018-19 234.73 234.73 7 4

2019-20 (Up to
134.29 209.48 4 1
November 2019 )

Total 2484.22 2529.47 155 100


150 Economic Survey of Karnataka 2019-20

For the year 2018-19, there are 29 on-going Tranche-2: 4 towns viz. Mangaluru, Puttur,
Water Supply Schemes with a budget Udupi and Kundapur 6 UGD and 7 Water
allocation of Rs.631.02 Crores. It is Supply works have taken up under
proposed to commission 4 projects during KIUWMIP. Except One Water Supply and
2019-20 of which Basavanabagewadi Water Two UGD works, all other works are
Supply Scheme is commissioned and awarded and are in progress. The total
remaining projects are in progress and project cost of Tranche-2 is Rs.1000.14
proposed to commission during 2019-20. Crores. The expenditure incurred is of
Rs. 92.70 upto November 2019.
a) Karnataka Urban Water Supply
Modernisation Project (KUWSMP): 6.4.2 Bengaluru Water Supply and
Sewerage Board (BWSSB):
Based on the success of 24x7 water supply
Demonstration Project, the proposal of up- Bengaluru Water Supply and Sewerage
scaling 24x7 water supply to the entire Board is an autonomous body formed under
corporation areas of Belagavi, Kalaburagi Bengaluru Water supply and Sewerage
and Hubballi-Dharwad at an estimated cost Board Act to provide Water Supply & Sewage
of Rs. 1809.00 Crores has been approved by disposal. It is one of the first Water supply &
Government in 2013 with 67% of share from Sanitation Utilities in India with jurisdiction
the World Bank (Rs. 1209.00 Crores) of entire Bruhath Bengaluru Mahanagara
Palike which covers an area of 800 Sqkms.
b) Karnataka Integrated Urban Water
Management Investment Program Vision document 2050:
(KIUWMIP):
In order to develop an effective road map
ADB assisted Karnataka Integrated Urban BWSSB has envisioned a vision document
Water Management Investment Programme with strategic Master plan to address the
(KIUWMIP) scheme was approved in 2013. future outlook and challenges. This vision
The aim of the programmes are to provide document includes a holistic and integrated
Under Ground Drainage (UDG) facility and evaluation of all available and current water
continuous water supply to selected resources, including recycled water, and
towns/cities and reforms in Urban Local identification of alternatives and strategies,
Bodies. The cost of the project is 2187.72 which can be further developed as future
crore which includes 975 Cr ADB share. water resources. It will result into a vision
This project covers 377 square Km area and document which will have identified
benefits 1.3 million population. The scheme potential Water Supply and Sewerage
period is 10 years and it is expected to Schemes along with their implementation
complete by 15th March 2024. framework that will serve as a guidance
document for BWSSB.
Under KIUWMIP there are 2 Tranches:
Since its inception in the year 1964, BWSSB
Tranche-1: 4 UGD works and 8 Water has executed several water supply and
Supply works were taken in 4 towns viz. sewage schemes for the city, including the
Davanagere, Harihara, Ranebennur and prestigious Cauvery Water Supply Scheme
Byadgi, under KIUWMIP, of which one UGD (CWSS) Stages - I, II, III & Stage IV Phase - I,
and one Water Supply works were Phase - II and sewerage system
completed and are in O&M, trail run phase. improvement projects concentrating on
Action is being taken up to complete the sewage collection, conveyance and
other UGD works in 2019-20. and Water treatment works. Three major Sewage
Supply works are under progress. The total Treatment Plants(STP) are constructed at
project cost of Tranche-1 is Rs 1187.58 Vrishabhavathi, K&C and Hebbal Valleys
Crores. The expenditure incurred is of Rs. (major and minor). The work of providing
571.46 upto November 2019. UGD facilities for newly added areas mainly
for 110 village area of Bruhath Bengaluru
Mahanagara Palike is under progress.
Economic Survey of Karnataka 2019-20 151

Overview of Water Supply and Sewerage Rs. 925.06 Crore was sanctioned. The work
System: has been started from march 2018 which is
under progress and planned to complete
Bengaluru, the Capital city of Karnataka is within 36 months. The total cumulative
the 5th largest Metropolitan and fastest physical progress achieved is 528 Kms and
growing metropolitan city in India. As per cumulative financial progress achieved is
the 2011 census of, Bangalore has a Rs.166.86 Crores.
population of 8.5 million. The Bangalore
Water Supply and Sewerage Board is Outcomes
responsible for providing water supply and
r Government of Karnataka has accorded
disposal of sewerage to 800 Sq. Kms of
approval to the DPR for “Water Supply
BBMP area. The Cauvery Water Supply
Component of 110 Villages merged to
Scheme Stage IV Phase-II with total
BBMP including improvement in
installed capacity of 550 MLD. Is taken up
distribution and UFW reduction
with an estimated cost of Rs.3383.70 crore
Component of Core area” amounting to
with financial assistance from JICA. The
Rs.1500 Crore of which works
new scheme taken up to cater Cauvery
amounting to Rs. 982.77 crore were
water to 110 villages under BBMP area is
commenced in May 2017 and they were
CWSS Stage V (Phase III). The existing
under progress. Physical and financial
sewage system covers an area of 265 Kmsq.
progress is 2536 kms and Rs.887.99
Of core area of the city in which major
crore respectively.
sewage treatment plants are constructed at
Vrishabhavathy Valley, Koramangala and r The work of providing water supply
Chalaghatta Valley and Hebbal Valley. facilities to 110 villages is taken up in 5
zones for an estimated cost of Rs.982.77
Main features of BWSSB: crores and the work has been
With a yearly allocation of 19 TMC of commenced from May -2017 and will be
Cauvery water, a maximum of 1450 MLD of be completed within 24 months. The
water can be pumped daily to Bangalore. total physical progress and the financial
Presently 1450 MLD of Cauvery water is progress achieved is 2661Kms is
being supplied to city which caters for about Rs.936.61 crores respectively.
11.00 million people covering an area of 575 r The modified DPR of CWSS stage-V of
Sq.km. About 1067.50 MLD of waste water bulk water supply of 775 MLD along
is treated from 25 plants. with laying of mains, sub mains, Trunk
sewers, STPs and ISPS of 110 villages
Cauvery Water Supply Scheme Stage-V
proposed with a total cost of Rs.5550
The Cauvery water supply scheme stage-V is Crore. The funding pattern will be 85%
taken up at an estimated cost of Rs. 5550 loan from JICA, 7.5% assistance from
crores with financial assistance of JICA. An GOK and 7.5% from the BWSSB.
additional 775 MLD of water will be r Providing Sewerage System infrastructure
augmented after commissioning of this in the areas of erstwhile 7 CMCs and 1
project. As a first part of this project tender TMC area has been taken up with the
process for deploying the project financial assistance of JnNURM, GOI
management consultancy services has been and the World Bank at a cost of
completed and the work orders are also Rs.1191.79 Crore. Works are under
issued. As a second part the tender process progress. 98% of physical works are
for the work is under progress. completed with an expenditure of
Initiatives taken in 2019-20 Rs.1025.05 crores.
r Providing sewerage system to extended
To provide Underground Drainage Facilities
areas of erstwhile RR Nagar & Kengeri
for 110 villages coming under the
TMC areas under AMRUT work has
jurisdiction of Bruhath Bengaluru
been taken up.
Mahanagara Palike, for an amount of
152 Economic Survey of Karnataka 2019-20

Challenges ensure sustain good public health and


environmental outcomes for all their
The challenges faced by BWSSB mainly
citizens etc. with a special focus on hygienic
being, supply management with fresh water
and affordable sanitation facilities for the
resources, engineering solutions to fetch
urban poor and women”. As per the NSUP
water from far off places, financial resource.
2008 Karnataka State has proposed the
Apart from these challenges following issues
State Sanitation Policy (draft) as mentioned
are also to be addressed immediately:
below:
r Condition of water/wastewater
r Final City Sanitation Plan reports of all
infrastructure
the 8 towns completed.
r Lack of public awareness about the
r SIUD is preparing CSP reports for towns
value of water
through All India Institute of Local Self
r Funding for capital improvement Government (AIILSG)
projects
r To improve the sanitary condition in
r Water scarcity/supply urban areas, construction of STP in
r Customer/community relations Doddaballpur, Tiptur, Chikkaballpur
was completed and it is in progress in
r Recovering costs for service/investment
Humnabad.
r Government regulations
Under Ground Drainage (UGD) Schemes
r Emergency planning and response
During the year 2019-20 there are 49 On-
r Energy usage/cost
going Under Ground Drainage Schemes
r Climate change with Budget allocation of Rs 520.18 crores.
r Utility security It is proposed to commission 11 schemes
during 2019-20 of which Nargund Under
6.4.3 Sanitation (Including Sewerage
Ground Drainage Scheme is commissioned
and Drainage)
and remaining projects are in progress
The GOI vision for urban sanitation in India which are expected to commission during
is set forth as: “All Indian cities and towns 2019-20. The details of progress in given
become totally sanitized, healthy and livable below in Table 6.8.

Table 6.8 : Progress of UGD Schemes

Financial (Rs. in Crores) Physical


Year
Target Achievement Target Achievement
2010-14 (Cum) 697.06 449.54 40 4

2014-15 112.00 253.85 11 1

2015-16 134.33 270.03 6 7

2016-17 180.06 259.87 8 6


2017-18 180.06 180.06 13 6

2018-19 180.06 180.06 13 7


2019-20 ( Upto
106.12 103.36 4 3
November 2019)
Total 1589.69 1696.97 95 34
Economic Survey of Karnataka 2019-20 153

Improvements in the Water and cities including Comprehensive Traffic and


Sanitation Infrastructure System. Transport Plan for 6 cities in Karnataka;
feasibility studies for mass transit systems
1. Centralized billing and collection (Suburban Rail Projects) etc. It is also
system (SAJALA). working in tandem with BBMP, the city
2. Online payment corporation of Bangalore and other city
corporations on Non-Motorized Transport
3. ECS options (NMT) initiatives. The Directorate is also
4. Payment through easy bill spearheading the implementation of Bus
Rapid Transit (BRT) system between the
5. Payment through B1 centres. twin cities of Hubballi and Dharwad,
6. Payment through Karnataka mobile implementation of Suburban Rail Projects
apps. in Bengaluru in collaboration with
Railways. Public Bicycle Sharing (PBS)
7. Improvement of the water supply System in Mysore has already been
system by replacing corroded pipelines. launched and it is now decided to implement
8. Replacement of defective water meters. in Bengaluru. It is planned to implement in
Bangalore cycle day initiatives cross
9. Improvement in revenue collection. Bangalore city as Part of its awareness and
10. After commissioning of CWSS IV Phase community outreach.
Stage-II in 2012 Cauvery Water is being
a) Bus Rapid Transit System (BRTS) for
supplied to the scarcity areas.
Hubli-Dharwad:
11. By Providing individual toilet facilities
The Directorate is responsible for overall
in slums open defecation is avoided
monitoring and supervision of Hubli-
6.4.4 Domestic Energy: Dharwad, Bus Rapid Transit Project (HD-
BRTS) which is the first BRTS in Karnataka.
The census 2011 revealed that 64.33% of
The Bus Rapid Transit System (BRTS) is a
households in urban areas are using
dedicated public transport system
LPG/PNG for cooking followed by
implemented in the twin cities of Hubli
firewood(21.23%), Kerosene (11.67%) and
&Dharwad. It is intended to provide high
the remaining Households use the other
quality, low and high density passenger
sources such as Crop residue(0.91%),
movement at a low cost urban mobility. The
Biogas (0.80%), Electricity (0.21%),
BRTS corridor length is 22.25 km which
Coal/Lignite (0.11%), Cowpat (0.10%) and
includes segregated bus ways with central
other sources (0.11).
bus lanes and median bus stops, trunk and
6.4.5 Road Infrastructure feeder system; accessible and comfortable
bus stations in the level boarding and
Works for a length of 252 km amounting to external ticketing. This corridor is a closed
Rs. 118 cr are completed in Madikeri, system i.e no other vehicle except BRTS
Sringeri, Chittapur, Hassan, Kolar, buses will be allowed in the corridor. Infra
Savanur, Robertsonpet, Chitradurga, includes construction of 33 bus shelters, 3
Chintamani, Hassan Kanakapura, bus depots, 1 workshop, 2 terminals and
Nagamangala, Shimoga, Chikkamagalur intelligent traffic system.72.29 acres of land
and Hiriyur to bring in better road is acquired. 95% of the project has been
connectivity. completed and trail run of BRTS operation
6.4.6 Urban Land Transport: has started in October 2018 and has
received good response from commuters
The Directorate of Urban Land Transport travelling between this twin cities. A total
has implemented several initiatives number of 100 buses are operating in this
including service level benchmarking in route with a frequency of 3-4 minutes and
Bangalore; preparation of policies on around 85,000 commuters are travelling
parking preparation of mobility plans for 12 every day. Currently the fare of non A.C
buses is adopted for BRTS AC buses.
154 Economic Survey of Karnataka 2019-20

The estimated total project cost is revised to Sub Urban Rail Corridor is estimated at
970.87 Crores of which assistance from Rs. 18,621 crores. The proposed
World Bank is 343.24 Crores. As up to alignment has 62 stations and details of
November 2019, an amount of Rs. 848.07 the four corridors with a total route
Crores has been utilized. Additional fund length of 148.17 kms. GoK has
requirement Rs. 41.87 crores has been accorded approval to this revised
agreed to be provided in supplementary project. Approval of MoR is awaited for
estimate during the current year. start of implementation of the project.
For the year 2019-20 an amount of Rs.
b) Sub-Urban Rail System for Bengaluru: 400.00 crores is provided for
The Directorate is also coordinating for the implementation of Bengaluru Sub
development of Suburban Rail Network Urban Rail Project. Expenditure is
connecting in Bangalore. anticipated during the last quarter of
F.Y.
I. GoK has accorded approval for phase-
wise implementation of Bengaluru C) Public Bicycle Sharing System in
Suburban Rail System on a joint Bengaluru:
venture with Ministry of Railways at a
The public bicycle sharing system in
cost of Rs. 345 crores. Memorandum of
Bengaluru is a dock-less model, where
Understanding (MoU) was signed by the
multiple private bicycle sharing operators
State Government with Ministry of
will offer their services in various parts of the
Railways on 16.01.2017 to take up
city. The cycles can be located and unlocked
conversion of 15 pairs of conventional
using a mobile phone application provided
trains to MEMU services and
by the service provider and the user will be
augmenting MEMU maintenance
charged based on the duration of usage. The
facilities at Banaswadi on 80:20 cost
Public Bicycle Sharing System in Bengaluru
sharing pattern between Government of
is branded as “Trin-Trin”, in lines with the
Karnataka and Ministry of Railways
Mysuru Public Bicycle Sharing System.
respectively. So far 16 units of MEMU
rakes are procured and converted to 10 In first phase, DULT identified over 400
pair of trains. The Government has so bicycle parking hubs in a closely spaced
far released Rs.100 crores to SWR network across areas like HSR Layout,
towards GoK share. Koramangala, Indiranagar, CBD, Vidhana
Soudha etc. and at all the Namma Metro
II. The formation of SPV, as a subsidiary of
stations (40 nos). Presently over 3000 cycles
Rail Infrastructure Development
are available to public and is expected to be
Corporation- Karnataka (K-RIDE)
expanded to 6000 cycles. The Trin-Trin
which is State Joint Venture Company
system will be expanded to other areas with
of MoR and GoK, is approved by the
potential for high usage like tech parks in a
board of K-RIDE and the process of
phased manner.
setting up SPV is underway.
DULT has issued permit to operate bicycle
III. South Western Railways had identified
sharing in the city to 4 operators, namely,
priority projects that are to be
Yulu, PEDL by Zoomcar, Lejonet and
implemented through Special Purpose
Bounce. The PBS will be handled by the
Vehicle (SPV).Accordingly, GoK has
newly formed society, called Karnataka
sanctioned the identified projects worth
Non-Motorized Transport Agency (KNMTA)
Rs.1745 Crores of Doubling,
The Government of Karnataka has initially
Electrification, Automatic Signaling
allocated an amount of Rs. 80.18 crore for
and Procurement of Rakes to be
the implementation of the PBS system in
implemented by SPV.
Bengaluru. 50% of this amount will be met
IV. Subsequently, South Western Railways out from State Urban Transport Fund
submitted Detailed Project Report for (SUTF) and the balance 50% of grants will be
Bengaluru Sub-Urban Rail. The earmarked from the budget allocation.
completion cost for dedicated Bangalore During the year 2018-19 GoK has released
Economic Survey of Karnataka 2019-20 155

Rs. 5.00 crores and for the year 2019-20 an from other Urban Local Bodies to avail the
amount of Rs. 10.00 crores has been financial assistance under this programme.
budgeted. Rs. 17.38 crores under SUTF to
KNMTA Society for implementation.B.B.M.P 6.4.7 State Urban Transport Fund:
has awarded the contract for construction of The State Urban Transport Fund has been
273 hubs. However there were certain leveraged to promote DULT's mandate. It
issues with regard to identified hubs for includes assistance provided for
which resurvey was conducted jointly by introduction of Public Transport System in
B.B.M.P and DULT and the modified hubs cities of Karnataka, assistance for
are now being taken up for construction. construction of Transit Infrastructure in
The expenditure is anticipated during the cities, implementation of Cycle Tracks in the
last quarter of this F.Y. neighbourhoods of Bangalore, passenger
information for TTMCs in Bangalore etc.
d) Green Links Programme of NMT
Since 2011-12 up till November 2019. An
Projects in District Headquarters:
amount of Rs. 441.57 Crores was
Directorate of Urban Land Transport has earmarked as against which Rs. 322.68
formulated “Green Links” programe to take Crores has been released for implemen-
up non-motorised transport projects and tation. During the year 2019-20, 49 ongoing
District Headquarters in the State for projects are in progress, 03 of new projects
planning, design, funding and for providing assistance are approved and
implementation in collaboration with the 04 projects are completed, which include
local ULBs. Under this program, at the start projects on augmentation of buses,
of every financial year, KNMTA shall invite construction of bus infrastructure facilities,
proposals from ULB's, Government footpath improvements, cycling
Agencies/Statutory Bodies for availing infrastructures, etc. An amount of Rs. 23.39
financial assistance for development of NMT crores is utilized by various urban transport
infrastructure in ULBs. The activities would projects as against the allocation of Rs.
involve improvement of pedestrian and 77.39 crores.
cycling infrastructure in important areas of
6.5 URBAN ENVIRONMENT
central business area or active commercial
corridors. Full pedestrianization of locations The geographical expansion and
around heritage monuments, city core demographic growth of urban areas have
areas, market street etc., will also be taken exerted an adverse impact on the urban
up. environment. The large scale conversion of
agricultural land in the urban periphery for
Guidelines for identification of projects
urban uses like industries, housing and
under this programme is finalized.
infrastructure has resulted not only in loss
Proposals are invited from concerned ULB's
of greenery but in creation of urban heat
to propose stretches of road up to 5 km that
islands. The increase in motor vehicular
meets the guidelines framed for the
traffic in cities and industrialization has
programme. Accordingly, proposals from 06
contributed to air pollution which in turn
Urban Local Bodies of Vijayapura, Bellary,
has an adverse effect on the health of the
Raichur, Tumkur, Chitradurga and
people. The increasing consumption of
Mangalore are received for development of
water is leading to depletion of water
footpaths/cycle path in the respective City
resources, particularly underground water.
Business Divisions. Based on these
The enormous quantities of waste generated
proposals and the guidelines of the
in cities, proliferation of slums and lack of
programme, concept reports were prepared
sanitation are serious environmental
by DULT and handed over to these Urban
hazards. These issues need to be addressed
LocalBodies for preparation and submission
to meet environmental goals.
of Detailed Project Reports by November
2019. The actual implementation of the 6.5.1 Solid Waste Management:
projects is likely to commence from January
2020. In the meantime proposals are invited Solid Waste Management is one of the basic
functions of the Municipalities. Rapid
156 Economic Survey of Karnataka 2019-20

urbanization, heterogeneous nature of Corporation (KUIDFC) has been nominated


waste, lack of awareness among the public as the Nodal Agency. The Government has
and various other stake holders, lack of allocated Rs.440/- crore for this purpose.
appropriate infrastructure, disintegrated & The Solid Waste processing, treatment and
unscientific approach of waste management disposal facilities are established in 6 sites
has made the waste management into an besides upgrading the KCDC plant. These
unmanageable situation. plants can handle about 2300 TPD of waste.
There are totally 281 Urban Local Bodies In order to operate and maintain these
(ULBs) in the State (including 4 notified area plants, private operators have been
commissioned & BBMP). Excluding BBMP, appointed through a “Performance Based
217 ULBs generates 5020 tons of municipal Management Contract” for carrying out day-
solid waste and it is estimated that 61 new to-day operations in an efficient and
ULBs generates about 480 tons of MSW effective manner.
every day. AS per the Solid Waste
The details of the mechanical composting
Management Rules, 2016 of Ministry of
facilities and the current status are as
Environment, Forest and Climate Change,
follows;
all the ULBs are responsible for
development of necessary infrastructure for r Fire fighting works in 3 plants are
collection, storage, segregation, final stage (Lingadheeranahalli,
transportation, processing and disposal of Subbarayanapalya &
municipal solid wastes. Doddabidarkallu).
Initiatives Taken Up in BBMP. The overall expenditure is Rs.313 crore as
on November 2019.
The Government of Karnataka (GoK) with an
objective to improve the quality of Solid 6.5.2 Steps taken towards Solid Waste
Waste Management (SWM) services in the Management in ULBs :
Bruhat Bengaluru Mahanagara Palike As per MSW Rules, following steps have
(BBMP) area has proposed to establish Solid been taken in ULBs of the State, inorder to
Waste processing, treatment and disposal achieve scientific and systematic waste
facilities. The Karnataka Urban management system.
Infrastructure Development and Finance

Table 6.9: Mixed Fertilizer production capacity and its present status

Extent Capacity
No. Name of the Location Current status
(acres) (TPD)

1 Lingadheeranahalli 11 200 Commissioned

2 Doddabidarkallu 9 200 Commissioned

3 Kannahalli 23.75 500 Commissioned

4 Seegehalli 7 200 Commissioned

5 Subbarayanapalya 9.34 200 Commissioned

6 Chikkanagamangala 15.3 500 Commissioned

.plant capacity upgraded and


7 KCDC, Kudlu 30 500
commissioned
Economic Survey of Karnataka 2019-20 157

a. Procurement of land for processing and 219 ULBs have been approved by State
disposal of waste and development of SBM High Powered Committee (SHPC)
basic required infrastructure such as headed by Chief Secretary to GoK. The
construction of compound walls, DPRs for balance ULBs (which are
approach road, internal roads, newly formed ULBs) are under
watchman shed, bore-wells, electricity preparation.
connections, plantation of trees &
plants in the periphery of the landfill Funds allocated for SWM
site etc. Under Swachh Bharat Mission, the
r To carryout segregation of waste at MoH&UA provides 35% of the approved DPR
source at least into wet & dry waste. Cost and State Govt. will provide 2/3rd of
GoI grants i.e. 23.33% of DPR Cost to the
r To carryout door-to-door collection of concerned ULBs for its implementation of
waste SWM. MoHUA has allocated Rs. 512.52
r To establish dry waste collection crores of central share for 281 ULBs of
centres at ward level to manage dry Karnataka including BBMP and so far, GoI
wastes at ward level itself has released Rs. 313.51 crores to the State.
r To establish decentralized waste Adding State's matching share of Rs. 189.92
processing units inorder to manage crores to it, a total grants of Rs. 503.43
waste at ward level itself to minimise crores has been released so far, for SWM
burden on transportation & landfill site. activities.
r To establish separate collection and Construction of Modern Abattoirs:
transportation system for bulk waste, The DPRs for construction of modern
chicken & mutton waste, C & D waste abattoirs in Mysuru, Hospet, Chitradurga
etc. and Chamarajanagara cities have been
r To establish composting facilities at prepared and approval from MoFPI, Govt. of
landfill site such as, windrow platform, India has been already obtained. Project
vermi-composting units, bio-gas units Management Consultants (PMC) for all the 4
etc. projects has been selected. In Hospet
r To minimise the qty. of waste going to Construction of modern abattoirs work has
landfill to less than 20% of the total started, in Mysuru tender process to select
incoming waste the contractor is completed (Agreement yet
to execute), in Chitradurga work order has
r To procure modern type of door-to-door
been issued and in Chamarajanagara
collection vehicles, simple waste
Technical sanction is obtained, DTS
processing machines, shredders,
scrutiny is in progress.
plastic baling machines, screening
machines, compactors etc. 6.5.3 Swachh Bharat Mission:
b. Normative standards for various SWM Swacch Bharath Mission (SBM) was
activities such as street sweeping, door- launched on 2nd October 2014. The Mission
to-door collection of waste, cleaning of will continue up to 2nd October 2019 for a
public toilets, public places, markets period of 5 years. The Mission has the
etc have been formulated in order to following components;
standardize the outsourcing activities.
r Household toilets,
c. Under Swachha Bharat Mission (SBM),
219 ULBs have been asked to prepare r Community toilets:
DPRs for integrated solid waste r Public toilets:
management which includes micro- r Solid Waste Management (SWM):
level planning for door to door collection
r IEC & Public Awareness:
of waste, management of dry/recyclable
wastes etc. So far DPRs pertaining to r Capacity building and Administrative &
Office Expenses (A&OE):
158 Economic Survey of Karnataka 2019-20

Individual House Hold Toilets (IHHT) r ULBs have to prepare Detailed Project
Reports (DPRs) on Integrated Municipal
3.94 lakhs Individual Households Toilets
Solid Waste Management and so far,
have been constructed as on November
219 DPRs have been approved by High
2019 and 4463 toilets and under
Power Committee (SBM).
constructions 262 urban local bodies are
certified as open defecation free wards and r 215 ULBs possessing landfill sites in
17 are ODF (Someshwara in DK and Kalagi State
in Kalburgi District not included in ODF). r 91 ULBs are developed Sanitary
Community Toilets & Public Toilets Landfill Facilities in State.
(CT & PT) 6.5.4 Indira Canteen Scheme
Among Public toilets, construction of 1567 Food is the basic necessity of all human
toilet blocks(11,700 seats) are completed beings. People living in cities are deprived of
and 40 toilet blocks (320 seats) are under sufficient quantity of balanced diet due to
construction stage. In case of Community socio economic status. With this back
toilets, construction of 1890 toilet blocks ground, Government has started Indira
(17241seats) are completed and 110 toilet Canteen to provide vegetarian breakfast,
blocks (962 seats) are construction stage. lunch and dinner to the common people at
an affordable price of Rs.5/- for breakfast
Solid Waste Management and Rs.10/- for lunch & dinner each.
r 100% door to door waste collection is At BBMP 174 India Canteens and 24 Mobile
implemented in 6550 wards out of 6635 Canteens are installed and daily on an
wards average about 1.75 lakh to 2.00 lakh people
r 100% segregation of waste at source is are served food. An amount of Rs.70.00
implemented in 3442 wards out of 6635 crore has been provided during 2019-20 by
wards BBMP own fund for maintenance of Indira
r 4981 tons of Municipal Solid Waste is Canteens and the same amount is incurred
processed daily (out of 11085 TPD total as expenditure upto November 2019.
waste generated in the State)
Table: 6.10: SBM targets for Karnataka

Components Under SBM(U) Targets as per survey

Construction of Indivi dual Household toilets 3.94 Lakhs

Construction of Community Toi lets) 11033 seats

Construction of Public Toilets 5407 seats

Municipal Solid Waste Management 218 ULBs + 61 newly formed ULBs

Table: 6.11: Open Defecation Free (ODF) wards


Particulars Cities
ODF Certified (Including BBMP) 244
ODF Self Declaration Completed 35
Someshwara in Dakshina Kannada and Kal agi in Kalaburagi District not
2
included ODF l ist
Total 281
Economic Survey of Karnataka 2019-20 159

r The Directorate of Municipal i) Conservation of Water Resources:


Administration is the State level nodal The objective should be to reduce the
Agency for the implementation of Indira demand for fresh water. Conservation
Canteen Scheme in all ULBs of the state measures such as rain water harvesting
except BBMP. A committee has been should be made mandatory.
constituted to look after the
implementation of the scheme and ii) Waste Water Management: The
further monitoring the functioning of recycling and re-use of waste water
the canteen under the chairmanship of should be encouraged in cities which
respective Deputy Commissioner's of generate substantial quantities of
the Districts. sewerage and silage. Decentralized
waste water treatment plants must be
As on 12-12-2019, Construction of 197 set up at appropriate places.
Canteens and 15 Master Kitchen are
completed and in 168 Canteens Kitchen iii) Controlling Air pollution: Air quality
equipments have been installed, installation monitoring systems must be set up to
of kitchen equipments in 03 Canteens is measure various pollutants like carbon
under progress. At 168 Indira Canteens dioxide, carbon monoxide etc
daily on an average about 1.80 lakh to 2.20 Controlling air pollution depend upon
lakh people are served food. An amount of factors such as density of vehicular
Rs 211.00 crores have been provided for traffic and emission from industries.
establishment of Indira Canteens in Urban The Prevention of Air Pollution Act will
Local Bodies and total expenditure incurred have to be enforced strictly.
upto November 2019 is Rs. 158.78 crores. iv) Energy Conservation: Cities consume
6.5.5 Environmental Challenges (air enormous quantities of energy. In view
pollution, water pollution, noise of the shortage of electrical power, it is
pollution etc.): imperative to promote the use of
renewable energy such as solar and
Some of the most critical problems facing wind power and other energy efficiency
our cities concern are the health impacts of measures. Urban design will have to
urban pollution generated by inadequate take into account the efficient use of
water, sanitation, drainage, poor waste energy and promote green buildings.
management and air pollution. This set of
problems known as the 'Brown Agenda' 6.5.6 Urban Conservation and Urban
combined with what are called the 'Green Heritage:
Issues' such as depletion of water and forest
Urban conservation has been defined as
resources, up gradation of environmentally
follows:
fragile lands, occupation of areas prone to
flooding, landslides etc. and the carbon “Urban conservation seeks to retain that
emissions from energy use, heating, part of the urban environment whose
industry and transport now known as character is improvement of national or
'Climate Change Issues' all pose serious local heritage. It also seeks to enhance the
challenges to the health of the eco system of environmental character by ensuring that
a city and its people. To tackle these issues, the sitting and the design of any new
an Urban Environmental Management development is complementary to it”.
Action Plan must be formulated. A city
This heritage may be in the form of:
specific plan would be required for large
cities such as Bengaluru, Hubballi- r Buildings or places of architectural,
Dharwad, Mysuru and Mangalore and a historical or cultural importance.
common strategy can be evolved for other r Unique temples, mosques, and other
towns and smaller cities in the State. The monuments
major components of the action plan could
be the following: r Designed environments such as Russell
Market or City Market in Bengaluru,
Connaught Place in Delhi etc.
160 Economic Survey of Karnataka 2019-20

r Water front areas: lakes, rivers or sea. c) Environmental Action Plan–B: The
r Centres of recreation and tourism - project consists of replacement of 70
natural or man made “Other items may Kms of trunk sewers. The works of this
be added depending on their scheme has been completed and about
significance to heritage”. 150 MLD of sewage flowing in SWDs has
been diverted through the pipe network
6.5.7 Waste Water Management (WWM): to the treatment plants.
The city of Bengaluru has a total area of 800 For treating the waste water, BWSSB has
Sq. Kms which includes core area, established the following 25 Waste water
CMC/TMCs and 110 villages of BBMP treatment plants with a capacity of 1067.50
limits. BWSSB has the jurisdiction in this MLD.
area to supply potable water to the citizens
and to collect, convey and to treat the Further, under Megacity Revolving Funds
wastewater generated. Several schemes the Board has taken up the following four
have been implemented to supply potable projects with a total cost of Rs.1203 crore.
water to the city. For collection of These works are targeted for completion by
wastewater generated in the city, about the end of 2020.
5994 Kms of smaller diameter pipelines are a) 150 MLD wastewater treatment plant at
laid. To convey the collected wastewater to V Valley at a cost of Rs.470.93 Crore
the treatment plants, 720 Kms of higher
diameter pipes are laid. Some of the b) 100 MLD wastewater treatment plant at
pipelines were laid about 40 to 50 years Hebbal at a cost of Rs.360.77 Crore
back. Due to various reasons, viz. ageing of c) 150 MLD wastewater treatment plant at
sewers, encroachment of sewers, damages K & C Valley at a cost of Rs.297.37 Crore
in the sewerage system, crown corrosion of
sewers, abuse of sewers, direct discharges d) 40 MLD wastewater treatment plant at
from the houses built on the side of Storm Doddabele at a cost of Rs.73.93 Crore
Water Drain, direct discharges from Under AMRUT Scheme, the following
apartments, new layouts etc., a part of projects have been taken up in Waste Water
wastewater is flowing through Storm Water Management Zone. These works are under
Drains. progress and targeted for completion by end
To avoid waste water flowing in storm water of 2020.
drains and to convey the waste water to the 1) 5 MLD wastewater treatment plant at
nearby waste water treatment plants, the Sarakki at a cost of Rs.14.50 crore.
Board has carried out the following projects:
2) 5 MLD wastewater treatment plant at
a) Environmental Action Plan (EAP) – A: Chikkabegur at a cost of Rs.13.90 crore.
This plan was initiated during 2001. 33
Kms of the existing trunk sewers were 3) 10 MLD wastewater treatment plant at
replaced at a cost of Rs.54.00 crore. Hulimavu at a cost of Rs.20.25 crore.
There was an increase of 40 MLD of 4) 35 MLD wastewater treatment plant at
sewage inflow into the STPs there by, Agaram at a cost of Rs.53.65 crore.
reduction in wastewater flow in the
SWD. 5) 20 MLD wastewater treatment plant at
K.R.Puram at a cost of Rs.28.40 crore.
b) Hebbal Valley Scheme: In this scheme
18 Kms of trunk sewers were replaced 6) Replacement of existing sewerage
at a cost of Rs. 45.00 Crore. The benefits system in Vrishabhavathi valley from
of the scheme would be zero flow in the Ranganatha colony Bridge behind Total
SWD upto Nagavara Lake, there is no Gas Station on Outer Ring Road to
entry of sewage to Hebbal and Nagavara V.Valley STP at a cost of Rs.52.50 crore.
Lakes from core area. The STP at Hebbal 7) EAP-C of V.Valley drainage zone at an
would be completely utilized. The evaluated cost of Rs.396.00 crore. The
increase in flow is 40 MLD.
Economic Survey of Karnataka 2019-20 161

Table 6.12 : Details of capacity of waste water treatment units

Capacity in MLD

1) Vrishabhavathi Valley 180

2) K & C Valley 248

3) Hebbal Valley 60

4) Mallathahalli 05

5) Kempambudhi 01

6) Yelahanka 10

7) Mylasandra 75

8) Nagasandra 20

9) Jakkur 15

10) K. R. Puram 20

11) Kadabeesanahalli 50

12) Rajacanal 40

13) Cubbon Park 4

14) Lalbagh 1.5

15) K&C Valley 60

16) Rajacanal 40

17) Nagasandra 20

18) Chikkabanavara 5

19) Kadugodi 6

20) Bellandur Ammanikane 90

21) Horamavu Agara 20

22) Doddabele 20

23) Yellemallappa Chettykere 15

24) Kengeri 60

25) Halasuru 2

Total 1067.50
162 Economic Survey of Karnataka 2019-20

works are taken up in 4 different Kolar, Savanur, Robertsonpet, Chitradurga,


packages. Chintamani, Sira, Nagamangala and
8) S2D- Two works of intermediate sewage Hiriyur.
pumping station at Koramangala Construction of Low Cost Sanitation (LCS):
Sports Complex and providing and Construction of 3139 nos. LCS units at a
laying rising main from ISPS to K&C cost of Rs. 6.84 cr have been completed.
Valley STP.
6.6 DEVELOPMENT OF BENGALURU
Other works METROPOLITAN REGION
The Board has identified 914 locations 6.6.1 Bengaluru Metropolitan Region
where sewage is entering the storm water Development Authority (BMRDA):
drains of the entire city and to prevent this
148 works are required. The works are The Bengaluru Metropolitan Region
under progress at various locations. Development Authority (BMRDA) is
established under the Bengaluru
Earlier the up gradation work on the 4 MLD Metropolitan Region Development Authority
capacity waste water treatment plant at Act, 1985, for the purposes of proper and
Madiwala was taken up by the Karnataka orderly development of the area within the
Lake Conservation and Development Bengaluru Metropolitan Region.
Authority. After dissolution of this Authority
and as per the orders of Government of Structure Plan:-
Karnataka this plant including the balance The structure plan prepared by the BMRDA
works was handed over to BWSSB. Now the in 1998 based on the availability and future
board is carrying out the balance work. prospects in respect of the natural resources
Under Ground Drainage (UGD): UGD work and infrastructure and the trend of
amounting to Rs. 130.34 cr has been urbanization in the region was approved by
completed in Chikkaballapur, the Government during 2005. As per the
Doddaballapur, Tiptur, Harihara, Structure Plan, the areas suitable for
Humnabad and the UGD missing link works urbanization have been categorized as Area
at Hassan and Chintamani are completed at Planning Zones (APZs) and areas where
a cost of Rs. 2.24 cr. Bhadravathi UGD work agriculture is a predominant occupation
is terminated . Sewer network length of and forestry is abundant, conservation has
425.90 km has been laid and service been stressed more and such areas have
connections were given to 43704 Houses. been classified as Interstitial Zones (IZs).

Storm Water Drains (SWD): Works for a The Structure Plan prepared by the BMRDA
length of 33.59 km, amounting to Rs. 43.02 is in the nature of a broad area development
crore has been completed in Sringeri, plan for the entire BMR and requires
Hassan, Savanur, Kolar, Robertsonpet, preparation of detailed sector specific and
Gurmitkal, Chikkamangalur, Chitradurga area specific plans. Separate Planning
& Chintamani. Authorities and Urban Development
Authorities have been constituted for the
Solid Waste Management: The work of various Local Planning Areas under the
development of Land fill site in Chitradurga Karnataka Town and Country Planning Act,
at a cost of Rs. 1.56 cr has been completed. 1961 and other Acts for preparation of
Bid documents for outsourcing Operation detailed Master Plans and enforcement of
and maintenance through Performance the same.The Authorities so formed besides
Based Managemnt Contract has been the Bengaluru Development Authority are
prepared in consultation with WB and the as detailed below.
same has been forwarded to ULB for further
necessary action. 1) Bengaluru International Airport Area
Planning Authority (BIAnAPA).
Rain Water Harvesting (RWH): Works
amounting to Rs. 2.70 cr are completed in 2) Nelamangala Planing Authority.
Economic Survey of Karnataka 2019-20 163

3) Magadi Planning Authority. continuously growing, there is a need for


green solutions. Mass Rapid Transit
4) Kanakapura Planning Authority.
Systems are fast, safe and comfortable to
5) Ramanagara-Channapatna Urban travel. This alone will encourage people to
Development Authority (RCUDA). switch over from personalized vehicles to
public transport.
6) Bengaluru-Mysuru Infrastructure
Corridor Area Planning Authority Bangalore Metro Rail Project Phase-1 is
(BMICAPA) Anekal Planning Authority. having a track length of 42.3 Kms, the
Project cost is Rs. 13845.01 crore and it is
7) Hosakote Planning Authority.
having two corridors.
6.6.2 Bruhath Bengaluru Mahanagara
The East-West corridor is 18.10 km. long,
Palike (BBMP): starts from Baiyappanahalli and
The Bengaluru Mahanagara Palike terminates at the Mysuru Road Terminal.
(Bengaluru City Corporation) was The 24.20 km. North-South Corridor begins
established in 1949 by merging two separate at Nagasandra Terminal and terminates at
municipalities, which were in charge of the the Yelachenahalli Terminal. .
administration of the “City Area” and the
Cantonment Area of the city. The Population Entire Phase-1 project has been completed
of Bengaluru at that time was about 0.75 on 17.06.2017. 31 Numbers 6 coach metro
million. The municipal corporation started rail is under operation in East-West corridor
with 7 divisions with as many elected and it is programmed to convert all 3
councilors. This was subsequently coaches into 6 coaches by March -2020.
increased to 50 divisons. The area of the city Daily on an average of 4 lakhs passengers
was expanded to include 87 wards in 1991, are traveling.
100 wards in 1995 and 198 wards in 2007.
Bangalore Metro Rail Project Phase-2:
Prior to the formation of Greater Bengaluru
the city had an area of 224 Sq.km and 100 The Phase-2 of the Bangalore Metro Rail
wards represented by counselor counselor Project was sanctioned by GOI in February
in the city corporation. 7 CMCs, 1 TMC and 2014. The Project consists of Four
110 villages were added to BBMP. To BBMP Extensions to the existing lines and two New
comprising 8 zones viz, R.R.Nagar, Lines. The total length of Phase-2 is 72.095
Bommanahalli, Dasrahalli, Mahadevapura, km with 60 stations (48 Elevated and 12
Yelahanka, Bangalore East, Bangalore Underground). The estimated project cost
South and Bangalore West. BBMP has taken is Rs. 30695 Crore and the details are
up many infrastructure projects to improve furnished below in Table.6.13.
the infrastructure of the city. Flyovers,
Underpasses, Grade separators, Signal free The physical and financial progress as
roads, road widening has smoothened the on November 2019 is 39% and 37%
traffic flow of the city. respectively.
Special Infrastructure Projects of Phase-2 works will be completed in stages
Bangalore: from 2020 and entire work is programmed
to complete by June-2024.
During the year 2019-20 for Bangalore
development a sum of Rs.2300 crores has Reach-6 New line (Underground) of from
been sanctioned of which a sum of Dairy circle to nagawara (14.00 kms) which
Rs.1019.97 crore has been spent. construct of 4 civil tender packages of which
2 are under progress.
6.6.3 Bengaluru Metro Rail Corporation
Limited (BMRCL) Bangalore Metro Rail Project Phase-2A:

Metro rail is a vital component of the Silk Board to K.R. Puram 19.5 Km length is
transformation of the urban trans[prt approved by the Government of Karnataka
scenario in India. With urban population on 24.01.2019 for Rs. 5446.73 Crore. Work
164 Economic Survey of Karnataka 2019-20

Table 6.13:
Length of
Estimated Cost
Name of the Line the line in
(Rs. in Crore)
Km

Baiyappanahalli to ITPL – Whitefield 15.500 5449

Mysore Road Terminal to Kengeri 6.465 2019.

Hesaraghatta Cross to BIEC 3.770 1147

Yalachenahalli to Anjanapura Township 6.290 2363

R.V. Road to Bommasandra 18.820 6900

Gottigere to Nagawara 21.250 12817

72.095 30,695

will be started of the getting approval from culture life style and has very salubrious
the Government of India. climate.
Bangalore Metro Rail Project Phase-2B: Objectives of the Authority
Nagawara Metro Station to Kempegowda The objects of the Authority shall be to
International Airport Bangalore, having a promote and secure the development of the
length of 38 Kms is approved by the Bangalore Metropolitan Area and for the
Government of Karnataka on 19.01.2019 for purpose the Authority shall have the power
Rs. 9934.58 Crore. The work will be started to acquire, hold, manage and dispose of
soon after getting approval from the movable and immovable property, whether
Government of India. within or outside the area under its
jurisdictions and to carry out building,
Proposed Project: engineering and other operations and
Bangalore Metro Rail Project Phase-3: generally to do all things necessary of
expedient for the purpose of such
In 2019-20 Budget, feasibility study for development and for purpose incidental
105 kms new metro lines has been proposed thereto.
during 2019-20 details project report will
prepared. Bangalore Development Authority also
performs development functions as per the
6.6.4 Bengaluru Development Authority directions of the Government such as
(BDA): preparation of Development plans for Group
The Bengaluru Development Authority Housing and Layouts, Approval of building
(BDA) established on 16th January 1976 plans (BDA's Jurisdiction), other statutory
under a separate act of the State Legislature functions under KTCP Act, formation of ring
viz the BDA Act 1976. The Authority has road to minimize traffic congestion and
been established with the goals of planning facilitate commuters to reach their
function of the City Planning Authority and destination quickly, rejuvenation of lakes
the developmental functions as in the which is vital for all living beings and to
erstwhile city improvement Trust Board increase the ground water level,
(CITB) Bengaluru is a metropolitan city construction of flyovers to prevent traffic
covering an area of 1306 sq mts attracting jam and provide safe, speedy and smooth
people around the world. The Authority also transport, planning and implementing
having aims at checking the haphazard and schemes to provide Residential/
irregular growth of the city. The Garden City Commercial/Industrial/Civic Amenities
has a glorious past track records with varied sites/Parks & Play Grounds, construction of
Economic Survey of Karnataka 2019-20 165

commercial complexes/construction of d) Formation of layouts and distribution


houses to economically weaker sections & of sites:
Development of Major infrastructure
facilities etc. BDA has so far formed 64 layouts and
allotted 1,44,453 sites of different
a) Construction of Houses for EWS and dimensions, out of which 18,173 sites have
General Public: been allotted to people belonging to SC
category and 4194 sites allotted to ST
The Government of Karnataka has allotted
Category and 2796 Sites have been allotted
323 acres of land for the formation of
to Category-A. A total of 1339 Civic amenity
Housing Projects for the members of
sites have been allotted so far.
General Public and Economically weaker
sections of the society. 190 Acres of land Bangalore Development Authority has
have been handed over to BDA for under taken the formation of a new layouts
construction of houses including for viz. Nada Prabhu Kempegowda Layout
Economically Weaker Sections of the which is in progress. Allotment of 5000 sites
Society. BDA has taken up construction of of various dimensions has been made to the
about 30000 Housing units at 29 different public in Nadaprabhu Kempegowda Layout
places in Bangalore.So far 13059 flats have and revenue of Rs. 921.77 crore has been
been construction, of these, 7335 flats are received. For providing major infrastructure
allotted to public. Revenue expected from works in Bangalore metropolitan area, BDA
these flats is about Rs. 1303.13 crores out of has spent Rs.2986.94 crores.
which Rs. 1028.20 (Nov 2018) crore has
6.7 OTHER SCHEMES FOR URBAN
been received so far. At present flats are
allotted to public across the table enabling DEVELOPMENT
them to choose the flats as their choice. 6.7.1 Smart City Mission:(SCM)
b) The formation of peripheral Ring Road The Government of India has launched
The formation of Peripheral Ring Road at an Smart City Mission to cover 100 cities over a
estimated cost of Rs. 11950 crore has been period of five years from 2015-16 to 2019-
approved by Government in July 2016 with 20. This Project is being implemented as a
the financial assistance from JICA. A special Centrally Sponsored Scheme (CSS) spread
purpose vehicle viz Bangalore PRR over a period of 5 years with an annual
Development Corporation Ltd has been allocation of Rs 100 Crore each from GoI and
incorporated in October 2017 under the GoK for each of the city and thus each city
Companies Act 2013 for implementing the will get Rs. 1000 Crore at the end of the 5
project. For providing major infrastructure year period.
works in Bangalore Metropolitan area, The scheme will have the following key
Under peripheral ring road an amount of objectives:
Rs.1000.00crore has been made during the a. To provide a fillip to the development of
2019-20 to BDA. However no releases has new and innovative Smart Solutions
been made till the end of November 2019. that directly impact the needs of cities;
c) Development of Lakes b. To ensure availability of funding for
The provision of Rs. 85.00 crore is made in practice research of direct relevance to
the budget for 2018-19 towards the outcomes desired under the
rejuvenation and development of lakes and Missions;
provision of Rs. 5.00 crore is made for new c. To make available a large body of pilot-
plantations in BDA layouts and tested and proven Smart Solutions that
rejuvenation of tank bed areas. Provision of can be adopted by cities as per their
Rs. 12.00 crore is made for maintenance of specific needs;
Nursery Gardens and Horticulture works in d. To promote a culture of innovation
BDA Layouts. within the urban sector.
166 Economic Survey of Karnataka 2019-20

As per the SCM guidelines Smart Cities A total of 401 works amounting to
Mission at the City level is implemented by a Rs.4952.87 crore were approved, of which
Special Purpose Vehicle (SPV) headed by a 171 works amounting to Rs.350.49 crore
full time MD/CEO with the nominees of were completed upto November 2019.
Central Government, State Government and
The allocation for 2019-20 is Rs.600.00
ULB on its Board.
crore and the Government has released
7 cities from the State namely, Belagavi, Rs.400.11 crore towards project fund and
Davanagere, Hubballi-Dharwad, A&OE. The cumulative expenditure under
Shivamogga, Mangaluru, Tumakuru & the scheme is Rs.2667.67 crore upto
Bengaluru are selected under the mission. November 2019.
Under smart cities Rs. 2303 Crore
272 works with an estimated cost of
(Rs. 1325 Crore from GoI and Rs. 978 Crore
Rs. 4919.41 crores are in various stages of
from GoK) has been released to cities and
progress. 15 works amounting to Rs.120.18
Rs. 413.52 Crore has been spent up to
crore are under tender process. 18 works
November 2019.
have been completed during the year
6.7.2 Atal Mission for Rejuvenation and 2019-20.
Urban Transformation (AMRUT)
6.7.3 Nagarothana CMSMTDP Phase –2
The Central Government has launched a Project:
new scheme namely “Atal Mission for
Nagarothana Chief Minister's Small and
Rejuvenation and Urban Transformation”
Medium Towns Development Programme
(AMRUT) during 2015. Under the scheme,
(CMSMTDP) Phase II has been approved for
26 cities/towns with a population of one
211 ULBs with revised outlay of Rs. 2060.64
lakh and above (BBMP, Tumkur ,
crore with an objective to improve roads
Chitradurga, Davanagere, Shimoga,
(80% of allocation to roads) to drains (20%
Bhadravathi, Kolar, Robertsonpet, Mysuru,
allocation)of ULBs.
Mangalore,Udupi, Hassan, Chikamagalur,
Mandya, Dharward, Belguam, Bijapur, An amount of Rs. 1825.72 crore has been
Bagalkote, Gadag-Bettageri, Rannebennur, spent as against the released amount of
Gulbarga, Bidar, Bellary, Gangavathy, Rs. 1794.05 crore up to November 2019 by
Hospet, and Raichur) have been selected completing 2118 works as against the
and Badami city which is categorized as approved works of 2166.
heritage city under HRIDAY scheme is also
selected. Nagarothana Kalaburagi Cabinet:

Under this scheme, for cities with less than State Cabinet during October 2010, has
10 lakh population, the Central Government announced Rs. 365.54 crore as special
will fund 50% of the project cost and the grant for the backward regions of Northern
remaining 50% of the project cost is to be Karnataka. An amount of Rs. 289.51 crore
borne by State Government and ULBs, has been spent as against the released
whereas for city with more than 10 lakhs amount of Rs. 365.54 crore by completing
population the Central Government share is 531 works up to the end of November 2019.
33.33%, State and ULB share is 66.67%. Nagarothana (Municipality) Phase–3
The approved State Government share is Project:
20% and the ULB share is 30% and for
Bangalore Metropolitan city it is 46.67%. This project is implemented in 267 ULBs
with an allocation of Rs. 2890 crore.
Government of India has approved Drinking Water Supply works; Road
Rs.4952.87 crore for the entire mission for a improvement work, road side drains,
period of 5 years. About 91% of the footpath and traffic Management works,
allocation of Rs.4500.79 crores is Storm water drain improvement works and
earmarked for Water Supply and UGD Construction of office building, Community
schemes. An amount of Rs.1985.61 crores and Public toilets, Modern bus stand and
has been released by the Government for the Market Complex have been prioritized. An
project as on November 2019. expenditure of Rs. 1040.24 crore has been
Economic Survey of Karnataka 2019-20 167

incurred against the released amount of Rs. Projects are identified on an ongoing basis.
1275.79 crore by completing 1679 works as So far 40 projects identified which were
against 3481 approved works as on mainly in the nature of redevelopment of
November 2019. existing commercial complexes in as many
as 20 ULBs. Further construction of
6.7.4 Urban Infrastructure Development
vegetable market cum commercial complex
Scheme for Small and Medium Towns is under completion stage at Moodbidri with
(UIDSSMT) a project cost of 24 crores is under
Under Centrally Sponsored UIDSSMT completion stage.
(mission period) scheme, out of the 38 In respect of 7 proposals from 6 ULBs
projects sanctioned with an estimated cost various projects like costruction and
of Rs. 682.48 crores ( revised cost is Rs. redevelopment of market complex,
877.69 crores) 31 projects are completed. In commercial complexes etc, for a total project
the remaining 7 projects, 1 UGD project of cost of rupees 143.61 crore.( with a total
Soundatti town has been dropped and other loan to the tune of Rs. 69.29 crores) The
6 projects are in progress. The total projects of Construction of market complex
expenditure incurred upto November 2019 at Srinivasapura has been completed and
is Rs.198.34 crores. the remaining projects are under various
Out of 6 projects 3 projects yaragola, stages of implementation.
mulbagilu, Gajendragad,are sewerage and The Trust also assists in borrowing funds on
the remaining 3 projects namely behalf of ULB's from Banks/Financial
pandavapura, channapatna, shikaripura, Institutions/Bonds/Tax free bonds for EPC
water supply schemes.As on November Projects, and complete hand holding for PPP
2019.An amount of Rs.198.34 crores. Projects. The repayment of loan availed
UIDSSMT – Transition Phase would be met out of revenue generated from
these commercial assets.
Under the Transition Phase of UIDSSMT, an
amount of Rs. 768.42 crore has been 6.7.6 Externally Aided Projects:
sanctioned by SLSC and Government of
Karnataka Municipal Reforms Project
Karnataka has approved Rs.930.13 crore
(KMRP –World Bank assisted)
(including additional State share) for 14
water supply schemes, 5-UGD and 2-Roads The Karnataka Municipal Reforms Project
& Drains projects. Rs. 851.02 crores has (KMRP) aims to improve the quality of life of
been released to the implementing agencies citizens by improving the delivery of urban
by incurring an expenditure of Rs. 784.23 services and promoting good governance
crore for completion of 13 water supply among the urban local bodies (ULBs). KMRP
schemes and 2 UGD works. The remaining addresses the need to strengthen
0ne water supply scheme, 3 UGD works and institutional and financial frame works in
2 Roads& Drain works are under progress. Urban Service Delivery at ULB level. The
total funding for this project is Rs.1364 cr
6.7.5 Scheme for implementation of and expenditure, as on November -2019 is
Commercial/ Infrastructure projects in Rs. 1359.78 cr.
vacant lands of ULBs:
a) Institutional Development
The Government of Karnataka acting
Component:
through Karnataka Water & Sanitation
Pooled Fund Trust (KWSPFT) for which This component includes support for
KUIDFC is the fund manager, plans to implementation of statewide reforms
encourage Urban Local Bodies who own real namely implementation of Double Entry
estate of significant value, to unlock the Accrual Based Accounting system in 158
values in these real estates, develop models Urban Local bodies (ULB) and
on sound commercial basis for development computerization of municipal functions in
of these lands with an aim to improve 164 ULBs of the State. A separate Cell under
infrastructure and quality of public life. the control of the Directorate of Municipal
168 Economic Survey of Karnataka 2019-20

Administration has been created for this with JNNURM program which has been
purpose. The computerization of municipal approved by GoI for an amount of Rs.
function covers 4 modules namely ULB 383.44 Cr. So far, 2299 Km of sewer
website, Public Grievance Redressal, Birth lines has been laid.
and Death Certification and GIS based r Greater Bangalore Pro-Poor
property tax information and the same are Sanitation Programme: Construction
made live in all 164 ULBs. of Low cost sanitation units 1991 LCS
This component supports preparation of geo units have been constructed in the slum
referenced base maps for 27 urban areas. A settlements under the Greater
dedicated Urban Mapping cell has been Bangalore pro-poor sanitation program.
constituted under the control of Directorate After closure of world Bank loan, Under
of Town and Country Planning to oversee the support to KMRP two spill over works are
implementation. This component also taken out of the GOK fund . In Tiptur UGD
provides capacity building activity to the Phase –II work is planned at Rs.25 crore,
ULB officials and elected representatives in present progress is 14.37 Cr and is intended
identified 21 areas for which State Institute to complete in the year 2019-20 . In kollegal
of Urban Development (SIUD), Mysore has 24/7 water supply work is planned at 54 Cr ,
been appointed as the nodal agency. work awarded on 26-4-19, present progress
Training through MRC to the ULB officials in is Rs.4.54 crore and works are under
various modules of computerization have progress.
also been imparted. So far, 25,539
municipal functionaries have been trained 6.8 URBAN PLANNING
and all training related activities have been Urban planning in the State, as in the rest of
completed under the project. the country, has been largely identified with
b) Municipal Investment Component: town planning or land use, planning. It is
necessary to broaden the vision of the urban
This component provides investment planning process and integrate spatial
support for urban infrastructure planning with economic development
improvement in selected 32 ULBs of the planning. The main components of urban
State. The ULBs have been grouped into 4 Planning are:
packages of 9, 5, 10 and 8 ULBs. 88 works
have been completed, out of 90 works 6.8.1 Integrating spatial planning with
proposed water supply work in magadi and economic development planning:
UGD work in bhadravathi is under progress. The 74th CAA has provided a new
c) Bengaluru Development Component: framework to the planning process and
mandates:
r Bangalore Road Rehabilitation
Program: Bangalore Road a) Constitution of a District Planning
Rehabilitation component supports Committee at the district level charged
rehabilitation of roads about 125 kms of with the responsibility of preparing a
core city road networks including draft District Development Plan.
improvement of foot path, drainage etc. b) Constitution of a Metropolitan Planning
The road rehabilitation work has Committee in every metropolitan area
already been completed by the BBMP. which would be responsible to prepare a
r Greater Bangalore Under-Ground draft development plan for the
Drainage (GB-UGD) Program: Greater metropolitan area.
Bangalore Underground Drainage c) Municipalities are responsible for
Program project supports construction urban planning including town
of underground (UGD) sewerage planning and for preparation of plans
network of about 2314 Km & about for economic development and social
210,000 House Service Connections. justice.
This component has been dovetailed
Economic Survey of Karnataka 2019-20 169

6.8.2 State Level Spatial Planning: housing. With increasing urbanization in its
hinterland; Bengaluru is facing enormous
The approach to urban development in the
challenges in providing infrastructure and
Five Year Plans has been ad hoc and
services to meet the needs of the growing
piecemeal. As pointed out by the National
population. The BMRDA was set up in 1985
Commission on Urbanization, there has
to address the problems of the region and
been a lack of spatial concern in the
prepare a Structure Plan. The Bengaluru
planning process, and no efforts have been
Metropolitan Comiittee has been
made to link the process of urbanization
constituted for the Bengaluru Metropolitan
with the general pattern of economic
Region covering Bengaluru Urban,
development. Spatial planning deals with a
Bengaluru Rural and Ramanagaram
hierarchical system of settlements and
districts. In order to deal effectively with the
plays a vital role in investment decisions
planning and development issues of
depending on the growth potential of
Hubballi- Dharwad and Mysuru,
different settlements. Planned economic
Metropolitan Planning Committees must be
development should take into account the
set up for these two cities to plan for their
spatial aspects of development. The
future growth. The physical jurisdiction of
objective of spatial planning is to generate a
these two metropolitan areas must be
process of spatial development which
carefully demarcated taking into
optimizes utilization of resources, reduces
consideration the peripheral outgrowths
regional, spatial and economic imbalances,
and potential for urban expansion.
strengthens rural and urban relationships,
protects the environment and maintains an b) Planning at the city level:
ecological balance.
Under the Constitution, urban planning,
6.8.3 Regional perspectives: town planning, social and economic
development and protection of the
The Industrial Policy of the state aims at
environment are to be performed by the
industrialization in backward regions and
urban local bodies. Once the scope of the
also development of industrial corridors and
municipal functions is expanded, municipal
identifying potential locations to set up
management will acquire a new dimension.
industries. In this context, it is essential to
To the traditional municipal functions of
identify a spatial configuration of the
water supply, sanitation, solid waste
existing and future urbanization in or near
management and regulatory functions such
future cities and along emerging urban
as licensing, construction of buildings,
corridors.
regulation of food establishments etc. will be
a) Planning for metropolitan areas: added. At present, Master Plans under the
KTCP Act are prepared by the Local planning
Although Bengaluru is the only Authorities or UDAs. It is proposed to
metropolitan city in Karnataka at present, prepare only one plan at the city level which
Hubballi-Dharwad and Mysuru are fast includes the spatial plan, development plan
emerging as metros and as such, it is and development control measures by the
necessary to plan for orderly development of Municipality. The capacity building of ULBs
these three metropolitan areas in the State. is essential to take up the planning
The Bengaluru metropolitan area covers an responsibilities.
extent of about 1307 sq. kms of which about
420 sq. kms is earmarked as agricultural The time frame for different plans will be as
land or green belt. The Bengaluru City follows:
Corporation or BBMP which has been (a) A 15 – 20 year Spatial Perspective Plan
extended recently from an area of 223 sq. for the State.
kms to 820 sq. kms comes within the
metropolitan planning area. The Bengaluru (b) A five year development plan for the
Development Authority is the Planning district/ metropolitan area.
Authority for the metropolitan area and is ( c) A five year plan for each municipality
also responsible for land development and with city / town.
170 Economic Survey of Karnataka 2019-20

(d) Annual plan for the district and the r Till now 100 master plans have been
local body with budgetary allocations. prepared for cities/Towns.
c) Town and Country Planning: r Master plan of (Chikanayakanahalli,
Savanur and Koppal) Cities/Town was
Preparation of Master Plans is essential for provisionally approved by the
the orderly development of cities, towns and Government
villages in the State and providing technical
r Preparation of Master plan for 05
assistance to Urban Development
(Bhalki, Aurad, Chitaguppa,
Authorities/ Planning Authorities and Local
Chittapura and Sirsi) Cities/Towns are
Bodies in the State for the implementation &
Under Process.
enforcement of these plans and schemes.
6.9 FINANCING URBAN DEVELOPMENT
The Karnataka Town and Country Planning
Act, 1961 has been extended to 157 urban The resource base of the Urban Local Bodies
centres in the State so far and Statutory are Own revenue (tax and non-tax),
Authorities have been constituted in these Government grants, User charges and
urban centres by declaring Local Planning External assistance (loans). The Urban
Area. Accordingly, 30 Urban Development Local Bodies require the financial resources
Authorities excluding Bangalore for Provision of municipal services,
Development Authority and 52 Planning Operation and Maintenance of assets
Authorities are functioning in the State and (O&M), Infrastructure Development and
for 74 Towns, Municipal/ Town Panchayath Debt Servicing
limits are declared as Local Planning Areas In general the ULBs are characterized by low
and the respective Municipal Councils are municipal receipts leading to low municipal
functioning as Planning Authorities and as expenditure and low level of municipal
per 74th Constitutional Amendment Act, services. This can be explained by low
these Local Bodies are required to function elasticity and buoyancy of local taxes, poor
as Planning Authorities and have to perform tax administration and lack of financial
the planning functions also. autonomy for local governments.
The Department is technically assisting the 6.9.1 Grants from State Finance
Planning Authorities in preparation of
Commission
Master Plans for the respective Local
Planning Areas and as on date, Government The state's devolution of revenue grants
has approved Master Plans for 100 Cities/ thus takes place through the institution of
Towns in the State. the SFC. The framework of devolution
suggested by the SFCs demarcated the
The Department extends technical
amount of state resources to be made
assistance to Karnataka Housing Board,
available to the local governments and
Karnataka Industrial Area Development
applied a percentage share on that amount
Board, Karnataka Slum Development
for devolution to rural and urban local
Board in preparation of layout plans
bodies. The 3rd Finance Commission in its
Further, the Department is extending
2009 report recommended for providing 10
technical assistance to Local Bodies / other
% of state NLNORR funds to Urban Local
government agencies Housing Redevelop-
Bodies and also recommended a formula to
ment schemes, Rehabilitation schemes,
distribution of the fund. In order to decide
Ashraya schemes.
the ULBs share it is recommended to
The minister for Urban Development is the consider NLNORR instead of NLGORR and
Chairman and The Director of Town and government has decided to reach the target
Country Planning is working as the Member beginning from 8.5% of NLNORR from 2011-
Secretary to the Karnataka State Town 12 to 10 % during 2015-16 in a phased
Planning Board and The Board is extending manner.
assistance and advices to the Government
Highlights of SFC untied Grants:
for Planned development.
The State Government grants is being
released through SFC. As per the 3rd SFC
Economic Survey of Karnataka 2019-20 171

ULBs share was 6% which was later 6.10.2 Tax Revenue:


increased to 10% in the year 2009-10.
Municipalities are empowered to levy taxes
Details of Untied Grants Allocation,
on i) buildings or lands, ii) advertisements,
Releases and Expenditure (Excluding
iii) toll on vehicles other than those taxed
BBMP) are given in Table 6.14.
under Karnataka Motor Vehicles Taxation
b) 14th Finance commission Grants: Act, 1957 iv) water rate on water supplied by
Details of allocation,ULBs convened the Municipalities. Property tax is the major
and priority schemes are as given source of tax revenue for ULBs, an average
Table 6.16. of 53% of own revenues. The ARV system
which was in vogue in the state has been
6.10 MUNICIPAL FINANCE AND ULBS IN replaced by the Capital Value System. The
KARNATAKA new system is more rational and has come to
6.10.1 Directorate of Municipal be accepted by all municipalities. It is,
Administration (DMA): however, necessary to take measures to
improve tax administration in terms of
Role & Responsibilities: coverage of properties. and collection
r Nodal Agency for regulating day to day efficiency. The performance varies across
governance of 280 ULBs including different classes of ULBs in tax collection.
Corporations in the State and BBMP
6.10.3 Pricing of Services – Tariff Policy:
r Supervising administration in
Corporations & ULBs as mandated in Local taxes should be viewed as a form of
Corporations Act, Municipal Acts and benefit tax or user charge for services
its interpretation. provided at the local level. In this premise, it
r Facilitating implementation and is now being argued that services such as
monitoring of schemes of State and water supply, sanitation and solid waste
Central Government. management should be priced on the basis
of the cost of provision. The aim is not just
r Formulating recruitment and service recovering the cost but to ensure that under
rules for corporations, municipal pricing does not lead to over consumption.
employees and officers. At the same time, it is important to
r Regulating service delivery in remember that it is the State's responsibility
Corporations & ULBs. to provide the minimum level of basic
The Directorate of Municipal Administration services for all sections of the population
is the Nodal Agency to monitor the irrespective of their status and affordability.
Administrative, Developmental and It must be borne in mind that traditionally
Financial Activities of the Corporations & property tax has been regarded as a general
coming under its jurisdiction. purpose tax to take care of the civic services
Table 6.14 (Rs. in crores)

Year Allocation Releases Expenditure

2015-16 812.54 599.19 592.73

2016-17 701.84 524.33 514.27

2017-18 701.83 540.09 526.39

2018-19 666.05 503.25 379.73

2019-20 574.38 281.46 122.16

Total 2448.32 2448.32 2135.28


172 Economic Survey of Karnataka 2019-20

Table 6.15 : 14th Finance commission grants details of allocation ULBs covered and
priority schemes are as details below:

Allocation: Rs.4685.51 crores (including BBMP)

Implementation period 2015- 16 to 2019-20

Target ULBs 280 urban local bodies

SWM (min.25% ), Water supply (max. 20% ), UGD(max.20% ), SWD


Priority sectors ( max. 25%), Streetlights (min.10% -Max.15% ), Municipal buildi ngs
( max.5% ) and Parks & Afforestation ( min.5% - max.10% ).

Table 6.16: Details of General Basic Grant upto end of November -2019
(Rs. in Crores)

Year Allocation Releases Expenditure

2015-16 413.32 413.32 362.94

2016-17 549.57 549.57 483.33

2016-17 633.95 633.95 538.41

2018-19 738.55 738.55 391.30

2019-20 999.86 499.93 67.39

to be provided by the municipalities. The municipal bonds. It is essential to enhance


increased revenue may help to provide credit worthiness of municipalities to raise
quality services. funds from capital market. Multilateral
institutions like the World Bank, ADB and
6.10.4 Funding Capital Expenditure: JBIC provide long term debt with
Capital expenditure is usually met through comfortable terms of repayment. Karnataka
budget provision and institutional finance. has been availing funds from this source
Institutions such as HUDCO and during the last 10-12 years. Public-Private
multilateral agencies like ADB and World Partnership is being increasingly advocated
Bank have been extending financial for infrastructure development in recent
assistance to ULBs and other urban years. Karnataka Government has issued
development authorities to build policy guidelines on PPPs. Negotiating and
infrastructure and housing. What Land is operating PPPs require a professional
the most productive asset owned by approach and as such ULBs and urban
Municipalities and UDAs. They can increase authorities should equip themselves
their revenues through: adequately for the implementation of PPP
ventures. Private sector participation in
a) Betterment levies, impact charges, delivery of municipal services is seen as
development charges etc. contributing to efficiency and cost
b) Transfer of Development Rights (TDR). effectiveness. There are different options for
private sector such as service contract,
c) Levy of a Fee on tapping of ground management contract, lease, concession
water. and BOT/ BOOT. Options must be exercised
6.10.5 Access to capital markets: carefully depending on the nature of the
project and expected outcomes. There is a
Cities like Bengaluru, Hyderabad and view that business must be made to
Ahmadabad etc. have raised funds through
Economic Survey of Karnataka 2019-20 173

participate in the process of creating new construction, food and trade activities all
social assets in the city as social wealth is these come within the domain of the local
created over generations and its exploitation bodies. Besides these traditional core
for private profit without participation in its functions of municipalities, the
creation and upkeep is not fair. It is their Constitution has also included certain other
Corporate Social Responsibility also. A functions like planning for economic
system can be devised whereby businesses development and social justice, urban
are given exemptions or incentives when poverty alleviation, and urban and town
they create assets such as housing and planning. However, while recognizing local
infrastructure. governments and providing a list of
functions which could be performed by
6.11 URBAN GOVERNANCE
them, the Constitution does not directly
The structure of urban governance in endow them with any functions,
Karnataka and in India general, in the responsibilities and powers. They derive
context of a local government, stands very their powers and functions from the States
far from the philosophy of the Constitution through specific legislation. Thus, in
and the theory of decentralization. The practice, it is the state governments which
colonial authoritarian structure of city determine the degree of decentralization and
governance continues to this day with autonomy of the local bodies.
resistance to sharing political power with
local urban institutions. It is therefore, one 6.11.2 New Institutional Arrangements:
could find a scenario where apart from The image of local government is equally
urban local bodies, there is a host of characterized by democracy and efficiency.
parastatal Urban Development and This should be the guiding principle. The
departmental agencies dealing with urban elected representatives formulate the policy
services. This is particularly so in and set the targets. The administration's
metropolitan cities where there are separate task is to support the elected
government agencies dealing with water representatives in this endeavor and reach
supply and sewerage, transport, land and the defined targets without detailed political
infrastructure development etc. This multi supervision.
institutional approach has led to lack of
holistic look at urban development. a) KARNATAKA MUNICIPAL DATA
SOCIETY (MUNICIPAL REFORMS CELL)
6.11.1 - 74th Constitutional Amendment
Act: MeGISS- Municipal e-Governance
Integrated Software System-
The passage of 74th CAA has provided new
opportunities for urban governance reforms MeGISS is an integrated delivery and
in the country. The municipal bodies have monitoring platform through which all the
for the first time been provided the municipal services are delivered and
constitutional status of the third tier of monitored digitally through a transparent,
government. They have been vested with faster and efficient system . This integrated
increased responsibilities as a result of the system reduces efforts for citizens and ULB
devolution of 18 functions through the 12th officials, provides flexibility for availing
schedule to the Constitution. Clearly, the services , carrying out services or provides
intention of the Constitution is to provide a logs and history for audit purpose without
decentralized democratic structure of violating any Act or rules that are bound to
governance at the local level. these urban local bodies and as per the
government orders time to time.
Local democracy is based on the principle of
subsidiarity i.e., functions which are local in b) GIS based property survey (With
nature should be performed by the local KSRSAC and DMA)
government. Thus, public health, water Establishing Geographical information
supply, sanitation, public works, public system based on property information
safety, welfare, recreation and regulation of system in ULBs across the state to increase
174 Economic Survey of Karnataka 2019-20

ULBs revenue, make ULBs self sustainable, r E-Aasthi – Property details


necessary decision and accord approval and management system.
to integrate data generated into other r Sweekruthi application integrated with
applications enhancing informed decision Khajane 2 has been developed and
making. Phase-1 survey is planned in 18 implemented across all ULBs to avoid
ULBs (10 City corporations, 4 City cash based transactions at ULBs.
Municipal Councils, 2 Town Municipal
Councils and 2 Town Panchayat) and tender r Role Based facility in FBAS application
is floated. is made available to digitize the
payment approvals online.
C) DTCP Computerization project r FBAS application is implemented in
r Computerization of various activities of DUDCs, DMA , newly formed ULBs and
Urban Development Authorities and planned to implement in authorities.
similar organizations coming under r PID number based Property tax
UDD. calculator has been developed.
r Computersation of Administration in r Online application to manage AMRUT
Directorate of Town Planning. project has been developed and
Under this projects, The activities taken up planned to implemented in AMRUT
are-Website, Allotment of sites / Issue of ULBs.
Conveyance deed, Demand, Collection, r Integration of Schemes application with
Balance of dues to UDAs, Technical opinion FBAS and E-procurement applications
on Conversion of agriculture land for non- is done to ensure online updation of
agricultural purposes, Asset Management - financial transactions.
Rental Activities, Accounts, Personnel
6.11.3 Specific Challenges and the
Information System, Scanning and
Future Outlook of the Department:
uploading of approved layouts, Scanning
and uploading of approved Master Plans, The Urban Local Bodies have to provide
Stages of Master Plans at state level, basic services to the citizens and have a vital
Technical opinion on approval of Cinema role in the State's socio economic transfor-
Theatres, Schemes of the Development mation. Most of the ULBs are severely
Authorities, File and letter monitoring stressed in terms of infrastructure and
system, Indexing and scanning of old effective service delivery. The major
records and Tracking of Court Cases. challenges of the ULBs are indicated below.
Existing online applications: Urban Challenges
r Birth & Death Registration and r Present Urban Population is 2.36 crore.
Certification System. E-Janma The increase in the growth of urban
application. Population and upcoming new ULBs
r Janahitha - Improved version of online need more resources to meet the
Public Grievance and Redressal requirements of the people..
System. r Migration from Rural to Urban Areas.
r Nirman - Online Building License r Widening urban infrastructure deficit -
issuance System Water Supply, Improving, Monitoring
r Nirman 2-End to end online system and Delivery of Public Services.
with auto DCR for Building license r Addressing Regional Imbalances.
issuance service has been developed r UGD, Solid Waste Management
and implemented in AMRUT.
r Power supply and shortage.
r Vyapar - End to end Online Trade
License issuance system.
r Jalanidhi - End to end water tap and
UGD connection permit and water tariff
management System.
AGRICULTURE AND ALLIED CHAPTER 7
SECTORS AND FOOD SECURITY

7.1 AGRICULTURE r Accelerate farm mechanization and


The Department of Agriculture implements post-harvest technology development
various schemes and programmes of the with appropriate value chain linkages.
Central and State Government for overall r Convergence of policies, programmes
welfare of the farming community and and technologies for planned
ensures timely supply of important inputs agriculture development.
i.e. seeds, fertilizers, plant protection r Strengthen effective and timely delivery
chemicals, farm equipments along with mechanism of all inputs and related
effective transfer of technology from lab to developmental programmes.
land through demonstrations to achieve
Budgets for Agriculture:
maximum output from the available natural
resources viz. soil, water, etc. This, in turn, For the year 2019-20, an amount of
leads to enhancement in the economic Rs.4267.79 crores has been earmarked for
status of the farming community and food agriculture department both for Plan
grain needs of the people. Though the scheme and Non-Plan schemes. For
contribution of the agricultural sector in the comprehensive development of agriculture,
Gross State Domestic Product is decreasing, thrust has been given on department
agriculture remains to be the major flagship programmes viz., “Soil Health
employment generating activity. Mission”, “Krishi Bhagya”, “Farm
Mechanization”, “Custom Hiring Centers”,
Vision:
“Micro-irrigation”, and “Zero Budget Natural
r To accomplish productivity Farming”. Besides, emphasizing millet
enhancement, cost reduction for production and processing aspects.
sustainable agriculture to ensure
In the current year, “Raitha Siri”- an
increased income, farmers' welfare and
incentive oriented Millet production progra-
food security in Karnataka.
mme, “Karavali Package –an incentive
Mission: oriented Paddy Production Programme” and
r Accomplish 4.5% sustained growth rate “Encouragement for Value Addition and
in the agriculture sector. Strengthening of Organic Market” are three
new schemes being implemented to
r Promote climate-resilient agriculture enhance the organic and millet production
with adequate drought-proofing and which are the Next Generation Smart Foods.
natural resources conservation.
r Promote farmer-friendly Research & 7.2 MONSOON IN 2019
Development, education and effective Pre-monsoon Rainfall:
technology transfer for cost reduction.
Pre-monsoon rainfall during April-May was
r Institutionalize aggregation of farmers 69 mm as against a normal of 118 mm thus
like Farmer Producer Organizations deficit by 42% and it affected normal sowing
(FPOs), farmer's organizations, of early kharif crops in parts of Mysuru,
federations to roll out Public-Private Chamarajnagar, Mandya, Chikkamagalur,
Partnership for Integrated Agriculture Chitradurga and Tumakuru districts.
Development (PPP- IAD).
r Encourage Rural youth to engage in Southwest Monsoon :
agribusiness enterprise with Southwest monsoon advanced in Coastal
appropriate policy support. and some parts of Southern districts on 12th

175
176 Economic Survey of Karnataka 2019-20

June and covered all parts of the State by 7.3 AGRICULTURAL PRODUCTION-
26th June. Rainfall during June was below PERFORMANCE AND PROSPECTS
normal in major parts and further deficit
The advance estimates of production based
rainfall during July caused set back in
on area coverage under various crops, loss
sowing progress of rainfed kharif crops.
of crops due to excess rains/floods in some
Widespread rainfall in August helped to
parts and deficit rainfall in some parts
take-up sowings briskly in many parts the
during 2019-20 indicate likely production of
State. At the same time heavy to very heavy
102.03 lakh tonnes Cereals and 17.37 lakh
rainfall and excess water flow in major rivers
tonnes of Pulses against the target of 117.22
led to flood situation in many Northern and
and 21.45 lakh tonnes, respectively.
some Southern parts. As a result, crop loss
Oilseeds production is estimated to be 10.73
was reported in 7.21 lakh hectares and the
lakh tonnes against the target of 14.71 lakh
State Government declared 103 taluks of 22
tonnes. Production of cotton is likely to be
districts as flood-affected. Further, during
14.75 lakh bales against the target of 16.58
September also excess rainfall occurred in
lakh bales. The shortfall in production
malnad and coastal regions.
against the set target can be attributed to
In spite of late onset of monsoon onset and i) failure of rains during June and July,
deficient rainfall during June and July the ii) excess rainfall/floods in several parts
seasonal rainfall ended in normal category during August, September and October iii)
with +16% against the normal rainfall. below normal area coverage under Rabi
Cumulative rainfall during southwest crops due to excess soil moisture in some
monsoon period from 1st June to 30th northern parts. However, the current year
September was 977mm as against a normal agriculture production is anticipated to be
of 839mm and it was deficit in 22 taluks. better than the previous year. Area and
Southwest monsoon withdrew from the Production of Major crops are given in
th
State on 16 October 2019. Table 7.1.
Northeast Monsoon : The projected production of principal crops
in Karnataka for Kharif, Rabi and summer
Northeast monsoon rains during October
crops of 2019-20 are given in Appendix7.2.
were excess/normal in all districts of the
State, except Yadgir and 62 taluks were Table 7.2. and 7.2.a and Appendix 7.3
declared as flood affected during October. provide details of area coverage and
During November, rainfall was deficit except production under kharif, Rabi and summer
in Ramnagar, Mysuru, Mandya, Bidar, crops during the current and previous year.
Belgavi, Bagalkote, Vijaypura, Gadag, The index number of area, production and
Dharwad, Dakshina Kannada and Udupi yield of agriculture crops over the years are
districts. South Interior, Malnad and given in Appendix 7.4. The area under
Dakshina Kannada and Udupi in Coastal principal crops in Karnataka over the years
regions experienced moderate rainfall is given in Appendix 7.5. Details of
during December, while light rainfall was production of principal crops in Karnataka
observed in major parts of North Interior over the years are given in Appendix 7.6.
region. Cumulative rainfall during
st
northeast monsoon period from 1 October Average yield of selected crops in India and
st
to 31 December was 288mm as against a Karnataka are given in Appendix 7.7. Area
normal of 188mm, thus excess by 54%. irrigated by various sources in the State is
shown in Appendix 7.8.
Details of District-wise and Month-wise
rainfall received during pre-monsoon,
southwest monsoon and northeast
monsoon during the year 2019 are given in
Appendix– 7.1.
Economic Survey of Karnataka 2019-20 177

Table 7.1: Area and Production of Major Crops in the State


(Area in lakh hectares, Production in lakh tonnes)

Average growth over


2019-20 2018-19
previous year (%)
Crop / Group
Area Prodn. Area Prodn. Area Prodn.

Cereals 44.45 102.03 45.28 92.00 -1.83 10.90

Pulses 29.65 17.37 35.70 18.46 -16.95 -5.90

Total food grains 74.10 119.40 80.98 110.46 -8.50 8.09

Oilseeds 11.67 10.73 9.99 7.92 16.82 35.48

Cotton # 6.71 14.75 7.18 14.00 -6.55 5.36

Sugarcane * 6.84 396.00 7.94 424.11 -13.85 -6.63

Tobacco 0.90 0.77 0.64 0.52 40.63 48.08

# Lakh bales of 170 Kg. lint, * Sugarcane production for the harvested area during the year. 2018-19 Final
Estimates of DE&S, 2019-20 2nd Advance Estimates of DE&S.

Table 7.2 : Area coverage: Kharif, Rabi and Summer (Lakh hectares)

Kharif Rabi Summer


Crop/
Groups 2019- 2018- 2019- 2018- 2019- 2018-
Normal Normal Normal
20 19 20 19 20 19

32.70
Cereals 31.36 31.74 12.55 8.90 11.76 1.87 2.85 1.78

18.41
Pulses 15.37 21.96 14.04 11.05 13.70 0.13 0.19 0.05

Total food
46.73 51.11 53.70 26.59 19.95 25.46 2.00 3.04 1.83
grains

7.98
Oilseeds 9.17 7.87 2.61 1.67 0.68 1.36 2.02 1.44

6.50
Cotton 5.60 7.14 0.32 0.20 0.05 - 0.01 -

6.00
Sugarcane 4.72 7.07 0.51 0.43 0.65 0.28 0.41 0.22

0.90
Tobacco 0.93 0.64 0.04 - - - - -

Aggregate 67.16 72.49 76.42 30.07 22.25 26.84 3.64 5.48 3.49

Source: 2018-19 Final Estimates, 2019-20 -2nd advance Estimates of DE&S.


178 Economic Survey of Karnataka 2019-20

Table 7.2.a : Production: Kharif, Rabi and Summer


(Lakh tonnes)

Crop/ Kharif Rabi Summer


Groups 2019-20 2018-19 2019-20 2018-19 2019-20 2018-19
Cereals 83.38 73.05 9.82 13.29 8.83 5.64
Pulses 10.64 11.80 6.67 6.64 0.06 0.01
Total food
94.02 84.85 16.49 19.93 8.89 5.65
grains
Oilseeds 7.22 6.29 1.44 0.40 2.06 1.21
Cotton 14.53 13.98 0.20 0.02 0.02 -
Sugarcane 396.00 424.11 - - - -
Tobacco 0.77 0.52 - - - -

Production of Cotton in Bales of 170 kgs.


Source: 2018-19 Final Estimates and 2019-20- 2nd Advance Estimates of DE&S.

7.4 LAND UTILIZATION AND holdings and operate 44% of the total
OPERATIONAL HOLDINGS operated area, while semi-medium, medium
and large holdings account for 20% of the
7.4.1 Land Utilization : total holdings and their operational land
As per the land utilization statistics of holding is 56% out of the total operational
2017-18, out of the total 190.50 lakh area. Details of Agricultural Land Holdings
hectares geographical area of the State, the in Karnataka is given in Table 7.4.
net cropped area was 98.95 lakh hectares
7.5 CROPPING PATTERN
accounting to 51.94%. Gross cropped area
was 119.94 lakh hectares including 20.98 Karnataka State falls is in Zone X (Southern
lakh hectares area sown more than once, Plateau and Hilly region) and Zone XII (West
this works out to 121% cropping intensity. Coast Plains and Ghats region) as per the
Around 16.13% of the area was covered Agro-climatic Regional Planning of Planning
under forests, 7.88% area was under non- Commission. The State is divided into 10
agricultural uses, 4.16% of the land was Agro-climatic zones on the basis of soil
barren and uncultivable land and 2.10% of structure, humidity, elevation, topography,
the land was a cultivable waste. Permanent vegetation, rainfall and other agro-climatic
pastures, grazing land and miscellaneous factors.
tree crops constituted 6.19% of the total
On account of this varied agro-climatic
geographical area. About 11.58% of the total
features, almost all cereals, pulses, oilseeds
area falls under current fallow and other
and commercial crops are cultivated in
fallow lands. The details of the Land
different parts of the State. Farmers in
Utilization are presented in Table 7.3, Karnataka are very innovative and take lead
Appendix 7.9(a) and 7.9(b). in diversification as per the market trends.
7.4.2 Agriculture Land Holdings : The average area (2014-15 to 2018-19) of
agriculture crops grown in three seasons'
As per Agriculture Census 2015-16, there
viz. Kharif (67.16 lakh ha.), Rabi (30.07 lakh
are 86.81 lakh farm holdings operating an
ha.) & summer (3.64 lakh ha.) is 100.87
area of 118.05 lakh hectares. The average
lakh hectares. Cereals, Pulses, Oilseeds,
size of holding is 1.36 hectare. Small and
Cotton, Sugarcane and Tobacco account for
marginal holdings account for 80% of total
46%, 30%, 13%, 6%, 6% and 1%
Economic Survey of Karnataka 2019-20 179

Table 7.3 :Classification of Total Geographical Area-2017-18


Area
Sl. No. Classification
(lakh ha.)
Total Geographi cal Area 190.50
1 Forest 30.73
Not avail able for cultivation:
2 a) Land put to non-agri . Uses 15.01
3 b) Barren & unculti vable land 7.93
4 Cultivable waste 4.00
Uncultivated land excluding fallow land:
5 a) Permanent pastures & other grazing land 9.05
6 b) Misc. Tree crops, Groves 2.74
Fallow Land
7 a) Current fal low 15.21
8 b) Other fallow land 6.86
9 Net Area Sown 98.95
Total (Gross) Cropped Area 119.94
Area sown more than once 20.98
Cropping Intensity - % 121
Source: Annual Season & Crop Report of DE&S, Bangalore.
Table 7.4 : Land Holdings in Karnataka
I .Number of Operational Holdings (‘000)
Size Class 1995-96 2000-01 2005-06 2010-11 2015-16
Marginal (Below 1 ha.) 2610 3252 3655 3849 4767
Small (1 to 2 ha.) 1707 1909 2014 2138 2214
Semi Medium (2 to 4 ha.) 1204 1259 1278 1267 1193
Medium (4 to 10 ha.) 594 569 555 511 451
Large (Above 10 ha.) 106 90 79 68 56
Total 6221 7079 7581 7832 8681
I I .Area of O perational Holdings (‘000 hectares)
Marginal 1248 1492 1651 1851 2080
Small 2480 2742 2876 3020 3107
Semi Medium 3298 3429 3468 3393 3188
Medium 3490 3317 3206 2904 2569
Large 1593 1327 1184 994 861
Total 12109 12307 12385 12161 11805
180 Economic Survey of Karnataka 2019-20

III. Average Size of Operational Holdings (hectares)


Marginal 0.48 0.46 0.45 0.48 0.44
Small 1.45 1.44 1.43 1.41 1.40
Semi Medium 2.74 2.72 2.71 2.68 2.67
Medium 5.88 5.83 5.78 5.69 5.69
Large 15.02 14.74 14.99 14.71 15.45
Total 1.95 1.74 1.63 1.55 1.36
Source: Agricultural Census 2015-16, GoI.

respectively of the total agricultural cropped tonnes, Urea – 7.45 lakh tonnes, SSP and
area. Area under Maize, Tur, Bengal others 0.27 lakh tonnes.
gram, Cotton and Soyabean are witnessing
Based on the projected requirement of
a higher trend in recent years, whereas
different grades of fertilizers for
crops like Sunflower, Jowar, Groundnut
Rabi/summer 2019-20, Govt. of India has
etc. are witnessing a declining trend. The
allocated 21.67 lakh tonnes of different
details on cropping pattern are given in
grades of fertilizers consisting DAP-2.49
Appendix - 7.10.
lakh tonnes, MOP – 2.62 lakh tonnes,
7.6 DISTRIBUTION OF INPUTS Complex-6.44 lakh tonnes, Urea-9.41 lakh
tonnes and SSP – 0.71 lakh tonnes {Others-
a) Distribution of Fertilizers: Mono Ammonium Phosphate, Potassium
Based on the projected requirement of Schoenite (PS), Ammonium Sulphate,
different grades of fertilizers for Kharif 2019, Ammonium chloride (AC), Calcium
Govt. of India had allocated 22.75 lakh Ammonium Nitrate (CAN), Rock Phosphate
tonnes of different grades of fertilizers (RP)}. Trends in fertilizer consumption in
consisting DAP-4.00 lakh tonnes, MOP – terms of NPK nutrients are furnished in
2.18 lakh tonnes, Complex-7.70 lakh Table 7.5.
tonnes, Urea-8.50 lakh tonnes and SSP – b) Buffer Stock of Fertilizer for Kharif
0.30 lakh tonnes {Others-Mono Ammonium
2019:
Phosphate, Potassium Schoenite (PS),
Ammonium Sulphate, Ammonium chloride To overcome the scarcity of fertilizers at a
(AC), Calcium Ammonium Nitrate (CAN), critical period, during the Kharif season, the
Rock Phosphate (RP)}. The State has received State Government has decided to operate
20.32 lakh tonnes of different grades of the Buffer Stocking of Fertilizers. The
fertilizers by the end of Kharif 2019 scheme of buffer stocking has been
consisting DAP – 3.43 lakh tonnes, MOP- continued for Kharif 2019. During summer
1.60 lakh tonnes, Complexes – 7.57 lakh and pre-monsoon season itself Department

Table: 7.5 : Consumption of NPK in Karnataka State Nitrogen (N), Phosphorus (P) &
Potash (K) (Quantity in Tonnes)
Nitrogen Phosphorus Potash Total
Years
(N) (P) (K) (N+P+K )
2016-17 871761 503287 240199 1615247
2017-18 878217 459306 257777 1595300
2018-19 936448 536280 307052 1779780
2019-20
704121 371305 208502 1283928
(till Nov.2019)
Economic Survey of Karnataka 2019-20 181

has instructed KSCMF to stock various the procurement and selling rates of various
fertilizers at district and taluk levels. As on seeds taking into account, procurement
26th Nov. 2019 under the scheme, at KSCMF rates, production costs, certification,
Branches, DAP – 45,147 tonnes, MOP- processing, packaging and other overhead
18,258 tonnes, Complexes –35,377 tonnes, charges.
Urea – 2,383 tonnes, SSP and others 948
Production and distribution of Certified:
tonnes fertilizer has been stocked. This
Quality seeds in the State from 2016-17 to
arrangement, in turn, helped to manage the
2019-20 are furnished in Table 7.6.
supply of fertilizers in demand situation
smoothly in the State and there was no b) Distribution of seeds at subsidized
problem regarding the availability of rates to Farmers during 2019-20:
fertilizers.
During Kharif 2019, it was programmed to
7.6.1. Seeds Distribution : distribute Paddy, Ragi, Jowar, Maize, Bajra,
Navane, Cowpea, Greengram, Blackgram,
a. Production and distribution of Seeds:
Red gram, Groundnut, Wheat, Sunflower
As per the Seed Replacement Norms, Seed and Soybean seeds under State Sectors
Replacement Rates fixed for different Seeds Supply and Other Investments
Agricultural Crops for 2019-20 is as follows: Scheme. During Kharif 2019 about 4.33
lakh quintals seeds have been distributed
1. Cereals : 33 to 40 percent
and Rs.103.89 crore subsidy amount is
2. Pulses : 33 to 50 percent utilized for this purpose and 13.86 lakh
farmers have been benefitted. During
3. Oilseeds : 33 to 89 percent
Rabi/Summer 2019-20, 2.60 lakh quintals
4. Cotton : 33 percent of seeds have been distributed upto
December and Rs.61.23 crore subsidy
5. All Hybrids : 100 percent
amount is utilized for this purpose and 4.22
Production and supply of Breeder Seeds of lakh farmers have been benefitted.
different crops is being done by the State
7.6.2. Plant Protection :
Agricultural Universities and Indian
Council of Agricultural Research Institutes Objectives of the scheme:
(ICAR). These organizations produce and
supply Breeder Seeds required for the State 1. To provide necessary techniques and
based on the advance indents placed by the technology along with distribution of
Department of Agriculture. The Seed bio-pesticides which reduce
Association of India is the Nodal agency for environmental pollution, under subsidy
the supply of breeder seeds to the private to farmers to control insects, diseases
seed producing agencies. Certified Seed and weeds of crops effectively. Bio-
production and distribution in the State is pesticides are distributed to the farmers
being done by Karnataka State Seeds at 50% subsidy.
Corporation, National Seeds Corporation, 2.
Similarly, produce of the crops must be
Karnataka Co-operative Oilseed Growers' scientifically stored to reduce the
Federation, State Agricultural Universities wastage from rats, bandicoots, insects
and many private seed supplying agencies. and diseases. To reduce the storage
Seed producing and supplying agencies fix losses, scientific storage bins are
distributed to farmers under subsidy.
Table. 7.6. Production and distribution of Certified: Quality seeds
(Quantity in quintals)
Particulars 2016-17 2017-18 2018-19 2019-20 (Target)

Production 1120200 1115006 1160643 1194146

Distribution 1315191 1306233 1247156 1276317


182 Economic Survey of Karnataka 2019-20

3. Pesticides are supplied to farmers control of an outbreak of insect, pests


under subsidy to control endemic and and diseases.
epidemic pests of important agriculture
2. Prevention of environmental pollution.
crops.
3. Reduction in loss of grains due to
4. During the current year, Fall Army
Rodents, insects, diseases and
Worm was noticed in Maize in 17
moisture.
districts of Karnataka. University
Scientists and Department officials 4. Availability of quality inputs to the
conducted an extensive survey and farmers.
farmers were advised regarding the
5. Effective management of crop pests and
timely management of the pest.
diseases.
Pesticides were also distributed to
farmers under subsidised rates for 6. Increase in yield of crops.
management of fall armyworm.
7.6.3. Agricultural implements -
5. In order to protect the crops from seed
and soil-borne diseases and also to get Farm Mechanization:
higher yields, seed treatment Mechanization of Farm Operations helps to
campaigns are conducted. reduce the drudgery of farm operations,
6. To create awareness among farmers saves time, and improves efficiency and
regarding the safe and judicious use of farm productivity. Farm Mechanization
pesticides, training programmes are Programme is being implemented both
conducted with the available funds under State and Central Sector. The general
under this scheme. farmers are provided with a subsidy of 50%
and 90% subsidy is provided to the farmers
7. The Composite Inspectors of seed, belonging to Schedule Caste/Schedule
fertiliser and pesticides and dealers are Tribe limited to Rs.1.00 lakh. The amount
given training on the various Input provided under Rashtriya Krishi Vikas
Regulation Act. Amount is also Yojana is used as matching grants with the
earmarked for meeting expenditure for State Fund to provide the subsidy. The
collection of seed, fertilizer and details of expenditure incurred during the
pesticides samples for quality control. last three years under Farm Mechanization
The details of allocation of funds, releases programme are given in Table 7.8 & during
and expenditure for Plant Protection 2019-20 in Table 7.9.
Scheme are given in Table 7.7. Sub Mission on Agricultural
Scope of the Scheme : Mechanization (SMAM)
The scheme is being implemented to
1. Use of eco-friendly Bio-pesticides and
promote the usage of farm mechanization
bio-control agents by the farmers,
and increase the ratio of farm power to a

Table 7.7 : Expenditure Details of Plant Protection Scheme


Rs. in lakhs

2019-20
2016-17 2017-18 2018-19 (up to Nov.
2019)

Allocation/Releases 981.00 981.00 981.00 981.00

Expenditure 922.46 937.32 962.00 867.00


Economic Survey of Karnataka 2019-20 183

Table 7.8 : Farm Mechanization Programme in Karnataka (Rs. in Lakh)


Scheme 2016-17 2017-18 2018-19
Farm Mechanization 30702.98 33696.04 33666.29

Table 7.9 : Progress achieved under Farm Mechanization for the year 2019-20 (Up
to November) (Physical in Numbers, Financial in Rs. in Lakhs)
Progress
Scheme Programme Releases
Phy Fin
Farm Mechanization -
22572.34 13862.26 112444 11664.93
State Sector

cultivable unit area up to 2.5 kW/ha. machinery on custom hiring basis at the
Progress achieved under the scheme during hobli level Custom Hire Service Centres
2019-20 is furnished in Table 7.10. were established through Charitable
Trusts/ Non-Government Organizations/
A) Agro-Processing: Farm Equipment Manufacturers in phased
Department of Agriculture is implementing manner on a PPP model from 2014-15.
the Agro-Processing scheme under which From 2014-15, 493 centres have been
various agro-processing equipments are established to date, with a budget of
made available to farmers, Self Help Groups Rs.21108.43 lakhs.
and Farm Women at subsidized rates. This
encourages value addition of the farm During 2019-20, the budget allocated is
produce and increase the income of the Rs.2816.66 lakhs and till date and 12.50
beneficiary. Under this Scheme, preference lakh, farmers have been benefited so far.
will be given to distribution of Agro-
7.7 PROGRAMME AND SCHEMES
Processing unit and Tarpaulins.
IMPLEMENTED BY THE STATE
Under SCP and TSP, agro-processing units GOVERNMENT CENTRALLY SPONSORED
to SC/ST farmer groups, women SHG's and SCHEMES
individual farmers will be provided with an
assistance of 90% or maximum of Rs 1.00 7.7.1. National Food Security Mission
lakh. To protect the agriculture (NFSM) :
produce/food grains from rain, wind and National Food Security Mission, which was
other unnatural weather conditions and to started during the 11th Five Year Plan has
maintain quality, the five-layered 250 GSM- been continued for the 12th Five-year plan
HDPE black colour tarpaulin with different also. In addition to NFSM-Rice and NFSM-
sizes (8mx6m & 10mx10m) is made Pulses, to achieve higher production and
available to farmers at 50% subsidy. Under productivity of Coarse Cereals and
SCP and TSP tarpaulins are distributed to Commercial crops “Nutri Cereals Schemes”
SC/ST farmers with an assistance of 90% and “NFSM-Commercial Crops” are being
(Anyone type (8x6m or 10x10m) of Tarpaulin implemented in the State during 2019-20
will be distributed under 90% per farmer per also.
Year). Progress achieved under Agro
Processing for 2019-20 given in Table 7.11. 1. NFSM-Rice: Under this scheme,
provision has been made for 100 hectare
B) Custom Hire and Service Centers: area cluster demonstrations on Rice
Krishi Yantra Dhare-Farm Machinery Production Technologies (Direct Seeded
Custom Hire Service Centers: In order to Rice, Line sowing, Mechanical
facilitate farmers to avail the farm
184 Economic Survey of Karnataka 2019-20

Table 7.10 Progress achieved under SMAM for 2019-20 (Up to Nov. 2019)
Progress
Scheme Programm e
Releases Phy. (nos.) Fin (in Rs. lakhs)
SMAM 9500.00 6000.00 25542 4982.50

Table 7.11: Progress achieved under Agro Processing for 2019-20 (till Nov. 2019)
Progress
Scheme Program me
Releases Phy (nos.) Fin (in Rs. lakhs)

Agro-processing 4340.23 2348.14 69260 1162.58

Transplanting, SRI Method, Stress Tolerant Demonstrations on intercropping,


Varieties etc.) and Cropping Systems, integrated crop management and desi
distribution of improved varieties/hybrid cotton, inputs for Integrated Pest
seeds, and inputs for Integrated Nutrient Management and training to farmers.
and Pest Management, agricultural
machinery, water tools, green manure seeds ii) NFSM-Sugarcane: Under this scheme,
under subsidy and trainings to farmers. provision is made for Demonstration on
intercropping and Pest Management,
2. NFSM-Pulses: Under this scheme, distribution of tissue culture plantlets,
provision has been made for 100 hectare breeder seed production, and trainings
area cluster demonstrations on improved to farmers.
technologies, cropping systems and
intercropping, distribution of improved 6. Intercropping of pulses with
varieties seeds, and inputs for Integrated sugarcane: Under this scheme, provision
Nutrient and Pest Management, agricultural has been made for Demonstrations on
machinery, water tools, post-harvest intercropping of pulses with sugarcane,
equipment under subsidy and training to distribution of certified seeds, inputs for
farmers. Integrated Nutrient and Pest Management
and training to farmers.
3. NFSM-Coarse Cereals: Under this
scheme, provision has been made for 100 7. NFSM-Oilseeds: NMOOP is a Centrally
hectare area demonstrations on Sponsored Scheme for the development of
intercropping with pulses and integrated Oilseeds and Oil Palm started during 2014-
crop management in maize has been 15 year with the objective of increasing
implemented. production and productivity of these crops
and to attain sustainability in Agriculture,
4. NFSM-Nutri Cereals: Under this scheme, and the scheme continued in 2018-19 also.
provision has been made for 100 hectare The mission is proposed to be implemented
area cluster frontline demonstrations, through three Mini Missions. MM-I on
distribution of improved varieties seeds, oilseeds, MM-II on oil palm, MM-III on tree-
inputs for Integrated Nutrient and Pest borne oilseeds. The Scheme is implemented
Management, Sprinkler sets under subsidy, in 28 districts of the state. The above
training to farmers and other initiatives. programme is being implemented with 60%
of Central and 40% of State share. From
5. NFSM- Commercial crops:
2019-20 NMOOP is merged with NFSM as
i) NFSM-Cotton: Under this scheme, “NFSM-OS”, and being implemented with
provision has been made for Frontline 60:40 central and state share.
Economic Survey of Karnataka 2019-20 185

The progress of NFSM for the year 2019-20 Schemes of Agriculture and Agri-allied
is given in Table 7.12. Departments. For the year 2018-19, an
amount of Rs.251.05 crore was released and
7.7.2. Rashtriya Krishi Vikas Yojana funds were utilized for implementation of
(RKVY-RAFTAAR) : the schemes related to Department of
“Rashtriya Krishi Vikas Yojana", Special Agriculture/ Horticulture/ Animal
Additional Central Assistance Scheme of Husbandry/ Fisheries/ Agricultural
Government of India is in implementation Marketing/ Sericulture/ Watershed
from 2007-08. The main objective of the Development, University of Agricultural
scheme is to reorient the Agriculture Sciences (Bangalore, Raichur) University of
Development strategies for the rejuvenation Agricultural and Horticultural Science,
of agriculture to meet the needs/demands of Shivamogga, University of Horticultural
farmers. It incentivizes the States to Sciences, Bagalkote, Karnataka State Seeds
increase public investment in Agriculture Corporation, Karnataka State Seed and
and allied sectors and aims at achieving the Organic Certification Agency (KSSOCA),
goal of reducing the yield gaps in important Indian Institute of Horticultural Research
crops and thus maximizes returns to the (IIHR), Director of Cashew Research
farmers. Putturu, Karnataka Cashew Development
Corporation (KCDC) Mangalore.
Agriculture Department is the nodal
Department for Implementation of RKVY

Table 7.12 Progress under NFSM during 2019-20 (Centre: State - 60:40)
(Rs. in lakhs)

Expenditure
Budget Expected
Sl. Allocated as Grants Grants Total up to Expenditure
Programme Released by Released Grants end of
No. per Annual up to end of
Action plan GoI by GoK Available November March-20
2019

1 NFSM -Rice 975.54 438.99 292.66 731.65 400.007 975.54

2 NFSM -Pulses 13943.34 5653.03 3768.69 9421.72 5817.34 13943.34

NFSM - Coarse
3 1332.90 599.81 399.8 999.69 76.00 1332.90
Cereals

NFSM - Nutri
4 5832.68 2474.99 1650.00 4124.99 1851.85 5832.68
Cereals

NFSM -
5 Commercial 212.52 95.634 63.756 159.39 57.02 212.52
Crops

Intercropping of
6 pulses with 135.11 0 0 0 0 135.11
sugar cane

7 NFSM-Oilseeds 670.00 0 0 0 138.32 670.00

Grand Total 23102.09 9262.454 6174.906 15437.44 8340.537 18967.19


186 Economic Survey of Karnataka 2019-20

During 2019-20 an amount of Rs.318.67 Out of the total released amount of Rs.87.83
crores (Normal RKVY Rs.298.93 crores + crores (Normal RKVY Rs.81.92 crores + Sub-
Sub-schemes Rs.19.74 crores) has been schemes Rs.5.91 crores), an amount of
sanctioned for implementation of various Rs.65.28 crore (Normal RKVY Rs.59.66
schemes of RKVY as mentioned below. crores + Sub-schemes Rs.5.62 crores) has
(Table 7.13) been utilized for various schemes up to
November 2019.
Up to end of November 2019, Government of
India has released an amount of Rs.53.09 Details of Sub-Schemes approved by the
crores (Normal RKVY Rs.49.15 crores + Sub- Government of India for the year 2019-20
schemes Rs.3.94 crores) as the first are mentioned below in Table 7.14.
instalment under sharing pattern and the
An amount of Rs.107.662 crore has been
matching share of Rs.34.74 crores (Normal
earmarked to Agriculture Department for
RKVY Rs.32.77 crores + Sub-schemes
implementation of the schemes in the year
Rs.1.97 crores) has been met by the State.
2019-20. Table 7.15
Table 7.13 : Department/Institution wise Releases and Expenditure for the year
2019-20 (end of November 2019) - Regular RKVY.
Rs. in crores

Sl. Department/ Funds Progress


Release
No. Institution Approved Achieved

1 Agriculture 107.66 11.90 10.31


2 Horticulture 33.21 14.33 7.99
3 Animal Husbandry 31.78 11.76 4.21
4 Sericulture 7.08 6.08 3.00

5 Fisheries 21.73 6.22 0.00


6 Agri. Marketing 3.45 0.00 0.00

7 WDD 40.00 9.00 5.40


8 CFTRI 12.55 10.55 10.55
9 UAS, Bengaluru 9.70 0.00 3.55

10 UAS, Dharwad 5.20 0.00 0.00


11 UAS, Raichur 5.99 0.00 2.57

12 UHS, Bagalkot 4.93 2.43 2.43


13 KSSC 3.90 3.90 3.90

14 KSSOCA 0.85 0.85 0.85


15 IIHR 0.66 0.66 0.66

16 Karnataka Cashew Development


3.66 1.66 1.66
Corporation Ltd, Mangalore
17 Co-operative Dept. 2.58 2.58 2.58

Administrative cost 3.00 0.00 0.00


Total 298.93 81.92 59.66
Economic Survey of Karnataka 2019-20 187

Table 7.14 : Allocation, Releases and Expenditure for the year 2019-20 Sub-
schemes (up to end of November 2019) - Rs. in crores

Sl. Funds Progres s


Sub-s cheme Name Release
No. Approved Achieved

Ad ditional Fodde r Developm ent P rogram me


1 4.1 7 2.08 2.08
( AFDP)
2 Crop Dive rsification Program me (CDP) 2.6 8 1.33 1.114
3 R eclamation of P roblem Soils (R PS) 5.0 0 2.50 2.43
4 Animal He alth 2.1 6 0.00 0.00
5 Are a Expans ion of Cashew 2.4 0 0.00 0.00
P ilot Programme on im ple mentation of
6 Inte rventions for most vulne rable Drought 3.3 3 0.00 0.00
P rone Distric ts (NRAA)
Total 19.74 5.911 5.624

Table 7.15 : Allocation and releases under RKVY for the Projects implemented by
the Department of Agriculture for the year 2019-20
Rs. in crores
Sl. Funds Progress
Name of Project Release
No. Approved Achieved

Distribution of Tarpaulins under subsidy to


1 10.00 0.00 0.00
farmers

Improvement of Moong bean (Green Gram)


2 and Vegetable Cowpea productivity in 0.31 0.31 0.31
Karnataka State

Establishment of a Center for Millets training


3 4.34 0.25 0.00
and processing facility.

4 Raitha Siri for promotion of millets 31.42 11.59 10.00

Establishment of Krishi Yantra Dhare (Farm


5 16.00 0.00 0.00
Machinery Custom Hire Service Centres).

6 Strengthening of Seed Farms. 12.00 0.00 0.00

7 Strengthening of Seed Testing Laboratories. 1.30 0.00 0.00

Center of excellence on water use efficiency in


8 southern dry zone-District Agriculture 1.10 0.30 0.00
Training Center (DATC) Mandya.

Centre of Excellence to educate farming


community of Koppal District in enhancement
9 of pulse production, storage and post-harvest 2.20 0.20 0.00
technologies in District Agriculture Training
Center (DATC) Gangavati.
188 Economic Survey of Karnataka 2019-20

Sl. Funds Progress


Name of Project Release
No. Approved Achieved

10 Strengthening of Bio-Fertilizer Labs. 1.00 0.00 0.00

11 Construction of RSK Godowns. 0.00 0.00 0.00

Establishment of Centre for Integrated Pest


12 Management in District Agriculture Training 2.50 0.50 0.00
Center (DATC) Dharwad.

Up-gradation of District Agriculture Training


13 1.50 0.30 0.00
Center (DATC) Tumkur.

14 Establishment of mobile plant health clinics. 8.00 0.00 0.00

Organics & Millets hub- To serve as an


important confluence for all organic and
15 millet stakeholders for the promotion of trade 13.00 0.00 0.00
and sharing information and knowledge about
organic and millet business.

Management of Fall Army Worm (FAW)


16 through Integrated Pest Management (IPM) 2.992 2.60 0.00
and Farmers Participation.

Total 107.662 16.05 10.31

7.7.3. National Mission on Sustainable Mission Objectives :


Agriculture
1. To issue soil health cards to all farmers
7.7.3.1. Soil Health Mission: of the Karnataka in a span of every two
Sustaining agricultural productivity years, to provide a basis to include
depends on the quality and availability of nutrient deficiencies in fertilization
natural resources like soil and water. practices.
Agricultural growth can be sustained by 2. To diagnose soil fertility related
promoting conservation and sustainable constraints with standardized
use of these scarce natural resources procedures for sampling and analysis
through appropriate location-specific and design taluka/block level fertilizer
measures. The components of soils are recommendations in targeted districts.
mineral, organic matter, water and air, the
proportions of which vary and together form 3. To develop crops specific nutrient
a system for plant growth. Soils are studied management in the districts for
and classified according to their use. Soil enhancing nutrient use efficiency.
Testing is a part of the discipline of Fertilizer 4. To promote soil test based balancing of
Use and Management. nutrients to manage fertility-related
In Karnataka, 86.81 lakh farm holdings risks for higher production.
exist. At present, 30 Soil testing laboratories 5. To conduct demonstrations with
(29 static & 1 mobile soil testing lab) of diversified crops to quantify benefits of
Agriculture Department are catering to the improved nutrient management
needs of State farmers in respect of soil practices in terms of increased crop
testing. Soil health cards are issued to all yields and economic viability of farmers.
the farm holdings once in every two years.
Economic Survey of Karnataka 2019-20 189

The pay for the outsourced staff of soil plan and grant release is still awaited.
testing labs and Data Entry Operators, Sharing pattern for this programme is 60:40
building and electricity cost, purchase of (Central: State).
equipment/filter paper/chemicals and cost
for maintenance of soil health centres are 7.7.3.3. Soil Health Cards :
borne under this programme. Table 7.16 It requires a long period to analyze the soil
samples from all the farm holdings and
Expected Outcome:
issue soil health cards. Soil test values will
r It will promote a balanced and judicious remain varied for three years. So, for at least
use of plant nutrients. 3 years once soil analysis should be done.
r Promotion of integrated nutrient system Government of India has launched soil
is expected to reduce the consumption health card scheme under National Mission
of chemical fertilizers by 20%. for Sustainable Agriculture to issue soil
health cards to all the farm holdings once in
r The productivity of selected crops is every 2 years. So, State Government is
expected to increase by about 20%. implementing the programme intending to
r The demand for organic sources of plant analyze the samples from all the farm
nutrient like bio-fertilizers, organic holdings and issue soil health cards once in
manure, vermi-compost, slow-release every two years. First (2015-16 & 2016-17)
nitrogenous fertilizer like & Second (2017-8 & 2018-19) cycle of soil
Neem/Sulphur coated urea will health card programme has been
increase, which in turn improve the soil successfully completed. During 2019-20,
fertility as well nutrient use efficiency. this programme is limited to pilot project,
7.7.3.2. Soil Health Management : wherein one village in each taluk is selected
as model village and in these model villages'
During 2018-19, 143 village-level soil soil sample collection and distribution of soil
testing projects have been established by health cards is based on farm holdings.
providing financial assistance to selected Sharing pattern for this programme during
beneficiaries. 2 soil testing laboratories and 2018-19 is 60:40 (Central:State). 177
3 fertilizer quality control laboratories of the villages are selected and the target for 2019-
Agriculture department have been 20 is 65,034 soil health card distributions.
strengthened. During 2019-20, an action So far 48,137 soil health cards are
plan for Rs. 500.00 lakhs for promotion & distributed. Details of soil testing
distribution of micronutrients have been
programme are given in Table 7.17.
submitted to GoI. Approval of the action

Table 7.16 Progress during 2019-20under Soil Health Mission (Rs.in lakhs)
Allotted Grants Expenditure incurred
Year Target
grants released (up to end of Nov. 2019)

2019-20 435* 1482.00 1050.00 471.06

*No of outsourced staff per month in all the soil testing labs and Data entry operators in taluk level.

Table 7.17 : Details of Soil Testing Programme 2019-20 (Rs in lakhs)


Allotted Amount Expenditure incurred
Year Target
grants released (up to Nov. 2019)

65034
2019-20 571.91 1135.233* 268.30
Soil health cards

*Release include grants of Rs.706.283 lakhs of 2018-19 and 1st instalment grants Rs.428.95 lakhs of
2019-20.
190 Economic Survey of Karnataka 2019-20

7.7.4. National Mission for Sustainable “Paramparagath Krishi Vikas Yojana


Agriculture-Rainfed Area Development (PKVY)” under National Mission of
(NMSA-RAD): Sustainable Agriculture is being
The Central Sponsored Scheme- National implemented in the State from the year
Mission for Sustainable Agriculture (NMSA) 2015-16 under Soil Health Mission
has been developed mainly for improvement programme. This scheme is implemented on
of Agriculture Production, especially in Central & State share basis i.e., 60:40. The
rainfed areas. The scheme is being project is implemented in all the districts &
implemented in the State since the year Taluks of Karnataka in project areas of 50
2014-15. The Watershed Development acres (clusters) each. Clusters are selected
Department is overseeing implementation of adjacent to “Savayava Bhagya”
the scheme. villages/Sansad Adarsh Gram Yojana
Rainfed Area Development (RAD) villages in the rainfed areas of districts
Programme aims at promoting Integrated where traditional agriculture is followed
Farming System (IFS) with emphasis on with minimal fertilizer usage as per the
multi-cropping, rotational cropping, inter- guidelines of PKVY. An area of 27,250 acres
cropping, mixed-cropping practices with is being brought under organic cultivation
allied activities like horticulture, livestock, benefiting 25,968 farmers in 545 clusters of
fishery, agro-forestry, apiculture etc. to the State.
enable farmers not only in maximizing the Objective:
farm returns for sustaining livelihood, but
also to mitigate the impacts of drought, flood The main objective of the scheme is the
or other extreme weather events. production of quality and safe agricultural
For, 2019-20, Government of India has products free from chemicals & pesticides
sanctioned Rs. 10.00 Crore, along with by adopting eco-friendly low-cost
State share of Rs. 6.67 crore (on 60:40 funds technologies that restore & maintain soil
sharing basis) the action plan for Rs 16.67 health. Under PKVY, organic farming is
crore has been approved. Accordingly, the promoted through the adoption of an
programme is being implemented in State. organic village by cluster approach and PGS
certification. Progress on PKVY is given in
7.7.5. Paramparagath Krishi Vikas
Table 7.18.
Yojana (PKVY) :
Central Government scheme
Table 7.18 : Progress report of Paramparagath Krishi Vikas Yojana (PKVY)
(in Rs: lakhs)
Year Earmarked Amount released Expenditure
2015-16 3241.88 3241.88 3200.22
2016-17 2719.56 1358.78 1328.93
2017-18 1594.05 1814.29 1793.39
(Including pending balance of
2016-17 also)
2018-19 0.00 298.285 292.143
(Including pending balance of
2016-17 & 2017-18 also)
2019-20 From 2018-19, PKVY programme is implemented through Horticulture Dept. No
grant was released during 2018-19. However, during 2019-20 an amount of Rs:
1734.00 lakhs (GOI: Rs.1040.40 lakhs: GOK Rs.693.60 lakhs) has been
earmarked. An amount of Rs: 707.39 lakhs was released (GOI Share: Rs.424.434
lakhs: GOK Share Rs.282.956 lakhs) to Horticulture Department for
implementation of PKVY.
Economic Survey of Karnataka 2019-20 191

7.7.6 Micro Irrigation : Dated: 05-10-2019 the sharing pattern of


To promote efficient use of water in the subsidy under PMKSY is given in Table
agriculture production, Micro Irrigation 7.19.
programme is being implemented since Details of Micro Irrigation:
2003-04. Under this programme subsidy/
assistance is provided for installation of drip Details of Micro Irrigation for the year 2019-
and sprinkler irrigation units to all 20 are given in Table 7.19 A. Releases and
categories of farmers. Government of India Expenditure details of Micro Irrigation for
is also providing funds for Micro Irrigation the last three years are given in
programme since, 2005-06. Table 7.19 B.

During 2019-20, the Micro Irrigation 7.7.7. Support to State Extension


programme was implemented under Prime Programmes for Extension Reforms
Minister's Krishi Sinchayee Yojana (PMKSY) (ATMA Scheme)
and Rural Infrastructure Development The 12th Plan Approach Paper by Ministry
Fund (RIDF). As per the Govt. order No.: of Agriculture and Cooperation,
Horti.20 HPP 2019 (e-Office), Bangalore Government of India identified several

Table 7.19 : Subsidy sharing Pattern for Micro irrigation programme.

Category of Up to 2 ha. After 2.0 ha. And


farmers up to 5 Ha.
Central State Total Central State Total
Govt (%) Govt Subsidy Govt (%) Govt (%) Subsidy
(%) (%) (%)
Small & Marginal/
SCSP/ TSP 33 57 90 33 22 55

Others (General) 27 63 90 27 18 45

Table 7.19 A : Programme and Progress of Micro irrigation for the year 2019-20
(Up to Nov. 2019) (Rs. in Lakhs)
Sl. Scheme Allocation Releases Expenditure Physical progress
No. (Ha.)

1 PMKSY 33600.00 26900 20696.87 102000.00


2 RIDF 3218.00 2413.50 2386.07 10486.00
TOTAL 36818.00 29313.85 230082.94 112486.00

Table 7.19 B : Allocation, Releases and expenditure of Micro irrigation from 2016-
17 to 2018-19 (Rs. in Lakhs)

Financial Year
Micro Irrigation
2016-17 2017-18 2018-19
Programme 37663.00 51229.79 49529.00
Releases 37663.00 44287.04 44735.31
Expenditure 36571.54 43473.12 44036.76
192 Economic Survey of Karnataka 2019-20

challenges faced by the Agricultural consistent with the farming system


Extension and also gave suggestions to deal approach with a focus on the bottom-up
with the same. Some of these include planning process through farmers
integrating Krishi Vigyan Kendras (KVKs), advisories committees
problem-solving skills and the feedback r Adopting a group approach to extension
they provide to State Agriculture in line with the identified needs and
Universities (SAUs) and National Agri- requirements of the farmers in the form
culture Research System (NARS) with Agri- of CIGs & FIGs.
culture Technology Management Agency
r ·Facilitating convergence of farmer-
(ATMA Scheme) and thereby strengthening
the district plans and schemes. centric programmes in planning,
execution and implementation.
The aim of the Mission is capacity building r Addressing gender concerns by
and institution strengthening to promote mobilizing farm women into groups and
mechanization, make available of quality providing training to them.
seeds, plant protection etc. and encourage
the aggregation of farmers into Farmer Also, the scheme provides innovative
Interest Groups (FIGs) thereby to go for technology dissemination component in
formation of Farmer Producer which the extension personnel can make
Organizations (FPOs). use of Hand-held Devices, Pico-projector,
Kala jathas, Display boards etc. for the
Use of interactive and innovative methods of benefit of farm information extension.
information dissemination will be used and Details of Progress under ATMA Scheme
to ensure convergence under different during 2019-20 are given in Table 7.20.
programmes and scheme at village level
through the institution of ATMA (Agriculture 7.7.8. Crop Insurance Scheme:
Technology Management Agency) and Block a. Karn atak a Raith a S u rak sh a
Technology Teams (BTTs) laid out as per the Pradhan Mantri Fasal Bima Yojane:
guidelines.
As per GoI directions, the State has
Scheme focuses on the following key implemented Karnataka Raitha Suraksha
extension reforms: Pradhan Mantri Fasal Bima Yojana from
r Encouraging multi-agency extension Kharif 2016 season onwards. The scheme is
strategies involving Public/ Private compulsory for loanee farmers and
Extension Service Providers. voluntary for non-loanee farmers. All the
payable claims shall be the responsibility of
r Ensuring an integrated, broad-based
the Insurance Companies.
extension delivery mechanism
Farmer Premium:
Crops Kharif Rabi
Food & Oil seeds crops 2.00% of Sum Insured 1.50% of Sum Insured
Annual Commercial & Horticulture 5.00% of Sum Insured 5.00% of Sum Insured
crops

Table 7.20: Progress under ATMA Scheme during 2019-20 (Rs. in Lakhs)

Total Grants available Expenditure


Action Plan Unspent
Release including previous year's (up to November-
2019-20 balance*
unspent balance 2019)

3586.08 1793.04 2986.51 2527.23 459.28

*Note: As per Action Plan the different farmer based activities are under implementation stage and the
Un-spent balance will be utilized fully by March-2020.
Economic Survey of Karnataka 2019-20 193

The Insurance Companies will quote During Rabi 2019-20, 22 crops are being
Actuarial/commercial rates of premium, notified viz., Paddy (I), Maize (I), Maize (RF),
but farmers will pay the fixed rates of Jowar (I), Jowar (RF), Ragi (I), Ragi (RF),
premium as below and the remaining Wheat (I), Wheat (RF), Bengal gram (I),
premium will be shared equally by both GoK Bengal gram (RF), Black gram (RF), Green
& GoI. gram (RF), Horse gram (RF), Linseed (RF),
Safflower (RF), Sunflower (I), Sunflower (RF),
Farmer Premium: Groundnut (RF), Onion (I), Potato (I) and
During 2019 Kharif, 36 Food, Oilseeds, Tomato. During Summer, 6 crops are being
Annual Commercial & Horticulture crops notified viz., Paddy (I), Ragi (I), Groundnut
were notified viz., Paddy (I), Paddy (RF), (I), Sunflower (I), Onion (I) and Tomato.
Maize (I), Maize (RF), Jowar (I), Jowar (RF), Taluk-wise major crops were notified at
Ragi (I), Ragi (RF), Bajra (I), Bajra (RF), Grama Panchayath level and other crops
Navane (RF), Save (RF), Black gram (RF), Tur were notified at Hobli level.
(I), Tur (RF), Green gram (RF), Horse gram
(RF), Soyabean (I), Soyabean (RF), Sesamum The Insurance Companies implementing
(RF), Castor (RF), Sunflower (I), Sunflower PMFBY during Kharif, Rabi and summer
(RF), Groundnut (I), Groundnut (RF), Cotton 2019-20 are - Agriculture Insurance
(I), Cotton (RF), Onion (I), Onion (RF), Potato Company of India Ltd., Universal Sompo
(I), Potato (RF), Red Chillies (I), Red Chillies GIC, United India Insurance Company,
(RF), Tomato, Cabbage, and Turmeric. Reliance General Insurance Company, New
India GIC and Future Generali GIC.
During Rabi & Summer 2019-20 KRS- The progress details of Karnataka Raitha
PMFBY is implemented in all the Districts Suraksha Pradhan Mantri Fasal Bima
except Bangalore (Rural) and Bangalore
Yojana are given in Table 7.21.
(Urban).

Table 7.21: Details of Karnataka Raitha Suraksha Pradhan Mantri Fasal Bima Yojane

No. of Prem ium paid by


No. of Claims
Season/year farmers farmers
Beneficiaries (Rs. in lakhs)
participated (Rs. in lakhs)
943553 14937.06 690851 101701.21
2016 Kharif
1179697 6617.84 1157110 86645.61
2016-17
Rabi& Summer
2123235 21554.56 1847961 188346.82
Total 2016-17
1333153 20303.06 499612 60549.08
2017 Kharif
22921 231.16
2017-18 Rabi &
Summer
8981 1050.48
1356074 20534.22
Total 2017-18
508593 61599.56
1222988 15464.23
2018 Kharif
795105 160111.40
469984 3716.00
2018-19 Rabi &
Summer
444864 98524.08
1692972 19180.23
Total 2018-19
1239969 258635.48
1102341 13552.29
2019 Kharif
- -
194 Economic Survey of Karnataka 2019-20

b. Weather Based Crop Insurance State and Central Governments on 50: 50


Scheme (WBCIS) : basis. During Rabi 2019-20, 4 Horticulture
The scheme is being implemented from crops viz., Mango, Grapes, Pomegranate
Kharif 2016. The scheme compensates the and Green Chillies (I) are notified.
insured farmers against the likelihood of The Insurance Companies implementing R-
financial loss on account of anticipated loss WBCIS during Kharif 2019 are AIC and
in crop yield resulting from incidence of Oriental GIC implementing the scheme
adverse weather conditions and will cover during Rabi 2019-20 in all notified districts
the risk of weather parameters like rainfall, except Chamarajanagar. The progress
relative humidity, temperature, wind details of Weather Based Crop Insurance
velocity etc. The scheme is compulsory for Scheme are given in Table 7.22.
loanee farmers and voluntary for non-loanee
farmers. All the payable claims shall be the 7.7.9. Pradhan Mantri Kisan Samman
responsibility of the Insurance Companies. Nidhi (PMKISAN) :
During Kharif 2019-20, 10 Annual The Pradhan Mantri Kisan Samman Nidhi
Commercial and Horticulture crops viz., scheme of Government of India is effective
Green Chillies (IRR & RF), Cauliflower, from 01.02.2019. Under the Scheme as per
Mango, Grapes, Pomegranate, Lime, the Central Government Circular dtd.
Papaya, Areca nut, Betel vine & Black 07.06.2019, each eligible farmer family is
pepper are notified. provided with financial assistance of
Rs.6,000 in 3 instalments of Rs.2,000 each.
The actuarial premium rates are charged
under the scheme, but Farmers would pay So far, 53,20,053 farmers in the State have
concessional rates of premium i.e. 5%. The registered by giving self-declarations under
difference in the premium will be borne by this scheme; 50,32,998 farmers information
(Aadhaar number and bank account

Table 7.22: Details of Weather Based Crop Insurance Scheme


No. of Premium paid
No. of Claims
Season/year farmers by farmers
participated (Rs. in lakhs) Beneficiaries (Rs. in lakhs)

Kharif 2016-17 (RWBCIS) 99373 4255.75 150725* 26443.45


Rabi 2016-17 (RWBCIS) 6894 410.60 6073* 1834.25
Total 2016-17 106267 4666.35 156798 28277.70
Kharif 2017-18 (RWBCIS) 90283 37.68 136419* 20610.15
Rabi 2017-18 (RWBCIS) 2462 285.99 3072* 2893.20
Total 2017-18 92745 323.67 139491 23503.35
Kharif 2018-19 99851 3955.66 132200* 24878.32
Rabi 2018-19 (RWBCIS) 5820 458.97 6617* 5016.00
Total 2018-19 105671 4414.63 138817* 29947.59
Kharif 2019-20 108264 6135.12 - -
Rabi 2019-20 19166 957.59 - -
Total 2019-20 127430 7092.71 - -

Note:* Single proposal may have multiple crops as well as multiple survey numbers, hence
number of beneficiary considered as Number of cases.
The financial allocation for the year 2019-20 is Rs.845.00 Crores.
Economic Survey of Karnataka 2019-20 195

number) has been sent to the Government of surplus rain water and using it as a
India. lifesaving resource.
The Central Government has transferred Mode of Implementation:
the financial assistance of Rs. 2655.60 crore
to 47,36,965 farmers of the state till date. The program was implemented in 23
districts of the state during 2014-15
7.7.9.1: PM Kisan - Karnataka scheme covering 107 taluks of 5 major dryland areas
and further during the year 2015-16, the
The State Government has been providing
scheme was extended to 131 taluks of 25
additional financial assistance of
districts where the average annual rainfall
Rs.4,000/- in two instalments under the
was less than 850 mm. During 2016-17
PMK is an-Karnataka Scheme to all eligible
another taluk was added making the total
farmers of the Central Government's PMK is
132 taluks across 25 districts. From 2017-
an scheme from 14.08.2019. Rs.2,200
18, owing to the demand from the farming
crores has been allocated for the scheme
community, the scheme is extended to all
during the financial year.
the districts of the state excluding command
Farmer's information is maintained by the areas.
State Government through the
http://fruitspmk.karnataka.gov.in web Objectives
portal and financial assistance is The main objective of the scheme is to
transferred directly to the farmers' account improve rain fed agriculture scenario with
through the Aadhaar based Direct Benefit the efficient management of rain water, to
Transfer. enhance the farm productivity. Thrust is
So far, the State Government has being given to conserve rain water and
transferred Rs.824.36 crore to 41,21,833 utilization of the collected water to irrigate
farmers' bank accounts. the crop at critical stages of the crop growth

7.8 MAJOR PROGRAMMES Components:


Krishi Bhagya was implemented in from of
7.8.1 Krishi Bhagya
package from the year 2014-15. The
Karnataka is predominantly an agrarian components provided to farmers under
state wherein nearly 68% of the cultivated subsidy during this year are construction of
area is under rainfed farming. The scope for Farm Ponds to collect runoff water, Lining of
increasing the irrigation potential in the ponds with Polythene Lining/alternate
state is limited given its geographical lining to avoid percolation losses,
position as an upper riparian state and distribution of Diesel Pump sets to lift the
further the close analysis of rainfall pattern stored water, distribution of Micro irrigation
of the state, indicates that 3 to 4 years in (Sprinkler/Drip) sets to irrigate the crops
every decade face severe drought, and shade nets around the farm ponds to
sometimes consecutively also. A vast avoid evaporation losses and accidental
majority of dryland area receive an annual deaths.
average rainfall of 450 to 700 mm, which is
Allocation, Releases and Expenditure under
highly erratic and unevenly distributed in
Krishi Bhagya from 2016-17 to 2019-20 are
cropping seasons. Reduced rainy days and
given in Table 7.23.
increased rainfall intensity as a resultant of
climate change has added undesirable Outcome
dimension to the sustainability of rainfed From the year 2014-15 to 30.11.2019,
ecosystem in the state. totally 3.02 lakhs. (Krishi Bhagya-Farm
To address these issues, Krishi Bhagya ponds-2,79,291 and convergence with
scheme is being implemented in the state watershed dept-26,801 farm ponds and
from 2014-15 mainly to help farmers by 2460 poly house/shade net) farmers have
making dry land farming not only been benefitted under the scheme by
sustainable but also lucrative by harvesting utilizing Rs.2786.55 crore (Krishi Bhagya-
196 Economic Survey of Karnataka 2019-20

Table 7.23 : Allocation, Releases and Expenditure under Krishi Bhagya from 2016-
17 to 2019-20 (Up to Nov. 2019) (In lakhs)

Sl. No. Year Allocation Release Expenditure


1 2016-17 50000.00 50000.00 49925.07
2 2017-18 60000.00 *64000.00 63300.59
3 2018-19 50000.00 45800.30 45700.41
4 2019-20 25000.00 **18700.00 **17191.16

Note: * Additional Grants of Rs. 40.00 crores was released during 2017-18
**Release and expenditure up to 30.11.2019.

2593.29 Crores + convergence with other certification programme through Karnataka


schemes Rs.193.26 Crores) State Organic Certification Agency (KSOCA).
Further, to facilitate systematic marketing
Further, as per the evaluation reports of the
of organic produce, Govt. of Karnataka has
University of Agricultural Sciences
facilitated setting up of 15 regional
Bangalore, Dharwad and Shimoga, this
federations of organic farmers' associations
scheme has enabled the farmers:
throughout the State. It is proposed to take
1. Grow high-value vegetables and flower up collection, grading, value addition,
crops in poly houses/shade net fetching processing, packing, brand development,
higher yield and income. marketing of organic produce, consumer
awareness programme and other activities
2. It has helped in generating employment
through these Regional Federations. It is
and thus preventing the migration of
expected to improve the economic condition
youths from the rural area
of the organic farmers with the expected
3. Use of stored water through premium price for their organic produce.
drip/sprinkler has lead to increase in Karnataka State Cooperative Organic
water use efficiency and area under Marketing Federation Ltd. has been set up
irrigation. in the state.
4. Adoption of the scheme has helped in In addition following New Programmes from
improving the standard of living and 2019-20 are being implemented in the
socio-economic status of the farmers. State:
5. Increase in value of the farm assets. 1. Zero Budget Natural Farming.
7.8.2 Organic farming promotional 2. Raita Siri.
activities: 3. Subsidy for setting up Processing,
This mega programme initiated during the Grading, Value addition, packing,
latter part of 2013-14 is an extension of the Labelling and Branding of Organic &
earlier Organic village/site programme to ZBNF products.
hobli level with few modifications in its 4. Organic Farming Adoption &
implementation viz. developing good Certification.
marketing linkages and market
development to the organic produce of the I. Zero Budget Natural farming:
state. This programme is being
Zero Budget Natural Farming is a low-input,
discontinued from 2019-20 except for
low-risk farming practice and a climate-
providing certification assistance to the
resilient model since it is in harmony with
eligible SBY groups.
nature. Pioneered by Shri. Subhash
The entire area under Savayava Bhagya Palekar, an innovative farmer from
Yojana has been brought under a group Maharashtra, ZBNF has been in vogue on
Economic Survey of Karnataka 2019-20 197

small scale across several farms in the r Implementation of ZBNF at farmers


country for over a decade now. In Karnataka field is planned as per Crop-wise
Zero Budget Natural Farming (ZBNF) is technical information for each zone
being proposed for the First time under the prepared by Zone head of SAU's.
State Scheme by Hon'ble Chief Minister of r 31,622 Farmers / 18,500 hectares of
Karnataka. area has been identified for ZBNF
Mode of implementation: practice in the state.
II. Raita Siri- Encouragement for farmers
r Nodal Department: Karnataka State
Department of Agriculture to grow minor millets

r Implementation: Through the Millets contain higher protein, fibre,


concerned State Agriculture/ calcium and minerals than the widely
Horticulture Universities consumed fine cereals, and can ensure
nutritional security to the poor people who
r Project area: 2000 hectares in each of cannot afford a variety of food items in their
the 10 Agro Climatic Zones on pilot diet. Millets are rich in nutrients as
basis. compared to cereals and can grow well
r Target: To cover 1.00 lakh hectares in under dryland conditions and relatively
the next 5 years. poor soils and require low inputs. The state
r Mode of implementation: government has been encouraging
Demonstrations / Experimental trials cultivation of millet crops in the state for the
in the farmer's field and Research past few years, in continuation to this
Stations on Operational Research various melas including National and
Project (ORP) mode. International Fairs has been organized to
create awareness amongst farmers,
Budget allocation: businessmen and consumers regarding
A budget of Rs. 50.00 crores and Rs. 40 benefits of millets besides creating
crores earmarked during the year 2018-19 /facilitating market linkages.
& 2019-20 respectively. During the year 2019-20, a new scheme
Progress achieved: called “Raita Siri” has been announced to
encourage farmers to take up minor millets
In the first phase, experimental trials are in a big way. It is proposed to promote area of
being conducted at research stations 6 Nutri Cereals viz., Foxtail millet (Navane),
coming under 5 SAU's of Karnataka. In the Little millet (Saame), Kodo millet (Haraka),
second phase, demonstrations are being Porso millet (Baragu), Barnyard millet
conducted at selected farmer's field and the (Oodhalu) and Brown top millet (Korale). The
progress achieved is as below: scheme will be implemented in all the
r 2000 hectares of area target is fixed per districts of Karnataka. This will encourage a
zone on cluster basis with minimum 20 large number of farmers to grow nutria
hectare per a cluster. cereals by which the area & production
would be increased.
r Training to selected Community
Assistant/Community Resource Components under Raita Siri:
Persons have been conducted at each
1. Assistance to farmers through DBT @
zone by SAU's
Rs. 10,000/- per ha.
r Baseline survey of the selected farmers
have been carried out. 2. Assistance for establishment of Nutri
Cereals processing units at 50%
r Analysis of soil samples drawn from Subsidy - maximum of Rs.10.00 lakh
selected farmers is in progress. per unit.
r Training and exposure visits have been
conducted for selected farmers.
198 Economic Survey of Karnataka 2019-20

Objectives: great demand among all sections of society.


In turn, it would lead to an increase in the
r Encouraging farmers to cultivate nutri
income of the farmer who grows Nutri
cereals by creating awareness among
Cereals.
the farmers by incentivizing farmers
through DBT. III. Subsidy for setting up Processing,
r Area expansion of Nutri cereals in the Grading, Value addition, Packing,
State. Labelling and Branding of Organic &
ZBNF products.
r Recognizing the lack of modern
processing facilities as one of the major Under this Programme subsidy of 50%
obstacles in promoting millets across limited to Rs. 10.00 lakhs is provided to
Karnataka state. farmers, farmer groups, FPOs, Startups,
r Improve or setting up processing units. Entrepreneurs to setup Processing,
Grading, Value addition, Packing, Labeling
Targetted Beneficiaries: and Branding of Organic & ZBNF products.
Any Farmer taking up minor millet An amount of Rs. 2.00 crores is earmarked
cultivation as the main crop are eligible. for 2019-20. This is a proposal based
While the assistance to the primary programme.
processing units will be given to Farmer
IV. Organic Farming Adoption &
Entrepreneurs/ SHG/FPO of the local area
Certification.
by inviting applications.
Under this programme farmers and farmer
Outcome: groups are provided 75% subsidy for the
Enhancement of area under Nutri cereals construction of Vermi Compost units, Bio-
from the proposed expansion of cropped digesters, Cattle floor along with bearing the
area under minor millets. Since the cost of Certification charges. This is also a
processing of millets is still a big challenge, proposal based programme which is being
Nutri cereals processing are also being implemented through Karnataka State
encouraged under this scheme by way of Seeds and Organic Certification Agency.
assisting suitable nutri cereal processing The Progress under Savayava Bhagya
units. Nutri cereals when processed and Yojane from 2016-17 to 2019-20 is given in
polished are sold at double the price in the
Table 7.24.
markets. The value-added products are in

Table 7.24 : Financial Progress made under Organic Farming Promotional Activities
(In. Rs. Crores)
Year Earmarked Released Expenditure

2016-17 56.57 56.57 56.07

2017-18 40.00 40.00 39.32

2018-19 100.00 56.50 56.33

2019-20 87.00 43.50 21.77


(up to end of November 2019)
Economic Survey of Karnataka 2019-20 199

7.8.3. Raitha Samparka Kendra: institutional agencies. This relief amount


The Department of Agriculture under has been enhanced to Rs. 5.00 lakhs for
“Raitha Mitra Yojana” established 742 each of the deceased family with effect from
Raitha Samparka Kendra's (RSKs), one per 01.04.2015. A budget provision of Rs.
Hobli to provide services and information at 4500.00 lakhs has been made for the
a single point required by the farmers. scheme during 2019-20 and an amount of
Based on the various agro-climatic zones of Rs. 2250 lakhs have been released from
the state, the new good production Government. An amount of Rs. 2899.92
technologies and skills are being lakhs has been utilized up to the end of
implemented in the farmers' field aiming to November 2019.
increase the state good production levels 7.8.5. Relief to farmers / agricultural
under this scheme. labourers for accidental death from snake
Bimonthly and Fortnightly training bites, fall from trees and other accidental
programmes are being conducted at the death occurred while carrying out
district level and taluk level respectively, to agricultural activities and also
continuously upgrade and update the latest compensations for the loss of fodder/hay
agricultural technologies and also the from fire accidents:
professional teaching skills of the Extension
This scheme was launched during 2010-11
Workers and Department Officers.
to provide Rs. One lakh as a relief to the
To strengthen the Raitha Samparka family of farmers / agricultural labourers
Kendras for effective implementation of died due to accidental death from snake
Department programmes and technology bites, fall from trees and other accidental
transfer, the students graduating from death occurred while carry out agricultural
Agriculture and Horticulture Universities activities and compensation for loss of
are deputed at least for 3 months to Raitha fodder/hay from fire accidents up to
Samparka Kendras for acquiring minimum maximum of Rs. 10,000.00.
practical skills, field experience and
Government Order No.kru.e.77.kruyoka
knowledge. Progress under Raitha
2018 dated 20-8-2018 the Compensation is
Samparka Kendra Programme is given in
increased from Rs. One lakh to Rs. Two
Table 7.25. lakhs and compensation for loss of
7.8.4. Scheme to provide relief to the fodder/hay from fire accidents maximum of
families of the farmers who have Rs. 10,000.00 is increased to a maximum of
committed suicide: Rs. 20,000.00. A budget provision of
Rs.1000.00 lakhs has been made during
This scheme was launched during 2003-04
2019-20. An amount of Rs 500.00 lakhs has
to provide Rs. One lakh as a relief to families
been released and Rs. 715.93 lakhs has
of farmers committing suicide on account of
been utilized up to end of November 2019.
the heavy burden of loans borrowed from the

Table 7.25: Details of Allocation, Release & Expenditure under Raitha Samparka
Kendra (Rs. in Lakhs)

Raitha Samparka Kendra 2016-17 2017-18 2018-19 2019-20


Allocation 180.00 173.00 180.00 180.00
Releases 69.52 173.00 174.61 90.00
Expenditure 69.52 172.64 174.61 90.00

*Up to the end of November, 2019


200 Economic Survey of Karnataka 2019-20

7.8.6 Sanction of Crop loans to the recommend suitable policy measures to


farmers through Commercial banks and ensure remunerative prices to farmers.
Regional Rural Banks (RRBs) at 3% Karnataka is the first state in the country to
interest rate : form the Agricultural Price Commission.
This scheme was launched during 2009-10 Since 2014-15 KAPC is involved in the
to provide zero % interest subsidy for short scientific estimation of cost of cultivation of
term agricultural crop loans through major agriculture and horticulture crops
commercial banks and Regional Rural and submitting the reports annually by
Banks up to Rs. One Lakh for the farmers analyzing the cost of cultivation data,
who repay the principal amount along with supply and price situation with overall
the interest before the due date fixed by the scenario of agriculture sector in the state.
banks, and 3% interest up to Rs. 10.00 Based on the KAPC report and its
Lakhs. A budget provision of Rs. 1000.00 recommendation the state government is
lakhs has been made during 2019-20. An regularly undertaking market interventions
amount of Rs. 549.50 lakhs has been to stabilize market prices.
released. As of November 2019 an amount of KAPC as an advisory body is keeping abreast
Rs. 643.77 lakhs has been released to SLBC. with national-level policies related to
7.8.7. Training in Agricultural agriculture market and prices. To ensure
Technology: remunerative prices GoI initiated new three
schemes Viz., “1. Market Assurance
Training programmes (3/5/6 days) are Scheme, 2. (MAS)”, “Price Deficiency
being conducted for Farmers/Farm Women Payment Scheme (PDPS)” & 3. Private
and Extension workers to train them in Procurement and Stockiest Scheme (PPSS)”.
advanced Agricultural Technology adoption Recently KAPC organized a National
and Agricultural Extension Skills. Farmers Workshop on these schemes by inviting all
study tours are being planned for Farmers the stakeholders and the policymakers from
and Farm Women at the DATCs. Funds are different parts of the country. On its part,
also provided for strengthening basic KAPC has submitted recommendations to
infrastructure and up-gradations of DATCs. State Government is contemplating to
Details of Trainings and Budget/ implement PDPS for Onion and Tomato by
Expenditure from 2016-17 to 2019-20 are considering the experience of Haryana.
furnished in Table 7.26. During 2018-19 for the first time, the state
7.9 KARNATAKA AGRICULTURE PRICE government has introduced Price Deficiency
COMMISSION Payment Scheme (PDPS) for Onion and
Mango, by considering its success during
Karnataka Agriculture Price Commission 2019-20 state government has made
(KAPC) is an advisory body constituted to separate budgetary allocation for this
look into the issues related to Agriculture purpose.
Produce Prices and Marketing and to

Table 7.26: Number of Training conducted and Budget/Expenditure details


(Rs. In Lakhs)

Trainings in Agricultural
2016-17 2017-18 2018-19 2019-20
Technology
No. of Traini ng conducted 294 582 617 324
Allocation 230.68 254.18 255.68 256.295
Releases 162.16 238.81 244.37 164.37
Expenditure 116.50 230.2 240.08 120.70

*Up to the end of, November 2019


Economic Survey of Karnataka 2019-20 201

During 2019-20 the State Government has market situation, price forecasting which
announced an additional incentive of help the policymakers to decide on market
Rs. 300/- per quintal of Tur over MSP intervention. One such online Dash Board
announced by Central Government and called “Krishi Dharane Vishleshana Phalak
made required arrangements for – KRIPA” has been launched. KAPC in
procurement of Paddy, Ragi, Jowar and Tur. collaboration with Software Giant IBM India
Ltd. has developed an online web-based
KAPC will be submitting its 2019-20 report
dashboard for supply projections and price
with scientific analysis of production cost,
forecasting of Tomato and Maize in selected
price forecasting, marketing etc., of 27
districts on a pilot basis to explore the
major Agriculture and Horticulture by
possibility developing AI & ML (Artificial
collecting data from 2050 farmers in 90
Intelligence & Machine learning) based
taluks distributed across 24 districts with
state of the art solutions to agriculture.
the assistance of Cost of Cultivation &
This dash board can be accessed at
Market Intelligence Cells (COC MI) setup in
kapc.mybluemix.net.
5 universities of Agricultural sciences in the
state. Price Commission has also looked into Non-
Price measures to enhance farmers' income.
During 2019-20 KAPC is holding wider
Study on quantification of reduction in the
consultation with farmers and policymakers
cost of cultivation by the use of farm
to achieve self-sufficiency in producing good
machinery in major agriculture and
grains required under PDS to achieve the
horticulture crops has helped to increase
twin objective of increasing the production
the use of machinery among farmers and
millets such as Ragi and Jowar and rainfed
thereby enhancing their income. KAPC in
paddy and assuring assured price to
partnership with state agriculture and
farmers by procuring the same at Minimum
horticulture universities has brought out an
Support Price. A detailed report with road
elaborate list of existing low-cost
map will be submitted to the government
technologies and same is incorporated in its
shortly.
report- 'Assured Prices and Stable Market
KAPC strive to provide good market and for Farmers' Produce'.
remunerative prices to the farmers and
Another important aspect of remunerative
thereby enhancing the farmers' income and
prices to farmers is to enhance their
welfare through integrated measures. KAPC
bargaining capacity through group
is working on the task through a
marketing. In this regard KAPC during
coordinated effort of universities,
2019-20 in collaboration with Indian
development departments, district
Institute of Plantation Management (IIPM),
administration, institutions etc., In this
Bengaluru has brought out a book entitled
regard, KAPC has initiated Pilot Project on
“GROUP APPROACH ON MARKETING OF
“Enhancing Farmers Income & Welfare in
FARM COMMODITIES: A ROAD MAP FOR
selected 8 Villages across different Agro
GOVERNMENT OF KARNATAKA”,
Climatic Zones in Collaboration with KVK's.
consisting of eleven papers on different
KAPC in collaboration with national level aspects of group marketing with policy
prestigious institutions viz., ISEC, IIHR, recommendations. This book is designed to
IIPM, and National Law College etc. has meet the requirements of the farming
taken up studies on 19 different policy- community, particularly Farmers Producer
related issues concerned with agriculture Organizations (FPOs) and the policymakers
growth and development. Based on the of the Government.
outcome of these studies KAPC has
In addition to this, KAPC is continuously
submitted a report to the Government with
interacting and exchanging views with
policy recommendation.
Farmers, Farmer Leaders, experts, NGOs,
Price Commission is also putting its efforts Various Government Departments and
on developing web-based Decision Support other senior officers through discussions,
System (DSS) platform for analyzing the Seminars, Workshops etc., to bring in
202 Economic Survey of Karnataka 2019-20

harmony between farmers and the interfaces with other Departments through
Government. Details of Allocation, Release implementation of K-Kisan (Karnataka –
& Expenditure of KAPC are furnished in Krishi Information Services and
Table 7.27. Networking) Project. Under this project the
Department has developed application
7.9.1 Other initiatives by Department of modules through NIC for implementation of
Agriculture Farm Mechanization/Micro Irrigation,
a) Raitha Sahayavani Kendra (Farmers Krishi Bhagya, Agro Processing etc.
helpline centre) : schemes.
The State Department of Agriculture has E-governance Department is extending
farmers' helpline called “Raitha Sahayavani KSWAN-2 (Karnataka State Wide Area
Kendra” to provide information pertaining to Network) connectivity to all offices of the
agriculture and allied subjects for farming Department of Agriculture.
community in the local language. Farmers
Department of Agriculture has redesigned
are facilitated to make toll free call on Phone
the existing “Raitha Mitra” website
No. 1800 425 3553. The centre functions
(bilingual) so as to provide timely
from 8.00 am to 7.00 pm on all days. Subject
information on various schemes, Rate
matter specialists are entrusted to receive
Contracts of the inputs, Market
the calls and provide information to the
Information, Weather forecast, Tender
farmers. On an average 35-60 calls are
Notification etc., Further, for the first time in
received per day.
the State, the Department has developed
b) Kisan call Centre : and provided an interactive platform,
“Raitha Snehi – Interaction”- in order to
Kisan call centres are set up in the country address the queries of the farmers/public.
by Central Government to make agriculture The farmers/public can send queries
knowledge available at free of cost to the related to agriculture either in Kannada or
farmers as and when desired. The Call English to the Department through this
Centres can be accessed by farmers all over platform and receive solutions to their
the country on common toll-free Number mobiles and e-mails. In addition, the
1800 180 1551. farmers can share audio or videos in this
c) The e-Governance initiatives website with respect to innovative
undertaken by the Department: agriculture practice for all others to view and
follow.
Department has taken steps to strengthen
the extension system by greater use of d) Telemetric Rain gauge Stations:
modern Information and Communication Rainfall is the most important indicator for
Technology (ICT) applications from RSK to the determination of Drought. The spatial
Secretariat (Agriculture) to meet the core and temporal variability of rainfall is very
functions of the Department viz., service high in the semi-arid and arid areas like
delivery, information dissemination, public Karnataka. Hence, to capture the spatial
grievances and redressal, schemes/ and temporal distribution and variability of
programme implementation and to have rainfall and weather parameters like

Table 7.27: Details of Allocation, Releases & Expenditure of KAPC (Rs. In Lakhs)

Karnataka Agriculture
2016-17 2017-18 2018-19 2019-20*
Price Commission
Releases 640.00 210.00 260.00 212.00
Expenditure 380.00 176.00 184.46 130.00

*Up to the end of December 2019


Economic Survey of Karnataka 2019-20 203

Relative Humidity, Temperature, and Wind production and welfare of farming


Velocity & Direction etc. and to assess the community. As major part of the cultivated
impact of the varying weather condition on area in the State is under rainfed farming,
Agricultural and Horticultural crops, the the Government has concentrated more on
State has taken up establishment of sustainable production and farmers' income
Telemetric Rain Gauges and Telemetric through flagship programmes i.e. “Krishi
Weather stations network since 2007. Bhagya” for sustaining the rainfed
production, “Micro-Irrigation” for judicious
Agriculture Department has allotted grants
use of water, “Raita Siri” for promoting Nutri
under RKVY to Karnataka State Natural
cereals “Farm Mechanization” for solving
Disaster Monitoring Centre (KSNDMC) for
the scarcity of agricultural labour, “Krishi
establishing GPRS enabled and solar-
Yanthra Dhare” for providing agricultural
powered Telemetric Rain Gauges (TRG) at
implements on rental basis to carry out the
Grama Panchayath level and Telemetric
agricultural operations in time and to
Weather Stations (TWS) at Hobli level.
reduce the cost of cultivation. The various
KSNDMC has successfully installed and
development programmes and schemes
maintaining 6495 Telemetric Rain Gauges
implemented by the Government have
which include Pattana Panchayaths, Hobli
resulted in achieving sustainable
headquarters and all the Gram
production.
Panchayaths in the State. Telemetric
Weather Stations have been installed in all Major constraints confronting Agriculture
the 747 Hobli headquarters and 173 micro Sector-
watersheds. The dense network of weather
r Predominantly rainfed agriculture,
monitoring stations is unique and first of its
kind in the Country. r Sub-division and fragmentation of
landholdings,
The Grama Panchayath level weather data
and the weather forecast is being used to r Inadequate and injudicious use of
generate and disseminate weather-related irrigation facilities,
Alerts, Early warnings and Agro-Met r Low level of public investment,
advisories directly to the officers and r Exhaustion of the yield potential of new
farmers through a 24x7 interactive help high yielding varieties,
desk “VARUNA MITRA”.
r Technological & Extension Constraints,
e) Agro-met Advisories through Mobile r Environmental degradation and
SMS: impaired soil fertility,
Agriculture Department in coordination r Depleting water resources,
with Karnataka State Natural Disaster r Adverse impacts of climate change,
Monitoring Centre (KSNDMC) has been
providing weather and crop advisories in r The rising cost of production,
Kannada directly to the farming community r Diminishing agricultural labour
through SMS to their mobile phones. At availability,
present weather and crop advisories are r Inadequate post-harvest value
disseminated to about 30 lakh farmers in addition,
the State. This information is helping the
r Inadequate infrastructure facilities
Farming Community for planning and
(lack of proper storage and
taking up their Agricultural Activities and
transportation facilities warehouses,
also minimizes the loss due to any weather
cold and dry storage facilities for
aberrations.
perishable goods) &
7.10. OUTCOME OF VARIOUS r Farmers' reduced interest in
DEVELOPMENT PROGRAMMES agriculture.
The department is initiating necessary
strategies to maintain the agriculture
204 Economic Survey of Karnataka 2019-20

7.11 WATERSHED DEVELOPMENT 7.11.1 Karnataka Watershed


DEPARTMENT Development Project-II (Sujala-III)
Karnataka State is predominantly Watershed Development Department is
agriculture-based State with more than 70% implementing Karnataka Watershed
of its population depending up on Development Project-II (Sujala-III) with the
agriculture and allied activities for their World Bank assistance from 2013-14 in
livelihood. Total geographical area of State is the 2531 micro-watersheds covering
190.50 lakh hectares, out of which 129.70 44 taluks located in 12 project
lakh hectare area is available for watershed districts viz., Bidar, Kalaburagi, Yadgir,
interventions. So far, 69.85 lakh hectares Raichur, Koppal, Vijayapura, Gadag,
rainfed area is brought under watershed Davangere, Chikkamagalur, Tumakuru,
interventions. The remaining area of 59.85 Chamarajanagara and Ballari. The project
lakh hectares is planned for scientific cost is Rs.412.59 crores and in which 70% is
watershed interventions in a phased the World Bank loan and 30% is the State
manner. Government fund. Horticulture component
is being implemented by the Department of
Karnataka State Watershed Development Horticulture.
approach/ interventions has been widely
acknowledged for its effective, community Project Objective:
based and use of scientific tools to address To demonstrate more effective watershed
the needs of rainfed agriculture in the rural management through greater integration of
area of the State. The community-based programmes related to rainfed agriculture,
watershed approach of the State is being innovative and science-based approaches,
widely adopted by many other states of the and strengthen institutions and capacities
country. of stakeholders at different levels.
The budget allocation of the department Project components:
from 2017-18 to 2019-20 is given below in
Table 7.28. The project has the following five
components:
The area covered under watershed
development from 2016-17 to 2019-20 is Component 1: Improved Program
depicted in the Table 7.29. Integration in Rainfed Areas:
This unit demonstrates the successful

Table 7.28 : Budget Allocation of the Department from 2017-18 to 2019-20


(Rs. in lakhs)

Year 2017-18(RE ) 2018-19 (RE) 2019-20 (BE )


Budget 534 65.33 46 239.3 3 365 44.00

Table 7.29 : Area covered under Watershed Development (Unit: Lakh hectares)

Year During the Year Cummulative

2016-17 1.63 65.34

2017-18 1.54 66.88

2018-19 2.97 69.85

2019-20 (Anticipated) 1.08 70.93


Economic Survey of Karnataka 2019-20 205

integration of programs in watershed by signing the MoU / contracts with the


development, using a science-based following project partner institutes:
approach.
1. National Bureau of Soil Survey and
Component 2: Research, Development Land Use Planning (ICAR-NBSSLUP)
and innovation: 2. Indian Institute of Science (IISc),
To enhance practical knowledge in Bengaluru
integrated watershed management. 3. University of Agricultural Sciences,
Component 3: Strengthening of the Bengaluru
institutions: 4. University of Agricultural Sciences,
Strengthening of the institutions and Dharwad
capacity building of the project stakeholders 5. University of Agricultural Sciences,
to improve the effective delivery of services Raichur
for integrated watershed management.
6. University of Horticultural Sciences,
Component 4: Strengthening Bagalkot
Horticulture:
7. University of Agricultural and
In rainfed areas, strengthening the Horticultural Sciences, Shivamogga.
knowledge base regarding horticulture
potential; demonstrate and build the 8. Karnataka State Remote Sensing and
capacity of institutions and communities to Applications Centre (KSRSAC),
improve production and value addition of Bengaluru
horticulture in project areas. 9. Karnataka State Natural Disaster
Component 5: Project Management and Monitoring Cell (KSNDMC), Bengaluru
Coordination: 10. Karnataka Veterinary Animals and
Would ensure effective and efficient project Fisheries Science University (KVAFSU),
management and provide incremental Bidar
support to the Watershed Development 11. International Crop Research Institute
Department. for Semi-Arid Tropics (ICRISAT),
The project activities aim at providing Hyderabad
scientific planning tools through the 12. National Centre for Excellence of
generation of data of Land Resource RSETIs (NACER)
Inventory (LRI), Hydrological Studies,
Baseline studies, weather data etc., to 13. Indian Institute of Soil & Water
enable institutions to develop more accurate Conservation, (ICAR-IIS&WC), Ballari.
participatory micro-watershed plans for 14. The Energy and Resource Institute
effective implementation of watershed (TERI), Bangalore
development projects. It is also aimed for
establishment of Digital Library, Decision 15. Agricultural Technology Application
Support System (DSS) and Land Resource Research Institute (ICAR-ATARI),
Inventory Portal using these data, for Bengaluru.
agriculture development and benefit of The NBSS&LUP has been assigned the role
farmers and exchange of information and of lead project partner for LRI activity and
knowledge for better planning, IISc, Bengaluru is the lead partner for
implementation and integration of the hydrological activities, to coordinate among
schemes of various land-related the State Agricultural and Horticultural
departments. Universities. KSRSAC, Bengaluru is
assigned with the task of providing various
Project Partner Institutions and Roles:
satellite imageries and the KSNDMC
The project activities are being implemented provides the climate and weather data of the
project area.
206 Economic Survey of Karnataka 2019-20

KVAFSU has taken up demonstrations of Progress of Hydrological activities:


various innovative and improved Hydrological studies are taken up by the
technologies related to animal husbandry State Agricultural and Horticultural
and veterinary aspects. ICAR-Agricultural Universities under the guidance of IISc in
Technology Application Research Institute the selected 14 model micro-watersheds
(ATARI) taken up trainings in the selected and also in other project areas at the sub-
333 villages in the project area, for watershed level. The data collected at
dissemination of project outputs and the specific intervals on groundwater
National Centre for Excellence of RSETIs fluctuation, analysis of soil moisture,
(NACER) taken up the task of organizing IGA monitoring of wells for water yield, analysis
(Income Generating Activities) trainings for of water samples etc., and maps are being
members of the SHGs in the project area and generated.
settlement.
Saturation of watersheds:
IIS&WC institute, Ballari has taken-up the
technical monitoring and evaluation of the Saturation of watersheds by utilizing
project. The Energy and Resource Institute scientific inputs generated in the project is
(TERI) is carrying out third party monitoring under implementation in all 11 project
and evaluation at field level in saturated districts in the selected watersheds. In this
projects. regard, one sub-watershed each in 9
districts and 2 micro-watersheds each in
Land Resource Inventory: remaining 2 districts have been selected in
Land Resource Inventory is taken up by the PMKSY-WD Batch-V area and
NBSS&LUP and State Agricultural and implementation is under progress with the
Horticultural Universities. It involves soil achievement of 1,312 hectares up to
profile studies, analysis of soil samples and November 2019.
soil fertility etc., and micro-watershed and DL, DSS & LRI Portal:
Sub-watershed wise atlases and reports are
generated based on the analysis of the data The process of establishment of LRI (Land
collected during the studies. Resource Inventory) portal, Digital Library
and the Decision Support System (DSS) has
The details of micro-watershed wise LRI been taken up and work is under progress.
progress up to November-2019 is furnished
below in Table 7.30. LED T.V. units have been installed in the
premises of RSK, ADA and JDA offices in the

Table 7.30 : Details of Micro-Watershed wise LRI progress


Sl. NBSS UAS UAS UAS UHS UAHS
Particulars Total %
No. LUP Bengaluru Dharwad Raichur Bagalkot Shivamogga

Micro-
Watershe Tar. 604 420 633 430 229 215 2531
ds (Nos)
1
LRI work
complete Ach. 604 423 633 430 229 215 2534 100
d (Nos)

English
Atlases
2 Ach. 604 423 633 430 229 215 2534 100
generated
(Nos)

Kannada
Atlases
3 Ach. 604 423 633 430 229 215 2534 100
generated
(Nos)

MWs
4 Reports Ach. 580 398 633 159 229 215 2214 87
generated
Economic Survey of Karnataka 2019-20 207

project area to disseminate the day to day Department and Department of


meteorological information to the farming Horticulture. During the financial year
community, with the assistance of 2019-20, budget allocation to WDD is
KSNDMC. Rs.5000 lakhs and DoH is Rs. 233 lakhs and
the total allocation amounts to Rs.5233
Dissemination of LRI outputs: lakhs, in which a total of Rs.1074.22 lakhs
LRI cards: budget from WDD has been re-appropriated
for DoH. Accordingly, the revised budget for
LRI partner institutions generate LRI cards 2019-20 for WDD is Rs.3925.78 lakhs and
for each survey number and provide to the DoH is Rs.1307.00 lakhs. Details of Budget
respective district offices for printing and Allocation, Releases and expenditure under
distribution to the concerned farmers. Sujala-III are furnished in Table 7.31.
Concerned districts have distributed LRI
Cards by conducting village level LRI II. Pradhan Mantri Krishi Sinchayee
Trainings. Workshops are conducted at Yojana--Watershed Development
State, District and Taluk levels. KVKs are Component (PMKSY-WDC) (erstwhile
conducting village level LRI trainings in 333 IWMP):
Villages. PMKSY-WD is being implemented in the
Financial progress: state since 2009-10 as per the Common
Guidelines-2008 (Revised edition-2011)
State Government allocates budget for issued by Government of India. Desert
Sujala-III project under separate head of Development Programme, Drought Prone
accounts for the Watershed Development Area Development Programme and

Table 7.31 : Statement showing the financial progress details of the Sujala-III
Project (WDD & DOH), (up to November 2019) (Rs.in lakhs)

Reim-
Exp. as burse Reim- Reim-
Exp. As
Sl. Budget Grant per IUFR -ment burse- burse –
Year per 62b
No. allocation Released (100%) claimed ment ment
in IUFR received %
(70%)

Up to
1 2342.00 2303.00 923.69 448.68 287.93 289.11 1.07
2014

2 2014-15 4381.00 3535.50 3440.15 2275.84 1459.18 1461.43 5.40

3 2015-16 8500.00 6500.00 6417.64 5691.77 3925.39 3916.73 14.48

4 2016-17 5630.00 5630.00 5557.07 4520.38 3040.48 3037.19 11.24

5 2017-18 7200.00 7200.00 6889.77 7259.95 4734.55 4722.63 17.46

6 2018-19 13303.00 12980.00 12841.39 11685.98 7887.63 7885.40 29.16

7 2019-20 5233.00 3705.48 1731.76 3771.03 2444.65 1987.99 7.19

Total 46589.00 41853.98 37801.47 35653.63 23779.81 23300.48 86.00

Note: Provisional IUFR Exp. for November 2019 month is included and the Final IUFR is under preparation.
208 Economic Survey of Karnataka 2019-20

Integrated Wasteland Development 3. Actual wages


Programme have been brought under one
umbrella with the nomenclature of 4. Percentage of small and marginal
“Integrated Watershed Management farmers
Programme”. It is a centrally sponsored 5. Groundwater status
scheme with the sharing pattern of 90:10
(centre and state) ratio up to 2014-15. From 6. Moisture index/DPAP/ DDP Block
2015-16 onwards IWMP is renamed as 7. The area under rain-fed agriculture
“Pradhan Mantri Krishi Sinchayee Yojana-
Watershed Development Component” 8. Drinking water
(PMKSY-WDC) and sharing pattern of 9. Degraded land
Centre and State are in the ratio of 60:40.
10. Productivity potential of the land
The main objective of PMKSY is:
11. Contiguity to another watershed that
r To conserve soil moisture and
has already been developed/ treated
nutrients.
r To enhance recharge of underground 12. Cluster approach (more than one
water and agricultural productivity. contiguous micro-watershed in the
project)
r To improve vegetation by afforestation
and dry land horticulture. After selecting the area for the treatment
r To increase availability of fodder and with the above criteria, the project activities
fuel. are implemented in 3 different phases.
r To form and strengthen community- A) Preparatory Phase activities:
based organizations, providing
livelihood activities for the asset less Preparatory Phase activities are
persons. implemented to gain the confidence of the
people rural community before
r To encourage livestock production,
implementing the project activities in the
production systems and micro-
project area. Entry point activities which are
enterprises i.e., income generation.
related Natural Resources Management are
r Effective management of run-off water implemented. Apart from this, awareness
and improved soil & moisture programme regarding the projects is
conservation activities such as ridge implemented. Net planning of the activities
area treatment, drainage line is done by involving the Watershed
treatment, rainwater harvesting, in- Committee (WC) and the preparation and
situ moisture conservation and other approval of detailed project reports by
allied activities on a watershed basis. Grama sabha to implement the activities.
r Converging with MGNREGS for
creation of water source to full potential B) Work Phase activities:
in identified backward rain-fed blocks Year-wise action plans are prepared for the
including renovation of traditional activities which are approved in the Grama
water bodies Sabha. To harvest and percolate the
Method of Implementation: rainwater, the soil conservation activities
like bund formation, farm ponds, check
Before implementing the watershed
dam, Nala-bund and percolation tanks are
activities in the field the area for the
constructed in the project area. Apart from
watershed treatment will be selected based
this dry-land horticulture, agro-forestry and
on the following criteria:
animal husbandry activities were also
1. Poverty index (% of poor to total implemented in the project area. Activities
population) under production system and micro-
enterprises are also implemented apart from
2. Percentage of SC/ ST population
encouraging the Self Help Groups to take up
the income-generating activities.
Economic Survey of Karnataka 2019-20 209

c) Consolidation and withdrawal phase: and nalabund etc., agro-forestry and


dryland horticulture programmes.
This phase includes sustainable
management of (developed) natural Under PMKSY scheme Rs. 1938.00 lakhs
resources and up-scaling of successful have been earmarked for Special
experiences regarding farm production Component Plan. An amount of Rs. 568.25
systems/off-farm livelihoods and lakhs has been spent and 1,335 hectares of
documentation of successful experiences as land belonging to SC families has been
well as lessons learnt for future use. The developed up to the end of November-2019.
members of community-based Similarly under Tribal Sub Plan Rs. 1013.00
organisations are trained with the lakhs have been earmarked. An amount of
utilization of Watershed Development Fund Rs. 208.51 lakhs has been spent and 1,084
(WDF) for the further maintenance of hectares of land belonging to ST families
community assets. have been developed up to the end of
November-2019.
An amount of Rs.30,776.33 lakhs was
allocated for this scheme for the year 2018- Impact of the Programme:
19 and was targetted to treat and develop 1. Reduction in soil erosion
1,50,517 hectares of land. An amount of Rs.
45,905.93 lakhs was spent from the total 2. Improvement in Groundwater regions
available amount (including opening 3. Improvement in Crop production and
balance) of Rs.58,195.78 lakhs up to March productivity
2019 and developed an area of 2,37,904
hectares through the implementation of 4. Improved availability of fodder and fuel
bunding, water harvesting structures like 5. Availability of drinking water for
check dam, vented dam, farm pond, domestic animals
percolation tank and nalabund etc., agro-
forestry and dryland horticulture 6. Availability of water for protective
programmes. irrigation during critical crop growth
period.
Under PMKSY scheme Rs. 4456.60 lakhs
have been earmarked (Released) for Special 7.11.3. WATERSHED DEVELOPMENT
Component Plan. An amount of Rs. 4332.27 FOR DROUGHT PROOFING (WDDP)
lakhs has been spent and 17,978 hectares of
land belonging to SC families has been There is need to implement drought-
developed up to the end of March-2019. proofing watershed activities in the
Similarly, under Tribal Sub Plan Rs.2145.01 watershed area from 2019 to 2024 in 100
lakhs was earmarked. An amount of drought-hit and low groundwater level
Rs.2055.89 lakhs has been spent and 7,206 taluks covering an area of 5,000 to 10,000
hectares of land belonging to ST families has hectares in each taluk, using Land Resource
been developed up to the end of March- Inventory (LRI) and it's precision farming
2019. recommendations on watershed
development projects in saturation
An amount of Rs. 16,600 lakhs has been approach, in convergence with Mahatma
allocated for this scheme for the year 2019- Gandhi National Rural Employment
20. It is targeted to treat and develop 1.06 Guarantee Scheme (MGNREGS) and
lakh hectares of land. An amount of Rs. Pradhan Mantri Krishi Sinchayee Yojana
10381.63 lakhs has been spent from the (PMKSY). For the implementation of this
total available amount (including opening project, a grant of Rs.100 crore has been
balance) of Rs. 22082.42 lakhs up to provided during the year 2019-20.
November-2019 to develop an area of
35,625 hectares through the I. The objective of the programme
implementation of bunding, water 1. To manage the natural resources based
harvesting structures like check dam, on the watershed principle and/or by
vented dam, farm pond, percolation tank using the Scientific Land Resource
210 Economic Survey of Karnataka 2019-20

Information to improve the rainfed area programme:


land productivity and its production
I. The rainfed watershed shall be
capabilities.
developed for drought-proofing the
2. To improve the soil and water dryland farming. The sustainability of
conservation and groundwater rainfed farming shall be ensured
recharging. through implementation of integrated
watershed activities.
3. To harvest rainwater for moisture
availability and protective irrigation. II. Increase in the productivity potential of
the project area through the
4. To convert uncultivable wasteland to
implementation of various soil and
cultivable land.
water conservation activities compared
5. To improve the living status of the to the non-project areas.
people of the watershed area and also
III. The moisture availability for rainfed
provide livelihood activities to asset less
farming shall be improved through the
farmers in the project area through
in-situ and ex-situ soil and water
various quality skill-based training
conservation measures like field bunds,
programme thereby providing
trench cum bunds and boulder/
employment opportunity at their
rubble/vegetative checks, farm ponds,
doorstep.
check dams and nala bunds activities
6. To improve the soil health through implemented in the arable and non-
improvement in soil carbon status. arable lands.
7. To enhance the green cover in the IV. Assured protective irrigation in the
watershed area. project area through the utilization of
rainwater harvested through water
8. To improve the availability of fodder,
harvesting structures.
fuel and increase in the milk
production. V. Conversion of degraded and barren
land into a cultivable land and thereby
9. To strengthen the community-based
increase in the agriculture area and
organizations to manage the natural
productivity as well as increase in the
resources.
dryland horticulture, agroforestry and
II. Method of Implementation fodder production in the watershed
area.
The project area for watershed treatment
area will be selected based on the following VI. Upliftment of Small, Marginal, SC and
criteria: ST farmers through the implementation
of watershed activities in participation
1. Groundwater exploited/vulnerable
with the community for more
taluks
sustainable benefits and towards
2. Continuous drought over the years doubling of the farmer income.
3. Contiguous untreated sub-watersheds 7.12. AGRICULTURAL MARKETING
4. Readily available Land Resources The state has 162 Agricultural Produce
Information of the project area Market Committees (APMC's) to facilitate
and regulate the marketing of agricultural
5. More area available for watershed
commodities. The Department of
treatment
Agricultural Marketing is working under the
6. Watershed treatment should be of a Karnataka Agricultural Produce Marketing
ridge to valley concept (Regulation and Development) Act, 1966
and Rules 1968. The Department of
By implementing the above watershed
Agricultural Marketing supervises and
programme following measurable outcomes
guides the working of APMCs to implement
can be achieved at the end of the
the provisions of the Act and Rules of the
Economic Survey of Karnataka 2019-20 211

Department. The APMCs are managed by an a) Karnataka Agricultural Marketing


elected Managing Committee. The Secretary Policy 2013 and Implementation of an
and supporting staff are Government online trading system
servants working in the APMCs.
In order to improve the agricultural
The department aims to develop and marketing system in the state, the
regulate participative, transparent and Government had appointed a Committee
scientific agricultural marketing system under the Chairmanship of Additional
with adequate infrastructure and user- Secretary to Government, Department of
friendly e-initiatives in the state. To promote Co-operation. The Agricultural Marketing
and encourage participatory and equitable Reforms Committee appointed by the State
socio-economic development of people of Government in March 2013 submitted its
Karnataka and especially farmer from report in May 2013. The State Government
Karnataka through a vibrant agricultural has accepted the recommendations of the
marketing system. Reforms Committee and came out with the
Since, The Department has provided Karnataka State Agricultural Marketing
infrastructure facilities for better marketing Policy- 2013 on 4th September 2013. A
of the commodities, during the year 2017- Special Purpose Vehicle has been
18, the value of total arrivals in the regulated established on 20-1-2014 for the
markets of the state is Rs.44,217.94 crore. implementation of reforms measures.
The arrival of agricultural commodities to Implementation of Agricultural Marketing
the market yard is increasing year by year. Policy will help the farmers to get
competitive prices for their commodities,
The challenges of the Department are to bring transparency in the system and
provide the additional required facilitate simplification of various activities
infrastructure for trade in the markets, to in the market yards.
ensure transparency in the markets, to
modernize the markets, and to ensure On line trading system is being implemented
competitive price to the farmers produce. In to sell the agricultural produce of the
this regard, action has been taken to farmers in the markets through the
implement an online trading system in all electronic trading system. Actions are being
the APMCs of the state in phased manner. taken to ensure transparency, simplify the
An online trading system is introduced in marketing procedures, ensure competitive
160 markets so far. Up to the end of price for farmers' produce by introducing
December-2019, 50.94 lakh farmers have technology in all market activities including
registered their names for participating at auction system, price discovery and
Unified Marketing Platform. The budgetary payment of sale proceeds to farmers on line.
allocation for the department from the year Arrangements are being made to link
2017-18 to 2019-20 are furnished in different markets in the state by the
Table 7.32. introduction of technology and facilitating
the traders of different markets in the state
to participate in buying of commodities
online from any of the markets of the state
where the farmers have offered for sale.

Table 7.32 : The budgetary allocation for the department from 2017-18 to 2019-20
is as follows: (Rs in lakhs)

Year 2017-18 2018-19 2019-20


Allocation 36804.69 29320.25 Provision- Rs.17601.47 lakh
Release till date – Rs.7273.50 lakh
Finance Department in i ts UO note No.
FD/79/GIE/2019 D ate: 9-12-2019 has revised the
estimate as Rs.7903.47 lakhs for this scheme.
212 Economic Survey of Karnataka 2019-20

So far, 160 markets are brought under Rs.27903.47 lakh and directed to utilize
Unified Market Platform. The Unified Rs.10000.00 lakh for revolving fund,
Market Platform has transacted 6.68 Crore Rs.12,903.47 lakh for incentive and
MTs of agricultural commodities worth Rs.5000.00 lakh for the procurement of
Rs.1,67,220 Crore. Onion, Potato and Tomato under Price
Deficiency Payment scheme. Later, Finance
For the implementation of online trading,
Department has restricted the allocation to
action has been taken to provide necessary
Rs.7903.47 lakhs. The contribution
Hardware/peripherals to the 102 APMCs
received from the APMCs to the revolving
under RKVY grant of Rs.20.00 crore and
fund was Rs.5960.00 lakhs. During 2019-
13th Finance Commission grant of Rs.3.00
20, under revolving fund of Rs.5000.00
crore i.e. totalling of Rs.23.00 crore. The
lakhs, action has been taken to procure
tender process is under progress and the
green gram and urad dal from different
received tenders have been submitted to
procurement agencies.
Government and the Government approval
is awaited. For the procurement of central During the current year, under support
server, approval from the Technical price scheme, procurement of green gram of
Advisory Panel is awaited. 58,742.05 quintals has been made from
14,696 farmers and action has been taken
b) Minimum Floor Price scheme: to procure Soyabean and Tur dal.
To ensure sustainable development and
7.12.1 Rural Infrastructure
stability in agricultural sector and to protect
Development Fund (RIDF) :
the interest of the farmers against distress
sale of agricultural commodities, whenever Rural markets are the places where a large
the rates of such commodities go down, the number of small and marginal farmers sell
Floor Price Scheme for Agricultural/ their agricultural produce. These markets
Horticultural commodities in Karnataka is are being developed by providing
being implemented. The scheme is infrastructure for the benefit of farmers and
applicable to all the notified Agricultural & traders. The National Agriculture and Rural
Horticultural commodities as per Karnataka Development Bank of Government of India
Agricultural Produce Marketing (Regulation provide partial financial assistance for
& Development) Act 1966. In addition to this providing infrastructure facilities for rural
Scheme, the Price Support Scheme of markets. Remaining financial requirements
Government of India is also being are provided by the APMCs for the
implemented. By implementing this scheme development of infrastructure facilities. The
it is possible to stabilize the prices in the Department of Agricultural Marketing gets
markets and ensure a better price for the information from the APMCs, prepares
farmers' produce by avoiding distress sale of the project report, submits the proposal to
commodities. NABARD and after sanction supervises the
implementation of the project. The facilities
The Scheme has come into effect
provided in the rural markets like godowns,
from 24.11.1999. For the successful
roads, sanitary, auction platforms, drinking
implementation of the said scheme, a
water, etc. will help the sellers and buyers.
corpus of Revolving Fund was created. As
per Karnataka Agricultural Produce During 2018-19, total budgetary allocation
Marketing (R&D) act 1966, and as per the of Rs.5228.00 lakh was made, the same was
decision taken by the Agriculture/ utilized to take up 60 number of works in
Horticulture Commodities Price select 48 APMCs, and the works are
Stabilization Cabinet Sub-Committee, the completed. During 2019-20, a budgetary
Karnataka State Agricultural Marketing provision of Rs.8019.00 lakhs has been
Board is authorized to operate the Revolving made, the same has been utilized to take up
Fund. 110 number of works in select 76 APMCs.
Out of which, 36 works are completed and
During the year 2019-20, State Government
the remaining 74 works are under progress.
has earmarked budgetary provision of
(Table 7.33)
Economic Survey of Karnataka 2019-20 213

Table 7.33 : Details of Godown and Shop-cum-Godowns Constructed in APMC's in


the State
Completed
Total
Sl. Godowns Shop-cum-godowns
Plan
No.
Capacity Capacity Capacity
No’s No’s No’s
(In M.T.) (In M.T.) (In M.T.)
1 Annual Action 1,539 2,05,335 2,939 2,12,811 4,478 4,18,146
Plan
2 R.K.V.Y 182 2,43,350 86 8,600 268 2,51,950
3 Gramina 537 82,845 0 0 537 82,845
Bhandara
4 R.I.D.F 103 67,370 12 2,400 115 69,770
Total 2,361 5,98,900 3,037 2,23,811 5,398 8,22,711

7.12.2 Rural Godown the Final feasibility Report/Detailed Project


Scheme/Grameena Bhandar Yojana Report. It is proposed to take up this scheme
(Central and State Sector) : under RFP/PPP mode. To provide basic
This scheme has been introduced in 2006- amenities at Rice Technology Park,
07 to help the farmers to store their Karatagi, approval has been accorded to
commodities scientifically in godowns and take up development works at a cost of
to sell the same when the prices are high. Rs.120.00 crore under Warehouse
Farmers can also get pledge loan based on Infrastructure Fund. Tender process
the commodities stored in the godowns. completed and the works are under
progress.
The APMCs are implementing the rural
godown scheme by getting 25% subsidy 7.12.4: Assistance to APMC's for special
from Government of India. The assistance projects :
given by Government of India is going The objective of this project is to provide
directly to APMCs account. infrastructure facilities like auction
Under this scheme, construction of 537 platforms, godowns, roads, drinking water
godowns have been constructed in the rural and sanitary facilities, etc., in the markets
areas coming under 14 APMC's. coming under the backward areas and
providing housing facility for hamals under
7.12.3: Rice Technology Park – Karatagi: SCSP & TSP sub heads.
Rice Technology Park in Karatagi of During 2018-19, Government has
Gangavati Taluk is being developed to earmarked Rs.2023.00 lakhs under this
provide state of the art technology facilities scheme. Under SDP, 18 works in the APMCs
for cleaning, grading, processing, packing, coming under backward taluks from an
selling, branding, export, etc. for amount of Rs.760.00 lakh, under
paddy/rice. construction sub head, 11 numbers of
For the implementation of the scheme, 315 works from an amount of Rs.1085.00 lakh,
acre 28 guntas of land has been acquired. under SCSP & TSP construction of 24 and
For the implementation of Rice Technology 114 numbers of houses for hamals have
Park at Karatagi, IL & FS Clusters been taken up respectively from an amount
development Initiative Limited, Bengaluru of Rs.150.00 & Rs.793.00 lakh. The works
has been appointed as Technical are completed.
Consultant. IL & FS Clusters development During 2019-20, Government has
Initiative Limited, Bengaluru has submitted earmarked Rs.1679.00 lakhs under this
214 Economic Survey of Karnataka 2019-20

scheme. Under SDP, 13 works in the APMCs Under RKVY scheme of 2019-20, approval
coming under backward taluks from an has been accorded for the development of 20
amount of Rs.556.00 lakh, under rural shandies at a total cost of Rs.15.00
construction sub head, integrated waste crores (Rs.75.00 lakhs per shandy). But, as
management system at Kolar, Chintamani, per the guidelines of the Central
Hassan, Belagavi, and Bidar works from an Government, only a grant of Rs.3.45 crore
amount of Rs.992.00 lakh, under SCSP & will be released and the remaining amount
TSP construction of 22 and 6 numbers of has to be borne by the APMCs. Following
houses for hamals have been taken up this, action has been taken to develop the
respectively from an amount of Rs.105.00 & rural shandies with a grant of Rs.17.226
Rs.26.00 lakh. lakhs in the APMCs who can spend the
remaining amount of Rs.57.774 lakhs.
7.12.5: Rashtiya Krishi Vikas Yojana
(RKVY) : 7.12.6: Establishment of Tur Technology
Construction of godowns under RKVY Park at Kalaburagi:
scheme will help to promote scientific Action had been taken for the establishment
storage of commodities there by reducing of Tur Technology Park at Kalaburagi, to
storage losses. Further, these scientifically take up value addition activities for Tur and
constructed godowns will also help to take other pulses produced in the area, and also
up online trading through godown based to create better infrastructure for cleaning,
sales thereby helping the farmers to get grading, sorting, processing, branding,
better price for their commodities and marketing and export of tur and its
reduce transportation charges to the products.
distance markets.
APMC, Kalaburagi has taken necessary
Under the centrally sponsored RKVY steps for the acquisition of 250 acre of land
Scheme, 75% grant is given for providing through KIADB. In the KIADB's 349th board
infrastructure facilities like scientific meeting held on 30-5-2017, a resolution has
godowns etc., remaining 25% amount been passed regarding dropping of 2229.27
required for the project will be borne by the acre of land acquisition process. There by,
concerned APMCs. the APMC request for the acquisition of 250
During 2015-16, under RKVY scheme acre of land which is included in the above
Rs.148.84 crores have been allocated and acquisition process gets dropped. In this
the works are revalidated to 2016-17 also. regard, for the implementation of the
By utilizing this grant, 70 nos. of different scheme, in spite of continuous effort
capacity godowns, 52 numbers of grading suitable land has not been obtained. Hence
units, 23 number of covered auction Government has accorded permission to
platforms, 29 number of Sheep and Goat drop the scheme. Action has been taken to
market development works, 2 number of surrender the grant amount by withdrawing
cold storages and 1 number of Irradiation from the K.I.A.D.B.
unit are taken up. Out of 177 works 174 7.12.7: Establishment of Maize
works have been completed and 3 works are Technology Park at Ranebennur:
under progress.
Action had been taken to establish Maize
During 2017-18, under this scheme, Technology Park in Ranebennur to take up
utilising Rs.5000.00 lakhs (Rs.25.00 crores value addition activities for Maize and other
from RKVY and Rs.25.00 Crore committee commodities produced in the area and also
share) 73 works have been taken up. Out of to create better infrastructure for cleaning,
which 71 works are completed and 2 works grading, sorting, processing, branding,
are under progress. marketing and export of maize and its
products.
Economic Survey of Karnataka 2019-20 215

Action has been taken to establish maize 7.12.10 Establishment of Irradiation unit
technology park in the 60 acre of land at Dasanapura
belongs to proposed mega market area.
DARASHAW & Co Pvt Ltd in Regents Action has been taken under 2015-16 RKVY
Chambers of Naariman Point, Mumbai has grant. Regarding the implementation of the
been appointed as Technical Consultant. scheme, necessary information and
The technical consultant have submitted approval has been obtained from BRIT and
Environment & Social Impact assessment BARC institutions. Approval has been
Report, Feasibility Report, GAD Structure accorded to DPR and also for appointment of
report & Bid documents. In the committee technical consultant. The Cabinet approval
meeting held on 13-4-2017, a resolution has process is under progress.
been passed to obtain permission from the 7.12.11 Raitha Sanjeevini
Government to transfer the implementation
of the scheme to Commerce and Industries This is an insurance scheme for farmers
department. In this regard, proposal has being implemented by the Karnataka State
been submitted to Government to accord Agricultural Marketing Board. Under this
permission to transfer the scheme to scheme, farmers who meet with an
Commerce & Industries Department. The accidental death or permanently disabled
proposal is under verification at the while being involved in farming/marketing
Government level. activities are provided a compensation
ranging from Rs.10,000/- to Rs.1,00,000/-.
7.12.8: Establishment of Coconut During 2019-20, up to December, 129
Technology Park at Tiptur: farmers were given compensation of
Rs.1,11,90,000/-.
Action had been taken to establish Coconut
Technology Park including coconut 7.12.12 Aam Admi Bima Yojane
products research and development unit at
Tiptur to take up value addition activities for The Aam Admi Bima Yojane is an insurance
Coconut/Copra produced in the area and scheme implemented with the help of Life
also to give better infrastructure for Insurance Corporation of India for the
cleaning, grading, sorting, processing, welfare of licensed weighmen, hamals and
branding, marketing and export of cartmen working in AMPCs. The Karnataka
coconut/copra and its products are State Agricultural Marketing Board is the
provided. nodal agency for implementing the scheme.
Under the Scheme, for accidental death or
For the implementation of the scheme, the permanently disability, an amount for
land identified on priority basis has not been Rs.75,000/- and for natural death
obtained in spite of continuous efforts for Rs.30,000/- is given as compensation to his
the acquisition of land. Hence the scheme family. Besides, the Government of India
has not been taken up. pays scholarship of Rs.100/- per month for
students of 9th to 12th standard whose
7.12.9 Kayaka Nidhi
parents have registered under this scheme.
Implementation of Kayaka Nidhi Scheme
will help about 29,000 licensed hamals Achievements of the Department:
working in APMCs who are under below
1. The Market Reforms of Karnataka has
poverty line. The amount under this scheme
helped farmers in realizing 38% more
had been utilized to meet the medical
income. The stakeholders of the market
expenses of surgical operation up to Rs.1.00
are using the online platform for trading
lakh & Rs.10,000/- to meet expenses
of Agricultural Commodities. Through
related to cremation in case of death of
this online platform, 6.68 Crore MTs of
Hamals working in the market area. During
Agricultural Commodities worth
2019-20 up to the end of December,
Rs.1,67,220 Crore has been transacted
Rs.12,36,914/- has been released as
till the end of December 2019.
compensation to 109 Hamals.
216 Economic Survey of Karnataka 2019-20

2. During the last five years, under platform, Shops, Parking place for
support price scheme, 157.36 lakh vehicles, Toilets, Drinking water facility
quintals of agricultural and horti- at a cost of Rs.40.00 crore.
cultural commodities worth value of
Rs.6080.20 crore was procured from 13. Approval has been accorded under
8.14 lakh farmers. Warehouse Infrastructure Fund (WIF)
3. During the last five years, 3,21,720 MT 2014-15, to provide necessary
capacity scientific storage godowns infrastructure facilities at Rice
have been constructed. Technology Park of Karatagi & Maize
4. 6 Solid waste management system has Technology Park of Ranebennur at a
been constructed at Mysore, Shiva- cost of Rs.120.00 crore and Rs.105
mogga, Vijayapura, Hubballi and crore respectively. Works are under
Dasanapura & Singena Agrahara of progress.
Bengaluru. In addition to this, action 14. As announced in the budget speech of
has been taken to construct integrated 2018-19, action has been taken to
scientific waste management system at develop markets equipped with all basic
Kolar, Chintamani. Hassan, Belagavi & infrastructures by APMC or on Public
Bidar. Private Partnership on market fee
5. Cold storages have been established at revenue sharing model in 10 identified
Dasanapura & Singena Agrahara of places on highways/roads connecting
Bengaluru. major cities in the State. Robust RFP
6. Primary Assaying labs have been has been prepared, the same has been
established at select 60 APMCs. sent PPP cell of Infrastructure
7. Scientific assaying labs have been Development Department for its
established at select 4 APMCs. opinion and to Government to obtain
cabinet approval to take up the project.
8. To disseminate market information to
Cabinet approval is awaited.
farmers, 220 Kiosks have been
installed. Challenges:
9. Action has been taken to establish r As only 34.48% posts have been filled
cleaning, grading units at select 61 up in the Department it has become
APMCs. Out of which work has been very difficult to take up regulatory and
completed at 60 APMCs. administrative initiatives effectively.
10. Silos have been constructed at r Integration of Unified Market Platform
Gangavati, Kalaburagi, Yadgir, & with e-NAM.
Haveri. r The Department is to provide additional
11. 30 Sakala services of the Department required infrastructure for trade in the
have been brought under online markets & ensure transparency, to
system. modernize the markets and to ensure
competitive price to the farmers
12. Basic amenities have been already
produce.
provided at 60 acre land of Dasanapura
sub market of APMC, Bengaluru. The r Providing pure drinking water facility,
trade has been shifted to the said sub toilet facility, and necessary
market. Presently, action has been hardware/peripherals for online
taken to provide additional basic trading, and establishment of assaying
amenities like covered auction and grading labs in the markets.
Economic Survey of Karnataka 2019-20 217

7.13. HORTICULTURE: to reduce the Post-Harvest loss of


Horticulture crops.
Horticulture sector has emerged as an
important component of the economy of our 5. Promoting good quality education,
State and has contributed more than one extension and research (Horticulture
third share to the economy of agriculture University) to face Horticultural
and allied sectors. In many dry regions of the challenges and develop appropriate
State, Horticultural crops have evolved as technologies.
an alternative crop to agricultural crops. In
Objectives:
2017-18 Horticulture crop covers an area of
20.63 lakh hectares and the annual 1. To strengthen Horticulture research
production is 185.20 lakh Metric Tons. The (Horticulture University), extension of
average productivity of horticultural crops advanced technologies and formulation
in the State is 8.98 Metric Tons per hectare. and implementation of region specific
The annual value of Horticultural products schemes.
produced in the State is Rs.44,879 crore and
2. To increase the production of
constitutes 32.45% of the total income from
Horticultural crops.
entire agriculture sector. The share of
Horticultural produces in total GSDP of the 3. To improve Post-Harvest Management
state is 3.39%. and Marketing linkages.
The budget allocation for the department for 4. Provide technical information on
the years 2017-18, 2018-19 and 2019-20 processing and export.
are given in Table 7.34.
5. To encourage conservation of natural
Vision: resources and environment.
To increase the income and livelihood of 6. To assist certification of Horticulture
farmers in the state through the produces.
development of horticulture and
horticultural sector. 7. Support by providing infrastructure
and essential services.
Mission:
The State Government has undertaken
1. Increasing area, production and several initiatives to boost the growth in this
productivity of Horticulture crops. sector. The major initiatives include
2. To conserve soil and water resources by 1) Area expansion programme
its limited utilization.
2) Providing micro irrigation under
3. By formulating and implementing Pradhana Mantri Krishi Sinchayi
Specific central and state sector Yojane
schemes for the development of
3) Horticulture extension and training
Horticulture and Horticultural sector as
business venture by cultivating crops 4) Disease and pest management
which provide income livelihood and
5) Rashtriya Krishi Vikas Yojane (RKVY)
nutrition.
6) Comprehensive Horticulture Development
4. To encourage investment in Post-
Harvest Technology and management

Table 7.34: Budget allocation for Horticulture Department.


(Rs. in lakh)
Year 2017-18 2018-19 2019-20

Plan 118182.03 150534.52 133613.72


218 Economic Survey of Karnataka 2019-20

7) Assistance to Horticulture Boards and Mission (NHM) Scheme in Karnataka since


Corporations 2005-06. The scheme is being implemented
in all 30 districts of the State. At present,
8) Biotechnology
this scheme is a sub scheme of Mission for
9) Apiculture Integrated Development of Horticulture
(MIDH) of 2014-15.
10) Karnataka watershed development
project (Sujala-III) Objectives of the Programme :
11) Krishi Bhagya Yojane (KBY) r Enhancing quality and productivity of
12) S u b M i s s i o n A g r i c u l t u r a l major Horticultural crops adopting new
Mechanization (SMAM) innovative technology.
r To develop horticulture in clusters
13) National Ayush Mission. approach.
Category wise Area under Horticultural r To improve standard of living of farmers
crops in the State for the period 2013-14 to by increasing their income.
2017-18 is given in Table 7.35. A r To provide employment opportunities to
comparative statement of area and unemployed youths.
production of selected fruit crops is given in
Appendix- 7.13. Major Programmes :

7.13.1 Area Expansion Programme: Adoption of protected cultivation method,


rejuvenation of the unproductive orchards,
The area expansion programme is being rain water harvesting, organic farming,
taken up under different schemes. Among induction of Integrated Nutrition
those, important ones are National Management (INM) and Integrated Pest
Horticulture Mission, National Mission for Management (IPM), providing post harvest
Oil seeds and Oil Palm and Comprehensive support, improving marketing, enhancing
Horticulture Development. The details of the technical knowledge and skills of
these schemes and progress in farmers, extension officials and
implementation are discussed below. entrepreneurs through an array of training
a) National Horticulture Mission (NHM): programmes.
For overall development of Horticulture, During the year 2019-20, an amount of
the Government of India started Rs. 206.54 crores was allocated and an
implementation of the National Horticulture amount of Rs. 74.31 crores was incurred

Table 7.35: Category wise Area under Horticultural crops in Karnataka


(lakh Ha.)

Commer-
Spice Garden / Medicinal Aromatic
Year Fruits Vegetables cial Total
Crops Plantation Plants Plants
Flowers

2013-14 3.87 4.46 2.00 8.56 0.30 0.02 0.01 19.22

2014-15 3.94 5.03 2.24 8.81 0.31 0.02 0.01 20.37

2015-16 4.03 4.82 2.21 9.05 0.32 0.01 0.01 20.36

2016-17 4.18 4.92 2.48 8.86 0.31 0.001 0.02 20.76

2017-18 4.15 4.83 2.21 9.10 0.31 0.01 0.02 20.63

Source: Directorate of Horticulture


Economic Survey of Karnataka 2019-20 219

upto the end of November 2019. assistance of Rs.10.80 crores has been
provided for area expansion of 5722.00 ha.
The financial progress achieved under NHM
up to the end of November -2019.
is given in Appendix 7.14.
During 2019-20 more emphasis is given for
During 2019-20, the annual physical and
providing water storage structures,
financial targets for area expansion of major
mechanization, protected cultivation and
categories of horticulture crops like fruits,
Post Harvest Management. The details are
plantation crops, spices, flowers and
given in Table. 7.36
aromatic crops are 7346.00 ha, and Rs.
14.21 Crore respectively. Financial

Table 7.36: Progress of programme implementation during 2019-20 under NHM.

Achi evem en t
Annu al Tar get
(u p to Novem ber. 2 01 9 )
P rogram m e
(U n its ) Finan cial Finan cial
P hy s ical P h y sical
(R s .in l akh ) (R s .inl ak h)

N urse ry (N os.) 3.00 5 5.00 0 .00 0.00

Tis sue Culture Lab (N os.) 5.00 2 10.00 1.0 0 74. 48

S ee d pro ductio n for veg etables an d


(Ha.) 100 .00 2 3.63 0.0 0 0.0 0
s pices

N ew Are a Exp an sio n (Ha) 7346 .00 14 21.7 3 572 2.80 108 0.14

I an d II ye ar Main ten an ce (Ha.) 4518 .53 2 96.39 439 1.46 28 0.86

M us h roo ms ( No s) 10.0 0 7 2.00 1.0 0 8.0 0

R ejuven atio n of Old/Se nile


(Ha.) 3250 .00 6 50.00 267 8.23 39 1.10
Orch ard s
C re atio n of Wate r S tor ag e
1250 .00 24 66.5 0 64 2.00 120 1.95
Str ucture s (No .)

P ro te cted C ultiv atio n (Ha.) 3235 .52 30 89.0 4 187 2.61 102 4.76

I nte grated N utrien t / Pes t


(Ha.) 2500 3.00 4 35.00 186 06.24 29 0.46
an d Disease M anage men t.

O rganic Farm ing

O rgan ic F ar min g (Ha.) 400 .00 1 2.00 20 0.00 6.0 0

(No .)
P ollin ation suppo rt th ro ugh
bee keepin g 7463 .00 6 3.41 220 7.00 18. 31

M ech anizatio n (No .) 1401 .00 9 62.50 29 1.00 24 3.10

F ro n t Li ne De mo n str atio n (FLD) (N o) 21.0 0 1 05.00 0.0 0 0.0 0

H uman Re so urce De velo pmen t/


(No .) 1351 5.00 2 60.00 165 2.00 15. 52
Tr ai nin g to F arme rs
220 Economic Survey of Karnataka 2019-20

Achi evemen t
Annual Tar get
(up to November.2019)
Programme
(Un its) Finan cial Finan cial
Physical Ph ysical
(Rs.in lakh ) (Rs.inlakh)
Integrated Post Harvest
Management.

i. Pack Houses (No.) 900.00 1800.00 268.00 504.76

ii. Integrated pack house (No.) 12.00 210.00 3.00 42.36

iii. Pre-cooling unit (No.) 5.00 43.75 0.00 0.00

iv. Cold Room Staging (No.) 10.00 52.50 4.00 15.35

v. Reefer Vans (No.) 5.00 45.50 1.00 3.51

vi. Primary/Mobile Processing (No.) 200.00 2000.00 165.00 490.36

13.00
vii. Cold Storage (No.) 870 5.00 303.36

viii. Ripening Chamber (No.) 28.00 280.00 2.00 15.22

xi. Onion Storage Structures (No.) 2200.00 1925.00 616.00 455.90

X. Solar Tunnel dryer (No.) 50.00 150.00 5.00 3.50

XI. Establishments of
Marketing Infrastructures (No.) 258.00 652.50 43.00 4.65

XII. Center of Excellence (No.) 0.00 0.00 0.00 0.00

XIII. Publicity and Literature (No.) 49.00 240.00 4.00 23.56

Future plans for Implementation of a) Productivity Improvement through:


NHM Scheme for 2019-20:
r Rejuvenation
The Mission has planned to prepare the
r Water storage Structure
draft annual action plan for an amount of
Rs. 220.00 crore for the year 2020-21. r Integrated pest /disease and Nutrient
Emphasis will be given on the following management
programmes: r Mechanization
r Protected cultivation
Economic Survey of Karnataka 2019-20 221

b) Reducing the Post Harvest losses by Malaprabha and Ghattaprabha through


adopting PHM activities like Government approved oil palm
entrepreneurs.
r Integrated Pack House
r Ripening Units For integrated oil palm development, the
responsibility of nursery raising, area
r Onion Storage Structures expansion, distribution of inputs,
r Cold Storage procurement of Fresh Fruit Bunches (FFBs)
r Refer Vans and establishment of processing mill has
been entrusted to Private partners. Hence,
r Cold Room Staging this programme is being implemented in a
c) Creating Marketing Infrastructure Public Private Participation (PPP) module.
r Whole Sale Market Currently, 3 entrepreneurs are operating in
Karnataka. In order to protect the interest
r Rural Market of oil palm farmers, oil palm entrepreneurs
r Retail Market and oil palm industry as a whole, the State
r Static/Mobile Vending Cart Government has passed the “Oil Palm
Cultivation, Production and Processing
B) National Food Security Mission regulation Bill” during the year 2013.
(NFSM):
Currently in the State, around 6200 farmers
In India, every year about 144 lakh tons of are cultivating oil palm in an area of about
edible oil is being imported at a total cost of 7749 ha out of which 4500 ha is under
Rs.65,000.00 crores per annum. Therefore, bearing. The annual production of oil palm
in order to decrease National foreign FFBs is about 13240 M.T, out of which
exchange and achieve self sufficiency in about 2278 M.T of Crude Palm Oil (CPO) is
edible oil production, both Central and State being extracted.
Govt. are encouraging oil palm cultivation
since 1990-91. The financial sharing In order to encourage the farmers to take up
pattern between Central and State oil palm cultivation, the farmers are being
Governments is in the ratio of 60:40. provided with various kinds of assistance.
To establish oil palm plantations, farmers
Objectives of the scheme: are given input assistance at the rate of
r To increase area and productivity of oil Rs.20,000/- per hectare in the form of
palm crop in the state inorganic fertilizers for an initial period of
four years or pre-bearing period and
r To bring about crop diversity in the planting material subsidy at Rs.11,912/-
state. per hectare. Subsidies are also extended for
r To improve the economic status of the purchase of various implements; inter
farmers through oil palm cultivation. cropping, borewell, and diesel pumpset.
r To bridge the existing gap between Farmers are also taken on exposure visits
demand and supply of edible oil in the and imparted training on advance
country. cultivation practices.
r To achieve self sustainability in edible As on November-2019, 1,48,291 seedlings
oil production and save foreign have been distributed to the farmers for area
exchange involved in importing edible expansion.
oil.
Well-Organized Marketing Facility:
It is known from survey that in Karnataka,
an area of about 2.60 lakh ha. Has potential Under Oil Palm Development Programme, in
for oil palm cultivation. Since, Oil Palm is a order to purchase the produce of farmers,
water loving crop, its cultivation is being there is a well-organized buy-back
taken up by farmers in the districts which arrangement. The oil palm entrepreneurs, to
come under Command areas of Cauvery, whom specific areas have been allotted,
Bhadra, Thungabhadra, Krishna, procure the FFBs from the farmers at a price
222 Economic Survey of Karnataka 2019-20

declared by the Government. The prices are among the farmers since 1991-92. During
decided based on scientific formula 2014-15 the assistance for Micro Irrigation
approved by Price Fixation Committee, in was a part of On Farm Water Management
which the oil palm farmers, oil palm (OFWM) under the new scheme National
entrepreneurs are the members. The Mission on Sustainable Agriculture (NMSA).
Committee is headed by Principal Secretary
The Government of India has instructed to
to Government, Horticulture Department.
implement the micro irrigation
The entrepreneurs make payment to the
(NMSA/OFWM)under Pradhan Mantri
farmers once in a month directly to their
Krishi Sinchayee Yojana (PMKSY) from
bank account through ECS. The FFBs price
2015-16.
for the month of October-2019 has been
fixed at Rs.7015/- per ton of FFBs. For the year 2019-20, Central Government
has allocated Rs. 23404.00 lakh under Per
The Central Govt. has allocated an amount
Drop More Crop Component Central Share
of Rs.332.54 lakhs for the year 2019-20.
to Horticulture.
Under State Sector an amount of
Rs.1051.31 lakh and under District Sector As per the GOI letter No-11-42/2015-Hort
program an amount of Rs.55.20 lakh has dated 10.11.2015 as per the (Sharing
been allocated. The physical and financial pattern between central and State
achievements of the oil palm development government) 60:40 this scheme has to be
program are given in Table 7.37. implemented.
If 90% of assistance is provided to all
C) Pradhan Mantri Krishi Sinchayee categories of farmers in Karnataka State,
Yojana (PMKSY): the sharing pattern of central and State is
given in Table 7.38.
Water is the most important input in
Agriculture sector especially for As per above sharing pattern between
Horticulture crops. Micro Irrigation system central and state government, as per
not only increases the water use efficiency, it Government order: HCD/20/HPP/2019
also helps in improving yield, quality of Bangalore (e-office), Dated; 05-10-2019
produce, reduced dependency on labour during 2019-20, Annual action plan of
and in reducing weed menace. Rs.70921.00 lakh has been approved and
permitted to continue to provide the 90%
Karnataka is one of the pioneering states in subsidy by increasing the state share to all
recognizing the advantages of Micro- categories of farmers up to 2.00 ha and from
Irrigation (Drip Irrigation and Sprinkler above 2.00 ha and upto 5.00 ha subsidy
Irrigation) and has been promoting its use

Table 7.37: Physical and Financial progress under Oil Palm Development
programme

P hysical
Financial (Rs. In lak h)
(Area Exp ans ion) (ha)
Year
Target Achievement Target A chievement

2016 -17 16 00 966 1272 .68 1 101.2 5

201 7-18 15 00 112 0 1200 .79 8 88.5 0

201 8-19 16 00 102 8 1300 .13 3 57.8 0

2019 -20* 17 00 103 7 1106 .51 3 83.1 0

(* As on November-2019)
Economic Survey of Karnataka 2019-20 223

Table 7.38: Sharing pattern between central and state Government

State Share Total subsidy


Central
to the
Category of share
Mandatory Additional Total farmers in %
farmers

A) Up to 2.00 Ha

SF/MF 33 22 35 57 90

Others 27 18 45 63 90

B) After 2.00 Ha upto 5.00 Ha

SF/MF 33 22 - 22 55

Others 27 18 - 18 45

provided as per GOI norms under Centrally Program Guidelines:


Sponsored Micro Irrigation under PMKSY. 1. During 2019-20 the assistance for
Under Micro Irrigation Scheme for the year Micro Irrigation is a part of Centrally
2019-20, as per vol-III Rs.26400.00 lakh Sponsored Micro Irrigation under
budget provision has been made under state Pradhan Mantri Krishi Sinchayee
sector scheme, Rs.1095.09 lakh budget Yojana (PMKSY).
provision has been made under district 2. Under the scheme, subsidy is provided
sector scheme. for installation of drip irrigation for all
Objectives of the scheme: Horticulture crops except Coffee, Tea
and Rubber.
r Per drop more crop
3. The assistance is extended up to 5.00
r Conservation of water by adopting
hectares per beneficiary family. In case
micro irrigation.
of Vegetables and Flowers the subsidy is
r To save 50 to 70 percent water, given upto maximum of 2.00 ha.
electricity and labour cost by
encouraging the farmers to adopt micro 4. Assistance for installation of
irrigation. drip/Sprinkler irrigation is provided
under centrally sponsored scheme to
r To save 30-40% chemical fertilizers by each beneficiary family up to 90% of
providing fertilizers to the crops cost of installation for first 2.00 ha and
through fertigation under micro 45% as per Government of India norms
irrigation for subsequent 3.00 ha.
r Increase in the yield and productivity by
30-100%. 7.13.2 : Horticulture Extension and
Training :
Since from inception till 2019-20 (up to
November-2019), an area of 6.57 lakh Various media are functioning to give
hectares has been brought under Micro information about the new technologies and
Irrigation by providing subsidy of improved hybrid varieties of crops to
Rs.2575.86 crores for 5.82 lakh farmers farmers. To conduct these programmes
who have installed Drip/ Sprinkler for effectively, Horticulture Extension and
Horticulture. The progress achieved under Training scheme is being implemented. The
Micro irrigation scheme is given in the following main activities are being taken up
Table 7.39. under this programme.
224 Economic Survey of Karnataka 2019-20

Table 7.39 : Progress under Micro irrigation.

Physical (In.lakh Ha.) Financial (Rs.in crores)


Period
Target Achievement Target Achievement

2016-17 0.38 0.39 233.27 226.50

2017-18 0.62 0.50 390.00 300.18

2018-19 0.70 0.59 445.25 375.87

2019-20 * 1.39 0.29 709.21 172.17

(*up to the end of November 2019).

Horticulture Extension: horticulture training Institute was


established in the year 1995-96 in Lalbagh
The newly developed technologies and
Bengaluru. Currently, there are 11 training
improved hybrid varieties of high yielding
centers functioning. Every year about 400-
potential crops information is given to
450 Farmer's children are being trained in
farmers through various media to enable
this center.
them to adopt it and get better returns.
Training programmes are also conducted by 10 months training will be given to farmers
the Horticulture Department on the latest children's in the 11 training centers.
available technologies in horticulture to
(a) Horti-clinic Activities :
farmers and officers.
Horticulture information and consultancy
Activities of Horticulture Information
center, Horti-clinic was established during
Center : the year 2010-11. At present, 1 State level
r Participating in National and horti-clinic, 28 district level horti clinics are
International Flower/Horticulture working.
Shows, Krishi Mela, Republic day and
Activities of the scheme:
Independence Day flower show etc., to
provide information about Department r Collecting and publishing recent
schemes. technology about new technologies for
r Organizing Trainings, Horticulture Day, Development of Horticulture.
Seminars, Workshops etc. r To Prepare Horticulture Project for
r Printing and distributionof Brochure/ adoption of horticulture schemes and to
Technical Bulletin/Manuals/ prepare project proposal for bank loan.
Calendars/Blowups/CD/Advertiseme r Giving information about horticulture
nt etc. schemes.
r Purchasing and distribution of books, r Acting as Nodal Center by Providing
magazines/Journals of Horticulture Technical staff for Horticulture
from the Universities/Research Development.
centers. r Conducting training to farmers in Horti-
r Preparation of documentary films on clinic Centers.
Horticulture Development and r Organizing training programs, study
Departmental Schemes. tour to the Farmers/ officers,
Horticulture Training Programme : Horticulture Department and
University of Horticultural Sciences to
In order to enrich theoretical, practical and organize tri-monthly workshop for the
creative knowledge among the rural youth, a officers.
Economic Survey of Karnataka 2019-20 225

(b) Flower Shows : cost in the affected Coconut gardens for


the control of Black headed caterpillar.
Conducting District / State level trainings
and flower show programmes to provide r Assistance to farmers for purchase of
information about recent development in plant protection chemicals to control
horticulture for interested farmers and the pest and diseases of Horticulture
public. crops.
During the year 2018-19 an amount of
Rs.938.11 lakh has been allocated, out of During 2018-19, Rs.1643.79 lakh has been
which Rs.913.96 lakh has been spent. For spent as against release of Rs.1661.95 lakh.
the year 2019-20, Rs.500.00 lakh has been During 2019-20, Rs.1215.00 lakh has been
allocated out of which, Rs.189.75 lakh has allocated for parasite production,
been released of which Rs.153.24 lakh has brachimeria production, assistance for
been spent till the end of November 2019. chemicals purchase, staff salary, tour
allowance and others, special component
7.13.3 : Integrated Pest and Disease
programme and tribal sub plan. As on
Management in Horticultural Crops :
November 2019, Rs.706.45 lakh has been
To increase the yield of Horticultural crops released, out of which Rs. 634.85 lakh has
by protecting them from pests and diseases, been spent. There are 26 parasite
Integrated Management of Pests and laboratories in the department where in
Disease Programme is being implemented 406.13920 lakh Goniozus parasites and
by the Department. To control pests and 0.58 lakh Brachymeria parasites were
diseases in Horticultural crops, subsidy is produced and released during 2018-19.
being provided to the farmers for purchase During 2019-20, 207.049 lakh Goniozus
of Bio-pesticide, plant based pesticide, parasites were produced up to end of
chemical pesticides. In addition, pest November-2019 and distributed to the
surveillance is undertaken in different beneficiaries for releasing in coconut
districts to predict the outbreak of pest and garden. Details of the programmes progress
diseases and create awareness in the are given in Table. 7.40.
management of pests and diseases like
eriophyidmite, black-headed caterpillar, 7.13.4 Sub Mission Agricultural
stem bleeding, tomato leaf curl virus, Mechanization (SMAM)
bacterial blight and koleroga of arecanut. Assistance to Purchase of farm
Equipments:
Objectives :
Agricultural land area in world as limited,
r Production of parasites in Department but the demand for food is ever increasing
laboratories and release them free of

Table 7.40: Details of Disease and Pest Management Programme


(Rs. in lakh)
2018-19 2019-20

Sl. Programme A chiev emen t


N o. N ame A chiev e (u pto
Targe t Releas e Targe t Releas e
men t November-
2019)

Integ rate d Pes t


and Disease
Manag eme nt
1 16 66 1661. 95 164 3.79 1215.00 706 .45 634.85
Prog ramme fo r
Horticulture
crops
226 Economic Survey of Karnataka 2019-20

due to population growth. To increase 7.13.5 : Rashtriya Krishi Vikas Yojane


productivity in the limited land so as to meet (RKVY):
the expanding demand arising from
population growth as well as higher income Rashtriya Krishi Vikas Yojana (RKVY) is a
is very important mission. Centrally Sponsored Scheme which is
focused to reorient the development
To increase productivity, timely and precise strategies for rejuvenation of agriculture
field work is necessary. To make it possible, and allied sectors and to meet the
Horticultural missions take a important needs/demands of farmers. The Scheme is
role. In this state farm power has availability designed to incentivize the State and to draw
is lower than rest of the states. So significant up plans for Horticulture more
necessity is promote for mechanization as a comprehensively and to set up investment
special mission under Sub Mission on in Horticulture. This scheme is being
Agricultural Mechanization (SMAM) will implemented since 2008-09 in all the 30
be implemented in accordance with districts of the State.
guidelines.
Objectives:
Objectives:
1. To assist farming community by
r Increasing the reach of farm formation of Farmer Producer
mechanization to small and marginal Organizations.
farmers and to the regions where
2. Augmenting the Government efforts in
availability of farm power is low.
horticultural development through
r Creating awareness among stake Public Private Partnership (PPP-IHD).
holders through demonstration and
capacity building activities. 3. To provide impetus to low cost
mechanization that could provide
r Ensuring performance testing and effective solutions for increasing
certification at designated testing efficiency in farming operations.
center located all over country.
During the year 2017-18 Under National 4. Computerization of Department
Mission on Agricultural Extension and schemes to have a more informed view
Technology (NMAET) Scheme for of the status of various activities and
implementation of Mission on Agricultural allow quicker implementation.
Mechanization (SMAM) Rs. 2500.00 lakh 5. To help the farmers to take up scientific
was allocated. But, the fund was released cultivation of various fruits and
last week of march-2018, the fund was not vegetable crops by following scientific
spent during the financial year. So that the management practices and providing
fund was revalidated for the year 2018-19 necessary inputs.
for implementation of scheme and fund has
been released on 31st July 2018. The 6. To give greater impetus to Post Harvest
program was implemented and spent handling and Value addition of
Rs.2472.36 lakh for 7896 beneficiaries. Horticultural crops.

During the year 2019-20 Under National 7. To improve the financial status of
Mission on Agricultural Extension and growers of Horticulture Crops.
Technology (NMAET) Scheme for 8. To strengthen Centers of Excellence for
implementation of Submission Mission on Floriculture, Training and Protected
Agricultural Mechanization (SMAM) Rs. Cultivation situated at Shivamogga,
3000.00 lakh was provided. In that the Maddur and Hassan for the
central share of 60% of Rs. 1800.00 lakh demonstration of advanced
was released, but the state share of 40% of technologies
Rs.1200.00 lakh and revalidated amount of
Rs.16.76 lakhs totally Rs.3016.76 lakhs 9. Dissemination of advanced and
was released at the end of the November- scientific technologies in Horticulture
2019. The program has been implementing. to the farming community.
Economic Survey of Karnataka 2019-20 227

Various important programmes onwards. During 2016-17, in addition to


implemented under RKVY: banana, various other horticulture crops
have been included under this project.
a) Incentives for Post Harvest
Management Activities in The main objective of the programme is to
Horticulture : raise the productivity levels by educating
the farmers about scientific cultivation,
In the state, horticulture crops are grown to using tissue culture plants, drip irrigation,
an extent of 20.63 lakh ha, with an annual fertigation, mulching, integrated nutrition
production of 185.20 lakh tons. The diverse and appropriate plant protection measures.
agro climatic conditions and crop diversity
prevailing in Karnataka, makes it possible to During the year 2018-19 an amount of
grow various types of horticultural crops. Rs.100.00 lakh was released with a financial
Though, the production of horticultural achievement of Rs. 99.97 lakh covering
crops is steadily increasing, approximately about 634.77 acres of Horticulture crop area
20-30% of the fruits and vegetables are under precision farming techniques. Under
wasted due to improper Post Harvest this scheme, the benefits were extended
Management practices. exclusively for scheduled caste and
scheduled tribes' beneficiaries. 305
Aims and Objectives: scheduled caste and 181 scheduled tribe
r To give greater impetus to Post Harvest beneficiaries' availed benefits during 2018-
handling, Processing and Value 19.
addition of Horticultural crops. In 2019-20, the scheme is not being
r To encourage farmers groups and implemented as there is shortfall in the total
entrepreneurs to establish horticultural fund allocation for RKVY projects from the
crop based processing and value Govt of India.
addition units, suiting to the
c) Mechanization :
requirements of the region and the
needs of the consumer. It has become very essential to encourage
The annual targets and achievements for production and post harvest activities in
the period 2018-19 to 2019-20 are given in horticulture with the increase in the value of
Table 7.41. horticulture production in the state.
Horticultural Mechanization is a solution for
b) Precision Farming in the problems like drastic shortage of
Banana/Horticulture Crops: agricultural labourers and sharp increase in
There is scope to increase the yield of labour cost.
banana up to 40–50% by application of The main objective of the programme is to
necessary inputs and adoption of improved reduce the investment cost in horticulture
cultivation practices. Precision Farming in and to decrease the cost of cultivation by
banana programme was taken up under reducing dependence on labour.
RKVY in all the 30 districts from 2011-12
Table 7.41: Physical and financial achievement under Incentives for Post Harvest
Management Activities in Horticulture.

P h y sical Finan cial


Year ( N o. of p ro ces sing u nits) ( Rs. in lakh )

Target A chie vem ent Targ et A chiev em ent

20 18-19 2 73 27 2 656 .00 62 6.59

20 19-20 44 0 253 .00 0

(*upto the end of November 2019)


228 Economic Survey of Karnataka 2019-20

"Mechanization in Horticulture" is being has been taken for the utilization of this
implemented under Rashtriya Krishi Vikas fund.
Yojana (RKVY). Only those farmers
During 2019-20, an amount of Rs.161.00
purchasing equipments /machineries from
lakh has been earmarked out of which the
the companies/ suppliers empanelled by
entire amount has been released upto the
the Horticulture Department will be
end of September 2019 to strengthen the
assisted in the form of subsidy. During the
existing Department Bio-center
year 2018-19, an allocation of Rs.835.00
laboratories. In the current year, civil
lakh was approved for this project. An
works/ infrastructure work/purchase of
amount of Rs. 507.14 lakh expenditure was
Lab Equipment is in progress at Bio-
incurred during 2018-19 as the final
centers. Additional fund of Rs.643.00 lakh
installment of Rs.300.00 lakh was released
has been approved for this project and the
in the far end of the financial year. Subsidy
funds are yet to be released.
was given to 665 beneficiaries. The unspent
balance amount of Rs. 328.00 lakh has been e) Implementation of PPP-IHD:
revalidated and released to the
implementing district officers for its PPP-IHD Project is in accordance with the
utilization in 2019-20. Action has been framework of PPP-IAD of Department of
taken for the utilization of this fund. Agriculture and Co-operation, Government
of India. This project was approved under
During the year 2019-20, the project is RKVY in the 14th State Level Sanctioning
approved with an allocation of Rs.1000.00 Committee (SLSC) for implementation
lakh. An amount of Rs.600.00 lakh has been during the year 2015-16.
spent and Rs. 150.00 lakh is the committed
expenditure upto to the end of November The Department of Horticulture has been
2019. implementing various schemes for the
benefit of the farmers from seed to
d) Strengthening of Departmental marketing including post harvest handling.
Laboratories: However, these interventions are stand
alone in most cases and in some cases
This project is implemented for
implemented within clusters of farmers.
strengthening of existing Departmental
Although the majority of the interventions in
Laboratories and it is taken up for input
the recent past have focused on increasing
production and to take up service providing
the area and production, the department is
facilities under one roof to achieve
also focusing on development of
productive and sustainable growth in
infrastructure for harvesting, post harvest
Horticulture. Various components like
handling and marketing. To make use of the
Tissue culture, Bio-fertilizers and Bio-
technologies developed by the private sector
control agents, Analytical facilities - Soil,
for increasing the productivity and reducing
water, plant tissue, heavy metals, active
the post harvest losses and to ensure
ingredients in medicinal and aromatic
complete value chain for farmers, the
plants, quality parameters in Bio-fertilizers
involvement of the private sector as per the
and Bio-control agents and nursery
“Framework for supporting PPP-IHD under
activities are taken up under this project.
RKVY seems to be an important tool.
During 2018-19, an amount of Rs.299.00
Under this Project, an amount of Rs.216.19
lakh was allocated to this project and
lakh was released for 5 programmes
Rs.283.00 lakh was released, out of which
implemented in 2016-17 of which
Rs.232.98 lakh has been utilized for
Rs.167.17 lakh progress was achieved in 4
strengthening Bio-centers at Davanagere,
districts. During 2017-18, an amount of
Mysore and Bidar. The unspent balance
Rs.504.00 lakh was released to 15 projects
amount of Rs. 50.00 lakh has been
for various activities from production to
revalidated and released for the
marketing of horticulture crops for which
strengthening of Department Biocenters
Rs.431.573 lakh progress was achieved.
located at Davanagere and Mysore. Action
During 2018-19, an amount of Rs. 322.176
Economic Survey of Karnataka 2019-20 229

lakh was released for 9 projects and a g) Development of Farmer Producers


progress of Rs. 293.88 lakh was achieved. Organisation (FPO):
For the year 2019-20 an amount of
Rs.500.00 lakh has been earmarked of Collectivization of producers, especially
which Rs.72.00 lakh has been released for small and marginal farmers, into producer
5 projects and the progress of Rs. 25.34 lakh organizations has emerged as one of the
is achieved till the end of November 2019 for most effective pathways to address the
the current year programmes many challenges faced by farmers. Most
importantly, this provides improved access
f) Computerisation of Horticulture to investments, technology and inputs and
Department: markets. Department of Agriculture and Co-
operation, Ministry of Agriculture, Govt. of
The Department of Horticulture currently
India has identified farmer producers
manages various subsidy schemes under
organizations registered under the special
which funds are released to farmers
provisions of the Companies Act, 2013 as
throughout the year. Currently the entire
the most appropriate institutional form to
process from identification of beneficiaries
mobilize farmers and build their capacity to
to final disbursement of subsidy is carried
collectively leverage their production and
out manually by the Department. As a
marketing strength.
consequence, there is lot of difficulties faced
ranging from non-transparent selection Objectives :
process to difference between the actual
1. Mobilizing farmers into groups of
amounts disbursed versus that reported by
between 15- 20 members at the village
the various taluk officials at any given point
level (called Farmer Interest Groups or
of time. The processing and reporting
FIGs) and building up their associations
functions are also very cumbersome.
to an appropriate federating point i.e.,
With the above points in mind, the Farmer Producer Organizations (FPOs)
Department of Horticulture has taken up consisting of 1000 members from 50
computerization project covering all aspects FIGs so as to plan and implement
of processing of subsidy schemes and all the product-specific cluster/commercial
stake holders including farmers and offices crop cycles.
involved therein. The project has been
2. Enhancing productivity through best
approved during 2015-16 and allocation
agricultural practices
has been made under Rashtriya Krishi
Vikas Yojana (RKVY). An amount of 3. Ensuring usage of quality inputs and
Rs.1045.00 lakh was released during 2016- services for intensive agriculture
17 for this project. The project was production and enhancing cluster
continued during 2017-18 with an competitiveness.
allocation of Rs. 374.00 lakh. During 2018-
4. Facilitating access to fair and
19, an amount of Rs.487.00 lakh was
remunerative markets by linking
allocated out of which the entire amount
producer groups to marketing
was released for Computerisation of
opportunities through market
Horticulture Department. The last
aggregators.
instalment funds of Rs. 162.00 lakh was
released in the fag end of the year. Hence, an During 2016-17, Rs. 326.25 lakh and
amount of Rs. 325.00 Lakh only could be Rs.608.64 lakh has been deposited to SFAC
utilised during 2018-19 for Software and for II year maintenance of 25 new FPOs and
Hardware development of Horticulture III year maintenance of 48 FPOs
Department in the State/Districts and respectively. During 2017-18 and 2018-19
taluks. The unspent balance amount of no amount was deposited to SFAC, since the
Rs.162.00 lakh has been revalidated and progress was less. For the year 2019-20,
released during 2019-20 for the approved Rs.205.00 lakh has been earmarked for III
programme of 2018-19. Action is in progress year maintenance of 25 FPOs. Till date no
for its utilization in the current year. budget has been released.
230 Economic Survey of Karnataka 2019-20

h) Center of Excellence (Training) in i) Strengthening Of Center Of


Maddur: Excellence For Floriculture at Tunga
Horticulture Farm, Shivamogga.
In Integrated horticulture development, on-
farm production and use of bio-inputs and Karnataka is known for Flower cultivation
micronutrient mixtures by the farming since ages. The most grown kinds of flowers
community is decreasing day by day, are Tuberose, Marigold, Jasmine,
whereas non judicious use of chemical Chrysanthemum, Aster, Gerbera, field
inputs is increasing every day in farm grown rose, white and yellow
activities. This will largely envisage the Chrysanthemum, Gladiolus, Dutch Rose of
degradation of soil fertility and various colors, Anthurium, Orchids and
environmental hazards. The cost of Bird of Paradise. All these flowers are grown
production is high due to large consumption mostly by small and marginal farmers. Most
of chemical inputs resulting in low income of them practice this as a family avocation.
and socio- economic problems among the The cultivation of traditional flower is
farming community. The alternate remedy mainly meant to supply flowers to the needs
is to reduce the use of chemical inputs and of the local folk, for religious functions, for
increase the application of bio-inputs and hair decoration and garland preparation.
micronutrient mixture for crop production
In Shimoga greenhouse cultivation is of
with proper soil testing. This will enhance
recent origin and in the past 10 years
the soil organic matter and microbial
Gerbera, Carnation, Anthurium, and
activity resulting in good crop growth and
Orchids etc., is extensively grown under 15
increased revenue to the farmers. This
structures. These units are of small size
project will cater to the skill training to
varying from 500 sq.mt to 1.5 acres.
farmers and departmental extension
Farmers incur an additional expenditure
functionaries on on-farm production of bio-
towards transportation and have poor
inputs and micronutrient mixtures and
facilities for grading and packing. As a result
their use in crop production, which is a step
the produce loses its quality and the price
forward in acquiring production skills and
offered in the market goes down many folds.
adoption of technology by the farming
community. Thus, COE can encourage So in this regard, as progressive farmers
Integrated Horticulture Development for have already started flower cultivation
farmers, officers, visitors and tourist. under green houses, there is lot of enquires
for further expansion of area under
During 2018-19, an amount of Rs. 200.00
floriculture. So there is absolute need for
lakh was earmarked for integrated
imparting practical knowledge to the
horticulture development, on-farm
farmers. In this view, there is a vision to
production and use of bio-inputs and
develop an International standard
micronutrient mixtures by the farming
Technology and Knowledge Driven
community and procurement of production
Floriculture Resource Hub with excellent
protocols for vermiwash technology. As on
facilities, market focus products and
March 2019, an amount of Rs.161.00 lakh
customized services aimed for achieving
was released for the implementation of
sustainability in Floriculture sector and
activities targeted to be taken up under this
enhancing economic development of the
project and an amount of Rs.158.08 lakh
farming community.
was utilized. The unspent balance amount
will be spent in the current year. During 2018-19, an amount of Rs. 100.00
lakh was earmarked for this project for
For the year 2019-20, the project for Mass
infrastructure development of the Center.
production of micronutrient mixture is
An amount of Rs.80.00 lakh was released
proposed in this center for an amount of
and the entire amount was spent for
Rs.100.00 lakh. The project is approved and
infrastructure development and purchase of
the funds are yet to be released.
input materials. During 2019-20, the
remaining amount of Rs. 20.00 lakh has
Economic Survey of Karnataka 2019-20 231

been released out of the revalidated amount 7.13.6: Comprehensive Horticulture


for this project and action has been taken up Development:
for its utilization.
There is an urgent need to bring about
j) Strengthening of Center Of changes in the following aspects to set right
Excellence for Protected Cultivation drawbacks in the chain of Horticulture
of Horticulture Crops: development in the State.
Present trend in horticulture is to increase r Adopting precision farming in the field
the productivity per square meter area of production.
through adoption of horticulture r Scientific and effective management of
technologies under protected cultivation. water.
The farmers need to be trained in this line to
r Post harvest management.
cultivate the low volume but high value
crops in mass so that the production, r Processing, value addition, market and
productivity and profitability can be export management.
increased. To achieve this, a new programme
Farming Technologies both under protected Comprehensive Horticulture Development
cultivation and open cultivation are the scheme is being implemented since 2012-
need of the hour. This can be achieved 13.
by hands on training to farmers and officers Objectives of the scheme:
of the department by conducting
demonstration of crops in departmental r Increase production / productivity,
farms, field days, seminars and exposure r To improve the quality of produce,
visit to various national institutes and r Overcome the shortcomings in the post
Center of Excellence in horticulture crops in harvest chain,
the state as well as outside the state.
r To improve the market for the produce
Center Of Excellence for Protected by streamlining the process of
Cultivation of Horticulture Crops, located at marketing,
Somanahalli Kaval, Hassan aims at r Adoption of processing and value
suppling good quality planting material of addition and finally,
Vegetable/Flower/Spices crops for farming
cumunity, to demonstrate Hi-tech protected r To improve the economic and social
cultivation technologies, promotion of conditions of the farmers depending on
Organic farming, efficient use of water and the horticulture sector.
fertigation through automization and The scheme has been implemented on
training to farmers, Officers, NGO, Private cluster mode by grouping the farmers from
Entrepreneurs etc. 2-3 neighboring villages willing to grow
Horticulture crops. The crop/crops are
During 2018-19, an amount of Rs. 270.00
selected based on the geographical and
lakh was earmarked for this project for
agro-climatic conditions of the particular
infrastructure development of the Center
cluster. These Cluster farmers are promoted
and production aspects. An amount of
to adopt new improved technologies. And
Rs.270.00 lakh was released and Rs. 200.00
also the Cluster farmers are trained to adopt
lakh was spent for infrastructure
new scientific technologies for production,
development and purchase of input
post harvest management and marketing.
materials for production of vegetable crops
under protected conditions. The remaining Under Comprehensive Horticulture
Rs.70.00 lakh which was released in the far Development Programme, 16 Sub- Schemes
end of the financial year has been are implemented during the financial year
revalidated for 2019-20 and action has been 2019-20. The total achievement under this
taken for its utilization. programme is as follows in Table 7.42.
232 Economic Survey of Karnataka 2019-20

Table 7.42: The progress achieved under Comprehensive Horticulture Development


Programme (Rs. In lakh)

% achieved to
Financial Budget
Year Achievement the released
allocation released
budget

2017-18 16460.00 13606.57 13428.539 98.69%

2018-19 16500.00 16500.00 16107.77 97.62 %

2019-20* 13000.00 6500.00 5734.755 88.23%

(*Up to end of November - 2019)

a) Farmer Producers Organizations b) Post Harvest Management:


(FPO's) :
Post harvest management is a component
As part of its efforts to strengthen Integrated under CHD scheme and have been
Horticultural Development, Department of implementing from 2014-15. Since
Horticulture, Government of Karnataka Horticulture produce like fruits, vegetables
(DoH-GoK) has been promoting Farmer and flower are perishable, it is important to
Producer Organisations (FPOs) as provide proper post harvest management
institutional vehicles for mainstreaming of practices for these produces. The primary
producers in horticultural value chains. The processing units who have taken 40 %
primary goal of an FPO is to provide services subsidy under centrally sponsored scheme
that support producers in their farming such as NHM/NHB/CDB will be eligible in
activities, including marketing of farm this scheme for taking matching grants of
products. Most shareholders in FPCs 50% maximum upto Rs. 10.00 lakh. It
promoted by DoH-GoK are small and includes primary processing activities kike
marginal farmers. DoH-GoK has taken grape dehydration, red chilli powdering,
proactive measures to empower the newly vanilla processing, wine making unit and
formed FPOs by providing a range of desiccated coconut powder units etc.
financial and non-financial assistance such Details of progress of activities for post
as working capital in the form of revolving harvest management are given in
fund, infrastructure development Table 7.43.
assistance along with custom hiring centers
(CHCs) and various other types of technical c) Potato Special Package:
and institutional benefits. Year wise support With the main objective of providing subsidy
provided for strengthening FPOs. The to potato growing farmers for purchase of
details are given in Table 7.42a. Bio-fertilizers, Plant Protection Chemicals

Table 7.42 a : The details of Farmer Producers Organizations


CHC
Working FPO KVK
(Machinery Infrastructure TOTAL
Capital Linkage
Year Bank)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

2017-18 24 360.00 31 663.69 1 39.96 56 173.49 112 1237.13

2018-19 02 30.00 11 153.29 5 122.67 34 105.33 52 411.30

2019-20 - - - - - - - - - -
Economic Survey of Karnataka 2019-20 233

and Organic manures to prevent Late Blight of introduction of new scheme “Incentives
of potato and for potato crop insurance, the for Potato growing farmers” .The progress is
scheme Potato Special Package is being given in Table 7.44(A).
implemented from the year 2012-13. The
annual targets and achievements for the e) Promotion for the development of
period 2017-18 and 2018-19 are given Kitchen and terrace garden.
Table 7.44. Keeping in view of the health hazards from
waste water irrigation, Government of
During 2019-20 this scheme had been
Karnataka, Department of Horticulture is
discontinued because of introduction of new
successfully undertaking Kitchen and
scheme “Incentives for Potato growing
Terrace Gardening programme under urban
farmers”
Horticulture in urban and peri urban areas
d) Seed Subsidy for purchase of providing suitable training to the general
certified seed potato : public for growing safer fruits and
vegetables in their kitchen backyards and
To encourage potato growers and make terraces and also providing suitable seed
available certified seed potatoes at low and input kits to the urban public which is
prices, the scheme is being implemented gaining much importance.
from the year 2016-17 In this scheme
certified seed potato has been procured from The annual targets and achievements for
Jalandhra, Punjab through NSC and the period 2018-19 to 2019-20 are given in
distributing to the farmers through Table 7.44b.
distributing agencies with 50% of
f) Incentives for Potato growing
subsidized rate. The annual targets and
farmers
achievements for the period 2016-17 to
2018-19 are given below. During 2019-20 In Karnataka Potato is being grown in an
this scheme had been discontinued because area of approximately 35,000 hectares. In

Table 7.43: Physical and financial achievement under Post Harvest Management

Physi cal F in an cial


(No. of processin g units) (Rs. in lakh)
Year
Target Achievemen t Target Ach ievemen t

2017-18 72 72 267.92 267.90


152.86
2018-19 103 101 155.12

2019-20* 203 46 100.00 25.00

* Upto end of November-2019

Table 7.44: Progress of Potato Package

Annual Physical (in ha.) Annual Financial (Rs. in lakh)


Year
Target Achievement Target Achievement

2017-18 9383.00 9275.50 443.73 443.17

2018-19 9749.40 9753.19 480.47 480.23


234 Economic Survey of Karnataka 2019-20

the interest of farmers who are facing from growth in floriculture industry deteriorated
various problems such as high cost of and those who were into floriculture
planting material and incidence of pest and business were in a loss.
diseases in potato. Hence, a new program
For the survival of the hi-tech floriculture
called "Incentives for Potato Growing the Department of Horticulture has
Farmers" has been formulated for the year implemented a scheme for Incentive to
2019-20. Under this scheme, incentives will Floriculture under Comprehensive
be given to potato tubers used by farmers for Horticulture Development for the year
sowing and plant protection chemicals. A 2019-20,
maximum of 2.00 hectares per beneficiary
would be benefited and the total 20,000 Objectives:
hectares of potato growing would be covered
r Revival of existing old hi-tech
under this scheme. The details are given in
floriculture units in the state
Table 7.44c.
r To introduced the new and commercial
Incentives for Floriculture: verities suitable for particular climatic
Introduction of advanced technology in conditions.
cultivation of flower crops in Karnataka was r The production/productivity will
started in 1990's. The progress made in this be increased in existing hi-tech
field attracted the entire Nation. More and floriculture units.
more farmers were attracted towards the
r To encourage the farmers to take up
cultivation of Roses, Carnation, Gerbera,
more hi-tech floriculture units in the
Chrysanthemum, Orchids, Anthurium and
state.
other flower crops under green house using
advanced technology which was lucrative in r Increased foreign exchange income for
internal as well as international markets. the farmers and the state through
Although, cultivation of flower crops using export of quality flowers.
advanced technology earned good profits in r To encourage the farmers to more
the initial years, due to various reasons, the competitive in domestic as well as
foreign markets.
Table 7.44a : Progress of Seed Subsidy for purchase of certified seed potato
Financial
Physical (in ha.)
( Rs in Lakh)
Year
Target Achievement Target Achiev ement

2016- 17 1530.00 1516.00 267.64 263.42

2017- 18 1526.86 1520.03 321.69 321.50

2018- 19 1246.05 1246.05 171.32 171.32

Table 7.44b : Development of Kitchen and Terrac Garden


Annual Financial
Annual Physical (in ha.)
(Rs in Lakh)
Year
Target Achievement Target Achievement

2018-19 143 143 200.00 200.00

2019-20* 131 1 100.00 57.500

(*Upto the end of November -2019)


Economic Survey of Karnataka 2019-20 235

r It helps to farmers to boosting their amount of Rs. 112500/- and Rs. 126000/-
income. respectively to the Scheduled Caste and
For the year 2019-20, the Annual financial Scheduled Tribe farmers as per the
target is Rs.250.00 lakh and physical target announcement made in the budget speech
39.30 Hectares +13 No's. Training, Publicity of 2017-18 para 40. The program assistance
and propaganda for cultivation of flower to purchase water tanker is being
crops, Development and Maintenance of implementing under Comprehensive
flower action centers, Center of Excellence Horticulture Development scheme during
for floriculture Shimogga, Center of 2019-20.
Excellence for protected cultivation Hassan Objectives:
& floriculture section in Lalbagh. At the end
of November -2019, the financial target is Since, there is a drastic reduction in the
Rs. 193.12 lakh and Physical target is 33.97 ground water due to occurrence of drought
hectare +13 No's. The released amount at from last 3 years, horticulture crops will be
the end of November 2019 is Rs.193.40 saved by providing irrigation through
lakh, out of which 167.064 lakh was spent tankers.
and physically achieved target of 30.48 During 2018-19, the budget of Rs. 1276.01
hectare. Remaining amount 26.34 lakh and lakh has been provided under the
physical target 8.82 hectare + 13 No's work Comprehensive Horticulture Development
will be under progress. This programme is scheme with a total physical target of 1527
implementing in the 12 Districts. nos. for 30 districts of the state. An amount
g) Assistance to purchase Water of Rs. 1276.01 lakh was released at the end
Tanker: of the march-2019 and Rs.1234.16 was
spent to provide water tankers to the 1559
In order to prevent the scarcity of water for beneficiaries.
farmer's crops due occurrence of severe
drought since last 3 years, there is a During 2019-20, the budget of Rs. 1000.00
provision for subsidy for the purchase of lakh has been provided under the
Water tankers wide Government order No: Comprehensive Horticulture Development
HD 264 HCM 2017, Bangalore, Dated: scheme with a total physical target of 1238
09.01.2018 for 4000 and 5000 liter Water nos. for 30 districts of the state. The grants
tanker with an subsidy assistance of 50% have been not released till November 2019
limited to maximum amount of Rs. 62500/- and the program will be implemented
and Rs. 70000/- respectively to the general compliantly after releasing the grants.
farmers and 90% limited to maximum
Table 7.44c : Incentives for Potato growing farmers
Annual Financial
Annual Physical (in ha.)
( Rs in Lakh)
Year
Target Achievement Target Achievement

2019-20* 24761 15556 1521.98 1127.360

(*Up to the end of November-2019)


Table 7.44d : Low cost Mushroom production unit
Physical Financial (Rs.in Lakh)
2019-20
Target Achievement Target Achievement

Without Building 40 20 60.00 11.50

With Building 8 8 40.00 24.00


(Upto November-2019)
236 Economic Survey of Karnataka 2019-20

h) Low cost Mushroom production unit: provision in the budget for Global GAP
certification for 1000 hectare mango
During 2019-20, an amount of Rs.100.00
growers with allocation of Rs. 382.50 lakh
lakh is allocated to provide subsidy for low
fund.
cost mushroom production unit. The unit
cost should be Rs.3.00 lakh and subsidy During 2019-20 up to November 2019,
provided is Rs.1.50 lakh (50%). Similarly, under GAP certification programme during
project cost for establishing mushroom 2017-18, 935.56 Ha covering 934 farmers
production unit with a civil structure is and in 2018-19, 203 Ha covering 193
Rs.10.00 lakh and subsidy provided is 50% farmers were certified with financial
of the project cost amounting to Max of assistance of Rs.200.00 lakh. Presently
Rs.5.00 lakh only. The details are given in 2019-20 MPIC programmes for Rs.200.00
Table 7.44d. lakh has not approved.
7.13.6 Karnataka State mango b) Establishment of 100 Ripening
Development Board chambers units at APMC/Sub APMC
a) Global GAP (Good Agriculture Premises in Karnataka State:
Practice) Certification for mango and As per the food safety and standards,
other Horticulture Crops : Government of India in its official Gazette
Notification: 26/08/16 No.334 New Delhi
In the recent days there is lot of imposition
“Provided that fruits may be artificially
for agriculture produce with chemical
ripened by use of ethylene gas at a
residues at international markets; even
concentration up to 100 ppm depending
some countries have banned import of
upon the crop, variety and maturity”, using
chemical residual produce. Europe and
of carbide chemical for ripening of fruits is
other countries are insisting for GAP
hazardous to health. Now the ethylene gas
certified products, especially Fruits and
for ripening is globally accepted. Hence,
Vegetables. In future days even in domestic
government of Karnataka in during 2018-19
markets like super markets insists for GAP
has proposed to establish 100 ripening
certification products. In the view of above
chambers units at APMC premises for the
issues, adoption of GAP for all agriculture
benefit of farmers and also consumers.
produce is prime important and it is a
private sector body that sets voluntary Purpose:
standards for the certification of
agricultural products around the globe. r To promote use ethylene for scientific
ripening.
Objectives: r To provide carbide free good quality
r Enhance the quality production for produce to consumers.
domestic and international market r To encourage direct marketing.
r Encourage to adopt Good agriculture r To increase shelf life of the produce.
practice. r To reduce the post harvest losses.
r Minimizing detrimental environmental
Unit capacity:
impacts of farming operations
r To enhance income and higher foreign Establishment of ripening chambers units
return. from 5 to 300 ton capacity with minimum 2
to 10 chambers based on the availability of
Subsidy pattern: raw material in the premises of 100 APMC/
To enhance the quality production, promote Sub APMC of Karnataka state.
export assistance is provided to obtain Subsidy pattern:
Global GAP certificate. Unit cost for each Ha
Rs: 51.000 and assistance of Rs 45.000/ha As per the 2018-19 budgetary allocation,
for SC/ST farmers and Rs 36.000/ha for with 25 % additional assistance is provided
other farmers is provided. In this contest from mango corporation along with 35%
2017 -18, Govt of Karnataka, made assistance under MIDH for establishment of
Economic Survey of Karnataka 2019-20 237

100 Ripening chambers units at APMC/Sub horticultural produce, the State government
APMC Premises in total 60% assistance for is giving assistance to horticulture boards
each unit will provided with an financial and corporation.
outlay of Rs.30.00 lakh.
Objectives :
Progress:
r To create infrastructure facilities in
During 2019-20 up to November, APMC district HOPCOMS for Fruit and
premises of Bangalore urban, Tumkur and Vegetables growers and to assure fair
shivmoga districts 84 metric ton capacity price for the crops.
ripening chamber units were built with the r To provide corpus fund to Karnataka
financial assistance of Rs. 25.17 lakh. State Mango Development and
During 2019-20, MPIC programmes for Marketing Corporation or organizing
Rs.200.00 lakh has not approved. developmental programmes.
7.13.7 Karnataka State Spices r To Provide Financial Assistance to
Development Board : Karnataka State Wine Board for
organizing developmental programmes.
To increase spice production by area
expansion, improvement of productivity, to r To Provide Financial Assistance to Lime
improve quality, marketing facilities and to Board for organizing developmental
enhance the skills of farmers by imparting programmes.
knowledge about spices production and a) Karnataka State Mango Development
processing and for value addition, and Marketing Corporation Ltd:
Karnataka State Spices Development Board
has been established at Hubli. Karnataka State Mango Development and
Marketing Corporation Ltd. came into
Objectives : existence under the Companies Act 1956 on
r To achieve good progress in this sector 19-01-2011. Its Head Office is located in
by giving emphasis for comprehensive Lalbagh, Bangalore.
development of spice crops. Vision:
r To institutionalize the production, Formulating schemes related to cultivation
marketing and processing spice crops aspects, Post-harvest Management, Mango
in the state through the establishment Mela and Export Oriented activities on
of a statutory board. scientific basis for comprehensive
r To promote the cultivation of suitable development of the Mango crop and
quality spice crops in the state to suit prosperity of mango growers.
both domestic and international
markets. Mission:
r To improve professional skill and To increase production, productivity and to
efficiency of the farmers by providing improve the quality of mango crop on
scientific information. scientific basis by dissemination of excellent
technology through training and
During 2018-19, Rs.200.00 lakh has been
demonstrations.
released and this amount is being utilizing
for spice crops development programmes. Objectives :
During 2019-20, an amount of Rs.200.00
lakh is earmarked and upto the end of 1. To promote cultivation of Mangoes on
November 2019, Rs. 100.00 lakh is released scientific lines in order to produce good
and used for developmental activities. quality fruits suitable for both domestic
and export markets.
7.13.8 Assistance to Horticulture Boards
2. To assist the farmers and entrepreneurs
and Corporations:
in post harvest management and
With an intention of providing marketing of Mangoes.
comprehensive marketing facility to
3. To give importance for processing and
value addition.
238 Economic Survey of Karnataka 2019-20

4. To earn valuable foreign exchange by Horticulture Federation has been approved


promoting export trade of Mangoes under RKVY. During 2015-16, the above
said programme is being implemented
5. To achieve greater scientific knowledge,
under Assistance to Boards and
professional skill and efficiency by
Corporations and not under RKVY. The
imparting training to all the
stakeholders regarding Mango progress under this scheme is given in Table
production and marketing 7.47.

The details of progress are given in Table d) Lime Board:


7.45. The Karnataka State Lime Development
Board has been sanctioned by the
b) Karnataka Wine Board: Government order No:vÉÆÃE146 vÉÆøÀ«
To take up the developmental activities of 2016, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ.15.02.2017 for the
the Wine Board, budgetary provision has
purpose of developing the production and
been made under Assistance to Boards and
sale of lime in the Karnataka State.
Corporations. Progress is given in
Table 7.46. The progress under this scheme is given in
Table 7.47a.
c) Karnataka State Horticulture
Federation (KHF) : e) Spice Board;
The 22 Horticultural Produce Marketing The Karnataka State Spice Development
and Co-operative Societies which have been Board has been sanctioned by the
established at the district level on the lines Government during 2013-14 for the
of HOPCOMS in Bangalore are unable to purpose of developing the production, sale,
work under profit due to lack of export of spice crops in the Karnataka State.
infrastructure and basic amenities. In this From 2019-20 under assistance to boards
regard, a project for strengthening all and cooperation scheme, Rs. 200.00 lakh
district level HOPCOMS through Karnataka assistance has been given in Table 7.47b.

Table 7.45: Progress under Karnataka State Mango Development and Marketing
Corporation Ltd. (Rs.in lakh)

Year Particulars B ud get Release Ex penditure


allocation

20 17-18 De velopme ntal fund 1231.00 1231.00 1231.00

20 18-19 De velopme ntal fund 150.00 150.00 150.00

201 9-20* De velopme ntal fund 200.00 0 0

* Upto the end of November 2019

Table 7.46: Progress under Karnataka Wine Board (Rs. in lakh)

Year Particulars Bud get Release Exp end iture


Allocation

2 017-1 8 De velopmental fund 1 95.0 0 195 .00 195.0 0

2 018-1 9 De velopmental fund 3 50.0 0 350 .00 350.0 0

20 19-2 0* De velopmental fund 3 00.0 0 200 .00 200.0 0

* Upto the end of November-2019


Economic Survey of Karnataka 2019-20 239

Table 7.47: Progress achieved under Integrated Marketing Facilities to


Horticultural Products

F in a n cial (R s.in l ak h )
Year
Tar g et A ch ieve m en t

2 017- 18 30.00 30.00

2 018- 19 200.00 2 0 0 .0 0

2 019-2 0* 200.00 1 5 0 .0 0

* Upto the end of November 2019


Table 7.47a: Lime Board

Fina ncial (Rs. in lakh )


Year
Targ et Ach ieve ment

2017-18 100.00 75.00

2018-19* 100.00 50.00

* Upto the end of November 2019


Table 7.47b: Spice Board

Fina ncial (Rs. in lakh )


Year
Targ et Ach ieve ment

2018-19 200.00 200.00

2019-20* 200.00 100.00


* Upto the end of November 2019

7.13.9 Biotechnology : control agents and vermicompost have been


Department of Horticulture has developed produced by utilizing Rs.52.95 lakhs upto
Biotechnology Centers at Hulimavu, the end of November-2019 under the
Belagavi and Shivamogga all of which have Development of Departmental Laboratories.
been actively functioning. Germplasm Training programmes and demonstrations
conservation, production of tissue culture have been arranged at this centre to create
saplings, mushroom development, awareness about cultivation and
production of Bio-fertilizers and Bio- consumption of mushroom, Organic
pesticides, soil, water and leaf analysis are farming, Kitchen & Terrace gardening,
the important production and service usage of medicinal plants for home
providing activities being carried out in remedies, etc. A total of 24748 Spawn
these centers. Propagation of horticulture bottles (250gm/pack), 190 kg mushroom
crops including medicinal and aromatic crop and 6902 spawn run bags were
plants and production of fruit grafts/ produced upto the end of November-2019.
seedlings, is also an important activity of the
centre. Under Extension and Training Programme,
16 training programmes were organized and
A total of 5.16 lakhs tissue culture plants a total of 427 farmers/public/students have
have been produced by utilizing Rs.124.25 been trained.
lakhs. 121 tonnes of bio-fertilizers and bio-
240 Economic Survey of Karnataka 2019-20

In the departmental labs, a total of 952 & spent and 541.55 Ha physical progress is
402 water, soil and leaf samples were achieved. The area expansion made in
analyzed for macro nutrients & micro the above said scheme is indicated in
nutrients respectively. In addition Annexure 1.
205 samples of organic manure for quality,
An action plan of Rs.148.10 lakh for
0 samples for residue analysis, 130 samples
575.55 Ha. cultivation has been approved
for heavy metal contents have also been
for the year 2018-19 under National AYUSH
analysed. 477 phytosanitary certificates
Mission and the budget release for the same
have been issued to exporters of
is anticipated.
horticulture produce up to the end of
November 2019. An action plan of Rs.177.63 lakh for
787.30 Ha. cultivation has been approved
Further, under the scheme of Development
for the year 2019-20 under National AYUSH
of Departmental Laboratories, upto
Mission and the approval for the same is
November 2019, a total of 3069 and 1800
anticipated.
water, soil and leaf samples were analyzed in
Shimoga and Belgaum districts 7.13.9A Apiculture Development
respectively. A total of 3500 mushroom Programme :
spawn bottles and 1000 spawn run bags
were produced in Mysore district. Apiculture being beneficial to mankind
is emerging as a profitable industry
The programme Vegetable Seed Sampling providing export opportunity. Apiculture
and Analysis is being implemented under plays a major role in providing financial
Development of Departmental Labs scheme independence to the practicing bee keepers.
since 2011-12. The main objective of the As Honey bees help cross-pollination in
scheme is to correctly analyse quality Horticulture and Agriculture crops, high
of the seed samples and thereby control and good quality yield can be obtained.
sale of spurious seeds, Progress under Having many medicinal properties, Honey is
Departmental Labs is given in Table 7.48. the gift of nature to the human kind and Bee
keeping can be practiced without much
National AYUSH Mission:
investment by landless small and marginal
An amount of Rs. 219.34 lakh was approved farmers, women and handicapped. During
to Karnataka state for implementation of 2019-20 the State Government is giving
Medicinal plants component under NAM special emphasis for promotion of
during 2017-18. Accordingly State Govt has beekeeping.
released Rs.25.00 lakh (as part of 40% state
share) out of which Rs.24.27 lakh has been The department of Horticulture is
spent. Central government share of implementing various programmes for bee
Rs. 131.60 lakh was released on 01.06.2018 keeping development under State/District
and a total release amounts to Rs. 156.60 sectors and National Horticulture Mission
lakh, out of which Rs. 147.87 lakh has been schemes.

Table 7.48: Progress under Departmental Labs

Physical (No.) Financial (Rs in lakh)


Year
Target Achievem ent Target Achievement

2017-18 1500 1463 15.00 15.00

2018-19 1500 1457 17.00 16.90

2019-20* 1650 419 16.50 4.19

* Upto November 2019


Economic Survey of Karnataka 2019-20 241

Annexure 1
National AYUSH Mission:

Total Target Total Achievement


Eligible
Sl.
Components Units Subsidy
No.
/ha/ unit. Phy Phy
Fin Fin
(Ha./ (Ha./
(Lakh) (Lakh)
Nos) Nos)

1 2 3 4 5 6 7 8

NURSERY:
A Production of
plantting material

Private Sector

Small Nursery (1 ha) Nos. 3.125 0.00 0.000

Sub total 1 0 0 0 0
CULTIVATION (2nd
I year maintenance of
2016-17)
Crops for 75%
i
subsidy
Sandalwood (Santalum
1 album Linn) 2nd year Ha. 0.13369 67.50 9.024 8.66 2.484
installment @25%

Raktachandan
(Pterocarpus
2 Ha. 0.15510 20.00 3.102 2.12 0.987
santalinus) 2 nd year
installment @25%
Crops for 30%
ii
subsidy
Amla - 2nd year
1 Ha. 0.07137 0.00 0.000
installment @ 25%

Sub total-2 87.500 12.126 10.783 3.471


CULTIVATION -
II
2017-18
Crops for 75%
i.
subsidy

Sandalwood (Santalum
album Linn)
1 Ha. 0.40106 80.00 32.085 86.10 33.588
1st year installment
@75% for 2017-18
242 Economic Survey of Karnataka 2019-20

Total Target Total Achievement


Eligible
Sl.
Components Units Subsidy
No.
/ha/ unit. Phy Phy
Fin Fin
(Ha./ (Ha./
(Lakh) (Lakh)
Nos) Nos)

1 2 3 4 5 6 7 8

Raktachandan
(Pterocarpus
2 santalinus) Ha. 0.46531 40.00 18.612 35.52 10.057
1st year installment
@75% for 2017-18
Agar (Aquilaria
agallocha Roxb) 1st
3 Ha. 0.27465 10.00 2.747 8.24 2.047
year installment @75%
for 2017-18
Sub total -3 130.000 53.444 129.856 45.692

Crops for 50%


ii.
subsidy

Ashoka (Saraca asoka


Roxb) 1st year
1 Ha. 0.34315 10.00 3.432 0.00 0.000
installment @75% for
2017-18

Sub total -4 10.000 3.432 0.000 0.000


Crops for 30%
iii.
subsidy
1 Ashwagandha Ha. 0.10981 192.00 21.084 177.03 19.201

2 Tulsi Ha. 0.13177 299.00 39.399 223.88 29.510

3 Aloe vera Ha. 0.18667 10.00 1.867 0.00 0.000

Amla - 1st year


4 installment @75% for Ha. 0.21412 15.00 3.212 0.00 0.000
current year

5 Safedmusli Ha. 1.37259 5.00 6.863 0.00 0.000


Pippali (piper longum
6 Ha. 0.27452 40.00 10.981 0.00 0.000
Linn)
Madhunashini
7 (Gymnema sylvestre R. Ha. 0.10981 0 0 0.00 0.000
Br.)
Mucuna ( Mucuna
8 Ha. 0.08785 50.00 4.393 0.00 0.000
prurita Linn)
Economic Survey of Karnataka 2019-20 243

Total Target Total Achievement


Eligible
Sl.
Components Units Subsidy
No.
/ha/ unit. Phy Phy
Fin Fin
(Ha./ (Ha./
(Lakh) (Lakh)
Nos) Nos)

1 2 3 4 5 6 7 8

Kokum (Garcinia
indica Choisy) 1st year
9 Ha. 0.20589 13.00 2.677 0.00 0.000
installment @75% for
current year

10 Stevia (Stevia Ha. 1.37259 5.00 6.863 0.00 0.000


rebaudiana Bert.)

Sub total -5 629.000 97.337 400.906 48.711

AEP (sub total 3+4+5) 769.000 154.212 530.762 94.402

POST HARVEST
III
MANAGEMENT

a)Private Sector

i) Drying sheds /
Nos. 5.00 0.00 0.000
Storage Godowns

b)Public Sector
i)Processing and value
addition (UAS-
Bengaloru, Upgrdation
of processing, Lab for Nos. 50.00 1.00 50.000 1.00 50.000
training women on
product development
of Medicinal and
Arommatic Plants)

Sub total-6 1.00 50.00 1.00 50.00

IV IEC activities

Growers and buyers


meet at Koppal dist. Nos. 1.00 1.00 1.000 0.00 0.000
(1 no)
244 Economic Survey of Karnataka 2019-20

Total Target Total Achievem ent


Eligible
Sl.
Components Units Subsidy
No.
/ha/ unit. Phy Phy
Fin Fin
(Ha./ (Ha./
(Lakh) (Lakh)
Nos) Nos)

1 2 3 4 5 6 7 8

Workshop involving
Ayurvedic
practitioners,
collectors, growers,
Nos. 1.00 1.00 1.000 0.00 0.000
Traders and
processing
companies at Udupi
Dist. (1 no)

Grow ers and Buyers


Meet at Biocentre,
Nos. 1.00 1.00 1.002 0.00 0.000
Hulim avu, Bengaluru
(1 no)

Sub total-7 3.00 3.00 0.00 0.00

Grand Total(1-7)
856.50 219.340 541.55 147.873
(ha./Nos)

Units 4.00 1

Objectives : r To give wide publicity for beekeeping


through leaflets / video and audio
r To create awareness on the importance
programmes.
of Honey bees in increasing farm
production and on bee keeping and To create awareness on bee keeping among
conducting training programmes, beneficiaries, 2 days training is being given
and interested beneficiaries are being given
r Distribution of bee boxes, colonies and
75% assistance i.e Rs. 3375/- for purchase
stand to the interested bee keepers on
of bee boxes, colonies and stand. SC and ST
subsidized rates.
beneficiaries are eligible for 90%
r Providing assistance to interested bee assistance, i.e, Rs. 4050/-. In order to
keepers to establish bee nurseries and facilitate the production of healthy bee
production of disease resistant bee colonies farmers are given 75% assistance
colonies (Apiaries). of Rs. 75,000/- for establishment of
r Providing assistance for establishment Apiaries/Colony production centers. For
of Honey processing unit. establishment of Honey processing units
r Maintenance and Development of assistance of 50% i.e Rs. 75,000/- is given.
Madhuvanas and nurseries of the Interested farmers sons are given 3 months
department. residential beekeeping training in
Bhagamandala Beekeeping training Centre.
r To organize Madhumahothsavas /
Madhumela and tour programmes at
State / district level.
Economic Survey of Karnataka 2019-20 245

A budget provision of Rs. 75.00 lakh is made productivity in the field of farmers.
for infrastructure development of r To take up trainings, field days and
Madhuvana at Dakshina Kannada, exposure visits to educate the farmers
Dharwad and Kodagu Districts. on the improved technologies that can
During 2019-20, to implement Apiculture be adopted in crop diversification, post-
Development programmes an allocation of harvest management and marketing
Rs.700.00 lakh under State Sector and facilities.
Rs.228.20 lakh under District Sector is For monitoring the project at state level and
earmarked, out of which Rs.350.00 lakh for implementation of the various project
under State Sector and Rs.124.13 lakh activities at the districts, 65 posts are
under District sector has been released up created for which service support is
to the end of November-2019 respectively. provided under the project. The original
Bee keeping training of 2 days duration is project cost is Rs.11066.82 lakh and the
given to 2731 beneficiaries and Rs.132.19 revised project cost will be Rs. 10274.22
lakh subsidy is given to interested lakh. Upto the end of November-2019, the
beneficiaries for the purchase of 4801 financial achievement is Rs. 9404.00 lakh
bee boxes, colonies and stand. An since the project inception (2012-13). The
amount of Rs.39.25 lakh subsidy is given to year wise breakup of budget allocation and
establish 52 private madhuvanas and the expenditure is given in the Table 7.57.
Rs. 84.986 lakh are utilised for development Under the Farmers Hortiuclture Soil and
of infrastructure in departmental Crop Monitoring, one Soil, water and leaf
Madhuvanas. Total financial progress analysis laboratory has been established at
under these schemes for the end of Koppal District. The GIS facility laboratory
November 2019 is Rs.359.39 lakh. as been established Project Monitoring Unit,
Lalbagh, Bengaluru to map the details of
7.13.10 Karnataka Watershed
SUJALA-III horticulture activities
Development Project-II SUJALA-III :
undertaken in the project. The progress
Based on the success of the Sujala- I, under this scheme is given in Table 7.49.
Sujala-II, the World Bank assisted
During the project period, demonstrations
Karnataka Watershed Development Project-
of perennial and annual horticultural crops
II, Suja1a-III is being implemented from
programmed in an area of 4189 ha and up to
2012-13 to 2019-20 (up to Dec-2019) for a
November 2019 physical progress of 3765
period of six years in eleven districts of
ha perennials and an annual was achieved.
Karnataka namely Bidar, Chamarajnagar,
To encourage the co-operative Ideology
Davangere, Gadag, Kalburgi, Koppal,
amongst the farmers, 550 Farmer Interest
Yadgiri, Chikkamagalur, Vijayapura,
Groups (FIGs) were formed and federated to
Tumkur and Raichur. To implement this
SUJALA-III, 11 FPOs and a study on post-
project totally 2531 micro watersheds
harvest and marketing linkages is taken
have been identified aiming to increase the
up through consultant to assist the
income of farmers in rainfed areas
FPO farmers by creating post-harvest
by encouraging farmers to cultivate
infrastructures like Pack Houses, Pre-
Horticulture Crops.
cooling Units, Ripening Units, Low energy
Objectives : storage Units etc., for this budget outlay of
Rs. 3827.00 lakh is earmarked. So for land
r To increase the production and
has been procured by 5 FPOs which has
productivity through demonstrations of
been cleared by DCs of Chamarajnagar,
perennial and annual horticulture
Vijayapura, Koppal, Davanagere and
crops.
Kalburgi districts, tender contracts has
r To establish soil, water and leaf analysis already been awarded to take up FPOs
laboratory to identify the nutritional infrastructural facilities such as, collection
deficiencies in soil and to make suitable centres, community pack houses, solar
recommendations for increasing dehydration unit, custom hiring centre and
246 Economic Survey of Karnataka 2019-20

farmers one stop shop and action plan for an 1) Establishment and maintenance of
amount Rs. 325.00 lakh is approved for demonstration plots
each FPOs. These infrastructure works are
2) Subsidy for purchase of plant
in progress by the contract awardee and
protection chemicals
the circular has been issued to complete
the works before March 2019. Farm 3) Production of TXD hybrid coconut
development of 6 Departmental seedlings
Horticulture farms in project Dist. have
4) Area expansion of coconut crop
been taken up under Sujala-3 for
demonstration of soil and water 5) Assistance for establishment of Neera
conservation works and establishing Processing unit etc.
progeny orchard and nursery and spent
Rs.263.91 lakh upto end of November 2019 Objectives :
since project inception. r To enhance the productivity of the
coconut gardens by adoption of
7.13.11 Integrated Farming in Coconut
integrated farming systems.
for Productivity Improvement
Programme: r To increase the farmers' economy by
growing Hybrid / dwarf coconut plants
To create awareness among the or inters / mixed crops.
coconut growers about the adoption of
r To encourage farmers to develop their
improved farming systems/new
Coconut garden into a model profitable
technologies in coconut like, Integrated
plot.
nutrient management, Integrated
management of pest and disease, adopting r To provide insurance facility to the
inter/mixed cropping practices, moisture coconut palms destroyed by natural
conservation methods in coconut calamities.
plantation, etc, to increase the farm Details of progress achieved under
production for comprehensive development integrated farming in coconut for
of Coconut crop, which is an important productivity improvement progremme is
commercial crop of the State and to get given in the Table 7.50.
better market price, "Integrated Farming in
Coconut for Productivity Improvement 7.13.12 Other important Activities
Programme" is being implemented by the Undertaken by the Department :
department with the assistance from a) Assistance to Farmers :
Coconut Development Board and State
Govt. Assistance to farmers is a district sector
scheme comprising of 4 components, Area
The activities that are being implemented expansion, Plant Protection, Ornamental
are, plant production and Social horticulture.

Table 7.49 : Financial Target and Expenditure under SUJALA-III Horti since Project
Inception (2016-17 to 2019-20 upto November)

Sl. Year Financial Financial Remarks


No. Target A chievem ents (%)

1 2016 -17 630.0 0 59 3.71 9 4.24

2 2017 -18 2 200. 00 190 1.68 8 6.44

3 2018 -19 3 303. 00 284 8.81 8 6.25

2019 -20
4 620.8 7 44 2.49 7 1.27
(Up to N ov. 2019 )
Economic Survey of Karnataka 2019-20 247

Table 7.50: Progress achieved under Integrated Farming in Coconut for


Productivity Improvement Programme

Sl. Fina ncial Ph ys ical


No . Year ( Rs.in l akh) (Ha)
Achieveme
I 2018-19 Target A chievement Target
nt
Coconut De ve lopm ent Boa rd
a ss is tanc e- L aying out of
D e mon stration p lots and
A. 14 29.82 10 11.2 0 61 56.58 522 5.60
m aintenan ce , R ep lant in g and
re juv enati on of Coc onut
G ard en in the sta te

Coc onut c ro p i m p rov e m en t


B 1426 9.57 13 929.5 8 1 2871 .86 1249 3.57
p ro gra m m e

II 2 01 9- 20
(Up to November 20 19 )

Coconut De ve lopm ent Boa rd


a ss is tanc e - Laying ou t of
A. 297 0.05 0 .00 1 1321 .92 0.00
D e mon stration p lots and
m aintenan ce

Coc onut c ro p i m p rov e m en t


B 1282 .66 0 .00 1 7230 .00 0.00
p ro gra m m e

Objectives : Objectives:
r Area expansion of perennial fruit crops r Giving information to farmers about
by providing assistance to farmer. new developments in horticulture and
r Providing assistance to plant encouraging them to adopt the same for
protection. earning higher income.
During the year 2018-19, a budgetary r Providing information to farmers about
provision of Rs.241.10 lakh has been made the new technologies/ developments in
for this program and the program is being Horticulture.
implemented effectively with a financial r To increase technical knowledge of
achievement of Rs.227.86 lakh. farmers by printing and distributing
Brochure /Bulletin/Manuals having
During the year 2019-20, a budgetary
technical information on the cultivation
provision of Rs.255.62 lakh has been made
of horticultural crops and departmental
for this program and the program is being
schemes.
implemented effectively with a financial
achievement of Rs.52.60 lakh up to the end r Conducting Symposium / Seminar /
of November 2019. workshop / Field day in order to discuss
and implement organic farming,
b) Publicity and Literature : Technical farming and drip irrigation in
By providing information to farmers about horticulture crops
recent technologies in Horticulture through r Conducting District level Horticulture
various media effectively, Publicity and shows and Agriculture and Horticulture
Literature Scheme is being implemented Melas.
throughout the state.
248 Economic Survey of Karnataka 2019-20

For the year 2018-19, an amount of Progress under Assistance Cold Storage is
Rs.185.77 lakh has been earmarked and given in Table 7.51.
Rs.185.74 lakh released out of which
Rs. 177.76 lakh has been spent. For the year e) Karnataka State Horticulture
2019-20, Rs.221.27 lakh has been allocated development Agency (KSHDA):
out of which, Rs. 98.63 lakh has been Seeds and planting materials of different
released and Rs. 75.43 lakh has been spent Horticulture crops are being produced and
till the end of November 2019. supplied to farmers at Departmental rates in
different Horticultural farms and nurseries.
c) Training to the Farmers: A total of 39.86 lakh of planting materials of
In order to educate farmers to get better different Horticulture crops have been
returns by adopting newly developed produced during 2016-17. In the year 2017-
technologies in Horticulture and improved 18, 50.49 lakh ,during 2018-19, 50 lakh of
hybrid varieties of high yielding potential grafts/seedlings and during 2019-20,
crops, training programmes are being 80.00 lakh to be produced, in which 52.49
conducted to farmers through “Training to lakh grafts/seedlings, of different
the Farmers” scheme under zilla Panchayat Horticulture crops are being produced till
Schemes. Under this programme, both November 2019. Mother blocks of required
women and men farmers are being trained Horticulture crops have been established in
in preservation of fruits and vegetables and farms. Various infrastructure facilities
Mushroom cultivation. such as Polyhouse, shade net and irrigation
facilities are being developed in these farms
For the year 2018-19, an amount of Rs. and nurseries. During the year 2019-20, the
60.90 lakh has been earmarked and financial target of Rs.1300.00 lakh
Rs.57.77 lakh released out of which Rs. (including model farm development as
54.45 lakh has been spent. For the year mentioned below) is earmarked for
2019-20, Rs. 61.82 lakh has been allocated propagation of various horticulture crops,
out of which, Rs. 13.57 lakh has been establishment of mother blocks, insect proof
released and Rs. 3.49 lakh has been spent net, irrigation facilities and construction of
till the end of November 2019. compound wall/chain link fencing of
d) Assistance to Cold Storage : selected farms and nurseries.
Karnataka has 108 cold storages, of which Success story:
105 are in private and 3 are in public sector. Supply / sale of grafts / seedlings of
To make the existing storages facilities different horticulture crops was initiated
economical and to encourage establishment through "Sasya Sante" a special
of new cold storages in private / co-operative programme.
sector, electricity subsidy of Rs.1/-is
provided for every unit of electricity The grafts / seedlings of different
consumed by the cold storage units. horticulture crops are made available to

Table 7.51: Progress Under Assistance to Cold Storage

Annual Ph ys ical Annual Finan cial


(no ’s ) ( Rs . in lakh)
Year
Targ et A chiev em ent Target A chiev emen t

20 17-1 8 63 57 70.80 70.77

20 18-1 9 43 41 66.10 62.73

20 19-20 * 43 30 69.86 29.02

* Upto the end of November 2019


Economic Survey of Karnataka 2019-20 249

farmers and public at a common point of these zones adoption of protected


place through special programme called cultivation and rain water harvesting
"Sasya Sante" which was implemented in all structures techniques will be promoted.
districts. In addition to that, Technical r The establishment of these structures,
information on different horticulture crops, the production and productivity
installation of drip irrigation systems was increase 2 to 3 times which results in
also provided to the farming community. financial strength to the farmers.
Awareness has been created regarding
various schemes of the department. r This Scheme will be implemented in
128 taluks of 25 districts in the State.
f) Development of Model Horticulture r To implement the scheme comprehensively,
Farm: the beneficiaries who construct
100 Farms have been selected to develop as polyhouses should compulsorily have a
model farms in the next 5 years involving water source and should also construct
various concepts such as propagation, Krishi Honda for Rain water harvesting,
demonstration of new technology, soil and adoption of diesel/solar motor for
water conservation with mini watershed utilization of the storage water and also
concept and farm productivity production of high value
improvement. In first phase, in the year flower/vegetable /other horticultural
2017-18, 30 farms, 2018-19, 40 farms and crops.
2019-20, 30 farms @ rate of two to three in r the beneficiaries who construct Shade
each district are being developed as model net should also involve in multiplication
farms. The approved programs are under of plants through nursery/production
implementation. These programs includes of high value horticultural crops.
propagation of different horticulture crops, During the year 2019-20, a total allocation
area expansion, demonstration, installation of Rs.6000.00 lakh earmarked. Out of which
of drip irrigation systems, farms Rs. 4690.00 lakh is allocated for General
productivity improvement activity along farmers. Out of this, an amount of
with soil and moisture conservation Rs.3000.00 lakh released and expenditure
activities. The construction of compound of Rs.2615.12 lakh is incurred for the end of
wall/chain link fencing of selected farms is November 2019. For SC farmers Rs 917.00
also under implementation. lakh is allocated, against which an amount
During 2019-20, an annual allocation is of Rs.458.50 lakh released and expenditure
Rs.1300.00 lakh. Out of which Rs.975.00 of Rs.442.08 lakh is incurred for the end of
lakh of released grants and Rs.650.00 lakh November 2019. Similarly, budget allocated
expenditure is incurred up to the end of for ST farmers Rs.393.00 lakh against
November 2019, with Physical achievement which an amount of Rs.196.50 lakh
of 221 hectare of area expansion, released and Rs.161.94 lakh expenditure
demonstration, installation of drip incurred for the end of November 2019.
irrigation systems and maintenance of
Objectives:
propagated plants, plants wealth, basin
formation etc,. To Harvest rain water effectively and to
storage, construct Krishi Hondas in the field
7.13.13 : Krishi Bhagya Yojane (KBY): for maximum utilisation of water. To
r Out of 10 agro-climatic zones in construct green house and shade net house
Karnataka (Zone 2,3,4,5 and 6) north- to cultivate high value horticulture crops
eastern arid zone, northern dry zone, like vegetables and flowers also to establish
central dry zone , north-eastern dry nurseries.
zone and southern dry zone are r Conversion of Rainfed horticulture into
considered as dry zones. sustainable horticulture and increase
r In these five zones average annual dryland Horticultural crops area.
rainfall is 450-850 mm. In order to r Increase Horticultural area under
increase production and productivity in protected cultivation.
250 Economic Survey of Karnataka 2019-20

r Reduction of pests/diseases in amount is not allocated till date. Progress


horticultural crops. under this scheme is given in Table 7.52.
r Encourage farmers to grow Success Stories
Horticultural crops under protected
cultivation. Brief note on various Success Stories
r Increase in Horticultural crops published/occurred under KWDP-II,
production and productivity. Sujala-III, Horticulture Project
r Effective Rain water harvesting and The Karnataka Water Development Program
precise utilization of Rainwater. (KWDP)-II, SUJALA-III (Horticulture
r To increase the production by reduction Component) project is under implementation
the wastage of water. since 2013-14 in 11 districts viz., Bidar,
Kalaburgi, Yadgir, Koppal, Gadag,
r Increase per capital income of Davanagere, Chamarajnagar, Raichur,
horticulture farmers. Tumkuru, Vijayapura and Chikkamagaluru
Under this scheme, process of selection of through the Department of Horticulture.
beneficiaries is completed and issuing of The horticulture component has six sub
work orders is in progress. components viz., Extension and Demonstration
for Productivity Improvement, Farmer
During 2019-20 an amount of Rs. 3000.00
Horticulture Soil and Crop Monitoring,
lakh is released for implementation of
Strengthening Model Nurseries, Post-
Krishi Bhagya programmes. The Financial
Harvest Management, Strengthening
progress under this programme for the end
Market Linkages for Horticulture Farmers
of Nov.2019 is Rs. 2615.12 lakh.
and Horticulture Service Support. All the
a) “Vegetable Seeds Kit Distribution sub components of the project are either
Program”: implemented successfully or under
implementation in all the project districts in
Currently farmers are eager to grow the sub watershed and micro watershed
advanced / hybrid breeding / open polyned areas by preparing a strategic plan, detailed
vegetable cultivars profitably. In this action plan (DAP) with targets and time line.
context, a new program called "Vegetable The progress, achievements and success
Seeds Kit Distribution Program" is being are now being brought out in the form of
implemented under the Krushi Baghya various publications /documents which
Scheme during 2017-18, which will be able comprises of a few significant success
to help farmers with in reducing the cost of stories of the project, lessons learnt and few
vegetable production by providing vegetable new initiatives.
seeds kits to eligible small and marginal
farmers. 1. Impact of Cucumber Seed Production
under Shade Net
The annual targets and achievements for the
period 2017-18 and 2018-19 are given 2. Crop Diversification –Replacing Cereal
below. During 2019-20 under the scheme (Maize) Crop with Vegetable (Tomato
and Brinjal) Crops
Table 7.52: Progress of Vegetable Seeds Kit Distribution Program under Krushi
Bhagya

Annual Financial
Annual Physical (in acres)
( Rs in lakh)
Year
Target Achievement Target Achievement

2017-18 1,47,000.00 1,32,105.00 30.00 29.93

2018-19 71,975.00 66,176.00 15.00 14.19


Economic Survey of Karnataka 2019-20 251

3. Advanced Production Technology Fair and Transparent Procurement


Practices in Ginger Cultivation Practices
4. Protected Cultivation of Capsicum: A New initiatives
Profitable Enterprise for Small and
1. GIS -A catalyst for boom to Farmers (A
Marginal Farmers also
New Initiative under KWDP-II, Sujala-III
5. Protected Cultivation of Capsicum – a Project)
Success Story
2. CALL for a Farm Equipment/
6. Introduction of Vegetable Cultivation in Machinery-Rest Assured, GET it at
Non-Traditional Horticulture Belt Doorstep are some of the publications
brought out till now.
7. Sustainable Livelihood in Rainfed Areas
through Convergence Programs Constraints
8. Area Expansion of Perennial Constraints under KWDP-II SUJALA-
Horticulture Crop - Convergence with III(Horti)
Krishi Bhagya Scheme
1. Extension and Demonstration: Since
9. Vegetable Seedlings Production in the Sujala Project is a science based
Portrays under Protected project and LRI is an important aspect
10. Utilization of Solar Energy for Irrigation of the project, in many cases, the
of Horticulture Crops in the Project horticulture crops suggested is not in
Farm line with the existing crops. Hence
there is resistance for immediate
11. Horticulture: a Wise Option to Reverse acceptance of the suggested crops. It
Shying Away from Farming requires a lot of awareness creation,
12. Horticulture Crops –Boon to Barren capacity building and convincing of the
Land Also farmers to take up LRI based cropping.
13. Successful Mango Cultivation with 2. Hydrology: Work on hydrology which is
Drum Kit Irrigation a crucial input is still under progress.
Lessons learnt 3. Post Harvest and Marketing
Management (PHM): The Project
1. Strategies to Manage and Liquidate consists of establishment of post
Unsold Inventory of FPOs: Optimizing harvest facilities at the Farmer
Input Procurement Process and Producer Organisations (FPOs). It has
Adoption of Distribution not been easy for the FPOs to procure
2. Awareness Building and Availing land for setting up of the PHM and
Services of FPOs through Marketing facilities. Procurement of
Advertisement and Sales Promotion: land by the FPOs for their activities
Strategies adopted by Kayakalpa HPCL, requires some stream lining and policy
Humnabad and Puttaraju Gawai by the Government.
HFPCL, Gadag, 4. Farmer Producer Organisation (FPO):
3. Value Chain Development to Reduce Formation of the FPOs and
Farmers' Market Risk: a Strategy implementing of the activities of the
Adopted by Kapilatheertha HFPCL, FPOs majorly is one of the activities
Kushtagi for Foxtail Millet Marketing under the Sujala Project. Since the FPO
is a new concept for the farmers, its
4. Social Mobilization Process and operation, management and specifically
Farmers Expectation Setting: a Strong business operations by the FPO is
Tool for Promotion of FPOs - Experience taking time. It takes a lot of time and
of FPO, Tarikere effort in training and capacity building
5. Institutional Market Linkages through and handholding of the FPOs.
FPO for Higher Price Realization and
252 Economic Survey of Karnataka 2019-20

5. Marketing of produce through FPOs: 2018-19, the share of Animal Husbandry in


Output marketing is one of the main Gross State Domestic Product (GSDP) of
activities of the FPOs. Though the Agriculture and Allied activities was 20.07
buyers are willing and ready, it is per cent. As per the 19th Livestock Census,
becoming difficult for the FPO to the share of Karnataka in all India livestock
actually execute the output business and poultry population was 5.41 per cent
orders as it involves several activities and 7.33 per cent respectively. The density
such as aggregation of produce, grading of livestock in the state was estimated at
and meeting buyers specifications, 151.21 per sq.km and 47468 per lakh
price negotiations, logistics, packing human population. The livestock and
etc., It is taking time for the FPOs to poultry statistics is given in Table 7.54 and
understand and absorb the the detailed information is depicted in
requirements. Appendix 7.15.
7.14 ANIMAL HUSBANDRY 7.14.2. Livestock and Poultry
Production:
Animal Husbandry and Veterinary
Services: In Buffalos milk production, India ranks
First in the world, similarly in Cow milk
The Livestock sector plays vital role in production India took second rank and
development of rural economy of the State. during 2018-19, Karnataka state ranks
In Karnataka majority of the population is 11th among Indian States. The production
dependent on Agriculture and allied of milk in the state was 7.90 million metric
activities. As per the 19th Livestock Census, tonnes during the year 2018-19. Details of
Karnataka has 2.9 crores of livestock and the production of the major livestock
5.3 crores of poultry population. To provide products namely, Milk, Meat, Wool and Eggs
health care to the animals and for are shown in Table 7.55 and the detailed
improvement and development of breeds of information is depicted in Appendix 7.16.
animals, various programmes are
implemented successfully by the 7.14.3: Animal Health and Veterinary
Department of Animal Husbandry and Services:
Veterinary Services through its institutional During 2018-19, the livestock and poultry
network. are rendered health services through a
During 2019-20, an amount of Rs.2671.27 network of 4214 Veterinary Institutions,
crores (includes RKVY funds Rs.15.72 comprising of one Super Speciality
Crores) has been allocated for Departmental hospital, 4 Speciality Hospital, 27 District
programmes and Rs.1270.79 crore has been Poly Clinic, 665 Taluk/Hobli level
spent up to the end of November 2019. Veterinary Hospitals, 2135 Hobli/ Village
Budget allocation for the years 2017-18, Veterinary Dispensaries, 1206 Primary
2018-19 and 2019-20 are given in Veterinary Centers and 176 Mobile
Table 7.53. Veterinary Clinics. Further 64 other
Veterinary Institutions are also rendering
7.14.1 Animal Husbandry services. During 2018-19, 2,92,68,416
In Karnataka, the Animal Husbandry and cases were treated for various diseases and
Livestock Sector has been playing a 704.66 lakh vaccinations were carried out
significant role in rural economy. During as preventive measure for various diseases.
Details of developmental activities of Animal
Table 7.53 : Details of Budget Allocation
(Rs. in lakh)
Year 2017-18 2018-19 2019-20

Allocation * 234737.00 *267634.11 *267127.00

* Including RKVY allocation


Economic Survey of Karnataka 2019-20 253

Table 7.54: Livestock and Poultry Statistic


(No. in crores)
Livestock Census
Particulars
Percentage change in 2012
2003 2007 2012
over 2007
Cattle 0.9 5 1.05 0 .95 -9.5 2

Buffalo 0.4 0 0.43 0 .35 -18.60

Goat & Sheep 1.1 8 1.57 1 .44 -8.2 8

Other Livestock * 0.3 0 0.24 0 .16 -33.33

Total Livestock 2.83 3.29 2.90 -11.85

Poultry 2.4 4 4.24 5 .34 25.94

* Other Livestock : Pig, Horse, Donkey, Mules, Camels, Domestic Dogs, Rabbits and Elephants.

Table 7.55: Livestock and Poultry Production

2019-20 Percentage change in


Item Unit 2017-18 2018-19
(up to Nov.2019) 2018-19 over 2017-18

‘000
Milk 7137 7901 2789 10.70
Tonnes

Meat * Tonnes 228032 253604 107186 11.21

Wool Tonnes 4304 3058 643 -28.95

No. in
Eggs 556.61 599.94 215.52 7.78
crores

* Includes Poultry Meat.

Husbandry and Veterinary Services are State are given in Table 7.58. Bengaluru
given in Table 7.56. Division shows high achievement under AI
programme and Milk Production as
A. Performance under Artificial
compared to other divisions.
Insemination (AI) Programme :
The Artificial Insemination (AI) facility has 7.14.4 Rashtriya Gokul Mission
been provided through 4214 institutions. 1. National Programme for Bovine
Sperm stations are located at Bangalore and Breeding (NPBB):
Dharwad. Performance under Artificial
Insemination programme is shown in Table National Programme for Bovine Breeding
is being implemented in the State since
7.57.
2015-16. 801 Multipurpose Artificial
B. Divisionwise progress of Artificial Insemination Technicians in Rural India
Insemination programme and milk (MAITRI) have been trained and established
production: up to date in 16 districts in places where A.I.
The progress of artificial insemination and and other Veterinary facilities are not being
milk production of various divisions of the extended either by Department or KMF.
254 Economic Survey of Karnataka 2019-20

Table 7.56: Developmental activities of Animal Husbandry and Veterinary Services

Sl.N 2 0 18 -19 2 0 19 -20


P articu lars Unit 20 1 7-18
o. (u p to N ov.2 01 9 )

Ve te rin ary i nstituti on s


( in cludin g Artificial
1 N o. 421 5 4212
Ins emin ation cen ters and
4214
M ob ile Veter inary Clin ics)

2 Li vestoc k farm s N o. 11 11 11

3 P oultry farm s N o. 24 24 24

4 Ar tificial in semin ation s l ak h 2 7.26 31. 05 14.2 3

5 N o. of cases treated l ak h 23 5.48 29 2.68 138 .29


In
6 F od der Produced 106 19.3 0 351 55.12 1503 1.20
Ton ne s
‘000
7 M il k pr oduce d 713 7 7901 2789
Ton ne s
8 Eg g p roduced l ak h 556 61 5 9994 2 1552

9 W ool p roduced Ton ne s 430 4 3058 643

10 Me at produced Ton ne s 2280 32 2 5360 4 1 0718 6

Table 7.57: Performance under Artificial Insemination Programme:


(No. in lakhs)
% change in
2017-18 2018-19 2019-20
Particulars 2018-19 over
(up to Nov.2019)
2017-18
Total Insemination done 27.26 31.05 14.23 3.79

Total No of calves born 7.70 5.24 3.82 -2.46

Table 7.58: Divisionwise progress of Artificial Insemination (AI) Programme and


Milk Production.
20 17-18 20 18-19 20 19-20 (up to Nov.201 9)

Nam e of the AI Milk AI Milk AI Milk


Division Produ ct Produ c
Prod ucti
% of ion % of on % of tion
Target Achieve (‘000 Target Achieve Target Achieve (‘00 0T
(‘00 0T.)
ment T.) ment ment .)

Ban galore 11048 71 99.56 2343 107 3375 121.00 30 98 1315000 46.30 109 3

Mysore 720000 59.10 1834 758000 100.47 19 64 762000 47.01 682

Belgaum 700250 61.79 1889 828300 96.66 18 86 797000 42.14 663

Gulbarga 225210 63.05 1071 267670 91.71 953 261000 46.08 351
Economic Survey of Karnataka 2019-20 255

12 Liquid Nitrogen Silos have been II. National Livestock Mission:


established at 12 selected places in the State
to improve Liquid Nitrogen and semen A. Centrally Sponsored programmes:
straws supply network. Under this 1. Innovative Poultry Productivity
programme, 1440 para-vets and 784 Vets Project (IPPP):
have been given refresher training. Three
Semen Stations in the State have been Implementing Agency: Karnataka Co-
strengthened by providing assistance for operative Poultry Federation. The 4 years
procurement and maintenance of period programme has been taken up to
equipments under the programme. encourage farmers for rearing of broiler
birds by providing assistance for
2. Establishment of Gokul Grams: infrastructure development and supplying
Action has been initiated to establish Gokul broiler birds in batches. A total of 600 birds
Gram as per the guidelines of Rashtriya will be provided in 4 batches to 200
Gokul Mission (RGM) to conserve and beneficiaries.
propogate local indigenous breed, It was implemented the programme in
Amritmahal Breed at Lingadahally in Chitradurga and Monakalmor taluks of
Chikkamagalur District. Rs 310.00 lakh has Chitradurga district during 2018-19, and
been released for the same and Field will be in Hukkeri and Kittur taluks of
Performance Recording of the breed has Belgaum district during 2019-20. It will be
been conducted by KVAFSU and action has implemented in Kalburgi and Mysore
been initiated to develop infrastructure districts during third and fourth years.
facilities at the Lingadahally centre.
The programme was approved with a total
3. National Mission on Bovine allocation of Rs 225.00 lakh for each year
Productivity: and Rs.900.00 lakh for 4 years. Unit Cost:
Rs 1,12,500 (100% free).
For identification and traceability of animals
and enhance milk production and 2. Genetic Improvement for Sheep and
productivity of bovine population, National Goats (GISG):
Mission on Bovine Productivity programme
(NMBP) under Rashtriya Gokul Mission has Implementing Agency: Karnataka Sheep
been sanctioned by Government of India. and Wool Development Agency. It is a five
year duration scheme involving two steps
Under Pashu Sanjivani component of NMBP action plan with focus on Mandya breed for
the livestock breeding, health, nutrition and meat production.
productivity details are to be recorded
through INAPH software by way of ear (i) Genetic improvement of the breed
tagging the animals using unique through selective breeding has been
identification number provided by NDDB. planned by distributing high genetic
merit rams to selected farmers.
A total amount of Rs 791.86 lakh has been
released for the purpose which is in the (ii) Improvement of Non-descript breeds of
proportion of 60:40 (GoI: GoK). As against sheep through artificial insemination
the target of 46.10 lakh breedable animals using germ-plasm from existing and
details to be recorded in INAPH software improved Mandya breed has been
from the allocated funds, details of 34 lakh proposed.
animals has been recorded. The duration of the scheme is for 5 years and
For the purpose of recording of livestock is being implemented since 2018-19. The
data in the software, tabs have been details are given in Table 7.58a.
procured and distributed and Animal Details of the program:
Health cards also have been distributed to
1. Identification of 693 best females with
livestock owners.
good genotypic characters in the
breeding tract and distribution of prize
money for these ewes.
256 Economic Survey of Karnataka 2019-20

Table 7.58a : Component wise and Year wise costs involved


(Rs. in lakh)
Central
State Share
Share Total
60% 40%

Fi rst year (2018-19) 75.12 50.08 125.20

Second year (2019-20) 162.37 108.25 270.62

Third year (2020-21) 15.92 10.61 26.53

Forth year (2021-22) 19.40 12.93 32.33

Fi fth year (2022-23) 19.40 12.93 32.33

Total financial requirem ent 292.20 194.80 487.00

2. Procurement and distribution of 21 share are 50% for APL beneficiaries and
elite rams for breeding with prized ewes Rs. 75% for BPL/SC/ST beneficiaries.
in the ratio of 1 ram for every 33 ewes. Average price of milch cattle/ other animals
is calculated @ Rs.30,000/ per animal and
3. Identification and selection of male
insurance premium portion in the State is
lambs from these identified ewes and
@ 2.0%.
incentives of Rs. 5000 to each ram
produced, as rearing cost for 9 months. Three insurance agencies, United India
Insurance Com., New India Assurance Com.
4. Purchase of these High Genetic Merit
and Oriental Insurance Com., are allocated
male lambs at Rs 30,000 for
different districts for insurance coverage.
distribution to other farmers for up
gradation of their flock and to Semen During 2017-18, and 2018-19, funds were
lab. not released under the programme. During
2019-20, a total of Rs 192.00 lakh is
5. Veterinary College, Hebbal, Bangalore
released from both GOI and GOK share
to produce Mandya (Bandur) breed
during first and second quarter.
semen for AI in the project area.
During 2019-20, the total amount has been 4. Fodder seed production and
released to Karnataka Sheep & Wool distribution:
Development Corporation under General Under the Centrally sponsored National
category by GOI. Livestock Mission sub-mission, Fodder seed
production, during 2018-19, Rs.166.67
3. Risk management- Livestock
lakh has been utilized to distribute ATM and
Insurance Scheme:
Sorghum fodder seeds mini kits to 65,787
Under the Centrally sponsored National beneficiaries. During 2019-20, Rs.43.22
Livestock Mission sub-mission, Risk lakh is released in the first two quarters.
Management to help the farmers who lose
their valuable animals due to diseases and NAFCC funded project under Climate
accidents, insurance cover to cattle and Change:
buffaloes is provided. An amount of Rs. 24.21 crore has been
Benefits are restricted to a maximum of 5 sanctioned by Government of India for
cattle units per beneficiary. As per NLM conservation and propagation of Indigenous
Guidelines Insurance premium subsidy cattle breeds and sheep. (Amritmahal/
Hallikar/ Malnad Gidda breeds of cattle and
Economic Survey of Karnataka 2019-20 257

Deccani/ Bannur/ Bellary breeds of sheep). To enhance the effective utilization of fodder,
Out of the sanctioned amount Rs 9.56 crore 2080 Chaff cutters are being distributed to
has been released as 1st and 2nd farmers in 17 districts of the State.
installment. Rs.4.94 crores are utilized for
the implementation of the programme as on 5. Rural backyard development
15.10.2019. programme for sheep, goat and pigs:

The implementing agencies of the project are The main objectives of the programme are to
Karnataka sheep and Wool Development encourage farmers in activities allied to
Corporation, KVAFSU and NDRI. Baseline agriculture for better income and to
survey and Field Performance recording of enhance productivity of Sheep, Goat and
indigenous breeds is under progress. Pigs. The budget sharing pattern for the
Establishment of Gokul gram for programme is Central: State: Beneficiary:
Amritmahal breed at Lingadahally, 60:30:10. Sheep /goat units of 10 female
Chikkamagalur district, for Malnad Gidda lamb's and1 male lamb or pig units of 3 gilt
at Koila, Dakshina Kannada district and for and 1 boar will be distributed to farmers.
Hallikar at Kunikenahally, Tumkur district During 2019-20, Rs 5.22 crores of central
is under progress. 32 Hallikar elite cows shares is released and Rs 1.97 crores is
have been inducted at Hallikar Breeding released under SCP and TSP.
Farm, Kunikenahally.
SCP/TSP Programme details:
Indigenous breed of sheep (600 female +24
male) have been inducted in three State (a) Sheep and Goat unit: 4 to 5 months 10
farms (Khudapur in Chitradurga, Dhangur female and 5 to 6 months old one male
in Mandya and Suthatti in Belagaum (10+1).
districts) by Karnataka Sheep and Wool (b) Piggery unit: 3 to 4 months 3 female and
Development Corporation and 78 ram 4 to 5 months old one male (3+1).
lambs have been distributed to shepherds
till date. Budget sharing for each unit at 60:30:10 %
Central: State: Beneficiary share:
(a) Sheep and Goat unit: 4 to 5 months 10 female and 5 to 6 months old one male
(10+1).

Cos t per unit


Sl No Details of the unit
(in Rs.)

1 @ Rs 60 00/ m al e and Rs 5 000/ fe male animal. 5600 0

2 Thre e Y ears Ins urance for 11 anim als at 7.5% prem ium 420 0

3 Equipm ents, fee d supple ments & m edicines 580 0

Total 6600 0

(b) Piggery unit: 3 to 4 months 3 female and 4 to 5 months old one male (3+1).

Co st per unit
Sl No Details of the unit
(in Rs.)

1 @ R s 50 00/ male and Rs 4 000/ female animal. 170 00

2 Equipments, feed supplements, medicines and Insurance cost. 40 00

Total 210 00
258 Economic Survey of Karnataka 2019-20

Budget sharing for each unit at 60:30:10 % Central: State: Beneficiary share:
Subsidy from Subs idy fro m Beneficiary
To tal unit cost Central s hare State s hare contribution
(60%) (30% ) (10%)

Shee p and
Rs 6 6000 R s 396 00 Rs 19800 R s 660 0
Goat unit

Piggery unit Rs 2 1000 R s 126 00 Rs 6300 R s 210 0

Physical and financial targets:

Financial Targets
Physical Targets
(Rs. In lakh)
Sl.
N ame of the Program me
No.
SC P TSP Total SCP TSP Total

R ural Back yard De velopme nt


1 49.8 9 26. 13 7 6.02 84 44 12 8
p rogram me for she ep

R ural Back yard De velopme nt


2 49.8 9 26. 13 7 6.02 84 44 12 8
p rogram me for goat

R ural Back yard De velopme nt


3 30.2 4 15. 12 4 5.36 160 80 24 0
p rogram me for pig

TOTA L 130.0 2 67.38 19 7.40 3 28 168 496

B. 100% State funded programmes under and Oriental Insurance Com., are allocated
NLM: different districts for insurance coverage.
1. Free livestock insurance for SC/ST As on 15.10.2019, 30,575 animals
beneficiaries: belonging to SC beneficiaries and 20,073
animals belonging to ST beneficiaries have
During 2018-19, under Milk Incentives to been insured in the State.
farmers, Rs 12.00 crore and under National
Livestock Mission, Rs 7.31 crore, a total of 2. Ex-gratia for accidental death of
Rs.12.89 crore under SCP and Rs 6.42 crore animals:
under TSP were allocated for 100% Free As per Government order no: AHF 81 AHP
Livestock Insurance to milch animals 2017, Bangalore, Dated: 05.08.2017,
belonging to SC/ST beneficiaries, for three compensation of Rs. 10000/- for accidental
years period. death of non-insured bullocks and cows has
The premium rate considered for the been provided and as per the Government
insurance of animals under this programme Addendum order no: AHF 81 AHP 2017,
is 5.7%, for 3 years and maximum value of Bangalore, Dated: 28.10.2017, the
animals considered is 50,000. programme to compensate accidental death
of non-insured animals has been extended
Three insurance agencies, United India to bullock/ cow/ bull/ he buffalo/ she
Insurance Com., New India Assurance Com. buffalo/ heifer/ buffalo heifer (above six
months age).
Economic Survey of Karnataka 2019-20 259

During 2017-18, Rs 265.68 lakh has been supplied and distributed to shepherds
released to 2659 beneficiaries, out of which through all veterinary institutions of Dept of
Rs 98.68 lakh are released to beneficiaries Animal husbandry and Veterinary services
under SCP and TSP. During 2018-19, Rs from 01.12.2018 to 15.12.2018.
1017.59 lakh has been released to 10194
During 2019-20 proposed Rs.595.50 lakh
beneficiaries.
deworming have been supplied to shepherds
During 2019-20, Rs 45.40 lakh are released through all veterinary institutions of Dept of
under SCP to 456 beneficiaries and Rs 25.05 Animal husbandry and Veterinary
lakh under TSP to 252 beneficiaries. services.
7.14.5 Karnataka Sheep and Wool During 2017-18 , 112 one day Scientific
Development Corporation (KSWDCL) Sheep Rearing training camps conducted
for 4863 shepherds at the cost of Rs.15.63
Karnataka Sheep and Wool Development lakh in the state. During 2018-19, 230 day
Corporation have established five sheep Scientific Sheep Rearing training camps
breeding farms across the state. We conducted for 9200 shepherds at the cost of
have distributed 353, 354 and 172 23.00 lakh in the state. During 2019-20,
crossbred/Improved varieties of rams and 118 one day Scientific Sheep Rearing
bucks to shepherds for breeding purpose training camps conducted for 4720 at the
during the year 2017-18, 2018-19 and cost of Rs.11.80 lakh in the state.
2019-20 (up to November 2019) respectively
from these breeding farms. During 2018-19, one day training
programme conducted on scientific wool
Karnataka Sheep and Wool Development shearing for 300 shepherds. Training
Corporation has taken up sheep wool programmes condctued on Scientific Sheep
improvement scheme (SWIS) with the Rearing and Fodder development etc., at
collaboration of Central Wool Board, sheep breeding farm Dhangur.
Jodhapur. Rs 48.00 lakh has been spent
for health care of 50,000 sheep in During 2018-19, Rs.1375.00 lakh provided
each taluks-Muddebihal, Molkalmuru, to 275 Sheep and Wool Cooperative societies
Chikkaballapura, Sira, Hosapete, Lingasugur, as one time grant of Rs.5.00 lakh each.
Chincholli, Gokak, Bidar and Ourad taluks During 2019-20 Rs.65.00 lakh provided to
under this scheme during the year 2017-18. 13 Sheep and Wool Cooperative societies as
one time grant of Rs.5.00 lakh each upto
Incentive of Rs. 3000/- each has been given November- 2019.
to 500 farmers to purchase good quality
breeding rams during the year 2017-18. To So far Rs. 1440.00 lakh provided to 288
introduce twinning gene in the sheep flocks Sheep and Wool Co-operative societies as
of the state, a program has been taken up one time grant of Rs.5.00 lakh each
during the year 2018-19 to supply 666 Fec-
SCP & TSP:-
B carrier ( NARI SUWARNA) breeding rams
to shepherds at subsidized rate (Rs. During 2017-18, 685 SC/ST beneficiaries
15,000/- subsidy ), so far 123 such rams (members) of sheep and wool producers
have been distributed. Co-operative Societies provided 10+1
sheep/ goat unit cost Rs. 67440/- {subsidy
KSWDCL has taken up dewormimg program
of 90% or maximum Rs 60000/-} to each
for entire sheep and goat's population of the
beneficiary.
state on a mass basis. Under this program
Rs.300.00 lakh dewormers have been During 2018-19, 501 SC/ST beneficiaries
supplied and distributed to shepherds (members) of sheep and wool producers
through all veterinary institutions of Dept of Co-operative Societies provided 10+1
Animal husbandry and Veterinary services sheep/ goat unit cost Rs. 67440/- {subsidy
from 01.12.2017 to 15.12.2017. In 2018-19, of 90% /maximum Rs 60000/-} to each
Rs. 500.00 lakh dewormers have been beneficiary.
260 Economic Survey of Karnataka 2019-20

During 2019-20, 477 SC/ST beneficiaries subsidy of 90% or maximum Rs 63000/- to


(members) of sheep and wool producers each beneficiary.
Co-operative Societies provided 10+1
The Progress achieved under these schemes
sheep/ goat unit cost of Rs.70000/- with
from 2017-18 to 2019-20 are given in
Table 7.59 and 7.59(a).

Table 7.59 : SCP/TSP and General schemes (10+1sheep/goat unit):

Year Scheme SCP TSP

2017-18 Loan amount Rs.7440.00 Rs.7440.00

Subsidy 90% or maximum


2017-18 Rs.60,000.00 Rs.60,000.00
Rs.60000.00 for SC/ST

Total unit cost Rs. 67,440.00 Rs. 67,440.00

2018-19 Loan amount Rs.7440.00 Rs.7440.00

Subsidy 90% or maximum


2018-19 Rs.60,000.00 Rs.60,000.00
Rs.60000.00 for SC/ST

Total unit cost Rs. 67,440.00 Rs. 67,440.00

2019-20 Loan amount Rs.7000.00 Rs.7000.00


Subsidy 90% or maximum
2019-20 Rs.63,000.00 Rs.63,000.00
Rs.63000.00 for SC/ST
Total Unit Cost Rs. 70000.00 Rs. 70000.00

(Upto end of November 2019)

Table 7.59(a): Progress Achieved under SCP and TSP


Physical (in units of Financial
Budget (10+1)Sheep/Goat unit (Rs. in lakh)
allocated
Sl Schemes Year Target Achievement
(Rs. in Achieve
No. Target
lakh) ment
Sheep/Goat Sheep/Goat
300.00
2017-18 300.00 500 500 300.00
Special
1 Component 2018-19 214.00 356 356 214.00 214.00
Plan
2019-20* 214.00 339 169 107.00 106.47
111.00
2017-18 111.00 185 185 111.00

2 TSP 2018-19 87.00 145 145 87.00 87.00

2019-20* 87.00 138 69 43.50 43.47

(Upto end of November 2019)


Economic Survey of Karnataka 2019-20 261

a) Suraksh Yojane/Anugraha koduge for unspent amount of Rs.443.53 lakh of


Shepherds: previous year. An ex-gratia provided to
As per the 19th Livestock Census, 95.83 43035 beneficiaries to the death of 52891
lakh sheep and 47.96 lakh goats were there sheep/goat and kids. An amount of
in the state. Under this scheme, ex-gratia Rs.2568.03 lakh was credited to
will be provided to shepherds to overcome beneficiaries' Bank account.
the accidental loss due to death of sheep and During 2019-20, Rs. 1711.00 lakh budget
goats and an ex-gratia compensation of Rs. allocated. Including previous year balance
5,000/- to each given for death of sheep and Rs.75.51 lakh, total amount of Rs.931.01
goat which is above 6 months of age and lakh budget available. Upto end of
which die accidentally or die due to certified November 2019, an ex-gratia provided to
epidemic diseases not covered under 16798 beneficiaries to the death of 19234
Natural Calamity Relief or Insurance sheep/goat and kids. Rs. 930.99 lakh
Schemes. During 2017-18, as per budget credited to beneficiaries Bank account.
announcement, an ex-gratia amount of
Rs.2500/- will be provided to below 6 During 2017-18, under RKVY Rs.537.00
months sheep and goat kids. lakh allocated and the same is being utilized
as follows:
In 2017-18, Rs.2568.00 lakh allocated for
exgratia. An ex-gratia provided to 45407 r To procure multiutility ambulatory
beneficiaries to the death of 45155 clinic vehicles Rs.80.00 lakh for
sheep/goat and 252 sheep and goat kids. sheep/goat to 8 districts
Rs. 2246.72 lakh credited to beneficiaries r To procure 51 shearing machines at
Bank account. cost of Rs.150.00 lakh.
During 2018-19, Rs. 2200.00 lakh is r To implement 175 units of 100+5
realsed. During 2018-19, total amount of sheep/goat unit at the cost of Rs.307.00
Rs. 2643.53 lakh spent which includes lakh.

Scheme details:100+4/100+5 Sheep/Goat unit


Loan
Sl.No Year Unit Subsidy (Rs.) Total unit cost (Rs.)
amount
100+5
1 2017-18 Sheep/Goat 175000 525000 700000
unit
10+1
2 2018-19 Sheep/Goat 60000 7440 67440
unit
3 2019-20 Budget is not allocated during 2019-20

Ph ys ic a l 10 0 +5/1 0+1 F in a n c ia l
S l. A nn u a l Bu dg e t S h ee p /G o at u n it (R s.i n l ak h )
Year bu dg e t
No re l ea se d
a ll oc at e d
T a rg e t a c h ie ve m e n t T ar g e t ac h i e vem e n t

1 20 17-18 300.0 0 30 7.00 1 75 1 75 3 07.0 0 30 7.00

2 20 18-19 600.0 0 60 0.00 1000 1 000 6 00.0 0 60 0.00

3 20 19-20 Bu dg e t is n ot a llo ca t ed d u ri n g 20 19 - 20

** Same unit cost for Sheep and Goat Unit


262 Economic Survey of Karnataka 2019-20

Establishment of Bellary Sheep Breeding Establishment of Sheep Skin processing


Farm:- unit:
An amount of Rs.100.00 lakh is allocated to Rs. 200.00 lakh released and action has
establish Bellary breed conservation farm at taken to establish sheep goat skin
Kurikuppe and Rs.100.00 lakh was released processing unit at Cheelanahally
during 2017-18 and during 2018-19, village.Survey No.14, Sira Tq, Tumkur Dt.
Rs. 110.00 lakh is released. During 2019-20
Rs.100.00 lakh is allocated. So for Rs.50.00 Drought relief programme:
lakh released upto this date and Rs. 160.00 Under drought relief programme, Rs.500.00
lakh budget released is utilised for lakh released and 2,56,410 fodder kits
establishment of Sheep breeding Farm. given to 92,859 shepherds during this year.
Establishment of Sheep wool processing 7.14.6. Poultry Development :
and value addition products producing
State of Karnataka has 156.70 million
unit:
layers and 275.60 million broilers
To establish a Wool processing Centre at producing 412.30 million eggs and 81,828
Veterinary Hospital premises, Hospet tones of chicken meat respectively. There
Rs.250.00 lakh is realesed during 2017-18 are 24 poultry farms functioning under the
and Rs.250.00 released during 2018-19. Department of AH&VS for development of
Total Amount of Rs.500.00 lakh is utilised poultry in the State. The major
for Establishment of Sheep wool processing developmental activities are breeding and
and value addition products . During 2019- rearing of Giriraja parent stock and supply
20 Rs.150.00 lakh allocated, so for Rs.75.00 of day old chicks to the farmers. During
lakh is released. 2018-19, 1312 farmers were trained in
poultry rearing and 423046 Giriraja chicks
Establishment of Sheep Wool and Skin were produced. During 2019-20 up to the
storage gowdons: end November- 2019, 1303 farmers were
To construct around 20 Wool and skin trained in poultry rearing and 427834 eggs
storage godowns at Sheep and Wool and 183731 chicks were produced.
producers Co-operative societies, an The following departmental poultry farms
amount of Rs.200.00 lakh is released with are producing day old Giriraja chicks with
Rs.11.25 lakh subsidy and Rs.3.75 lakh the facility of breeding stock of parent
society share the total cost of constructing Giriraja birds.
building is Rs.15.00 lakh. and 17 Societies
are being identified. 1. State Poultry Farm, Hesaraghatta.
Certified Breeding Programme : 2. Regional Poultry Rearing and Training
Centre, Malavalli. Mandya District.
To establish “Certified Elite Breed Ram
Producing Units” Rs. 100.00 lakh was 3. Regional Laboratory, Bangarpet, Kolar
earmarked during 2017-18. Farmers were district.
provided Rs. 3000/- each male Ram totally 4. District poultry rearing and training
3333 elite lambs were selected. centre, Kudige Kodagu district.
Shepherd kit for Migratory shepherds: 5. District poultry rearing and training
In the year 2018-19, Rs.400.00 lakh centre, Gundlupet, Chamarajanagar
released and 2325 migratory shepherd district.
provided shepherd kit including rain coat, 6. Poultry Extension centre, Koila,
tent, torch, rubber floor mat. Dakshina kannada district.
In 2019-20 Rs.288.10 lakh released and The budgetary allocation for the year 2018-
1675 migratory shepherd provided 19 was Rs.697.00 lakh, out of which
shepherd kit including rain coat, tent, torch, expenditure incurred was Rs.696.04 lakh.
rubber floor mat.
Economic Survey of Karnataka 2019-20 263

Budget allocation for the year 2019-20 is (4) Distribution of 5 weeks Aseel Cross
Rs.787.00 lakh and the expenditure chicks to farmers.
incurred is Rs.371.00 lakh up to the end of
(5) Production of backyard chicks for
November- 2019.
backyard poultry development.
Karnataka Co-Operative Poultry (6) Organizing Seminar.
Federation
(7) Study and awareness tour programme
Presently 134 Primary Poultry Co-operative to farmers.
Societies are affiliated to Federation,
Federation receives Grant in aid from the (8) Refreshment Training to Veterinarians
State Govenrment, under Plan Head of of Department of AH&VS.
Account, for its activities like:- (9) Organizing World Egg day.
(1) Short term training programme in (10) Distribution of 22 weeks B.V-380, 20
Poultry Farming. nos Hens along with cages.
(2) Rearing and distribution of Giriraja During 2019-20, an amount of Rs. 1100.00
birds. lakh is allocated to Karnataka Co-Operative
(3) Maintenance of Regional Centers. Poultry Federation. The financial and
physical progress is given in Table 7.60
and Table 7.61.

Table 7.60: Financial Achievements of Poultry Development


(Rs.in lakh)

Plan
Year
Amo unt Sanctioned Amount Released Amo unt Spent

2017- 18 750.0 0 750 .00 750.0 0

2018- 19 650.0 0 650 .00 650.0 0

2019- 20 1 100. 00 550 .00 550.0 0

Table 7.61: Physical Progress of Poultry Development

2019-20 (upto No ve m ber


2017-18 2018-19
Sl. 2019)
A ctiv ity
No.
Ta rget A ch % T arge t A ch % T arg et Ach %

Short term
t raining t o
01 farm er s in
1 0 00 1 1 59 1 15 .9 % 600 6 10 1 0 1.6 % 800 77 6 97 %
P oultry
Farm ing.

R earing and
Distribu tion
02 1 0 00 0 8 2 20 8 2.2% 2 0 00 2 06 0 1 0 3% 4 0 00 16 48 41 .2%
of Giriraj
b ird s.

M aintena nce
03 of R egional 4 4 1 00% 4 4 1 0 0% 04 04 10 0%
C enters
264 Economic Survey of Karnataka 2019-20

2019-20 (upto November


2017-18 2018-19
Sl. 2019)
Activity
No.
Target Ach % Target Ach % Target Ach %

Assistance to
Un employed
Youths to
establishment
04 189 189 100% 84 84 100% - - -
Boiler Poultry
Farm (500
birds)
(Beneficiaries)

Production of
backyard
chicks for
05 backyard 100000 80166 80.16% 64800 37000 62.23% 64800 47816 73.79%
poultry
development
(chicks)

Organizing
06 1 1 100% 1 1 100% 2 2 100%
workshop

Study and
awareness
07 tour 250 250 100% -- -- -- -- -- --
programme
to farmers

Refreshment
Training to
Veterinarian
08 s of 100 100 100% -- -- -- -- -- --
Department
of AH and
VS.

Organizing
09 World Egg 1 1 100% -- -- -- -- -- --
day.

Incentives for
newly
registered
10 10 10 100% -- -- -- -- -- --
societies
under
Federation.
Economic Survey of Karnataka 2019-20 265

7.14.7 Piggery Development (Bangalore), Sirsi (Uttara Kannada) and


In the State, there are 5 pig Breeding Bankapur (Haveri). In these centres
Stations, which are located in Hesaraghatta Newzealand white, California white,
in Bangalore District, Kudige in Kodagu Russian Grey giant and Chinchilla breeds of
District, Koila in Dakshina Kannada District Rabbit are being maintained. Rabbit
and Bangarpet in Kolar District and Kalasa bunnies produced in these centres are being
in Chickmaglur District. Among other sold to interested farmers (at fixed rate) for
activities, these stations are engaged in breeding purposes. Farmers are being
production and distribution of pure breed trained in scientific way of Rabbit rearing.
piglets, training and extension services in The progress is given in Table 7.63.
modern pig rearing to various socio- Feed and Fodder Development:
economic beneficiaries. In the state, most of
the unemployed educated youths and To mitigate the shortage of green fodder in
farmers are interested in modern pig rearing the State livestock farms, fodder
as a result of which, production of good production, fodder seed production and
quality of pork and the lifestyle of the pig training of farmers are being undertaken
rearers are being improved. Under RKVY with the assistance of State disaster relief
scheme, the District Pig Rearer's fund, RKVY Centrally sponsored scheme
Cooperative Societies are established in 12 and Calamity Relief funds. The progress
districts namely Bangalore Urban, made under this programme in the last
Bangalore Rural, Ramanagar, Kolar, three years is given in Table 7.64.
Mandya, Tumkur, Madikeri, Hassan, During the year 2017-18, under State
Dakshina Kannada, Udupi, Disaster Management funds, 2.80 lakh
Chikkaballapura and Chikmagalur for good fodder minikits worth Rs.5.00 crores has
quality of pork. The details are given in been distributed to drought prone district
Table 7.62. from which 16 to 17 lakh metric tones green
fodder has been produced.
7.14.8 Rabbit Development
In order to popularise rabbit rearing for During the year 2018-19, Under
meat production, 3 Rabbit Rearing Centres Department funds, State Disaster
are functioning at Hessaraghatta Management funds, RKVY and NLM

Table. 7.62. The progress achieved under pig breeding programme

Distribution of piglets (Nos.) Farmers Trained (Nos.)


Name of the pig
Sl.No
breeding farm
Target Achievement Target Achievement

1 Hesaraghatta 700 358 200 193

2 Kudige 450 269 450 250

3 Koila 275 97 300 134

4 Bangarapet 150 78 200 45

5 Kalasa 250 81 250 85

Total 1825 883 1100 707

(upto November-2019)
266 Economic Survey of Karnataka 2019-20

Schemes, total-16,80,255 fodder minikits During 2019-20 Rs.15.30 lakh allocated for
worth Rs.42.74 crores has been distributed the purchase of fodder seed minikit, silage
to drought prone district from which 63.00 production unit, and to encourage Perennial
lakh tones green fodder has been produced. grass growing. Action has been taken.

Table 7.63: Progress achieved during 2019-20 in Rabbit farms

N o. Of No. of N o. Of
N o. O f
Sl.NO. Name o f the centre Rabbits Rabbit farmers
Rabbits sold
maintained produced trained

Live stoc k bre eding f ar m,


1 88 13 02 12 4
He ssaraghatta.

As sistant Dire ctor ,


2 91 31 - -
ve te rinary Hos pital , Sir si.

3 K hillar Cattle B reedi ng and 90 86 97 27 6


Tr ai ning Centre, Bankapura.

Total 269 130 99 400

(upto November-2019)

Table 7.64 : Progress under Feed and Fodder development

Sl. 2019-20
Programme 2017-18 2018-19
No. (November-2019)

Minikit Distribution Programme


1 2,80,000 16,80,255 --
(in Nos.)

2 Fodder Production in Farms(in MT) 9888.73 11296.25 5538

Fodder seed production in farms


3 577.36 21.50 --
(in Tonnes)

Root slips distributed in farms


4 475800 274500 495100
(in lakh nos.)

Training to farmers regarding fodder


5 1093 4322 2619
development (in nos)
Economic Survey of Karnataka 2019-20 267

7.14.9 Rastriya Krishi Vikasa Yojane: Rs.68.17 Crores and the expenditure
incurred was Rs.67.96 crores. The details
The Budget allocation for the year 2018-19
are given in Table 7.65.
is Rs.68.17 crores and the release is

Table 7.65 : Financial Outlay for the Project Approved for 2018-19.

Sl.
N ame of the Pro ject Sector Allocation Release Exp enditure
N o.

1 2 3 4 5 6

Strengthening o f Farmers Training Centres and creation


of Infras tructure for skill develop ment

C reation of infrastruc ture for


1]
Training fac ility to the
a] farm ers at Veterinary A H&VS 1 .00 1.0 0 1.00
Inspe ctor Training Ce ntre ,
Hass an

Strengthening of Ve te rinary
b] assi stant traini ng centre, A H&VS 0 .50 0.5 0 0.50
Be llary

C reation of infrastruc ture for


training facility to the
c] farm ers at veterinary A H&VS 1 .23 1.2 3 1.23
assi stant traini ng centre at
be lagavi

C onstruction of b uil ding for


d] farm ers training Center, A H&VS 0 .14 0.1 4 0.14
B idar

Sub Total: 2.87 2.87 2.87

Com prehensive Development of sheep and Goat in Karnataka

Establis hm ent of Goat


F arms f or Milk Production of
AH&VS,
2) a] Marketing Infras tructure of 1 .80 1.8 0 1.80
KLDA
include Goat Milk
Procureme nt

Sub Total: 1.80 1.80 1.80

3) Dairy Infrastructure Develo pment in Karnataka

10 0 MTP D Capaci ty Milk


Powder Plant with 12 LLP D
a] capaci ty Liqui d Milk 6 .68 6.6 8 6.68
Proce ssing Unit at Kanv a, KMF
C hennapattana Taluk

b] My sore Me ga Dairy 6 .07 6.0 7 6.07


12.75
Sub Total: 12.75 12.75
268 Economic Survey of Karnataka 2019-20

Sl.
Name of the Project Sector Allocation Release Expenditure
No.

1 2 3 4 5 6

Strengthening Animal Health, Animal Breeding and


Extension Services in Karnataka

Strengthening of Disease
Dignosis Infrastructure by
Supply of Digital WBC
analyser and HB analyser
a] AH&VS 2.02 2.02 2.00
and Large/Small animal
4)
ultrasound scanning
mechines for spot disease
diagnosis to all districts.

Strengthening of Existing
b] AH&VS 8.45 8.45 8.45
Taluk veterinary Hospitals

Sub Total: 10.47 10.47 10.45

Strengthening Frozen Semen Production Centers and Livestock


breeding farms for genetic upgradation.

Existing Frozen Semen


Production Centers at State
5) a] Livestock Breeding and AH&VS 1.10 1.10 1.10
Training Center,
Hesaraghatta.

State Semen Production


b] AH&VS 0.50 0.50 0.50
Center, Hessaraghatta

Supply of liquid nitrogen


silos for cold chain
c] AH&VS 2.40 2.40 2.40
maintenance and storage of
frozen semen

Bull Mother Farm at


d] AH&VS 2.03 2.03 2.03
Hullenahalli

Bull Mother farm at


e] Lingadahalli, AH&VS 2.00 2.00 2.00
Chikkamagalur District
Economic Survey of Karnataka 2019-20 269

Sl.
Name of the Project Sector Allocation Release Expenditure
No.

1 2 3 4 5 6

Establishing three new


Amruthmahal cattle
breeding centres at Bilavala
f] (Chikkamagalur district), AH&VS 5.00 5.00 5.00
Bidare (Hassan district),
Kynodu (Chitradurga
district).

Sub Total: 13.03 13.03 13.03

6) Piggery Development Programme

Strengthening of existing
piggery farms and make
a] these as self sustainable by AH&VS 1.22 1.22 1.22
utilizing the farm revenue at
Hessaraghatta

Sub Total: 1.22 1.22 1.22

7) Pashu Bhagya :- Animal Induction Programme

Assistance to SC/ST
beneficiaries for induction of
a. AH&VS 10.55 10.55 10.36
dairy animals (2 crossbreed
Cows/ Buffaloes)

Sheep and Goat


Development by induction of
b. KSWDCL 6.00 6.00 6.00
10+1 Sheep/Goat units to
SC/ST Beneficiaries.

Assistance to SC/ST
c. beneficiaries for 500 boiler KCPF 2.98 2.98 2.98
poultry units

Sub Total: 19.53 19.53 19.34

Fodder Development
8] AH&VS 5.00 5.00 5.00
Programme

Sub Total 5.00 5.00 5.00


270 Economic Survey of Karnataka 2019-20

Sl. Name of the Project Sector Allocation Release Expenditure


No.

1 2 3 4 5 6

9] Strenthening of Animal Vaccination and Diagnosis Services in Karnataka

Upgradation of Vaccine
storage, packi ng and
a] IAH&VB 1.00 1.00 1.00
dispatch at bangalore
IAH& VB

Sub Total 1.00 1.00 1.00

10] Research and Extension Projects of Veterinary University

Establishment of Model Feed


Technology Unit, Fodder
Museum and strengthening
of Feed Analytical
a] Laboratory for Knowledge KVAFSU 0.50 0.50 0.50
and Skill Empowerment of
Farmers to augment
livestock Productivity in
Malnad Region

Sub Total 0.50 0.50 0.50

Grand Total 68.17 68.17 67.96

Table 7.65(a). Financial Outlay for the Project Approved for 2019-20.
Sl. Allocation for
Name of the Project Sector Released Expenditure
No . 2019-20

1] Strengthening Anim al Health, A nimal Breeding and Ex tension Services in Karnataka

Supply of Large
ani mal ultrasound
sc anning machine
a] for s pot disease AH& VS 1.98 1 .98 0.00
diagnosis to 30
taluk veterinary
hosp itals

2] Formation o f FPO

Farmers produc ers KSWDCL


a] 7.96 4 .00 0.00
organization &KCPF

3] Fo dder Developm ent Pro gramme

Supply of Chaff
a] Cutter at 50% AH& VS 1.57 1 .57 0.00
subs idy
Economic Survey of Karnataka 2019-20 271

Sl. A llo cation for


Name of the Project Secto r Released Ex penditure
No . 2019-20

4] Research and Ex tension Pro jects of Veterinary University.

Hygeini c Milk
a] Production and Skill K VAFSU 0.40 0.4 0 0 .40
Development

Strengthening Frozen Sem en Production Centers and Livestock


5]
breeding farms fo r genetic upgradation.

Strengthening of
existing
infrastructure
facilities at four
Amruthmahal cattle
breeding sub centres,
Chikkayemmiganuru
a] KLD A 2.00 2.0 0 2 .00
(Chitradurga
district), Ramagiri
(Chitradurga
district), Rayasandra
(Hassan district) and
Habbanaghatta
(Hassan district)

Establishment of
frozen semen banks
b] KLD A 1.31 1.3 1 1 .31
at mysore, gulbarga,
munirabad

6] Strengthening of Diagnostic and Vaccine Production Institution

Development of
a] Recombinant Protien IAH&VB 0.50 0.5 0 0 .50
Based Diagnosis kits

Grand Total 15.72 11.76 4.21

The Budget allocation for the year 2019-20 is Rs.15.72 crores and the release is Rs.11.76 Crores out of which
Rs.4.21 crores is spent upto the end of November 2019. The details are given in Table 7.65(a).

7.14.10 Assistance to States for Control During 2019-20, out of Rs.1102.04 lakh of
of Animal Diseases (ASCAD): Central Share (60%) Rs. 765.00 lakh was
released on 19/8/2019 and Rs.337.04 lakh
Under this programme, financial assistance released on 10/10/2019. The proposal to
is provided for systematic control of release the matching grant of state share
livestock diseases of national importance. (40%) of Rs. 734.69 lakh was sent to
Animal Disease Surveillance, upgradation of Government of Karnataka and the releases
Diagnostic Laboratory and Biological are awaited.
production Units. For Organization of
Seminars and training programmes 100% During 2018-19, 55.04 lakhs cattle and
funding is provided by GOI. During 2019- buffaloes were vaccinated against
20, action plan for Rs.1836.73 lakh has Hemorrhagic Septicaemia (HS). Preventive
been sanctioned by GOI, which includes vaccination against Enterotoxaemia (ET)
central share of Rs.1102.04 lakh and state was done for 254.14 lakh of sheep and
share of Rs.734.69 lakh. goats. As a part of surveillance work, 49
272 Economic Survey of Karnataka 2019-20

brain samples from clinically suspected impact. The disease affects Cattle, Buffalo
animals and 84 brain samples from and swine as well as sheep, goats and other
slaughtered animals were collected and cloven-hoofed ruminants. The Foot and
forwarded to the laboratory and ascertained Mouth Disease (FMD) have serious socio-
that BSE is not present in our state. In order economic implication. Therefore, in order to
to keep vigilance on the presence of Avian control FMD in the State, mass vaccination
Influenza, 2629 serum samples, 2588 of all the cattle, buffaloes and pigs (Pulse
cloacal/tracheal and 927 environmental Polio mode) once in every six months is
samples were collected from all the district being carried out under this programme. On
and forwarded to the laboratories for '0' and 28th day, serum samples will be
examination. collected from identified animals in selected
villages and percentage of animals having
During 2019-20, from April-2019 to
immunity against the virus will be
November 2019, 25.25 lakhs cattle and
measured. Foot and Mouth Disease Control
buffaloes were vaccinated against
Programme (FMD-CP) is being implemented
Haemorrhagic Septicaemia(H.S). Preventive
in the state since 2011 and 15 rounds of
vaccination against Enterotoxaemia (ET)
vaccination programme have been
was done in 102.76 lakh sheep and goats. As
successfully completed.
a part of surveillance work 74 no's of brain
samples from clinically suspected animals With the effective implementation of FMD-
and 82 no's of brain samples from CP, the number of outbreaks has been
slaughtered animals were collected and reduced in the recent years. The percentage
forwarded to the IAH & VB laboratory and of population having immunity against
ascertained that BSE is not present in our virus, which was 5% in the pre vaccination
state. In order to keep vigilance on the samples and 18% in post vaccination
presence of Avian Influenza, 2844 serum samples at the beginning of the programme
samples, 2709 cloacal/tracheal and 840 has increased to 44.5% in pre vaccination
environmental samples collected from all samples and 59.1% in post vaccination
the districts and forwarded to the serum samples after 14th round of FMD
laboratories for examination. No evidence of Vaccination Programme and in 15th round
avian influenza was observed in the state of FMD Vaccination programme increased
during 2019-20 till November 2019. to 35.1% in pre vaccination samples and
54.7% in post vaccination serum samples.
a) Mass vaccination Programmes:
During 2017-18, action plan for Rs. 3117.60
Several mass vaccination programmes are lakh has been submitted to GOI. Total
being implemented in the State. Up to amount of Rs 2716.15 lakh comprising of
2014-15, GOI has provided 100% Rs. 1548.97 lakh with central share of (60%)
assistance for FMD-CP, BCP, PPR-CP, and Rs. 1167.18 lakh state share of (40%)
NPRSM and NADRS. But under ASCAD, the has been released including the unspent
sharing pattern was 75:25. The sharing balance for the year 2016-17 has been
pattern from 2015-16 onwards is 60:40 released. Total amount of Rs 2707.89 lakh
under ASCAD, FMD-CP, PPR-CP and BCP comprising of Rs. 1544.01 of central share &
and 100% assistance for NPRSM and 1163.88 lakh of state share has been
NADRS. utilized during 2017-18.
b) Foot and Mouth Disease Control During 2018-19, action plan for Rs. 3519.54
Program (FMD-CP): lakh has been submitted to GOI.,
Foot and Mouth Disease Control Program comprising of Central share (60%) of Rs.
(FMD-CP) is one of the Centrally Sponsored 2111.73 lakh and state share (40%) of Rs.
Programme is being implemented in the 1407.81 lakh. As a first installment, a total
state under 60%-40% (GOI-GOK) sharing of Rs. 1364.61 lakh has been released
pattern. Foot and Mouth Disease (FMD) comprising of Central share (60%) of Rs.
have severe, highly contagious viral disease 818.77 lakh including the Rs. 8.26 lakh
of livestock with significant economic unspent balance for the year 2017-18 and
Economic Survey of Karnataka 2019-20 273

state share (40%) of Rs. 545.84 lakh total to Rinderpest are prevalent in any village or
Rs. 2685.29 has been released. Rs. 2344.67 presented for treatment in any veterinary
lakh upto end of March 2019. institutions. For 2019-20, an assistance of
Rs. 5.00 lakh has been proposed.
During 2019-20, action plan for Rs. 3941.76
lakh has been submitted to GOI., f) National control programme on Peste
comprising of Central share (60%) of Des Petits Ruminants (PPR) Control
Rs.2335.06 lakh and state share (40%) of Programme:
Rs.1606.70 lakh. As a first installment a
total of Rs. 1102.04 lakh has been released The mass vaccination of Sheep and goats
comprising of Central share (60%) and against PPR is being implemented since
unspent balance for the year 2018-19. State 2011-12, during which 116.33 lakhs sheep
share 40% of Rs. 287.60 lakh and 60% of Rs. and goats were vaccinated. Subsequently,
435.38 lakh Central Share amounting to at 6 monthly intervals, newly born and
Rs.722.98 lakh. State share of Rs.734.69 adults left over during the previous round of
lakh are yet to be released. vaccination ie, 30% of the population, are
being vaccinated.
c) National Animal Disease Reporting
During 2017-18 a grant of Rs. 202.93 lakh
System (NADRS)
was released and could not be utilized due to
This programme envisages periodical online non receipt of order in time. About 170.88
reporting of outbreaks of diseases from the lakh sheep and goats were vaccinated
field veterinarians. All the 176 block and 30 during the year.
districts and 1 centre at state level have
During 2018-19, Rs. 356.00 lakh has been
been provided with the hardware, software
proposed in the action plan. Budget not
and internet facility. The state monitoring
released. 171.47 lakh of sheep and goats
unit located in Bangalore consolidates the
have been vaccinated upto end of March
reports at state level and forwards to the
2019.
state Govt and GOI. During 2019-20, Rs.
5.00 lakh was allocated in the action plan. During 2019-20, Rs. 278.00 lakh has been
proposed in the action plan. 102.76 lakh
d) National Programme on Brucellosis
sheep and goats have been vaccinated up to
Control end of November 2019.
This disease is characterized by abortions in
Details of State Sector Schemes for the
the last trimester of pregnancy and it is
year 2019-20.
communicable to persons who come in
contact with the animals (Zoonotic). 1. Direction and Administration
Vaccinating 6-8 month old female calves
protects them for lifetime. Hence since During 2019-20, the total allocated budget
2011-12, screening of animals by Milk Ring is Rs. 9547.00 lakh. Out of this allocation,
Test (MRT) has been done and the incidence Rs.225.00 lakh is earmarked for SCP and
was found to be 3.5%. During 2019-20, Rs. Rs.165.00 lakh earmarked for TSP. The
385.00 lakh has been proposed in the action budget will be utilized for payment of salary
plan. From April 2019 to November 2019, and allowances of officers, staff and
0.022 lakh 6-8-month-old female calves are outsourced D group employees,
vaccinated. procurement of drugs and chemicals to
meet the requirement of 4214 Veterinary
e) National programme on Rinderpest Institutions, printing of departmental
Surveillance and monitoring registers, “Januvaru Mahiti pustaka” and “
(NPRSM): feed charts”, advertisement and publicity, to
maintain public grievance cell/call centre,
Rinderpest has been eradicated in the
purchase of computers and printers at
country. Surveillance work is being done
hobli level veterinary institutions, purchase
continuously to ascertain that no cases of
of furniture to commissionerate and offices
Rinderpest or cases with symptoms related
under commissionerate, maintenance of
274 Economic Survey of Karnataka 2019-20

vehicles at commissionerate, and other lakh is central share and Rs.906.00 lakh is
activities. An amount of Rs.6474.00 lakh state share and Rs.361.00 lakh is
released and Rs.3681.00 lakh expenditure earmarked for SCP and Rs.129.00 lakh is
has been incurred up to the end of earmarked for TSP. Under this scheme,
November 2019. vaccination programmes for the diseases
[FMD, Enterotoxaemia Haemmorrghic
2. Unspent SCSP-TSP amount as per the Septicaemia and Anthrax] that are of
SCSP-TSP act 2013 economic and zoonotic importance will be
During 2019-20, the total allocated budget carried out. Other activities being
is Rs 806.93 lakh. Out of this, Rs.745.59 maintenance and repair of office buildings,
lakh is earmarked for SCP and Rs.61.34 de-worming campaigns, disease
lakh for TSP. Dairy (unit cost Rs.60,000/-), surveillance disease monitoring
3 sheep/3 goat (unit cost Rs. 15,000/-) and programmes and the salary for officers and
pork stall establishment unit (unit cost Rs. staff. An amount of Rs.1905.00 lakh is
1,50,000/-)units will be provided to SC/ST released and Rs 1589.00 lakh expenditure
beneficiaries with 90 % subsidy. has been incurred upto the end of November
2019.
SC beneficiaries will receive 944 Dairy, 746 -
3 Sheep/3 Goat and 100 pork stall units. 6. Amrithmahal Kaval:
ST beneficiaries will receive 23 Dairy, 3 This scheme is merged under the sheme
Sheep/3 Goat 61 units and 30 pork stall Livstock Farms and Training centres.
units.
7. Livestock Farms and Training centers:
Rs. 403.00 lakh released and Rs.17.00 lakh
During 2019-20, the total allocated budget
expenditure has been incurred up to the end
is Rs. 5800.00 lakh. Amount will be utilized
of November 2019.
towards salary and allowances of officers
3. Institute of Animal Health and and staff, pay for outsource D group
Veterinary Biologicals, Bangalore employees, supply of chemicals and liquid
nitrogen for semen production centres of the
During 2019-20, the total allocated budget state, Fodder security policies like
is Rs 3629.22 lakh. Under this scheme, establishing hydrophonic units
amount of Rs. 1517.94 lakh will be spent for encouragement of Perennial grass for green
production of vaccine to control livestock fodder production, distribution of chaff
diseases, disease diagnosis and cutters and fodder minikits, conducting
investigation, providing expert advisory Pashumela, purchase of feeds for the
services, trainings, office expenditures etc., livestock farms, purchase of equipments,
amount will be utilized towards salary for maintenance and repair of farm vehicles.
officers/staff, pensioners. Rs. 2722.00 lakh An amount of Rs.4353.00 lakh is released
released and Rs.1690.00 lakh expenditure and Rs 2852.00 lakh expenditure has been
has been incurred up to the end of incurred upto the end of November 2019.
November 2019.
8. Assistance to Pinjarapole and
4. Civil works:
Goshalas:
During 2019-20, Rs.32.00 lakh is allocated
During 2019-20 the total allocated budget
under this scheme. Amount will be spent to
is Rs. 450.00 lakh. It is proposed to support
take up civil works of the departmental
pinjarapoles and goshalas for maintenance
farms and other state sector buildings. An
(water, feed, health care) of unproductive
amount of Rs.16.00 lakh released and Rs
and abandoned animals and also to support
16.00 lakh expenditure has been incurred
State Animal Welfare Board and
upto the end of November 2019.
strengthening district society for prevention
5. Control of Animal Diseases: of cruelty to animals (SPCA).An amount of
Rs.225.00 lakh is released and no
During 2019-20, the total allocated budget expenditure has been incurred upto the end
is Rs 3077.00 lakh, out of this Rs. 1359.00 of November 2019.
Economic Survey of Karnataka 2019-20 275

9. State Poultry Farms: 12. Pig Breeding Stations


During 2019-20, the total allocated budget For 2019-20, the total allocated budget is
is Rs. 787.00 lakh. Amount will be utilized Rs. 169.00 lakh. Allocation will be utilized
towards salary and allowances of KCPF and for salary and allowances of the staff,
state poultry farms, daily wages and payment for outsource employees, purchase
outsource D-group employees, purchase of of concentrate feed for pigs, purchase of
poultry feed for 6 poultry farms, minor equipments, minor works and repairs of
repairs and maintenance of buildings, buildings, and farm maintenance. An
repairs and fuel for vehicles and generators, amount of Rs.130.00 lakh is released and Rs
and other essential items. An amount of 130.00 lakh expenditure has been incurred
Rs.492.00 lakh is released and Rs. 412.00 upto the end of November 2019.
lakh expenditure has been incurred upto
the end of November 2019. 13. Livestock Development farms:
This scheme is merged under the scheme
10. Karnataka Sheep & Wool
Livstock Farms and Training centres.
Development Corporation limited
14. National Livestock Mission
For 2019-20, the total allocated budget is
Rs. 2615.00 lakh. Out of this Rs.214.00 During 2019-20, an amount of Rs. 1666.00
lakh is for SCP and Rs.87.00 for TSP. lakh is allocated. Out of this, Rs.519.60 lakh
Amount will be utilized towards salary and is central share and Rs.1146.40 lakh is state
allowances of officers, staff and outsource share and Rs.739.00 lakh is earmarked for
employees, office expenses, providing SCP and Rs.282.00 lakh is earmarked for
deworming medicines, mineral mixtures TSP. It is proposed to take up programmes
and other essential drugs and chemicals for approved by SLEC, viz, integrated poultry
sheep and goat, maintenance of 6 sheep development, genetic improvement and
breeding farms of the State and Bellary breeding of sheep, supply of fodder seed
sheep breeding centre, trainings, mini kits and under risk management
distribution of rams for breeding purpose, animal insurance scheme.
distribution of (10+1) Sheep or Goat Units
With 100% State share, Rs. 10000/- ex
for SC and ST beneficiaries. Supply of
gratia will be provided to the farmers for the
mobile tent solar torch, rubber floor
accidental death of cattle that are neither
mat,rain coat to migratory shepherds. An
covered under insurance nor under
amount of Rs.1961.00 lakh is released and
calamity relief fund . Out of this allocation
Rs 1307.00 lakh expenditure has been
Rs. 800.00 lakh is earmarked for SCP & TSP
incurred upto the end of November 2019.
schemes. An amount of Rs.832.99 lakh
11. Ex-gratia to Sheep Owners for released released and Rs 562.00 lakh
accidental death of sheep and Goat: expenditure has been incurred upto the end
of November 2019.
For 2019-20, the total allocated budget is
Rs 1711.00 lakh. Out of this Rs.293.00 lakh 15. Veterinary Education and Training:
is earmarked for SCP and Rs.87.00 lakh for
Rs. 373.00 lakh allocation is provided under
TSP. Ex-gratia will be paid to shepherds
this scheme for 2019-20. It will be utilized
For the accidental death of sheep/goat that
towards salary and allowances,
are not covered under any other insurances
maintenance and strengthening of 9
schemes or calamity relief funds, at rate of
training centres, training of farmers and
Rs.5000/- per adult sheep/goat and Rs.
staff, organizing state level seminars and
2500/- for sheep/goat below six months of
advertising the departmental programmes
age. An amount of Rs.1283.00 lakh is
through print and electronic media,
released and Rs 856.00 lakh expenditure
conducting Mysore Dasara Exhibition. An
has been incurred upto the end of November
amount of Rs.279.00 lakh is released and Rs
2019.
212.00 lakh expenditure has been incurred
upto the end of November 2019.
276 Economic Survey of Karnataka 2019-20

16. Animal Husbandry Statistics: released and Rs 4888.00 lakh expenditure


has been incurred upto the end of November
Rs. 295.00 lakh allocation is provided under
2019.
this scheme for 2019-20. Amount will be
utilized for salary and allowances of officers 20. Grants to Animal Husbandry Co-
and staff, purchase of computers, operatives:
equipments, and other office expenses. An
amount of Rs.183.00 lakh is released and Rs During 2019-20 the total allocated budget
183.00 lakh expenditure has been incurred is Rs.1100.00 lakh. The allocated amount
upto the end of November 2019. will be utilized towards salary and
allowances, to create awareness and
17. Integrated Sample survey for interest in backyard poultry farming in rural
estimation of milk, Meat,Egg and wool areas. It is proposed to produce 2,00,000
products (50:50): backyard poultry birds and distribution to
farmers , Implementation of rearing layer
Rs. 395.00 lakh allocation is provided under birds unit under cage system, conducting
this scheme for 2019-20, out of this awareness training and tour for 2000
Rs.197.50 lakh is central share and progressive farmers and short term training
Rs.197.50 lakh is state share. It is proposed for 2000 beneficiaries. Establishment of egg
to utilize the allocation towards staff salary, & mutton stall, Conducting world egg day,
expenditure for carrying out Survey of major seminars, office expenses, maintenance of 4
livestock producers like milk, egg, meat and regional KCPF centres. An amount of
wool during three seasons of the year viz. Rs.825.00 lakh is released and Rs 550.00
summer, rainy and winter. Survey will be lakh expenditure has been incurred upto
carried out in randomly selected villages; the end of November 2019.
reports will be complied and sent to the
government also purchase of computers, 21. Vacant Post Provision:
AC, UPS, annual maintenance, printing of
During 2019-20, the total allocated budget
formats, other office expenses. An amount
is Rs.102.00 lakh. Need based expenditures
of Rs.283.00 lakh is released and Rs 187.00
will be made.
lakh expenditure has been incurred up to
the end of November 2019. 22. Payments under the Karnataka
Guarantee of services Act:
18. Animal Husbandry Statistics and
Livestock Census: During 2019-20 the total allocated
budget is Rs.50.00 lakh. Need based
During 2019-20 the total allocated budget
expenditures will be made.
is Rs. 221.00 lakh. An amount of Rs.221.00
lakh is released and Rs 1.00 lakh 23. Additional Provision for Salaries 6th
expenditure has been incurred up to the end pay commission:
of November 2019.
This scheme is discontinued during
19. Establishment of Veterinary and 2019-20.
Animal Sciences University:
Dairy Development:
During 2019-20 the total allocated budget
is Rs 9775.00 lakh, out of this Rs.200.00 24. National Plan for Bovine Breeding:
lakh is earmarked for SCP and Rs.100.00 During 2019-20, Notional Allocation is Rs
lakh for TSP. Amount will be utilized for the 1.00 lakh is allocated.
salary and allowances of teaching and non
teaching staff, state share of 25% of the 25. Animal Husbandry Programme for
expenditure towards ICAR schemes, women:
student's stipend, study tour, maintenance During 2019-20, the total allocated budget
of buildings, vehicles and animals, office is Rs 900.00 lakh, out of this Rs.271.00 lakh
expenditure, pensions, provision has been is earmarked for SCP and Rs.136.00 lakh for
made to meet the expenditure of SC/ST TSP. Aim of this programme is to assist
students. An amount of Rs.7331.00 lakh is devadasis/ widows/ destitute women in
Economic Survey of Karnataka 2019-20 277

attaining economic upliftment and social construction of Bengalruru Super speciality


status. Implementation of 3 sheep or 3 goats Hospital, Mysore, Belgavi, Kalburgi
unit and dairy units comprising of one Speciality Hospitals. An amount of
crossbred cows or upgraded buffalo units Rs.562.00 lakh is released and Rs 322.00
and establishment of pork stall. An amount lakh expenditure has been incurred upto
of Rs.450.00 lakh is released and Rs 5.00 the end of November 2019.
lakh expenditure has been incurred upto
the end of November 2019. District Sector Schemes:

26. Incentive to Milk Producers: A. Zilla Panchayat Programmes:

During 2019-20, the total allocated budget 1. Executive Establishment:


is Rs.145900.00 lakh. Out of this For 2019-20 the total allocated budget is
allocation Rs. 13000.00 lakh is provided for Rs.8310.78 lakh. Amount will be utilized
SCP and Rs. 8000.00 lakh is provided for for the salary and allowances of the officers
TSP. The allocated amount will be utilized and staff of 4214 veterinary institutions. An
to provide incentive of Rs.6/- per liter of milk amount of Rs.8310.78 lakh is released and
to the milk pourers of MPCS. The unspent Rs.4859.00 lakh expenditure has been
amount will utilized to provide dairy unit for incurred up to the end of November 2019.
SC and ST beneficiaries. An amount of
Rs.72950.00 lakh is released and Rs 2. Supply of Drugs and Chemicals and
62030.00 lakh expenditure has been Equipments:
incurred upto the end of November 2019. During 2019-20, the total allocated budget
27. Construction of Veterinary is Rs. 3930.05 lakh, the amount is allocated
Institutions buildings under RIDF: for purchase of Liquid Nitrogen which is
required for preservation of Frozen Semen
During 2019-20, the total allocated budget needed for Artificial Insemination, purchase
is Rs 4462.00 lakh. The allocated amount and supply of emergency Drugs and
will be utilized for construction of buildings Chemicals, vaccines and Frozen Semen
for veterinary institutions and civil works of Straws. An amount of Rs. 3930.05 lakh is
modern abattoirs with the assistance of released and Rs 848.00 lakh expenditure
NABARD. An amount of Rs.3347.00 lakh is has been incurred upto the end of November
released and Rs.2231.00 lakh expenditure 2019.
has been incurred up to the end of
November 2019. 3. Maintenance of Buildings:

28. Education Extension & Research For 2019-20, the total allocated budget is
(KVAFSU) Bidar: Rs.1635.00 lakh. The amount is allocated
for repair and maintenance of buildings of
During 2019-20 the total allocated budget various Veterinary Institutions in the ZP
is Rs.5306.00 lakh, The allocated amount Sector. An amount of Rs. 1635.00 lakh is
is utilized to take up approved civil works released and Rs 33.00 lakh expenditure has
pertaining to Gadag, Athani, Puttur, land been incurred upto the end of November
acquisition, purchase of books to library 2019.
and other expenses. An amount of
Rs.4730.00 lakh is released and Rs 4153.00 4. Strengthening of Extension Units:
lakh expenditure has been incurred upto During 2019-20 the total allocated budget is
the end of November 2019. Rs.664.00 lakh, under this scheme
29. Construction and Maintenance of extension activities like Kissan Samparka
Sabha, Grama Sandarshana, Livestock
Veterinary Institutions Buildings:
shows etc., are being taken up. An amount
During 2019-20 the total allocated budget of Rs. 664.00 lakh is released and Rs 76.00
is Rs. 800.00 lakh. Amount will be lakh expenditure has been incurred upto
utilized for the civil works and interiors to the end of November 2019.
“Pashupalana bhavana” and for
278 Economic Survey of Karnataka 2019-20

5. Cattle Breeding Farms: 9. Organization of sterile/ Infertile


livestock Camps:
During 2019-20, the total allocated
budget is Rs. 1.22 lakh. Amount will be For 2019-20, the total allocated budget is
utilized for the maintenance of two AI Rs.601.65 lakh. Free livestock health
centers in Uttara Kannada District. An camps will be conducted to treat infertility
amount of Rs.1.22 lakh released and no and to enhance fertility rate in animals. An
expenditure incurred upto the end of amount of Rs. 601.65 lakh is released and
November 2019. Rs.138.00 lakh expenditure has been
incurred upto the end of November 2019.
6. Rearing of Giriraja Birds and others:
Success Story:
For 2019-20, the total allocated budget is
Rs. 546.00 lakh, out of this Rs.107.62 lakh Smt. Mutthakka W/O Late.Koragappa Alva
is earmarked for SCP and Rs.50.61 lakh for resident of Neerkaje, Kepu Village Bantwal
TSP. Amount will be utilized for rearing of Taluk started rearing of cows 10 years back
Giriraja birds in the state govt. farms and to with just one cow and she could not buy
be distributed to the public at the rate more cows due to financial problems . There
prescribed by the department, so that was ample demand for milk as the milk
backyard poultry rearing is encouraged in production in the area was not sufficient to
rural areas. An amount of Rs.546.00 lakh is met the local demand. But getting financial
released and Rs 122.00 lakh expenditure assistance from RKVY Schme and
has been incurred upto the end of November Karnataka bank she started increasing the
2019. number of cows by purchase as well as by
rearing calves produced through artificial
B. Taluk Panchayat Programmes:
insemination. Presently she has 3 milch
7. Opening of Rural Veterinary cows and 2 heifers with her and is being
Dispensaries and their upgradation as managed by herself and her son. She gets
Taluka level Dispensaries. on an average of 15 liter of milk / day /cow.
She produced green fodder required for her
During 2019-20, the total allocated budget cows with her available land and manure
is Rs. 49890.00 lakh. Amount will be produced from her cows. Dairy farming has
utilized for salary, allowance and other been supporting her family through years
expenses of existing institutions and and she wishes to continue with this
expenditure for Institutions to be opened venture.
newly and upgraded. Health, breeding and
other Services are being provided to the Future Challenges and Constraints:
farmers through these institutions. An The 12th Five year plan which laid greater
amount of Rs. 49890.00 lakh is released and emphasis on Agriculture, farming and
Rs 33076.00 lakh expenditure has been development of need based and market
incurred upto the end of November 2019. demand driven programmes would pave for
8. Disposal of Biomedical Waste: augmented productivity in livestock and
poultry sector. This could be achieved
For 2019-20, the total allocated budget is through conservation and development of
Rs. 226.27 lakh. It has been allocated to animal genetic resources, establishment of
maintain deep burial pits and sharp pits in milk traits and value addition by training
the veterinary dispensaries for disposal of and extension methods, professional
biomedical waste and also to keep the efficiency development programmes and
premises clean. An amount of Rs.75.00 lakh quality health coverage system and disease
is released and Rs 26.00 lakh expenditure control programme.
has been incurred upto the end of November
2019.
Economic Survey of Karnataka 2019-20 279

The ongoing programmes and activities of bullock/ cow/buffalo/bulls/heifers etc


the 11th Five year Plan are also continued to compensate loss to the farmer.
during 12th five year plan with more thrust
given on: Challenges:

1. Conservation of indigenous breeds of a. Animal health sector:


livestock for enhancement of milk 1. Effective management of animal health
production. protection programmes.
2. By managing all the Veterinary 2. To promote export of animal products
institutions of the state by qualified by creating disease free zones by
veterinarians better services will be controlling livestock/ poultry diseases
provided. of economic importance and contagious
3. Encourage crossbreeds without animal diseases.
harming the native breed's purity. 3. Monitoring and control of animal
4. Fodder Development by encouraging diseases in view of constant migrations,
fodder growers, through supply of bio- diversity and varied agro -
minikits, fodder and other inputs. climatic conditions.

5. Providing dairy/piggery/ sheep- 4. Creation of awareness about


goat/poultry units to widows/ communicable animal diseases.
devadasis/ downtrodden women to 5. Preparedness for control of Avian
improve their economic status. Influenza / Equine influenza.
6. To provide healthy and quality meat. 6. Health coverage of livestock in remote
7. Establishment of scientific and modern villages
slaughter house. 7. Online registration of animals and
8. Promotion of Giriraja and Desi poultry veterinary services provided.
rearing by providing Assistance to 8. Awareness creation and assistance to
SHGs/poultry co-operatives and farmers regarding efficient utilization of
promoting women empowerment. available feed and fodder resources to
9. Piggery Development through up- formulate balanced ration for animals.
gradation and strengthening of pig 9. Creating awareness and management
breeding stations for more production of situations arising due to climate
of piglets for distribution. change.
10. Strengthening of Extension, Training 10. Effective implementation of state's cow
and Animal Health units. and buffalo breeding policy.
11. Enhancement of semen bank for b. Breeding, Production and Marketing
development of Sheep and Goat breed. Sector:
12. Control of various animal diseases 1. Conservation and development of
through mass vaccination/periodical indigenous breeds of cattle like Krishna
Vaccination programme. Valley, Amruthmahal, Khillar, Deoni
13. Strentghening of breed improvement and breeds of Sheep and goat.
and health protection programme 2. Genetic characterization of these native
through MAITRI workers. breeds and establishing milk traits.
14. Providing veterinary services to 3. Encouraging NGO's for development of
nomadic shepherds and to famers at local breeds.
their doorstep through toll free call
centres and ambulatory clinics. 4. Providing clean and hygienic milk,
healthy and wholesome meat and meat
15. Providing Ex-gratia of Rs.10000/- to products to consumers.
farmer for the death of uninsured
280 Economic Survey of Karnataka 2019-20

5. Selective breeding for sustainability of 3) Federation at state level.


cross breeding programmes.
KMF is an Organization implementing dairy
6. Developing permanent pasture land for development activities in the state under
zero input management system, a 'Operation Flood'. This organization has the
system that was traditionally followed. responsibility of providing remunerative
price and market to the rural milk producers
7. Comprehensive development of farms.
of the state and supplying quality milk and
8. Improving upon low digestibility of poor milk products to the consumers. The
quality roughages for better utilization. progress for the three years is given in the
Table: 7.66.
9. Reducing the gap between availability
and requirement of cattle feed, fodder The Federation has 25 dairy processing
and essential nutrients. plants with a capacity of 66.10 lakh liters /
day. Organization has 44 milk chilling
10. Correcting low productivity by
centers and 1639 B.M.C units and also 6
addressing the problem on animal
milk product dairies which manufacture
reproduction, infertility, low fat and
188 MT milk powder every day. The
SNF etc.
Karnataka Milk Federation has 5 cattle feed
11. Encouraging biomass fuel and organic plants which produces 45000 MT's of cattle
farming practices. feed / month this plants have secured
quality mark certification for quality
12. Providing effective delivery systems for
production and supply of cattle feed to
adopting new and innovative
producers. At present, 14602 dairy co-
technologies.
operative societies are functioning, within
7.14.11. Karnataka Milk Federation: the limit of 14 district milk unions with
The Karnataka Co-operative Milk Federation has
25.20 lakh farmers are enrolled as
been formed on Co-operative basis which has members, out of which, 8.78 lakh farmers
three tier systems. are active members.
1) Milk cooperative societies at primary Incentives to Milk Producers:
level. In order to encourage dairy farmers Rs.2/-
2) Cooperative unions at district level. has been given as remuneration per liter

Table 7.66 : Progress On Dairy Development In Karnataka Cooperatives

Sl. 2019-20
Items Unit 2016-17 2017-18 2018-19
No. (up to Nov 19)

1 DCS registered No. 525 708 417 438

2 DCS made functional No. 558 786 463 331

3 Members enrolled No 65627 64894 42520 47342

Lakh/
4 Milk procured 23.91 25.85 27.30 18.84
Tonnes

5 Animals Treated Lakh 0.02 0.03 0.01 0.014

6 Animals inseminated Lakh 34.46 35.73 35.29 23.41

Animals examined for


7 Lakh 26.53 26.65 29.08 19.44
pregnancy
Economic Survey of Karnataka 2019-20 281

milk. Govt. of Karnataka increase Rs.4/- member only (including GOK Rs. 5/- as
w.e.f. 14.5.2013 and again further incentive).
increased to Rs.5/- effective from Dec-2016.
“Ksheera Sanjeevini”:
Rs.294.00 crores has been released by end
of Nov-2019 under this project. The amount KMF initiated 'Ksheera Sanjeevini' Phase-I
is directly paid to the milk producer's bank project with the help of Sanjeevini-KSRLPS
account linked with Adhaar through from April 2014. In this project KMF has
Kshirasiri protal. An average 8.50 lakh milk covered 250 existing Women Dairy Co-
producers are benefited by this scheme. operative Societies (WDCS) in 30 District
under the fold of Ksheera Sanjeevini
Rashtriya Krishi Vikasa Yojane (RKVY): scheme. Under this 10,000 women as Target
Group Members (TGMs) are enrolled. The
To establish 100 MTPD capacity of milk
outlay of the project is Rs.17.10 crores for
powder plant in Kanva, Channapatatna
three years. From 2014-15 to 2017-2018,
Taluk of Ramanagar district Rs..6.68 crores
Rs.13.53 crores has been released from
and Rs.6.07 crores for Mysore Mega dairy
KSRLPS and covered 250 WDCS. In each
construction together Rs.12.75 crores
WDCS there are 40 Target group members,
released under RKVY project during the year
totally 10,000 members are benefitted with
2018-19.
trainings, Margin money for purchase of
National Programme for Dairy milch animal, Equipments to WDCS and
Development (NPDD) : Awareness Programmes are conducted at
village level.
During the year 2018-19, under NPDD
scheme Rs.20.22 crores grant sanctioned “KMF Sanjeevini”:
for installation of 1348 AMCU's at DCS level
After the very good impact of STEP &
with a grant of Rs.1.50 lakh per unit. Out of
Ksheera Sanjeevini scheme in uplifting the
sanctioned amount Rs.10.11 crores
rural women economically and socially,
released for installation of 674 AMCU's at
KMF also started a new scheme KMF
different DCS of Bangalore, Kolar, Dakshina
Sanjeevini program in the same lines of
Kannada, Mandya, Mysore, Tumkur and
STEP/ Ksheera Sanjeevini in all milk
Shivamoga milk unions. The programme is
unions. During 2016-17, funds are
under progress. Further in second
allocated for “KMF Sanjeevini” under “KMF
installment expect Kolar Milk Union Rs.8.95
IBP”. This scheme is implemented in 100
crores has been release to establish AMCU
WDCS, 4000 beneficiaries are covered in 14
unit in the remaining unions.
milk unions with an outlay of Rs.4.25
Support to Training and Employment crores,Out of which 90% is KMF share and
Programme (STEP) : 10% is milk union share. This scheme also
covers Training, Animal purchase through
Karnataka Milk Federation (KMF) initiated margin money and Bank linkages, WDCS
the Support to training and employment are provided with furniture, AMCU and
programme (STEP) for women in Karnataka Solar pack, Awareness programmes are
from October 1997. Since then KMF has conducted at village level. SHG groups are
organized 1924 WDCS in STEP 1 to VIII formed among the TG members with the
Phases. Under STEP program, the Ministry initial grant of Rs. 15000/- per SHG is
of Women and Child Development, GOI has released to strengthening the SHG.
sanctioned Rs.5647.00 lakh and released
Rs.4618.86 lakh. The KMF and milk unions KMF Sanjeevini scheme is continued for the
have spent Rs.5323.10 lakh to this project. year 2017-18 covering 4000 beneficiaries in
As part of Women Empowerment, 3761 Self 100 WDCS of 14 milk union with an outlay
Help Groups are formed with a saving of of Rs.6.06 crores.
Rs.3973 lakh. The Milk Procurement from KMF Sanjeevini scheme is continued for the
these WDCS is 10.60 LLPD and a payment of year 2018-19 covering 4000 beneficiaries in
Rs.318.21 lakh is made directly to Women
282 Economic Survey of Karnataka 2019-20

100 WDCS of 14 milk union with an outlay “Ksheera Bhagya yojane” wherein the school
of Rs.7.85 crores. children/Anganwadi children are provided
with 150 ml of milk a day to overcome
KMF Sanjeevini scheme is further continued
nutritional deficiency .
for the year 2019-20 covering 4000
beneficiaries in 100 WDCS of 14 milk union 1. There is an average milk procurement of
with an outlay of Rs.7.60 crores. 74.80 lakh liters per day with average
liquid milk sales of 48.10 lakh liters per
Like 2018-19, Rs. 100 lakh is allocated for
day and the balance being converted
strengthening of existing Women Dairy Co-
into different form of milk products.
operative Societies (WDCS). Margin money
of Rs. 1,00,000/- per WDCS is allotted to 2. There is an increase in the number of
purchase 5 milch animals at Rs. 20,000/- Dairy Co-operative Societies organized
per animal in 7 WDCS. This amount is used at the village level covering almost all
to increase the procurement in WDCS, the districts of Karnataka.
which has less than 250 Ltrs of procurement
3. Women Dairy Co-operative Societies
per day. If the procurement is more than 250
are being organized under the STEP
Ltrs, AMCU can be purchase. The amount is
Scheme only for Women to stabilize the
reimbursed to unions once the documents
livelihood.
are submitted. Allocated Rs. 2 crores for
North Karnataka milk unions including 4. Landless farmers and other rural folk
Shimoga milk union towards formation have taken up Dairy farming as a major
(initial grant of Rs. 50000/- per SHG is of source of income which resulted in
released )and strengthening of new WDCS. the economic upliftment of these
farmers.
Six more additional facilities are included
for TG members in KMF Sanjeevini 2019-20. 5. KMF owns 5 cattle feed production
plants which supply an average of
1) Management Committee Members
43000-45000 MT per month of balance
Training.
cattle feed to milk producers.
2) TG Members Orientation Programme
6. Input activities such as Artificial
AMUL visit.
Insemination, Health coverage, Urea
3) DAM Training. Mollases Brick, Liquid Nitrogen etc. are
being provided at the door step of these
4) Milk Testing/Rationalzation price
dairy farmers.
chart/ Quaility of milk/CMP-
Awareness Programmes. CHALLENGES:
5) Medicinal Plants and Primary Health 1. To ensure assured and remunerative
Care of Human and Animals - Ayurvedic market round the year for the milk
Training. produced by the farmer members.
6) Cow Mat for 40 TGms per WDCS. 2. To make available quality milk and
other premier dairy products to urban
OUTCOME:
consumers.
The Milk procurement, membership and the
3. To ensure prosperity of the rural milk
artificial insemination have considerably
producers by adopting modern
increased due to incentive to dairy
Technology.
development activities, there by bringing
financial growth in the dairy sector. This 4. To compete with MNCs and private
growth has brought in socio-economic dairies with better quality of milk and
development at the grass root level. Dairying milk products and in the process,
has become a sustainable activity by sustain viability of co-operatives.
providing continuous remunerative price for
the milk.
Economic Survey of Karnataka 2019-20 283

7.15 FISHERIES r To provide Extension services to fish


farmers for adoption of scientific
In Karnataka State, fisheries has attained as methodologies.
an important sector contributing to fish
production besides source of foreign r To take up Capacity building
exchange earner. Fish being one of the programmes for officers and staff of the
sources of quality protein, use of fish as food department.
helps in eradication of malnutrition among The budget allocation for the department is
rural population. Fisheries Sector as follows:
contributes to production of quality animal
(Rs in lakh)
protein required for human being besides
provides more employment opportunities.
The vast marine, brackish water and inland Year 2017-18 2018-19 2019-20
freshwater resources are the source of fish
production in the State. Allocation 34636.81 24834.00 28296.14
Karnataka State has 320 Km long coast line
along with 27000 Sq. km continental shelf
area, 5.65 lakh hectares of various inland 7.15.1 Fish Production :
water resources and has vast scope for The annual fish production in Karnataka
fisheries development. The brackish water has shown a considerable increase from
area of 8000 hectares also provides good 2.51 lakh metric tons in 2004-05 to 5.87
scope for shrimp/fish culture. There are lakh metric tons in 2018-19 with annual
about 9.61 lakh fishermen in the state of average growth rate of 9.53%. Details of fish
which 3.28 lakh fishermen in marine and production for the last 6 years are given in
6.33 lakh fishermen are in inland who are Table 7.67.
involved in various fisheries activities.
Karnataka is in 4th position in marine fish 7.15.2. Marine Fisheries:
production and 11th position in inland fish Development of marine fisheries sector is
production when compared to fish taken up with a focus on sustainability
production in the country. The total fish through empowering the traditional sector,
production during 2018-19 is 5.87 lakhs enhancing of sea safety and rational
metric tonnes. exploitation of untapped deep-sea
The major objectives of Department of resources, achieving employment
Fisheries are: generation, social security of fishers,
increased food security and augmenting sea
r To enhance fish production by utilizing food exports. Most important in the
all the available resources in fisheries sector is development, expansion
sustainable manner through effective and maintenance of infrastructure facilities
management measures. like fishing harbours and landing centres.
r Improvement of the socio-economic In this direction, Department of Fisheries
conditions of fishermen community. has taken up construction and expansion of
r To Develop and maintain infrastructure major fishing harbours and landing centres
for fishing, fish landing, preservation, with assistance of Central Share. Besides
processing and marketing in both this, desilting programme in fishing
marine and inland sector. harbours is also being implemented.
During 2018-19, the marine exports
r To encourage adoption of new including fishmeal and fish oil exports from
technologies for fish seed production Karnataka was 1.42 lakh metric tons worth
and aquaculture. Rs.1890.00 crores and the production of the
r To develop fish marketing network and marine fishe for the year 2018-19 is 3.89
enhance availability of fish. lakhs Metric tonnes. Trends in fish exports
of Marine Produce from Karnataka for the
last twelve years are given in Figure A.
284 Economic Survey of Karnataka 2019-20

Table 7.67: Details of Fish Production in Karnataka (MTs)

Year Marine Inland Total

2014-15 389822 223419 613241

2015-16 411762 168828 580590

2016-17 399000 158000 557000

2017-18 414348 188174 602522

2018-19 389491 197921 587412

2019-20* 250562 126829 377391

*Upto November 2019

Fig A : Exports of Marine Products from Karnataka

Year Exports Value


2007-08 26155 16261
2008-09 33083 23844
2009-10 5900 40033
2010-11 104821 68832
2011-12 86367 65941
2012-13 96442 85586
2013-14 98619 112239
2014-15 116323 137497
2015-16 84032 105037
2016-17 126592 158900
2017-18 144295 179668
2018-19 142049 189088

7.15.3. Fishing Fleet Operating In inland fisheries in the State. The available
Karnataka: inland fisheries resources in Karnataka are
shown in Table 7.69.
Details of fishing boats operating is
furnished in Table 7.68. 7.15.5. Fish seed production:
7.15.4. Inland Fisheries : The fish seed production detail of the state is
provided in Table 7.70.
Immense scope exists for development of
Economic Survey of Karnataka 2019-20 285

Table 7.68 : Fishing Fleet Operating In Karnataka

M ech an ized boats M oto rised boats Tradit io nal boat s Total

4 57 6 9 2 66 9 0 73 2 2 91 5

(Source: Department of Fisheries)

Table 7.69 : Inland fisheries resources in Karnataka

Type Area/Length

Department Tanks 1.77 lakh ha

GramaPanchayat Tanks 1.21 lakh ha

Reservoir 2.72 lakh ha

Rivers 5813 km

Canals 3187 km

Brackish water areas 0.08 lakh ha

Production Potential 4.02 lakh MT

Source: Department of Fisheries

Table 7.70: Fish Seed Production (In lakh fry)

Year Target Achievement* (Upto Nov 2019)

2013-14 6800.00 4966.22

2014-15 6750.00 5299.67

2015-16 6800.00 5915.20

2016-17 7080.00 4999.00

2017-18 7080.00 4962.28

2018-19 7000.00 6298.01

2019-20* 6540.50 5107.93

Source: Department of Fisheries


286 Economic Survey of Karnataka 2019-20

7.15.6. Fish Sanctuaries in Karnataka: ecosystem, any type of fishing is banned in


these declared river stretches. These rivers
River stretches are declared as fish
stretch help in developing natural breeding
sanctuaries due to conservation of
of fish species. Details of fish sanctuaries in
endangered and rare native fish species.
Karnataka declared by Department of
Because of their unique and delicate
Fisheries are given in Table 7.71.

Table 7.71 : Fish sanctuaries in Karnataka

S l. L en g t h of
P la ce /T a lu k /D is tr ic t R ive r pr ot ec t ed
N o.
ar e a

“V a hin i P us ka ra ni ” (Ra ma na th a pu r)
1 Ca u very -
A ra ka lgu d , H a ssa n

2 Ra n ga n ath ittu , S.R .Pa tna , M an dy a Ca u very 5km

3 M u ttath i a re a M ala v alli, M a n dya Ca u very -

4 S hish ila , B elth an ga di, D .Ka nn a da Ku ma ra dh a ra 500 m

5 A bh ira ma fis h s an ctu a ry


Tu n g a -
(H a rih a ra pu ra ) Ko ppa ,C h ikma ga lu r

6 D h ar ma sth ala , B elth an g adi , D .Ka n n ad a Ne thr av ath i 1km

7 Kelk ar u , Bel th a ng a di, D .K an n a da P alg u ni -


8
M a ra ka th a, Su ly a , D .Ka n na da Ye nek ka l (Ku ma ra dh a ra ) -

9 Se etha n a di, Ka rk al a,U d u pi S ee th a n adi -

10 Na ku r ga ya , P uttu r, D .Ka nn a da Ne thr av ath i -

11 Nis ar ga dh a ma , Ku sh a lna g a ra , Ko da gu Ca u very -

12 U ppu ka la , S u lya , D .Ka nn a da Ka lla je -

13 Ba ch a n ay ak an a gu di, S u ly a, D .Ka n na da Ye nek ka l (Ku ma ra dh a ra ) 2. 0 Km

14 Th od ikan a , S u lya , D . Ka nn a da Ch an dr a giri 500 m

15 Th ing ale , Ka rk al a,U d u pi S ee th a n adi 500 m

16 S ring er i, C hikm a ga lu r Tu n g a 1km

17 Ja mma ta gi (H a rih a ra pu ra ), Ko pp a, Ch ikma g alu r Tu n g a 500 m

18 Ch ippa la gu d da , Th irth ah a lli, S him og a Tu n g a 500 m

19 M a ttu r -H os ah a lli, S him og a Tal u k& D ist. Tu n g a 1. 5 Km

20 S hiva n a sa mu dra , M a lav a ll i, M a n dya S hi msh a 1. 4 Km

21 Bh a ga va thi Ch ay a Ko lla , S ur pu ra Ta lu k, G u lba r ga K rish n a -

H ar a ng i D a m to Ku dligi D ya va kere ,
22 Ca u ve ri 5. 8 K m
S o mw a rpe t Tal uk , Ko da gu D is tr ict

Source: Department of Fisheries


Economic Survey of Karnataka 2019-20 287

7.15.7. Infrastructure in Fisheries coastal transects who do not necessarily


Sector: belong to the fishing community. Seafood
exports from Karnataka is exploring new
The state government has given importance heights with increasing opportunities for
for the development of infrastructure value addition and branding of products.
facilities like fishing harbours, landing Further, over the years, there is increase in
centres, auction halls, ice plants, cold the coastal fisher folk population inducing
storages, freezing plants and frozen more and more people into fishing and allied
storages. An overview of the infrastructure activities. Employment status and
in fisheries sector is given in Table 7.71a. opportunities in marine fisheries sector of
7.15.8. Labour Employed in Fisheries Karnataka has increased over the years
Sector: along with mechanization and increased
replacement of l abour-intensive fishing
Fisheries sector has been faring high in technologies. Fish, being a highly perishable
terms of its foreign exchange, earning product, needs the services of several people
potential and employability of vast majority for its fast movement from harvesting point
of coastal community in fisheries sectors to consuming centres without deterioration
associated with fishing. Improvements in in its quality. The size of fisher folk in
technology has led to unbridled capital Karnataka population in the State is given in
investment in this sector and has attracted Table 7.72.
more and more people from the adjacent

Table 7.71a : Infrastructure in Fisheries Sector

Infrastructure Marine (Nos.) Inland (Nos.)

Harbours 8 -

Fi sh Landing Centres & Jetties 26 -

Beachlanding Centres 81 -

Shrimp H atchery 5 -

Production Farms - 19 (Govt 17 Private 02)

Rearing Farms - Gov- 30, Private -300

Taluk Level Nursery - 60

Fi sheries Co-Operative Societies 125 501

Federation 2 1

Cold Storages 32 21

Ice Plants 195 75

Frozen Storage 14 1

Training Centres - 4
288 Economic Survey of Karnataka 2019-20

Table 7.72: Fishermen population


(in Lakhs)
Sector Number of fishermen No. of active fishermen

Marine 3.28 1.57

Inland 6.33 1.39

Total 9.61 2.96

Source: Department of Fisheries

7.15.9. Major Programmes Of The Kodikanyana at Rs.646.00 lakh, Malpe


Department basin at Rs.225.00 lakh, Belikeri at
Rs.300.00 lakh.
A) Marine Fisheries :
During the year 2019-20, an allocation of
1) Construction of fishing harbours (CSS): Rs.1.00 lakh was made under this scheme.
Under this scheme, the construction and No expenditure incurred under this scheme
expansion of major fishing harbours and upto the end of the November 2019.
landing centres will be taken up for the 3) Rashtriya Krishi Vikasa Yojana:
marine infrastructure development in the
State. Apart from this preference will be Under Rashtriya Krishi Vikasa Yojana, an
given for new harbour and jetties for the allocation of Rs.388.00 lakh was provided
moment of motorised boats. During 2018- during 2018-19. Under this scheme,
19, Rs.1504.25 lakh was spent for sanction has been accorded to take up
construction of fishing harbours at Malpe, programmes viz., distribution of kits and
Mangalore and Honnavar fishing harbours. coracle to increase inland fish production,
Under the scheme development of 3rd stage up gradation of fish seed production farm.
fishing harbour at Mangaluru and Malpe, Rs.388.00 lakh has been spent. Fishery
development of fishing harbour at Honnavar requisite kits/ coracles were distributed to
and construction of break water works at 1278 fishermen. Action has been taken to
Gangolli were taken up. upgrade Menasinahalli fish seed centre,
Bhadra Reservoir Project, Shivamogga
During 2019-20, budget provision of (Rs.1.34 crore), and Markandeya fish seed
Rs.1.00 lakh has been provided. Rs.2699.00 centre, Kolar (Rs.1.27 crore).
lakh expenditure has been incurred up to
November 2019. During the year 2019-20, an allocation of
Rs.783.00 lakh was made under this
2) Dredging of fishing harbours and scheme. Rs.6.00 lakh expenditure has been
landing centers (CSS): incurred upto the end of the November
2019.
In the State, under centrally sponsored
scheme and other schemes major fishing 4) Maintenance of coastal link roads:
harbours and small landing centres have
been constructed and after construction The state has 355.13 Km long 218 fisheries
due to lack of periodic dredging and other link roads connecting fishing harbours and
natural reasons some of these harbours and landing centres to National Highway and
landing centres have severe problem of major processing centers in the coastal area.
siltation. To solve the problem of siltation, Every year budgetary provision is provided
dredging of harbours has been taken up. for construction and maintenance of these
The dredging works are under progress at roads. In the year 2018-19, an allocation of
Rs.300.00 lakh was provided and Rs.299.54
Economic Survey of Karnataka 2019-20 289

lakh has been incurred for maintenance of electricity consumed by the Ice plants
98 roads upto the end of March 2019. subject to a maximum of Rs.3.50 lakh per
ice plant.
Against the budget outlay of Rs.150.00 lakh
during 2019-20, expenditure of Rs.24.17 An allocation of Rs.400.00 lakh was made
lakh has been incurred for 06 roads up to during 2018-19. Out of the total allocation
end of November 2019. of Rs.493.50 provided by re-appropriating
Rs.93.50 lakhs from “Reimbursement of
5) NABARD assisted Rural Infrastructure sales tax on diesel used by mechanised
Development Fund (RIDF) scheme: boats”, Rs.493.30 lakh was released to 184
An expenditure of Rs.16.53 crore has been Ice plants as subsidy.
made for the 69 works approved under RIDF During 2019-20 an allocation of Rs.400.00
19, 20, 21, 22, 23 and 24 under NABARD lakh has been provided and expenditure of
assisted RIDF scheme. Rs.276.34 lakh has been incurred and
Under RIDF 24 approval has been accorded distributed to 182 plants up to end of
for 16 works at a cost of Rs.25.77 crores for November 2019.
the development of fisheries. The works B) Inland Fisheries :
approved are 8 fish seed farms of the
fisheries department (Rs.15.09 crore), 5 During 2018-19, 6298.01 lakh fish seed (fry)
hygienic fish markets (Rs.5.00 crore), have been produced. 2791 department
Extension of jetty at Bobbaryapade, Udupi tanks were developed by stocking 1768 lakh
district (Rs.1.30 crore), construction of fingerlings. Similarly, 1734 Gram
traditional berthing centre at Thotabengre, Panchayat tanks have been developed by
Mangalore taluk (Rs.3.37 crore) and stocking 410 lakh fingerlings. It is
construction of auction hall at estimated that 1.97 lakh MT of inland fish
Hangarakatte (Rs.1.01crore). In the budget has been produced.
of 2018-19, an allocation of Rs.1653.00 lakh
was provided and the entire amount was During the year 2019-20, 2839
spent. departmental tanks and 1656 Gram
Panchayat tanks have developed by
During the year 2019-20, Rs.1921.00 lakh stocking 1796.00 lakh fingerlings and
budget has been provided and as on 386.00 lakh fingerlings respectively upto
November 2019, Rs.767.38 lakh has been November 2019. It is estimated that 0.85
spent. lakh M.T. of fish has been produced from
inland resources upto November 2019.
6) Development and maintenance of
fishing harbour and landing centers: Various Programmes under inland
fisheries are given below:
Allocation has been made for the
maintenance, cleaning, electricity, drinking 1. Subsidy for purchase of fish seed :
water supply and repairs of fishing harbours
and fish landing centres of the State. During Under this scheme 50% of the cost of fish
2018-19, an expenditure of Rs. 222.53 lakh seed of any species purchased by the fish
was incurred as against the allocation of Rs. farmer subject to a maximum of Rs. 5000/-
232.00 lakh. for an individual and Rs. 20000/- for an
institution is provided as subsidy. Provision
During the year 2019-20 this scheme has has been made to avail 50% subsidy subject
been merged with the scheme “Direction to a maximum of Rs.25,000 for purchase of
and Administration”. 50 lakh spawn or 10 lakh fish fry by fish seed
rearers who are interested to take up fish
7) Subsidy on the electricity used by ice seed rearing in their own ponds registered
plants: with the fisheries department. Under this
Under this scheme provision was made to programme an allocation of Rs.10.00 lakh
provide subsidy @ Rs.1.75 per unit of the was made during 2018-19 and Rs.9.95 lakh
290 Economic Survey of Karnataka 2019-20

was given as subsidy. 208 beneficiaries have spent to give the benefit to 400 fishermen.
availed the benefit of the scheme.
During the year 2019-20 this scheme has
During the year 2019-20, this scheme has been merged with the scheme “Supply of
been merged with the scheme “Assistance fishery requisite kits”.
for Inland fisheries development”.
4. Assistance for Inland fisheries
2. Supply of fishery requisite kits : development :
Under the scheme “Supply of Fishery During 2018-19, sanction has been
requisite Kit”, a kit consisting of fishing net obtained for the scheme “Encouragement
and other fishery requisites worth for inland fish culture” under which, 2000
Rs.10,000/-are given with 100% subsidy to fish fingerlings will be stocked in per hectare
coastal and inland fishermen involved in effective water spread area of the water
traditional capture fisheries. The budget resources of the state through Fishermen
allocation was Rs.50.00 lakhs. Co-operative Societies at free of cost. No
expenditure was incurred under this
In 2018-19, under this scheme a new component during 2018-19. Along with this
component “Free distribution of square component, “Matsya Krishi Asha Kirana”
meshed cod end nets for trawl nets of trawl scheme had also been taken up to increase
boats” was introduced. The objective of the fish production and to encourage fish
scheme is to provide 35 mm square meshed culture in major tanks across the state, 50%
nets worth Rs.10,000/- each to fishermen of the unit cost upto a maximum of
for attaching it the cod end in order to Rs.27,000 will be provided to purchase
conserve the fish wealth in sea by preventing 4,000 fingerlings and 2 tonnes of artificial
fishing of juvenile fish. The budget feed per ha. Under this component 80 tanks
allocation was Rs.250.00 lakh. have been developed and Rs.149.44 lakh
During the year 2018-19, an amount of has been spent upto the end of March 2019.
Rs.300.00 lakh was provided and out of this Allocation was also made towards the
Rs.299.38 lakh has been spent to provide operational cost for production of fish seed
fishery requisite to 500 beneficiaries and in fish seed production farms, rearing of fish
cod end nets to 2500 beneficiaries. seed in farms and at taluk level nurseries,
During the year 2019-20, an amount of procurement and transportation of fish
Rs.500.00 lakh is provided and Rs.21.54 seed, the purchase of seed transport
lakh expenditure has been incurred upto vehicles, maintenance of vehicles and staff
end of November 2019. salary.

3. Distribution of Fibre glass coracle for During 2018-19, a total allocation of


inland fishermen : Rs.766.00 lakh was made under this
scheme and an expenditure of Rs.766.00
Fisheries department has formulated a lakh was incurred.
scheme “Distribution of Fiberglass coracle
to inland fishermen” for the safety and During 2019-20, schemes of the department
welfare of the fishermen. These fiber glass were reworked and merged three schemes
coracles are not only durable but also very under this head.viz; Assistance for Inland
strong and it also helps the fishermen to fish fisheries development, Subsidy for
in deeper waters and ensure the safety to the purchase of fish seed and Cluster based
life of fishermen. Under this scheme, a development of Fisheries. In the budget
fiberglass coracle and two oars worth 2019-20, a new component was announced
Rs.10,000/- is given free of cost to “Prawn and brackishwater fin fish culture”
fishermen involved in fishing in the tanks, under the same head of account, where in
reservoirs and river stretches of inland areas 50% of subsidy is proposed to be provided
of the State. During 2018-19, Rs.40.00 lakh for 1 hecatre area of culture with an unit
was provided and Rs.39.63 lakh has been cost of Rs.1.00 lakh/ha.
Economic Survey of Karnataka 2019-20 291

Thus during 2019-20, under this head of During the year 2019-20 this scheme has
account altogether Rs.719.00 has been been merged with the scheme “Assistance
provided and Rs.59.02 lakh has been spent for Inland fisheries development”.
up to the end of November 2019.
7. Reimbursement of sales tax on diesel
5. Stocking of fish seed in reservoirs: used by fishing boats.
There are 82 reservoirs in the State. The Under the scheme, Reimbursement of sales
total water spread area of these reservoirs is tax on diesel used by fishing boats the
2.72 lakh hectares. Thousands of fishermen amount equivalent to sales tax on the diesel
families are depending on these reservoirs used by mechanized fishing boats as
for their life. Fishermen depending on these subsidy is reimbursed by transferring it
reservoirs and rivers are in deep trouble off directly to the bank account of the boat
late as there is a big scarcity of fisheries owner. An allocation of Rs.13500.00 lakh
resource. It is essential to stock often these was earmarked. An additional allocation of
reservoirs with fast growing catla, rohu, Rs.2780.00 lakh has been provided in 2018-
mrigal species which will not be produced 19. Out of this amount Rs.1050.00 lakh
naturally. was spent towards supply of kerosene to
traditional boats. Apart from this,
Under this scheme, reservoir development is Rs.232.20 lakh for Blue revolution scheme,
being taken up in selected reservoirs and Rs.93.50 lakh to provide subsidy for
advanced fingerlings are stocked. During electricity utilized by ice plants and
2018-19, Rs.50.00 lakh has been provided Rs.10.00 lakh for the administrative
and the entire amount has been spent. charges under the assistance for
50.00 lakh fingerlings have been stocked in development of inland fisheries scheme was
selected 3 reservoirs. provided through re-appropriation. An
During 2019-20, Rs.150.00 lakh budget has expenditure of Rs.14720.25 lakh has been
been provided for implementation of this made to supply 1.499 lakh kilo litres of
scheme. The stocking of reservoirs with diesel to 3632 boats.
advanced fingerlings is under progress and During 2019-20, a total allocated
financial expenditure of Rs.32.67 lakh has Rs.13500.00 lakh was made under this
been incurred upto the end of November programme and an expenditure of
2019. Rs.9687.20 lakh has been incurred up to
6. Cluster based development of November 2019.
Fisheries. 8. Research, Extension, Exhibition and
The objective of this scheme is to take up Training.
fisheries development in an integrated and For the extension activities of the
organized way in a cluster based manner in Department like publicity, workshops,
14 selected taluks. Under this programme documentary film, Matsya Mela, evaluation
subsidy will be provided to culturists for studies of schemes, training, organising fish
construction of ponds and other farmers day, etc., a budget allocation of
infrastructure facilities. Priority will be given Rs.167.00 lakh has been made during
to take up fish culture in unsuitable alkaline 2018-19. A sum of Rs.160.40 lakh has been
and saline areas in the cluster areas. An spent. 27 fish farmers day, 27 trainings and
allocation of Rs.20.00 lakh was made under 3 Matsya Melas were organised.
this scheme for 2018-19 and Rs.19.88 lakh
has been spent. Subsidy has been provided During the year 2019-20, this scheme has
to take up fish culture in 7.79 hectare area. been merged with the scheme “Direction
and Administration”.
292 Economic Survey of Karnataka 2019-20

C) Schemes for Preservation, Processing An allocation of Rs.75.00 lakh has been


and Development of Marketing Facilities: provided for the financial year 2019-20 and
out of which Rs.33.50 lakh has been spent
1. Assistance for construction of fish towards construction of 5 fish storage
market : buildings of co-operative societies up to end
Fish markets are being constructed and of November 2019.
maintained by the local bodies. National D) Fishermen Welfare Schemes :
Fisheries Development Board, Hydarabad is
giving lot of importance for construction of 1. Group Accident Insurance Scheme:
hygienic fish markets. In order to assist
Under this Centrally Sponsored Group
these local bodies, the board is providing
Accident insurance Scheme, the premium
50% of the project cost as financial
amount of Rs.20.27 per fisherman, shared
assistance for construction of fish markets.
equally by State and Centre has been paid to
In order to assist these local bodies, under
the National Federation of Fishers Co-
this scheme it is proposed to finance the
operative Ltd., (FISHCOFED) New Delhi
balance 10% cost subject to a maximum of
towards insurance coverage of 2.05 lakh
Rs.25.00 lakh by the State Government.
fishermen of the State. During 2018-19,
75% subsidy subject to maximum of
Rs.12.28 lakh has been paid to
Rs.7.50 lakh will be provided to Fishermen
FISHCOFED, New Delhi towards premium
co-operative societies to construct Fish
by the State Government. During 2018-19,
Collection and Marketing Building on their
Rs.18.00 lakh has been distributed as relief
own site with water, electricity and other
in 9 cases.
facilities at an estimated unit cost of
Rs.10.00 lakh. An allocation of Rs.13.00 lakh is provided
for this purpose during 2019-20. Now, this
In 2018-19 a new scheme “Mathsya
scheme has been converged with Pradhan
Jopasane Yojane” has been introduced.
Mantri Suraksha Bima Yojana and
Under this scheme, provision has been
premium amount of Rs.12.28 lakh has been
made for establishment of cold storage
paid till November 2019.
units, at an expenditure of Rs. 10.00 lakh
each in the State for the fish sellers to 2. Reimbursement of differential interest
preserve the unsold fish at cold storage to commercial banks :
units in the fish markets. For this purpose,
Rs.100.00 lakh grant was earmarked and Provision has been made to reimburse the
this amount has been released to the difference of interest to the Commercial
implementing agency, Karnataka Fisheries Banks and Regional Rural Banks that will
Development Corporation, Mangalore for provide loans to fishermen @ 2% interest up
establishing 19 plants. to Rs.50, 000/- for fisheries activities.
An allocation of Rs.40.00 lakh was From 2018-19, provision has been made for
earmarked for construction of Fish fisher women to avail loan from
Collection and Marketing Building through commercial/ rural regional banks upto
Fishermen co-operative societies and the Rs.50,000 at zero percent interest to take up
entire amount was spent by providing the fisheries activities.
amount to 10 Fishermen co-operative
An allocation of Rs.500.00 lakh was made
societies. An allocation of Rs.10.00 lakh was
during the year 2018-19. In order to pay the
made for construction of markets and
salary of outsource staff, Rs.38.00 lakh was
Rs.9.87 lakh for construction of market at
reappropriated to Direction and
Mysore was released to the implementing
administration scheme. The balance
agency. Thus, under this scheme
amount of Rs.462.00 lakh has been
Rs.149.87 lakh has been spent against
completely spent to clear claims of 29,652
allocated amount of Rs.150.00 lakh.
fishermen.
Economic Survey of Karnataka 2019-20 293

An allocation of Rs.151.04 lakh has been 5. Unspent SCP-TSP amount as per the
provided during 2019-20 and Rs. 75.52 SCP– TSP Act 2013:
lakh expenditure has been incurred up to
end of November 2019. Under this scheme programmes have been
taken up for the beneficiaries involved in
3. Distress Relief Fund: fisheries activities and belonging Scheduled
caste and scheduled tribe. In 2018-19 under
Distress Relief Fund was started to provide this scheme provision has been made for
relief to fishermen/their dependents in case distribution of requisite kits. In 2018-19 an
of death/permanent disability while fishing. allocation of Rs.8.00 lakh was made and
From the Distress Relief Fund Rs.7.98 lakh was spent. 40 beneficiaries
compensation of Rs.6,00,000/- for death, have availed benefit.
Rs.3,00,000/- for permanent disability and
Rs.1,50,000/- in case of partial disability is During 2019-20 an allocation of Rs.1.04
provided to fishermen/their dependents in lakh has been made and Rs.0.50 lakh is
case of death / accident while fishing. spent up to the end of November 2019.
Provision of Rs.1,00,000/- has been fixed as
relief for loss/damage of boat/net and 6) Tribal area sub plan:
medical expenses. Under this scheme various programmes
During 2018-19, Rs.1.00 lakh was given to have been taken up for the beneficiaries
the fund. 82 cases have been settled. For involved in fisheries activities and belonging
these, Rs.150.46 lakh relief has been given. Scheduled tribe. In 2018-19, under this
scheme provision has been made for
During 2019-20, An allocation of Rs.1.00 purchase of mobile/ retail fish canteen or
lakh is provided for contribution towards vehicle fresh fish sale. In 2018-19 an
the Relief fund and Rs.179.80 lakh has been allocation of Rs.103.00 lakh was made.
given to 77 cases upto the end of November Rs.102.98 lakh was spent for the
2019. implementation of these programmes. 15
beneficiaries have been assisted.
4. Matsy Ashraya Yojane:
During 2019-20 an allocation of Rs.40.00
Under this scheme provision has been made lakh has been made and Rs.19.00 lakh is
to provide housing facility to houseless spent up to the end of November 2019.
fishermen. Rs.1.20 lakh is being given as
subsidy to general category fishermen E. District Sector Programmes:
under Matsyashraya Scheme to construct
the house. The subsidy given to 1. Construction and maintenance of
beneficiaries belonging to Scheduled caste fisheries buildings and facilities :
and scheduled tribe is Rs.1.75 lakh to Grant has been provided under this scheme
beneficiaries living in rural areas and for construction and maintenance of office
Rs.2.00 lakh to beneficiaries living in urban buildings, repair and improvement of fish
areas. 2570 houses have been sanctioned in seed production center and Taluk level
2018-19. nurseries, construction and maintenance of
In the year 2018-19, an allocation of fisheries jetties, landing centers, auction
Rs.400.00 lakh was made. This amount has halls in coastal districts, expenditure on
been released to the Nodal Agency, Rajiv maintenance of aquarium at Karwar,
Gandhi Housing Corporation, Bangalore. Hassan, Belagavi, Kalaburagi, Dakshina
Kannada, Bidar, Kolar, Kodagu and
During 2019-20, no allocation has been Vijayapur Districts and purchase of other
earmarked and hence no expenditure has materials. During 2018-19, Rs.418.00 lakh
been incurred up to end of November 2019. has been provided under this scheme and
Rs.413.10 lakh has been spent. 111 works
were taken up for this amount.
294 Economic Survey of Karnataka 2019-20

An allocation of Rs.435.50 lakh has been provided for the purchase of a bicycle and
made in the year 2019-20 and so far insulated boxes with 50% subsidy, subject
Rs.72.43 lakh has been spent upto to a maximum limit of Rs.2000/- and 25%
November 2019. subsidy for purchase of 2 wheeler and ice
box subject to maximum of Rs.10,000/- .
2. Assistance for development of inland
fisheries : For quick transportation of fresh fish in
hygienic condition from fish landing centres
Under this scheme, assistance is given for to marketing places, financial assistance is
construction of ponds in waterlogged saline provided under "Matsya Vahini". Under this
and alkaline soils. 25% subsidy subject to a scheme, 25% subsidy to a maximum of
maximum of Rs.30,000/- is given for Rs.30,000/- for the purchase of a 3-wheeler
construction of 1 acre fish culture pond and tempo rickshaw and 25% subsidy subject to
for first year inputs. Subsidy of Rs.10,000/- a maximum of Rs.35000/- for the purchase
is provided to the entrepreneurs who of 4 wheeler will be provided to a group of 3-4
construct one acre fish culture tanks in persons.
their own land and take up fish culture.
Apart from this, 50% subsidy subject to a Apart from this, under this scheme
maximum of Rs. 5000 is provided to farmers provision has been made for fishermen who
who have stocked their tanks with grass possess non motorised (pathi doni) boats to
carp seed. Fish farmers are given purchase fishery requisites for unit cost of
awareness regarding fish culture and they Rs.10,000 and avail subsidy of maximum
are provided with free 250 fish seeds to stock Rs.5000/-.An expenditure of Rs.155.20
in wells and irrigation ponds. lakh has been incurred against the budget
provision of Rs.157.50 lakh under this
Allocation is made towards the operation scheme during 2018-19. Subsidy was given
cost for production of fish seed in fish seed to 1189 beneficiaries.
production farms, rearing of fish seed in
farms and at taluk level nurseries, cages During 2019-20, an allocation of Rs.180.00
and pens, procurement and transportation lakh has been provided and Rs. 16.61 lakh
of fish seed, purchase of seed transport expenditure is incurred up to end of
vehicles, maintenance of vehicles and November 2019.
purchase of farm equipments.
4. Exhibition and training:
The allocation for the scheme during 2018-
19 was Rs.575.30 lakh and the total Under this scheme, allocation has been
expenditure to implement the above made for participation and to prepare
programmes was Rs.526.46 lakh. 2791 suitable exhibits on fisheries department
beneficiaries have availed the benefit of this and its activities at State, District and
scheme. Taluklevel exhibitions. Training is provided
to interested fish farmers on fish culture
In the year 2019-20, an allocation of activities and information on departmental
Rs.676.05 lakh has been made and schemes is given. An allocation of Rs.91.20
Rs.141.00 lakh expenditure has been lakh was made for exhibition and training,
incurred up to November 2019. out of which Rs.88.82 lakh has been spent
in 2018-19.
3. Assistance to construction of fish
markets and fish marketing (ZP sector) An allocation of Rs. 109.51 lakh has been
made during 2019-20 and an expenditure of
In order to help fisher folk, to sell and Rs.11.27 lakh has been incurred up to the
transport harvested fish in fresh and end of November 2019.
hygienic condition, assistance is being
Economic Survey of Karnataka 2019-20 295

5. Blue Revolution-Integrated Rs.477.48 lakh (including Opening


Development and management of Balance) has been incurred up to the end of
Fisheries: November 2019.
Central Government has introduced a The constraints and gaps identified in
flagship programme called Blue Revolution- the Department:
Integrated development and management of
r Resources of the state are Rain
fisheries to bring about a significant growth
dependent due to which there is varied
in the fisheries sector in the next 5 years.
utilizaiton of resources and production.
Under this scheme the following
programmes have been included for the r Inadequate availavbility of inputs
overall development of the fisheries sector including fish seeds.
and socio economic development of
r High Cost of feed and non availability of
fishermen.
feed locally is affecting the feed based
1. National Fisheries Development Board aquaculture.
(NFDB) and its activities.
r Non-availability of alternative fast
2. Development of Inland Fisheries and growing candidate species to diversify
Aquaculture. the aquaculture practices.
3. Development of Marine Fisheries, r Lack of field functionaries to take up
Infrastructure and Post-Harvest effective extension.
Operations.
Results (Achievements) and challenges:
4. Strengthening of Database &
Geographical Information System of Achievements:
the Fisheries Sector. r Overall improvement in the socio
5. Institutional Arrangement for Fisheries economic status of fishermen
Sector. r Introduction of new candidate species
6. Monitoring, Control and Surveillance for culture like Pungasius, GIFT
(MCS) and other need-based Tilapia and local varieties of carps.
Interventions. r Utilization of all resources effectively,
7. National Scheme of Welfare of efficiently and sustainably for
Fishermen. enhancing fish production and enhace
income Fishers.
In the 2018-19, a budget allocation of
Rs.100.00 lakh has been earmarked. Future Challenges:
The balance amount Rs.232.20 lakh of the r Open sea cage culture to promote
year 2016-17 was allocated through mariculture as an alternative to
reappropriation from the scheme capture fishery.
“Reimbursement of Sales Tax on Diesel for
fishing boats”. In order to utilise the balance r Implementation of “MISSION
amount of Rs.730.23 lakh (Central: FINGERLINGS” to address the
Rs.438.14 lakh; State: Rs.292.09 lakh) of inadequate supply of quality fish seed.
the year 2017-18, an additional allocation of r Strengthening Inland fish marketing
Rs.630.23 lakh has been provided. Thus, a infrastructure and cold chain.
total of Rs.962.43 lakh was released for
various programmes. Out of this, Rs.939.45 r Diversification of aquaculture practices.
lakh has been spent. In the last week of r Introduction of high yielding and eco
March 2019, Rs.751.28 lakh has been friendly culture systems.
released by Government of India for the
programmes proposed in 2018-19. r Paradigm shift towards new
opportunities in the sector to achieve
An allocation of Rs.100.00 lakh has been the intended objectives of “BLUE
made during 2019-20 and expenditure of REVOLUTION”.
296 Economic Survey of Karnataka 2019-20

7.16 FOOD SECURITY THROUGH families that shall be eligible for PDS
PUBLIC DISTRIBUTION SYSTEM entitlement under Antyodaya Anna Yojana
(AAY) and Below Poverty Line (BPL)
7.16.1 Provision of Food to the Poor categories. Necessary arrangements are
through Public Distribution System in made for the delivery of qualitative, fixed
Karnataka quantity of food grains at free and
1. The Public Distribution System (PDS) concessional rate in a transparent and
evolved as a system of management of accountable manner to the poor through the
scarcity and for distribution of food Fair Price Shops (FPSs). The term BPL has
grains at affordable prices. Over the been discontinued under National Food
years, PDS has become an important Security Act (NFSA) and instead the term
part of Government's policy for Priority Household has been introduced in
management of food economy in the place of BPL. This indicates wider coverage
country. PDS is supplemental in nature as compared to the earlier concept of BPL.
and is not intended to make available Accordingly, the State Government in its
the entire requirement of any of the order dated16-08-2016, 25-03-2017 and
commodities distributed under it to a 20-05-2017 has notified 04 exclusion
household or a section of the society. criteria. The same is given below:

2. PDS is operated under the joint 1) Without considering salary, all


responsibility of the Central and the permanent employees of Government or
State Governments. The Central Government Aided Organisation or
Government, through Food Corporation Government sponsored Government
of India (FCI) has assumed the owned organisations/ Boards/
responsibility for procurement, storage, Corporations/Deemed organizations
transportation and bulk allocation of and all families remitting Income
food grains to the State Government. Tax/Service Tax/ VAT/Professional
Food grains are distributed through the Tax.
PDS to the poor at fixed rates 2) 3 Hectares Dry land or equivalent
throughout the year. The PDS runs Irrigation land in Rural areas or in
parallel with the market mechanisms to Urban areas, families owning self
provide food at free and controlled rates owned pakka house with a dimension of
to the poor to provide sustenance and not more than 1000 square feet.
food security to the people for whom
food at market prices are beyond reach. 3) Families owning four wheeler other
As in other States, rice, wheat, sugar than those owning one self driven
and kerosene oil are distributed commercial vehicle either Tractor,
through the Fair Price Shops (FPSs) in Maxicab, Taxi etc for livelihood
Karnataka as well. Distribution of sugar purpose.
has been discontinued from April 2017. 4) Those who are not within the Income
3. The operational responsibility limit of Rs.1,20,000/-.
including allocation within State, National Food Security Act-2013 has been
identification of families below the implemented in the State from January
poverty line, issue of Ration Cards and 2014. Under this Act, Central Government
supervision of the functioning of FPS, releases 35 kg of foodgrains to AAY and 5 kg
rests with the State Governments. foodgrains for each unit or member of
priority household in the State. Households
7.16.2 Targeted Public Distribution
belonging to both AAY and Priority
System (TPDS)
Household (PHH) families are being
The PDS was revamped as Targeted Public distributed foodgrains as specified under
Distribution System (TPDS) in1997 in order NFSA and as per the NFSA foodgrain
to target the system towards the poor. The allocation. But the foodgrains are
State Government identifies such poor distributed free of cost by the State
Government.
Economic Survey of Karnataka 2019-20 297

7.16.3 Wholesale Depots and Fair Price According to this Act AAY families are
Shops entitled to 35 kgs of foodgrains and each
member of the Priority household are
At present, release of foodgrains to the state entitled to 5 kg foodgrains under NFSA.
from the Central Government are being Besides 5 kg foodgrains, an additional 2 kg
lifted from the district FCI godowns to the foodgrains is being distributed to each
taluk wholesale depots by the Wholesale member of priority household. During
transporters, selected by the department November-2019 there are around 3.93
through a process of tender. As per the Crore PHH beneficiaries under Public
earlier practice, foodgrains from the taluk Distribution System which is according to
wholesale godowns upto the fair price shops the directions of the Central Government.
were lifted by the respective fair price shop APL families are considered as Non-priority
owners. With the implementation of Door families and they have been issued
Step Delivery system, foodgrains from the foodgrains at concessional rate with effect
Taluk Wholesale Godowns upto the Fair from June 2015. Presently the Central
Price Shops are being lifted by the Retail Government is releasing 2,17,403 MTs of
Transporters who are selected through the rice to the State as NFSA allocation. The
tender process. In Taluks where retail State Government requires around 75000
transporters have not been selected, MT of additional foodgrain to meet the
foodgrains from the wholesale godowns are requirement of 2 kg allocation given by the
lifted by the Fair Price Shop Owners. State. The entire expenditure of the said
Depending on the topography and existing additional quantity is borne by the State
cardholders, there is one FPS in every Government.
Revenue village. Keeping in view the PDS is being implemented based on the
economic viability of the Fair Price Shops, NFSA guidelines. Which emphasises mainly
minimum number of ration cards in fair on food security with respect to hunger
price shops in rural and urban areas has index. State also tried to improve nutritional
been specified in the Karnataka Essential quality in PDS.
Commodities Public Distribution System
(Control) Order 2016. In the hilly areas of 7.16.5 Anthyodaya Anna Yojane (AAY)
Dakshina Kannada, Kodagu, Raichur,
The Central Government has implemented
Mysore and Chamarajanagara, 9 mobile
Anthyodaya Anna Yojane (AAY) which is in
FPSs are also working which are operated by
force w.e.f. August-2002 in the State. It
the Karnataka Food and Civil Supplies
considers the poorest of the poor and the
Corporation. Around 19885 FPSs are
concept has been evolved for those who are
operating in the State as on November-
not able to afford two square meals per day.
2019. Details of the number of FPSs in
They are the poorest segment of the BPL
various districts of the State are given in
population such as landless agricultural
Appendix 12.5. laborers, households headed by widows,
7.16.4 National Food Security Act-2013 terminally-ill persons affected by HIV,
(NFSA) households headed by old age person with
meagre income or non-income come under
National Food Security Act-2013 is in force this scheme. Such beneficiaries are
w.e.f. January-2014 in the State. NFSA has identified in the Grama Sabha by the
adopted the concept of “Priority households” concerned Grama Panchayath. Under this
and “Non-Priority households” in place of scheme 35 kgs of foodgrain is being
BPL and APL. Under this Act the Central distributed to each AAY family. Accordingly,
Government has specified percentage during November-2019 around 7,64,745
population coverage under priority cardholders have been identified as AAY and
household as 76.04 % in rural area and in these families have availed 35 kgs of
49.36% urban area. In Karnataka State AAY foodgrains under NFSA.
and BPL cards families has been considered
as Priority Families under this Act.
298 Economic Survey of Karnataka 2019-20

7.16.6 Annabhagya Yojane Kerosene is also being allocated for fishing


purpose during fishing season. Based on the
Annabhagya scheme is in force w.e.f. July-
permits issued by the Deputy
2013 in Karnataka. From the date of
Commissioners, each permit is entitled to
implementation of Annabhagya yojane the
300 Ltrs of Kerosene in the coastal districts
beneficiaries of BPL card holders are availing
of Dakshina Kannada, Udupi and Uttara
enhanced quantity of foodgrains. Earlier to
Kannada. Presently 1355 KL of subsidized
this a BPL card family having one member
kerosene is being allocated for fishing
were availing a minimum quantity of 4 kg
purpose every month. GOI has allotted
rice and 1 kg wheat, and a maximum
12996 KL of Superior Kerosene Oil (SKO) at
quantity of 20 kg rice and 3 kg wheat.
non subsidized price for special purpose like
According to New Scheme a BPL family
fishing, flood etc., for the year 2019-20.
having 1 member is availing quantity 10 kg,
2 members family is availing 20 kg, 3 Bangalore IRA, Bangalore Urban, Bangalore
members and above family is availing 30 kg Rural and Shimoga Districts have been
of foodgrains. Under Annabhagya Scheme declared kerosene free along with the urban
upto April 2015 the rate of issue of areas of Dakshina Kannada District.
foodgrains per kg is also reduced to Rs. 1.00.
With the implementation of Annabhagya
Unit system of foodgrain distribution was
Yojana there is more positive effect in the
introduced from May 2015 onwards.
production on Agricultural field. In addition
Accordingly, every unit of priority household
to Central supporting price, the local
are being distributed 5 Kg of foodgrains at
attractive bonus on the crops of paddy, ragi
free of cost.
and jowar is also declared. Because of this
From the Year 2017-18, each member of the requirement of foodgrains in the state
priority household (PHH) is being under PDS system can also be stored locally
distributed 7 kg foodgrains and AAY and conveniently.
households are given 35 kg foodgrains.
The Central Government NFSA-2013 and
Foodgrains are distributed free of cost.
the State Annabhagya schemes are
These cardholders are also entitled to 1 kg
implemented in combination in the State.
dal per card as subsidized rates. Under this
According to this combined scheme the
scheme during the month of November-
requirement of food grains for every month
2019 around 1.26 crore BPL (AAY+PHH)
is 3 lakh MT. But the Central Government
families have been the beneficiaries.
monthly allotment of foodgrains is 2.17 lakh
Distribution of foodgains at no cost has not
MT, which is insufficient to meet the actual
only ensured food security but has also
foodgrain requirement of the State. As such
contributed to the purchasing power of the
this shortage is met from foodgrains like
AAY and PHH households. Sugar, Salt and
Rice (Custom Milled Rice), Ragi and Jowar
Palmoil/Sunflower Oil distribution has been
procured under MSP scheme in the State.
discontinued from the year 2017-18.
The additional requirement of the State is
Uniform rate for Kerosene is introduced fulfilled from the Open Market Sales Scheme
throughout the State. Presently, non-gas [OMSS (D)] foodgrains purchased in the e-
cardholders are being distributed 3 ltrs of auction held by Food Corporation of India.
kerosene. In rural areas, cardholders with Foodgrains Distribution under Annabhagya
LPG connection who register their Scheme Rate and Quantity details are given
willingness to obtain kerosene in their in Table 7.73.
respective gram panchayats are being
Besides Rice, as when Ragi and Jowar is
distributed 1 ltr of kerosene every month.
purchased under Minimum Support price
Kerosene is distributed at Rs.35 per litre.
Operations they are distributed under
Districtwise Kerosene Card counts and
Public Distribution System. But there is no
willingness registered card details as shown
continuous distribution of Ragi and Jowar
in Appndix-12.6.
under Public Distribution System.
Economic Survey of Karnataka 2019-20 299

The category wise beneficiaries identified as the Fair price shops shall function on all
AAY, PHH and NPHH are shown in the the days from 7-00 AM to 12-00 noon
Table 7.74. and from 4.00 PM to 8.00 PM (Except
every Tuesday and State Government
7.16.7 Padithara Khatari Scheme holidays).
As per Government modification Order no.
Aanasa 284 DRA 2014 Dated 28.06.2018 7.16.8 Annabhagya Adalath
Padithara Khatari Scheme has been revised Annabhagya Adalat has been introduced
in the state. from 01.06.2014 vide Government Order
1. This scheme has ensured availability of No. Aanasa 125 DRA 2014, Dated 09-06-
foodgrains from the beginning of the 2014. Adaalaths are conducted on 7th of
month and during the entire month. every month near selected Fair Price Shops
in the presence of any Government Officer.
2. As per the scheme the Fair Price Shops
are to issue PDS commodities from 1st At the Annabhagya Adalat, apart from
of every month to the cardholders and tackling the issues raised by the public, the

Table 7.73 : Food Grains Distribution under Annabhagya

Rice Wheat/ Ragi/ Jowar Toor dal


Sl. Category of
Ration cards scale of Rate scale of Rate scale of Rate per
No issue per kg issue perkg issue kg
( in Kgs) (in.Rs.) (in kgs) ( in.Rs.) (in Kgs) (in.Rs.)

1. AAY 35 K.G Free 0 0 0 0

PHH
7 K.G per
2. (Priority Free 0 0 0 0
member
Household)

Table 7.74 : Details of number of PDS Cardholders (In Nos)

Number of Card Holders

%ge to %ge to %ge to %ge to


Card %ge to
the the the the
type 2015-16 2016-17 2017-18 the state 2018-19 2019-20*
state state state state
total
total total total total

AAY 801845 7.61 793321 7.38 782776 6.52 776287 6.02 764745 5.82

PHH 9597173 91.12 9728718 90.57 10884899 90.73 11678053 90.60 11848983 90.17

NPHH 132779 1.27 220755 2.05 329388 2.75 435240 3.38 527146 4.01

Total
Cards
10531797 100 10742794 100 11997063 100 12889580 100 13140874 100
in the
State

* Upto November-2019. Source: Based on monthly allotment data, Food and Civil Suppies Department.
300 Economic Survey of Karnataka 2019-20

following issues are to be looked into: r Computerisation of Public


i) Complaints regarding ration card and Distribution System
the shop. The PDS identified every beneficiary
through their Aadhar demographic and
ii) Verification regarding quality, rate and biometric records. Also complete supply
scale of issue of PDS commodities chain management is made online and
issued to card holders as per their targeted beneficiary is being issued the
entitlements. entitlement through Aadhar authentication
iii) Correctness of the weighing scale / every month. Applicants can apply online to
measuring equipments for PDS request an NPHH Ration Cards and obtain
commodities. the ration card by creating an OTP.
Provision for online application for new
iv) Functioning of the shop as per ration card, installation of computers in
prescribed schedule. wholesale godowns, enabling of online
v) Functioning of the Vigilance Committee billing, installation of Point of Sale (PoS) at
Fair Price Shops in a phased manner have
vi) Diversion of PDS commodities to Black been initiated.
Market by the shop owner or possession
of bogus ration cards with shop owner r Right to information regarding the
or some other person etc. Fair Price Shops (FPSs)
Officer conducting adalat should verify The card holders have the right to know the
display of mandatory information by the address of the FPSs to which their ration
shop keeper like rate, scale of issue, stock card is assigned in order to avail foodgrains.
etc. and also verify the correct maintenance They also have a right to know other
of mandatory books of accounts like stock information about their FPSs like the
register etc. number of cards attached to the shop, the
actual entitlement of PDS commodities
The complaints received during received by the shop, rate at which the PDS
Annabhagya Adaalat and the discripancies commodities are to be distributed, timings
noticed by the adaalat conducting officer of distribution etc. Hence each FPS should
needs to be brought to the notice of the maintain basic information with regard to
concerned Deputy Commissioners. The number of cards, category of such cards
Deputy Commissioners have been directed assigned to their shops, name of the card
to redress the grievances and take holder, the number of units of each card etc.
necessary action to set right the Districtwise, Taluk wise Fair price shop wise
discripancies notified by the adaalat. allotment and card wise details have been
7.16.9 Action taken to implement made available on the department's website
Annabhagya yojane effectively www.ahara.kar.nic.in for public
information and scrutiny.
To implement Annabhagya yojane
effectively and transparently, the State r Statement of Eligible beneficiaries
Government has taken sustainable The list of eligible BPL beneficiaries is
measures. It is necessary that the available with the FPS holder and it will be
functioning of Fair Price Shop is displayed in the notice board of the
transparent. It is also necessary that particular FPSs. This will help to the card
sufficient information regarding the PDS holders to know the details of Foodgrains/
entitlement, rates etc. is provided to the Kerosene quantity, with assigned to that
ratin cardholders so that they obtain the particular card. During the time of lifting all
same without fail. In order to avoid the the card holders can ascertain the quantity
possibility of misuse of PDS foodgrains by of foodgrains/ kerosene that will be issued
negative elements in the society the to them. Then the card holders can sign in
following measures have been undertaken that particular statement and avail their
by the State. foodgrains.
Economic Survey of Karnataka 2019-20 301

r Display of stock details in the notice complainant shall receive cash reward of
board. Rs.400/- per such card. Besides this, the
The details of foodgrains lifted from the FPS informant who shall provide information
holder for that particular month will be regarding illegal diversion and black
displayed in the notice board of that marketing of PDS commodities shall receive
particular FPD. The card holders related to cash reward of upto 5% of the market value
that shop can easily avail their foodgrains of such commodities if the case stands
quota in time. Any violation of the rules by proved.
the FPD holder severe action will be initiated r Transparency in Public Distribution
against that FPD. System
r Distribution of new ration cards In order to induce transparency and
The procedure for issue of ration cards has efficiency in implementation of public
been simplified. The facility of intimating to distribution system, each beneficiary's
the card holders is implemented in the Aadhar number is attached to ration cards.
system whether the ration card application The department has successfully achieved a
has been accepted or rejected. With the help great success in introducing complete
of computer system available at Grama transparency with respect to beneficiary
Panchayath one can apply for new ration database and distribution system. And also
card. Government has to accord permission department introduces Intra and Inter state
to issue ration card at Grama Panchayath portability, so that any beneficiary can avail
level. At present in the urban area their entitlement in any Fair price Shop in
Bengaluru-one, Karnataka-1 and Atal the State as well as outside the state.
Janasnehi Centers has been appointed as r Complaint redressal
agencies, for the public to apply for ration
“AHARAVANI” Toll free No. 1967 and 1800
card through online.
425 9339 facility has been provided to
As on November 2019, around 851975 receive complaints with regard to the
applications have been received for PHH and distribution of foodgrains in “ANNABHAGYA
NPHH ration cards. Out of which 472012 YOJANE”. Also, online facility in the
applications have been disposed. department website has been provided to
lodge the complaint.
r SMS system
For the first time in the nation State r Sanction of Fair Price shops to
Government has introduced SMS system Government agencies and co-
free of cost to the card holders to know the operative bodies
entitlement of quantity of food grains and During Sanction of new FPSs priority has
the amount to be paid to FPS. been considered as per the below
Government Notification No.FCS/
r Identification of ineligible ration
17/RPR/2011(1) Dated: 21-05-2018 and
cards
action has been taken not to sanction the
Identification and cancellation of ineligible private individuals.
ration cards in the State is a continuous
process. During the year 2019-20, upto i. State Government Owned Corporation/
November-2019, around 1,24,157 ration undertakings or Companies or Gram
cards have been identified and cancelled. Panchayats/ Urban local bodies.

r Reward Scheme ii. Societies.


With a view to curb leakages in Public 1. Taluk Agricultural Primary Societies
Distribution System, reward scheme has & Co-operative marketing societies.
been introduced to identify ineligible ration 2. Primary Agricultural Co-operative
cards with active participation of general society or VSSMS.
public. As per the scheme, for information
on proven ineligible ration cards, the 3. HOPCOMS.
302 Economic Survey of Karnataka 2019-20

4. Registered Co-operative society. r A separate State Food Commission has


been constituted and functioning
5. Registered primary consumer Co-
effectively.
operative society
r Ineligible ration cards are being
6. LAMPS (Large size Adivasi's Multi cancelled after detail inspection of
Purpose Society). FPD by the Food Inspectors. Due
7. Registered weavers co-operative instructions have been given to the
society. Food Inspectors to conduct such
inspections frequently.
8. Registered women multipurpose
co-operative society. r While issuing foodgrains and kerosene
at Wholesale Point and FPD, the
9. Registered multipurpose Eligibility List of the ration card holders
co-operative society. can be obtained, certified and PDS
10. Physically disabled welfare commodities can be distributed after
co- operative society. obtaining signature of the eligible card
holders in the eligibility list.
11. Banks run by co-operative societies r Aadhaar number of all ration card
or co-operative banks. holders has been seeded to their
III. Individuals respective Ration cards. Presently,
around 99% of seeding of members is
a) Persons with benchmark disability completed.
category (400 shops to start with)
r The ration card details have been
b) Persons of transgenders category (30 displayed in the department website.
shops to start with) On the basis of this, one can record any
7.16.10 Monitoring of Annabhagya opinion regarding ration card and also
Yojane by this information regarding ineligible
ration card holders can be ascertain
For effective implementation of and action will be initiated against such
“Annabhagya yojane” which is one of the card holders.
flagship programmes of the State r Presently PDS commodities are being
Government and to avoid diversion of distributed through POS machines as
foodgrains the following steps have been against the earlier system of bio
undertaken. authenticated aadhaar based coupon
r Directions have been issued to the system for distribution of PDS
concerned Executive officers/ staff to commodities.
initiate stringent action under EC act r To ascertain whether the ration card
1955 and Karnataka Essential holder have availed correct quantity
Commodies Public Distribution System and rate of foodgrains the Fair Price
(Control) Order 2016 against those who Shop owners have to upload the
misuse PDS commodities distributed information through IVRS on the same
under Annabhagya Yojane. day.
r Prevention of Black Marketing and r Under Annabhagya Yojane, around 118
Maintenance of Supply of Essential cases during 2015-16, 63 cases during
Commodities Act 1980 has been 2016-17, 81 cases during 2017-18 and
strengthened and the executive 171 cases during 2018-19 and during
officers/staffs have been directed to 2019-20 upto the month of November
initiate action as per the provision of 2019 around 154 cases have been
this act. booked under Essential Commodities
r Presently, the process of re-constituting Act. Foodgrains stock has been seized
Fair Price Shop, Taluk, District and and action has been initiated against
State Level Vigilance Committees is concerned persons.
under progress.
Economic Survey of Karnataka 2019-20 303

7.16.11 Food grains Allotment and Vide Government Order No.FCS 61 RPR
Offtake 2018, dt.27-12-2018, the rate of MSP Ragi
and Jowar has been fixed at Rs. 2,897/- and
Foodgrains allotted by the Food Corporation Rs.2,450/- per quintal respectively.
of India (FCI) godown to the State are being Accordingly, 94390.00 MT Ragi has been
transported to the concerned taluk godown procured from farmers in Bangalore,
by the agencies appointed by the State Bellary, Chikkaballapura, Chitradurga,
Government. Davanagere, Kolar, Ramanagara, Tumkuru,
The State Government has identified Hassan, Chikkamagaluru,
agencies for lifting and distribution from FCI Chamarajanagara, Mandya and Mysore
wholesale godowns to the taluk godowns in Districts. Similarly, 1129.600 MT Jowar has
the State. The State Government has two been procured in Bellary, Haveri and
agencies, Karnataka Food and Civil Raichur districts.
Supplies Corporation Ltd, (KFCSC) which is The procured Ragi, Jowar and Custom
a Government organization and Taluk Milled Rice has been distributed under
Agricultural Produce Cooperative Marketing Public Distribution System to the card
Societies (TAPCMS) as wholesale nominees. holders from the month of September 2019.
Under PDS, food grains are lifted from FCI
godowns and godowns owned or hired by the 7.16.13 Allotment of foodgrains to the
wholesale nominees. The total capacity of welfare institutions under “DASOHA”
State-owned godowns and hired godowns is scheme
indicated in Appendix 12.7.
The Central Government provides foodgrain
National Food Security Act (NFSA) is in force allocation to the State under other Welfare
w.e.f. January-2014. Under this act Scheme for supply to welfare institutes such
foodgrains are distributed only for Priority as Nariniketans, Old Age Homes,
households (AAY and BPL cardholders Orphanages, Hostels, Homeless/Beggar
only). rehabilitation Centres etc. This foodgrain
allocation is released to the State at BPL
As per Government Order No.FCS 62 DRA
rates. The State Government vide
2019 (e-office), dt. 17-08-2019, distribution
Government Order No. Aanasa/
of Turdal under Public Distribution System
14/Aanasa/2017, dated 20-05-2017 has
has been dis-continued from September
ordered issue of foodgrains free of cost to
2019.
such welfare institutes in the State under
The percentage of allotment and off take of “DASOHA” scheme. Accordingly, from
food grains by the State since 2015-16 as September 2017 onwards 15 kg foodgrains
shown in Table 7.75 and Table 7.76. including 10 Kg rice and 5 kg wheat per
inmate is being distributed to the welfare
7.16.12 Minimum Support Price Scheme institutes in the State.
(MSP)
In order to induce transparency in selection
Government of India (GoI) Vide Order of eligible welfare institutes and allocation of
No. 3(4) 2018-PY-1, Dated 27-07-2018 has foodgrains to verified inmates of the
fixed the rate of Paddy Common and Grade A institutes, software has been developed for
variety at Rs.1750/- and 1770/-per quintal online registration of institutes and for
respectively for MSP operations. The State collection of aadhaar number and biometric
Government has issued Order No. FCS 77 of inmates of registered institutes. Also,
RPR 2018, Dated 24-11-2018 for exemption has been provided to certain
procurement of Paddy during the year 2018- category of inmates like blind, leprosy
19 at the price fixed by GoI. Accordingly, patients, terminally ill, mentally retarded
during 2018-19, 87909.727 MT Paddy has etc for providing aadhaar number and
been procured from farmers in Mandya, biometric. Certain institutes like hospital
Mysore, Chamrajnagar, Chikkamagaluru, dharmashala, remand homes and distress
Hassan, Shimogga, Ramanagara, Kodagu, homes for women etc have been exempted
Haveri and Davangere districts. from providing inmate details.
304 Economic Survey of Karnataka 2019-20

Table 7.75 : Details of Allotment and off take of Food Grains for AAY and PHH card
holders. (In MTs)

Sl. No. Year Foodgrains Allotment Off take %ge

Rice 1873543 1873462 100

Wheat 333746 333595 100

Ragi 101043 101043 100


1 2015-16
Jowar 6838 6838 100

Palm Oil (in KL) 89721 89721 100

Iodized Salt 87844 87844 100

Rice 1404806 1404806 100

Wheat 280412 280412 100

Ragi 203769 203769 100

Jowar 7128 7128 100


2 2016-17
Palm Oil/Sunflower
97784 97784 100
oil (in KL)

Iodized Salt 97784 97784 100

Green Gram 21033 21033 100

Rice 3039039 3039039 100

3 2017-18 Tur dal 109252 109252 100

Wheat 123987 123987 100

Rice 3391042 3391042 100

Tur dal 146152 146152 100


4 2018-19
Wheat 46186 46186 100

Ragi 41495 41495 100

Rice 2302094 2302094 100

5 2019-20* Jowar 1113 1113 100

Ragi 94492 94492 100

Source: Food and Civil Supplies Department. *Upto November-2019


Economic Survey of Karnataka 2019-20 305

Table 7.76 : Details of Allotment and off take of Food Grains for NPHH card
holders. (In MTs)

Sl.
Year Foodgrains Allotment O ff take %ge
No.

Rice 2379 2379 100


1 2015-16
Wheat 2452 2452 100

Rice 6911 6911 100


2 2016-17
Wheat 6788 6788 100

Rice 28907 28907 100


3 2017-18
Wheat No Allotment

Rice 19478 19478 100


4 2018-19
Wheat No Allotment

Rice 35429 35429 100


5 2019-20*
Wheat No Allotment

Source: Food and Civil Supplies Department. *Upto November-2019

As per November-2019 allocation 33079 C) As per Government Order number


inmates of 449 welfare institutes have been Aanasa 114 DRA 2016 (Part -2), dated
allotted 330.790 MT of Rice and 165.390 MT 05-05-2017, Fair Price Shops having
of Wheat. POS machines and distributing
foodgrains through POS transaction
7.16.14 Reformation by increasing the shall be paid an additional retail margin
margin for FPS holders amount of Rs. 17/- per quintal besides
A) As per Government Order No. Rs.70/-.
Aanasa/36/RPR/2016, dated 06-10- D) As per Government Order number
2016, retail transportation charge of Aanasa 110 DRA 2018 (Part-1), dated
Fair Price Shop owners has been revised 17-12-2018, Fair Price Shop margin
to Rs.14/- per quintal per kilometre for has been increased to Rs.83/- per
a distance of 0-10 kilometre and quintal the earlier margin of Rs.70/- per
Rs.1.40/- per quintal per kilometre for quintal. Along with the additional retail
distance covered beyond 10 kilometer. margin of Rs.17/- per quintal for POS
Also, loading/ unloading and hamali distribution, the total retail margin
charges have been revised to Rs.14/- amounts to Rs.100/- per quintal.
B) Vide Government Order No. Aanasa 13
7.16.15 Food Subsidy and Transportation
DRA 2016, dated 21-07-2016, retail
margin per quintal has been increased The expenditure incurred under PDS for
from Rs.36/- to Rs.70/-. As per GO No. purchase, transportation, storage and
Aanasa 114 DRA 2016 (Part-2) dated maintenance of PDS commodites is termed
05-05-2017, those Fair Price Shops “Subsidy on PDS Commodity”. Out of the
which have not installed POS machines total cost incurred towards transportation
shall be paid retail margin of Rs.13/- of NFSA allocation 50% of the cost is borne
per card. by the State Government while the other
306 Economic Survey of Karnataka 2019-20

50% is reimbursed by the Central verify the ration cards statistics by


Government. With respect to PDS visiting Web page: ahara.kar.nic.in/
commodities other than NFSA allocation, fcsstat. Supply chain is also
the entire cost is borne by the State computerized. Online Billing is done in
Governement. The details of Subsidy on all the wholesale points. Targeted
PDS commodity (including transportation) Public Distribution System (TPDS)
is given in Table7.77. related data and information have been
made available for Public in the
7.16.16 Retail Margin and transportation Departmental website.
charges
As per the Central Assistance Rules framed 3. Computers have been installed in 287
by Government of India under NFSA, out of PDS Whole Sale Points. All these
the total expenditure incurred towards Computers have been connected to the
payment of retail margin, transporation and NIC's Central Server through Broad
handling charges by the State Govenment, band. Apart from this facilities of the
Central Government will reimburse 50% of Computers connected to central server
the cost subject to maximum limit of Rs. through Broad band in the 6024
70/- per qtl towards retail margin and Rs. Panchayaths in the state, are also being
65/- per qtl towards transportation / used to process the application
handling charges. Also, out of the additional regarding ration cards in the village
retail margin of Rs. 17/- payble to Fair Price level. Web Cameras and Bio-metric
Shops for POS transactions, 50% of the cost devices have also been supplied to all
is reimbursed to the state. these Panchayaths.
4. Services of the Bangalore-one,
7.16.17 Computerisation of Public
Karnataka-one centres and Atalji Jana
Distribution System in the State
snehi centres and where there is no
1. The Department of Food has a digitized such centres, services of the Private
database of all ration cards. It includes Photo-bio centres are also being utilized
Priority households (PHH and to Capture the photos and Bio-metric of
Anthyodaya families) and Non priority the ration card holders and new
households (NPHH families). The applicants.
database is stored in the servers
5. Allotment of Public Distribution System
maintained by NIC at a centralized
Commodities up to the level of Fair Price
location in Bangalore.
Shops and up to the RC level is made
2. Public can visit the department online. It can be seen anybody by
website: ahara.kar.nic.in and if they visiting department website.
find any ineligible family possessing
6. Biometric of the ration shop owners are
BPL Ration Card and other
collected and the bio authentication in
irregularities, they can register their
wholesale point billing is being done to
opinion. Based on their opinion
confirm the authorized person is going
necessary action can be taken from the
to the wholesale point to collect food
department. Provision is also made to
grains.

Table 7.77 : Subsidy and transportation (Rs. in Lakhs)

Year 2015-16 2016-17 2017-18 2018-19 2019-20*

Expenditure
including Subsidy
219585.02 185387.76 254171.80 357004.47 224580.39
and transportation
(In Lakhs)

* Upto November-2019 Source:Food and Civil Supplies Department.


Economic Survey of Karnataka 2019-20 307

7. Departmental officers and public can System (IVRS) service wherein the
visit department website beneficiary could obtain coupon code on
http://ahara.kar.nic.in Karnataka his/her registered (with aadhaar number)
PDS Data Centre and they can see the mobile number by dialling 1614. The
foodgrains details, stocks etc., and beneficiary could generate One-Time
stock supplied to the Fair Price Shops Password (OTP) and obtain coupon.
from wholesale gowdowns in the State.
Through the coupon system aadhaar based
8. In order to identify cases where same bio authenticated distribution of foodgrain
family is in possession of more than one was introduced. And further the sytem was
ration card or more than one ration card simplified by introducing distribution of
has been issued to the same residential foodgrains through POS machines. Fair
address and in order to identify the Price Shop owners could use
residential address of the ration card computer/laptop/tablet or any smart phone
holder, aadhaar number of Head of as POS and utilise the web based service to
Household and all member of the ration distribute foodgrains to the cardholders.
card are being collected and seeded to Fair Price shop owners are paid and
the ration cards. In rural area, the additional retail margin of Rs.17/- per
department data has been linked to the quintal for POS transactions. During
PANCHATANTRA database of Rural November-2019, out of 19885 fair price
Development and Panchayat Raj shops, around 19487 fair price shops have
department to access property tax installed POS.
numbers.
7.16.19 Action taken as per NFSA 2013
7.16.18 Establishment of E-POS
As per National Food Security Act 2013,
Machines
obtaining PDS foodgrains has become a
In order to curb irregularities in the Fair right. The ration card holders shall be
Price Shops, Electronic Weighing-cum point eligible for payment of food security
of Sale Machines (E-POS) having special allowance if their entitlement is denied.
features were established in 3877 fair price NFSA has been implemented from January
shops in the State by the Government itself 2014 in the State. Accordingly AAY card
and it was intended to install such POS in all holders are given 35 kg and each member of
the fair price shops in the State. But the PHH ration card are being given 5 kg
scheme has been dropped due to huge foodgrains as NFSA allocation. Besides 5 kg
expenditure that could be incurred on PHH beneficiaries are being given additional
installation and maintenance of such 2 kg foodgrains. The entire expense incurred
machines. The Department adopted coupon towards 2 kg additional foodgrains is
system to distribute PDS commodites. As completely borne by the State Government.
per this system, the beneficiaries could
7.16.20 Following Measures have been
obtain monthly coupon from the designated
kiosks like Bangalore One, Karnataka One, undertaken by the State Government
Jansnehi Kendra, Gram Panchayat and regarding Grievance Reddressal, Social
authorised Private Centres against their Audit etc., as per NFSA 2013 is given in
biometric authentication. The printed Table 7.78.
coupons contained information regarding 7.16.21 Mukhya Mantri Anila Bhagya
the PDS commodities, quantity and price Yojana
which the beneficiary is entitled to. This
ensured awareness among PDS In order to make the State Kerosene free and
beneficiaries regarding their monthly to provide pure fuel to the households in
entitlement and assured them a right to place of kerosene Mukhya Mantri Anila
obtain the same with due clarity. The system Bhagya scheme has been introduced from
of obtaining coupon was further simplified 31-10-2017. The scheme of departments
by providing Interactive Voice Response like Food, Forest, Labour and Social Welfare
Department related to providing of LPG
308 Economic Survey of Karnataka 2019-20

Table 7.78: Details of Sate Government Grievance Reddressals

Government Order Subject

No. Aanasa 52 DRA Deputy Commisioners of the districts have been designated as
2012, dated 5-9-2013 District Grievance Reddressal Officers (DGRO)

No. Aanasa 52 DRA


2012(1), dated 18-6- Guidelines have been framed for Grievance Reddressal by DGROs
2016

Aanasa 52 DRA 2012, Assistant Directors of Food department and Tahasildar grade 1 have
dated 5-9-2013 and been designated as district level and taluk level nodal officers
24-3-2017 respectively as part of internal grievance reddressal mechanism

Aanasa 52 DRA 2012, Guidelines with respect to duties and responsibilities of nodal
dated 18-6-2016 officers have been framed.

Aanasa 52 DRA 2012,


State Consumer Forum had been designated to function has State
dated 10-6-2017 and
Food Commission and a separate State Food Commission has been
Aanasa 100 DRA 2017
constituted.
dated 5-7-2017
FCS 144 DRA 2013,
Regarding constitution of Vigilance Committees at Fair Price Shop,
dated 30-5-2016 and 8-
Taluk and District Level and Rules with regard to duties and
11-2016 and Aanasa 52
responsibilities of the Fair Price Shop level vigilance committee
DRA 2012(5), dated
members has been framed.
18-6-2016

For conducting social audit of implementation of PDS at FPS,


Aanasa 52 DRA 2012(4),
through the Directorate of MGNREGA which has been constituted
dated 18-6-2016
under the State MGNREGA Social Audit Rules 2011

Source: Food and Civil Supplies Department.

connections have been brought together 7.16.22 Punarbelaku Yojana


under MMABY for implementation by Food
Government has issued GO for
Department which the nodal department for
implementation of the said scheme. Under implementation of “Punarbelaku” scheme
the scheme, households having non gas vide GO dated 31-10-2017. According to
ration card, will be provided gas connection this, if the rural ration card holders
at a cost of Rs.4254/- (This includes single presently availing 1ltr kerosene express
LPG connection, 2 burner gas stove, 2 their willingness at the Gram panchyats
cylinder refill cost). Presently, a target of 10 regarding their preference for the same
lakh beneficiaries has been fixed for the instead of kerosene, they shall be entitled to
scheme. As on 14-11-2019 about 3.25 lakh rechargeable LED bulb costing Rs.300/-
applications have been received and have Creation of awareness among the card
been approved at different stages. Action holders is being taken.
has been taken to distribute upto the month 7.16.23 Expected Outcome of
of November 2019 about 96,753 gas stoves Annabhagya
to the beneficiaries. The Expenditure for this
programme incurred by the department Annabhagya Scheme was introduced with
under head of account 3456-00-103-0- the vision of creating hungerfree State. This
01(106). scheme has to a large extent achieved this
Economic Survey of Karnataka 2019-20 309

vision by distributing foodgrains in the form from the local farmers under MSP
of rice, wheat, ragi and jowar, double operations under Annabhagya Scheme has
fortified edible oil, double fortified salt and helped the local farmers to get assured rates
pulses either free of cost or at subsidized and a market for their commodity. This has
prices thereby fulfilling the nutritional not only contributed to the financial security
needs of the card holders. This has of farmers but has also given a boost to
contributed to the purchasing capacity of production of these commodities locally. It
the card holder i.e. the cardholder has been may be concluded that Annabhagya Scheme
able to afford purchase of other day to day has improved the standard of living,
essentials due to fulfilment of basic need. ensured food security and assured a life
The distribution of ragi and jowar procured with dignity to all the beneficiaries.
310 Economic Survey of Karnataka 2019-20
NATURAL RESOURCES CHAPTER 8
AND ENVIRONMENT

8.1 FORESTS natural habitat, mining and quarrying,


Forests are an integral part of the natural wildlife poaching, smuggling of timber,
resources and integral part of erosion of common property resources,
environmental and ecological systems. The excessive fuel wood collection and live
State's dense forests are located in the stock grazing. The Forest Department
Western Ghats region. About 60% of the of Karnataka has succeeded in halting
Western Ghats of the country is located in quantitative depletion of forest cover
the State. In order to protect and through afforestation programmes but
develop bio-diversity, the State has formed the deteriorating quality of forests
4467 Bio-diversity Management continues to be a major threat to the
Committees at Grama Panchayat level. Bio- sustainability of both human beings and
diversity heritage sites (such as the 400- animals.
year old tamarind grooves at Nallur, 8.1.1 Area under forests:
Devanahalli taluk) have been developed to
conserve and develop the unique genetic Karnataka's geographical area of 191,791
diversities. sq. km. constitutes 5.83% of India's area.
Forest accounts for the second largest land
In recent years, due to fundamental and use after agriculture. As on November 2019,
proximate factors, Western Ghats, one of the the total area under forests in the state is
hot spots of the world's bio-diversity has 42,200.44 sq. km. Thus, about 22% of the
been under severe threat. Although the State's geographical area is under forest
depletion of forest cover is halted to a (Table 8 .1).
large extent and forest cover has
quantitatively increased in the recent years, The estimates of Forest Survey of India (FSI
the natural forest stock is qualitatively 2017) on the basis of satellite data show that
still under degradation. Increased the forest cover within and outside recorded
deforestation and degradation of the forest area of the State is 43263 sq.km,
environmental resource base has serious which is lower than the State's estimates
implications for production and resilience of Thereby, about 22.56% of the geographical
the ecosystem. area of the state is under forest and tree
cover (Table 8.2). The estimation of forest
Forest resources significantly contribute to cover, classified on the basis of forest
the State's Gross Domestic Product (GDP) canopy density, shows that the State has
by being a major source of timber, medicinal 4502 sq. km of very dense forest, 20,444 sq.
plants, Non timber forest products (NTFPs), km of moderately dense forest and 12,604
grazing, recreational activities, carbon sq.km of open forest. District wise forest
sequestration, watershed provisions etc. canopy density estimates along with the
Forest resources are under severe pressure changes (as compared to the 2013
due to rapid population growth and in this assessment) are given in (Table 8.3),
scenario, meeting developmental, Figure 8.2
livelihood, agricultural and industrial needs
and conserving forests for productive and (A) Reasons for change detected in 2017
ecological services is a major challenge. The assessment:
main factors responsible for the depletion of The main reason for net increase of
the forest resource base are diversion of 1101sq.km in forest cover and 161sq.km in
forest areas for developmental activities, tree cover in the state can be attributed to
encroachment of forest area, destruction of plantations and conservation activities both

311
312 Economic Survey of Karnataka 2019-20

Table 8.1: Classification of total forest area in Karnataka

Legal Status Area (Sq. Km.) % age of geographical area

1 Reserved Forest 29978.90 15.63

2 Protected Forest 2133.42 1.11

3 Village Forest 86.84 0.05

4 Unclassified Forest 9948.81 5.18

5 Private Forest 52.47 0.03

Total 42200.44 22.00

Figure 8.1: Classification of total forest area

Table 8.2 : Forest cover within and outside recorded Forest Area as per Forest
Survey of India -2017

Forest Area Area in Sq. km

Forest cover within Recorded Forest Area 22384

Forest cover outside Recorded Forest Area 15166

Tree cover 5713

Total 43263
State’s Geographical Areas 22.56%
Economic Survey of Karnataka 2019-20 313

Table 8.3 : District–wise Forest Cover along with Geographical Area in 2017
(sq.km)

Very Mod. Total % of


District Geog. Dense Dense Open Forest Geog. Change Scrub
Area Forest
Forest Forest Area area

Bagalkot 6552 0 19 234 253 3.86 54 399


Bengaluru Rural 2298 0 16 99 115 5.00 -136 23
Bengaluru Urban 2196 0 19 215 234 10.66 117 8
Belgavi 13433 36 738 360 1134 8.44 40 688
Bellary 8461 0 110 624 734 8.68 -53 466
Bidar 5448 0 22 63 85 1.56 30 37
Vijayapura 10498 0 0 24 24 0.23 11 10
Chamarajnagar 5648 91 1524 1105 2720 48.16 62 129
Chickkaballapura 4244 0 17 232 249 5.87 71 181
Chikmagaluru 7202 902 2530 504 3936 54.65 264 74
Chitradurga 8436 0 51 503 554 6.57 53 595
D.Kannada 4861 558 1105 1262 2925 60.17 -74 3
Davangere 5924 11 167 531 709 11.97 171 320
Dharwad 4260 0 224 158 382 8.97 -5 3
Gadag 4657 0 0 143 143 3.07 20 117
Kalaburagi 10954 0 92 100 192 1.75 22 29
Hassan 6814 148 734 562 1444 21.19 81 68
Haveri 4823 0 148 213 361 7.48 -36 103
Kodagu 4102 796 1880 575 3251 79.25 -102 2
Kolara 3979 0 55 265 320 8.04 17 68
Koppal 5570 0 0 30 30 0.54 16 172
Mandya 4962 0 110 262 372 7.5 50 97
Mysuru 6307 125 586 318 1029 16.32 -18 30
Raichur 8442 0 1 43 44 0.52 20 149
Ramnagara 3516 0 190 421 611 17.38 48 170
Shivamogga 8478 477 2826 1017 4320 50.96 -87 23
Tumkuru 10597 0 65 911 976 9.21 66 387
Udupi 3582 215 1336 587 2138 59.69 86 0
Uttara Kannada 10277 1143 5862 1113 8118 78.99 293 2
Yadgiri 5270 0 17 130 147 2.79 20 131
Total 191791 4502 20444 12604 37550 19.58 1101 4484
Source: Forest survey of India 2017.
314 Economic Survey of Karnataka 2019-20

within and outside the recorded forest area B. Comparison with southern states:
as well as improvement in interpretation
Forest cover in Karnataka is 19.58% to total
due to better radiometric resolution of the
geographical area of the state as per Forest
recent satellite data from Resourcesat-2.
Survey of India, where as, in southern states
Large scale increase in commercial
Kerala has highest proportion of forest cover
plantation of palms outside the forest areas,
to its total area. The comparison with
density improvement in scrub forests and
expansion of mangrove cover due to neighboring states is given in Table 8.6 &
conservation, planting activities in forest Figure 8.3
and non forest areas and rehabilitation C. Forest cover in Different Forest Types:
efforts are also the other important reasons
for the net increase of forest and tree cover in The forest vegetation is classified into seven
the state.(Table 8.3) types based on gradients of rainfall, length

Table 8.4 Forest cover according to Forest Survey of India (sq.km)

Yearw ise Fo rest cover ( area in Sq k m)


S l.
Fo rest C lass
No .
2 0 05 2 0 07 2 0 09 2 01 1 20 1 3 2 0 15 20 1 7

1 Den se Fores t 219 68 219 58 2196 8 21 956 219 56 218 44 219 60

2 Open F orest 142 32 142 32 1423 2 14 238 141 76 145 77 144 89

Total 36 2 00 36 1 90 3 6 20 0 3 61 9 4 3 61 3 2 36 4 21 3 64 49

3 India 6901 71 6908 99 6 9017 1 692 077 6978 98 7016 73 7014 95

Pe rcen tage f ore st


4 cove r of state vis-a 5.2 5 5.24 5.24 5 .24 5. 17 5.1 9 5.1 9
vis In dia

Table 8.5 Forest Cover Change Matrix of Karnataka according to Forest Survey of
India (area in Sq. km)

2017 Assessment Total ISFR


2015
VDF MDF OF SCRUB NF updated
Very Dense Forest 1422 317 28 0 16 1783

Moderately Dense Forest 2713 14857 1594 21 992 20177

Open Forest 367 4171 7910 508 1533 14489


Scrub 0 61 640 2251 230 3182

Non-Forest 0 1038 2432 1704 146986 152160

Total ISFR 2017 4502 20444 12604 4484 149757 191791

Net Change 2719 267 -1885 1302 -2403


Economic Survey of Karnataka 2019-20 315

of dry season and temperature. About 8.1.2 National Parks and Wildlife
16.70% of forests are wet evergreen, 13.56% Sanctuaries:
is semi-evergreen, 24.20% is moist
deciduous and 24.34% is dry deciduous. The forests of Karnataka support a wide
Thorn forests form 11.93%, plantations range of flora and fauna (bio-diversity)
form 8.24% and broad-leaved hill forests through a network of well-connected and
protected Wildlife Sanctuaries and National
form 1.03% (Table 8.7).
Parks (Tables 8.9 & 8.10). The State has 5
D. Tree Cover and Forest Cover : National Parks and 33 Wildlife Sanctuaries
covering an area of 10,717.27 sq. kms.
The estimated forest cover is 19.58% and
Apart from the National Parks and
the tree cover is 2.98% of the geographical
Sanctuaries, the State has 14 Conservation
area totaling 22.56% (Table 8.8).
Reserves and 1 Community Reserve

Figure 8.2: Forest areas according to Forest survey of India

Table 8.6 : Comparison with southern states

Geographical Total Forest Percent of


State
area cover Geographical area

Karnataka 191791 37550 19.58

Andhra Pradesh 162968 28147 17.27

Telangana 112077 20419 18.22

Kerala 38852 20321 52.30

Maharashtra 307713 50682 16.47

Tamilnadu 130060 26281 20.20

India (Total) 943461 183400 19.44


316 Economic Survey of Karnataka 2019-20

Figure 8.3 : Proportion of Forest cover to Geographical Area in Percentage

Table 8.7 Forest cover in Different Forest Types

Sl.
Types of Forests % of Forest Area
No.

1 Wet Evergreen Forests 16.70

2 Semi-Ever green Forests 13.56

3 Moist Deciduous Forests 24.20

4 Plantation/TOF 8.24

5 Dry Deciduous Forests 24.34

6 Thorn Forests 11.93

7 Sub-Tropical Broad Leaved Hill Forests 1.03

Total 100.00

Table 8.8: Forest and Tree Cover


Area
Category % of Geographical Area
(in sq. km.)

Tree Cover 5713 2.98

Forest Cover 37550 19.58

Total Forest & Tree Cover 43263 22.56


Economic Survey of Karnataka 2019-20 317

comprising of 175.029 sq. kms. All these second highest tiger population in the
areas form 25.33% of the total forest area. country.
These are spread over evergreen to scrub
The proposals for expansion of various
forests, representing different ecosystems
Sanctuaries in Karnataka in the purview of
with rare and endangered species of plants,
connecting corridors were discussed in
animals and birds.
detail and was approved unanimously as
State has 25% of the country's Elephant per the proceedings of the 11th meeting of
population. As per 2017 population State Board for Wildlife held under the
estimation, there are 6049 elephants. The Chairmanship of Hon'ble Chief Minister of
State has 5 Tiger Reserves As per the All Karnataka on 09-01-2019. In addition some
India Tiger Estimation conducted during of the potential Reserved Forests areas have
2017, the tiger population of Karnataka is been identified and declared as Wildlife
estimated at 524 nos. and Karnataka has Sanctuaries namely Kappathagudda

Table 8.9: Wildlife Preservation: National Parks / Bird Sanctuaries / Wildlife

Sl. National Park / Wildlife Area


Circle Division
No. Sanctuary (Sq.Kms)

1 CCF Bangalore Circle 1. DCF, Bannerghatta 1. Bannerghatta National Park 260.51


National Park

2. DCF, Ramanagara 2. Ramadevara Betta Vulture 3.46


Dvn.
Sanctuary

3. DCF, Kolar Dvn. 3. Kamsandra Wildlife Sanctuary 78.62

2 CCF, 4. DCF, WLD, 4. Adichunchanagiri Peacock 0.84


Mysore Circle. Mysore Wildlife Sanctuary

5. Ranganathittu Bird Sanctuary 0.67

6. Arabithittu Wildlife Sanctuary 13.50

7. Melkote Wildlife Sanctuary 49.82

3 CCF, 5. CF & Director 8. BRT Tiger Reserve 539.52


Chamarajanagar Circle, Chamarajanagar

6. DCF, Cauvery WLD, 9. Cauvery Wildlife Sanctuary 1027.53


Kollegal
Cauvery Extension Wildlife 53.39
Sanctuary,

7. DCF M.M.Hills 10. Malai Mahadeshwara Wildlife 906.187


WLD, Kollegal Sanctuary
318 Economic Survey of Karnataka 2019-20

Sl. National Park / Wildlife Area


Circle Division
No. Sanctuary (Sq.Kms)

4 CCF, Kodagu Circle 8. DCF, WLD, Madikeri 11. Pushpagiri Wildlife Sanctuary 102.92

12. Talacauvery Wildlife 105.59


Sanctuary

13. Bramhagiri Wildlife Sanctuary 181.29

5 CCF, Mangalore 9. DCF, Kudremukh 14. Kudremukh National Park 600.57


Circle WL Dvn, Karkala
15. Someshwara Wildlife Sanctuary 314.25

16. Mookambika Wildlife 370.37


Sanctuary

6 CCF Kanara Circle 10. CF & Director, 17. Dandeli Tiger Reserve 886.41
Dandeli
18. Anshi Tiger Reserve 417.34

19. Attiveri Bird Sanctuary 2.23

7 CCF, Shimoga Circle 11. DCF, WL Dvn., 20. Shettihalli Wildlife Sanctuary 395.60
Shimoga
21. Sharavathi Valley LTM 930.16
Sanctuary,

22. Gudavi Bird Sanctuary 0.73

8 CCF Chikmgalur Circle 12. CF & Director, 23. Bhadra Wildlife Sanctuary 500.16
Bhadra T.R.

9 CCF, Dharwad Circle 13. DCF, Haveri Dn. 24. Ranebennur Blackbuck 119.00
Sanctuary

14. DCF, Gadag Dn. 25. Kappathagudda Wildlife 244.15


Sanctuary

10. CCF, Bellary Circle 15. DCF, Bellary, (T) 26. Daroji Bear Sanctuary 82.72

27. Gudekote Sloth Bear Sanctuary 47.61

Gudekote Extension Sloth Bear 120.05


Sanctuary

16. DCF, Davanagere 28. Rangayyadurga Four Horned 77.23


(T) Dvn, Davanagere Antelope Wildlife Sanctuary

17. DCF, Chitradurga 29. Jogimatti Wildlife Sanctuary 100.48


Economic Survey of Karnataka 2019-20 319

S l. Na t io na l P ar k / W il dli fe Area
Ci r cl e D iv i si on
No . S an c tu a ry (S q.K m s)

11 A PC CF 18 . C F & D ir ector 30. Ba n dipu r T iger R ese rve 872 .24


F ield D ir ector Ba ndip ur
31. Nu gu W ildlife Sa n ctua r y 30 .32
Pr oje ct Tige r, M yso re.
19 . C F & D ir ector 32. Na ga r ah o le Tig er R eser ve 64 3.39
H un su r

12 C CF, Belg a um Cir cle 20 . D CF , B elga u m (T) 33. Bh im g ad W ild life S a nctu a ry 190.42
D vn, Belg au m

21 . D CF , G o ka k (T) 34. G ha ta pra bh a Bir d S a nctu a ry 29.78


D vn, G ok ak

22 . D CF , B ag a lkote (T) 35. Ya da h alli Ch inka r a W ildlif e 96 .36


S an ctu ar y

13 C CF, G u lba rga 22 . D CF , G u lba rg a (T) 36. Ch inc ho li W ildlife S a n ctua ry 134 .88
C ircle D vn. G ulb ar ga

14 C CF, H a ssa n Circ le 23 . D CF , T um ku r (T ) 37. Thi m la pu ra W ildlife Sa n ctua r y 50 .86


D vn. , Tu m k ur

38. Bu kka pa tta Ch ink ar a W ild life 136 .11


S an ctu ar y

T o ta l A r ea : 1 0, 71 7 .2 7

Table 8.10: Conservation & Community Reserves

Sl. A rea
Dis tric ts Co ns erv atio n / Co m m itte e Res erv es
N o. (i n Sq. K m s)

1 Hav e ri Ba nkap ura P e ac ock Cons e rv at io n R e se rv e 0.5 60

2 Tum k uru Myd ha nahalli (Jayam angali) B la ck Buc k Cons e rva tion Re se rv e. 3.2 30

3 Chic km agaluru Ba sur Am ruth M ahal Kav al Cons e rva tion Re se rv e 7.3 60

4 Utta ra Ka nnada Hornb ill C os erv at ion R es e rv e 5 2.5 00

5 Utta ra Ka nnada Be d thi Cos e rva tion R e se rv e 5 7.3 00

6 Utta ra Ka nnada Shalmala R ip arian Ec o- sys te m C ons erv at ion R es e rve 4.8 90

7 Be lla ry Thunga bhd ra Ott er C ons erv at ion R es e rve 20 .00

8 Ba ngalore Urb an Pu ttenaha lli L ak e B ird s Cons e rva tion R e se rv e 0.1 50

9 Gad ag Magad i Ke re C ons erv at ion R es e rve 0.5 40

10 Mand ya Me la pura Be e E at er B ird Cons e rva tion Re se rv e 0 .0 3 18

11 Tum k uru Thimlap ura C ons erv at ion Re s e rve 17 .38

Ank asa mud ra B ird s C ons erv at ion R es e rva tion R e se rv e (Haga ri
12 Be lla ry 0 .9 8 76
Bom ma nahalli Tq . B e llary Dis t.

13 Cha mara jana ga r Umm athu r C ons erv at ion R es e rve (Cham arajnagar Dis t.) 6 .08

14 Kolar Kolara le af Nos e d B at C ons erv at ion R es e rve 0 .90

15 Mand ya Kok k are B e llur C omm unit y Re se rv e 3.1 20

To tal 175.029
320 Economic Survey of Karnataka 2019-20

Wildlife Sanctuary 244.14 Sq. kms. ( a) Eco-tourism Activities :


Bukkapattana Chinkara Wildlife Sanctuary
136.11 Sq.kms, Kamsandra Wildlife Information of visitors to National Parks
Sanctuary 78.62 Sq. kms. Apart from this, / Wildlife Sanctuaries:
M.M.Hills Wildlife Sanctuary have been 1. Among the visitors to the sanctuaries,
approved as a Tiger Reserve. 98.73% are domestic visitors while
By adding adjoining areas to the 1.27% are foreigners (Table 8.11)
Sanctuaries, the area of Cauvery, 2. Maximum number of Foreigners visited
Sharavathi Valley Sanctuary and Gudikote to Nagarahole National Park followed by
Bear Sanctuary has increased to an extent Ranganathittu Bird Sanctuary and
of 53.39 Sq. Kms., 500.29 Sq. Kms., 120.02 Bandipur Tiger Reserve.
Sq. Kms., respectively.
3. From this analysis it is clear that some
The board also approved three Conservation of the Protected Areas are having high
Reserves namely River front of Nandini River pressure of Eco-tourism while others
and islands of Nethravathi Conservation are underutilized. Therefore to reduce
Reserve, Mullaiahnagiri Conservation the pressure on the Protected Areas
Reserve and Kolar Leaf Nosed Bat like Bandipura, Nagarahole and
Conservation Reserve. Kudremukh etc., it is necessary that

Table 8.11 : Visitors to National Parks & Wildlife Sanctuaries during (2018-19 )
S l.
Park / Sanctu ary Indians Foreigners Total
N o.
1 Nagar ah ole Tig er Reser ve 1,16, 928 6,7 92 1,23, 720

2 Ban dipura Tig er Reser ve 1,86, 303 4,7 07 1,91, 010

3 Kudre mukh Nation al Par k 16, 315 11 16, 326

4 S ome shwara W ildlife San ctuar y 28, 758 26 28, 784

5 Mookam bika W ildlife S an ctuary 1,99, 924 - 1,99, 924


6 Kali Tig er Reser ve (Dan deli-An shi) 3, 915 1 3, 916

7 Bh adra Tig er Reser ve 36, 532 1 37 36, 669

8 Cauver y W ildlife San ctuar y 39, 840 - 39, 840

9 Ran ganatittu Bird San ctuar y 3,80, 362 4,8 64 3,85, 226

10 Push pagir i Wildlif e S an ctuary 92, 108 9 92, 117


11 Talacauv ery W ildlife San ctuar y 1 012 - 1, 012

12 Br ah mag iri W ildlife San ctuar y 2,68, 054 4 27 2,68, 481

13 B.R .T. Tiger Rese rve 488 - 488

14 S haravath i, W ildlife S anc tuary 726 - 726


15 Gudavi Bir d S anctuary 9, 756 3 9, 759

16 S hettyh alli W ildlife s an ctuary - - -

17 S akar ebyle Safar i 97, 514 1,5 65 99, 079

18 Daroji Bear San ctuar y 7, 200 3 96 7, 596

19 Ran eben nur Black Buck S anc tuary 219 - 219

Total 1 4,85 ,9 5 4 18 ,9 3 8 1 5,04 ,8 92


Economic Survey of Karnataka 2019-20 321

Figure 8.4: Visitors to National Parks & Wildlife Sanctuaries for the year 2018-19

Table 8.12 : Visitors to National Parks & Wildlife Sanctuaries for the year 2019-20
Upto November 2019

Sl.
Park / Sanctuary Indians Foreigners Total
No.
1 Nagarahole Tiger Reserve 79093 1002 80095
2 Bandipura Tiger Reserve 99673 844 100517
3 Kudremukh National Park 4494 1 4495
4 Someshwara Wildlife Sanctuary 6884 3 6887
5 Mookambika Wildlife Sanctuary 124397 - 124397
6 Kali Tiger Reserve (Dandeli-Anshi) 2567 - 2567
7 Bhadra Tiger Reserve 21971 120 22091
8 Cauvery Wildlife Sanctuary 35351 - 35351
9 Ranganatittu Bird Sanctuary 228528 1988 230516
10 Pushpagiri Wildlife Sanctuary
11 Talacauvery Wildlife Sanctuary 19815 16 19831
12 Brahmagiri Wildlife Sanctuary
13 B.R.T. Tiger Reserve 588 - 588
14 Sharavathi, Wildlife Sanctuary 320 - 320
15 Gudavi Bird Sanctuary 5048 - 5048
16 Shettyhalli Wildlife sanctuary - - -
17 Sakarebyle Safar i 19103 233 19336
18 Daroji Bear Sanctuary 3800 163 3963
19 Ranebennur Black Buck Sanctuary 194 - 194
Total 651826 4370 656196
322 Economic Survey of Karnataka 2019-20

the less visited Protected Areas like As per the Govt. order No. FEE 143 FWL
BRT, Bhadra, Dandeli and some other 2010 dated: 03-08-2011 in case of human
Protected Areas may be provided death by wild animals, the ex-gratia of Rs
with better Eco-tourism facilities, 5,00,000/- is paid to the legal heir of the
infrastructure. Their potential may also deceased person.
be given more publicity. Once they
For the crop damages the farmers are paid
become popular they may also have
ex-gratia with a minimum Rs 7500/- and a
more tourists. This will help in
maximum of Rs 50,000/-, As per the Govt.
sensitizing the people and also creating
order No. FEE 109 FAP 2014 dated
awareness about the Wildlife
13.09.2014 the maximum amount of ex-
conservation in the State.
gratia payable towards crop damages is
(b) Deaths of humans and wild animals : enhanced from Rs.50,000/- to
Rs. 1,00,000/-.
Table 8.13 provides details of deaths of wild
animals (due to natural and unnatural The Govt. has enhanced the ex-gratia
causes) during 2018-19 Due to attacks by payment for the cattle kill by wild animals
wildlife, 25 persons were killed. Ex-gratia at vide Govt. order No. FEE 109 FAP 2014
Rs.5.00 lakhs per person amounting to dated 13.09.2014. In case of death of cow,
Rs.125.00 lakhs was paid, as given in the ox, buffalo and oxen ex-gratia of Rs.
Table 8.14. 10,000/- is paid to the cattle owners and in
case of goat and sheep Rs. 5,000/- ex-gratia
The scale of ex-gratia payments for the is paid to the cattle owners.
damages caused by wild animals are as
follows:

Table 8.13: Death of wild animals during 2018-19 and 2019-20


(Upto November 2019)
No. of deaths
Sl. 2019-20
Name of the animal
No. 2018-19 (Upto November-2019)
NN-2019)

1 Elephants 75 33

2 Tiger 11 7

3 Other animals 133 112

Total 219 152

Table 8.14 : Man – Animal conflict – Loss of Human Life & Compensation paid
Year
Sl. Loss of Human Life and
No. Ex-gratia paid 2019-20
2018-19
(Upto November 2019)

No. of persons killed due to wild


1 25 30
animals attack by wild animals.

2 Total Compensation paid (Rs.) 125.00 lakhs 150.00 lakhs


Economic Survey of Karnataka 2019-20 323

As per the existing Govt. order No. FEE 130 For the implementation of the above
FWL 2016 dated 19.09.2016, in case of human-elephant conflict mitigation
permanent disability caused by wild program from used rails as barrier, an
animals ,an ex-gratia of Rs. 5,00,000/- is amount of Rs.10,000.00 lakhs is allocated
paid to the disabled person. In case of partial and released Rs. 5,000.00 lakhs for erection
disability an ex-gratia of Rs. 2,50,000/- is of 118 kms. under the budget head
paid to the disabled person. 4406-Capital Outlay on Forestry &
Wildlife-01-Forestry-101-Forest Protection,
In case of human injury an ex-gratia of Rs.
Regeneration & Cultural Operation-0-01-
30,000/- is paid to the injured persons. In
Railway Barricade to Prevent Man-animal
case of property loss caused by wild animals
Conflict-132-Capital Expenses during
an ex-gratia of Rs. 10,000/- is to be paid.
2019-20 and works are under Progress.
As per G.O. No. FEE 61 FAP 2018 dated
16.10.2018 a monthly pension of Rs.2,000 3. Establishing Forest Fire Management
will be paid to the family of the deceased for a and Analysis cell:
period of 5 years along with the ex-gratia of The Government has provided Rs. 200.00
Rs.5.00 lakhs and also to the permanently lakhs under the budget head “2406-01-013-
disabled persons. 0-01-Computarisation of Forest
Department-125-Modernisation” during the
New Programme announced during the
2019-20 supplementary budgetary, to
year 2019-20.
establish Forest Fire Management and
1. Eradication of Lantana and Analysis Cell to monitor forest fires
Eupatorium weeds: using remote sensing technologies in
collaboration with Karnataka State
During 2019-20 in the para 109 of the Remote Sensing Applications Centre,
Budget Speech announced the new program Bangalore. Through the fire cell, awareness
for eradication of Lantana and Eupatorium programmes, workshops are being
Weeds. For the implementation of this conducted to the DCF's, ACF and RFO's for
program Rs. 5.00 crore grants has been taking precautionary measures to prevent
released under the budget heading 2406- forest fires.
01-101-2-85-Protection of Grass Lands-
139-Major Works and works are in progress. The following important decisions
pertaining to Wildlife Wing has been taken
The above project envisages removing the during 12th Meeting of the State Board for
Lantana and Eupatorium weeds grown in Wildlife held under the Chairman- ship of
grassy areas patch by patch, as it has grown the Hon'ble Chief Minister on 26.9.2019.
abundantly in most grass land and forest
areas considerably, reducing grass patches 1. Considering the fact that the ex-gratia
in the forest and is a serious obstacle to amount of Rs. 5.00 lakh being paid by
grass growth. In this regard, a new program the Government in case of human death
has been started to increase the grass by wild animals, As per the present
growth and grass patches in forest area and Government Order amount needs to be
phasing out lantana and eupatorium weeds increased, the Chairman of the Board
stage by stage in the forests. approved to increase the ex-gratia
amount from Rs.5.00 lakhs to Rs. 10.00
2. Human-Elephant Conflict Control by lakhs in case of human death by wild
Using Railway barricade as barrier: animals.
In 2019-20 budget speech, a new program 2. The Board approved to declare a total of
has been announced to mitigate Human- 10088.37 hectares of reserve forest
Elephant Conflict by constructing areas in Hirekallugudda-Ramenahalli-
barricades using used rails. Accordingly, a Chakankatte-Garudanagiri as
three year Rails barricade Plan has been “Arasikere Sloth Bear Sanctuary”under
prepared and submitted to the government section 26 (A) of Wildlife (Protection) Act
to mitigate human-elephant conflict. 1972
324 Economic Survey of Karnataka 2019-20

3. The Board approved to declare Bonal from Tiger Reserves and National parks
Lake in Surapura Taluk, Yadagiri during 2018-19 (Table 8.15).
District as "Bonal Bird Conservation
Reserve" under section 36 (A) of Wildlife (d) Revenue Realized from Forestry :
(Protection) Act 1972 The State has realized revenue to the tune of
C. Expenditure on wildlife development Rs.13174.37 lakhs during 2019-20 (upto
activities in National parks and wildlife end of November 2019) from marketing of
sanctuaries: forest produce such as timber, firewood,
sandalwood, bamboos, canes and other non
Among the schemes of the Forest timber forest produce (Table 8.16).
Department concerning wildlife and
8.1.3. Developmental programs :
national parks, Mitigation Measures to
mitigate Man-Animal Conflict incurred (A) Afforestation :
an expenditure of 44.31%, Project Tiger Afforestation programmes are being
21.35%, Integrated Development of undertaken periodically. During 2018-19,
Wildlife Habitats 3.62%, Project area to an extent of 44494 hectares has been
Elephant 2.58% and Rs. 5.00 crores afforested by planting 279.983 lakh
expenditure is incurred towards seedlings. Under the farm forestry 247.893
Voluntary Rehabilitation of families lakh seedlings were distributed to farmers

Table 8.15: Expenditure under Wildlife and National Parks / Sanctuaries (Rs. lakh)
E x pe nd it u re ( Rs . l a kh ) 2 0 19 -2 0
S l.
S ch e m e u pt o
No. 2 01 5- 1 6 20 16 - 17 20 1 7- 18 20 18 - 19 3 0 -N o v -1 9

1. P r ojec t T iger 2 ,0 0 0 .5 3 6 ,1 0 2 .7 3 4 , 7 3 0 .8 3 4 ,2 0 1 .6 0 1 ,7 7 7 . 7 3 3

2. P r ojec t E lep h an t 1 7 8 .6 5 400. 820 6 2 3 .5 3 8 5 0 8 .4 3 1 6 4 .2 4


In t egr a t ed
3. D eve lop m en t of 5 5 7 .5 1 495. 400 7 2 1 .7 8 7 1 2 .7 2 1 7 8 .1 6
W ild life H a b it a t s

M it iga t ion
m e as ur es t o
a d d r ess M an -
A nim al con flict /
E co -t ou ris m
4. - - 7 , 4 7 5 .5 1 8 ,7 1 8 .3 1 3 ,2 7 7 .0 9
W or k s / N a tu r e
C o n serv at io n -
W ild life / N ew ly
d ecl ar ed
S an ct u ar ies.

2 4 0 6 -0 2 -1 1 0 -0 -
0 1 -N a tu r e
5. - - 4 2 0 .9 8 3 1 1 .1 7 1 3 4 .9 6
C o n serv at io n -
1 3 9 - M a jor w or k s

2 4 0 6 -0 2 -1 1 0 -0 -
4 6 -P r o te ct ed A rea
6. D eve lop m en t - - 3 7 8 .0 1 3 9 4 .2 5 5 2 .0 1
Fu n d -1 3 9 - M a jor
w or k s
V o lu nt a ry
R eha b ilit a t ion o f
7. f am ilies f ro m T ig er 1 ,6 9 0 .0 0 2 ,0 0 0 .0 0 8 0 0 .0 0 5 0 0 .0 0 2 0 6 .2 0
R eser ves a n d
N at io n al p ar k s
Economic Survey of Karnataka 2019-20 325

Ex penditure (Rs. lakh) 2019-20


Sl.
Scheme upto
No.
2015-16 2016-17 2017-18 2018-19 30-Nov-19

Eco-tourism-
8. Chinnara Vana 159.86 173.83 174.46 199.33 89.87
Darshana
Solar Powered
9. Fencing-(50:50 32.72 25.860 24.87 25.00 6.36
Subsidies)

Grants-in-Aid-Eco-
10. - 75.00 86.00 97.00 72.00
tourism Board

Contract / Out
11. - - 12.47 14.00 0.48
Source
12. Eco-Tourism 99.00 150.000 - 1.00 -
2406-01-101-2-85-
Protection of Grass
13. - - - - 34.75
Lands-139-Major
Works

4406-01-101-0-01-
Railway Barricade
to Prevent Man- Funds yet to
14. - - - -
animal Conflict- be released
132-Capital
Expenses

2406-01-102-1-03-
15. KFDF-139-Major - - 3,986.38 3,994.04 -
Works

Kudremukh
16. National Park for 50.00 750.000 - - -
Rehabilitation

Nature
17. 1,186.75 2,686.300 - - -
Conservation
Long Term
Measures to
18. 8,364.37 4,978.520 - - -
mitigate Man-
Animal Conflict
Development of
19. Newly Declared 1,525.33 1,997.520 - - -
Sanctuary

20. SCSP-TSP 422-SCP - 167.00 - - -

21. SCSP-TSP 423-TSP - 70.00 - - -

Total 15,844.72 20,072.99 19,434.82 19,676.85 5,993.85


326 Economic Survey of Karnataka 2019-20

and general publics for planting in their incurring expenditure of Rs.892.80344


private lands. lakhs.
In 2019-20 upto the end of November - In the year 2019-20, up to the end of
2019, 41426 hectares have been covered by November 2019, the construction of 66 new
planting 282.91 lakh seedlings. 337.888 buildings and 108 older buildings
lakh seedlings have been distributed to maintenance works are under progress by
farmers and general public for planting in incurring expenditure of Rs.221.947 lakhs.
private lands.
8.1.4. State Sector Plan Schemes:
(B) District Sector Schemes :
i. Special Component Plan :
Social Forestry Scheme :
The LPG gas connection, distribution of
During the year 2018-19 a budget provision Solar Lamp was given to the beneficiaries of
of Rs.6861.45 lakh was provided. Out of Schedule caste families to reduce the
which expenditure of Rs. 6836.64 lakh pressure on forest. In addition to this, Bee-
incurred for raising 5947.88 ha of hive boxes are also given to them to improve
plantation, for maintenance of 9081.78 ha their economic conditions. Initiative is taken
of older plantation, 3406.78 ha of advance to maintain avenue plantations along the
work and for raising 26.51629 lakh roads leading to the colonies inhabituated
seedlings. by Schedule Caste population.
During the year 2019-20, raising of 5227.48 During the year 2018-19, LPG gas
ha of plantation, maintenance of 11560.830 connection were provided along with the
ha of older plantation, 167 ha of advance refilling of LPG gas cylinders to the
work, raising of 14.625 lakh seedlings, beneficiaries who were provided LPG
maintenance of 23.447 lakh seedlings have connection during 2017-18. The
been carried out up to the end of November distribution of Solar Lamps, solar water
2019, by incurring an expenditure of Rs. heater were given to the beneficiaries of
3789.53813 lakh. Schedule caste families to reduce the
pressure on forests. In addition to this,
During 2018-19 Under District Sector, New training on bee hive boxes, Bee-keeping,
Building and Maintenance Schemes:- 35 booking of gas cylinders through mobile and
new buildings were constructed and 188 collection of minor forest produce (MFP)
older buildings were maintained by were given to the selected beneficiaries in

Table 8.16: Revenue Realized from Forest Produce (upto end of November 2019)

Sl. Revenue realized


Forest Produce
No. (Rs. lakh)
1 Timber 5281.14

2 Firewood and charcoal 1051.87

3 Bamboos 6.50

4 Sandalwood 94.88

5 Non-timber Forest Produce 364.64


6 Other source of revenue 6375.35

Non taxable revenue of the Dept. 13174.37

Forest Development tax


(FDT )collection 1077.13
Economic Survey of Karnataka 2019-20 327

batches so as to improve their economic During the year 2019-20 no budget


conditions. Study has been conducted on provision is made under this scheme.
the utilization of the benefits by the
beneficiaries. Maintenance of avenue iv) Un spent SCSP-TSP amount as per the
plantations along the roads leading to the SCSP-TSP Act -2013 -423 TSP :
colonies inhabituated by Schedule Caste In order to reduce pressure on forest refilling
population. of LPG Gas cylinders has been provided
In the year 2018-19, an annual allocation of directly to the selected schedule tribe
Rs.979.13 lakh has been made & following beneficiaries. For this purpose Rs.12.67
amount has been spent up to end of March lakh has been provided and the same was
2019. utilized upto end of March-2019 by
providing 1990 nos refilling of LPG cylinders
During the year 2019-20 no budget to the beneficiaries.
provision is made under this scheme.
In the year 2019-20, an annual allocation of
ii) Un spent SCSP-TSP amount as per the Rs.2.68 lakh has been made for conducting
SCSP-TSP Act -2013 -422 SCP : wildlife exposure camps (5 camps) to the ST
students studying in 9th Standard at KREIS
In order to reduce pressure on forest,
Schools. Rs.2.010 lakh has been spent upto
refilling of LPG Gas cylinders has been
November 2019.
provided directly to the selected schedule
caste beneficiaries. For this purpose v) Sirichandana Vana :
Rs.14.67 lakh has been provided and the
same has been spent up to end of March- Protection and maintenance of Sandalwood
2019 by providing 2174 nos refilling of LPG plantation and naturally grown sandalwood
cylinders to the beneficiaries. trees area through erection of chain link
mesh, watch and ward, soil working,
In the year 2019-20, an annual allocation of cultural operation and other protective
Rs.4.28 lakh has been made for conducting measures are taken up.
wildlife exposure camps (8 camps) to the SC
In the year 2018-19, Rs.663.63 lakh has
students studying in 9th Standard at KREIS
been earmarked ,out of this Rs.661.54 lakhs
Schools. Rs.3.210 lakh has been spent upto
has been spent upto the end of March 2019
November 2019.
for engaging and maintaining the watchers,
iii) Tribal Sub-Plan : maintaining the dogs, maintenance of 1102
ha. plantations, seedlings, inspection paths,
LPG gas connection, refilling of gas cylinder,
firelines maintenance, raising of plantation,
solar water heater, distribution of Solar
distribution of 6.635 lakh seedlings and
Lamp was given to the beneficiaries of
raising of 11.039 lakh sandal seedlings.
Schedule Tribe families to reduce the
pressure on forest. In addition to this, Bee- During 2019-20 Rs.1000 lakh has been
hive boxes are also given to them to improve earmarked, out of this Rs.793.829 lakh is
their economic conditions. Initiative is relased and Rs.331.52lakh spent upto end
taken to maintain raise avenue plantations of November 2019 towards engaging and
along the roads leading to the colonies maintaining the watchers, maintaining the
inhabituated by Schedule Tribe Caste dogs, maintenance of 2020.5 ha.
population. plantations, 11.04 lakh seedlings,
inspection paths, firelines maintenance,
In the year 2018-19, an allocation of
raising of plantation, distribution of 11.04
Rs.1581.76 lakh has been made and spent
lakh seedlings and raising of 8.90 lakh
Rs.1552.14 lakh towards LPG Connection,
sandal seedlings.
Refilling of gas cylinders, Solar lamp, solar
water heaters, bee hive boxes, distribution vi) Development of Degraded Forests :
of bamboo and training for bee keeping,
Under this scheme, degraded forests are
collection on MFP, training on gas booking,
rejuvenated through afforestation, besides
preparation of bamboo handicraft items etc.
soil and water conservation measures.
328 Economic Survey of Karnataka 2019-20

Wherever there is adequate rootstock, such (b) Krishi Aranya Protsaha Yojane:
areas are protected from biotic pressure,
As per National Forest Policy of 1988, 33% of
thereby encouraging natural regeneration.
the Geographical area must be under forest
Alternatively, plantations are raised in other
and tree cover. To achieve the goal, the
areas based on the requirement of small
Department is implementing various
timber, fuel wood and fodder. In the year
afforestation programmes. Since the target
2018-19, Rs.1275.01 lakh has been
of afforestation and tree planting is very
earmarked out of which Rs.1270.39 lakh
high, planting must be done in a massive
has been spent upto the end of March- 2019
scale. This can be achieved successfully by
for raising of 4727 ha, plantation,
voluntary involvement of farmers, public
maintenance of 1480.59 ha. older
and NGOs.
plantations.
To enlist the cooperation of farmers and
During the year 2019-20 Rs.1478.23 lakh
general public in the noble task of
has been allocated out of this Rs.550.36
increasing tree cover, Government of
lakh has been spent upto end of November
Karnataka has launched a programme titled
2019 towards maintenance of 5950.99 ha.
“KRISHI ARANHYA PROTSAHA YOJANE”
plantation and to takeup 1955 ha. of
from the year 2011. As per the guidelines of
advance works.
the programme, the farmers may obtain the
vii) Raising of Seedlings for Public seedlings at subsidized rates at nearest
Distribution : nurseries of the department. Seedlings so
obtained be planted in their lands and
Seedlings have been raised for public nurtured, At the end of first, second & third
distribution and to implement the year an incentive of Rs.30/-, Rs.30/-, &
programme “Krishi Aranya Protsaha Yojane Rs.40/- respectively will be paid to the
(KAPY)”. beneficiary for each survived seedling as per
(a) Raising of Seedlings for Public the Govt order No..FEE 94 FAP 2017 dated
Distribution 19.06.2017. In addition to this, provision
has been made to utilize the usufructs by
Under this Scheme, seedlings are being the beneficiaries.
raised for Distribution to Public, Farmers
and organizations at subsidized rates to Besides, the Government has enchanced
plant in their lands. For this purpose, the incentive amount to the beneficiaries
seedlings of suitable local species as per the from Rs. 100/- to Rs. 125/- (At the end of
demand are raised in 6”X9” and 8”X12” first, second & third year an incentive of
sized bags every year by the department. Rs.35/-, Rs.40/-, & Rs.50/- respectively for
each survived seedlings) vide Govt order No.
In the year 2018-19, an allocation of FEE 88 FAP 2019, dated:27.12.2019. By
Rs.3229.85 lakh is earmarked, out of which using products of these tree economic
Rs.3213.95 lakhs has been spent upto the conditions of the people will be improved
end of March 2019 towards maintenance of .Further, interested organizations, NGO's,
148.90 lakh seedlings and same distributed VFC's and EDC's have to enroll in the
in 2019 rains to Public, Farmers, respective Forest Divisions of their
organizations at subsidized rates and jurisdiction in order to participate in this
raising of 185.41 lakhs seedlings. programme. Those who have enrolled have
During 2019-20 Rs. 4511.04lakh has been to visit the villages of the respective Forest
allocated, out of this Rs.1906.20 lakh has Divisions and appraise the farmers about
been utilized upto end of November towards the benefits of the scheme and motivate
maintenance of 187.403 lakh seedlings, and them to participate and enroll them in this
raising of 80.330 lakh seedlings 4600 nos programme. Besides, they have to be
raising of teak beds, payment of incentive to informed timely about excavation of pits and
the beneficiaries and service charges to the other forestry operations.
NGO's and other registered organizations To guide them for obtaining the seedlings at
participating under KAPY. the right time and planting the same.
Economic Survey of Karnataka 2019-20 329

Besides, rendering all assistance to the and taking up of 665 ha. advance works.
departmental officers, staff and Out of the allocated amount Rs. 1074.18
organsiations during evaluation of the lakh has been spent upto end of November
survived seedlings planted by the farmers 2019.
under this programme.
1. Roadside Plantation: Special
Service charges of Rs. 5/- will be paid as Component Plan:
mentioned below for a period of 4 years to
the organizations, NGO's, VFC's and EDC's This scheme is in progress from 2011-12.
who will motivate the farmers to plant the The main objective of the scheme is to raise
saplings in their land under this avenue plantations along the roads leading
programme. to the colonies inhabited by Schedule Caste
population.
r In the first year Rs 2/- per planted
seedling will be paid to the beneficiary During 2018-19 Rs. 197.523 lakh was
for having planted in their agricultural allocated out of which Rs. 148.15 lakh was
land released and Rs. 84.12 lakh has been spent
r In the second, third and fourth years for maintenance of 582.62 kms avenue
Re 1/- for each survived seedling will be plantations along the roads leading to the
paid every year. colonies inhabited by Schedule Caste
population.
In the year 2017-18 under KAPY pending
incentive of Rs.641.412 lakh and Rs.61.232 During the year 2019-20 no budget
lakh service charges totaling to Rs.702.644 provision is made under this scheme.
lakh was paid during 2018-19.
2. Roadside Plantation: Tribal Sub Plan:
In the year 2018-19 under KAPY pending
incentive of Rs.1275.991 lakh and This scheme is in progress from 2011-12.
Rs.38.737 lakh service charges totaling to The main objective of the scheme is to raise
Rs.1314.728 lakh has been paid in 2019-20 avenue plantations along the roads leading
(upto end of November 2019. ) to the colonies inhabited by Schedule Tribe
population.
viii) Roadside Plantation Scheme :
During 2018-19 Rs.123.28 lakh is allocated
Karnataka State has an area of about 4000 out of which Rs. 116.87 lakh was released
Km National Highway, 21,000 Km State and Rs. 94.56 lakh has been spent for
Highway and 38,000 Km Districts Roads. maintenance of 254 Kms avenue
Under various afforestation programmes, plantations along the roads leading to the
about 15000 km of roadside planting has colonies inhabited by Schedule Tribe
been taken up by the forest department population.
since 1980. From 2000 onward a large
During the year 2019-20 no budget
number of trees have been felled for the
provision is made under this scheme.
purpose of widening roads. The department
has felt the urgency to take up roadside ix) A Tree for every child and a park for
plantations in all the districts under the every school :
roadside plantation scheme from 2011-12 .
(Maguvigondu mara Shalegondu vana): In
During 2018-19, Rs.2061.42 lakh has been order to create awareness regarding ecology
earmarked, out of which Rs.2059.45 lakh and environment among school children
has been spent up to the end of March-2019 and to encourage them to plant trees
for raising of 398.00 kms roadside voluntarily. Open areas around educational
mansoons plantation and maintenance of Institutions will be identified for planting
3099 km roadside plantations. seedlings by providing seedlings to school
In the year 2019-20 Rs.2506.23 lakh has authorities for planting. Schools from the
been allocated for raising of 207.37 kms primary level, colleges and even universities
plantation, raising of monsoon plantation, are involved.
maintenance of 3425.86 kms plantation
330 Economic Survey of Karnataka 2019-20

During 2018-19 Rs.50.77 lakhs has been which are nutritious and medicinal value,
allocated, out of which Rs.51.08 lakhs has useful to the school children are being
been utilized upto end of March 2019 grown in co-ordination with students and
towards maintenance of 3.209lakhs education department.
seedlings and raising of 2.491 lakhs
This program is implemented for a period of
seedlings for distribution to school children
5 years from 2015-16 vide Govt order
during 2019 rains.
No.FEE 87 FAP 2015, dated:15.07.2015.
In the year 2019-20 Rs. 60.759 lakh is
In the year 2018-19, Rs.0.8595 lakh has
allocated. Out of this Rs.25.159 lakh has
been allocated and released. The same has
been spent(upto Nov-2019) for maintenance
been utilized to implement the programme
of 2.483 lakh seedlings, for raiseing of 3.223
in the following districts. (Table 8.17)
lakh seedlings and 89.50 acres raising
manoon plantion and for executing advance During 2019-20, 3600 saplings have been
work of 46 acres. planted in 26 Government schools of 10
Taluks in 2019 rains
1) Talukigondu Hasiru Shala Vana”
(Green school for each Taluka ) : x) Greening of Urban Areas :
To implement this scheme in the relevant The main objective of this scheme is to
taluks, government primary/higher minimize effects of pollution caused due to
primary/high school / colleges within a high intensity of population, vehicles and
distance of about 3 to 5 kms to the forest industries in urban areas by planting
area having own land or the schools which ornamental, shade and fruit-bearing trees.
are having minimum 3 to 5 acres of Tree parks, wood lots and avenue
government land will be selected. Seedlings plantations are also established in towns
of naturally grown, nelli, nerale, mango etc and cities to improve aesthetics.

Table 8.17: Talukigondu Hasiru Shala Vana Programme.

Sl. Extent
Divis ion Taluk Details of School
No . (in acres)

Sri Matha Higher Primary School, Mudd ur


1 K undapur 4
Maidan
Kund ap ur
Gov t. P.U. Colle ge, Kem mannu college ground
2 Udupi 5
surroundings

Kittur Rani Chennamm a Girls Boarding


3 Koppal Gangavathi 5
School, Malakanamaradi

4 R ona Gov t. High School 4

Gov t. Primary and High Sc hool,


5 Gadag N aragunda 5
Radderanaganuru

6 M undaragi Aadarsh Vidyalaya (Raati) 5

7 B elgaum Hukk eri K.B.S. School, Aralekatte 3

8 P av agada Gov t. High School, B. Hosahalli 5

9 Tumk ur M ad hugiri Gov t. High School, Hanum anthap ura 5

10 Gubb i Morarji D esai Sc hool, Hoovinakatte 5

Total 46
Economic Survey of Karnataka 2019-20 331

In the year 2018-19, Rs.2640.60 lakh has During 2018-19, Rs.54.96 lakh have been
been earmarked out of which, Rs. 2604.56 allocated, out ot which Rs.54.85 lakh has
lakh has been spent for raising 1125.32 ha. been utilized upto end of March 2019 for
of monsoon plantations, maintenance of maintenance of 350 ha plantation and
8149 ha. of older plantations and 6.47 lakh maintenance of 10,000 nos 8''X12''
seedlings. seedlings for distribution.
During 2019-20 Rs.2301.48 lakh has been During 2019-20, Rs.19.075 lakh has been
allocated out of which Rs.1017.80 lakh has provided. Out of which Rs.9.522 lakh has
been utilized upto end of November 2019 been released. Rs. 9.00 lakh has been spent
towards maintenance of 8282.45 kms upto end of November 2019 for maintenance
plantation, maintenance of 0.060 seedlings, of 350 ha. plantation.
raising of 3.240 lakh seedlings and raising of
207.05 kms monsoon plantation. xii) Talukigondu Hasiru Grama Yojane :

In the year 2019-20 under the budget As declared in the Budget Speech of 2015-
head 2406-01-101-2-83-AFNA-139-MW 16, the scheme Talukigondu Hasiru
Rs. 1515.00 lakh additional allocation has Grama Yojane came into existence.
been provided in the second supplementary Talukingodu Hasiru Grama Yojane is being
budget to execute forestry works through implemented in selected 6 VFC's of 6 Taluks
drip irrigation method in deemed forests of on pilot basis.
dry land districts. Out of this 158.17 kms of During 2018-19 Rs. 45.26 lakh was relased,
monsoon plantation has been created under out of which Rs. 45.25lakh expenditure was
Greening of Urban Areas and Roadside incurred upto end of March 2019 for
plantation. Action is being taken to execute maintenance of 610ha older plantation.
advance work to an extent of 2797 ha. to
raise plantation in 2020 monsoon in During 2019-20 Rs.35.776 lakh has been
deemed forest areas. 147.5 ha of plantations provided and Rs.17.888 lakh has been
has been raised under drip irrigation released. Rs.16.60 lakh has been
programme. In the year 2019-20 under spent (upto November 2019) towards
KAPY Programme Rs. 66.46 lakh has been maintenance of 610 ha old plantation.
distributed for making payment of incentive. xiii) Village Forest Committees :
xi) Samruddha Hasiru Grama Yojane This scheme is being implemented from
(SHGY) (State Sector): 2013-14 for Revitalization of 150 inactive
VFCs. In the year 2018-19 Rs.51.94 lakh
The Government is implementing
has been released ,out of which Rs.51.924
“Samrudda Hasiru Grama Yojane” in the
lakh was utilized in Maintenance of 130 ha.
selected villages across the state on
Plantation.
experimental basis to make villages self
reliant. Accordingly, 80 Village Forest During 2019-20 Rs.37.099 lakhs has been
Committees (VFC's) were selected for allocated and Rs.18.426 lakh is released
implementation. The objectives of the and Rs.16.479 lakh was spent upto end of
scheme are as under. November 2019 for maintenance of 130 ha
of old plantation and remuneration to JFPM
r To enhance the natural resource base in
Facilitator.
these villages by afforestation and
conservation of forests and by xiv) Tree Park Scheme :
conserving Natural Resources.
In order to create environmental awareness
r To recharge and enhance the among citizens in Urban areas Tree Parks
availability of ground water through are being created for publicity and
Soil and Moisture Conservation Works. awareness regarding conservation of forests
r Promote energy efficient lifestyle by and environment.
promoting gobar gas, Sarala vole, LPG
During 2018-19, Rs.1496.29 lakh was
etc.
allocated, out of which Rs. 1494.61 was
332 Economic Survey of Karnataka 2019-20

spent upto end of March 2019 for 90 old tree xvi) Medicinal Plants Conservation Areas
parks maintenance and creation of 1 tree & Medicinal Plants Development Areas
park. (MPCA & MPDA):
During 2019-20 Rs.3507.80 lakh has been Under the Scheme revitalization of MPCA &
provided and Rs.1228.40 lakh has been MPDA in the forest areas components are
released out of which Rs.681.90 lakh was being implemented. The development and
spent upto November 2019 towards maintenance works of the 17 nos identified
maintenance of 103 old tree parks and MPCA is implemented.
19 new tree parks are being created.
Maintenance of Tree Parks, raising In the year 2018-19, Rs.11.00 lakh was
of Plantation and advance works released and the same was spent upto end of
along with raising of seedlings are under March 2019. It was proposed to allocate
implementation. Rs.15.14 lakh to study the Rapid
Assessment of population of Conservation
xv) Devarakadu (Dyvivana) : Concern Species at Medicinal Plantation
Devarakadu Forests are very unique and Conservation Area in Karnataka, directly to
significant from religious and Eco-systems Foundation for Revitalization of Local
points. This scheme has been introduced to Health Traditions (FRLHT), Bengaluru
conserve the valuable Eco-systems in their Maintenance of 17 Nos. MPCA's and
pristine conditions as sacred groves and Conservation and Development of Rare and
allowing them to have their natural Endangered Species are under taken under
evolutionary process to continue without this scheme.
any disturbance and this scheme has been During 2019-20 Rs.17.90 lakh has been
started to construct and develop one provided and Rs.10.10 lakh has been
Daivivana at every district. released out of which Rs.4.30 lakh was
A unique programme for development of spent upto November 2019.
Dyvivana on 100 ha. Area in each division is xvii) Forest Protection Natural Re-
being implemented by the Karnataka Forest generation and Cultural Operations-139-
Department by planting fruit yielding Major Works:
seedlings and seedling of religious
significance. In this Dyvivana separate During 2018-19, under the budget head
nurseries are established for raising of 2406-01-101-2-11-Cultural Operations-
seedlings of religious, medicinal plants for 139-Major Works an amount of Rs.1025.00
distribution to the public to plant the same lakhs was allocated and released to this
in the open land of their house and in their wing for further distribution to the
lands. This Dyvivana is raised and implementing officers. Out of this allocation
developed nearest to the temple of the funds, an amount of 307.02 lakh have been
respective division to educate public and released for maintenance of research plots,
children about biodiversity. collection and distribution of good quality
seeds, treatment of logged areas in dense
During 2018-19, Rs.92.00 lakh was forests and fire protection works, excluding
released out of which Rs. 91.59 lakh was Dharwad, Kalaburgi and Mangalore circles.
spent up to end of March 2019 for However, Haveri division of Dharwad Circle
maintenance of 42 nos old deverakadu. has been allocated and released Rs.15.00
During 2019-20 Rs. 222.40 lakh has been lakhs for extraction of bamboo during 2018-
provided and Rs.116.60 lakh was released, 19. This amount has been completely spent
out of which Rs.40.03 lakh was spent upto for the allocated works.
November 2019 for taking up works at 41 During 2019-20, an amount of Rs.1025.00
existing Devarakadus's and 5 new lakhs has been allocated to this wing for fire
Devearakadus. protection works, collection and
Economic Survey of Karnataka 2019-20 333

distribution of good quality seeds, treatment each taluk, a forest to each district. With
of logged areas in dense forests. An amount this motto a scheme titled Hasiru
of Rs.768.75 lakh has been released upto Karnataka has been launced. A budget
end of November-2019, out of which provision of Rs. 10.00 crore has been
Rs.512.50 lakh has been allocated and earmarked in 2018-19 budget. The entire
released to the implementing officers and amount was allocated and Rs.975.61 lakh
Rs.241.23 lakh has been spent up to end of was spent upto end of march 2019.
November-2019. In order to implement this programme
xviii) River Conservation: extensively all over the State as per
In the year 2018-19 a new scheme titled Government Order No:FEE 108 FAP 2018
“Conservations of Rivers” has been dated 14.08.2018. From 15.08.2018 to
announced and a budget provision of 18.08.2018 planting of seed ball,
Rs.10.00 crore is provided. Under this distribution of seedlings, planting of
programme action is being taken to bring seedlings in open land of schools and in
awareness to conserve rivers. This front of houses, in government and private
programme is proposed to be implemented vacant lands, besides railway lines, in
in various forest divisions coming under 13 premises of government offices, court, police
Forest circles by planting seedlings in station, school and colleges and in other
watershed areas of the various rivers. State places has been done by involving
Government in their order No FEE 60 FAP volunteers, organization, corporation,
2018, dated 14-08-2018 has accorded municipality, railway under the leadership
sanction for Rs.10.00 crore for of district minister, elected representatives,
implementing the programme under Budget local MLA's /local dignitaries of the areas
head 2406-01-111-02-84-059. the programme has been successfully
executed.
Initially it was decided to implement this
programme in the areas of the river r To bring awareness about this
Malaprabha flowing in Dharwad and programme among the public, action
Belagavi circles and in the areas of the river has been taken for its wide
Kaveri flowing in Mysore, Madikeri, publicity through radio, television,
Bangalore and Hassan circles by taking up advertisement in newspapers, road
afforestation work. For this Rs.600.00 lakh shows, displaying pamphlets,
has been released and spent. distribution of printed hand bills etc.
In the year 2019-20, the provision of r The details of the programme
Rs.700.00 lakh has been made in the state implemented under this scheme during
budget, Rs.500.00 lakh in the main budget 2018-19 is shown in Table 8.18 are as
and Rs.200.00 lakh in the supplementary under.
budget. The state Government has released In the year 2019-20, Rs.753.23 lakh has
Rs.375.00 lakh to the department as 1st been allocated, out of which Rs.568.67 lakh
,2nd and 3rd installment. the same has has been utilized upto end of November
been released to the implementing officers to 2019 towards raising of 1222 ha. plantation,
clear the pending payment of 2018-19. maintenance of 51.10 lakh seedlings,
raising of 50.00 lakh seedlings for
xix) Hasiru Karnataka Programme distribution during 2020 rains and 1000
In order to give more impetus for ha. advance works.
development of social forestry, action is
8.1.5 Centrally Sponsored Schemes and
being taken to plant seedlings suitable to
Central Plan Schemes :
each area in the government lands of small
hills, gomals and areas surrounding tanks. i. National Afforestation Programme-
By involving students of school, colleges and Forest Development Agency (NAP-FDA) :
environmental organization with their active
participation. A tree to each house, a The Ministry of environment and forest GOI
has merged different afforestation programs
groove to each village, a small forest to
of 9th five year plan and titled the scheme as
334 Economic Survey of Karnataka 2019-20

Table 8.18: Details of the Hasiru Karnataka Programme

Sl. Fin target


Programme details Phy target
No. (Rs in lakhs)

Advance work of 25 ha. for creation of one forest/vana


1 325 ha. 69.260
in one district

Advance work of 25 ha. for creation of minor forest in


2 522 ha. 93.829
one taluk

Advance work of 25 ha. for creation of a groove in one


3 350 ha. 72.628
village

4 Raising of seedlings for distribution in 2019 monsoon 50.00 lakh 360.811

For celebration of Hasiru Karnataka programme at


5 - 207.018
district level

6 For celebration of vanamahotsava programme - 119.960

7 For Publicity, awareness etc - 76.494

Total 1000.000

National Afforestation Program (NAP). Mission under the budget head 2406-02-
The scheme is operated by the National 110-0-53-GIM-139-Major works. In the year
Afforestration and Eco-Development Board 2018-19 GOI has approved the programme
(NAEB), Ministry of Environment and Forest for Rs.632.86 lakh in the ratio of 60:40 and
(MOEF) as a 100% Central Sector Scheme. approved for releases of Rs.695.75 lakh and
The scheme involves two tier set up namely released Rs.686.63 lakh to the State
Forest Development Agency at the Government by adjusting Rs.9.12 lakh
division/district level and Joint Forest being the balance amount available under
Management Committees (JFMC's) at the KSFDA Account to this office. Towards 1st
village level. installment of Central share of Rs.379.72
lakh and Rs.316.03 lakh being the pending
In Karnataka, NAP is being implemented
payment of the years 2015-16, 2016-17 and
from 2002-03 under 10th and 11th Five year
2017-18. Inturn, State Government has
plan in 45- FDA's with the following
released Rs.900.00 lakh, including its share
objectives.
of Rs.213.37 lakh to the department. This
1. Sustainable development and amount has been released to the
management of Forest resources. implementing officers for raising of 2095 ha
of plantation, maintenance of 2580 ha of
2. Increase and improve forest and tree
2nd year plantation and maintenance of
cover.
2750 ha of 3rd year plantations.
3. Rehabilitation of degraded forest and
In the year 2019-20, a budget provision of
other areas by institutionalizing
Rs.1000.00 lakh has been made in the State
decentralized participatory forest
Budget for implementing the schemes under
management and supplementing
National Afforestation Programme and
livelihood improvement process.
Green India Mission under budget head
In the year 2018-19, a budget provision of 2406-02-110-0-53-GIM-139-Major works.
Rs.900.00 lakh has been provided in the In the year 2019-20 GOI has approved the
State Budget for implementing the National programme for Rs.915.80 lakh in the ratio of
Afforestation Programme and Green India 60:40 for executing the advance work only.
Economic Survey of Karnataka 2019-20 335

and released Rs.412.11 lakh to the State objective of the Scheme is to develop
Government out of 60% of its share. Inturn bamboo in forest lands through Forest
the State Government has released Development Agencies (FDA's) with the
Rs.937.34 lakhs to the department, support of Joint Forest Management
including its share of Rs.274.74 lakh and Committees (JFMC's) and in non forest
the balance amount of Rs.250.49 lakh of the areas through Bamboo Development
year 2018-19. This amount has been Agencies (BDA's).
released to the respective implementing
In the year 2018-19, the GOI has
officers for executing 6085 ha of Advance
restructured the National Bamboo Mission
work.
Scheme. Under this scheme GoI has
ii. National Agro Forestry and Bamboo approved the work programme for
Mission : Rs.2787.70 lakh in the ratio 60:40 (Central
share Rs.1672.64 and State share 1115.05
The Department of Agricultural and Co- lakh) and released Rs.1000.000 lakh as 1st
Operation, GOI has launched a new installment out of its share of 60% to State
Centrally Sponsored Scheme titled National Government. Inturn the State Government
Bamboo Mission with 100% Central has released Rs.1666.66 lakh to the
assistance from 2007-08. The main Department, including its share of

Table 8.19: Physical and financial progress of NAP-FDA


Financial
Plantations
Year Progress
raised (ha)
(Rs. in crore)
2013-14 3240 9.25

2014-15 450 18.12

2015-16 2850 7.97

2016-17 2580 12.21

2017-18 - 5.39

2018-19 2095 9.00

Table 8.20 : Physical and financial Progress of National Agro Forestry and Bamboo
Mission

Plantations raised Financial Progress


Year
(ha ) (Rs. in crore)

2013-14 3405 9.34

2014-15 500 1.05

2015-16 2000 6.47

2016-17 - 1.96

2017-18 - 1.57
2018-19 12.50 10.10
336 Economic Survey of Karnataka 2019-20

Rs.666.66 lakh. Out of this Rs.1010.00 lakh Rs.83.13 lakh) and informed that the 1st
has been released to the implementing installment of Rs.124.62 lakh will be
officers for executing works. transferred to the S.B Account opened to
operate this scheme. Proposal has been
In the state budget during 2019-20, a
submitted to State Government to released
budget provision of Rs.1895.00 lakh has
its share of Rs.83.128 lakh to the
been made under the budget head 2406-01-
department.
101-2-30-National Bamboo Mission-139-
Major Works. The GOI has approved the iv) Green India Mission:
work programme for Rs.2287.91 lakh in the
ratio 60:40 (Central share Rs.1372.75 lakh The central government project, the Green
and State share Rs.915.16 lakh) and India National Campaign, is being
released Rs.294.11 lakh as 1st instalment to implemented by the Ministry of
the State Government. Proposal has been Environment and Forests of the Central
submitted to the State Government to Government through the Climate Change.
release Rs.490.14 lakh including, its share This includes acknowledging the impact of
of Rs.196.03 lakh. forest cover on environmental mitigation, in
spite of climate mitigation, food security,
iii Conservation and Management of water security, biodiversity conservation
Mangroves : and livelihood security of forested
communities.
The main objective of the scheme is to check
and prevent sea erosion in the coastal The purpose of the campaign are being
region. Under this scheme, activities done:
like raising of mangrove plantations, 1. Increase of forest cover in five million
maintenance of older mangrove plantations hectares of forest area and
in coastal Divisions, besides this creating improvement of forest cover quality in
awareness, training and publicity among five million hectares of forest (10 million
the local population are being undertaken. hectares in total)
This Programme is being implemented in
2. To perform many advanced ecosystem
Honnavara, Mangalore, Karwar and
services, including biodiversity, water
Kundapur Divisions.
conservation services, carbon
In the year 2018-19 a budget provision of management on 10 million hectares of
Rs.343.00 lakh has been provided in the forest / non-forest land.
State Budget for implementing the Scheme 3. Increasing the forest based livelihood
in Karwar, Honnavara, Mangalore and income of nearly three million residents
Kundapur divisions. GOI has approved the living in the vicinity of forests.
work programme for Rs.245.33 lakh in the
4. Redusing of 43 milion tones of CO2
ration 60:40 and transferred Rs.107.848
sinking by 2020.
lakh to the S.B Account opened to operate
this scheme out of its share of 60%. Inturn This programme is being under
the State Government has released implemented in Kalburgi, Hassan and Sirsi
Rs.71.91 lakh as its share to the forest divisions since 2015-16. In the year
department. In total Rs.179.76 lakh has 2018-19 a budget provision of Rs.900.00
been released to the respective divisions for lakh has been provided in the State Budget
implementing the approved works and to for implementing the scheme under
incured the expenditure. National Afforestation Programme and
Green India Mission under the budget head
In the year 2019-20 a budget provision of
2406-02-110-0-53-GIM-139-Major works.
Rs.90.00 lakh only has been provided under
In the year 2018-19 Government of India
the budget head 2406-01-101-2-19-
has approved the programme for
Conservation and Management of
Rs.397.619 lakh in the ratio of 60:40
Mangroves-139-Major works. GOI has
(Central share Rs.238.572 lakh and state
approved the work programme for
share 159.048 lakh) and released Rs.162.35
Rs.207.82 lakh in the ration 60:40 (Central
lakh out of the 1st installment of Rs.167.00
share Rs.124.69 lakh and State share
Economic Survey of Karnataka 2019-20 337

lakh by adjusting Rs.4.66 lakh being the lakhs was released to the Department and
unspent amount of previous year. Inturn, this amount has been reallocated to the
the state Government has to released Project Implementing Officers. This amount
Rs.273.672 lakh to the department has been spent for maintenance of 5000
including its share of Rs.111.333 lakh. But, Kms of fire line, construction of 3 water
due to shortage of budget allocation, the storage structures, soil and moisture
state has release the central share of conservation works, JFPM activities
Rs.162.35 lakh to the state government and involving 50 Village Forest Committees,
the same has been released and expenditure engaging 350 Fire Watchers and training
has been booked by the implementing and capacity building activities on fire
officers. fighting methods for frontline staff in
Darwad, Kalaburgi and Mangalore circles.
In the year 2019-20, a budget provision of
Rs.1000.00 lakh has been made in the State During 2019-20, the Government of India
Budget for implementing the scheme under has approved the APO for Rs.284.90 lakhs
National Afforestation Programme and comprising of Rs.170.94 lakhs central share
Green India Mission. The GOI has approved and Rs.113.96 lakhs State share. The
the work programme for Rs.363.057 lakh in Government of India has released Rs.136.75
the ration 60:40 (central share Rs.217.834 lakhs out of the Central share to the State
lakh and state share Rs.145.223 lakh) and Government. But the State Government
released Rs.220.993 lakh being the 1st has not released any amount under this
installment of Rs.19.422 lakh of 2019-20 scheme so far (as on 30.11.2019).
and 2nd installment of Rs.71.571 lakh of
2018-19 to the state Government. Proposal 8.1.6 Revenue and Expenditure :
has been submitted to State Government to Table 8.21 presents the details of revenue
release Rs.479.656 lakh being the state realized by sale of forest produce such as
share of Rs.147.33 lakh and the pending timber, firewood, bamboos, sandalwood,
payment amount of Rs.111.33 lakh of non-timber forest produce and also revenue
2018-19. realized from sanctuaries, and other
v) CSS Intensification of Forest miscellaneous revenue items etc. The
expenditure component includes the
Management Scheme:
establishment cost as well as cost of
During 2018-19, under this scheme, afforestation and other departmental
Rs.425.00 lakhs has been earmarked for fire programmes.
protection works. The Government of India
has approved the APO for Rs.292.70 lakhs. 8.1.7 Karnataka State Pollution Control
Out of which Rs.175.62 lakhs being the Board:
Central share and Rs.117.08 lakhs being The Karnataka State Pollution Control
the State share. An amount of Rs. 291.17 Board has been established on 21.09.1974,
Table 8.21: Revenue and Expenditure from Forest Department (Rs. crore)
Year Revenue Expenditure
2014-15 174.11 1161.51
2015-16 155.47 1253.86
2016-17 286.81 1391.25
2017-18 310.62 1425.31
2018-19 280.16 1536.22

131.74 955.56
2019-20
(upto Nov 2019) (upto Dec 2019)

2019-20(A) - 900.00
Anticipated (A)
338 Economic Survey of Karnataka 2019-20

under the Water (Prevention and Control of sectors under Red/Orange/Green/White


Pollution) Act,1974. It is a statutory body categories.
vested with the duties of implementing the
As per the directions, White category
provisions of both the Water and the Air Acts
industries are exempted from consent
for control of pollution. The Board is also
management. The Red category activities
enforcing rules and regulations framed by
with high pollution potential are given
Government of India under the Environment
priority in monitoring mechanism. The
(Protection) Act, 1986 viz., the Hazardous
effluents/emissions are regularly monitored
and Other Wastes (Management and
as per the statutory norms to ensure
Transboundary Movement) Rules, 2016, the
compliance to the standards prescribed.
Plastic Waste Management Rules, 2016, the
Bio-medical Waste Management Rules, The total of 1,08,379 (Operating – 78,908)
2016, the Solid Waste Management Rules, industrial sectors / organizations are
2016, the Noise Pollution (Regulation and covered under the consent mechanism, out
Control) Rules,2000 and the Batteries of which 8,599- Red, 22,641- Orange,
(Manufacturing and Handling) Rules, 2001 24,391- Green and 52,748- White category
and its amendment 2010. In addition to this, industries/institutions are operating in the
it is also discharging the duties entrusted to State. Among these Industries the details of
it both by the State and Central the Industries/Organizations covered by the
Governments from time to time on other Board are given in Table 8.22.
environment related matters.
8.1.8: Comprehensive Environmental
Industrial Pollution: Pollution Index(CEPI):
The Karnataka State Pollution Control The Central Pollution Control Board has
Board is covering all the industries/ issued direction under Section 18(1)(b) of
activities generating effluents and emissions the Water Act and the Air Act to calculate
under the consent mechanism. The CEPI, as per revised criteria for calculating
industrial activities are categorized as Red, CEPI Index on 26.04.2016. The “Revised
Orange, Green and White based on their Criteria of CEPI” is based on the following
pollution potential as per the direction of principles:
CPCB issued during 2016. The KSPCB has 1. Retaining the existing algorithm based
adopted CPCB directions issued under on Source, Pathway and Receptor.
Section 18(1)(b) of the Water (Prevention and
Control of Pollution) Act, 1974 and the Air 2. Develop the Revised CEPI considering
(Prevention and Control of Pollution)Act, the sources of pollution, real time
1981 vide letter No.B-29012/ ESS(CPA)/ observed values of the pollutants in the
2015-16, dated:07.03.2016, regarding ambient air, surface water and ground
harmonization of classification of industrial water of the industrial cluster and

Table 8.22 : Number of operating industries/institutions covered by KSPCB

Sl.No. Category Operating

1. Red 3,973

2. Orange 12,749

3. Green 12,972

4. White 49,214

Total 78,908
Economic Survey of Karnataka 2019-20 339

health related statistics. The concept is iii. The cost of restoration of the damage to
based on the selection of 3 criteria the environment of the said areas.
pollutants for each of the environment
components i.e., air, surface water and The Board has initiated following actions to
ground water, which together indicate mitigate environmental pollution in
the quality of ambient environment. critically and severely polluted areas.

3. Assessment of environmental quality of a) Identified defaulting industries in the


the area, based on the concept of critically and severely polluted
Surrogated Number level Exposure Industrial Areas to initiate action.
Factor (SNLF), to which is a surrogate b) Action plan has been prepared to
number representing the level of mitigate environmental pollution for the
exposure (a function of percentage critically and severely polluted
sample exceedence and Exceedence Industrial Areas.
factor).
c) Constituted the Local Area Committee
4. Health statistics to be based on health with TOR, as specified earlier to review
data available from major hospital in action plan and action taken.
the area.
d) State Level Monitoring Committee is
Accordingly, 100 Industrial Areas were constituted to review the issue related
monitored by CPCB and the industrial to Critically Polluted and Severely
clusters/areas having aggregated Polluted Area under the Chairmanship
Comprehensive Environmental Pollution of Development Commissioner and
Index (CEPI) scores of 70 and above, are Additional Chief Secretary and the
considered as critically polluted industrial committee is conducting meetings
clusters / areas by the Central Pollution regularly.
Control Board. Peenya and Jigani-
Bommasandra Industrial Areas in 8.1.9 Environmental compliance by
Bangalore District were categorized as some of the identified industrial sectors:
Critically Polluted Areas with CEPI score Mining, Thermal Power, Petro Chemicals,
78.12 and 70.99 respectively. Sponge Iron, Chemical & Pharmaceutical
The industrial clusters/areas having industries and Stone crushers are some of
aggregated CEPI score between 60 to 70 the focus areas of concern in terms of
were considered as Severely Polluted Areas. pollution load and their impact on
Kolhar Industrial Area, Bidar with score of environment.
65.64 is considered as Severely Polluted a) Pollution control status in mining
Area. Three other industrial Clusters sector:
viz., Raichur Industrial Area-53.42,
Bhadravathi-58.48, Mangalore-58.20 have Mining is one of the main industrial
been classified as other polluted areas in activities in Karnataka. The major minerals
Karnataka. being mined are Iron Ore, Manganese ore,
Limestone and Dolomite. Iron Ore mining is
The Hon`ble NGT in respect of O.A No. mainly confined to Ballary, Chitradurga &
1038/2018 has issued following directions Tumakuru Districts and the Limestone
vide order dated 14.11.2019, corrected on mining is located mainly in the districts of
19.11.2019 and directed to Submit Report Kalaburagi, Yadgir, Bagalkot, Belagavi &
by SPCBs before 31.01.2020 to CPCB. majorly the Manganese Ore mining is
i. Number of identified polluters in located in Davangere District. During
polluted Industrial Areas, extent of 1980's major mining activity was started in
closure of polluting activities. Chikkamagaluru District with the setting
up of Kudremukh Iron Ore Company
ii. The extent of environmental Limited (KIOCL) and the same is now closed.
compensation recovered.
340 Economic Survey of Karnataka 2019-20

In recent past, due to high demand in the stored as dumps in the mine lease area
market, large scale mining has taken place and to be stabilized.
in Bellari, Chitradurga & Tumakuru r Retaining walls have to be provided to
Districts. stabilize the dumps.
In Karnataka, 750 mines are covered under r Afforestation has to be carried out on
the Pollution Control Acts and only 183 are the slopes of the dumps.
operating as on 31.03.2019. Initially, r Constant sprinkling of water in the
KSPCB started covering only few major mine lease area, including approach
mining companies under the Water & Air roads.
Acts like National Minerals Development
Corporation (NMDC), Donimalai and KIOCL, r To metal and asphalt the roads inside
as they were using water for mining activity the mine lease area, as well as the
and discharging tailings. These mines were approach road to the mines.
also covered under the Air Act keeping in r To transport ore in a covered truck in
view emissions from crushers, D.G.Sets and wet conditions always.
other point and non point sources. r Even at stock yards, moisture contents
Action initiated by KSPCB for control of have to be maintained to prevent the
pollution in mining activity: dust nuisance.
r Providing conveyor belts within the
KSPCB has taken steps to strictly
mine lease area for ore transportation to
implement the provisions of the Water
avoid fugitive emissions due to
(Prevention & Control of Pollution) Act, 1974
movement of trucks.
and the Air (Prevention & Control of
Pollution) Act, 1981 irrespective of the size of b) Pollution Control Status in Sponge
mining area. The Hon'ble Supreme Court Iron Sector:
has constituted Central Empowering In Karnataka, 37 Sponge Iron units are
Committee (CEC) for resumption of mines. operating. Most of the units are located in
The mines have been categorized as A, B and the district of Bellari (27), Koppal (8),
C categories. The Hon'ble Supreme Court, Dharwad (1) & Tumakuru (1). All the units
during September 2012 has given directions uses coal based technology.
to restart A and B category mines as per the
Reclamation and Rehabilitation (R & R plan) The Ministry of Environment and Forests &
approved by the CEC. Climate Change (MoEF & CC), GoI has
notified standards for sponge iron units,
The CEC has approved 46 mines under A vide Notification No.GSR 414(E), dated:
category, 70 mines under B category and 51 30.05.2008. As per the Notification, the
mines under C category. The details relating chimney height for the Kilns is calculated
the production, water & air pollution control based on the fuel consumption and the
measures adopted by the mines, compliance sulphur content of the fuel. Further, a
to previous consent conditions, etc., are minimum chimney height of 30 metre is
verified thoroughly while issuing consents stipulated for all de-dusting facilities.
for operation. Further, the Board stipulates
and advices the following pollution control Sponge iron units are not significant from
measures while issuing consents to the water pollution point of view and water is
mining activity, in line with the used only for domestic purposes and cooling
Reclamation & Rehabilitation Plan (R & R water is completely recycled. However, these
Plan). units are very significant from air pollution
point of view. The main sources of air
r To provide check dams, gully-traps etc., pollution from these units are ,kiln and de-
to prevent the runoff from carrying the dusting facilities, loading and unloading of
fine particles of ore and silt. raw materials, crushing and processing of
r Fines, sub-grade ore, mineral rejects, raw materials, storage of raw material and
over burden and side burden. etc., to be solid waste vehicle movements.
Economic Survey of Karnataka 2019-20 341

Following conditions are stipulated and r 100 mtrs. away from Major District road
implemented by the Board to mitigate air (MDR) or other roads.
pollution from these industries. r 500 mtrs. away from Revenue village,
r Storage of raw materials within the temple, schools.
closed sheds. r 1 KM away from boundary of municipal
r Providing Bag filter for all raw material corporation, city municipal corporation,
processing and de-dusting facilities. town municipal corporation.
r Providing Electrostatic precipitator r Must be Minimum of 1 acre land.
(ESP) to the Kiln with interlocking d) Other highly polluting industries:
between the working of kiln and the
ESP. There are 263 industries under the 17-
category of highly polluting industries in the
r Providing Metalled roads within the State, of which 205 are in operation. The
premises. waste water generated from these industries
r Sprinkling of water in raw materials are treated and disposed as per the norms of
storage, process area and on roads of the Board. The West Coast Paper Mills at
raw material transportation. Dandeli is permitted to discharge effluent
r Regular monitoring of ambient air into Kali River and Harihar Poly fibers and
quality. Grasim division at Harihar are permitted to
discharge the effluents to Tungabhadra
c) Pollution Control Status in Stone River.
Crushers:
Apart from these industries, no other
There are 4,377 Stone Crushing units in industry is permitted to discharge treated
Karnataka as on 31.03.2019, 1815 are in effluents into rivers. The policy of the Board
operation. The Karnataka State Pollution is to ensure that, the industrial effluents are
Control Board is covering the Stone treated to the standards prescribed by the
Crushing activity under the Air (Prevention KSPCB and to use the treated effluent for
& Control of Pollution) Act, 1981. The State Secondary purposes, within the industry as
Government has passed an ordinance on far as possible and for irrigation/gardening/
07.09.2011 called The Karnataka green-belt development and construction
Regulation of Stone Crushers, Ordinance purpose.
2011, later enacted as The Karnataka
Regulation of Stone Crusher Act, 2011 on The Central Pollution Control Board, New
05.10.2012. The Rules have been framed on Delhi has issued directions under Section
22.06.2012. Further amendment to Act and 18(1)(b) of the Water (Prevention and Control
Rules was notified on 26.12.2013 and of Pollution) Act, 1974 and the Air
06.02.2014 respectively. (Prevention and Control of Pollution) Act,
1981 on 05.02.2014, to insist all the 17-
According to the above said Act & Rules, all Category of highly polluting industries to
crushers shall have to be established & install Continuous Online Emission/
operated in the safer zones only, except the Effluent Monitoring System, for self
crushers established for temporary period monitoring of effluents and emissions, in
for specific government development order to strengthen the monitoring and
projects with specific time frame. compliance through self regulatory
The licensing authority of the district/ mechanism.
individual crusher shall identify the safer Accordingly, the Board has issued directions
zones and the licensing authorities shall to all the 17-Category industries, under
declare and issue notification for them, after Section 33(A) of the Water Act and Section
fulfilling of following distance and other 31(A) of the Air Act to install Continuous
criteria. The conditions for declaring safer Online Monitoring Systems for monitoring
zones for the stone crusher are: specified environment parameters and to
r 200 mtrs. away from National Highway connect the online monitors to CPCB server,
and State Highway. for online transmission of the data. The
342 Economic Survey of Karnataka 2019-20

exceedence of the monitored data is being r Class A – Drinking water source without
regularly monitored at Board and alerts conventional treatment, but after
through SMS & e-mail are being sent to disinfection.
industries to take appropriate steps to r Class B – Out door bathing (organized).
operate the pollution control systems
scientifically. r Class C – Drinking water source with
conventional treatment, followed by
Out of 205 operating industries, 189 disinfection.
industries (10 industries are exempted from
r Class D – Propagation of wild life,
OCEMS) have installed continuous online
fisheries.
monitors as on 31.03.2019. The Board has
established “Air Care Cell” to monitor the r Class E – Irrigation, Industrial Cooling,
online emission and effluent Parameters/on Controlled Waste disposal.
continuous basis and send alerts to the Monitoring of the major rivers under various
industries, incase of exceedances, by the programmes indicates that, the major
way of issuing directions and refusing the pollutants in these water bodies are mainly
consent. organic and bacterial contaminants. This is
mainly due to domestic sewage discharge
8.1.10: Water quality management:
into the rivers from towns and villages
The Karnataka State Pollution Control located on the river banks.
Board is monitoring the quality of water
At the following three locations, the treated
sources in the State. Water samples from
industrial effluents are permitted for
lakes, rivers, ponds, bore well, open wells
discharge into the Rivers. The water quality
and sea are analyzed for monitoring the
at these locations about 100 meters
water quality. Discharge of domestic sewage
downstream of the treated effluent
and trade effluents from the industries are
discharge point are as under:-
the major sources of water pollution.
Therefore, the Board is regularly monitoring 1. Harihara Poly Fibres-Grasim
these sources from time to time, as Division- treated combined effluent
prescribed in the Act/Guidelines framed by into Tungabhadra River near Harihar,
Central Pollution Control Board. Regular Haveri District. Tungabhadra river
inspections and sample collections are water quality at downstream of
made to analyze the quality of water. Harihara Poly fibres conforms to 'D'
The Board is monitoring and analyzing river Class.
water samples at 103 locations (Under 2. West Coast Paper Mills Ltd treated
GEMS-5 & MINARS-98) in the State. effluent into Kali River near Bangur
According to the analysis report, rivers and Nagar near Dandeli, Uttara Kannada
lakes are susceptible to pollution mostly due District. Kali river water quality,
to industrial, domestic effluent discharge monitored quarterly indicates that, at
and agricultural runoff. The results of the downstream of the industry, it
samples drawn at 103 stations, located in all conforms to 'C' Class.
rivers across the State shows that, the
quality of water comply largely to category The Board has analyzed 90,394 samples
'C', which means the water is potable after from the discharge of organizations
treatment and disinfection. River water (including industries) and other waste water
quality is related to seasonal variations like generating units identified. The same are
rainfall and flow of the river etc. being monitored with inspection and sample
analysis. The Board is initiating action to
Inference on the River Water Quality ensure compliance from the concerned
Monitoring: organizations, wherever the samples are not
CPCB has specified water quality criteria meeting the prescribed standards. Figure
depending on the designated best use and 8.5 shows the classification of river water
activities in the river. The classifications are: quality under NWQMP for the period from
2014 to 2019(up to October 2019.
Economic Survey of Karnataka 2019-20 343

In order to control pollution of water bodies, Karnataka State Pollution Control Board is
KSPCB has accorded consent to11 Common monitoring the ambient air quality of
Effluent Treatment Plants (CETP) in the Bangalore city at 20 stations, 13 stations
State at different places for treatment of under the National Ambient Air Quality
effluents generated from homogeneous type Monitoring Programme (NAMP) and 07
of industries in the small scale sector. stations under the Continuous Ambient Air
Presently 10 CETP's are in operation. Quality Monitoring programme (CAAQM).
8.1.11. Air Quality Management: Monitoring is done twice-a-week for 24
hours at 13 Stations under NAMP and 24
The Karnataka State Pollution Control hours through-out the year at 7 stations
Board is monitoring the air quality in the under CAAQM.
State, in accordance with the provisions of
the Air (Prevention and Control of Pollution) According to the revised national ambient
Act, 1981. The main sources of air pollution air quality standards (18-11-2009), six
are (i) vehicular emissions (ii) industrial parameters are monitored using manual
emissions (iii) construction activities, (iv) re- equipments viz., Particulate Matter (PM10),
suspended road dust and open burning of Particulate Matter (PM2.5), Sulphur dioxide
waste in the public place. (SO2), Nitrogen dioxide (NO2), Ammonia (NH3)
and Lead (Pb). In the Continuous Ambient
About 1.30 crore vehicles were registered in Air Quality Monitoring Stations (CAAQMS),
the State as on 31.03.2019. (Source: rto. 8 parameters viz., Particulate Matter
kar.nic.in). Emission from the vehicles is (PM10), Particulate Matter (PM2.5), Sulphur
monitored in accordance with the Motor dioxide (SO2), Nitrogen dioxide (NO2),
Vehicle Rules. The vehicles are being check- Ammonia (NH3), Carbon monoxide (CO) ,
ed and penalties are being imposed by the Ozone (O3) and Benzene(C6H6) is monitored.
traffic police and RTO for non-compliance of
standards prescribed. The KSPCB takes up The data measured are compared with
the issue with the concerned authorities, as the revised national ambient air quality
and when the air pollution levels exceeds the standards. Annual average values of air
prescribed limits. One such measure pollutants in the 13 manual stations in
implemented is, supply of low sulphur Bangalore city is depicted in Table 8.23.
petrol in Bangalore City. The results are being notified in the Board's

Figure 8.5 : Classification of River Water Quality under National Water Quality
Monitoring Programme during the Year 2014 to 2019 (Upto Oct-2019)
344 Economic Survey of Karnataka 2019-20

website, as well as through SMS to all 2017-18 in Bengaluru viz., City Railway
stakeholder Departments. station, Regional Office complex at S.G
Halli; near Central Silk Board, H.S.R
Apart from existing two CAAQMS,
Layout; Rajeev Gandhi Child Care Institute,
additional 5 stations are established during

Table 8.23: Annual average values of Air Pollutants at Bengaluru city during the
year 2018-19

SO2 PM
Sl. Name of the NO2 PM 10 NH3 Pb O3 CO
µg/ 2.5 AQI Category
No. Station µg/m3 µg/m3 µg/m3 µg/m3 µg/m3 mg/m3
m3 µg/m3

Export
promotional
1 Park, ITPL, 2.0 33.3 121.7 49.8 25.2 0.122 * * 114 Moderate
Whitefield
Industrial Area

Rail Wheel
2 Factory, 2.0 32.7 105.9 * 25.2 0.071 * * 104 Moderate
Yelahanka

Yeshwanthpura
3 2.0 33.0 102.0 46.5 25.2 0.112 * * 101 Moderate
Police Station

Central Silk
4 Board, Hosur 2.1 32.5 124.0 59.5 25.9 0.108 * * 116 Moderate
Road

City Railway
5 6.8 39.0 126.0 * * * * 1.6 117 Moderate
Stn(CAAQMS)

Central Silk
6 Board 6.9 32.2 103.9 39.6 21.5 * 29.1 1.0 103 Moderate
(CAAQMS)

Urban Ecopark
7 2.0 33.0 96.0 41.5 27.3 0.169 * * 96 Satisfactory
Peenya

Swan Silk Pvt.


8 2.0 32.9 97.5 44.5 25.5 0.135 * * 98 Satisfactory
Ltd , Peenya

AMCO Batteries,
9 2.0 33.4 100.5 43.9 26.8 0.186 * * 100 Satisfactory
Mysore Road

Banaswadi
10 2.0 27.8 67.7 * 24.7 0.035 * * 68 Satisfactory
police station

S.G.Halli
11 3.9 22.9 58.8 60.0 12.9 * * 0.9 59 Satisfactory
(CAAQMS)

12 Kajisonnenahalli 2.0 32.2 86.5 53.0 24.7 0.143 * * 88 Satisfactory

TERI Office,
13 2.0 34.7 84.8 40.0 26.4 0.058 * * 85 Satisfactory
Domlur

UVCE, K.R
14 2.0 28.9 75.0 34.0 25.0 0.092 * * 75 Satisfactory
Circle
Economic Survey of Karnataka 2019-20 345

Table 8.23: Annual average values of Air Pollutants at Bengaluru city during the
year 2018-19

SO2
Sl. Name of the NO2 PM10 PM2.5 NH3 Pb O3 CO
µg/ AQI Category
No. Station µg/m3 µg/m3 µg/m3 µg/m3 µg/m3 µg/m3 mg/m3
m3

Victoria
15 Hospital, 2.0 32.5 65.8 27.5 25.2 0.037 * * 66 Satisfactory
Bengaluru

Indira Gandhi
16 Child Health 2.0 32.7 69.7 37.0 25.1 0.033 * * 70 Satisfactory
Care Centre

Veternary
17 College, Hebbal 4.7 29.5 70.1 34.9 16.7 * 33.9 0.9 70 Satisfactory
(CAAQMS)

Jayanagara 5th
18 7.3 35.9 87.2 38.0 24.1 * 35.7 1.1 87 Satisfactory
Block (CAAQMS)

Kavika, Mysore
19 8.3 48.5 87.6 40.0 15.3 * 37.3 0.9 88 Satisfactory
Road(CAAQMS)

Rajeev Gandhi
Institute of
20 Chest Diseases, 7.0 28.5 68.9 30.6 15.2 * 51.6 0.6 69 Satisfactory
NIMHANS
(CAAQMS)

Standards,
50.0 40.0 60.0 40.0 100.0 0.500 100.0 2.0
µg/m3

Note : * Monitoring Annual average


88.7 Satisfactory
not carried out AQI

Figure 8.6 : Classification of Catogorywise possible health impact

Category Category
Possible Health Impacts Possible Health Impacts
(Range) (Range)

Breathing discomfort to
Good Poor
Minimal Impact people on prolonged
(0–50) (201–300)
exposure
Minor breathing Respiratory illness to the
Satisfactory Very Poor
discomfort to sensitive people on prolonged
(51–100) (301–400)
people exposure
Breathing discomfort to
Respiratory effects even on
Moderate the people with lung, Severe
healthy people
(101–200) Heart disease, children (>401)
and older adults
346 Economic Survey of Karnataka 2019-20

NIMHANS ; Veternary College, Hebbal; The Board has issued directions under
Kavika, Mysuru Road and Shalini Ground, Section 31(A) of the Air Act to the
Jayanagar 5th Block, Bengaluru. Commissioner, Transport and Road Safety
Monitoring is being carried out on 24x7 for and Commissioner, Bruhat Bangalore
Particulate Matter (PM10), Particulate Mahanagara Palike to take up ameliorative
Matter (PM2.5), Sulphur dioxide (SO2), measures to address the problem of urban
Nitrogen dioxide (NO2), Ammonia (NH3), air pollution. The analysis of ambient air
Carbon monoxide (CO) Ozone (O3) and quality monitoring has indicated that, the
Benzene(C6H6) and the data are sent to PM10 values have exceeded the national
CPCB, New Delhi electronically and also the ambient air quality standards (60.0 µg/M3)
data are entered in the Board Website. at Mangalore, Hubli- Dharwad, Belgaum,
Raichur, Kalburagi, Bellary, Bidar, Tumkur
During 2017-18, Board has installed and and Davanagere. The PM2.5 values have
commissioned 22 continuous ambient air exceeded at Belgaum, Kalburagi, Bidar and
quality monitoring stations (CAAQMS) at Tumkur. NO2 and SO2 values are within the
district headquarters of the State, in
national limit of 40.0 µg/M3 and 50.0
addition to Bangalore District. The Board is
µg/M3 for the year. This is due to the
monitoring the ambient air quality at all the
construction activities and vehicular
major cities, under the National Ambient Air
movement and re-suspended road dust.
Quality Monitoring Program. viz., Mysore-2
Annual average values of air pollutants, at
stations, Hubli–Dharwad-2 stations,
different locations in the districts are
Davanagere- 2 stations, one each at
depicted in Figure 8.7.
Bhadravati, Mandya, Chamarajanagar,
Hassan, Mangalore, Karwar, Kodagu Industrial air emissions are regularly
,Belagavi, Kalaburagi, Bidar, Raichur, monitored by the KSPCB, through
Ballari , Kolar , VISL - Shivamogga, inspections and sample collections.
Ranebennur, Chitradurga and Tumkur. Wherever the samples are not complied with
the standards prescribed, actions are being
The CAAQMS are equipped with Sulphur
taken to set right the problem by strict
dioxide (SO 2 ) Nitrogen dioxide (NO 2 )
enforcement of law.
Ammonia (NH3) Benzene, Carbon monoxide
(CO), Ozone (O3), Particulate matter (Size 8.1.12 Noise Quality Monitoring:
less than 2.5 micron) PM2.5 and Particulate The Karnataka State Pollution Control
matter (Size less than 10 micron) PM10 Board is monitoring the noise level in 10
analysers, along with weather monitoring stations located at various places in
equipments having the facility to measure – Bangalore under National Ambient Noise
Wind Speed, Wind Direction, Atmospheric Monitoring Programme (NANMP)
Temperature, Relative Humidity, etc.
The details are submitted in Table 8.24
In Karnataka, 4 Cities viz., Bengaluru, below:
Davangere, Kalburgi and Hubli- Dharwad
have been identified by CPCB as Non The Noise levels in the cities are generally
attainment cities, based on PM10 exceeding the standards in most of the silent
exceedence. Action Plan has been approved zone and Residential areas, due to vehicular
by CPCB and is under implementation. movement and honking. The noise levels
measured in industrial areas are found to
The summary of air quality monitoring: meet the standards. The noise monitoring is
The continuous ambient air quality made compulsory for large scale industries.
monitoring data is online and can be viewed The Board monitors the noise levels
in CPCB website, SAMEER app and in whenever the complaints are received and
KSPCB website. The 'air quality index' of the data are shared with the police for
Bangalore city, as per the continuous further regulation as per the notification of
monitoring is generally in the range of Govt. of Karnataka issued under the Noise
'Satisfactory' and sometimes it is Pollution (Regulation and Control) Rules,
'Moderate'. 2000 vide G.O.No:FEE 46 ENV 2000,
Economic Survey of Karnataka 2019-20 347

dated:13.08.2002. (Figure 8.8 & Figure Industrial Area, Kanakapura taluk,


8.9) Ramnagar district.
8.1.13. Hazardous Waste Status: Further, there are six standalone hazardous
waste incinerators in the State for
About 3451 operating industries are found incineration of hazardous waste. In
to be generating hazardous waste of about addition, Board has permitted 8 cement
1.91 lakh metric tons annually in the State. industries to use hazardous waste for co-
Out of this, 65,851MTPA is recyclable. The processing.
remaining waste of around 79,542 MTPA is
sent to incineration and 46,596 MTPA is a) Management and Handling of
sent to landfill. The land fillable hazardous Batteries:
waste is being sent to two secured landfill
In the State about 686 Battery sellers are
facilities located at (i) Dobbaspet near
identified by the Karnataka State Pollution
Nelamangala in Bangalore and (ii) Harohalli

Figure 8.7: Annual Average of Air Pollutants in Major Districts for the year 2018-19

Table 8.24: Noise level measuring stations located at various places in Bengaluru
Sl.
Nam e of the sta tions Ty pe of Ar ea
No.

1 KSPCB, Parisara bhavan, # 49 Church Street, Bengaluru. Commercial area

KSPCB office Buil ding, Nisarga Bha van, S.G .halli,


2 Residentia l area
Benga luru .

3 CAAQM at 29th main Madival lake, BTM II nd stage, Residentia l area


Bengaluru
Ace Manufacturing System,
4 Industrial Area,
Peenya Industrial Area, Bengaluru -58.

5 BWSSB site No. 137. Kadubidnahalli, Bengaluru Commercial Area


6 Indira Gandhi Institute of Chi ld Hea lth (NIMHANS) S ensi tive Area

7 RVCE Mysore Road , Ben galuru S ensi tive Area

8 TERI O ffice, Domlur, Bengaluru Residentia l Area

9 Wh ite field Industrial Area (Graphite India), Bengaluru Industrial Area

10 Yeshwanthpur Poli ce Station, Ben gal uru Commercial Area


348 Economic Survey of Karnataka 2019-20

Figure 8.8: Bangalore Noise Monitoring Centre

Figure 8.9: Noise monitoring results at different locations in Bengaluru for year
2018-19

Note:
1. Day time shall mean from 6.00 AM to 10.00 PM.
2. Night time shall mean from 10.00PM to 6.00 AM.
3. Silence zone is an area comprising not less than 100 meters around Hospitals, Educational Institutions,
Courts, Religious places or any other which is declared as such by the competent authority.
4. dB(A) Leq denotes the time weighted average of the level of sound decibels on scale 'A' which is relatable to
human hearing.
5. 'A' decibel is a unit in which noise is measured.
6. 'A' in dB(A) Leq, denotes the frequency weighting in the measurements of noise and corresponds to
frequency response characteristics of the human ear.
7. 'Leq' it is energy mean of the noise level over a specific period.

Control Board and are being monitored b) Plastic Waste Management:


regularly. As per extended producers
As per Plastic Waste Management Rules,
responsibilities, the battery manufacturing
2016, the Karnataka State Pollution Control
industries need to take back the old
Board is the prescribed authority for
batteries from the dealers when the new
enforcement of the provisions of these rules
batteries are sold. KSPCB has given consent
related to registration, manufacture and
to 37 old batteries recycling units.
recycling of plastic and the muncipal
Economic Survey of Karnataka 2019-20 349

authority are the prescribed authority for e) Solid Waste Status and Management:
enforcement of the provisions of these rules The Rule places responsibility on the
relating to the use, collection, segregation, municipal authority within their jurisdiction
transportation and disposal of the plastic for the implementation of this Rule and for
waste. any infrastructure development for
The State Government vide Notification collection, storage, segregation,
No.FEE17EPC2012,Bangalore,dated:11- transportation, processing and disposal of
03- 2016 in exercise of the powers conferred municipal solid waste. The State Pollution
under the Environment(Protection) Act, Control Board is to grant authorization for
1986,issued directions imposing ban on the setting up of landfill/ processing
manufacture, supply, sale and use of plastic facilities and to monitor the ground water,
carry bags, plastic banners, plastic ambient air, leachate quality and the quality
buntings, flex, plastic flags, plastic plates, of compost.
plastic cups, plastic spoons, cling films and There are 277 local bodies in the State
plastic sheets used for spreading on dining including BBMP. Out of these local bodies,
table irrespective of thickness including the 214 local bodies have taken possession of
above items made of thermocol and plastic land fill sites, 52 urban local bodies have
which use plastic micro beads in the established sanitary land fill facilities as per
Karnataka State. SWM Rules. BBMP has identified landfill
KSPCB is one of the agencies for sites for development under public private
implementation of the above said partnership.
notification and in addition implementing Scientific disposal of slaughter house waste
Plastic Waste Management Rules, 2016 for is another sector which requires priority. In
the non banned items. order to achieve this, modern abattoir is
The Board in co-ordination with Local planned in major cities of the State. Proposal
bodies conduct regular raids in the state. of establishing modern abattoir at urban
The Board has permitted seven cement local bodies is to be executed in a time
industries for co- processing of plastic waste bound manner by the local bodies. KSPCB is
in their kilns and also given permission to currently following the guidelines stipulated
45 recyclers for recyling the plastic waste. by the CPCB.
c) E-waste management: f) Ozone Layer Protection:
The Karnataka State Pollution Control The 1987 UN Montreal Protocol outlawed
Board has issued authorization to 102 units chlorofluorocarbon gases (CFCs) that erode
for recycling /dismantling E-waste in which Earth's ozone layer, which protects the
71 units are operating. There are 2 E-waste planet from cancer-causing solar rays.
refurbishers operating with a capacity of Further expansion of the Antarctic ozone
706 MTPA. hole has been halted, but full recovery is not
expected until mid-century or later. Usage of
d) Bio-Medical Waste Management: CFCs is therefore discouraged.
The Bio-medical waste generated from the Success Stories
health care establishments is being
monitored in accordance with the Ease of doing Business - Business Reforms
provisions of the Bio Medical Waste Action Plan, 2017 &its Implementation
Management Rules, 2016. The Board has Status.
identified 35,869 health care establishments r The Karnataka State Pollution Control
in the State. It is estimated that 65.62 Board for introducing transparency in
Tonnes per day of biomedical waste is its consent management process & to
generated in the State, which is sent to 26 comply with the Ease of doing business
common bio-medical waste treatment requirements, has simplified its
facilities in the State and 4 units are yet to procedures for issue of Consent,
be commissioned.
350 Economic Survey of Karnataka 2019-20

Authorization, Registration to the The following are the important action


organizations and facility for points implemented by the Board:
online issue of Consent Order/
r Board has launched online application
Authorization letter/Registration letter
for Green, Orange and Red categories of
is implemented.
Consents for Establishment, Consent
r The Department for Promotion of for Operation, Consent for Expansion
Industry & Internal Trade (DPIIT), and HWM authorization. The
Government of India has framed applications are processed through
Business Reform Action Plan for the online mode and digitally signed, E-out
year 2018-19 under EODB, 2018. In warded consents orders / authorization
the Business Reforms Action Plan, orders are issued through XGN-
2018-19 communicated by the Karnataka Software.
Commissioner for Industrial
r The Board has made mandatory
Development & Director of Industries &
provision for collection of consent fee by
Commerce, 9 action points pertains to
online mode through XGN Karnataka
the Board. The Board has implemented
(Payment Gateway (Debit card, Credit
all the action points.
card, Net banking)).
r To comply with EODB action points,
r Board is issuing CFE with a validity of 5
Board has brought CFO, HWM
years and CFO with a validity of 10
applications under SAKALA services
years, 5 years & 5 years for Green,
from March 2018. In this regard, 8 new
Orange & Red categories industry/
services are incorporated under
organization respectively.
SAKALA scheme and Board has
integrated XGN Karnataka software r Board has published a well defined
with SAKALA software for real time data compliance inspection procedure,
transfer to SAKALA. Check list on the Board's website.
Designed and implemented a system for
r Board has introduced E-sign digital
identifying establishments that need to
signature from the Centre for E-
be inspected based on computerized
Governance, DPAR (IT) for the
risk assessment, mandated online
applicants & officers of the Board since
submission of inspection report within
December 2018 to enable submission
48 hours to the Department, and also
of application without the need to
provided the provision to view and
submit the physical copy of the
download submitted inspection
application and eliminate the physical
reports by the organizations.
touch point for document submission.
r Facility has been provided for third
r The Board has made a provision for
parties to easily verify the approval
collection of consent fee by online
certificates (Consent order) in the public
mode through XGN Karnataka
domain.
(Payment Gateway (Debit card, Credit
card, Net banking)). r Board has exempted Green industries
with a history of satisfactory compliance
r Facility has been provided for third
from environmental compliance
parties to easily verify the approval
inspection.
certificates (Consent order) in the
public domain. r Board has provided the facility for third
party certifications instead of
r Board has exempted Green industries
Departmental inspections under
with a history of satisfactory
environment/pollution laws for
compliance from environmental
medium risk industries (Orange
compliance inspection.
category industries).
r Board has implemented Random
r Board has implemented Random
inspection of highly polluting
inspection of highly polluting
industries.
industries.
Economic Survey of Karnataka 2019-20 351

Vehicular Emission Monitoring: phased manner in different locations in


the State as below Table 8.26.
To know the impact of vehicular emission on
the ambient air quality on ambient air, the Real Time River Water Quality
Karnataka State Pollution Control Board Monitoring
has procured 12 vehicular emission The CPCB has published the report on river
monitoring vehicle fitted with smoke density stretches for restoration of water quality and
meter and gas analyser. 6 are issued to inter boundary monitoring programme
Bangalore city and one number each to during March 2015. As per the report there
Mysore, Mangalore, Dharwad, Gulbarga, are 17 polluted river stretches in the State
Chitradurga and Bellary. The Board has which are not meeting the criteria based on
conducted “Joint monitoring of vehicular the BOD concentration.
emission at major cities along with
Transport & Road Safety Department, In the first phase, KSPCB has installed Real
Traffic Police, BMTC and Zonal Office CPCB. Time Water Quality Monitoring Stations
(RTWQMS) at Cauvery River, Satyagala
Online monitoring for self regulation: bridge at Chamarajanagara, and at Krishna
Directions have been issued by the Central River at intake point of Shaktinagar,
Pollution Control Board under Section 18 (1) Raichur.
(b) of the water (Prevention and Control of 8.1.15. Karnataka Bio-diversity Board
Pollution ) Act , 1974 and the Air (Prevention (KBB):
and Control of Pollution ) Act ,1981 and
State Pollution Control Board under Karnataka Bio-diversity Board was
Section 33(A) of the Water (Prevention and established vide section 22 of Biological
Control of Pollution ) Act, 1974 and under Diversity Act, 2002, by Government of
Section 31(A) of the Air (Prevention and Karnataka on 01.08.2003.
control of pollution ) Act ,1981 to provide I. Main objectives of the Board:
continuous online monitoring system in
respect of all the 17-Category of Highly 1. Implementation of Biological Diversity
Polluting industries, Common Effluent Act, 2002 and Karnataka Biological
Treatment Plants(CETP's), Common Diversity Rules, 2005.
Hazardous Waste and Biomedical Waste 2. Conservation of Biological Diversity.
Incinerators in order to strengthen
monitoring mechanism for effective 3. Promotion of in-situ an d ex-situ
compliance through self monitoring. Status conservation of biological resources,
of industries who have connected Online incentives for research, training and
Monitoring Systems (OCEMS) to CPCB public education to increase awareness
Server for the year 2018-19 is given in Table with respect to bio-diversity.
8.25 below. 4. Planning schemes and programs for the
8.1.14 Other Major Achievements of sustainable utilization of biological
KSPCB diversity.

r Ban on immersion of Plaster of Paris II. Functions of the Board:


and coloured idols in water bodies : In 1. Advise the State Government, subject
order to maintain the quality of water to any guidelines issued by the Central
bodies during Ganesha festival, KSPCB Government, on matters relating to the
under Section 33(A) of the Water Act has conservation of biodiversity,
notified on 22nd July 2016 banning the sustainable use of its components and
immersion of idols made of plaster of equitable sharing of the benefits arising
paris and coloured idols in water bodies. out of the utilization of biological
r Continuous Ambient Air Quality resources.
Monitoring Stations (CAAQMS) : The 2. Regulate by granting of approvals or
Board has established CAAQMS in otherwise requests for commercial
352 Economic Survey of Karnataka 2019-20

Table 8.25 : Status of Industries who have connected online Monitoring Systems to
CPCB Server for the year 2018-19

Total No. of Not


Sl. No. 17 -Cate gory Indu st ries Connec te d
Indu stri es C onne cte d

1 Alumin um 1 1 -

2 B ulk Drugs & Ph arma ceut ical 62 59 3

3 C au stic Soda 1 1 -

4 C em en t 21 21 -

5 Dist illery 13 13 -

6 Dyes & Dye In termediates 2 2 -

7 Fertilizer 3 3 -

8 Oil Refinery 1 1 -

9 Pesticides 1 1 -

10 Petrochemica ls 1 1 -

11 Pulp & Paper 5 5 -

S uga r
12 (Suga r, Sugar & Co-gen 67 66 1
,Sugar ,Co-gen a nd distillery)

13 Therma l Power 9 9 -

14 Int egra ted Iro n & Steel 1 1 -

15 Tan nery - - -

16 C opper Smelter - - -

17 Zinc S melter - - -

1 7-Ca tegory Industries


188 184 4
Tota l

C ommon Fac ilitie s

1 C BMWI 26 23 03

2 C ETP 10 07 03

3 C HW I 07 07 -

C ommon Fac ilitie s Total 43 37 06

Gran d Total 231 221 10


Economic Survey of Karnataka 2019-20 353

Table 8.26: Continuous Ambient Air Quality Monitoring Stations


Phases Name of the city Total No.

Upgradation of 5 Manual AAQM Stations to- 5 CAAQMS at


5
Bengaluru
Phase –I
Non- Attainment Cities – One each to Mangalore, Hubli and
3
Kalaburagi– 3 CAAQMS

CAAQMS one each at Chikkballapur, Ramnagara,


Phase-II 7
Udupi, Haveri, Koppal, Yadgir & Gadag

Mysuru, Chamarajnagar, Hassan, Davanagere, Shivamogga,


Phase-III Karwar, Raichur, Bidar, Chikkamagaluru,Vijayapura, 12
Bagalkote & Kolar

Iron ore mining areas Tumkur, chithradurga, Koppala, Ballary and


Phase-IV 09
mandya – 09 CAAQMS Stattions.

Note : Installation of CAAQMS at Madikeri & Belagavi is under progress.

utilization of bio survey and bio 8. Bio-diversity Awards during celebration


utilization of any biological resource by of International day of Bio-diversity on
Indians; 22nd May of every year.
3. Perform such other functions as may be 9. Special Programs
necessary to carry out the provisions of
this Act or as may be prescribed by the 10. Publications.
State Government. IV. Activities and performance of
III. Activities of Karnataka Biodiversity Karnataka Biodiversity Board for the year
Board: 2019 -20 (From April 2019 to December
2019)
1. Formation of Biodiversity Management
Committees at local bodies 1. Formation of Bio-diversity
Management Committees (BMCs):
2. Facilitate to prepare the People's
Biodiversity Registers by Biodiversity As per section 41 of Biological Diversity Act
Management Committees. 2002, every local body shall constitute a Bio-
diversity Management Committee with its
3. Conducting Awareness Trainings on area for the purpose of promoting
Biodiversity in Biodiversity conservation, sustainable use and
Management Committees, Universities documentation of Biological Diversity.
and Institutions
2. People's Bio-diversity Register (PBRs):
4. Funding Research Projects / Special
Studies concerning Bio-diversity People's Biodiversity Registers is a
issues. Panchayat level register that documents
local biodiversity and local community
5. Declaration of Bio-diversity Heritage knowledge on bio-diversity including its
Sites. conservation and traditional uses. The PBRs
6. Board Meetings. are prepared in various districts at Gram
Panchayat level, Taluk Panchayat and Zilla
7. Survey of Bio industries and Utilization Panchayat level. PBR's are prepared both in
of bio resources Kannada and English.
354 Economic Survey of Karnataka 2019-20

3. Awareness and Training Programs: Government Organizations, Panchayat


members and general public is being
The Bio-diversity awareness training
conducted throughout the state. Progress as
program to Government employees,
below Table 8.27.
university students, teachers, Non-

Table 8.27 :Progress of Awreness programs conducted at GP.TP.ZP.and local body


level

A c hiev e me nt ( Fro m T o tal


Sl. A p ril 20 19 to A c hie ve m ent
Pro g ram s
No D ece m be r 2019 ) ( F ro m 2 003 to 2019 )
(I n nu m be rs ) (I n nu m be rs )

G P le v e l – 4 7 9 G P L e v el – 5 8 7 4
F orm a tion of B iod iv e rsit y T P le v e l – 2 6 TP L e ve l- 1 7 5
1 M an ag e m e nt C om m itte e s Z P le ve l – 1 4 Z P L e ve l – 3 0
(B M C ) L oc al B od i es - 3 0 L oc al B od ie s - 3 0
T o tal - 6109

G P L ev e l - 20 1 1
P rep a ra tio n of P e op le ’ s GP – 72
2 TP L ev e l - 24
B io di ve rs ity R eg i st ers ( P B R s) TP - 1
T o tal - 2035

3 B M C Aw are ne s s trai ning s - 1076

Pro g res s fro m Ap ril 201 9 to D ec em b er 2019

C o- ord ina tors trai ning a t


4 10 1 0
T um k u r d is tri ct.

C irc le L e v el W ork sho p a t


5 1 1
C ha m raj nag a r d is tric t.

Sa tco m Trai ning P rog ram m e s


c ond uc te d a t Ta luk a l ev e l for
G ram a p a nc hay a t, Ta lu k a
P anc ha y at, Z i lla P a nc hay a t
6 B M C M e m b e rs, L ine 2 2
D ep a rtm e nt Of f ic ial s,
N at iv id ay a s and othe r
Sta k eh old e rs on Ju ne 2 0 t h,
2 0 19 an d O ct ob er 1 6 , 2 0 1 9 .

T ra ine rs T rain ing P rog ram m e


at B a ng alu ru Urb a n, M y so re,
7 M an g alu ru, H a ss an, B el la ry , 8 8
Shi vm og g a, K a lb urg i an d
D harw ad .

V id e o c onf e ren ce c ond u c ted


b y K a rn ata ka B iod iv e rs i ty
B oa rd an d R ura l
8 D ev e lop m en t a nd P a nc hay at 8 8
R aj to re vi ew th e p rog res s of
C ons ti tuti on of B M C s and
PBRs.
Economic Survey of Karnataka 2019-20 355

4. Research Projects/Studies of the 6. Survey documentation and


Board: conservation of genetic diversity of
New project proposals for the year 2019- elite jackfruit in Western Ghats area
20. The Board had invited new project of Karnataka. Submitted by Dr. G.
proposals from various research/academic Karunakaran, PI & Head, ICAR-IIHR,
institutions in the State. 15 proposals have Central horticultural experiment
been shortlisted and the Board is under the station, Hirehalli, Tumakuru,
process of sanctioning the studies, for a Karnataka.
maximum period of 2 years. The details of 7. Collection, documentation,
the shortlisted proposals are as below: conservation and use of nutritionally
A. List of Research Proposals and potential under exploited plant
Principal Investigators: species to enhance agro-biodiversity.
Submitted by Dr. S.R Anand, Jr.
1. Diversity of Ants in Different Agronomist, AICRN on Potential Crops,
Habitats of Kalaburagi District, GKVK, Bengaluru – 560065.
Karnataka, India. Submitted by Dr.
Shashikanth H. Majagi, Assitant 8. Survey documentation a n d
Professor, Dept. of Studies and research establishment of community linked
in Zoology, Govt. College (Autonomous), germplasm of wild edible fruits of
Sedam Road, Kalaburagi. Central Western Ghats. Submitted by
Dr. Satish B.N, Asst. Prof & Head, Dept.
2. Biodiversity significance, land use of Forest products and utilization,
pattern and conservation of College of Forestry, Ponnampet,
fragmented Kaan forests. Submitted Kodagu.
by Dr. Jagadish M.R, Assistant
Professor (Agro-forestry), Sirsi College 9. Assessment of population and
of Forestry, Dept. of Silviculture and regeneration status of plant species
Agroforestry, Sirsi. notified under Section- 38 of
Biological Diversity Act of
3. Inventorization and ecological Karnataka. Submitted by Dr.
studies of lichens in some sacred Mahadeva Murthy, Professor, Dept. of
forests of central Western Ghats, Forestry & Environmental Science,
Karnataka. Submitted by Dr. Sanjeeva GKVK, Bengaluru.
Nayaka, Principal Scientist,
Lichenology laboratory, CSIR, 10. Study and formulate an inventory &
Lucknow, Uttar Pradesh. network on alien invasive plant
species in Karnataka. Submitted by
4. A Study of changing Socio-economic Dr. Kavitha Sagar, Assistant Prof.
and ecological scenario of Devara Vijayanagara Sri Krishnadevaraya
Kaadu (Sacred Groves) forest in Coorg University, Bellary- 583 105.
District of Karnataka. Submitted by
Dr. D.C Nanjunda, Associate Professor 11. Supply chain management and value
& Deputy Director, Centre for study of addition to Ayurvedic Industry by
Social Exclusion and Inclusive Policy, Tribal Communities in Karnataka.
University of Mysore. Submitted by Dr. Mallikarjun. G
Kerutagi, Professor (Agril. Economics)
5. Collection, identification, & HOD, University of Horticultural
documentation and molecular Sciences, Udyanagiri, Bagalkot 587
characterization of Elite Tamarind 104.
(Tamarindus indica L) accessions of
Karnataka. Submitted by Dr. Suneetha 12. Plant Diversity of Honnavar and
C, Assistant Prof of Horticulture, Karwar towns of Uttara Kannada,
College of Agriculture, GKVK, Karnataka. Submitted by Dr.
Bengaluru- 560 065. Shivanand S. Bhat, Assistant Prof. of
356 Economic Survey of Karnataka 2019-20

Botany, Government Arts & Science Authority (KAMPA) and Department of


College, Karwar. Forest. Project Management Unit (PMU)
consists of Project Co-ordinator and one
13. C o l l e c t i o n C o n s e r v a t i o n a n d technical executive. Progress of the
assessment of traditional rice (Oryza works as below Table 8.28.
sativa) landraces in Western Ghats of
Karnataka. Submitted by Dr. 5. Declaration of Heritage Sites: --Nil--
Dushyanta Kumar. B.M, Professor & 6. Board Meetings:
Head, UA&HS, Shivamogga.
1. Special Board Meeting held on
14. C o l l e c t i o n , c o n s e r v a t i o n , 29/04/2019
characterization and documenting
2. 41st Board Meeting held on
traditional knowledge of land races of
28/05/2019
Betelvine (Piper betel L.) from
Karnataka. Submitted by Dr. K. Hima 3. 42nd Board Meeting held on
Bindu, Principal Scientist ICAR-IIHR, 07/09/2019
Hesarghatta lake post.14.
7. Survey of Bio Industries and
15. Status of forests and sacred groves in Utilization of Bio Resources:
Sagar Forest Division of Shimogga Action was initiated to collect the
District. Submitted by Dr. T.V information of bio resources from bio
Ramachandra, Coordinator, Energy industries with the involvement of
and wetlands Research Group (CES), Karnataka Indian Medicine Manufacturers
IISc, Bengaluru. Association (Regd.) The information has
B. Status of projects sanctioned in been collected.
previous years: 1) Form 1 Submission - 133 applications
1. Project titled - Documentation of amounting to Rs. 1,33,000.00
traditional knowledge of livestock 2) ABS amount accrued - 49 applications
keepers of Karnataka State: The final amounting to Rs. 22,16,350.35
report of the study has been accepted by
the Board on 21/06/2019. 3) ABS from Red Sanders – 02
applications, amount to Rs. 1,
2. Project titled - Establishment of 95,450.00
herbarium and botanical museum of
4) ABS from Sandalwood – 04
the plants of Western Ghats at
applications, amounting to Rs.
Pilikula Nisargadhama: The final 4,17,320.00
report of the project has been submitted
to the Board on 28/11/2019 for Total amount of Rs.28,29,120.34/-
approval. collected from Access and Benefit Sharing
(ABS) from April to December 2019.
3. Project titled - Shola Forest
Grassland Complexes of Karnataka: 8. Biodiversity Awards:
The project has been approved and Karnataka Biodiversity Board awarded and
sanctioned on 02/12/2019 for the total felicitated achievers for the year 2019-20
cost of Rs. 21.53 lakhs for a period of 3 during the celebration of International Day
years. for Biological Diversity.
4. Assessment of population status and The following are the list of awardees.
removal of bio-resources in forests
with special emphasis on medicinal 1. General Biodiversity – Shri Salumurada
plants in Karnataka. This project will Ninganna from Rmanagara
be implemented by Karnataka Bio- 2. Biodiversity award for Women –
diversity Board in collaboration with Khanana Krushika Mahileyara Sangha
Karnataka State Medicinal Plants from Mysore
Economic Survey of Karnataka 2019-20 357

Table 8.28:shows peogress report

Field
Training Data Entry Report Writing
Survey

Completed

Completed Completed
Completed in
in 40 in 40 1.Honnavara 12.Chikkamagaluru
40 divisions
divisions divisions

2.Karwar 13.Shivamogga

3.Chikkaballapura 14.Dharwad

4.Haliyala 15.Koppa

5.Kalburgi 16.Madikeri

6.Tumkur 17.Yellapura

7.Sagara 18.Sirsi

8.Bhadravathi 19.Hassan

9.Kundapura 20.Davangere

10.Chitradurga 21.Gadag

11.Kolar

Training Field Survey Data Entry Report Writing

Under Progress

Nil Nil Nil 1.Haveri 5. Bellary

2.Belagavi 6.Koppal

3.Bagalkote 7.Ramanagara

4.Gokak

3. Agro Biodiversity – Sahaja Samrudha 9. Special Programs:


Samsthe from Bangalore
a) International Day for Biological
4. Conservation and Sustainable use of Diversity (IDB) 2019:
Biodiversity – Padma Shri Saalumarada
Thimmakka. The Karnataka Biodiversity Board
celebrated International Day for Biological
The all 4 awardees were felicitated with Diversity 2019 on 22/05/2019 at Aranya
mementos and cash prize of Rs. 25,000/- Bhawan, Malleshwaram, Bangalore with
each.
358 Economic Survey of Karnataka 2019-20

Table 8.29 : Details of the Competitions:

Sl. No. Competitions Topic Participants

Our Biodiversity, Our Food,


1 Essay Writing General Public
Our Health.

Our Biodiversity, Our Food, Students between


2 Painting
Our Health. class VII to X

Our Biodiversity, Our Food,


3 Photography General Public
Our Health.

the theme “Our Biodiversity, Our Food, 10. Publications:


Our Health.”
1. Annual Report and Audited Report for
Padma Sri. Saalumarada Thimmakka the year 2018-19
inaugurated the function to celebrate the
2. Broucher – Rachanathmaka Chowkattu
International Day for Biological Diversity
for Biodiversity Management Committees.
2019. Sri. S.P.Sheshadri, Chairman and
Dr. Virender Singh, Member Secretary of 3. Broucher – Samvadada Kaipidi for
KBB presided over the function. Sri. Biodiversity Management Committee.
Mahendra Jain, IAS, ACS, Dept. of FEE Sri.
Punati Sridhar IFS, PCCF (HOFF) were the 11. Programmes for the upcoming year:
Chief Guests. 1. Constitution of Biodiversity Management
In this regard, Karnataka Biodiversity Committees.
Board organised several competitions, and 2. Documentation of Biodiversity at the
distributed prizes for winners. level of local bodies.
b) Documentary Film on Biodiversity 3. Conducting Training Programmes on
Management Committees Biodiversity
Karnataka Biodiversity Board produced a 4. Enactment of Access and Benefit
13-minute documentary film at Sharing of Biological Resources.
Hanchikuppe Grama Panchayat, Magadi
taluk, Ramanagara district with the support 5. Implementation of Biological Diversity
of Deputy Conservator of Forests (Social Act 2002.
Forestry), Ramanagara, Panchayat 6. Identification of Biodiversity Heritage
Development Officer and Chairman of Sites.
Hanchikuppe Grama Panchayat along with
the Board's technical Staff. The 7. Research Projects and Special Studies
documentary film aims to explain the on Biodiversity.
objectives of Biological Diversity Act 2002, 8. Other activities of the Board and
Karnataka Biological Diversity Rules 2005, Government towards conservation.
constitution of Biodiversity Management
Committees, roles and responsibilities of 8.1.16 COASTAL REGULATION ZONE
the committees in a way that can be easily MANAGEMENT
understood by the audience. The coastal stretches up to 500 metres from
the HTL towards the landward side all along
Economic Survey of Karnataka 2019-20 359

the coast, area up to 12 nautical miles in the Accordingly, the NCSCM, Chennai has
sea, river, creeks, bays, estuaries and revised the CZMP and State Government of
backwaters up to a point till the tidal Karnataka have sent the revised Coastal
influence is felt and the land on either side Zone Management Plan to Karnataka State
of these tidally influenced water bodies up to Coastal Zone Management Authority for
a maximum of 100 metres is declared as recommending the same to MoEF & CC, GoI.
"Coastal Regulation Zone" as per the MoEF The draft CZMP's of Karnataka have been
Notification No. S.O. 19 (E) dated 6th submitted to MoEF & CC, GoI vide letter
January 2011 which was issued in FEE 289 CRZ 2017, dated 28.04.2018 for
supersession of Notification No.S.O.114(E) approval. The MoEF & CC has conveyed it's
dated 18.2.1991. The coastal stretches approval to the Coastal Zone management
declared as CRZ have been classified into 4 Plan for the State of Karnataka on
zones, viz., CRZ-I. CRZ-II, CRZ-III and CRZ- 07.08.2018. The approved CZMP Maps(40
IV based on the ecological sensitivity and the Nos) were handed over to the State by the
land use pattern. Norms for regulation of MoEF & CC on 19.09.2018.
activities in these zones and the
institutional mechanism for enforcement of Now, the MoEF & CC, have issued CRZ
the provisions of this notification have also Notification 2019 vide No. G.S.R 37 (E)
been built in. dated 18.01.2019. As per this notification
all coastal states and union territory
Karnataka State Coastal Zone Management administrations shall revise or update their
Authority has been constituted under the respective coastal zone management plan
chairmanship of the Additional Chief (CZMP) framed under CRZ Notification,
Secretary to Government, Department of
2011 number S.O.19 (E), dated 6th January
Forest, Ecology and Environment for
2011, and submit to the Ministry of
ensuring compliance to the provisions of
Environment, Forest and Climate Change
CRZ Notification.
for approval at the earliest and all the
Karnataka State Coastal Zone Management project activities attracting the provisions of
Plans (CZMP's) which was prepared in this notification shall be required to be
accordance with the provisions of CRZ appraised as per the updated CZMP under
Notification, 1991 is to be revised as per the this notification and until and unless the
CRZ Notification 2011. Demarcation of High CZMPs is so revised or updated, provisions
Tide Line (HTL), have been completed by the of this notification shall not apply and the
Centre for Sustainable Coastal Management CZMP as per provisions of CRZ Notification,
(NCSCM) which is authorized by the 2011 shall continue to be followed for
Ministry of Environment Forests and appraisal and CRZ clearance to such
climate change Government of India for this projects. The work of preparation of CZMP
purpose. as per the provisions of CRZ Notification
2019 is entrusted to NCSCM, Chennai on
The job of preparation of CZMPs for
11.11.2019.
Karnataka as per CRZ Notification, 2011
has been entrusted to the National Centre 8.1.17: State Environment Impact
for Sustainable Coastal Management, Assessment Authority (SEIAA) A Key to
Chennai and they have submitted the draft Ensure Sustainable Development
CZMPs, which have been published for
comments/ suggestions / objections from State Level Impact Assessment Authority
the Public and the Stakeholders by giving 60 (SEIAA) and State Level Expert Appraisal
days time on 07.09.2017. A total number of Committees (SEAC) were constituted
805 applications containing objections, according to Environmental Impact
suggestions and comments were received Assessment Notification 2006, first time in
from the Public/NGO's/Government June 2007 for a period of three years. These
Departments. Authorities and Committees are being
360 Economic Survey of Karnataka 2019-20

reconstituted regularly by The Ministry of the Schedule to the notification. Detailed


Environment and Forests and Climate procedure and institutional mechanism has
Change, Government of India on the been provided in the Notification. The
recommendation of Government of process of scrutinizing the projects seeking
Karnataka. The present Authority and Environmental Clearance comprises of the
committee are reconstituted as per the following four steps.
Notification No. S.O. 2936(E) dated 5th
September 2017 issued by The Ministry of Screening: The process of determining
Environment and Forests and Climate whether or not the project or activity
Change, Government of India. Detailed requires further environmental studies for
evaluation of environmental impact and use assessment of its impact on the
of natural resources in each activity during environment and to arrive at the mitigative
issue of environmental Clearance. measures.
Conditions will be imposed on Scoping: The process by which the Expert
environmental protection and sustainable Appraisal Committees determine detailed
development for project activities and comprehensive Terms of Reference
determined to provide environmental (TOR) addressing all relevant environmental
Clearance. concerns for the preparation of
The Ministry of Environment and Forests Environment Impact Assessment.
and Climate Change, Government of India in Public Consultation: The process by
exercise of the powers conferred under which the concerns of local affected persons
section of the Environment (Protection) Act, and others who have plausible stake in the
1986 read with rule 5 of the Environment environmental impacts of the proposed
(Protection) Rules 1986 have issued project are ascertained with a view to take
Notification No. S.O. 1533(E) dated 14th into account all the material concerns in the
September 2006. Requirement of prior project. Public consultation normally have
Environmental Clearance have been two components comprising of (a) public
mandated for the activities that are listed in

State Level Environment Impact Assessment Authority (SEIAA), Karnataka


Pursuant to the EIA Notification, 2006, State Level Environment Impact
Assessment Authority and the State Expert Appraisal Committee were constituted
during June 2007 for a period of three years. The Authority and committees were then
reconstituted on the recommendations of the State Government.
The SEIAA, Karnataka received 1077 number of applications between
01.01.2019 to 30.12.2019. In These peroid 888 applications have been disposed
including the application received during the previous year.
The Authority has followed a transparent procedure and all their proceedings
are posted in the website http://seiaakarnataka.gov.in and
http://environmentclearance.nic.in.
Detailed scrutiny of the proposals with respect to the use of natural resources
and the possible impact on the environment is being done. The projects that are
considered for issue of Environmental Clearance are imposed with strict conditions to
ensure environment safety and sustainable development.
Economic Survey of Karnataka 2019-20 361

hearing and (b) response from the 25 Ha, in case of clusters at the district level
concerned persons having plausible stake vide Notification No. S.O.141 (E) dated 15th
in the environmental aspects of project in January, 2016. The Ministry have further
writing. The opinion, suggestions and the constituted District Level Environment
concerns that emerge from the public Impact Assessment Authority (DEIAA)
consultation are to be incorporated in the under the chairmanship of the concerned
Environment Impact Assessment Report Deputy Commissioners and District Level
and the same has to be appropriately Expert Appraisal Committee (DEAC) under
addressed. the chairmanship of the senior most
Executive Engineer, Irrigation Department
Appraisal: The process of detailed scrutiny vide Notification No. S.O. 190 (E) dated 20th
of the projects along with relevant details by January, 2016.
the expert Appraisal Committee and making
categorical recommendations to the Sub-Divisional Magistrate or Sub-Divisional
regulatory Authority concerned either for Officer of the district head quarter will serve
grant of Environmental Clearance on as the Member Secretary of DEIAA and
stipulated terms and conditions or rejection Assistant Director or Deputy Director or
of the application together with reasons for District Mines Officer or Geologist in the
the same. district in that order will serve as the
Member Secretary of DEAC.
The Regulatory authority concerned viz.,
the State Level Environment Impact Both the District level authority and the
Assessment Authority in the State level for Expert Appraisal Committee have ex-officio
'B' category activities or the Ministry of official members and experts to be
Environment and Forests, Government of appointed by the concerned Divisional
India at Central level for 'A' category Commissioners or Chief Conservator of
activities takes appropriate decision Forests based on the term and qualifications
either to grant or reject Environmental of the expert fulfilling the eligibility criteria
Clearance taking into account the given in Appendix VII to the notification
recommendation made by the Expert dated 15th January 2016.
Appraisal Committees. The notification also District Level Environment Impact Assessment
provide for deemed clearance in order to Authorities and District Level Expert
ensure timely decision making by the Appraisal Committees have been
concerned regulatory authority and to avoid constituted in all the districts of the State as
possible hardship to the entrepreneurs in per the above said notification. The said
case of undue delay if any. authorities / committees are working as
The notification has built in sufficient arms of MoEF & CC of Government of India
provisions to ensure fair and transparent at the district level for the de-centralized
decision making process. decision making on environmental issues in
the interest of sustainable development.
Establishment of District Level Environment
Impact Assessment Authorities/District However, the District Level Environment
Level Expert Appraisal Committees: Impact Assessment Authorities and District
Level Expert Appraisal Committees have
The Ministry of Environment, Forests and become dis-functional in view of the orders
Climate Change, Government of India have of the Hon'ble NGT dated 11.12.2018 in O.A.
brought in amendment to the Notification No. 520/2016. The applications that were to
No. S.O. 1533 (E) dated 14th September be considered by the district level
2006 (EIA Notification, 2006) providing for Authority/Committee are now considered
considering applications seeking by the State Level Environment Impact
Environmental Clearance for mining of Assessment Authority/Expert Appraisal
minor minerals having lease area up to 5 Committee
Ha, in case of individual leases less then to
362 Economic Survey of Karnataka 2019-20

8.2 WATER RESOURCES tanks, which were historically a major


source of irrigation, has accounted for about
Irrigation is an important source of raising
only 3.99% of the net irrigated area.
productivity in agricultural sector.
Expansion of both the groundwater and 8.2.1. Year wise Allocation and
surface water resources has helped to Expenditure on Major & Medium
increase the cultivated area under irrigation Irrigation Projects:
in the state over time. Details of trends in
Irrigated Area are given in Table 8.30. Expenditure on major and medium
irrigation projects was Rs. 14804.08 crores
Table 8.31 presents source wise irrigation in 2018-19. The amount of expenditure
for the year 2017-18. Among all irrigation anticipated in 2019-20 is Rs. 17212.33
sources, tubewells/borewells accounted for crores. Expenditure incurred upto
the highest proportion of 44.82 percent of November 2019 is 10420.22 crores (Table
the net irrigated area followed by canals 8.32).
(29.95%) and wells (9.16%). The share of

Table 8.30 : Trends in Irrigated Area in Karnataka (Area in lakh hectares)

Gross Gross Net Gross Irrigated Area


Year Cultivated Irrigated Irrigated as a % of Gross
Area Area Area Cultivated Area

1980-81 106.60 16.76 13.62 16


1990-91 117.59 25.98 21.13 22
2000-01 122.84 32.71 26.43 27
2010-11 130.62 42.79 34.90 33
2011-12 120.59 41.37 34.40 34
2012-13 117.48 40.07 34.20 34
2013-14 122.67 41.12 35.56 34
2014-15 122.47 41.86 35.89 34
2015-16 120.09 37.42 32.43 31
2016-17 117.79 35.48 31.04 30
2017-18 119.94 36.39 31.55 30
Source: Directorate of Economics & Statistics, GOK
Table 8.31 : Source-wise Irrigation during 2017-18 (Area in lakh hectares)
Irrigated Area % Share to
Source
Gross Net Net Irrigated Area

Canals 10.55 9.45 29.95


Tanks 1.35 1.26 3.99
Wells 3.35 2.89 9.16
Tube/Bore Wells 16.66 14.14 44.82
Other Sources 4.48 3.81 12.08
Total 36.39 31.55 100.00
Source: Directorate of Economics & Statistics, GOK
Economic Survey of Karnataka 2019-20 363

Table 8.32: Year wise Allocation and Expenditure of Irrigation Sector


(Rs. in crores)
Year Allocation Expenditure

2009-10 3144.08 2787.62


2010-11 4640.17 3394.10
2011-12 6029.25 3930.68
2012-13 6044.27 5294.50
2013-14 8007.36 6527.75
2014-15 10000.90 9768.08
2015-16 11515.42 8732.35
2016-17 12620.92 10759.69
2017-18 15853.31 12498.80
2018-19 15993.73 14804.08
10420.22
2019-20 17212.33
(up to Nov-2019)

8.2.2 Irrigation Potentials Created been completed in 2012-13 and completion


through Major and Minor Irrigation report has been submitted to Central Water
Projects Commission (CWC).
The surface water (canal) irrigation projects In addition to UKP Stage-I&II Nigam has
are classified into major, medium and minor been entrusted with additional projects for
irrigation projects based on the cultivated implementation through Administrative
command area generated by them. Approvals accorded by the Govt. from time to
Irrigation Potential Cretaed Cumulative time.
Area is detailed in Table 8.33, Appendix 8.1 The details of Ongoing Projects and
highlights irrigation potential created since Estimated Cost, Expenditure up to
VII Five Year Plan. November 2019 and Command area and
8.2.3 Krishna Bhagya Jala Nigam Potential created up to November 2019 are
Projects: given in Table 8.34.
The Upper Krishna Project Stage I&II has

Table 8.33 : Irrigation Potential Created (Cumulative area in lakh Ha.)


2019-20
Source 2014-15 2015-16 2016-17 2017-18 2018-19 (Anticipated)

Major and
Medium 27.85 28.68 28.86 28.97 29.19 29.64
Irrigation

Minor Irrigation
10.97 11.31 11.56 11.81 11.98 12.07
(Surface water)

Total 38.82 39.99 40.42 40.78 41.17 41.71


364 Economic Survey of Karnataka 2019-20

Table 8.34 : Additional Projects (Other than UKP Stage I, II & III) being
implemented by KBJNL (Rs in Crore / Area in HA)

C um. Potential
Revised /
Exp end i- Command Created up
SL U pdated
N ame of Pro jects ture up to A rea to N ovember
No. C ost of
No vember (in HA ) 2019
Project
2019 (in HA)

A Irrigatio n Projects

NRB C DY 9A (Including Ar ker a


1 23 5.00 223.9 6 15,2 50 13,74 9
& W ad av atti B ranc h Dis try. )

Ramthal LIS-Including Drip


2 110 0.00 1 051.2 3 38,7 25 38,49 3
Ir rig ation.

3 Sonthi LIS 67 3.90 335.7 5 16,0 00 10,55 3


4 Sonna & R olli M anni keri LIS 3 5.00 34. 41 3,5 00 3,25 0
5 Teg i Sid dhapur LIS. 5 4.50 53. 42 3,0 00 3,00 0
6 Thimmapur LIS 17 3.00 170.4 0 20,1 00 16,91 6
Nandawadagi LIS
7 153 0.00 162.1 3 36,1 00 0
(Drip Irr igation)
8 Bhudihal- P irapur LIS 84 0.00 412.4 4 20,2 43 0
9 Chadchan LIS 41 3.20 238.2 0 9,2 15 0
10 Nagar ab etta LIS 17 0.70 40. 63 3,2 00 0
11 Yalligutti LIS 3 5.00 0 5 00 0
12 Herk al (South) LIS Extension 23 8.00 0 6,1 00 0
Kong andi LIS – unde r N AB ARD
13 2 5.55 25. 50 -- --
Assistanc e
B Tank Filling Pro jects
Filling of M I Tanks in Vijayapur
14 12 0.00 119.2 0 -- --
& Bag alk ot Dist. (Package-I)
Anachi LIS- F illing up of 9 M I
15 4 2.00 41. 24 -- --
Tank s- in Indi T q.
Sankh LIS- Filling up of 8 MI
16 5 7.50 54. 68 -- --
Tank s in Indi Tq.
Bhuy ar LIS-F illing up of 8 MI
17 6 8.00 67. 37 -- --
Tank s in Indi Tq.
Filling up of Mamdapur,
18 Bhutnal, B egumtalab & othe r 25 0.00 241.8 2 -- --
MI Tanks in Vijay apur Dt.
Tikota & Other 10 MI T anks in
19 5 5.00 52. 90 -- --
Vijayapur & Bagalkot Dist.

Yarg ol & Other 5 M I Tanks


20 6 0.10 33. 50 -- --
filling f rom Bhima R iver

Filling up of 35 MI / Z P Tanks
21 in Yadgir Dist. f rom Riv er 44 0.00 157.9 1 -- --
Bhima
Economic Survey of Karnataka 2019-20 365

C um. P otential
Revised /
Exp end i- Command Created u p
SL U pdated
N ame of P ro jects ture u p to A rea to N ovember
No. C ost of
No vember (in HA ) 20 1 9
P roject
20 1 9 (in HA)

Brid ge cu m B arrage wo rk s

Gug al Bar rage Ac ross Ri ver


22 10 5.00 98. 50 -- --
Kris hn a

4 N o. Manjr a Brid ge c um
23 30 0.00 287.3 5 -- --
Barr ages in B idar Dis t.

Adivih al–K ud als an gam Br idge


24 5 9.80 15. 76 -- --
across M alapr abha R iver

Jettur Br idge cum B arrag e


25 2 6.26 20. 26 -- --
across R iver Kagin a

Providin g of Vertical Lift Gates


for Gh atar ag a, Kallur-B , Yadg ir
26 19 8.00 115.7 2 -- --
& Jolad ad ag i–Gudur B ar rag es
across R iver Bh ima

Str eng then in g of Kor ti-Kolh ar


27 3 1.00 1.5 0 -- --
Barr age acr os s Rive r Kr ish na

Mod ernization of Canal


D
Network

NLB C-ERM un der AIB P –


28 469 9.00 3 691.7 0 -- --
PMKS Y

Re-m ode ling of ALBC Canal


29 11 2.46 53. 64 -- --
Networ k

Re-m ode ling of


30 75 0.00 0.0 0 -- --
NRB C K m.0. 00 to 95.0 0

Dam Rehabilitation &


E -- --
Improvement P roject (DRIP)

DRIP Work s of Almatti &


31 Naray an apur R eser voir s un der 19 1.25 176.2 8
World Ban k Assistan ce

Total 13 0 89 .2 2 7 97 7.40 1,71 ,9 33 8 5 ,9 61


366 Economic Survey of Karnataka 2019-20

8.2.4 Upper Krishna Project Stage – III will facilitate providing drinking water to the
villagers apart from ground water recharge
The Krishna Water Disputes Tribunal-II has
and irrigation facility for the Atchcut coming
passed an award in December, 2010
under tanks.
allocating 173 TMC of water to Karnataka
State. Out of this, 130 TMC is the share of In accordance with the approval of the
UKP Stage -III. This utilization involves Government under 2nd Stage of Ramthal
raising the storage at Almatti from (Marol) LIS Drip Irrigation for 24,000
RL.519.60 MT to 524.256 Mtr and providing Hectares of command area coming under
irrigation for 5.94 lakh Hectares of Hungund Taluk of Bagalkot District has
command area (Including 1.12 Lakh HA of been implemented successfully.
Drip Irrigation under Koppal LIS) falling
Under KBJNL Canal Top Solar Power
under Vijayapura, Bagalkot, Kalburgi,
Projects viz, 1 MW Canal Top Solar PV on
Yadgir, Raichur, Koppal and Gadag districts
ARBC and 10 MW Canal Top Solar PV
of Northern Karnataka.
Project on lead off Canal of Koppal LIS have
The Government of Karnataka on been implemented successfully and the
09.10.2017 has accorded Administrative Solar Power Generated being evacuated to
approval to the Revised Estimated Cost of the nearby KPTCL Sub-Stations. These
UKP Stage-III Project for Rs. 51,148.94 projects facilitated in reduction of Water
Crore, (2014-15 SR). This revised cost Evaporation apart from addressing Water-
includes estimated amount of Rs. 30,143.17 Food-Energy Nexus.
Crore towards LAQ, R&R & BTDA
With the implementation of Canal Modernizations
component of works. The 9 Project sub
works including components of SCADA
components under UKP Stage-III and the
Automation the Water Use Efficiency is
LAQ, R&R and BTDA works are in various
enhanced apart from facilitating equitable
stages of progress. To end of November
distribution of water in the canal network.
2019, an expenditure of Rs. 10,124.85
Crore has been incurred under UKP 8.2.6 Karnataka Neeravari Nigam
Stage-III. Limited Projects:
8.2.5 Outcome The Karnataka NeeravariNigama Limited
(KNNL) is established by the Government of
I. KBJNL Karnataka in 26.11.1998 under Companies
With the implementation UKP Stage I & II Act 1956 as a special purpose vehicle to
already 6.19 Lakh HA of command area is accelerate the implementation of Krishna
brought under irrigation coming under Basin Projects except Upper Krishna
Vijayapura, Bagalkot, Kalburgi, Yadgir & Project. (Table 8.35 & 8.36)
Raichur Dist. Under UKP Stage– III, 9
8.2.7 Modernization Projects:
Projects sub components are being
implemented to utilize allocated 130 TMC of To increase the irrigation efficiency and to
Water under KWDT – II Award. It is proposed save water KNNL has taken up
to provide irrigation for 5.94 lakh Hectares modernization works under various
of command area in drought prone areas of Projects. The details are given in Table 8.37.
Vijayapur, Bagalkot, Kalburgi, Yadgir,
8.2.8 Visvesvaraya Jala Nigam Limited:
Raichur, Koppal & Gadag Districts of
Northen Karnataka by taking up 9 irrigation The Government of Karnataka vide its Order
schemes. Kalburgi, Yadgir, Raichur and No WRD/35/VEEBYEE/2016 Bangalore
Koppal districts comes under Article 371(J) Dtd 20.08.2016 has accorded approval for
and are to be benefited from the Upper creation of new corporation namely M/s
Krishna Project Statge– III, VISVESVARAYA JALA NIGAM LIMITED,
BANGALORE, as a wholly owned
The implementation of number of tank Government of Karnataka Undertaking
filling projects in the drought prone under Water Resources Department.
Vijayapur, Bagalkot, and Yadgiri districts Accordingly the new company has been
Economic Survey of Karnataka 2019-20 367

Table 8.35: KNNL Projects

Cumulative
potential
Ultimate Created upto
Sl.
Projects Potential No v. 2019 Status
No.
(in Ha) since
inception
(in H a)
Dam work s, Ghataprabha le ft
bank, Right bank and
1. Ghataprabha Project 31 0823 30 8326
Chikkodi branch canal works
are comp leted.
Project is completed . FIC
2. M arkand eya 1 4448 1 4383
work s are under progress .
Nidhori branch canal is
completed. Bidari branch
canal is unde r progress.
Dattawad a Branch c anal runs
both in Maharashtra and
Dudhganga 1 5167 4800 Karnataka. Since Maharashtra
3. Gove rnment has not taken up
work s. Karnataka portion is to
be tackled . Kurandawad
branch canal work s has to be
take n up by the Maharashtra
Gove rnment
Construc tion of Barrage works
is c ompleted. Lifts work s are
completed. Construction of
4. Hip pargi 7 4742 7 4742 canal, dis tributaries, laterals
and minors are completed . FIC
and R & R works are under
progress.
Lift works, canal and p ower
supply to LIS work s are
5. Sri Rameshwar LIS 1 3800 1 3800
completed. FIC works are
under progress .
Headworks works are under
6. M urgodu LIS 1939 0
progress.

Headworks works are under


7. Chachadi LIS 2718 0 progress.

Sri Veerbhadreshwara
8. 1 7377 0 Works are under progress.
LIS

Basaveshwara 2 7462 0 Works are under progress.


9. (K empwad) LIS

Headworks are ne aring


T ub ac hi-Babale shwara
10. 5 2700 4800 completion. Canal works are
LIS
under progress .

11. Ve nkateshwara LIS 7200 0 Works are under progress.


368 Economic Survey of Karnataka 2019-20

Cumulative
potential
Ultimate Created upto
Sl.
No. Projects Potential Nov. 2019 Status
(in Ha) since
inception
(in Ha)

12. K inaye Project 1200 30 0 Works are under progress.

13. Bellary Nala Project 8200 0 Works are under progress.

Stabilisation of 916 4Ha.


atchkat of Jamkhandi Branch
14. K ulahalli -Hunur LIS 0 0 Canal. Works are under
progress.

15. Godchinamal ki LIS 2568 0 Works are under progress

Salapur LIS 1 3000 0 Works are under progress


16.

Dam works, M alaprabha left


17. Malaprabha 20 2009 196438 bank, Right bank works are
completed.
990 0Ha sprink ler irrigation
works are completed. Di version
weir works are under progress.
18. Shiggaon LIS. 1 3500 990 0
Estimates are under
preparation for remaining 3600
Ha dri p irrigation works.
Headwork works are under
progress. Further, estimate for
19. Savanur LIS 1 5500 0 providing micro irrigation for
an area of 1 5500 Ha is under
scrutiny.
Stabilisation of Malaprabha
Amargol-Gob bargumpi Command area. LIS works are
20. 0 0 completed. Further works of
LIS
construction of d iversion weir
are under progress.

Stabilisation of Malaprabha
Mad gunaki-Hadli-
21. 0 0 Command area. Works are
Gangapur LIS
completed.
Dam works are completed.
22. Upp er T unga Proj ect 8 0494 78941 Canal and FIC works are under
progress.
1st stage works are completed.
23. Basapura LIS 2000 200 0 2nd stage work s are under
progress.

Project is completed. FIC works


24. Gudd ad amallap ur LIS 5261 526 1
und er p rogress.
Economic Survey of Karnataka 2019-20 369

Cumulative
potential
Ultimate Created upto
Sl.
Projects Potential Nov. 2019 Status
No.
(in Ha) since
inception
(in Ha)

Diversion weir works are


completed. Right Bank Canal,
25. Varahi Project 15702 5891
Left Bank Canal and FIC works
are under progress.
Stabilisation of 1296 ha of area
Hodirayanahalla of Jambadahalla Project and
26. 243 0
Diversion Scheme creation of new command of
243 ha. Works are completed.

Dam and canal works are


27. Bennithora Project 20234 19978 completed. Modernization
works are nearing completion.

Barrage works are completed.


28. Bhima Lift 24292 24292 Canal and FIC works are under
progress.

Except Attiwal lift all other


29. Karanja 29227 27201
works are nearing completion.

Canal and FIC works are


30. Amarja 8903 8903
nearing completion.

Barrage and Right bank canal


works are completed. Left bank
canal works are nearing
31. Singatalur LIS 107380 20687 completion. Work has been
awarded for providing drip
irrigation for an area of 71094
ha.

Project is completed and R&R


32. Hirehalla 8206 8206
works are under progress.

33. Alavandi-Betageri 2425 0 Worksare under process.

34. Olabellary LIS 2542 0 Worksare under process.

35. Bahaddurbandi LIS 5256 0 Works are under progress.

The project involves


stabilization of atchkat of
36. Thimmapura LIS 0 0 Distributary-54 of TLBC. At
present the works are under
progress
370 Economic Survey of Karnataka 2019-20

Cumulative
potential
Ultimate Created upto
Sl.
Projects Potential Nov. 2019 Status
No.
(in Ha) since
inception
(in Ha)

Project involves providing


irrigation to 1350Ha of area in
37. Sowkuru LIS 1350 0 Kundapurataluk, Udupi
District. Presently, the works
are under progress.
Project involves providing
drinking water facility and
irrigation to 1500Ha of area in
38. Yennehole LIS 1500 0
Karkalataluk, Udupi District.
Presently, the works are under
progress.
Total 1109368 828849

Table 8.36: Tank filling proposals are as follows

Sl. No. of Est. Expend Presen t


Project District Taluks
No. Tanks Amount iture Status

Malikwad tank filling The project is


1. 3 Belagavi Chikodi 1.45 1.50
scheme completed

Filling of Shiragaon The project is


2. 1 Belagavi Chikodi 3.51 2.20
Basavanna tank completed

Filling of Kadapura The project is


3. 1 Belagavi Chikodi 3.90 4.55
tank completed

Kaduhinabylu
Chikkamaga The project is
4. Bakrihalla tank 8 N.R. Pura 6.90 12.50
luru completed
filling scheme

Thilu valli Tank The project is


5. 3 Haveri Hangal 34.00 47.55
Filling Scheme completed

The project is
6. Kaginele TFS 22 Haveri Byadagi 48.90 58.07
completed

Filling of 22 tanks by 4 Chikodi The project is


7. lifting water from Belagavi 77.00 78.18
completed
Hiranyakeshi river
18 Hu keri

89 Davanagere Channagiri
Ubrani-Amru thapura The project is
8. 122.00 143.11
TFS completed
Chikkamaga
57 Tarikere
luru
371 Economic Survey of Karnataka 2019-20

Sl. No. of Est. Expend Presen t


Project District Taluks
No. Tanks Amount iture Status

3 Jagaluru
Davanagere 112.69
The project is
9. Rajanahali TFS 19 D avanagere 143.47
completed

Chitradurg
3 Chitradu rga 14.00
a

Filling of Jodukurli
The project is
10. tank from Krishna 1 Belagavi Chikodi 6.50 6.95
completed
river

Filling of Nayanglaj
The project is
11. tank from 1 Belagavi Chikodi 7.00 6.25
completed
Vedhaganga river

The project is
12. Tunga LIS 32 Shimoga Shimoga 71.33 97.76
completed

The project is
13. Honawada TFS 1 Vijayapura Vijayapura 4.70 4.95
completed

Works are
Huvinahadagali 10 Huvinahad
14. 10 Bellari 114.85 109.06 nearing
TFS agali
completion

Headwork
Sri
works are
15. Veerbhadreshwara 10 Belagavi Ramdurga 544.00 145.77
under
LIS
progress

Headwork
Filling of Tadasalur
works are
16. Tank under Mu rgod 1 Belagavi Savadatti 51.66 13.61
under
LIS
progress

4 Honnali
Davanagere
71 Chanagiri
1st stage
works are
17. Sasvehallli TFS 3 Shimoga Shimoga 415.68 195.48
under
progress
39
Chitradu rga
4 Chitradurga

Work under
18. Kachavi LIS 32 Shimoga Sorba 16.50 3.58
Progress

2 G adag
Filling of 4 tanks in Works are
19. Gadag district under Gadag 15.38 10.40 nearing
Singatalur LIS completion
2 Mundargi
372 Economic Survey of Karnataka 2019-20

Sl. No. of Est. Expend Present


Project District Taluks
No. Tanks Amount iture Status

Shiggaon LIS -

Project
20. Filling of 13 tanks 13 Haveri Shiggaon 34.58 26.62
completed
Work under
Filling of 39 tanks 39 Haveri Shiggaon 45.00 4.41
Progress

34 Savanur
Haveri
Work under
21. Savanur LIS 13 Shiggaon 97.00 57.77
Progress

Filling of MI tanks of
Tadakoda,
Bokhyapura, Garaga,
Work under
22. Haletegur, Bogur and 9 Dharwad Dharwad 22.50 -
Progress
Neeralakatti villages
of Dharwadtaluk
from Tuprihalla

Filling of minor
irrigation tanks of
Work under
23. Kalghatgi Taluk , 35 Dharwad Kalghatgi 125.00 57.80
Progress
Dharwad District
from Bedthi River

Filling of
Siddhanabhavi,
Bendgeri and Work under
24. 3 Belagavi Belagavi 12.57 8.63
Muthnal tanks of Progress
Belagavitaluk from
Malaprabha River.

Filling of tanks and


bandharas of Uttara Uttara Work under
25. 46 Halyal 218.00 54.43
Kannada Taluk from Kannada Progress
Kali River

Work under
26. Halyal TFS 62 Belagavi Belagavi 379.92 26.82
Progress

Ranebennur
Work under
27. Doddakere and 3 4 Haveri Ranebennur 31.00 23.92
Progress
other tanks filling

Harappanahalli 60 Harappana Work under


28. 50 Davanege 227.00 55.15
Tank Filling halli Progress

Guddadamallapura Work under


29. 56 Haveri Hirekeruu 38.00 8.76
(Madlur) LIS Progress
Economic Survey of Karnataka 2019-20 373

Sl. No. of Est. Expend Present


Project District Taluks
No. Tanks Amount iture Status

Filling of Asundi and Ranebennur,


Work under
30. Other nearby tanks 17 Haveri Bydagi & 79.80 39.97
Progress
in Haveri District. Hirekeruru

Guddadamadhapura Work under


31. 13 Haveri Hirekeruru 23.00 13.98
TFS Progress

Udugani-Talagunda- Sorba&Hire Work under


32. 186 Shimoga 850.00 -
Hosur TFS keruru Progress

Hangal&Hir Work under


33. Mudi TFS 66 Shimoga 285.00 -
ekeruru Progress

Work under
34. Mugur TFS 31 Shimoga Sorba 105.00 -
Progress

Work under
35. Hosahalli 75 Shimoga Shimoga 250.00 -
Progress

Work under
36. Jagalur TFS 53 Davanagere Jagalur 660.00 -
Progress

Work under
37. Baramasagar TFS 39 Chitradurga Davanagere 565.00 -
Progress

Work under
38. Anur TFS 30 Haveri Byadagi 212.00 -
Progress

Work under
39. Budapanahalli TFS 17 Haveri Byadagi 157.00 -
Progress

Work under
40. Hirekoushi TFS 77 Haveri Hangal 117.55 -
Progress

Work under
41. Balambeedu TFS 162 Haveri Hangal 386.55 -
Progress

Filling of 20
Percolation Tanks
near Itagi village of Work under
42. 20 Gadag Shirahatti 140.00 -
Shirahatti Taluk of Progress
Gadag District from
Tungabhadra River

Filling of 17 Tanks of
Work under
43. 13 Villages of 39 Belagavi Raibag 91.40 74.92
Progress
Raibag Taluk.

Filling of 19 Tanks of
10 villages of
Kudchi assembly Work under
44. 19 Belagavi Raibag 34.38 19.03
constituency of Progress
Raibag Taluk in
Belagavi District.
374 Economic Survey of Karnataka 2019-20

Sl. No. of Est. Expe nd Pre sen t


Project District Taluks
No. Tanks Amount iture Status

Filling of MI ta nk
nea r Ullagaddi Work under
45. 1 Bela ga vi Hu keri 6.00 2.40
Khana pur in Hukkeri Progress
Taluk (NABARD )

Filling of Chinchani
Tank by pumping
water from Work under
46. 1 Bela ga vi Chikodi 6.90 6.51
Doodhga nga River in Progress
Chikodi Ta luk
(NABARD )

Filling of Durgadevi
tank nea r Hirekerur
town from M ada ga
Masur Ta nk of Haveri Work under
47. 8 Haveri Hirekeruru 24.00 15.47
district and Progress
Ba hugrama Tanks
from Ku mudva thi
River
Project fo r filling up
of Chulkinala
Reservoir a nd tanks
Basavaka la Work under
48. by lifting of water 15 Bidar 188.00 134.67
yna Progress
from Ko nga li ba rrage
of Basavakalyana
Taluk.

Uttar Work under


49. Ba navasi TFS 32 Sirsi 62.58 -
Ka nnada Progress

Work under
49 Ba ilhongal
Project to fill water to Progress
tanks of Kitturu
50. Constituency of Bela ga vi 248.20 -
Belagavi district from
Malaprabha River. Work under
15 Savada tti
Progress

Filling of Ta nks of
Uttar Work under
51. Kadgarni and Ulavi 3 Joida 15.01 -
Ka nnada Progress
Village

Filling of 129 M I/ZP


Uttar Work under
52. tanks of M undagod 129 Mundgod 282.00 57.80
Ka nnada Progress
Taluka

Work under
10 Afzalpur
Filling of excess Progress
53. water of Ama rja& 13 Kalaburgi 450.00 108.49
tanks Work under
3 Ala nd
Progress
Economic Survey of Karnataka 2019-20 375

Sl. No. of Est. Expend Present


Project District Taluks
No. Tanks Amount iture Status

Filling of 84 MI/ZP
Estimate and
tanks in 5 Gram U ttar
54. 84 Mundgod 225.00 - DTP is under
Panchay aths of Kannada
review
Mundagod Taluka

Filling of 18 tanks Estimate and


55. and 4 check dams in 18 Ballari Hospet 243.35 - DTP is under
Hospete Taluk review

Estimate and
56. Hingaragi TFS 13 Belagavi Belagavi 143.35 - DTP is under
preparation

Filling of Aladamma
tank of Sugnalli
Estimate and
village and other 2
57. 3 Gadag Shirahatti 10.00 - DTP is under
tanks in Bannikoppa
review
village in Gadag
District

Total (KNNL) 2034 8763.59 1882. 49

registered under Companies Act 2013 on geographical area of 1,91,791 Sq.Km in


20.10.2016 with CIN:U41000KA2016 Karnataka Major Rivers flowing in this basin
SGC097260. are Harangi (50 KM), Hemavathy (245 KM),
The Government has also transferred the Lakshmanatheertha (131 KM), Kabini (230
projects namely Upper Bhadra Project, KM), Shimsha (221 KM), Suvarnvathi (88
Yettinahole projects, Gayathri and KM), Arkavathy (161 KM) and the main river
VaniVilasaSagar projects and its related Cauvery (381 KM). The Cauvery Basin is
offices along with officers/staff to VJNL. spread in 11 districts.
Accordingly the VJNL has started 1. Allocation and Expenditure for the
functioning w.e.f 01.01.2017 (Table 8.38 & year 2019-20:
8.39).
Total grant of Rs.3156.88 Crores has been
8.2.9 Cauvery Neeravari Nigama allocated by the Govt for the year 2019-20.
Projects: The overall expenditure for all the projects
The Cauvery Neeravari Nigama Limited coming under CNNL upto end of November
(CNNL) is established by the Government of 2019 is Rs. 2181.85Crores. It is
Karnataka in 03.06.2003 under Companies programmed to create a physical potential of
Act 1956 as a special purpose vehicle to 894 Ha in the current year. The details of
accelerate the implementation of Cauvery program and expenditure under different
Basin Projects in Karnataka. The Cauvery head of account is given in Table 8.40.
basin in Karnataka is 34,273 Sq.Kms which
constitutes about 17.99% of the
376 Economic Survey of Karnataka 2019-20

Table 8.37 : Modernization Projects


Cumulative
Latest
Expenditure Balance
Sl. Estimate
Projects as of Cost Remarks
No. Cost
30-11-2019 (Rs. Cr.)
(in Rs. Cr.)
(Rs. Cr.)

Modernisation of Bhadra
1. 1400.00 1343.54 56.46 Ongoing
Canal System

2. Bennithora Modernisation 174.15 172.03 2.12 Nearing


Completion

Nearing
3. Dharma Modernisation 46.10 43.52 2.58 Completion

Modernisation of Gondi Nearing


4. 128.95 112.05 16.90
Anicut Canals Completion

Modernisation of
5. Tungabhadra Canal 3161.35 2536.18 625.17 Ongoing
System

Modernisation of Tunga
6. 309.00 222.93 86.07 Ongoing
Anicut Canals

Kolachi RBC
7. 101.04 19.93 81.11 Ongoing
Modernisation

8. Malaprabha ERM 1120.00 976.29 143.71 Ongoing

9. Lower Mullamari 124.76 65.02 59.74 Ongoing


Moderniation

Gandorinala & Upper


10. 160.60 107.32 53.28 Ongoing
Mullamari modernisation

11. Karanja Modernisation 538.39 174.69 363.70 Ongoing

Modernisation of
12. 456.63 19.03 437.60 Ongoing
Vijayanagar Channels

Total 7720.97 5792.53 1928.44


Economic Survey of Karnataka 2019-20 377

Table 8.38 : Brief status of potential of VJNL projects

Cumulat ive
Ultima te potent ial Creat ed
SL.
Project s Potent ial upto Marc h/2019 Status
No.
(in Ha) sinc e inc eption
(in H a)

1. In first sta ge two number of lift


works a nd one tunnel work ha ve
been ta ken up in 3 packages.
Lift work from Bha dra to
Ajja mpura & Ajja mpura tunnel
works are completed and
commissioned during Oct 2019
and water let to Vani Vilas Sagar
Dam on trial basis. Lift work
from Tu nga to Bhadra is under
pro gress.
2. In second stage the works of
gravity canals are ta ken;
I) Chitradurga Branch Canal
(Total length- 134.597 Km.) the
canal works from Km 0.00 to
134.597 Km a re taken up and
are in different stages of
progress.
II) Tumkur Bra nch cana l (Total
length-159.684 Km) Canal
works from Km. 0.00 to 159.684
Km ta ken up and are in different
stages o f progress.
3. Tarikere Lift Irrigatio n scheme
which is part of Upper Bhadra
2,25,515 Project has been ta ken up in 2
1 Upper Bhadra Project NIL packages (one at approach
Ha
&ano ther at Exit of Ajjampura
tunnel) du ring A pril-2018. The
works are in progress.
4. Survey, Investigation and
estimation for providing micro
irrigation in the initia l reach of
60Kms of Chitrdurga Branch
Canal for 36000 hectares and in
the initia l reach of 76 Kms of
Tumkur Branch Canal for
28699.56 hectares is in
progress.
5. Estimates of the Jagalur Branch
canal coming u nder Chitradurga
Branch Canal are u nder
preparation.
6. Works of Holalkere Feeder is in
progress.
7. Tenders ha ve been a pproved for
Challakere, Molakalmuru and
Pavagada Feeder ca nals coming
under Chitradurga Branch
Canal and work is being started.
8. Estimates for Sira,
Chikkanayakanahalli feeder
canalsunder Tumkur Branch
Canal are under finalization.
378 Economic Survey of Karnataka 2019-20

Cumulative
Ultimate potential Created
SL.
Projects Potential upto March/2019 Status
No.
(in Ha) since inception
(in Ha)

1. The works of first phase


comprising of lift components
taken up in 5 packages are in
different stages of progress.
2. The works of construction of
sub-station and construction of
transmission line are in
progress.
3. Out of 260 Km of Gravity canal,
works from Ch. 0.00 Km to
249.150 Km & 255.00 Km to
258.970 Km have been taken up
and are in different stages of
progress and tender is under
process for the work from
Ch.249.150 Km to 255.00 Km.
Out of this, about 60 km length
of work is completed.
Tank 4. Bhyragondlu reservoir: The work
2 Yettinahole NIL of Bhyragondlu reservoir is
Filling
entrusted on tender basis and
preliminary works are in
progress.
5. Work of Ramanagara feeder
canal offtaking from Ch.244.90
Km of Yettinahole gravity canal
to provide drinking water to
Bangalore Rural & Ramanagara
District and to fill 2 tanks in
Nelamangala Taluk is under
progress.
6. Tenders have been approved for
Madhugiri & Gouribidanur
feeder canals, and the works are
being started.
7. Estimates are under preparation
of Kundana lift, Kolar &
Chikkaballapura feeder canals.

3 Vani Vilas Sagar 12135 12135 Project completed.

4 Gayatri 2367 2305 Project completed.


Economic Survey of Karnataka 2019-20 379

Table 8.39 : Details of Financial &physical Programme and Progress


(Financial Rs. in lakhs, Potential in hectares)

Financial Potential

Potential Anticipated
Sl. Name of the Cum. Expected
Latest Total created Potential
No. Project Expt. Expt.
Estimated Planned upto to be
Till Nov. During
cost Potential Nov. created in
2019 2019-20
2019 2019-20

Upper Bhadra
1 20,931.00 3,552.03 190.00 225515 Nil Nil
Project
Drinking
water and
2 Yettinahole 12,912.36 5,968.65 425.00 Nil Nil
tank filling
project

3 Vani Vilas Sagar - 12135 12135 -

4 Gayatri - 2305 2305 -

TOTAL 33,843.36 9,520.68 615.00 239955 14440 -

Table 8.40 : CNNL Project details (Rs in Crores)

Sl. Programme for year Expenditure upto


Head of Account
No. 2019-20 Nov. 2019
1 Potential oriented works 481.00 236.36

Other works under capital head 1092.72 369.15

2 Modernisation of anecut canals 29.65 212.62

3 Drinking water schemes 165.95 182.10

4 Improvments to canal system 401.50 804.74

5 SCP 442.57 171.11


6 TSP 397.68 72.26

7 SDP 44.53 45.60

8 NABARD 19.47 0.08

9 DRIP 51.23 7.49

10 Others (Roads, pickups, buildings, 435.73 80.34


maintenance, debt servicing etc.)

Total 3562.03 2181.85


380 Economic Survey of Karnataka 2019-20

2. Physical and Financial Progress of progress are Hemavathy project and


On-going Major and Medium Projects: Yagachi project, the lift irrigation schemes
There are totally 29 potential oriented which are in progress are Kyathanahalli lift
schemes taken up under the jurisdiction of irrigation schemes (part of yagachi project)
Cauvery Neeravari Nigam Ltd, Out of which and Kachenahalli Lift irrigation schemes.
5 are Major schemes, 17 Medium irrigation Three zones viz., Irrigation (S) zone, Mysore,
schemes and 7 allied schemes. Most of the Hemavathy Canal Zone, Tumkur and
works are physically completed and the two Hemavathy Project Zone, Gorur are coming
major Potential oriented works which are in under the jurisdiction of CNNL (Table 8.41)

Table 8.41 : The total achkat created with overall expenditure of the projects
(Rs in Crores, Potential in Ha)

Cumulative Cumulative
Name o f Name of the Status Expenditure Potential
Zone Project up to created upto
N ov. 2019 Nov . 2019

D. D. Urs Canal Phy sically Com pleted 719.4 4 31 740

Kab ini P roject Phy sically com pleted 1 057.9 6 44 222

Har angi Project Phy sically com pleted 774.7 9 53 520

Tar aka Pr oject Phy sically com pleted 86. 89 7 040

Ar kavathy Phy sically com pleted 213.1 1 6 226

Uduthor ehalla
Phy sically Com pleted 238.8 1 6 232
Irr igation (S) Project
zone , My sor e
Igg alur Pr oject Phy sically Com pleted 99. 12 4 196

Manchanabele
Phy sically com pleted 108.1 8 2 432
Project
K.R.S .
Phy sically com pleted 533.5 4 2 125
Mode rnization
Nanjapura LIS Phy sically Com pleted 88. 62 4 049
Bannahallihundi
Phy sically com pleted 26. 80 1 774
LIS

Hemavathy
He mavathy Canal
Canal Zone, On-going 2 035.3 5 119 408
Tum kur Project

He mavathy
Phy sically Com pleted 2 243.4 5 126 149
Project
Yagachi Project On-going 683.6 1 14 879

Hemavathy Huchanak oppalu Ne ar ing C om pletion 63. 39 3 360


P roject Zone, LIS
Gor ur Kam asamudra LIS Phy sically Com pleted 99. 88 3 682

Kac henahally LIS On-going 100.0 4 3 238

Votehole Project Phy sically Com pleted 74. 53 7 487


Malalur LIS Phy sically Com pleted 4.0 8 485
Economic Survey of Karnataka 2019-20 381

3. The details of on-going projects are submitted to Govt. for administrative


as below: approval & remaining 2 canal
Hemavathy Project: The project envisages modernization works not taken up.
construction of a composite dam across The cumulative expenditure incurred up to
Hemavathy River near Gorur village in end of Nov 2019 is Rs.2089.79 Crores.
Hassan taluk of Hassan District. The (Table 8.42)
planned utilization from this project is 56.67 8.2.11 Improvements of Canal system:
TMC. The ultimate potential to be created
r Improvements to canals under
under this project is 283592 Ha under flow
reservoirs has also been taken up to
and lift component. The taluks benefitted by
improve the system efficiency. 48 Nos.
the project Hassan, Alur, Arkalagud,
of modernization work at a cost of
Holenarsipura, Channarayapatna of
Rs.6514.90 Cr has been taken up in
Hassan District; Mandya, K.R.Pet,
CNNL. Out of which 28 works (Est cost:
Pandavapura, Nagamangala of Mandya
Rs.2732.61 Cr) are completed, 7 No of
District; K.R.Nagara of Mysore District and
Modernisation works (Est cost:
Somwarapete of Kodagu District;
Rs.501.92) namely Taraka Right Bank
Turevekere, Tumkur&Tiptur, Gubbi and
canal 10 to 36 Km, Suvernavathy left &
Kunigaltaluk. Dam and allied works are
right bank canal, Hebbala left bank
completed, canal lining works in progress.
canal 0 to 27.20 Km, RBLL under KRS,
Potential created upto March 2019 is
Harangi Left banck canal 27 to149 Km,
2,45,557 Ha.
Sir cotton channel &Hosaholalu high
Yagachi Project: The project envisages the level canal 0 to 11) works are under
construction of a composite dam across progress.
Yagachi River a tributary of Hemavathy near r Tender process completed for 4 No. of
Chikkabyadagere village in BelurTaluk of works (Est. Cst: Rs.1238.25 Cr) namely
Hassan District.The planned utilisation Kanva canal, VC system under KRS
from this project is 5.74 TMC to create an project package 1A, Hemavathy Right
ultimate potential 17265 ha including bank canal 0 to 92.48 Km and Tumkur
Kyathanahalli LIS. The taluk benefitted by branch canal 0 to 70 Km & Y alignment
this project are Hassan, Belur and Alur of re modeling.
Hassan District. Kyathanahalli LIS is a part
r DPR for 6 works namely Improvements
of Yagachi Project. Ist stage works of
to canal network in VC system under
Kyathanahalli LIS are physically completed
KRS project package 1 to 4, Taraka link
and 2nd Stage work is under progress
canal, Hosaholalu 11 to 16 km,
process. Kamasamudra branch canal under
K.R.Nagara branch canal under
Yagachi Project is under progress. The
Harangi right bank canal, D-64 under
irrigation potential created under Yagachi
Hemavathy left bank canal and Re-
project (including Kyathanahalli LIS) since
modeling of Tumkur branch canal
inception to the end of March-2019 is 14879
70.36 to 166.90 k.m (Est Cost:
Ha. Potential of 894 Ha is programmed for
Rs.902.67 Cr) submitted to Govt.
the year 2019-20.
administrative approval.
8.2.10 Modernisation of Anecut Canals: r DPR for 1 proposal (Est cost: 1139.45
Apart from these, it is proposed to taken up Cr) placed before Board for approval
Modernisation of Anecuts canals under 22 and remaining DPR's are under
Anecuts coming under the jurisdiction of preparation. (Package 5-11)
CNNL, accordingly 34 anecut channels/ 8.2.12 Drinking water supply schemes
branche canal modernization are taken up (Tank Filling Schemes)
with the total estimated cost of Rs.1969.13
Crores. Out of which 21 works are r To alleviate the severe drinking water
completed, 3 work is on-going; Tender problems of the drought prone areas, 70
process is completed for 4 works and work to Drinking water schemes at an
be started. DPR for 4 works has been estimated cost of Rs.4549.45 Cr has
382 Economic Survey of Karnataka 2019-20

Table 8.42 : Modernisation of Anecut canals

Length proposed
Sl. Estimated cost
Anecut canal for modernization
No. (in Cr)
(in Km)

I COMPLETED WORKS
1 Sreeramadavara 154.25 288.39
2 Mandagere 116.98 110.01
3 Hemagiri 39.2 30.99
4 Shimsha Left Bank Canal 23 6.86
5 Kattepura (Krishnaraja) 116.6 88.5
6 Madhavamanthri 21 19
7 CDS Extension 26.5 17
8 D.J Anecut 9.96 2.95

9 Rajaparameshwari 37.25 26.5

10 Ramaswamy 86.5 80

11 Rampura 54.48 43.5

12 Halasur 70.5 35
13 Hullahalli 69 99
14 Chamaraja 210.4 132
15 Mirle & Ramasamudra 67.8 64
16 Devaraya 22.68 21
17 Keetur 11 2.1
18 Virija 69 83
19 Chikkadevarayasagara 104 240
20 Shimsha Right Bank Canal 21 28
21 Kudlur 18 4.3
Sub Total - I 1349.1 1422.1
II ONGOING WORKS
22 Hanagodu series 125 151.65
23 Harohalli high level canal 26 27.80
Kallahalli branch canal under
24 3.8 1.97
Ramasamudraanecut
Grand Total 1504.90 1603.52
Economic Survey of Karnataka 2019-20 383

been taken up under the jurisdiction of Assistance and it is 100% Central


CNNL. It is proposed to fill 1660 tanks to funded project for the State. The project
benefit 2307 villages coming is proposed over a period of 8 years and
under Mysore, Mandya, Kodagu, to be executed in two phases i.e,
Tumkur, Hassan, & Ramanagara, Phase I : FY 2015-16 to 2020-21
Chamarajanagara district. The total (5 years) Phase-II: FY 2020-21 to 2023-
requirement of water is 18.169 TMC. 24 (3 years). The project is effective from
r Out of 70 schemes, 16 schemes namely 05-05-2017.
Doddaguni, GulurHebbur, Honnavalli, 2. The project aims at Establishment/
Kergodi Rangapura, Alambur, modernization of new & existing
Kanva, Chikkanandi, Bellavi, hydromet observation networks to
Kanathur, Dabbeghatta, Shivasandra, automated, real time monitoring
Hagalavadi, Chelur, Kodiyala, systems for surface water, Development
Mathikere & Alilughatta DWS are of IWRM plan for Krishna & Godavari
completed & commissioned. basin through e-water source by
r 41 schemes namely Elechakanahally, extending existing system,
Gandhigrama, Satanur-Kailancha, Development & Integration of Micro
Neralekere, Suthur, Hura, Garalapura, IWRM plan for Krishna & Godavari
Narayanapura, Muthinamulusoge, basin, establishment of SCADA for
Uthur, Raghavapura, Bannhalli, barrages & Reservoir gate operation in
Ramanagudda, Ibbajala, Styagala, Krishna & Cauvery basins, Bathymetric
Ataguru, Byramanagala, Hadya, studies for Reservoir Sedimentation,
Malligere, Halebeedu-Madehalli, Extension of decision support system
Nugehalli, Hiresave-Shravanabelagola, (P) to other basins & Studies. It also
Arakalgudu, Rangenahalli, involves digitization of all existing
Channarayapatna, Kaniyar, Bagurunavile records, maps, data etc.., of all water
exit, Anekere shambudevearakere, resources structures, providing public
Dudda & shantigrama, Bikkegudda, domain services, Establishment of state
Sriranga, Neeragunda, Byaladakere, informatics centre, institutional
Kenkere and Devarayapatna tank filling modernization, Capacity building &
schemes are under progress. training programmes.
r Tender is under process for the 3 3. Physical & financial Progress till date :
schemes namely Athaguru,
Rajatadripura and Matadahalla. r Upgradation of CMG,SRG, SRRG & FCS
Remaining proposals are under Stations.
approval stage. The total expenditure r Upgradation of State data center.
incurred upto Nov 2019 is Rs.1776.42 r Procurement of IT equipments for State
Crores. Data Center, Divisional, Sub divisional
8.2.13 Karnataka Integrated and Data Centers & KERS
Sustainable Water Resources r Procurement of Bridge outfits for
Management Investment Program. gauging.
Details are given in Table 8.43. r Procurement of lab equipments for
8.2.14. The National Hydrology Project: KERS
World Bank Aided National Hydrology r Upgradation of KERS training center
Project (NHP) Karnataka Component r Upgradation of rainfall receiving
application
r Project Period : 8 years.
r Upgradation of Arc GIS Software
r Grant Allocation : Rs.110.00 Crore
The Annual Work Plan for 2019-20 is
1. National Hydrology Project (NHP) is approved for Rs.22.50 Crores by MoWR. The
taken up by Ministry Of Water fund for 2016-17 & 2017-18(1st tranche)
Resources (MOWR) with World Bank totaling to Rs.6.54 Crores is released by
384 Economic Survey of Karnataka 2019-20

Table 8.43 : Karnataka Integrated and Sustainable Water Resources Management


Investment Program (KISWRMIP)

Brief Note on KISWRMIP Project-1

1 Name of the Project Karnataka Integrated and Sustainable Water


Resources Management Investment Program
(KISWRMIP) (MFF 0085/ Loan 3172-IND)

2 Financial Plan for MFF 2014-2021 ADB $150 million: GoK $75 million= $225
million
(ADB Rs. 750 Cr:GoKRs.375 Cr= Rs.1125 Cr )
@50/$
3
First Tranche 2014-2019 ADB $31 million: GoK$ 17 million= $48 million
(ADB Rs.155 Cr:GoK Rs.85 Cr= Rs.240 Cr )
@50/$

(i) Loan Signing for Tranche-1 07 May 2015

(ii) Loan effectiveness date 13 July 2015

(iii) Executing Agency Water Resources Department of Karnataka


through Karnataka Neeravari Nigam Limited
(KNNL)

(iv) Implementing Agencies a) Advanced Centre for Integrated Water


Resources Management (AC-IWRM)

b) Karnataka Neeravari Nigam Limited (KNNL)

4 Activities of KNNL

(i) Modernization of Gondi Main Contract AwardedforRs.112.22 Cr. on Feb 26,


Canal and Distributaries in 2016+EFI of Rs.16.74Cr. awarded.
Shivamogga District of
Karnataka (GONDI-NCB-1) Objective:

1) Modernisation of 74.6 km of Gondi right bank


and 14.50 km of Gondi Left Bank Canal.
2) CAD works in 4600 ha command area.
Progress:

a) All the works are physically completed. An


expenditure of Rs.112.05 Cr. is made upto the
end of Nov.-2019.
b) 243 Community Participation Packages (CAD
Works) amounting to Rs.42.52 Cr. have been
awarded to 11 Water Users Co-operative
Societies (WUCS). All the works are physically
completed and an expenditure of Rs.33.02 Cr.
is made upto the end of Nov.-2019.
Economic Survey of Karnataka 2019-20 385

5 Activities of ACIWRM

1) Operationalization of ACIWRM ACIWRM Operationalized

2) Training and Capacity Building Plan Trainings:


· 15 batches of IWRM Training conducted
455 engineers of WRD are got trained in
IWRM
· 19 trainings were conducted on different
theme and 508 engineers are got trained.
· 3 International trainings on SOURCERiver
basin modeling software were completed for
20 engineers held at Australiaand one batch
of 9 participants were got trained in
Hydrology-International best practices and
its application at NIWA, New Zealand.
· Two senior officers of ACIWRM attended
Water Accounting+training program
conducted by IHE-Delft, The Netherlands.
3) IWRM Certification Process IWRM Certification process is completed
4) Karnataka Water Resources IWRM based Water Resource Information and
Information System (KWRIS) Knowledge System (WRIS) Software is installed at
State data center and user credential is issued to
all the stakeholder departments.Phase-3 Module
work is in progress.
5) Inventory of River Basins in Inventory of River Basins in Karnataka- K8& K9
Karnataka River basin atlas is completed and printer Atlas is
shared with the concerned stakeholder
departments.
6) River Basin Plans in Selected River River Basin Profile& Plan for Tungabhadra (K-8) &
Basins Vedavati (K-9) is prepared and State-level
consultation workshop is conducted for
implementation of the same.
7)
Land and Water Management Pilots Pilot Concepts and understanding of Water
Productivity, Water Use Efficiency, Crop and
Agricultural Productivity – Water productivity
assessment of TLBC is completed and Land &
Water Management Pilots are prepared for
implementation.
8) Conducting MASSCOTE Training 3 MASSCOTE workshop completed and totally 126
Engineers were got trained.
9) ABhY- (AtalBhujalYojana) Proposal amounting to Rs.1232.21 Crores along
with comments on revised EFC has been
submitted to MoWR, RD & GR, GoI during Nov-
2017. EFC approved by MoF, GoI in June 2018.
ABhY program is officially launched on 25th
December 2019
10) Preparation of State Specific State Specific Action Plan for Climate change for
Action Plan on Climate Change Water Sector is prepared and consultation
(SSAPCC) for Water Sector workshop is conducted for stakeholders.
386 Economic Survey of Karnataka 2019-20

5 Activities of ACIWRM

11) Recruitment of Consultants 5 International, 6 National and 9 Short Term


Consultants are recruited.

12) Budget for the year 2019-20 Grant allocation for the year 2019-20 is Rs.
2253.00 lakhs. Revised Estimate for the year
2019-20 is 1390.00 Lakhs. Expenditure during
2019-20 (uptoNov 2019) is Rs. 992.38 lakhs.
Cumulative Expenditure since inception is Rs.
4134.62 lakhs.

Rs. In lakhs
Yearwise allocation and
Expenditure of ACIWRM Year Allocation Expenditure
2014-15 1500.00 10.73

2015-16 1973.00 273.58

2016-17 469.00 694.15

2017-18 2580.00 910.64

2018-19 1805.00 1454.52

791.00
2019-20 2253.00
(upto Nov-2019)
4134.62
Total 10580.00
(upto Nov-2019)

Government of India and the Financial ii) Balance 1 package pertaining to


Progress till date is Rs. 478.00 lakhs. KRS Dam, Hydro-Mechanical
package agreement executed on
8.2.15 Dam Rehabilitation & 21.09.2019 for the bid amount of
Improvement Programme (DRIP): Rs. 58.46 Crore and work is under
r 22 dams of the State have been progress [Due date of completion is
considered by the Central Water 20.03.2021].
Commission with an allocation of r The upto date Financial Progress
Rs.581.00 crores (including institutional incurred upto 31.12.2019 is Rs. 467.19
strengthening and works) under Dam Crores (80.41%).
Rehabilitation & Improvement
Programme (DRIP)with World Bank 8.2.16 Accelerated Irrigation Benefit
assistance. The said works are taken up Programme (AIBP) including CADWM:
in 43 packages. Out of 43 Packages of The GoI prioritized 99 projects under AIBP of
22 Dams, 41 packages works are PMKSY scheme, in which, 5 projects of
physically completed Karnataka are included. Out of these 5
i) 1 Package of Lower Mullamari projects, Sri Rameshwar LIS project is
Project is 90% Physically included under priority 1 & the remaining 4
completed and will be completed projcts i.e. Upper Tunga Project, Bhima Lis,
before 31stMarch 2020. Karanja & NLBC-ERM are included in
Economic Survey of Karnataka 2019-20 387

priority 3. Total Central Assistance received Construction of the Percolation tanks


for the said projects during 2019-20 is are also being done under this head of
Rs. 171.66 Crores. Sri Rameshwara LIS and account which are mainly intended to
Bhima LIS are nearing completion and other recharge the Ground Water table and
projects are in various stages of progress. help in raising the water level in the bore
wells and open wells in the surrounding
8.2.17 Minor Irrigation (Surface water): area which will be used for irrigation.
Projects having atchkat up to 2000 Ha. are
2. Modernization of tank: Under this
classified as Minor Irrigation Schemes.
head of account Department is taking
Projects having atchkat between 40 Ha to
up modernization of tanks under which
2000 Ha are under the jurisdiction of the
the works such as strengthening of
Minor Irrigation Department. These include
bund, repair of Waste weirs, canals
Tanks, Pickup, Bhandaras, Barrages and
including lining of canals are being
Lift Irrigation Schemes. These Minor
taken up.
Irrigation projects are widely spread all over
the state. As on 1st April 2019, there are 3. Construction of Barrage, Anicut, Etc.
9796 Minor Irrigation projects in existence Under this head of account Department
under the jurisdiction of this Department is taking up the construction of
with a culturable command area of 826885 Barrages, Bridge cum Barrages, Vented
hectares. In addition to these projects, this Dams, Salt Water Exclusion dams,
Department is looking after the operation Anicut and Pickups across rivers and
and maintenance of 7 Medium Irrigation streams to store water. Permission is
projects having a command area of 8342 being given to the farmers to lift water
hectares. from these storage structures for
Minor Irrigation Department is having 3219 irrigation by using their own pumps.
Irrigation tanks and 490Percolation tanks. There will be increase in ground water
These tanks are being inspected twice in a table in the surrounding area due to the
year by the concerned Executive Engineers water stored in these structures due to
and Assistant Executive Engineer. The which water will be available in the open
defects noticed during inspection will be wells and in the bore wells. Thereby
recorded in the inspection report. Necessary farmers will get water for irrigation and
repair works will be taken up out of the also for drinking purposes.
grants made available during the year on 4. Lift Irrigation Schemes: Under this
priority. head of account Department is
I. State Schemes implementing the lift irrigation schemes
to lift water from the rivers, streams,
1. Construction of new tanks: Under and other surface water sources to an
this head of account new tanks are elevated area and to provide irrigation
constructed and water is being stored to the farmers lands.
during rainy season to supplement the
In accordance with Budget Speech
deficit of water to the crops during non
during 2016-17, Administrative
rainy period or scarce rainfall period.
Approval has been accorded in vide G O
Earthen bunds are constructed across
No. SANEEYI 44 yeniyo 2015 dated 20-
the rivers, streams etc and the water is
10-2015 for filling treated waste water
being stored during rainy season which
to 126 tanks of Kolar and
will be utilized for irrigation during
Chikkaballapur districts from
deficit rainfall period. The Minor
Koramangala Challaghatta valley. The
Irrigation Department is involved in
work is in progress.
proper distribution of stored water to
the fields for irrigation by gravity flow. Administrative Approval has been
Construction of new tank is being accorded for Rs. 883.54 crores vide G O
carried out from state fund and also No. SANEEYI 57 yeniyo 2015 (tech)
from NABARD loan assistance. dated:21-06-2016 for filling treated
388 Economic Survey of Karnataka 2019-20

waste water to 54 tanks of approved under the scheme, with an


Chikkaballapur district. The work is in estimated cost of Rs.374.00 crore.
progress.
An expenditure of Rs.5358.65 lakhs is
Administrative Approval has been incurred against the grant of
accorded for Rs. 240.00 crores vide G O Rs.10000.00 lakhs during 2019-20
No. SANEEYI 75 yeniyo 2014 (tech) (End of November 2019). Irrigation
dated:10-05-2016 for filling treated facility of 1130.00 Ha is created.
waste water to 60 tanks of Anekal taluk
Bangalore Urban district. The work is 8. Land Acquisition/charges &
in progress. settlement of claims: Under this head
of account an expenditure of
5. Special Component Plan : Under this Rs.2108.00 lakhs is incurred against
head of account Department is taken up the grant of 5000.00 lakhs during
MI Schemes such as construction of 2019-20 (End of November2019).
new tanks, anicut / pickup bhandars, Mainly this grant has been utilized to
Modernization of Tanks and lift make payments to land acquisition
irrigation schemes etc., to create cases involving enhancement of land
irrigation facility to the lands belonging values including the interest as per the
to Scheduled Caste beneficiaries. court orders.
An expenditure of Rs.13536.72 lakhs is 9. Accelerated Irrigation Benefit
incurred against the grant of Rs. Programme (AIBP) Major works :
25192.51 lakhs during 2018-19 (End of Government of India is giving approval
November 2019). Irrigation facility of for taking up of the new Minor Irrigation
369.77 Ha is created against the target works involving the creation of fresh
of 9005.77Ha. During 2019-2020 (End Irrigation facility since 2009-10, in the
of November 2019). These Schemes are Drought Prone Area Development
being handed over to respective Programme (DPAP) taluks under
beneficiaries after construction. Accelerated Irrigation Benefit
6. Tribal Sub Plan: Under this head of Programme (AIBP)
account Department is taken up MI Minor irrigation Department is
Schemes such as construction of new implementing 1273 Minor Irrigation
tanks, anicut / pickup bhandars, works with an estimated cost of
Modernization of Tanks and lift Rs.955.08 crores after obtaining
irrigation schemes etc., to create approval to these works in 10 batches
irrigation facility to the lands belonging since 2009-10. So far 1157 works are
to Scheduled Tribe beneficiaries. completed and the new irrigation
An expenditure of Rs.5255.73 lakhs is facility is created in 10255.00 Ha.
incurred against the grant of There is no works have been approved
Rs.11465.87 lakhs during 2019-20 in present year. Rs.500.00 lakh grant is
(End of November 2019). Irrigation provided in present year and it is
facility of 453.53 Ha is created against utilized for clearance of pending bills.
the target of 3142 Ha. During 2019-20
(End of November 2019). These 10. State Schemes Flood Control Works:
Schemes are being handed over to The Minor Irrigation Department is
respective beneficiaries after implementing River bank protection
construction. works to prevent damages due to floods.
The river banks are being protected by
7. Pashchima Vahini: Vented dams are the construction of retaining wall to the
constructed under “Paschima Vahini” river banks for the prevention of loss of
project to collect and store water flowing lives and properties due to the erosion
in west-flowing rivers of coastal of the banks during the floods in rivers
districts. A total of 54 works have been and streams.
Economic Survey of Karnataka 2019-20 389

11. Karnataka Tank Conservation and Conservation and Development


Development Authority: The Authority.
Authority started functioning from
12. Ground Water Directorate: The
November 2017. The functions of
establishment of separate Ground
Karntaka Tank Conservation and
Water Directorate by bifurcating the
Development Authority include
Groundwater wing from the
Conservation of Lakes/Tanks,
Department of Mines and Geology in
rejuvenation, Ground Water
order to strengthen and develop the
Development, Environmental
ground water wing in the State in vide
protection, wet land development,
G.O. No. Saniyi 13 aja aa 2013, dated
water management, agriculture and
23.11.2013. At present Grounde water
horticulture development, development
directorate is working under Minor
of Agriculture based industries etc.,
Irrigation Department.
either directly or through departments/
agencies. In 2019-20 Rs.2133.00 lakh grant is
provided to Ground water directorate and
Rs.750.00 lakhs is released against the
Rs. 453.79 lakh is released end of November
grant of Rs. 3000.00 lakhs during
2019. Progress of last 10 years under minor
2018-19 (End of November 2019). “Kere
irrigation (surface water) schemes is given
Sanjeevini” programme is being
implemented through Karnataka Tank in Table 8.44.

Table 8.44 : Statement showing progress under Minor Irrigation (Surface water)
Schemes

Expenditure Potential created


Year
(Rs. in Lakhs) (in Ha).

2008-09 39593.92 16040

2009-10 59408.24 17299

2010-11 82384.52 15889

2011-12 110038.45 21720

2012-13 102710.48 32769

2013-14 98632.20 36108

2014-15 104170.82 29562

2015-16 120563.74 33869.8

2016-17 125171.90 25101.61

2017-18 223590.83 25457.32

2018-19 202187.23 16540


2019-20
112728.18 9354.07
(Upto November 2019)
390 Economic Survey of Karnataka 2019-20

8.3. MINING SECTOR 44 mining leases are going to be expiring by


31.03.2020. These mining leases should
8.3.1. Karnataka's Mineral Resources
disposed off through auction. Accordingly,
Karnataka is having valuable mineral 04 mining leases already auctioned in 2019-
deposits covering around 1.92 lakh sq. km. 20. Status of auctioned 4 mining leases are
such as iron ore and manganese in Ballari, provided in Table 8.45.
Chitradurga, Tumkur, Uttara Kannada and
There are 2764 Quarry leases for Building
Chikmagalur districts, chromium
Stone and other minor minerals and 504
(Chromite) deposits in Hassan and Mysuru
Ornamental Granite Quarry working leases
districts. Besides these ores, aluminium
in the State. Further, in the present
(bauxite) reserves in Belagavi, copper
financial year, upto the end of November
(malachite) reserves in Hassan, Chitradurga
2019, the department has granted 141
and Raichur are also found. State is also
Quarry leases for Building Stone and other
rich in industrial minerals such as kyanite,
minor minerals and 15 Ornamental Granite
soapstone, corundum and a wide variety of
Quarry leases.
ornamental stones such as granite,
gneisses, pink porphyries and felsites The Department of Mines and Geology has
deposits. The state has more than 40,000 realized revenues of Rs.2277.61 crores as
sq. kms. of green stone belt which are a against the target of Rs.2272.00 crores upto
treasure trove of several mineral deposits November 2019 and as against the annual
and also indicates the occurrence of target of Rs.3550.00 crores for the year
polymetallic deposits, diamond and gold. 2019-20. Details of royalty collections from
2015-16 to 2019-20 (upto November 2019)
In the State, the Department of Mines and
Geology, is responsible for the effective and are provided in Table 8.46.
efficient administration of these mineral District Mineral Foundation Trust:
resources, which are raw materials for
various industries. Locating mineral r Government of India has amended the
deposits, which are not readily open on the MMDR Act w.e.f 12.01.2015 wherein
surface, is the thrust area of exploration. To under Section 9(B) a provision has been
achieve this, department has granted more made to establish a trust called, the
number of reconnaissance permits and “District Mineral Foundation”, which is
prospecting license to National and a non-profit body, to work for the
International exploration companies for interest and benefit of persons and
taking up exploration activities. areas affected by mining related
operations.
8.3.2. Mining and Mineral industries r State Government vide G.O. dated
As per order of Hon'ble Supreme Court, 14 05.11.2015 notified the establishment
'C' category iron ore leases of Ballari & of District Mineral Foundation Fund
Chitradurga districts have been auctioned. (DMF) in each of the district of
Out of which, 03 iron ore mining leases of Karnataka. Further, the State
Ballari district have been executed. From Government under section 15(4) of
April 2019 onwards, for the 'C' category iron MMDR Act, The District Mineral
ore lease named Tungabhadra Minerals Pvt. Foundation Fund (DMF) Rules were
Ltd., (ML No: 2365) and Mysore Minerals framed on 11.01.2016 under the
Ltd., of Ubbalagundi village, Sandur Taluk, guidelines of Pradhan Mantri Khanij
Ballari district (ML No: 995) two mining Khsethra Kalyan Yojan (PMKKKY) and
leases which was auctioned in the year same has been amended on 25.07.2016
2018-19, lease deed has been executed in and 08.03.2018.
favour of successful bidder JSW Ltd., Ballari r In respect of major mineral,
(Lease No: 007 & 008, extent: 130.53 & Government of India vide Notification
32.89 Hectares) on 27.05.2019 and dated: 17.09.2015 has directed to
11.11.2019 respectively. collect the DMF from:
Economic Survey of Karnataka 2019-20 391

Table 8.45: Status of auctioned 4 mining leases exprining on 31.03.2020

Old Exte Estimated Date Preferr Final Date of


Sl. of issue of
Name of Mine ML nt in Reserves in ed price
No e- Letter of
No Ha MMT bidder offer
auction Intent

BBH Mines
JSW
1 presently held by 2346 93.6 61.217 MMT 24.07.2 STEEL 67.1 13.08.2019
M/s Mineral 019 0%
LIMITED
Enterprises Limited

12.207 MMT
Dharmapura Iron [10.51 Fe
JSW
2 Ore Mine presently 2239 43.58 and 1.697 24.07.2 STEEL 97.5 13.08.2019
held by M/s Zeenath BHQ (with 019 0%
LIMITED
Transport Company 60% Iron ore
recovery)]
Fe 21.79
Narayanpura
MMT
Manganese & Iron
[3.869MMT, JSW
Ore Mine presently 107.5 25.07.2 102.
3 1602 9.147MMT, STEEL 13.08.2019
held by M/s 1 019 70%
8.774MMT] LIMITED
Narayan Mines Mn 0.476
Private Limited
MMT

Jaisingpur Iron Ore


Mine presently held
25.07.2 MSPL 72.1
4 by M/s 2531 56 3.567 MMT 13.08.2019
019 Limited 0%
Ashwathanarayana
Singh & Co

(i) prospecting license-cum-mining granted prior to 12.08.2016 and leases


lease granted on or after granted after 12.08.2016, 10% is
12.01.2015 at the rate of 10% on collected.
royalty r Rule 18 of DMF Amendment Rules
(ii) Mining lease granted on or before 2018:
12.01.2015 at the rate of 30% on 1) 10% of the fund is earmarked for
royalty. As per the ruling of the endowments purpose after closure of
Hon'ble Supreme Court in mining activity in affected area.
Transferred case (civil) No.
43/2016, FIMI v/s Union of India 2) 5% of the funds from DMF is earmarked
and others dtd:13.10.2017, for administrative purpose of which 4%
collection of royalty as per the is to be utilized at the District level and
DMF rules have came into effect 1% is utilized at State Level Monitoring
from Dtd: 17.09.2015. & Evaluation Cell.

r As per the amendment for KMMCR Rule 3) Remaining 85% shall be utilised for
2016, DMF collection for minor mineral, implementation of projects and
has started w.e.f. 12.08.2016 and 30% schemes prescribed under Pradhan
of royalty is collected for the leases Mantri Khanij Khsethra Kalyan Yojan
392 Economic Survey of Karnataka 2019-20

Table 8.46 : Details of Royalty Collections (Rs. in crore)

Major Minor
Year Target Achievement
Mineral Mineral

2015-16 1807.18 2003.79 811.12 1192.67

2016-17 2410.71 2419.43 1047.32 1372.11

2017-18 2550.00 2746.26 1294.89 1451.37

2018-19 3000.00 3026.42 1405.79 1620.63

3550.00
2019-20 Annual Target
2277.61 1310.68 966.93
(upto Nov-2019) (2272.00 upto
Nov-2019)

Royalty collection is as per reconciled figures.

Source: Demand, Collection, Balance (DCB) Section, Department of Mines & Geology.

(PMKKKY) in the ratio of 60:40, for high 8.3.3 Policy initiatives


priority areas and other priority areas,
respectively. Karnataka State Mineral Policy 2008

The following are the high priority The Mines and Minerals (Development and
areas(60%) for utilization of funds: Regulation) Act, 1957 (MMDR Act), lays
down the legal frame-work for regulation of
(a) Drinking Water Supply; mines and development of all minerals other
(b) Centralized preservation and pollution than petroleum and natural gas. The
control measures; following sets of rules are framed by the
central government under the act to deal
(c) Health Care; with major minerals. state governments are
(d) Education; free to deal with mineral concessions related
to minor minerals.
(e) Welfare of Women and Children
including on their nutrition; r The Minerals (other than Atomic,
Hydrocarbon Energy Minerals)
(f) Welfare of Age old and disabled people; concession rules, 2016 w.e.f
(g) Skill development; and 04.03.2016.
r The (Evidence of Mineral Content) rules
(h) Sanitation. 2015, w.e.f 17.04.2015.
The following are other priority areas (40%); r The mineral (Auction) rule 2015, w.e.f
(a) Physical infrastructures 20.05.2015.
r The mineral (Mining by Government
(b) Irrigation
Company) rules 2015, w.e.f
(c) Energy and Watersheds developments 03.12.2015.
(d) Other measures for enhancing r The Mineral Conservation and
environmental quality in mining area Development Rules, 1988 (MCDR) deals
with conservation and systematic
development of all minerals except coal,
atomic minerals and minor minerals.
Economic Survey of Karnataka 2019-20 393

r FDI is permitted cent percent for the mineral exploration, by collecting 2% of


automatic route to explore and exploit royalty from mining lease holders and to
all non-fuel and non-atomic minerals in estimate the value of mineral wealth
India. with an objective of declaring it has
r FDI is permitted cent percent for the National Natural Wealth.
automatic route to process all metals as Karnataka State Sand Policy 2011
well as for metallurgy.
In view of the geographic setting and
r Optimization of state's geological administration of state, Government has
potential by scientific and detailed brought new sand policy as per Government
prospecting. order No: CI 81 MMN 2009, Bangalore
r Notification of mineral based area to dated: 29.01.2011. As per new policy sand
avoid clash of interest between mineral mining is entrusted to PWD department.
exploitation and other development On 12th August 2016, Government of
activities. Karnataka has brought amendment to
r Promote indigenous utilization of KMMCR 1994. As per amendment rule
minerals. 2016, additional responsibility of
monitoring the illegal sand mining and
r Evaluate the mineral resources transportation has been given to disctrict
including the coastal and sea belt. commissioner and tahsildars. The
r Review mining areas granted to public/ responsibility of sand mining being brought
private companies to adhere to mining back to the Department of Mines & Geology.
plan discourage unproductive holding. Sand blocks of appropriate size will be
r In order to implement the granted through auction for the private
developmental and environment people for sand extraction. Leases for sand
restoration works in mines affected extraction will be given for period of five
areas of Iron ore in Chitradurga, Bellary years.
and Tumkur districts a new body, Highlights of Amendment to KMMCR
Karnataka Mining Environment 1994 dated 12.08.2016 are as follows:
Restoration Company (KMERC) has
come into existence on 21-06-2014. r Provision is made to grant sand
r Government of India Promulgated quarrying leases for the period of 5
ordinance amending the Mines and years through public tender cum
Minerals (Development and Regulation) Auction.
Act with effect from 12.01.2015, and r Additional responsibility has been given
same has been gazette on 27.03.2015. to District and Taluk sand monitoring
committees to monitor sand quarrying
Salient features of Amendment Act:
activities and powers are delegated to all
r Granting of mining leases through the members of the Taluk & District
auction by transparent and competitive Sand Monitoring Committees to control
method is adopted, by discarding the the illegal sand mining & transportation
old system of granting mining leases on under rule 31-R sub rule 13 of KMMCR
first-cum-first basis. By adopting this 1994 Amendment Rules 2016.
method of auctioning the mineral r Deputy Commissioner and Assistant
wealth, highest revenue to the Commissioners are the Chairperson for
Government is expected. District sand monitoring committee and
r Establishment of District level Taluk sand monitoring committee,
Committees for collecting DMF and respectively.
utilizing DMF fund for the development r Officers of Revenue, Police, Forest,
of the mine affected areas. PWD, Mines & Geology, Zilla
r National Mineral Exploration Trust Panchayat, Regional Transport Office
(NMET) has been formed for conducting and Social Welfare departments are the
394 Economic Survey of Karnataka 2019-20

members to District and Taluk Sand Rs.99.00 crores has been collected in the
monitoring Committees. way of Royalty/ additional periodical
r Provision is made for reservation in payment/average additional periodical
grant of sand mining leases as per the payment.
reservation policy of the state for SC and Further, sand has been imported from other
ST. Countries as per KMMCR 1994 Amendment
r Provisions are made to allow sand Rules 2017. Accordingly, 8 companies have
mining available in Patta Lands, to meet been registered to import the sand from
the short supply. other countries. So far 4.27 lakh MT sand
r Provision is made to reserve sand blocks has been imported from Malaysia, out of
for Government works which are which 1.8 lakh MT has been supplied to
identified by District and Taluk Sand public construction work and amount of
monitoring Committees. Rs.67.97 lakhs has been remitted to
Government.
r In such of those cases where PWD has
in the past auctioned and executed As an alternate to river sand, to promote M-
leases for sand quarrying, sand provisions are made, important points
transportation is allowed till the validity are as here under:
of lease period under Rule 31-X. r Quarry leases would be granted to a
r Provision is made to sanction budget maximum extent of 50 acres for those
through corpus fund under rule 31-Z to who establish M-Sand units under Rule
bear the expenses in controlling sand 15 of KMMCR 2016.
quarrying and transportation at the r Provision is made in KMMCR 1994
district level. (amendment) Rules 2016, vide Rule 8A
r Prohibition of Inter State sand for grant of quarry leases for a period of
transportation. 30 years for M-Sand units.
r Provision is made to import river sand r Under Amendment of KMMCR 1994,
from other countries and for sale in the Rule 31-ZD of 2016 a provision has
State under rule 31-ZF to 31-ZL of been made for grant of quarry leases in
KMMCR 1994. such cases where in NOC from Revenue
There are 512 notified sand blocks in the & Forest department have been
state, out of which 18 sand blocks reserved obtained as per rule 8(5) and
for Government works. Presently, 342 sand applications are pending for grant of
blocks has been disposed through tender quarry lease for production of M-Sand
cum e-auction, out of which for 236 sand prior to date of amendment of the rule.
blocks quarrying leases has been granted r Programme are being arranged to bring
and 44 sand mining licenses have been awareness among the public about
issued in Patta land. Temporary permits has usage of m-sand from the department
been given to remove the sand in 38 sand by publicity through jingles, phone in
bars in the river streams of CRZ areas programme and interviews via
(Coastal Regulation Zone) to traditional Akashavani, Bengaluru, Also
sand removal manner as per Ministry of advertising through posters, hand bills,
Environmental, Forest and Climatic printing, flexes about the uses of M-
changes office order 2011. sand.
In total, as mentioned from the above r To maintain the ecological balance and
sources, approximately 12 MMT of sand has adverse effect on groundwater,
been estimated for sand mining and same Government has taken the measures to
quantity have been approved by initiate M-Sand production and
environmental clearance (EC). By end of utilization as an alternate to river sand.
November-2019, 2.73 MMT sand has been Presently, M-sand producing is done in
mined and supplied for Public and 18 district of the state. For the year
Government construction works. A sum of 2019-20, the annual target of M-Sand
Economic Survey of Karnataka 2019-20 395

production is 30 MMT, out of which, E-services provided to the lease holders


17.64 MMT of M-Sand is produced by includes registration of stake holders,
the end of November-2019. online application for Bulk permit, Mineral
A. Comprehensive Computerization of Dispatch release order, Mineral dispatch
Mineral Administration permit (any trip sheet issuance permit),
Rake Permit, e-Returns etc., Therefore, the
In 2011, Department of mines and geology system has reduced the scope of using fake
got a comprehensive web based application permits and supports monitoring and
from (n) Code solutions for tracking the tracking of royalty payment and
movement of the mineral from mines to the accountability.
end user called “Integrated Lease
management system”. This system provides A major achievement through this
real-time services to the lease holders and application in sale of iron ore through e-
other stake holder of mining industries in auction is complied for the year 2017-18,
the Karnataka is running successfully. 2018-19 and the current year is in the
shown in Table 8.47.
The centralized database contains
information related to the lease holders, B. Salient features:
payment transaction, updated mineral The department has adopted a new system
rates, issuance of e-permit, Demand of e- permitting online through Integrated
registration information, weighbridges, Lease Management System (ILMS), in which
Check posts etc system is designed keeping '(n)Code' has offered integrated software
in the view the mining industry and to widen development and portal application
the ambit of the e-governance. modules such as, e-Permit, e-return,
This system provides seamless service by demand collection & assessment, Weigh
capturing data related to the production at Bridge Integration and other related
individual mines, auction transaction, modules covered in a single portal for
dispatches and monitors mineral transport stakeholders & Mining in Karnataka. The
up to the destination. overall intention is to introduce a
controllable mechanism and framework for
Integrated Lease management system transportation of minerals such as Iron Ore,
consists of following modules Manganese Ore, Granite and Building
1. E-Permit stones etc.
2. E- returns C. Status of Computerization of mining
3. DCB details of the state:
4. Monthly progress report The ILMS registration details are given in
Table 8.48
5. Offline module
6. DMF web portal Milestones achieved in the current year
7. Digital Signature Certificate 1. Integrated Lease Management System
8. SSPP Module (Special Security Permit (ILMS) has been integrated with the
Paper) Karnataka forest department
application (Forest Produce Track
9. Integration with Forest Pass Tracking system) to provide single platform for
System generation of Mineral dispatch permits.
10. Integration with Google for distance
2. Departmental Web portal redesigned
calculation form source to destination
for providing information about the
11. I n t e g r a t i o n w i t h c h e c k p o s t , department along DMF (District
weighbridge mineral foundation) sub portal.
12. Report module
3. Offline application has been
13. Vehicle registration implemented to facilitate the remote
396 Economic Survey of Karnataka 2019-20

Table 8.47 : Revenue from Royalty to the Government

2019-20
Sl. (Upto end of
Particulars 2017-18 2018-19
No. November
2019)

1 Q uantity e-auctioned 17.863 MMT 16.86 M MT 19.97 MM T

M aterial value of e- auctioned


2 4029.99 Cr 4267.14 Cr 4683.77 Cr
i ron ore

R oyal ty @ 15% paid to DMG till


3 611.52 Cr 592.95 Cr 683.29 Cr
date (in Rs.)

FDT @ 12% paid to Forest


4 315.79 Cr - -
department till date (in R s.)

Total Commercial Tax


5 recovered & paid to Dept. till 241.36 Cr - -
date (in Rs.)

6 PWD Toll fee (in crores) - - -

Table 8.48 : The ILM S Registration details of M ajor M ineral:

From 01.04.2019 to
Particulars Upto March 2019
30.11.2019

Total No of Leases 373 2

Total no of Be ne ficiation plant 21 1

Total no of Weighbridge 642 32

No of weighb ridge inte grated 385 11

Total no of buye rs 2 580 ( including minor 207 1 (including minor


mi ne rals) minerals)

The ILMS Regi stration details of M inor M ine ral:

76 6 (including
Total No of Leases 7389 Te mporary Pe rmi ts &
Work Permission)

Total no of Crushe rs 990 18 0

lease areas to generate Mineral Minerals (Development and Regulation) Act,


dispatch permits without internet. As a 1957, called The Karnataka (Prevention of
pilot project it is launched in Bangalore illegal mining, transportation and storage of
Urban district. minerals) Rules, 2010 to curb illegal mining
and transportation. End user registration,
D. Curbing of illegal mining and
proportionate validity of the trip sheets,
transportation:
establishment of checkposts is some of the
The department has notified the amended salient features. Presently, 2 squad teams at
rules under Section 23-C of Mines and State level and 6 squad teams at district
Economic Survey of Karnataka 2019-20 397

levels have been formed to control illegal with the various standards stipulated
mining and transportation throughout the under the various environmental
State. /mining statues e.g. air quality, noise /
vibration level, water quality, scientific
E. Implementation of R&R Plan for over burden/waste dumping,
mining-affected districts: stabilization of slopes etc.
As per the Hon'ble Supreme court orders 4. For achieving 2 and 3 above, fixation of
dated:05.08.2011 and 26.08.2011 in S.L.P permissible annual production, and
(civil) No. 736667/2010 & WP(C) No.
562/2009 the State is committed to develop 5. Regular and effective monitoring and
and implement suitable Reclamation and evaluation.
Rehabilitation (R&R) plans for mining ICFRE has submitted 98+28 (i.e A, B + C
affected districts of Bellary, Chitradurga category mines) Reclamation and
and Tumkur. The State Government has Rehabilitation (R & R) reports on mining
assigned this task to the Indian Council of leases. The permissible production for all 97
Forestry Research and Education (ICFRE). mining leases is 41.065 (after enhancement
The main objective of the project is to considered by CEC) MMTS per annum for
prepare R&R plan and to implement the iron ore and 0.568 MMTS per annum for
plan after the approval of mining leases by manganese ore. Hitherto CEC has approved
the Central Empowered Committee (CEC). R & R plans for 97 (A+B) mines.
Based on ICFRE's R&R plans, the Central
Empowered Committee (CEC) has approved The production limit is going to fix as and
R&R plans for 97 ('A' & 'B' category mines). when ICFRE submits its R & R for all the
ICFRE has prepared R&R plans of 28 'C' A,B,C categories of mines after due approval
category mines till date. The Hon'ble of CEC.
Supreme Court in its order dated 20.4.2012,
F. Check posts :
has directed the Ministry of Environment
and Forests to re-visit the statutory To control illegal mining and transportation
clearances earlier granted by it in the light of check post has been established in the
R & R Plan and in its Order dated strategic point of the state. 13 Integrated
03/09/2012, 28/09/2012 & 18/04/2013 composite check posts have been
has allowed mining operations in category established involving Forest, Police,
'A' and category 'B' mines to resume mining Transport, PWD and Department of Mines
operation after the clearance of the R&R and Geology. It has been intended to
plan by CEC and, after obtaining other computerize these composite check posts
statutory clearances from various including already working 17 important
organizations. check posts of the department. To control
illegal transportation of mineral to
The broad objectives/parameters of R&R neighbouring states, departments which are
plan are as under. already working in the interstate border
1. To carry out time bound implementation check post, in the same check post
of R & R plan in the area under illegal department has provided UPS, CCTV and
mining by way of mining pits, over other basic amenities for 19 interstate
burden/waste dumps etc. outside the border check post such as Talapadi,
sanctioned lease area as well as within Sampaje/ Jalasur, Ukkad of Mangalore,
the lease area. Majali, Anmod of Karwar, Mungsoli,
Kagawada, Kanakumbi and Koganolli of
2. To ensure scientific and sustainable Belagavi, Dhulkhed and Shirdon of
mining after taking into consideration Vijayapur, Bagepalli NH, Chinnasandra of
the mining resources assessed to be Chikkaballapura, Kutta and Perambadi of
available within the lease area as per Madikeri, Bavali of Mysuru, Moolehole,
IBM CEC approval. Punajanuru of Chamarajanagar, Attibele of
3. To ensure environment friendly mining Bengaluru Urban districts of existing check
and related activities and complying posts of other departments. Presently
398 Economic Survey of Karnataka 2019-20

constructions of 7 modern checkposts at Madakaripura of Chitradurga,


Bannihatti, Kallahalli, Kakubalu in Bellary Siddarampura of Raichur, Lakkur of
district, Malappanahatti & D.B.Kere cross Bangalore Rural, Koginalli of Belagavi
in Chitradurga district, Somanahalli & districts are under progress.
Chowdlapura (Tumkur district) have been
G. The Department has 07 ongoing
completed. Construction of checkpost at
schemes, Budgetary out lay for 2019-20 and
Somanahalli of Tumkur, Ubbalagundi,
Expenditure upto the end of November 2019
Bandri, B. Gonal of Ballari, Lakkihalli, D.
are given in Table 8.49.

Table 8.49 : 07 On-going Schemes of Department of Mines & Geology (in lakhs)

Budget
Name of the Scheme Budgetary Expenditure Budgetary Expenditure
Sl. Released
& outlay for upto end of outlay for upto end of
No. upto Nov-
Head of Account 2018-19 March-2018 2019-20 Nov-2019
2019

Training of officers and


1. staff of the Department 25.00 10.26 25.00 12.50 7.83
2853-02-102-0-10

Publication Wing in the


2. Department 5.00 3.23 5.00 1.25 0.51
2853-02-102-0-11
Mineral Conservation
cell in the Department 200.00 56.57 200.00 50.00 0.0
2853-02-102-0-14
3.
SCP (422) 100.00 0 100.00 0 0

TSP (423) 100.00 0 100.00 0 0

Environmental
Geological Wing of the
4. Department 3120.00 1172.99 4228.00 1057.00 54.1
2853-02-102-0-15

Sand Mining Policy


5. 500.00 500.00 200.00 50.00 50.00
2853-02-102-0-16
Filling up of Stone
6. Quarry Pits 700.00 219.92 200.00 50.00 0.0
2853-02-102-0-17
Modernization
7. 2853-02-001-0-01 1372.00 833.04 1000.00 500.00 243.60
sub head 125

Total 6122.00 2796.01 6058.00 1720.75 356.04

Note: As per Government order No: DE 113 ªÉZÀÑ-1/2019,dt.10.10.2019 Budget allocated for SCP & TSP
programme had been surrender.
Economic Survey of Karnataka 2019-20 399

8.4 CLIMATE CHANGE AND MITIGATION The features of the web-portal include:
MEASURES 1. Discussion forum for interacting with
Environmental Management and Policy the domain experts, researchers,
Research Institute (EMPRI)undertakes students and public
scientific research, policy research and 2. Interlinking with all knowledge
offers training on concurrent environmental Institutions who are engaged in
issues relevant to the society, industry and research and development on climate
Government. EMPRI is an autonomous change and responses
society established under Forest, Ecology &
Environment Department, Government of 3. All climate change related reports from
Karnataka and registered under Karnataka EMPRI and other MoU institutes
Societies Registration Act, 1960 on 17th 4. Featured videos which include various
September, 2002. The following are the activities & social awareness by EMPRI,
Research and Training activities (upto short film on plastic ban awareness &
November 2019) undertaken during lake conservation, TV quiz programme
2019-20. on climate change named Thatt Antha
I. Centre for Climate Change Heli, DD Chandana programme 'Hello
Geleyare' about awareness on plastic
r Under the National Mission on Strategic ban
Knowledge for Climate Change
(NMSKCC), Department of Science and 5. Important national and international
Technology, Govt. of India, a Strategic news & events related to climate change
Knowledge Centre on Climate Change is 6. Dashboard for monitoring the
established in EMPRI during 2016. butterflies in Bengaluru/others
r For setting up a strategic knowledge districts in Karnataka. For this a
centre on climate change, the centre for Butterfly Identification App (BIA)
climate change in EMPRI was (android based mobile application) was
strengthened through establishing a developed and the dashboard for the
Climate Change laboratory, developing same has been hosted in KSCCSKP.
a knowledge portal, undertaking
7. The BIA is hosted in the EMPRI/
research projects and creating
KSCCSKP portal and the link has been
awareness on climate change. The
provided to school children/ teachers,
Climate Change (CC) laboratory with a
forest officials, researchers and public.
total of 30 equipments is fully functional
As a pilot study, 149 records of
and procurement of two equipments
identified butterfly information
(GHG analyser and TOC Analyzer)is
submitted through the mobile APP (BIA)
under progress. The laboratory will
have been received in the dashboard.
facilitate the analysis of various
parameters related to climate change 8. Frequently Asked Questions (FAQs)
viz., soil, plant and microbiological with answers about climate change
aspects.
9. Proceedings and abstract books of the
r A web-portal named “KARNATAKA two National Seminars on Climate
STATE CLIMATE CHANGE STRATEGIC Change conducted by EMPRI under the
KNOWLEDGE PORTAL” has been sponsorship of Dept. of Science &
developed to disseminate knowledge on Technology (DST), GoI.
climate change and related activities in
an interactive and efficient way II. Sub-projects
throughout the state of Karnataka. It is Research on Permanent Preservation Plots
developed using PHP & MYSQL and is is a long term study on climate change to
hosted in Karnataka State Data Centre, help in many policy decisions for forest
CeG. The link to the web portal is management. Studies were undertaken in
:http://skcccempri.karnataka.gov.in. the permanent plots established by EMPRI
400 Economic Survey of Karnataka 2019-20

at Bannerghatta National Park (BNP) and date. Vegetative and Reproductive


Doresanipalya Reserve Forest (DRF) for soil phenophases (leaf, flower, fruit, herbivory,
and litter analysis, phenology and frugivory) of the tagged trees have been
photosynthetic potential of selected tree monitored for the last 5 months (July,
species. Weather data from the PPP August, September, October, November
stations were collected for compiling the 2019). Herbivory by insects is expressed as
weather information. 0-25%, 25-50%, 50-75%, and 75-100%.
Phenological monitoring of trees would be
The following subprojects are under done every month on the same day and will
progress in the Permanent Preservation be initially for a period of 3 years
Plots (PPPs)established in Bannerghatta (2018-2021).
National Park and Doresanipalya forest.
5) Butterfly Monitoring Programme for
1) Photosynthetic potential of some Karnataka
important tree species in permanent
preservation plots of Bannerghatta As butterflies are bio-indicators of climate
national park and Doresanipalya forest change, the creation of a database on the
diversity/distribution of butterflies in
Photosynthetic potential of six important different districts of Karnataka will help in
and dominant species were estimated using the monitoring of the impact of climate
IRGA analyser. change. An innovative programme titled,
2) Microbiological studies in forest soils Butterfly Monitoring Programme for
of Permanent Preservation Plots. Karnataka is initiated. A mobile app (BIA-
Butterfly Identification Application) will
Microbiological parameters [General facilitate the identification of butterflies in
Bacteria, Fungi, Azotobacter sp, the field. The data submitted from different
Pseudomonas sp., Phosphate solubilising districts/regions will be received and
bacteria (PSB), Actinobacteria and VAM processed in the dashboard of the
spores] were studied in the different PPPs. Karnataka state climate change knowledge
3) Carbon dynamics and Soil Physico- portal. This programme is facilitated
Chemical Analysis through the involvement of National Green
Corps (NGC) schools, forest department and
Soil samples collected in pre-monsoon the public. To facilitate in the field of
season from three permanent preservation identification of butterflies, a field guide,
plots are analysed for physico-chemical Karnataka Butterflies is also prepared.
[Moisture content, pH, EC, Phosphorus(P),
Calcium (Ca), Magnesium(Mg), Sodium(Na) III. GoK / MoEF funded projects
and Potassium(K)]. The data is being 1. Studies on Plastic Degrading Microbes
compiled and analysed. Isolated From Soil
4) Phenological studies on selected tree Initially, literature study is made by
species of Thalewood house (BNP), collecting different articles related to the
Bugurikallu (BNP) and Doresanipalya plastic degradation potential of bacteria and
(DRF). fungi. Accordingly, the Standard operating
procedures (SOPs) are prepared for soil
These studies will find applications in a) sampling and isolation of bacteria and fungi
Understanding the timing of ecosystem from soil samples. The required lab items for
processes b) Assessing the vulnerability of analysis are in the course of procurement.
species to climatic variations and c) Relating Soil Sample from the permanent
phenological changes with the climatic preservation plot (PPP) of Thale woodhouse
factors to establish the effect of climate plot in Banneraghatta National Park (BNP) is
change on trees. A total of 250 trees each in collected and stored at 4ºC. Sample analysis
the localities of two plots at BNP and 50 trees is under progress.
in Doresanipalya locality were tagged till
Economic Survey of Karnataka 2019-20 401

2. Understanding and projecting the is in the process of revising the 1st State
effect of climate change on native bee Action Plan on Climate Change. The SAPCC
species and its implication on crop need to be revised and strengthened
production further, considering the evolving context of
climate science, policy and actions. The
This study is aimed to assess the impact of revision is to be made in light of the
climate change on native bees and its commitments made under Nationally
implication on crop production. The Determined Contribution (NDCs) goals for
objectives of the projects are: post 2020. A common framework for
r Assess the geographic distribution of revision of SAPCC is being prescribed by
native bee species and impact of climate MoEF&CC. In order to facilitate the revision
change. process, a core group was constituted
under the chairmanship of Additional Chief
r Investigate the effect of projected Secretary and Development Commissioner
climate change on crop productivity. vide GO No. FEE 27 ENV 2018, dated:
r Perform climatic modulation 29.05.2019 and a meeting was held on 19th
experiments on crop plants and native June, 2019 to assign the responsibility to
bees. different institutes/ agencies for framing
Data on few native bee species namely, the chapters of SAPCC. The 1st, 2nd, 3rd
Apisdorsata, A. florae from India is collected and 4th chapter-wise meetings were held
from publicly available records, thesis, with the concerned officials and resource
published articles to develop distribution persons to discuss about the various
map, habitat suitability and generate chapters of SAPCC. A training program cum
historic and future prediction maps. The 1st Stakeholder meeting was organized on
records were searched for collecting the 21st September, 2019 to train the nodal
data on 1.Species name 2. Family 3.Year of officers and facilitate interaction between
study, 4. Location of Study Area (State the nodal officers and experts/authors. A
/District /Taluk/ Place), 5.Co-ordinates review meeting was held on 19th November
and altitude of the study location, 6. Type of 2019, to review the progress of work on
habitat 7. Substratum to build the species State Action Plan. The report is scheduled to
nest 8. Number of colonies observed. 9. be completed by March, 2020.
Direction of the nest / nest orientation 10. 5. Green Index Development
Reason for decline.
EMPRI in collaboration with IISc has
3. Mapping of selected Green House initiated the development of Green or
Gases in the selected BBMP areas of Environment Performance Index for
Bengaluru City e v a l u a t i n g / a u d i t i n g t h e
The project has been initiated in July 2019. schemes/programs of the state government
The instrument, GHG analyser for helping departments. The Green Index is a measure
in the estimation of Green House Gases is of the relative environmental performance of
under procurement. The air sampling different developmental and infrastructure
would be done in 60 different locations schemes, programmes and projects using
across the 4 zones over a period of three criteria and a set of indicators. The project is
seasons. Across the three seasons, a total of proposed in view of promoting green or
180 samples would be analysed for the GHG environment friendly programmes and
concentration. A 24-hour sampling would projects by highlighting the environmental
be done using GHG analyser in each benefits/ damages and ensuring there are
selected location. The parameters to be no adverse effects on the environment. The
assessed include CO 2 , and CH 4. outcome of the project would be to rank the
departments as green/non-green and
4. Revision of Karnataka State Action provide suitable recommendations for
Plan on Climate Change (KSPACC) greening the schemes/programs.
As per the guidelines of MoEF&CC, EMPRI
402 Economic Survey of Karnataka 2019-20

6. Estimation of Forest and Tree cover to IV. Coordination with government


create an additional carbon sink of 2.5 to departments for developing projects
3 billion tons of CO2 equivalent by 2030 - under National/International funding
in collaboration with University of
a) Monitoring the NAFCC Project
Agricultural sciences (UAS), Bangalore
undertaken by AH&VS
As required by Karnataka Forest
A project entitled, “Conservation and
Department for providing inputs to National
Management of Indigenous varieties of
Action Plan on Climate Change (NAPCC),
livestock (Cattle and Sheep) in the Wake of
EMPRI was assigned with the task of
Climate Change in Karnataka” sanctioned
preparing Strategy and Action plan for
in 2016 for Rs.24, 21,52,632/- by MoEF&
meeting forest and tree cover under
CC, New Delhi is being undertaken by
Nationally Determined Contributions (NDC)
Karnataka livestock Development Agency
targets for the State of Karnataka. Present
(KLDA), Animal Husbandry and Veterinary
study done in collaboration with University
Services (AH&VS). From the total
of Agriculture Science Bangalore is for a
sanctioned amount of Rs.9.34 crores (2016-
period of 3 months and with the specific
2019),an amount of 4.99 crore (Second
objectives. 1. To estimate the total carbon installment) has been released on 23rd
stock created from various tree planting August 2019 to the implementing agencies-
programs taken up in the recent past, 2. To KVAFSU/NDRI/KSWDC. An amount of
estimate the carbon stock accrued from Rs.493.60 lakh was spent up to
these tree planting programs by the year 30/10/2019 and the balance amount is
2030 without significant anthropogenic Rs.450.67 lakhs. As on date, a total amount
and natural interference, 3. To arrive at of Rs 496.60 lakh has been utilized by the
possible interventions needed to create a implementing agencies. The work is under
carbon sink capacity of 2.5 to 3.0 billion progress.
tones of CO2 equivalent by 2030. The study
is under progress. b) The following NAFCC Fund projects
submitted in 2018 are under review at
7. Case studies NABARD.
Under the theme, Adaptation/Mitigation 1. Building resilience to climate change
strategies for climate change studies through revival of traditional agro-
were undertaken for evaluating the fishery system in coastal Karnataka by
departmental schemes. A case study on Environmental Management and Policy
Krishi Aranya Prothsaha Yojane (KAPY) of Research Institute (EMPRI).
KFD is studied and published in My Forest
Journal (March issue, 2019). Case study for 2. Karnataka Farmer Tree Support Project
evaluating the scheme, Pradhan Mantri (for Bidar and Chitradurga Districts) by
Krishi Sinchayee Yojana for Watershed Karnataka Forest department.
Development is initiated. 3. Karnataka State Action plan for
8. Internship project Climate Change and Human Health
(KSAPCCHH) by Department of Health
A project, “Study of distribution pattern of and Family Welfare.
flora in Bugurikallu permanent
preservation plot of Banneraghattta 4. Bio-fuel Programme at KSRTC-
National Park, using GIS tools” has been blending of biodiesel with Diesel by
carried out by Ms. Bhuvaneshwari Karnataka Road Transport Corporation
Karamudi (Reg no. 1701301008), a (KSRTC).
bonafide student of Karnataka State Rural 5. Construction, Supply, Installation,
Development and Panchayatraj University, Co m m is s io n in g , Op e r a tio n a n d
Gadag in partial fulfillment for the award of Maintenance of 20K LD and capacity
Master of Science in Geo-Informatics of the effluent treatment plants in KSRTC bus
KSRDPR University, Gadag. depots at 40 locations by Karnataka
Road Transport Corporation (KSRTC).
Economic Survey of Karnataka 2019-20 403

6. Drought Monitoring forecasting and interactions to climate change:


Agro-Meteorological advisories for Potential shifts and mitigation
adaptation to climate smart agriculture strategies".
at Micro Level in Karnataka by VI. Research papers published/
Karnataka Natural Disaster Monitoring communicated.
Centre (KSNDMC).
1. Hema N, O.K. Remadevi, C. Ramesha,
V. Capacity Building for in house staff K.H. Vinaya Kumar and RituKakkar
Lecture series (2019). The Socio-Economic and
Environmental Perceptions of the Metro
r For improving the capacity of the Rail Commuters: A case study of
Research Staff at EMPRI, a Capacity Bengaluru City. Indian Journal of
BuildingProgramme is initiated in the Spatial Science.10 (2) : 14 – 19.
month of September, 2019. Research
Persons from different institutes are 2. Saritha B, O.K. Remadevi, K.H. Vinaya
invited for giving lectures. So far six Kumar and RituKakkar (2019).
talks are delivered by the experts as per KrishiAranyaProthsahaYojane, An
the list below. Agro-forestry Scheme for Climate
Change Mitigation-A Case Study. My
r During September 2019, Professor
Forest. 55(1): 51-61.
Govinda Swamy Bala from Centre for
Atmospheric and Oceanic Sciences, 3. Ritu Kakkar, K.H. Vinaya Kumar, O.K.
Indian Institute of Science deliberated a Remadevi, Balasubramanya Sharma,
talk on – “what is the ultimate fate of M. Manjunatha, B. Saritha, Kiranraddi
anthropogenic co2 in the atmosphere?” M., H.S. Dattaraja and H.S. Suresh.
Then, Prof. P.P. Nageswara Rao, Retired
Floral Diversity studies in the
Scientist from ISRO and Faculty
Permanent Preservation Plot of tropical
Member at VTU-EC/KSRSAC, GOK
deciduous forest region, Bannerghatta
spoke on the topic “Geoinformatics
National Park, Eastern Ghats,
Applications in natural resources and
Southern India (submitted to Journal of
climate change management”.
Tropical Ecology).
r While, in the month of October 2019,
two resource persons namely Dr. 4. Minhui, Hao; Gadow, Klaus von; Alavi ,
Mahesh Kashyap, a former faculty SeyedJalil; Álvarez-González, Juan
member from CiSTUP, Indian Institute Gabriel; Baluarte-Vásquez, Juan;
of Science and consultant at EMPRI and Corral-Rivas, Javier; Hui, Gangying;
Dr.UlkaKelkar, Director, Climate, WRI Korol, Mykola; Kumar, Rajesh; Liang,
India and her team delivered a talk on Jingjing; Meyer, Peter; Remadevi, OK;
“Environmental protection–learning Kakkar, Ritu; Liu, Wenzhen; Zhao,
from others” and “Tools and Xiuhai; Zhang, Chunyu, 2019.
methodologies to integrate climate and A Classification of 35 Natural Forest
sustainability considerations into Communities based on Biological
development” respectively. Dissimilarity. Submitted to Applied
r In November 2019, Professor K.S. Bhat, Vegetation Science - Manuscript ID AVS-
Retired Professor from Osmania RA-02487.
University shared his experience on the VII. Centre for Capacity Building:
lines of “Paradigm shifts in our
environment and priorities for action Capacity building as "activities which
research to protect climate changes”. strengthen the knowledge, abilities, skills
Secondly, Dr P.V.R. Reddy, Principal and behaviour of individuals and improve
Scientist, Indian Institute of institutional structures and processes such
Horticultural Research, Bangalore that the organization can efficiently meet its
delivered a talk on "Plant-Pollinator mission and goals in a sustainable way." It
404 Economic Survey of Karnataka 2019-20

is, however, important to put into Katte & Kunte), land use and land cover
consideration the principles that govern changes analysis over the time period using
community capacity building. Geographic Information System
In the year 2019-20 a total of 32 (up to the application; Unique Identification Code
end of November -2019) training (UID) for all water bodies, Identification of
programmes were organized and 10,539 pollution sources, encroachments; Physico-
Participants have been trained (Plastic Ban chemical analysis and biodiversity
Notification 2016, Biomedical Waste documentation, Estimated economic value
Management and Solid Waste Management, of the major lakes; preparation of Lake
Environmental laws & Climate Change ) for Health Card. During the study an effort has
Officers and staff of various departments, been made to understand the present status
staff and students of Eco- clubs, members of of the water bodies in the study area in a
Hoteliers Association, members of Self-help holistic manner, for formulating
groups, NGOs and general public. conservation strategies which would help
the Policy makers, administrators and the
Awareness Creation: stakeholders to look into the integrated
management of the water bodies.
It includes following activities
1. Participated in exhibition organized by 2. Documentation of the Yettinahole
Bruhat Bengaluru Mahanagara Palike Project Sites and Assessment of
and display of banned plastic products Cumulative Impact of Multiple
and eco-friendly alternatives to be used Projects in a Forested Landscape:
for creating awareness on ill effects of The Government of Karnataka (GoK)
plastic on environment and living through Karnataka Neeravari Nigama
beings at Freedom park Limited (KNNL) has initiated Yettinahole
2. Published audio message about Plastic Integrated Drinking Water project in
ban notification in Selected Bengaluru Sakleshpura Taluk of Hassan District, to
KSRTC bus stations. the drought prone areas such as Kolar,
Chikkaballapura, Ramanagar, Bangalore
The following activities are planed this year Rural, Tumakuru, parts of Chikkamagaluru
to raise awareness of the "plantic ban". & Hassan Districts. A cumulative
r Activity 1 : Distribution of cloth bag, environmental impact assessment is under
paper bags, plastic prohibition progress.
notifications with message. 3. Reassessment of Water Quality in the
VIII. Centre for Lake Conservation Existing Drinking Water Supply
System in Bangalore:
1. Developing Conservation Strategies
for the Water bodies in Huballi As a follow-up of the study on 'Water Safety
Dharwad Municipal Corporation Plan for Bangalore'the EMPRI has
(HDMC); successfully completed the above title study
in the existing water supply system at three
Environmental Management and Policy levels (at Source, Transmission and User
Research Institute (EMPRI), Bengaluru, end) of the study area (Halasuru –Ward 90
under the financial assistance from Centre and Bharathinagar-Ward 91), for the
for Infrastructure, Sustainable parameter such as pH, Iron, Lead, Free
Transportation & Urban Planning (CiSTUP), chlorine, Total-coliforms and Faecal-
IISc., Bengaluru has completed the above coliforms and has submitted the report to
entitled study and has prepared the report. the Government.
The same report will be released shortly.
IX. Outreach Activities.
The study has addressed the present status
of the 101 inventorized water bodies (54 i) Environmental Information System
existing and 47 disused, preparation of the (ENVIS): Environmental Information
water bodies database (including Kere, System Ministry of Environment and Forest
Economic Survey of Karnataka 2019-20 405

& Climate Change (MoEF & CC) has notified System (GRIDSS) of Ramanagara
EMPRI as the nodal agency for ENVIS in District was released in April 2019.
Karnataka and has the responsibility of r The focus of ENVIS has been to provide
running the ENVIS Centre from dated environmental information to decision
01-01-2009. makers, policy planners, scientists and
Following are the components of engineers, research workers etc.
Karnataka ENVIS Centre: ii) National Green Corps (NGC)
Programme
r Indian State level Basic Environmental
Information Database (ISBEID): An National Green Corps is a major initiative of
environment related database on 17 MoEF& CC launched in 2001.The objective
modules are accessible in the of the programme is to establish “National
http://www.isbeid.gov.in/. Green Army" in schools all over the state to
r ENVIS website contains 9 sections create awareness on environment and carry
namely State of Environment & out action based programmes for protection
Related Issues, Environment News, and improvement of environment. EMPRI is
publications, events, kids centre, serving as Nodal Agency for NGC in
glossary, major activities, performance Karnataka, since Jan, 2009. The details of
report and bibliography can be accessed eco-club schools given in Table 8.4.1.
in the link www.karenvis.nic.in. Eco-Clubs each year undertake various
r ENVIS newsletter: 53 issues of activities at three levels. The first level of
'Parisara' Newsletter have been activity namely awareness based activity eg.
published and can be accessed in the Rally/jathas, expert talks, educative film
link www.karenvis.nic.in shows/seminars, the second level activity is
more about action and observation like
r Under the Grid based decision survey outings, data collection, record
support system (GRIDSS): Scheme for keeping and the third level activity is more
Sustainable Management of Natural action oriented which entails activities like
Resources, GRIDSS program for the FY Plantations, vermicomposting, water/
2019-20 in consultation and with the energy conservation and sanitation. Each
approval of ENVIS Secretariat, Eco-club schools with NGC (National Green
MoEF&CC for mapping of district data Corps) entitled for Rs.5000/- to carry out
at 9 x 9 km. EMPRI – ENVIS hub NGC activities for the year 2018-19. The
Bangalore, was assigned 14 districts of NGC team is involved in providing
Karnataka to carry out GRIDSS continuous support and assistance to
Program. Out of 14 districts mapping of implement and strengthen the progamme
9 districts has been completed. by conducting regular school visits and also
r A report on “National Environmental conducting training/ workshops for eco-
Survey (NES) Grid Based Resource club teacher in-charge and the district level
Information and Decision Support officers

Table 8.4.1 : Details of eco-club schools


No. of Eco-clubs formed till
Sl. No. Category of School
September 2019

G overnment schools and


1 14,132
Government Aided schools

Total 14,132
406 Economic Survey of Karnataka 2019-20
INDUSTRY CHAPTER 9

9.1 INTRODUCTION by electricity sector (11.8%) and the mining


sector (6.9%).
Karnataka has been spearheading the
growth of Indian industry, particularly in Index of industrial production (IIP) with base
terms of high-technology industries in the year as 2004-05 of Karnataka covering
areas of electrical and electronics, mining, manufacturing and electricity
information & communication technology sectors and the General Index for current
(ICT), biotechnology and, more recently, year 2018-19 stood at 201.03 The sector
nanotechnology. The industrial structure of wise indices for the period from 2016-17 to
Karnataka presents a blend of modern high- 2018-19 with base year as 2004-05 are
tech capital goods and knowledge intensive presented in Table 9.1. The overall
industries on the one hand and traditional organized industrial sector of Karnataka
consumer goods industries on the other. has registered 4.03% growth in 2018-19 as
Given this, this chapter throws light on the compared to 2017-18. Within the organized
industrial growth of Karnataka in 2018-19 industrial sector, Electricity sector shows
as well as the industrial policy initiatives the highest growth of 11.32% followed by
taken by the Government, among others. the Mining sector 5.89% and Manufacturing
sector registered growth of 3.01%. As a
9.2 TRENDS IN INDUSTRIAL result of this moderate growth rate of 4.03%
PRODUCTION was observed.
Trends in industrial production can be The average annual growth rates for the
analyzed by considering the changes in the overall organized industry mainly for
index of industrial production (IIP). Towards mining, manufacturing and electricity
calculating the index, the weights of sectors for the period from 2005-06 to
different sectors and sub-sectors are 2018-19 with base year as 2004-05 are
assigned based on their contribution to presented in Appendix 9.1. The compound
Gross Value Added (GVA) of industry in the average growth rate (CAGR) for this period
base year. The manufacturing sector has for the entire organized industry was about
the highest weight of about 81.1% followed 5.11% whereas it was 5.46% for

Table 9.1: Index of Industrial Production of Karnataka: 2016-17 to 2018-19


Base Year: 2004-05
Sector Weight 2016-17 2017-18 2018-19
78.11 79.52 84.20
Mining 69.8321
(12.59) (1.81) (5.89)
199.08 204.34 210.49
Manufacturing* 811.3591
(2.47) (2.64) (3.01)
180.52 184.24 205.10
Electricity 118.8089
(-7.96) (2.06) (11.32)
188.43 193.24 201.03
General Index 1000.000
(1.42) (2.55) (4.03)
Note: 1) Figures in brackets indicate percentage changes over the previous year.
2) * Provisional figures.
Source: Directorate of Economics & Statistics.

407
408 Economic Survey of Karnataka 2019-20

manufacturing and 5.26% for electricity. A to 2019-20 with base year 2004-05 along
decline of 1.22% was seen in the output of with the sector-wise weights are given in
the State's mining sector. Table 9.2. The State's industrial sector has
The quarterly growth rate in IIP under major experienced positive growth rate in Mining &
sectors for the first & second quarter April to Manufacturing sector whereas in Electricity
June and July to September from 2017-18 sector negative growth rate was observed in
both the quarters for the year 2019-20.
Figure 9.1: Index of Industrial Production of Karnataka-2016-17 to 2018-19

Index of Industrial Production Sector Level

250
200
150
Index

100
50
0
2016-17 2017-18 2018-19
Mining Manufacturing Electricity

Table 9.2: Quarterly Growth in IIP: 2017-18 to 2019-20 (First & Second Quarter)
Base Year: 2004-05
Period /S ector Mining Manu facturing * E lectricity General
Weight 69.8 3 811 .36 11 8.81 1 000. 00
2 0 17 -18
78.2 9 186 .87 17 8.19 178.2 6
Q1 April 1 7- June 17
(9.9 3) (2.6 1) (2 .15) (2.77 )
Q2 July 17- Se pt 17 78.8 3 203 .02 16 3.90 189.7 0
(-10 .09) (2.6 3) (14 .22) (3.29 )
2 01 8 -1 9
82.4 7 192 .57 19 8.98 185.6 5
Q1 April 1 8- June 18
(5.3 4) (3.0 5) (11 .67) (4.15 )
Q2 July 18- Se pt 18 89.2 6 208 .77 16 4.46 195.1 6
(13. 23) (2.8 3) (0 .34) (2.88 )
2 01 9 -2 0
95.0 0 198 .37 19 8.56 191.1 7
Q1 April 1 9- June 19
(15. 19) (3.0 1) (-0 .21) (2.97 )
Q2 July 19- Se pt 19 98.0 1 213 .70 14 3.59 197.2 9
(9.8 0) (2.3 6) (-1 2.69) (1.09 )

1. *Provisional
2. Figures in the brackets indicate %age over the corresponding quarter during Previous year.
Source: Directorate of Economics & Statistics.
Economic Survey of Karnataka 2019-20 409

Figure 9.2: Quarterly Growth Rate in IIP: 2017-18 to 2019-20


(First & Second Quarter )

Index of Industrial Production Sector level

250.00

200.00

150.00
Index

100.00

50.00

0.00

Quarter 1 Quarter 2

9.3 INDUSTRIAL GROWTH BY USE- Comparative growth rates of the four broad
BASED CLASSIFICATION industrial groups and the two sub-groups of
Industrial growth in terms of use-based consumer goods from 2016-17 to 2018-19
classification of industries is presented in with base 2004-05 are given in Table 9.3.
Table 9.3 for four broad groups of organized For 2018-19, among the four broad groups,
manufacturing industries: (i) Basic goods, Consumer goods registered the highest
(ii) Capital goods, (iii) Intermediate goods, growth of 3.13% followed by Basic goods at
and (iv) Consumer goods consisting of 3.08%, Intermediate goods at 3.01% &
durables and non-durables. Among the four Capital goods 2.69%. For the period 2005-
broad groups, the consumer goods industry 06 to 2018-19, with the base year as 2004-
sector accounts for the highest weight 05, the CAGR for all the groups in
followed by the basic goods industry. Within Manufacturing sector was 5.65% of which
the consumer goods industry sector, non- Basic goods stood at 5.46%, Capital goods at
durables account for 24.7% and durables 6.01%, Intermediate goods at 6.70% and
account for 3.7% of the total weight of Consumer goods at 4.44%. Details of the
28.5%. These weights indicate relative compounded growth rates are presented in
importance of the different groups in the Appendix 9.2.
manufacturing industry of Karnataka.
410 Economic Survey of Karnataka 2019-20

Table 9.3: Index of Industrial Production for Organized Manufacturing Industry in


Karnataka – Use-based Classification: 2016-17 to 2018-19
Base Year: 2004-05
Sl.
Industry Group Weight 2016-17* 2017-18* 2018-19*
No.
194.65 199.75 205.91
1. Basic goods 219.8377
(1.75) (2.62) (3.08)
215.04 220.44 226.38
2. Capital goods 132.8699
(2.55) (2.51) (2.69)
234.75 240.78 248.03
3. Intermediate goods 173.5747
(2.70) (2.57) (3.01)
173.34 178.18 183.76
4. Consumer goods 285.0769
(2.85) (2.80) (3.13)
127.04 130.11 133.76
a) Consumer durables 37.4330
(2.21) (2.41) (2.81)
180.34 185.45 191.31
b) Consumer non-durables 247.6439
(2.92) (2.84) (3.16)
199.08 204.34 210.49
Total (Manufacturing sector) 811.3591
(2.47) (2.64) (3.01)
Note : 1. Figures in brackets indicate percentage change over the previous year.
2. * Provisional Figures.
Source: Directorate of Economics and Statistics.

Figure 9.3: Index of Industrial Production for Organized Manufacturing Industry in


Karnataka – Use-based Classification: 2016-17 to 2018-19

Index of Industrial Production


Use Based Classification
300

250

200
Index

150

100

50

0
2016 -17 2017 -18 2018 -19

Basic goods Capital goods


Intermediate goods a) Consumer durables
b) Consumer non -durables
Economic Survey of Karnataka 2019-20 411

9.4 INDUSTRIAL GROWTH BY TWO 9.5 ORGANIZED MANUFACTURING


DIGIT INDUSTRIAL CLASSIFICATION SECTOR
At the two digit NIC-04 level, manufacturing The Annual Survey of Industries (ASI)
industry sector has been sub-divided into presents detailed statistics on the
22 major industry groups. Among the major manufacturing sector of the organized
industry groups, Basic Metals have the industrial sector. Table 9.4 presents ASI
highest weight of 119.93 followed by statistics for registered factories for 2015-16
Chemical and chemical products (107.89) & and 2016-17 for Karnataka and All-India.
Food products & beverages (71.30). These Karnataka accounted for 5.68% of the total
three groups contribute more than 1/3rd of registered factories in 2016-17 in the
total weight (811.36), for the base year country. The contribution of registered
2004-05. factories of Karnataka stood at 5.68% of
During 2018-19, among the two digit level total fixed capital, 6.90% of total output and
industries, highest index is observed in 7.11% of Gross Value Added in the same
group 22- Publishing & Printing Materials year. The share of Karnataka in total
(364.14) followed by group 20- Wood and registered factories has marginally
Wood products (267.62),34- Motor vehicles, increased in 2016-17 as compared to
Trailers and semi – Trailers (265.96), group 2015-16. However, the relative contribution
29- machinery equipment (257.59), group of Karnataka's registered factories to the
35- Other Transport Equipment (242.60). national industrial performance in terms of
The indices for two-digit level industries working capital, total input and output,
from 2006-07 to 2018-19 with base year gross and net value added and profits has
2004-05 are given in Appendix 9.3. It is marginally increased, fixed capital has been
observed that the growth rate has decreased decreased during the same period.
during 2008-09 & has sudden shoot up in According to ASI2016-17 with NIC-2008,
2009-10 & observed a fluctuation in 2011- the major industrial groups in the registered
12 & 2012-13, decreased during 2013-14, factory sector of Karnataka in terms of value
2014-15, 2015-16 & marginal growth was of output are (i) Manufacture of Food
observed from 2016-17 to 2018-19. Products (15.75%)(ii) Manufacture of Coke

Table 9.4 : Selected Key indicators of Registered Factories: Karnataka & All-India
(Rs. crore)
2015-16 2016-17
Particulars % %
Karnataka India Karnataka India
share share
Industries (No) 12,973 2,33,116 5.57 13,344 2,34,865 5.68
Fixed Capital 1,73,736 28,09,647 6.18 1,81,221 31,90,386 5.68

Working Capital 51,846 7,40,530 7.00 59,009 6,63,083 8.90

Total Output 4,37,723 68,62,354 6.38 5,01,647 72,65,514 6.90

Total Input 3,59,037 55,89,074 6.42 4,04,355 58,97,464 6.86

Gross value added 78,685 12,73,280 6.18 97,292 13,68,050 7.11

Net value added 64,265 10,72,485 5.99 82,766 11,45,919 7.22


Profi t 26,660 5,13,193 5.19 39,995 5,39,353 7.42

Source: Central Statistics Office (CSO),GOI


412 Economic Survey of Karnataka 2019-20

and refined petroleum products (11.26%) (iii) Karnataka compares favorably with all-
Manufacture of Basic Metals (11.09%) (iv) India in terms of all the indicators – per
Manufacture of Motor vehicle, trailers &semi factory employment, output and gross value
trailers(8.32%) (v) Other manufacturing added. Though registered factories of
materials (8.21%)(vi) Manufacture of Karnataka, on an average are more capital
Machinery and equipment (7.01%) (vii) intensive than that of all-India, they are also
Manufacture of Wearing Apparels (3.99%) more employment-intensive and generated
and (viii) Manufacture of Electrical more value added as well as output.
Equipment (3.91%). These eight industry
The selected economic indicators per worker
groups together accounted for more than
for Karnataka and All-India are given in
70% of the total value of output of registered
Table 9.6. Annual wages per worker reveal
factories of Karnataka in 2016-17. Details
that Karnataka was better-off than the all-
are presented in Appendix 9.4.
India, while the State lagged behind in total
The important indicators per registered output and input per worker and Net value
factory based on ASI results for 2015-16 and added with all India in 2016-17.
2016-17 are presented in Table 9.5.

Table 9.5 : Important Indicators per Factory


2015-16 2016-17
Indicator Unit
Karnataka India K arnataka India

Investment in fixed capital Rs. Lakh 1339.21 1205.26 1358.07 1358.39

Employment No. 77.47 61.34 79.81 63.49

Value of output Rs. Lakh 3374.11 2943.75 3759.34 3093.49


Gross Val ue Added Rs. Lakh 606.53 546.20 729.10 582.48
Source: Central Statistics Office (CSO), GOI

Table 9.6 : Selected Economic Indicators of Industries (2010-11 to 2016-17)


Labour
productivity Total input Total output Annual wages per
(Net value added per worker per worker worker
Year per rupee in (Rs. Lakh) (Rs. Lakh) (Rs.)
wages)
Karnataka India Karnataka India Karnataka India Karnataka India

2010-11 6.80 8.30 38.90 38.80 46.90 47.20 97,406 86,449

2011-12* 6.54 7.59 39.94 45.88 47.81 54.55 99,948 95,662

2012-13 5.98 7.68 50.42 49.93 60.02 59.95 1,34,364 1,10,327

2013-14 5.68 7.08 53.41 52.57 62.99 62.76 1,37,892 1,21,114

2014-15 5.25 6.94 52.12 53.17 61.72 64.00 1,44,963 1,30,619

2015-16 5.27 6.87 46.70 50.19 56.94 61.62 1,58,744 1,40,086

2016-17 5.66 6.60 48.85 50.57 60.61 62.30 1,76,598 1,48,794

Source: Central Statistics Office (CSO), GoI* Revised data as per CSO, GOI
Economic Survey of Karnataka 2019-20 413

9.6 MICRO, SMALL & MEDIUM units in Karnataka (Cumulative) is shown in


ENTERPRISES Appendix 9.5.
Micro, Small & Medium Enterprises As compared to 2017-18, there is a 42.89%
(MSMEs) form an important and growing increase in the number of units registered,
segment of Karnataka's industrial sector. As 28.41% increase in investment and 32.34 %
per the MSME Act 2006, MSME units have increase in number of persons employed
been categorized broadly into those engaged during 2018-19. During the first 8 months
in manufacturing and those providing of the current year (April-2019 to Nov.2019),
/rendering services. Under the Act, Micro, 60230 units have been registered with an
Small and Medium Enterprises (MSMEs) are investment of Rs.1029434 lakh by providing
classified as under employment to 460714 persons. When
During 2018-19, 69278 MSME Units have compared to previous year for the same
been registered in the State with an period (April-2018 to Nov.2018), there is a
investment of Rs. 1487698 lakh by increase of 3.27 % in the number of units
providing employment to 582943 persons. registered under MSME with 17.00%
Details of year wise registration of MSMEs in increase in investment and 25.68% increase
the State, persons employed in the in the employment generated. Details of the
registered MSME enterprises and MSMEs registered in Karnataka and
employment per unit during 2013-14 to number of units registered every year in
2019-20 up to November are given in Table Karnataka has been increasing since
9.7. Registration of Small-Scale Industrial 2011-12 are given in Table 9.8.

Investment in Plant & Machinery Investment in Equipment


Enterprises
(Manufacturing) (Service)

Micro Up to Rs. 25 lakh Up to Rs. 10 l akh

Small Above Rs.25 lakh up to Rs.5 crore Above Rs.10 lakh up to Rs.2 crore

Medium Above Rs.5 crore up to Rs.10 crore AboveRs.2 crore up to Rs.5 crore

Table 9.7: Micro, Small & Medium Enterprises: 2013-14 to 2019-20


Employment
Year MSME Units Employment
Per Unit

2013-14 25966 167347 6.44

2014-15 28742 175469 6.10

2015-16 25656 221706 8.64

2016-17 39170 508966 12.99

2017-18 48482 440476 9.08

2018-19 69278 582943 8.41

2019-20
60230 460714 7.64
(up to Nov. 2019)

Up to November 2019
Source: Directorate of Micro, Small and Medium Industries.
414 Economic Survey of Karnataka 2019-20

Out of 69278 units that were registered in investments followed by Manufacturing of


Karnataka during 2018-19, about 9.43% Textiles with 6.10% investment. Details of
(i.e. 6539 units) of the units were related to the top ten products classified by
manufacturing of of Textiles which occupied investments are provided in Table 9.10.
the top position followed by Manufacturing In terms of employment also, Manufacturing
of Food Products and Beverages 8.26% of Wearing Apparel; dressing and Dyeing of
registration. Details of the top ten products Fur stood first by generating about 7.76% of
in which units were established during the total employment closely followed by
2018-19 are given in Table 9.9. Manufacturing of Food Products and
During 2018-19 Manufacturing of Food Beverages with about 7.53% employment.
Products and Beverages occupied the top Details of employment generated in the
position in 6 terms of investment units registered during 2018-19 are given in
accounting for about 11.08% of the total Table 9.11.

Table 9.8: Details of MSMEs registered in Karnataka 2011-12 to 2019-20


2019-
20 (Up
Year 2011-12 2012-13 2013-14 2014-15 2015-16 2016 -17 2017- 18 2018-19
to Nov.
2019)

Units (Nos.) 19610 22169 23229 26005 21769 30511 39509 56450 49509

Invt.
Micro 43650 66019 79416 87609 122131 213140 252544 329929 290421
(Rs. lakh)

Empl. Nos.) 86216 105029 110070 121599 119614 213450 224597 297999 245881

Units (Nos.) 1370 1981 2661 2661 3740 8216 8568 12277 10283

Invt.
Small 91266 116791 144096 138516 277468 746088 640154 826535 654603
(Rs. Lakh)

Empl. Nos.) 34400 46029 46741 47311 86176 239711 181438 241096 177933

Units (Nos.) 41 56 76 77 147 443 405 551 438

Invt.
Medium 24724 34041 61545 53168 94993 307186 265877 331234 264410
(Rs. Lakh)

Empl. Nos.) 7771 4493 10536 6563 15916 55805 34441 43848 36900

Units (Nos.) 21021 24206 25966 28742 25656 39170 48482 69278 60230

Invt.
Total 159641 216851 285056 279291 494592 1266414 1158575 1487698 1209434
(Rs. Lakh)

Empl. Nos.) 128387 155551 167347 175469 221706 508966 440476 582943 460714

Up to November 2019
Source: Directorate of Micro, Small and Medium Industries.
Economic Survey of Karnataka 2019-20 415

Table 9.9: Top-10 products (by number of units) registered in 2018-19

Sl. NIC- No. of Investment Employment


Products
No. 2008 Units (Rs. Lakhs) (Nos.)

1. Manufacturing of Textiles 13 6539 90755 40252

Manufacturing of Food Products and


2. 10 5729 164901 43928
Beverages

Manufacturing of Wearing Apparel;


3. 14 4898 55383 45294
dressing and Dyeing of Fur

Manufacturing of Machinery and


4. Equipment N.E.C 28 2490 82261 20695

Manufacturing of fabricated Metals


5. Products, Except Machinery and 25 2285 65450 20035
Equipment
Manufacturing of wood, products of
6. Wood, Cork, Articles of Straw & Plating 16 1438 22857 9186
Materials, except furniture

Manufacturing of Other Non-Metallic


7. 23 1207 39967 11955
Mineral Products

8. Manufacturing of Rubber and Plastic 15 983 53321 11431


Products

Manufacturing of Chemical & Chemicals


9. 20 982 24594 7732
Products

Manufacturing of Furniture,
10. 31 860 14849 6384
Manufacturing N.E.C

Grand Total during 2018-19 (63 Classification) 69278 1487698 582943

Source: Directorate of Micro, Small and Medium Industries.


416 Economic Survey of Karnataka 2019-20

Table 9.10: Top-10 products (by investment) of units registered in 2018-19

Sl. NIC- No. of Investment Employment


Products
No. 2008 Units (Rs. Lakhs) (Nos.)

Manufacturing of Food Products and


1. 10 5729 164901 43928
Beverages

2. Manufacturing of Textiles 13 6539 90755 40252

Manufacturing of Machinery and


3. 28 2490 82261 20695
Equipment N.E.C

Manufacturing of fabricated Metals


4. Products, Except Machinery and 25 2285 65450 20035
Equipment

Manufacturing of Wearing Apparel;


5. 14 4898 55383 45294
dressing and Dyeing of Fur

Manufacturing of Rubber and Plastic


6. 15 983 53321 11431
Products

Manufacturing of Other Non-Metallic


7. 23 1207 39967 11955
Mineral Products

Manufacturing of Chemical & Chemicals


8. 20 982 24594 7732
Products

Manufacturing of wood, products of


9. Wood, Cork, Articles of Straw & Plating 16 1438 22857 9186
Materials, except furniture

Manufacturing of Furniture,
10. 31 860 14849 6384
Manufacturing N.E.C

Grand Total during 2018-19 (63 Classification) 69278 1487698 582943

* NIC-2008: National Industrial Classification Code, **NEC: Not Elsewhere Classified.


Source: Directorate of Micro, Small and Medium Industries.
Economic Survey of Karnataka 2019-20 417

Table 9.11: Top-10 Products (by employment generated) of units registered in


2018-19

Sl. NIC- No. of Investment Employment


Products
No. 2008 Units (Rs. Lakhs) (Nos.)

Manufacturing of Wearing Apparel;


1. 14 4898 55383 45294
dressing and Dyeing of Fur

2. Manufacturing of Food Products and 10 5729 164901 43928


Beverages

3. Manufacturing of Textiles 13 6539 90755 40252

Manufacturing of Machinery and


4. 28 2490 82261 20695
Equipment N.E.C

Manufacturing of fabricated Metals


5. Products, Except Machinery and 25 2285 65450 20035
Equipment

Manufacturing of Other Non-Metallic


6. 23 1207 39967 11955
Mineral Products

Manufacturing of Rubber and Plastic


7. 15 983 53321 11431
Products

Manufacturing of wood, products of


8. Wood, Cork, Articles of Straw & Plating 16 1438 22857 9186
Materials, except furniture

Manufacturing of Chemical & Chemicals


9. 20 982 24594 7732
Products

Manufacturing of Furniture,
10. 31 860 14849 6384
Manufacturing N.E.C

Grand Total during 2018-19 (63 Classification) 69278 1487698 582943

Source: Directorate of Micro, Small and Medium Industries.


418 Economic Survey of Karnataka 2019-20

9.7 SELECTED INDUSTRIAL SECTORS storage grading, sorting, packaging


9.7.1. Status of Implementation of Food machines, weigh bridge facilities have
parks: been completed. The civil works for the
buildings ware house, administrative
I. Status of Implementation of Food block and R&D centre are in the
parks: completion stage. The implementing
agency has allotted 52.5 acres of
Food Karnataka Ltd., has been nominated
land for 18 food processing units/
as the nodal agency to look after the
companies and the balance land
implementation at the following Food Parks
available for allotment is 2.25 acres. The
in the State. Ministry of Food Processing
total project cost reported by the
Industries, Govt of India, under the 10th five
company as on 19.11.2018 is Rs.
year plan had approved the establishment of
2241.05 lakhs. The Government of
food parks in Malur(Kolar District), Hiriyur
Karnataka has released an amount of
(Chitradurga District), Bagalkote (Bagalkote
Rs 400Lakhs and Government of India
District) and Jewargi (Kalburgi District) to
has released an amount of Rs. 300
give impetus to value addition to agriculture
Lakhs so far as against the total
and horticulture produce. The status of
sanctioned amount of Rs. 800 lakhs.
implementation of these food parks are as
Totally 06 food processing units are
detailed below:
currently functioning in the park.
1. M/s Innova Agri Bio Tech Park
3. M/s. Akshaya Food Park Limited,
Limited, Malur: This Food Park has
Hiriyur: The Food Park has been
been developed in an area of 87 acres
developed in an area of 106 acres and 37
of land in KIADB Industrial Area Malur,
guntas of land at Huchavanahally
Kolar District. To compliment the
village, Hiriyur Taluk, Chitradurga
activities in addition to the food
District. The total project cost is
processing, a gamma irradiation facility
reported by the company as on
has been installed and accredited from
19.11.2018 Rs. 1886.89 lakh. The
USFDA. 50.48 acres in the park has
Government of India and Government of
been allotted to 22 food processing
Karnataka have, sanctioned and
units. The balance land available for
disbursed grant/un-secured loan of Rs.
allotment is 3.08 acres. The total project
400 lakhs each respectively. Totally 08
cost reported by the company as on
food processing units are currently
19.11.2018 is Rs. 2315 lakhs. The
functioning in the park.
Government of India and Government
of Karnataka have sanctioned and 4. M/s. Jewargi Agro Food Park Limited,
disbursed grant of Rs. 400 lakhs each Jewargi: This Food Park is being
(Total Rs. 800 Lakhs) respectively. developed in an area of 105 acres of
Totally 14 food processing units are land. Land development laying of roads,
currently functioning in the park. Also drains is completed. The warehouse is
the export activities have been under the stage of completion. The total
undertaken for exporting Mangoes to project cost reported by the company as
USA and Australia by utilizing the on 21.09.2016 is Rs. 2507 lakh. So far
Gamma Irradiation facility. the Government of Karnataka has
released Rs. 400 Lakhs and
2. M/s. Green Food Park Limited,
Government of India has released Rs.
Bagalkote: This Food Park is being
396. The balance amount has been
developed in an area of 100 acres of
mobilized by the implementing agency.
land at Navnagar KIADB Industrial
The developer has allotted land to 113
Area, Bagalkote. Land development,
entrepreneurs to start food processing
laying of roads, drains, etc. Common
units. Totally 03 food processing units
infrastructure facilities such as cold
are currently functioning in the park.
Economic Survey of Karnataka 2019-20 419

II. Food Parks under the State Scheme: sector which contributed employment and
investments and exports. The department
As part of the State Budget 2008-09, the
is under the administrative control of
Government of Karnataka had approved the
Commerce & industries Secretariat of
establishment of food parks in six
Government of Karnataka.
districts i.e., Bangalore (Rural), Tumkur,
Shivamogga, Davanagere, Vijayapura and Vision:
Belagavi.
To establish the textile and garment
The present status is as under:- industry of Karnataka, as a producer of
internationally competitive value added
1. Shivamogga Food Park: M/s. LMJ
products thereby maintaining dominant
International Limited has been selected
presence in the growing domestic and
as the developer for establishing the
international market and contributing to
food park in an area of 100 acres of land
the sustainable employment and economic
at Sogane Village in NidhigeHobli,
growth of the State. To reinforce the value
Shivamogga District. In view of the very
chain of the exile industry across the State
slow progress of the earlier food parks,
through capital infusion, technology
the Government is examining the
transfer, skill up-gradation and
handing over of land to the developer.
handholding.
However the developer has assured to
complete the park as per the guidelines Objectives:
in a time bound manner and
approached the court for suitable (a) To achieve higher and sustainable
directions to the Government to growth in the entire textile value chain
handover the land. Hence, the matter is from fibre to finished products, with
pending before the Hon'ble court. emphasis on balanced regional
development
2. Vijayapura Food Park: 75 acres of land
(b) To facilitate emerging Technical Textiles
acquired by the Deputy Commissioner,
in critical areas such as production,
Vijayapur at Ittangihala in Vijayapur
technology and research &
District has been allotted to Food
development. The Department will
Karnataka Limited for the proposed
encourage integrated development in
food park. The Government is yet to
the sector aiming to sustainability of the
decide on whether to call for bids for the
textile units in the State
selection of developers in view of
lukewarm progress of other food parks. (c) To support the industry with skilled
human resource and to create
3. Spice Park at Byadagi, Haveri
employment opportunities in the State.
District: The State Government has The Department will support skill
approved the establishment of a Spice development activities for skilling
Park at Byadagi in Haveri district. Food unemployed youth and up-gradation of
Karnataka Ltd has invited expression of skills for the people employed in the
interest twice from the private textile sector
developers. However, there was no
response. An amount of Rs.100 lakhs Functions :
has been given to KIADB for acquiring
land to set up the Park. The focus areas for interventions in the
textile sector were:
9.7.2 Textiles Industries
(a) Strengthening of Textile Value Chain
Background: Activities
Prior to 1992-93 The Department was a part (b) Technical Textiles
of Industries and Commerce. The
(c) Geographical Dispersion of Textile &
department was newly established during
Garment units
1992-93 for the development of the textile
(d) Human Resource Development
420 Economic Survey of Karnataka 2019-20

(e) Infrastructure Development (h) Institutional Development


(f) Technology Up-gradation of entire (i) Standards & Compliance
Textile Value Chain
Details of Handloom Weavers and Looms in
(g) C a p a c i t y B u i l d i n g - M a r k e t the State , Registered Weavers Co-op.
Development, Branding, Design Societies and Particulars of co-operative
Development & Product Diversification Spinning mills in the State are presented in
Table 9.12, 9.13 and 9.14 respectively.
Table 9.12: Details of Handloom Weavers and Looms in the State (As per 2019-20
Handloom census conducted by Govt. of India)
Sl. No. Particulars Rural Urban Total

1 Total Weaver households 28597 5080 33677

2 Weaver Population 22565 4610 27175

a) Male 22394 4203 26597

b) Female 50558 4231 54789


Total 124114 18124 142238

3 Weaving workforce

a) No. of adult weavers 22564 27174 49738

b) No. of adult allied workers 23791 3824 27615

Total 46355 30998 77353

4 Looms

a) Working 24863 4514 29377

b) Idle 3561 601 4162

Total 28424 5115 33539

5 Per capita income of weaver 26320 27360 53680


households (Rs.)

Source: Handloom & Textile Department

Table 9.13: Registered Weavers Co-op. Societies


Sector Total Working Defunct Liquidated

Cotton Handlooms 332 202 69 61

Silk Handlooms 180 121 39 20

W oolen Hand looms 216 160 40 16

Total - HWS 728 483 1 48 97

Powerlooms 216 127 69 20

Total – HW S & PWS 944 610 217 11 7

Mem bers 1 8195 6 1362 88 3 6873 87 95

Source: Handloom & Textile Department


Economic Survey of Karnataka 2019-20 421

728 Handloom and 216 power loom Weavers' Special Package:


cooperative societies are registered, working
r Under the Tribal sub plan Rs.70.20
610 cooperative societies under this
crores has been released for 26
department authority.
beneficiaries for purchase of looms and
The Details of Statistics of Textile units other facilities.
as on 31.03.2019 r In the financial year 2018-19, total
Progress Report for the year April 2018 to amount of Rs.130 crores has been
March 2019 allocated for implementation of
different schemes till March 2019. An
Budget allotment for the year 2018-19 is amount of Rs.114.7620 crores has
Rs.224.82 crores. An amount of Rs.224.82 been released and same has been
crores has been released, and Rs. 221.77 utilized.
crores expenditure for implementation of
Expenditure incurred towards
various schemes.
implementation of projects during the
Rs.570.00 lakhs is released to Rajiv Gandhi year 2018-19 is as under:
Rural Housing Corporation Limited for
construction of Living Cum Workshed to a) Medical Reimbursement for 19
Weavers for the year 2018-19 and Unit cost Weavers Rs.7,12,812/-
of Rs.2.50 lakhs for implementation of this b) 37 Weaver families assisted with
scheme. Rs. 5,000/- last rites expenses
Rs.1,85,000/-

Table 9.14: Particulars of Co-operative Spinning mills in the State


Sl. No. Particulars Nos.

1 Total no. of Co-operative spinning mills in the State 11

2 No. of Spinning mills working on own capital 03

3 No. of Spinning mills working on Contract base 03

4 No. of Spinning mills defunct 05


Source: Handloom & Textile Department

I. Details of Power loom and Handloom Weavers in the State


Sl. No. of No. of No. of No. of
No Pow er loom Weavers Handlooms Weavers

1 1,19,773 2,39,546 29,377 26,73,891

II. Details of Readymade Garment Industries in the State

Sl. No. No. of Units No. of Employment

1 1036 4,41,738

III. Details of Ginning, Spinning and Weaving units in the State


Sl. No. No. of Ginning No. of Spinning No. of Weaving Total

1 317 23 24779 25119

Source: Handloom & Textile Department


422 Economic Survey of Karnataka 2019-20

c) NABARD Reimbursement Scheme-2 introduce the unemployed Scheduled Tribe


Co-operative societies Rs.20,260/- persons to weaving activity by providing
them training, Living cum Workshed,
d) Weavers' Study Tour for 56 Co-
Common facility centre, improved looms
operative societies Rs.28,00,000/-
and accessories, working capital, share
r Under Thrift Fund Scheme 75 capital assistance to become members of
Cooperative Societies were assisted Co-operative Societies, providing preloom
with an amount Rs.39,56,116/-. facilities, providing marketing vehicle etc.,
r Rs. 10.00 Lakhs is released to KHTI, upto 90% subsidy.
Gadag and Jamakhandi. During the year 2018-19, Rs.447.00 lakhs
r Released as subsidy of Rs.17,77,937/- budget has been provided 1762 Scheduled
for purchase of Raw Material to 30 Tribe beneficiaries.
cooperative societies.
Under Weavers' Special Package KHDC:
r In order to encourage the Handloom
Products 20% rebate facility is extended During the year 2018-19, Rs.756.00 lakhs
to 92 Handloom Societies and Rs. 5.45 has been released for implementing general
Crores is spent for this purpose. programmes, Rs.129.75 lakhs for SCP
programmes and Rs.53.25 lakhs towards
r Rs. 63.25 Crores are released to various TSP programmes, to Karnataka Handloom
ESCOMS as Power Subsidy of 29000 Development Corporation.
Powerloom Societies.
r Under 2 Power loom Purchase Scheme Implementation of Garment Policy:
Rs. 83.65 lakhs is released to 49 various During the year 2018-19 Rs.22177.00
beneficiares and Rs. 55.35 Lakhs is lakhs has been allotted & released from
released for 23 beneficiaries for Government Rs.22177.00 lakhs has been
purchase of Electronic Jacquard. utilized. Rs.4990.18143 lakhs has been
r Rs.50.50 Lakhs released in favour of 9 released to 341 MSME Textile Units.
beneficiares under Wool Sector Rs.14531.77859 lakhs has been released to
Development Scheme. 03 Mega Projects for Capital Subsidy, Power
Subsidy and ESI/EPF Reimbursement and
r A total amount of Rs.366.50 lakhs have
Rs.238.54208 Lakhs has been released to
been provided for 3 co-operative
textile park foe development subsidies and
spinning mills in the State for providing
Rs.99.999 Lakhs has been released for the
Electricity at a cost of Rs.2/- per unit.
office Expenditure under Incentives &
r Co-operative spinning mills have been Concessions.
given a subsidy of Rs.26.42 at 5%
concession rate on purchase of cotton r Rs.2316.4989 lakhs has been utilized
from Cotton Corporation of India (CCI). for 18953 General category, 1730
Scheduled Caste and 1713 for
Weavers' Special Package – Special Scheduled Tribe Beneficiaries Total
Component Plan: The Scheme proposes to 22396 under Employment Oriented
introduce the unemployed Scheduled Caste Training Programme.
persons to weaving activity by providing
them training, Living cum Workshed, Progress report for the 2019-20 from
Common facility centre, improved looms April -2019 to November- 2019
and accessories, working capital, share Budget allotment for the year 2019-20 is
capital assistance to become members of Rs.30653.40 lakhs. An amount of
Co-operative Societies, providing preloom Rs.18140.05 lakhs has been released and
facilities, providing marketing vehicle etc., expenditure of Rs. 11634.32 lakhs upto
at 90% subsidy. November 2019 for implementation of
During the 2018-19, Rs.1273.20 lakhs has various schemes. Progress report for the
been released to 3927 SC beneficiaries. 2019-20 upto November 2019 is given in
Table 9.15.
Under Weavers' Special Package – Tribal
Sub Plan: The Scheme proposes to
Economic Survey of Karnataka 2019-20 423

Table 9.15: Progress report for the month of November- 2019

Plan Schemes (Rs. In lakhs)

Sl. Name of the Scheme Expen- Physical Physical


Budget Release
No. and Head of Account diture Target Achievement

Living-cum-workshed-
1. 300.00 225.00 150.00 223 77
Grant

2. Weavers Package 11700.00 7500.00 4996.81 32723 21148

3. Weavers Package- 2000.00 1500.00 878.00 7668 2557


KHDC

Unspent SCSP-TSP
4. amount as per the 953.40 715.05 476.70 26 6
SCSP-TSP Act 2013

Implementation of
5. 1000.00 5000.00 4957.81 25655 10425
Garment Policy

Karnataka Handloom
6. Development 700.00 700.00 175.00 1 1
Corporation Loans

Grand total of all Schemes 16653.40 15640.05 11634.32 66296 34214

Source: Handloom & Textile Department

9.7.3 Sericulture Sericulturists and reelers. During 2018-19


Sericulture is one of the major employment mulberry silk production in Karnataka was
generating sectors in the State and its 11592.308 MTs.
growth has immense employment In order to bring in, more number of farmers
generation potential, particularly in rural under sericulture umbrella, various
Karnataka. The area under mulberry programmes are being implemented. The
cultivation in the State is about 1,07,590.49 stakeholders are being provided with Seed
hectares at the end of November 2019, cocoon bonus/incentive, Bivoltine/MSC
which is higher than the area under chawki cost, Raw silk incentive produced in
mulberry cultivation in 2018-19 (Table Automatic Reeling Machines. Sericulturists
9.16) during the same period. The are also being provided financial assistance
production of cocoons, quantity of cocoons for infrastructure development i.e.,
marketed, raw silk production is low in construction of rearing houses/mounting
2019-20 compared to 2018-19 and total halls, establishment of chawki rearing
employment in industry was high in 2019- centers, drip irrigation etc., and also to
20 compared to 2018-19. Details of the establish Automatic reeling machines,
State's production and imports of silk yarn multi-end reeling machines, cottage/
are presented in Table 9.17. Table 9.18 filature basin reeling machinaries etc.,
provides details of expenditure incurred Increase in the mulberry area confirms the
under various beneficiary oriented fact that sericulture is the only sustainable
programs while Table 9.19 presents details vocation which can generate income to the
of financial assistance availed by rural folks.
424 Economic Survey of Karnataka 2019-20

Table 9.16: Sericulture industry in Karnataka 2014-15 to 2019-20


(Up to November 2019)

April to Variation
Sl. November 2019 over
Category Unit 2014-15 2015-16 2016-17 2017-18 2018-19
No. 2018
(Upto Nov.)
2018 2019

Area under
1 ‘000 he 88.489 87.597 91.492 98.135 104.578 105.224 107.591 (+)2.367
mulberry

Production of ‘000
2 68.759 70.436 68.381 66.833 83.017 53.786 51.955 (-)1.831
cocoons MTs.

Quantum of
‘000
3 Cocoons 48.492 53.541 47.030 43.535 56.001 39.786 28.781 (-)11.005
MTs.
marketed

Raw silk ‘000


4 9.645 9.823 9.571 9.322 11.592 7.504 7.252 (-)0.252
production MTs.

Employment
5 lakhs 11.50 11.388 11.894 12.757 13.595 13.679 13.987 (+)0.308
in sericu lture

Note: MTs –Metric Tonnes, Source: Department of Sericulture.

Table 9.17: Production of raw silk in Karnataka and import of raw silk in India
(Qty: MT)

Production of raw silk Import of raw silk


Year
in Karnataka by India

2012-13 7063 4951

2013-14 8574 3260

2014-15 9645 3489

2015-16 9822.905 3529

2016-17 9571.007 3795

2017-18 9321.51 3712

2018-19 11592.308 2785

2049
2019-20* 7251.24
(Oct. 2019)

* April to September period; Source: DOS, Karnataka & Central Silk Board
Economic Survey of Karnataka 2019-20 425

Table 9.18: Beneficiary oriented Programs for Sericulture (2019-20)


Expen-
2018-19
diture
2019-20
Sl. Head of (Upto end
Programmes Budget Expen - Budget
No. Account of Nove-
Allocation diture allocation
mber
2019)
I State Plan Schemes

1 Sericulture Development Programme

a General 2851-00-107-1-35 (106) 3930.000 3915.851 3599.420 2044.256

Special Component
b 2851-00-107-1-35 (422) 1553.000 1549.719 1423.000 763.798
Sub Plan (SCSP)

c Tribal Sub-Plan (TSP) 2851-00-107-1-35 (423) 776.000 771.069 711.000 397.225

Sericulture Development Programme Total 6259.000 6236.639 5733.420 3205.279


New Initiatives for Sericulture Development &
2
Assistance to Stake holders
a General 2851-00-107-1-48 (106) 4468.000 4442.908 4110.000 2275.546

3 PMKSY

a General 2851-00-107-1-49 (106) 5212.933 5206.511 2110.000 860.291

4 Unspent balance as per 2013 Act


Special Component
a 2851-00-107-1-50 (422) 3.000 2.947 3.580 0.522
Sub Plan (SCSP)
b Tribal Sub-Plan (TSP) 2851-00-107-1-50 (423) 135.000 132.706 2.510 -
6.090 0.522
Unspent balance as per 2013 Act Total 138.000 135.653

5 Civil Works
Special Component
a 4851-00-107-1-01 (422) 46.000 43.560 46.000 26.910
Sub Plan (SCSP)
b Tribal Sub-Plan (TSP) 4851-00-107-1-01 (423) 22.000 21.946 22.000 5.400

Civil Works Total 68.000 65.506 68.000 32.310

6 Unspent balance as per 2013 Act


Special Component
a 4851-00-107-0-01 (422) - - 5.600 -
Sub Plan (SCSP)
State Sector Total 16145.933 16087.217 12033.110 6373.948

Contd...
426 Economic Survey of Karnataka 2019-20

Expen-
2018-19 2019-20
Sl. Head of diture (Upto
Programmes Budget
No. Account Budget Expen - end of Nove-
Allocation diture allocation
mber 2019)
II District Sector Schemes

Zilla Panchayath

5 Assistance to Sericulturists

a Assistance/Relief 2851-00-104-0-30 (100) 743.500 739.443 1029.730 278.211

Special Component
b 2851-00-104-0-30 (422) 126.500 124.335 203.410 53.449
Sub Plan (SCSP)

c Tribal Sub-Plan (TSP) 2851-00-104-0-30 (423) 57.500 53.451 85.880 22.855

ZillaPanchayath Total 927.500 917.229 1319.020 354.515

Taluk Panchayath

6 Production/Productivity Incentive

a Assistance/Relief 2851-00-104-0-61 (100) 123.500 107.082 132.300 0.050

District Sector Total 1051.000 1024.311 1451.320 354.565

III Central Sector Schemes

7 Rastriya Krishi Vikasa Yojane (RKVY)

a General 2401-00-800-1-57 (059) 50.000 50.000 53.000 -

b Subsidies 2401-00-800-1-57 (106) 254.000 224.289 541.200 259.482

Special Component
c 2401-00-800-1-57 (422) 205.000 202.380 118.690 50.174
Sub Plan (SCSP)

d Tribal Sub-Plan (TSP) 2401-00-800-1-57 (423) 88.000 86.595 48.110 20.261

Rastriya Krishi Vikasa Yojane (RKVY) Total 597.000 563.264 761.000 329.917

Central Sector Total 597.000 563.264 761.000 329.917

Total (State Sector + District Sector +


17793.933 17674.792 14245.430 7058.430
Central Sector)

Source: Department of Sericulture.


Economic Survey of Karnataka 2019-20 427

Table 9.19: Financial Assistance provided to Sericulturists and Reelers (2019-20)

April – Nov.
A. 2016-17 2017-18 2018-19
2019-20

Amount Amount Amount Amount


Bene Bene Bene Bene
Particulars ficiaries (Rs. ficiaries (Rs. ficiaries (Rs. ficiaries (Rs.
Lakhs) Lakhs) Lakhs) Lakhs)

1. Financial Assistance provided to Sericulturists

Mulberry Nursery 28 29.858 230 86.350 143 64.550 12 5.360

Mulberry Plantation 881 92.523 2607 362.907 4127 519.430 747 178.175

Purchase of 11813 3412.257 8978 1847.243 6932 1114.567 713 129.955


equipment

Construction of
5619 5117.579 4875 4675.380 3491 4125.301 1101 3013.701
Rearing House

Drip Irrigation
4598 2664.439 5988 3478.619 8668 5206.511 980 860.291
system

Construction of
337 133.744 206 90.514 116 44.330 - -
Mounting halls

Construction of
Chawki Rearing 19 39.212 8 26.113 4 9.229 1 3.959
Centres

Supply of
5754 511.272 23383 620.427 276 46.188 - -
disinfectants

Tree mulberry,
- - 285 41.375 1931 285.264 1199 183.024
Trenching/Mulching

New technology
116 46.434 - - - 138.370 - -
transmission

Bio-fertilizer/Root
rot disease
54009 205.100 5072 311.168 2410 146.387 1920 109.891
controle/Foliar
spray supply

Supply of Bamboo/
- - 61061 505.580 162 35.425 143 37.002
Rotary Mountages

Study Tour, Printing


of Broucher,
Exhibition, - - - - 31986 434.870 37604 171.026
Workshop, Mahila
Prathyakshike

Farmer Producer
- - - - 50.000 1 22.848
Organisation

Contd...
428 Economic Survey of Karnataka 2019-20

April – Nov.
A. 2016-17 2017-18 2018-19
2019-20

Amount Amount Amount Amount


Bene Bene Bene Bene
Particulars ficiaries (Rs. ficiaries (Rs. ficiaries (Rs. ficiaries (Rs.
Lakhs) Lakhs) Lakhs) Lakhs)

Seed cocoon bonus &


16438 865.407 30088 1390.483 17564 1530.911 15715 959.274
incentive

Productivity &
28801 3122.017 30240 2530.080 30258 289.857 - -
production incentive

Transportation Cost
321 9.817 10981 225.399 6618 133.437 2104 41.003
to Bivoltine cocoons

MSC/BivoltineChawki
39269 902.893 242 1512.700 243 1322.060 255 627.555
Cost

Total 17152.552 17704.338 15496.687 6343.064

1. Financial Assistance provided to Reelers

Silk Incentive 2436 1104.470 1408 1080.573 7 161.231 8 104.711

Cottage Basin 242 360.108 148 200.518 107 190.544 57 75.227

Multi-end Reeling
30 338.271 9 102.865 18 227.434 9 112.167
Machine

Automatic Reeling
10 831.240 13 964.800 8 909.583 - -
Machine

Pledge loan to reelers - - - - - - 3 30.000

Reeling Shed/
1151 1109.224 1420 1186.369 982 689.313 377 393.261
Machinaries

Total 3743.313 3535.125 2178.105 715.366

Source: Department of Sericulture.

During 2018-19 action has been taken to be developed at Talaghattapura's


implement the following new programmes Karnataka State Silk Research and
which were announced in the 2018-19 Development Institute (3)An extent of 40
budget speech (1)Thedepartment is acres of land is available under the
proposed to develop Sericulture Tourism jurisdiction of the Sericulture department
(Seri Tourism) on the Bengaluru - Mysuru and sub centre of State Silk Research and
corridor in collaboration with the Central Development Centre at Biligiri Ranga hill
Silk Board. An international level “live area. In this, after developing mulberry tree
museum” will be established in the agriculture, by constructing silk worm
sericulture area of Channapatna(2) From farming shed at low cost for the benefit of
mulberry agricultural activity upto the Soliga community, it is proposed to
manufacture of silk cloth “silk museum” will undertake bivoltine silk worm farming. This
Economic Survey of Karnataka 2019-20 429

will lead to the improvement of economic the intention of stablising the prices of Silk
status of this community and there will be yarn. During 2019-20 the Company has
scope for the extension of sericulture made a turnover of Rs.346.00 Lakhs upto
activities too (4)For the benefit of silk November 2019. The Government has
growers and reelers of Mysuru district, Rs.3 provided grants of Rs.300.00 lakhs for
crore will be spent for establishing silk 2019-20 and has released Rs.165.00 lakhs
cocoon market in Mysuru district to provide upto November 2019 for administrative
marketing facility for silk cocoons produced expenses. During the current year the
locally (5) Karnataka is a land of silk. Company has made trading profit of
Karnataka State Silk Research and Rs.20.00 lakhs as on November 2019.
Development Institute was established in Table 9.20 represents the detail of
Talagattapura near Bengaluru in 70s with Financial performance of Silk Marketing
World Bank assistance. Rs.5 crore will be Board.
provided for rejuvenation of this institute to
During the financial year 2019-20 upto
get full benefit of the institute by getting
November 2019, the transactions in the Silk
expert report after a thorough study. (6)In
Exchanges have decreased by 204 M. tons
addition to traditional production of silk
(35%) when compared to the corresponding
fabric, there is worldwide demand for silk
period of pervious year. The average prices
by-products such as nail polish, lipstick and
of silk yarn for filature silk has decreased by
silk colours. Rs.2 crore will be provided to
9.5% and charaka silk prices decreased by
formulate a strategy to exploit this market
7.5%, when compared to the prices of
(7)Rs.5 crore will be provided for
corresponding period of 2018-19.
rejuvenation of Karnataka Silk Industries
Corporation (K.S.I.C.) unit at Channapatna. During 2018-19 the Company has
purchased 21 tons of silk amounting to
During 2019-20 following new programmes Rs.556.00 lakhs and sold 12 tons valued at
have been announced. (1)There is no growth Rs.382.00 lakhs. During the year 2015-16
in the sericulture sector in the past decades on the Govt. loan of Rs.10.00 Crores,
and silk productivity has come to a Rs.102.50 Lakhs has been provided in the
standstill. Extension activities are to be books of accounts towards interest @
taken up immediately. A new method to take 10.25% and Rs.77.00 Lakhs towards penal
up sericulture extension activities i.e., an interest @ 2.75% P.A. Apart from this
innovative approach will be evolved by provision of Rs.1.27 Crores towards leave
imparting additional training to progressive encashment and Rs.76.92 Lakhs towards
farmers and utilize them as sericulture gratuity policy premium is provided in the
extension workers. For this purpose, a books of accounts. During the year 2018-
grant of Rs.2 crore has been provided. (2) 19 the Company has earned trading profit of
Silk reeling activity can be performed by Rs.23.28 Lakhs and other income of
skilled labourers only. At present there is a Rs.122.75 Lakhs. The net loss during the
shortage of skilled labourers. In this year is Rs.132.99 Lakhs.
background, government has proposed to
establish new technology reeling machinery To meet the Administrative expenses, the
in Santhemarahalli silk factory to impart Govt. has given the grant of Rs.300.00
training to youth of this region and make Lakhs for the year 2018-19.
them self reliant. For this, a grant of Rs.2 Table 9.21 presents details of Transactions
crore has been provided. of Silk Yarn at Silk Exchange and average
KARNATAKA SILK MARKETING BOARD prices for 2011-12 to 2019-20 (November
LTD 2019). Particulars of Purchase & Sale and
profit/Loss of Silk Marketing Board
The Karnataka Silk Marketing Board Ltd. from 2007-08 to 2019-20 are given in
promoted by the Government of Karnataka Table 9.22.
was established in 1979. This was done with
430 Economic Survey of Karnataka 2019-20

Table 9.20: Financial performance of Silk Marketing Board (Rs in Lakhs)


2019-20
Particulars 2015-16 2016-17 2017-18 2018-19 (Upto Nov.
2019)
1. Turnover 1145.00 841.59 401.00 383.61 346.00
2. Profit after tax (-) 416.00 (+)6.35 (-)54.56 (-)132.99 (+) 54.00
Source: Karnataka Silk Marketing Board Ltd

Table 9.21: Transactions of Silk Yarn at Silk Exchange and average prices during
2011-12 to 2019-20, (Upto November 2019)

Quantity Average Price Rs. Per Kg.


Year (Tonnes) Filature Charka
2011-12 1310 1913 1655
2012-13 1238 2236 2182
2013-14 1358 2860 2624
2014-15. 2057 2539 2249
2015-16 2818 2179 1774
2016-17 1514 2790 1839
2017-18 1172 3302 3087
2018-19 860 3122 2725
2019- 20 374 2928 2580
(Upto Nov. 2019)

Source: Karnataka Silk Marketing Board Ltd.

Table 9.22: Particulars of Purchase & Sales and Profit/Loss of Silk Marketing Board
from 2007-08 to 2019-20 (Upto November 2019)
P u rc h a se S a le s
(+ ) Pr ofi t A c c um u la t e d
Y e ar
(- ) L oss (-) Lo ss
Q u a nt i ty V a lu e Q u a n ti ty V a l ue
20 07-08 87 959 113 132 4 ( -)4 05.8 6 1819 .73
20 08-09 127 156 9 147 189 8 (-) 3 61.88 2181 .61
20 09-10 171 266 1 163 265 3 (-) 2 58.79 2440 .40
20 10-11 201 417 9 161 344 4 (-) 3 99.63 2840 .04
20 11-12 270 500 8 215 432 0 ( -)3 68.7 0 3208 .74
20 12-13 118 269 6 209 464 7 ( -)1 54.4 7 3363 .21
20 13-14 132 390 9 129 386 0 ( -)5 41.8 2 3905 .00
20 14-15 66 180 1 80 231 3 ( -)4 39.4 4 4344 .44
20 15-16 45 968 47 114 7 ( -)4 19.0 3 4763 .47
20 16-17 18 519 24 841 (+ )6.3 5 4757 .12
20 17-18 10 356 10 401 (-)54.56 4811 .68
20 18-19 21 559 12 382 (-)1.33 4944 .67

20 19-20
2. 6 69 11 .04 346 (+ )54.0 0 4890 .01
(U pto No v. 19 )

(Quantity in tons and value in Rs. Lakhs.)


Source: Karnataka Silk Marketing Board Ltd
Economic Survey of Karnataka 2019-20 431

During the year 2019-20 the prices of prevent formation of groups and cartels
imported silk is higher than the domestic among traders and merchants. The Board
silk price. The imported China silk price is maintains sufficient stocks to meet the
ruling at Rs.3800/- and the prevailing requirements of consumers spread over the
market rates for domestic filature raw silk is states of Karnataka, Tamil Nadu, Andhra
in the range of Rs.2600/- per Kg to Pradesh & Telangana State. The Board
Rs.3750/- per Kg (During November 2019.) caters to the requirements of Primary Co-
The production of silk yarn in Karnataka operative Societies, weavers, National
and import of silk yarn from 2002-03 to Handloom Development Corporation,
2018-19 is given in Table 9.23. Karnataka Handloom Development
Corporation. When the prices are
The Board is primarily discharging the continuously stable, the intervention of
function of Price Stabilization of silk yarn KSMB in the market may not be necessary
which is generally a non-profitable which may result in very low purchase and
proposition. The Board is protecting the sales. This is in fact the role of any Price
interest of reelers and farmers by Stabilization Agency and KSMB is one
continuously purchasing the silk in all Silk among them. Maintenance of procurement
Exchanges in Karnataka. The Board being and distribution points involves
the biggest Government licensed buyer of considerable overhead expenses such as
silk at Silk Exchanges of Karnataka State rent for office and godown, insurance etc.
strives to maintain price stability and to
Table 9.23: Production of silk yarn and import of silk yarn in Karnataka 2002-03 to
2018-19
Karnataka Silk Prod uctio n Imp ort of Silk Yarn to India
Year
(in to ns) (in to ns)

2 002 – 2003 872 8 905 4

2 003 – 2004 676 0 925 8

2 004 – 2005 730 2 718 5

2 005 – 2006 747 1 833 4

2 006 – 2007 788 3 556 7

200 7 - 20 08 824 0 792 1

2 008 – 2009 723 8 839 2

2 009 – 2010 736 0 734 1


2 010 – 2011 733 8 587 0

2 011 – 2012 779 6 567 3

2 012 – 2013 706 3 495 1

2 013 – 2014 857 4 325 9

2 014 – 2015 964 5 348 9

201 5 - 20 16 982 3 352 9

201 6 - 20 17 957 1 379 5


201 7 - 20 18 932 1 371 2

201 8 - 20 19 1159 2 278 5

Source: i) Department of Sericulture, ii) Central Silk Board


432 Economic Survey of Karnataka 2019-20

Strength and strategy of the Board: Karnataka is initially began in Bengaluru.


Board is buying Silk yarn in the open The details of the following are given in
auction in all the Silk Exchanges and Chapter 4:
maintaining the stability in the prices of silk The details of IT revolution in Bengaluru
yarn thereby protecting the interest of silk
reelers and farmers: r The Penetration of ITBT into regions
other than Bangalore along with
r To give fair price to the reelers and to Karnataka i4Policy and its highlights
make available twisted silk to weavers
r GOK-NASSCOM Second Startup
at reasonable rate.
Warehouse
r To intervene the market effectively for
r Karnataka Semiconductor Venture
the stabilization of prices.
Capital Fund (KARSEMVEN Fund)
r To create a linkage between the reelers
r KARNATAKA ANIMATION VISUAL
and consumers.
GAMING & COMICS (KAVGC) POLICY
r Effective usage of financial assistance
r Karnataka's Electronics Systems
extended by the Government of
Design and Manufacturing Policy 2013
Karnataka.
r ICT Skills Development Society
r Board is having its marketing network
in the states of Karnataka, Tamil Nadu, r Investment in ITBT sector
Telangana & Andhra Pradesh. The details of achievement in IT & BT sector
9.7.4 Karnataka Information from 2011-12 to 2019-20 (UptoNovember
Technology and Biotechnology Services 2019) are presented in Table 9.24.
The Information Technology Revolution in

Table 9.24: Achievements in IT & BT Sector for the year

2 0 1 9 -2 0
S l. (A p ri l –
P a rt icu la r s Un its 2 0 1 1 -1 2 2 0 1 2 -1 3 2 0 1 3 -1 4 2 0 1 4 -1 5 2 0 1 5 -1 6 2 0 1 6 -1 7 2 0 1 7 -1 8 2 0 1 8 -1 9
No No v e m be r
19)

S oft w ar e Rs. in
1 82110 95 0 48 102273 1 0 7 12 5 . 7 7 1 2 0 78 0. 4 6 14 1 84 6 . 1 2 1 5 1 82 2 . 4 8 16 9 6 9 9 . 0 8 9 6 0 02 . 0 3
E xp o rts cro res

N o ST P
2 U n its N os. 26 16 24 15 17 117 101 167 111
A p pr ov ed

I n ve stm en t
f ro m S T P Rs. in
3 6 2 . 71 1 7 .0 9 7 8 .1 4 2 4. 0 6 5 5. 6 8 10 1 2. 4 2 5 7 5 7. 4 8 1205 580
U n its cro res
A p pr ov ed
N o s. of
F o rei gn
4 N os. 19 14 14 10 11 71 63 107 68
E q uity
C o m p a n ies
I n ve stm en t
f ro m Rs. in
5 2 1 . 35 1 .3 2 9 .3 9 2 3. 6 3 1 9. 5 3 9 4 3 .8 7 5 5 5 9. 9 4 1088 430
F o rei gn cro res
E q uity
H a r dw ar e Rs. in
6 3021 3250 4 2 9 1 .1 0 4 6 1 7. 6 1 4 8 4 6 .7 4 45 7 2. 4 3 4 4 4 6. 9 3 51 9 5 . 4 4 2267
E xp o rts cro res

No of
7 E lec tro n ic N os. 1 2 4 1 0 1 0 0 4
H a r dw ar e

I n ve stm en t
f ro m Rs. in
8 0 .1 0.11 182.02 1 5. 4 1 0 0.15 0 0 543
H a r dw ar e cro res
U n its

Contd...
Economic Survey of Karnataka 2019-20 433

2019-20
Sl. (April –
Particulars Units 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
No November
19)

No of Major
9 India Nos. 0 1 5 0 1* 0 0 0 0
Companies

Investment
from Major Rs.in
10 0 15.2 223.05 0 33.82 0 0 0 0
Indian crores
Companies

No of SME's
11 Nos 8 3 9 5 5 46 38 60 43
Companies

Investment
Rs.in
12 from SME's 41.46 0.79 7.72 0.43 2.32 68.55 197.54 117 150
crores
Companies

No of BPO
13 Nos 3 0 0 0 1* 0 0 0 0
Companies

BPO Rs.in
14 17775 20392 16692.73 18984.37 25196.33 32302.47 36930.69 55357.80* N/A
Exports crores

Investment
from BPO Rs.in
15 1.02 0.6 0 0 33.82 0 0 0 0
Units crores
Approved

Source: Software Technology Parks of India, Bengaluru


Note: The details provided from FY 2016-17 onwards include the details of STP units and Unit registered for
softex Certification. * Tentative data

9.7 5 e-Governance INITIATIVES 1. Mobile Governance:


RELATING TO THE DEPARTMENT OF
MobileOne has the unique distinction of
PERSONNEL AND ADMINISTRATIVE being certified as India's first and world's
REFORMS (e-Governance) largest multi-modal mobile governance
Karnataka has an exclusive e-Governance platform. It is a unified mobile platform for
Division in the Department of personnel & delivery of citizen's services both from the
Administrative Reforms, headed by Government and private sector. These
secretary to Government. This was set up in anytime, anywhere, any how, services will
the year 2003 with a view to accelerate the be available 24x7x365 days at any locations
process of IT enabling eg. Government in India on any mobile device.
processes for the benefit of citizens and to Categories of Services:
improve transparency and efficiency in
administration. The Department of The Following categories of services are
Personnel & Administration reforms (e- available on Mobile One:-
Governance) has created the necessary
2 KSWAN: Ensuring Last mile
infrastructure for implementing e-
connectivity
governance initiatives in the state. The
Schemes of e-Governance Department are The Karnataka State Wide Area Network is
as follows: in operation since Dec 2009. It is serving as
a state information high way for various
434 Economic Survey of Karnataka 2019-20

departments of Government of Karnataka, KSWAN 2.0 contract is awarded to M/s


providing voice, video data services and Wipro and Consortium partner who has
secured internet services. taken over the existing network and are
upgrading it. As part of KSWAN2.0
Initially, KSWAN was built on BOOT model
implementation, bandwidth are to be taken
and declared operational in December 2009.
from two Telecom Service providers,one
Since its operation, KSWAN is meeting the
being Primary other as secondary link
requirement of secured network
provider. This will ensure uptime of more
connectivity to important government
than 99.99% for network.
departments like Treasury, IGR, Health,
RTO, Bhoomi etc. Some of the critical Security being important aspect in
applications like Kaveri, Khajane, e- Government data transactions over
Hospital, Bhoomi, e-Procurement e-Office network, in KSWAN2.0, Sate of the
are running on KSWAN. More than 3000 ArtIPSec, DMVPN and MPLS features are
Government offices are connected to being enabled.
KSWAN. KSWAN Control Rooms (PoP) are
Though more than 3500 government offices
operational at District and Taluka HQ and
are connected to KSWAN, and Bandwidth
serve as aggregation point for network
for these offices are upgraded time to time as
traffic. Bandwidths are taken from BSNL for
per need basis, as per KSWAN 2.0, CEG will
all District and Taluka PoP, depending on
facilitate secured connectivity to most of the
actual need and are upgraded from time to
Government offices in the state (about 6400
time to meet requirement of traffic demand.
government offices).
Government of Karnataka is upgrading
Work order is placed on M/s BSNL and M/s
KSWAN to more robust and secure network
Airtel for 4000+ links and commissioning
namely KSWAN 2.0., which will ensure end
are under progress. All district Head
to end secured WAN services using MPLS
Quarters LAN will be upgraded to cater to
technology within the network and that of
the growing need of online government
the bandwidth service provider and LAN
transactions.
services in important Government
buildings.

Service Type Channels

Payment Services SMS, IVR, Mobile Web, smart Client Apps

Pull Services SMS, IVR, Mobile Web, smart Client Apps

Push Servi ces SMS, IVR,

Data Capture Services SMS, IVR, Mobile Web, smart Client Apps

Current Status of MobileOne (as on 30.10.2018):

Mobile App & Web Visitors: More than 17.7 Crores(Across all channels)

Number of IVR calls: More than 1.30Crores

Payment services: More than Rs.71.4 Crores

1)169 Pull/Data Capture/App/Web services


Department Services: 2)140 Push SMS services
3)856 SAKALA services
Economic Survey of Karnataka 2019-20 435

3.E-Procurement: facilitate in getting their leave title


online.
E-Procurement is aimed to enhance
transparency, accountability and reliability e) For salary processing and approval
and responsiveness in all Government HRMS application is integrated with
procurement activities. The E-Procurement State Treasury application-Khajane-2.
is implemented on an 'end to end' solution. It After the generation of pay bills from
is to the credit of the project that it is a less- HRMS application, the bills are getting
paper office. pushed to Khajane-2 electronically as
part of this integration.
Project Status:
5. Karnataka State Data Centre
This project has been extended to
331procurement entities as on 31st Government of Karnataka (GoK) is
December 2019. A total of 813320 tenders committed to providing a secure, robust,
and 33502 auctions have been published in reliable and scalable information
e-Procurement portal and 20,08,675 bids infrastructure for all Government
have been received against these published Departments for hosting and running their
tenders. This platform has enabled e-governance applications/initiatives in a
competition among the bidders.1,17,659 secure manner for providing faster and
suppliers are registered on the platform. reliable citizen services.
4. Human Resource Management System To realize above objective, 1st State Data
(HRMS) Centre of Government of Karnataka was set
up during 2004-05 as part of the core
The Human resource Management System common technology infrastructure, at
covers automating all the Human resource Khanija Bhavan (Khanija SDC) and is
functions like leave, transfer, payroll, operational till date. This State Data Centre
administration and service procedures of (SDC) provides infrastructure required for
the government and also provides a unified consolidating & hosting state level
view of deployment of human resources applications at a central location.
across the state. Human resource
Management System helps to create an Government of India initiated a nationwide
exhaustive and accurate database of scheme, National e-Governance Action Plan
Government employees for effective (NeGAP) under which Ministry of
administration, improving productivity and Electronics and Information Technology
efficiency. HRMS is completely adopted in (MeitY) provided financial assistance to
the state, status to the end of November states for setting up State Data Centre
2019. (SDC). This financial assistance covered
both CAPEX & OPEX over a period of 5
a) Pay, D.A., Advance, arrears, etc., paid years. Karnataka State Data Centre located
through electronic platform at Vikasa Soudha (Karnataka SDC) was
b) Immediate availability of salary setup in 2012 and is operational till date
component of Budget to the Finance which is the second Data Centre offering
Department. services to all departments of Government
of Karnataka. Both the Data Centers run
c) Government has given sanction to on 24 X 7 basis and serve as State Data
upgrade the present HRMS system into Centers catering to all Government of
HRMS-2.0, Application is in Karnataka departments. Hereafter, in this
development stage Bandle-1 document, the term SDC is used to refer
development is almost ready. both SDCs. CeG has been managing these
d) An interface is provided to Accountant Data Centers with the assistance from
General Office for updating the Leave outsourced service providers and has
balance of Gazetted officers, which will developed extensive expertise in managing
Data Centers.
436 Economic Survey of Karnataka 2019-20

SDC currently provides the following Bangalore Traffic police, Treasury, Labour,
types of services/facilities to DSSP, Department of Public Instructions,
departments of the Government of Commerce and Industries, DPAR, KEA,
Karnataka: BWSSB, Mines and Geology ,KSRAC,
Directorate of Health and FW, Karnataka
Equipment Hosting: SDC can act as a Legislative Assembly, KREDL,HED,
secure, controlled and monitored area with Backward Classes department,
physical space and server rack space for Horticulture Department, KSRTC, BMTC,
hosting equipment of departments. Utilizing Karnataka Police Housing Corporation,
this feature of SDC avoids investment from Rajiv Gandhi Housing Corporation, IT & BT,
departments on establishing, securing and Department of technical education, UPOR,
maintaining individual data centers. Karnataka Pollution control board, E-
Application Hosting: SDC possesses Governance.
servers and software stacks that can be used 6. UID
to host diverse applications for
departments. The hosted applications can Aadhaar is a 12 digit unique Identity
be further secured by software controls and number issued to all Indian residents based
monitoring mechanisms. Data Hosting: on their Biometric and Demographic Data.
SDC has the capacity to hold several As on today, 96% of residents of Karnataka
terabytes of data on storage systems with have been issued Aadhaar.
backing secondary storage media. This The following steps have been taken by CEG
allows departments to store and access large to cover residual population:
volumes of data at SDC.
1. Since majority of the residual
Management Services: population is within the age group of 0-
Monitoring: SDC has 24/7 operations and 5 Years, intensify the enrollments of
management staff who continuously children in that age group, a total of
monitor the health of systems and assist in 2000 Tablets have been provided to
early detection of possible problems. The Women and Child Welfare Department,
physical entry and access to systems is also and suitable instructions have been
closely monitored and logged. given to complete the enrollments of all
Children.
Maintenance: 24/7 Operations and
managements staff can assist in regular or 2. Since the population in Bengaluru is
on-demand maintenance activities such as high, the number of people to be
data backup, installing system/security enrolled is higher than other Districts.
patches and updates etc. The Data Center Hence, on additional 208 Aadhaar
operations at KSDC (VikasaSoudha) and Enrolment Kits have been provided to
RSDC (KhanijaBhavan) is being provided by Bengaluru One Centers belonging to
M/s Orange Business India Pvt.Ltd. KSDC EDCS Directorate. It is proposed to
is 2250 sqft and RSDC is 500 sq ft. open 210 enrollment centers at BBMP
Ward Offices at cross subsidized cost by
267+ physical servers, 1600+ VMs, 1500 TB CeG.
of SAN storage are deployed in both the Data
3. Since the left out population contains
Canters. KSDC is ISO 27001 and ISO 20000 Bed ridden, Specially Abled and
certified, which is valid upto 06-Sep-2021. Physically impaired persons, Home
258 applications of 142department are basedAadhaar enrollments are being
hosted in KSDC & RSDC. Some of the carried out as per their requests.
important department who have hosted 4. The concerned Departments of Post
applications in data centre as below: Offices and Banks have started
Aadhaar enrollments in many Postal
Revenue, IGR, SSLR, Election Commission, and Bank branches. It is being
Electronic delivery of Citizen Services, coordinated with Postal Departments
and Banks to increase the enrollments.
Economic Survey of Karnataka 2019-20 437

5. All Aadhaar related issues with public 1.1 Name Matcher App Software
are being addressed by conducting Support/Maintenance for Annual basis:
AadhaarAdaalats in all Districts.
Namescape software will contain functions
6. Currently, enrollments and updates are namely string to string comparison, bulk
being facilitated through CeG string to string comparison for English to
designated kits, permanent Aadhaar Kannada names and vice versa. The web
enrollment centers in 722 services will be hosted at State Data Centre.
Nadakacheries (AJSK) in all the
Districts across the State of Karnataka. C-DAC GIST Namescape Tool software has
been purchased by CeG in the month of
7. Updates have been facilitated at September 2017, the software/
Panchayathi level through 6024 RDPR Maintenance can be provided for the period
update centers. of 1 year i.e. till September 2019. It is
8. A Call Centre has been set-up to resolve required to obtain Support/Maintenance
the issues of queries and complaints. for smooth functioning of software. Annual
Maintenance cost per year – Rs.6.37,200/=
9. ECMP kits have also been proposed to (Inclusive of taxes)
be deployed in schools across the State
to enable updates on a regular basis as 1.2 C-DAC AUA-ASA Security Audit:
children at 5 and 15 years need updates AUA-ASA Web-services are in pre-
to their Aadhaar Bio-metric details. production and Production Environment
10. It is proposed to integrate Aadhaar with and transactions are being carried out
birth registration. successfully by various departments/
applications. C-DAC has conducted
7. Karnataka Resident Data Hub (KRDH): Security Audit on AUA-ASA for KRDH
Project Service System which is installed in
1. On-board Department for ASA/AUA:
164.100.133.67…:8080. Testing is started
Pre-Production: on 26/06/2018. The objective of the entire
test was to find out vulnerabilities that can
1. CeG
be seen and compromise the application by
2. Bhoomi Monitoring Cell malicious users. The results indicate the
3. Rajiv Gandhi Rural Housing status of the application during the
Corporation Limited. evaluation period only. Charges towards
4. Animal Husbandry security audit on AUA & ASA Web Services
to C-DAC for Security Audit. This amount
Production: will be Rs.53,100.
1. CeG 2. KRDH as ASP for e-Sign Services:
l DBT and Scholarship Portal e-Signenables digital signing of documents
l Mobile One and / or application forms electronically
l Animal Husbandry and online by leveraging Aadhaar. C-DAC
(Pune) is selected to develop the application
l Horticulture Department
for CeG to become the ASP for e-Sign
l Directorate of Electronic Delivery service.
of citizen Services(EDCS) r Creation of e-Sign as a Service for
l Crop Insurance Digital signing of the e-Documents
l Agriculture Department using Aadhaar based e-KYC.
l Bhoomi Monitoring Cell r Setting up of Certifying Authority as per
guidelines issued by CCA.
l Single Sign on
r Implementing Software's, API,
l State Scholarship portal.
Connector codes.
2. Education Department
r CeG had procured 50,000 e-Signs from
3. SuvarnaArogya Suraksha Trust C-DAC Pune, on dated: 06-01-2018.
438 Economic Survey of Karnataka 2019-20

r After usage of 50,00,000 e-Signs, again r Karnataka Housing Board 107 e-Signs.
CeG purchased 50,000 e-Signs on r KIADB-Directorate of Large and Mega
dated: 18-06-2018. industries has used 113 e-Signs.
Departments Implemented e-Sign: r KMDS has used 40089 e-Signs.
r BBMP has used 417152 eigns through r Transport department has used 561
Online Khata Transfer. e-Signs.
r School scholarship portal has used r e-Office has used 34 e-Signs
38758 eigns, whereas 40,000 eigns r Department of Agriculture marketing
assigned. has used 289 e-Signs
r Seva Sindhu project has used 673946 e- r Revenue-BMC has used 204 e-Signs
Signs is using for 10 services (Ex: Senior r BESCOM has used 30 e-Signs
citizen certificate etc..) r KMF has used 278 e-Signs
r Drug Control department has used r Excise department has used 93 e-Signs
33068 eigns. r Bangalore Water Supply and Sewerage
r BDA department has used 18 e-Signs. Board has used 1668 e-Signs.
r Police department has used 6 e-Signs. r SSP-Post matric project (DBT) has used
r AJSK department has used 918350 e- 5199 e-Sign.
Signs. Departments In The Process Of
r e-Attestation application has use Implementing e-Sign:
1065031 e-Signs. 1. Electrical Inspectorate Department.
r KBITS department has used 3 e-Signs. 2. Agriculture Department.
r KSPCB department has used 29417 3. Digilocker
e-Signs.
r Health and family welfare department Digital Locker, one of the key initiatives
has used 283 e-Signs. under the Digital India Initiative, is aimed at
r Stamp and registration department has eliminating the usage of physical
used 113 e-Signs. documents and enable sharing of e-
documents across Government agencies via
r Bangalore One has used 47360 e-Signs.
a mechanism to verify” authenticity “of the
r Agriculture Department has used 147 documents online.
e-Signs.
r Electrical inspectorate department Residents can also upload their own e-
used 107 e-Signs. Documents and Digitally Sign them using
the e-Sign facility. These Digitally Signed
r PM-KISAN has used 24620 e-Signs.
Documents can be shared with Government
r Labour department has used 10297 Organizations or other entities. Details of
e-Signs Departments Implemented Digilocker is
r Karnataka Slum Development Board given in Table 9.25.
has used 83 e-Signs

Table 9.25: Details of Departments Implemented Digilocker


Sl. No. of
Departments Remarks
No . Reco rds

Registration Certific ate - 1,80, 34,89 0,


1 RTO( Trans port Dep artment) 2,7 0,06, 789
dri ving license - 89,7 1,89 9.

2 AJSK 4,5 7,09, 480 37 Service s

Uploade d ce rtific ates of 2 nd PUC 2018


3 PU Board 4,0 8,774
Marc h exami nation marks shee ts

4 SSLC Board 6,7 0,991 SSLC Marks card

Source: e-Governance
Economic Survey of Karnataka 2019-20 439

Departments in the process of Centricity and universal accessibility.


Implementing Digilocker: Additionally, enabling all government
r Drug Control Department website stakeholders to adopt a consistent
and tested framework, so that uniformity is
r Food & Civil Services maintained, a set of template policies have
r KBITS been devised. The Guidelines stipulated
Karnataka State DBT Portal herein are based on International
Standards ISO 23026, W3C's Web Content
CeG hosted DBT Karnataka Portal in the Accessibility Guidelines and Government of
Karnataka State data Centre and created India Guidelines for Government Websites
login credential for the departments and (GIGW). It further makes references to the
shared. Departments update the Scheme various laws of India such as the Access to
data 5th day of every month. CeGis Information Technology Act 2005 among
coordinating with DBT Bharat mission to others.
update the Latest versions of DBT
Karnataka portal and sharing the data 3. Domain Nomenclature for State
through web services to the DBT Bharat Government Websites
mission. According to DBT Karnataka Portal The Universal Resource Locator
Currently 27 Departments with 165 (URL)/Domain name/Web address of any
Schemes on-boarded, Total Direct Benefit Government website is a strong indicator of
transfer-170Cr+, Total Number of its authenticity and status of being official.
transactions-1Cr+ and Estimated gain By having a commonly acceptable Domain
Rs.818Cr. Name Service (DNS) naming convention,
Karnataka State Web Portal (KSWP)tr departments will establish their online
identity while minimizing complexities of
The web portal of Government of Karnataka choosing a name. Knowing particular
is an integrated solution providing a single domains of the department will be very
point of information and interaction, for all simple since a common pattern will always
citizens, visitors and businesses. The be followed such as; department-
websites of various Departments are further name.karnataka.gov.inshall be registered.
enabling the Government to bring G2C, G2G
and G2B services to the citizens and 4. Security Audit
external agencies. A secured web portal mitigates risk of
1. Establishment of Project Monitoring unauthorized access to resources, has an
Unit auditable trail to support transactions,
particularly those with high sensitivity or
The Project Monitoring Unit has been high value, protects important information
established for State Web Portal which has from the moment it is entered by the user
undertaken various activities such as; and it continues through backend
creation and maintenance of websites. It applications and workflow processes,
includes domain maintenance, application strengthens on-line relationships enabling
development, server maintenance, database more and more applications and services to
administration, server certificates, security be integrated with and accessed via the
audit, domain name creation, application high-value web portal.
support and training and transactional
features within web pages for State 5. Convergence of Web Portal
Government Websites. The convergence of State Web Portal
2. Guidelines for Karnataka Government involves in unifying all the WebPages of a
Websites (KGIGW) department into a single mother portal
providing links to all child portals. Also, the
Guidelines have been created with an page layout and the functionalities are
objective to make the Karnataka uniform across all web pages which would
Government Websites conform to the help users to locate the relevant information
essential pre-requisites of Usability, User- quickly and without much difficulty.
440 Economic Survey of Karnataka 2019-20

A proof of concept has been carried out in 7. e-Office:


which all static information relating to the
e-Office is a Mission Mode Project (MMP)
department like Services/Benefits/Scheme
under the National e-Governance
details, eligibility and the processes are
Programme of the Government. The product
made available on the web portal. If
is developed by National Informatics Centre
department has any online services it is
(NIC) and is aimed for conducting office
connected to the portal, otherwise the right
procedures electronically which is excepted
contact details are provided. Actual delivery
to transform government functioning to a
of services happens through department
more efficient, effective and transparent
portal. This proof of concept has been done
intra-government transactions and
based on the gov.uk portal.
process. The product is built as single
6. Accessibility and Content Authenticity reusable system by bringing together
based on Content Contribution, independent functions and systems under a
Moderation and Approval Policy (CMAP): single framework to enchance trans-
parency, increase accountability and
A workflow based Content Management transform the government work culture and
System (CMS) is being deployed centrally to ethics.
provide access to the Government
departments are to create / upload, verify, The features of e-Office are:
approve and publish the content based on
r Open Architecture &Technology;
the CMAP Policy. This Web interface ensures
Neutral
authenticity and accuracy of information
disseminated to citizens through the official r Common Data Sets and Standards
Government websites. Website Hosting r Role based access for authorization
and Maintenance Details are given in r Workflow manager
Table 9.26.
r Open Standards & technologies based

Table 9.26: Website Hosting and Maintenance Details

Sl. No. Description Nos.

1 Web site s Des igne d, hosted and Maintained b y CeG 51

2 Traini ng provide d to Gov t. Departments 174

3 R egular up dation by De partment through online 51

4 O nline Applic ation 4


5 Chief Minister We bsite M aintenance 1

6 Chief Secre tary Office Webs ite (Office r Profile , M yGOK, GOK Dire ctory) 1

7 Ap plication & Database Serve r M aintenance 11

8 NIC Site s Updates ( 150) -

9 D omain Name Re gistration 58

10 Sec urity Auditing 140

11 De signing new State Web Portal wi th Conte nt Contribution, M ode ration 341
and Ap proval Policy (CMAP)
Source: e-Governance
Economic Survey of Karnataka 2019-20 441

r Unicode Compliant - Support for local r Promote greater collaboration in the


languages work place and effective knowledge
r Organization level common repository management
of user information for various services The implementation progress is given Table
and applications. 9.27.
The Benefits of e-Office are The Implementation approach is as
r Enhance transparency – files can be follows:
tracked and their status is known to all r Phase one: In all the state level officers-
at all times Implemented in Secretariat
r Increase accountability – the departments and in process at Head
responsibility of quality and speed of offices.
decision making is easier to monitor
r Phase two: In all the District level
r Assure data security and data integrity officers-In progress
r Transform the government work culture r Phase three: In all the Taluk level
and ethics Officers-Next phase.

Table 9.27 : e-Office implementation progress

Sl. No. Sections Offices Users Files Receipts

1 CM Office 1 50 18 13194

2 Minister Offices 2 10 0 0

3 Legislative 1 140 549 679

4 Election commission 1 49 442 2988

5 Secretariat 46 2531 83657 377886

6 Directorates/Commissionerates 29 2695 72001 538444

7 Regional /Zonal offices 6 149 3804 7880

8 District offices 119 3875 285277 1431244

9 Taluk level offices 17 345 561 7541

10 Police instance(KSP) 26 723 8947 26934

11 Boards and corporations 46 2556 19356 167194

Total 294 13123 474612 2573984


Source: e-Governance
442 Economic Survey of Karnataka 2019-20

Adoption of extend modules of e-office like e- 2015-16. Government has issued G.O for its
Leave to all officers in 2020. implementation of Kannada languages in all
the departments, for e-Governance
8. Capacity Building applications data storage, internet, Mobile
Government of Karnataka is in the forefront Laptop, Tablet Applications, Kiosks and
in initiating and implementing successfully Information Technology to implement
several e-Governance projects of national Unicode 6.0.0 and it's future Kannada
importance in order to improve delivery of Languages.
public services. Imparting of specialized Proposed to conduct training programs for
training and enhancing the knowledge, all Officers and employees of State
skills of the employees in various facets of e- Government in Coordination with Kannada
Governance and ICT is envisaged. Culture Departments and with
The Department is providing consultants to Administrative Training Institutes Mysore.
other Departments for the implementation
9. State Scholarship Portal:
of e-Governance Initiatives. For this purpose
State e-Mission Team (SEMT) is established An Integrated State Scholarship Portal
in the Department and it is interacting with (SSP) is developed by Center for e-
other Departments. Governance, Government of Karnataka for
sanctioning of Pre-Matric & Post-Matric
Future Plan (Up to March-2019) Scholarship under various Schemes of
r Proposed to set up e-governance Government of Karnataka. SSP does Direct
Initiative training Cells at all District Benefit Transfer into Aadhaar seeded bank
Training Centers in co ordination with account of the student. Department-wise
ATI, Mysore Up to March-2020. Scholarship Disbursement Statistics are
r Proposed to conduct training programs given in Table 9.28.
for Group A&B Officers on e- I. PRE-MATRIC SCHOLARSHIP
Governance initiatives in states, out of
state, and outside country. Participating Departments are:
r In House Trainings programs to Group r Department of Social Welfare
A & B officers r Department of Tribal Welfare
Kannada Computing: r Department of Backward Classes
Hon'ble chief minister has announced Welfare
kannada computing project in the budget of
Achievements:

Number of Number of trainings on Number of


trainings on trainings on Total no of
e-Governance
Sl.No. e-Governance e-Governance officers and
initiatives arranged at
initiatives initiatives employees
arranged at ATI District Training arranged at benefited
Institutes in State
Mysore Bengaluru

1 35 90 5 28,000.00

Opening Balance in Lakhs 156.70

Programmes scheduled in on District Training Centre in


Total Amount Expended
co-ordination with ATI Mysore.(Approximately 87.00Lakhs
approved and releasing shortly)
Economic Survey of Karnataka 2019-20 443

r Department of Minorities Welfare 10. Direct Benefit Transfer (DBT):


II. Post-matric Scholarship Direct Benefit Transfer is a major reform
1. State Scholarship Portal was developed initiative to re-engineer the existing delivery
by NIC and launched on 1st November, processes of Government using IT. Vision of
2019 for the Post-Matric students to DBT is enable departments to transfer
apply for Scholarship. benefits directly into Aadhaar seeded bank
accounts of accurately targeted
2. Scholarship Sponsoring Departments beneficiaries. DBT is intended to resolve the
are: issues related to wrong inclusion/exclusion
i. Department of Social Welfare of beneficiaries, inaccurate beneficiary
identification and unreliable database
ii. Department of Tribal Welfare
which resulted in fakes, duplicates and
iii.Department of Minorities Welfare non-achievement of objectives. DBT will
iv. Department of Technical improve targeting, plug loop holes etc.
Education
9.7.6 Mining and Minerals Industries
v. Department of Medical Education
vi. AYUSH Department During the year 2019-20, upto the end of
November 2019, the department has
3. Last date for Application Submission is granted 141 Quarry leases for Building
31st January, 2020. Stone and other minor minerals and 15
4. As on 18.01.2020, - Ornamental Granite Quarry leases. There
are 2764 Quarry leases for Building Stone
l 6,65,770 students have registered in and other minor minerals and 504
SSP for availing Post- Ornamental Granite Quarry working leases
Matricscholarship. in the State.
l Department-wise Scholarship
Application statistics are given in
Table 9.29.
Table 9.28: Department-wise Scholarship Disbursement Statistics
FY – 2019-20
FY – 2018-19
(As on 18.01.2020)
No. of
DEPARTMENT No. of No. of Students
No. of Students Students who
Students who have been
applied for have been
applied for paid Scholarship
Scholarship paid
Scholarship (in Progress)
Scholarship
Social Welfare 11,99,998 10,08,361 12,37,026 3,87,538

Tribal Welfare 5,12,275 4,27,555 5,25,332 1,52,074

Backward Classes
29,10,346 21,49,637 19,21,802 2,12,062
Welfare

3,02,000 Portal is still


open for
Minorities Welfare 9,25,995 (Still under -
Application
process)
Submission

Total 55,48,614 38,87,553 24,47,134 7,51,674

Source: e-Governance
444 Economic Survey of Karnataka 2019-20

Table 9.29: Department-wise Scholarship Application statistics

No of Students who
No of Students who
No. of Students who have partially
have completed
Departm ent have started applying completed
application
for Scholarship application
submission
submission

Social Welfare 341762 9368 332394

Tribal Welfare 126403 2977 123426

Minorities Welfare 121440 6668 114772

Technical Education 5041 265 4776

Medical Education 826 47 779

AYUSH 260 260 0

Total 5,95,732 19,585 5,76,147


Source: e-Governance

The Department of Mines and Geology has 9.8 STATUS OF PUBLIC ENTERPRISES
realized revenues of Rs.2277.61 crores as IN KARNATAKA
against the target of Rs.2272.00 crores upto 9.8.1 Karnataka State Small Industries
November 2019 and as against the annual
Development Corporation (KSSIDC)
target of Rs.3550.00 crores for the year
2019-20. Details of royalty collections from Karnataka State Small Industries
2015-16 to 2019-20 (upto November 2019) Development Corporation Limited (KSSIDC)
are provided in Table 30. On-going Schemes promotes the development of Small
of Department of Mines & Geology are Scale Industry (SSI) sector by providing
presented in Appendix 9.6. Industrial Sheds, channels for Procurement

Table 30 : Details of Royalty Collections (Rs. in crore)

Major Minor
Year Target Achievement
Mineral Mineral

2015-16 1807.18 2 003.79 8 11.12 1 192.6 7

2016-17 2410.71 2 419.43 1047.3 2 1 372.1 1

2017-18 2550.00 2 746.26 1294.8 9 1 451.3 7

2018-19 3000.00 3 026.42 1405.7 9 1 620.6 3

3550.00
2019-20 Annual Target
2 277.61 1310.6 8 9 66.93
(upto Nov-2019) (2272.00 upto
No v. 2019)
Ro yalty collection is a s per reconciled figures.
Source: Demand, Collection, Ba lance (D CB) Section, Department of Mines & Geology .
Economic Survey of Karnataka 2019-20 445

and Distribution of Raw Materials KSSIDC given in Table 9.35. New Industrial
and Management Guidance to SSI Estates/construction of sheds/complexes
entrepreneurs. The Corporation has a of KSSIDC is given in Table 9.36.
network of 09 Raw Material Depots for the Upgradation of Infrastructures at Various
distribution of required Raw Materials to Industrial Estates (CID Phase-1) & (CID
MSME Units in the State. It has also Phase-2) are furnished in Table 9.37 and
obtained the lands in and around Bengaluru 9.38 respectively.
and also in other Districts for the
construction of sheds and for the r In the Government's New Industrial
development of plots as per the demand Policy 2014-19, a policy provision has
from MSME units. The details of Royalty been made that, K.I.A.D.B. has to
collected, Raw Materials sold, Sheds earmark / reserve minimum 20% of
constructed and Plots developed by the allotable land out of the lands acquired
Corporation are given in Table 9.31 and by K.I.A.D.B., for the establishment of
9.32 respectively. The Financial M.S.M.E. Units and also to allot the
same as per the request of K.S.S.I.D.C.
Performance of KSSIDC's is given in Table
As such, the lands required and
9.33 and 9.34. Sales Performance of
suitable for K.S.S.I.D.C. will be got

Table 9.31: Details of Royalty Collections (Rs. in crores)

2019-2020
Particulars 2014-15 2015-16 2016-17 2017-18 2018-19
Upto Dec.2019

Royalty
0.1528 0.3920 0.2442 1.4773 1.8678 0.4213
Collection

Source: KSSIDC

Table 9.32: Performance of Karnataka State Small Industries Development


Corporation
2019-20
Particulars Unit 2014-15 2015-16 2016-17 2017-18 2018-19 Upto
Dec.2019

Depots for
9
distribution of Number 17 16 9 9 9
raw material

Raw material
Rs.in
sold (Iron & 48.52 32.82 42.86 12.76 14.86 14.84
Crore
Steel)

Industrial
sheds
constructed
Number 6180 6209 6227 6284 6367 6428
(Indl. Sheds /
Godowns /
Flats/ Shops)

Industrial Plots
developed Number 8258 8457 8433 8462 9593 9504
(cumulative)
Source: KSSIDC
446 Economic Survey of Karnataka 2019-20

Table 9.33: Financial Performance of Karnataka State Small Industries


Development Corporation Limited (Rs. Lakhs)

Year Total Total Net Profit


Income Ex penditure After Tax

20 14-15 11 276.0 0 92 70.00 1482 .00


20 15-16 10 680.8 1 81 07.12 1761 .76
20 16-17 8 225.0 0 59 55.00 1636 .00
20 17-18 6 566.7 9 45 17.80 1232 .06
20 18-19 6 825.1 3 65 16.59 132 .58

20 19-20
(As pe r Budget 54 139.4 8 53 010.9 3 753 .55
p rovision up to Dec .2019)

Source: KSSIDC

Table 9.34: Financial Projections for the period 01.04.2019 to 31.03.2024


(Rs. Lakhs)
Year Total Income Total Expenditure Net Profit

2019-20 14212.80 10290.00 2826.00

2020-21 17054.40 12348.00 3391.20

2021-22 20464.80 14817.60 4069.20

2022-23 24557.76 17781.12 4883.04


2023-24 29469.31 21337.34 5859.65

Source: KSSIDC
Table 9.35: Sales Performance of KSSIDC (2017-18 to 2019-2020)
Sales
Target fo r Sales Sales
Target for Performance
2018-19& Performance Performance
2017-18 2019-20
2019-20 2017-18 2018-19
Sl. up to Dec.19
Item s
No.
Qty Value Qty Value Qty V alue Qty Value Qty Value
In In Rs. in in Rs. in in Rs . in in Rs. in in Rs.
M ts lakhs M ts lakhs Mts lakhs Mts lakhs Mts lakhs

1 Iron & Stee l 12000 555 6 12 500 5812 28 78 1277 3089 148 6 3025 1484

2 C oal ** 40000 112 0 0 0 0 0 0 0 0 0

3 P araffin Wax 0 0 0 0 17 13 0 0 0 0

4 C eme nt * 0 0 0 0 0 0 0 0 0 0

** D ue to change in policy regarding the m ode o f transportation by M/ s. WCL, Nagpur, Coa l transaction
has not taken place from 2015-16 and onwa rds. However, considering the logistic convenience and a lso
short dista nce, the Governm ent requested the Ministry of Coal, New Delhi to allocate the Coal on M/s.
Singareni Collieries Com pany L td., Telangana State instead of M/ s. WCL, Nagpur, Maha rashtra and the
orders from M inistry of Coal, Governm ent of India is awa ited.
* NOTE : Cement is sold on com mission ba sis. Therefore value is not taken.

Source: KSSIDC
Economic Survey of Karnataka 2019-20 447

Table 9.36: New Industrial Estates / construction of sheds /complexes of KSSIDC


Ongoing works of 2019-20

E xten t of P roj ect


Sl .
In du strial Es tate D istrict lan d in Co st in
No.
acres lakh s

U pgr ad atio n of I nfr as tr u ctur e at


1 B en galu ru U rban 1 41.50 30 00.00
In du strial Estate Pe eny a 2n d S tag e

7 59.00
Co nstr uc tio n of M S Co mplex at
S mtr.
2 In du strial Estate R ajajin agar (in place B en galu ru U rban OR 7 00.00
of exis tin g old Cantee n B u ilding ).
0.18 Ac res

Source: KSSIDC

Table 9.37: Details of construction of New 'C' and 'D' Type Sheds at various
Industrial Estates by the Corporation.
Sl. Industrial No. of Sheds Project Cost
District
No. Estates Constructed Rs. In lakhs.

1. Chikkaballapura Kudumalakunte 9 143.00


2. Mandya Nagamangala 4 68.00
3. Shivamogga Sidlipura 10 164.00
4. Shivamogga Hireshekuna 4 71.00
5. Dharward Gamanagatti 21 375.50
6. Vijayapura Sindhagi 11 192.00
7. Bagalkote Jamakhandi 10 172.00
8. Koppala Basapura 16 278.40
9. Bellary Haraginadoni 15 271.80
100 1735.70
Source: KSSIDC

Table 9.38: Upgradation of Infrastructures at Various Industrial Estate


(CID Phase-2)

Ex tent of
Sl. Project Cost
Industrial Estate District land in
No in lakhs
acres

1 Veerasandra 2nd Stage Bengaluru Urban 10.00 233.00

Bengaluru Urban, Anekal


2 Ji gani 2nd Stage 13.55 255.00
Taluk

3 M agadi Ramanagar 13.25 135.00

4 H olenarasipura Hassan 5.00 152.00

Contd...
448 Economic Survey of Karnataka 2019-20

Ex tent of
Sl. Project Cost
Industrial Estate District land in
No in lakhs
acres

5 Yeyyadi Mangaluru 17.58 735.00

6 Manipal Udupi 13.91 280.00

7 Hebbal Mysuru 75.49 270.00

8 H osanagar Shivamogga 4.80 121.00

9 Chikkamagaluru Chikkamagalur 13.45 285.00

10 Kadur-birur Chikkamagalur 11.25 231.00


11 Channarayapatna Hassan 2.00 52.00

H ubball i-(M.T. Sagar)


12 Improvements to existing Hubballi 123.10 1850.00
roads

13 Betageri Gadag 7.08 97.00

14 G ajendragada Gadag 5.00 66.00


15 Lakshmishwara Gadag 9.15 133.00

16 Majal ahatti Belagavi 15.00 500.00

17 Mangur (Sil ver Park) Belagavi 14.10 700.00

18 Udyambhag Belagavi 55.00 230.00

19 Sedam Kalaburgi 16.70 373.00

20 Navabad Bidar 10.00 178.00


21 Kapnoor 2nd Stage Kalaburgi 11.50 217.00

22 Bellary Bell ary 15.75 209.00

23 H ospet Bell ary 24.95 710.00

Total 8012.00
Source: KSSIDC

allotted from K.I.A.D.B. where the Secretary to Government, Commerce &


Industrial Areas has been established Industries Department and issue of
and the same will be given for the suitable authorized Government Order
establishment of M.S.M.E. Units. with regard to allot suitable lands to
K.I.A.D.B. is not allotting the suitable KSSIDC by fixing the Land Rate at
lands to K.S.S.I.D.C. in accordance Acquired Cost + Service Charges and
with New Industrial Policy 2014-19 of Pro-Rata Developmental Expenditure,
Government of Karnataka. In this is anticipated.
connection, a meeting was held on r In Government's New Industrial Policy
03.12.2016 under the Chairmanship of of 2014-19, a provision has been made
Economic Survey of Karnataka 2019-20 449

to purchase the land directly from the of lands for this purpose. The response
Land Owners to an extent of 50 acres from K.I.A.D.B. is awaited.
and above at the same place, under the
scheme of establishment of proposed r Apart from this as per the New
Industrial Estates by K.S.S.I.D.C. As Industrial Policy of 2014-19 of the
per the said Rule, New Industrial Government of Karnataka, the Deputy
Estates will be established for the Commissioners of all the Districts of the
establishment of small and micro State have been requested to allot at
industries after identifying selecting the least 10 acres extent of land to the
required lands to establish Industrial Corporation at District and Taluka
Estate, by obtaining consent from the places for the establishment of
Land Owners and also after obtaining Industrial Estates and in this regard a
the approval from the Revenue proposal has been sent on 23.04.2019
Department under Clause No.109 of and thereafter on 11.10.2019 to all the
Karnataka Land Reform Act 1961. A Deputy Commissioners for the
proposal has already been submitted to allotment of suitable land and response
the Government on 24.04.2017 in is awaited.
connection with purchase of land The details of Target & Achievement of
directly from the farmers by obtaining the corresponding department are given
the approval from Revenue Department in Appendix 9.7. The Corporation's
under Clause No.109 of Karnataka principal objective is Promotion and
Land Reform Act 1961. Development of Small Scale Industries in
r Further approval of the Government the State. Construction and Utilization of
has been sought for vide letter dated Infrastructure especially in the backward
21.03.2017 in connection with the areas, Procurement and Marketing
purchase of 5 to 50 acres of land Industrial raw materials and extending
required for the proposed project technical support and assistance are
directly from the land owners under the means to achieve the above Goals. In the
clause No.109 of Karnataka Land last few years, the Corporation is playing a
Reforms Act 1961. key role in the development of M.S.M.E.
Sector in terms of establishment of New
r As such, two separate proposals have Industrial Estates, Upgradation of basic
already been submitted to the infrastructure in the existing Industrial
Government by the Corporation in Estates by introducing various
connection with issue of suitable orders entrepreneur friendly measures both in
regarding purchase of required land to Industrial Estate and Commercial Activities.
the Corporation directly from the Land KSSIDC's policy initiatives and strategies
Owners (For purchase of 5 to 50 acres include.
and above 50 acres) and the issue of
Govt. orders from the Government is r Monitoring of the lands allotted by way
awaited. of introducing strict time limit on
utilisation of plots.
r As per the announcement made by the
Hon'ble Chief Minister, Government of r Initiating participative policy in which
Karnataka in the Budget speech for the land owners are made partners in the
year 2018-19 about the establishment benefits of the Industrial Estates to be
of 11 New Industrial Estates in order to developed.
implement the measures taken by the r Policy to develop Functional Industrial
Government in this regard, the Estates / Parks on P.P.P. Model on
Corporation in its letter dated privately owned to avoid land
22.12.2018 addressed to the acquisition and thereby, to avoid
K.I.A.D.B., has requested for allotment blockage of funds.
450 Economic Survey of Karnataka 2019-20

r Proposals to develop new Industrial K.S.S.I.D.C., M/s. Karnataka State


Estates keeping in mind the modern Financial Corporation is extending
infrastructure, utility and service Rs.100.00 lakhs Financial Assistance per
requirements. unit / per year to the M.S.M.E. Sector for
purchase of Industrial Raw Materials under
r To upgrade the existing Infrastructure line of credit. This has helped the M.S.M.E.
and to take up Critical Infrastructure units to meet their raw material
works in the Industrial Estates, by requirements without immediately
seeking separate funds in the State arranging the funds.
Budgets and also by bringing them
under the ambit of Industrial Township Due to severe competition, the prospects of
Act so that the concerned Industries improving the sales of raw materials
Associations of the Estates can collect through K.S.S.I.D.C. are not encouraging.
taxes and other levies and maintain the K.S.S.I.D.C. found it difficult to achieve the
Estates themselves efficiently. sales target for 2018-19 and 2019-20.
However, all-out efforts will be made to
r With a view to assist the SSI Sector in achieve maximum possible sales target
marketing their products, Marketing through KSSIDC Raw Material Depots.
Assistance Scheme was proposed to
be taken up in catering to the 9.8.2 Karnataka State Industrial Area
requirements of Public Sector Development Board (KIADB)
Undertakings/Boards & Corporations
and other Agencies. In this connection Karnataka Industrial Areas Development
if the Government extends exemption Board (KIADB) is a statutory body, playing
under Section 4(g) of the KTPP Act. an important role in development of
Marketing Assistance Scheme can be industries in the state. Since inception, the
perused by the Corporation. KIADB has developed 170 Industrial Areas
in 30 districts of the state covering an area of
K.S.S.I.D.C. has been continuing to serve about 61354.73 acres. In all the industrial
the M.S.M.E. units in the State by procuring areas developed by KIADB, basic
and distributing various Industrial Raw infrastructural facilities like internal roads,
materials required by them like Iron & Steel, water supply, power supply, street lights,
Coal, Cement, Paraffin Wax etc., through its common facilities centers, buildings,
9 raw material depots throughout the State. housing and offsite infrastructure like
widening & improvement of approach roads
Since K.S.S.I.D.C. is procuring & etc., are provided.
distributing various industrial raw
materials, this has helped the M.S.M.E. Govt. of Karnataka vide its order dtd.13-08-
units in getting good quality of raw 2007 and 13-05-2010 in order to facilitate
materials at reasonable prices. This has land acquisition activities for industrial
acted as a deterrent to the Private Traders development, has introduced a land-
from exploiting the M.S.M.E. units. sharing scheme to KIADB acquired lands,
K.S.S.I.D.C. has been extending 30 days wherein about 9583.00Sq.ft. of developed
interest free credit facility to the M.S.M.E. land will be provided to the land owner in
units for purchase of raw materials through lieu of land compensation fixed for one acre
K.S.S.I.D.C. raw material depots against of land acquired. The statistics on the
Bank Guarantee. Also under the provisions performance of KIADB for the last five
of M.O.U executed between Karnataka years are given in Table 9.39. Achievement
State Financial Corporation and made by KIADB details are presented in
Appendix 9.8.
Economic Survey of Karnataka 2019-20 451

Table 9.39: Performance of Karnataka State Industrial Areas Development Board


2013-14 to 2019-20 (upto November 2019)
2019-20
Sl.
Particulars Unit 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 (Upto Nov.
No.
2019)

1. Area acquired Acres 5497.47 5922.50 1733.80 1192.95 2618.00 2423.00 885.00

Area allotted
(a) SSI, 458.56 335.54 848.68 961.72 1113.78 1272.55 237.66
Acres
(b) L &M
2. (c) Single Unit 574.88 2825.46 858.21 51.34 157.26 60.03 11.20
Acres
Complex

Total Acres 1033.44 3161.00 1706.89 1013.06 1271.04 1332.58 248.86

Expenditure
Rs. in 221475.0
3. incurred for 118,021.00 140,919.92 150,576.65 176259.59 255485.72 17547.89
lakhs 8
acquisition

Expenditure
Rs. in
4. incurred for 52,894.00 36,758.08 54,644.57 45655.23 57972.66 61531.83 48150.29
Lakhs
development

Total
Rs. in 279447.7
5. Expenditure 170,915.00 177,678.00 205,221.22 221914.82 317017.55 223608.18
Lakhs 4
incurred

No. of
Entrepreneurs No. 359 225 444 511 934 745 192
(a) SSI
6. No. 10 16 7 6 4 5 1
units, L & M
(b) Single
Unit Complex
Total 369 241 451 517 938 750 193

Source: Karnataka Industrial Areas Development Board, Bengaluru

9.8.3 Karnataka State Electronics Bengaluru. These IT majors have a decisive


Development Corporation Limited role in IT Exports and instrumental in
(KEONICS) regularly achieving and sub staining
Karnataka, specifically, Bengaluru is a growth.
preferred destination for companies looking In order to ensure that the fruits of the IT
to offshore their Information Technology (IT) revolution are obtained in all regions of the
and back-office functions, due to the State and to encourage the local
metropolis natural and strategic advantages entrepreneurs to set up their business
coupled with the support extended by the units, the Government of Karnataka has
Government of Karnataka to the IT industry taken a series of measures to establish IT
in the form of allotment of land at Infrastructure/IT Parks in the Tier-II Cities.
concessional rates, IT infrastructure and To supplement the measures taken in this
other tax incentives to the IT Entrepreneurs. direction, the Government entrusted the
Further, the industry has its low-cost Karnataka State Electronics Development
advantage and is a financially attractive Corporation Limited (KEONICS) with the
location when viewed in combination with responsibility of setting up IT Parks in Tier –
the business environment which the State II Cities in the State and done the role of a
offers, and the availability of skilled people. nodal agency to provide necessary IT
Further, a number of India's top technology Infrastructure and support to the IT
firms have their strong base in the Silicon Industry and the entrepreneurs in the State.
valley of India, i.e. in Electronic City,
452 Economic Survey of Karnataka 2019-20

Review of Business Operations : Associates. The experience gained in this


new area of activity is quite encouraging as
I. IT Services:
the contribution from the HR Division of the
Company has undertaken many projects of Company has been quite substantial to the
providing and programming of IT software total turnover of the Company and the trend
and e-governance projects to various indicates long sustainability and growth. As
Government Departments of Government on date the Company has provided
of Karnataka and other States. Company employment opportunity to as many as
is also marketing computer hardware, 10,500 people by deploying them to various
software, e-tendering services, various Government Departments/ Boards and
electronic and IT equipment's, LED lights, Corporations.
solar LED street lights, surveillance
IV. Infrastructure Development:
cameras, etc., to various Government
Departments/Organizations of Government Electronics City:
of Karnataka and other States.
Company has set up Electronics City on a
Besides, the Company continues to provide sprawling 332 acres of land on Hosur Road,
consultancy on project implementation to Bengaluru. This Electronics City is today a
various Government Departments in the major hub for Information Technology
areas of Networking, Web Creation, Software activities.
Development and Computerization plans.
KEONICS is actively involved in establishing
II. IT Education Services: IT Parks in Tier – II Cities in the State such as
IT Education Division is playing a vital role Hubballi, Kalaburgi, Shivamogga, Mysuru
in taking the benefits of IT to rural and Mangaluru. The progress made in this
Karnataka. Company has a network of direction is as under :-
around 190 franchisee training centers IT Park, Hubballi : The Government of
throughout Karnataka. One of the major Karnataka has established IT Park
activities of the Company is IT Education. in Hubballi with state-of-the art
The Company is conducting training infrastructure. The first step in this
programmes starting from Basic, Job direction was taken way back in the year
Oriented, Professional and High End 1999-2000 by setting up an IT Park with
training courses across the State from Hobli, 2,75,000sq.ft. built up area in a sprawling IT
Taluka and District level. Company has also Complex at Hubballi with a total investment
taken up computer training programme to of Rs. 42.36 crore. The Government has
Government employees. Company has also offered additional incentives including
taken up the assignment of conducting providing work space at concessional lease
computer literacy on-line test to the rentals to prospective entrepreneurs to
Government employees. Most of the utilize the space available for establishing IT
Government Sponsored Computer Training and IT enabled businesses in the Complex.
Programmes of Government of Karnataka, KEONICS has been entrusted with the
are implemented by the Company. The responsibility of maintaining the IT Park
Company is deploying these trained Complex at Hubballi by utilizing the grant
candidates to the various Government released by Government of Karnataka.
Departments/Organizations through
Manpower Supply Services Division. IT Park, SEZ, Shivamogga: The
Government of Karnataka has announced
III. Manpower Supply Services: the establishment of IT SEZ and IT Park in
Apart from pursuing the main activities of Non-SEZ areas in Shivamogga. KEONICS
the Company, the Company has been has been mandated to establish and develop
engaged in the business of providing skilled IT-SEZ and IT Park in KIADB Industrial
Manpower services to various Government Estate, of Shivamogga Bhadravathi
Departments, Boards and Corporations Highway. The land available stood at 33
through its Business Partners and acres out of which 6 acre had been allotted to
SEZ entrepreneurs.
Economic Survey of Karnataka 2019-20 453

IT Park Non-SEZ Shivamogga : Out of 33 Bengaluru has allotted 12.13 acre of land in
acres of land 5 acre utilized for the Amenity Plot No.4 of HightechDefence
establishment of IT Park, Shivamogga (Non- and Aerospace Park, Devanahalli,
SEZ) at construction cost of Rs. 16.10 crore. Bengaluru Rural District. The cost of land
The IT Park, Shivamogga consists of Ground amounting to Rs. 33.36 crore has been paid
+ four floors with carpet and common area to M/s. KIADB, Bengaluru and possession
totaling to 70623.11 sq.ft. out of which certificate of the land has also been received.
66788.73 sq.ft. has been allotted to
entrepreneurs. The IT Park is being 9.8.4 Department of Factories, Boilers,
maintained by KEONICS. Industrial Safety and Health
Department of Factories, Boilers, Industrial
IT Park, Kalburgi : KEONICS has taken up Safety Health is associated with the
IT Park project in Kalburgi in an area of responsibility of ensuring occupational
1.72 acres of land with a built-up area of safety, health and welfare of the workers in
53000 sq.ft.with a construction cost of the registered factories and at construction
Rs.9.19 crore. The construction of the IT activities through effective enforcement. The
Park Complex 1st Phase has been State of Karnataka is having 16,914
completed. Several incentives are offered to registered factories with 17,61,721 workers
the local entrepreneurs including allotting and there are 5224 registered Boilers.
workspace at very nominal rates. This park Taking into consideration the volume of
consists of Ground + four floors measuring storage of hazardous chemicals, there are 84
33552.486 sq.ft. Allotted to entrepreneurs & Major Accidents Hazardous Factories in the
four incubation centers are also 21 districts in the state. Special and
established and allotted to entrepreneurs. effective importance is given at the time of
Along with the implementation of activities inspection to avert any possible disasters.
related to establishment of IT Parks, There are about 1432 factories having
KEONICS is also involved in other activities hazardous manufacturing process and
as indicated above. The financial effective inspections are conducted to avoid
performance of KEONICS is given in possible accidents. The main objective of the
Table 9.40. department is to ensure Safety and Health of
the workers. The Department is conducting
KEONICS is poised to play a vital role in the risk based inspection of Factories to ensure
upcoming Information Technology occupational safety and Health of workers at
Investment Region (ITIR) project conceived work place. Further the, department is
and being developed by the Government of providing all the possible and required
India and Government of Karnataka near assistance to the management to ensure in
the International Airport, Bengaluru with providing occupational safety & health at
an initial investment of Rs. 1600 crore in work place. The details of registered units
and area spreading over 2100 acres in the under various production categories are
first phase. The project is aimed at housing given in Table 9.41. Registered Factories by
IT SEZ, Electronic Hardware Park among Industries in 2019-20 are presented in
other ancillary industries with an integrated Appendix 9.9.
township. Presently M/s. KIADB,

Table 9.40: Financial Performance from 2014-15 to 2019-20 Rs. in crores


2 0 1 9 -2 0
P ro v i s i o n a l
H ea d 2 0 1 4 -1 5 2 0 1 5 -1 6 2 0 1 6 -1 7 2 0 1 7 -1 8 2 0 1 8 - 19
(A p ri l 2 0 1 9 t o
D e c .1 9 )

S ale s a n d Se rv ic e
1 8 1 .0 2 2 3 6 .7 1 2 0 4. 51 3 8 8 .7 5 5 3 5 .4 5 3 59 . 73
T u rn o v e r
O t he r I nc om e 6 .8 2 5 .8 9 6. 20 6 .6 1 8 .5 8 6 . 43
T o t al T u rn ov e r 1 8 7 .8 4 2 4 2 .6 0 2 1 0. 71 3 9 5 .3 6 5 4 4 .0 3 3 66 . 16
P r ofi t b e fo re T ax 4 .9 0 9 .6 5 6. 76 1 8 .4 1 1 8 .4 1 9 . 85

P r ofi t aft e r T a x 3 .3 1 6 .1 7 4. 37 1 1 .8 5 1 1 .8 0 6 . 40

Source : KEONICS
454 Economic Survey of Karnataka 2019-20

Table 9.41: Registration of Industrial Units in Karnataka between 2019-20

Sl. No. Industrial Units 2017-18 2018-19 2019-20

1 Food Products 83 116 80

2 Paper & Paper Products 26 17 16

3 Metals & Alloys 84 148 113

Chemical manufacturing & Chemical


4 23 24 19
using Industries

5 Transports & Equipment 42 19 25

6 Textiles 96 68 58

7 Wood & Wood Products 23 24 14

8 Other 598 490 410

Total 975 906 735


Source: Department of Factories, Boilers, Industrial Safety and Health

9.8.5 Karnataka State Financial


736.35 crore.
Corporation (KSFC)
r The Corporation earned a net profit of
Industrial Finance: 9.55 crore during the FY: 2018-19.
Karnataka State Financial Corporation r The Standard Assets of the Corporation
(KSFC) is a State Level Financial Institution reached 1715.91 crore as on
established by the State Government in the 31.03.2019.
year 1959 under the provisions of SFCs Act,
1951 to cater to the long term financial r The net NPAs stood at 6.09% during the
needs of Micro, Small & Medium Enterprises FY: 2018-19.
(MSMEs) in the State of Karnataka. KSFC r During the year, the Government of
takes pride being pioneer in serving MSMEs Karnataka provided an equity capital of
of industrial and service segments in the 68.45 crore and interest subsidy
State for the past 60 years. The cumulative support of 99.94 crore towards following
Gross Sanctions of the Corporation reached schemes.
17,216.91 crore covering1,73,507 cases as Performance of the Corporation During
on 31.3.2019. Since inception upto the end The FY 2019-20 (April to November
of March 2019, 30,683 cases promoted by 2019) :
Women Entrepreneurs were assisted to an
extent of 4029.64 crore, 21,474 cases During the FY:2019-20 (April to November
promoted by Scheduled Caste & Scheduled 2019) the Corporation assisted 529 cases to
Tribe Entrepreneurs were assisted to an an extent of 475.14 crore, disbursed
extent of` 1,904.28 crore and 1,283.49 crore 496.22 crore and recovered 443.61 crore.
was sanctioned to 19,210 cases promoted by The Corporation earned a half year (April to
Entrepreneurs belonging to the Minority September 2019) net profit of 19.04 Crore
community. during 2019-20.
Major Achievements during The performance of the Corporation in the
FY: 2018-19: key areas of operations is summarized in
r During the FY: 2018-19, the Table 9.42. Assistance sanctioned and
Corporation Sanctioned 1,098.73 crore, disbursed by KSFC are presented in
disbursed 665.90 crore & recovered Appendix 9.10.
Economic Survey of Karnataka 2019-20 455

Scheduled Caste Entrepreneurs 43.00 crore


Scheduled Tribes Entrepreneurs 12.00 crore
Women Entrepreneurs 32.94 crore
First Generation Entrepreneurs 2.00 crore
Interest Subvention for Manufacturing Industries 10.00 crore

Table 9.42: Performance of KSFC (in Crore)

Sanctio ns Dis bursement Recovery


Period
No . Amount Amount Amo unt

April’11 to Nov.’1 1 8 76 508.3 3 33 3.09 398.18

FY 201 1-12 14 85 817.3 2 59 7.08 660.90

April’12 to Nov.’1 2 9 79 564.3 9 43 1.98 465.44

FY 201 2-13 15 98 944.0 6 73 4.70 792.89

April’13 to Nov.’1 3 8 59 553.9 2 39 4.16 536.18

FY 201 3-14 14 26 909.2 6 70 7.47 836.52

April’14 to Nov.’1 4 6 20 343.4 0 32 8.19 509.30

FY 201 4-15 10 92 675.1 5 55 3.62 814.00

April’15 to Nov.’1 5 6 53 391.6 7 33 2.87 532.64

FY 201 5-16 11 11 731.9 4 56 6.36 841.10

April’16 to Nov.’1 6 6 39 468.7 9 34 1.18 545.59

FY 201 6-17 10 59 733.4 3 61 4.38 884.73

April’17 to Nov.’1 7 5 91 452.3 0 30 5.23 503.15

FY 201 7-18 10 37 842.1 3 56 1.21 787.91

April’18 to Nov.’1 8 5 33 448.9 1 35 6.02 476.45

FY 201 8-19 10 56 1098.73 66 5.90 736.35

April’19 to Nov.’1 9 5 29 475.1 4 49 6.22 443.61

Source: Karnataka State Financial Corporation

9.8.6 Karnataka State Industrial medium sector. KSIIDC has stopped


Investment & Development Corporation financial lending activity since October 2002
(KSIIDC) onwards. At present, recovery of the past
KSIIDC, established in 1964, has been lending/advances and loans and
greatly instrumental in the industrialization disinvestment of Equity are the main
of the State, especially in the large and activity. However, certain Investments as
per the directions of Government of
456 Economic Survey of Karnataka 2019-20

Karnataka are being made from time to time. e) City Gas Distribution Project for
Bengaluru.
KSIIDC continued its proactive role in the
promotion of infrastructure projects on Also, KSIIDC will continue to act as Nodal
Public Private Partnership model and its role Agency of the State Government in respect
as nodal agency for Bengaluru International of the specified projects assigned from time
Airport Project. Duly noting the initiatives to time by the State Government.
taken up by KSIIDC in the infrastructure
In addition to the above activities in the
sector, the name was changed to “Karnataka
infrastructure sector, the following existing
State Industrial and Infrastructure
activities will be pursued.
Development Corporation Limited” with
effect from November 22, 2010. a. Settlement of remaining loan accounts
under the proposed new OTS policy
As the nodal agency of the State
Government, KSIIDC has initiated activities b. Sale of primary assets taken over under
for the development of the following projects section 29 & recovery of advances
which will be pursued for completion during through legal recourse under SFC &
12th five year plan. other Acts.
a) Expansion of the Bengaluru International Besides, KSIIDC through its Joint Venture
Airport; Company with IL & FS, Viz KSIIDC would
extend advisory services for project
b) Development of Bengaluru Signature
development to the Government Agencies
Business Park;
for development of their projects on PPP
c) Development of Bengaluru International model. Performance of KSIIDC from 2015-
Convention Centre adjacent to the 16 to 2019-20 (upto November 2019) are
Kempegowda International Airport on given in Table 9.43. Department target &
PPP mode; achievements are given in Appendix 9.11.
d) Development of Airstrips and Helipads;
and
Table 9.43: Performance of Karnataka State Industrial and Infrastructure
development Corporation limited from 2015-16 to 2019-20 (Upto November 2019)
Achievement Target
Achievement Achievement Achievement
2017-18 2018-19 2019-20
Programme/ (up to (up to (up to
Unit
Scheme November November November
2015-16 2016-17 2017-18
2017) 2018) 2019)
(Provisional) (Provisional) (Provisional)

I. Sanctions

a) Loan 0.00 0.00 0.00 0.00 0.00 0.00


(Rs.in
b) Equity 0.00 0.00 0.00 0.00 0.00 0.00
crores)
c) Others* 5.00 5.00 5.00 5.00 0.00 0.00

II. Disbursements

a) Loan 0.00 0.00 0.00 0.00 0.00 0.00


(Rs.in
b) Equity 0.00 0.00 0.00 0.00 0.00 0.00
crores)
c) Others* 0.00 1.50 1.60 1.60 0.51 1.12
(Rs.in
III. Recovery 26.13 15.95 35.44 6.88 15.31 12.78
crores)
Note: KSIIDC has stopped financial lending activity since October 2002 onwards. At present, recovery of the
past lending/advances and loans and disinvestment of Equity are the main activity.
* Others : Venture Capital Fund
Economic Survey of Karnataka 2019-20 457

9.8.7 Department of Public Enterprises Husbandry, Energy, Housing, Transport,


Government of Karnataka had established Co-operation etc. While more than 36
the Karnataka State Bureau of Public Enterprises are profit making and rest are
Enterprises in the year 1981. Later on, in the experiencing loss. State Public Sector
year 2002 this Bureau was converted as The Undertakings play a key role in the socio-
Department of Disinvestment economic development of the State. Their
and Public Enterprises Reforms. mandate is primarily development and
The main aim/object of this department welfare oriented with the objective of
is to take decisions in matters assisting the Government in better
relating to disinvestment, restructuring, governance and to provide requisite
amalgamation etc. In the year 2005 services. In keeping with their mandate, it is
Government had accorded independent imperative that systems and structures be
status to this department and re-named it as put in place to enhance their efficiency,
The Department of Public Enterprises. This streamline their efficacy and optimize their
department is vested with the responsibility output to enable them to cope with a highly
of monitoring, regulatory, evaluator and competitive and fast changing environment.
advisory functions for the betterment of the Hence, the Department sponsors evaluation
Enterprises. of PSU's from reputed institutions in order
to enable the loss making PSU's to move
Out of the 60 operating units, details of the towards profit.
profit-making top 5 State-level Public
Enterprises in Karnataka are given in Table In order to update knowledge and skill, the
9.44. Department also conducts Management
Development and Training programmes to
The 60 State Level Public Enterprises in the officers and officials working in the PSEs
Karnataka are grouped into various sectors which aim at improving the performance in
like Agriculture, Horticulture, Animal the areas of productivity, marketing,

Table 9.44: Performance of top 5 State Level Public Enterprises in Karnataka.


Enterprise status as on 31-03-2019 Enterprise status as on 30.11.2019

Sl. Name of the Investment Employment Profit Investment Employment Profit


No. Enterprise (Rs. (in (Rs. (Rs. (in (Rs.
in Lakh) Numbers) in Lakh) in Lakh) Number) in Lakh)

Karnataka Power
01 476944.86 4482 24435.23 476944.86 4437 31472.59
Corporatio n Limited

Karnataka State
55.75
Agricultural Produce 136.62
02 50.00 8 50.00 8 (Profit before
Processing &Export (Profit After Tax)
Tax)
Corporatio n Limited

Karnataka Rural
Infrastructure
03 1225.00 774 20350.26 1225.00 774 12000.00
Development
Limited

Mysore Paints & 1889.45(PBT) 375.35(PBT)


04 103.65 47 103.65 46
Varnish Ltd. 1337.94(PAT) (Provisional)

Karnataka Silk
05 Industries 3600 490 3601.97 3600 452 2050.00
Corporation Ltd.

Source : Department of Public Enterprises


458 Economic Survey of Karnataka 2019-20

finance, Human resources, administration, employment. The policy aims to enhance


industrial regulations, environment and share of manufacturing in GDP to 25%
ecology, industrial safety etc, through within a decade and create 100 million jobs
various recognized institutions. with appropriate skill sets, increase the
depth in manufacturing and enhance global
Further, in order to recognize, motivate and
competitiveness.
appreciate the best performing Public Sector
Enterprise, this Department gives Annual The Karnataka Manufacturing Taskforce
'Chief Minister's Ratna Award' for the best (MTF) constituted by the State Government
performing Public Sector Enterprises, every to study the manufacturing sector in
year. This year to promote and enhance the Karnataka and suggest interventions to
efficiency of Public Enterprises in drive growth in the sector in a sustainable
Karnataka, the following five companies and holistic manner, taking into account
have been selected to receive the Chief global trends and existing challenges in the
Minister's Ratna Award. manufacturing sector has given its valuable
recommendations and suggestions. It is in
r Karnataka State Minerals Corperation
this context that the State Government is
r Karnataka Supplies and Detergent desirous of formulating a new Industrial
limited Policy to be in alignment with the objectives
r Mangalore Electricity Company Limited and goals of the National Manufacturing
r Karnataka Silk Companies Limited. Policy 2011 and the recommendations of
Bangalore Karnataka Manufacturing Taskforce (MTF)
which would enable smooth transition of
r Karnataka Women Development policy measures for the benefit of investors
Limited in the State.
9.9 INDUSTRIAL POLICY INITIATIVES
The Government of Karnataka has
AND INDUSTRIAL INVESTMENT
announced the New Industrial Policy 2014-
The State Government now intends to 19, vide Government Order No.CI 58 SPI
consolidate the strategies and achievements 2013 Bengaluru Dated: 1.10.2014.
made so far by providing adequate Industrial investments proposed through
infrastructure support with attractive filing of industrial entrepreneurs'
enhanced incentives and improved memorandum (IEM) and issuing of
facilitation mechanism coupled with industrial licenses (IL) are presented in
governance reforms. Government of India Table 9.45. There is decrease in the number
has come out with the National of Industrial Entrepreneurs Memorandum
Manufacturing Policy in 2011 with the filed andamount of proposed investment
objective of accelerated development, upto October 2019 when compared to
inclusive growth and provision of gainful
Table 9.45: Details of Industrial Approvals in Karnataka

January - December
Particulars 2019
2016 2017 2018
(up to Nov.19)
Industrial Entrepreneurs
285 194 142 224
Memorandum filed (Nos.)
Proposed investment (Rs. crores) 1,54,173 1,52,118 90,583 71,475
Letter of Intent & Direct Industrial
2 - - -
Licenses issued
Proposed Investment (Rs. crores) 42 - - -

Source : Department of Industrial Policy & Promotion, GoI.


Economic Survey of Karnataka 2019-20 459

Table 9.46 : State-wise FDI Equity Inflows1 (Amount US Dollar in Million)

Cumulative
Reserve Bank 2016-17
Sl. 2017-18 2018–19 2019–20 Inflows % to
of India – States
(Apr. to (Apr. to (Apr. to (Apr. to (April Total
No. Regional Covered
Mar.) Mar.) Mar.) Sept.19) 2000 – Inflows
Office2
Sept. 2019)

1 2 3 4 5 6 7 8 9

Maharashtra, 29%
Dadra & Nagar
1 Mumbai 19,654 13,423 11,383 3,617 1,30,706
Haveli, Daman &
Diu

Delhi, Part of UP 21%


2 New Delhi 5,884 7,656 10,142 7,171 91,812
& Haryana
9%
3 Bangalore Karnataka 2,132 8,575 6,721 4,649 42,320

7%
Tamil Nadu,
4 Chennai 2,218 3,475 2,613 1,348 31,196
Pondicherry

5%
5 Ahmedabad Gujarat 3,367 2,091 1,803 3,461 24,006
4%
6 Hyderabad Andhra Pradesh 2,195 1,246 3,457 512 18,981

1%
West Bengal,
Sikkim,
7 Kolkata 50 218 1,229 418 5,850
Andaman &
Nicobar Islands

Kerala, 0.5%
8 Kochi 454 208 257 152 2,373
Lakshadweep

Chandigarh, 0.5%
Punjab,
9 Chandigarah Haryana, 6 108 618 303 2,393
Himachal
Pradesh

10 Jaipur Rajasthan 165 117 363 88 2,048 0.5%

Madhya Pradesh, 0.3%


11 Bhopal 76 28 32 6 1,437
Chattisgarh

12 Panaji Goa 83 43 16 6 989 0.2%

Uttar Pradesh, 0.2%


13 Kanpur 8 90 34 5 699
Uttaranchal
592 0.1%
14 Bhubaneshwar Orissa 12 65 69 43

Contd...
460 Economic Survey of Karnataka 2019-20

Cumulative
Reserv e Bank
2016-17 2017-18 2018–19 2019–20 Inflows % to
Sl. of India – States
(Apr. to (Apr. to (Apr. to (Apr. to (April Total
No. Regional Covered
Mar.) Mar.) Mar.) Sept.19) 2000 – Inflows
Office2
Sept. 2019)

1 2 3 4 5 6 7 8 9
0.03%
Assam,
Arunachal
Pradesh,
Manipur,
15 G uwahatti 2 13 7 7 122
Meghalaya,
Mi zoram,
Nagaland,
Tri pura

0.03%
16 Patna Bihar, Jharkhand 10 10 0.03 0.6 113

-
Jammu &
17 Jammu 0.2 - 0.06 0.1 6
Kashmi r
20%
Region Not
18 7,162 7,491 5,624 4309 90473
Indicated

Sub-Total 43,478 44,857 44,366 26,096 4,46,116 -


- -
RBI’s- NRI
Schemes
19 - - - - 121
( from 2000 to
2002)
-
Grand Total 43,478 44,857 44,366 26,096 4,46,237

1. Includes 'Equity Capital Component' only


2. The Region-wise FDI inflows are as per RBIs – Regional Office received FDI inflows furnished by RBI,
Mumbai
Source : Department of Industrial Policy & Promotion, GoI

December period in 2018. receiving an investment proposal to the


eventual implementation of the project.
9.9.1 Foreign Direct Investment (FDI)
It acts as a secretariat for State High Level
Details of State-wise FDI inflows from 2016-
Clearance Committee (SHLCC) chaired by
17 up to 2019-20 (upto September 2019) as
Hon'ble Chief Minister for projects above
well as cumulative FDI inflows from April
Rs.500.00 crores & State Level Single
2000 till September 2019 are given in
Window Clearance Committee (SLSWCC)
Table 9.46. The total FDI inflows to the
chaired by Minister for Large & Mega
State in the last decade accounted for 9% of
Industries for projects between Rs.15 to
the total FDI inflows to India and Karnataka
500.00 Crores.
stands Third among Indian States, in terms
of quantum of FDI inflows. During 2019-20, 12 SLSWCC meetings were
held under the Chairmanship of Hon'ble
9.9.2 Karnataka Udyog Mitra (KUM) Minister for Large and Medium Industries,
Karnataka Udyog Mitra (KUM) is a single Government of Karnataka and 30 projects
contact point for all investors who are with an investment of Rs.1,885.89 crores
looking at setting up enterprises/business were approved. These projects are likely to
in Karnataka. As a nodal agency, its role is to create employment to 21,768 people.
facilitate investments & execute initiatives
to enable a smooth transition, from The details of projects cleared indicating the
investment & employment to be generated
Economic Survey of Karnataka 2019-20 461

Table 9.47 : Projects approved by State Level Single Window Clearance Committee
(SLSWCC)

Investments Employment
Year Approved Projects (Rs. in crores) (in Nos.)

2019-20 30 1,885.89 21,768

Source: Karnataka Udyog Mitra

Table 9.48 : Events held in 2018-19

S l. No. E vents N am e D ate P lace

20th – 24th Air Fo rce Station , Y elahan ka,


1. Ae ro sh ow
F ebr uary , 2 019 B en galuru

AS EAN Ch am ber s o f
25th – 27th
2. Co mme rce & In dustry T he Lalit Ash o k, B eng alur u
F ebr uary , 2 019
Busin ess M eet – 2 019

B en galuru In tern ation al


Futur e Mo bility Sh ow 26-28
3. E xh ibition C entr e, B eng alur u,
(FMS 20 19) F ebr uary , 2 019
I n dia
Electr ic Veh icle
4. 30th Jan uar y, 2 019 T aj West End , Be ng alur u.
Summ it 2019

Vibran t Gujar at Gl obal T he Exh ibitio n C en tr e,


5. 18 -22 Jan uar y, 2 019
Summ it 2019 Gan dh inagar

6. Pravasi B har atiy a Divas


21-23 January 2019 Var an asi, U ttar Pr adesh
(PBD)

In dia Ph ar ma 20 19 &
7. In dia Medic al Device 1 8-19 F ebr uar y, 2 019 B en galuru
2019

8. IMTE X & To o lte ch 2019 24 t h Jan uar y, 2019 B en galuru

9. Reco mm erce Ex po 2019 1-3 Fe bru ary , 201 9 B en galuru

10. Tech Cir cle Liv e S um mit 25 June 2019 I TC Gar den ia Hotel, Ben g aluru

Auto Tech n ika& Gree n


11. 14 June 2019 B IEC , B eng alur u
Vehic le Ex po 2019

21st W or ld C on gr ess on
En viro nm ent
Manage men t and
12. 4th to 5th July, 2019 B en galuru
Climate Chan ge &
Pres entation o f Go lden
Peaco ck Aw ards

Ae ro space &De fen ce


HAL c on ven tion cen tre,
13. Manufacturin g s ho w - 9th & 1 0th Aug 2018
B en galuru
ADM S 2 018

Source: Karnataka Udyog Mitra


462 Economic Survey of Karnataka 2019-20

Table 9.49 : Invest Karnataka Forum

Sl. No . Particulars

1. International SM E Conventi on held from 22nd to 24th April, 2018 at New Delhi

2. Global Exhib ition on services held from 15th to 18th May, 20 18 at Mumbai

Signature Golf Tournament (IACC Green TE E – 20 18) & annual American


3.
Independence Day celebrations scheduled on 2 6th June at Bengaluru Golf Club

4. India Innovation Summit, Karnataka held from 12th to13 th July, 2018 at Bangalore

Fi fth edition of Aerospace &Defence M anufacturing Show – ADM S 2 018 held from 9th
5. to 10th Aug, 20 18 at Bengaluru

International Business Convention Forging Li nks Leveraging Networks-Reaching Out -


6. FLLN 201 8 scheduled on 2 3rd August, 201 8 at Bengaluru

7. Taiwan-Indi a Industrial Collaborati on Summit scheduled on 29 th August, 2 018 at


New Delhi

8. 8t h International Conference on 3 D printing and Ad ditive M anufacturing Technologies


held from 7th to 8th Sept, 2018 at Bengaluru

9. 26th CII Quality Summit 2018 scheduled on 23rd to 24th Nov, 2 018 at Bengaluru

10. Global Auto Busi ness Summit (GABS) scheduled on 2 9th Nov, 201 8 at New Delhi

11. Bauma CONEX PO INDIA 2 018 held from 1 1th to 14th December 201 8 at New Delhi

Comp rehensive Capacity Building and Continuous Improvement Program CII EXPOR T
12. CLINIC New Markets and Emerging O pportunities scheduled on 12th Dec, 2 018 at
Bengaluru

13. Kisan Fair 2018 held from 12th to 16th Dec, 2 018 at Pune

14. India International Mega Trade Fair held from 14th to 25th Dec, 20 18 at Kolkata

Source: Karnataka Udyog Mitra

by the projects cleared be the State Level Policy 2014-19 and it gives emphasis on
Single Window Clearance Committee providing good infrastructure support for
(SLSWCC) For the year 2019-20 are given in promotion of industries. In order to provide
Table 9.47. world class industrial infrastructure
support, the policy proposes to encourage
Karnataka UdyogMitra has participated in
private investment in establishing industrial
the following events 2018-19and is given in
area/ estate either individually or through
Table 9.48. Karnataka UdyogMitra has PPP mode.
participated in the following important
domestic events which was a part of The Policy aims at holistic development of
investment promotion activities are given in the State and looks beyond Bengaluru with
Table 9.49. equitable distribution of industries all over
Karnataka.
9.9.3 Major Industrial Policy Initiatives
Karnataka Industrial Policy 2014-19 Incentives and Concessions offered in the
policy are as follows:
Government has brought out New Industrial
Economic Survey of Karnataka 2019-20 463

i. Interest Free Loan to Large, Mega, Ultra x. Incentives for Technology Upgradation,
Mega and Super Mega enterprises on Quality Certification for MSMEs
Net VAT and CST Incentive is interest (Interest subsidy – 5%, ISO series
free loan of 40 % to 100% of NET Certification – 75% or maximum of Rs.1
VAT+CST with max limit of 100 % of lakh, BIS Certification – 75% to 100%
value of fixed assets for a period of 7 subject to maximum of Rs.1 lakh,
years to 14 years depending on Technology Adoption – 25% to 50%
investments and zone. subject to maximum of Rs.1 lakh,
Technology Business Incubation
ii. Anchor Industries: Anchor Units
Centre - 25% to 50% subject to
(Manufacturing enterprises in a taluk
maximum of Rs.75 lakh, Recycling of
providing a minimum direct
electronic waste and plastic waste - 5%
employment of 150 persons with a
or subject to maximum of Rs.15 lakh)
minimum investment of Rs.250 crore)
based on the investment and location of
are given special importance by
project. (Details of Zones)
providing special investment promotion
subsidies and enhanced tax related xi. Incentives for Water Harvesting/
incentives for taking the industries to Conservation Measures (Manufacturing
taluks where industrial activity needs to SMEs Only) (Rainwater harvesting -
be encouraged. 50% to 75% subject to maximum of
Rs.1.5 lakh, Waste water recycling -
iii. Investment Promotion Subsidy ranging
50% to 75% subject to maximum of
from minimum of Rs.9 Lakhs to a
Rs.7.5 lakh, Zero discharge process -
maximum of Rs.65 Lakhs based on
50% to 75% subject to maximum of
investment and location of project
Rs.7.5 lakh) based on the investment
(Details of Zones)
and location of project. (Details of
iv. Stamp Duty Exemption & Concessional Zones)
Registration Charges
xii. Energy Conservation: Manufacturing
v. Reimbursement of Land Conversion Fee MSMEs (Energy conservation measures
from 75% to 100% based on investment - 10% to 15% subject to maximum of
and location of project (Details of Zones) Rs.7.5 lakh, Non conventional energy
sources - 10% to 15% subject to
vi. Exemption from Entry Tax: 100 % on
maximum of Rs.7.5 lakh, Captive power
Plant and Machinery for period of 3 to 5
generation subsidy – Rs.0.5 to Rs.0.75
years and 100% on Raw Material for
per unit through Solar and Wind
period of 5 to 8 Years based on the
energy) based on the investment and
investment and location of project
location of project. (Details of Zones)
(Details of Zones)
xiii. Focus on MSME: Special attention has
vii. Subsidy for Setting up Effluent
been given to this sector by reserving
Treatment Plant (ETP) from 50% of cost
20% of the allotable land in each
of ETP subject to a maximum of Rs.50
industrial area. Further, an attractive
Lakhs to 75% of cost of ETP subject to a
package of incentives and concessions
maximum of Rs.100 Lakhs based on the
provided in the policy coupled with
investment and location of project
suitable measures for marketing and
(Details of Zones)
financial support for MSMEs are
viii. Interest subsidy (Micro enterprises proposed.
only) of 5% for period from 4 years to 7
years based on the investment and xiv. Inclusive Growth: The Policy not only
location of project (Details of Zones) aims at spreading industries all over
Karnataka, it also aims at inclusive
ix. 100% Exemption from Tax on growth covering all sections of the
Electricity Tariff (for MSMEs) for period society like Women, SC/ST, Backward
from 4 years to 8 years
464 Economic Survey of Karnataka 2019-20

Classes & Minorities, special package of sections.


incentives and concessions have been
given to them. In order to accommodate the above and also
to broad base the scope of the policy, the
i. For SC/ST Entrepreneurs: following amendments were brought to the
existing Karnataka Industrial Policy
1. KIADB/KSSIDC to reserve 22.50% of
2014-19.
allotable area
r The provisions along with the revised
2. KIADB/KSSIDC to allot land at
incentives of the Karnataka
subsidised rates at 30% to 40 % subject
Pharmaceutical Policy 2012 have been
to maximum of Rs.35 lakhs based on
annexed to the Industrial Policy 2014-
the investment and location of project.
(Details of Zones) 19 as Annexure 7.
r A new chapter for the promotion of
ii. For Women entrepreneurs: Medical Devises in the State with
1. KIADB/KSSIDC to reserve 5% of attractive incentives and concessions is
allotable area appended as Annexure 8.
2. Special package of incentives r To have a focused approach, propagate
the policies and opportunities in the
iii. For Minorities, Backward Classes, Pharma sector, a Vision Group headed
Physically challenged persons, by Sector expert is proposed.
Ex-Servicemen entrepreneurs r It is proposed to organize Annual/
1. KIADB/KSSIDC to reserve 5% of Biennial Pharma trade show and
allotable area conferences which will help consolidate
the eminent position of Karnataka.
2. Special package of incentives
Amendments to Aerospace Policy
xv. Encouragement to Non Resident 2013-23
Kannadigas (NRKs)
National Civil Aviation Policy, 2016 &
xvi. Additional Package of incentives and changes in policy pertaining to Defence
Concessions to focused Manufacturing Sector have brought into focus
sector i.e., Automotive & Machine Tools opportunities for investments in the
(Excluding Steel and Cement) Ultra and Aerospace, Defence & MRO sector in India
Super Mega projects
Industry experts have represented to
xvii. Special Incentives – special package of Government to broad base the scope of the
incentives and concessions and Aerospace Policy 2013-23 to cover the MRO,
relaxation in the conditions mentioned Civil Aviation etc and also to match the
in the policy will be considered for incentives and concessions offered in other
deserving cases. States.
Amendments to New Industrial Policy In order to bring clarity to the Aerospace
2014-19 Policy 2013-23 & applicability of Industrial
Karnataka Pharmaceutical Policy 2012 Policies 2014-19 and also to broad base
formulated by Health & Family Welfare the scope of the Policy, the following
Department was transferred to C&I amendments were brought in to the existing
Department in October 2015. Govt. of India Aerospace Policy 2013-23.
has published the draft National Medical r A new para focusing on skills in
Devices Policy 2015. Budget 2016-17 has Aerospace Sector is inserted.
announced allotment of industrial plots and r Incentives and Concessions for
shed to SC/ST at concessional rate and Aerospace Sector were available to units
reservation of plots/sheds to weaker
Economic Survey of Karnataka 2019-20 465

coming up in designated aerospace l Anchor unit subsidy for first two


parks in Zone 4 i.e in and around manufacturing enterprises
Bengaluru – in order to encourage Electronic System Design and
investments in Aerospace Sector, which Manufacturing
is a specialized sector, the incentives are
proposed for investments coming up in r 4th largest producer (contributing 10%
Zone 4 including units coming up even to national output) growing at 18%
in other than designated parks. CAGR in 2008 – 13.
Besides, State has sector specific policy like r Karnataka is 2nd largest chip design
Textile Policy, IT &BT Policy, Electronics and hub in the country.
Semiconductors, Tourism Policy, Integrated Karnataka ESDM policy
Agri Business Policy, Solar Policy and
infrastructure Policy. r Capital subsidy for anchor units in
Greenfield clusters
Highlights of Strengths and Incentives
r Fiscal incentives in the form Capital
Offered for Various Sectors
subsidy and R&D subsidy
Biotechnology r Monetary support for filing patents
r Bengaluru is the number 1 biotech hub r Two ESDM clusters coming up with
in India with revenues of 1.18 bn in total investment of USD 25 mn
2013-14 (Bangalore and Mysore) with facilities
r Biopharma is the biggest segment of like
biotech industry (~60%) l Rapid prototyping
r Karnataka contributes to around 1/3rd l Proto PCB Manufacturing
of the BT exports of the country. l SMT assembly line with Testing
r It is home to over 50% of the country's facility
Biotech companies. l Calibration center
r Bio-Ventures Fund and Bio Innovation l EM Discharge Simulation Lab, Tool
Centre being established with state-of- room and moldings
the-art laboratory facilities First state to roll out ESDM skill
l Fund of INR 50 crore in partnership development program, aiming to train
with a VC firm 15,000 youth in 5 years
l Bengaluru Bio Innovation Centre – Two World class innovation centers for
25 fully furnished labs to promote designing, prototyping, testing,
innovation driven R&D startups characterization and certification (IIIT-
r Biotech startups growing at 30% Bangalore and STPI-Bangalore).
annually in the state. An upcoming ICT Academy of Karnataka in
r First state in the country to bring out association with Government of India &
biotech policy. 5 Biotech Finishing NASSCOM for industry oriented ICT Skill
Schools offering post graduate Development Programs.
diploma, Centre for Human genetics Government of Karnataka in partnership
conducting courses and workshops for with STPI set up SMART
scientists and clinicians, Institute Lab(Semiconductor Measurement, Analysis
of Bioinformatics and Applied and Reliability Test Lab), a state of the art
Biotechnology offering courses for PG, lab to test, measure parameters and
M.Sc, and PhD. conduct failure analysis of chips.
r Karnataka has the highest R&D
expenditure in south India (3rd in the Animation, Visual Effects, Gaming &
country) Comics
l Biotech parks being developed. r Karnataka is the first state roll out a
l Research labs under green category
dedicated AVGC policy.
r Karnataka has presence of prominent
players in the AVGC industry.
466 Economic Survey of Karnataka 2019-20

r Bangalore based companies have r 80% (400) Fortune 500 companies have
contributed to Oscar winning and many their outsourcing operations in
nominated movies. Karnataka.
r Presence of bodies like Association of r Bengaluru has been ranked 2nd in
Bangalore Animation Industries (ABAI) Global startup ecosystem growth index
serving as a 'nodal connector' between by “Compass”.
the industry, academia and government r ICT Skill Development Society provides
greatly help the sector in the state by an opportunity for industry
incubating, skill development, stakeholders to train personnel for their
networking and creating new specific requirements.
initiatives. Various initiatives are being
r Government of Karnataka/KBITS in
undertaken to develop talent pool in the
partnership with NASSCOM set up the
state:
first start up warehouse in the country
r Train the Trainer – Six weeks training to provide startups with.
program including practical work,
r The Karnataka's i4 policy aims to
activities, individual and group projects
increase penetration of sector to other
to enhance the skills of the trainers.
parts of the state. The policy also
r Digitalisation of Art Colleges – Digital provides number of incentives to
Arts Training centers being set up in startups, SMEs as well as Mega
willing colleges in association with ABAI Projects.
to teach latest skills with a curriculum
r The Karnataka Startup Policy 2015 – 20
designed by ABAI experts.
shall also help improve the ecosystem
r AVGC Finishing Schools to be set up in by creating incubation infrastructure,
the state aimed to raise skill quotient at fostering partnership between R&D
entry & get students industry-ready institutions and industry and
and providing skill enhancement of channelizing innovation for social
fresh graduates by industry internship impact.
& apprenticeship.
r More than 900 acres of land available in
r Government of Karnataka has declared various parks and investment zones.
development of Digital Media City
providing core media services catering Infrastructure
to entire value chain of media and r Karnataka has been an Investor friendly
entertainment industry. state with many flagship projects
r Investment Opportunities in upcoming undertaken in partnership with private
sector under the PPP model
l KAVGC Park
r Bengaluru International Airport which
l Digital Media City
is now the third largest and one of the
l AVGC Lab most preferred airport in India was done
IT and ITeS in partnership with GVK
r Karnataka is the largest software r Karnataka is flag bearer in terms of
exporter in India, contributing to 1/3rd pioneering PPP models such as Hybrid
of total export. annuity models
r Karnataka is expected to be the largest r Number of other success stories in
IT cluster globally by 2020, employing urban water supply, bus station
around 2 million people. developments transport and industrial
parks
r Karnataka is the 4th largest
technological cluster in the world r Our infrastructure Policy recently
approved by State Cabinet gives clarity
r Karnataka's IT – BPM revenue is on the procurement models for various
envisaged to grow to USD 90bn in 2020 strategic infrastructure projects which
from 50bn in 2015.
Economic Survey of Karnataka 2019-20 467

include new capacity creation as well as investments from Government of India


operations and maintenance of existing and multi-lateral agencies such as
infrastructure JICA. Other industrial parks focused on
r We have many flagship infrastructure Agri-Business and Food processing
investment projects where we look such as Sea Food Park in Mangalore
forward to partnering again with and IT-BT parks across the states are
reputed investors. being planned which present
investment opportunities to develop
r Roads – In roads sector we have these industrial parks on a PPP basis.
identified 23 projects with more than
1900 km opportunity under KSHIP and r Urban Infrastructure – The Dabhol-
KRDCL with total investment Bengaluru gas pipeline presents a
opportunity of Rs. 4600 crore. unique opportunity for the state to build
City Gas Distribution network in
r Water – To ensure sustainable water multiple urban centers. The first
supply for urban centers, we are investment opportunity in this sector is
binging Integrated water supply and presented in the Bengaluru with a 1583
water recycling projects with a INR 125 inch-km plan over 5 years to further
crore investment opportunity. cover Bengaluru Urban and Rural
r Ports- We have more than 330km long districts completely in next 25 years.
coastline which we want to continue The first phase investment requirement
developing for maritime trade. We have is Rs. 750 Crore which can benefit over
identified potential Port Development 1.5 lakh domestic customers.
opportunities at Tadri, Belekari, Karwar Agri Business and Food Processing
and other ports our western coastline.
r Karnataka is the leader in horticulture
r Airports – We want to improve regional
and floriculture business. The state is
connectivity within our state with
the largest exporter of Gherkins and
development of airstrips, helipads and
Flowers in the country.
regional air-travel and air-taxi services.
There are multiple urban centers such r Karnataka is R&D hub of the country
as Mysuru and Hubballi-Dharwad, with 5 national level R&D institutes in
attractive tourist destinations such as Agriculture and Horticulture
Coorg Valley and Chikmagalur which r Karnataka is leading the country in
can be connected with Bengaluru sector reform, being the first state with
through NON-SCHEDULED Air Taxi unified platform for commodity trade
services. We ARE inviting investors to (ReMS) and to have unveiled dedicated
take advantage of Government of India Agriculture and Wine Policy.
Regional Air Travel policy initiative and r Karnataka is the Coffee Capital of India
our own air strip development producing 70% of India's output.
programme to invest in this lucrative
sector. r The state has revealed Karnataka
Agribusiness and Food Processing
r Industrial Infrastructure – Karnataka Policy 2015, focussed towards
is focusing on development of sustainable development for the entire
manufacturing sector within the state value chain of Agri Business and Food
by creating holistic ecosystems for Processing Sector. The policy declares
nurturing investments in industrial the state as a single zone, providing
projects. Karnataka is home to two incentives uniformly.
major industrial corridor initiatives, the
Chennai, Bengaluru, Chitradurga r There is opportunity in Karnataka to
Industrial Corridor and Bengaluru invest in new farm technology like solar
Mumbai Economic Corridor under powered pumps, drip and sprinkler
which 9 world class industrial irrigation and also in organic farming
townships will be created with help of and cold chains.
468 Economic Survey of Karnataka 2019-20

Tourism producing state in the country,


contributing 8.5% to the national
r Karnataka is recipient of Best State in
output in the sector.
Integrated Development and Innovation
Award by Travel Awards in 2015. r Automotive is one of the focus sector
identified in the Industrial Policy 2014 –
r Karnataka is home to variety of tourist
19. The state has proposed initiatives
attractions ranging from wildlife to
like 'Karnataka Automobile Research &
cities, heritage structures to adventure
Innovation Centre' and creation of
sports, spiritual destinations and
FTWZ for engineering sector in the
beaches.
policy to further strengthen
r Tourist visits to Karnataka have Karnataka's position in the sector. The
increased sevenfold in 2008 – 2013. policy provides additional package of
r Pride of South, Southern Splendors - incentives Ultra Mega (INR 500 – 1000
Luxury tourist trains sojourning crore) and Super Mega (> 1000 crore)
through well-known and off beat projects in automotive sector.
destinations of Karnataka and other r Karnataka has a huge local market with
parts of south India, providing world more than 14 million registered vehicles
class travel experience. in the state and connectivity to four of
r Jungle Lodges & Resorts Ltd - 18 resorts the top five automobile markets in the
and 2 heritage hotels promoting eco and country, creating potential for
adventure tourism in the state. automobile and component
r Government of Karnataka has manufacturers to grow.
undertaken various initiatives to ensure r Land bank of more than 19000 acres
quality of service, safety and security of across the state. The Industrial Policy
tourists like Karnataka Tourism Trade 2014 – 19 provides higher quantum of
Facilitation Bill, Empanelment of Rating incentives for units in backward parts
Agencies. of the state, promoting inclusive growth
r The new Tourism Policy 2015 – 19 aims of the state.
to encourage Mega Tourism Projects Machine Tools & Heavy Engineering
and position Karnataka as preferred r Karnataka is the second highest
tourist destination. The policy has producer of Special Purpose Machinery
envisaged private investment of INR and Heavy Electrical Machinery in the
27,000 crore in 2015 – 20, generating country.
employment for 30 lakh people.
r Karnataka is the only state among the
r A range of projects have been identified top five capital goods producing states
with investment potential of more than to produce more special purpose
INR 1100 crore in the following machinery than general purpose
categories machinery (in terms of value), clearly
l Cruise Tourism showcasing state's capability in
l Adventure Tourism – Water based manufacturing high value products.
and cable cars r Karnataka is the leading state in
l Hotels & Resorts Machine Tools industry with Bengaluru
is alone producing 60% (in terms of
l Theme Parks
value) of the machine tools in the
l Wayside Amenities country.
Automobile & Auto Component r India's first Integrated Machine Tool
r Karnataka is home to 7 major OEMs and Industry Park was set up near
more than 50 auto component Bengaluru in an area of 300 acres by
manufacturers. India Machine Tools Manufacturing
Association.
r Karnataka is the 4th largest automobile
r Advanced Machine Tool Testing Facility
(AMTTF), a state-of-art equipment
Economic Survey of Karnataka 2019-20 469

facility at the Central Manufacturing country to roll out a dedicated


Technology Institute(CMTI), was jointly Aerospace Policy to boost the sector in
established in Bengaluru by machine the state by providing sector specific
tool industry and DIPP, Government of incentives and propose tailor made
India. initiatives for the sector.
r Land bank of more than 19000 acres r Incentives and concessions like anchor
across the state. Machine Tools is unit subsidy, exemption from stamp
identified as a focus manufacturing duty, concessional registration
sector in Industrial Policy 2014 – 15. charges, exemption from electricity
The policy provides additional package duty (duration depending on the size of
of incentives Ultra Mega (INR 500 – the project), entry tax exemption, etc.
1000 crore) and Super Mega (> 1000 r Special package of incentives &
crore) projects in Machine Tools sector. concessions shall be provide to large,
r The upcoming Chennai Bengaluru mega, ultra-mega and super-mega
Industrial Corridor and Bengaluru projects on case to case basis.
Mumbai Industrial corridor shall create r Establishment of Bengaluru Aerospace
a conducive environment for the Park and Bengaluru Aerospace SEZ
manufacturing industries in the state containing facilities like manufacturing
by improving connectivity & logistics. are and SEZ, MRO with direct
Aerospace and Defence access to BIAL runway, Testing Center,
Hardware/embedded technology
r Karnataka is the undisputed leader of
center, technology innovation center
the country in the Aerospace and
including a certification/calibration
Defence sector producing quarter of
center, a common finishing facility and
India's aircraft and spacecraft.
housing.
r The state has a strong base of lower tier
r Develop Greenfield airports at
suppliers with more than 2000 SMEs
Shivamogga, Vijayapura, Hassan and
which execute niche subcontracting
Kalburgi through the PPP model.
work for the defense PSUscreating a
strong ecosystem in the state. Textiles & Apparel
r Karnataka contributes 65% to r Karnataka is the garment capital
aerospace related exports from the of India accounting for 20% of
country. national garment production valued at
r With increase in national defense USD 1.56 bn.
budget and increasing demand of civil r The state has abundant availability of
aviation globally, Karnataka is in raw material. Karnataka contributes
unique position in the country to 65% to silk, 12% to wool and 6% to
leverage this potential growth in the cotton production of the country.
sector. r Karnataka has 144 skill development
r India's first aerospace SEZ is centers and 168 private training centers
operational at Belgavi. which have trained more than 1,60,000
r More than 950 acres has been personnel to date.
earmarked for aerospace SEZ near r The state exports readymade garments
Bengaluru International Airport. to countries like USA, UK, Italy,
r Karnataka has the advantage of Germany, Western Europe, Hong Kong,
presence of number of top companies in Turkey, Canada and Australia.
IT/ITeS and electronics hardware, r The state is keen to emerge as a leader of
many of them being integrated in Technical textiles (Builtech, Clothtech,
supply chain of integrated sector. Hometech, Meditech, etc.) with
r Karnataka's the first state in the Mysuru, Hassan and Bengaluru being
470 Economic Survey of Karnataka 2019-20

growth beds of Technical Textiles. The 7.9 GW of pumped storage hydro power
state has already attracted investments in South India.
worth INR 1480 crore in the segment. r Government of Karnataka is committed
r The new Textile Policy-Nuthana Javali to provide 24x7 power to all by 2020 to
Neethi 2013-18 aims to strengthen the provide 24x7 power to all by 2020.
value chain, attract more investment Energy sector successfully bridged the
across the state, develop skills of the difference between energy requirement
manpower and infrastructure for the and availability by 10% in last 3 FYs.
sector. r Installed capacity for private sector has
r Zone dependent reimbursement based grown at a CAGR of 12% in the last 5
fiscal incentives. FYs; private sector contributes to 43%
r Support for development of common (6,582 MW) of the total installed
infrastructure in Greenfield textile capacity.
parks and common facilities in r Karnataka has a wind potential and
Brownfield clusters solar PV potential in excess of ~14 GW
r Support for setting up Specific Textiles and 24.7 GW respectively. The state
Zones in backward areas has made amendments to Renewable
Energy policy, keen to attract renewable
r Reimbursement based incentives for energy projects.
mega projects
r Industry status to RE projects, simple
Pharmaceutical Industry land conversion and forest clearance,
r Karnataka contributes 8% to attractive Feed-in-Tariffs promote wind,
the country's revenue in the SHP and Biomass power projects.
pharmaceutical sector. r Amendments to building bye laws for
r The state has exclusive pharma SEZs in Floor Area Ratio (FAR) exemptions
Hassan and Yadgir. driving the growth of roof top solar PV
r Karnataka ranks 5th in pharmaceutical project investments.
exports, contributing 12% to country's r Open bid process & competitive tariff for
exports. solar PV projects; Industry friendly
r Karnataka Pharmaceutical Policy 2012 regulations support open access
aims to develop infrastructure, foster projects with waiver of open access
R&D and attract mega projects in the charges, loss & 100% banking for solar
sector. projects.
r Initiatives like Venture Capital fund of r Central excise duty exemptions, Tax
INR 50 crore with 26% contribution holiday, Customs Duty exemption, and
from government, formation of up to 50% VAT reimbursement.
Karnataka Pharmaceutical Development r Attractive incentives provided
Council and the Vision Group and specifically to solar power generation
promotional activities have been projects via dedicated Karnataka Solar
introduced in the policy. Policy 2014 – 21.
Energy 9.9.4 Special Economic Zones (SEZs)
r Bengaluru (Karnataka) is the best test In order to support the efforts of the Govt. of
site for the Smart Grid in the Country India in development and promotion of SEZs
because of Distribution Automation in the State, the Government of Karnataka
System being implemented here and the has formulated a State policy for SEZs as per
transmission SCADA is already in place. the Central SEZ Act 2005 & Rules 2006.
Presence of local IT and professional The Policy aims to provide a hassle-free
skills adds advantage for bringing in environment for the manufacturing &
Smart Grid. service sectors and to attract FDI. The
r Karnataka has the highest potential of salient features of the State Policy for SEZs
are as below:
Economic Survey of Karnataka 2019-20 471

r Single point clearance to SEZ development of Tourism, other related


developers & units. sectors such as, Transport, Hospitality,
r Acquisition of land on consent basis. Horticulture, Handicrafts and other micro
enterprises have developed.
r To set up SEZs on waste, dry and single
crop land. The Economic benefits of Tourism are far-
r Delegation of Labour Commissioner's reaching. In addition to enhancing revenues
powers to Development Commissioner within the segment, tourism has the
– SEZ. potential to create employment and
generate wealth in a sort of "ripple effect"
r Monitoring and Review committee is across industries throughout an entire
constituted to monitor and review the geographical region. By boosting local
implementation of SEZs under the spending and generating direct job
Chairmanship of Chief Secretary, Govt. opportunities, tourism provides socio-
of Karnataka. economic benefits that far outweigh the
The Fiscal Package of Incentives & costs. Rural areas, in particular, stand to
Concessions extended to SEZ developers gain the most from the improved regional
and SEZ units includes: infrastructure and enhanced revenue
circulation engendered by tourism-related
r Exemption from stamp duty and
development projects.
electricity duty.
r Capital subsidy for common effluent The growth of Tourism is directly
treatment plant. proportional to the arrivals of tourists to a
particular destination. More number of
The Board of approval of SEZ constituted arrivals will create more economic activities
under SEZ Act 2005 has granted formal and generate employment and other social
approvals for 75 SEZs in the State. SEZs facilities.
numbering 35 are operational in the State
with an investment of Rs.72,904 crores and The impact is measurable at a particular
generating employment for 3,23,110 destination comparing with its previous
persons. Currently there are 457 SEZ units position. Road connectivity, Electrical
functioning in these SEZs. The value of Connection, Water Supply, Handicrafts and
exports from these SEZs during the year various other related sectors also improve in
2018-19 accounted to Rs.97,812.00 crores. particular destination. Growth of
Community Development in particular area
9.10 KARNATAKA TOURISM can also be attributed to growth of Tourism.
Karnataka with its great Heritage and Karnataka is a veritable Treasure Trove of
Cultural Background has vast potential for Tourism hills, bewitching white sand
the sustainable development of tourism beaches, magnificent monuments, temples
industry. State Government has declared and palaces, exciting wild life, exquisite
Tourism as an industry' since 1988. The handicrafts, salubrious and eco-friendly
Department has brought out series of climate, endless varieties of mouth-watering
Tourism Policies with the package of cuisines, hospitality of the people, rich
incentives, concessions and subsidies for heritage and glorious culture make the
development of Tourist Infrastructure in the whole state a tourist's paradise.
State through the private investment. The exclusive perfume of sandalwood and
Tourism has been given priority and it is agarbathis, the aroma of fresh blooming
instrumental for Socio-Economic growth of coffee flowers, the heady fragrance of the
the State as well as providing lot of Mysore jasmine and the thousand varieties
employment opportunities for both skilled of roses make Karnataka a land of
and unskilled man power. Human Resource fragrance. The State has all the ingredients
Development has also been given for a great holiday-the relaxed length of the
importance and initiatives have been taken Arabian sea coast line, the majestic rocks of
to impart short term courses in hospitality the Deccan, thick lush green tropical
sector to the younger generation. With the forests, an unimaginable variety of trees,
472 Economic Survey of Karnataka 2019-20

Plants, flowers, animals and birds and an Department of Archeology, Museums and
all-pervasive sense of history and culture. Heritage was also brought in the ambit of,
Karnataka is probably the only state in India Department of Tourism to facilitate overall
where you can take an elephant ride hike development of Heritage Tourism in the
across an excitingly rugged terrains, swim State.
and surf in a green blue sea, wander Tourism Infrastructure Development:
through the forts and ruins, pay a
devotional visit to magnificent Temples, Department of Tourism as ventured upon
churches, Mosques, Gurudwaras and Jain following activities in order to develop basic
Basadis, relax in an unpolluted and Tourism Infrastructure to facilitate the
peaceful natural environment or simply tourist visiting the destination.
watch the monsoon rains batter the earth, 1. Last mile connectivity to tourist
transforming the land into a variegated form destinations.
of productivity.
2. Development of Yatrinivas and
Karnataka is a State of charming contrasts Dormitory.
with the modern blending harmoniously
with the ancient. Even in the thick of the 3. Publicity material providing
bustling life of the modern cities, one can 4. Toilet facilities.
discern an easy-going, relaxed way of life. All
these and many more make the state an 5. Measures for tourists safety.
enigmatic, unforgettable and ecstatic 6. Drinking water
experience for all tourists. Hence,
Karnataka is aptly called "ONE STATE, 7. Providing Signages and Hoardings.
MANY WORLDS".
Promotion Publicity:
The Director, Department of Tourism at
As a part of tourism promotion, the
Bengaluru is looking after the
department is participating in the national
administration of Tourism Department
and international travel marts held every
along with promotional and developmental
year. During 2018-19 the department
activities. It is supported by two other
participated in the following events are
Government undertaking agencies namely,
presented in Table 9.50.
Karnataka State Tourism Development
Corporation Ltd (KSTDC) and Jungle Lodges Karnataka Department of Tourism has
and Resorts ltd. Every district has a District taken up infrastructure development on top
Tourism Promotional Council headed by the priority and has taken several concrete steps
Deputy Commissioners of the concerned to enhance facilities at tourist destinations.
districts. This committee will look after the Department has also made all possible
tourism activities and also monitor the efforts for aggressive marketing and
progress of tourism works. publicity campaigns both at National and
International levels. As a result of this,
The KSTDC undertakes commercial
Karnataka has a considerable growth in
activities like operation and maintenance of
tourist arrivals, the flow of tourists
infrastructure facilities created by the
registered a considerable increase compared
Department and running of Hotels,
to the past three years. The details of tourist
restaurants and organizing package tours
in and outside the State. It is also looking arrivals are provided in Table 9.51.
after the operation of Golden Chariot The state stood at 5th position in attracting
(Luxury Tourist Train). Jungle Lodges and domestic tourist in the country.
Resorts manage the Eco-Tourism units in Accommodation Facilities:
the State; currently it is managing 18 such
Eco-Tourism units & 4 Jungle Camps As a result of sustained promotional activity
across the State, which is the best of its kind of the Department, the tourist inflow is
in the country. expected to increase substantially in the
Economic Survey of Karnataka 2019-20 473

Table 9.50: The department participated in the following events in 2018-19

A List of Domestic Events


1 TTF - Kolkata
2 TTF - Hyderabad
3 IITM - Bengaluru
4 IITM - Chennai
5 TTF - Ahmedabad
6 TTF - Surat
7 IITM - Delhi
8 IITM - Cochin
9 SATTE - Delhi
10 OTM - Mumbai
11 GITB - Jaipur
12 TTF - Bengaluru
13 ITM - Goa
14 ParyatanParv
15 Bharat Parv
B List of International Events
1 Arabian Travel Market
2 JATA-Japan
3 IFTM-Top Resa - Paris
4 World Travel Market-WTM
5 FITUR
6 ITB Berlin
7 MITT
8 Bit Milano
Source: Department of Tourism

Table 9.51: Tourist's Arrival from 2017 to 2019


Sl.No. Year Domestic Tourist Foreign Tourist Total

1 2017 179980191 498148 180478339

2 2018 187239994 544152 187784146

2019
3 186728001 615149 187343150
(Provisional)

Total 553948186 1657449 555605635


Source: Department of Tourism
474 Economic Survey of Karnataka 2019-20

coming years, the demand for hotel rooms is attractions, monuments etc fall in the rural
expected to go up sharply and supply would area therefore it is a good opportunity for the
fall short. In order to meet the demand rural people to get employment.
Department has taken initiatives to
encourage private stake holders by Karnataka is one of the India's most
introducing new Tourism Policy “2015-20”. promising tourism destinations. Tourism
Sector contributes one out of ten jobs in the
Besides, “Atithi”– Home Stay scheme has state.
been introduced in the State. Many families
are coming forward to offer their homes to Income from Revenue Earnings:
tourists as Home stays with excellent Tourism earns foreign exchange. The
facilities to the tourists in the state. revenue generated by the Tourism is both by
Separate guidelines have been issued to direct and indirect. World Travel and
encourage Home Stays in the state. Tourism Council report says tourism sector
Eco-Tourism accommodation facilities are accounts for 9.6% of India's GDP. Tourism
provided by Jungle Lodges and Resorts sector supported 40.30 million jobs in 2016
across the State. KSTDC is operating which ranks India second in the world in
providing services to Tourists through terms of total employment. Tourism sector
Mayura brand of hotels. Department is accounts for 9.3% of the countries total jobs.
increasing the Budget Class accommodation Budget allocation and Expenditure details
facilities at various tourist places by are presented in Table 9.52.
constructing Yatrinivas and Dormitories. Other Initiatives taken by the
Tourism as an Economic Activity: Department:
For integrated development of Tourism in In order to maximize impact, Karnataka
the State Department of Tourism has Tourism has devised and implemented a
introduced new tourism policy “2015-20” (5 four-pronged strategy for the development of
Years). Karnataka Tourism Vision Group tourism in Karnataka. The Department has
report envisaged that during the policy focused its efforts on four separate area, -
period Rs 54000 Cr investments will be policy and implementation, infrastructure
made which will generate around 30 lakhs development, marketing and preservation
employment. More investment expected and sustenance. It is hoped that progress
from the private sector or under PPP. made on these four fronts will help to
achieve the ambitious self imposed targets.
Tourism value chain provides employment
for not only skilled man power but also for Promotion and Publicity:
unskilled man power. As per estimation, Script Your Adventure
approximately 8 to 11 percent of the world
population gets direct or indirect livelihood A land known for its silks, spices and
through Tourism sector. Tourism sandalwood, Karnataka is an experience to

Table 9.52: Budget allocation and Expenditure details from 2016-17 to 2019-20
(Rs. In lakhs)
Sl. No. Year Budget Expenditure

1 2016-17 403.58 409.69

2 2017-18 463.64 459.94

3 2018-19 416.99 414.51

2019-20
4 405.16 180.65
(As on December – 2019)
Source: Department of Tourism
Economic Survey of Karnataka 2019-20 475

remember. Tourism in Karnataka stands interests. With this in mind and to retain the
out with its diverse offerings and is momentum generated during the previous
unparalleled in terms of touristic offerings. year, Karnataka Tourism has initiated steps
Karnataka is a state of diverse landscapes to portray 2018 with a new theme “Script
and experiences, and offers every tourist a Your Adventure”.
unique holiday and lifelong memories. From
ancient temples and monuments, verdant Today, more than ever before, travel is
forests teaming with amazing flora and becoming less about sightseeing and more
fauna, pristine beaches, romantic hill about how and what we do. People are opting
stations, also for people undertaking for the 'beyond the usual' approach in
pilgrimage to many of the divine whatever they do and are looking for
destinations. Thus, making it an ideal place experiential travel. Karnataka, true to its tag
for a traveller with diverse interests. With line “One State, Many Worlds” has a variety
this in mind and to retain the momentum of unexplored experiences to offer for every
generated in previous years, Karnataka type of tourist. In this context, Karnataka
Tourism has initiated a new theme “Script Tourism is going ahead with the “Script Your
Your Adventure”. Adventure” theme.

Karnataka is primarily known for its In lines with the new theme, a new brand
heritage destinations and its wildlife/ campaign TVC along with a print ad
national Parks. Apart from that, it is also campaign and marketing collaterals was
famous for its magical hill stations, launched.
spectacular waterfalls, pilgrimage centers The festivals, tournaments like Surfing
and a 320km long coastline dotted with festival, Kayak festival at Kali River,
unspoilt beaches. In fact, Karnataka has it Bengaluru Bouldering Festival, Devis Cup
all, except snow clad mountains, making it Tennis Tournament, BFC Football
an ideal place for a traveller with diverse Tournament, Golf Festival, RCB Cricket

Table 9.53: Festivals/events sponsored by the Department

1 Karnataka Hakki Habba in Bidar 9 Jalapata Utsava- Gaganachukki

Kite Festival and Janapada Lokotsava


2 10 Jalapata Utsava- Chunchanakatte.
conducted by Karnataka Janapada Parishat

Theatre Festival of Bangaluru Rangashankara


3 11 Madikeri Tourists Festival
Festival

4 Hampi Festival 12 Scuba diving

5 Alupotsava - Udupi 13 Uttara kannada Karavali Utsava

6 Edakuthore Utsava-Mysuru 14 Kitturchennamma festival

FHVI Royal Classic Car Drive-


7 Mysuru Dasara Festival 15
Mysuru

8 International Art Festival 16 Bengaluru Literature Festival

Source: Department of Tourism


476 Economic Survey of Karnataka 2019-20

Tournament, Karnataka Premier Cricket Tourism Infrastructure:


League and Basket ball Tournaments have
Under this scheme 1017 various
been sponsored by the Dept. during the
Infrastructure works sanctioned in the
year. In addition the following festivals/
previous years have been continued as
events are also sponsored by the
ongoing works. In addition 249 new works
Department are given in Table 9.53.
were also sanctioned. The sum of Rs.63.60
Namma Bengaluru Habba: crores have been released to the
Namma Bengaluru Habba was celebrated in implementing Agencies for completion of
Bengaluru at Sankey tank, Rachenahalli ongoing works and to start new works.
tank and in front of Vidhana Soudha. These works are under various stages of
implementation.
Celebration of International Yoga Day:
NABARD Works :-
International Yoga day was celebrated at
Mysore in the race course grounds on Under this scheme 32 RIDF works
21/06/2018. On this occasion one day sanctioned in the previous years have been
Mega Yoga class was arranged. For this continued during the year and the sum of
event district administration has won the Rs.2.06 crores have been released to
gunnies record. the public works department to complete
these ongoing works out of Rs.10.52 crores
Tourism Policy: Subsidy Incentives and reserved for ongoing works.
Concessions:
Karnataka Tourism Vision Group
The sum of Rs.15.16 Crores has been Recommendations :
released to 21 hotel projects approved
during the year 2019-20 of the tourism Under the recommendations of KTVG 48
policy. works for infrastructure development in
various tourism destinations are continued
and 33 new works are sanctioned for the

Table 9.54: Details of monuments


Bidar fort, re vival of Kharej , Mysuru, C hamundi Hi ll s & Othe r
1 11
Choukandi&Astur Tombs places

2 Kalburgi fort 12 Melukote

3 Malakhe d fort 13 Shrav anabelagola

4 Sannati 14 Be lur-Hale bidu

Vijayapura, re vival of Khare j ,


5 15 Choudadanapura
Golgumbaz and other Monuments,

6 Badami-Ihole-Pattadakal lu 16 Dev anahalli f ort

7 Ham pi - Anegundi 17 Banavasi

8 Nand i Hills, BhogaN andis hwara tem ple 18 Lakkundi

9 Chitradurga f ort 19 Talacauvery

10 Srirangapattana fort & Othe r 20 Yadgiri fort


Monume nts

Source: Department of Tourism


Economic Survey of Karnataka 2019-20 477

Beneficiary Oriented Programmes: (Rs. In Crores)

Details Allocation Expenditure %

SCP 15.36 15.36 100

TSP 6.39 6.39 100

Total 21.75 21.75 100

current year 2019-20. An amount of 209 tourist taxies have been distributed.
Rs.8.18 crores released for development of Selection of beneficiaries is under progress
Kittur Fort, Haliyala Fort and various other in the districts.
works in Belur and Chikkamagaluru.
Out of 13500 students, all students are
Development of 20 Heritage covered under Karnataka Darshan
Destinations : programme at a cost of Rs.4.72 crores.
Orders have been issued for the overall Karnataka Darshan programme for 10000
development of 20 heritage destinations Scouts and Guides students were also
including conservation and preservation of covered at a cost of Rs.3.50 crores.
monuments. Details of monuments are
Development of Tourist infrastructure
given in Table 9.54.
with the financial assistance of Ministry
For development of the above heritage of Tourism, Government of India :
destinations Inception reports and master
plans got prepared through M/s. INTACH & A Concept Report for the development
M/s.IHCNF organizations. For development Heritage Circuit including the heritage
of the above destinations amounts have sites at Chitradurga, Shivamogga and
been released to the Karnataka Tourism Davanagere districts under Swadesh
Infrastructure Ltd.(KTIL). KTIL has initiated Darshan Schemes is submitted to Ministry
implantation of various projects. of Tourism for the approval.

Amount released to other works Under PRASAD scheme:

An amount of Rs.500.00 lakhs released to A Concept Report is submitted to Ministry of


KSTDC to provide for six open Double Tourism for the overall development of
Decker Buses at Hampi and Mysuru for Chamundeshwari Temple at Mysuru.
tourists to visit the tourism places. Tourist Mitra Programme:
Special Component Plan (SCP)/Tribal In order to provide safety and security
Sub Plan (TSP) Programmes : tourists at tourist destinations 458 home
guards have been trained in the second
A target of 557 taxies at a cost of Rs.16.71
batch including 75 women candidates &
crores was taken up during the year. Out of
totally 500 deputed to important tourist
557 taxies 380 taxies have been provided to
destinations to assist tourists as 'Tourist
the beneficiary. Selection of beneficiaries
arenearing completion. Mitras'. (Tourist Police) (1st batch 42 + 2nd
batch 458).
Karnataka Darshan programme was
covered to 14400 students at a cost of Hampi Festival:
Rs.5.04 crores. The Sum of Rs. 150.00 lakhs have been
Programmes for OBC and others : released to Deputy Commissioner, Bellary,
for celebration of Hampi Festival at World
During the year 2019-20 a target of Heritage site, Hampi.
providing 300 tourist taxies at an estimated
cost of Rs.9.00 crores for beneficiaries of
OBC & Minorities was taken up. Till date
478 Economic Survey of Karnataka 2019-20
EMPLOYMENT AND CHAPTER 10
LABOUR WELFARE

10.1. INTRODUCTION Low LFPR primarily implies high


Achieving high rate of growth along with dependency ratio. The development
commensurate generation of productive and experience suggests a strong negative
quality employment opportunities for the correlation between dependency and
rising labour force continues to be a major growth.
challenge for both the central and the state Employment and Unemployment Survey-
governments. Low growth in employment, 2017-18:
prevalence of low productive and low quality
employment especially in the unorganized Employment and Unemployment surveys
sector and high unemployment rate among (EUS) of National Sample Survey (NSS) are
the youth and educated indicate that the the Primary source of Labour market data at
expansion of productive, quality and decent National and State level in India. This is the
employment has been the principal concern First Annual report based on the data
of the state government's policy in recent collected in Periodic Labour Force Survey
years. It reduces not only poverty but also (PLFS) during July-2017 to June-2018. As
makes the growth process more inclusive. In this is annual Survey there is continuity in
Karnataka, agriculture is the predominant the data collection.
source of livelihood for the majority of the In this analysis two approaches for each
population and employment is largely parameter are considered. They are Usual
unorganized, rural and non-industrial in Principal status (UPS) and Usual Principal
nature. and Subsidiary Status (UPSS] or (PS+SS)
10.2 KEY LABOUR MARKET approach. Here the age criteria is 15 years
INDICATORS and above for all the estimates. Following
analysis gives comparisons among Andhra
In the policy context the most critical factor Pradesh, Tamil Nadu, Karnataka, Kerala,
that impinges on labour supply is the Maharashtra, Gujarat, Telangana and along
Labour Force Participation Rate (LFPR). with all India average.
LFPR is a measure of the proportion of a
country's/state's working-age population The parameters considered are Labour
that engages actively in the labour market, Force Participation Rate (LFPR), Worker
either by actual working or seeking for work. Population Ratio (WPR), and Unemployment
It provides an indication about the Rate (UR).
availability of labour force for production of The activity in which a person spends
goods and services. relatively longer time during the reference
Other than Labour Force Participation period is termed as usual principal activity
Rate, Worker Population Ratio and of the person. To decide the usual principal
Unemployment Rates are also very activity of a person, he/she is first
important indicators in social and economic categorized as belonging to the labour force
arena. Worker Population Ratio (WPR) is or not, during the reference period on the
defined as the number of persons employed basis of major time criterion. A person may
per 1000 persons. Unemployment Rate (UR) have pursued some other activity for more
is defined as the number of persons than 30 days or more other than his usual
unemployed per 1000 in the labour force. principal activity. This status is termed as
However in this report it is expressed in usual principal activity and subsidiary
percentage. activity status (PS+SS) or (UPSS) approach.

479
480 Economic Survey of Karnataka 2019-20

The critical issues in the context of labour Karnataka is 49.1% which is more than all
force enquiries pertain to defining the India average of 46.8%. This rate is more in
labourforce and measuring participation of Andhra Pradesh (57.2%), Tamil Nadu
labour force in different economic activities. (51.0%) and Telangana (49.8%). However, it
The activity participation of the people is not is less in Kerala (41.2%) and Gujarat
only dynamic but also multidimensional as (47.4%). Highest WPR in Karnataka is
it varies between regions, age, education, 77.2% for rural male and for female it is
gender, industry and occupational 27.2%. Both are more than the all India
categories. average of 72.0% and 23.7% respectively.
For urban male it is 69.2% and for urban
10.2.1 Labour Force Participation Rate female it is 21.2% and the all India average is
The statistics presented in the following 69.3% and 18.2% respectively. The state
Tables show the scenario on employment - average male and female worker population
unemployment in Karnataka. There is also ratios (74.0% and 24.8%) are higher than all
comparison among the comparable states India average. Among the comparable
and National average. This indicates that states, Andhra Pradesh has the highest
LFPR for persons aged 15 years and above ratio of 57.2% and Kerala has the lowest
according to PS+SS status approach is ratio of 41.2%. Table 10.2 shows Worker
51.6% in Karnataka, whereas this is 49.8% Population Ratio Rate for persons aged 15
for India. Among comparable states, lowest years and above according to UPSS
rate is in Kerala and the highest rate is in approach.
Andhra Pradesh. This rate is 80.5% for
10.2.3 Unemployment Rate (UR)
males in rural Karnataka, which is highest
among the comparable States. In Karnataka Yet another important parameter of
this rate is Third lowest in urban female employment scenario is Unemployment
group (22.8%) and this is more than the all Rate (UR). It is the ratio of number of
India rate of 20.4% (urban female). Table unemployed persons/person-days to the
10.1 shows Labour Force Participation Rate number of persons/person-days in the
for Persons Aged 15 Years and above labour force. The estimates of URs are
According to UPSS Status Approach. obtained based on the estimates of
unemployment obtained by the number of
10.2.2 Worker Population Ratio (WPR) persons usually unemployed based on
The WPR indicates the proportion of 'usual principal status' approach, used for
workers/employed persons in the total the classification of the activity status of
population. WPR under UPSS approach for persons.

Table 10.1: Labour Force Participation Rate for Persons Aged 15 Years and above According
to UPSS Status Approach (in Percentage)
Rural Urban Urban & Rural
State
Male Female Person Male Female Person Male Female Person
Andhra
79.5 48.4 63.3 78.3 30.7 52.8 79.1 42.5 59.9
Pradesh
Gujarat 78.7 22.5 51.7 76.6 16.2 47.1 77.8 19.9 49.8
Karnataka 80.5 28.2 54.0 73.8 22.8 48.0 77.8 26.0 51.6
Kerala 71.1 25.9 46.6 68.9 27.3 46.4 70.1 26.5 46.5
Maharashtra 75.4 37.7 56.8 74.2 21.6 48.2 74.9 30.8 53.1
Tamil Nadu 78.5 39.0 58.3 76.7 27.6 51.4 77.7 33.7 55.1
Telangana 73.7 39.2 56.6 76.7 22.9 49.9 74.9 32.6 53.9
All Indi a 76.4 24.6 50.7 74.5 20.4 47.6 75.8 23.3 49.8
Source: Annual Report, PLFS 2017-18 Table-16,Page no.A65,NSSO, MOSPI, GOI
Economic Survey of Karnataka 2019-20 481

Table 10.2: Worker Population Ratio Rate for Persons Aged 15 Years and above
According to Usual Principal & Subsidiary Status Approach (in percentage)
Rural Urban Urban & Rural
State
Male Female Total Male Female Total Male Female Total
Andhra Pradesh 75.9 47.3 61.0 74.0 27.9 49.3 75.3 40.8 57.2
Gujarat 74.4 21.6 49.1 73.4 15.5 45.1 74.0 19.0 47.4
Karnataka 77.2 27.2 51.9 69.2 21.2 44.9 74.0 24.8 49.1
Kerala 67.0 20.8 41.9 64.4 19.8 40.2 65.8 20.4 41.2
Maharashtra 72.8 36.7 55.0 69.6 19.1 44.7 71.4 29.1 50.5
Tamil Nadu 71.6 36.7 53.7 71.9 25.2 47.9 71.8 31.3 51.0
Telangana 68.3 37.3 52.9 70.2 20.0 45.2 69.1 30.4 49.8
All India 72.0 23.7 48.1 69.3 18.2 43.9 71.2 22.0 46.8
Source: Annual Report, PLFS 2017-18 Table-17,Page no.A-69, NSSO,MOSPI,GOI

Table 10.3: Unemployment Rate Among Persons Aged 15 Years and above
According to Usual Principal & Subsidiary Status Approach (in percentages)
Rural Urban Urban & Rural
State
Male Female Total Male Female Total Male Female Total
Andhra Pradesh 4.5 2.3 3.6 5.5 9.0 6.6 4.8 3.9 4.5
Gujarat 5.4 4.1 5.2 4.2 4.3 4.2 5.0 4.1 4.8
Karnataka 4.0 3.4 3.9 6.3 7.2 6.5 4.9 4.7 4.8
Kerala 5.9 19.6 10.0 6.6 27.4 13.2 6.2 23.2 11.4
Maharashtra 3.4 2.8 3.2 6.2 11.4 7.4 4.6 5.4 4.8
Tamil Nadu 8.8 6.0 7.9 6.2 9.0 6.9 7.6 7.1 7.5
Telangana 7.2 5.0 6.5 8.5 12.6 9.4 7.7 7.2 7.6
All India 5.7 3.8 5.3 6.9 10.8 7.7 6.1 5.6 6.0
Source: Annual Report, PLFS 2017-18 Table-18,Page no.A-73, NSSO,MOSPI,GOI

Here UPSS is taken for comparison and 10.2.4 Distribution of Workers According
Table 10.3 presents the UPSS UR for the to Work Conditions (UPSS Approach)
comparable states. Under UPSS approach,
UR of Karnataka is 4.8% for all persons i.e., In the Table 10.4an attempt has been made
urban and rural put together which is very to present the proportion of workers
less compared to India's rate of 6.0%. This according to the nature of the work. For this
rate is lowest in Andhra pradesh (4.5%) and four categories are considered i.e., self
this rate is highest in Kerala (11.4%). In employed, wage/salaried, casual labourers.
Karnataka, the rural areas unemployment For this analysis all southern states are
rate is 4.0% for males and 3.4% for females. considered and compared with all India
Whereas in urban areas, for males it is 6.3% average.
and for females it is 7.2%. At all India level, From the above Table the following
for males in rural areas it is 5.7% and for observations can be made.
females it is 3.8%. The corresponding
figures for urban male and female are 6.9% r In Karnataka the highest numbers of
and 10.8% respectively. persons are self-employed (47.8%). This
is followed by casual labourers with
482 Economic Survey of Karnataka 2019-20

Table 10.4: Distribution of Workers According to Nature of Work (PS+SS)


States Self Employed Wage/ Salary Casual Labour
Andhra Pradesh 44.7 18.4 36.9
Gujarat 54.7 28.5 16.7
Karnataka 47.8 25.4 26.8
Kerala 37.8 32.9 29.3
Maharashtra 47.0 28.9 24.1
Tamil Nadu 32.8 33.8 33.5
Telangana 47.9 27.7 24.4
All India 52.2 22.8 24.9

Source: Annual Report, PLFS 2017-18 Table-19,Page no.A-83, NSSO, MOSPI,GOI

26.8 and wage earners with 25.4. The comprising 56.64% male workers and
State has more number of casual 31.98% female workers. On the whole WPR
workers than the National average of in 2011 has increased in general
24.9% and wage earners of 22.8%. irrespective of gender and more significantly
r Among all the comparable states the in urban areas (4%) compared to 2001. It is
percentage of self-employed is highest noted that female WPR has marginally
in Gujarat with 54.7% followed by declined in rural Karnataka (Table 10.5).
Telangana with 47.9% and Karnataka The proportion of total workers over the
with 47.8%. The lowest percentage of period of time from 1961- 2011 is given in
self-employed is found in Tamil Nadu Figure. 10.1.
and it is just 32.8%. Table 10.5 and Figure 10.1 explain the
r Among casual labourers highest trends in WPR in Karnataka with rural –
percentage is found in Andhra Pradesh urban and male and female break up. In the
with 36.9% followed by Tamil Nadu with state there is an overall increase in the WPR
33.5% and Kerala with 29.3%. from 45.48% in 1961 to 45.62% in 2011. If
r The proportion of wage earners / we compare the WPR between the two
salaried is just 22.8% at all India level. censuses, 2001 and 2011 the following
However Tamil Nadu has the highest observations can be made.
share of such workers that is 33.8% r The overall, rural and urban WPR have
followed by Kerala with 32.9% and increased during this period. The extent
Maharashtra with 28.9%. of increase is more in urban areas when
10.2.5 Labour Force and Work Force compared to rural areas.
Participation Rate r The WPR among males has increased
According to Census 2011, the Work both in rural and urban areas and again
Participation Rate (WPR) is defined as the in urban areas the extent of increase is
proportion of total workers (i.e. main and more.
marginal workers) to total population. In the r The WPR among females has registered
State, 2,78,72,597 persons constituting a negative growth rate in rural areas.
45.62% of the total population have However, in urban areas it has
enumerated themselves as workers. Among increased from 16.37% to 20.81%.
them, 1,82,70,116 are males and 96,02,481 r The WPR for females is 32% whereas the
are females. In other words, 59% of the total same is 59% for males, in rural areas
male population and 31.87% of the total they are 39% and 60% respectively. In
female population are workers. In 2001 urban areas the WPR for males is 58%
Census the WPR in the State was 44.53% and for females it is 21%. This indicates
Economic Survey of Karnataka 2019-20 483

Table10.5: Work force Participation Rate (in Percentage)


Total Rural Urban
2001 2011 Change 2001 2011 Change 2001 2011 Change
Total 44.53 45.62 1.09 49.04 49.38 0.34 35.67 39.66 3.99
Male 56.64 59.00 2.36 58.10 59.76 1.66 53.85 57.81 3.96
Female 31.98 31.87 -0.11 39.87 38.79 -1.08 16.37 20.81 4.44
Source: Census, 2011

Figure 10.1 Proportion of Total Workers in Karnataka 1961-2011

50

45
45.48 45.62
44.53
40
41.99
40.24
35
34.74
Percentage

30

25

20

15

10

0
1961 1971 1981 1991 2001 2011

Source: Census, 2011

Table10.6: WPR by Districts – 2011(in percentages)

Top 5 Districts Bottom 5 Districts


District Total Rural Urban District Total Rural Urban
Chitradurga 51.62 55.13 37.43 Vijayapur 42.61 45.40 33.30
Chikkaball apur 50.97 54.34 39.32 Dharwad 42.49 51.06 35.98
Hassan 50.87 54.55 37.17 Kalaburgi 42.36 46.64 33.49
Tumkuru 50.57 53.86 39.13 Uttara Kannada 42.34 45.50 34.66
Kodagu 50.30 51.96 40.62 Bidar 41.25 44.33 32.00
Source: Census, 2011
484 Economic Survey of Karnataka 2019-20

Table10.7: Male Work Participation Rate by Districts-2011


Top 5 Dis tricts Bottom 5 Dis tricts
District Total Rural Urban District Total Rural Urban
Mandya 63.5 5 6 4.47 59.09 Bagalkot 53.8 4 54 .02 53.4 5
Hass an 63.4 2 6 4.94 57.82 Yad giri 53.7 2 54 .52 50.3 0
Chamarajanagar 63.3 2 6 4.36 58.25 Bi dar 52.7 2 54 .32 47.9 8
Chik magaluru 63.1 6 6 4.28 58.95 Kalaburgi 52.2 4 53 .69 49.2 5
Ramanagar 62.8 4 6 4.52 57.73 Vijayapura 52.2 1 52 .94 49.7 5

Source: Census, 2011

Table10.8: Female WPR by Districts, 2011


Top 5 Districts Bottom 5 Districts
District Total Rural Urban District Total Rural Urban
Chitradurga 41.93 47.78 18.65 Shivamogga 28.12 35.35 15.07
Chikkaball apur 41.27 46.99 21.55 Dharwad 26.50 40.35 16.19
Yadgiri 39.48 43.60 21.63 Mysore 26.35 32.22 18.14
Tumakuru 38.93 44.14 20.85 Uttara Kannada 25.03 29.37 14.52
Raichuru 38.69 45.24 19.32 Bengaluru 24.61 28.02 24.27
Source: Census, 2011

that everywhere female WPR is less than r The highest proportion of male workers
male WPR. Further it is very low in is registered in Mandya (63.55%) and
urban areas implying the dependency the lowest proportion of male workers is
syndrome among urban females. recorded in Vijayapura (52.21%)
District-wise Work Participation Rates (Table10.7).
r In respect of female workers the highest
In this section an attempt has been made to
proportion is recorded in Chitradurga
compare and analyze district wise WPR.
(41.93%) and the lowest proportion is
2011 census data reveal that among all the
registered in Bengaluru District
districts, Chitradurga has the highest WPR
(24.61%) (Table 10.8).
of 51.62% and Bidar has the lowest WPR of
41.25%. The details are presented in Table r When compared with the State average
10.6, 10.7 and 10.8. WPR, Bidar (41.25%), Kalaburgi
(42.36%) and Bellary (45.54%) districts
From the above Tables 10.6, 10.7 and 10.8 have recorded less than the State
the following trends can be observed. average of 45.62%. The rest of the other
r Among all the districts, Chitradurga districts in Hyderabad Karnataka
with a WPR of 51.62% occupies the top region have recorded WPR above the
position, followed closely by State average (Table 10.9).
Chikkaballapur, Hassan, Tumakuru r Though the WPR of the districts are
and Kodagu with WPR of more than above the State average, employment is
50%. mainly in dry land agriculture, which is
r The lowest WPR of 41.25% is recorded both insecure and less remunerative.
in Bidar preceded closely by Uttara Among all the divisions, Mysore
Kannada, Kalaburgi, Dharwad and Division has the highest WPR (47.12%).
Vijayapura with WPR between 42 and The above Table 10.10 shows division wise
43% (Table 10.6). WPR in 2011; among all the divisions,
Economic Survey of Karnataka 2019-20 485

Table 10.9: District Wise WPR-2011 (Kalaburgi Division)


Districts WPR (%)
Bi dar 41.25
Bellary 45.54
Kalaburgi 42.36
Koppal 47.11
Raichur 46.84
Yadgiri 46.64
Source: Census, 2011

Table 10.10: Division Wise Work Participation Rate WPR, 2011


Divisions WPR (%)
Kalaburgi Division 44.69
Be ngaluru Division 46.45
Mysore Div ision 47.17
Be lagavi Divisi on 43.74

State 45.62

Source: Census, 2011

Table10.11: Main Workers, 2011 (in percentage)


Total Rural Urban
2001 2011 Change 2001 2011 Change 2001 2011 Change
Total 82.28 83.94 1.66 78.60 81.40 2.8 92.12 88.96 (-) 3.16
Male 91.21 89.49 (-) 1.72 89.67 84.43 (-) 5 .24 94.40 91.21 (-) 3.19
Female 65.88 73.39 7.51 62.09 70.34 8.25 84.17 82.49 (-) 1.68

Source: Census, 2011

Mysore division has the highest WPR of 47% in 2001 to 16.06% in 2011 (Table 10.12).
and Belagavi division has the lowest rate of The proportion of male main workers has
43.74%. Bengaluru and Mysore divisions decreased from 91.21% in 2001 to 89.49%
have the work participation rate more than in 2011, whereas, the proposition of female
the state average. main workers has increased from 65.88% to
73.39%. With respect to marginal workers,
10.2.6 Main and Marginal Workers
the proportion of male marginal workers has
Of the total 2,78,72,597 workers in the recorded a marginal increase from 8.79% in
State, 2,33,97,181 persons, constituting 2001 to 10.51% in 2011. On the other hand,
83.94% of the total workers, are main the proportion of female marginal workers
workers and 44,75,416 persons, has registered a sharp decrease from
constituting 16.06% are marginal workers. 34.12% in 2001 to 26.61% in 2011.
The proportion of main workers has
10.2.7 Composition of Workers
marginally increased from 82.28% in 2001
to 83.94% in 2011(Table 10.11). On the According to census definition, total
contrary, the proportion of marginal workers (main+marginal) have been further
workers has slightly decreased from 17.72% classified into four broad categories viz.,
486 Economic Survey of Karnataka 2019-20

Table 10.12: Marginal Workers (in percentage)


To tal Ru ral U rban
2 00 1 20 1 1 Change 2 0 01 2 01 1 Change 2 0 01 2 01 1 Change
Total 17 .72 16. 06 (- ) 1.66 2 1.4 18. 6 (- ) 2.8 7 .88 11 .04 3.16
Male 8 .79 10. 51 1.72 10 .33 11.5 7 1.24 5.6 8. 79 3.19
Fe male 34 .12 26. 61 (- ) 7.51 37 .91 29.6 6 (-) 8.25 1 5.83 17 .51 1.68
Source: Census, 2011

Table 10.13: Category wise Distribution of Workers by Location- 2011

Agricultural H ouseho ld O ther


Details Cultivators
L abourers I ndus try Wo rkers

Total 26 .46 29 .25 4. 08 40 .21

2 001 Rural 34 .46 39 .03 3. 48 23 .03

Urb an 5 .07 3 .11 5. 67 86 .14


Pe rsons
Total 25 .67 23 .61 3. 28 47 .44

2 011 Rural 36 .41 34 .27 2. 82 26 .49

Urb an 4 .47 2 .56 4. 17 88 .80

Total 17 .20 31 .72 2. 66 48 .42

2 001 Rural 23 .94 45 .57 2. 43 28 .06

Urb an 3 .33 3 .22 3. 13 90 .32


Males
Total 17 .97 26 .02 2. 40 53 .61

2 011 Rural 26 .94 40 .36 2. 04 30 .66

Urb an 3 .39 2 .70 3. 00 90 .91

Total 43 .45 24 .71 6. 68 25 .16

2 001 Rural 50 .15 29 .27 5. 05 15 .53

Urb an 11 .16 2 .75 14. 55 71 .55


Fe males
Total 40 .33 19 .03 4. 94 35 .71

2 011 Rural 51 .32 24 .69 4. 06 19 .93

Urb an 7 .57 2 .14 7. 55 82 .73

Source: Census, 2011


Economic Survey of Karnataka 2019-20 487

Figure 10.2 : Category of Workers in Karnataka 2001-2011

100

40.21
80 47.44

4.08
Percentage

60
3.28
26.46
40 25.67

20 29.25
23.61

Cultivators Agricultural Labourers Household Industry Workers Other Workers

Source: Census, 2011

cultivators, agricultural labourers, workers When compared with State average of


in household industry and other workers. agricultural labourers, all the districts of
The category wise details of workers are Hyderabad Karnataka region have recorded
given in Table 10.13 and Figure 10.2. higher than the State average of 25.7%
(Table 10.14). However, employment is
Agricultural Labourers mainly in dry land agriculture, which is both
Though the number of agricultural insecure and less remunerative.
labourers has increased in the State by
Cultivators
14.92% in 2001-11, their proportion to total
workers has marginally declined from The number of cultivators has decreased
26.46% in 2001 to 25.67% in 2011 (Table from 68,83,856 in 2001 to 65,80,649 in
10.13).The proportion of male agricultural 2011. Of the total decrease of 3,03,207, the
labourers has increased by a nominal decrease in the number of female cultivators
0.77%, their female counterparts have (2,24,075) is more than the decrease in the
registered a decline of 3.12%. Among all the number of male cultivators (79,132).The
districts, the proportion of agricultural proportion of cultivators to total workers has
labourers has varied between 2.31% in decreased by 5.64% and the decrease in the
Bengaluru District and 44.49% in proportion of male cultivators is by 5.7%,
Chamarajanagar District. whereas the decrease in the proportion of
female cultivators is by 5.68%.
In 19 out of 30 districts, the proportion of
agricultural labourers is higher than the Among the districts, the decrease in the
State average of 25.67% with 16 districts proportion of cultivators is more than 5% in
reporting more than 30%. In 3 out of the 11 districts with Bengaluru Rural District
remaining 11 districts, where the proportion registering the highest decrease of 9.55%
is below the State average, the proportion of followed closely by Mysore District, i.e. by
agricultural labourers is less than 6%. 9.26%. In the remaining 19 districts, the
488 Economic Survey of Karnataka 2019-20

decrease is less than 5% with the least i.e. 1,32,22,758 or 47.44% of total workers
decrease of 0.31% recorded in Kodagu at the State level. In comparison to 2001
preceded by Raichuru with a decrease by Census, the proportion of Other Workers
1.05%.Even though all the districts have has increased by 7.23% in 2011 Census.
registered decline in the proportion of The proportion of male Other Workers has
cultivators in their work force, the increased from 48.42% to 53.61% and the
proportion of cultivators is more than 45% proportion of female Other Workers has
in Hassan (48.37%) followed by Mandya increased from 25.16% to 35.71%. Among
(44.64%). The least proportion of cultivators the districts, the proportion varies from a
is recorded in Bengaluru District (2.25%) very high of 92.88% in Bengaluru District to
preceded by Dakshina Kannada (3.39%). a low of 25.66% in Yadgiri. The proportion of
Other Workers to total workers is more than
Household Industry Workers 50% in 6 districts, whereas it is below 30%
The proportion of workers engaged in in 6 districts. In the remaining 18 districts,
Household Industry, which was 4.08% in the proportion of Other Workers is between
2001 has declined to 3.28% in 2011. Among 30 to 50%.
the districts, Dakshina Kannada with a
From the Table 10.14 the following trends
proportion of 18.86% of household industry
can be observed.
workers tops the ranking, followed by
Bagalkot with 5.48%. In the remaining r Among four divisions the proportion of
districts the proportion of workers engaged agricultural labourers is highest in
in household industry is less than 5% and Kalaburgi division that is 39.8% and the
the least proportion of 0.56% is recorded in lowest is in Bengaluru division that is
Kodagu. Among the total 9,13,227 persons 18%.
enumerated as workers engaged in r Among cultivators the highest
household industry in the State, nearly 3 proportion is in Belgavi division that is
lakh workers are accounted in Dakshina 27.46% and again Bengaluru division
Kannada and Bengaluru districts alone. has the lowest of 19.63%.
Both these districts together account for
more than 30% of the total workers engaged r The proportion of other workers is as
in household industry. high as 59.34% in Bengaluru division
and in Kalaburgi division it is 34.2%.
Other Workers 10.3 EMPLOYMENT IN PUBLIC AND
All workers engaged in any category of PRIVATE SECTORS
economic activity other than cultivation, Organised sector employment in the State
agricultural labour or household industry has increased by 0.2% from 24.003 lakh at
are treated as 'Other Workers'. This category the end of the March-2019 to 24.054 lakh at
accounts for the highest number of workers

Table 10.14: Category wise Distribution of Workers by Division- 2011


(in percentages)
Agricultural Household O ther
Division Cultivators
Labourers I ndustry workers Workers
Kalaburgi Division 39.80 23.69 2.35 34.20
Bengaluru Division 18.00 19.63 3.04 59.34
Mysore Division 19.30 26.36 4.81 49.56
Belagavi Divisi on 33.10 27.46 2.97 36.50
State 25.70 23.61 3.28 47.44
Source: Census, 2011
Economic Survey of Karnataka 2019-20 489

the end of June-2019. Public Sector constant in Agriculture, Forestry and


employment account for 10.316 lakh Fishing, Mining and Quarrying, Water
(42.88%) and Private Sector for 13.738 lakh Supply, Sewerage, Waste management and
(57.12%), Public sector has decreased by Remediation Activities, Professional,
0.06% where as Private sector has increased Scientific & Technical activities,
by 0.4% between March and June-2019. Administrative and support service
activities, Arts, entertainment and
Branch-wise comparison shows that
recreation, and Other service Activities
employment in State Government, Central
Sectors.( Table 10.16).
Quasi Government, and State Quasi
Government has decreased from March- 10.4 EMPLOYMENT EXCHANGE
2019 to June-2019. Table-10.15 gives STATISTICS
branch-wise details of the organised sector
employment at the end of June-2019. The number of job seekers as per the live
register figures of employment exchanges
(a) Employment in Public and Private was 3.46 lakh in November-2019 compared
Sectors (Industry group-wise): to 3.43 lakh at the end of March-2019, an
increase of 0.7 percent. There is an increase
An analysis of the organised sector
of 5.8% in Post Graduates, 3.3% in
employment by Industry group reveals there
Matriculates' and Stenographers, 1.8% in
was an increase in Employment in
Graduates. There has been 8.0% percent
Manufacturing, Wholesale & Retail Trade,
decrease in the Below matriculates, 4.62%
Repair of motor vehicles and Motor cycles,
in registrants of ITI and other certificate
Accommodation and Food service activities,
holders,and 2.7% in Diploma Holders.
Information and communication, Financial
Registrants on the Live Registers of
& Insurance activities, education and
Employment Exchanges in Karnataka are
Human Health & Social work activities
given in Table 10.17.
sector. where as there was decrease
in Employment in Electricity, Gas, 10.5 PLACEMENTS AND VACANCIES
Steam and Air-conditioning system,
Construction, Transportation & Storage, Between April-2019 and November-2019,
Public Administration and Defence; 12,987 placements were made (1623 on
Compulsory Social Security sector. Further an average every month). During the
Organised sector employment has remained corresponding period of the previous year

Table 10.15: Employment in Public and Private Sector (in Thousands)

March, March, Percentage


June,
Branch variation June-2019
2018 2019 2019
/ March, 2019.
1. Central Government 92.9 92.3 92.3 0.00
2. State Government 560.9 544.10 543.7 -0.07
3. Central Government (Quasi) 167.3 165.8 165.7 -0.06
4. State Government (Q uasi) 161.6 166.9 166.8 -0.06
5. Local Bodies 64.3 63.1 63.1 0.00
6. Private Sector- Act 1287.6 1310.0 1315.9 0.45
7. Private Sector - Non-Act 61.5 58.1 57.9 -0.34
Total - Public Sector 1047.0 1032.2 1031.6 -0.06
Total - Private Sector 1349.1 1368.1 1373.8 0.42
GRAND TOTAL 2396.1 2400.3 2405.4 0.21
Source: Department of Employment & Training, GoK
Table 10.16: Employment in Public and Private Sector (Industry Group-wise)
490
(In Lakhs)

Source: Department of Employment & Training, GoK


Economic Survey of Karnataka 2019-20
Economic Survey of Karnataka 2019-20 491

Table 10.17 : Registrants on the Live Registers of Employment Exchanges in


Karnataka.

At the end of V ariatio n


Sl. (Nov-19/
Registrants
N o. March M arch No vember M arch-19)
2018 2019 2019 %

1. Post- Graduate s 3 213 3570 377 8 5.8

2. Graduate s 47 345 4 9095 4997 3 1.8

3. Diplom a Hol ders 12 749 1 3279 1292 0 -2.7

4. I.T.I. App renticeship, O ther Certificate Hol ders 48 838 4 8668 4641 8 -4.6

5. Matriculate s and Ste nographe rs 186 739 19 6030 2 0242 8 3.3

6. Below Matriculation 32 379 3 3124 3049 0 -8.0

Total 331 263 34 3766 3 4600 7 0.7

Source: Department of Employment & Training, GoK

this number was about 10,844 (1355 on an registrations at the end of November-2019.
average per month). The number of During the year 2018-19, 260 vacancies
placements was 3.75% of the total have been notified (22 on an average every
registrations at the end of November-2019. month). (Table-10.18)
During the year 2018-19, 25,300
placements were made (2108 on an average 10.6 WAGE EMPLOYMENT
every month). 400 vacancies have been PROGRAMMES
notified during the current year up to a. Mahatma Gandhi National Rural
November-2019 (50 on an average every Employment Guarantee Scheme
month) compared to 205 during the
corresponding period of the previous year Mahatma Gandhi National Rural
(26 on an average every month). The Employment Guarantee Act came into force
number of vacancies notified was 0.11% of from 02-02-2006. It was rolled out in a

Table-10.18: No.of vacancies notified & placements made during 2013-14 to 2019-20.
Vacancies Placements
Year
notified made.*
20 13-1 4 2,629 5,6 09
20 14-1 5 1,827 5,1 31
20 15-1 6 2,059 5,1 01
20 16-1 7 2,062 8,2 00
20 17-1 8 1,100 14, 362
20 18-1 9 26 0 25, 300
2019 -20 (up to Novem ber-2019) 40 0 12, 987

Source: Department of Employment & Training, GoK


(Note:* placements including placed in Job fairs)
492 Economic Survey of Karnataka 2019-20

phased manner to cover all the districts of 5278.80 Crores. As at the end of November
the rural areas of the entire State by 2008. In 2019, an amount of Rs. 3723.81 Crores has
the first phase, 5 districts were covered with been spent and 812.39 lakh person days
effect from 01-04-2006, while in the second has been generated through which 19.46
phase, 6 districts were covered with effect lakh households have been provided
from 01-04-2007 and the remaining employment. Progress achieved under
districts were covered in the Third phase MGNREGA is given in Table 10.19 and
with effect from 01-04-2008. The main 10.20 and Annexures 10.1a, 10.1b, 10.1c
objective of the Act is to enhance livelihood and 10.2
security in rural areas by providing 100 days
of guaranteed wage employment in a 10.7 WAGE EMPLOYMENT GENERATION
financial year to every household whose UNDER MAJOR PROGRAMMES
adult members volunteer to do unskilled Wage employment generated under various
manual work. This also serves other state government programmes was 12.87
objectives such as generation of productive crore Mandays between April and November
assets, protecting the environment, 2019. During the corresponding period of
empowering rural women, reducing rural- the preceding year 14.34 crore Mandays
urban migration and fostering social equity were generated. The breakup is – Major and
among others etc. The scheme is being medium irrigation and Flood control 2.25
implemented as centrally sponsored scheme crore mandays (17.48 percent), Minor
on a cost sharing basis between Central and irrigation 1.14 crore mandays (8.86
State Governments in the ratio of 90:10 percent), Roads and Bridges 1.11crore
nearly. Labour and material ratio has to be mandays (8.62 percent) followed by
maintained at 60:40. The wage portion is Watershed development 0.13 crore
fully (i.e. labour) borne by Government of mandays (1.01 percent), Buildings 0.11
India, where as material portion has to be crore mandays (7.77 percent), CADA 0.01
borne by Central and State Governments in crore mandays (0.07 percent) and
the ratio of 75:25. For all works taken up for MGNREGS 8.12 crore mandays.
implementation by all GPs and all other
implementing agencies, the cost of the The wage employment generated as a
material component including the wages of proportion of the annual target was the
the skilled and semi-skilled workers shall highest in respect of Watershed
not exceed 40% at the district level. (District development 0.13 crore mandays (62.48
to be considered as a unit). percent), Major and medium irrigation and
Flood control generated 2.25 crore mandays
Labour budget under MGNREGS for the (50.41percent) followed by Roads and
generation of 1200.00 lakh person days for Bridges 1.11 crore mandays (38.65 percent),
the financial year 2019-20 has been Buildings 0.11 crore mandays (29.98
approved by Ministry of Rural Development, percent), Minor Irrigation 1.14 crore
Government of India. Corresponding Mandays (29.63 percent), CADA 0.01 crore
allocation for the scheme works out to Rs. mandays (8.24percent). During the

Table 10.19: Progress Achieved Under MGNREGA (Includes State Available Fund &
State Level Expenditure)
Employment Works (in lakhs)
Available Person
Expenditure provided
Year funds days Under Under
(Rs. In crores) (Households Completed
(in crores) (Lakh) taken progress
lakhs.)
2018-19
3097.82 3619.01 1047.05 21.10 10.22 3.83 6.39
FY
2019-20
up to 3743.20 3723.81 812.39 19.46 8.37 2.30 6.07
Nov 2019
Source: RDPR, Government of Karnataka.
Economic Survey of Karnataka 2019-20 493

corresponding period of the previous year Minor Irrigation (85.31 per cent) and
102.60 per cent of the annual target was Watershed development (79.39 per cent).
achieved in Buildings followed by Details are given in Table 10.21.

Table 10.20: Physical Progress under MGNREGS, 2018-19 and 2019-20


(up to November 2019)
Progress achieved in
Programmes/Schemes Unit Progress achieved in 2018-19
2019-20 (up to N ov-19)
Job Cards is sued (s ince
inc eption) No 587 7843 614 9281

Person day s ge nerate d Lakh 104 7.05 pers on days 812. 39 p erson days

House holds provided


Lakh 21. 10 Hous eholds 19. 46 Hous eholds
emp loy ment
House holds completed No 212 13 Hous eholds 212 41 Hous eholds
100 days of e mploym ent
Averag e no of p erson
days provided per No 49. 57 d ay s 42. 00 days
household

Note: Inconsistency in issuance of Job cards to the Households due to the introduction of the Job card
validation process. This process removes the Fake/Duplicate/Ghost Job cards from the physical as well as
from data base.
Source: RDPR, Government of Karnataka

Table 10.21: Wage Employment Generation under Major Programmes (2019-20)


(Mandays in lakhs)
An n ua l ta r ge t Ac h i eve m e n t
T a rg e t for
P ro gr a m m e s 2 01 9 -2 0 2 0 18 -1 9 2 01 9- 2 0
20 1 8- 19 2 0 19 - 20 (N ov.2 0 19 ) (up t o (u p t o
No v.1 8 ) No v. 1 9 )
1. M a jo r a nd M ediu m 218 .35 252. 93 2 24.90
I rrig a tio n & Flo o d 42 1.03 446 .17
Co n tro l (60.0 7) (5 0.41 )

262. 71 1 14.43
2. M ino r Ir rig atio n 30 7.95 386 .26 187 .82
(85.3 1) (2 9.63 )
5.7 0 0.71
3. C A D A 15 .38 8.6 2 4.61
(37.0 6) ( 8.24)

4. W a ter she d 34.2 1 1 2.57


43 .09 20.1 2 13.0 9
D eve lop m en t
(79.3 9) (6 2.48 )
39 3.42 262. 78 1 10.61
5. R oa ds & B ridge s 286 .22 166 .50
(66.7 9) (3 8.65 )
37.3 6 72.5 1 1 1.20
6. B u ildin gs 70 .67 21.8 1
(102 .60) (2 9.98 )

To tal Pro g ra m m e s 890. 84 4 74.42


12 51.54 118 4.75 612 .18
(Ta rg eted) (71.1 8) (4 0.04 )
N. R.E.G . S * * * 543. 67 8 12.39
T ot a l Pr og ra m m e s 12 51.54 118 4.75 612 .18 1434 .51 12 86.8 1

Figures in brackets indicate percentage to annual target.


* Demand driven programme - no target
494 Economic Survey of Karnataka 2019-20

Table 10.22: Beneficiaries under Self Employment Schemes 2016-17 to 2018-19

Achievement Target Achievement


Programme/Scheme Unit
2017-18 2018-19 2019-20 (upto Nov.-2019)

Karnataka State Finance Corporation

No.s 120 84 - 37
a) Single Window
Rs lakh 3983.55 2753.45 - 1151.80

b) Hospitals/Nursing Nos 24 18 - 18
Homes Rs lakh 2613.00 2352.70 - 2227.00

No.s 344 354 - 167


c) Assistance to
SC & ST
Rs lakh 28983.00 34850.00 - 14997.64

d) Minority No.s 73 85 - 36
Community Rs lakh 4160.00 5894.70 - 2829.00

e) Women No.s 429 364 - 178


Entrepreneurs Rs lakh 32851.65 41491.05 - 16303.64

f) Privileged No.s 109 66 - 5


Entrepreneurs
Rs lakh 4060.00 3320.60 - 291.75

Dr. DevarajUrs Backward Classes Development Corp. Ltd

i. Chaitanya No. of
3102 1665 2500 1020
Subsidies Cum beneficiaries
Margin Money
Scheme Rs lakh 1186.50 610.69 500.00 156.80

No. of
ii. D. DevrajUrs 22958 5638 6000 4951
beneficiaries
Individual Loan
Scheme Rs lakh 9732.44 2620.32 3000.00 2271.12

No. of
5203 4144 3333 479
iii. Micro Credit beneficiaries
Scheme
Rs lakh 780.45 621.60 500.00 71.85

No. of
5819 6207 9743 4908
iv. Arivu-Education beneficiaries
Loan Scheme
Rs lakh 2800.66 3716.28 5000.00 2893.73

v. Ganga Kalyana No. of


5859 6874 4500 790
Irrigation beneficiaries
Scheme Rs lakh 9452.00 13950.68 9500.00 5732.94
Economic Survey of Karnataka 2019-20 495

Achievement Target Achievement


Programme/Scheme Unit
2017-18 2018-19 2019-20 (upto Nov.-2019)

vi. Assistance to No. of


1560 19402 4000 2310
Traditional beneficiaries
Artisans and
Occupational
Rs lakh 711.45 8831.05 2000.00 995.05
groups

Stree Shakti Programme

a) No. of Groups
No.
taken loans from 11740 857 8868 1233
Cumulative
Bank
546.21 376.71 - 102.31
b) Loan amount Rs.In crores
128123 10051 7729 5746
c) Revolving Fund No. of SHG
Released by Groups
Govt. To Self
Rs. In Lakh 7320.11 1224.64 1079.00 316.25
help Groups

Dr.B.R.Ambedkar Development Corporation Ltd.

No. of 11477 8453 1384 1196


i) Self Employment beneficiaries
Scheme
Rs.Lakh 12506.52 8194.56 13000.00 4827.70

No. of 2086 347 556 632


ii) Land Purchase beneficiaries
Scheme
Rs.Lakh 17976.00 3216.36 10000.00 7502.24

No. of 13397 10905 20574 2212


iii) Ganga Kalyana beneficiaries
Scheme
Rs.Lakh 31563.48 34942.14 20000.00 9496.93

No. of 11653 7880 7000 3287


iv) Micro
beneficiaries
Credit(Prerana)
Scheme
Rs.Lakh 1165.30 788.00 2400.00 493.05

v) Micro Credit No. of 11653 7880 7000 3287


Scheme- beneficiaries
((Prerana-Margin
money) Rs.Lakh 582.65 394.00 525.00 328.70
496 Economic Survey of Karnataka 2019-20

Achievement Target Achievement


Program me/Scheme Unit
2017-18 2018-19 2019-20 (upto No v.-2019)

PMEGP

a) P rojects No. 21 26 3644 2967 1742

b) Pe rsons trained No. 26 06 2216 2967 730

c) Empl oyment
No. 17 008 2951 2 2373 6 1393 6
ge ne rate d

c) Total amount
s pent (Margi n
M oney rele ase d
from Khadi and Rs. Lak h 11 401.8 6 1068 8.47 8901 .13 5227 .11
Vil lage Industrie s
Commiss ion,
G OI)

CMEGP

a) P rojects No. 61 5 765 3000 425

b) Pe rsons traine d No. 13 45 1725 3000 57

c) Emp loyme nt
No. 19 05 3060 9000 1700
gene rated

c) Total amount
s pent ( Margin
M oney rele ase d
from Khadi and Rs. Lak h 11 74.31 1385 .50 6000 .00 799. 90
Vill age Industrie s
Commiss ion,
GOI)

Source: Concerned Departments of Government of Karnataka

Table 10.23: Number of Persons Trained for Self-employment 2018-19 to 2019-20.


(Numbers)

Achievement Target
Achievement
Programme/Scheme
2017-18 2018-19 2019-20 (upto Nov. 2019)

1. Enterpreneuship Development Programme Sponsored by CEDOK

a) Persons Trained 38,580 110422 51,640 35,808


b) Programmes 741 1523 1291 924

Source: Concerned Departments of Government of Karnataka


Economic Survey of Karnataka 2019-20 497

10.8 GOVERNMENT INITIATIVES – b) ESI SCHEME MEDICAL SERVICES


SOCIAL SECURITY SCHEMES
(i) The ESI Scheme is a premier Social
a) Social Security and Pension: security Scheme implemented in
accordance with the ESI Act 1948 and
The Directorate of Social Security and
rules framed there under. The Scheme
Pension, Revenue Department of the
was inaugurated on Feb. 24th 1952 in
Government is providing social security
the industrial town of Delhi and
benefits to the old, widows, physically
Kanpur.
challenged, single women and transgender.
Under old age pension scheme any person The Scheme provides two types of services,
aged between 60 to 64 years and belonging namely, medical and non-medical. Medical
to BPL household is eligible to avail the services are rendered by ESIS Medical
pension of Rs. 600 per month. The pension Services which is under the control of State
amount has been enhanced to Rs.1000/- Government, Labour Department. The Non
from 1st November,2018 for the medical services are rendered through ESI
beneficiaries aged above 65 year, under Old Corporation, which is under the control of
Age pension and Sandhya Suraksha Yojane. Central Government, Department of
Widows aged between 18 to 65 years Labourand Employment.
belonging to BPL households are eligible to
The Scheme made a humble beginning with
avail pension under Destitute Widow
12 ESI Dispensaries and 100 bedded ESI
pension scheme of Rs. 600 per month. A
Hospital in Karnataka as on 27-07-1958 at
pension amount of Rs. 600 per month is
Bangalore. Catering to 48,000 beneficiaries
given for Disabled person with disability
with a wage limit of Rs.400/- P.M. The ESI
percentage between 40 to 74 and Rs. 1400
Act 1948, envisages the following seven
per month for those having disability above
benefits to the insured persons and their
75%. Sandhya Suraksha Yojane is the
families.
programme initiated by the government of
Karnataka in 2007 to provide social security 1) Medical benefit
benefits to small and marginal farmers,
2) Sickness benefit
agricultural labourers, weavers, fisher men
and other labourers from unorganized 3) Maternity benefit
sector excluding construction workers.
4) Disablement benefit
Under this programme workers in the age
group of 65 years and above having income 5) Dependent benefit
Rs. 20,000 per annum are eligible and they
6) Funeral Expenses
are being paid with pension of Rs. 1000 per
month. Schemes “Manaswini” for 7) Unemployment allowance (Rajiv
unmarried women of age 40 to 64 and Gandhi ShramikKalyanYojana)
“Mythri” for Transgender aged between 25 to
The Scheme was first implemented to cover
64 years are implemented during 2013 and
non seasonal factories using power and
beneficiaries under these schemes are paid
employing 20 or more persons, who were
pension amount of Rs.600 per month. New
drawing the salary Rs.400/- P.M. or less.
Schemes for widows of farmer who
This limit has been enhanced to Rs.15000/-
committed suicide and Acid Victims is
P.M. w.e.f. 01-05-2010. Further, this limit
implemented during 2015. Beneficiaries
has been enhanced to Rs.21,000/- PM w.e.f.
under these schemes are paid pension
01-01-2017. The Act has been amended to
amount of Rs.2000 and Rs. 3000 per month
cover other sectors of employment with ten
respectively. The information about number
or more persons working using power /
of beneficiaries and expenditure details of
without power, Shops, commercial
these programmes are given in the Table establishments, hotels, Preview Theatres
10.24 newspapers and transport establishment
498 Economic Survey of Karnataka 2019-20

Table 10.24: Progress of Social Security Schemes

Financial assistance to Pension to destitute Sandhya Suraksha


Old Age Pension
Physically handicapped Widows Yojane
Year
Exp. Exp. Exp. Exp.
Beneficiaries Beneficiaries Beneficiaries Beneficiaries
(Rs. (Rs. (Rs. (Rs.
(000’s) (000’s) (000’s) (000’s)
Lakhs) Lakhs) Lakhs) Lakhs)

2007-08 27841 686 22491 464 328 74 771 87689 262

2008-09 26253 791 17802 530 386 74 865 119848 539

2009-10 41758 818 35261 636 454 08 10 23 166936 1018

2010-11 36936 783 42133 686 528 26 11 25 197213 1405

2011-12 40123 572 51434 553 597 47 936 73040 1130

2012-13 30455 581 43290 605 498 83 10 40 71543 1257

2013-14 32575 591 55474 672 639 36 12 07 86930 1558

2014-15 39335 702 68694 783 799 83 14 37 106839 1965

2015-16 41248 718 76990 811 889 45 15 06 126969 2129

2016-17 41372 747 82934 859 951 22 15 49 139480 2367

2017-18 45072 851 87250 901 988 98 17 04 147364 2519

2018-19 120 41
69896 1004 10601 8 935 17 66 220096 2618
7

2019-20
68302 1133 72817.01 940 819 87 17 91 205119 2725
(Nov.-19)

Source: Directorate of Social Security and Pension GoK

are also covered under the scheme. The State Government enter into an
Further, the Government of Karnataka have agreement with ESIC to provide full medical
issued notification to cover the employees of care to Insured Persons and their family for
educational institutions (Private, Aided, which ESIC reimburses 87.50% share of the
Partial Aided) and medical institution under total expenditure and the State Government
the ambit of ESI Scheme. The ESI Scheme bearers 12.50% share subject to ceiling
in the Karnataka Region at a glance is given prescribed by ESIC and full medical care
in Table 10.27. from time to time. The State Government
initially bears expenditure from and get
In Karnataka full medical care has been
reimbursement from ESIC.
extended to about Rs.34.73 lakhs (Table
10.30) insured persons and about Rs.150 Financial Achievements:
lakhs of their families through a network 10
The State Government releasing the budget
ESI Hospitals (ESIC Model Hospital,
and the details of expenditure made by the
Rajajinagar, Peenya and Kalaburgi). 113
department from 2010-11 to 2019-20
full time ESI Dispensaries, 06 IMP System
Dispensaries and One Diagnostic Centre. (uptoNov. 2019) are given in Table 10.25.
Economic Survey of Karnataka 2019-20 499

Table 10.25: the details of expenditure made by the department from 2010-11 to
2019-20
(Rupees in Lakhs)
Allocation
Sl. Achievement
Year under Plan Ex penditure Surrender
No %
Scheme
1 2010-11 1760.00 1665.26 79.74 94.61
2 2011-12 2000.00 1552.51 447.49 77.62
3 2012-13 5200.00 4822.75 377.25 92.74
4 2013-14 5200.00 4877.87 322.13 93.80
5 2014-15 5516.12 5217.70 298.92 94.58
6 2015-16 10101.00 9791.13 309.87 96.93
7 2016-17 10371.00 9915.42 455.58 90.61
8 2017-18 34652.00 32183.48 2468.52 92.87
9 2018-19 32364.00 29616.70 2747.30 91.51
36683.00
2019-20 81.86
10 27512.25 22522.00 ---
(upto Nov.19) (For release)
(Release amt)
Source: Directorate of Employees State Insurance Scheme, GoK

Table:10.26 : Number of Insured Persons in the State (up to November 2019)

Sl.
Year I nsured persons in lakhs
No.
1 2010-11 15.55
2 2011-12 16.00
3 2012-13 18.52
4 2013-14 20.80
5 2014-15 21.45
6 2015-16 22.26
7 2016-17 23.85
8 2017-18 34.00
9 2018-19 34.96
10 2019-20 (Nov 19) 34.73

Source: Directorate of Employees State Insurance Scheme, GoK


500 Economic Survey of Karnataka 2019-20

Table 10.27: ESI Scheme in Karnataka Region at a glance:

1 No. of implemented centres / sub-centres 160/758


2 No. of district covered 30
3 Approved No. of Insured Persons as on 01-04-2019 34.73 lakhs
4 Pehchan Card as on 01-04-2019 At present employer
themselves generating e-
pehchan card online
5 No. of ESI Hospitals 10
6 Total No. of beds commissioned 2155
7 No. of ESI Dispensaries 113
8 No. of IMO’s post sanctioned, in position 610/326
9 No. of Assistant Dental Surgeons, sanctioned, in position 8/3
+
(5 Contract basis)
10 No. of tie-up hospitals as on 30-11-2019 76
Source: Directorate of Employees State Insurance Scheme, GoK

ii) Vision and Mission of ESI Scheme 7. Providing of cashless super-speciality


Medical Services medical care like, Cancer, Dialysis
treatment to the IP's and their family
VISION: members or insured patients through
1. Extending of full medical care to the Tie-up hospitals.
Insured Persons and their family
8. Providing of artificial limbs,
members of the State.
Orthopedicimplants and Hearing Aids
MISSION: to the IP's and their family members
and insured patients.
1. Extending of Primary Medical Care to
the IP's and their family members 9. Conducting of Health Check up camps
through ESI Dispensaries through IMP for insured patients
System,
10. Commissioning of ESI Hospitals &
Primary Health Centres and Taluk Dispensaries based on No. of IP's.
Hospitals.
c) Vision and Mission of Labour
2. Providing Out-Patient, In-Patient and Department:
speciality services to the beneficiaries
through ESI Hospitals. Vision: “Making Karnataka as a model state
for global investment and sustainable
3. Providing Ambulance services at ESI industrial production based on the twin
Hospitals principles of decent quality employment
4. Providing of Super-speciality, Medical generation and inclusive all-round
care through Tie-up hospitals. development of working class by designing
and implementing feasible creative
5. Continuous supply drugs and Super- approaches and pragmatic operational
specialty drugs to the IP's. strategies”.
6. Clearance of medical reimbursement
bills of IP's with in the Stipulated period.
Economic Survey of Karnataka 2019-20 501

Mission: implementing an Accident Benefit Scheme


named “Karnataka State Private
“To evolve model frameworks in respect of
Commercial Vehicle Drivers Accident
Labour Legislation, Policies, Action Plans,
Benefit Scheme” from the year 2011-12. In
Schemes and Programmes by involving all
order to extend the said benefit to the
the parties vitally concerned and
Conductors and Cleaners along with the
implementing the same using advanced
drivers, the existing scheme has been
technologies so as to achieve efficiency and
revised and renamed as “Karnataka State
effectiveness in reaching the target group
Private Commercial Transport Workers
and thereby ensuring Karnataka's
Accident Benefit Scheme” which came into
competitiveness in the domestic and global
force on 01-11-2017. The following benefits
market as a preferred destination for
are available under the scheme.
investment and decent quality employment
generation”. r Accident benefit :
1] Karnataka State Unorganised Workers r In case of accidental death of
Social Security Board: the beneficiary, Rs.5.00 lakhs
compensation to the nominee of the
To improve the living conditions of the deceased.
unorganised workers and to bring them
r In case of permanent total disability due
under the social security net, the State
to accident, upto Rs.2.00 lakhs
Government has constituted the Karnataka
compensation to the beneficiary.
State Unorganised Workers' Social Security
Board under the provisions of Unorganised r In case of permanent partial disability
workers Social Security Act, 2008.The State due to accident, upto Rs.1.00 lakh
Government has identified 43 categories of Hospital expenses to the beneficiary.
unorganized workers for extending social r Insurance Benefit is available to both
security benefits. "On-duty and Off-duty" accidents.
At present the Board is implementing the r In the State, 7,78,485 drivers have been
following Social security Schemes. covered under the scheme.
Karnataka State Private Commercial Educational Assistance :
Transport Workers Accident Benefit Educational Assistance of Rs.10,000/- per
Scheme. annum is being paid to maximum 2 children
To provide the financial and social security of the driver who succumbed to death due to
to the drivers and their families of the accident or suffered total permanent
private commercial transport vehicle drivers disablement. This benefit will be given to
who meet with accidents, the Board is study from 1st standard to 12th / PUC.

Table 10.28: Claims / Compensation from April-2019 to November-2019

Sl Amount of
Description No of cases Compensation
No.

1 Death 56 Rs. 2,77,00,000/-

2 Permanent Disability -- --

Re-imbursement of Medical Expenditure/


3 04 Rs. 2,38,646/-
Temporary Disability

Grand Total 60 Rs.2,79,38,646/-

Source: Labour Department, GoK


502 Economic Survey of Karnataka 2019-20

During the said period, 148 students have the cost of building and other construction
been sanctioned with a total amount works undertaken by them and to collect
Rs.14,80,000/-. cess from the permission seekers for
construction of building. This has facilitated
r Life Saviour's (Good Samaritan) a great deal in augmenting the cess
Scheme : collection. With the help of Legal Services
To create Accident Life Saviour to save Authorities in various district meeting with
the life of accident victims, 10,186 construction workers are being held to
drivers have been trained in First Aid educate them regarding registration as
Treatment under this programme. beneficiary and the welfare benefits
available to them. The number of
r Smart Card :
construction workers registered with
Smart card is being distributed to construction welfare board is 21,78,260
beneficiaries of the scheme. workers of which 15,17,327 and 6,60,933
(2) Ambedkar Karmika Sahaya Hastha are male and female workers respectively
Scheme: (Table 10.29). The Cumulative Figure of
cess collected is Rs. 6353.94 crores as on
(a) Smart Card Benefit : Under the scheme, 30-11-2019. The detailed information is
47,034 workers belonging to 11 categories of given in Table 10.30.
unorganised categories such as Hamalis,
Domestic Workers, Rag Pickers, Tailors, 3) Karnataka State Child Labour
Mechanics, Washer men, Barbers, Gold Eradication
Smiths, Iron Smiths, Potters and Kiln To eradicate the child and adolescent
Workers have been issued with Smart Card. Labour system in Karnataka, the Central
(b) Karmika Seva Kendras : As per the and State Governments are implementing
decision taken to open Karmika Seva the following two Projects:
Kendra in all 175 Taluks across the State, to i. National Child Labour Project (NCLP)
deliver the benefits available under various
schemes to be implemented by the Under this Project, Special Training Centers
Department of Labour and the Boards (STCs) are established to provide
working under it, to the beneficiaries, 158 residential-cum-learning environment to
KarmikaSevaKendras have been started. the children rescued from workplaces. In
STCs, the children are provided bridge
2) Building and Other Construction education, day –care and stipend of Rs
Workers Welfare Board. 400/child/month. The NCLP is presently
District wise meetings were conducted in implemented in 17 districts of Karnataka.
the office of the Deputy Commissioners of Under the NCLP scheme, Twenty Two (22)
each district wherein the representatives of Special Training Centers (STCs) are
the development departments like PWD, functioning in NCLP districts.
Irrigation, Z.P., City Corporation and Local ii. State Child Labour Project (SCLP)
Bodies were invited. They have been
apprised of the obligation to collect cess on The Government of Karnataka has launched
SCLP as a supplement of NCLP to extend

Table 10.29: No. of Construction Workers Registered with Construction Welfare Board
in 2019-20 as on 30-11-2019

Monthly Total no. of registered workers


Registration Fee
Subscription Male Female Total
Rs.25 25 (1 Year) 15,17,327 6,60,933 21,78,260
Source: Labour Department, GoK
Economic Survey of Karnataka 2019-20 503

Table 10.30: Cess collected by Construction Workers Welfare Board as on


30.11.2019
Amount of Cess Collected
Year
(Rs. in Crores)

2007-08 45.02

2008-09 164.93

2009-10 227.56

2010-11 325.20

2011-12 360.61

2012-13 483.58

2013-14 480.87

2014-15 656.06

2015-16 621.11

2016-17 709.25

2017-18 769.93

2018-19 868.53

2019-20 (November) 641.29

Total 6353.94

Source: Labour Department, GoK

beneficial support system in non-NCLP hazardous processes and occupations


districts. Under this Project, Residential and regulatory mechanisms are
Special Training Centers (STCs) are run. provided in non-hazardous workplaces.
Also, the funds available under this Project The quantum of punishment is in the
are utilized to extend residential facilities in range of Rs.20, 000/- to 50,000/- fine
STCs run under NCLP scheme. The SCLP is and/or six (06) months to thirty six (36)
presently implemented in the 13 districts of months imprisonment.
Karnataka.
ii. Government of Karnataka vide its
a. Major initiatives for elimination of notification No. LD 316 LET 2010(1)
Child and Adolescent labour are as dated 30/11/2010 has notified officials
follows of eleven (11) departments as inspectors
under section 17 of the Child Labour
i. The Government of India has amended (Prohibition & Regulation) Act, 1986. In
the Child and Adolescent (Prohibition & every district “Task Force” committees
regulation) Act, 1986 in 2016 and given are formed with the help of these Task
effect from 1st September 2016. Under Forces special drives/ raids have been
the amended Act, child labor is conducted to identify and rehabilitate
universally prohibited with an the working children and adolescents.
exception of working in family
enterprises and as an artist, without iii. Formation of Various monitoring
affecting their right to education. The committees for effective implementation
work of adolescents is prohibited in of The Child & Adolescent Labour
(Prohibition & Regulation) Act, 1986.
504 Economic Survey of Karnataka 2019-20

1. As per the Government order No. LD.54 children. The details of Inspections,
CLC 2000(III) dated 29/05/2001 State Prosecutions, Convictions and Fine
Level Co-ordination committee is imposed during 2019-20 (upto Nov 2019)
formed under the Chairmanship of are given in Table 10.31.
Additional Chief Secretary, Department
of Labour. d. Awareness Programmes

2. As per the Government order No. LD.88 1. On June 12th, every year “World day
CLC 2012 dated 20/10/2012, The Against Child Labour” is organized in
District Level Advisory Committee, the State, District level and Taluk level
District Level Executive Committee is in association with state government,
formed under the Chairmanship of District Legal Service Authorities and
Deputy Commissioners and Taluk Level District Taluk level administration,
Committee is formed under the NGO's etc.,
Chairmanship of Tahsildars. 2. Awareness Generation Programmes
These committees regularly monitor the (AGP's) are being organised in
Child and Adolescent Labour situation in collaboration with NGOs and other
the state, district and taluks respectively Stakeholders.
and formulate Action Plan for effective 3. Capacity Development Programmes
eradication of Child and Adolescent Labour. (Training) are organised to notified
inspectors and other Stakeholders.
b. Survey:
4. The Jatha's and Street plays are
In the year 2018-19, the State Government
conducted at State, District and Taluk
involving Rural Development and
level to create awareness among public.
Panchayath Raj Department, Department of
Women and Child Development, 5. Stickers, Pamphlets, wall paintings
Department of Primary and Secondary were distributed.
Education, Department of Labour and the
relevant stakeholders has conducted a 4) Welfare Schemes for Organised
survey of Out-of-School Children(OoSC),in labourers
this survey total 95 working Child and 10.9 KARNATAKA LABOUR WELFARE
Adolescent labours were identified. The legal BOARD BANGALORE
action in this regard is under process.
Various Welfare and Social Security
c. Inspection Details: schemes for the Organized sector workers,
In every district, regular and periodic working in registered factories, plantations,
inspections are carried out to identify, motor transport establishments, shops &
rescue, release and rehabilitate working commercial establishments, employing

Table:10.31: The details of Inspections, Prosecutions, Convictions and Fine imposed


(April-2019 to November-2019)
Sl. No. Details 2019-20 (Nov. 2019)
1 No of Inspections 7993
2 No of Prosecutions filed 49
3 No of Convictions 8
No. of child labourers identified and
4 167
rehabilitated
5 Amount of Fine Imposed 2,40,000/-
Source: Labour Department, GoK
Economic Survey of Karnataka 2019-20 505

more than 50 workers through the Board Unions, 4 members representing organized
constituted in 27-10-1969, in accordance sector employers, 4 from the Government
with Karnataka Labour Welfare Fund Act, and 2 women members for 3 years term. At
1965 & Rules 1963. The Government has present contribution ratio of Employees,
notified the members of the Board on 12-12- Government and Employers is 20 : 40: 20.
2016, Honourable Minister of Labour is the The details of contributions, establishments
Chairman, 4 members representing Trade covered, and beneficiaries is provided in the
Tables 10.32 and 10.33 and 10.34,

Table 10.32 : Benificiary Details 2019-20

Sl. No. Welfare schemes No of Beneficiaries Amount (in Rs.)


Education assistance to
1. 21210 8,60,81,000
children of workers
2. Medical Assistance 09 74,011
3. Funeral Expenses 326 16,27,500
4. Acci dent Benefit 1 3,000
Assi stance to purchase
5. 1 5,000
artificial limb equipment
700
6. Annual Sports Activity 50,000
[ 1 organisation]

TO TAL 22,247 8,78,40,511

Source: Labour Department, GoK

Table 10.33 : Benificiary Details 2019-20 (Upto November 2019)

Sl. No. Welfare Schem es No. of beneficiaries Amount (in Rs.)


Education assistance to
1 13,247 5,31,58,000
children of workers
2 Funeral expenses 170 8,50,000
3 Annual Sports Activi ty 600 [ 2 organisation] 1,00,000
400
4 Medical Checkup camps 60,000
[ 2 organisations]
Total 14,417 5,41,68,000

Source: Labour Department, GoK

Table 10.34: Contribution Details 2018-19 AND 2019-20 (Upto November 2019)

Government E mployer
Year Employee Contribution
Contribution Contribution

2018-19 5 Crore 15.60 crores 7.80 crores

2019-20 upto
7.18 crores 55.43 lakhs 27.71 lakhs
Nov. - 2019

Source: Labour Department, GoK


506 Economic Survey of Karnataka 2019-20

10.10 Progress of Various Labour Laws regulations can be broadly grouped into four
Enacted in Karnataka broad areas, based on the aspects of
employment covered by them, conditions of
A major issue in the area of labour reforms is work, wages and remuneration,
how to ensure minimum conditions of employment security and industrial
decent work and livelihood in the relations and social security and welfare of
unorganized or informal sector of the workers. The statistics regarding the
economy. The limited applicability of progress of labour laws enacted in
important laws and the application of
Karnataka State is provided in Table 10.35.
number filters have led to the emergency of a
The Table illustrates the remarkable
dual labour market with the resultant
achievements in the matter of enforcement
implication of the overwhelmingly larger
of various Acts in terms of prosecution and
sections of the unorganized sector labour
imposition of fine by the Department. Table
being deprived of protection from laws in
10.36 illustrates the progress of Industrial
many spheres. Labour is a concurrent
subject in the Constitution of India, on Disputes Act of 1947, Table 10.37
which both the Centre and the States can Absenteeism of Plantation Labour.
legislate in their respective spheres. Labour

Table 10.35: Information Regarding Implementation for Various Acts from


01.04.2019 to 30.11.2019

Nu mber of Fine
N u mber o f Pros ecu tion N o o f Case amou nt
N ame of the Acts
Insp ectio n p eriod Disp osal o ff (in Rs.)
Th e Karnataka S hops and 566 4 4 10 449 607 812
Com mer cial
Establis hme nts Ac t 1961
Th e Karnataka S hops and 767 -- 31 135 250
Com mer cial
Establis hme nts U/S 24
Act 19 61
Th e M inim um W ages Ac t 478 6 4 88 378 582 800
194 8
Th e Paym en t of W age s Ac t, 329 5 3 13 218 554 200
193 6
Th e Equal Remun er ation 223 3 2 16 105 592 719
Act,19 76
Th e Ch ild Lab our 526 0 44 27 145 000
(Pr oh ibition and
Reg ulation ) Act, 198 6
Th e Contract Lab our 789 1 19 43 290 100
(Re gulation an d Abol ition)
Act,19 70
Th e Pay men t of G ratuity 114 5 3 4 40 000
Act, 1 972
Th e In ter-S tate Mig ran t 57 12 3 5 000
worke r me n & Reg ulation
of Em ploym en t and
Con dition s of S er vices)
Act,19 79
Karn atak a Indus tr ial 35 -- 3 12 000
Establis hme nt (N ation al
and F estival Holid ay s) Ac t,
196 3
Economic Survey of Karnataka 2019-20 507

Number of
Number of No of Case Fine Amount
Name of the Acts Prosecution
Inspection Disposal off (in Rs.)
period
Karnataka Labour 344 4 -- --
Welfare fund Act, 1965
The Payment Bonus Act, 116 -- -- --
1965
The Motor Transport 17 -- 2 --
Workers Act, 1961
The Maternity Benefit Act, 9 -- -- --
1961
The Beedi and Cigar 2 -- -- --
Workers (Conditions of
Employment) Act, 1966
The Building and Other 149 -- -- --
Construction Workers
(Regulation of
Employment and
Conditions of Service)
Act, 1996
The Plantation Labour 17 -- -- --
Act, 1951
The Sales Promotion -- -- -- --
employees (Conditions of
Service) Act, 1976
The Trade Union Act, -- -- -- --
1936
The Industrial 5645 -- -- --
Employments (Standing
Orders) Act,1946
Total 30330 1609 1263 2964881
Source: Labour Department, GoK

Table 10.36: Progress Under the Industrial Disputes Act, 1947


(April 2019 to November - 2019)
Details Number of Cases
Opening Balance 485
Number of Cases received during the period 911
Total 1396
Settled 25
Failed 451
withdrawn 142
Total Disposal 618
Balance at the end of period 778
Source: Labour Department, GoK
508 Economic Survey of Karnataka 2019-20

10.11 INDUSTRIAL RELATIONS accidents hazardous Factories in the 21


districts in the state. Special and effective
a. Strikes and Lockouts – The number of importance is given at the time of inspection
strikes and lockouts indicate the level of to avert any possible disasters. There are
industrial peace in a State. Karnataka is by about 1432 Factories having hazardous
and large, a peaceful state as far as manufacturing process and effective
industrial environment is concerned. No inspections are conducted to avoid possible
strikes, lockouts, layoffs reported during accidents. The main objective of the
the year. department is to ensure Safety and Health of
b. Absenteeism - In the year 2019-20 at the the workers. The Department is conducting
end of 2019 November month, the risk based inspection of Factories to ensure
proportion of absenteeism of industrial occupational safety and Health of workers at
workers was 22.21% and during 2018-19 it work place. Further the, department is
was 8.06%. Absenteeism in plantation providing all the possible and required
labour was 15.20% in the previous year and assistance to the management to ensure in
during 2019-20 it is 27.51%. Details are providing occupational safety & health at
given in Table 10.37. work place. The details of the departmental
activities in brief are given in Table 10.38.
c) Occupational Safety and Health
The Details of Safety training programs
Department of factories, boilers, industrial conducted for workers through Karnataka
safety and health is associated with the State Safety Institute of the department is
responsibility of ensuring occupational given in Table 10.39.
safety, health and welfare of the workers in
the registered factories and at construction The Department of Factories, Boilers,
activities through effective enforcement. The Industrial Safety & Industrial Health is
Karnataka state is having 16,914 registered enforcing the acts and rules and the details
factories with 17,61,721 workers and there of prosecutions filed in the courts for
are 5224 registered Boilers. Taking into violations of provisions of law is given in
consideration the Volume of storage of Table 10.40.
hazardous chemicals, there are 84 major

Table 10.37: Absenteeism of Plantation Labour

Absenteeism (April to Nov. 2019)

No. of Man days No. of Man Percentage of


Particulars
Schedule to Work days Absent Absent

Industry 5323761 1182883 22.21

Plantation 21069 5797 27.51

Source: Labour Department, GoK


Economic Survey of Karnataka 2019-20 509

Table 10.38: Details of the Departmental activities

2019-20
Sl. No. Particulars 2017-18 2018-19
(Apr – Nov)

1 Registered Factories 975 906 735

2. Total Registered Factories 17,040 16,336 16,914

3. Total Workers 17,86,485 17,09,964 17,61,721

4. Inspections of Factories 6444 6905 5212

5. Prosecution (court Cases) 153 259 155

No. of cases in which fi ne i s


6. imposed 60 50 47

7. Compli ance reports received 4115 4343 3110

8. Registered Boilers 183 148 151

9. Total Registered Boilers 4944 5072 5224

10. Inspections of Boilers 2857 2988 1550

Source: Factories and Boilers Department, GoK

Table 10.39 : Details of Safety Training Programs


2019-20
Sl.No. Program s 2017-18 2018-19
(Apr - Nov)
Total No. of Training programs
1. Conducted 180 153 45

2. No. of Benefici aries 5966 5319 1525


3. Major programs Conducted 1 2 3
4. No. of persons participate 275 397 421
Source: Factories and Boilers Department, GoK

Table 10.40 : Details of the prosecutions filed for violations of provisions of law
No. of Cases N o. of cases in
S l. Fine
Act & R u les filed in the which fine is
N o. (in R s. )
cou rts im p osed
1. Th e Facto ries Act, 1 948 an d The
98 18 7,13,0 00/-
Karn atak a F acto ries R ule s, 1 969.
2. Matern ity ben efit act 1961 and rules
-- -- --
made the ir un der
3. Th e Paymen t o f W ag es Ac t, 19 36 an d The
Karn atak a Payme n t o f Wage s Rules, 6 -- --
196 3.
4. Th e Buildi ng an d o the r co nstr uc tio n
w o rker s (Reg ul atio n o f em plo ymen t an d
6 -- --
co nd itio n o f se rvice s) Ac t-19 96 and Rules
made the re un der .
Total 11 0 18 7 ,1 3 ,0 00 /-
Source: Factories and Boilers Department, GoK
510 Economic Survey of Karnataka 2019-20

10.12 Outcomes and Challenges employment of workers in the agriculture


sector in the country. Hence, it is very
Rapid industrialization is taking place in the
essential to ensure occupational safety and
country and also in Karnataka. Taking into
health of workers in the factories at work
consideration the new manufacturing
place.
processes, hazardous processes, usage of
hazardous chemicals and raw materials, it The department is ensuring the above, by
is very essential to ensure occupational effective and risk based inspections with
safety and health of the workers at the work total compliance of the provisions of law. As
place. In view of the above, risk based per the industrial policy and requirement of
inspections are conducted in the major the management of the factory, speedy and
accidents hazardous Factories and transparent processing of the applications
Factories having hazardous manufacturing in respect of registration of factories in line
process to ensure occupational safety and with ease of doing business by means of
health of the workers at the work place. online processing is implemented in the
department.
The employment of workers in the industrial
sector is second largest after the
ECONOMIC INFRASTRUCTURE CHAPTER 11

11.1 POWER SECTOR use KPTCL's transmission network to


distribute electricity
Electricity is one of the most precious things
that science has given to mankind. 11.1.1 Power Sector Reforms:
Electricity is used in every walk of life to Recognizing the crucial role of power in
meet the day to day domestic, commercial, achieving economic progress, Karnataka
industrial, transportation, communication, was one of the first Indian States to
entertainment, medical, research and implement power sector reforms.The
development works and every activity of the institutional setup for undertaking the
human beings. reforms was strengthened with the
enactment of the Karnataka Electricity
The use of electricity turns the wheel of life
Reforms Act in 1999. The Karnataka
and the usage is getting increased
Electricity Regulatory Commission (KERC)
continuously. The per capita consumption
was established as a regulatory authority
of electricity is one of the yardsticks for
of the State's Power Sector. Besides other
measuring the standard of living. The
functions, it regulates the tariff for supply of
wheels of economic progress revolve around
power to different categories of consumers.
meeting the demand for electricity.
Four Electricity Supply Companies (ESCOMs),
Electricity occupies a unique status in the
Bengaluru Electricity Supply Company Ltd.
annals of human life. Electricity is a
(BESCOM), Mangaluru Electricity Supply
precious thing and should be conserved.
Company Ltd. (MESCOM), Hubli Electricity
Karnataka State has been experiencing Supply Company Ltd. (HESCOM) and
conditions of power shortage because of the Kalaburagi Electricity Supply Company Ltd.
ever-growing demand for power influenced (GESCOM) were established during 2002
by the rapid economic progress. The State and another ESCOM, Chamundeshwari
Government has been taking various Electricity Supply Corporation Ltd. (CESC)
initiatives to implement projects in the was established in 2005. The Hukkeri Rural
public as well as private sectors for adding Electric Co-operative Society (HRECS) is
new installed capacities for power engaged in distribution business in Hukkeri
generation. Power generation in the public Taluk. These five distribution companies
sector is managed by the Karnataka Power and HRECS are engaged in retail supply of
Corporation Limited (KPCL), whereas the electricity to the end consumers.
Karnataka Power Transmission Corporation
Government of Karnataka accorded
Limited (KPTCL) deals with transmission of
approval in April,2007, for setting up of a
power and load despatch functions. As part
Special Purpose Vehicle (SPV) viz., Power
of the restructuring of the power sector in
Company of Karnataka Limited (PCKL) to
the State, the erstwhile Karnataka
supplement the efforts of KPCL in capacity
Electricity Board (KEB) was restructured as
addition. PCKL was incorporated on 20th
KPTCL in 1999 by giving it a corporate
August, 2007 under the Companies Act
status. As per the Electricity Act 2003,
1956. PCKL is responsible for capacity
KPTCL, being the State's transmission
addition by way of setting up of new power
utility, is not empowered to trade in
projects through bidding process, under
electricity. Therefore, the distribution
Case-II bidding guidelines issued by
companies directly procure power from
Ministry of Power, GOI and long term
power generators, both public and private
procurement of power under Case-I bidding
and ESCOMs' own distribution network and
guidelines of MoP, GoI. In order to bridge the

511
512 Economic Survey of Karnataka 2019-20

demand and supply gap, PCKL has been KPCL has been pioneering the capacity
procuring power on behalf of the ESCOMs addition for power generation in the public
from various sources including purchase of sector in the State. Benefiting from
power through Energy Exchange, Banking the reform processes, various private
(SWAP) as well bilateral transactions. PCKL generators have also established power
also co-ordinates with other States and plants in Karnataka. Further, the State
Central Government agencies on power Government has established the Karnataka
related issues through the forum of Renewable Energy Development Ltd
Southern Regional Power Committee (KREDL) to harness renewable sources of
(SRPC). energy.
The State Govt is on the right path to The total installed generation capacity
increase the Generation, Transmission and both in the public sector and private
Distribution capacity addition to meet the sector including the State's share in
ever-growing demand for power in the State. the Central Generation Station (CGS) up to
Nov-2019 is 29884.50MW. The installed
Installed capacity addition during 2019-20
capacity in the public sector is 12979.00MW
up to November is 1143.83 MW.
(including CGS allocation) and the private
With the addition of generation capacity, the sector's share is 16905.50MW. In the
state is able to ensure near self sufficiency in private sector capacity, the share of
availability of power. The variations in hydel renewable energy sources of power
availability and coal supply hamper the generation (excluding the Share of IPP
status of self sufficiency. Otherwise, the Thermal & Mini Hydel) in overall installed
State can meet its demand with the existing capacity is 46.24%. The status of power
and pipeline capacity addition. sector in terms of both installed capacity
and electricity generation in Karnataka is
Attaining self sufficiency in power
provided in Table 11.1.
availability is a dynamic aspect that
depends on various related aspects. The status of the installed capacity of Hydel
power generation as on 30.11.2019 is
11.1.2 Power Generation
12.31% in total installed capacity. This
The State of Karnataka depends on several share increases to 15.34%, if Mini-Hydel is
sources of supply for meeting its power included. The contribution from wind power
requirements. The State has power is the third highest at 4817.84 MW after coal
generation infrastructure within the State thermal and solar (Figure 11.1).
belonging to both public and private sectors.
It may be observed from Table 11.1, out of
In addition, it has guaranteed allocations
the total installed capacity of 29884.50 MW
from the central power generating stations,
as on 30.11.2019, the renewable energy
and finally relies on imports from other
share including Mini Hydel and Co-
states for bridging the demand-supply gap.
generation is 49.39%. The Hydro Thermal
Thus, the main sources of power supply in
mix in the State generation in public sector
Karnataka are:
including Central Generating share is in the
a. Generating Stations of KPCL ratio of about 1:2 .
b. Independent Power Producers (IPPs) The total power supply in 2018-19 was
(Conventional and Non-conventional) 75355.15 MU and that in 2019-20 up to
November was 46804.15 MU.
c. State's share from Central Generating
Stations Installed Capacity:
d. Procurement from other States through 1. The State has added 1183.83 MW of
bilateral trade, purchase and energy Generating capacity in renewable
exchanges energy sector (including Mini Hydel),
during 2019-20 (Up to November-19).
e. Barter arrangement (power banking)
Economic Survey of Karnataka 2019-20 513

Table 11.1: Progress in Power Sector

2019-20
Source Unit 2015-16 2016-17 2017-18 2018-19 (Up to
Nov-19)
A. Installed Capacity
1. Public Sector
a) Hydel MW 3,667.00 3,667.00 3,680.00 3,680.00 3,680.00
b) Wind Energy MW 5.00 5.00 5.00 5.00 5.00
c) Thermal MW 2,720.00 4,220.00 5,020.00 5,020.00 5,020.00
d) Diesel plants MW 108.00 0.00 0.00 0.00 0.00
e) Solar PV plant MW 24.00 24.00 34.00 34.00 34.00
Total MW 6,524.00 7,916.00 8,739.00 8739.00 8739.00
f) Jurala Hydro MW 117.00 117.00 117.00 117.00 117.00
2. Private Sector
g) IPP Thermal MW 1,200.00 1,200.00 1,200.00 2,183.30 2,183.30
h) Mini Hydel MW 835.46 843.46 851.96 853.46 903.46
i) Wind Energy MW 2,911.34 3,793.66 4,668.66 4,754.34 4,812.84
j) Co-generation
MW 1,379.58 1,519.58 1,777.19 1,837.19 1,865.19
& Biomass
k) Solar
(including solar MW 134.06 1,092.50 4,988.32 6,093.38 7140.71
rooftop)
Total MW 6,460.44 8,449.20 13,486.13 15,721.67 16905.50
3. Central
Generating
MW 2,677.00 2,898.00 3,693.00 4,163.00 4,123.00
Station
Allocation
TOTAL
INSTALLED MW 15,778.44 19,380.20 26,035.13 28,740.67 29884.50
CAPACITY

B. Electricity Supply

1. Electricity Generation(Net)

l) Hydel (KPCL) MU 6,972.66 6,564.42 7,012.61 11,857.65 8415.77


m) Thermal
MU 15,443.51 16,491.36 14,855.69 11,861.03 6824.05
(KPCL)
n) Wind MU 3,550.56 4,213.10 7,402.00 9,839.14 7938.84
o) Solar PV plant MU 202.08 469.12 2,524.00 6,797.83 5859.73
514 Economic Survey of Karnataka 2019-20

2019-20
Source Units 2015-16 2016-17 2017-18 2018-19 (Up to
Nov-19)
p) Mini Hydel MU 1,009.12 847.46 1,390.00 1,677.54 1178.16
q) Co-gen and
MU 279.73 501.23 2,098.00 2,500.56 1043.97
Bio-Mass
r) Private sector MU 18,940.59 8,158.59 8,264.00 6,650.56 2235.93
Total MU 46,398.25 37,245.28 43,546.30 51,184.31 33496.45
2. Electricity imports
a) Central
MU 15,203.77 23,267.00 25,236.00 23,205.01 13307.70
projects
b) Other States-
MU - 4,880.26 3841.96 965.83 0.00
Short Term
Total MU 15,203.77 28,147.26 29077.96 24,170.84 13307.70
Total Electricity
MU 61,602.02 65,392.54 72,624.26 75,355.15 46804.15
supply

Note:Under Wind Energy, capacity of 0.82 MW had been added twice in the year 2010-11. The same has
been rectified during Dec-2018 and the capacity is deducted in the cumulative capacity.
Source:KPCL, KPTCL, KREDL and PCKL.

Figure 11.1: Installed Capacity of Power generation in 2019-20 (Up to Nov-2019)


(in MW)

Source: KPTCL and KREDL.


Economic Survey of Karnataka 2019-20 515

2. The State is also in the forefront of 3. The availability factors of most of the
capacity addition in Renewable Energy generating plants have been found to be
Sector & there is constant increase in relatively high, suggesting an efficient
capacity under this category. preventive maintenance system being
in place (Table 11.2).

Table 11.2: Plant load Factors (PLF) and Availability Factors of the KPCL
2 017 -1 8 201 8-19 201 9-20 ( U p t o N ov .-201 9)
Sl.
S ta tion I nst alled Inst a lle d In st alled
No % Av . % A v. %A v .
C a pa cit y PLF % Ca pa cit y PLF % C a pac it y P LF%
Fa ct or F ac t or Fa c tor
( MW ) (MW ) ( MW)

R ai chur Th erm al
1 1470 69. 64 78. 06 1470 59. 30 87. 36 1470 54. 84 85. 73
Power Sta tio n(u 1-7)

R ai chur Th erm al
2 250 85. 27 91. 05 250 58. 53 88. 56 250 72. 31 98. 75
Power Sta tio n ( u- 8)

B al lar i The rm al
3 500 30. 78 62. 70 500 39. 99 86. 59 500 20. 80 95. 71
Power Sta tio n ( u-I)

B al lar i The rm al
4 500 42. 15 66. 62 500 44. 97 84. 34 500 37. 73 94. 10
Power Sta tio n ( u-II)

B al lar i The rm al
5 700 13. 48 24. 64 700 5.51 36. 98 700 9. 16 24. 96
Power Sta tio n ( u-III)

Yer am ar us Ther ma l
6 800 12. 71 30. 71 800 1.46 1.54 800 0 0
Power Sta tio n ( u-I)

Yer am ar us Ther ma l
7 800 1.52 5. 21 800 15. 44 16. 39 800 0 0
Power Sta tio n ( u-II)

T HE RMA L T OT AL 5 020 5 020 502 0

Sha r ava thi


8 1035 29. 73 90. 37 1035 52. 66 94. 52 1035 48. 83 92. 96
Gener a ting S tat ion

Ger uso ppa Da m


9 240 13. 26 98. 97 240 24. 96 99. 30 240 26. 04 99. 81
Power Ho use

L ing ana ma kki Da m


10 55 25. 58 88. 01 55 51. 76 87. 80 55 38. 49 79. 83
Power Ho use

N agj ha ri Po wer
11 900 19. 30 92. 02 900 35. 15 78. 78 900 35. 91 65. 24
Ho use

Supa Da m Power
12 100 33. 09 98. 47 100 67. 75 99. 78 100 53. 27 91. 73
Ho use

K adr a Da m Powe r
13 150 14. 52 93. 73 150 28. 18 93. 49 150 38. 51 98. 61
Ho use

K odas al li Da m
14 120 15. 90 94. 65 120 32. 03 93. 63 120 39. 83 96. 97
Power Ho use

Va ra hi
15 460 18. 92 93. 74 460 30. 87 98. 75 460 29. 76 93. 24
Under gr ou nd PH

Ma ni Da m Pow er
16 9 22. 18 91. 60 9 47. 44 99. 07 9 16. 50 83. 64
Ho use

Ala m att i Dam


17 290 17. 38 88. 63 290 16. 07 81. 41 290 62. 70 83. 33
Power Ho use

Gha ta pra bha D am


18 32 17. 22 78. 28 32 28. 77 95. 55 32 6. 82 41. 08
Power Ho use

B ha dr a Da m Po wer
19 39. 2 4.53 53. 63 39. 2 17. 44 65. 73 39. 2 14. 80 75. 20
Ho use

K al ma la, Sir wa r,
20 13. 15 0 0 13. 15 0 0 13. 15 0 0
Ga neka l & Ma ll apur
516 Economic Survey of Karnataka 2019-20

2017-18 2018-19 2019-20 (Up to Nov.-2019)


Sl.
Station Installed %Av. Installed %Av. Installed %Av.
No Capacity PLF% Capacity PLF% Capacity PLF%
(MW) Factor (MW) Factor (MW) Factor

21 Shivasamudram 42 45.16 91.56 42 59.53 96.05 42 47.29 99.48

Shimsha Hydro
22 Electric Station 17.2 35.36 92.50 17.2 35.02 54.42 17.2 33.27 65.94

Mahat ma Gandhi
23 HE Stat ion 139.2 15.64 63.70 139.2 15.81 38.65 139.2 22.33 48.90

Munirabad Power
24 House 38 17.96 99.83 38 27.28 98.93 38 16.54 90.34

HYDRO TOTAL 3679.75 3679.75 3679.75

25 Kappatagudda Wind 4.56 0 0 4.5 6 0 0 4.56 0 0


Farm

26 Solar PV Plant 34 0 0 34 0 0 34 0 0

OTHERS TOTAL 38.56 38.56 38.56

GRAND TOTAL 8738.31 8738.31 8738.31

Source –KPCL

Plant Load Factors (Capacity Utilisation) sold through overarching agreement/IEX.


As can be observed from Table 11.3, the The details of such sale during these years
average cost of power generation is higher in are given in Table 11.4(b).
thermal plants as compared to Hydel plants 11.1.3 Power Transmission: State
and the State's reliance on thermal plants for Transmission Utility (KPTCL)
power generation has increased over the
Karnataka Power Transmission Company
years. As a result, the average cost of
Ltd. (KPTCL) is the State Transmission Utility
power generation (paise/kWh) has
engaged in the business of transmission of
been increasing. Installed Capacity, Power
electricity in the State. It is the responsibility
Generation, Imports, T & D losses and
of KPTCL to construct power stations & lines
Consumption of Power since 2014-15 are
and strengthen the system for easing
given at Appendix 11.1.
network congestion, power evacuation etc.
Purchase of power from other States and The status of transmission infrastructure as
energy exchanges at the end of Nov-2019 is given in Table
Towards meeting shortages in electricity 11.5.
supply, Karnataka buys power from The transmission lines of different
neighbouring states, other states and from voltage classes, new substations added and
energy exchanges. The details of such capacity augmentation in the existing
purchases during the last five years are given substations during the period 2014-15 to
in Table 11.4(a). 2018-19 are shown in Tables 11.6 and
However, during 2018-19 & 2019-20 (Up to 11.7.
Nov-19),there was surplus power and it was
Economic Survey of Karnataka 2019-20 517

Table11.3: Plant Load Factor, Unit Cost of Power(Selected Power Stations)

Plant Load Factor (%) *Unit


Cost
Sl. Power
2019-20 2019-20
No. Station
2014-15 2015-16 2016-17 2017-18 2018-19 (Up to Paise/
Nov-19) kWh

1 Sharavathi 57.45 29.10 29.60 29.73 52.66 48.83 49.78

2 Nagjhari 41.58 24.46 16.92 19.30 35.15 35.91 69.66

3 Supa 51.18 37.13 27.28 33.09 67.75 53.27 69.66

4 Varahi 27.98 18.66 17.85 18.92 30.87 29.76 148.28

5 RTPS Unit-1 71.00 84.40 83.58 45.44 63.74 49.41 520.44

6 RTPS Unit-2 74.39 75.78 74.26 49.91 54.44 47.07 520.44

7 RTPS Unit-3 79.60 50.76 85.65 81.07 52.02 35.37 515.61

8 RTPS Unit-4 83.53 78.07 69.80 87.78 75.75 73.41 596.59

9 RTPS Unit-5 74.58 82.87 74.57 68.83 82.80 56.99 513.22

10 RTPS Unit-6 85.65 80.64 71.45 77.04 55.34 63.05 513.22

11 RTPS Unit-7 74.39 78.15 70.74 77.38 31.01 58.61 521.65

12 RTPS Unit-8 45.10 75.87 79.68 85.27 58.53 72.31 554.78

13 BTPS Unit-1 61.64 64.03 78.14 30.78 39.99 20.80 798.95

14 BTPS Unit-2 70.94 75.45 56.53 42.15 44.97 37.73 715.60

15 BTPS Unit-3 - - - 13.48 5.51 9.16 953.75

16 YTPS Unit-1 - - - 12.71 1.46 - -

17 YTPS Unit-2 - - - 1.52 15.44 - -

* Before accounting for T & D losses


Source: KPCL
518 Economic Survey of Karnataka 2019-20

Table 11.4(a): Procurement from other States through bilateral trade & purchase
through Energy Exchanges:

Year Energy in MU Amount (Rs. in crore) Average rate Rs/kWh

2014-15 5918.11 3108.03 5.25

2015-16 8547.90 4319.68 5.05

2016-17 4880.26 2156.52 4.42


2017-18 3841.96 1561.48 4.06

2018-19 ( Upto 966.09 394.16 4.08


May-18)
2019-20 ( Up to
0 0 0
Nov-19)

Source: Power Company of Karnataka Limited

Table 11.4(b): Sale of Surplus power through overarching agreement /IEX

Year Energy in MU Amount (Rs. in crore) Average rate Rs/kWh

2018-19 803.80 339.59 4.22

2019-20 (Up to 1326.40 339.88 2.56


Nov-19

Source: Power Company of Karnataka Limited

Table 11.5: Power stations & transmission lines of KPTCL (as on 30.11.2019)

V oltage Level (KVA) No. of Power stations Transmission Line Length in CKm.

400 6 3698.73

220 107 11607.69

110 427* 10792.21

66 663* 11315.10

33 367 6883.50*

Total 1570 44297.23

* Reconciled Figures
Source: KPTCL
Economic Survey of Karnataka 2019-20 519

Table 11.6: Transmission lines of different voltage class added

Transmission line length added in CKm.


Voltage class
in KVA
2014-15 2015-16 2016-17 2017-18 2018-19 Total

400 0.00 33.31 451.40 409.22 24.50 918.43

220 245.48 651.14 129.50 200.46 224.08 1450.66

110 318.42 158.55 148.77 167.13 202.62 995.49

66 169.00 190.71 152.30 228.20 282.78 1022.99

TOTAL 732.90 1,033.71 881.97 1,005.01 733.98 4387.57


Source: KPTCL

Table 11.7 New substations added and capacity augmented


Substations added (No.) Substations capacity augmented (No.)
Voltage
Class
(KVA) 2014 2015 2016 2017 2018 2014- 2015 2016 2017- 2018
TOTAL TOTAL
-15 -16 -17 -18 -19 15 -16 -17 18 -19

400 - - - 1 - 1 2 - - - - 2

220 1 3 2 2 4 12 2 - 4 1 4 11

110 16 10 13 15 10 64 18 36 17 18 26 115

66 15 17 13 22 21 88 21 43 44 40 30 178

TOTAL 32 30 28 40 35 165 43 79 65 59 60 306

Source: KPTCL

Transmission & Distribution Losses to release overloaded Distribution


(T&D Losses) and Aggregate Technical & Transformer Centres (DTCs).
Commercial Losses ( AT&C Losses) r 100% Metering and Accuracy in Billing.
The State Government has taken various r Load balancing and bifurcation of load.
measures to reduce T&D and AT&C losses. r Strengthening of Vigilance/Meter
Measures taken for reduction of T&D loss: Testing Activities.
r Bifurcation of lengthy HT/LT lines & r Replacing Electro mechanical meters by
overloaded 11KV feeders. Electro Static/High precision energy
meters.
r Reconductoring of HT/LT lines and
reduction of HT/LT ratio. r Encouraging consumers to install
energy efficient equipments
r Providing additional transformers
520 Economic Survey of Karnataka 2019-20

Measures taken for reduction of AT&C 11.1.4 Power Consumption:


Loss: As shown in Table 11.9, in the year
r 100% billing of consumer installations. 2018-19, the agricultural sector (water
pumping through irrigation pump sets)
r 100% collection efficiency.
accounted for the highest share of electricity
r Improving vigilance activities. consumed with a share of 38.98%. Domestic
r Periodical rating of HT & LT sector occupied a distant second position
Installations. with a share of 22.14%. However, in terms
Karnataka's power sector has reduced its of paying for the electricity, the agricultural
T&D losses from 22.00% (in 2009-10) to sector pays the least whereas the
16.16% in 2018-19 (Figure 11.2). It is commercial consumers pay the highest
expected to bring down T&D losses to about tariff.
15.00% by March 2020. It may also come The ESCOMs supply electricity to various
down further during 2019-20 depending on categories of consumers at different
the quantum of supply. The utilities in the price slabs. Details of revenue realized from
sector are making planned investment for different categories of consumers are given
strengthening and augmenting the network in Table 11.10. This shows that during the
for reduction of technical loss. year 2018-19, nearly 68.41% of
Figure 11.2 also shows the trends in AT&C the ESCOMs' revenue arises from LT
losses during the period 2009-10 to category consumers even though they
2018-19. The AT&C Loss which was 23.00% account for about 75.42% of the
in 2009-10 has been brought down to electricity consumption. The HT industrial
15.27% in 2018-19. & commercial sector, while accounting for
only 20.20% of the electricity sales,
The vigilance efforts by various authorities contributes 27.56% to the total revenue
of the ESCOMs have contributed to the earned in 2018-19. Electricity supplied to
reduction in AT&C losses (Table 11.8). HT Agriculture including lift irrigation
fetches the lowest average revenue of

Figure 11.2: Trends in Transmission & Distribution losses and Aggregate Technical
& Commercial Losses (in %)

24.00
23.00
22.00
22.00
22.00 21.50
21.30 20.09
20.00 19.07
20.20
19.50 18.52
18.00 17.10 17.30 17.02
18.25
17.08 16.16
16.00 16.34
14.00 15.01 15.12 15.27

12.00

10.00
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
AT & C Loss T & D Loss

Source: Energy Department


Economic Survey of Karnataka 2019-20 521

Table 11.8: Vigilance efforts of the ESCOMs in reducing theft and pilferages
No of Installations N o. of C as es Penalty Imposed
Year
Inspected Detected ( Rs . in crore)

201 4-15 40 8955 9341 2 157 .62

201 5-16 28 4771 6786 3 144 .23

201 6-17 52 0387 8222 3 164 .04

201 7-18 68 4875 8009 0 197 .49

201 8-19 58 3303 6434 8 165 .76

201 9-20
49 6146 4253 6 115 .51
(Up to Nov-19)

Source: ESCOMs

Table 11.9: Electricity Consumption by Category of Consumers

Cons umption (MU) % of Sales Demand (Rs. in Crore) *ARR Rs /kWh

Category of
Consumers 2019-20 2019-20 2019-20 2019-20
2018- 2018-
2018-19 (Up to (Up to 2018-19 (Up to (Up to
19 19
Nov-19) Nov-19) Nov-19 Nov-19)

Industries 8,231.37 5164.98 14.04 13.56 7,171.07 4733.94 8.71 9.17

IP Sets 22,84 3.35 13367.75 38.98 35.10 11,754.39 7344.37 5.15 5.49

Domestic 12,97 8.14 9374.20 22.14 24.62 8,084.85 6396.78 6.23 6.82

LT Industrie s 2,028.94 1330.16 3.46 3.49 1,575.67 1116.36 7.77 8.39

Water Works &


Sewage 3,899.63 2787.74 6.66 7.32 2,456.27 1853.36 6.30 6.65
pumping

Commercial
7,156.84 5007.07 12.21 13.15 7,237.51 5439.29 10.11 10.86
Lighting

Public Lighting 1,092.00 743.34 1.86 1.95 902.86 635.06 8.27 8.54

Others 379.04 305.92 0.65 0.81 686.60 578.47 18.11 18.91

TOTAL 58,609.31 38,081.16 100 100 39,869.22 28,097.63 6.80 7.38

*After T & D losses as on 31.03.2019


*ARR - Average Revenue Realisation.
Source: ESCOMs
522 Economic Survey of Karnataka 2019-20

Table 11.10: Electricity sales and revenue realization by category of consumers

Average revenue
Description Sales (MU) Revenue (Rs. in Crore) realization
(Rs./kWh)
Cate
gory 2019-20 2019-20 2019-20
2018-19 (Up to 2018-19 (Up to 2018-19 (Up to
Nov-19) Nov-19) Nov-19)

LT1 BJ/KJ 889.85 619.79 601.29 451.73 6.76 7.29

LT2 AEH 11,964.85 8664.08 7,396.45 5874.06 6.18 6.78

LT3 Commercial 3,550.26 2588.50 3,419.77 2623.28 9.63 10.13

Irrigation Pump
LT4 22,209.21 12980.69 11,525.24 7163.05 5.19 5.52
sets

LT5 Industries 2,028.94 1330.16 1,575.67 1116.36 7.77 8.39

Street lights
LT6 and water 3,333.02 2404.09 2,385.21 1788.73 7.16 7.44
supply

Temporary
LT7 226.03 196.86 371.45 395.03 16.43 20.07
Installations

Total LT 44,202.16 28784.17 27,275.08 19412.24 6.17 6.74

Water supply
HT1 1,658.61 1126.99 973.92 699.69 5.87 6.21
installations
HT Industrial &
HT2 11,837.95 7583.55 10,988.81 7549.95 9.28 9.96
Commercial

HT3 Lift Irrigation 634.14 387.06 229.15 181.32 3.61 4.68

HT4 HT Residential 123.44 90.33 87.11 70.99 7.06 7.86

HT5 HT Temporary 130.14 91.83 143.94* 105.72 11.06 11.51

Total HT 14,384.28 9279.76 12422.93 8607.67 8.64 9.28

Others / Misc. Income 22.87 17.23 171.21 77.72

Grand Total 58,609.31 38,081.16 39,869.22 28,097.63 6.80 7.38

*Reconciled fig.
Source: ESCOMs
Economic Survey of Karnataka 2019-20 523

Rs.3.61/kWh, whereas the LT commercial sets in the State as on Nov-2019. The power
category provides the highest revenue supply to IP sets has been made free with
realisation of Rs.9.63/kWh. Other than effect from 01.08.2008,whereas the BJ/KJ
temporary installations, commercial LT beneficiaries have been enjoying free power
consumers and HT industrial and since a very long time. From 2017-18, the
commercial consumers pay higher prices for free power supply to BJ/KJ has been
electricity consumed. enhanced from 18 units to 40 units per
installation per month.The entire cost of
Details of Energy Sales, Average Tariff and
supply of free power to agricultural sector &
Average Cost of Power Supplied by ESCOMs
BJ/KJ connections has been made good by
are given in Table 11.11.
the State Government through subsidy.The
Subsidy in Power Sector : subsidy provided by the State Government
There are a total number of 28,98,914 during the last 5 years and in 2019-20 (Up to
Bhagya Jyothi/Kutira Jyothi (BJ/KJ) Nov – 2019) is provided in Table 11.12
connections and 30,30,688 irrigation pump
Table 11.11: Energy Sales, Average Tariff and Average Cost of Power Supplied by
ESCOMs

Average cost
Energy sales(MU) Average tariff (Rs./kWh)
(Rs./kWh)
ESCOM 2019-20 2019-20 2019-20
2018-19 2018-19 2018-19
(KERC (KERC (KERC
(Actuals) (Actuals) (Actuals)
approved) approved) approved)

BESCOM 27736.03 18517.23 6.99 7.74 7.22 7.74

MESCOM 4953.99 3389.52 6.76 7.18 6.80 7.18

HESCOM 11760.00 7347.72 6.59 7.03 7.29 7.03

GESCOM 7528.30 4603.86 6.75 7.06 6.89 7.06

CESC 6350.55 4077.77 6.52 6.91 6.79 6.91

HRECS 280.44 145.06 6.24 6.68 7.45 6.68

Total 58,609.31 38081.16 6.80 7.38 7.07 7.38

Source: ESCOMs.

Table11.12: Subsidy Released by the State Government to Irrigation Pump Sets and
BJ/KJ Connections
Subsid y released
Year Remarks
(Rs. in Cr)

20 14-1 5 6200 .00

20 15-1 6 8143 .29 Includes arre ars of Rs .153 0.30 Cr.

20 16-1 7 8646 .77 Inc ludes arrears of Rs. 6 92.7 2 Cr.

20 17-1 8 8841 .00

20 18-1 9 9250 .00 Includes arre ars of Rs .126 9.83 Cr.

20 19-2 0 (Up to Nov -20 19) 7285 .96

Source: Energy Dept


524 Economic Survey of Karnataka 2019-20

11.1.5 Electricity Demand and Supply the State Government is taking steps for
Status: conservation of energy through Demand
The core issue in power supply in Karnataka Side Management programmes.
is the status of demand & supply to ensure Trends in peak demand for power and peak
that there is no shortage in supply in the energy supply per day during the period
State. The State of Karnataka has achieved 2005-06 to 2019-20 (Up to Nov-2019) are
near self sufficiency in power generation to given in Figure 11.3. It may be observed
meet the growing demand. The occasional that both the peak demand for power
gap due to seasonal variation in demand and and peak energy supply per day are
supply is met through short term purchases. showing increasing trends since 2008-09.
There is ever-growing demand for power in The peak demand met during 2018-19 was
Karnataka. The State Government has been 12881MW and in 2019-20 (Up to Nov -
planning through various means for 2019), it is 12688MW. The anticipated peak
capacity addition for adding more power to demand for power to be met during 2019-20
the grid to meet the growing demand. The is around 13796 MW.
State Government is sourcing power from all Figures 11.4 and 11.5 show the trends in
available sources including short term estimated gaps in demand and supply for
energy exchange to meet the demand. power and energy respectively. The power
Apart from augmenting its generation, supply shortage was the highest at
the State has been importing power 1709 MW in 2014-15 (Figure 11.4) and
from Central power-generating stations energy supply shortage was the highest at
and also through energy exchanges, for 8226 MU in 2007-08 (Figure 11.5).
minimising power shortages. In addition,

Figure 11.3: Trends in Peak Demand for Power and Peak Energy Supply

Source: KPTCL
Economic Survey of Karnataka 2019-20 525

Figure 11.4: Gap in Demand for Power & Supply (in MW)

Source: KPTCL

Figure 11.5: Gap in Demand for Energy & Supply (in Million Unit)

Source: KPTCL
526 Economic Survey of Karnataka 2019-20

Demand Side Management (DSM) 12. Vidhyuth Jagruthi Yojana, an awareness


programme on DSM activities for
The Government of Karnataka has
students.
implemented several programmes to
conserve energy as part of its Demand Side 13. Bringing Surya Raitha Scheme, a pilot
Management (DSM) initiatives. Some of the project for arranging power supply to IP
important programmes are: sets through solar, under Net-metering
concept.
1. Time of Day Tariff Metering is made
mandatory for industrial consumers, 14. Distribution of LED bulbs under
especially for HT consumers having Hosabelaku through EESL as part of
sanction load of 500 KVA and above. UJALA Scheme.
2. Installing Energy Efficient Street ESCOMs are currently implementing a
Lighting Systems and Electronic Time smart grid pilot project and a project for
Switches for street light installations for implementation of smart meter technologies
switching “ON” and “OFF”. for online recording of energy consumption
and provision of post-paid/pre-paid options
3. Segregating agricultural loads from
to consumers of electricity.
the existing 11KV feeders through
Niranthara Jyothi and Deena Dayal 11.1.6 Rural Electrification:
Upadhyaya Gram Jyothi Yojana (DDUGJY)
Towards meeting the targets stipulated
schemes to provide 24X7 uninterrupted
by the National Electricity Policy (NEP), the
power supply to non-agricultural loads
State Government has planned initiatives
in rural areas.
for energisation of Villages, Hamlets, Harijan
4. Adoption of High Voltage Distribution Bastis and Thandas. All the villages of
System (HVDS) for agricultural loads in Karnataka have been electrified.
rural areas.
The ESCOMs have planned to energise
5. Encouraging domestic consumers to Hamlets and Thandas in a phased manner.
use solar water heaters. The details of electrification status in
Hamlets, Harijan Bastis, Thandas and IP
6. Mandatory use of solar water heating
sets during the last 5 years and in the
systems for all residential buildings
current financial year are provided in
with a built up area of 600 Sq.Ft.
and above falling within the limits Table 11.13 and cumulative progress of
of Municipalities/Corporations, Bengaluru Energisation of IP sets since 2000-01 is
Development Authority, etc. given at Appendix 11.3.

7. Mandatory use of LED in Government 11.1.7 Karnataka Renewable Energy


buildings/Aided institutions/Boards/ Development Limited (KREDL)
Corporations. KREDL is the nodal agency for the
development of renewable energy sources in
8. Mandatory use of star rated energy
Karnataka. To harness green and clean
efficient irrigation pump sets conforming
renewable energy sources in the State for
to standards prescribed by the Bureau
environmental benefits, energy security and
of Energy Efficiency.
to initiate energy conservation & efficiency
9. Promotion of energy efficient building measures in all the sectors for sustainable
designs. development, the Government of Karnataka
enacted a policy on renewable energy (for the
10. Adoption of Bachat Lamp Yojana
period 2009-14) on 19.01.2010.
launched by Bureau of Energy Efficiency
(BEE), Government of India. Solar Policy
11. Implementation of Solar Rooftop To harness the potential of solar resources
programme under Net-meterng in the State, Government of Karnataka
concept.
Economic Survey of Karnataka 2019-20 527

Table 11.13: Progress in Rural Electrification

Irrigation Pump sets Hamlets/Harijan


Year Electrified Bastis/Thandas Electrified
(Cumulative No.in lakh) (No.)

2014-15 22.03 182


2015-16 23.33 25
2016-17 25.06 3041
2017-18 26.30 4485
2018-19 29.68 19*
2019-20 (Up to Nov 2019) 30.28 26
*Reconciled figure
Source: Energy Department

The left out work under the RGGVY for Energisation of Hamlets,
Rapid progress in Harijan Bastis & Thandas set by the MoP was taken up aggressively
Rural Electrification in during 2016-17 & 2017-18 to achieve the target. Number of Hamlets,
2016-17 and 2017-18 Harijan Bastis & Thandas Energised during these two years are 3041
and 4485 respectively.

issued Solar Policy 2014-2021 on r To encourage decentralized generation


22.05.2014 with a target of 2000MW for & distribution of energy where access to
purchase of solar energy by State ESCOMs. grid is difficult.
Further, to be on par with the Government of KREDL, the nodal agency envisages private
India tariff policy dated 28.01.2016, sector investment for renewable energy
Government of Karnataka amended the development in the State. The capacity addition
Solar Policy on 12.01.2017 and the target in private sector under the renewable energy
was revised from minimum 2000MW to sector during 2018-19 was 1253.06 MW and
minimum 6000MW for purchase of solar it is 1183.83 MW during 2019-20 up to
energy by the State ESCOMs during the Nov-2019 (Table 11.14).
policy period.
The cumulative progress in installed
Objectives of the Solar Policy: capacity under renewable energy sector in
r To add solar generation of minimum the State as on 30.11.2019 is shown in
6000 MW by 2021 in a phased manner Table 11.15. Solar energy (including Solar
by creating a favourable industrial Rooftop) accounts for a major share in total
atmosphere. installed capacity.
r To translate Karnataka into an investor 11.1.8 Rural Energy Programmes
- friendly state. Two main schemes are being implemented
r To encourage public-private participation under Rural Energy Programmes through
in the sector. Rural Development and Panchayat Raj
r To promote Solar Rooftop Generation Department, viz., New National Biogas and
and Technologies. Organic Manure Programme (NNBOMP) and
The Karnataka State Bio-fuel Policy – 2009.
528 Economic Survey of Karnataka 2019-20

Table 11.14: Capacity Addition under Renewable Energy Sector


Capacity Add ition (in M W)

So urce 2019-20
2014-15 2015-16 2016-17 2017-18 2018-19 (U p to
N ov -2019)
W ind Powe r 3 20.10 230. 90 882 .32 875 .00 86.5 0 5 8.50

Small/Mini Hydro 4 3.15 39.0 5 8. 00 8.5 0 1.5 0 5 0.00

Co-Generation 2 8.00 79.5 0 134 .00 257 .61 60.0 0 2 8.00


Solar (inc ludi ng 3905 .82
5 7.38 69.6 8 958 .44 1105 .06 10 47.3 3
solar rooftop)
Bi om as s 1 2.85 15.0 0 6. 00 0.0 0 0.0 0 0.00

Total 461.48 434.13 1988.76 5046.93 1253.06 1183.83

Source: KREDL

Table11.15: Cumulative Progress in Installed Capacity under Renewable Energy


sector as on 30.11.2019 (in MW)
Potential Allotted Installed
Source
Available Capacity* Capacity

Wind Power 55857 18 300.9 7 48 17.84

Small/Mini Hydro 3100 30 10.05 9 03.46

Co-Generation 2000 21 77.65 17 31.16

Solar (including solar rooftop) 24700 94 77.94 71 74.71

Biomass 1000 3 91.18 1 34.03

Total 86657 33357.79 14761.20

*Alloted Capacity is the capacity allotted by the State Government to the developers.
Source: KREDL

a) New National Biogas and Organic objective of reducing use of LPG and
Manure Programme (NNBOMP) other conventional fuels
Biogas is a clean, non-polluting, smoke and r To meet 'lifeline energy' needs for
soot-free fuel, containing methane gas cooking gas,envisaged in 'Integrated
produced from cattle dung, human waste Energy Policy'
and other organic matter in a biogas plant r To provide bio-fertilizer/organic manure
through a process called anaerobic to reduce use of chemical fertilizers
digestion. The digested slurry can be used r To improve sanitation in villages by
as a good quality manure in agricultural linking sanitary toilets with biogas
fields. This is a Central Sector Scheme & is plants
being implemented since 1982-83. This is a
100% women oriented programme. r To mitigate Climate Change by preventing
black carbon and methane emissions.
Objectives : The existing Financial Assistance for setting
r To provide clean bio-gaseous fuel up of family type biogas plants is given in
mainly for cooking purposes with an Table 11.16.
Economic Survey of Karnataka 2019-20 529

Based on the cattle population in the State, 2019-20 (Up to end of November-2019) are
6.80 lakh biogas plants can be constructed, given in Table 11.17.
of which, 4.59 lakh biogas plants have been
constructed up to November 2019. b) The Karnataka State Biofuel Policy-
2009.
Beneficiaries are selected by the Grama
Panchayats. In the State Budget, for the year The Karnataka State Biofuel Policy-2009
2019-20, a lumpsum amount of Rs. 515.00 has come into force from 1st March, 2009. It
lakh has been provided under District is a State Plan programme. This programme
Sector. is being implemented through Karnataka
State Biofuel Development Board. Rs.400.00
Physical and Financial Progress under New lakh has been provided for the year
National Biogas and Organic Manure 2019-20 and Rs.200.00 lakh has been
Programme (NNBOMP) from 2014-15 to released to Karnataka State Biofuel

Table 11.16: Financial Assistance for setting up of family type biogas plants

Subsidy (in Rs.)


Particulars General SC & ST
Catego ry Catego ry
Central Subsidy 1 2,000/- 13000/-

Turn Key Fee 2500/- 2500/-

T otal Sub sidy (Central) 14500/- 15500/-

State Subsidy 6000/- 6000/-

T otal Sub sidy (Central & State) 20500/- 21500/-

Latri ne Linked Bi ogas Plants – incentives 1600/- 1600/-


Source:Rural Infrastructure-2,RDPR

Table 11.17: Physical and Financial Progress under NNBOMP


Physical
Financial
(No. of Biogas Plants
(Rs. in lakh)
constructed)

Year Target Achievement


Target Ach ie vement
(S+C) (S+C)

2014-15 10500 8419 1139.24 1018.38


2015-16 16000 6444 1256.00 1341.13
2016-17 10000 5294 1344.00 1090.26
2017-18 8000 5423 1214.00 536.25
2018-19 8900 6408 1004.00 1020.02 *
2019-20
(Up to end of 7000 2326 1355.00 291.69
Nov-2019)

* The total expenditure of Rs.1020.02 lakh includes O.B for the year 2018-19.
Source:Rural Infrastructure-2,RDPR
530 Economic Survey of Karnataka 2019-20

Development Board for implementation of agricultural and non-agricultural


biofuel activities. consumers in the rural areas.
11.1.9 Investment in Power Sector: ii. Strengthening and augmentation of
sub-transmission & distribution
KPCL has planned various projects to infrastructure in rural areas, including
augment the generation capacity in the metering of distribution transformers/
State during 2019-20. feeders/consumers.
Similarly, KPTCL is strengthening the iii. Rural electrification, as per CCEA
system for easing transmission network approval dated 01.08.2013 for
congestion by constructing power stations & completion of the targets laid down
lines. under RGGVY for 12th and 13th Plans
The five ESCOMs are implementing various by carrying forward the approved outlay
projects for strengthening distribution for RGGVY to DDUGJY.
network. r The Monitoring Committee of Ministry
The Plan Outlay and Expenditure incurred of Power has approved the projects
during the last five years and during under DDUGJY on 06.08.2015. The
2019-20 up to Nov 2019 are given in sanction details for the State are given
Table.11.18 and investment in power in Table 11.19.
development since 2014-15 is given at 2. Integrated Power Development
Appendix 11.2. Scheme (IPDS)
11.1.10. Centrally Sponsored Schemes: r Integrated Power Development Scheme
(IPDS) is being implemented since
1. Deendayal Upadhyaya Gram Jyothi
03.12.2014 with the following
Yojana (DDUGJY) components:
r Deendayal Upadhyaya Gram Jyothi i. Strengthening of sub-transmission and
Yojana (DDUGJY) is being implemented distribution networks in the urban
since 03.12.2014 with the following areas.
components.
ii. Metering of distribution transformers/
i. Separation of agriculture and non- feeders/consumers in the urban areas.
agriculture feeders facilitating
judicious rostering of supply to

Table 11.18 : Investment in Power Sector (Rs. In Crore)


IE B R C apit a l Ou tla y/ S ta te Gov t
E x pe ndit ur e for Loa ns for
T ot al
KP TC L & P ow er Pr ojec t s Pow er Pr oje c ts-
Y ea r K PC L (I R & E Q U ITY ) DA S – JI C A
E SC OM s

Plan Plan P la n P la n Pla n


Ex pr . E x pr . E x pr. E x pr . E x pr.
Ou tla y Out la y Out lay O ut la y O ut la y

20 14-15 2850.00 2588. 55 1200. 00 1200. 00 820. 00 770. 00 80. 00 57.59 4 950.00 46 16.14

20 15-16 2685.00 2343. 76 1200. 00 1200. 00 869. 02 869. 02 64. 41 30.29 4 818.43 44 43.07

20 16-17 2526.51 1535. 32 2476. 80 2476. 80 861. 29 861. 29 96. 20 63.00 5 960.80 49 36.41

20 17-18 1822.00 968. 14 2000. 00 2005. 14 3555. 25 3555. 25 -- 7 377.25 65 28.53

20 18-19 1404.00 1001. 66 2000. 00 3711. 64 3129. 00 3129. 00 -- 6 533.00 78 42.30

20 19-20
(Up to 1916.00 288. 06 3208. 00 2406. 04 2181. 31 2181. 31 -- 7 305.31 48 75.41
N ov -19 )

Source: Details of Provision for Plan Schemes, Finance Department, GoK


Economic Survey of Karnataka 2019-20 531

iii. IT enablement of distribution sector r Smart Grid and Smart Meters scheme
and strengthening of distribution will be implemented on pilot basis.
network, as per CCEA approval dated r Implementation of Green Energy
21.06.2013 for completion of the targets Corridor scheme with the assistance of
laid down under R-APDRP for 12th and KPTCL and MNRE.
13th Plans by carrying forward the
approved outlay for R-APDRP to IPDS. r Augmenting Transmission Capacity to
future growth and evacuation.
r The Monitoring Committee of Ministry r Around 12900 acres of land has been
of Power has approved the projects obtained on lease basis from the
under IPDS on 06.08.2015. The farmers for establishing world's largest
sanction details for the State are given Solar Park of 2050 MW capacity in
in Table 11.20. Pavagada Taluk of Tumkur District. Up
11.1.11 New Initiatives, Challenges and to the end of Financial year 2018-19,
Outcome: projects of 1400 MW capacity had been
1. Initiative taken up in 2019-20 commissioned in the park. During
2019-20 (up to November 2019),
r The State Government has implemented projects of 550MW capacity have been
solar energy projects through Karnataka commissioned and action has been
Renewable Energy Development Ltd. taken for early commissioning of
(KREDL) for providing solar water balance projects of 100MW capacity.
pumps to farmers. During 2019-20 (up Under Decentralized Distributed
to November 2019), the Government Generation, 860 MW solar projects are
has provided 900 solar water pumps to allotted to 43 Taluks, with maximum
farmers. 20MW per Taluk, 435MW projects are
r Providing solar water pumps to commissioned up to November 2019
beneficiaries under SCSP and TSP and balance projects are under
schemes. progress.
r Upgradation of Distribution Automation 2. Ujwal DISCOM Assurance Yojana
System in other corporation areas. (UDAY) Scheme:
r The HVDS, implemented on pilot basis, r Ujwal DISCOM Assurance Yojana
will be continued in other sub divisions (UDAY), a Scheme for Financial
of ESCOMs after detailed study of the Turnaround of Power Distribution
scheme. Companies (DISCOMs), has been
approved by Government of India with
Table 11.19: Sanction details for projects under DDUGJY ( Rs.in Crore)
Sl. Cost approved by
Item
No. Monitoring Committee
1 Electrification of un-electri fied vill ages 23.17
2 System Strengthening and Access to Rural Households 492.81
3 Metering 444.96
4 SAGY 55.09
5 Feeder Separation 729.76
Grand Total 1745.79
PMA Charges @ 0.5% 8.73
Total Project Cost 1754.52
Overall achievement as on Nov- 2019 is 89.00%
Source: Energy Department
532 Economic Survey of Karnataka 2019-20

Table 11.20: Sanction Details for Projects under IPDS


Sl. No. Name of the Company No. of towns DPR Cost (Rs.in Crore)

1 BESCOM 45 459.45

2 CESC 33 179.06

3 GESCOM 42 184.33

4 MESCOM 30 168.44

5 HESCOM 73 206..37

Total 223 1197.65


Overall achievement as on Nov- 2019 is 92.00%
Source: Energy Department

an objective to improve the operation c. Project is in commercial operation since


and financial efficiency of the State March 2019.
DISCOMs.
d. Status of the project:
r The ESCOMs have signed MoU under
UDAY in respect of Operational r Two State-of-the-art Control Centres
Parameters in the Power Ministers' with all hardware/software equipments
Conference held at Goa. for remote monitoring and operation of
11KV distribution network have been
r The State DISCOMs have taken steps to established.
achieve the targeted Operational
Parameters under UDAY. r Licensed Communication Network
(Microwave and UHF) dedicated for
r Karnataka stands 2nd in the ranking as DAS operation has been established by
per the UDAY Dash Board. commissioning of 10 Master Towers
r HESCOM & CESC stand at the across various locations in BMAZ
2nd place, BESCOM & MESCOM area with last mile connectivity to
occupy the 5th place while GESCOM remote devices through UHF radios.
stands at the 9th place as per Integration testing between remote field
performance parameter on UDAY Dash devices and DAS system is in progress.
Board. r Distribution network is upgraded
3. Steps to improve Quality: with 11KV overhead lines with
Coyote conductor 698.6 Km., AB cable
Bangalore Distribution Upgradation
254.6 Km. and Underground cable 228
Project: Km. to meet automation requirement.
a. BESCOM has taken up “Distribution r DAS remote field equipments (LRC &
Automation System (DAS) Project” LBS totalling 795 & 745 Nos.
for Bengaluru Metropolitan Zone Area respectively and RMUs & RTUs totalling
to provide reliable power supply to 1590 Nos.) designed and manufactured
its consumers by integrated remote are installed and connected to live
monitoring & automated control system network, Integration testing of 2593
for 11KV distribution network in remote field equipments is completed,
Bengaluru comprising of 104 SCADA functions are being monitored
substations, 1500 feeders and 3130 and commercial operation of feeders are
remote devices. rolled out in phases. Integration testing
b. JICA loan assistance is Rs.417.10 Crore of other filed equipments is in progress.
and the balance amount of Rs.146.60 r Integrated network management
Crore is met by the State Govt. and system is established and is in use.
BESCOM.
Economic Survey of Karnataka 2019-20 533

r Integration and Data acquisition with renewable energy sources and save
KPTCL Transmission SCADA is natural resources like coal.
successfully completed for 55 substations. r Niranthara Jyothi Yojane is a major
r Operators for eleven out of twelve project that aims to segregate the rural
divisions are trained internally for area loads into agricultural and non-
operations. agricultural loads so as to provide
r System capabilities are utilised for 24 hours of quality power supply to
capacity building of the 11KV rural areas and assured hours of power
distribution network. supply to the irrigation pump sets. As
r In-house capabilities developed in on Nov-2019, 1721 Niranthara Jyothi
system (Network) study and capacity feeder works (884 feeders in phase1 and
building. 837 feeders in phase 2) have been
r Customized SCADA displays and completed,of which 1716 feeders have
Dashboards have been developed In- been commissioned as at the end of
house. Nov- 2019.
r Qualitative report/feedback on GIS and r Some of the energy conservation
Asset Management. programs like Demand Side Management
r Mechanism has been developed for (DSM) and smart grid pilot project have
creation of Network Operation Model on resulted in saving energy.
fast track. 6. Issues/Challenges:
r In-house team is maintaining the DAS
master stations (Hardware and i) Subsidy burden:
software) on routine issues related to The Number of IP sets & BJ/KJ installations
SCADA, DMS & Cyber Security and are increasing over the years resulting in
incident management. increased consumption. The monthly
r In-house team built for management of consumption limit per installation of BJ/KJ
Microwave and UHF based Communication has been increased from 18 to 40 units and
system, SCADA switches and RTU. hence the subsidy need has increased. Due
r Financial progress achieved under to inflationary tendency, the cost of supply
the project as on Nov-2019 including is increasing over the years. The tariff is
JICA assistance and BESCOM is getting increased due to increase in input cost
Rs 566.52 Cr. of Generation, Transmission and Distribution.
4. Specific challenges and the future Consequently, subsidy burden is also
increasing.
outlook of the department
r Optimum utilisation of natural resources ii) Cost of Supply:
under renewable energy sector. Due to increased demand for power in the
r Generation capacity addition to meet the state, the thermal share is increased adding
growing demand for achieving self to the cost of supply. The operational cost is
sufficiency. also getting increased. The revenue
r Reduction of Transmission & Distribution realisation from sales is not matching with
Losses. the overall cost of supply and there is a gap
r Reduction of Aggregate Technical & or deficit in revenue every year. In order to
Commercial Losses. bridge this revenue deficit temporarily,
r Making Power Supply consumer-friendly. ESCOMs are resorting to short term
borrowings. The State regulators are
r Reduction of Electrical Accidents. considering the revenue deficit of the
5. Outcome: previous years during the Annual
Performance Review & trying to bridge the
r The State Government has published
revenue deficit as far as possible. The
its Solar Policy for 2014-2021 for giving
approved average cost of supply for 2019-20
impetus to exploitation of solar energy.
is Rs.7.38 per unit. The provisional actual
The State Govt. is able to harness
average cost of supply in 2018-19 is Rs. 7.07
per unit.
534 Economic Survey of Karnataka 2019-20

11.2 ROADS, TRANSPORT, All the National Highways and State


INFRASTRUCTURE AND Highways (99.50%) are covered with black
COMMUNICATIONS top and 98.41% of Major District Roads are
covered with black top. (Figure 11.6.)
11.2.1 ROADS
The carriageway width details of the roads
The State's road network consists of showed that about 18% of National
National Highways (NH), State Highways Highways and 1% of State Highways have
(SH), Major District Roads (MDR), Municipal four lane widths. Similarly, 62% of NH, 19%
roads and other roads including village of SH and 1.5% of MDRs have two lane
connectivity roads. The road development width. Highlights of the roads in Karnataka
works in the State are carried out by from 2001-02 to 2018-2019 is indicated in
multiple agencies, which include Public Appendix 11.4.
Works Department (PWD) of the State
Government, local Governments such as 1. ROAD DEVELOPMENT PLAN 2001-
Zilla Panchayat and its wings & in urban 2021:
areas, the City Corporations, City Municipal
The Government of India, Ministry of
Corporations (CMC) etc. the roads are
Surface Transport (Road Wings) has
maintained by the respective agencies.
prepared the Road Development Plan for
In the State, the average length of the PWD India 2001-2021. In this road development
roads (viz; NH, SH &MDR) per 100 sq km plan, the concept of Primary, Secondary &
area is 40.07 Km. Among the districts, the Tertiary Road System has been introduced
road length per 100 sqkm in Mandya district for the purpose of transport planning,
has the highest road length of 69.34 Km and functional identification, earmarking
Kalburgi district has the lowest road length administrative jurisdiction and assigning
of 26.02 Km per 100 Sq Km. Further, the priorities on a road network.
road length per 100 sqkm in
The Primary Road System consists of
Chamarajanagar, Raichur, Bidar,
Express Highways and the National
Chikkaballapura, Vijayapura, D.Kannada,
Highways. The Secondary Road System
Yadgir, Chikkamagaluru, Chitradurga,
consists of the State Highways and Major
U.Kannada, Ballari, Bagalakote, Kodagu, &
District Roads and the Tertiary Road System
Udupi districts are below the State average.
consist of the other District Road and village
The details of road length in the state are
roads. The latter two categories are also
given in the Table 11.21.

Table 11.21: The Road lengths in Karnataka (In Km)

Year
Category of Road
2017-18 2018-19
Na tional Highways 6572 7257.63*
State Highways 19578 19445.98*
Major District Roads 49909 49552.75*
Mu nicipal Roads & Other Roads 40108.71** 40108.71**

Rural Roads 190862*** 190862***


All Roa ds 307029.71 307227.07

Source:* Information Provided from CE, PRAMC office, **Director, Directorate of Municipal Administration,
(as on March-2017) *** RD &PR Department.
(In 2015-16, Government of India has agreed in principle for the up-gradation of 3800 km length of State
Highways as new National Highways and up-gradation of 2266 km length of State Highways as new National
Highways during 2016-17. Final notification is awaited)
Economic Survey of Karnataka 2019-20 535

Figure 11.6 Length of Black Top & Cement Concrete surface (in kms)

48764
49552.75
50000

40000

30000
19369
Total Length
19445.98
Surfaced length (CC & BT)
20000
7257.63

7257.63
10000

0
NH SH MDR

Surce: Chief Engineer, PRAMC office.

commonly known by the term “Rural Roads” d) All villages in the population group of
since they represent the links to the rural 1000 to 1500 should be connected with
area of the country. Other District Roads.
In this road development plan, road length is As per the Road Development Plan, PWD
defined as here under in terms of certain initiated State Highways Development
fixed and tangible objectives, having due Programme for the improvement and
regard to the popular demands for better strengthening of the existing State
type of roads as suggested here under. Highways based on the following criteria.
a) The length of the National Highways is a. District HQ to District HQ connectivity.
calculated on the basis of the demand
b. District HQ to Taluk HQ connectivity.
from the various states, subject to the
consideration that the National c. Taluk HQ to Taluk HQ connectivity.
Highways may not be very close to each
d. Connectivity to tourist places, religious
other, except in area where no other
centers and other economic activity
convenient transport facility exists.
center.
b) The length of the State Highways is
3567 km of State Highways in 66 packages
calculated in such a fashion that the
under SHDP-I has been taken up at an
State Highways connect major
estimated cost of Rs. 1439 crore. As per the
Industrial centers, District Places,
site conditions, 3403 km of road length is
Taluk/Tehsil head-quarters, places of
improved incurring an expenditure of
commercial interest, tourist centers,
Rs.1683 crore and all the packages are
major agricultural produce markets
completed.
and also major growth centers in tribal
areas. Under SHDP-II, improvements of 3745 km
of State Highways in 70 packages at an
c) All villages in the population group of
estimated amount of Rs.1498.90 crore are
1500 and above should be connected
being implemented. As per the site
with at least one on Major District
conditions, 3136 km road length is taken up
Roads.
for improvement. 3136 km length has been
completed incurring an expenditure of
536 Economic Survey of Karnataka 2019-20

Rs.1855 crore. All packages are completed. current financial year (by end of 31-3-2019)
80 Bridges are programmed for completion.
Under SHDP-III, improvement of 2795 km of
State Highways and 1520 km Major District Development of Bengaluru surrounding
Roads at an estimated amount of Rs. 3500 roads for a length of 155 Km including ROB
crore in 127 packages are being /RUB and Grade Separator has been taken
implemented. Out of 127 packages, 108 up in 10 packages amounting to Rs.2095 Cr
packages are completed and the remaining with a construction period of 30 months,
19 packages are under progress. 3746 km works are in progress.
length improvement is completed incurring
an expenditure of Rs. 3769 crore. Karnataka State Highways Improvement
Project-II (KSHIP-II):
Under SHDP-IV, in-principle approval has
been given for implementation of 7800 kms Under KSHIP-II, Proposal is to develop 834
road development under 3 stages at an kms of roads under World Bank assistance.
estimated amount of Rs. 10,000 crores. As on Nov 2019, a road length of 823 kms
Under Phase-I, improvements of 3692 km has been completed at construction cost of
(1460 Km SH & 2232 Km MDR) of State Rs.2373 Crore. A road length of 7.5 kms de
Highways in 161 packages at an estimated scoped due to land acquisition issues.
amount of Rs.4500 crore are being Similarly proposal was to develop 616 kms
implemented vide Government order no of roads under Asian Development Bank
PWD EAP(p1) Bangalore, Dated:16-02- assistance. As on Nov 2019, a road length of
2019. Out of 161 Packages, 130 Packages 614 kms has been completed at
Tenders have been Awarded and remaining construction cost of Rs.1926 Crore.
31 packages tenders are under Process. Karnataka State Highways Improvement
In 1999, Karnataka Road Development Project-III(KSHIP-III):
Corporation Limited (KRDCL) was created as r Under KSHIP-III (ADB 2nd Loan), it is
a State-owned enterprise for the proposed to develop 418 km of road
development of road infrastructure facilities under Asian Development Bank
in the State. Through this agency, the assistance at a project cost of Rs.5334
construction of 686 bridges and crore. Procurement of Concessionaires
development of 1561 km length of road have and Independent Engineers completed
been completed by KRDCL. Under PPP, a and the road works are expected to
length of 123 km i.e Yelahanka-AP border commence during December, 2019.
road (74.35km) Provisional commercial
r Roads will be improved to minimum 2
Operation date (PCOD) has been declared
lane carriageway with 1.5 m paved
and Toll collection has been commenced by
shoulder and 1 m earthen shoulder on
the concessioner on 22-09-2018. Whereas,
either side with provision for four lane in
Devanahalli - Kolar road (49 km), the work
urban settlement. The reach from
has been taken up by SHDP in selected
Bengaluru (NICE Road Jn.) to Magadi
reaches. Further, 361 km State Highway are
for a length of 35 km will be developed to
being improved with World Bank co-finance
divide four lane carriageways. The
(annuity) scheme at an estimated cost of Rs
roads are designed for a design life
1095 crore. The works are implemented in 6
period of 20 years with all geometric
projects. All the six projects have achieved
corrections and incorporating road
provisional completion and COD has been
safety features.
declared.
The improvement of rural roads (MDRs and
Construction of 217 bridges at an estimated VRs) and construction/reconstruction of
amount of Rs. 1395.58 crore has been taken bridges are being taken up through
up on Turnkey basis, of which 6 bridges are NABARD assisted Rural Infrastructure
dropped. Bridge proper in respect of 14 Development Fund since 1996-97 (RIDF-II).
bridges completed and balance are under The Tranches from RIDF-II to RIDF-XIX are
various stages of construction. During the completed and RIDF-XX to XXIV are under
Economic Survey of Karnataka 2019-20 537

progress. Table 11.22 shows the details of during October 2005. The agency is involved
plan outlay and expenditure for PWD from in preparation of detailed project reports in
2012-13 to 2018-19. each stage, implementation of the works (as
approved by Government of India) as per the
Rural Roads: required standards and release of grants
The total length of rural roads for the year provided by Government of India. The
2018-19 in Karnataka is 190862 kms. details of rural Connectivity are shown in
Improvement of Rural roads and their the Table 11.23.
maintenance is being taken up under
Pradhan Manthri Gram Sadak Yojana 2) Namma Grama Namma Raste Yojane
(PMGSY), Mukhya Manthri Grameena (NGNRY)
Rasthe Abhivruddhi Yojane (CMGSY) & NGNRY was launched during the year 2010
RIDF schemes. with an objective to provide rural
connectivity as per PMGSY guidelines.
Rural Communications:
Under this programme, Rs 6567.50 crore
(1). Pradhana Manthri Gram Sadak Yojana has been spent and 14070.84 kms of road
(PMGSY): length has been asphalted as on November
2019. Karnataka Rural Road Development
PMGSY was launched during December Agency is involved in preparation of detailed
2000 with an objective to provide rural project reports in each stage,
connectivity by way of all-weather roads to implementation of the works (as approved
eligible habitations having a population of by Government of Karnataka) as per the
500 and above. Under this programme Rs required standards and release of grants
4776.35 crore has been spent and 18549.67 provided by State Government.
kms of road length has been asphalted as on
November 2019. In order to implement the Chief Minister Gram Sadak Yojana:
scheme more effectively, Karnataka Rural Under Mukhya Mantri Gramina Raste
Road Development Agency has been formed Abhivruddi Yojane (Head of Account-3054) a

Table 11.22: Plan Outlay & Expenditure, PWD (Rs. In Crores)

IEBR Capital Outlay Total Revenue Total


Year
Plan Expr.
Plan Expr. Plan Expr. Plan Expr.
Outlay Outlay Outlay Outlay

2012-13 318.03 270.52 4215.92 3950.61 191.00 180.12 4724.95 4401.25

2013-14 468.98 366.22 4483.62 4228.48 140.00 103.34 5092.60 4698.04

2014-15 552.71 348.90 4879.67 4614.40 160.90 152.29 5593.28 5115.59

2015-16 677.90 594.16 5876.91 5861.05 174.00 153.99 6728.81 6609.20

2016-17 1193.84 1154.88 6331.99 6040.31 137.56 132.38 7662.59 6982.53

2017-18 1369.36 1369.36 6155.36 5992.34 1651.59 1568.90 9176.31 8930.60

2018-19 1151.03 1146.54 6587.69 6162.27 1773.83 1733.89 9512.55 9042.69

Source: Public Works Department, GoK


538 Economic Survey of Karnataka 2019-20

Table 11.23: District Rural Road Map (Details Of Rural Connectivity)

Bituminous Surface Earthen / Gravel Surface


Year Metal Surface (Kms)
(Kms) (Kms)

2018-19 61777.81 21925.02 113580.06

sum of Rs.27513.56 lakhs have been works, 102 works are completed, 6 works
provided in the annual budget for 2019-20. are dropped, due to works taken up by other
The funds so provided have been allocated to Department and various reasons.
Zilla Panchayats as per Dr.D.M.
Nanjundappa Committee report for RIDF Nabard-22 (2016-17): The
maintenance of rural roads. Government has administratively approved
110 Road & 14 Bridge works for Rs.5220.50
NABARD: lakhs & Rs.634.00 lakhs respectively during
the year 2016-17. Out of 110 road works,
RIDF Nabard-18 (2012-13): The 108 works are completed & 2 works are
Government has administratively approved dropped due to works taken up by other
199 Roads works for Rs.7330.00 lakhs & 2 Department and various reasons. Out of 14
Foot Bridge works for Rs.65.00 lakhs during Bridge works, 11 works are completed and 3
the year 2012-13. Out of 199 works, 195 works are dropped due to works taken up by
Works are completed & 4 works are dropped other Department and various reasons.
due to works taken up by other Department Govt has administratively approved 194 MI
and various reasons. Out of 2 Foot Bridge works for Rs.8520.05 lakhs. Out of 194, 181
works, both are completed. Tank works are completed, 6 works under
RIDF Nabard-19 (2013-14): The progress and 7 MI works are dropped due to
Government has administratively approved various reasons.
391 Roads & Bridges works for Rs.14095.43 RIDF Nabard-23 (2017-18): The
lakhs during the year 2013-14. Out of 391 Government has administratively approved
Road & Bridge works, 346 works are 116 Road works for Rs.7292.80 lakhs & 5
completed & 45 works are dropped due to bridge works for Rs.370.00 lakhs during the
works taken up by other Department and year 2017-18. Out of 116 road works, 107
various reasons. works are competed, 2 works under
RIDF Nabard-20 (2014-15): The progress and 7 works Dropped due to works
Government has administratively approved taken up by other Department and various
366 road & 79 Bridge works for Rs.18820.00 reasons. Out of 5 bridge works, 4 works are
lakhs & 2290.00 lakhs respectively. 87 completed, 1 work is under progress.
MI(ZP) Tank works for Rs.1374.50 lakhs RIDF Nabard-24 (2018-19): The
during the year 2014-15. Out of 366 Road & Government has administratively approved
79 Bridge works, 356 road works & 73 146 Road works for Rs.14283.75 lakhs & 7
Bridge works are completed. 10 road works bridge works for Rs.740.00 lakhs during the
and 6 Bridge works are dropped due to year 2018-19. Out of 146 road works, 22
works taken up by other Department, site works are competed, 66 works are under
problem and various reasons. Out of 87 progress, 54 works yet to be started and 4
Tank works 84 works are completed & 3 MI works Dropped due to works taken up by
works are dropped, due to various reasons. other Department and various reasons. Out
RIDF Nabard-21 (2015-16): The of 7 bridge works, 4 works under progress &
Government has administratively approved 3 works yet to be started.
108 Road works for Rs.6274.50 lakhs Issues & Challenges and Outcome:
during the year 2015-16. Out of 108 road
Economic Survey of Karnataka 2019-20 539

(a) Issues & Challenges 'Sector Apex Body' for Road Sector Policy,
Planning and Asset Management matters.
r The road network in the State shows
The centre has been provided with latest
disparity in inter–district connectivity of
State of the Art Equipment's for the road
National Highways and State Highways.
condition data collection to facilitate the
This disparity in connectivity needs to
collection of the road condition Data. The
be set right based on Dr.Nanjudappa
pavement conditions, asset details and
Report on redressal for Regional
pavement distress details are collected
Imbalance.
using Road condition Data collection
r Rural Roads - Rural connectivity is a key Vehicle (RCDCV). Pavement strength details
component in the overall development of are collected using Falling Weight
the state. Rapid development of roads Deflectometer (FWD). Layer composition
can have a multiplier effect on the and thickness details are collected using
overall growth of backward regions. Ground Penetration radar (GPR).
Investment in roads has one of the
largest impacts on poverty alleviation The data collected are compiled and
and increase in total factor productivity. analysed in the Karnataka Road Asset
Management System (KRAMS) and the
r About 29% of State Highways and 82% detailed Annual works program is prepared
of Major District Roads carriageway for the Core Road Network of the roads
width are single Lane. To ease the traffic under the jurisdiction of the Department.
congestion most of the State Highways The Government has mandated through
and some of the Major District Roads Government order, to prepare the work
needs to be upgraded to two lane program and to follow the same for the
width.(Widening of SHs are being taken development of the roads.
up through KRDCL and KSHIP on Core
Road Network concept) As per the directions of the Supreme Court
r The vehicular population in the State committee on Road Safety, Accident prone
has risen to about 15.85 lakh year-on locations and Black spot rectification
year from March-2016 to March 2017. programme is initiated and PRAMC is
To accommodate growing population of appointed as the nodal agency for the
vehicles, roads have to be widened on implementation of the program. The main
National Highways and State Highways. aim is to reduce the accidents as enunciated
At present, only 19% of National in “Karnataka Road Safety Policy-2015”.
Highways and State Highways are The Road safety policy aims at the reduction
having 4 lane carriageway widths. of road accidents by 25% and fatalities by
30% by the year 2020. A separate head of
(b) Innovations account has been created for the road safety
The Planning and Road Asset Management programme from 2017-18. PRAMC has
Centre (PRAMC) is established to strengthen taken up 110 black spots/corridors
the planning, programming and other /Accident prone location for rectification in
mandated functions of the Department. The 2019-20 Action Plan.
Planning and Road Asset Management (c) Outcome
Centre is responsible for all planning and
programming functions related to road r Under State Highway Development
sector development and maintenance of Programme (SHDP) existing State
Road assets and will prepare the Annual Highways which have connectivity
Works Program in a scientific way. It is between District Headquarter
mandated that the Annual works program to District Headquarter, District
shall be followed strictly in the selection of Headquarter to Taluk Headquarter
the roads for development and necessary and Taluk Headquarter to Taluk
Government orders are issued already. Headquarter are being developed in
phased manner.
The PRAMC at PWD level will function as
r Road widening projects taken up by
540 Economic Survey of Karnataka 2019-20

PWD based on the PCU factor commuters daily with workforce of 38880
(Passenger Car Unit) has resulted in employees.
adequacy of carriageway width of State
Thus KSRTC operated 7138.57 lakh
Highways and National Highways to
effective kms. during the year 2019-20 (upto
reduce traffic congestion.
November-2019) as against 7042.64 lakh
11.2.2 Transport: effective kms. Operated during the same
I. KARNATAKA STATE ROAD period of previous year. The percentage fleet
utilization has increased to 93.0 during the
TRANSPORT CORPORATION
current year from 91.6 in previous year.
KSRTC was established in the year 1961 to During the current year period it has
provide efficient, adequate, economic and inducted 162 new buses and replaced 304
well coordinated transport services to the old vehicles which were not fit for operation.
commuters of the State with its The percentage of vehicles scrapped to the
head office in Bangalore. The Govt. of total vehicles was 3.4.
Karnataka decided to bifurcate the monolith
Details of Yearwise fleet held, new vehicles
Corporation into four seperate Corporations
inducted from 2014-15 to 2019-20
based on geographical location to fulfil the
diverse needs of commuters through (UptoNov-2019) are given in the Figures
effective and efficient control. Accordingly, 11.7A, 11.7B and 11.7C. The Physical
KSRTC was bifurcated into BMTC on 15-08- performance statistics of KSRTC for the year
1997(for Bangalore city), NWKRTC on 01- 2017-18, 2018-19, 2017-18(upto
11-1997(for North Western Districts of November-2017), 2018-19 (upto November -
Karnataka) and NEKRTC on 01-10-2000 (for 2018) and 2019-20(upto November -2019) is
North Eastern Districts of Karnataka). furnished in the the Appendix 11.5.
KSRTC remained as an independent Financial Performance:
Corporation with effect from October-2000.
During the year 2018-19, the Corporation
KSRTC with its Corporate office at incurred a loss of Rs.134.93crores as
Bangalore,has in its jurisdiction seventeen against a profit of Rs.4.50 crore made during
southern districts of Karnataka and 2017-18. The financial statistics of KSRTC
provides bus service to 16181 villages out of for the year 2017-18, 2018-19, 2017-18
20792 villages, the percentage service (upto November-2017), 2018-19 (upto
provided being 77.8. During the year 2018- November-2018) and 2019-20 (upto
19, the Corporation has operated 10598.57 November-2019) furnished in the Appendix
lakh kms. as against 10487.54 lakh kms. 11.6. Year-wise profit/loss and
which was operated during 2017-18. The accumulated loss of the Corporation from
percentage fleet utilization stood at 92.2% the year 2014-15are shown in the Figures
during 2018-19. During 2018-19 the 11.8A and 11.8B.
Corporation has inducted 391 new buses
and replaced 479 old vehicles which were KSRTC has to pay 5.55% of traffic revenue
not fit for operation. The percentage of as motor vehicle tax. During the year2018-
vehicles scrapped to the total vehicles was 19, the corporation has paid motor vehicle
5.5%. The details of Passenger fleet strength tax of Rs.175.35crores. During the year
and utilization is given in Table 11.24. 2019-20, the Corporation by utilizing its
internal resources and grants released by
As on 30-11-2019, it had 17 divisions (16 the Government under SDP/KGIDF/
operating divisions and Kempegowda Bus SCSP/TSP has takenup 162 works at an
Station), 83 depots, two Regional approximate cost of Rs.28209.92 lakhs and
Workshops, one Central and four Regional as on 30-11-2019, completed 51 works and
Training Institutes, one printing press and a spent Rs. 3630.75 lakhs.
hospital. It operated 8145 Schedules
utilizing 8535 vehicles, operating 29.26 lakh r Under SDP scheme, 67 works were
kms/day earning gross revenue of taken up and out of which 16 works
Rs.947.83 lakh and carrying 29.65 lakh were completed and the remaining 51
Economic Survey of Karnataka 2019-20 541

works are under progress. The Freedom Fighters in all type of buses
expenditure incurred as on 30-11-2019 (including Volvo buses) within and
under this scheme was Rs. 2577.02 outside the State.
lakhs.
5. For freedom fighters aged 75 years and
r Under SCSP/TSP scheme, 07 works above, free travel was allowed along
were taken up and all the works are with a companion.
under progress. The expenditure
incurred as on 30-11-2019 under this 6. Concessional travel facility was
scheme during the year 2019-20 was extended to all the physically
Rs. 172.00 lakhs. challenged persons within the state
with a restricted travel upto 100 Kms
r Under KGID Fund scheme, 46 works from the address given by them.
were taken up out of which 16 works
were completed and the remaining 30 7. Free travel coupons was given to the
works are under progress. The wife/widow of freedom fighters to travel
expenditure incurred as on 30-11-2019 within the State.
under this scheme during the year 8. 25% concession in fare was given for
2019-20 was Rs.2062.25 lakhs senior citizens of age 60 years and
r By utilizing internal resources, the above.
Corporation has taken up 19 works
during the year under report, out of 9. Free travel facility was extended to the
which 04 works were completed and the totally blind persons to travel within the
remaining 15 works were under State.
progress. The expenditure incurred as 10. Free travel facility to Ex- MLAs & MLCs
on 30-11-2019 during the year 2019-20 to travel within the State and Inter State
was Rs.49.60 lakhs. in any bus along with a companion.
During the year 2018-19, the Corporation 11. Free travel facility to sitting MLAs &
has upgraded 08 bus stations. These bus MLCs to travel within the State and
station were provided with bus bays and Inter State in any bus along with a
modern passenger amenities like dust proof companion. They are issued with a Gold
parking area, sanitary block, seating Card on production of which they can
arrangements etc. travel in any type of bus.
Social Obligations: 12. Free passes were given to accredited
1. KSRTC has issued free passes to all SC journalists and permitted to travel
& ST students and to students till 7th throughout the State in all type of buses
standard an additional 25% concession including premium services. Home
is extended to girl students studying in guards (in uniform) are allowed to travel
high schools. free in city services while on duty.
2. Free passes were given to Olympians, 13. Free bus pass is given to National award
Para Olympians and Arjuna awardees winning writers/artists proposed by
to travel in KSRTC buses. Kannada and Culture Department of
Government. Free bus passes are
3. Free bus passes were issued to National issued to dependants of martyrs i.e,
Shourya Prashasti award winning parents, wife and dependent children
children upto the age of 18 years. for a period of 10 years.
4. Free travel facility was extended to all Smoke Emission Checks:
542 Economic Survey of Karnataka 2019-20

Table 11.24: Fleet strength and Fleet utilization:


Sl. 2018-19 2019-20
Particulars 2017-18 2018-19
No. (upto Nov.) (upto Nov.)
1 No. of buses as at the end of 8784 8695 8713 8535
the year
2 % over aged buses 29.1 37.5 28.8 42.5

3 % Fleet utilization 92.7 92.2 91.6 93.0

Figure 11.7A: Vehicle held as on last day

10000 8784
8326 8695 8535
9000 8227 8090
8000
7000
6000
5000
4000
3000
2000
1000
0
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 (As
on Nov-2019)

Figure 11.7B New vehicles added

2000
1514
1500

938
1000 743

500 391
206 162

0
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
(upto Nov-
2019)
Economic Survey of Karnataka 2019-20 543

Figure 11.7C: Vehicles Scrapped

1200
1041
1000

785
800
688

600
479

400 304
290

200
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 (upto
Nov-2019)

Figure 11.8A: Profit and Loss (Rs. in crore)

60 50.95

40
20 4.50
0
-20 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20( upto Nov)
-40
-60 -43.49
-80
-100
-120
-140
-134.93 -137.40
-160
-180
-177.08
-200
-220
-240

Figure 11.8B:Accumulated Loss (Rs. in crores)


100

50

0
2014-15 2015-16 2016-17 2017-18 2018-19
-50
-54.75 -3.80
-100

-150

-200 -176.38
-180.88
-250

-300
-311.30
-350
544 Economic Survey of Karnataka 2019-20

During 2018-19, totally 91610 vehicles were candidate's data is done online through
checked for smoke emission levels during KSRTC jobs site www.ksrtcjobs.com/.
the year under report and out of which 483
(0.53%) buses were found to be slightly Provident Fund and Voluntary Provident
above the prescribed norms. These buses Fund Online Software:
were attended to and put back to operation. Online Software has been developed and
deployed to view the PF and VPF annual
SAKALA Implementation:
information using password facility for the
As per Karnataka Guarantee of Services to officers and officials of KSRTC.
Citizen's Act, 2011, 06 services related to
KSRTC viz., issue of students concessional Leave Management System:
bus passes, Accident Relief Fund, issue of Leave Kiosks have been installed in all the
bus passes to Physically challenged, issue of Depots and Divisional Workshops to enable
free bus passes to freedom fighters, issue of crew and mechanics to avail their leave
free bus pass to Blind person, issue of without any manual intervention. The main
concessional bus coupons to wife/widow of objective of implementation of Leave
Freedom Fighters are implemented under Kiosk software is to bring transparency,
SAKALA portal. to eliminate favoritism, to ensure
accountability of leave and optimum
KSTDC Package Bookings:
utilization of crew.
KSRTC has entered into an MoU with
A web-based online system has been
Karnataka State Tourism Development
implemented to enable all crew to avail their
Corporation (KSTDC) to make online
leave using password facility. A Mobile-App
booking through Awatar for Casual contract
is developed to facilitate to use the
and tour package services in order to
technology.
facilitate the passengers and also to improve
the revenue mobilization of the Corporation. Health Checkup scheme:
KSTDC package tour booking has been
integrated with KSRTC online reservation KSRTC has entered into an MoU with Sri
system and bookings are made available in Jayadeva Institute of Cardio-vascular
website for public for planning their tour. Science and Research Centre for free 10
Master Cardiac and Health Check-up of
APTDC Package Bookings: employees of the Corporation.
KSRTC has started package tours to Intelligent Transport System:
Thirupathi to facilitate the passengers from
various locations, the initiative was well Intelligent Transport System has been
utilized by the public. implemented in all buses of Mysore City
Transport Division. The project scope
Safety Measures: includes 500 buses, 105 bus shelters and
45 platforms. ITS project is disseminating
1. Anti-Collision Avoidance System (CAS)
the bus arrival and departure information in
is being introduced in few premier
real time through 167 Passenger
service buses to avoid the accidents.
Information System Boards, 20 small
2. Installation of FDSS (Fire detection and Screens and 16 big screens. The same is also
suppression system) in few premier provided through SMS, IVRS and Commuter
service buses to control fire incidents. Portal for public usage.
Recruitment: Electronic Ticketing Machine (ETM):
Recruitment forms the core process of the r Electronic Ticketing Machines with
Human Resource Management. Complete GPRS/GSM, Bluetooth were being used
activity of recruitment was brought and software has been developed to get
under the Information Technology and real time information.
communication network. Capturing of r Software has been implemented to
Economic Survey of Karnataka 2019-20 545

calculate GST for each ticket in premier Excellence Award -2019 under the
services. category of Supply Chain & Logistics
r Daily passes for City Service and Volvo Sector for the new brand 'Ambari dream
services are issued through ETM class'
machine. Issue of intercity and r National PRAWAAS Excellence Awards-
integrated passes has been developed. 2019
Awards: II. BENGALURU METROPOLITAN
TRANSPORT CORPORATION
During the year 2018-19 and 2019-20 (up to
Nov-2019) KSRTC has bagged the following After the bifurcating from the MSRTC/
awards which are as under. KSRTC, Bengaluru Metropolitan Transport
Corporation (BMTC) started functioning as
r India Pride Award
an independent Corporation with effect from
r Smart Governance award- VTMS 15-08-1997. Presently, Benguluru
r Smart Governance award- AWATAR Metropolitan Transport Corporation's
r Smart Governance award- Healthy administrative system functioning under
Workplace Initiatives two–tier system (viz., Depots and Corporate
Office).
r Smart Governance award- Smart
Technology in Operations The operational jurisdiction of BMTC went
beyond BBMP limits by 25 kms of
r India Bus Award
Bengaluru, thus providing services to
r State e-Governance Award commuters in and around sub-urban of
r Award of Excellence –MoUD Bengaluru city. During 2019-20 (Up to Nov-
r SKOCH AWARD-Silver 19), the Corporation has operated 6191
schedules utilizing 6447 vehicles, it has
r SKOCH Award-Copper operated 11.38 lakh kms per day and earns
r SKOCH Mobility Award-Silver an average of Rs. 5.13 crores of traffic
r PRCI- In-house magazine- Silver revenue by providing transportation facility
to 35 lakh commuters. The Corporation
r PRCI_ Public awareness video-Silver having a work force of 33504 with staff ratio
r PRCI- Corporate video-Silver of 5.41 The Corporation has inducted 4 new
r CMAK Best Practice Award buses and scrapped 46 old vehicles during
r Profit Making STU –ASRTU Productivity the said period. Table 11.25 shows the
Award details of passenger fleet strength and
utilization. The operational performance
r Minimum Operational Cost Mysore City statistics of BMTC for the year 2017-18,
–ASRTU 2018-19 and 2019-20 (Upto Nov-19) are
r International accolade CMO Asia Brand furnished in the Appendix 11.7.

Table 11.25: Passsenger fleet strength and utilization:

Sl. 2019-20
Particulars 2017-18 2018-19
no. (Up to Nov-19)

1 No. of buses as at the end of the year 6677 6521 6477

2 % over aged buses ( in years) 16.4 10.6 14.0

3 % Fleet utilization 87.5 84.1 87.5


546 Economic Survey of Karnataka 2019-20

The year-wise fleet held and new vehicles Accumulated loss/ profits are Shown in the
inducted are depicted in the figures 11.9A figures 11.10 A and 11.10 B.
and 11.9B. The year-wise Profit/Loss and

Figure 11.9A: Vehicles held as on last day

6900
6775
6800
6677
6700 6631
6600 6522 6521
6477
6500 6431 6401
6400
6300
6162 6157
6200
6100
6000
5900
5800
Mar-12Mar-13Mar-14Mar-15Mar-16Mar-17Mar-18Mar-19 Nov-18 Nov-19

Figure 11.9B: New vehicles added

1600
1406
1400

1200

1000
838
800

600 549
385
400 290 279
197
200 101
0 4
0
Mar-12 Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Nov-18 Nov-19
Economic Survey of Karnataka 2019-20 547

Figure 11.10A: Profit/Loss (Rs. In Crore)

50.00 21.42 13.78


0.00
Mar-12 Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Nov-18 Nov-19
-50.00
-64.9
-100.00

-150.00
-147.95 -147.59
-200.00

-250.00 -217.61 -221.83


-242.65
-260.91
-300.00

-350.00
-349.49
-400.00

Figure 11.10B: Accumulated Profit/Loss (Rs. In Crore)

800

663.04
625.21 641.63
587.55
600 560.02
515.09
460.12

400 367.51
302.60 316.33
261.13

200

55.42

-200 -162.19

-400

-511.68
-600
'05-06 '06-07 '07-08 '08-09 '09-10 '10-11 '11-12 '12-13 13-14 14-15 15-16 16-17 17-18 18-19

Financial Performance: (Upto Nov-19) in prescribed proforma is


During the year 2019-20 (April 19 to furnished in the Appendix 11.8.
Novmeber 19) the Corporation has operated Social Obligations:
27.77 crore effective kms, earned gross
revenue of Rs.1457.60 crores inccured an BMTC issuing Free/Concessional passes to
expenditure of Rs.1700.15 crore and students and other categories of public. The
sustained a loss of Rs.242.65 crore. The details are given below
financial performance of the Corporation for r Free student pass facility for student
the year 2017-18, 2018-19 and 2019-20 upto 7th standard.
548 Economic Survey of Karnataka 2019-20

r 25% concession for female students office trips, these pass holders can travel in
from 8th std to 10th std. BMTC services.
r 25% concession for Senior Citizens on Induction of Pink Sarathi:
tickets and passes.
For the purpose of women safety 25 Pink
r Free travelling facility for Blind people.
Sarathi have been purchased under
r Concession travelling facility for Nirbhaya scheme inaugurated on 6-6-
Physically Handicapped people. 2019 and the sarathi vehicles are
r Free travelling facility for Freedom presently in operation.
Fighters and their wives/widows. Light and Heavy vehicle training:
r Free pass facility for the student's
belongings to SCSP and TSP category. The Corporation has given Light and Heavy
vehicle training to 490 candidates under
r Concessional pass facility for registered CMKKY, 272 women candidates under
building construction laborers. Nirbhaya scheme, 459 candidates under
r Free pass Goa vimochana activities. Special component Sub Plan (SCSP) and 82
The Corporation has issued Closed loop candidates under Tribal Sub Plan (TSP) for
smart cards to 64109 Schedule caste the period from April 19 to November 19.
students, 9459 to Schedule tribe students New Bus station & New Depots:
and 267380 passes to General category
students totaling to 340948 during the During the year 2019-20 the Corporation
year 2019-20 ( for the period April 19 to has constructed and inaugurated new
November 19) bus station at Hosakote (Under Special
Development Plan) on 15-6-2019. The
The Corporation has one of the best and Corporation also constructed new bus
well-patronized Commuter pass system. A Depot at Byrathi.
variety of passes tailored to suit the travel
requirements of different sections of society Intelligent Transport System (ITS):
are made available to the public. The system Intelligent Transport System in the
is very popular owing to services offered at Corporation BMTC includes
modest rates to these pass users, The details
of the various kinds of passes available for r GPS based Vehicle Tracking System
the travelling public is given below. (VTS) with real time connectivity: 6500
vehicles are fitted with VTUs
r Day Pass (limit less travel in a day in
Non AC buses) r Electronic Ticketing System (ETS)
System with real time connectivity:
r Vajra Gold Day Pass (limit less travel 10000 ETMs have been provided
in a day in AC Vajra service expect
Vayu vajra service) r Passenger Information System (PIS)
with LED display screens: 35 PIS Units
r Monthly Commuter Passes ( Limit less are functioning
travel in a month in Non AC buses)
r Command-Control Centre and Data
r Vajra Gold Monthly Pass (limit less Centre (with required infrastructure) at
travel in a month in AC Vajra service BMTC premises in Bengaluru
except Vayu vajra service
r Applications to automate and integrate
r Vajra Student Pass (limit less travel in depot level activities
all service expect Vayu vajra service)
r Project, System Health and Service
r Monthly Dedicated Passes. Level Monitoring Tools to support the
This pass is being issued to passengers ITS project.
travelling for office and companies and for ITS enhances efficiency for both the
the benefit of these passengers BMTC is commuter and BMTC through data driven
operating dedicated trips in Vajra/Corona decision making & service planning,
vehicles. Further, during holidays and non improvement & publicity, assisting in
Economic Survey of Karnataka 2019-20 549

marketing its services better by r Commuters can locate the nearest bus
Strengthening two-way communication stop for planning the trip.
between BMTC and commuter and r Commuters can see the bus
Providing service related information to information displayed in Passenger
commuters. Information System at major Bus
Implementation of ITS project has following Stands and Kempegowda International
advantages: Airport.
r Improve efficiency and decrease Inventory Management System (IMS):
operational costs IMS is an integrated web based application
r Provide real time information on for Stores & Purchase Management. Stores
revenue and bus operation and Purchase module is a feature rich
system that supports all aspects of
r Monitor, Track and manage service
materials management, various types of
adherence and performance
Purchase Orders, goods receiving,
r Integrate, automate and secure Dispatches & Goods Returns, stock issues,
ticketing receipts, transfers, Stock & Consumption
r Automate data compilation & report Monitoring vendor returns etc. Inventory
generation to build a reliable MIS levels are managed by using Maximum,
r Act as a one stop shop for all ITS data Minimum, Re-order levels and tracking the
viewable through a web application consumption pattern of an item. IMS
supports multi-locations to define and
r Utilize analytical (BI) tools to plan, manage materials in a consistent manner.
analyze and appraise service
r Provide reliable real time information on Online Recruitment process in BMTC
bus routes to commuters through The recruitment of all staff in BMTC is now
different media done by online process. Details are as
r Interface with applications authorized under:
by BMTC r Hosting of website www.mybmtc.com
r Manage and handle incidents and r Notification through www.mybmtc.com
accidents indicating the vacancy as per roaster
r Increase convenience and safety to and last date for submitting application
commuters and crew on-line.
r Encourage modal shift from private r Candidates can apply for the post
vehicles to buses through on-line.
r Optimize utilization of manpower, bus r Candidates can take the print out of call
fleet and other resources letter immediately after the submission
r Facilitate fare-Service Integration of application.
through smart cards r Scrutiny and verification done through
Mobile Application Project: software application.
r Computerization of Driving Trade test.
The Corporation has launched user friendly
Smart phone Mobile Application in Android r Posting based on merit by using
and iOS (i-phone Operating System) Counseling Software
platform. The features are as under: Awards: During the year 2019-20, Bus &
r The application helps to know the Car Operators Confederation of India has
timetable, route information and fare given the Prawaas excellence award 2019 to
for the buses they wish to travel. BMTC for “Intra City Bus Operator” and IT
Excellence Awards - “Vehicle Tracking
r Commuters can know the estimated System”
time of arrival which helps to plan their
travel.
550 Economic Survey of Karnataka 2019-20

III. North Western Karnataka Road corresponding period of the previous year. It
Transport Corporation: is mainly due to increase of Rs. 79.82 crores
reimbursement towards concession pass
NWKRTC was established in the year 1997, from Government as compared to previous
has been providing efficient, adequate, year. NWKRTC is operating both city and
economic and well co-ordinated Transport mofussil services apart from premier
Services to the Commuters. It has its services such as Rajahamsa, Sleeper Coach
Corporate Office at Hubli and covers six and Volvo buses.
Districts in the State. During 2019-20 (up
to Nov-2019), the Corporation has a The operational performance and financial
workforce of about 23171 employees, it statistics of NWKRTC for the year 2017-18,
operated 4631 schedules utilizing 4899 2018-19 and 2019-20(Up to Nov-2019) are
vehicles, operating 15.82 lakh Kms per day, furnished in Appendix 11.09 and
earning gross revenue of Rs.493.80 lakh Appendix 11.10 respectively. Year-wise
and carrying 22.46 lakh passengers on an fleet held and new vehicles inducted from
average daily. NWKRTC has extended 2017-18 to 2019-20 (upto Nov-2019) are
services to 4519 villages out of 4609 villages, given in the Figures 11.11A and 11.11B.
the percentage service provided being
98.0%. As on 30-11-2019 it had one Central New IT initiatives :
Office, 9 Divisional Offices, 51 depots, 171 In order to improve the efficiency and
bus stations, one regional Workshop and performance of the Corporation, following
one Regional Training Institute. During the are the IT initiatives undertaken by the
year 2018-19, corporation incurred loss of Corporation.
Rs.89.07 crores as against the losses of
r Seva Spandana software: The project
Rs.71.98 crores sustained during 2017-18.
on “EMPLOYEE GUARANTEED
During 2018-19, there is increase in HSD
SERVICE” was undertaken in the brand
cost by Rs. 102.24 crores and staff cost by
name of SEVA SPANDANA to address
Rs. 59.00 crores as compared to previous
the employee grievances proactively
year. Inspite of this loss is increased by only
and timely. IT department has
Rs. 17.09 Crores. During 2019-20 (up to 30-
successfully developed and installed
11-2019) loss is decreased to Rs. 105.08
SEVASPANDANA software in all the
crores from Rs. 180.26. crores during the
depots, divisional offices, regional

Figure 11.11A: Year-wise Fleet Held (as on last day)

5100
5048
5050
5013
5000

4950
4899
4900

4850

4800
2017-18 2018-19 2019-20(Upto Nov-19)
Economic Survey of Karnataka 2019-20 551

Figure 11.11B: Year-wise New Vehicles Added

600 566

500

400

300 243

200
89
100

0
2017-18 2018-19 2019-20(Upto Nov-19)

workshop and central offices of transparency in administration and to


Corporation and it is working provide better approaches and
successfully. ambience to employees, IT department
r Newly recruited crew posting developed “Smart Leave Application
through counselling: Previously Management System” application
posting of newly recruited crew to the software for the crew. With this
depots was done as per the vacancies application crew can apply leave online
existed in various divisions without and get acknowledgement for the same.
considering the requests and Based on quota leave will be
requirements of crew. Due to this crew automatically get sanctioned. The
are facing problems, to set right this software has been successfully
based on division/depot requirement implemented in all depots of
and place choice of the crew, IT Corporation.
department has developed and r Aadhar based Biometric Attendance
implemented counseling software Monitoring System: With the support
successfully in a very short time. of E-Governance department, Aadhaar
Through this, a system has been based Biometric Attendance System
developed to post the crew to the depots has been implemented in Central Office,
of their choice. This has also resulted in to monitor the Officers and Employees
bringing high level of transparency in attendance regularity.
filling up of vacancies in the r Classification of Schedules (ABC)
Corporation. Similarly the same Software: To analyse schedule wise
counselling software is also used to ABC, in house IT team has developed
transfer the Crew. ABC software was and is implemented
r Smart Leave Application in all Divisions of the Corporation.
Management System: Previously r Seniority based duty allocation
NWKRTC was practicing manual through counseling (Duty Rota) :
system for sanctioning of leave to the Presently duty allocation of crew in
crew at depots, due to which lot of depots is done as per circular number
problems were faced in sanctioning of 593/91-92, dtd :30-01-1992. To bring
leave to the employee. In order to bring transparency and to avoid partiality in
552 Economic Survey of Karnataka 2019-20

duty allocation and to allocate duty as r Concessional Monthly passes are


per rota, “Seniority based duty issued to travel in NWKRTC City & Sub-
allocation through counselling” urban buses
software is developed by IT Department r Free passes are issued to the chairman
and this software has been installed in of Kannada Kriya Samithi to travel in
all the depots. Express and Ordinary Services
r Material Management and Inventory r Free passes are issued to travel
Control: Previously the documents and throughout the State and in Interstate
records related to stores department, to Arjun Awardees
having more than 20000 materials were
r One day different passes are issued to
managed and handled manually.
travelling public to travel within and
Resulting more man power and time
between Hubli Dharwad; Hubli-
and also work related to calculation,
Belgam, Hubli-Gadag, Hubli–Haveri,
reports generation, material
Hubli-Naragund, Naragund-Gadag,
management and inventory has become
Belgavi City, Bagalkot City, Belgavi-
tougher. To overcome these problems,
Chikkodi, Belgavi–Gokak, Hukkeri-
the Material Management and
Belgavi Sankeshwar-Belgavi etc
Inventory Control software developed
by KSRTC is successfully installed in r 25% Concession is given to the Senior
NWKRTC Central Stores department. citizens age of 60 & above to travel in the
Presently the software has been Buses of city Sub-Urban Ordinary
installed in Regional Workshop Express and Rajhans Services
Hubballi, on pilot basis. throughout the state and interstate.
Social Obligations : Free/concessional r Free passes are issued to the chairman
passes issued by the Corporation to the of Zilla Kannada Sahitya Parishath to
various categories are as under. : travel in Express and Ordinary
Services.in his Dist and to Bangalore.
r School Students up to 7th Std. free President of State Kannada Sahitya
passes have been issued. Parishath is permitted to travel through
r Students of Scheduled Caste and out State in express and ordinary
Scheduled Tribe are issued with free services
passes r Free travel coupons of Rs. 2000/- p.a.
r · Concessional passes to students will be issued to Wives and Widows of
studying in High School and college Freedom Fighters to travel in Ordinary
students. and Express services within the state.
r Extra 25% fare concession to girl r Government of India's National
students studying in High school. Shourya Prashasti awardees are issued
r Home Guards (on Uniforms) are allowed with free passes to travel in Corporation
to travel free in City Services while on buses up to 18 years of age
duty r Passes are issued to Recognised
r Blind persons are issued with free Journalists of Karnataka and they are
passes to travel in Mofussil, Sub-urban allowed to travel throughout the state
and City services throughout the State for journalism activities.
r Free travel facility to the freedom r Free bus passes have been issued to
fighters throughout the state and all laurels/artists belonging to Kannada
services along with one assistant for the and Sanskrit Department to travel in all
persons aged above 75 years. services within and outside the state.
r Concessional passes for Physically r Dependents of Martyr Soldiers are
challenged are issued to travel 100 Kms issued with free passes.
from their respective native places. r Free travel facility is provided to
Endosulphan victims for their medical
Economic Survey of Karnataka 2019-20 553

treatment in ordinary and express Physical performance:


NWKRTC buses along with one
During the year 2019-20(up to November-
assistant.
19), the Corporation operated 4256
r Free travel facility for Goa freedom schedules utilizing 4701 vehicles, scrapped
fighters and for the persons aged above 166 old vehicles which were not fit for
75 years along with one assistant operation. It is operating 14.17 lakh km,
throughout the state. and earning daily gross revenue of
IV. North Eastern Karnataka Road Rs.4.91 Crore. The detailed Operational
Transport Corporation performance Statistics are given in
Appendix 11.11.
North Eastern Karnataka Road Transport
Corporation was established in the year Financial Performance:
2000, to provide adequate, efficient, reliable
During the current year 2019-20 (upto
and economically viable transport facility
November 2019), the Corporation, incurred
to the travelling public of the north
loss of Rs. 92.29 Crore on total revenue as
eastern region of Karnataka State. It
against the previous year period loss of Rs.
has jurisdiction over 7 revenue districts viz.,
123.69 Crore. The loss of the Corporation is
Kalaburagi, Bidar, Yadgiri, Raichur,
decreased by Rs. 31.40 crore, as compared
Bellari, Koppala and Vijayapura. NEKRTC
with the margin of the previous year period.
has its Corporate Head Quarters at
The detailed financial statistics given in
Kalaburagi, 9-operating Divisions, 53-Bus
Appendix 11.12.
Depots, 149-Bus stands, 9-Divisional
Workshop, 1-Regional Workshop, 2- Vehicles and induction of new vehicles:
Regional Training Institutes.(Humnabad
Details of Year wise fleet held and new
and Hagari bommanalli) .
vehicles inducted from 2000-2001 to
2019-20 (upto November-2019)are
presented in the Fig 11.12A and 11.12B.

Figure 11.12A: Year-wise Fleet Held

6000
4759 4835 4701
5000 4463 4369 4495 4549
4206 4356
3899 3971
4000
2866
3000 2586 2677 2757
2268 2413 2380
2027 2049
2000
1000
0
554 Economic Survey of Karnataka 2019-20

Special Development Plan(SDP): r Unrestricted free travel facility to the


Details of works taken under SDP from from Goa Activists, One assistant is also
2016-17 to 2019-20(up to November-19) are allowed to accompany the Goa Activists
given in Table 11.26. who is above 75 years.
r Free passes to students who are
Social Obligations :- studying up to VIIth class and
Concessional/free passes to students and concessional passes to other students.
passengers of different category. r Blind persons are issued with free
r Free passes to SC/ST students to travel passes to travel in Mofussil, Sub-urban
for school/college from their native and City services throughout the State.
place up to 60 kms. with effect from the r Physically Challenged persons are
year 2017-18. issued with concessional pass travel

Figure 11.12B: Year-wise New Vehicles Added:

1200
996
1000
789
800
560 569 544
600 481 467 451 441 455
367 384
400 316 299
265
204
200 131
64
11 0
0

Table 11.26: Special Development Plan 2016-17

NEW WORKS SPILL OVER WORKS Expendit


Allocation
Details ure.
(Rs. in
Comple Comple Progre (Rs. in
No Progress No lakh)
ted ted ss lakh)
Bus Stand 9 - 9 13 7 6 642.00 642.00
Bus Depot 1 - 1 - - - 25.00 25.00
Divisional
- - - - - - - -
work shop
Upgr.of Bus
11 11 - 5 3 2 803.00 803.00
station
Upgr.of Bus
21 21 - 2 2 0 1530.00 1530.00
Depots.
Total 42 32 10 20 12 8 3000.00 3000.00
Economic Survey of Karnataka 2019-20 555

2017-18

NEW WORKS SPILL OVER WORKS Allocatio Ex pendit


Details n ure.
Complet Prog- Co mplet Prog- (Rs. in (Rs. in
No No
ed ress ed ress lakh) lakh)

Bus Stand 10 1 9 15 5 10 815 .00 815.0 0

Bus Depot 2 - 2 1 - 1 215 .00 215.0 0

Divisional - - - - - - - -
work shop

Upgr.o f Bus
43 43 0 1 1 - 181 1.00 1 811.0 0
station

Upgr.o f Bus 29 29 0 1 1 - 215 9.00 2 159.0 0


Depots.

Total 84 73 11 18 7 11 500 0.00 5 000.0 0

2018-19
NEW WO RKS SPILL O VER WORKS

Commen Alloc at
Deta ils Comp-
Est
T ender Comp-
Est Under (Rs. i n Expend
cing (Rs. in
No apprl No approv Prog - lakh )
letd civil sta ge lted lakh)
st age al stage r ess
works

Bus Stand 2 - 2 - - 19 4 2 13 840.00 665.00

Bus De pot 2 - 1 0 1 1 1 - - 145. 00 95.00

Divisiona l
work shop 1 - 1 0 0 - - - 25.00 0.00

Upgr . of Bus
st ation 14 13 1 - - 0 0 0 704.00 704.00

Upgr . of Bus
De pots. - - - -
32 31 1 2 2 2286.00 2286.00

51 44 6 - 1 22 7 2 13 4000. 00 3750.00
556 Economic Survey of Karnataka 2019-20

2019 - 20 (Up to November-19)


NEW WO RKS SPILL O VER WORKS
Commen Est Alloc at
Deta ils Comp-
Est
cing T ender Comp- appro-
Under (Rs. i n Expend
No appr l No Prog - (Rs. in
lte d civi l sta ge lted va l lakh )
sta ge r ess lakh)
works sta ge

Bus Stand 18 - - 9 1 8 - - 8 840.00 415.00


Bus De pot 2 - - 2 0 1 - - 1 145.00 119.75

Divi si ona l - 0 - - -
work shop 18 1 17 0 969.00 210.00

Upgr . of Bus - 0 - - -
st ation 14 - 14 0 1596.00 200.00

Upgr . of Bus - 0 - - -
De pots. 6 - 5 0 450.00 55.00

- -
58 1 47 1 9 - 9 4000.00 999.75

facility from their native place up to 100 died for Country). This Facility is
kms. extended in Ordinary & Express
r Unrestricted free travel facility to the Services within state to the Dependents
freedom fighters. One assistant is also (i.e, Father, Mother, wife & Dependent
allowed to accompany the freedom Sons up to 10 years, i.e. From July-
fighter who is above 75 years. 2012 to July-2022).
r 25% concessional travel facility to r 50% Concessional travel facility to the
the Senior Citizens 60 & above age Drama Troupes/Yakshaganna Troupes
permitted in Ordinary/Express/ sponsored by Karnataka Sangeetha
Rajhamsa including Inter-state Nataka Academy.
services. r Home Guards (in Uniforms) are allowed
r Monthly passes are issued at the rate of to travel free in City Services while on
Rs.620/-per month in City Services to duty.
the General Public. SAKAL Implementation:
r Widows of freedom fighters are being As per Karnataka Guarantee of Services to
issued free journey coupons worth of Citizen's Act, 2011, the following services
Rs. 2000/- per annum. related to the corporation have implemented
r The children up to age of 18 years who under SAKAL Portal.
has been honored by union
r Issue of bus passes to school children
Government with “Shourya Prashasti”
are issued free pass to travel in r Issue of bus passes to physically
Mofussil, city/suburban, express, challenged
Rajhamsa services throughout the r Issue of free passes to blind persons.
state. r Issue of free passes to Freedom Fighters
r Free travel Facility to recognized press r Issue of free passes to Freedom Fighters
persons in any class of services within widows
the Karnataka state.
r Accident relief claim settlement.
r Free Passes have been issued to the
Dependents of Martyr (Soldiers who
Economic Survey of Karnataka 2019-20 557

New Initiatives: r The construction of Truck Terminal in


Phase-I & II in an area of 13.28 Acres of
r City Buses: NEKRTC has introduced Dasanapura of Bangalore North Taluk
branded city bus services in Kalburgi, (National Highway-4) has been
Bidar, Vijaypur, Yadgiri, Ballari, completed. Land acquisition process
Koppal, Raichur, Hospet, Gangavaathi, for approach road to Truck Terminal is
Sindanur and Sedam. These city buses in final stage. After handing over of
have been fitted with GPS based present land, the approach road work will be
and next stop announcement, LED completed and Terminal will be put in
destination boards, pneumatic doors use for Truck Operators. The cost of the
and comfortably ergonomically Project is Rs.28.00 Crore.
designed seat facility.
ON GOING NEW SCHEMES PROJECT
r Computerized Audio-Video Announcement DURING THE YEAR 2019-20:
System: The Corporation has provided
the Computerized Audio- Video r HOSPET: For the construction of
Announcement System in 53 bus Phase-I Truck Terminal at Amaravathi
stands. Village Hospet Taluk Bellary District in
Financial assistance from HKRDB: an area of 37.82 acres of land. Work
order has been given to the Contractor
r Rs.500.00 lakh grant for the with an amount of Rs.35.00 crore. Work
construction of city bus station at super has been taken up as per Government
market. instructions.
r Rs. 200.00 lakh grant for up gradation The Government of Karnataka has
of Sedam bus station announced the following four Projects in the
r Rs 400.00 lakh grant for construction of Budget for the year 2018-19, out of four
bus stations at Kukanur and Talakal of project, three (sl.No.1-3) Viability Reports
Koppal district were prepared by TECSOK. Some
modifications were suggested. After getting
r Providing pavement concrete to the
the revised report, the proposal will be
premises of Kavithal bus station of
submitted to the Government for further
Manvi taluk (at the cost of Rs 100.00
action.
lakh.)
V. D.DEVARAJ URS TRUCK TERMINALS 1. Construction of 2nd Stage Truck
LTD. Terminal in an area of 6.5 Acre on
Mysore Nanjangud Ring Road.
The Government of Karnataka has
established D.Devaraj Urs Truck Terminals 2. Construction of Truck Terminal/
Ltd Company under the Companies Act, Logistic park/ware houses in an area of
1956 with following objectives. 56-13 acres at Anchetegere village of
Establishment of Truck Terminals for the Dharwad District.
benefit of Lorry/Truck Transporters at 3. Construction of Multi Layer Parking
National Highways in Bangalore and other Building and upgrading of
Cities of the State to avoid Traffic infrastructure facility at Bengaluru
Congestion, Road Accidents, Air Pollution, Yeshwanthapur Truck Terminal.
Facilities for Loading and Unloading the
Goods and providing infrastructure 4. For the construction of Truck
facilities to crew members. Terminal/Highway Amenities in
Chitradurga District with an extent of
ACHIEVEMENTS: 14.00 acres of land. Action will be
initiating to purchase private land from
r D.Devaraj Urs Truck Terminals Ltd has
the Deputy Commissioner, Chitradurga
constructed Truck Terminal in
District.
Bengaluru Yeshwanthpura, Mysore
and Dharwad. These Truck Terminals
are operational.
558 Economic Survey of Karnataka 2019-20

r DANDELI: Construction of Truck concerned Districts have been requested for


Terminal at Dandeli in an area of 3.00 allotment of suitable lands. The above
acres of land which was purchased from Projects will be taken up depending on the
C.M.C at a cost of Rs.11.15 lakhs. availability of land and grant from the
Construction of Truck Terminal will be Government.
taken up during the year.
VI. Vehicle Population:
Further, Company is proposing to construct
Truck Terminal/Logistic Parks/Highway The details of motor vehicles under different
Amenities in Bengaluru, Mangalore, categories from 2016-17 to 2019-20 (upto
Raichur, Chitradurga, Gadag, Vijayapur, November 2019) is presented in Table
Hassan, Bidar, Belgavi and other Districts of 11.27. It may be observed that highest
Karnataka. The Deputy Commissioners of addition of two wheelers, followed by cars.
As on November 2019, out of 2,20,09,700

Table 11.27 : Number of Motor Vehicles under different categories: From 2016-17
to November 2019 (cumulative) (000)

As on
Sl.No. Category of vehicles 2016-17 2017-18 2018-19
Nov. 2019
1 Two wheelers 12955 14105 15376 16135
2 Cars 2110 2300 2495 2612
3 Jeeps 46 47 48 48
4 Omni buses 131 134 137 139
5 Tractors 499 526 557 578
6 Trailers 335 348 361 370
Construction Equipment
7 11 12 14 15
vehicle
8 Other Vehicles 98 105 111 118
Total Non-Transport Vehicle 16185 17577 19100 20,015
1 KSRTC Buses 42 44 45 46
2 Priavte Buses 18 18 19 20
3 Contract Carriages 4 4 4 4
4 Educational Institution Buses 20 23 25 29
5 Other Buses 11 12 12 14
6 Goods vehicles 706 756 826 869
7 Auto rickshaws 403 431 483 495
8 Taxies 292 318 345 362
9 4 to 6 seater vehicles 45 46 51 56
10 Other vehicles(private service
144 148 166 187
vehicles)
Total Transport Vehicles 1685 1800 1976 2082
Total(Transport+ NonTransport) 17870 19377 21076 22,097
Economic Survey of Karnataka 2019-20 559

total vehicles, 20,82,700 vehicles were sanction for taking up New Broad Gauge line
transport vehicles. Out of 2,00,15,000 non- between Tumakuru-Rayadurga at the
transport vehicles, 1,61,35,000 vehicles project cost of Rs.1027.89 Cr. The Railway
were two wheelers. (From April 2019 to project has been taken up on 50:50 cost
November 2019, totally 10,21,478 new sharing basis. Out of 876.67 acres of
vehicles have been registered). required land in Tumkur District Pavagada
and Tumkur taluk 561.72 acres of land has
11.2.3 Infrastructure handed over to Railways. In Koretagere
I. Railway Projects: taluk out of 617.65 acres, 47.63 acres
handed over to Railways. The remaining
1. Munirabad (Ginigere)-Mehaboobnagar
land acquisition process is in progress.
(Raichur) Railway Line Project:
In Rs.239.80 crore of state share Rs.170.00
The total length of this project is 170 Kms crore has been released by the Government
and is taken up on 50:50 cost sharing basis of Karnataka.
with Railways at an revised estimated cost
4.Bagalkot-Kudachi New Railway Line
Rs.1350.91 crore and provide the necessary
land to an extent of 2421.40 acres at free of Project:
cost. The land to an extent of 1007.28 acres The total length of the project is 144 Kms
in Koppal District has been handed over to has accorded sanction for taking up New
south Western Railways. The land to the Broad Gauge line between Bagalkot-
extent of 235.67 acres in Raichur district Kudachi at the project cost of Rs.816.14
has been acquired by the Government of crore. This project was approved and has
Karnataka, the process of acquiring been implementing on 50:50 cost sharing
remaining land is under progress. In basis and provide the necessary land at free
Rs.675.45 crores of state share, Rs.534.12 of cost, between Government of Karnataka
crore has been released by the Government & Ministry of Railways. Out of the cost of the
of Karnataka. project Rs.408.07 Crores of State Share
Rs.148.48 crore for Construction and
2. Tumkur-Davanagere Railway Line
Rs.240.62 Crores towards has been
Project:
released to the Deputy Commissioners and
The total length of the project is 199.05 Kms KIADB(Karnataka Industrial Area
and has taken up on 50:50 cost sharing Development Board) for Land acquisition.
basis with Railway at an estimated cost of Bagalkote-Khajadoni section of 30 Kms
Rs.1801.00 crore and provide the necessary work is completed. The required land in
land to an extent of 2281.40 acres at free of Jamakandi, Mudhol, Gokak, Ramadurga,
cost. At present, out of 1014.95 acres of land Raibagh and Belagavi taluks will be
required in Tumkur and Shira taluks of acquired and handed over to Railways is in
Tumkur District. 1st stage- 135.66 acres of progress.
land handed over to Railways. 389.28 acres
5.Chikkamagalur-Sakaleshpura Railway
of land in Chitradurga, 238.58 acres of land
in Davangere District land acquisition is in Line Project:
progress. In 2nd stage –639.58 acres of land The length of the project is 46 Kms at an
JMC is completed in Hiriyuru taluk of estimated cost of Rs.657.80 crore. This
chitradurga District and 19(1) notification Project has been taken up on 50:50 cost
has been issued. Gok has released Rs.50.00 sharing basis between MoR and GoK. The
crore to South Western Railway for Government has already released Rs.25.00
construction and Rs.80.98 crore released to crore to the South Western Railway and
Deputy Commissioners for land acquisition. Rs.85.14 crore towards the cost of land
acquisition to the Deputy Commissioners,
3. Tumkur-Rayadurga Broad Gauge
land acquisition process is in progress.
Railway Line Project:
The total length of the project is 102.63 Kms.
Government of Karnataka has accorded
560 Economic Survey of Karnataka 2019-20

6.Gadag-Wadi New Railway Line Project: II. Bengaluru Metro Rail Corporation
Limited (BMRCL):
The length of the project is 252.5 Km. This
project has been taken up on 50:50 cost The Project is being implemented through a
sharing basis between GoK and Ministry of Special Purpose Vehicle (SPV) Bangalore
Railways at an estimated cost of Rs.1922.14 Metro Rail Corporation Limited (BMRCL),
crore and to provide required land free of with an equal share holding owned by
cost to South Western Railway. The Government of India and Government of
Government has approved the required land Karnataka.
at free of cost. The entire required land is
Bangalore Metro Rail Project Phase-1 is
acquired through Karnataka Industrial Area
having a track length of 42.3 Kms, the
Development Board. So far out of 3926
Project cost is Rs. 13845.01 crore and it is
acres, 1877.77 acres of land handed over to
having two corridors.
Railways. Land acquisition process is in
progress for remaining 2048.23 acres. The East-West corridor is 18.10 km. long,
Rs.256.62 crore has released to KIADB for starting from Baiyappanahalli and
land acquisition and Rs.105.28 crore terminating at the Mysuru Road Terminal.
released to South Western Railway for The stations coming along this corridor are
construction. Baiyappanahalli, Swamy Vivekananda
Road, Indiranagar, Halasuru, Trinity,
7. Shimoga-Shikaripura-Ranebennur New
Mahathma Gandhi Road, Cubbon Park,
Railway Line Project: Dr. B.R. Ambedkar, Vidhana Soudha,
Shimoga-Shikaripura-Ranebennur New Sir M. Visvesaraya Stn., Central College,
Railway Line Project has been taken up on Nadaprabhu Kempegowda Station
50:50 cost sharing basis between GoK and Majestic, Kranthiveera Sangolli Rayanna
Ministry of Railways at an estimated cost of Railway Station, Magadi Road,
Rs.956.00 crore. The length of the project is Shri Balagangadharanath Swamiji Stn.,
192 Km. The Government has approved the Hosahalli, Vijayanagar, Attiguppe,
required land at free of cost. The required Deepanjalinagar, Mysuru Road Terminal
land acquisition process from Deputy Stations.
Commissioner is under progress. The 24.20 km. North-South Corridor begins
8. Kolar Coach Factory: at Nagasandra Terminal and terminates at
the Yelachenahalli Terminal. The stations
Government of Karnataka has agreed to coming along this corridor are Nagasandra,
setup Rail Coach Factory in Kolar District, Dasarahalli, Jalahalli, Peenya Industry,
by sharing 50:50 of construction cost in Peenya, Goruguntepalya, Yeshwanthpur,
addition to providing 1118.8 acres free of Sandal Soap Factory, Mahalakshmi,
land. Memorandum of Understanding (MoU) Rajajinagar, Srirampura, Mahakavi
entered into between Railways & Kuvempu Road, Mantri Square Sampige
Government of Karnataka. Railway Board Road, Nadaprabhu Kempegowda Station
was reviewing the capacities of Rail Coach Majestic, Krishna Rajendra Market,
Factories in India. Project report is under National College, Lalbagh, South End
scrutiny by the Railways. GoK awaited the Circle, Jayanagar, Rashtriya Vidyalaya
Railways report. Road, Banashankari, Jayaprakash Nagar,
9. Road over bridge(RoB)/Road under Yelachenahalli Stations.
bridge(RuB) Project work: The Phase-1 of the Bangalore Metro Rail
The State Government has accorded Project works are completed in stages from
administrative approval to take 41RoB/RuB 2011 and commercial operations started.
works on 50:50 cost sharing basis at an Entire Phase-1 project has been completed
estimated cost of Rs. 593.902 crore and on 17.06.2017. 31 Numbers 6 coach metro
released an amount of Rs. 357.964 crore so rail is under operation, 22 Numbers in East-
far. Railways have completed 8 RoB/RuBs, West corridor and 09 Numbers in North-
and the other works are in progress. South corridor. It is programmed to convert
Economic Survey of Karnataka 2019-20 561

all 3 coaches into 6 coaches by March-2020. r Reach -6 (Elevated): From Gottigere to


Daily on an average of 4 lakhs passengers dairy circle 7.25 Kms Civil works under
are traveling. progress.
Bangalore Metro Rail Project Phase-2: r Reach -6 New Line (Underground):
From Dairy Circle to Nagawara 14.00
The Phase-2 of the Bangalore Metro Rail Kms. There are 4 Civil tender packages,
Project was sanctioned by GOI in February 2 are under progress and remaining 2
2014. The Project consists of Four packages will be starting shortly.
Extensions to the existing lines and two new
lines. The total length of Phase-2 is 72.095 The physical and financial progress
km with 60 stations (48 Elevated and 12 as on November 2019 is 39% and 37%
Underground). The estimated project cost is respectively.
Rs. 30695 Crore. The details of summary of Phase-2 works are programmed to complete
breakup of costs for new lines are given in in stages from August-2020 and entire work
the Table 11.28. is programmed to complete by June-2024.
STATUS OF PHASE-2: New Project for the year 2019-20:
Details of Physical Progress are as below: Bangalore Metro Rail Project Phase-2A:
r Reach-1Extn.: Baiyappanahalli to Silk Board to K.R. Puram (Outer ring road)
Whitefield 15.50 Kms Civil works are 19.5 Km length is approved by
under progress. the Government of Karnataka for
r Reach-2 Extn.: Mysore Road to Kengeri Rs. 5446.73 crore. Innovative plan has been
6.465 Kms Civil works are under designed for financing. Work will be started
progress. after getting approval from the Government
of India.
r Reach-3 Extn.: Nagasandra to BIEC
3.77 Kms Civil works are under Bangalore Metro Rail Project Phase-2B:
progress.
K.R. Puram Metro Station to Kempegowda
r Reach-4 Extn.: Yelachenahalli to International Airport Bangalore via Hebbal
Anjanapura Township 6.290 Kms Civil having a length of 38 Kms is approved by the
works are under progress. Government of Karnataka for Rs. 9934.58
r Reach -5 New Line: From R.V. Road to crore. It contains 17 stations. The work will
Bommasandra 18.820 Kms Civil works be started soon after getting approval from
under progress. the Government of India.

Table 11.28: Summary of breakup of costs for new lines:

Name of the Line Length of Estimated Completion


the line in Cost
Km (Rs. in Crore)
Baiyappanahalli to ITPL – Whitefield 15.500 5,449.00
Mysore Road Terminal to Kengeri 6.465 2,019.00
Hesaraghatta Cross to BIEC 3.770 1,147.00

Yalachenahalli to Anjanapura Township 6.290 2,363.00

R.V. Road to Bommasandra 18.820 6,900.00

Gottigere to Nagawara 21.250 12,817.00

72.095 30,695.00
562 Economic Survey of Karnataka 2019-20

Proposed Project: Shivamogga Airport Development and


to deposit the amount in court
Bangalore Metro Rail Project Phase-3: for connection with the Belgavi airport
In 2018-19 Budget, feasibility study for is Rs. 3.07 crore and Rs. 5.47 lakhs
105.55 kms new metro lines has been has been released. The Operation of
proposed. Kalaburagi Airport has been
commenced on 22-11-2019.
III. AIRPORT:
r Head of Account "3451-00-090-1-18-
Head of account wise target for the financial 059- Regional Aviation Connection
year 2019-20 for airports are given in Table Plan- From the allocation of Rs.20.00
11.29. crore, Rs.11.66 crore has been released
for VGF (Viability gap funding) and Fire
Following are the major activities
Fighting Services and Security
undertaken:
Equipments for the selected airports in
r Head of Account “5465-01-190-01-05- the regional aviation project.
132-Development of Small Airports – IV. Ports and Inland Water Transport:
Capital” : From the allocation of
Rs.150.5259 crore, Rs.6.00 crore Karnataka has a coastline of 300 km with
released for Kalaburagi Airport one major port and 12 minor ports. While
Development, Rs.6.00 crore released for the New Mangalore major port is under the
control of Ministry of Shipping, Government

Table 11.29: Head of account wise target for the year 2019-20 for airports

Budget for Expenditure up


Sl.
Head of Account 2019-20 to Nov 2019
No.
(Rs. Lakhs) (Rs. Lakhs)

1 Development of Minor Airports -Ca- 5465-01-190-1- 15052.59 2084.39


05-132

2 Bangalore International Convention Centre 0.25 0.00


5465-01-190-1-22-211

3 Alternate Roads- Capital Investment. 5465-01-190- 1000.00 0.00


2-05-211

4 Land acqui sition for Trumpet Interchange 1000.00 0.00


investments-Capital Investment – 5465-01-190-2-
06-211

5 Bangalore Business Signature Park- Capital 6600.00 0.00


Expenses – 5465-01-190-2-07-132

6 Development of Minor Airports Building Expenses. 104.00 0.00


3451-00-090-1-11-071.

7 Regional Air Connectivity other expenses. 2000.00 1166.58


3451-00-090-1-18-059

8 Aviation Development Cell-Other Expenses. 0.25 0.00


3451-00-090-1-20-059

TOTAL 25757.09 3250.97


Economic Survey of Karnataka 2019-20 563

of India and remaining 12 minor ports are Development of Pavinakurve Port in


under the control of the State Government. Honnavar Taluk is taken up under Swiss
Among the 12 minor ports, Karwar and Old challenge method with 14 MPTA capacity at
Mangalore ports have handled significant an estimated cost of Rs.1767.00 Cr. The
volumes of cargo (Table 11.30). DPR has been prepared by M/s JSW,
Mumbai and I-deck has updated & finalized
To provide better infrastructure facilities by
the DPR with assistance of Indian Ports
developing State minor ports with Private
Association (IPA) and submitted to the
Investment, the State Government
Government with bid documents.
formulated “Karnataka Minor Port
Development Policy-2014” and the process Establishment of Karnataka Maritime
for development of Honnavar, Belekeri and Board
Pavinakurve Ports on PPP Mode has been
initiated. The Karnataka Maritime Board has been
established with effect from 19.03.2018 in
The Government has sanctioned 8,47,560 order to provide for the rapid development
Sqm of port land on lease basis to M/s and management of Ports & Inland
Honnavar Port Pvt. Limited (HPPL), Waterways and Coastal region of the state
Hyderabad at Honnavar port to handle 5 vide the Karnataka Maritime Board Act
MTPA cargo. The DPR has been approved by 2015. This Act has received the assent of the
the Government and statutory clearances Hon'ble President of India on 11.05.2017.
have been obtained by the developer. The Chief Executive officer of I.A.S. cadre
Designs for construction of jetty, has been appointed on 09.05.2019 by the
breakwaters & undertaking dredging works State Government. Shri.Ujwal Kumar
have been approved by the Director and at Ghosh, IAS, has taken charge on 10-06-
present the Jetty work is under progress. 2019.
Ministry of Shipping (MoS), Government of CENTRALLY SPONSORED COASTAL
India has prepared “Techno Economic BERTH SCHEME
Feasibility Report” (TEFR) for development
of Belekeri Port near Keni village in Ankola Government of India has approved revised
Taluk as a Satellite port to New Mangalore Central Sector Scheme for providing
Port Trust (NMPT) with 10 MTPA capacity at support to Major/ Non-major Ports/ State
an estimated cost of Rs.1720.00 Cr. Government for creation of infrastructures
Government of Karnataka has given to promote movement of cargo/ passengers
concurrence to TEFR prepared by Ministry by sea/National waterways. The CSS
of Shipping. Scheme is administered by Ministry of

Table 11.30: Crago Handled by State Minor Ports

Cargo handled in 1000 MT

Ports 2019-20 up to
2015-16 2016-17 2017-18 2018-19 November
2019

98.00 121.67 74.59 98.00 35.52


Old Mangalore

Karwar 714.00 582.80 599.12 946.16 593.28

Malpe, Belekeri,
3.00 3.05 1.39 0.22 --
Hangarkatta&Kundapur

Total 815.00 707.52 675.10 1044.38 628.80


Source: Directorate of Ports and Inland Water Transport
564 Economic Survey of Karnataka 2019-20

Shipping with the following conditions for –SM- PART-II dated : 15-09-2017
assistance. r GOK Sanction No. PWD 125 PSP 2017
r The financial assistance under the dated : 21-03-2018.
scheme will be given only for (a) r EIA clearance is obtained. The Financial
Construction/upgradation of (i) bid is submitted to the Government for
exclusive coastal berths for coastal approval
cargo (ii) berths/jetties for passenger
PROJECT 2 - Construction of Existing
ferries in major/Non–major ports (b)
south breakwater by 145 m &
Construction of platforms/jetties for
construction of new north breakwater of
hovercrafts/seaplanes by Ports
(Major Ports, Non major Ports/State 1160 m at Karwar Port.
Governments) in port waters and (c) r Cost of the Project : Rs.215 Cr. (GOI
construction of berths/jetties in Share-Rs.50 Cr. and released Rs.25.00
National Waterways and Islands by Cr. & GOK Share Rs.165 Cr.)
State Governments concerned (iv) r GOI Sanction No.C2- 25021 /11/2017
mechanization of coastal berths for –SM (PART-III )dated : 27-09-2017
Major Ports and Non-major Ports (v)
Capital dredging grant for operating r GOK Sanction No. PWD 127 PSP 2017
non-major ports and (vi) construction of dated : 21-03-2018.
breakwater for existing and Greenfield r Preliminary bathymetric survey work
ports. has been completed and work is under
r Financial assistance would be upto 50% progress for the 1st phase work of
of the total cost of the project subject to construction of 880 Mtr. Northern
(i) a maximum of Rs.25 Cr. for project breakwater with an estimated cost of
relates to construction / upgradation of Rs.125.00 Cr.
coastal berths by Major/Non-major EIA Clearance is obtained for the 2nd phase
ports, (ii) a maximum of Rs.10 Cr. for work of Rs.90.00 Cr. (215.00-125.00 Cr)
construction of platforms/ jetties for which includes, Extension of 145 Mtr.
hovercrafts & seaplanes by Ports / State Southern breakwater with an estimated cost
Governments & passenger jetties in of Rs.39.00 Cr. and construction of 280 Mtr.
National Waterways and islands by (Ch.880 to 1160 Mtr.) Northern breakwater
State Governments, (iii) a maximum of with an estimated cost of Rs.51.00 Cr.
Rs.15 Cr. for mechanization of berths Action has been taken for extension of
by Major/Non-major ports (iv) a southern breakwater with an estimated cost
maximum of Rs.50 Cr. for capital of Rs.39.00 Cr. Construction of 280 Mtr.
dredging of operational Non-Major Ports northern breakwater will be commenced
; and (v) a maximum of Rs.50 Cr. for after the completion of 1st phase
construction of breakwater for existing work of construction of 880 Mtr. northern
and Greenfield ports. The balance breakwater.
expenditure has to be incurred by the
PROJECT 3 - Capital dredging at Old
respective ports/concerned State
Government from their own resources. Mangalore Port (Bengre side).
r Ministry of Shipping, GoI has approved r Cost of the Project : Rs.29 Cr. (GOI
the following 4 State Projects to be taken Share-Rs.14.50 Cr. and released
up at Karwar and Old Mangaluru Port. Rs.7.25 Cr. & GOK Share Rs.14.50 Cr.)
PROJECT 1 - Construction of Coastal r GOI Sanction No.: C2-25021/11/2017-
Berth of 250 mtr at Karwar Port SM-PART I: Dt. 14.09.2017.
r GOK Sanction : G.O. No PWD 124 PSP
r Cost of the Project : Rs.61 Cr. (GOI
2017, Dt. 21.03.2018.
Share-Rs.25 Cr. and released Rs.12.50
Cr. & GOK Share Rs.36 Cr.) r Draft tender schedule is submitted for
approval. Rapid EIA studies completed.
r GOI Sanction No.C2- 25021/11/2017
EC clearance is awaited in the meeting
scheduled on 02.12.2019.
Economic Survey of Karnataka 2019-20 565

PROJECT 4 - Construction of Coastal ADB loan project. Shoreline Management


berth at Old Mangalore Port Plans for the entire Karnataka and for the 3
coastal districts have been prepared. This
r Cost of the Project: Rs.65 Cr. (GOI plan is now being updated with more
Share-Rs.25 Cr. and released Rs.12.50 detailed information. A fully functional
Cr. & GOK Share Rs.40 Cr.) Coastal Management Information System
r GOI Sanction No.: C2-25021/11/2017- has been developed for the first time for the
SM Dt. 14.09.2017. state. A series of training programs have
r GOK Sanction G. O. No. PWD 123 PSP been conducted to the key stakeholders on
2017, Dt. 21.03.2018. various topics related to coastal processes,
coastal protection, coastal regulations,
r Draft tender schedule is submitted for
environmental and construction
approval. Rapid EIA studies completed.
management.
EC clearance is obtained.
Coastal Protection Works: 11.2.4 Telecommunication
During the year 2018-19 an amount of The telecommunication system in the State
Rs.32.91 crore has been spent under the is operated by both private and public sector
head of Account 4711 and constructed 2540 undertakings. Apart from BSNL, a number
m long rubble mound sea walls at severe of private companies like Vodafone,
eroding areas of 3 coastal districts. Rs. 9.80 Reliance, Aircel, Airtel, Bharati, TATA,
crore budgetary allocation has been MTNL etc. are providing the wireless and
provided for the year 2019-20 for wireline phones. The number and
construction of 900 m length of long term percentage of wireless and wireline
coastal protection works. These works are subscribers in Southern States is presented
under progress. in Table 11.31.

Sustainable Coastal Protection & The teledensity (both BSNL and private
Management Program: cellular operators) in the southern states is
presented in Table 11.32. Karnataka
Sustainable Coastal Protection and stands in 3rd position among the southern
Management Plan with loan assistance from states in total teledensity .
Asian Development Bank at an estimated
cost of Rs.911 crore is being implemented. Compared to previous year 27 telephone
Under Tranche-1, coastal protection works exchanges have decreased during the year
were taken up at Ullal, Dakshina Kannada 2018-19 in our state. The number of
District for construction of 8 inshore berms, landline connections has declined
2 offshore reefs and 1300m of breakwater significantly. The decline in landlines can be
and an expenditure of Rs.246.11 Crore has partly attributed due to increased private
been incurred up to November 2019. participation in the mobile telephony sector
and switchover to mobile phones. The
Under Tranche-II, coastal protection works trends in postal services suggest that there
are being taken up at Someshwara in is a sudden decline in the total number of
Dakshina Kannada District, Yermal post offices for the year 2018-19. This may
Thenka, Udyavara, KodiKanyana, be due to merger of post offices in urban
KodiBengre and Marvanthe in Udupi areas. The details of number of post offices,
Districts for a coast length of about 54.00 telephone exchanges and number of
km at an estimated amount of Rs.620.20 telephones are presented in Table 11.33.
crore and an expenditure of Rs.245.58 has Appendix 11.13, 11.14 and 11.15 indicate
been incurred during the year 2019-20 upto the No.of Post Offices, No. of Telephone
November -2019.. Exchanges and No. of Telephones in
A Coastal Infrastructure Management Unit Karnataka from 2009-10 to 2018-19.
has been established as a requirement of the
566 Economic Survey of Karnataka 2019-20

Table 11.31 : Number of Wireless & Wireline Subscribers in Southern States


(subscribers in Millions)

States Subscribers Percentage


Tamil Nadu (incl. Chennai) 84.25 19.85
Kerala 46.12 10.87
Maharashtra 94.07 21.17
Mumbai 41.27 9.72
Karnataka 70.27 16.56
Andhra Pradesh 88.35 20.82
Total 424.33 100.00

Source: Indian Telecom Services Performance Indicator Report for Quarter ending June, 2019

Table 11.32 : Southern States Teledensity


Service Area Rural Teledensity Urban Teledensity Total Teledensity

Tamil Nadu(incl.Chennai) 84.43 137.50 117.78


Kerala 78.40 270.63 126.81
Maharashtra(incl .Mumbai) 69.36 143.62 106.10

Karnataka 61.69 181.71 109.64


Andhra Pradesh 64.54 182.27 50.83

All Indi a 56.99 160.78 90.11

Source: Indian Telecom Services Performance Indicator Report for Quarter ending June, 2019.

Table 11.33 Number of Post Offices, Exchanges and Telephones


Telepho ne
Year Po st offices Telephones
E xchanges
2009- 10 9820 2694 21878 02
2010- 11 9772 2789 20404 56
2011- 12 9703 2884 19518 78
2012- 13 9686 2802 16703 78
2013- 14 9681 2806 15359 31
2014- 15 9340 2844 13891 92
2015- 16 9661 2793 12947 26
2016- 17 9 662* 2793 12298 13
2017- 18 9 663* 2787 11474 20

2018- 19 962 0** 27 60** 10 10759 **

Source: 1) General Manager, Telecom Office, Karnataka Circle, Bengaluru , *Chief Post Master General
Office, Karnataka Circle, Bengaluru & ** Karnataka State at Glance- Statistical Report- FY 2018-19
Economic Survey of Karnataka 2019-20 567

11.3 BANKING AND FINANCE INCLUDING Disbursement of credit in rural areas takes
COOPERATIVES place through co-operatives, commercial
banks and regional rural banks.
11.3.1 Introduction:
National Bank for Agriculture and Rural
Karnataka State has a fairly well developed Development (NABARD), as an apex level
financial infrastructure. The State has financial institution, plays a lead role in the
pioneered in establishment of many leading promotion of agriculture and rural
commercial banks and is home to a wide development, by preparing Potential Linked
network of commercial bank branches in Credit Plans (PLPs) and annual action plans
the country. The banking business is at the grass root level. A major portion of
predominantly contributed by seven NABARD's refinance and developmental
commercial banks constituting almost initiatives are channellised through the
three-fourths of the banking business. banking sector.
Currently, eighteen public sector banks,
twenty private commercial banks, two Karnataka – Banking scenario
regional rural banks, two small finance An overview of the position of the banking
banks and one payment's bank are network in Karnataka during the last 5
operating in the State. years is furnished below:
Table 11.34 : Branch network

Increase/
Sl. March March March March
Branch Network Decrease in
No. 2016 2017 2018 2019
2019-20

1 Rural 3941 3987 4039 4053 14

2 Semi urban 2449 2543 2441 2554 113

3 Urban 2046 2207 2172 2268 96

4 Metro/PT 2066 2231 2155 2265 110

Total Branches 10502 10968 10807 11140 333

Source: State Level Bankers Committee, Karnataka

Table 11.35: category wise Bank Branch network-year ending


Sl. March March March
Branch
No 2017 2018 2019
1 Commercial Banks 8168 7952 8260*
2 Regional Rural Banks 1769 1797 1816
3 KASCARD 203 202 202
4 DCC bank(K.S.co-op Apex Bk) 758 786 830**
5 Karnataka Industrial co-operative bank 38 38 -
6 KSFC 32 32 32
Total 10968 10807 11140
Source: State Level Bankers Committee, Karnataka
* including 2 Small Finance Bank & 1 payment bank
** including Industrail co-op banks
568 Economic Survey of Karnataka 2019-20

The ever growing demand for institutional Out of the total number of 11140 branches
finance in the state has resulted in of all the agencies as on 31 March 2019, as
expansion of banking network and credit many as 4053 branches ( 36.38%) and 2554
flow. There were 755 bank branches during branches (22.92%) are operating in Rural
the time of Nationalisation of Banks in the and Semi-Urban areas respectively.
year 1969. Since then 10385 Bank
branches have been added by March 2019 11.3.2: Deposits and Advances:
thus taking the total Bank branches to The aggregrate deposits of all the
11140 as shown in the above Table 11.34. banks(commercial, RRBs and cooperative)
In the last couple of years there has been stood at Rs. 894824.56 crore as at the end of
special impetus to increase branch March 2019, an increase of Rs.93898.75
networking in Rural and Semi urban areas crore compared to last year (March 2018),
compared to urban and Metro areas. registering an growth of 11.72 %cent.
Increased network is providing better access Similarly, the total outstanding advances of
of financial services to people in urban and all the banks in the state stood at
rural areas.

Table 11.36 : Aggregrate Bank Deposits and Gross Credit in selected states
(Rs.in crore)
2019-20

State Number of
Aggregrate Gross
Reporting Rank Rank
Deposit Credit
offices
Maharastra 12917 2611882 1 2695456 1
NCT of Delhi 3623 1216958 2 1204536 2
UP 17395 1082319 3 450319 7
Karnataka 10372 981260 4 661527 4
Tamilnadu 11315 838282 5 914610 3
West Bengal 8936 802424 6 383383 8
Gujarat 8246 708492 7 530740 5
Kerala 6524 517779 8 338128 10
Telangana 5205 481080 9 484662 6
Haryana 5011 442572 10 252654 13
Rajasthan 7491 402457 11 315149 11
Punjab 6477 399377 12 230799 14
Madhya Pradesh 6948 388378 13 256985 12
Bihar 7215 356924 14 126014 15
Odisha 5029 321940 15 121988 16
Andhra Pradesh 7032 310290 16 379017 9
All India 147210 13041717 9862159

Source: quarterly statistics issued by R.B.I.-Sept. 2019


Economic Survey of Karnataka 2019-20 569

Rs. 714923.66 Crore as against the level of on march 2019 is 79.89 percent, which has
advances of Rs 615843.41 crore recorded a increased compared to previous year as
year ago indicating a growth of 16%. The shown in the Table 11.37.
credit deposit ratio (C-D Ratio) of the state as

Table 11.37: performance of scheduled commercial & other banks.


Sl .
Indicator U nit 20 1 6-17 2 01 7 -2 01 8 2 01 8 -1 9
N o.
B ranch network
A)Co mme rcial B an ks
(inc ludi ng 2 S FB N o. 81 68 7952 8 260
& 1 P ay men t ban k)
1 B)Reg io nal Rur al
N o. 17 69 1797 1 816
Ban ks
C)Co -o per ative Ban ks
N o. 10 31 1058 1 064
etc.
Total No . 10 9 68 1 0 80 7 1 11 4 0
D ep osits
A)Co mme rcial B an ks
Rs.in
(inc ludi ng 2 S FB & 1 708 301.7 1 7311 46.41 82 0427 .32
cr ore
Payme n t b an k)

2 B)Reg io nal Rur al Rs.in


369 96.4 9 3796 8.43 39 329. 72
Ban ks cr ore
C)Co -o per ative Ban ks Rs.in
270 84.6 7 3181 0.97 35 067. 52
etc. cr ore
Rs.in
Total 7 7 23 82 .8 7 8 00 9 25 .8 1 8 9 48 2 4. 56
cr ore
A dvances
A)Co mme rcial B an ks
Rs.in
(inc ludi ng 2 S FB & 1 500 601.5 7 5528 68.62 64 7079 .68
cr ore
Payme n t b an k)

3 B)Reg io nal Rur al Rs.in


277 42.1 4 3064 9.81 32 627. 23
Ban ks cr ore
C)Co -o per ative Ban ks Rs.in
348 65.2 8 3232 4.98 35 216. 75
etc. cr ore
Rs.in
Total 5 6 32 08 .9 9 6 15 8 43 .4 1 7 1 49 2 3. 66
cr ore
C red it-D ep osit R atio
A)Co mme rcial B an ks
(inc ludi ng 2 S FB & 1 % 7 0.68 75 .62 78.87
Payme n t b an k)

4 B)Reg io nal Rur al


% 7 4.98 80 .72 82.95
Ban ks
C)Co -o per ative Ban ks
% 12 8.73 95 .88 1 00.4 2
etc.

Total % 7 2 .9 2 7 6 .89 79 .8 9

Source: State Level Bankers Committee, Karnataka


570 Economic Survey of Karnataka 2019-20

11.3.3 Priority Sector Advances : II Ground Level Credit Flow for


The Priority Sector Advances of all the Agriculture:
Banks in the State amounted to Rs.293743 The State has consistently been achieving
crore in march 2019 as against Rs. 261671 its overall targets under ACP except for the
crore as on march 2018 showing an year 2018-19. The disbursement under crop
increase of Rs.32072 crore recording a loan were 57.27% and 58.22% as against
growth of 12.25%. It contributed to 41.08 % the ACP target for 2017-18 and 2018-19
in total advances, which is marginally respectively. The achievement under
higher than the stipulated 40% by RBI. Agriculture Term Loan ranged between
The Agricultural advances stood at Rs. 94.6% to 264.90% of the respective targets
129913 crore constituting 18.17 % of total during 2014-15 to 2018-19.
advances in march 2019. Credit disbursed (b) Annual Credit Plan 2019-20 and
by the banks towards the MSME sectors performance as on 30 September 2019 :
stood at Rs. 119027 crore as against
Rs.83067 crore as on March 2018. The Union Finance Minister in his budget
Similarly, Advances to the weaker section speech for the year 2019-20 has announced
stood at Rs.95694 crore as on march as the ground level credit target for agriculture
againt Rs. 87745 crore as on March 2018. at Rs.13,50,000 crores. Considering the
budgetary formulations and on the basis of
Details of the Priority Sector Advances is as the ground level disbursements, the
shown in the table 11.38. projections made by NABARD in the
11.3.4. NABARD (National Bank for Potential Linked Plans, the annual credit
Agriculture and Rural Development) came plan for Priority Sector advances for the
into existence on 12 July 1982 by year 2019-20 for the State of Karnataka has
transferring the agricultural credit been pegged at Rs.212517 crore. The crop
functions of RBI and refinance functions of loan target has been fixed at Rs.72816 crore
the then Agricultural Refinance and and agriculture Term loan target at
Development Corporation (ARDC). It was Rs.42122 crore.
dedicated to the service of the nation by the During the period ended 30 September
late Prime Minister Smt. Indira Gandhi on 2019, Banks have disbursed Rs.90465
05 November 1982. crore under ACP 2019-20 against annual

Table : 11.38 : Distribution of Priority Sector Advances (Amount in crore)


March 2017 March 2018 March 2019
Sl. % to % to % to
Indicator
No. Advances Total Advances Total Advances Total
Advances Advances Advances
Total
1 563209 -- 615843 -- 714923 --
Advances
Total Priority
2 Sector 256093 45.47 261671 42.49 293743 41.08
Advances(PSA)
3 Agriculture 116007 20.60 131037 21.28 129913 18.17
4 MSMEs 78598 13.96 83067 13.49 119027 16.64
Weaker
5 80587 14.31 87745 14.25 95694 13.38
Sections

Source: State Level Bankers Committee, Karnataka


Economic Survey of Karnataka 2019-20 571

(a) Performance under Annual Credit Plan (ACP) during last 5 years from 2014-2015
to 2018-19 (Rs. in Crores)

2014-15 2015-16 2016-17 2017-18 2018-19


Particulars
Target Ach. Target Ach. Target Ach. Target Ach. Target Ach.

Crop Loan 39,252 38,50 6 41,600 29,155 48,908 39,056 58562.88 33538.75 64972.28 37824.00

Term Loan 17,995 19,34 7 21,020 55,679 23,983 40,181 28127.17 55566.13 33682.25 31879.00

Total Agri. 57,247 57,853 62,620 84,834 72,891 79,237 86690.05 89104.88 98654.53 69703.00

Percentage : Achievement to target

Crop Loan 98 70.1 79.85 57.27 58.22

Term Loan 108 264.9 167.53 197.55 94.65

Overall 101 135.5 108.70 102.78 70.65

(Source SLBC)

Agency wise performance under Annual Credit Plan as on 30.09.2019 was as under.
(Rs. in Crores)
Annual Disbursement as on 30.09.2019
target % Ach as on
Sector Comm. Coop
2019- RRBs KSFC Total 30.09.2019
20 banks Banks

Agri and Allied 114938 28086 4927 6815 293 40120 34.91
MSME 54074 41288 981 0 628 42898 79.33
Export credit 2611 3405 0 0 0 3405 130.41
Education 4971 680 33 0 0 713 14.34
Housing 25577 2176 158 0 56 2390 9.34
Social Infrastructure 1490 37 0 0 0 37 2.48
Renewable Energy 1275 2 0 0 0 2 0.16
Others 7581 515 151 0 234 900 11.87
Total PSA 212517 76189 6250 6815 1211 90465 42.57
Crop Loan 72816 7509 3567 6542 0 17618 24.19

(Source SLBC)

target of Rs.212517 crore recording an Cooperative Banks and Regional Rural


achievement level of 42.57 % under total Banks at a concessional rate of 4.5%. It
priority sector. also extends refinance to Scheduled
Commercial Banks at the same rate for
B. Production Credit for Short Term the ceded PACS.
(Seasonal Agricultural Operations)
(ii) Additional Short Term (Seasonal
(I) NABARD extends refinance to Agricultural Operations) at a very
572 Economic Survey of Karnataka 2019-20

competitive rate (at present – 7.35 %) the various short term credit
has been introduced in addition to the requirements of handloom weavers,
normal ST (SAO) product. The basic master craftsmen, Handloom Weavers'
objectives of the product are as follows: Groups, Primary Weavers Coop
Societies and Apex Weavers Coop
r To address severe liquidity problems in
Societies.
banks, particularly of cooperative banks
in meeting the fresh loan requirements (iv) Interest Subvention Scheme of the
of the farmers in the current season. Government of India (GoI)
r To make available cheaper funds at NABARD is the implementing agency for the
nominal cost to the Cooperatives and Interest Subvention Scheme of Government
RRBs so as to enable them to be in the of India for Regional Rural Banks and
competitive market for financing Cooperative Banks. GoI provides 2%
Seasonal Agriculture Operations. interest subvention to banks for extending
The major advantage of the product is that crop loan out of own funds at 7% p.a. upto
the refinance availed by banks under new Rs.3.00 lakh per borrower. This subvention
line of credit can be reckoned as own is available from the date of disbursement to
resources for banks and is eligible for the date of repayment or due date fixed by
interest subvention as per extant Interest the bank whichever is earlier subject to a
Subvention Guidelines issued by maximum of 365 days.
Government of India.
Government of India also provides interest
(iii) Short Term Credit for purposes incentive @ 3% to the farmers who promptly
other than crop production repay their crop loan on or before the due
date. This incentive is also available from
(a) NABARD extends Short Term (Others) the date of disbursement to date of
refinance to Cooperative Banks and repayment or due date fixed by the bank
Regional Rural Banks to meet other whichever is earlier subject to a maximum of
short term credit requirements of 365 days.
farmers other than crop production
such as marketing of crops, fisheries, (v) Progress under Kisan Credit Card
industrial cooperatives, working capital Scheme in Karnataka:
loans for economic activities, bonafide
commercial and trading activities, etc. (vi) Scheme for Extending Financial
Assistance to Sugar Undertakings
(b) NABARD also extends Short Term (SEFASU), 2014
(Weavers) refinance to Cooperative
Banks and Regional Rural Banks and NABARD is the implementing agency for the
Scheduled Commercial Banks to meet SEFASU scheme of GoI. Under the above

((v) Progress under Kisan Credit Card Scheme in Karnataka


Out of which
No. of live KCCs
Name of the Agency ATM enabled KCCs
as on 31.10.2019
(Rupay KCC)
Karnataka Gramin Bank 236702 218734
Karnataka Vikas Grameena
287835 50232
Bank
Total (Grameena Banks) 524537 268966
Cooperative Banks 2622938 1339532
Grand Total 3147475 1608496
Economic Survey of Karnataka 2019-20 573

Scheme, the loan sanctioned by the Banks Sugar Mills to facilitate payment of cane
will be utilized by the sugar mills for clearing dues of the farmers for the current sugar
cane payment arrears of previous sugar season 2018-19 vide Notification dated 2nd
seasons and timely settlement of cane price March 2019. In terms of the said
of current sugar season as per the Fair and notification, NABARD is the Nodal Agency
Remunerative Price (FRP) fixed by the for interacting with DFPD and managing
Central Government to the sugarcane interest subvention under the scheme.
farmers. Interest subvention upto 12% or at
the actual rate charged by the banks, (viii) Kisan Credit Card Scheme -
whichever is lower, as per the normal Working Capital for Animal Husbandry
banking practice will be provided to the and Fisheries
sugar mills through participating RRBs and In the Budget 2018-19 the Union
Cooperatives for the total duration of the Government had announced their decision
loan i.e. 5 years including moratorium for 2 to extend the facilities of Kisan Credit Card
years. Loans sanctioned by 30 June 2014 (KCC) to Animal Husbandry farmers and
and disbursed by 30 September 2014 by the Fisheries (AH & F) to help them meet their
lending banks, pursuant to the GoI working capital requirements. In pursuance
notification, were eligible for interest of the said budget announcement the KCC
subvention facility. In Karnataka, 4 facility for working capital requirement for
DCCBs viz., Bagalkot, Belagavi, Bidar and activities related to Animal Husbandry and
Vijayapura sanctioned and disbursed the Fisheries. NABARD has issued guidelines
loan (equivalent to last three years sugar in this regard during the financial year
seasons' excise duty, cess and surcharge on 2019-20.
sugar) to 20 sugar mills functional during
2013-14 sugar season under the Scheme. C. Investment Credit for Agriculture:
Interest Subvention claims are being (i) Resources for Capital formation /
submitted quarterly by the DCCBs to SBI Term Lending in Agriculture
which is the nodal bank for settlement of
claims through NABARD. NABARD has been supplementing the
resources of banks and other eligible
(vii) Scheme for Extending Soft Loan to agencies by refinancing the credit
Sugar Mills to facilitate payment of cane extended by them for capital formation
dues of the farmers for the current sugar in agriculture and allied activities.
season 2018-19:
(ii) The agency-wise details of refinance for
Department of Food and Public Distribution term loans disbursed in Karnataka
(DFPD), Government of India has notified during the last 5 years were as under.
the Scheme for Extending Soft Loan to

The agency-wise details of refinance for term loans disbursed in Karnataka during the
last 5 years. (Rs. in crore)

Agency/ Year 2014-15 2015-16 2016-17 2017-18 2018-19

Comml. Banks 1,427.14 2,313.53 1,817.10 2742.32 5745.46


Coop. Banks 1,381.46 1,269.14 1,405.05 1556.33 1387.29

RRBs 916.72 1,748.46 1,601.57 1238.66 1520.27

NABFINS 401.22 525.77 285.10 792.53 568.55

NBFC 110.00 660.00 2,078.00 100 900

Total 4,236.54 6,766.90 7,187.44 6429.85 10121.57


574 Economic Survey of Karnataka 2019-20

Centrally Sponsored Subsidy Schemes: (iii) NABARD Initiative - Area


Development Scheme to increase
NABARD is implementing various Centrally
sponsored subsidy schemes in the State. Agriculture Term Lending
There is very good response for availing As per various assessments of the
subsidy under the Schemes. The progress in Government of India, if Indian agriculture
this regard upto 30.11.2019 is as follows: has to grow at 4%, investment in
The Schemes have ensured creation of agriculture has to increase. In this
much needed marketing infrastructure, connection, adoption of Cluster approach
development of extension services with and area based schemes is getting attention.
private participation and also provided To encourage Agricultural Term Lending,
additional income to the farmers. NABARD has identified and prepared two

DOR-GSS-DEDS/IDSRR/PVCF/PIG & SOLAR LIGHT/PUMPSETS – 30/11/2019


(Rs. in lakhs)

Cumulative Total
Sl. Bank loan Subsidy
Name of the scheme No. of Financial
No. sanctioned sanctioned
units Outlay

1
Grami n Bhandaran Yojana 4196 98678.80 63552.35 19460.13

2 Installation of Solar Off-grid and


Decentralised applications under 13740 7022.44 5665.86 1825.3
JNNSM ( SH LS)

3 Scheme of MNRE, GoI for


promoting Sol ar PV Water 1238 5524 4429 2676
Pumpsets for Irrigation
4 Dairy Entrepreneurship
23298 32356 26353 7350
Development Scheme

5 Venture Capital Fund for Poultry


1595711 6837.21 5458.83 815.02
(Subsidy) Scheme

6 Integrated Development of Small


51860 17316.7 13079.36 3235.43
Ruminants and Rabbits
7 Agri Clinic and Agri Business
303 5560.77 4071.97 1779.59
Centres
8 Development / Strengthening of
Agricultural Marketing
333 36300.17 23250.92 7280.97
Infrastructure, Grading and
Staandardisation InfrastructureIGS

9 National Project for Organi c


61 2,468 1,158 597
Farming
10 Central sector scheme on Pig 22 213 164.5 27
Development
11 New AMI Subsidy Scheme-Storage
59 4204.54 2891.30 339.73
& Non-Storage
Economic Survey of Karnataka 2019-20 575

Area Development scheme (ADS) for each b. Share of term lending to agriculture at
district of Karnataka for implementation for least 30% during 2018-19 to step up
5 years starting from 2018-19. Eight types capital formation
of potential activities are covered under ADS
c. Bringing down the Gross NPAs to
and launched along with the Potential
below 5%
Linked Credit Plans for 2018-19. As many
as 60 ADS have been launched in all 30 d. Improving Net Margin
districts of Karnataka and the banks
e. Preparation of Information
concerned are being pursued for extending
Technology, Information System and
credit in respect of the identified activities.
Cyber Security Policy and
D. Institutional Development – implementation of the same in a
Cooperatives b etter manner on Post CBS
environmental process.
(i) High Level Committee (HLC) to review
the health of Cooperative institutions (iii) District Level Monitoring and Review
Committee (DLMRC)
A High Level Committee (HLC) under the
Chairmanship of Additional Chief Secretary At district level DLMRC meeting convened at
and Development Commissioner, GoK with quarterly interval and review the
Principal Secretary, Cooperation, RCS, performance of Cooperatives undertaken by
Regional Director, RBI and Official from DDM of NABARD.
Apex Bank as well as KSCARDB constituted
(iv) Support from NABARD for
by NABARD to review the financial health of
development of Co-operatives – Grant
Cooperative institutions in the State.
Assistance under Cooperative
NABARD convened the Committee meeting
at half yearly intervals to discuss various Development Fund
financial parameters as well as frauds, NABARD extends asssitance to
governance issues of Co-operative Cooperatives for infrastructure support,
institutions in the State. conduct of exposure visits, etc. to improve
their functioning/services under
(ii) State Level Task Force (SLTF)
Cooperative Development Fund. Grant
SLTF, as envisaged under the Memorandum assistance is also extended to cooperative
of Understanding (MoU) of the training institutes towards their training
Vaidyanathan Committee – I package, needs. Four institutes ACSTI, SAHARDA,
undertakes periodic review of the NIRB and RICM are under the ambit of
performance of the Short Term Co-operative SOFTCOB assistance form NABARD.
Credit Structure in respect of good StCB/DCCB should depute their staff to the
governance, compliance with statutory Cooperative Training Institutes for
requirements of regulatory and supervisory necessary skill enhancement and capacity
norms and directions of RBI /NABARD and building and management of CCS,
suggest improvements for its functioning especially in the present scenario of
including human resources. computerisation of banks which would
result in improved performance of banks in
Half yearly review & monitoring of the
measurable terms.
StCB/DCCBs is carried out in the SLTF
Meetings convened by NABARD at State E. Institutional Development – Regional
level to review the achievement of the Rural Banks (RRBs)
financial parameters as well as the
following: (a) Subsequent to amalgamation of RRBs,
the State has two RRBs namely
a. CASA deposit mix in the overall Karnataka Vikas Grameena Bank
deposit portfolio to bring it to at least headquartered at Dharwad with 636
30% - 40% of deposits during branches, Karnataka Gramin Bank
2018-19. headquartered at Ballary with 1155
branches as on 01.04.2019 (formed by
576 Economic Survey of Karnataka 2019-20

amalgamation of Pragathi Krishna (HLC) to monitor the health of


Grameena Bank and Kavery Grameena Cooperative Credit Institutions in the
Bank). State vide GO.No.CO375 CLS2017
dated 13 September 2017, under
(b) Both the RRBs in the State have been
Chairmanship of Additional Chief
making profits and are sustainably
Secretary & Development
viable with CRAR above 9%.
Commissioner, GOK and CGM,
(c ) The performance of the RRBs is NABARD, Karnataka RO being the
reviewed by the Empowered Committee Convenor. The Karnataka RO has been
meeting convened by RBI at quarterly convening the meeting regularly.
intervals.
G. Status of SHG and JLG in Karnataka
F. Supervision of StCB/DCCBs
(I) The Micro Finance Profile of the
(i) Karnataka State Apex Cooperative State for 2018-19
Bank and all the DCCBs of the State
have banking licence issued by RBI. (ii) Target and Achievement for the year
2018-19
(ii) The number of Rural Cooperative
Banks in the State continues to be 22 (iii) Target and Achievement for the year
consisiting of The Karnataka State 2019-20
Cooperative Apex Bank Ltd. at the Apex (iv) Activities undertaken during 2019-
level and 21 District Central 20 by NABARD
Cooperative Banks at the district level.
r Conduct of need based capacity
(iii) In terms of RBI instructions, StCB and building training programmes in all
DCCBs were required to achieve 9% districts of Karnataka for
CRAR (as on 31 March 2017) on a Bankers/NGOs/PRIs/SHG members.
sustainable basis. Karnataka State
Cooperative Apex Bank and all DCCBs r Entrepreneurs Development
except Kalaburgi and Yadgiri CCB in Programme (MEDP) for SHG members.
Karnataka have a CRAR above 9% as r Livelihood Enterprises Development
on 31 March 2019 (based on latest Programme for SHGs have been
Inspection and audited figures of the sanctioned to take up income
banks). generating activities on cluster basis
with extension of marketing support by
(iv) Government of Karnataka (GOK) had
the Implementing Agency.
constituted High Level Committee

The Micro Finance Profile of the State for 2018-19

Cumulative Number of SHG s Saving linked as on 31.03.2019


907391
( Number of live SB accounts of SHGs)

Number of SHGs credit linked during 2018-19 478490

Bank Loan disbursed during the year 2018-19 ( Rs. in crore) 8445.87

No. of SHGs with loan outstanding as on 31.03.2019 612742

Bank Loan outstanding as on 31.03.2019 (Rs. in crore) 11882.75

Average Loan per SHG issued (Rs. in lakh) 1.93

Percentage of Women SHGs 92%


Economic Survey of Karnataka 2019-20 577

Target and Achievement for the year 2018-19


Target for the year 2018-19 Achievement during the year 2018-19
Credit Linkage of Credit Linkage of Credit Linkage of Credit Linkage of
SHGs (No.) JLGs(No.) SHGs(No.) JLGs(No.)
4,00,000 1,10,000 4,78,490 1,27,678

Target and Achievement for the year 2019-20

Achievement during the year 2019-20


Target for the year 2019-20
( as on 30.06.2019)
Credit Linkage of Credit Linkage of Credit Linkage of Credit Linkage of
SHGs (No.) JLGs (No.) SHGs (No.) JLGs (No.)
4,40,000 1,20,000 2,46,014 1,74,000

r Grant support is provided to Banks for The project aims to make the complete data
organising Village Level Programmes of the SHGs available on a dedicated
through their Rural and Semi-urban website, www.eshakthi.nabard.org.
branches for strengthening the SHG
In Karnataka the project is under
movement and awareness creation.
implementation in 06 districts viz., Mysore,
r Grant support is provided to Banks Bidar, Bagalkot, Chitradurga, Dharwad and
and NGOs for formation and credit Uttara Kannada. Around 1,13,729 SHGs
linkage of SHGs and JLGs. have been digitized in these 6 districts as on
(v) Digitisation of SHGs - EShakti 10.12.2019. It is proposed to cover 23 new
project districts under expansion phase in
Karnataka. In addition, a new Bank Led
In line with the Prime Minister's vision for a Model is introduced under E-Shakti project
digital India, NABARD launched a pilot in Karnataka where NABARD and the
project, “E-Shakti”. Presently, the project Implementing agency Bidar DCCB share the
has progressed into a unique digital total cost involved in the project in the ratio
financial inclusion movement covering 100 80:20.
districts in 22 States and one Union
Territory across the length and breadth of H. RIDF Assistance to Karnataka
the country and has already digitized 4.46 I. Infrastructure Development is a
lakh SHGs benefitting 49.40 lakh rural poor necessary pre-condition for integrated
at national level (as on 10.12.2019). The rural development and in view of the
project is in its expansion phase covering limited scope for private investment in
150 new districts in 24 states and this rural infrastructure, there is a need to
expansion is expected to on-board over 7 step up public investment in this sector.
lakh SHGs across the country to the digital In this context Rural Infrastructure
platform and likely to scale up significantly Development Fund (RIDF) was set
in the long run. up in 1995-96 with an initial corpus
It is a project under which the social and of Rs.2,000 crore made up
financial data of the SHGs and their of contributions by Scheduled
members in the selected districts are Commercial Banks operating in India
digitized. Digitization brings all the SHGs from out of their shortfall in priority
on to the technology platform and into the sector lending. Since then the scheme
fold of financial inclusion, thereby directly has been continued with the
helping them to access wider range of announcement in successive Union
financial services. This helps the bankers in budgets. From an initial allocation of
client appraisal and credit dispensation. Rs.2,000 crore under RIDF Tranche I
578 Economic Survey of Karnataka 2019-20

for the year 1995-96, the allocation has iii. Impact of RIDF in the state
reached the level of Rs.28,000 crore
The sanctioned projects on completion will
under RIDF XXV (2019-20). As on 30
provide the following benefits:
September 2019, 24 tranches of RIDF
with total allocation of Rs.3,51,507.00 r Improving irrigation facility in 4.40 lakh
crore (including Rs.18,500 crore under ha of agriculture land
NRRDA) have made cumulative r Providing rural connectivity through
disbursement of Rs.2,75,210.00 Crore. 45,384 km of rural roads and 57,214
There are 37 activities eligible for meters of rural bridges
assistance under RIDF grouped under
Agriculture and related, Social and r Creation of 3,91,053 MT of storage
Rural Connectivity Sectors. During facility
2018-19, against normative allocation r Establishment of infrastructures in 820
of Rs.800 Crore, projects to tune of rural markets
Rs.809.75 Crore were sanctioned to r Establishment of 1508 Veterinary
Government of Karnataka under RIDF dispensaries
XXIV. During 2018-19 an amount of
r Establishment of 684 Rural Service
Rs.788.75 Crore was disbursed to the
Centers
State Government under the RIDF.
r Construction of additional
ii. Under RIDF tranches I to XXIV, as on 31 classrooms/other infrastructures in
March 2019, 39155 projects have been 9862 rural educational institutions.
sanctioned to Karnataka State with
RIDF loan of Rs.13,122.47 Crore. r Construction of 130 ITI Buildings
Against the sanctioned amount, GoK r Construction of 6472 Anganwadis
has as on 11 December 2019 drawn r Construction of 317 Health Centers
Rs.10, 822.68 Crore. The sector wise
r Construction of 21 Maternity and Child
sanction and disbursements details are
Hospitals
as given below:
Out of the total corpus of Rs.28,000 crore
43% of RIDF loan has been sanctioned to under RIDF tranche XXV for 2019-20,
Social sector. The share of Rural Rs.600 crore has been allocated to the State
Connectivity sector and Agri and allied and as on 12/12/2019 Rs.75.22 Crore was
sector were of the order of 32% and 25% sanctioned.
respectively.

The sector wise sanction and disbursements details are as given below:
(Rs. in Crore)

No. of Total Financial Loan Amount


Sr. Name of the Sector
projects Outlay Sanctioned Disbursed
No.

Agriculture and allied


1 4711 1481.67 1361.18 952.57
projects

2 Social sector projects 16803 3052.34 2599.63 1914.15

3 Irrigation projects 5048 3010.21 2712.32 2327.70

4 Rural roads and bridges 12593 7909.38 6449.34 5628.25

Total 39155 15453.60 13122.47 10822.68


Economic Survey of Karnataka 2019-20 579

iv. Warehouse Infrastructure Fund (WIF) (d) Private sector companies/ corporate for
storing food grains as well as other
Consequent upon the announcement of an
agricultural commodities, like pulses,
allocation of Rs.5,000 crore to NABARD in
oilseeds, cotton, spices & condiments
the budget for 2014-15, for supporting
and perishables like fruits & vegetables,
creation of infrastructure for storage of
dairy/ poultry/meat/fish.
agricultural commodities, Reserve Bank of
India (RBI) issued guidelines for creation of Loans under WIF are being availed by
Warehouse Infrastructure Fund (WIF 2014 - Karnataka State Warehousing Corporation
15) in NABARD. The fund envisages (KSWC) and Department of Agriculture &
extension of loans to Public and Private Marketing (DAM) for various projects and
sectors for construction of warehouses, the cumulative loan assistance sanctioned
silos, cold storages and other cold chain in Karnataka is given below:
infrastructure.
v. Long Term Irrigation Fund (LTIF)
Funds under this allocation would be
In the Union Budget 2016-17, the
utilized for meeting the growing demand for
Honourable Union Finance Minister
storage capacity for agricultural
announced the creation of dedicated Long
commodities and also in the wake of
Term Irrigation Fund (LTIF) in NABARD with
enactment of National Food Security Act
an initial corpus of Rs.20,000 crore, for
2013 from the following segments:
funding of Central and State Shares for the
(a) Food grain procurement agencies, like 99 identified medium and major irrigation
FCI (including under PEG Scheme), projects under Pradhan Mantri Krishi
Central Warehousing Corporation, Sinchayee Yojana (PMKSY). In Karnataka, 5
State Government Departments/ irrigation projects viz. Narayanpur Left
Agencies, SWCs, etc. Bank Canal (ERM), Upper Tunga Irrigation
Project, Bhima LIS, Karanja and Sri
(b) Panchayats, PACS and other Co-
Rameswar Irrigation had been prioritized for
operative Societies (including
loan assistance under LTIF. In respect of
modernization/renovation/ repairs of
these 5 projects, NABARD has sanctioned
the existing warehouses) for enabling
Rs.1837.34 Crore under LTIF towards
farmers to store their produce and avail
Central Share and as on 31 March 2019, an
concessional post-harvest loans.
amount of Rs.773.54 Crore was released
(c) State Civil Supplies Departments/ towards the Central Share. Government of
Corporations for Public Distribution Karnataka has not availed any assistance
System (PDS) and supply of essential for state share under LTIF.
commodities.

Loans under WIF are being availed by Karnataka State Warehousing Corporation
(KSWC) and Department of Agriculture & Marketing (DAM) for various projects and
the cumulative loan assistance sanctioned in Karnataka is given below:
(Rs. in Crore)
No. of
Sl. Total Loan Total Loan
Name of the Agency projects
No sanctioned Released
assisted
1 Dept. Of Agri Marketing (DAM) 382 813.06 411.15
Karnataka State Warehousing
2 112 696.53 615.79
Corporati on (KSWC)
Grand Total 494 1509.59 1026.94
580 Economic Survey of Karnataka 2019-20

vi. Micro Irrigation Fund I. Dairy Processing and


Infrastructure Development Fund
Government of India is committed to accord
high priority to water conservation and its (DIDF)
management. To this effect, Pradhan Mantri The Union Finance Minister in the Union
Krishi Sinchayee Yojana (PMKSY) was Budget 2017-18 had announced for setting
launched on 1st July 2015 with the vision of up of a Dairy Processing and Infrastructure
extending the coverage of irrigation 'Har Development fund (DIDF) of Rs.8004 crore
Khet Ko Pani' and improving water use in NABARD with the objective to modernize
efficiency 'Per Drop- More Crop ' (PDMC) in a milk processing plants and machinery, to
focused manner with end to end solution on create additional infrastructure in dairy
source creation, distribution, management, sector, create additional milk processing
field application and extension activities. capacity, to bring efficiency in dairy
In the Union Budget for 2017-18, Hon'ble processing plants, help the producers
Finance Minister announced setting up owned and controlled institutions to
of a dedicated Micro Irrigation Fund (MIF) increase their share of milk and consolidate
in NABARD to achieve the goal, 'per drop their position as a dominant player in the
more crop' (PDMC). The Fund will have organized liquid milk market. Various
an initial corpus of Rs.5000 cr. The corpus components eligible for financing under this
of the Fund shall comprise of borrowings scheme includes modernization & creation
raised by NABARD from the market. of new milk processing facilities,
The loans shall be extended by NABARD to manufacturing facilities for value added
the State Governments during the products, milk chilling infrastructure,
remaining period of 14th Finance setting up electronic milk testing facilities,
Commission, i.e., during 2018-19 and etc. The fund is meant to help Co-operative
2019-20 with allocation of Rs.2000cr and Milk Unions, State Cooperative Dairy
Rs.3000cr, respectively. Federations, Multi State Milk Cooperative,
Under PDMC- PMKSY, it is expected that Milk Producer Companies and NDDB
about 6 million ha will be brought subsidiaries by extending them financial
under micro irrigation during the remaining assistance at cheaper cost.
period of 14th Finance Commission, Progress made in Implementation
with annual target of about 2 million ha per
year. With the additional investment for In Karnataka State, till inception of the fund
micro irrigation through MIF, for financing State Project Screening and Review
of innovative, composite/ commodity/ Committee (SPSRC) had recommended 9
community/ cluster based micro irrigation proposals of Karnataka Milk Federation
projects, the coverage may be extended (KMF) and other milk unions worth
upto about 10 million ha during the Rs.1194.84 crore against which NABARD
period. Besides, the Fund will facilitate has sanctioned a loan of Rs.941.38 crore
States to mobilize resources for their and disbursed Rs.388 crore against these
initiatives, including additional (top up sanctions. The details of the project are
subsidy) in implementation of PMKSY- given in the following table.
PDMC. J. Fisheries and Aquaculture
The main objective of the fund shall be to Infrastructure Development Fund
facilitate the States in mobilizing the (FIDF)
resources for expanding coverage of The proposed Fisheries and Aquaculture
Micro Irrigation by taking up special Infrastructure Development Fund by GoI
and innovative projects and also for envisages creation of fisheries infrastruc-
incentivizing micro irrigation beyond the ture facilities both in marine and inland
provisions available under PMKSY-PDMC fisheries sectors and augment the fish
to encourage farmers to install micro production to achieve the target of 15 million
irrigation systems. tonnes by 2020 set under the Blue
Economic Survey of Karnataka 2019-20 581

The details of the project are given in the following table. (Rs. in Crore)

Re- Re-
commended commended Disbur-
by 1 s t by 2 nd Sanc- sed by
Sl. Name of the project Drawal
tioned by NABARD
No. with district SPSRC SPSRC Gap
NABARD
held on held on
28.03.2018 19.09.2018
1 KMF dairy plant at 210.00 -- 210.00 153.00 57.00
Kanva, Ramanagara
district
2 KMF dairy plant at 87.53 -- 87.53 56.00 31.53
Channarayapatna,
Hassan district
3 Dairy plant at Uppoor, 65.00 -- 65.00 32.00 33.00
Udupi district of
Dakshina Kannada Milk
Union
4 Dairy plant at 80.34 -- 80.34 69.00 11.34
Alanahally, Mysore
district of Mysore Milk
Union
5 Dairy plant at 103.18 -- 103.18 78.00 25.18
Chikkaballapur of Kolar
-Chikkaballapur Milk
Union
6 Dairy plant at -- 200.00 200.00 0.00 200.00
Kanakpura,
Ramanagara district of
Bangalore Milk Union
7 Dairy plant at Kuderu, -- 60.00 60.00 0.00 60.00
Chamrajanagar district
of Chamrajanagar Milk
Union
8 Dairy plant at Ballari of -- 86.79 0.00 0.00 Project
Raichur – Ballari – return
Koppal Milk Union ed to
NDDB
on
accou
nt of
land
issue.
9 Dairy plant at Hassan of - 302.00 135.33 0.00 135.33
Hassan Milk Union
Grand Total 1194.84 941.38 388.00 553.38
582 Economic Survey of Karnataka 2019-20

Revolution. Fisheries and Aquaculture 263 FPOs,10 FPOs had availed SFAC
Infrastructure Development Fund entails an grant and 50 FPOs were credit linked
estimated fund size of Rs.7522.48 Crore availing loan to the extent of Rs. 8.00 cr.
comprising of Rs.5266.40 crore to be raised Majority of the FPOs are involved in
by the Nodal Loaning Entities (NLEs), production, procurement and
Rs.1316.60 crore beneficiaries' contribution marketing of various agri - horti crops.
and Rs.939.48 crore budgetary support Some of the FPOs are also taking up the
from Government of India . The objectives of activities of promoting High Value
the fund are given below: Crops such as chia seeds, tender
coconuts, coffee, udipimattigulla, etc.,
r Creation and modernization of capture
& culture fisheries infrastructure Initiatives of NABARD
r Creation of Marine Aquaculture r In order to oversee the promotional
Infrastructure efforts and provide policy inputs for
r Creation and modernization of Inland creating appropriate ecosystem for
Fisheries Infrastructure FPOs to sustain their business
operations, NABARD has constituted a
r Reduce post-harvest losses and
National Advisory Committee headed by
improve domestic marketing facilities
its Chairman with members from the
through infrastructure support.
concerned Ministries of the Govt. of
r To bridge the resource gap and facilitate India, SFAC, Academic Institutions,
completion of ongoing infrastructure Professional agencies, Agri-Corporates,
projects. leading FPOs, etc.
NABARD is one of the Nodal Loaning r Considering the need for a centralized
Entities (NLEs) & would fund the public data base on FPOs, NABARD has
infrastructure components through the launched a dedicated web based portal
State Governments/State Entities. (www.nabfpo.com) and digitized the
K. Other Development Initiatives data in respect of all its FPOs including
profile of the shareholder members and
(a) Farmers Producers Organization uploaded on its website for use by the
(FPOs) stake holders.
r Collectivization of agricultural produce r A Performance Measurement Tool has
through Producer Organizations (POs) been developed in consultation with key
is one of the most effective means of stakeholders for the assessment,
linking Small and Marginal farmers / grading and monitoring of overall
Producers with the agricultural value performance of FPOs. The tool serves as
chain for the purpose of enhancing their an aid in designing need based
net income. nurturing interventions for building
robust organization and facilitating
r Since 2014 -15, NABARD Karnataka
credit linkages.
Regional Office has assisted in
promotion of 263 FPOs covering 30 Suggestions
districts of the State. These FPOs have r Karnataka has 16 registered GI Agri-
been formed through 80 odd NGOs / Horti crops. These GI tagged products, if
Institutions acting as Producer branded properly, would lead to
Organization Promoting Institutions development of GI clusters thereby
(POPIs). Around 1,00,000 farmers of the helping the farming community to fetch
State are members of FPOs promoted by higher returns. There is an urgent need
NABARD supported POPIs involving to promote FPOs with GI Crops.
grant assistance of Rs.20 cr. Out of the
243 FPOs, 200 are registered under r The State Government may support
various acts thereby mobilizing share FPOs by making provisions for easy
capital of Rs.10.00 cr. Out of the these issue of licenses for trading in inputs
Economic Survey of Karnataka 2019-20 583

like seed, fertilizer, farm machinery, (c) Watershed Development Fund


pesticides etc., In this connection,
r In order to mitigate the vagaries of
'Single Window Clearance System' by
drought, NABARD has sanctioned 239
the Department of Agriculture /
Watershed Development Projects of
Horticulture may be made applicable to
which 234 are regular Watershed
FPOs for issue of licenses for trading in
Development Projects (both completed
input, production, processing,
and ongoing), 03 are Springshed
distribution of seeds and saplings.
Watershed Development Projects and
r Apart from these 263 FPOs, there are 02 are Integrated Watershed
SFAC and self-promoted FPOs in Management Schemes (IWMS) in the
Karnataka. As these FPOs are formed in State involving grant assistance of
the interest of Farmers and most Rs.292.73 cr. The programme is
significantly these FPOs are serving the intended for improvement in soil quality
Agricultural & Rural Community of and regeneration of natural resource
Karnataka State, there is a critical need over an area of 2.90 lakh hectares
to treat all the FPOs uniformly in terms including 1.80 lakh ha. in six
of the support provided by GoK to the Distressed Districts (Belgaum,
FPOs. It should be noted that SFAC has Shimoga, Chickmagalur, Kodagu,
been granting its benefits to all FPOs Chitradurga and Hassan). These
irrespective of its origin / promoting projects are implemented through
agency. Accordingly, financial support participatory approach with the full
and Schemes of Karnataka State involvement of the local community.
Government may be made available to Under these projects, structures like
all FPOs irrespective of their origin and trench-cum-bundings, contour
promoting agency. bundings, farm ponds, pebble bunds,
(b) Integrated Tribal Development check bunds, check dams, etc. coupled
with forestry and horticulture
r NABARD has been implementing plantation, crop demonstration and
integrated tribal development projects livelihood activities for landless
on wadi (small orchard upto one acre) villagers were undertaken. Out of the
basis in various tribal dominated 239 projects sanctioned, 219 projects
pockets of the country, for which a have been completed till date and an
dedicated fund viz. “Tribal Development area of approximately 2.25 lakh ha has
Fund” has been created in NABARD in been treated through various
2003 - 04. The model, evolved out of measures.
successful implementation of tribal
development projects in Gujarat and r Some of the major impacts of these
Maharashtra with assistance from projects are increase in ground water,
Kreditanstalt fur Wiederaufbau (KfW), increase in agriculture production and
Development Bank of Germany, under productivity, introduction of new crops,
bilateral cooperation between particularly commercial crops, in
Government of Germany and traditionally dryland areas, adoption of
Government of India, works towards a latest agriculture technology by farmers
long term sustainable impact on the through Demonstrations and Training
tribal families focusing on creating Components, a very positive impact on
livelihoods rather than mere generation livestock population and fodder
of short term employment. availability, livelihood support to
landless and women and increase in
r Cumulatively, NABARD has sanctioned afforestation and horticulture.
30 projects in 12 districts with a total
financial assistance of Rs.92.38 Crore r During the current year (2019-20), nine
in the State so far under this fund. new regular Watershed Development
Projects have been sanctioned in the
State.
584 Economic Survey of Karnataka 2019-20

(d) Integrated Watershed development (f) Climate Change


for Rehabilitation of Degraded soils and
r NABARD is the National Implementing
Climate Change Adaptation Entity (NIE) for Green Climate Fund
r The project is designed to addresses (GCF), National Adoptation Fund for
issues of soil and water conservation, Climate Change (NAFCC) and
land reclamation, improving soil Adoptation Fund of United Nations
productivity and health, enhancing Frame work for Climate Change (AF-
crop resilience to climate change, UNFCC). NABARD is in close contact
enhancing opportunities for livelihood with Environment Management and
and income generation for communities Policy Research Institute (EMPRI), the
vulnerable to climate change in treated state nodal agency for implementation
watershed thereby ensuring their food of Karnataka State Action Plan for
and nutritional security. Climate Change for sanction of new
r Some of the major outcomes expected projects under National Adoptation
are to increase the productivity, income Fund for Climate Change (NAFCC),
of communities living in watershed and Green Climate Fund and Adoptation
strengthened adaptive capacity of the Fund.
communities in watersheds and r One project viz. Conservation and
reduced vulnerability to climate Management of Indigenous cattle &
change. sheep in the wake of Climate Change in
r Under climate proofing of completed Karnataka has been sanctioned by
watershed projects under NABARD- Ministry of Environment, Forest and
KfW Soil Health Project, 30 projects in Climate Change under NAFCC with a
12 districts have been sanctioned and total outlay of Rs.24.22 cr against
are under implementation in the state which Rs.9.44 cr has been released so
with financial assistance of Rs.14.18 far. As an adaptation strategy, the
crore. proposed project aims to conserve and
revitalize indigenous livestock varieties
(e) Sustainable Development Plan (SDP) of the State and breeds that are more
in completed watershed projects resilient to climate change. The project
r In order to enable the VWCs to function aimed at following outputs on
as vibrant and sustainable field level implementation ;
institutions for natural resources r Increase in the population of
management and improving the indigenous cattle breeds and hence
livelihoods of watershed community increasing milk yield throughout the
after the completion of the project, the year.
above programme has been formulated r Increase in the population of
by NABARD defining the roles and indigenous sheep breeds and hence
responsibilities of the VWCs and their increasing meat yield which will sustain
capacity building, extension, the income of small and marginal
technology transfer, financial inclusion farmers.
needs convergence of institutional
credit, etc., during and in the post r Sustainable production of feed and
watershed implementation period and fodder for farmers and sheep rearers.
post withdrawal of the PFA from the r Mainstreaming livestock adaptation
project area. strategies into policies and programmes
r The programme is being implemented through better Knowledge Management
with NABARD support in 50 completed and Sharing.
watershed projects in the State with
financial support of Rs.4.96 cr.
Economic Survey of Karnataka 2019-20 585

L. Information Technology in the rural areas is very low, the


Cooperative Banks cooperatives are encouraged to set up
micro ATMs in the affiliated PACS which
(a) Cooperative Banks have to take more is a cost effective model when compared
initiatives in the states to sustain in the to a full-fledged ATMs. Implementing
current banking scenario with a view to micro ATMs in PACS would increase the
compete with emerging new banks with use of RuPay cards issued, reduce the
latest technology solution. Accordingly transaction costs for the DCCBs and
with the assistance and guidance of also help the banks generate
NABARD, all the Rural Cooperative miscellaneous income through
Banks (RCBs) in the state implemented transaction costs of interbank
their Core Banking Solutions by the end transaction. The in principle approval
of 2014 and covered all the KCC accorded by NABARD for 1500 micro
accounts (around 20 Lakh) with RuPay ATMs devices for PACS may be utilized
cards. All banks are issuing RuPay at the earliest to enable a true digital
debit cards and also are offering environment in the rural areas of the
services like RTGS/NEFT, NACH, DBT, state.
SMS alerts etc to their customers. All 21
DCCBs and KStCB has accorded (e) PMJDY 2.0 - Pradhan Mantri Jan Dhan
approval for implementation of PFMS Yojana:Objective of "Pradhan Mantri
i.e. Public Financial Management Jan-DhanYojana (PMJDY)" is ensuring
System , 16 DCCBs are live on PFMS access to various financial services like
platform which will enable cooperative availability of basic savings bank
Banks to transfer funds to beneficiary account, access to need based credit,
account directly from GoI. remittances facility, insurance and
pension to the excluded sections i.e.
(b) Financial Inclusion Fund has been weaker sections & low income groups.
revamped in 2019 and a new This deep penetration at affordable cost
differentiated Strategy has been is possible only with effective use of
adopted. The new strategy involves technology. As on 31.09.2019 , 1.47
more thrust on backward districts that Crore Jan-Dhan Accounts are opened in
are constrained by various physical, Karnataka.
economic and sociological
characteristics, now termed as the (f) Financial Literacy Programmes are
Special Focus District (SFD), NABARD conducted through Commercials banks
under FIF will provide grant assistance and Cooperative Banks in the state of
of 90% in SFD for technological Karnataka , a total of 4500 Financial
adoption in SFD. There are two districts Literacy programmes have been
identified under SFD in Karataka i.e. sanctioned during 2019-20 with a unit
Raichur and Yadgir. cost of Rs.5000 per programme ( 90%
grant support of Cooperative banks,
(C) The special thrust is provided to 80% grant support to RRBs and 60%
cooperative Banks for adoption on CBS grant support to Commercial Banks.
plus services i.e CKYC, Micro ATM,
AUA/KUA, PoS/mPoS and BHIM UPI. Though various initiatives have been
These CBS plus services will enable the launched by Government of India, State
cooperative banks to be ready on digital Governments, RBI and NABARD to
platform and thus provide better financially include the poorest in India, the
services to customers. AUA/KUA (Dual problem of financial inclusion is not just one
Authentication) has been sanctioned to of access, but also of uptake. Given the sheer
KStCB which will enable bank for numbers of those excluded, it is virtually
Aadhaar enabled transactions. impossible for anyone agency to create full
financial inclusion. The solution lies in
(d) As all the RCBs are issuing RuPay achieving greater coordination among all the
cards, and the availability of ATMs in stakeholders to include the excluded into
586 Economic Survey of Karnataka 2019-20

the formal financial delivery system. 4. The net NPAs stood at 6.09% during the
FY: 2018-19.
11.3.11 State Term Lending Institutions:
5. During the year, the Government of
Industrial Finance: Karnataka provided an equity capital of
Karnataka State Financial Corporation Rs.68.45 crores and interest subsidy
(KSFC) is a State Level Financial Institution support of Rs.99.94 crores towards
established by the State Government in the following schemes.
year 1959 under the provisions of SFCs Act, PERFORMANCE OF THE CORPORATION
1951 to cater to the long term financial
DURING THE FY 2019-20 (April to
needs of Micro, Small & Medium
November 2019) :
Enterprises (MSMEs) in the State of
Karnataka. KSFC takes pride being pioneer During the FY: 2019-20 (April to November
in serving MSMEs of industrial and service 2019) the Corporation assisted 529 cases to
segments in the State for the past 60 years. an extent of Rs.475.14 crores, disbursed
The cumulative Gross Sanctions of the Rs.496.22 crores and recovered Rs.443.61
Corporation reached Rs.17,216.91 Crore crores.
covering 1,73,507 cases as on 31.3.2019.
The Corporation earned a half year (April to
Since inception up to the end of March 2019,
September 2019) net profit of Rs.19.04
30,683 cases promoted by Women
Crore during 2019-20.
Entrepreneurs were assisted to an extent of
Rs.4029.64 crore, 21,474 cases promoted The performance of the Corporation in the
by Scheduled Caste & Scheduled Tribe key areas of operations is summarized in
Entrepreneurs were assisted to an extent of Table 11.41.
Rs.1,904.28 crore and Rs.1,283.49 crore
was sanctioned to 19,210 cases promoted Karnataka State Industrial and
by Entrepreneurs belonging to the Minority Infrastructure Development Corporation
community. (KSIIDC)

MAJOR ACHIEVEMENTS DURING FY: KSIIDC, established in 1964, has been


2018-19 : greatly instrumental in the industrialization
of the State, especially in the large and
1. During the FY: 2018-19, the medium sector. KSIIDC has stopped
Corporation Sanctioned Rs.1,098.73 financial lending activity since October
crores, disbursed Rs.665.90 crores & 2002 onwards. At present, recovery of the
recovered Rs.736.35 crores. past lending/advances and loans and
2. The Corporation earned a net profit of disinvestment of Equity are the main
Rs.9.55 crores during the FY: 2018-19. activity. However, certain Investments as
per the directions of Government of
3. The Standard Assets of the Corporation Karnataka are being made from time to time.
reached Rs.1715.91 crores as on
31.03.2019. KSIIDC continued its proactive role in the
promotion of infrastructure projects on
Public Private Partnership model and its role

Scheduled Caste Entrepreneurs Rs. 43.00 crores

Scheduled Tribes Entrepreneurs Rs. 12.00 crores

Women Entrepreneurs Rs. 32.94 crores

First Generation Entrepreneurs Rs. 2.00 crores

Interest Subvention for Manufacturing Industries Rs. 10.00 crores


Economic Survey of Karnataka 2019-20 587

The performance of the Corporation in the key areas of operations is summarized


in Table 11.41.

Disburse-
Sanctions Recovery
Period ment
No. Amount Amount Amount
April’11 to Nov.’11 876 508.33 333.09 398.18
FY 2011-12 1485 817.32 597.08 660.90
April’12 to Nov.’12 979 564.39 431.98 465.44
FY 2012-13 1598 944.06 734.70 792.89
April’13 to Nov.’13 859 553.92 394.16 536.18
FY 2013-14 1426 909.26 707.47 836.52
April’14 to Nov.’14 620 343.40 328.19 509.30
FY 2014-15 1092 675.15 553.62 814.00
April’15 to Nov.’15 653 391.67 332.87 532.64
FY 2015-16 1111 731.94 566.36 841.10
April’16 to Nov.’16 639 468.79 341.18 545.59
FY 2016-17 1059 733.43 614.38 884.73
April’17 to Nov.’17 591 452.30 305.23 503.15
FY 2017-18 1037 842.13 561.21 787.91
April’18 to Nov.’18 533 448.91 356.02 476.45
FY 2018-19 1056 1098.73 665.90 736.35
April’19 to Nov.’19 529 475.14 496.22 443.61
Source: Karnataka State Financial Corporation

as Nodal Agency for Bangalore International b) Development of Bengaluru


Airport Project. Duly noting the initiatives International Convention Centre
taken up by KSIIDC in the infrastructure Complex adjacent to the Bengaluru
sector, the name was changed to International Airport on PPP mode
“Karnataka State Industrial and
Infrastructure Development Corporation c) Development of Devanahalli Business
Limited” with effect from November 22, Park
2010. d) Development of a Sea Port at Tadadi on
As the nodal agency of the State PPP mode
Government, KSIIDC has initiated activities e) Dabhol-Bangalore Gas Pipeline & City
for the development of the following projects Gas Distribution Project for Bangalore
which will be pursued for completion during
12th five year plan. f) Industrial Nodes-National Investment
and Manufacturing Zone (NIMZ)
a) Expansion of the Bengaluru
International Airport.
588 Economic Survey of Karnataka 2019-20

g) Industrial Corridor Projects: 11.3.14 Co-operative Credit:


l Chennai-Bangalore-Chithradurga Co-operative Credit:
Industrial Corridor (CBCIC)
The Cooperative credit system in Karnataka
l Bengaluru-Mumbai Economic has its own place in the credit delivery of
Corridor (BMEC) rural and urban areas. Apart from urban
h) Development of Airstrips cooperative banks, the major Primary
Agricultural cooperative society/banks are
Also, KSIIDC will continue to act as Nodal
operating in rural areas. Unlike in other
Agency of the State Government in respect of
states, in Karnataka two type of Cooperative
the specified projects assigned from time to
credit institutions are functioning, one is
time by the State Government.
looking after short term and medium term
In addition to the above activities in the credit and another looking after credit needs
infrastructure sector, the following existing of long term.
activities will be pursued.
a. Short Term and medium term Credit
a. Thrust on recovery from advances Cooperative Credit Structure (STCCS):
b. Settlement of remaining loan accounts The Karnataka state Cooperative Apex Bank
under OTS has 51 branches in Bangalore City and
c. Sale of primary assets taken over under through its affiliated District Central
section 29. Cooperative Bank (DCCB) and Primary
Agriculture Cooperative Societies (PACS) at
d. Recovery of advances through legal the villages' level extends short term credit
recourse under SFC & other Acts. to the farmers and others. The total number
of DCCBS is 21 with 789 branches. There
11.3.12 Non Performing Assets(NPA) in
are 5514 PACS functioning in the state.
Banks :
These institutions have prepared Business
There were 2999417 Non Performing Assets Development Plan (BDP) with a view to
(NPA) a/cs involving an amount of strengthen capital base of their financial
Rs.52430.71 Cr as of September 2019 and organization set up in accordance with
accounting for 7.33% of total advances. guidelines of NABARD, an MoU is signed by

Table 11.42 - Details of Sanctions and Disbursements made by KSIIDC.


(Rs in Lakhs)
Sl.No Particulars 2016-17 2017-18 2018-19 2019-20 (30.11.2019)
1 Sanctions* 500.00 500.00 Nil Nil
2 Disbursements* 150.00 160.00 50.54 111.54

·Others: VENTURE CAPITAL FUND

Particulars 2019-20 RE 2020-21 BE


Debt outstanding as on 31st March 2019 Nil Ni l
(principal )
Borrowing during the year Nil Ni l
Princi pal repayment duri ng the year Nil Ni l
Interest payable during the year N.A N.A
Total debt servici ng (3+4) Nil Ni l
Economic Survey of Karnataka 2019-20 589

NABARD, State Government and Apex bank Cooperative Agriculture and Rural
in June 1995, same was extended time to Development Banks at taluk level
time. numbering 177 cater to the long term credit
needs in the two tier credit delivery system.
As on 31-3-2018 the working capital of
The National bank for Agriculture and Rural
DCCBs was Rs.34710.01 crore, by 31-03-
Development (NABARD) provides refinance
2017, it had grown to Rs.37463.19 crore
to the KASCARD Banks.
indicating a growth of 7.93 per cent. The
total amount of Deposit in DCCBs was Rs. c. Agricultural loan disbursement:
22074.37 as on 31-3-2018. It had grown by
12.78 per cent to Rs. 24895.81 crore as on As on 31-3-2017, the short term (ST),
31-3-2019. During 2018-19 all the 21 Medium term (MT) and Long term (LT) loans
DCCBs in the State have shown profits. issued by the co-operative credit system in
These credit institutions provide short, the state was Rs.10235.63 crore, Rs 373.79
medium and long term credit to PACS and crore and Rs.262.50 crore respectively as
other societies at gross root level and deal against Rs.10571.89 crore, Rs.848.74 crore
directly with individual borrowers also. and Rs.198.58 crore issued a year ago
indicating a marked improvement in the
b. Long Term Credit Cooperative Credit issue of all type of Agricultural loans. In the
Structure (LTCCS): current fiscal up to the end of Sep 2018, the
Apex Bank, Karnataka state cooperative cooperative credit system has issued ST, MT
Agriculture and Rural development Bank and LT loans to the extent of Rs.5814.89 cr ,
(KASCARD) at the State level and Primary Rs. 255.13 cr and Rs.8.07 crore
respectively.

NPA across the type of Banks is shown in the below table.

Sl. As on 30/6/2018 As on 30/6/2019


Type of Banks
No A/Cs Amount A/Cs Amount
1 Commercial 1773871 43537.43 2380873 43611.33
2 RRBs 173406 1763.70 300858 3444.51
3 Cooperatives/KSFC 482754 3040.70 317686 5374.87

TOTAL 2430031 48341.83 299417 52430.71

Table 11.43 : Consolidated Financial Status of DCCB (Rs. in crore)

Particulars 2015-16 2016-17 2017-18 2018-19

No of DCCBs 21 21 21 21

Total share capital 995.04 1188.48 1265.63 1445.41

States’ share capital 15.73 21.73 21.73 25.03

Share of state share capital % 1.58 1.83 1.72 1.73

Deposits 17250.49 19186.37 22074.37 24895.81

Borrowings 8139.82 8604.19 8763.63 8992.67

Loans &Adv O/S 18686.37 20412.35 23268.19 24608.81

Profit shown by Banks 21 20 21 21


590 Economic Survey of Karnataka 2019-20

Table 11.44: Performance of Short Term, Medium Term and Long Term Credit
(Rs. in Crore)
%
Type of Loan Target Achievement
Achievement

Short term 10500 10235.63 97.48

2015-16 Medium term 400 373.79 93.45

Long term 300 262.50 87.50

Short term 11000.00 10769.00 97.90

2016-17 Medium term 1000.00 692.78 69.28

Long term 600.00 440.41 73.40

Short term 12000.00 10571.89 88.10

2017-18 Medium term 1000.00 848.74 84.87

Long term 500.00 198.58 39.72

Short term 12000.00 10585.97 88.22

2018-19 Medium term 1000.00 530.78 53.08

Long term 423.26 233.77 55.23

Short term 12300.00 8102.96 65.88

2019-20 (Nov.) Medium term 700.00 325.12 46.43

Long term 486.25 55.98 11.50

Table 11.45: Recovery (%) of loans in Karnataka

Type of loan 2016-17 2017-18 2018-19 2019-20 (October)

Short term 94.12 87.20 90.93 81.37


Medium term 74.13 73.31 82.00 45.55
Long term 50.92 50.42 55.23 20.00

d. Recovery of Loans: short term loans, the recovery has fallen


The Comparative position of recovery of drastically in the current year.
Short, Medium and Long term loans under e. Subsidised Agricultural loans to
the Cooperative Credit System in the State farmers @ 0 and 1 %
for the years from 2015-16 to 2019-20 is
presented vide Table 11.45 . The recovery The State Government has implemented the
figures show that there is high overdue in scheme of lending short term, medium term
long term loan compared to other term and and long term Agricultural and Agricultural
Economic Survey of Karnataka 2019-20 591

related loans to the farmers at 6 % from Rs.507.02 crores has been released by
01.04.2004 through agricultural Government to 1371922 farmers through
cooperative credit Institutions in the state. concerned Co-operative Institutions.
The rates was further reduced during the
subsequent years. During 2006-07 and f. Interest subsidy to Self help groups :-
2007-08, the rate was reduced to 4% and The scheme of advancing loans to Self Help
from the year 2008-09 to 2010-11 interest Groups in Karnataka at 4% has been
rate was again reduced to 3% and 1% for implemented from 01-04-2007.
2011-12 and 0% upto Rs.1 lakh and 1% Government is providing interest subsidy to
upto Rs.3.00 lakhs in 2012-13 for crop cooperative institutions in order to
loans. During the year 2013-14 Govt implement the scheme. During the year
reduced the interest rate to 0% up to Rs.2.00 2017-18 Women SHG'S are lending at the
lakhs and 1% upto Rs.3 lakhs for short term net rate of o% and Men SHGS at 4% with the
agricultural loans. The medium term and adoption of NRLM/NULM Scheme. This
long term agricultural loans up to Rs.10.00 scheme has been extended to year 2018-19.
lakhs are disbursed to farmers at 3%.
During the year 2016-17, totally 11419 no.
During the year 2014-15 Short Term loan of groups have been formed with the
up to Rs.3 lakhs are disbursed at 0% and MT cumulative formation of 248672 groups.
and LT loans up to Rs.10.00 lakhs are An amount of Rs 716.56 crores of loan has
disbursed at 3%.The scheme has been been disbursed to 32880 groups and a
continued for the years 2015-16 and 2016- budget of Rs.41.79 crore has been
17 and 2017-18 also. 3% interest subsidy earmarked out of this Rs 20.89 crores has
scheme has been extended to the loans been released to 75611 Groups.
disbursed to Solar pump set and poly house.
Interest subsidy is available up to Rs.10 During the year 2017-18, 38772 groups
lakhs for first loan amount provided that the have been formed and an amount of Rs
loan limit would be within the limit of Rs.25 1101.42 crores of loan was released through
lakhs. cooperative institutions and an amount of
Rs 32.00 crores of interest subsidy was also
The Government is reimbursing the released.
differential interest at pre determined rate to
concerned financial institutions. An amount During the year 2018-19, 32266 groups
of Rs.880.47 crores has been earmarked to have been formed and an amount of Rs
implement the scheme for the year 2016-17 889.92 crores of loan amount was released
and the entire amount has been released by through cooperative institutions and an
Government to 2258290 farmers through amount of Rs 60.00 crores of interest
concerned cooperative institutions. During subsidy has also been released.
the year 2017-18 a budget provision of As on the end of October 2019-20 a loan
Rs.816.80 crore has been provided towards amount of Rs 25441 crores for 18336
interest subsidy and entire amount has groups has been disbursed. And during this
been released to 2023979 farmers through year a budget of Rs 85.30 crores has been
Cooperative institutions. During the year allocated for recovery of loans and Rs 42.65
2018-19 a budget provision of Rs.777.49 crores has been released for 35001 groups
crore has been provided towards interest as on the end of November.
subsidy and the amount has been released
to 1989021 farmers through Cooperative g. In the back drop of severe drought
Institutions. prevailed in the state during the year
2015-16 the Govt. has introduced two
Due to non availability of Bills concerning schemes to give relief to the distressed
S.C. /S.Ts. an amount of Rs.184.92 Crores farmers.
has been surrendered to Govt. Of the total
amount of Rs.1039.83 Crores earmarked for 1) Scheme of Postponement of the re-
the Year 2019-20., so for an amount of payment of regular medium-term and
long-term agricultural loan installments
592 Economic Survey of Karnataka 2019-20

by one-year for agricultural loans: Govt has waived loans of 3195 farmers in
Primary Agricultural and Rural
Under this scheme, re-payment of regular
Development Banks, who have borrowed
medium-term and long-term agricultural
loans for the purpose of digging bore wells
loan instalments by farmers has been
and released an amount of Rs. 2.00 crores
postponed for one year. The Government
during the year 2015-16 and Rs.9.01 crores
has released an interest subsidy amount of
during the year 2017-18 for this purpose.
Rs.45.08 cr for app. 2.05 lakh farmers.
Rs. 50,000 Loan waiver scheme -2017
2) Interest waiver scheme on short term ,
medium term and long term overdue As the farmers were under distress situation
Agricultural loans: due to the occurrence of continuous
drought for the last 3 successive years, Gok
Under this scheme Government has waived has announced loan waiver of upto
the full interest on over due of Short term, Rs.50000 for the farmers who have crop
Medium term and long term Agricultural loan outstanding as on 20-6-2017 in
loans as on 30-9-2015, provided that cooperative societies. During the year 2017-
farmers pay the principal amount within 18, govt has released Rs.4971.99 crores for
31-03-2017 and interest waiver amount is 12.80 lakhs farmer and during the year
borne by Govt. This has helped the farmers 2018-19 so far 7.74 lakhs farmers have
to get the credit to do the agricultural benefitted from the scheme amounting to
operation. Rs2495.65 crores.
During the year 2016-17 an amount of During the year 2018-19 following new
Rs.124.70 crore has been released to 72583 schemes have been introduced.
farmers.
Badavara Bandhu Scheme
As the drought situation continued for the
year 2016-17, the agricultural loans which During the year 2018-19 Badavara Bandhu
became over due from 1-10-2015 to 15-4- scheme was introduced to provide loan to
2017 has also been given time to repay the street vendors. Under this scheme Rs 10000
overdue amount till 30-6-2017. During the loan through District Central Co Operative
year 2017-18 an amount of Rs 5000.00 Banks at 0% is being issued.
lakhs has been released to 28400 farmers During the year 2018-19, a sum of Rs 10.57
and during the year 2018-19 an amount of Crores has been released to 18344 street
Rs 46.25 crores has been released to waive vendors.
off the interest of 29603 farmers.
As on the end of October 2019-20., totally
For the year 2019-20 an amount of Rs 52.38 1938 street vendors have availed loan under
crores has been ear marked, and so far this scheme to a tune of Rs1.85 crores. In
Rs.26.19 crores has been released to 19404 the present year, a budget of Rs 8.10 crores
farmers. has been ear marked and so far Rs 10.00
Loan waiver of failed wells of farmers lakhs has been released to 7882
borrowed loan from Primary Agricultural beneficiaries.
and Rural Development Banks. Kayaka scheme
Govt. has waived loans of 1431 farmers in During the year 2018-19 Kayaka Scheme
Primary Agricultural and Rural has been implemented to enhance
Development Banks, who have borrowed skill and entrepreneurship quality in Self
loans for the purpose of digging wells and Help Groups to encourage taking up self
released an amount of Rs.2.63 corers for employment and increase their income.
this purpose during the year 2016-17. Under the Kayaka Scheme , loan to SHGs
Loan waiver of failed bore wells of farmers has been disbursing through DCC banks at
borrowed loan from Primary Agricultural 0% for loan upto Rs 5 lakhs and at 4 %
and Rural Development Banks. interest rate for loans between Rs 5 lakhs to
Rs 10 lakhs.
Economic Survey of Karnataka 2019-20 593

During the year 2018-19 loan of Rs 12.50 As on 10-07-2018 an estimated of Rs.19.07


crores for 232 SHGs has been released.As lakh farmers have an outstanding loan to
on the end of October 2019-20 loan of the tune of Rs.9099 crores in cooperative
Rs 4.65 crores for 121 SHGs has been banks and Rs.18.19 lakh farmers have
released. During this year a budget of Rs registered themselves for availing in this
10.00 crores has been ear marked and so far scheme. After limiting the scheme benefit for
Rs 15.00 lakhs has been released to 38 Rs.1 lakh and excluding the salaried,
SHGs under this scheme. pensioners and income tax assessee, it is
estimated that 18.08 lakh farmers will
Rs.1 lakh loan waiver scheme per family- benefit to the tune of Rs.7715 crores under
2018 the scheme. So far Rs.15.90 lakhs farmers
Govt. order has been issued on 14-08-2018 have fulfilled the criteria and are eligible for
to waive upto Rs.100000 of crop loans of loan waiver of up to Rs.7383.32 crores.
farmers who have loan outstanding as on During the year 2018-19 Rs. 2600 crores
10-07-2018 in cooperative societies with a has been released to 410375 farmers.
maximum of Rs.1 lakh of benefit for a During the year 2019-20 a budget of
family, excluding the salaried, pensioners Rs.6150 crores has been made. So far Govt.
and income tax assessee. The loan waiver has released Rs.4783.32 crores towards
will come into effect on due date of this. Rs.4284.81 crores has been released
repayment. to savings bank accounts of Rs.10.88 lakh
Co-operative institutions are entering the beneficiary farmers. This amount will be
farmer's information into the loan waiver adjusted to the loan accounts of co-
software developed by Revenue Department. operative bank
Identification of loan waiver beneficiaries is
under process by collecting self declaration
by farmers and entering the same into the
software.
594 Economic Survey of Karnataka 2019-20
HUMAN DEVELOPMENT
CHAPTER 12

12.1 EDUCATION Karnataka, the fast growing economy's


growth is based on the knowledge base of
There is a tremendous advancement in the
the society. The State has embarked on
field of knowledge, anew. The impressive
significant reforms in the education sector
development of education is termed as
with increased public investment to ensure
education explosion. But unfortunately the
access, equity and quality in education, with
quantitative change has not been
community involvement. Hence there are
accompanied by conceptual and qualitative
significant developments in all fields of
changes of comparable scale and depth,
education.
appropriate to the new situations,
requirements and needs (UNESCO, 1998). 12.1.1 Literacy in Karnataka
Thus changes in the field of education have
A review of growth of literacy during the
become indispensable for the better.
2001–2011 decade shows that Karnataka
Education should nurture the all-round
has achieved significant progress. The
development of an individual's personality,
literacy rate in the State during 2001 was
and thus make them an active member of
66.64 per cent, which increased to 75.36 per
knowledge society and a productive citizen
of the country. cent in 2011 (Table 12.1)

Education is having both intrinsic and Karnataka's overall literacy rate, male and
instrumental value and provides useful female literacy rates are above the national
services for the development of nation and average. Urban male literacy rate in the
enrichment of an individual's life. The State has crossed 90 per cent. However,
positive externalities of Education make it a rural female literacy rate in the State is yet to
public good, and therefore it needs to be cross 60 per cent. The literacy rank of the
supplied by the State as markets cannot State was 9th among 16 major States (States
provide it to the socially optimal levels. The with a population of more than 100 lakh)
human development paradigm recognises during 2001 and the same position is
the role of education in the expansion of maintained in 2011. The overall increase in
choices for wellbeing, security and comfort. literacy rate in the State during this decade
Therefore, the right to education is is 9 per cent. Districts like Kalburgi
recognized as one of the fundamental (undivided), Bengaluru Rural, Bagalkot,
human rights and the drive towards Raichur, Kolar, Chamarajanagar,
universal elementary education aims at Vijayapura and Bidar with a lower literacy
ensuring its delivery. rate in 2001 have crossed the State average
literacy rate in 2011. This is attributed to

Table12.1: Literacy rates in Karnataka and India


Karnataka India Karnataka (Rural) Karnataka (Urban)

Persons 75.36 73.00 68.73 85.78

Males 82.47 80.90 77.61 90.04

Females 68.08 64.60 59.71 81.36


Source: 2011 Census

595
596 Economic Survey of Karnataka 2019-20

literacy programmes implemented by the categories. In 2019-20 there were 24316


Department of Education with a focus on Lower Primary, 38003 Higher Primary
backward districts/regions of the State. The and 16808 High Schools in the State
SSA and RMSA initiatives resulted in good (Table 12.2).
schooling facilities, attractive incentive
In the total number of schools, the
schemes to improve learning, quality
percentage of Government education
assurance measures and increased
department's schools is as high as 85.42
awareness among the community.
percent in lower primary schools and 59.24
12.1.2 Status of School Education percent in higher primary schools. However,
Education Department's participation is low
In the state general education system is
in secondary education as only 28.12
divided into different levels such as pre-
percent of the high schools are managed by
primary level, primary level, upper primary,
Government. Government schools are
secondary education, under graduate and
mainly located in rural areas, where as
post-graduate education.
private schools are largely urban based.
School education in Karnataka is imparted
Elementary Education
through Lower Primary Schools (LPS, class I
to V), Higher Primary Schools (HPS, class I to Article 21 A of the Constitution of India and
VII / VIII) and High Schools (VIII to X). These the Right of Children to Free and
schools fall under three categories based on Compulsory Elementary Education (RTE)
type of management, namely (i) Government Act 2009 became operative in April 2010.
schools managed by the Departments of The State Rules under the RTE Act were
Education, Social Welfare and local self- notified in 2011. These developments have
governments (ii) Government aided schools thrown open fresh opportunities for quality
and (iii) Private unaided schools. There are schooling for children.
also few 'other' schools consisting of mixed

Table 12.2 : Schools by Management in Karnataka (2019-20)


Social
Education Un- Others +
Category Welfare + Aided Total
Department Aided Central
Local b ody
No. 20771 27 203 3203 112 24316
Lower Primary
Schools
% 85.42 0.11 0.83 13.17 0.46 100

No. 22514 351 2783 11441 914 38003


Upper Primary
Schools
% 59.24 0.92 7.32 30.11 2.41 100

No. 43285 378 2986 14644 1026 62319


Elementary
Schools
% 69.46 0.61 4.79 23.50 1.65 100

No. 4726 300 3788 7265 729 16808


Secondary
Schools
% 28.12 1.78 22.54 43.22 4.34 100

Total No. 48011 678 6774 21909 1755 79127


(Elementary +
Secondary) % 60.68 0.86 8.56 27.69 2.22 100
Source: SATS 2019-20
Economic Survey of Karnataka 2019-20 597

a) Access: There has been significant Schools during the period 2018-19 to
progress in improving access to schools 2019-20
in the State. The State has the policy to
c) Enrolments:
start a new primary school within one
kilometer in habitations where the i. Enrolment during 2019-20 in primary
population is more than 100 and child (class I to V) and in upper primary (class
population is more than 10. HPS is VI to VIII) stage was 54.33 lakh and
provided within 3 Kilometer radius and 31.24 lakh respectively (Table12.4). It
High Schools in 5 Kilometer radius. is noted that 83.24 percent of children
Feeder schools or transportation are studying in rural government
facilities are provided in small and schools.
sparsely populated habitations. All
habitations with a population of 100 ii. Since last years the enrolment has
and above now have access to a primary decreased marginally in the class I to V
school within a distance of one primary stage and an increase
kilometer. HPS are being upgraded to marginally in the class VI to VIII higher
include class 8, wherever there are no primary stage. This increase in higher
High Schools within 3 Kilometers. A primary is due to the continued efforts
total of 7817 HPS has been upgraded so made by the State for successful
far. completion of schooling at class V and
there is decreasing retention at upper
b) Number of Schools: During 2019-20, primary stage.
there were 62319 elementary schools in
iii. The number of SC / ST children in class
the State, of which 24316 were LPS and
I to VII in the State is 2017790.
38003 were HPS. In 2018-19, the State
had 25278 lower primary, and 36951 iv. Total enrolment in the State in 1 to 10
higher primary schools. The number of standards has marginally increased
LPS decreased by 962 and HPS is from 101.14 lakh in 2015-16 to 103.93
increased by 1052 between 2018-19 lakh in 2019-20. Both gender parity
and 2019-20. There were15867 high and gender equity are nearing unity in
schools in the state during 2018-19 and the State. Gender Parity in enrolment at
16808 schools in the year 2019-20. primary and upper primary is 0.99 and
There is a increase of 941 school during 1.02 in Government + Aided schools.
2019-20(Table12.3). Ratio of girls to boys (gender parity
index) in primary education is the ratio
From the above Table it can be noted that,
of the number of female students
there is an decrease in the number of lower
enrolled at primary level of education to
primary schools and increase in Higher
the number of male students in this
Primary Schools and also increase in High
level.

Table12.3: Schools in Karnataka (in nos.)


Schools 2015-16 2016-17 2017-18 2018-19 2019-20

Lower Primary 26118 26696 25795 25278 24316

Higher Primary 34795 35498 36197 36951 38003

Total Primary 60913 62194 61992 62229 62319

High Schools 15140 15773 15560 15867 16808

Total 76053 77967 77552 78096 79127

Source: U-DISE and SATS 2019-20


598 Economic Survey of Karnataka 2019-20

Table 12.4: Schools and Enrolments in Karnataka 2015-16 to 2019-20 (in No's)

Enrolments (All types of


2015-16 2016-17 2017-18 2018-19 2019-20
Schools)

Enrolments classes I to V

Total ( in lakh) 54.05 54.49 54.04 54.80 54.33

Boys ( in lakh) 27.87 28.25 28.06 28.50 28.26

Girls (in lakh) 26.19 26.24 25.98 26.30 26.08

Enrolments classes VI to VIII

Total ( in lakh) 29.34 29.20 29.59 30.50 31.24

Boys ( in lakh) 15.19 15.26 15.35 15.78 16.05

Girls (in lakh) 14.16 13.94 14.24 14.72 15.19

Enrolments IX to X

Total ( in lakh) 17.74 18.04 17.59 17.83 18.36

Boys ( in lakh) 9.24 9.44 9.16 9.28 9.57

Girls (in lakh) 8.50 8.59 8.43 8.55 8.78

Enrolment Total 1 to 10 101.14 101.74 101.24 103.13 103.93

Boys (in lakh) 52.30 52.96 52.59 53.56 53.88

Girls (in lakh) 48.84 48.78 46.65 49.57 50.05

Total Schools in State


76053 77697 77552 78096 79127
[ 1 to 10]
Source: U-DISE and SATS 2019-20

v. Gross Enrolment and Net Enrolment namely Vijayapura, Bidar, Yadgir,


Ratios (GER &NER): During the 2019- Kalburgi, Koppal, Ballari Dharwad,
20, GER and NER lower primary are Raichur, Gadag, Haveri, Chikkodi,
103.80 and 96.40 respectively. At Chitradurga, Davangere, Chikka-
Higher primary stage GER and NER are ballapura, Kolar, Chamarajanagar. The
99.60 and, 79.16 respectively (Table RTE Act specifies that drop-out children
12.5). Changes in GER and NER across should be mainstreamed in regular
recent years are slightly constant. schools. Every drop-out-child is
expected to be enrolled in a nearby
d) Drop-out Rates: school and provided Special Training.
In the Annual report 2019-20, Samagra Progress of the child is periodically
Shiksha – Karnataka (SSK) had assessed on a learning ladder on the
identified 10448 (7 to 14 years) drop- basis of which, the child is admitted to
out children in state. Most of the drop- an age-appropriate class (Table12.6).
out children were in the districts
Economic Survey of Karnataka 2019-20 599

Table 12.5: GER and NER at Lower Primary, Upper Primary and Secondary Stages
(in %)
Primary level Upper primary level Secondary Level
Year
GER NER GER NER GER NER

2006-07 108.28 98.43 107.25 98.52 62.00 -


2007-08 110.93 96.10 107.53 95.61 65.00 -
2008-09 107.15 97.33 107.48 98.09 69.77 39.03
2009-10 106.53 95.21 103.10 95.15 75.29 45.07
2010-11 107.53 98.86 103.92 93.57 81.42 58.47
2011-12 107.46 99.21 105.16 96.95 85.65 65.76
2012-13 106.81 97.69 105.66 94.83 84.54 69.30
2013-14 102.36 93.56 90.47 81.78 75.99 55.33
2014-15 102.97 95.47 89.18 81.37 77.31 55.97
2015-16 102.97 95.47 93.36 79.16 83.22 61.75
2016-17 103.71 96.40 92.90 79.16 83.22 61.75
2017-18 102.71 94.45 93.99 80.35 82.37 64.07
2018-19 104.40 95.72 97.07 81.77 83.68 64.45
2019-20 103.80 96.40 99.60 79.16 86.19 61.75
Source: U-DISE and SATS 2019-20

Table12.6: Drop-out Rates in Lower Primary and Higher Primary Stages(2019-20)


(in %)

Stage All children All (Boys) All (Girls)

Lower Primary 1.93 2.24 1.59

Higher Primary 2.94 3.03 2.84

Source: SATS 2019-20


e) Out of School Children (OOSC)- are brought into mainstream through
Strategies for: various following programmes.
As per RTE Act 2009, it is mandatory to The number of never enrolled children is
provide free and universal education to all quite low as compared to Dropout children.
children aged between 6 and 14 years. In It showed a decreasing trend over the years.
this context, the updated census was taken The children in the age group of 6+ below 7
from SATS and 10448 children between the years are enrolled directly during the special
age of 7 years and 14 years were identified as enrollment drive (Table12.7).
school dropout children. And also 850
Steps to ensure continuation of
children of previous year were prevented
from school dropout. Among the total 11298 mainstreamed children in regular schools
children identified till December end, Out of r School dropout period of children out of
this MHRD has approved plan for 11298 school is considered to be 7 days instead
children. 4196 children (till December end) of 60 days.
600 Economic Survey of Karnataka 2019-20

Table 12.7: Special enrolment drive to out of school children target and
achievement for the year 2019-20 (upto Dec 2019)

TARGET ACHIEVEMENT
Unit
Financial Financial
Sl.No Activity Master Cost
Physical (Rs in Physical (Rs in
Lakhs) Lakhs)

6 Month (Non-Residential
1 0.03 698 20.94 343 0
- Fresh)

6 Months Special Training


2 0.1 251 25.1 42 0
(Residential - Fresh)

12 Months Special
3 Training (Residential - 0.2 729 145.8 0 0
Fresh)
6 Months (Non -
4 0.1 850 85 600 33.72
Residential - Prev. Year)
5 Maqtab & Madarsas (New) 0.06 95 5.7 0 0

6 Home Based Education 0 8 0 0 0

7 Hostel Fasility 0 932 0 121 0

School Based Special


8 Training(Without 0 7735 0 3090 0
volunteers)

TOTAL 0 11298 282.54 4196 33.72


Source: SATS 2019-20

r To prevent absenteeism of children and bring out cooperation and coordination


to attend schools regularly Education of other departments. Similarly, the
Coordinator (ECO) is appointed as Coordination Committee at District and
Attendance Authority. In case Taluka levels are formed and they are
absenteeism of more than 7 days is functioning.
found, ECO is supposed to visit the r Each school is ordered to maintain the
students' family to persuade the VER (Village Education Register) / WER
parents to bring their children to (Ward Education Register).
schools and this method is being
implemented. r Totally 71 Kasturba Gandhi Balika
Vidyalaya(KGBV) schools and 86
r Free uniform, text books, mid-day KKGVB Hostels are opened in
meals plan, Ksheerabhagya, vitamin educationally backward blocks so that
tablets etc. are provided to encourage drop out girl students are admitted to
students to attend schools regularly. continue their education on priority
r Scholarships and admissions in hostels basis.
are provided to coordinate different r Pamphlets are printed in this regard to
incentives given by other departments reach out parents who take admissions
regarding Child Education. for their children and also action is
r Under the chairmanship of Honorable taken so as to teachers visiting the
Chief Secretary, the Inter departmental parents' homes to persuade them to
Coordination Committee is formed to send their children to schools.
Economic Survey of Karnataka 2019-20 601

r Accommodation is provided to students other facilities. The main five facilities


in the hostels run by other (Pancha Soulabhya) are drinking water,
departments. Toilet, Play Ground, Compound Wall and
r Action is taken to collect the data of all School Building. Significant progress is
children who have come to mainstream achieved by the state in providing
in the Vidyavahini software. fundamental facilities as shown below in
Table 12.8, 12.9 and Figure 12.1, 12.2. As
r The process of bringing in the school shown below, significant achievement is
dropout children to mainstream is a observed in providing toilet to girl students.
continuous and all the measures are There is a large difference in the data of
taken in this regard. 2018-19 and 2019-20 is due to during
f) Infrastructure 2018-19 only Government schools were
considered but during 2019-20 as per the
i) Basic facility under Sarva Shikshana
SATS data all the category of schools are
Abhiyan
considered.
Efforts are made by the state under
ii) School Buildings and Classrooms
universalization of Primary Education
Scheme to provide building to school, Building is important aspect of the physical
additional room, aid for repair and infrastructure of Schools. Majority of
maintenance of schools. Under RTE Act, the schools, that is 43285 schools (98.36%) out
state has put sufficient efforts to provide of 62319 elementary schools of the
basic facilities like free admission, sufficient department possess own buildings
class rooms, separate toilets for boys and (Table12.10). The remaining 1.64 per cent
girls, playground, library, compound includes those operating in rent free or
/fences, drinking water, toilet, kitchens and rented building and schools without any

Table 12.8: Fundamental facilities in Primary Schools (Elementary)


Toilets Toilets Play Wall Drinking
Year Electricity Ramps Library
for Boys for Girls Ground Compound Water
2011-12 97.91 98.81 95.49 54.34 78.27 69.21 99.55 98.66
2012-13 99.72 99.9 99.56 55.74 79.83 73.48 99.92 99.35
2013-14 99.97 99.98 98.71 56.3 80.96 75.48 99.99 99.66
2014-15 99.76 99.94 98.99 56.87 83.37 77.33 99.98 99.73
2015-16 99.28 99.72 98.71 57.02 83.34 78.37 99.94 99.74
2016-17 97.13 98.63 97.67 57.31 61.80 78.77 99.78 99.67
% More /
-2.15 -1.09 -1.04 0.29 -21.54 0.40 -0.16 0.01
Less

2017-18 93.73 96.01 94.17 63.94 47.24 79.70 97.31 39.39

% More /
-3.40 -2.62 -3.50 6.63 -14.56 0.93 -2.47 -60.12
Less
2018-19 93.13 95.49 93.92 63.55 46.73 79.65 96.60 34.45

% More /
-0.60 -0.52 -0.25 -0.39 -0.51 -0.05 -0.71 -4.94
Less

2019-20 92.52 96.29 86.43 52.23 58.08 77.93 97.28 87.41


% More /
-0.60 0.80 -7.49 -11.32 11.35 -1.72 0.68 52.97
Less
Source: U-DISE and SATS 2019-20
602 Economic Survey of Karnataka 2019-20

Figure 12.1: Basic facilities in Primary Schools,(Elementary)

Table 12.9: Details of Basic Facility in High School across the state

Toilets Toilets
Play Wall Drinking
Year for for Electricity Ramps Library
Ground Compound Water
Boys Girls
2011-12 88.87 93.01 82.69 75.01 38.18 62.02 97.86 94.05

2012-13 99.30 99.59 92.32 76.65 40.05 63.94 99.32 96.49

2013-14 98.70 99.74 92.76 78.53 45.29 67.68 99.47 98.11

2014-15 99.78 99.93 97.33 82.16 55.74 74.12 99.87 99.09

2015-16 99.79 99.94 97.94 82.70 59.78 76.22 99.89 99.40

2016-17 98.89 99.56 99.22 83.17 50.67 77.29 99.85 99.51


%More/Less 0.90 0.37 1.28 0.47 -9.10 1.07 -0.03 0.11

2017-18 98.53 99.07 98.39 89.32 28.93 84.02 99.32 48.80

%More/Less -0.36 -0.49 -0.83 -6.15 -21.74 6.73 -0.53 -50.71

2018-19 97.50 98.09 97.35 88.38 28.34 83.66 98.16 41.49

%More/Less -1.03 -0.98 -1.04 -0.94 -0.59 -0.36 -1.16 -7.31

2019-20 93.47 97.73 91.46 82.22 57.02 78.26 99.27 90.64


%More/Less -4.02 -0.36 -5.89 -6.16 28.68 -5.40 1.11 49.15

Source: U-DISE and SATS 2019-20


Economic Survey of Karnataka 2019-20 603

Figure 12.2: Basic Facility in High Schools

building facility. During 2019-20, there high at 1:55.48 and 1: 31.61 respectively
were 210313 classrooms in elementary (Table12.12).
schools indicating an increase of 21371
12.1.3 Quality Improvement Initiatives
classrooms in about ten years. 69.65% of
classrooms are in good condition. 11.82% Elementary Education: Quality Initiatives
classrooms need minor repairs, while are classified based on their focus on
18.53% of classrooms require major repairs. distinct stakeholder's groups: Schools,
Out of a total of 16808 secondary schools in Students, Teachers, Community and
the State, 4732 belong to the DoE. About Administration. Programmes under these
96.49% of schools of the Department initiatives serve more than one stakeholder
possess own buildings (Table12.11). groups simultaneously.
(h) Teachers a) Infrastructure: Provision of infrastruc-
ture facilities and adequate classrooms
In 2019-20 in the state, 281768 teachers
is the basic strategy for quality
(89.29%) are working in the LPSs and HPSs
schooling. In addition, every school is
against the sanctioned vacancies of 315557.
given 1) School Grant and 2)
Further, in aided schools at the elementary
Maintenance Grant. They are directly
stage, 15931 were working against the
transferred from the district
sanctioned posts of 22055. It is observed
educational office to individual schools
that 75.37% of the teachers in Government
and jointly operated by the President of
schools at the elementary stage are female
the School Development and
teachers. Teacher-Pupil ratio is satisfactory
Monitoring Committee (SDMC) and the
in Government schools; the average PTR
Head Teacher. The School Grant is used
being 1:26.06 at the elementary stage.
for procurement of charts, maps,
However, variations are seen across
specimens, newspapers, consumable
districts, blocks and at school levels. The
chemicals, chalk and other sundry
State has adopted a policy to rationalize
items. Maintenance Grant is used for
teacher deployment to correct such
paying electricity, water bills, white-
imbalances. However, PTR in private
washing, hygienic maintenance of
aided and unaided schools is comparatively
604 Economic Survey of Karnataka 2019-20

Table12.10: Classification of Elementary Schools by type of ownership of buildings


– Education Department Schools only
Rent
Category Govt. Building Rented No Building Others Total
Free

Elementary Schools 42577 300 379 0 29 43285

Percentage to Total Schools 98.36 0.69 0.88 0 0.07 100.00

Source: SATS 2019-20


Table12.11: Classification of Secondary Schools by type of ownership of buildings –
Education Department Schools only

Category Govt. Rented Rent No Others Total


Building Free Building

Secondary Schools 4566 125 15 7 19 4732


Percentage to total
Schools 96.49 2.64 0.32 0.15 0.40 100.00

Source: SATS 2019-20

Table12.12: Teachers in various types of schools (2019-20)


Teachers Education
SW + LB Aided Unaided Others Total
(Working) Dept.

Elementary level 166943 2334 15931 95494 1066 281768

PTR 26.06 35.00 55.48 31.61 49.76 28.14

High Schools 38401 2556 28188 36276 754 106175

Source: SATS 2019-20

school and similar heads. Major repairs benefitted. The construction of full-
grants are given on the basis of fledged building for Bengaluru South,
evidence-based demands. Dakshina Kannada, Mysuru and
Shivamogga District are completed but
b) Residential Schools for Specific in the Dharwad district is in progress
category of children: Five residential and the construction is expected to be
schools for specific category of children, completed within 3 months. Teachers
one each in Bengaluru Urban, are provided to these schools both from
Dakshina Kannada, Dharwad, Mysuru the Department and on outsource
and Shivamogga sanctioned under RTE basis. Other staff like warden, accounts
have been established during 2011-12. assistants, D-group and watch man
The intake capacity of each school is have also been appointed. Apart from
100 and presently 472 children are providing good education, children are
studying in these schools. In Bengaluru also being trained in sports, life skills
Urban, Mysuru and Dharwad these and self defense. Enrolment in
schools are catering to the needs of Residential Schools for Specific
deprived children in urban areas category of children during 2019-20 is
whereas in Shivamogga and Dakshina as given in Table 12.13 below.
Kannada, children from forest and
Naxal affected areas are being
Economic Survey of Karnataka 2019-20 605

Facilities provided in Residential d) Kasturba Gandhi Balika Vidyalaya:


Schools: Efforts have been put by Central and
r Four posts of teachers are sanctioned to State Govt. to educate girl children. 71
all residential schools. KGBV residential schools in 69
educationally backward blocks for girls
r Supporting staff including D-Group of 6th Std. to 8th Std. have been
and Watchmen have been appointed. established to continue education
r Arrangements have been made to under SSA of Central Resource
supply nutritious food to each school. Development Department in the view of
r Children are provided training in self gender disparity, rural areas, weaker
defense and vocational skills. sections of society, SC/ST and
economically backward classes. KGBV
r Adequate measures are taken for the at Siddapur of Gangavati taluka,
safety and security of the children. Koppal Dist and KGBV at Sindhanur of
r Proper medical care is provided. Raichur for girls of Muslim minority are
c) Nali Kali: All Government of Kannada imparting education in Urdu medium.
and Urdu medium Primary schools in Enrollment details of KGBV in 2019-20
the state have adopted the NALI KALI
mode in the learn and teach method. All r Number of KGBV with 100 students: 47
the schools are supplied with revised r Number of KGBV with 150 students: 24
Nali Kali learning cards. Totally 15477
r Total enrollment of at KGBVs: 8300
teachers are trained in this method and
assigned Nali Kali classes. Head r Total number of students enrolled at
Masters of all schools too are trained. KGBV: 8079

Table 12.13: Enrolment in Residential Schools for Specific category of children


during 2019-20

Enrolment
Gender
Sl. District & Place Social category wise
wise
No.
Boys Girls SC ST Muslims others Total

Bengaluru South – Govt. Model


1 School Premises, Arehalli, 58 39 44 11 0 42 97
Banashankari, Bangalore South

Dakshina Kannada – Govt. Model


2 School Premises, Beltangadi Main 62 38 15 6 4 75 100
Road, Beltangadi

Dharwad – Govt. HPS No.8, Opp.


3 Nehru College, Ghantakeri, Hubli 45 51 12 11 7 66 96
City

Mysuru Govt. HPS Premises,


4 66 34 40 17 0 43 100
Nazarabad, Mysuru North Zone

Shivamogga – Govt. HPS Premises,


5 38 41 26 5 0 48 79
Agumbe, Teerthahalli Taluka

Total 269 203 137 50 11 274 472

Source: SATS 2019-20


606 Economic Survey of Karnataka 2019-20

Facilities at KGBV schools: g) Research, Evaluation, Monitoring &


Supervision (REMS):
r Improved school building.
r Supply of good quality nutritious food. REMS is one of the major interventions
that focuses on Quality Dimension of
r Computer education and compulsory education under Samagra Shikshana-
medical check-up in schools. Karnataka(SSK) . The approved
r Personality development education activities under REMS focus on
including music, yoga, karate and Research and Evaluation which helps
cultural programmes. in assessing the strengths and
r Learning opportunity of vocational skills weaknesses of the educational
such as sewing, embroidery, doll practices. Monitoring and Supervision
making, and repairing electronic items. activities were conducted as per RTE
compliance. The activities conducted
r Parallel methods of learning for slow under REMS are means to achieve
learning children. quality in education. REMS activity is
r Extension of different departmental managed in 2 stages namely; State
programmes, conducting guest lectures Stage and District Stage.
and seminars.
12.1.4 Secondary Education
e) Children with Special Needs (CWSN):
With significant gains in primary education,
There are 80683 children in the state the State has set in motion the planning
who are identified with special needs process for universalization of secondary
group among which 72204 children are education to achieve the target of 85%
enrolled into schools and 8479 children enrolment in 14-18 age groups in classes 9
of them need most special needs care to 12. The State is also committed to
and are provided with home based strengthening the knowledge base of the
education. Other children of this society to sustain higher rate of economic
category are identified in medical growth.
camps, enrolled into schools equipped
with educational aids. a) Institutions / Enrolment / Teachers
f) Training for Teachers and The State has a total of 16808 secondary
Administrators : schools of which 4726 schools are run by
the DoE, 300 SW and LB schools, 3788 by
During the year 2019-20, a total aided managements, 7265 by private
financial outlay of Rs. 4,824.82 lakh unaided managements and 729 by others.
has been approved by MHRD for The concentration of the secondary schools
training of teachers at Elementary level in the private unaided sector may be one of
and Rs. 2524.83 lakh for training of the reasons for the low access of children
teachers at Secondary level. The from marginalized groups to higher
trainings cover the needs of teachers, education 34.62 percent of girls are enrolled
Head masters, Educational in Govt. schools, and 65.38 percent of them
administrators and resource persons. study in aided / unaided / other schools.
DSERT is the nodal agency to impart
the training which covers 30 DIETS, According to the available data, in the state,
204 Bolock Resource Centers and total of 106175 teachers were working out of
4,103 Cluster resource centres. During 38491 teachers are working in Government
2019-20, MHRD has approved Rs. Secondary schools (Table12.14). The State
1,448.40 lakh for training of all SDMC has set the goal of making secondary
members of 48,280 schools of the State education of good quality available,
for one day. Funds have been accessible and affordable to all children in
released to DSERT for all the trainings. the age group of 14 to 16 years.
Economic Survey of Karnataka 2019-20 607

Table 12.14: Schools, Teachers & Enrolment in High Schools (2019-20)


Particulars Govt. SW+LB Aided Unaided Others Total

No. of Schools 4726 300 3788 7265 729 16808

Enrollment of Boys (IX to X) 302858 10097 259093 363303 22019 957370

Enrollment of Girls (IX to X) 304101 12124 239685 297586 24951 878447

Total Enroll ment 606959 22221 498778 660889 46970 1835817


No. of Teachers Working 38401 2556 28188 36276 754 106175

Source: SATS 2019-20

b) Rashtriya Madhyamik Shiksha c) National Skills Qualification Frame


Abhiyan (RMSA): work (NSQF)
Since Universalisation of elementary 1. Ministry of Human Resource
education has become a Constitutional Development, GOI has introduced the
mandate. Hence it is absolutely essential to new scheme of National Skills
push this vision forward to move towards Qualification Frame work (NSQF) to be
Universalisation of secondary education. In implemented under Rashtriya
this connection both central and state Madhyamika Shiksha Abhiyan (RMSA)
governments have initiated different as per the guidelines. The main
programmes to universalise elementary and objective of this programme is to
secondary education. Rashtreeya introduce vocational courses along with
madhyamika shikshana abhiyan is one of the regular courses and thus enable the
such programme implementing jointly by students to gain skills and
central and state governments on the competencies essential to get employed.
sharing basis. This is a continuing programme
implemented in 10 different levels
Objectives:
starting from classes 9th to12th and
r To provide a secondary school within a thereafter up to graduation, post-
reasonable distance of any habitation. graduation and Ph.D levels.
r To ensure that, no child is derived from 2. MHRD GOI has approved to introduce
secondary education. NSQF Scheme in 250 Govt. Composite
r To provide necessary infrastructure to Schools, out of this the State
impart effective education in all the Government decided to implement in
government high schools . 100 schools from 9th standard during
r To plan the programmes to ensure 2014-15, 2015-16 the scheme
quality education to all the children . implemented in 9th & 10th std and
during 2018-19 the scheme
Schemes subsumed Under RMSA: implemented in 9th, 10th and 11th
r 70 Girls Hostels for 9th and 10th (PUC Ist Year) under IT / ITEs,
standard students in educationally Automobile, Health Care, Retail, Beauty
backward blocks one in each block. & Wellness sectors. PAB approved 50
more schools to the existing 100 schools
r Integrated education for disabled
where NSQF is to be implemented,
children of secondary schools
bringing the total to 150 schools in
r Vocation education Karnataka.
Activities Approved from MHRD for the 3. Each school is allotted 02 sectors. 300
year 2019-20 : vocational trainers to 150 Government
The important activities implemented as per High schools.
guidelines are (Table 12.15)
608 Economic Survey of Karnataka 2019-20

Table 12.15 : Activities Approved from MHRD for the year 2019-20

Samagra Shiskhna Karnataka Activities


Sl.No.
(SSA) (RMSA)

1 School Grants

2 Teachers Salary Headmasters Salary

In service Teacher training to all Government and Aided School Teachers and
3
Head Teachers

4 SDMC Training Self-defence skills for girl children

5 Maintenance grant Science And Mathamatics Mela

6 Kala Utsav programme

MMER (Monthly Monitoring


7 SwachaBharath – SwachaVidyalaya
Evaluation Report)

8 Girls Hostel

Inclusive Education of the Disabled at Secondary Schools (IEDSS) CWSN


9
children

10 Books and Stationary

11 Civil Works

12 Free Text books


Enhancing of Learning activities
13
in education
14 Inclusive Education (CWSN) Vocational education

15 Residential Schools for special category

Kasturba Gandhi Balika Vidyalaya


16
(KGBV)
English Training & Remedial
17 Major Repairs
Teaching

18 RTE re-imbursement Sports & Tournaments Activities

19 Management Cost (District & State) Equity Components

20 Teacher Training Girls Empowerment Programme

21 Student Oriented Activities

Source: SATS 2019-20


Economic Survey of Karnataka 2019-20 609

4. The students of 9th and 10th Std. who department to manage Pre -University
have opted vocational subject under Education and created a separate cadre of
NSQF are exempted in studying 3rd lecturers and principals to staff the
Language and the students of 11 and government PU colleges, PU stage is being
12th Std. opted vocational subject treated as a separate stage as well as a
under NSQF are exempted from in separate sub sector of education in
studying either one of the languages. Karnataka. However, for budgetary
purposes, PU education gets its funds from
d) Student Achievement Tracking Secondary Education budget-head.
System - “Shikshana Kirana”
Pre University Education is considered as a
“Shikshana Kirana”, the Students preparatory stage for university courses.
Achievement Tracking System that tracks The course offers two languages and four
every child enrolled in school, by unique electives, which are to be selected from a
identity and name, regularity, academic wide range of subjects (34 + NSQF subjects).
performance, promotions, transfers, These electives are further classified under
identify drop outs etc., has captured student three different streams: Arts, Science and
specific data of about 1 crore students Commerce.
studying in all schools of the state. The
system is designed for online monitoring of Pre-University education is an important
the performance of students, teachers and milestone between school education and
school managements. higher education. A separate Pre-University
education department has been established
This system could already digitize the in the state to plan, design and implement
records of more than one crore students, the entire Pre-University education
four lakhs teachers and seventy nine programme. The Government participation
thousand one hundred and twenty seven is immense in pre-university education
schools in the whole state including private (Table 12.16). It is observed that the
aided and unaided schools. . number of girl students admitted in
Adhar information linked with student Government Pre-University Colleges is more
details is under process, Online verification than that of private aided and unaided
of Caste and Income certificate. Automation colleges. This indicates the need for
of SSLC examination system through online expansion of these colleges in future to
(Nominal roll, Admission ticket, question promote girls' education.
paper indent). Text book indent generated Financial assistance is provided under
through online and conducting online NABARD-RIDF and Special Development
Student Achievement Test. Plan to meet the infrastructure require-
12.1.5 Pre-University Education: ments of the PU Colleges. Orientation
programmes are organized by the
Establishment of the Department of Pre department for lecturers with a view to
University Education: upgrade their knowledge and improve the
In order to administer the +2 stage of results. Emphasis is placed on those
education, the 'Karnataka Pre University districts where the pass percentage is low.
Education Board' was established in 1971. Henceforth, as per National Policy, pre-
The Board was abolished in 1988 and it was university stage of education will be a part of
converted into the 'Directorate of Pre- secondary education. It will not be tailored
university Education' in 1992. All colleges to University needs and it will not be pre-
imparting PU education in the State come university stage but senior secondary stage.
under the purview of the Directorate. The a) Enrolements:
Directorate looks after the administration,
examination and academic matters of the The year 2007-08 has been significant with
PU stage. regard to enrolments in the pre-university
stage (Table 12.17). There is a direct
Since the government formed a separate relation between percentage of passes at X
610 Economic Survey of Karnataka 2019-20

standard public examination (SSLC) and of pool of scientists in the country after post-
demand for pre-university education. graduate and research courses. Both school
Results at X standard were between 50% to science education and scientific pursuits
60 % till 2007. X standard results has suffer because of this trend. Initiatives by
improved significantly since 2007 onwards the Indian Institute of Science (Bangalore) to
and is currently around 75% to 80%. attract science talent for integrated 5-years,
post-graduate courses after the pre-
Still, it is observed that there is an attrition
university stage by offering a variety of
of around 11.50% between I and II years of
incentives need to be emulated and
pre-university education. This attrition has
expanded.
implications for expenditure levels across
two years. Career guidance and counseling b) Completion Rates:
programmes , if conducted immediately
after the announcement of the X standard Pass percentage at pre-university is about
examination results, may help in reduction 66.58% in science courses (Table 12.19).
of dropouts. This will normally be around 25% to 50% of
previous year's enrolments. It is also seen
The Education Commission of 1966 had that girls fare better than boys in II PUC
suggested an enrolment limit of 30% to 35% examination. Girls who reach II PUC are
for Arts courses. However, even by 2008-09, from among those who are left out after
nearly 50% of enrolments are in Arts being subjected to higher degree of
courses (Table 12.18). Relative proportions screening at various levels. This is not the
at II PUC stage do not change substantially. case of boys. It is also noted that English
The low enrolments in science courses are a medium results are always better than
cause for concern. There is a rush for Kannada medium results.
professional courses from science stream.
This is not the case with respect to Arts and c) Trainings and Programmes:
Commerce Courses. Low proportion of r Training : Capacity building training
science enrolments and the attraction of programmes was conducted in 20
professional courses lead to low enrolments different subjects for improving quality
in graduate science courses. Graduate of 2nd PUC results across the state of
science courses serve as nurseries for Karnataka. More than 15761 lectures
preparation and supply of science teachers of Government and Aided PU colleges
for secondary schools, as well as for creation utilised the training programme.

Table 12.16: Institutions at Pre-University Level (Nos.)


Institutions Govt. Aided Unaided Corporation Total

2011-12 1200 675 1874 13 3762

2012-13 1201 775 1995 13 3984

2013-14 1203 795 2145 13 4156

2014-15 1203 795 2346 13 4357

2015-16 1203 795 2778 13 4789

2016-17 1204 797 2990 13 5004

2017-18 1229 797 3196 13 5235

2018-19 1231 797 3194 13 5235

2019-20 1231 798 3435 13 5477

Source: Dept. of PUE


Economic Survey of Karnataka 2019-20 611

Table 12.17: Students Strength In Pre-University Courses


Year Ist PUC IInd PUC Attrition % age
2007-08 528879 433183 5195 1.21
2008-09 534430 434425 94454 17.86
2009-10 555977 428580 105850 19.81
2010-11 518179 450700 105277 18.94
2011-12 575673 430625 87554 16.90
2012-13 625542 480268 95405 16.57
2013-14 562449 467985 157557 25.19
2014-15 611570 496255 66194 11.77
2015-16 643508 516508 95062 15.54
2016-17 613865 566774 76734 11.92
2017-18 647319 540367 73498 11.97
2018-19 640644 563772 83457 12.91
2019-20 652350 567126 73518 11.50
Source: Dept. of PUE

Table 12.18: Enrolments Across Courses In Pre-University (2019-20)


Stage Arts Commerce Science Total

I year (No.s) 200400 248029 203921 652350

II year (No.s) 155243 222814 189069 567126

Proportions (%)

I year 30.71 38.02 31.25 100%

II year 27.37 39.28 33.33 100%

Source: Dept. of PUE

Table 12.19: Pass Percentage at Pre-University Level across Courses (2018-19)


Perform ance Arts Commerce Science Total

Appeared (No.) 200022 253865 217766 671653

Passed (No.) 101073 168531 144983 414587

Percentage 50.53 66.39 66.58 61.73


Source: Dept. of PUE

A budget of 1.56 crores was spent for grammar and spoken english classes
the training. were conducted in 411 nodal centres
r Vishwasa Kirana : In the academic year across the state to 2nd P U Students
2019-20, the classes were held from under SCP/TSP Scheme for Govern-
November-2019 and December -2019 ment P U colleges across the state. The
only on Sundays to improve English budget of 73.00 lakhs was spent for
this programme.
612 Economic Survey of Karnataka 2019-20

r Career Counselling And Guidance Subject is Prepared by subject experts


Cell: DPUE with the help of UNDP- and the same is uploaded on PU
DISHA has introduced career guidance website. www.pue.kar.nic.in.
cells in selected 50 Govt.P U Colleges in r PUC Text Books : PUC Text Books of all
the state. The programme aims at streams were printed and made
providing insight into career opportu- available to students at nominal rates.
nities for around 20,000 Girl students
in 50 GPUC. r College Dairies : College Dairies to P U
college students in all Govt. P U Colleges
r Youth Parliament : For the Academic across the state were Printed and
year 2019-20 at Pre University level in distributed free of cost.
order to gain Political knowledge “Youth
Parliament” competition is conducted, r Best lecturer and principal award : 2
this programme is being conducted by Principals and 8 Lecturers from
the P U E. Dept. since 2011-2012 . Government and Aided P U Colleges
were awarded with the best Principal
r Dhaklathi Andholana (Admission and Lecturers awards on teachers' day.
drive): Enrollment drive was under-
taken in all PU colleges to increase PU r Cultural activities : Cultural activities
student strength in colleges and at District, Division and state level are
enhance the enrolment. conducted every year and winners are
awarded cash prizes and certificates
r Fee Exemption For Girl Students : In
order to encourage the girl students to d) Sports and NCC Programmes: The
continue higher education, the Govt Department of Pre-University
has exempted from payment of fees to Education also facilities sports
the girl students studying in the Govt activates in the academic year 2019-20,
PU colleges. Under this programme 29 sports events were conducted at
143025 girl students benefitted during Taluk, District and State level students
the year 2019-20. who won 1st& 2nd place were selected
and send to national games conducted
r Laptop Programme:- In the year 2019- by SGFI (School Games Federation of
20, Under SCP/TSP scheme, students India).At nationals Karnataka team, till
scoring highest marks in Arts, Science today 22 teams were sent from PU
and Commerce combination are Department have won championship
awarded 01 Laptop each for SC trophies in Shuttle Badminton boys and
students for first three position & Plus Floor Ball girls and boys and in
03 laptops for second position, 01 individual team championship trophies
Laptop each under TSP for ST student were given to the students in the
at the district level to encourage the following games: Swimming boys,
students. Cycling (Road) girls, Sylambam girls
r NCERT Text Books Translated into and boys.
Kannada language : To benefit science The Department of Pre-University
students taking various competitive Education also facilitates NSS activities in a
examinations at national and state level number of PU college. In the Academic year
such as IIT/JEE,NEET, KVPY, CET, 2019-20, 800 Govt. and Private College had
CAT,AFLAT, CLAT etc..., NCERT text NSS units with 80,000 student volunteers.
books in Physics, Chemistry, Mathe- 550 Special Camps were conducted and
matics, Biology, Economics, Business 27,500 student volunteers participated in
Studies, Accountancy are translated these camps, Out of the 780 NSS
into Kannada meduium and one set Programme officers, 300 have completed
each of 1st PUC & 2nd PUC Books are training at life skill Training Programme.
supplied to Govt. P U College with
Science combination for free of cost. 1. Cleaning of roads, drainages,
construction of Toilets cleaning of
r Question Bank : To Support 1st & 2nd
Tanks. Moncements are the major
PUC students question bank in all the
works of NSS.
Economic Survey of Karnataka 2019-20 613

2. Awareness programmes about Aids, a proportion of total enrolments in general


Drug awareness, pulse polio, Health higher education. This is a carry-over
programmes, regarding malaria concern of pre-university enrolments.
Dengue Chikenguniyaalzeneirs will be Improving the proportion of enrolments in
undertaken. Science courses along with general
increases is a significant challenge. There
3. For the year 2019-20 adolescent
has been a significant increase in the funds
programme for all 70800 students will
released to the Department of Collegiate
be undertaken.
Education by the Government. Total budget
4. Special programmes will be organized under plan and non-plan increased from Rs.
on the occasion of mahathmagandiji's 429.50 crore in 2012-13 to Rs. 2494.59
birth anniversary of 150 years. Swami crore in 2019-20. The major share in the
vivekanand 125 years speech at plan budget was for the additional
Chicago and Dr.Ambedkar's workes . infrastructure and facilities required for
colleges.
5. Special programmes for volunteers like
trekking, enviorment awareness rock The SC /ST students enrolment in degree
climbing . colleges is given in Table 12.24.
12.1.6 Collegiate Education r New courses/combinations:
Permission has been given to start new
The Department of Collegiate Education was
Under Graduation degree courses/
set up in the year 1960, and has since been
combinations in 20 Government First
striving to make quality higher education
Grade Colleges and Post Graduation
affordable and accessible to all sections of
Courses/combinations in 07
students. The Department of Collegiate
Government First Grade Colleges.
Education oversees the administration of
430 Government First Grade Colleges and r Development of science courses: In
319 Private aided colleges affiliated to 19 regard to develop science courses, total
State Government universities, through its amount of Rs. 500.00 Lakhs grants is
6 regional offices located at Bengaluru, released to the 223 Government First
Mysuru, Mangaluru, Shivamogga, Dharwad Grade Colleges in which Degree and
and Kalburgi. Post Graduation Degree Science
subjects are taught, for purchasing
a) Institutions: required Laboratory Equipments,
The average strength in government and Chemicals/Consumables, Text-Books
aided degree colleges is 765 and 585 and Furnitures.
respectively (Table 12.20). The details of r Free Education to Girls: To encourage
spread of government sector degree colleges large of number of women getting
are given in Table 12.21. education in post-graduation, an
exemption from payment of full fees will
b) Enrolments:
be provided to all girl students taking
Analysis and discussion in this section is admission in Government Degree and
confined to Government and private-aided Post-Graduation courses, in relation
colleges. with declared about Rs.2400.00 lakhs
was released to students of 376
Enrolments for degree courses are not
Government First Grade Colleges and
increasing year by year (Tables 12.22 and
PG courses in 2019-20.
12.23). In fact, negative growth has been
observed in case of boys during 2010-11. r Dharwad Higher Education Academy:
The male-female ratio which was in favour of According to the Govt order, Higher
girls during 2010-11. 2010-11 to 2019-20 Education Academy at Dharwad has
the ratio was in favour of girls. This is not a been established to give induction
case of improvement in gender parity. training to lecturers. In 2019-20
Training will be conducted to 433 newly
Enrolment in Science courses is very poor as appointed Assistant Professors during
2017-18.
614 Economic Survey of Karnataka 2019-20

Table 12.20: Institutions for graduate education 2019-20.

Managements Govt. Pvt. Aided Total

Institutions 430 319 749

Students 329143 186764 515907

Av. Per college (Nos.) 765.45 585.47 688.79

Source: Dept. of Collegiate Edu.

Table 12.21: Spread of Government sector Degree Colleges

Region Bengaluru Mysuru Shivamogga Mangaluru Dharw ad K alburgi Total

Number 154 119 101 76 220 147 817

Proportion 18.85 14.57 12.36 9.30 26.93 17.99 100.00

Revenue
32 26 27 11 49 31 176
Blocks

Source: Dept. of Collegiate Edu.

Table 12.22: Growth of Enrolments in Degree colleges

% % % M:F
Year Boys Girls Total
growth growth growth Ratio

2010-11 181018 -0.42 186790 3.28 367808 2.69 49:51


2011-12 226785 25.28 235313 25.98 462098 24.34 49:51
2012-13 229681 1.28 235471 0.06 465152 1.76 49:51
2013-14 247140 7.60 282867 20.14 530007 13.94 47:53
2014-15 251078 1.56 283986 1.21 535064 0.89 47:53
2015-16 234655 -6.54 293739 3.43 528394 -1.24 44:56
2016-17 213474 -9.03 291486 -0.77 504960 -4.43 42:58
2017-18 201760 -5.49 285034 -2.21 486794 -3.60 41:58
2018-19 214625 6.38 292386 2.58 506531 4.05 42:58
2019-20 222784 3.80 293213 0.25 515907 1.85 43:57
Source: Dept. of Collegiate Edu.

Table 12.23: Enrolments across courses (2019-20)


BA B.Sc. B.Com
Courses Total
(BA & BSW) (B.Sc. & BCA) (B.com & BBM)

Number of students 185346 110640 219921 515907

% 35.93 21.45 42.63 100%

Source: Dept. of Collegiate Edu.


Economic Survey of Karnataka 2019-20 615

Table 12.24: SC /ST Students Enrolment for Academic year (2019-20)

No of SC Students No of ST Students

Male Female Total Male Female Total


Govt. Colleges 35083 38893 73976 13737 14153 27890
Pvt. Aided Colleges 11311 12841 24152 4982 5124 10106
Source: Dept. of Collegiate Edu.
r Training: A Training workshop is held Bangalore, Maharani Arts, Commerce
for 134 A and B cadre officers at and Management College for Women,
administrative Training Institute Bangalore and VHD Central Institute of
Mysore. In collaboration with NSS State Home sciences, Bangalore have been
cell and NIMHANS, Life skill training is selected as Cluster University and a
given to Lecturers of Government First total grant of Rs.55 crores has been
Grade Colleges through counseling at sanctioned for this project. Under
Epidemiology, People's Health Centre Component-5 of RUSA Phase-2 (new
NIMHANS, Bengaluru. Model Colleges) Raichur and Yadgir
r NAAC accreditation: As Government districts (Aspirational Districts) two
First Grade Colleges are undergoing the colleges are allotted Rs 12.00 crore.
process of NAAC accreditation & re- Under Component-9, 18 Govt Frist
accreditation 230 Government First Grade colleges are selected for a grant
Grade Colleges have been accredited. In of Rs.2.00 crores each.
the present year 08 Government First r Spoken English, Computer Funda-
Grade Colleges have been accredited. mentals & Life Skills are being taught to
Department of Collegiate Education the students of 327 Government First
stands 1st place in South India & 2nd Grade Colleges through EDUSAT for
place in National level for getting NAAC two hours at fixed time slots every day.
accreditation. r Tele-Education: Tele Education scheme
r To improve the quality of Higher in 73 colleges including 64 colleges in
Education, the Central Government Hyderabad-Karnataka region, under
under the component-7 (Infrastructure the purview of Depart-ment of
Grants to Colleges) of RUSA, a flagship Collegiate Education, by using the
project under Ministry of Human expertise of IIMB, Bangalore and
Resources Development (MHRD), member organizations of its union. This
Government of India has selected 90 programme is for the students studying
Government First Grade Colleges of our in First year degree courses in
state and grant of Rs 2 crores has been Government First Grade Colleges to
sanctioned to each of these colleges. improve the proficiency in English. The
Under component-1 of RUSA (Upgrada- programme has been started by
tion of Autonomous College to installing Tele Education classrooms.
Universities), Government College 12.1.7 Technical Education
Mandya (Autonomous) has been
selected and a grant of Rs.55 crores has During 1943 that is before independence
been sanctioned. Under component - 5 there were a few technical skill teaching
of RUSA Government First Grade schools in the department of Public
College, Jewargi has been selected to Instructions called Occupational Institutes.
transform as a Model Degree college Due to increase in number of such
(MDC) and a grant of Rs.4 crores has institutions and development of technical
been sanctioned to this college. Under education, particularly in the latter half of
component-2 of RUSA (Creation of the fifties, the necessity raised for the
Cluster Colleges to University), establishment of an independent
Maharani Science College for Women, department with the objectives of bringing
616 Economic Survey of Karnataka 2019-20

about coordination among institutes, Training Programme:


standard education, quality syllabi, conduct
of examination and for overall development To provide the Human Resources and
of the technical education. Thus, the enhance the teaching efficiency of the staff,
Department of Technical Education came the teaching faculties have been deputed to
into existence as a full-fledged independent higher education and also improve their
department from 1959. skills through short term training
programmes. The details are given in Tables
Objectives of the Department 12.27 and 12.28.
r Administrative control, inspection, As per the Govt. Apprenticeship Act 1973
design and development of plans and (amended) and 1986 the State Govt.
implementation of programs for all the /Central Govt./Private Companies will
Engineering colleges and Polytechnics. impart training to specific number of
r Conduct of examinations, evaluation students for duration of one year under this
and awarding certificates. scheme. The objective of the scheme is to
provide a connection between the technical
r Adopting need-based technical subjects
institutes and industries, to improve the
in the Engineering and Diploma courses
technical-know-how and to introduce the
by identifying new courses.
students to all fields of the industry. The
r Inspecting infrastructure facilities for number of beneficiaries of the training
commencement of new technical during 2018-19 is given in Table 12.29.
institutions and programs to recom-
mend for the regulatory authority. d) Scholarship/Merit awards (Reimburse-
r Inspection of administrative and ment of Fee):
academic procedures, evaluation of The SC and ST students who have been
infrastructure facilities of the technical selected for engineering courses by the
institutions. Karnataka Examination Authority through
r Approving intake and admission of all the CET are being provided the
the private aided/unaided institutions. reimbursement of fee. The number of SC/ST
students getting reimbursement of fee is
r Issuing guidelines for admission of
given in Table 12.30.
students into the technical institutions.
r Providing grants and other facilities to Other Programmes and Activities
the private aided technical institutions. 1. All India Survey on Higher Education
r Industry Institute Interaction and (AISHE):
assistance in placement.
The Department of Technical Education
r Selection of technical staff to depute for is participating in this survey since
higher studies and research. 2010-11 by providing the necessary
a) Institution: information (through online) to MHRD.
The Department of Technical Education
There were only 57 technical institutes, was the first department in the country
under Department of Technical Education to complete the 100% survey work in
initially but now there are a staggering 530 the inaugural AISHE (2010-11)
institutes across the state ranging from program. During 2018-19, all technical
Diploma to Degree, and Junior Technical institutes have filled the required
Schools (Table 12.25). formats of the survey.
b) Budget Provision: 2. Information and Communication
The Budget provided for government Technology Initiatives-ICTs:
polytechnics and engineering colleges under ICTs contribute for universal access to
plan & non-plan for previous 5 years is given education, equity in education, the
in Table 12.26. delivery of quality learning and
c) Staff Training and Apprenticeship teaching, teachers' professional
development and more efficient
Economic Survey of Karnataka 2019-20 617

Table 12.25 : Classification of Technical Institutes in the State during 2018-19

Classification
Technical Institutes
Pvt.
Govt. University Pvt. Total
Aided
Engineering Degree
Engineering Colleges 10 2 9 212 233
Women’s Engineering Colleges - - - 2 2
Evening Engineering Colleges 1 1 2 1 5
Total 11 3 11 215 240
Diploma
Co-Education Polytechnics 70 - 42 146 258
Women’s Polytechnics 8 - 1 4 13
Evening Polytechnics 2 - 1 2 5
Non- Engineering Polytechnics 2 - - - 2
Total 82 - 44 152 278
Others
Junior Technical Schools 6 - - 6 12
Total No. of Technical Institutions 545
There are 10 institutes conducting Engineering courses and 23 institutes conducting Diploma Courses on
2nd shift basis. In all there are 33 institutes conducting courses on 2nd Shift Basis.

Table 12.26: Budget Provision for Technical Education (Plan & Non-Plan),
Rs. in Lakhs)
Plan (Rs. in Lakhs) Non-plan (Rs. in Lakhs)
Year
Allocation Expenditure Allocation Expenditure

2014-15 55730.30 44797.23 30066.93 31633.37

2015-16 55197.10 49896.16 33367.00 33060.80

2016-17 72447.13 68861.05 39705.00 38857.77

2017-18 104877.91 101734.08 - -

2018-19 117193.17 114003.74 - -


Source: Dept. of Technical Edu.

Table 12.27: No. of Teaching Staff deputed for Higher Education


Subject 2014-15 2015-16 2016-17 2017-18 2018-19
M.E /M.Tech. 27 66 77 76 118
PhD 40 25 14 30 8
Source: Dept. of Technical Edu.
618 Economic Survey of Karnataka 2019-20

Table 12.28: No. of Teaching/Non-teaching staff deputed for short term training
Subject 2014-15 2015-16 2016-17 2017-18 2018-19
Programs conducted at the
115 150 132 76 60
NITTR, Chennai
Staff deputed (No.) 1205 1243 1110 600 694
Source: Dept. of Technical Edu.

Table 12.29: No. of beneficiary students who got benefitted from the ATS during
2018-19
Engg Dip Engg Dip Engg Dip Engg Dip Engg Dip Engg Dip Engg Dip Total

1999 1037 419 394 111 113 18 23 255 159 1784 1617 1309 636 7474

Figures may not tally with total due to overlapping in the breakups
Source: Dept. of Technical Edu.
Table 12.30: Details of the reimbursement of fee during last five years
(Rs. in lakhs)
SC Students ST Students
Year
No. of Amount No. of Amount
Students in Rs. Students in Rs.
2014-15 3248 1079.77 2056 716.20

2015-16 4006 1224.77 1374 440.49

2016-17 3781 1424.83 1237 490.74

2017-18 3633 1483.70 1218 521.60

2018-19 3418 1512.98 1122 517.56


Source: Dept. of Technical Edu.
education management, governance teaching-learning process, self-
and administration. Department takes evaluation, accountability and fulfills
a holistic and comprehensive approach the expectations of its stakeholder viz.,
for promoting ICTs in education in order academicians, industries, statutory
to address the challenges in realizing regulators, students and parents. In
the vision of higher education. The total, in all the 4 divisions of the state 22
department of Technical Education has accreditation workshops covering 1248
taken part in all the above initiatives. staff of teaching and non-teaching of
305 technical institutes have been
3. Accreditation by National Board of conducted by the department of
Accreditation (NBA): technical education.
The Department of Technical Education
4. Outcome Based Education System
(DTE) is taking up various quality
(OBE):
improvement initiatives among them
Accreditation is one of the major First time in India “Outcome Based
initiative both in terms of improving Education Curriculum” is introduced in
academic and infrastructural quality of all its 35 diploma programs affiliated to
the technical institutes. Accreditation is Board of Technical Examinations,
the continuous quality improvement Karnataka by conducting several
process. Which ensures quality in workshops including industrialists,
Economic Survey of Karnataka 2019-20 619

expert faculty and other stakeholders. studio it is planned to have programs to


On e o f th e m a in e le m e n ts o f all our students, faculty of Engineering
accreditation process is the formation of colleges and Polytechnic. This studio is
curricula based on OBE, which is based also being used for video conference
on revised Blooms Taxonomy. The OBE with institutions for administrative
enhances skill development amongst purposes.
technologists, improves employability
and supports entrepreneurship among 7. Distribution of Free Laptops to the
diploma students. Further, Students:
comprehensive training workshops to The action will be taken to provide free
implement OBE in the technical laptops to SC/ST Students (Family
institutes have been conducted across income less than Rs.2.50 lakhs) who
the state during 2016-17. are studying in Govt., Engineering
College in 2/3/4 academic years and
5. National Service Scheme (NSS):
students of 2/3 academic year Govt./
The National Service Scheme, under the Polytechnics during 2017-18. The
Ministry of Youth Affairs & Sports, action will be taken to provide free
Govt. of India, popularly known as NSS laptops for Students (Family income
was launched on Gandhiji's Birth less than Rs.2.50 lakhs) who are
Centenary Year 1969, in 37 Universities studying in Govt./Aided Polytechnics in
involving 40,000 students with primary 1st academic year during 2017-18.
focus on the development of personality
of students through community service. 8. Technical Education Quality
Under the NSS, students of Improvement Program-TEQIP-3
polytechnics are being taught about Objectives
Human values, Patriotism, Service-
motto, Health, Environment r Improving quality education in existing
awareness, Personality Development institution with the special
and Leadership qualities along with consideration for low income state.
traditional education through the day- r Twinning arrangements to build
to-day activities and special camps. capacity and improve performance of
Since, 1999 the Directorate is actively institution and ATU's.
and successfully conducting the r Sustainability of the project
activities as per the schedule of institutions.
programs.
Other Activities
6. DTE-e- Studio Channel:
r Improve student learning
The responsibility of the state is to r Research, Development and Innovation
provide an effective Technical
Education to students both in rural and r Academic & Non-Academic Reforms
urban areas. r Industry Interaction.
In this direction, Technical Education r Faculty and Staff Training
Department has taken an innovative r Improving Transition Rates
initiative to provide online interactive r Student Career Counseling and
classes in Teaching Learning Process. Placements
The Directorate of Technical education
is planning to provide academics 9. Rashtriya Uchchtar Shiksha Abhiyan
related activities and training programs (RUSA):
that will be for the students and faculty. This program aims for the development of
A studio has been established in higher education in the country by ensuring
Directorate of Technical Education with access, equity and quality. It also aims to
help of TEQIP-II project-a world bank attain higher levels of access, equity and
assisted MHRD program. Through this
620 Economic Survey of Karnataka 2019-20

excellence in the State Higher Education significant. 4085 ayurvedic doctors


system with greater efficiency, graduate from 58 Ayurvedic Colleges, 2487
transparency, accountability and doctors graduate from 38 Dental Colleges.
responsiveness. Ayurvedic, Homoeopathic and Unani
Doctors serve rural area in larger
Programs in Polytechnics: (1) proportions. 323 Nursing Colleges
Infrastructure (2) Research, innovation & recognized by Indian Nursing Council turn
quality improvement (3) Equity initiatives (4) out 19415 Nurses (B.Sc. Graduates) every
Leadership developments of Education year. Karnataka functions as a nursery for
administrators (5) Support to Polytechnics – nursing services not only for the State but
Strengthening of existing Polytechnics; also for other regions of India, Gulf countries
Starting of new Polytechnics. and Europe.
A new Engineering College at Somapura Availability of dependable and internally
Village of Naragund Taluk of Gadag District consistent data across various sources
is coming up under this scheme. needs serious attention. There is
12.1.8 Medical Education considerable clarity with regard to under
graduate and post graduate medical
There are 52 Medical Colleges (MBBS education. However, there are a large
degree) in the State which have a summated number of institutions which offer para
intake capacity of 6753 students (Tables medical certificate and diploma courses
12.31 and 12.32). Of them 17 colleges are about which there is hardly any reliable
run by the Government the Government's data. Various autonomous councils, boards
presence is visible in nominal strength in of examinations, universities regulate
other system. Relatively, the turnout of medical education.
Ayurvedic doctors (GCIM) is quite

Total Cost of the Project Rs. 70.00 Crore

Implementation Period: 2017-2020

No. of Colleges: 10

Finance Sharing Pattern: 100% from Govt. of India

Table 12.31: Medical Education Institutions and Enrolments for the year 2019-20

Type of Institution No. Enrolments

Medical Colleges (MBBS) 52 6753

Ayurvedic Colleges (GCIM) 58 4085

Homoeopathic Colleges (BHMS) 15 1190

Unani Colleges 04 240

Naturopathy & Yogic Sciences (BNYS) 08 600

Dental Colleges (BDS) 38 2487

Nursing Colleges (B.Sc.) 323 19415

Source: Dept. of Medical Edu.


Economic Survey of Karnataka 2019-20 621

Table 12.32: Medical Education Institutions by Managements for the year 2019-20
Type of Institution Govt. Aided Unaided

Allopathy: Colleges 17 - 35

Ayurveda 04 03 51

Homoeopathy 01 - 14

Unani 01 - 03
Naturopathy & Yoga 01 - 07

Dental 02 - 38
Source: Dept. of Medical Edu.

Post Graduate Institutions & Enrolments 1. The Literacy Programme as per Dr.
in the State: D.M.Nanjundappa's committee reports
with a target of 188500 non-literates
Medical Colleges are permitted to provide
with an estimated cost of Rs.622.05
Post Graduate Courses in the State. They
lakhs is implemented in the selected
offer Degree and Diploma Courses in
G.P.s of backward, more backward and
various specialties. There are several Super
most backward taluks in 19 districts of
Specialties of which training is imparted in
the state.
subjects like Cardiology, Cardio Thoracic
Surgery, Cardiac Anesthesia, Neurology, 2. The Literacy Programme in Urban/
Nephrology, Urology, Surgical Slum areas with a target of 188500 non-
Gastroenterology, Plastic Surgery, Medical literates with an estimated cost of
Oncology and Surgical Oncology. There has Rs.622.05 lakhs in 20 districts in the
been a great demand for specialists, due to state.
which many Medical Graduate of the State
3. The Literacy Programme for non-
who do not get P.G. seats enroll themselves
literate members of Woman Self Help
with the National Board of Examinations
Groups with a target of 136333 non-
and qualify as Diplomate of the National
literates with an estimated cost of
Board (DNB).The enrolment details for
Rs.449.90 lakhs in 20 districts of the
different courses are furnished in Table state.
12.33, 12.34 & 12.35.
4. The Camp literacy programme for non-
12.1.9 Mass Education literate Elected Members of Gram
The Directorate of Adult Education was Panchayaths with a target of 1250 non-
established in 1978 with a view to literates through 25 camps of 50
implement Adult literacy programmes in the members each with an estimated cost of
state. The department was renamed as Rs.141.00 laks in the 06 districts of
Directorate of Mass Education during 1988- Kalyana Karnataka area.
89; The State Literacy Mission Authority
was established during the year 1988 to 12.1.10 Public Library
implement the literacy programmes Public Libraries Act has come into force
effectively. since 1965 in Karnataka. Karnataka has
As per Government Order, during the year been the third state in the country to come
2019-20, with an object of literate 15-50 age under a Library Act. Under the act, a
group of SC/ST and minority groups with network of about 1032 libraries has been
priority to women illiterates to increase the functioning all over the State. Public Library
literacy rate of the state the following 04 is an institution established by the
basic literacy programmes. Government in order to inculcate interest in
education, communication and reading
622 Economic Survey of Karnataka 2019-20

Table 12.33: Enrollment Capacity across Medical Course – Post Graduate Degree for
the year 2019-20
No.of No.of No.of
PG Degree PG Diplom a Super Special ties
seats seats seats

M.D.(General Medicine) 411 - M.Ch (Urology) 40

M.D.(R.D) 203 DMRD 0 M.Ch (Plastic Surgery) 16

M.Ch (Surgical
M.D. Pediatrics 282 D.C.H 18 13
Oncology)

M.D.(R.T) 29 D.M.R.T. 0 D.M.(Oncology) 10

M.D.(Anesthesia) 350 D.A. 22 D.M. (Cardiology) 40

M.Ch (Cardio Thoracic


M.D.(Psychiatry) 109 D.P.M 14 13
Su rgery)

M.Ch. (Paediatric
M.D. (Pathalogy) 267 D.C.P. 20 18
Su rgery)

M.S. (A natomy) 121 - D.M. (Neu rology) 30

M.D.(Commu nity D.M. Cardiac


124 D.P.H . 3 09
Medicine) A nesthesia

M.D.(Forensic Medicine) 77 D.F.M. 2 M.Ch (Neuro Surgery) 20

M.Ch.Surgical Gastro
M.D.(Pharmacology ) 134 - 02
Enterolog y)

M.D.(Physiology) 117 - D.M. Nephrology 11

M.D.(Bio Chemistry) 100 - M.Ch.Gynic Oncology 04

M.Ch.Head-Neck
M.D.(Micro Biolo gy) 124 D.Bacteriology - 01
Su rgery

D.M. Paediatric
M.D.(Skin & VD ) 0 D.V.D. 0 02
Oncology

M.D.(T.B) 36 D.T.C.D 1 D.M. Medical Oncology 0

M.D.(Emergency
20 - D.M. Gastroenterology 07
Medicine)

M.S. (G eneral Surgery) 322 - D.M. Endocrinology 06

M.S.(Ophthalmology) 175 D.O.M.S. 0 D.M. Nenato logy 01

M.S.(ENT) 154 D.L.O. 0 Pulmonary Medicine 01

M.S.(Orthopaedics) 262 D.Ortho 15 Pediatric Nephrology 01


D.M.Critical care
M.S.(OBG) 303 D.G.O. 35 02
Medicine
M.Ch. Plastic &
M.D (Hospital Admn.) 11 - 01
Reconstruction surgery

M.D(Oncology) - - -

Total: 3731 Total: 130 Total: 248

Source: Dept. of Medical Edu.


Economic Survey of Karnataka 2019-20 623

Table 12.34: Total P.G.Degree seats for 2019-20

Govt/COMEDK/ Deemed
Sub ject Total Seats
KRLMPCA Universities

Pre-Clinical:

M.D. (Anatomy) 88 33 121

M.D.(Physiology) 85 32 117

M.D.(Bio Chemistry) 76 24 100

Para Clinical:

M.D.(Pharmacology) 103 31 134

M.D.(Pathology) 180 87 267

M.D.(Micro) 92 32 124

M.D.(Com.Med.)) 87 37 124

M.D.(F.M.) 55 22 77

M.D(Oncology) - - -

Clinical:

M.S.(Ophthalmology) 134 41 175

M.S.(ENT) 107 47 154

M.S.(Orthopaedics) 188 74 262

M.D.(Skin & D) 103 29 132

M.D.(RT) 26 03 29

M.D.(Anesthesia) 256 94 350

M.D. Paediatrics 215 67 282

M.D.(General Medicine) 292 119 411

M.S. (General Surgery) 238 84 322

M.S.(OBG) 226 77 303

M.D.(R.D) 151 52 203

M.D.(Psychiatry) 93 16 109

M.D.(T.B) 28 08 36

M.D.(Hospital Admn.) 06 05 11

M.D.(Emergency Medicine) 15 05 20

Total: 2844 1019 3863


Source: Dept. of Medical Edu.
624 Economic Survey of Karnataka 2019-20

Table 12.35: Total P.G. Diploma seats for 2019-20

Deemed Total
Subject Govt
Universities Seats

Doploma in Anesthesia 17 5 22

Diploma in child health 14 4 18

Diploma in clinical pathology 20 0 20

Diploma in Dermatology, Venereol ogy


7 5 12
and leprosy

Diploma in Forensi c Medicine 2 0 2

Diploma in Obstetrics & Gynecology 11 24 35

Diploma in opthamology 7 12 19

Diploma in Orthopaedics 9 6 15

Diploma in Oto-Rhino Laryngology 6 3 9

Diploma in psychological Medicene 1 13 14

Diploma in public health 3 0 3

Diploma in Radio therapy 3 0 3

Diploma in Radio diagnosis 10 2 12

Diploma in Tuberculosis & chest


1 0 1
diseases

Total: 111 74 185


Source: Dept. of Medical Edu.

among the General Public. It is an open with libraries at the taluk, municipality
public service system. levels.
The main purpose of this system is to help For the proper functioning of Public
people to develop interest in literature and Libraries, the Library authorities are
culture. Public Library system serves as a functioning throughout the state, city and
dynamic force giving people knowledge, district levels.
continuing education and information.
“Public Libraries are people's university”. It Activities of the department of Public
is a democratic institution working on Libraries are grouped as under
democratic principles. 1. State Central Library: It is an apex
Public Library equipped with reference
Details of the Public Library Department books and source books in all
The network of the libraries includes state languages on all subjects. Copyright,
Central Library at the state level, District Computer, Browsing section, Braille
Central Libraries at the District level and Books, carrier information, periodicals
City Central Libraries at all places having a sections are some of the important
population of more than one lakh together sections of the library.
Economic Survey of Karnataka 2019-20 625

2. City Central Libraries: Under the 8. Nomadic and Slum Libraries: 127
Karnataka Public Library Act, 1965, libraries have been started for the use of
there are 26 City Central Libraries with nomadic. These libraries are started in
branch libraries serving in the State. the areas of nomadic. Accordingly, 100
The Bangalore City Central Libraries slum libraries have been started under
have been bifurcated into 5 zones. this project in the slum areas also.
Namely East, West, North, South and These libraries are provided with books,
Central for the smooth administration. periodicals furniture. The honorarium
As 198 wards are there in Bangalore, of the staff working in these centers has
among these wards Branch Libraries been raised as per the Government
are functioning and providing services Order.
to the public.
9. Automation of Libraries: Network
3. District Central Library: There are 30 facility is provided to 11 District Central
Districts Libraries in the State as per Libraries under the scheme of Raja Ram
the section 16(1)(b) of Karnataka Public Mohan Roy Library Foundation,
Libraries Act, 1965. Its 703 branch National Mission on Libraries with
Libraries are serving the Public. In all matching Fund Ratio of 75:25.
district centers which has City Central
Libraries in the city and District Central 10. Cultural Activities: Cultural activities
library's offices only. are being conducted to create
awareness among the public about
4. Mobile Libraries: There are 13 Mobile reading habit and its use. National
Libraries functioning to inculcate and Library week will be celebrated on 14th
promote the reading habit of the public to 20th November every year and on this
at their own door steps in different parts occasion seminars, poet meet, book
of the City in the State. This has been exhibition, various competitions are
accepted as a popular library service conducted in the City, District and its
rendered by the Department. branch Libraries throughout the State.
5. Gram Panchayat Libraries: There are On 23rd April is celebrated as “World
5766 Gram Panchayat Libraries in the Book Day” every year. To inculcate
State. These libraries are helping to a reading habits among children, various
great extent to our rural community. It competitions are held during this
is of first time in India to have the occasion.
libraries in all the Gram Panchayats.
As per the Government order No.ED
6. Indira Priyadarshini Children 154 LIB 2007, August 12th will be
Library: Indira Priyadarshini Children celebrated as 'Librarians day' which is
Library is established in 1994 at birth anniversary of Dr. S.R.
Cubbon Park, Bangalore. There are Ranganathan, who is the father of the
separate Children sections maintained Library Science. Eminent professionals
in many City and District Libraries will be felicitated on this occasion and
which provides useful and entertaining also “Jatha” is organized in various
books for the children. streets in the City and District level.
7. Community Children Centers: 31 11. Training in Library Science: Library
Community Children centers are Training centers have been functioning
functioning in all the 30 districts in the in four Places i.e. Bangalore, Dharwad,
state. In these centers children's books, Kalburgi and Mangalore to give the
computer section and toys section for training in Library Science for the
the entertainment has been arranged. Employees of the Library who have not
The interior section is decorated to obtained the training. Information will
attract the children. These centers will be given about administrative and the
help the overall development of the technical subject by arranging
children. refreshing camps from time to time to
626 Economic Survey of Karnataka 2019-20

over 75% (It indicating that of ICT and importance of ICT in the
development of high quality MRPs.) Educational practices.
r An emphasis given in modules on the Karnataka can take proud in saying that it is
learning disorders & relief measures the first state that is training teachers and
identified in the CSAS &NAS exams, HMs under one MOODLE platform by
where trained teachers have adapted adopting CIET-NCERT prepared 'Teachers
suitable pedagogy in class to solve curriculum for ICT Education'. Teachers are
learning disabilities. involving in the training and acquiring
2. Technically Assisted Learning knowledge and skills of using many subject
Programme (TALP). related ICT Tools and mobile Apps in their
classroom practices. End of the December
TALP - Technically Assisted Learning 2019, 54709 teachers are trained against
Programme is under implementation during the target of 60,541.
right from 2016-17 to ensure the quality of
education by effective implementation and Outcomes of the Programme :
aptly managing the repetitiveness in r Introducing many subject related ICT
different technology based programmes in Tools and Mobile Apps in Refresher
schools of the state. The programmes such course for enhancing joyful teaching
as Edusat, Radio Programme, Tele- and learning practices in the classroom.
Education, CAL and ICT of SSA are devised
in this programme. With the objective of r There is an effort to increase the
implementing ICT programme under the attention span of the students in the
leadership of school teachers and the classrooms by using technology in
computer education curriculum given by teaching-learning practices.
NCERT, it is duly redesigned and being r Teachers will be professionally
implemented under the name IT@SCHOOLS reinforced by the use of technology.
IN KARNATAKA. 3. IT@Schools in Karnataka.
Objectives: Content development for TALP )Technology
r Making Teachers as the owners of their Assisted Learning Program( was planned by
Schools' ICT Education. GOK in the month of July 2016. A team of 11
members who were the teachers in different
r Enhance Learning Achievements by
parts of Karnataka along with the team of
way of improving mean score of High
APF started developing content for TALP in
School students by 5 percentage in
the month of August 2016.
SSLC examination.
r Use technology and e-content for Objectives
improving teaching pedagogy as well as r To ensure that the students of 8th Std.
for enhancing learning outcomes. to 10th Std. belong to Govt. schools and
r ·Enhancing the scope of Learning and colleges have gained technology based
Creation by using Free and Open learning skills.
Source Software's (FOSS) and r To create subject wise technology based
Operating Systems . processes related to learning and
Activities: teaching in general classes.
During 2016-17 and 2017-18 under r To ensure that teachers have the ability
IT@Schools Programme 8026 subject of using information technology and
teachers (of Mathematics, Science, English internet knowledge as learning media.
and Social Science) and HMs of 1750 r To establish Information Management
selected Govt. High Schools of 34 System in schools and colleges.
educational districts were given Induction-1 To enhance the educational quality by
training which is based on the Teachers ICT computer education at Govt. Primary
Curriculum prepared by CIET-NCERT. This schools, Secondary schools and Pre
training introduces the teachers to the world University colleges a Govt Order No. ED 64
Economic Survey of Karnataka 2019-20 627

the department staff. 80 candidates will through scholarships.


be selected for each batch.
8. Having found the teaching needs of
12.1.11 Department of State Educational High School teachers, enhancing the
Research and Training teaching skills of teachers.
The Department of State Educational 9. Accelerating the learning abilities of the
Research and Training, popularly known as students studying in Govt. Schools.
DSERT is the academic wing of the 10. Bringing about a better change in
Department of Public Instruction. It aims at educational quality of Teacher Training
providing academic leadership in school Institutes.
education as well as improving the quality of 11. Through Art Research Center of
education provided in primary and DSERT, organizing the exhibitions /
secondary schools in the state. The DSERT seminars to student – teacher
was formed as a small academic unit of the community of High Schools on
Department of Public Instruction. It was Applications of Art, New Explorations of
then known as the State Institute of Art and Action Research.
Education (SIE), and it originally started
12. Usage of technology in education.
functioning from the northern district town
of Dharwad in 1964. This unit was later DSERT Programmes:
shifted to Bangalore and the other academic
units of the department of public instruction 1. Guruchethana - Teacher Professional
– State Institute of Science (SIS), State Development Programme(TDP) :
Educational Evaluation Unit (SEEU) and Objectives:
Educational Vocational Guidance Bureau
(EVG), were merged in 1975 to form a single r To enable teachers to become reflective
monolithic Department of State Educational practitioners.
Research and Training. r To provide opportunity for self-
Objectives & Activities of DSERT : motivated teacher professional
development.
1. Enhancing the quality of education in
primary and secondary schools in the r To form autonomous and capable
state. teachers to understand and facilitate
self-learning opportunities during
2. Management of teacher education in school education.
the state (both pre service and in service
education) both at the elementary It is planned to develop about 200-250
education and secondary education modules in a span of 5 years catering
levels. teachers' actual need in the academic
subjects as well as in education perspective.
3. Management of Government Colleges of These modules are comprising education
teacher education, District Institutes of perspective, subject perspective, key
Education and Training and other concepts, pedagogy and assessment in a
Government teacher training integrative manner. Total 06 modules are
institutions. prepared in Kannada in this year. 12
4. Promoting Science Education in the modules are translated into Urdu and 11
state. modules are translated into Marathi
5. Designing and implementing in service medium. 14 new modules for 7 subjects are
teacher training courses in content, developed for this year. 1587 MRPs are
pedagogy, innovative methods like selected based on oral and written process,
theatre in education, use of low cost and they are trained to become MRPs. End of the
no cost teaching learning materials in December-2019, 54,709 teachers are
schools, etc. trained against the target of 60,541.
6. Making Satellite based training Programme Outcomes :
programmes. r Daily average assessment of MRPs is
7. Encouraging the talent of the students
628 Economic Survey of Karnataka 2019-20

Mahiti 2016, Dated: 05-07-2018 is issued. and LCD projectors. In the year 2019-20,
718 schools are aimed to provide this kind of
TALP-Technology Assisted Learning
technology based learning.
Programme is one part of IT@SCHOOLS
INKARNATAKA and it is intended to this 4. Edusat
programme in 4674 Govt schools of the state Government of Karnataka in co-ordination
in a period of 5 years from 2016-17. with ISRO implemented the EDUSAT
Computer lab is established with the supply Programme in Karnataka. The main
of adequate hardware in Govt. schools objective of this programme is to teach
under this programme. It aims to facilitate language & other subjects with the help of
the trained teachers to formulate text book video films so as to promote the Multigrade
related e-content for the students. One teaching.
laptop and LCD projector are provided to
each school for this. Since the studio equipments were outdated
and the quality of the telecast was affected,
During the year 2016-17 and 2017-18 and Krishna studio, SIT and Audio studios were
2018-19 totally 2500 Govt. high schools and upgraded under Transparency Act in
for the year 2019-20, 718 Govt. high schools consultation with technical experts
are selected. Computer education related spending Rs. 1.18 lakhs for the
Induction-1 training is underway for the upgradation. Presently it is pride of DSERT
teachers of these schools in Mathematics, to have an upgraded studio which is
Science, Social Science and English facilitating to carry out educational
including head teachers. 2500 schools are programmes of the educational and non
provided with each laptop and LCD educational departments along with state
projector and the trained teachers are using level progress review of the department. It is
them for student learning. Tender process is useful for recording of educational contents
underway to supply these equipments for and the same can be provided to schools.
the year 2019-20. Computer lab for 750
schools related to 2016-17 is ready for Video Conference: The Video Conference
usage. During 2019-20, depending upon the facility that is developed has become a very
number of students, it planned to provide useful tool in implementing programmes of
All-in-one computers along with BSNL education department. Reviewing,
Internet connections to these computer evaluating and monitoring of the
labs. For the effective implementation of programmes has become effective through
TALP programme, SATS and TTMS, State video conferencing and it is reaching 41
Project Management Unit (PMU) is formed video conference centers across the state.
and 4 Resource Consultants are hired from 5. D.El. Ed Curriculum Review and
NISG (National Institute for Smart Implementation.
Government Hyderabad. For the effective
This section of DSERT deals with Pre Service
implementation of TALP programme, State
Primary teachers' course D.Ed.Ed. –
level Empowered Committee, Steering
Diploma in Elementary Education.
Committee State Project Management Unit
Monitoring and inspection of D.El.Ed
(PMU), District Review Committee-DRC, and
institutions, to keep track of its functioning
District Implementation Unit-DIU are
as per the norms laid down by NCTE and
formed and functioning for the success of
the supervision of educational and
the programme.
administrative matters are governed by this
Teachers in the subjects of Science, section through District Institutions of
Mathematics, Social Science and English Education & Training.
along with head teachers from 2500 schools r Cluster meetings for capacity building
for the year 2016-17, 2017-18, 2018-19 and of trainees of D.El.Ed colleges and
2019-20 are provided with TALP training so DIETs are conducted through DIETs.
that they are able to enhance their technical This has enabled the lecturers to
knowledge and create learning related e- exchange views to each other with
contents to teach the students using laptops regard to D.El.Ed subjects and
academics.
Economic Survey of Karnataka 2019-20 629

6. NTSE and NMMS Competitive Std studying in Govt, Aided and Unaided
Examinations. schools prepare proposals for the
Objectives : development of a novel model based on a
scientific principle which can address
r To develop awareness among students/
Societal needs. The concerned school
parents / teachers on NTSE / NMMS
submit the proposal through online. During
Examination.
2019-20, 44006 students submitted
r Recognizing talented students by nominations for the awards; 7687 students
participation of more number of are awarded with Rs.10,000 at District Level
students in competitive examinations. Exhibition.
r Encouraging the recognized talented
students for further studies by 9. Samagra Shiskshana Abhiyana
providing scholarships to them. (Primary section and High school section)
7. Student ICT content and E-content. a) Primary section:
Under IT@Schools in Karnataka Project, DSERT composed various training
E-content unit is working on developing programmes through SAMAGRA
e-content with the following objectives: SHISKSHANA ABHIYANA, includes Primary
r To identify already available e- and High School teachers. The training
content/e-resources across various programmes are, In-service Trainings-
states, NCERT and other Agencies. Nalikali for 1st to 3rd std teachers, Odu
Karnataka+ Ganitha Kalika Andolana for
r To map the identified e-content to the
1st to 3rd std teachers, an Empowerment of
syllabus of the State.
English Language, subject wise training for
r To develop additional content with the 7th standard Aadarsha School teachers and
support of technical persons. 6th std Science and Maths. The objectives
r To curate the already available e are the following :
content/e resources as per the State r Introducing Nali-kali system,
need. milestones and Competencies.
Mapping of available e-resources for r Introducing Revised Nali-Kali Cards.
Concepts of Math and Science of Classes r Introducing revised Nali-Kali Activities.
8-10: Support Teachers to conduct effective
r E-resources from department classroom activities in mathematics.
programmes such as Edusat, Tele r Providing Mathematics kits to use in
education, CALC and Radio teaching learning process.
programme. r Increasing the result in mathematics at
r 5 Khan Academy videos in Kannada for the rate of 10% every ASER report from
Math concepts. this year. Support Teachers to conduct
effective classroom activities in basic
r 21 science resources from KOER. operations in mathematics and basic
r Agastya Foundation videos- 35 Physics, reading in Kannada.
21 Biology, and 17 Chemistry. r Providing kits to use in teaching
All these resources are mapped and learning process.
organized in the form of Offline webpage is r Enable teachers to support children to
preloaded onto the laptops supplied to 1000 make sentences in own and express
schools under IT@Schools in Karnataka themselves.
project. r Introducing to extended texts. Bringing
long-term changes in mathematics
8. Inspire Awards - State Institute of
teaching.
Science.
r To increase necessity communication
This programme initiated by Department of skill in class room through achieved in
Science and Technology, New Delhi. Under empowerment of English Language.
this programme the students from 6 to 10th
630 Economic Survey of Karnataka 2019-20

r The first time introducing the NCERT d ) High school section.


books for Aadarsha School.
st rd
10 Days Training for In-Service teachers
This year 1 to 3 std teachers are training (Maths & Science) and Objectives:
undergoing In-service Trainings- Nali-kali
Samagra. This module is consolidation of r Newly introduced NCERT books for high
Nail-Kali Kannada, EVS, Maths. This 5 day school.
programme addressed multi class and r To create activity based learning skill as
multilevel situations which influence learning communication.
learning. This training progrmme effectively r To provide information to use the
conducted under Guruchethana. Based on projects for Summatative Evaluation.
evaluation of ASER & KSQAAC
organizations, fulfill the training needs for r To use the teaching aids with the help
teachers with the help of questionnaires. In of available resources.
this training used the Literature which is r To make availability of the reference
written by Regional Institute of English, books and E-contents in the library .
South India, Bangalore. In 2019-20, 2018-19 Programme and activites Progress:
1,66,228 teachers are trained against target Samagra Shikshna Abhiyana High school
of 1,66,135. section In-service training for 44,717
b) English Language Empowerment teachers plan was prepared.
Programme(ELEP). r In order to implement 10th std text
ELEP was started in 2016-17 in Karnataka books for both maths & science 10 days
to empower the English Language teachers training was organized.
those are teaching of the English Language. r State resource group was set up and
Rs.320.00 lakhs is sanctioned for the training modules for 5 days content
present academic year. Basic training target base training was prepared and maths
is 1700 government primary school teachers module was called pramaya-1 & science
and Advanced ELEP training target is 2050 module was called prayoga-1.
government higher primary school teachers, r Content and activity based maths and
out of these 2250 teachers are trained in science training for 272 MRP has been
both the progarmmes at end of November given.
2019.
r Content and activity based maths and
r English Medium Teacher Induction science training was provided for 10
programme (EMTIP) is covered 1654 days to all the high school of aided and
teachers those are teaching in 1000 Govt school teachers. Out of the 10 days
English Medium Schools. training, 05 days training is provided.
c) Foundation of Sri. Alur Venkata Rao 44717 teachers are involved in training.
Language Skill Training Centers. 32,318 teachers are trained up by the
end of December 2019.
This training is giving to teaching of Programme Outcome:
Kannada, English and other regional
Languages teachers for Primary and High r Enabled the students to learn the
School by this foundation. Sri. Alur Venkata difficult concept in easier way.
Rao Language Skill based training centers r To access the children project methods
are established in 04 following academic are made easier.
divisions. 10. Teacher Education Cell.
r Bengaluru division- C.T.E, Chitradurga a) District Institute for Education and
r Mysuru division- C.T.E, Mysuru Training and college for Teachers
r Belagavi division –C.T.E, Belagavi Education and Training.
r Kalburgi division- C.T.E, kalburgi Aims and Objectives:
r ·Rs. 50.00 lakhs grant is released to r Strengthening of teacher education
training center. Institutions
Economic Survey of Karnataka 2019-20 631

r To organizese capacity building available to General Public through its Book


programs for Teacher Educators in Depots which were established division
DIET & DSERT wise. The department is also a publisher of
r To procure equipments essential for Karnataka State Gazette.
conducting In-service Teachers training
Major works executed during the year
r To provide technology support to 2018-19
teachers to integrate ICT in class room
teaching. r Printing & Supply of State Budget
Programs, Activities and Physical progress: Documents for the year 2019-20
Rs. 10.00crs have been uploaded to including Economic Survey report for
implement Program Advisory Board (PAB) the year 2018-19.
approved activities ( a. Programmes and r About 39.99 lakh School Text Books for
Activities, b. Specific Projects for Research the academic year 2018-19 have been
Activities, c. Annual Grants, d. Technical printed and supplied and about 15.02
Support ) pedagogy course in Science, lakhs of Text Books have been taken up
Maths & Language has been organized in for Printing for the academic year 2019-
collaboration with TISS, Mumbai ICT 2020.
Induction-01 course developed by CIET, r Printing of 51 issues consisting of
New Delhi has been organized. PAB 22,848 Pages of Karnataka State
approved programs are being implemented Gazette. Also 14,501 pages have been
in 30 DIETs & DSERT. published as Extra-Ordinary Gazette.
r Printing & Supply of I.L.R. in English
12.1.12 Printing, Stationery and (Fortnightly)-1.34 lakh copies and
Publications Department Kannada Edition (Monthly)- 21,900
The Department of Printing, Stationery and copies.
Publications is basically a service r Printing & Supply of Calendars,
department, which is fulfilling the printing Engagement Pads, Diary and Refill for
needs of State Legislature, Secretariat, the year 2019.
Governor's Office, High Court of Karnataka, r Printing & Supply of Calendars and
Karnataka State Government Departments Diary pertaining to Karnataka State
and other Autonomous Institutions. Official Legislature and High Court of
Government Publications are made Karnataka for the year 2019.
Programmes wise Progress Report of up to December 2019-20 (Rs.in Lakhs)
%
Budg et
Sl.No Name of t he Programme s Rele ase Expenditure (Against
2019-20
r elea se)
Non-G ovt.Teachers Training
1 1296.00 972.00 744.26 76.66
Institutio ns
Tea chers Training a nd
2 1820.00 1365.00 1192.53 87.36
Vo ca tional Training Centres
Director, State Research and
3 668.00 501.00 385.87 77.01
Training
District Institute for
Education a nd Training and
4 8212.00 6159.72 5714.18 92.76
College for Tea chers
Education a nd Training
Computer Literacy
5 Awa reness in Secondary 1531.00 1148.25 1148.25 100
Schools
Reform ation of Education
6 915.00 457.50 428.75 93.71
Qua lity
Gra nd Total 14442 1003.47 9613.84 90.66
632 Economic Survey of Karnataka 2019-20

r Printing of Proceedings and other r Printing & supply of Booklet of


publications of Karnataka Legislative Employment Cheeti of various Zilla
Assembly and Karnataka Legislative Panchayaths.
Council. 12.1.13 Karnataka State Higher
r Printing & Supply of 24,860 copies of Education Council (KSHEC)
Annual Reports, Annual Administrative
Reports and Performance Budget Karnataka State Higher Education Council
Reports of various departments and was established in 2010 with the objective of
Government undertakings. framing policies for higher education and to
r Printing and supply of Answer give suggestions to State Government,
Booklet to Pre-University Education Universities and other higher educational
Department. institutions regarding issues related to
r Printing & supply of RTO challans and higher education. The Council holds the
other security forms pertaining to responsibility relating to introduction of new
Transport Department. courses, development of higher education,
propaganda of research activities and
r Printing & supply of Learning Materials
developing syllabus etc. in order to achieve
pertaining to Odu Karnataka Odu
progress in the above said subjects. The
Programme and 42 kinds of Modules
Council has framed many programs last
pertaining to Department of State
year and is trying to continue the activities
Educational Research and Training.
in this direction.
r Printing of Various Forms/ Handbooks
/Envelopes for 2019 Lok Sabha For the year 2019-20 of the allotted
Election. Rs.200.00 lakhs grants, 1st, 2nd and 3rd
r Printing & Supply of Various installment of grants Rs. 150.00 lakhs has
Forms/Registers to ESIS Medical been released and the 4th quarter of Rs.50
Services, Kidwai Cancer Institute, lakhs is to be released. For the year 2019-
General Hospital, Community Health 20, Rs.90.75 crore released to RUSA funded
Centre as per their Requirements. Colleges and Universities under RUSA
r Printing & supply of Civil List of I.F.S, scheme.
I.A.S, K.A.S and Group 'A' Officers.
2018-19 Production Related Details:
Sl.
Descripti on 2018 -19
No.
DTP - A -4 size 79,767 pages
1
-W ords 1,53,61,655 words

2 Single colour W eb Offset Printing in A-1 size. 715.86 lakh Im pressions

3 HMT Sheetfed Printing in A-1 size. 150.95 lakh Im pressions

Fou r Colour web Offset Printing in D ouble


4 151.54 lakh Im pressions
Crown size. (16 Ups Printing)
Fou r Colour Sheetfed (K oma ri) Printing (8
5 22.55 lakh Impressions
Ups Printing)
6 Multi co lour Digital Printing(A3 size) 81.12 lakh Impressions
Single colour Digital printing + Riso
7 155.86 lakh im pressions
Printing(A3 size)
Single colour web offset Double Reel
8 th 42.69 lakh im pressions
Printing(32 Ups crown 1/4 size)

9 Binding of Books, Text Books & Pads etc., 33.37 lakh copies

10 Text Books Binding 19.96 lakh copies

11 Envelope M aking 8.15 lakh envelopes


Economic Survey of Karnataka 2019-20 633

12.2 HEALTH AND FAMILY WELFARE rural areas. Table 12.36 presents
information on health infrastructure in the
Health is essential to happiness and well-
State. There are 15 District Hospitals, 206
being. It significantly contributes to
Community Health Centers, 2359 Primary
economic development as healthy
Health Centers, 8871 Sub Centers, 11 Other
populations live longer and are more
Hospitals and 36 Autonomous & Teaching
productive. It is an important human
Hospitals in the State. The primary health
development indicator and has a great
infrastructure in rural areas has fulfilled the
significance for the overall development of
norms required under the “minimum needs
the State. Achieving and maintaining health
programme” at the aggregate level. District
is an important ongoing process. The
wise distribution of health facilities is given
Government of Karnataka has given
in Appendix 12.8.
significant importance to the health sector
and Provision of good health care to the The 12th Five year Plan (2012-17) in respect
people is an essential component of the of the health sector has aimed at controlling
health strategy adopted by the State. population and reducing infant and
maternal mortality through strengthening
The focus of possible health intervention is
health services. In addition attempts have
to prevent and manage diseases injuries and
been made to remove intra-regional and
other health conditions through
regional disparities by improving health
surveillance of cases and the promotion of
services. The progress of the health
healthy behaviors communities and
indicators has been encouraging in the
environments. Provision of good health care
State during the last few years. The death
to the people is an essential component of
rate is already at a lower level and the birth
the development strategy adopted by the
rate is declining faster.
State to achieve overall socio-economic
development. Karnataka has performed in population
control with total fertility rate reaching 1.8
Karnataka has made significant progress in
by 2016 itself.The infant mortality has
improving the health status of its people in
declined faster during the last few years and
the last few decades. However despite the
has reached 25 in 2019 (As per SRS 2017)
progress the State has a long way to go in
from 35 in 2011 which is almost 10 units
achieving the desired health goals. The State
reduction per 1000 live births in a span of 9
has made substantial progress in building
credible health infrastructure at different years. (Fig. 12.3).
levels. 12.2.2 Family Welfare:
12.2.1 Health Indicators: The State offers an excellent family welfare
The State has a wide institutional network programme operating through the existing
providing health services both in urban and health infrastructure. The main objective of

Table 12.36: Infrastructure of Public Health Services of the State Govt.


Type of Institution No.
District Hospitals 15
Other Hospitals under Health & FW 11
Autonomous & Teaching Hospitals 36
Taluk / General Hospitals 146
Community Health Centres 206
Primary Health Centres 2359
Sub-Centres 8871
634 Economic Survey of Karnataka 2019-20

Figure 12.3 : Infant Mortality Rate and Total Fertility Rate in Karnataka
2011-2019

Table: 12.37 Achievement of the family welfare programme in Karnataka


2019
Sl
Indicator 2011 2012 2013 2014 2015 2016 2017 2018 up to
No
Nov
Birth Rate (for
1 18.8 18.5 18.3 18.3 18.3 18.1* 17.6* 17.6* 17.6*
1000 Population)
Death Rate (for
2 7.1 7.1 7 7 7 6.8* 6.7* 6.7* 6.7*
1000 Population)
3 Total fertility rate 2 1.9 1.9 1.9 1.8** 1.8** 1.8** 1.8** 1.8**
Maternal
Mortality Rate
4 178 144 144 144 133 108* 108* 108* 108*
(for every 100000
live births)
Infant Mortality
5 Rate (per 1000 35 32 31 31 31 24* 24* 24* 25*
Live births)
Under-Five
Mortality Rate
6 40 37 37 37 35 32** 29* 29* 29*
(per 1000
children)
Eligible Couples
7 72 66.42 66.89 63 63 63* 63* 63* 63*
protected (%)

Average
Male 63.6 63.6 63.6 63.6 69*** 69*** 69*** 69*** 69***
life
8 expect-
ancy
Female 67.1 67.1 67.1 67.1 73.5*** 73.5*** 73.5*** 73.5*** 73.5***
(years)

* Data from SRS 2017** Data from NFHS 4***NHP-2019 (2011 census)
Economic Survey of Karnataka 2019-20 635

the programme is to provide better health r National Leprosy Eradication


services in general and family planning Programme (NLEP)
services in particular to check the rapid r National Programme for Control of
growth of population. Table 12.38 provides Blindness (NPCB)
details of the State's achievements in
sterilization and IUD during the last seven r Integrated Disease Surveillance Project
years. (IDSP)
r Additional Services to Under National
Though sterilization continues to be the Rural Health Mission
main method of family planning the spacing
between the births of two children is also r Programme of Pulse Polio
equally emphasized. r Mission Indradhanush
12.2.3 National Health Mission: r Health Education Training Preventive of
Deafness and other Programmes.
National Rural Health Mission (NRHM) was
r Strengthening of public health facilities
launched on 12th April 2005 by the
by providing new constructions
Government of India to improve medical
additional alternation and renovation.
facilities in the rural areas of the country. It
is modified as National Health Mission by 1. National Vector Borne Disease Control
combining the primary health care services programme (NVBDCP):
to the urban and rural population. The NHM In each of the Districts Program
seeks to provide Accessible Affordable and implementation is being done through its
Quality Health Care to the rural population Districts Vector Borne Disease Control
especially the vulnerable sections. Officer Taluka Health Officers and through
The following programmes are implemented Administrative Medical Officers CHC and
under National Health Mission: PHC. Certain activities are managed at the
State level such as drug procurement
r RMNCH+A including immunization information education and communication
r National Vector Borne Disease Control (IEC) civil works and training. The State is
programme(NVBDCP) implementing the activities for prevention
r Revised National Tuberculosis Control and control of Vector Borne Diseases like
Programme (RNTCP) Malaria Filaria Dengue Chikungunya and

Table 12.38: Performance of Family Welfare Sterilization Programme


Sterilization IUD Couples
Year Achievement Achieve- Protected
Target Target
Vasectomy Tubectomy Total ment (%)

2012- 13 484980 2857 330445 333302 311822 189981 66.42


2013- 14 407102 1390 310025 311415 311883 159540 66.89
2014- 15 449495 1006 321007 322013 303924 188756 63
2015- 16 450997 1039 316922 317961 308356 181620 63
2016- 17 454287 922 295520 296442 277007 181618 *** 51.3
2017- 18 462141 917 306273 307190 *592008 214916 *** 51.3
2018- 19 **406217 770 279996 280766 *505267 209353 *** 51.3
2019-20 **441371 422 185843 186265 **551908 143986 ***51.3
up to Nov

Note:- * No. of IUD & PPIUCD insertion ** 2019-20 ELA *** NFHS 4( 2015-16)
636 Economic Survey of Karnataka 2019-20

Japanese Encephalitis as per the guidelines from Udupi, followed by Upper Krishna
of GOI Directorate of NVBDCP Delhi. Project, Gadag, Kalburgi, Bagalkot and
Hassan. Special inputs have been provided
Malaria: in terms of Human resource & Logistics to
The State is experiencing downward trend of the Districts of Dakshina Kannada &Udupi
Malaria incidence. During 2019, an overall for achieving the reduction in Malaria
decrease of 35.5 % in total Malaria cases is morbidity and heading towards goal of
marked up to November as compared to elimination.
same period of 2018. The State is heading
I. Dengue & Chikungunya
towards Malaria Elimination and the State
Framework of Malaria Elimination is During 2019, till November, a total of 15586
launched on 12th May 2017 with the vision confirmed Dengue cases along with 13
of eliminating Malaria from the State by deaths are reported, showing an increase
2025. The State is under category-2 as per compared to same period of last year.
elimination criteria. During 2019, 80 % of Further, a total of 3218 Chikungunya
the cases are from D.Kannada and 4 % is confirmed cases have also been reported

Table 12.39: Details of NVBDCP


Malaria cases/ Dengue cases/ C hikungunya AES/JE AES/JE
Year
d eaths deaths cases cas es deaths
201 4 14 794/ 2 33 58/ 2 9 42 13 3/ 34 0/ 1

201 5 11 825/ 0 50 77/ 9 20 99 373/ 40 0/1


201 6 1060 7/0 608 3/8 15 28 406/ 11 0/0
201 7 738 1/0 178 44/ 10 35 11 332/ 23 0/ 0

201 8 528 9/0 484 8/4 29 51 3 80/35 0/5

201 9
320 6/0 15586 /13 32 18 3 29/25 0/1
(Till N ov )

Figure 12.4
Economic Survey of Karnataka 2019-20 637

Figure 12.5 District wise contribution of Malaria till Nov 2019

Figure 12.6 District wise contribution of Dengue incidence till Nov 2019
638 Economic Survey of Karnataka 2019-20

Figure 12.7 Districtwise contribution of Chikungunya incidence till Nov 2019

showing increase compared to same period Three districts out of nine endemic districts
of last year. (Dakshina Kananda Uttara Kananda and
Udupi) have achieved mf rates less than 1 %
II. Acute Encephalitis syndrome/ & are under Transmission Assessment
Japanese Encephalitis (AES/ JE) : AES Survey with stoppage of MDA. Dakshina
cases are being reported from most of the Kananda & Uttara Kananda districts have
districts. During 2019 till November, State passed TAS-1 and TAS-2. Udupi has already
has reported a total of 329 AES and 25 JE qualified TAS_ III.
cases and one JE death in Udupi District.
These JE cases are reported from the Dist of Gulbarga Yadgir & Bidarare under
Districts of Dakhsina Kannada, Udupi, Mass Drug Administration. Districts of
Vijayapura, Mysuru, Mandya, Hassan, Raichur Bagalkot and Vijayapura are
Koppal, Ballari, Kalaburagi, Yadgiri, Gadag, partially under Transmission assessment
Haveri, Bagalkot, Chitradurga, Bangalore Survey. Devadurga & Lingasugur Taluks of
Urban, Ramanagara, Kolar and Raichur Muddebihal&SindagiTaluks of
Chikkaballapur. 10 Sentinel Surveillance Vijayapura and Badami&HungundTaluks
Laboratories have been established for of Bagalkot are under MDA. Taluks of
diagnosis of JE. Vaccination against JE is RaichurManvi&Sindhanoor of Raichur
taken up in problematic districts of Bellary, District Bilagi&Bagalkote of Bagalkot
Raichur, Kolar, Mandya, Koppal, Bijapur, District and B.Bagewadi& Indi of Vijayapura
Dharwad, Chitradurga and Davanagere and district are under TAS.
are now under Universal Immunization
2. National Tuberculosis Control
Programme.
Programme:
III. Filariasis:Filariasis: Yearly Mass Drug Tuberculosis (TB) is a disease caused by
Administration (MDA) Programme for ELF is bacteria called as Mycobacterium
implemented in 9 endemic districts of the Tuberculosis. TB spreads through droplet
State with administration of DEC and infection. India is the country with the
Albendazole to the eligible population since highest burden of TB. The World Health
2004. Organisation (WHO) TB statistics give an
estimated incidence figure of 2.79 million
Economic Survey of Karnataka 2019-20 639

cases of TB for India during 2018 as per the exclusively for tuberculosis work – a Senior
global TB report 2019. India makes TB treatment supervisor (STS) and a Senior
tuberculosis a notifiable disease as an TB laboratory supervisor (STLS).Apart from
estimated two million new cases of this the program supports the districts by
tuberculosis (TB) is annually diagnosed. providing contractual medical officers to
Tuberculosis is still a major public health medical colleges laboratory technicians TB
problem. Every day more than 900 people health visitors in urban areas statistical
die of TB (1 person per 2 min die due to TB in assistants for DR-TB centres District
our country). High mortality especially Program Coordinators PPM coordinators
among socio-economically productive age DR-TB centre counselors senior DOTS Plus
group causes huge economic losses to the TB HIV supervisors and accountants.
society and country. Currently 1007 contractual employees are
working for TB control across the state.
The Tuberculosis (TB) burden in India is
staggering. About 40% of the adult State TB cell under “Karnataka State Health
population of the country is estimated to be and Family Welfare Society – TB control
infected with Mycobacterium Tuberculosis. Programme” and 31 districts TB centres
Every year nearly 2.2 million new TB cases under “District Health Society – TB control
occur of which nearly 0.8 million are programme” have been established to
infectious (Smear positive pulmonary). Once supervise and monitor the implementation
infected an individual has on average a 10% of this programme effectively.
life-time risk of developing TB Disease.
For administrative feasibility State is
India has more people with active TB disease divided into 31 District TB Centers (DTC). 31
than any other country in the world DTCs are divided into 265TB Units (TU) one
accounting for 27% of the global TB Burden. for every 2.5 lakh population. Selected
Also an estimated 2.34 million individuals in Primary Health Centers have been up-
India are now living with HIV/AIDS. With graded as Designated Microscopic Centers
HIV infection to active disease the potential (DMC) including 56 medical colleges and
impact of the HIV epidemic on TB control in facilities in private sector. There are a total of
India is large. 1343 DMCs providing sputum microscopy
services across the state.
Tuberculosis in Karnataka:
RNTCP Karnataka is aiming at Universal
Revised National Tuberculosis Control Access and Zero TB deaths as a part of End
Program was implemented in the State from TB Strategy. The death and default in the
1998 and the entire State was covered in State is addressed aggressively. The total
2004.More than 80000 TB patients put on lost to follow up rate which was 10% in 2009
treatment annually in Karnataka TB control is reduced to 5 % in 2016 and death rates
program. have decreased from 8% in 2009 to 6% in
The Joint Director TB is responsible for 2018 despite high HIV – TB burden. The
planning training supervising and success rates of TB treatment have
monitoring of the program as per the improved from 80% in 2008 to 85% in 2016
guidelines of the State Health Society and
TB Notification and Nikshay
central TB division. At the district level the
Registration:
District TB Officer is responsible for
implementing the TB control program. He is Tuberculosis is a notifiable disease. All
also responsible for involvement of other providers must notify TB patients including
sectors in RNTCP. At the sub district level public and private providers through
the Tuberculosis Unit (TU) is the nodal point “NIKSHAY” which is a case based wed based
for TB control activities. The TU consists of application for TB patient's registration.
designated medical officer- Tuberculosis This software was launched in May 2012
control who does RNTCP work in addition to and it is disseminated to all districts. There
other responsibilities. There are two full is a significant response from private
time RNTCP contractual supervisory staff providers. Around 27337 health facilities
640 Economic Survey of Karnataka 2019-20

have been registered on NIKSHAY till date for early diagnosis follow up and treatment
and out of which 2022 health facilities are of HIV infected TB patients.
notifying TB cases. A total of 17258 TB cases
have been notified from private sector so far The TB HIV collaborative services
from January 2019 to November 2019. include:
1. PITC (provider initiated testing and
Pediatric TB:
counseling) for presumptive TB
Pediatric tuberculosis (i.e. TB among the patients.
population aged less than 14 years) has
2. Offering HIV testing for the all TB
always been accorded high priority by
patients.
Revised National Tuberculosis Control
Programme (RNTCP). In our state screening 3. Providing CB NAAT testing for all the
of TB among SAM children is of high priority. presumptive TB and presumptive MDR
To overcome the delay and to augment the TB cases for all the symptomatic HIV
diagnosis of pediatric TB 64 gene Xpert infected patients.
machines are placed at district level. There
4. Linking all HIV infected TB patients to
are exclusive pediatric drugs with different
ART centres.
weight bands which helps in successful
outcomes. 5. Providing ART to all HIV infected TB
patients irrespective of their CD4
DR-TB (Drug Resistant TB):
counts.
Programmatic management of drug
6. Providing daily FDC to all co-infected
resistant TB aims at diagnosis treatment
patients
and follow-up of patients with drug resistant
TB. For the diagnosis of DRTB two dedicated 7. Providing Co-trimaxozole preventive
mycobacteriology laboratories are therapy (CPT) to all HIV infected TB
established one is Intermediate Reference patients.
laboratory at Bangalore and other is CDST
CBNAAT (Cartridge Based Nucleic Acid
laboratory at KIMS Hubli. Both the
laboratories are certified by government of Amplification Test):
India (CTD) to perform both genotypic and The Xpert MTB/RIF is a cartridge-based
phenotypic tests. The third one is being automated diagnostic test that can identify
established at RIMS Raichur. The diagnosis Mycobacterium tuberculosis (MTB) DNA
treatment and follow up of the patient is and resistance to rifampicin (RIF) by nucleic
done free of cost. The cost of treating MDR acid amplification technique (NAAT).
patients is 2-6 lakh rupees which is Results are obtained from unprocessed
provided free to the patients. Currently more sputum samples in 90 minutes with
than 25000 patient samples are tested for minimal biohazard and very little technical
MDR-TB and 2000 MDR patients are getting training required. The state has 65 gene
free treatment. The Xpert MTB/RIF is a Xpert machines which are placed at the
cartridge-based automated diagnostic test district level and at places where there is
that can identify Mycobacterium high HIV-TB burden thereby ensuring early
tuberculosis (MTB) DNA and resistance to quality diagnosis and management happens
rifampicin (RIF) by nucleic acid to these patients.
amplification technique (NAAT). The state
has 65 gene Xpert machines which are The TB control program in Karnataka
placed at the district level and at places recognizes the need of targeting special
where there is high HIV-TB burden thereby populations. TB control program in
ensuring early quality diagnosis and Karnataka has identified special
management happens to these patients. populations and has planned target
interventions. The target interventions
TB-HIV collaborative activities. – The RNTCP include active surveillance in these
programme closely collaborates with AIDS
control programme at state and district level
Economic Survey of Karnataka 2019-20 641

populations' and utilizing genotypic 11. Drugs stock exercises done in all
methods for the diagnosis TB and resistant districts.
TB.
12. Involving 104 services for TB care.
Active TB Case Finding (ACF): 13. Using ICT technology (99 DOTS) to
Active TB Case Finding (ACF) is basically a monitor adherence of TB treatment in
provider – initiated activity with the primary co-infected patients who are on daily
objective of detecting TB cases early by DOT.
active case finding is targeted groups and to 14. Patient charter and patient forums.
initiate treatment promptly. It can target
people who anyway have sought health care 15. Nutritional support through NGO's in
with or without symptoms or signs of TB and certain districts.
also people who do not seek care. Increased 16. Enrolling MDR TB patients in Jan Dhan
coverage can be achieved by focusing on and PMSBY.
clinically socially and occupationally
vulnerable population so that to enhance The Standards for Tuberculosis Care in
their life style. In the year 2019 a total of India (STCI) is developed published and
2.11 crore people was screened which disseminated by the Central TB Division
yielded 4586 additional TB cases. (CTD) Government of India in 2014. These
standards apply to all health care providers
The following innovations stand out in in the country both public and private and
programme strengthening in Karnataka establish a common yardstick for TB
state they are: management. The Standards for TB Care is
1. Joint TB HIV visits to districts involving widely disseminated in the state through the
officials from KSAPS and State TB medical college professional bodies and
Centre for monitoring TB HIV through NGOs and partner organizations.
collaborative activities. The current strategy of TB Control is as
2. Provider initiated TB suspects testing envisaged in the sustainable development
for HIV. goals (SDG) and it is called “The END TB
STRATEGY.”
3. Designing of formats for reporting HIV
TB collaborative activities. The END TB STRATEGY has a Vision:
4. Micro planning (TU wise analysis) for “Tuberculosis free India–achieving
identifying low performing TUs and universal access by provision of quality
planning focused interventions. diagnosis and treatment for all Tuberculosis
patients in the community”.
5. Guiding tool for ACSM activities.
Goal:
6. Social media activities-Whats App
group (RNTCP family) and Facebook To decrease the morbidity and mortality by
(Tuberculosis control in Karnataka) early diagnosis and early treatment of all
accounts for State TB Centre. Tuberculosis cases there by cutting the
chain of transmission.
7. Involvement of field general health staff
for pulmonary TB suspect referral. Objectives: “Universal Access to TB Care”
8. Incentives for ASHAs for sputum 1. RNTCP pilots in Karnataka which have
sample transportation in difficult to become National Policies are:
reach areas in some districts.
2. ATT-ART-CD4(HIV-TB)
9. Utilization of ophthalmic camps
3. PITC (provider initiated testing and
organized by NGO (Muslim forum) for
counseling) for presumptive TB patients
creating TB awareness.
4. TB-DM bi-directional screening
10. Focused DTOs review.
5. Human Resource for Health ( aligning
RNTCP with NHM)
642 Economic Survey of Karnataka 2019-20

Funding: 2. Strengthening Disability Prevention &


Medical Rehabilitation of persons
Government of India 60% and Government
affected by leprosy.
of Karnataka 40% funds for the programme.
Funds are released to the district TB 3. Reduction in the level of stigma
Societies from State TB Societies. The state associated with leprosy.
non- plan fund and plan fund is has follows.
At present 06 districts have prevalence rate
3. National Leprosy Eradication 0.50 to 1 (Bidar, Gadag, Uttara Kannada,
Programme: Chamarajangar and Koppal) i.e 10000
population. As on Nov 2019 there are 2119
Introduction: Leprosy cases on hand.
National Leprosy Control Programme was Activities under NLEP:
started in 1955. Tremendous achievement
was made in the Programme with regard to 1. Case Detection and Management:
accessibility and service delivery with the
r Special Activity Plan (SAP): Activity is
successful implementation of the
being done in Districts having blocks
Programme. The prevalence rate of leprosy
with ANCDR (Annual New case
dropped from 40/10000 population in the
detection Rate) more than 10 cases per
year 1986 to 0.31/10000 population in
1 lakh population as well as in Districts
November 2019- Karnataka.
having very Low endemicity. These 49
The main objectives under NLEP are: taluks include both high endemic and
non endemic blocks.
1. Elimination of leprosy i.e prevalence of
less than 1 case per 10000 population r Under Urban Leprosy Elimination
in all the Districts of the State. Programme (ULEP) 2019-20: 12
Towns 2 Medium cities 1 Mega City have

Table 12.40:
Approved Budget as per ROP SOE April 2019 to Nov 2019
2019-20
6645.21 (in Lakhs) 2156.77 (in Lakhs)

Table 12.41: Performance of RNTCP Karnataka:


Populatio Annual Total TB Case
Treatment Success rate
n in Notification Rate.
Year
lakhs New Re-treatment
Public Private Total
Cases cases
National
114 11 125 87% 70%
average
2013 629 97 1 98 2013 83% 57%
2014 635 97 3 100 2014 83% 59%
2015 643 96 8 104 2015 84% 64%
2016 650 92 9 101 2016 84% 67%
2017 658 94 14 108 2017 84% 68%
2018 668 102 22 124 2018 85% 64%
Jan to Nov
676 106 28 134 2019 79% 64%
2019
Economic Survey of Karnataka 2019-20 643

been selected. Activities conducted 3. Capacity building:


under ULEP are Survey of Slums
For the financial year 2019-20 – MOs 670
Residential Schools Hostels Leprosy
and Health workers 590 persons have been
Colonies Mutts running educational
sensitized. Intensified training will be given
institutions Hard to reach areas tribal
to Health workers and the Medical Officers
colonies and Monitoring Supervision &
to diagnose leprosy cases at the peripheral
Coordination with NGOs & Other
health centres itself.
departments.
Leprosy Case Detection Campaign (LCDC) RBSK teams are being sensitized to pick up
2019: suspected Leprosy cases validate them and
initiate treatment.
1st Phase of LCDC was conducted during
5th Sep 2019 to 23rd Sep 2019 in 1) 4. IEC:
Bengalurru (Urban) 2) Chitradurga 3) Special Drive to remove stigma surrounding
Chikkaballapura 4) Chamarajanagar 5) leprosy and prevent discrimination was
Davanagere 6) Kalburgi 7) Kolar 8) Tumkuru planned in the form of Table 12.42.
9) Vijayapura. Totally 156 (PB 74 & MB 82)
cases were detected. r Sparsh Leprosy Awareness Campaign
2019-20 (Anti Leprosy fortnight –
2nd Phase of LCDC was conducted during 30th Jan 2019 to Feb 13th 2019):
25th Nov 2019 to 10th Dec 2019 in 1)
Bagalkote, 2) Belagavi, 3) Bidar, 4) It was a unique and highly commendable
Chickmaglur, 5) Koppal, 6) Raichur 7) initiative which was carried out in
Shivmogga, 8) Uttara Kannada & 9) Yadgir. Karnataka as per guidelines of Central
Totally 269 cases confirmed, validation of Leprosy Division (CLD). Previously Anti
the cases under process. Leprosy fortnight was carried out depicting
pictures of leprosy cases in full blown
2. ASHA involvement: disease status. This year an approach
New activity (ABSULS –Asha Based showing solidarity and statement of Sparsh
surveillance Leprosy suspects) as per and oneness with leprosy patients was
Government of India guidelines was rolled depicted. The entire Panchayath Raj
out in 2017-18. institution functionaries were involved and
the problem/issue of leprosy which initially
For the financial year 2019-20 A total of was looked after by health functionaries was
7000 ASHAs were trained. Incentives were shared among the local population who are
paid to ASHAs for case detection the real stake holders. Awareness of the
(Rs.250/case) & after treatment completion disease and how to approach the health
i.e PB 6 months (PB Rs.400/case) & MB (MB system was widely propagated.
Rs.600/-case) 12 months. Also ASHA are
being regularly sensitized in ASHA Satcom
and in monthly meeting through DLOs.

Table 12.42 :
Sl. No. of
Medium
N o. districts
1. Mass M edia(TV Radio Press) 31
2. Outdoor Media (Hoardings Wall Paintings Banner Rally) 31
3. Rural M edia (IPC Meeting School Health Quiz) 31
4. Advocacy meeting (Meeting with Zilla Parishad NGOs) 31
5. IEC Activities – State 1
644 Economic Survey of Karnataka 2019-20

Table 12.43 : Physical Target and Achievements for Eradication of Leprosy from
2013-14 to 2019-20
New Cases Detected Cases Cured Deformity Deformity Child
PR
Year Target Ach % Target Ach % Rate Gr.II cases cases

2013-14 - 3461 - 0.45 - 3295 - 3.72 129 320


2014-15 - 3314 - 0.44 - 3260 - 4.41 146 287
2015-16 - 3065 - 0.40 - 3037 - 3.39 104 209
2016-17 - 2897 - 0.40 - 2710 - 3.52 102 166
2017-18 * - 2892 - 0.38 - 2774 - 4.05 117 171
2018-19 - 2789 - 0.34 - 2869 - 2.94 82 147
2019-20 - 1729 - 0.31 - 1853 - 2.20 38 66

*(Up to Nov 2019)

Welfare measures for the Persons adults and Rs275/bed for children per
Affected by Leprosy: month.
1. 5% of Group 'D' Jobs are reserved for Details of special events held in 2019-20:
the Persons affected by Leprosy during r In the Financial Year 2019-20 2 District
recruitment of Physically handicapped. Leprosy Officer's & 1 NGO's review
2. 42 Reconstructive Surgery Operations meeting was conducted .
done as on 30th Nov 2019 Rs.8000/- r Leprosy Case Detection Campaign
paid (As per Guidelines) incentive for (LCDC) of state level coordination
RCS undergone Persons Affected by committee meeting was held under
Leprosy. Chairmanship of Principal Secretary
HFW Department dt: 16-07-2019.
3. Micro Cellular Rubber Footwear
provided to 3141 Persons Affected by r 1st Phase of LCDC was conducted
Leprosy ( PALs). during 5th Sep 2019 to 23rd Sep 2019
in 1) Bengalurru (Urban) 2) Chitradurga
4. 1066 Self care kits provided to foot ulcer 3) Chikkaballapura 4)Chamarajanagar
cases. 5) Davanagere 6) Kalburgi 7) Kolar 8)
5. 125 Lepra reaction cases treated with Tumkuru 9) Vijayapura. Totally 156 (PB
supportive drugs. 74 & MB 82) cases were detected &
r 2nd Phase of LCDC was conducted
6. Splints crutches and other needed during 25th Nov 2019 to 10th Dec 2019
appliances provided. in 1) Bagalkote, 2) Belagavi, 3) Bidar, 4)
7. Prevention of Deformity (POD) camps Chickmaglur, 5) Koppal, 6) Raichur 7)
conducted regularly in all the Taluk Shivmogga, 8) Uttara Kannada & 9)
level hospital. Yadgir
r 2nd Phase of LCDC workshop was
8. Medical facilities are being provided to
conducted on 3rd and 4th Oct 2019 at
the Persons Affected by Leprosy family
Gandhibhavan Bengaluru.
member residing in 20 Leprosy colonies
in the State. It is expected a world with a reduce burden
of leprosy reduce stigma and discrimination
9. Grant-in Aid is provided by State Govt. activities based on the principles of equity
for the NGO hospitals providing and social justice and strong partnerships
treatment to the Persons Affected by based on equality and mutual respect at all
Leprosy at the rate Rs.500/bed for levels.
Economic Survey of Karnataka 2019-20 645

4. National Programme for Control of The identified children experiencing


Blindness: difficulties in reading are immediately
referred to the Para medical Ophthalmic
The National Programme for Control of Officers (PMOOs) for eye screening. The
Blindness was started in 1976 as a Centrally children detected with refractive error
Sponsored Scheme to counter the problems are provided free spectacles.
of Blindness due to various factors and also
to reduce the prevalence of Blindness to 5. 40 Eye Banks registered under Human
0.3% by 2020. The present prevalence rate Organs Transplantation Act are
of blindness is 1.1% as per National Survey functioning in Karnataka including 7
2006-07. Functioning Government Eye Banks.
As per the policy of Govt. of India under
1. The Karnataka State Health and Family NPCB eye bank infrastructure is also
Welfare Society (Blindness Control improved to increase cornea collection
Division) is working under National and Keratoplasty. Incentives are also
Health Mission (NHM) headed by given to all the eye banks registered
Mission Director. The State Programme under HOTA for collecting eye balls in
Officer will implement and monitor the order to increase the cornea collection.
programme through a network of
Districts Programme Managers 6. Karnataka state initiated Diabetic
(Blindness Control Division) at Districts Retinopathy project at Tumkur and this
level as per the Guidelines of NPCB. year the project extended to 5 more
Government of India releases the funds Talukas of Tumkur&Chikkballapura
to the State Society for onward Districts. By vittala institute of
distribution of funds to all Districts ophthalmology.
Health &Family Welfare Society 7. To make our state corneal blindness
(Blindness Control Division) based on black log eye collection centre to be
the Target assigned to each Districts. opened in all District Hospitals.
2. Cataract is the major cause of 8. 6 Districts or strengthen with mobile
Blindness. 99% of the Cataract ophthalmic units to reach the under
surgeries are IOL inserted surgeries. served and reached & unreached in the
The patient affected with cataract are year 2018-19 approved to procure 11
treated free of cost in Govt. hospitals more mobile vans for DMOU (District
and NGO hospitals who have MoU with Mobile Ophthalmic Unit). Tele
NPCB. Cataract camps are being ophthalmic unit – implemented at
conducted on regular basis throughout Tumkur District.
the state in both the government and
voluntary sector. 9. Retinopathy of Prematurity screening
& treatment being done by Narayana
3. Diabetic Retinopathy Glaucoma Nethralaya.
management Laser Technique Corneal
Transplantation Vitreo Retinal Surgery 5. The Integrated Disease Surveillance
Treatment of Childhood Blindness etc. Project (IDSP):
are also treated under NPCB in order to
The Integrated Disease Surveillance Project
provide improved eye care services and
was launched in 2005 and became
control the incidence of blindness. The
programme in the year 2012. The general
patient affected with any of the above
objectives of the program aims at
eye diseases will also be treated free of
establishing a decentralized state based
cost in Govt. hospitals and NGO
system of surveillance for communicable
hospitals who have MoU with NPCB.
diseases so that timely and effective public
4. In order to detect refractive errors in health actions can be initiated in response
school going children the school teacher to health challenges in the country at the
having their proximity to the children state and national level.
are trained in primary eye screening.
646 Economic Survey of Karnataka 2019-20

Physical Target & Achievements:

Table 12.44 : Cataract Surgeries

Year Target Achievement %

2013-14 354560 362481 102.23

2014-15 404563 363661 89.89

2015-16 404563 374971 92.69

2016-17 404563 366737 90.65

2017-18 404563 383497 94.79

2018-19 404563 390630 96.56

2019-20 (upto Nov) 404563 2,45,298 60.63

Table 12.45 : Achievement of School Eye Screening Programme


No. of Children No. of Children detected No. Spectacles given to
Year
Screened with Refractive Error Children
2013-14 3247402 32487 30161

2014-15 2905004 47003 37786

2015-16 4375400 77261 38379

2016-17 4155367 100426 45553

2017-18 4493399 110883 47871

2018-19 4639151 231958 56487


2019-20
4383465 100,73 25794
(upto Nov)

Table 12.46 : Eye Balls Collection

Year Target Achievement %

2013-14 5600 3499 62.48%

2014-15 5600 3938 70.32%

2015-16 5600 3572 63.79%

2016-17 5600 3527 62.98%

2017-18 5600 5914 105.61%


2018-19 5600 5561 99.30%
2019-20 (upto Nov) 5,600 3673 65.59%
Economic Survey of Karnataka 2019-20 647

Table 12.47 : Financial Progress (Provisional)

Year Budget Allocation Expenditure %

2014-15 1890.73 1276.47 68%

2015-16 954.00 914.00 96%

2016-17 1959.73 1616.23 82%

2017-18 3230.26 1998.54 62%

2018-19 3002.87 2576.31 86%

2019-20
1843.49 1134.67(Provisional) 62%
(upto Nov)

(Rs. in lakhs)

To improve the efficiency of the existing 2. Data Analysis and Feedback: Analysis
surveillance activities of disease control of the weekly 'S' 'P' and 'L' reports at
programs and facilitate sharing of relevant State and Districts Surveillance unit as
information with health administration vigilance against identifying impending
community and other stakeholders so as to outbreaks . Weekly feedback by higher
detect disease trends over time and evaluate institutions to the peripheral reporting
control strategies. units/health staff to initiate proper
containment measures.
The Specific Objectives of Integrated
Disease Surveillance Programme are: 3. Network of Laboratories: 14 District
Public Health Laboratories at the
1. To integrate and decentralize
district level are strengthened
surveillance activities.
by providing Laboratory Equipment
2. To establish systems for data collection Reagents kits consumables
reporting analysis and feedback using contingency and Manpower –
Information Technology. Microbiologist Laboratory Technician
Laboratory Assistant and Laboratory
3. To strengthen laboratory support for
attendant for sentinel surveillance and
disease surveillance and laboratory
lab confirmation of communicable
confirmation of outbreak.
diseases. In ROP 2018-19 5 DPHLs
4. To develop human resources for disease (Bellary Dharwad Chickmagalur
surveillance and action; Chikkaballapura and Ramanagara)
have been approved. Equipment
5. To involve all stakeholders including
procurement and renovation of these
private sector and communities in
labs is in progress. In RoP 2019-20
surveillance activities.
DPHL have been approved for Mysuru
Existing System (IDSP): district. Procurement of equipments for
Mysore lab has been initiated.
1. Reporting: Weekly reporting of
Syndromic (S) Presumptive (P) and All Districts have been linked to 8
Confirmed (L) cases of communicable Government Medical colleges for
diseases from Public and P & L Laboratory confirmation of outbreak.
reporting from Private health care The Medical Colleges have been funded
facilities throughout the state. for procurement of kits and
648 Economic Survey of Karnataka 2019-20

consumables. The program has 8. Water testing: All District Surveillance


provision for reimbursement of the cost laboratories are carrying out
incurred for carrying out tests for the bacteriological examination of water.
samples referred from outbreaks. The H2S media for water quality monitoring
District Public Health laboratories of and media stain are prepared here and
Udupi Chitradurga Tumkur Kolar distributed to the peripheral health
Bijapur Chamrajnagar Yadgiri Koppal centres. Training for the Lab
Davanagere Gulbarga Haveri Gadag Technicians of Bangalore Urban and
and Bagalkote are attached for External Banglaore Rural Districts has been
Quality assurance proficiency testing done and the water testing examination
for Microbiology with CMC Vellore. will be initiated soon.
4. Human Resource & Training: 9. Zoonotic disease control: As a part of
Recruitment of Epidemiologists IDSP Surveillance on important
Microbiologists Entomologist Data Zoonotic diseases of Karnataka viz.
Managers and Data Entry Operators on Japanese encephalitis Scrub typhus
contractual basis to support Leptospirosis Kyasanur Forest Disease
surveillance activities. Peripheral/ Brucellosis Anthrax Avian flu etc. is
Districts Health staff trained to identify done.
and report various diseases defined in
Joint outbreak investigation and
the S P and L formats.
containment of zoonotic disease
5. Media scanning & Verification cell: outbreaks is done along with
Media Scanning and Verification cell is Department of Animal Husbandry. In
function in the SSU and DSU by 2016 there were three major zoonotic
sending the media alerts to the disease events in Karnataka i.e. Avian
Districts/Taluks by scanning print & influenza outbreak with H5N1 strain at
electronic media and expect the Arunodaya poultry farm Molakera
districts to verify the incident and to village Humnabad taluk Bidar. Avian
send the report. These interns verify the influenza outbreak with H5N8 strain at
Media Alert by the CSU GoI and SSU Itagi village Hospete taluk Bellary and
respectively. Brucellosis outbreak at Janagalahalli
cattle farm Kolar taluk Kolar. Avian
6. IT strengthening: The video- influenza outbreak was investigated
conferencing facility is available at DSU and confirmed with H5N8 in free
& SSU and is used regularly for the ranging and migratory birds at Sri
supervision monitoring and to discuss Chamarajendra Zoological gardens at
the issues pertaining to implementation Mysuru.In first week of January 2018
of the programme. there was an outbreak of Avian
7. Outbreak Response and Manage- Influenza with H5 strain in Chicken at
ment: State and District Rapid Bhuvaneshwarinagar Dasarahalli
response teams are identified involving Bangalore-24.All these events were
DSO DVBDCP officer RCH Officer successfully tackled and no human
Physician Pediatrician Epidemiologist cases of avian influenza reported till
Microbiologist Entomologist Veterinary now.
Doctors and Designated officers from In the year 2018 a total 18 cases and 16
Food Safety headed by District deaths by Nipah Virus Disease have
Surveillance Officer to investigate cause been reported from Kozhikode and
and contain the outbreaks. The teams Malappuram Districts of Kerala. And in
are instructed to report outbreaks on the year 2019 on 04.05.2019 a 23 year
daily basis with mandatory nil reports. old student from Kerala has been
During 2019 a total 204 outbreaks have confirmed for the Nipah Virus Disease.
been investigated and tackled Hence in this view surveillance activity
effectively. Of these 117 outbreaks are has strengthened in all the bordering
confirmed by laboratories.
Economic Survey of Karnataka 2019-20 649

Districts of Kerala State in coordination IEC:


with Animal Husbandry & Veterinary
The following IEC programs have been
and many other departments till date
implemented under the IDSP program
no confirmed cases have been reported
Operational Cost Grant in the absence of a
in the State.
separate grant for IEC.
International Health Regulations - 2005
IEC activities
(IHR) activities:
r Antibiotic Awareness Week: Advertised
Monitoring of screening activities for
in Newspaper - State Activity
emerging diseases like MERS Zika done at
airport and seaports by Airport Health r Printing of laboratory definitions and
Organization of India GOI . The IDSP has case definitions - District activity
been entrusted to follow up on lab r Pamphlets on birdwatchers were
confirmation of such suspected diseases in printed and distributed - District
coordination with National reference activity
laboratories – NCDC Delhi and NIV Pune.

Table 12.48 : Financial Progress


Year Total Budget allocated Expenditure

2013-14 444.02 308.53

2014-15 550.72 374.60

2015-16 566.82 469.54

2016-17 528.10 501.59

2017-18 532.14 423.01

2018-19 317.21 237.76

2019-20 280.55 127.13 (prov. upto Nov-2019)

Table 12.49 : Physical Progress of IDSP reporting 2013-2019


S l. 20 1 9
P arameter 2 01 3 20 1 4 2 0 15 2 0 16 2 01 7 2 01 8
N o. ( Till Nov)

1 S F or m 8 5% 92% 95% 96% 98% 9 5% 97%

2 P form 9 0% 92% 94% 91% 97% 9 1% 95%

3 L form 8 7% 92% 93% 88% 95% 9 0% 95%

Warn in g
4 59 131 35 55 296 32 58
Aler ts

5 Media Aler ts 187 53 41 23 6 197 55 71

Outbr eaks
6 313 291 32 3 27 3 289 192 264
In vestig ated

Lab or atory
7 10 13 19 19 22 27 28
Networ k
650 Economic Survey of Karnataka 2019-20

Figure 12.8 : Depicting No. of Outbreaks, No. of Outbreaks lab Utilized and No. of
Outbreaks lab confirmed

Table 12.50 : Physical Progress of DPHLs- 2013-2019 (Up-to November.19)


Sl. Year wise Utilization of DPHL- Serology
Name of DPHL
No 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

1 Chitadurga 157 243 516 1259 1604 3472 2059 4538 2100 2751
2 Udupi 321 246 149 1244 1491 2525 4055 5054 5405 6583

3 Bijapur 274 1338 1375 2333


Approved in ROP 2013-14. Manpower
4 Yadgiri appointment in 2016. Lab started 475 1493 1894 4054
functioning from 2016.
5 Chamarajanagar 378 4839 2010 2279
6 Koppal 225 915 665 2305

7 Bagalkote 48 604 973 2331

8 Davanagere Approved in ROP 2014-15. Manpower 34 1895 2041 1953


appointment in 2016. Lab started
9 Gadag functioning from 2016 . ._ 905 1083 2808
10 Gulbarga 193 4061 7310 6181
11 Haveri 216 2147 3697 1535

12 Tumkur ._ 4662 1282 1900


13 Kolar Approved in ROP 2017 -18. ._ 1901 358 1648
14 Dakshin Kannada ._ 1984 7855 6100

15 Bellary 16

16 Dharwad 0
17 Chickmagalur Approved in ROP 2018-19. Renovation of the Lab and 2168
equipment procurement is in p rogress
18 Chikk aballapura 2063
19 Ramanagar 1559

20 Mysore Approved in ROP 2019-20.Equipment procurement is in progress 2719

Note : Serology tests includes Dengue IgM ELISA, Dengue NS1 ELISA, Chikungunya, IgM ELISA, Leptospira
ELISA, Heapatitis A & E, Weil Felix & Scrub Typhus . Tests done for Widal not included.
Economic Survey of Karnataka 2019-20 651

Table 12.51:
Year wis e Utilization of DPHL- Cu lture & Sensitivity
Sl. No Name of DPHL
20 10 20 11 20 12 20 13 20 14 20 15 20 16 20 17 2 018 201 9
1 Chitadurga 40 120 74 219 374 434 808 1292 2681 2807
2 Udupi 65 31 14 159 412 307 694 899 2283 2958
3 Bijapur 392 765 2232 2027
Approved in ROP 2013- 14. Manpower
4 Yadgiri appointment in 2016. Lab started func tionin g .- 212 454 240
from 2016.
5 Chamarajanagar .- 232 574 1330
6 Bagalkote .- 73 1588 808
7 Koppal 136 1430 732 2287
8 Davanagere Approve d in ROP 2014-15. Manpowe r .- 415 1294 1878
appointment in 2016. Lab started func tionin g
9 Gadag from 2016. .- 52 145 638
10 Gulbarga .- 132 602 986
11 Haveri .- 750 2999 2521
12 Tumkur .- 120 2601 3543
13 Kolar Approved in ROP 2017- 18. .- 233 853 1041
14 Dakshin Kann ada .- 114 760 1132
15 Bellary 448
16 Dh arwad 715
17 Chickmagalur Approved in ROP 2018-1 9. Re nov ation of the Lab an d equipme nt procure men t 90
is in progress
18 Chikkaballapura 0
19 Ramanagar 0

20 Mysore Approved in ROP 2019-20.Equipme nt procureme nt is in progress 490

NOTE : Culture tests includes tests done for Typhoid Fever, Cholera & Other Enteropathogens, Diphtheria
and other clinical samples.

Figure 12.9 : Depicting the year wise utilization of Referral Lab


652 Economic Survey of Karnataka 2019-20

Table 12.52 : IDSP Training Status

2019-20
Designation 2014-15 2015-16 2016-17 2017-18 2018-19 (till Nov)

Medical Officers 365 133 131 177 1063 920

Staff Nurse/
29 114 53 51 425 315
Pharmacists

Medical College
Doctors & DPHL - - 20 23 50& 4 23&1
Microbiologists

Pharmacists 232 120 60 47 0 46

Data Managers 30 0 0

ASHA mentors 72 40 - - 0 140

JHA (F) & (M) 316 197 221 & 63 82 & 37 103

Microbiologists - 9 - - 0

Lab tech. - 20 119 135 19 189

Sensitization to
Panchyat Development 207 144 110 50
Officers

Sensitization to multi-
sector group involving
School Teachers, Self
help group members,
567
AWW, High School 489
203 616
Students, ASHA,
GramaPanchayat
members

Veterinary Doctors 30 0 0
one training for Data
Entry and Block 80 24
Health Team

Training for private


75 0
practioners

Total 1014 633 1441 959 2370 2300

Integrated Health Information Platform recommended the revamping of information


(IHIP) system & IT architecture of the reporting
platform under the program. Subsequently
Integrated Health Information Platform on the request by MoHFW WHO Country
(IHIP) for IDSP: Joint Monitoring Mission Office-India has designed and developed
(JMM) organized by MoHFW and WHO in the Integrated Health Information Platform
year 2015 to review the programme (IHIP) with IDSP.
Economic Survey of Karnataka 2019-20 653

IHIP is near-real-time. Web-enabled State health programs of public health


electronic health information system importance and also provides
intended to capture village-level case-based comprehensive health care services to the
disease surveillance data under IDSP. The people of the State through various types of
IT platform shall also enable greater health and medical institutions. The
collaboration with other existing disease progress of the health programmes are
surveillance program and sectors with presented in Table 12.53.
support from WHO in future. All types of
surveillance standards data standards and 1. JANANI SURAKSHA YOJANE (JSY):
IT standards are incorporated in IHIP. The goals of JSY are reduction in maternal
and infant mortality rate as well as to
Along with the 6 other States IHIP is increase the institutional deliveries of BPL
launched on 26th November 2018 Secretary and SC/ST families. Under this scheme
Health MoHFWGoI in the Karnataka State. besides ensuring maternity services like 4
The reporting for “L” and P” Forms under the antenatal checkups and referral transport
IHIP is 59% and 63% respectively for the cash assistance is provided for deliveries
month of November 2019. taking place both in health institutions and
IHIP Training in the 2018-19 (Funds home. In rural areas cash assistance to the
from NHM training component): mother for institutional delivery is Rs. 700
per case whereas in urban areas cash
r State level training (TOTs): DSO
assistance to the mother is Rs. 600 for
Epidemiologist Microbiologist
institutional delivery. The cash assistance is
Entomologist Data Managers- 124
also available for women delivering at home
r District Level training: Medical with an amount of Rs. 500 being given per
Officers Physician Paediatrician THOs case. If specialists are not available in
Lab Technicians Staff Nurse DEOs of Government-run health centers or
different programmes PharmacistsSr hospitals, the institution can hire such
HA- 8092 specialists to manage complications or for
r Block level training: ANMs- 9261 caesarean section.
12.2.4 Other Major Health Programme 2. AROGYA KAVACHA 108:
Initiatives: “ArogyaKavacha” 108 Emergency service
The Department of health and family welfare was started in the state of Karnataka on
services implements various National and November 1 2008 by the Karnataka Health

Table 12.53: Progress of Various Health Programmes (Unit in Numbers)

2019-20
Programmes 2015-16 2016-17 2017-18 2018-19
(Upto No v.)

Janani Suraksha Yojane 425 711 3938 74 28273 1 325 197 3119 29

Rashtriya BalSwasthya
1 885 14 36 604 8 2 187 19 73
Karyakram

Arogya K avacha 739 884 10622 21 1 11639 5 945 095 6005 28

Dialysis 64 795 814 22 13711 1 308 347 2759 28

Telemedicine 53 958 498 09 521 85 55 871 316 55

Ayushman Bharat-Arogya
-- -- -- 83 779 1891 48
Karnataka
654 Economic Survey of Karnataka 2019-20

and Family Welfare Department under a 169901 pregnant women have utilized the
Private Public Partnership through an MOU services and 57222 lives are saved
signed with GVK EMRI.
3. JANANI SURAKSHA VAHINI:
The Role and Mission of '108' is to save lives
by providing a comprehensive 'Emergency Janani Suraksha Vahini Programme was
Response Service' to those in Medical Police initiated under NHM in 2009-10 to ensure
or Fire emergencies through a single 24/7 round the clock free referral transport
integrated number - 108. We operate 24 x 7 between the facilities for pregnant women
and 365 days of the year with a fleet of 711 and sick neonates/ infants. Out of the
well equipped ambulances. The ambulances existing ambulances of the CHCs/ THs/
are manned by a trained Emergency Medical DHs one ambulance of each facility was
Technician (EMT) and a trained driver designated as JSV Ambulance. At present
(Pilot). This service is available across the there are 180 JSV Ambulances. Drivers are
length and breadth of Karnataka i.e. all the outsourced by District Health Societies from
30 Districts. Manpower Agencies by calling tenders as
per KTPP Act.
The Ambulances are stationed strategically
in all Districts and taluks across Karnataka 3 drivers (1 Regular and 2 Out sourced) are
so they can reach the incident location given to each vehicle to work in 8th hourly
within the shortest possible time anywhere shifts. Total number of beneficiaries under
in the state. The services are operated JSV from April 2019 to Nov 2019 is 37032.
through a centralized Emergency Response 4. NAGU-MAGU:
Center located at Bangalore. At present
there is one ambulance for every 85000 To provide Drop Back facility for post
populations with a total of 711 Ambulances postnatal mothers and new born from
throughout the state. Government Health Facilities to their
residence 200 drop back vehicles called as
This service can be utilized by any individual “Nagu-Magu” were inaugurated on 5th
who requires emergency help (Medical February 2014. The Nagu-Magu vehicles are
Police or Fire) irrespective of his economic deployed one each at the District Hospital
status caste creed color ethnicity gender and Taluka Level Hospitals. Drivers for
and/or literacy levels. The process of calling Nagu-Magu Vehicle are outsourced by
for an ambulance is simplified to such an District Health Societies from Manpower
extent that a call to the toll-free number Agencies by calling tenders as per KTPP Act.
'108' with details of emergency the number
of people involved and the incident location Total number of beneficiaries under Nagu-
supported with a landmark; would trigger Magu from April 2019 to Nov. 2019 is
an ambulance dispatch. This is an 52687.
absolutely FREE SERVICE starting from the 5. BIKE AMBULANCES : (FIRST
phone call till the point of reaching the RESPONSE UNIT):
hospital.
The Bike Ambulances/ First Response unit
The medical emergencies can be availed for th
(FRU) is inaugurated on 15 of April 2015 by
Accident and Trauma (Vehicular and non Government of Karnataka. It is the
vehicular) complaints related to Cardiac “Platinum Ten Minutes” trauma care
Respiration Diabetes pregnancy initiative aimed at reducing deaths due to
Stroke/Convulsions Suicide attempts road accidents. It is an unique initiative and
Poisoning cases Assault/Violence Animal is the first of its kind to be taken up by the
Attacks Neonatal Building Collapse Fire State Government in our Country. The first
Burns hazardous material ingestion etc. aid and medical care during the “Platinum
From April 2019 to Nov 2019 680281 Ten Minutes” is paramount to save the life of
Emergency calls are attended 600528 an accident victim hence the pioneering
emergencies are attended and out of these attempt to start motorbike ambulance
service.
Economic Survey of Karnataka 2019-20 655

The motorbike ambulance service is another Those patients residing in the remote rural
pilot and pioneering initiative to ensure first villages who cannot access the medical
aid to the victims during the Golden Hour doctors in the hospitals can now contact
They are useful for negotiating the small with the doctors through Arogya
streets and heavy traffic in the large urban Sahayavani-104. “104” is a toll free number
areas where it would be difficult to move through which people can avail consultation
ambulances through crowds. The fleet of for minor ailments counseling services
high-powered touring motorcycles are information on services available in public
available when required to respond to Health facilities directory services (Eye bank
various trauma/medical incidents. The Bike Blood Bank) and grievance redressal
ambulances will be currently deployed in (Services Epidemics Corruption Hygiene
Bangalore (19 Nos) Mangalore (2 Nos) and Drugs and Diagnostics ASHA grievances
one each to the corporation areas of Mysore etc. )
Kalburgi Belagavi Hubli-Dharwad
Arogya Sahayavani-104 call centre is
Davanagere Tumkur Vijayapura Shimoga
situated at IT Park Hubli and Sir. C V Raman
and Kolar Districts where heavy traffic
Nagar Hospital with a capacity of 100 seater
congestion and narrow streets would be
each. People (Citizens) from any part of the
easily overcome by the agile nature of the
state can avail their service by calling 104.
bikes. The programme will be implemented
From April 2019 to Nov 2019 4502245 calls
through GVK-EMRI who are already
are received at the call centre out of which
experience in providing such services
4483234 calls are provided with the
through Arogya Kavacha-108. Riders are
different services.
paramedics or EMTs who are recruited and
trained on managing emergencies. 7. VATSALYAVANI:
Motorbike ambulance drivers would be fully
trained in rendering first aid and would start For the first time in India A Three way call
resuscitation measures to save the victim. conferencing structure for Mother Child
tracking system called “VatsalyaVani” is
Two-wheelers by virtue of their size could launched in Karnataka by then Chief
manoeuvre through narrow and busy roads Minister Shri. Siddaramaiah on 21st
and reach accident spots with ease while December 2015. This programme is
they would be followed by a fully equipped implemented through Arogya Sahayavani-
four-wheel ambulance for shifting the victim 104.
to a nearest hospital for further treatment if
necessary. VatsalyaVani call center will offer the
below services throughout the state:
Bike ambulance is able to respond to a
medical emergency much faster than an 1. Monitor all pregnant woman and child
ambulance or a car in heavy traffic which through ANC/PNC advice.
can increase survival rates for patients 2. Promote protect and maintain the
suffering cardiac arrest/ accident/ other health of the mother and child through
emergencies. advice e.g. nutrition health & wellbeing.
From April 2019 to Nov 2019 31641 3. Providing information of various
emergencies are attended by the bike government health programs and
ambulances schemes and their entitlements
6. AROGYA VANI-104: 4. Identify and track High Risk
The Government of Karnataka has started Pregnancies and low weight birth
the Arogya Sahayavani-104 service with the babies.
moto of reaching the unreached to provide 5. Motivate mothers for Institutional
all the health care services available in the Delivery and family planning methods.
public sector.
6. Arrange and monitor transfer to nearest
delivery point through state
ambulances.
656 Economic Survey of Karnataka 2019-20

7. Eliminate home deliveries. She is also working as a Member Secretary


for Village Health, Sanitation and Nutrition
8. Track Immunization status.
Committee in rural area and for
9. Prevent dropouts. Mahilaarogyasamithi in urban area.
10. Ensure complete service delivery. Providing the legal framework to ASHA
work, The certification process has been
8. ASHA: taken up. The main objective of the
The ASHA worker is a woman selected by Certification of ASHAs is enhance the skill
the community who is trained and and competencies, through skill
supported to function in her village to assessment and knowledge. Mohfw,
improve the health status of the community GOI, has made the tripartite MOU
through securing people's access to health between NIOS,NHSRC and MOHFW for
care services through improved health care conducting the Certification of ASHA. 303
practices and behaviours. In Rural area 1 ASHAs successfully completed 10 days
ASHA per 1000 population and in urban refresher training along with Internal
area 1 ASHA per 2500 population. She is assessment, External evaluation and
incentivized for 34 different health activities. Theory examinations.
The ASHA's work consists mainly of five In addition to the incentive provided by
activities: NHM, Govt. Of Karnataka has provided the
Rs.3500 as monthly fixed incentive since
1. Home Visits September 2017 onwards and as of by
2. Attending the Village Health and Enhancing Rs:500/- ASHA is getting
Nutrition Day (VHND) Rs:4000/- as monthly fixed incentive from
st
1 November-2019.
3. Visits to the health facility
As on 15th Dec 2019, there are 41532
4. Holding village level meeting of women's ASHAs working out of 42524 sanctioned
groups across the state.
5. Maintain records 9. SUVARNA AROGYA SURAKSHA
In addition to above work raising the TRUST (SAST):
awareness on health issues mentioned “Ayushman Bharat-Arogya Karnataka”
below: Scheme:
1. Nutrition Government of Karnataka has been very
2. Health &Hygiene and Health seeking proactive in the goal of providing health care
behaviours to its residents from a long time. Yeshasvini
scheme the first such scheme was initiated
3. Healthy Lifestyle in 2003. Later Suvarna Arogya Suraksha
4. Available Health services and its proper Trust was established in 2009 with the
utilisation. specific objectives of implementing health
schemes. The first scheme was Vajpayee
Counselling services : Arogyashree Scheme which provided
1. Birth preparedness cashless treatment for tertiary care to BPL
families. In 2014 Rajiv Arogya Bhagya was
2. Institutional Delivery introduced for APL families for tertiary care.
3. Importance of Breastfeeding. About 250386 patients benefitted from VAS
and RAB since their inceptions under VAS
4. Immunization and RAB. RSBY Scheme provided secondary
5. Importance of Contraceptives. health care services to 62 lakh families in an
insurance mode and about 168377
6. RTI/STI beneficiaries availed treatment under this
scheme from the year 2016 till its closure on
August 2018.
Economic Survey of Karnataka 2019-20 657

Table 12.54 : Details of ASHA incentives and component provided by NHM

ASHA incentives
Sl.
Name of the component Incentive in Rs.
No.
1 DO TS Provider for Multi drug resistant TB 5000
2 DO TS Provider for TB cat 2 1500
3 DO TS Provider for TB cat 1 1000
4 Treatment of leprosy MB Case 600
5 Reporting of Maternal Death 500
6 Ensuring Spacing of births 500
7 Treatment of leprosy PB case 400
8 Ante natal Care 300
9 Promoting Delivery 300
10 Home based Newborn Care 250
11 Identi ficati on of leprosy patients 250
12 Attending VHND 200
13 Motivating for Male sterilis ation 200
14 Attending PHC Meeting 150
15 Conducting VHSNC meeting 150
16 Attending immunisation session 150
17 Identi ficati on of SAM and referral 150
18 Preparing slides for suspected malaria 15/slide
19 Promoting insertion of PPIUCD 150
20 Motivating for Female sterilis ation 150
21 First Year Immunisation 100
22 Motivating for MTP 100
23 Maintaining due list of ANC 100
24 Maintaining due list of children for immunisation 100
25 Eligible couple update 100
26 Maintaining Vill age Health Register 100
27 Line li sting of Households 100
28 Providing treatment for malaria (RT) 75
29 Second year Immunisation 50
30 Follow up of LBW Babies 50
31 Follow up of SNCU Discharged babies 50
32 Salt testing 25
33 Support Group Meeting for MAA ( Quarter) 100
34 Promoting the Insertion of PAIUCD 100
658 Economic Survey of Karnataka 2019-20

Table 12.55 : Brief details of Expenditure Upto 30th Nov 2019.

Amount % age
Released
Sl.No Category Code for the Expenditure W.r.t.
Amount
2019-20 3 qtrs

1 General 059 20380.00 15285.00 11993.52 78.46

In line with the policy goals of the 30/10/2018. The Government Order
“Karnataka Integrated Public Health Policy No. HFW 69 CGE 2018 dated 15.11.2018
2017” which envisages merging all social was issued for implementation of integrated
health insurance schemes into a single Ayushman Bharat-Arogya Karnataka
health assurance plan to improve efficiency scheme. This is the only scheme at present
and outreach and to achieve the goal of that covers beneficiaries of all the other
Universal, Equitable and Sustainable hitherto existing schemes and is an
healthcare as envisaged in the Vision Universal Health Coverage Scheme.
document-2025; all the existing schemes
were merged and “Arogya Karnataka” a Entitlement and Eligibility for availing
Universal Health care Scheme was launched the scheme are as below;
on 2/3/2018, wherein cashless treatment i. Eligible Patient: A patient who is a
upto Rs. 2.00 lakh for specified 1516 resident of Karnataka State and belongs
secondary, tertiary and emergency health to “Eligible Household” as defined
care treatments was provided in an under the National Food Security Act,
Assurance Mode based on eligibility criteria 2013; This category shall also include
as per the National Food Security Act 2013. the beneficiaries listed in the SECC data
19 lakh APL families are also covered for and the enrolled members of the
financial assistance upto 30% of the hitherto existing Rashtriya Swasthya
package rates. Bhima Yojane.
Government of India has come out with its ii. General Patient: A patient who is a
own scheme called Ayushman Bharat - resident of Karnataka State but does
National Health Protection Mission, on not come under the definition of
25.9.2018, later renamed as PradhanMantri “Eligible Household” as defined under
Jan ArogyaYojana (PMJAY), to provide the National Food Security Act, 2013, or
health protection to over 10 Crore poor does not produce the eligible household
families identified based on the latest Socio- card.
Economic Caste Census (SECC) data, (50
crore beneficiaries). Since both Arogya Enrolment of patients:
Karnataka and Ayushman Bharat have the r One-time enrollment of patients, on an
same goal, scope and similar modalities for IT portal to be established by SAST as
providing specified treatments to the poor and when they approach any PHI for
and vulnerable sections of society, treatment for the first time or any other
integrating both the schemes was enrollment facility as designated from
imperative for smooth implementation time to time
especially at the field level. A single
integrated scheme under a co-branded r For single incident patient can get
name as “Ayushman Bharat-Arogya treatment under the scheme by
Karnataka” is now being implemented in an producing his Aadhar card and PDS
Assurance Mode. card.
r A patient approaching an empanelled
A MoU has been signed with National Health private hospital in case of emergency
Agency, Government of India in order to without a referral from a PHI can be
implement this integrated scheme on
Economic Survey of Karnataka 2019-20 659

enrolled at a designated enrollment r For 169 emergency procedures,


center or a PHI after stabilization and patients can directly go to the
discharge from hospital empanelled hospitals of their choice
AB-ArK Card: and avail treatment without referral.
Implementation Performance:
r Under the Ayushman Bharat - Arogya
Karnataka scheme the enrolment card r No. of hospitals empanelled
called AB-ArK Card and an unique Government - 2689 + Private – 448 =
AB-Ark ID is generated and provided to Total - 3137
the patient at the enrolment center on r No. of Arkid Cards issued from April
payment of a fee of Rs.10/-. 2019 to November 2019: 6994741
r Enrollment cards are issued in During the current financial year (2019-20)
Common service centers, B1, K1 and from April 2019 till November 2019, a total
SevaSindhu centers on a payment of of 189148 beneficiaries have availed benefit
Rs. 35/-. and an amount of Rs.425.89 crores has
Cost of treatment to be borne by the been paid to the network hospitals for
Government treating these beneficiaries.
For “Eligible Patients” the financial Jyothi Sanjeevini Scheme (JSS) :
assistance up to Rs.5.00 lakh will be
This health assurance scheme is specifically
provided for specified simple secondary
for the benefit of all State Government
care, complex secondary health care,
Employees and their dependents without
tertiary health care and emergency health
any cap on the financial limit and the
care per annum, for a family. This will be on
treatment is totally cashless. The scheme
family floater basis meaning one or more
was launched on 20-01-2015. The only
persons of the family can use the full cover of
expenditure to be borne by the beneficiary
Rs. 5.00 lakhs. One person can also use the
is:
entire Rs.5.00 lakh.
1. If the beneficiary wishes to have a
For “General Patient” the benefit limit is 30%
higher stent, prosthetics or implants
of Government package rates, with overall
other than those specified under SAST
annual limit of Rs.1.50 lakh per family, per
benefit package.
year on co-payment basis.
2. If the beneficiary wishes to avail a
Under integrated Ayushman Bharat- higher ward other than the ward eligible
Arogya Karnataka scheme, the for will have to be borne by the
treatments provided for primary health beneficiary. Eligibility of general ward,
care and benefit packages are as follows; semi-private and private wards
r The scheme covers 1650 treatment depends on the basic pay drawn by the
packages. employee.
r Primary treatments and 291 simple During the current financial year (2019-20)
secondary procedures will be limited to from April 2019 till November 2019, a total
PHIs only of 888 employees have availed benefit and
r 254 complex secondary procedures, an amount of Rs.597.78 lakhs has been paid
900 tertiary procedures and 169 to the network hospitals for treating these
emergency procedures will be beneficiaries.
performed in PHIs and empanelled Organ Transplant Scheme:
Private hospitals.
Government of Karnataka has implemented
r Complex secondary procedures and the 'Organ Transplantation Scheme' for
tertiary procedures require referral poor/BPL patients of Karnataka, vide GO
from PHIs. No. HFW 64 FPE 2018, Bengaluru,
dated: 3-12-2018.
660 Economic Survey of Karnataka 2019-20

Main features of the scheme are as under; evaluated and can register for human
organ transplant. If the centre of
r The scheme is applicable only for BPL
excellence has not having the capacity
recipients, receiving organs from live
to conduct the organ transplant those
related donors and such transplants
shall refer to empanelled network
will be conducted in Government
hospitals
hospitals.
Treatment & Benefit packages
r However in the event of the Government
hospitals not having the capacity to r The total cost of Kidney Transplant
perform such transplant then it may be surgery is –Rs.3 lakhs per patient, per
referred to empanelled private year
hospitals. r The total cost of Heart Transplant
r In the event of cadaveric transplants surgery is –Rs.11 lakhs per patient,
(brain dead), the transplant can be per year
conducted in government or private r The total cost of Liver Transplant
empanelled hospital as per the surgery is –Rs.12 lakhs per patient,
registration of the recipient and per year
availability of the Organ in the retrieval
centre. Suvarna Arogya Suraksha Trust (SAST) is
the nodal agency to implement the scheme.
r The allotment policy of the SAST will be responsible for empanelment of
Jeevasarthakathe society will be private hospitals, pre-authorization and
followed for preauthorization of the payments for transplants to hospitals as per
procedure other conditions like the mechanism followed in the Ayushman
BPL/Poor recipient is also applicable. . Bharath-Arogya Karnataka Scheme.
Eligibility:
Enrollment of patients in SAST:
r Poor/BPL patients of Karnataka State
The enrolment of the patients shall be based
identified by BPL card and Aaadhar
on Aadhaar and PDS Card and shall be done
card are eligible under the scheme.
in the hospital conducting transplant.
r The beneficiary should visit Public The hospital will obtain the authorization
Health Institutes (INU, SJICR, PMSSY, from the appropriate authorization
IGE) and after evaluation should committee and submit the same along with
register for Organ transplant other required documents during pre-
after getting the approval from authorization.
the authorization committee
(Hospital level/District/State level Implementation Performance:
authorization). As on 30/11/2019, the achievements under
Referral: Organ Transplant Scheme are as follows:
r All public Health Institutes can evaluate r No. of hospitals empanelled Govern-
the patients for Organ transplant and ment : 2 + Private : 6 = Total : 8.
can refer to the hospitals of centre of r Total no. of beneficiaries availed
excellence for further process of Human treatment : Heart -3, Kidney: Cadaveric
Organ transplant. – 7 + Live - 5 = 12 : Total - 15
r The center of excellence can evaluate During the current financial year (2019-20)
the patient and direct the patient to from April 2019 till November 2019, a total
register under the Jeevasarthakathe for of 15 beneficiaries have availed benefit for
cadaveric organ transplant. an amount of Rs. 55.20 lakhs.
r In the event of the patient opting for live
related organ transplant, he/she can be
Economic Survey of Karnataka 2019-20 661

10. CHILD HEALTH PROGRAMME: r The current Neonatal Mortality Rate


(NMR) is 18 (SRS 2017). Current goal is
The Child Health Programme
to reduce NMR from 18 to 12 according
comprehensively integrates interventions
to Sustainable Development Goal (SDG)
that improve child survival and addresses
2030.
factors contributing to Infant and Under 5
Mortality. Many initiatives have been taken r The current Early Neonatal Mortality
up to provide preventive promotive curative Rate is 13 (SRS 2017).
& rehabilitative health care services through Child Health Achievements:
evidence-based interventions like Facility 1. Karnataka bags award at the 5th
Based Newborn Care (SNCU NBSU NBCC) National Health Summit on Good and
Home Based Newborn Care Janani Shishu Replicable Practices 2018 in Public
Suraksha Karyakrama (JSSK) Child Death Health Care at Kaziranga Assam India.
Review Kangaroo Mother Care and
Lactation Clinic Integrated Management of a. 5th National Health Summit on
Neonatal & Childhood Illnesses (IMNCI) and Good and Replicable Practices in
Intensified Diarrhoea Control Fortnight Public Health Care was held from
(IDCF). 30th October 2018 to 1st November
2018 at Kaziranga Assam India.
r Infant Mortality Rate (IMR) in
Karnataka is declining steadily. It is b. Mission Director National Health
declined from 41 in 2009 to 25 as per Mission along with state level
Sample Registration System (SRS) officials participated in the summit.
2017. c. Sri. Jagat Prakash Nadda
r The Millennium Development Goal Honourable Union Minister for
(MDG) for Under 5 Mortality Rate has Health and Family Welfare
already been achieved in Karnataka. Government of India and
The current Under 5 Mortality Rate is Sri. Sarbananda Sonowal
28 (SRS 2017 data) Under 5 Mortality Honourable Chief Minister of
Rate has been reduced by 20 points Assam awarded the State of
since 2009.The current goal is to reduce Karnataka at the National Health
Under 5 Mortality Rate from 28 to 25 Summit on Good Replicable
according to Sustainable Development Practices in Public Health Care at
Goal (SDG) 2030. Kaziranga Assam.

Figure 12.10 :

Karnataka Child Mortality Trend (SRS 2017)


60
50 48
45
40 41 40
38 37
35 35
30 32 31 31
28 29 28 Under 5 Mortality rate
25 25 24 23 24 25
20 22 20 20 22 Infant Mortality Rate
19 18 19 18 18
15 13 13 Neonatal Mortality Rate
10 Early Neonatal Mortality Rate

0
2009 2010 2011 2012 2013 2015 2016 2017
Source: SRS Data
662 Economic Survey of Karnataka 2019-20

Figure 12.11:

India & Karnataka Infant Mortality Trend


100 50 47 44 42 40 39 37 34 33
50 41 38 35 32 31 29 28 24 25
0
2009 2010 2011 2012 2013 2014 2015 2016 2017

Karnataka India

Table 12.56:

2009 2010 2011 2012 2013 2014 2015 2016 2017


Indicators
I K I K I K I K I K I K I K I K I K

Under 5
Mortality 63 48 59 45 55 40 52 37 49 35 45 31 43 31 39 29 37 28
rate

Infant
mortality 50 41 47 38 44 35 42 32 40 31 39 29 37 28 34 24 33 25
rate

Neonatal
Mortality 34 25 33 25 31 24 29 23 28 22 26 20 25 19 24 18 23 18
rate

Early
Neonatal
27 19 25 22 24 20 23 20 22 18 20 16 19 15 18 13 18 13
Mortality
rate
Economic Survey of Karnataka 2019-20 663

d. Award for Best Performance was 10. State Resource Centre for Facility
awarded to Karnataka - Highest Based Newborn Care is established at
annual decline in Infant Mortality IGICH, Bengaluru and till date 76 staff
Rate 2015 Vs 2016 among States nurses from SNCUs are trained at
(India average - 4.0%). FBNC according to MoHFW FBNC
training module.
2. At present 42 Special Newborn Care
Units are functional and 8 more SNCUs The following programmes and activities
are envisaged for the FY 2020-21. are being carried out in Karnataka to
3. Kangaroo Mother Care wards and reduce the U5MR, IMR and NMR in the
lactation clinics are established in all Child Health Section:
District Hospitals as an adjunct to 1. Facility Based New Born Care (FBNC):
SNCUs to provide supportive services to
low birth weight/ preterm babies to a) New Born Care Corner (NBCC): 1070
improve survival rate and to increase NBCC are functioning at all delivery
the early initiation of breast-feeding points as on 2016. Newborn care
rates respectively. corners are established in labour rooms
&Operation Theatres in all the 24X7
4. All DTC principals & SNCU Staff nurses
PHCs CHCs Taluk Hospitals and
were trained as TOTs in KMC at St
District hospitals.
John's medical college as part of
IAPNEOCON 2019 BY National b) New Born Stabilization Units (NBSU):
stalwarts in the field of Kangaroo 165 NBSUs are functioning as on 2016.
Mother Care. NBSUs have been established in all
5. All SNCU Pediatricians were trained in First Referral Units (FRUs) and Taluk
Invasive and Non invasive ventilation. Hospitals.
6. SNCU Mentoring is going on in 6 SNCUs c) Special Newborn Care Unit (SNCU): 42
for improving the quality of newborn SNCUs are functioning at all district
care services. hospitals & government medical college
hospitals and some high performing
7. State level consultative meet for Taluk hospitals. At present 877 beds
drafting Karnataka Newborn Action with an average of 70,000 newborn
Plan was conducted during March admissions at all functional SNCUs in
2019, wherein Deputy Commissioner the State. Establishment 8 SNCUs at
(CH division, MoHFW), Experts in the Taluka hospital are in pipeline (at
field of Neonatology from National & Hospet, Humnabad, Jewargi, Sira,
State level, representatives of NNF, Holenarasipura, KR Pete, Gokak & CV
SNCU Nodal Officers, RCHOs and other Ramannagar)
stakeholders took active part in drafting
KNAP, dissemination and fine tuning of d) SNCU Online Monitoring Software:
KNAP is planned for District All 42 SNCUs are now integrated with
administrators. the SNCU Online Monitoring Software
8. Newborn resuscitation skill at their units.
enhancement corners are established e) Kangaroo Mother Care wards:
in 37 SNCUs for capacity building of Kangaroo Mother Care (KMC) ward and
staff nurses and medical officers Lactation Clinics are being established
involved in new born care services. in all the District Hospitals adjacent to
9. Basic NRP training in association with SNCUs to strengthen the supportive
IAP for 860 participants (staff nurses care to the newborn. KMC wards are
and medical officers from delivery established in all hospitals with SNCUs
points NBSUs and SNCUs) was and health care personals are trained in
conducted in 29 districts to improve the KMC at state level. Further community
essential new born care practices KMC will be rolled out in order to
amongst staff nurses. increase the survival of low birth weight
babies.
664 Economic Survey of Karnataka 2019-20

f) Lactation Clinics: Lactation clinics are 4. Janani Shishu Suraksha Karyakrama


established in district hospitals to (JSSK):
increase the early initiation of breast
Janani Shishu Suraksha Karyakrama
feeding and exclusive breastfeeding
(JSSK) was introduced in early 2012 to
rates. This will be established at all the
reduce the out of pocket expenditure of the
delivery points and further existing
parents towards the treatment of sick
lactation clinics will be upgraded to
newborn. An amount of Rs. 200/- for Drugs
lactation management centres and
and Consumables Rs. 100/- for diagnostics
mothers will be supported to store the
and Rs.300/- for Referral Transport was
expressed breast milk.
allocated per sick newborn as an indicative
g) Neonatal Transportation: Neonatal unit of calculation. The required amount
ambulances ensemble with intensive may be spent with justification. In the year
care will be provided for four divisions to 2013-14 the facility was extended for any
transfer sick neonates. This will be sick child below one year of age.
rolled out to all other districts based on
5. Child Death Review (CDR):
the experience of piloting.
Child and infant Death Review have been
2. Integrated Management of Neonatal &
implemented in all Districts of Karnataka.
Childhood Illnesses (IMNCI): State and District level Child Death Review
IMNCI is an approach where the field level committees have been formed and are
workers (ANMs &Anganwadi workers) are meeting regularly. All reports being sent are
trained to identify common diseases of early being reviewed validated and feedback given
child hood (Pneumonia, Diarrhoea, Measles, to districts. Through all these efforts the
Ear Infections, Malaria, Malnutrition, State has reduced the Under 5 Mortality to
Anemia) and its management or prompt, 29 per 1000 live births and Infant Mortality
timely referral.Staff nurses and medical Rate to 25 per 1000 live births as per SRS
officers also trained at F-IMNCI to enhance 2017. State level Reorientation and review of
their capacity in managing the neonatal and CDR was conducted for district &
child hood illness and also to stabilize the Taluk administrators for successful
cases prior referral. implementation of CDR and thereby take
necessary actions to fill the gaps to reduce
3. Home Based Newborn Care (HBNC): the Child deaths.
ASHAs visit the neonates at least 6 times in 6. National Newborn Week:
the first 42 days after delivery. 41222 ASHAs
are trained to identify common neonatal Newborn week is being celebrated in
illnesses & educate the mothers regarding Karnataka since 2016. This is a programme
Breast feeding & care of new born. In case of launched by Government of India to
SNCU graduates and low birth weight highlight care of newborns and to
babies, additional visits at 3rd 6th 9th & emphasize the importance of improving
12th month at the incentive of Rs. 50/- per newborn care. It is celebrated every year in
each visit is carried out by ASHA. They are the second week of November. Multiple
provided with a kit containing essential training programmes awareness activities
equipment & drugs to car for the newborn. and IEC activities are carried out in the
Knowledge of ASHAs is being reinforced community and at health care facilities
through the SATCOM facility where the across the state.
State Officials directly interacted with During the National Newborn week 2019,
ASHAs and cleared their doubts. Similarly 24085 newborns were visited at home by
Medical Officers and Staff Nurses of PHCs ASHAs, 6972 newborns were screened for
were also oriented regarding RMNCH+A birth defects at Public Health facilities and
strategies through SATCOM. 30401 mothers were counseled for essential
newborn care practices
Economic Survey of Karnataka 2019-20 665

Health Indicators: Considered all districts and state


headquarters and towns and cities with
Achievements of the Department of more than 50000 populations are
Health and Family Welfare Services: incorporated and implemented in all 79
1. IMR has been reduced from 47 to 25 ( cities and towns of Karnataka as per the
for 1000 live births) during 2007- 2017 Government of India guidelines. Totally 364
Urban Primary Health Centers (UPHCs) out
2. MMR has been reduced from 178 to 108 of which 204 UPHCs are in Non-Metro and
(For Lakh live births) from 2007-09 to 160 UPHCs (Including 27 Maternity
2016-17. Hospital) are in Metro city which comes
3. TFR has been reduced. The target to under urban development department. All
reduce 1.8 by GOI within 2016 has been the 364 Urban Primary Health Centers
achieved. (UPHC) 9 Urban Community Health Centres
(UCHC)/Referral Hospital 8 Mobile Medical
12.2.5 National Urban Health Mission: Units (MMUs) 49 Health KIOSKs and 2
Preamble: Transit clinics are implemented in urban
area with inter-sectoral coordination with
National Urban Health Mission was urban development and Municipalities.
launched on May 1 2013 as a sub-mission of
the National Health Mission (NHM) to The NUHM activities are implemented in
strengthen the primary health care system Metro city through BCH&FWS constituted
in cities & towns to provide essential during 2014-15 but made more functional
primary health services to the entire urban from 2016-17 onwards. The BBMP has 198
population and Special focus on People wards which includes the 135 wards of
living in listed unlisted slums and other low erstwhile BBM and 63 wards coming under
income neighborhoods All other vulnerable Bengaluru District Health & Family Welfare
population such as homeless rag-pickers Officer in so far as provision of health
street children rickshaw pullers and other services are concerned. The NUHM
temporary migrants. implementations in all the 198 wards were
brought functionally under the unified
It aims to improve the health status of the command of BCH & FWS headed by the
urban poor particularly the slum dwellers Commissioner BBMP.
and other staged sections by facilitating
equitable access to quality health care As a community activities special outreach
through a revamped public health system camps will be conducted by Auxiliary Nurse
partnerships and with the active Midwives (ANM) to ensure health care
involvement of the urban local bodies. delivery at the door-step. Community
participation will be facilitated by the Mahila

Table 12.57 : Achievement of the Health & Family Welfare Services programme in
Karnataka

Sl.
Indicator 2011 2012 2013 2014 2015 2016 2017*
No.

Infant Mortality Rate


1 35 32 31 31 31 24 25*
(per 1000 Live births)

Under-Five Mortality
2 Rate (per 1000 Live 40 37 37 37 35 29 28*
births)
* Data Source: SRS 2017
666 Economic Survey of Karnataka 2019-20

Arogya Samithis (MAS) which will act as a Health and Family Welfare Department or
bridge between the communities and the City Municipalities/Corporations to
nearest health facility. The U-ASHAs will effectively provide adequate primary health
play the role of provider of first contact care care to the urban poor focus on promotive
and also generate community awareness preventive and curative aspects of both
with regards to various health issues communicable and non-communicable
sanitation and nutrition. Special care will be diseases domestic violence on women and
taken to ensure that MAS would be strengthen trauma care and emergency
constituted by drawing representation of care to the urban poor.
people from local population by ensuring
The strategy will comprise of strengthening
adequate representations to the SC ST and
the existing primary health care centers
other minorities.
establishing new primary health care
Introduction: centers wherever appropriately needed.
Further special outreach camps will be
National Urban Health Mission (NUHM) conducted by ANMs and ASHAs to ensure
aims to improve the health status of the health care delivery at the door-step.
urban poor particularly the slum dwellers Community participation will be facilitated
and other disadvantaged sections by by the MahilaArogyaSamithis (MAS) which
facilitating equitable access to quality will act as a bridge between the
health care through a revamped public communities and the nearest health facility.
health system partnerships and with the The ASHAs will play the role of provider of
active involvement of the urban local bodies. first contact care and also generate
The main focus of the NUHM will be urban community awareness with regard to
poor population living in listed and unlisted various health issues sanitation and
slums all other vulnerable populations such nutrition.
as homeless rag-pickers street children It is generally felt that there is non-
rickshaw pullers construction brick lime availability of reliable data on health status
kiln workers commercial sex workers and of people living in urban areas. A
others. comprehensive baseline survey and
NUHM will cover all the District mapping is being undertaken to gain insight
headquarters and other cities/towns with a into the dynamics of health needs of existing
population of 50000 and above (as per listed and unlisted slum pockets urban poor
census 2011) in a phased manner. Cities concentration areas and other vulnerable
and towns with population below 50000 will population. This will help in assessing their
be covered under NRHM. health seeking behavior health indicators
such as morbidity and mortality patterns
As per 2011 census 236.25 lakh people ongoing health needs and existing
reside in urban areas and the urban slum provisions for health care and out of pocket
population is 38.61 lakhs in Karnataka expenses etc.
state. The challenge is that the state has
38.67% of population living in urban areas An amount of Rs 5081.05 Lakhs is provided
as against the National Average of 31.57%. during 2013-14 of which State share is
Rs 1270.00 Lakhs and Central share is
Under NUHM the emphasis will be to 3811.00 Lakhs. Sanction has been
improve existing public health delivery accorded by the Government for
system with a thrust on making available implementation Of National Urban Health
adequate health human resources Mission in 135 wards of BBMP 63 wards of
upgrading the existing health facilities in Bangalore Urban Mysore Bagalkote
terms of infrastructure and equipment and Mangalore and Ullal of Dakshina Kannada.
also establishing new health facilities Total number of cities taken up for
wherever necessary by providing specialist implementation of NUHM in 2014-15 were
care as well as strengthening emergency 25 of which 5 are part of 2013-14 and 18 are
response systems. This will enable the new cities. The amount approved was
Economic Survey of Karnataka 2019-20 667

Rs. 86.24 Crores of which GOI share was Rs. Infrastructure:


64.68 Crores and GOK share was Rs. One urban primary health centre (UPHC)
21.56.Crores.The 18 new cities are Belagavi may be planned for every 50-60 thousand
Bellary Bidar Vijayapura Chikkaballapur population under NUHM. In case there is an
Davangere Hubli-Dharwad Gadag Kolar existing Urban Family Welfare Centre Urban
Kalaburagi Sedum Gangavathi Raichur RCH Centre Urban Health Centre Urban
Udupi Yadgir Dandeli Puttur and Bantwal. Health Post etc. the same may be upgraded
In 2015-16 total budget approved is Rs. and strengthened as UPHC. Where none
104.21 Crores. exists new UPHCs will have to be planned
During the financial year 2016-17 54 cities and the Dist. Health Society will initiate the
/Towns have been added to the list with a process of identification of location/ land.
total amount of Rs 131 crores with a Centre NUHM will provide both capital and
state sharing pattern of 60:40. recurrent cost for up gradation and
maintenance of the UPHCs as per the
In the financial year 2017-18 2 cities have norms. The Dist. Health Society can also
been added to the list hire premises for new UPHCs where land is
In the state of Karnataka for FY 2019-20 not available.
National Urban health Mission is Renovation/ Up gradation of existing
implemented in 79 cities.
Urban Health Centre:
Human Resource: The existing health facilities to be up-graded
To improve existing public health delivery into urban-Primary health centres. Though
system with a thrust on making available an amount of Rs. 10 lakhs will be given per
adequate health human resources health facility the amount will be utilized
upgrading the existing health facilities in based on the requirement such as, the
terms of infrastructure and equipment and condition of the health facility, utilization of
also establishing new health facilities health services and number of OPD cases
wherever necessary by providing specialist per month and deliveries conducted.
care as well as strengthening emergency
response systems.

Table 12.58: Demographic Profile (based on 2011 census)


1 Total P opul ation (In lak hs) 6 10.95

2 Urban Population (In lakhs) 2 36.25

3 Urban Population as pe rcentage of total pop ulation 3 8.67

4 Urban slum population (i n lakhs) 3 2.91

5 Slum population as pe rcentage of urban population 1 3.95

6 Num ber of Metro cities 1

7 Num ber of Million + c itie s (> 1 0 lakh pop ul ation) 0

8 Num ber of citie s with 1 to 10 lakh population 25

Num ber of towns with les s than 1 l akh but m ore than 50
9 52
thousand population

Num ber of State HQs/Dist. HQs whi ch have le ss than 5 0


10 thousand population but are cove red unde r NUHM 1
668 Economic Survey of Karnataka 2019-20

Table 12.59:
FY 2019-20
Designation In position Vacant
RoP Approved

ANM 1259 816 443

LHV 43 29 14

Staff Nurse 593 565 28

Lab technician 315 304 11

Pharmacist 322 266 56

X-ray and
6+ 1 0 6+1
Mammogram Technician

OT Assistant 8 6 2

Medical officer
186 162 24
Full time
Medical officer
337 279 58
Part time

Specialist 45 36 9

Lower Division Clerk / DEO


223 222 1
cum Accountant

Group-D 306 303 3

Table 12.60: Financial Progress from 1st April 2019 to 30th November, 2019

Total Budget
Physical Expenditure in
allocated
Number Rs. Lakh
in Rs. Lakh

1. Medical Officers 523 2217.77 897.78

2. Paramedics: (ANM, SN, LT,


2654 3792.67 1786.30
Pharmacists )

3. Support Staff (LDC+ Group D) 529 642.29 402.73

4. Urban ASHAs 3329 798.96 476.88

2. MAS 4071 203.55 39.87

3. Untied Grants to UPHCs 364 296.50 207.93

4. Untied Grants to UCHC 9 45.00 21.11


Economic Survey of Karnataka 2019-20 669

12.2.6 HMIS &RCH in Karnataka: and 89.51% of Children registered in RCH


HMIS (Health Management Information portal during the year 2018-19 and79% of
Pregnant woman &89% of Children
System):
registered in RCH portal during the year
HMIS is an initiative undertaken under the 2019-20 (up to November).
National Health Mission (NHM) launched by
RCH portal helps Beneficiaries in providing
Government of India.
Information about desired services
To collect the information uniformly timely Government Schemes & Benefits advance
from all the states Government of India has information about the due services
prescribed HMIS formats throughout the Facilitate better interaction with Health
country. The System of collecting Service Provider and Free consultation from
information uploading online at the primary Central Helpdesk (Toll Free No)
level & to get various reports by compiling
RCH portal helps Jr.HAF / ASHAs in auto
the information for effective implementation
generation of work-plan Better guidance
of Health Schemes is Health Management
from senior supervisors micro planning for
Information System.
Filed Visit Payment of incentives to the
In Karnataka uploading of Information on Health Service Providers
HMIS portal from facility level is existing
RCH portal helps State District and Taluk
since Aug 2010 by which it is easier to get
Officers in Planning Decision making
timely information. As there is provision of
analysis Better planning for Vaccination
various reports at all levels it is possible to
Supply &Mgmt Group /Individual SMS's to
make use of these reports for various
health workers and monitor the High risk
schemes & their implementation.
cases and LBW cases closely.
In Karnataka after the implementation of
The RCH portal will be linked with other
HMIS 98% of the information is collected
department applications like for issuance of
online as data is being uploaded before 5th
Birth certificate (Directorate of Economics
of every month & more emphasis is given to
and Statistics) and to capture services
improve the quality of the data.
provided by ICDS W&CD department.
District Level Action Plans / PIP formulation
and monitoring the progress through Star ANMOL:
rating of facilities using HR Infrastructure ANMOL is TAB based version of RCH portal.
data equipment availability and service This application will act as a job aid tool to
utilization are being done based on HMIS the Jr.HAF by providing them with readily
data. available information such as due list
dashboard and guidance based on data
RCH PORTAL:
entered etc. Videos / audios on subjects like
RCH (Reproductive and Child Health) portal high risk pregnancy immunization family
is a centralized web based application for planning etc. are also available in the
early identification and tracking of the application for counselling to beneficiary.
individual beneficiary throughout the
ANMOL application works offline as well and
reproductive lifecycle. Application facilitates
can also be synchronize with RCH web
to ensure timely delivery of full component of
portal automatically when connected with
antenatal postnatal & delivery services and
internet and also on user request.
tracking of children for complete
immunization services. RCH portal has been This tablet based application allows Jr.HAF
designed to meet the requirements of the to enter and update the service delivery
RMNCH program by incorporating records of beneficiaries on real/near real
additional functionality and features of the time basis. This will ensure more prompt
MCTS. entry and updating of data as well as
improve the data quality since the data will
RCH portal started in the State from October
be entered “at source” (by providers of health
2018 and around 89% of Pregnant woman
services themselves).
670 Economic Survey of Karnataka 2019-20

12.2.7 Rashtriya Bal Swasthya 4. Health screening to identify children


Karyakram (RBSK): with 38 Health Conditions, broad
classified under 4'D's (Defects at birth,
School Health Programme has subsumed Developmental delays, Diseases and
under Rashtriya Bal Swasthya Karyakram Deficiencies) under the age group 0 to
(RBSK). This programme commenced from 18 years.
the year of 2013-14, under this programme
0 to 18 years children are screened for 38 5. Children requiring further management
health conditions broadly classified under are referred to the nearest health
4'D's. The screening is conducted by 02 facility.
dedicated RBSK Mobile Health Teams 6. Health Education to Anganwadi
constituted in each Taluka consisting of 2 workers, Teachers and Students as well
Medical Officers,1 Staff Nurse and 1 as students regarding Personal
Ophthalmic Assistant/ Pharmacist, the Hygiene, Environmental Sanitation,
main aim of this programme is to conduct Safe drinking water and use of latrines
health screening so as to identify children are being taught regularly.
with health conditions and to refer for
appropriate timely treatment. This programme is being implemented in
Co-ordination with Department of Health
Rashtriya Bal Swasthya Karyakram (RBSK) and Family Welfare, Women and Child
is implemented in the State in all Rural and Development, Public Instruction and PU
Urban areas children studying in 1st to 12th Board.
standard in Government, Government
Aided, Government Residential Schools / During 2019-20, out of an annual target of
Colleges and in Aganwadi Canters. 15347733, 8368290 students enrolled in
Anganwadies Centres, Government,
Children in 0-18 years age group are Government Aided and Government
screened annually and children found Residential Schools/Colleges were screened
positive for various heart related condition, and 1973 students (Apr-19 to Nov-19) have
Neuro problems, Cleft Lip Palate and others undergone for different surgeries.
are referred to hospitals empaneled under
Suvarna Arogya Suraksha Trust (SAST) for Weekly Iron & Folic Acid
cash less treatment. As per the guidelines, Supplementation Program (WIFS) :
the DHOs are implementing this programme
successfully in all taluks. Introduction:
Adolescents are the most vulnerable group
The activities are as follows:
among the children for Iron deficiency
1. Screening of 0 to 6 weeks children anaemia. During adolescence age,
through delivery points and ASHA – especially for girls, Iron deficiency anaemia
HBNC visits. results into growth deficiencies. During
adolescence, iron deficiency anaemia can
2. Screening of 6 months to 6 years
result in impaired physical growth, poor
children at Aganwadi Centres.
cognitive development, reduced physical
3. Screening of 6 to 18 years children fitness and work performance and lower
(1st to 12th std.) at Schools and concentration on daily tasks. Iron deficiency
Colleges. in adolescent girls influences the entire life
cycle.

Table 12.61 : Progress report for the period of 2019-20 (Upto Nov - 19)
Sl.
No. Beneficiaries Annual Target Achievement %

Health Screening of 0-18 years children 1,53,47,733 83,68,290 54.52


1
(Anganwadi and Schools)
Economic Survey of Karnataka 2019-20 671

In order to develop evidence based actions for prevention of intestinal


intervention for prevention and control of worm infestation.
adolescent anaemia in India, various “SHUCHI” Yojane:
studies were commissioned. Findings
across these studies reveal that weekly The Adolescent Reproductive & Sexual
supplementation of 100mg Iron and 500μg Health (ARSH) and the Adolescent
Folic acid is effective in decreasing Education Programme (AEP) are core
prevalence of anaemia. As adolescent components National Health Programmes
anaemia is a critical public health problem that address Adolescent Health Girls. Both
in the country, the Ministry of Health and these programmes include a range of
Family Welfare, Government of India, based intervention for adolescent girls who are in
on the empirical evidence generated by schools and out of schools.
these scientific studies, has developed In our State, menstruation and menstrual
Operational Framework for Weekly Iron and practices are clouded by taboos and socio-
Folic Acid Supplementation (WIFS) of cultural restrictions for women as well as
adolescent. adolescent girls. Limited access to the
Objective: products for sanitary hygiene and lack of
sanitary facilities could prove to be barriers
To reduce the prevalence and severity of to resorting to un-hygienic practices to
nutritional anaemia in children's. manage menstruation. Some of the
practices like use of old cloths as pads by
Target (Beneficiaries):
recycling them which offers no protection
Students studying in 1st to 5th standard and and endangering menstrual hygiene with
th th
6 to 10 standard for all Government and long term implications for reproductive
Government Aided School Children. health.
Strategies: Good menstrual hygiene is essential for
health & dignity of girls and women.
r Weekly once IFA tablets (WIFS) : Discussions on menstrual hygiene are
l Each IFA – Pink tablet contains 45 important for adolescent girls to clarify
mg of Iron with 400 mcg Folic Acid, it existing myths and misconceptions around
is given to children of 5 to 10 years menstruation. Improving menstrual
age group weekly once for 52 weeks. hygiene is important from the point of view
l Each IFA – Blue tablet contains 60 of personal comfort and increased mobility.
mg of Iron with 500 mcg Folic Acid, it It also reduces the likelihood of infections
is given to children of 11 to 19 years resulting from poor hygienic practices
age group weekly once for 52 weeks. during menstrual hygiene. Providing girls
with knowledge and skills on maintaining
r Biannual De-worming (Albendazole 400
menstrual hygiene improves school
mg), six months apart, for control of
attendance among the girls who may not
helminthes infestation.
attend the schools on those days are even
r Information and counselling for dropout of school altogether.
improving dietary intake and for taking

Table 12.62 : IFA & Albendazole tablets given to adolescents under WIFS Program –
2019-20

Target Achievem en t %

WIFS - IFA (Pink) & ( Blue) Tab. 61,83,752 39,75,797 64%

ND D – Albendazol e Tab. 1,63,03,326 1,58,04,524 97%


672 Economic Survey of Karnataka 2019-20

Promoting menstrual hygiene can be proportion of deaths. Among females in the


achieved through: age group of 15-49, Hypertensive disorders
in pregnancy (Includes eclampsia, pre-
1. Provision of health education to girls on eclampsia, hypertension) and Hemorrhage
menstruation and menstrual hygiene. are the leading causes of death- it may be
2. Promoting the availability & use of attributed to rise in diagnosis and reporting
sanitary products. of new cases.
3. Enabling safe disposal of sanitary 12.2.10 Mental Helath:
napkins. One of the strategies to address the
4. Increasing community action to treatment gap and to facilitate training of all
improve access to clean toilets with health staff starting from PHC level, for early
water both in home and in schools. identification and treatment of mentally ill,
is District Mental Health Programme
During the year 2019-20, total of 17,06,933 (DMHP) under National Mental Health
beneficiaries have been identified and Programme. During the year 19-20 District
28,05,639 units of Sanitary Napkin Pads Mental Health Programme (DMHP) is
were distributed upto November-2019. approved and being implemented in all the
30 districts and BBMP in Karnataka. Also
Table 12.63: taken 10 Talukas under Taluka mental
Target Achievement %
Health Program wherein 3 Psychiatrists
and 9 Social Worker are being recruited.
17,06,933 14,67,358 85% Trainings have been taken up in all the 30
districts and BBMP.

12.2.8 Universal Immunization: r 1120 Medical officers-trained to identify


and treat mentally ill at PHC level,
The universal immunization programme
was started to achieve 100 % immunization r 2205 paramedical workers, 732
and to reduce the mortality and morbidity RBSK/RKSK ,487 AYUSH
among infants and young children due to r 20202 ASHA workers have been
vaccine such as BCG Hepatitis B '0' OPV sensitized to identify mentally ill and
012 & 3 IPV 1 & 2 Pentavalent 1 2 & 3 treatment facilities available,
Measles – Rubella 1 & 2 DPT Booster-1 OPV r 6287 teachers have been trained on life
Booster JE 1 & 2 DPT Booster-2 TT 10 & 16 skills, who in turn would impart
years. It is clear that coverage of different these life skills to the students,
vaccination is increasing. Table 12.64 1,099 KSAPS/WCD counselors, 4603
presents information on the achievement of Police/Prison staff, 763 Faith Healers/
different vaccinations in the State. The full NGOs, 684 Elected representatives.
immunization rate is 98.49% currently till
r Counseling services are established in
November 2019. Rotavirus vaccine
110 colleges and catered to 24,885
introduced in our State on August 2019.
Beneficiaries, Counseling services are
12.2.9 Causes of Death: established in 89 workplaces and
For the effective control of maternal and catered to 9,503 Beneficiaries and
infant mortality, it is important to Counseling services are established in
understand the causes of such mortality. 58 urban slums and catered to 7,238
Table 12.65 and 12.66 provides the Beneficiaries.
information on top five causes of mortality r Sensitization of total 6,209 Village
for infants and maternal deaths in the age Rehabilitation Workers (VRWs),
group 15-49 respectively. The major causes Multipurpose Rehabilitation Workers
of infant deaths are due to prematurity or (MRWs), NTCP staff , NCD staff, RNTCP
low birth weight. Pneumonia, Heart Disease staff , Agricultural Department staff,
and birth asphyxia also account for a major Horticultural Department staff,
Economic Survey of Karnataka 2019-20 673

Table 12.64: Performance of Universal Immunization Programme

2019- 20
Sl. Name of t he
2013- 14 2014-15 2015-16 2016-17 2017-18 2018-19 (up to
No. Vacc ine
Nov .)

1 TT-1 1084287 1076094 1020611 991808 988392 964832 635169

2 TT-2 1195474 1206402 1156615 1120999 898163 880455 577400

3 BCG 1131948 1123203 1079589 1057174 1046206 1040629 701912

4 OPV-0 852613 860229 853899 845197 864408 860281 567636

5 HEP-B 0 570525 658243 692866 724493 776004 754775 502330

6 OPV-1 1054616 1100196 1091661 1071922 1104806 1102413 719677

7 IPV-1 397626 791853 603905

8 PENTA-1 932424 1115290 1097353 1077849 1112027 1109922 720586

9 ROTA-1 217729

10 OPV-2 1046233 1075456 1078709 1049666 1073148 1072279 693491

11 PENTA-2 893745 1076922 1078110 1051387 1079366 1079301 694986

12 ROTA-2 123849

13 OPV-3 1057853 1088334 1097507 1056341 1088081 1085062 706332

14 IPV-2 312721 705378 581039

15 PENTA-3 853718 1088508 1097687 1060888 1094383 1089951 708156

16 ROTA-3 65820

17 MR-1(Measles) 1030082 1043503 1070771 935530 1009109 1055094 693103

18 JE-1 164235 258929 346798 288202 342266 330268 218674


Fully
19 Im muniza tion (9 1039451 1043532 1067599 936304 1047450 1054455 691344
to 11 months)

20 MR-2(Measles) 707092 962800 854023 936040 985107 642600

21 JE-2 338078 224156 224156 298967 308092 197182

22 OPV-Booster 893404 930503 912096 912096 984266 987579 644331

Fully
Im muniza tion
23 454912 445919 399712
(12 to 23
Months)

24 DPT Booster 894994 933579 913050 913050 977296 983994 640749

25 DPT Booster 2 645336 822628 462194

26 TT (10 Yea r) 703311 714329 736145 736145 758979 821379 479936

27 TT (16 Yea r) 639792 670829 665781 665781 676416 722662 412165


674 Economic Survey of Karnataka 2019-20

Table 12.65: Details of Incidence of preventable Causes of Infant Mortality based on


manual reports from Districts for the period April 2019 to Nov 2019

Cause of Death Infant (0-1 Year)

Low Birth Weight & Pre-Maturity 767

Pneumonia 286

Diarrhea 8

Neonatal infections (Sepsis) 396

Birth asphyxia and birth trauma 958

Other 1539

Table 12.66: Top five Causes of Maternal Death for women in the age group 15-49

Death du ring 2 0 19 -2 0
Caus e of Death
(u pto N ov.)

Hype rten sive disorder s in pr egn anc y 91

Post-Partum He morr hage 79

Obstr ucte d labour 4

Abor tion 5

S epsis 13

Other s (in cludin g h igh f ever ) 319

Total 511

Panchayath Raj Officials and r 2019-20 Released Budget 1826.93


Volunteers from village level have been Lakhs, Expenditure 953.94 Lakhs.
sensitized on features of Mental illness (52.22%)
and treatment facilities available. IEC activities in the year 2019-20:
r During 19-20 Mental Health Drugs are
being procured from DMHP funds International day against drug abuse and
under NHM through KDL&WS. illicit trafficking Celebration across the
State (June 26th 2019):
r 5,18,080 Mentally ill patients are under
treatment. 1,07,409 Patients are r 74 Mental Health Camps held at Dist.
treated at taluka level itself. Level, Taluk Level, PHC/CHC Level and
r 781 Outreach Camps (other than 1,375 Patients catered.
Manochaitanya) 26,616 and 18,501 r 298 Public awareness programs were
Patients catered. 3197 Home Visits and conducted, 24,026 participated at
3238 Patients catered. Districts, Taluka/PHC/CHC level.
Economic Survey of Karnataka 2019-20 675

r 117 Jathas were conducted, 9,887 and Belagum). Efforts are continued to start
participated at Districts level, Taluka / these centers in all the districts. Allocated
PHC/CHC Budget – 258.00 Expenditure – 76.04
r 48 Essay Competition at (29.47%) Number of Beneficiaries – 1208
Schools/Colleges at Dist / Taluka level (Released Budget –111.03 Expenditure
and 5,309 participated. –76.04 lakhs (68.48%).
r 16 Elocution Competitions at “Manochaitanya”:
Schools/Colleges at Dist. Level, 477
(Super Tuesday clinic) Programme is a
Participated.
unique initiative of Govt. of Karnataka.
r 2 Radio Programme have been Under this programme, on selected
conducted. Tuesdays Psychiatrist from DMHP/DH/
r 1 T.V. Programmehave been conducted. Medical college/Private, provide specialist
r 2 drawing Competitions have been Services to the mentally ill at the Taluka
done, 32 participated. level hospitals. Currently these are
functional in 146 Taluks of the State and
International schezophrenia Day have catered to the needs of 1,07,409 (April
Celebration (24th May 2019): 19 to November 2019) patients.
r 169 Mental Health Camps held at Dist. Progress Report of Karnataka State
Level,TalukLevel,PHC/CHC Level and Mental Health Authority :
3,444 Patients catered.
Government of Karnataka has released 1.5
r 203 Public awareness programs were
Cores for Karnataka State Mental Health
conducted, 15,452 participated at
Authority to implement provisions of the
Districts, Taluka/PHC/CHC level.
Mental Health Care Act 2017.
r 175 Jathas were conducted, 11,046
participated at Districts level, Taluka/ 1. Mental Health Care Act 2017 is being
PHC/CHC implemented for providing treatment
care for mentally ill persons and to
r 20 Essay Competition at Schools/ protect rights of persons with mental
Colleges at Dist./Taluka level and 1,211 illness.
participated.
r 10 Elocution Competition at Schools/ 2. Government has established Karnataka
Colleges at Dist. Level, 1,261 State Mental Health Authority with
Participated. Principal Secretary to Government,
Health and Family Welfare Department,
r 1 Radio Programme have been as the Chairman of the Authority.
conducted.
3. Commissioner, Health and Family
r 116 T.V. Programme have been
Welfare Services, is appointed as the
conducted.
Chef Executive Officer.
r 1 drawing Competitions have been
done, 15 participated. 4. Professor and HOD of the Psychiatry,
Bengaluru Medical College & Research
Community Mental Health Day care Institute as the Medical Advisor.
Programme, funded by the state. One
for each District. Day Care Centre/ 5. The Official Members and Non Official
Rehabilitation centre for the recovered Members are selected.
mentally ill persons by recognized NGO's 6. Submitted proposal to expand the office
was inaugurated on 09.10.2014. These of the Karnataka State Mental Health
centers are functional in 15 districts Authority.
(Bangalore Urban, Bangalore Rural, DK,
Kodagu, Udupi, Tumkur, Hassan, 7. Submitted Proposal for mass media
Dharwad, Gadag, Mandya, Chitradurga, Programme in Radio to create
Chamarajnagar, Haveri, Chickkaballapura awareness of general public and reduce
the stigma towards Mentally illness.
676 Economic Survey of Karnataka 2019-20

8. Website of the State Mental Health It is critical that patients with severe mental
Authority is established and state is illnesses do not miss treatment and take the
coming out with mental health treatment for the longer period of time;
management system which is a Studies have shown that the functioning,
interactive website for implementing disability levels and symptoms improve
the mandates of the Mental Health consistently if treatment adherence is
Care Act 2017 and Mental Health maintained. Ii is piloted in 3 districts since
Programme. January 2018, the DMHP nurse and social
worker visit persons with severe mental
9. Submitted draft of Karnataka State
disorders (schizophrenia and bipolar
Mental Health Rules to the government.
disorders) who have dropped / missed out of
Innovations under Mental Health: regular DMHP services at their homes,
enquire about the reasons for the dropouts,
An e-initiative for Monitoring District provide psychosocial services, supply
Mental Health Program in Karnataka: medications (injectable psychotropics) and
Information system the 'sense organs' of the try and ensure regular follow-up. Till date,
Health systems are the 'eyes and ears' which many registered cases have been brought
help track the objectives and goals of the back under the AHCs treatment umbrella.
program. Recognizing the need for good The program will be expanded to the other
quality data which is regular, a web based districts after incorporating the learning.
Mental Health Program Management
Information System (MHP-MIS) has been Tele-mentoring: Adopting the technology,
initiated across the 31 DMHPs in Karnataka Tele-On Consultation Training (OCT) is
since December 2016 and has been fully being offered to PHC medical officers. The
functional with effect from April 2017. The PHC medical officers, while seeing their
software captures summary statistics of general patient pool, are offered guidance
patient care from each of the health facility and training to identify and treat psychiatric
in the public sector. A total of 5 different disorders. Under the first phase, 92 doctors
modules have been designed and these have been trained in Mandya district. These
include (i) patient care module, (ii) Training empowered doctors in turn have catered to
and events, (iii) Budget and expenditure (iv) more than 15,000 patients in the past year.
Human resources (v) Other data. The This activity is being co-ordinated by the
formats and reports conform to the existing Primary Care Psychiatry unit @ NIMHANS.
reporting system of NMHP. Along with a In addition, V-CSD (video based Continued
dashboard, at each level, validation by Skill Development program) is also in place.
approval / reject process has been built-in. theMentoring program involves nurses,
The dash board provides the Program clinical psychologists and psychiatric social
Officer to monitor activities on a day to day workers of Karnataka DMHP. Each of these
basis both at the District and State level. The teams are being hand held through regular
modular approach helps scale up the and periodic video-conferencing facility with
software to the National level. The next co-ordination of the departments of Clinical
phase of the software development is aimed Psychology, Psychiatric Social Work and
at designing mobile application for entering Nursing dept of NIMHANS for this program.
patient care data.
12.2.11 Karnataka State Aids Prevention
Assisted Home Care Services (AHC): Society (KSAPS):
Generally, about 30 – 50% of Severe Karnataka State AIDS Prevention Society
Mentally ill patients seeking care, drop out (KSAPS) was registered as a Society on 9th
after registering under DMHP. A variety of December 1997; it is an autonomous
reasons are responsible for the same: some institution and the highest policy-making
are due to financial constraints, distance structure with respect to HIV/AIDS in
related factors, inadequate awareness about Karnataka. The Governing council is headed
the illness, duration of treatment, long term by the Chief Minister and the Vice chairman
prognosis etc. is the Minister for Health and Family Welfare
Services.
Economic Survey of Karnataka 2019-20 677

The Chairman of Executive Committee is Karnataka State AIDS Prevention


Secretary to Government Health & Family Society Programmes:
Welfare Department. As per NACO 1. Targeted Intervention: Response from
Karnataka is one of the “High Prevalent Karnataka State AIDS Prevention Society
States” in India. The other high prevalent (KSAPS) has been to saturate targeted
states in India are Andhra Pradesh Mizoram interventions (TIs) in Karnataka under the
Maharashtra Manipur and Nagaland. thrust area of NACP -IV.
KSAPS is implementing National AIDS
Control Programme (NACP IV). Karnataka i. Core TI (FSW MSM TG & IDU):
has 30 Category “A” districts.
This saturation currently covers around
KSAPS is implementing NACP IV funded 70171 Female Sex Workers (FSWs) under
by National AIDS Control Organization targeted interventions and 18244 Men who
(NACO) New Delhi: have sex with Men (MSM) 2154 transgender
are covered under this programme. This
Karnataka has been conducting HIV programme is funded by NACO through
Sentinel Surveillance since 1998. KSAPS.
Surveillance is carried out annually by
testing for HIV at designated sentinel sites 2 TIs are implementing Injecting Drug User
and now the annual frequency of HSS was (IDU) programme of which 1 in Bangalore
shifted to biennial (once in two years). The and 1 in Kolar covering 950 IDUs. 2 Opioid
prevalence among antenatal clinic (ANC) Substitution Therapy (OST) centers 1 in
attendees as per HSS 2012-13 was 0.53%. Bangalore and 1 in Kolar covers intravenous
This is close to the NFHS-3 estimate of drug user population.
0.69% in 2006. HIV prevalence among ANC ii. Bridge TI (Migrant & Truckers):
attendees indicates decline in adult HIV
prevalence in the state from 1.5% in 2004 to 10 TI projects in Karnataka covers 142000
0.36% in 2014-15. In 2016-17 15th round of destination migrants. 6 truckers TIs cover a
HIV Sentinel Surveillance has been population of 80000 long distance male
conducted at both ANC & HRG sites where truckers. The Truckers program is
HIV prevalence among ANC attendees is implemented at Trans-shipment locations.
0.38% and HRG FSW is 3.33% MSM is
5.40% in Karnataka.

Figure 12.12: Declining trend among ANC attendees

2
1.5
1.3
1 1.1
0.86 0.85
0.69
0.53
0.36 0.38
0
2004 2005 2006 2007 2008 2010 2012 2015 2016
678 Economic Survey of Karnataka 2019-20

2. HIV Counseling & Testing at Integrated 2019-20, ICTCs. 17,42,429 General clients
Counseling and testing Centre: were counseled and tested with positivity
rate of 0.62% (From April 19 to November
In Karnataka Total 472 Stand alone ICTCs 19) and 9,85,417 Antenatal women were
and 2832 FICTC centers are functioning. counseled and tested with positivity rate of
During 2014-15, 19, 06,237 General clients 0.04% in ICTCs. (From April 19 to
were counseled and tested with a positivity November 19).
rate of 1.39% and 12,32,862 ANCs were
3. Care Support & Treatment:
counseled and tested with a positivity rate of
0.11% in ICTCs. For the FY 2015-16, During 2019-20, 64 ART centers and 314
1945282 General clients were counseled Link ART Centers are functioning. The
and tested with a positivity rate of 1.13% cumulative number of HIV cases registered
and 12,80,862 ANCs were counseled and at ART Centers till November 2019 are
tested with a positivity rate of 0.08% in 342197 out of which, 168928 cases are alive
ICTCs. For the FY 2016-17, 19,40,589 and on ART. The progress of ART centers is
General clients were counseled and tested given in Table 12.68.
with positivity rate of 1.03% and 13,21,668
Antenatal women were counseled and tested 4. STI (Sexually Transmitted Infections
with positivity rate of 0.06% In ICTC for FY / Reproductive Tract Infections):
2017-18, ICTCs. 22, 20, 292 General clients Major route of transmission of HIV in
were counseled and tested with positivity Karnataka in unprotected sexual
rate of 0.85% and 14,18,176 Antenatal intercourse and HIV is primarily considered
women were counseled and tested with to be a sexually transmitted infection. A
positivity rate of 0.06% in ICTCs. and person with STI/RTI is 2 to 9 times prone to
present FY 2018-19, ICTCs. 24,73,845 get HIV. HIV positive patients with STI are
General clients were counseled and tested more likely to acquire HIV. Hence, control of
with positivity rate of 0.73% and 14,23,045 STIs contributes significantly to the
Antenatal women were counseled and tested reduction in HIV transmission. Up to 40%
with positivity rate of 0.05% in ICTCs. of HIV transmission can be cut down by

Table: 12.67 : Tested and found Positive in ICTC

General clients ANC

Achievement Achievement
Year
Target % % Target % %
Tested Achiev +ve Posit Tested Achieve +ve Positi
ement ivity ment vity
2013-14 1467137 1664848 113.48 29473 1.77 1292519 1178907 91.21 1445 0.12

2014-15 1540494 1906237 123.74 26509 1.39 1253456 1232862 98.36 1295 0.11

2015-16 1617519 1945282 120.26 21989 1.13 1287757 1280862 99.46 1034 0.08

2016-17 1698395 1940589 114.3 20004 1.03 1287757 1321668 103 856 0.06

2017-18 1973772 2220292 112.49 18862 0.85 1315595 1418176 74.09. 891 0.06

2018-19 2225423 2473845 111.16 18143 0.73 1315595 1423045 108.17 776 0.05

2019-20
2634744 1742429 66.13 10805 0.62% 1381375 985417 71.34 398 0.04
(Nov 19)
Economic Survey of Karnataka 2019-20 679

treating STI, hence STI control could be r Release of budget to all districts for
considered as the most cost effective organising International Youth Day at
programme. district level.
There are 54 DSRCs in Karnataka, The r Budget has been released to all districts
DSRCs are located in all District Hospitals for sensitisationprogramme on HIV Bill
and some Taluka Hospitals. for PLHIVs at district level.
r Telecast of spots inside the train.
5. Information Education and
Communication: r To create awareness among the general
population Door to Door campaign/
IEC Activities undertaken for the year mass campaign was planned in 7
2019-20 (April – November 2019): districts and is going on in 7 high
r Broadcast of audio spots through All prevelence districts (Raichur, Koppal,
India Radio (State hookup, Bangalore Tumkuru, Bagalkot, Belagavi,
FM Rainbow, Bangalore VB and Vijayapura, Kalburagai). Out of 7
Dharwad VB) on youth (100 times of 30 districts Koppal, Raichur and Tumkuru
secs spots) during International Youth have completed the Door to Door
Day. campaign.

Table 12.68 : Cumulative Status report on ART (till November- 2019)

Adult Adult Child Child


Indicator TS/TG Total
Male Female Male Female

Pre ART Registration 164529 158188 838 10214 8428 342197

Ever Started on ART 130401 128103 619 7749 6286 273158

Alive on ART 70133 87826 374 5784 4811 168928

Reported on ART Death 45387 27224 141 1295 963 75010

Table 12.69 : The reports from these hospitals are as follows


Year Target Achievem ent Percentage

2012-13 187373 143950 66%

2013-14 237493 167526 71%

2014-15 248952 193949 78%

2015-16 319996 196882 62%


2016-17 393841 229884 58%

2017-18 397779 259363 65%


2018-19 413384 277184 77%

2019-20 420808 142585 34%


(upto Nov.)

Note : Source CIMS/SIMS


680 Economic Survey of Karnataka 2019-20

r IEC activities for this campaign 226 blood banks, 42 are in Governments
includes wall painting, audio Sectors (State Govt. - 39, Central Govt.- 3),
announcement at bus stations, IRCS blood banks are -9, Voluntary/
branding of buses, ToT for ASHA Charitable blood banks-62 and 108 are in
workers who inturn visit the houses and private sector (184 private Hospital Blood
create awareness on HIV/AIDS and also Banks & 5 are Private Stand Alone Blood
distribute the handouts. Banks).
r Release of budget to the districts for 12.2.12 Department of Ayush:
Adolescent Education programme for
school students. Department of AYUSH has the broad
mandate of providing Ayush services
r From April 2019 till Nov 2019; 76,243
regulating Ayush education and drug
members of various departments,
enforcement in the state.
institutions have been sensitized.
6. Blood Safety: Ayush Services:

State Blood Council was established in Mainstreaming of Ayush services in the


Karnataka during 1998-99 to provide health care delivery set up of the state is
adequate and safe blood and blood products sought to be achieved by co-location of
at reasonable rates. At present there are 226 Ayush doctors in district hospitals/taluk
registered blood banks in Karnataka of hospitals/ dispensaries in the state under
which 66 are supported by NACO. Out of National Health Mission.

Table 12.70 : PLHAs/ FSW/MSM Government schemes in Karnataka up to


November 2019

Beneficiaries
Name of
Sl. By concerned from
the Benefit To whom
No. Dept beginning to
scheme
till Nov 2019

Anna 35 Kgs Ration like HIV infected and affected


1 Food & Civil Dept 35522
anthyodaya Rice, dal Family

CABA
(Children HIV infected Women &
2 Rs. 1000 19493
affected by & affected children Child Dept
AIDS)

Rajiv Gandhi
Rajiv
HIV infected Rural
3 Gandhi free house 2598
& affected family Development
Housing
Corporation

Rs. 500/- per Women & Child


4 Mythree TS/TG 1197
month pension Dept

Travel
Those who are under Dept Health &
reimbursement
5 TA for ART Second line ART Family 7475
local TA as per
treatment Welfare
actuals

HIV people get free Dept Health &


Free HIV infected & affected
6 Testing and Family 60688
testing family
Treatment Welfare
Economic Survey of Karnataka 2019-20 681

Beneficiaries
Name of
Sl. By concerned from
the Benefit To whom
No. Dept beginning to
scheme
till Nov 2019

RTE
free admission in HIV infected & Dept of Primary
7 Education 671
private schools affected Children Education
ACT

Loan of Rs.
50,000/- will be
given to FSW. Out of
Rs. 50,000/- only
Dept of Women
Chetana 25,000/-to be
8 female sex worker Development 2167
Scheme remitted at the low
Corporation
rate of interest and
remaining Rs.
25,000/- is subisdy
amount.

Higher Under this scheme,


HIV infected &
education Rs. 23,000/- Dept of Higher
9 affected Children under 122
and Scholorship and Education
special category
Scholarship free education.

Loan of Rs.
50,000/- will be
given to PLHIV (only
Women) . Out of Rs.
Dhana 50,000/- only Dept of Women
This scheme particularly
10 Shree 25,000/-to be Development 2011
HIV positive women only
yojana remitted at the low Corporation
rate of interest and
remaining Rs.
25,000/- is subisdy
amount.

Monthly get who is not married Women & Child


11 Manaswini 124
Rs. 500 only above 45 years women Dept

Free legal Karnataka State


12 Free legal services PLHAs 934
services Legal Authority

662 Ayush dispensaries and 159 hospitals Mission. Apart from this one Hi-tech
are providing medical services through Panchakarma hospital with a bed
Ayurveda Unani Homoeopathy Yoga & strength of 100 is rendering services at
Nature Cure with a total bed strength of Mysore.
2534. r One Hi-tech Panchakarma centre at
r So far 65 Ayush hospitals have been Legislator's Home Bangalore is
upgraded under the National Ayush providing panchakarma services to
Hon'ble members of the Legislature.
682 Economic Survey of Karnataka 2019-20

Table 12.71 : Blood Safety Indicators (2014-15 to 2019-20)

2019-20
Indicator 2014-15 2015-16 2016-17 2017-19 2018-19
upto Nov.

Total blood units


7,54,485 7,46,716 7,87,330 844419 856215 608751
collection

Blood units collected


5,19,260 5,39,878 5,93,108 657612 738263 531332
from VBD

7. Financial Progress: FY – 2019-20.

Table 12.72 : Programme Component wise expenditure of KSAPS Budget

Y ea r 2019 -20 (30.11.20 19)


E x pe nditure
by
To ta l G ran ts Pro g ram m e
A ppro ve d
Pro g ram m e rec eive d/ av ail
B udge t fo r E x pe nditure o n to ta l
ab le fo r the
20 19-20 (in Lakh s ) g ran t
y ea r 20 19-20
(in Lakh s) (%)
(in La kh s)

Ta rge ted Inte rventi ons 2 09 1 .34 1 1 2 4 .2 2 7 4 0 .0 5 4 8 .78

L ink Work e r Sc he me 1 5 1 .3 4 1 00 .9 0 2 6 .27 1 8 .66

Se xu al ly Tra ns mitte d
Infecti on / R ep rod u cti ve 1 2 4 .9 0 8 3 .26 7 6 .51 9 1 .89
T rac t In fe c tion s Se rvi ces

Bl ood S afe ty 3 6 9 .3 7 2 46 .2 4 2 2 1 .1 0 8 9 .79

L ab Se rv ic e s 9 9 .64 6 6 .42 4 8 .16 7 2 .51

ICTC /H I-T B/ P P TC T 3 17 5 .98 2 3 0 7 .3 2 1 61 9 .47 6 9 .05

Informa tion, E d uc a tion


2 5 6 .1 5 1 70 .7 6 1 5 3 .9 1 9 0 .13
& C omm uni ca tion

AR T/ CCC 2 79 0 .35 1 8 8 0 .2 4 1 01 1 .35 5 2 .62

Ins titu tion al


5 6 3 .9 5 3 75 .9 8 3 6 4 .1 4 7 3 .57
Stre ngthe ni ng
Stra tegi c Informa tion
5 0 .76 3 3 .84 1 9 .5 4 5 7 .74
M a nage me nt Sys te m

U NICE F 0 0 0 0
Economic Survey of Karnataka 2019-20 683

Y ea r 2019 -20 (30.11.20 19) E x pe nditure


by
To ta l G ran ts
A ppro ve d Pro g ram m e
Pro g ram m e rec eive d/ av ail
B udge t fo r E x pe nditure o n to ta l
ab le fo r the
20 19-20 (in Lakh s) g ran t
y ea r 20 19-20
(in Lakh s) (%)
(in La kh s)

Sta te F und

2 2 1 0 -0 6 -1 01 - 7 -1 5 -1 0 3
5 0 0 .0 0 2 50 .0 0 4 8 3 .6 7 3 3 .80
G rant in A id S ala ry
2 2 1 0 -0 6 -1 01 - 7 -1 5 -1 0 0
R eimb u rsement of
1 5 1 .0 0 7 5 .50 8 4 .71 9 0 .71
T ravel co st to H IV
p at ient

2 2 1 0 -0 6 -1 01 - 7 -1 5 -0 5 9
3 1 .00 1 5 .50 2 9 .97 2 8 .05
L WS p rogram me

2 2 1 0 -0 6 -8 00 - 0 -1 4 - TB
& H IV p at ients n utriti on 0 .0 0 0 .0 0 0 .0 0 0 .0 0
food s

T o tal 10355 .7 8 6790 .18 4 870.35 56 .0 0

Karnataka Ayurveda and Unani State Pollution Control Board at all Ayush
Practitioners Board; Karnataka dispensaries/hospitals.
Homeopathy Board: Government Central Pharmacy:
Ayush medical practitioners board regulates
the registration of Ayush medical Ayurveda and Unani medicines
practitioners through biometric registration manufactured at Government Central
in the state. Pharmacy Bangalore is supplied to
Government Ayurveda and Unani
Bio-Medical waste management has been dispensaries/hospitals throughout the
adopted under the guidelines of Karnataka
Table 12.73:
Government Ho spitals
Sl. Governm ent
Sy stem of M ed icine
No Dis pensaries.
No of Ho spitals Bed Strength

1 Ayurve da 115 1 821 56 4

2 Unani 18 39 2 50

3 H omoeopathy 18 26 0 43

4 N ature C ure 05 46
05
5 Y oga 03 15

To tal 159 2534 662

* Some of the 159 hospitals have combined Ayush systems.


684 Economic Survey of Karnataka 2019-20

state. Other than this Ayurveda and Unani Awareness & I.E.C Activities
medicines were procured under NAM
r To augment physical and mental health
(National Ayush Mission) Government of
of high school teachers & students of
India and also from Government notified 4G
the state the department is successfully
companies.
conducting training in Yoga to teachers
Drug Testing Laboratory: who in turn guide their students under
health & IEC programmes.
To ensure the quality control and
strengthening regulatory mechanism of r Regular health camps are conducted at
Ayurveda and Unani medicines raw drugs identified remote places thereby
and prepared medicines samples are tested providing services to SC/ST population
at Drug Testing Laboratory Bangalore. under Government sanctioned
schemes.
Drug licensing authority regulates
Ayurveda Unani Drugs and Cosmetics r IEC programmes on home remedies
manufacturers and manufacturing units in (Manemaddu) for common ailments are
the state. conducted regularly.

Table 12.74 : System wise details of Hospitals

No. of Beds
100 50 25 15 10 5
Ayurveda 1 - - - 36 -
Unani - 1 - - 5 -

District Homeopathy - - - - 1 -
Nature Cure & Yoga - - - - - 1
Ayurveda - - - - - -
State sector
Unani - - - - 4 -

Taluk Homeopathy - - - -

Nature Cure & Yoga - - - - 2 -

Ayurveda - 1 3 4 6 1
Unani - 1 - - 1

District Homeopathy - - - - 8 -
Nature Cure & Yoga - - - - - -
Ayurveda - - 1 - 12 28
ZillaPanchayat Unani - - - - 8 1

Taluk Homeopathy - - - - 1 -
Nature Cure & Yoga - - - - - -
Total 1 3 4 4 82 32
Economic Survey of Karnataka 2019-20 685

r International Yoga Day was celebrated r Post graduate education was newly
throughout the state on a large scale at started in the previous year in
Bengaluru. ShalyaTantra at Taranath Government
r National Ayurveda Day Homeopathy Ayurveda Medical College Bellary in
Day Unani Day were conducted Ayurveda Siddhanta at Government
effectively through out the state. Ayurveda Medical College Bengaluru &
in Panchakarma Shalakya Tantra at
r Diabetes control programmes are Government Ayurveda Medical College
conducted regularly. Mysore.
r IEC programmes are conducted at r In co-ordination with management of
SC/ST hostels on request by the parent private AYUSH medical colleges
department of social welfare and also on admissions to undergraduate courses
Women's day and other important has been done through NEET
dates. examination.
r Medical fees collected from SC/ST
Ayush Department Achievements
students studying in Government-
aided AYUSH Colleges are being r New Unani Dispensary opened at
reimbursed. Mulabagal TalukKolar Dist.
r SC/ST candidates studying in r On June 21st 2019 International Yoga
Government and Government-aided day was celebrated throughout the
Colleges are provided medical books state.
and laptops at free of cost. r Special Postal Cover was released to
r TOT for establishing NCD (Non mark Ayurveda Day.
Communicable Diseases) clinics are r In flood affected areas of North
conducted to provide health care Karnataka free medical centres were
facilities. opened to provide health services to the
r Herbal gardens at Government people.
Ayurveda Colleges and few Government r New post graduate courses were started
Ayurveda dispensaries and hospitals in Panchakarma Kayachikitsa Shalya
where place is available are established Tantra and Swasta Vrutha subjects in
for growing medicinal herbal plants for Mysore and Bellary Government
demonstration and use of fresh Ayurveda Medical Colleges.
medicinal preparations.' r Co-location of Ayush Doctors in 116
r Dhanwantari Vana' herbal garden is Taluk General Hospitals.
being maintained in 37 acres of land Proposed Plan For The Year 2020-21
near Bangalore university maintained
by the Karnataka Forest Department. r For the overall development and
Medicinal plants grown here are effective implementation of the AYUSH
distributed to public. programmes the State Government in
association with Government of India is
Ayush Training Centre:
continuing the National Ayush Mission
Ayush Training Centre at Sugganahalli project.
Ramanagara district has been set up to r It is planned to uplift the Ayush Medical
provide technical and other training to Education institutes by improving the
AYUSH officers/Medical officers staff. present infrastructure and effective IEC
Medical Education: programmes.
r UG & PG AYUSH Medical Education r It is planned to continue with IEC
is provided through Government programme like Home Remedies
Government-aided and Un-aided Medical Health Camps Yoga Training
AYUSH Medical Institutions. (table no. Programmes and Seminars at Taluk
12.75) and District level.
686 Economic Survey of Karnataka 2019-20

Table 12.75: UG & PG AYUSH Medical Colleges functioning in Karnataka during


2018-19 Academic year recognized by Ministry of AYUSH Government of India.

Government Government Aided Unaided Total

Sl. Faculty Stud- Stud- Stud- Stud-


Institu- Institu- Institu- Institu-
No. ents ents ents ents
tions tions tions tions
enrolled enrolled enrolled enrolled

1. Ayurveda - - - - - - - -

a) Graduate 320 195 4045 5265


03
04 71 75
-
b) Postgraduate 59 126 800 985

2. Unani - - - - - - - -

a) Graduate 01 60 - - 240 300


04 05
b) Postgraduate - - - - 07 07

3. Homoeopathy - - - - - - - -

a) Graduate 100 - - 1290 1390


01 16 17
b) Postgraduate 28 - - 101 129

Yoga and
4. - - - - - - - -
Nature Cure

a) Graduate 60 - - 540 600


01 07 08
b) Postgraduate - - - 30 30

Total 07 627 03 321 98 7053 108 8706

* Note: 2019-20 Academic year admission is under process which will be completed by December-2019.

Table 12.76: Details of In-patient and Out-patient in AYUSH Hospitals/


Dispensaries
Y oga and
Ayurv eda Unan i Homoe opathy Total
Nat uropat hy
Ye ar
IPD OPD IPD OPD IP D OPD IPD O PD IPD OPD

2010-11 5443 3783417 794 491148 280 520395 41 18045 6558 4813005

2011-12 60587 3859795 748 475501 429 385394 31 20974 7265 4741664
2012-13 13661 3800729 473 574435 565 137975 21 24492 15020 4739828

2013-14 10569 4387176 897 346428 565 359673 0 50697 12031 5143974
2014-15 25180 2268388 10589 293851 281 192389 435 28538 39085 2783065

2015-16 28000 2500500 10900 300700 425 200200 520 29100 39845 3030500
2016-17 82004 3845893 2919 327079 3610 299397 0 166057 88533 4638426

2017-18 123527 3309105 22793 426130 31 301477 1175 45619 147526 4082331

2018 -19 12495 3342124 773 457097 66 218609 2293 59852 15627 4077682

Upto
Nov- 15658 2278947 1445 287514 713 196646 209 51936 18025 2815043
2019
Economic Survey of Karnataka 2019-20 687

Table 12.77: Cadre Strength details in AYUSH department upto Nov-2019

Non-Teaching Teaching Total


Group
Sanctioned Filled Vacant Sanctioned Filled Vacant Sanctioned Filled Vacant

Group –A 1113 789 324 203 119 84 1316 908 408

Group –B 74 34 40 126 10 116 200 44 156

Group –C 1430 400 1030 0 0 0 1430 400 1030

Group –D 1592 460 1132 0 0 0 1592 460 1132

TOTAL 4209 1683 2526 329 129 200 4538 1812 2726

r It is planned to upgrade Kolar and State, the Department eradicates the


Karwar Hospitals to 50 bedded menace of Spurious and substandard
combined Ayush Hospitals. drugs, ensures safety of drugs and their
r New initiatives like setting up specialty availability at the controlled prices to the
Ayush Clinics in District Hospitals and public. The Department functions under
palliative care centres in PPP mode are three wings:
being planned. (1) The Enforcement Wing,
r To conduct job oriented training (2) Drugs Testing Laboratory and
courses for SC/ST candidates
under SCP/TSP schemes in Ayush (3) The Pharmacy Education
Panchakarma massage therapy For the financial year 2019-20, a total
cosmetology yoga under department of provision of Rs. 6171.00 lakhs under the
Social Welfare budget plan. State scheme and Rs. 168.00 lakhs -under
r To provide training in Ayush prevention Centrally Sponsored schemes is allocated
of non-communicable diseases to ASHA for the Department.
workers in State.
The establishment and construction work of
r Ayush medicines manufacturing unit is laboratory buildings of 2 Regional Drugs
being setup at Belgaum. Testing Laboratories, one at Hubli and the
r To increase number of OPD & IPD other at Bellary in North Karnataka, are
patients by providing improved health completed through KHSDRP and started
care. functioning in respective own buildings as
12.2.13 Drugs Conrol Department: proposed under the State budget 2008-09.
The Department has taken initiatives to get
The State Drugs Control Department is the NABL accreditation in the National level
existing since 1956 as an Independent body for these two laboratories.
under the control of the Ministry of Health
and Family Welfare Karnataka. It is headed The Department is providing 22 services
by the Drugs Controller. The main objective under the Karnataka Sakala Services Act
of the Department is to implement the Drugs 2011 and (Amendment) Act, 2014 to assure
and Cosmetics Act, 1940 and Rules there the guarantee of services to the public
under and to ensure the quality of Drugs within the specified time frame. Grant and
and Cosmetics manufactured and marketed retention of manufacturing licenses, sales
in the state in the interest of the public licenses and issue of non statutory
health. By exercising strict control and certificates are covered under SAKALA
vigilance on the drugs marketed in the services.
688 Economic Survey of Karnataka 2019-20

The licensing activity of the drugs sales banking is enabled and payment is made
establishments is fully computerized. The online through khajane2.
Department has successfully adopted the
LMS/FMS software under e-governance for 12.2.14 Karnataka State Drugs Logistic
its internal files and letters management. Warehousing Society:
The Department has also successfully Introduction and Objectives:
implemented e-sampling program for Drug Karnataka State Drug Logistics and
Testing and Analysis in the State Drugs Warehousing Society Bangalore was
Testing Laboratories as a part of e- established with an objective to cater to the
governance program. The information needs of Health Institutions coming under
about the not of standard quality drugs is the Directorate of Health and Family Welfare
published through the Departmental web Services as well as those Hospitals coming
portal, as soon as it is declared as not of under the control of Directorate of Medical
standard quality. The information is Education and such other programmes
reflected in the department portal and coming under Health and Family Welfare
around 35000 auto generated SMS alerts Services.
will reach the various stakeholders like,
retailers, wholesalers, Doctors & Objectives:
enforcement officers to prevent the use of Karnataka State Drug Logistics and
substandard drugs. The information is also Warehousing Society Bangalore is headed
published in the News papers. by Additional Director. He functions under
For the first, time a consensual agreement the Administrative control of the
has been made between Government and Commissioner Health & Family Welfare
Private Pharmacy colleges management Services and the Director of Health & Family
association for seat sharing of government Welfare Services. The requirement of Drugs
quota seats in the private colleges in the Chemicals & other items of all State Sector
ratio has detailed below for the year 2018-19 Hospital Teaching Hospitals under the
and 2019-20. Directorate of Medical Education and the
Hospitals/Institutions coming under ZP are
In the current financial year 2019-20, Rs. procured and supplied in accordance with
1000.00lakhs is allotted for the the budget allotted and the indent of
construction of ladies hostel at government individual Hospitals/Institutions through
college of pharmacy, Bangalore and for District Drugs Warehouses.
construction of office buildings at Udupi and
Raichur. Rs. 384.16 lakhs is the Plan of Action:
expenditure by the end of November.
1) The erstwhile Government Medical
In order to encourage exports and for speedy Stores has been restructured into a
disposal of various applications submitted society and is functioning as Karnataka
by the manufacturers a “Technical Cell” as State Drugs Logistic & Warehousing
been established in the department which is Society ® which was formed with the
functioning effectively. financial assistance of the European
Commission through Government of
A web portal under the name “JEEVA India during the year 2003. Presently
SANJEEVINI” is operational which provides 27 Dist. Ware Houses catering to the
the information on the availability of needs of hospitals. Cold Storage Room
BLOOD and BLOOD COMPONENTS for the has been installed in all 27 Dist. Drug
information of public which has also link in Warehouses. As per the indents of the
the department website regarding Health Institutions drugs are supplied
availability of Blood and Blood Components to them through the Troop Carrier
“ http://blood.kar.nic.in”. Vehicles of Warehouses. During 2014-
In order to promote cashless transaction for 15 6 new Troop Carriers were issued to
the services provided by the department, net warehouses.
Economic Survey of Karnataka 2019-20 689

Table 12.78 : Ratio of the seats for the year 2018-19

Sl. Government Private


Course Remarks
No. Seats seats

Applicable only for D


1 D Pharma 10% 90%
Pharma Course Students.

Applicable for D Pharma and


2 D Pharma 20% 80% other Pharmacy Course
Students.

3 B Pharma 25% 75%

4 M Pharma 30% 70%

5 Pharma D 30% 70%

6 Pharma D( P.G) 30% 70%

Table 12.79 : Ratio of the seats for the year 2019-20

Sl. Government Private


Course Remarks
No. Seats seats

Applicable only for D


1 D Pharma 20% 80%
Pharma Course Students.

Applicable for D Pharma and


2 D Pharma 30% 70% other Pharmacy Course
Students.

3 B Pharma 30% 70%

4 M Pharma 30% 70%

5 Pharma D 30% 70%

6 Pharma D( P.G) 30% 70%

2) The essential equipment's and 3) From 2014-15 Online Drug Inventory


necessary materials were supplied to all Management System has been followed
the 27 Drug Warehouses All the for Indenting of Drugs from various
warehouses are computerized and Health Institutions & Medical
internet connection is also provided. Educational Institutions. Drugs and
Karnataka State Drugs and Logistics Chemicals are also supplied by this
Warehousing Society is connected to all Society to combat Natural calamities
Districts. Drug Warehouses where in like floods droughts which are supplied
data is feed through Warehouse as per the directions of the Government
Information System WIS. from time to time.
690 Economic Survey of Karnataka 2019-20

4) The Equipment's and Furniture Other Department Programmes:


required for different health
institutions are procured through Under “AksharaDasoha” Programme of the
KDLWS from the year 2011-12. Education Department certain drugs like
Tab. Albendazole Iron with Folic Acid and
5) Bio-Medical Equipment Maintenance vitamins 'A' Capsules are being procured
Outsourcing Cell is maintaining by 09 and supplied to BEO's which are in turn
Bio Medical Engineers this Cell supplied to schools for distribution to
compiles the Equipment's information students from class I to 7th Std. as per
of the state monitors the repair work requirement of education Dept.
and AMC/CMC of the equipment's.
Drugs Chemicals diagnostic kits Lab
6) Providing Need Based Drugs to 2800 consumables Blood Bank Consumables and
Health Institutions in the state without instruments medical equipment required
Budget ceiling. QC Section is regularly under AYUSH National Rural Health
formatted and properly checking the Mission Karnataka Aids Prevention Society
quality of the drugs and supplies drugs are procured and supplied as per their
to prisons Education Department requirements
Social Welfare department and Medical
Education institutions etc.

Budget Allocations:

Table 12.80 : Budget released KSDLWS Bangalore for procurement of Drugs and
Chemicals and expenditure for the past five years is as follows:

B ud get Released Exp end iture


Year
(Rs. In L akhs) (Rs. In lakhs)

2013 -14 10 500. 00 1 0500 .00

2014 -15 13 349. 00 1 3349 .00

2015 -16 15 000. 00 1 5000 .00

2016 -17 16 624. 38 1 6624 .38

2017 -18 17 575. 45 1 7575 .45

2 018- 19 17 961. 45 1 7961 .45

20 19-20 (Up to N ov ) 8 360.0 0 8360. 00


Economic Survey of Karnataka 2019-20 691

Table 12.81 : Budget released KSDLWS Bangalore for procurement of Equipment SDP
SCP & TSP ICU SCP Unspent TSP Unspent and expenditure for the past five years is as
follows:
Budget Released Expenditure
Year
(Rs. in Lakhs) (Rs. in lakhs)

2013-14 2500.00 2500.00

2014-15 2045.00 2045.00

2015-16 2300.00 2300.00


2016-17 2500.00 2500.00

2017-18 9185.50 9185.50

2018-19 8259.22 8259.22

2019-20
2508.50 2508.50
(Up to Nov.)

12.2.15 EXPENDITURE ON HEALTH


Table 12.82: Budget allocation and Expenditure on Health & Family Welfare
(Rs.in lakh)
Year Budget allocation Expenditure

2018-19 BE 672719.39 645564.21

2019-20 BE (uptoNov) 747417.77 383107.74

Table 12.83: Funds received from Government of India and Utilization (Rs.in lakh)

GOI
GOK releses Expenditure % of
releses to
Financial Opening to S tate Total of State Expenditure
State
Year Balance Health Funds Health on Total
Health
Society Society Funds
Society

2011-12 18127.42 65572.82 16000.00 99700.24 76106.34 76.34

2012-13 25084.64 64533.66 18274.16 107892.46 86547.43 80.22


2013-14 27951.46 60882.83 26236.82 115071.11 82032.14 71.29
2014-15 42887.80 66540.14 25587.24 135015.19 106471.00 78.86
2015-16 57604.53 73748.66 29980.13 161333.32 117801.00 73.01

2016-17 64482.07 65292.63 57803.59 187578.29 136470.00 72.75


2017-18 86535.00 110158.00 73428.00 270121.00 193213.00 71.53
2018-19 83123.00 120162.00 73818.00 277103.00 188770.00 68.12

2019-20
(U pto 90249.30 37654.00 29598.00 157501.30 107471.52 68.24
Nov-19)
692 Economic Survey of Karnataka 2019-20

12.3 HUMAN AND GENDER HDI three major indicators and the way they
DEVELOPMENT are measured by UNDP for the Year 2014 are
given in Figure 12.13.
12.3.1 Introduction
UNDP released 2019 Human Development
Human development approach Report; India ranks 129 out of 189 countries
concentrates on improving the lives of in the latest HD rankings. India's HDI value
people lead rather than assuming that for 2018 is 0.647, which have put the
economic growth will lead, automatically, to country in the medium human development
greater opportunities for all. UNDP states category. It may be noted that India's HDI
that human development approach focuses value increased nearly 50 percent between
on people, their opportunities and choices. 1990 and 2018, in absolute terms HDI value
Hence human development emphasizes increased from 0.427 in 1990 to 0.647 in
mainly on health, education, and standard 2018.
of living. Economic growth does not
necessarily correlate with the progress in 12.3.2 Human Development Index among
Human Development (HD). Hence, the core major States in India
objectives of any planning and policy
Karnataka's performance in human
processes, at present revolve around
development has been improving over the
enhancing the human capabilities and
years in terms of HDI value, despite the
creating opportunities for people to exercise
slightly hovering ranking position varying
their choice to live long, healthy and creative
between 6th to 8th over the period from
life.
1981 to 2012. Formation of new States
The efforts to quantify the qualitative results could be one of the reasons for the change of
of human development processes has taken ranking position. Among major southern
the forms of many such HD-Indices as States, Karnataka is marginally better than
Human Development Index (HDI), Andhra Pradesh (before the formation of
Inequality Adjusted Human Development Telangana State). However, Karnataka is
Index (IAHDI), Gender Development way behind Kerala (Rank 1) and Tamil Nadu
Index(GDI), Gender Inequality Index (GII), (Rank 5). Table 12.84 gives the information
Multi-dimensional Poverty Index (MPI) etc. of Human Development Index among major
States in India from 1981 to 2012 in terms of
The HDI is a measure of broader concept of
value and rank of the respective states.
development. In HDI, economic welfare is
given higher importance than economic 12.3.3 Human Development Reports in
growth. It emphasizes that the individual's Karnataka – An Overview
capabilities must be the ultimate criteria for
Karnataka has been a pioneering State in
assessing the development of the country.
addressing the issues concerned to human

Figure 12.13 : HDI three major indicators by UNDP 2014

Long & Life Expectancy at


Birth
Healthy Life

Mean Years of
HDI Knowledge Schooling & Expected
Years of Schooling

Standard of Gross National


Income Percapita
Living (PPP 2011 $)
Economic Survey of Karnataka 2019-20 693

development through various policy district human development goals and


initiatives consequent upon the preparation outcomes especially for vulnerable sections
of human development reports at various and also examined the efficacy of service
levels over the years. The first Karnataka delivery mechanisms.
State Human Development Report (KSHDR)
During the period of 1990-2001, the issue of
was published in 1999 which helped the
prevailing regional disparities and the need
State to realize the existence of sharp socio-
to address the same through focused
economic disparities between districts. The
interventions became paramount, leading to
second KSHDR brought out in 2005
the constitution of High Power Committee
provided a comprehensive analysis of
for Redressal of Regional Imbalances

Table 12.84 : Human Development Index among major States in India, 1981 – 2012

1981 1991 2001 2011 2012


States
Value Rank Value Rank Value Rank Value Rank Value Rank

Andhra
0.298 9 0.377 9 0.416 10 0.485 11 0.593 11
Pradesh

Assam 0.272 10 0.348 10 0386 14 0.474 12 0.563 14

Bihar 0.237 15 0.308 15 0.367 15 0.447 18 0.536 20

Gujarat 0.360 4 0.431 6 0.479 6 0.514 8 0.598 10

Haryana 0.360 5 0.443 5 0.509 5 0.545 5 0.628 6

Karnataka 0.346 6 0.412 7 0.478 7 0.508 10 0.611 8

Kerala 0.500 1 0.591 1 0.638 1 0.625 1 0.693 1

Madhya
Pradesh 0.245 14 0.328 13 0.394 12 0.451 16 0.548 16

Maharashtra 0.363 3 0.452 4 0.523 4 0.549 4 0.642 3

Orissa 0.267 11 0.345 12 0.404 11 0.442 19 0.540 18

Punjab 0.411 2 0.475 2 0.537 2 0.569 2 0.641 4

Rajasthan 0.256 12 0.347 11 0.424 9 0.468 14 0.566 13

Tamil Nadu 0.343 7 0.466 3 0.531 3 0.544 6 0.634 5

Uttar
0.255 13 0.314 14 0.388 13 0.468 13 0.538 19
Pradesh

West Bengal 0.305 8 0.404 8 0.472 8 0.509 9 0.593 12

All India 0.302 0.381 0.472 0.504 0.587

Source: 1. National Human Development Report 2001 [Note: The HDI for 2001 has been estimated only for a
few selected States for which some data, including the Census 2001, was available]. 2. M.H. Suryanarayana,
Ankush Agrawal and K. Seetha Prabhu (2011), UNDP working paper. 3.Karnataka State Human
Development Report, 2015
694 Economic Survey of Karnataka 2019-20

(HPCFRRI) under the Chairmanship of of Districts, Taluks and Urban Local Bodies
renowned economist, Dr. D. M. in Karnataka, 2014 – A Snapshot”, has also
Nanjudappa. been brought out with a slighter modified
methodology. This snapshot document
In order to know the status of human
captures the essence of all the 30 DHDRs,
development indicators at the taluk level, an
2014. All the reports are available on the
exercise for the preparation of District
websites of the respective ZPs.
Human Development Reports (DHDRs) for
the districts of Kalaburagi (then Gulbarga), Table 12.85 presents the relative
Mysuru (then Mysore), Udupi and performance of all the 30 districts of all the
Vijayapura (then Bijapur) with the four administrative divisions on various HD-
assistance of UNDP was made from 2005 to Indices.
2008. The reports were released in 2010. It
is a matter of pride that the reports of Udupi Urban Development Index (UDI – for Urban
and Vijayapura districts were nationally Local Bodies) is done for all the 30 districts,
recognized. The first ever India Human 176 taluks and 219 Urban Local Bodies
Development Award – Manava Vikas– was (ULBs) in the State, depicting their relative
awarded to the DHDR of Udupi district for performance in the relevant HD-Index. As a
'focus on innovation in measurement' and case study, each DHDR also computes the
the DHDR of Vijayapura reached to the Composite Dalit Development Index (CDDI)
finals. for a selected Grama Panchayat (GP) having
more than 50 Households of Scheduled
For the first time in the country, Grama Castes in that GP. In addition, four district-
Panchayat human development specific Small Area / Micro Studies have
index(GPHDI) was also computed for all the also been conducted and the results are
5898 grama panchayats, in the state and presented in each of the respective DHDRs.
presented through a report title “Huamn 12.3.4 Human Development At District
development:Performance of Grama
Level In Karnataka
Panchayats in Karnataka 2015”.
Human Development Index is estimated at
The third Karnataka State Human
district level for all the thirty districts in
Development Report, 2015 brought out in
Karnataka State using the goal posts as that
2019, which provides a comprehensive
of international one provided in HDR 2014.
analysis “Accelerating Equitable Human
The Global goalposts set by UNDP for the
Development”.
year 2014 are as follows.
1. Preparation of DHDRs, 2014 for all the
The global goalposts set by UNDP 2014
districts and the HD-Snapshot, 2014
Encouraged by the preparation of four
DHDRs in 2010, Government of Karnataka Dimension Indicator Min. Max.
decided to prepare District Human Life Expectancy
Health 20 85
Development Reports (DHDRs) for all the (years)
thirty districts in the State simultaneously – Expected years
0 18
an exercise for the first time in the country. of schooling
Education
A comprehensive “Guidelines Document for Mean years of
0 15
the Preparation of DHDRs, 2014” was also schooling
prepared to facilitate the nodal agencies and Gross natio nal
others to produce quality reports. All the Standard of Income per
100 75000
living capita(PPP
DHDRs-2014, prepared by respective Zilla
2011$)
Panchayats, has been released by the ZPs in
their district headquarters. Source: UNDP(2014),Karnataka Human
Development Report-2015.
Based on all the 30 DHDRs, a compendium
titled, “Human Development: Performance
Economic Survey of Karnataka 2019-20 695

Table 12.85 : Human Development Indices across Divisions / Districts of


Karnataka, 2011

FSI DCDI
HDI GII CDI
Sl.
Division / Dist rict
No
Value Rank Value Rank Value Rank Value Rank Value Rank

1 Bagalkot 0.384 24 0.130 27 0.474 24 0. 519 9 0.385 26

2 Bela gavi 0.449 18 0.112 20 0.547 19 0. 544 8 0.497 16


Belaga vi Division

3 Dharwad 0.610 6 0.111 19 0.624 13 0. 695 1 0.539 9

4 Gadag 0.350 26 0.123 24 0.628 12 0. 452 13 0.501 15

5 Haveri 0.406 21 0.089 11 0.525 22 0. 422 14 0.510 14

6 Uttar a Kannada 0.565 10 0.070 7 0.734 5 0. 547 7 0.406 24

7 Vijaya pura 0.330 27 0.105 16 0.617 14 0. 508 10 0.323 29

8 Ballari 0.354 25 0.167 29 0.569 17 0. 350 22 0.453 22


Kalaburagi Division

9 Bidar 0.430 19 0.115 23 0.530 21 0. 569 5 0.408 23

10 Kalabuaragi 0.407 20 0.130 26 0.334 28 0. 466 12 0.345 28

11 Koppal 0.280 28 0.169 30 0.303 29 0. 269 28 0.395 25

12 Raichur 0.165 30 0.150 28 0.231 30 0. 266 29 0.371 27

13 Yadgir 0.196 29 0.110 18 0.416 27 0. 348 23 0.276 30

14 Bengaluru Rural 0.603 7 0.084 9 0.733 6 0. 280 27 0.597 3

15 Bengaluru Urban 0.928 1 0.056 3 0.690 9 0. 589 4 0.708 1

16 Chikkaballapura 0.486 16 0.105 15 0.685 10 0. 216 30 0.472 20


Bengaluru Division

17 Chitradur ga 0.386 23 0.115 22 0.469 25 0. 301 26 0.483 19

18 Davangere 0.528 14 0.124 25 0.575 16 0. 405 15 0.533 11

19 Kolar 0.543 11 0.114 21 0.479 23 0. 346 24 0.491 17

20 Ramanagar 0.533 13 0.092 12 0.725 8 0. 343 25 0.536 10

21 Shivamogga 0.596 8 0.088 10 0.743 4 0. 358 21 0.601 2

22 Tumakur u 0.471 17 0.080 8 0.466 26 0. 393 17 0.517 13

23 Chamaraja nagar 0.401 22 0.105 17 0.555 18 0. 398 16 0.485 18

24 Chikkamagaluru 0.627 5 0.057 4 0.783 2 0. 380 18 0.565 8

Dakshina
25 0.691 2 0.050 2 0.840 1 0. 694 2 0.593 4
Mysur u Division

Kannada

26 Hassa n 0.576 9 0.069 6 0.730 7 0. 362 20 0.457 21

27 Kodagu 0.658 4 0.069 5 0.664 11 0. 568 6 0.572 7

28 Mandya 0.491 15 0.092 13 0.603 15 0. 364 19 0.585 5

29 Mysuru 0.533 12 0.093 14 0.537 20 0. 493 11 0.574 6

30 Udupi 0.675 3 0.038 1 0.746 3 0. 664 3 0.525 12

Source: “Human Development: Performance of Districts, Taluks and Urban Local Bodies in Karnataka, 2014
– A Snapshot”
696 Economic Survey of Karnataka 2019-20

Table 12.86 shows that Bangalore urban close to that of Kerala state. Dakshina
stands first with HDI being 0.73. Comparing Kannada district stands in the third position
with other states, human development is with HDI value being 0.663. Yadgir,
much higher than Kerala state and with Kalburagi and Haveri are the districts in the
global comparison, Bangalore falls under last three positions. HDI value in these
the category high Human development districts is only around 0.52, which belongs
countries. Kodagu stands second highest to the category low human development
with HDI value being 0.682, which value is countries.
Table 12.86 : HDI across the districts of Karnataka (2012)
Expe cted
M ea n Year s
H ealt h Inco me Y ears o f E duc atio n
District s o f Sc hoo ling HDI Rank
Index In dex Sch oo ling Index
Index
Index

B agalkot e 0.7 24 0 .5 43 1 0.2 8 4 0.5 6 81 0.4 26 0 .55 13 24

B allari 0.6 85 4 0 .5 55 1 0 .2 3 61 0.6 1 28 0.4 24 5 0 .54 46 26

B elagavi 0.7 44 2 0 .5 67 2 0.3 3 3 0.5 8 89 0.4 60 9 0 .57 94 18

B engaluru R ural 0.7 76 0 .6 20 4 0 .4 5 42 0.6 7 82 0.5 66 2 0 .64 84 4

B engaluru Urb an 0.8 15 1 0 .7 27 9 0 .6 4 77 0.6 5 99 0.6 53 8 0 .72 93 1

B id ar 0.7 64 7 0 .5 31 1 0 .2 9 07 0.5 9 79 0.4 44 3 0 .56 51 22

C hama ra ja nagara 0.7 53 7 0 .5 93 7 0 .2 4 41 0.5 7 62 0.4 10 1 0 .56 83 21

C hik ka ba llap ura* 0.7 53 9 0 .5 88 5 0 .3 3 65 0.6 7 28 0.5 04 6 0 .60 72 13

C hik ka maga luru 0.7 92 8 0 .5 52 1 0 .4 6 43 0.7 1 11 0.5 87 7 0 .6 3 6 5

C hit radu rga 0.7 25 6 0 .5 35 6 0.2 7 2 0.6 3 03 0.4 51 1 0 .55 97 23

Dak shina K annad a 0.8 02 7 0 .6 79 6 0 .4 4 76 0.6 2 39 0.5 35 8 0 .66 36 3

Davana gere 0.7 39 6 0 .5 76 1 0 .2 9 01 0.6 3 84 0.4 64 3 0 .58 27 16

Dharwa d 0.7 48 8 0 .5 92 2 0 .4 3 12 0.6 62 0.5 46 6 0 .62 35 8

Gad ag 0.7 01 9 0 .5 65 9 0.3 0 6 0.6 3 38 0.4 69 9 0 .57 15 20

Hassan 0.7 99 8 0 .5 62 5 0 .3 3 25 0.6 6 73 0.4 99 9 0 .60 81 12

Haveri 0.7 48 5 0 .5 58 3 0 .2 2 86 0.5 2 07 0.3 74 7 0 .5 3 9 28

Ka la bura gi 0.7 03 8 0 .5 37 3 0 .2 1 78 0.5 8 84 0.4 03 1 0 .53 42 29


Kod agu 0.7 69 3 0 .7 14 7 0 .5 8 53 0.5 6 67 0.5 76 0 .68 16 2

Kolar 0.7 53 9 0 .6 27 1 0 .3 4 09 0 .7 0.5 20 4 0 .62 66 7

Kop p al 0.6 74 4 0 .53 8 0.2 4 7 0.6 7 53 0.4 61 1 0 .5 5 1 25

Mand ya 0.7 80 1 0 .6 01 2 0 .2 9 57 0.6 1 88 0.4 57 2 0 .59 86 14

Mysuru 0.7 37 5 0 .6 14 3 0 .4 0 72 0.6 4 68 0.5 27 0 .62 04 9

Ra ichur 0.6 44 4 0 .5 63 3 0 .2 1 95 0.6 4 77 0.4 33 6 0 .53 99 27

Ra mana gara* 0.7 76 0 .5 81 9 0 .3 2 88 0.5 8 81 0.4 58 4 0 .59 16 15

Shiva mogga 0.7 86 8 0 .5 61 5 0 .3 5 88 0.6 69 0.5 13 9 0 .61 01 10

Tu mk uru 0.7 52 8 0 .55 9 0 .2 9 22 0.6 3 87 0.4 65 4 0 .58 07 17

Ud upi 0.8 28 9 0 .62 5 0 .3 5 91 0.6 1 23 0.4 85 7 0 .63 13 6

Utt ara K annad a 0.7 82 8 0 .5 94 3 0 .3 4 62 0.6 2 89 0.4 87 6 0 .60 99 11

Vijayap ura 0.7 53 9 0 .5 42 4 0 .2 9 51 0.6 3 83 0.4 66 7 0 .57 57 19

Yad agir* 0.7 03 8 0 .5 37 3 0 .2 1 78 0.4 2 53 0.3 21 5 0 .49 54 30

KA RN ATAK A 0.7 46 2 0 .6 15 1 0 .3 7 67 0.6 1 78 0.4 97 3 0 .61 11

Source: Karnataka Human Development Report -2015.


Economic Survey of Karnataka 2019-20 697

Source: Karnataka Human Development Report-2015

7
698 Economic Survey of Karnataka 2019-20

12.3.5 Engendering Human control of females even over their own


Development in Karnataka course of lives, let alone over others', that
Human Development sans gender has led to the developmental chasm of
sensitivity is certainly the paralysed state of inequalities between men and women.
development; for the loss of potential of This section makes an attempt to document
those not having got involved in the the gender development scenario in
development process would be grossly Karnataka through such equality /
ignored. The term 'gender' refers to the inequality terms as – women compared with
women / females, the men / males and the men on different dimensions, Gender
trans-genders / third-genders. Hence, the Inequality Index, the Trans-gender
development opportunities should be segment, etc.
equally spread across all the three. However,
the development process has all through (A) Gender-wise Population
witnessed the predominance of male It is a good sign that Karnataka is inching
participation thus conveniently discounting close towards the ideal state of equal
the women's contribution and completely numbers and ratio with not much
ignoring the trans-genders' issues. While significant Female Deprivation /
the gender discrimination has all along been Disadvantage Factor (FDF), in terms of
a global symptom, the developing nations gender-wise population. Tables from 12.87
including India are said to be witnessing the to 12.89 clearly exemplify this trend,
high prevalence of such a discrimination though the State is little behind when
against the women though India, the great compared to other major southern states,
civilization, has also always been known for with the number of missing women in the
its glorious culture of worshipping the State being considerably high and sex ratio
women. being relatively low. Further, it can be noted
Various socio-political and socio-cultural that the sex ratio in urban Karnataka is
factors prevailing at times – some inevitable lower than in the rural Karnataka, though
and some deliberate – have contributed to the trend is slowly changing. Karnataka sex
the less unwritten but widely and deeply ratio is better when compared to India but
practiced male-domination and female- worse when compared to southern states
subordination dictum of the societies the this indicates there is a gender disparity in
world over, resulting into little freedom and the state.

Table 12.87: Population in Karnataka & Major Southern states & India.

Population 2011
% Share o f
State FDF
Female
To tal Male Female

Karnataka 61095297 30966657 30128640 49.3 -0.028

Andhra
8458 0777 42 44214 6 4 21386 31 4 9.8 -0.0 07
P radesh

K erala 3340 6061 16 02741 2 1 73786 49 5 2.0 0.07 8

Tami l Nadu 7214 7030 36 13797 5 3 60090 55 4 9.9 -0.0 04

India 1210854977 623270258 587584719 48.5 -0.061

Source: Census of India 2011


Note: Female Deprivation/Disadvantage factor,(FDF)=(F-M)/F,
Kerala women outnumbering to men
Economic Survey of Karnataka 2019-20 699

Table 12.88: Missing Females in Karnataka – A Trend

Gender-wise Popul ation

Total Female Male


Missing
Year F DF* (%)
Femal es
No % No % No %

1991 4,49,77,201 100 2,20,25,284 48.97 2,29,51,917 51.03 9,26,633 -0.04

2001 5,28,50,562 100 2,59,51,644 49.10 2,68,98,918 50.90 9,47,274 -0.04

2011 6,10,95,297 100 3,01,28, 640 49.32 3,09,66,657 50.68 8,38,017 -0.03

Source: Census of India 1991, 2001, 2011


Note: Female Deprivation / Disadvantage Factor (FDF) = (F-M) / (F)

Table 12.89: Sex Ratio in Karnataka & major Southern States and India

Sex Ratio 2011


State
Total Rural Urban Diff

Karnataka 973 979 963 16

Andhra Pradesh 993 996 987 9


Kerala 1084 1078 1091 -13

Tamil Nadu 996 993 1000 -7

India 943 949 929 20

Source: Census of India, 2011

(B) Sex Ratio and Child Sex Ratio 12.3.6 Gender and Health
With reference to child sex ratio, though Life Expectancy (LE)
there is a slight improvement over the last
decade, the concern is that State has a long Life Expectancy is one of the key indicators
way to go in attaining the fair gender of health. On biological terms, women are
equality (Tables 12.90 and 12.91). The usually expected to have a greater LE than
State is relatively better when compared to men. The same is demonstrated in case of
Andhra Pradesh and Tamil Nadu, but worse both Karnataka and India (Table 12.92).
when compared to Kerala. Hence, necessary The LE for both men and women has been
steps must be taken to arrest this negative increasing over the years, which is a good
trend. Moreover, much against the general sign of improved health conditions.
belief that elite and educated urban people Further, normally the difference between
are indifferent to the male child preference, the LE-Female and LE-Male is expected to
the State's rural-urban child sex ratio be widened favoring the LE of females. The
figures and the trend present such a picture situation in the State of Kerala is normally
to give sufficient scope to hypothesize the considered to be an ideal one which has an
existence of strong male preference and LE-Female-Male-Gap of 5.3 years during
female negligence attitude among the urban 2013-17 (Male:72.5 and Female:77.8).
people. Such a state has almost been achieved in
the case of Karnataka with LE-Female-
Male-Gap being 3.1 years during 2013-17.
700 Economic Survey of Karnataka 2019-20

Table 12.90: Child Sex Ratio - Southern States and India (1961 to 2011)
Child Sex Ratio – Census Year-wise
State Dip from Sex Ratio
1961 1971 1981 1991 2001 2011 1961 to change 2001
2011 to 2011
Karnataka 987 978 975 960 946 948 39 2

Andhra Pradesh 1002 990 992 975 961 939 63 -22

Kerala 972 976 970 958 960 964 8 4

TamilNadu 985 974 967 948 942 943 42 1

India 976 964 962 945 927 919 57 -8

Source: Census of India, 2011

Table 12.91: Child Sex Ratio (0-6 years) in Karnataka and India – Residential Area-
wise 1991-2011
Karnataka India
Year
Total Rural Urban Diff Total Rural Urban Diff
1991 960 963 951 12 945 948 935 13
2001 946 949 940 9 927 934 906 28
2011 948 950 946 4 919 923 905 18
Source: Census of India, 1991, 2001, 2011

Table 12.92 : Life Expectancy in Karnataka, 2009-13 to 2013-17

Total Male Female


Years
Difference
Karnataka India Karnataka India Karnataka India
in years

2009-13 68.5 67.5 1.0 66.4 65.8 70.8 69.3

2010-14 68.8 67.9 0.9 66.9 66.4 70.8 69.6

2011-15 69.0 68.3 0.7 67.2 66.9 70.9 70.0

2012-16 69.1 68.7 0.9 67.6 67.4 70.7 70.2

2013-17 69.2 69.0 0.2 67.7 67.8 70.8 70.4

Source: Office of the Registrar General of India, Various Years, Abridged Life Tables
Economic Survey of Karnataka 2019-20 701

12.3.7. Gender and Literacy & Education the levels of education is a matter of genuine
concern at both India and Karnataka Levels
(A) Literacy
(Table 12.94). Though Karnataka fares
The gender disparity with respect to literacy little better in comparison with Andhra
in the State has been gradually decreasing Pradesh, Kerala and Telangana, it is way
over the decades reflecting a healthy sign behind when compared to Tamil Nadu.
(Table 12.93). However, the still prevailing
12.3.8. Gender and Employment
difference of 16.46% and the female
deprivation / disadvantage factor of -0.25 Employment is an effective means of
are the matters of concern. economic empowerment and gender
equality. Against gender parity in
B) Educational Attainment employment for Karnataka, Tables from
The gender-wise educational attainment, 12.95 to 12.98 present a mixed trend of
according to the All India Survey on Higher both gradual but very slow movement
Education 2018-19, shows that the female towards gender equality and also prevailing
deprivation / disadvantage factor across all glaring female deprivation /

Table 12.93: Gender-wise Literacy in Karnataka (In percentages)


Details 1971 1981 1991 2001 2011
Male 41.62 48.81 67.26 76.29 82.47
Female 20.97 27.71 44.34 57.45 66.01
Difference (M-F) 20.65 21.10 22.92 18.84 16.46
FDF -0.98 -0.76 -0.52 -0.33 -0.25
Source: Census of various years

Table 12.94 : Gender Distribution across Levels of Education in India and major
southern States (2018-19)
Ph. D Post Graduate Under Graduate Diploma
State
M F M F M F M F

Andhra
3054 1927 112753 98539 741636 625754 97733 64378
Pradesh

Karnataka 8070 5230 93614 118327 768616 789369 113795 73333

Kerala 2503 4183 37756 88754 375536 505771 37153 29567

Tamil Nadu 13699 12121 169812 274576 1206721 1287997 314888 62697

Telangana 2191 1239 83964 104787 536108 565609 71055 48142

All India 95043 74127 1761330 2281192 15203346 14625729 1803208 896187

Source: AISHE (2018-19)

Table 12.95: Work Participation rate in Karnataka & India


W ork Participation Rate
State/Country 2001 2011
Total Male Fem ale Total M ale Fem ale
Karnatak a 44 .5 56 .6 32 .0 45 .6 59 .0 31.9
India 39 .1 51 .7 25 .6 39 .8 53 .3 25.5
Source: Census of India 2001, 2011.
702 Economic Survey of Karnataka 2019-20

Table 12.96: Gender-wise Employment in the organized sector in Karnataka


2010-11 to 2017-18 (In '000s)

Public Sector Private Sector Total


Year
Total Women Men Total Women Men Total Women Men

1061.4 284.4 777.0 1233.1 471.2 761.9 2294.5 755.5 1539.0


2010-11
(100) (26.6) (73.4) (100) (38.2) (61.8) (100) (32.9) (67.1)

1045.4 287.1 758.3 1340.2 485.3 854.9 2385.6 772.4 1613.2


2014-15
(100) (27.5) (72.5) (100) (36.2) (63.8) 100 (32.4) (67.6)

1042.4 286.9 755.5 1344.5 488.3 856.2 2387.1 775.3 1611.8


2015-16
(100) (27.5) (72.5) (100) (36.3) (63.7) (100) (32.5) (67.5)

1040.1 287.0 753.0 1352.1 490.9 861.1 2392.2 778.0 1614.1


2016-17
(100) (27.6) (72.4) (100) (36.3) (63.7) (100) (32.5) (67.5)

1036.5 284.3 752.2 1348.3 491.0 857.3 2384.8 775.3 1609.5


2017-18
(100) (27.4) (72.5) (100) (36.4) (63.5) (100) (32.5) (67.4)
Source: Directorate of Employment and Training, Publication, Training and Coordination Division,
Directorate of Economics and Statistics, Government of Karnataka, Men and Women in Karnataka 2010-11
to 2017-18.
Note: Figures in brackets are percentages.

Table 12.97: Judges in Karnataka – Gender-wise


Year Women Men Total Women (%)
2010-11 172 612 784 21.94
2014-15 209 615 824 25.36
2015-16 208 602 810 25.68
2016-17 279 701 980 28.46
2017-18 275 684 959 28.67
Source: Directorate of Economics & Statistics, Men and women in Karnataka – 2010-11 to 2017-18.

Table 12.98: Gender composition of Bureaucrats in Karnataka


IAS IPS IFS
Services/
Year Women Women Women
Women Men Women Men Women Men
(%) (%) (%)
2014 44 171 20.47 10 134 6.94 17 132 11.41
2015 53 176 23.14 13 130 9.09 17 126 11.89
2016 59 166 26.22 14 127 9.93 17 129 11.64
2017 64 156 29.09 19 133 12.50 17 119 12.50
2018 74 174 29.83 26 149 14.85 17 104 14.04
Source: DPAR Services, Vidhana Soudha, Bengaluru as on 31.05.2017. Directorate of Economics &
Statistics, Men and women in Karnataka 2017-18.
Economic Survey of Karnataka 2019-20 703

disadvantageous situation. This trend is The currently rural married women (78%)
visible more glaringly even in the high profile are relatively way behind the currently
employment categories of judges and urban married women (83.5%) with respect
bureaucrats. Concerted efforts should, to participation rate in household decision
therefore, be effectively carried out to ensure making, which is a matter of concern. Table
the removal of gender discrimination at all 12.99 gives the picture of participation by
levels. currently married women in the house hold
decisions.
12.3.9. Gender and Decision Making
There is a general belief that women should 12.3.10. Gender and Political
not encouraged to participate even in the Representation
household decision making. However, much Gender Parity in political sphere ensures the
against such belief, the National Family adoption and effective implementation of
Health Surveys (NFHS) data reveals that policies and programs to achieve gender
there has been a significant increase in the equality in all the spheres. The performance
participation rate of women in the of the State is impressive in respect of
household decisions. It has increased to women's representation in Panchayat Raj
80.4 per cent among currently married Institutions (PRIs), which has crossed the
women in 2015-16 (NFHS-4) as compared to mandatory half-way (50%) mark in all the
68.6 per cent of then married women three tiers of PRIs (Table 12.100).
affirming it in 2005-06 (NFHS-3).

Table 12.99: Currently Married Women who usually participate in Household


Decisions (Percent)
NFHS-4 NFHS-3
Major Southern States (2015-16) (2005-06)

Urban Rural Total Total

Karnataka 83.5 78.0 80.4 68.6

Andhra Pradesh 78.8 80.4 79.9 -

Tamil Nadu 83.3 84.7 84.0 87.4

Source: NFHS-4 and 3

Table 12.100: Women's Representation Status in all the three-tier Panchayat Raj
Institutions (PRIs) of Karnataka
Grama Panchayat Taluk Panchayat Zilla Panchayat

Total Number Total Total Number Total Total Number


Year Total of Women of Women of Women
Number Number
Number of Members Members Members
of of
Members
Members Members No.
No. % No. % %

2000 78349 35064 44.75 3255 1375 42.20 890 339 38.10

2005 91402 39318 43.00 3683 1519 41.20 1005 373 37.10

2010 90643 39327 43.39 3659 2018 55.15 1013 539 53.21

2015 & 2016 94344 48252 51.14 3903 1998 51.19 1083 548 50.60

Source: SEC cited in the Monograph on status of women in Karnataka, 2000. State Election Commission
(SEC), Govt. of Karnataka, cited in Men and women in Karnataka, 2005, 2010 , 2014-15 and Karnataka
state election commission – Grama Panchayat elections(2015), Taluk and Zilla Panchayat elections (2016).
704 Economic Survey of Karnataka 2019-20

12.3.11. Gender Inequality Index GII in Table 12.102 shows that Districts Udupi,
Karnataka Dakshina Kannada and Kodagu are top in
the list with less inequality and districts with
GII was computed with available
high GII are Kalaguragi, Ballari and
information. Table 12.101 shows that at
Bagalkote. Bengaluru urban is ranked at
the district level gender inequality ranged
9thplace with GII being 0.377 reflecting a
from 0.21 to 0.50 i.e., losses due to gender
38% decrease in achievement across the
inequality varies from 21% to 50%. The
three dimensions due to gender inequality.
Table 12.101: Basic data for Gender Inequality Index (GII) construction at District
level
Se c & H ig h e r
P oli ti c a l E d uc a ti on
AF R LF PR ( 15 + )
P a rt ic i pa t io n at ta i n m en t b y
Di st ri c ts M MR
(1 5- 1 9) ad ul ts (25 + )

Fe m a le M al e Fe m a le M al e Fe m a le M a le

Ba ga lko te 163 83. 0 0. 49 0. 81 0 .42 0. 58 0 .21 0. 50


Ben ga lu ru (U ) 73 36. 0 0. 36 0. 82 0 .43 0. 57 0 .69 0. 82
Ben ga lu ru (R ) 120 19. 0 0. 43 0. 84 0 .45 0. 55 0 .43 0. 75
Bela g av i 155 65. 0 0. 46 0. 82 0 .44 0. 56 0 .31 0. 50
Ba lla ri 227 57. 0 0. 50 0. 83 0 .39 0. 61 0 .15 0. 41
Bida r 134 39. 0 0. 46 0. 79 0 .42 0. 58 0 .24 0. 52
V ija ya pu ra 135 50. 0 0. 50 0. 79 0 .43 0. 57 0 .24 0. 46
Ch a m a ra ja na g ar 142 52. 0 0. 44 0. 85 0 .42 0. 58 0 .18 0. 33
Ch ikka m a g alu r u 94 40. 0 0. 50 0. 84 0 .49 0. 51 0 .44 0. 66
Ch ikka ba lla pu ra 137 40. 0 0. 58 0. 83 0 .42 0. 58 0 .33 0. 38
Ch itra du rg a 170 31. 0 0. 59 0. 84 0 .39 0. 61 0 .24 0. 42
D a ksh ina
K a nn a da 89 7 .0 0. 48 0. 80 0 .45 0. 55 0 .47 0. 57

D a va na ge re 163 29. 0 0. 44 0. 83 0 .44 0. 56 0 .30 0. 41


D ha r wa d 157 39. 0 0. 39 0. 81 0 .46 0. 54 0 .41 0. 64
G a da g 215 55. 0 0. 51 0. 82 0 .39 0. 61 0 .21 0. 49
K a la bu ra gi 182 86. 0 0. 51 0. 80 0 .44 0. 56 0 .14 0. 39
H a ssa n 98 27. 0 0. 53 0. 85 0 .46 0. 55 0 .27 0. 45
H a veri 163 31. 0 0. 45 0. 84 0 .45 0. 55 0 .12 0. 35

K o da gu 138 11. 0 0. 53 0. 85 0 .49 0. 51 0 .67 0. 80

K o lar 140 51. 0 0. 51 0. 82 0 .43 0. 57 0 .37 0. 50

K o ppa l 236 43. 0 0. 58 0. 83 0 .41 0. 59 0 .16 0. 42


M a nd ya 111 35. 0 0. 46 0. 85 0 .44 0. 56 0 .33 0. 47
M ys ur u 155 48. 0 0. 38 0. 83 0 .42 0. 58 0 .39 0. 60
R a ich ur 244 54. 0 0. 58 0. 83 0 .40 0. 60 0 .19 0. 39
R a m a n ag a ra 114 37. 0 0. 49 0. 84 0 .43 0. 57 0 .30 0. 45
Sh iva m o gg a 106 24. 0 0. 41 0. 83 0 .49 0. 51 0 .28 0. 45
Tu m ku r 124 44. 0 0. 54 0. 84 0 .44 0. 56 0 .26 0. 46
U du pi 50 6 .0 0. 39 0. 78 0 .45 0. 55 0 .35 0. 55
U tta r a K a nn a da 99 26. 0 0. 38 0. 82 0 .48 0. 52 0 .33 0. 42
Ya dg ir 186 66. 0 0. 59 0. 83 0 .42 0. 58 0 .35 0. 54

Source: Karnataka Human Development Report-2015


Economic Survey of Karnataka 2019-20 705

Table 12.102 : Gender Inequality Index (2012)


Districts GII Rank
Bagalkote 0.4948 28
Bengaluru Urban 0.3770 9
Bengaluru Rural 0.3630 5
Belagavi 0.4642 24
Ballari 0.5018 29
Bidar 0.4286 17
Vijayapura 0.4346 18
Chamarajanagara 0.4547 21
Chikkamagaluru 0.3757 8
Chikkaballapura 0.3925 10
Chitradurga 0.4106 14
Dakshina Kannada 0.2354 2

Davanagere 0.4068 13

Dharwad 0.4363 19

Gadag 0.4889 27
Kalaburagi 0.5037 30
Hassan 0.3546 4
Haveri 0.4389 20
Kodagu 0.2958 3
Kolar 0.4255 16

Koppal 0.4698 25
Mandya 0.3939 11
Mysuru 0.4587 22
Raichur 0.4803 26
Ramanagara 0.3960 12
Shivamogga 0.3675 7
Tumkur 0.4115 15
Udupi 0.2077 1
Uttara Kannada 0.3653 6
Yadgir 0.4600 23
Source: Karnataka Human Development Report-2015.
706 Economic Survey of Karnataka 2019-20

Source: Karnataka Human Development Report-2015.

17
Economic Survey of Karnataka 2019-20 707

12.3.12 The Third Gender Community transgender cell has been set up at State,
The Third Gender People or commonly District and Taluka level for the effective
referred to as the Trans-gender People are implementation of the Policy. However, still
the most neglected section of the society more concrete and concerted efforts are
across India. Even their exact number is also needed to ensure their development.
not properly estimated. Census, 2011 has 12.3.13 Conclusion
attempted to capture their number across
States, the number of Trans-gender within The status of human development in
the age group of six years (Children), and Karnataka is witnessing an improving trend
transgender belonging to SC and ST over the years. However, the disparities
community. Trans-genders' number and across different dimensions certainly need
Literacy Status is provided in the Table to be taken care.
12.103. The Karnataka Government has The engendering scenario in Karnataka is
released the "Karnataka State also a mixed bag with impressive
Transgenders-Policy 2017" in December performance in some areas but having
2017 to provide transgender people with relatively gloomy performance in most of the
issues such as fear, shame, gender areas which need immediate attention.
discrimination and social discrimination The issues of the third gender people are
and provide infrastructure, health, also of genuine concern and hence should
education, housing and livelihood in be given utmost attention to ensure their
partnership with various department. The development.

Table 12.103: Trans-genders in Karnataka and India – 2011 census


Number of transgender persons
Location
Trans-genders Child (0-6) SC ST Literacy
Karnataka 20,266 1,771 3,275 1,324 58.82
India 4,87,803 54,854 78,811 33,293 56.07

Source: http://www.census2011.co.in/transgender.php
708 Economic Survey of Karnataka 2019-20
GENDER AND SOCIAL EQUITY CHAPTER 13

13.1 WOMEN AND CHILD DEVELOPMENT to the extent of Rs.8168.61 crore and there
has been internal loan circulation to the
13.1.1 Women Population. tune of Rs.7141.43 crore and used for
Women comprise nearly half the population taking up various Income Generating
in Karnataka. According to the recent 2011 Activities.
Census, women comprise 49.31% of the Several programmes like revolving fund,
total state population the pattern being financial incentives, providing marketing
more or less same in the southern states of facilities for the products produced by SHGs
India. However, the percentage of SC women etc. are taken up by the department.
to total population is more in Tamil Nadu
(10.03%) compared to Karnataka (8.53%) Table.13.2 and 13.3 shows that progress
and All India (8.08%). But percentage of ST and budgetary allocations for various
women to total population is more in Andhra activities under stree Shakthi during
Pradesh (3.49%) compared to other 2019-20.
southern states. Table 13.1 gives
r Rs. 1079.00 lakhs for Strengthening of
information on district wise women
SHGs, of which an expenditure of
population and percentage to total
Rs.347.80 lakhs was incurred as on
population.
December-2019.
13.1.2 Women Development r An amount of Rs.20.00 lakhs is
Programmes: allocated for the continuation pro-
It is in the recent years that the issue of gramme of the construction of Mysore
women's empowerment as a development Divisional Level Training centre of
objective has moved center stage. With this which up to the month of December-
objective in mind, the Department of Women 2019 Rs.15.00 lakhs has been released
and Child Development, Government of by the Government.
Karnataka, has designed the following B. Hostel for Girls
schemes that aim, not only on empowering
women, but also for their well-being in To encourage girls' education in rural areas
various spheres. and to reduce school drop outs, free hostel
facility is provided for girl students. At
A. StreeShakthi : present 20 pre matric and 21 post matric- a
total of 41 girls' hostels are functioning
Self Help Group is a good medium to
through NGOs which are funded by the
congregate women. Streeshakthi pro-
gramme was launched in 2000-01 and is Department (Table 13.4).
implemented throughout the State. Each C. Special Gram Sabhas
group comprises of about 15 to 20 women
members who come from below the poverty General Grama Sabhas are being conducted
line families, women belonging to families in all the Grama Panchayats of the State.
that are landless or agricultural labourers, Government is facilitating holding of Special
and largely SC/ST women. At present there Grama Sabhas for women to get their
are 1.65 lakh self help groups, comprising entitlements and also to select suitable
25.81 lakh women members. women beneficiaries under various schemes
of development departments. During
Upto December-2019 the groups had saved 2019-20 total 1764 Special Grama Sabhas
Rs. 6037.28 crore since inception. Bank have been conducted upto the end of
loans have been availed by 145531 groups December-2019.

709
710 Economic Survey of Karnataka 2019-20

Table 13.1: District-wise Women Population in Karnataka

Percentage of
Sl. As per 2001 As per 2011
Name of the District women population
No. census census
(Census 2011)
1 Bangalore (Urban) 3110525 4598890 15.26
2 Bangalore (Rural) 413479 481751 1.60
3 Chitradurga 741675 818613 2.72
4 Kolar 685385 760005 2.52
5 Shimoga 819186 875338 2.91
6 Tumkur 1270910 1328386 4.41
7 Davangere 873247 959097 3.18
8 Ramanagar 505852 534628 1.77
9 Chikkaballapur 264491 618667 2.05
10 Mysore 1296357 1489527 4.94
11 Chikkamagalur 565994 571339 1.90
12 Dakshina Kannada 959296 1054935 3.50
13 Hassan 862583 892754 2.96
14 Kodagu 273730 279911 0.93
15 Mandya 875671 900684 2.99
16 Chamarajanagar 475522 508560 1.69
17 Udupi 590012 615230 2.04
18 Belgaum 2064415 2356598 7.82
19 Bijapur 880494 1066309 3.54
20 Dharwad 781049 909817 3.02
21 Karwar 666768 710913 2.36
22 Bagalkote 817645 939641 3.12
23 Gadag 478302 527423 1.75
24 Haveri 698647 778540 2.58
25 Gulbarga 1064300 1264571 4.20
26 Bellary 997426 1215641 4.03
27 Bidar 731351 832635 2.76
28 Raichur 827922 964301 3.20
29 Koppal 592777 689994 2.29
30 Yadgiri 473833 583942 1.94
Total 25658844 30128640 100
Economic Survey of Karnataka 2019-20 711

Table 13.2: Progress under StreeShakthi Scheme (Physical & Financial Achievement)
Expenditure Achievement
Years
(Rs.in lakhs) (No.)

2015-2016 6332.90 126658 groups

2016-2017 7957.59 144295 groups

2017-2018 7320.11 128123 groups

2018-2019 1224.64 10051 groups

2019-2020 (upto Dec-2019) 347.80 6057 groups

Table 13.3 : Progress under Sthree Shakthi Programme

Achive
Achive Achive Achive Achi ve ment
Target ment T arget ment Target ment Target men t T arget Upto
Programmes/
Unit
scheme Dec-19

2015-16 2016-17 2017-18 2018-19 2019-20

No. of Groups
wit h
take n loans from 11721 1645 9961 10445 15265 11740 15265 857 8868 1359
Nos.
Banks

Rs. in
Loan Amount - 153.22 - 384.55 - 546.21 - 376.71 - 103.63
Crores

126658 126658 117564 117564 130000 128123 10152 10051 7729 6057
Revolving Fund Self Grou ps Groups Groups Groups Groups Groups Groups Groups Groups Groups
rele ased by Help Rs. Rs Rs. Rs Rs Rs Rs. Rs. Rs. Rs.
Government Groups 6332.90 6332.90 5878.20 5878.20 6500.00 7320.11 1470.00 1224.64 1079.00 347.80
Lakhs Lakhs Lakhs Lakhs Lakhs Lakhs lakhs Lakhs lakhs Lakhs

Table 13.4 : Details of Hostel for Girls


Year Expenditure (Rs.lakhs) No of Hostels

2015- 16 408.61 44

2016- 17 368.86 44

2017- 18 407.77 41

2018- 19 474.68 41

2019-20 (upto December-2019) 281.50 41

D. Working Women's Hostel- State 13.1.3 Women Component Plans


The main aim of the scheme is to provide a) Gender based Budget
safe and suitable accommodation facilities
for working women. Under this scheme a Karnataka has taken major steps towards
grant of Rs. 25.00 lakhs is given to promoting gender equality and gender
NGOs who are willing to construct the based budgeting is yet another development
hostel. As of now, one hostel has been in this direction. Making a beginning in
constructed by J.S.S. Mahavidyapeetha at 2006-07, gender based budgeting helps to
Chamarajanagar. prioritize and orient public expenditure to
712 Economic Survey of Karnataka 2019-20

reflect the concerns of women. Sub- category 'B' beneficiary oriented schemes are
sequently, the Finance Department also 333. A budget of Rs.46887.63 crores has
established a Gender Budget Cell (GBC) to been allotted during 2019-20, out of which
identify the quantum of resource allocation Rs.16175.00 crores had been reserved for
and expenditure for women and proper women comprises of minimum Rs.9155.87
translation of policy commitments. crores has been spent upto the end of
Karnataka is one of the 3 States in India that December-2019.
has implemented gender based budgeting.
13.1.4 Protection of Women from
The GBC has been regularly bringing out a Domestic Violence:
Gender Budget document reflecting
allocation of funds under various schemes With the objective of controlling violence
cutting across different departments. The against women, achieving gender equality
schemes are presented in two parts; and saving women from oppression
Category-A and Category-B. The Karnataka is implementing the protection of
classification is broadly on the lines adopted women from Domestic Violence Act, from the
by GOI in the Expenditure Budget Vol-II. year 2007. In order to provide shelter and
The categorization of schemes is based on; counseling to victims of domestic violence,
116 service providers have been notified. In
r Category–A which presents women addition to this, 31 Swadhar Centers, 21
specific budget provisions in which Short Stay Homes and 185 Santhwana
100% budget provisions are meant for Centers have been notified as Shelter Homes
women. in the State. Free legal aid is provided to the
r Category-B which present women– victims. One Protection Officer is notified in
specific budget provisions wherein at each taluk. Under this scheme, 2852 cases
least 30% provisions are meant for have been registered and Rs.266.60 lakhs
women. Details of allocation are given expenditure is incurred upto the end of
below. (Table: 13.5) December-2019.
There are 59 schemes comes under Gender 13.1.5. Santwana
Budget 'A' category, a budget of Rs.5222.46
r Santwana is a scheme aimed at
crores has been allocated during 2019-20,
rehabilitation of women who have been
out of which Rs. 3386.59 crores has been
subjected to atrocities like rape,
spent up to the end of December-2019. In

Table: 13.5 Allocation under Gender based Budget

Category A

Year No. of Depts Allocation (Rs. lakhs)


No. of schemes
Plan Non-Plan

2015-16 36 54 469419 92846

2016-17 36 57 400455 108652

2017-18 32 58 590183 -

2018-19 29 56 604941 545107

2019-20 29 59 522246 -
Economic Survey of Karnataka 2019-20 713

domestic violence, dowry, sexual police and legal aid, counselling are
harassment and so on. In addition to provided under one roof to women and
provision of legal assistance, support is children who are victims of various
also provided in the form of financial aid, atrocities. These centres are set up at
temporary shelter and protection and district hospitals in each district. In
training/education to equip them with Bangalore, centres are set up at Bowring
skills needed to get back into the normal and Lady Curzon Hospitals, K.C. General
course of life. Hospital and Vani Vilas Hospital, KR. Puram
r At present 196 Santwana centers are and Jayanagar General Hospital. Totally 33
functioning through NGOs. During Special Treatment Units are functioning.
2019-20 budget of Rs. 1380.00 lakhs These units function round the clock and a
has been earmarked out of which Rs. toll free women's Helpline 181 is provided.
546.75lakhs has been released to the Gelathi Taluk Special Treatment Unit
districts for the implementation of the
scheme and of which an amount of As per the 2017-18 Budget Speech 145
Rs.521.13 lakhs has been spent upto taluk Gelathi Taluk Special Treatment Unit
the end of December 2019. Table 13.6. has been established in 145 Taluk
Progress under Santwana Scheme. Hospitals. A proposal has been sent to
Government to Creation of Post in this
13.1.6 “Gelathi” Special Treatment Units Sector.
Special treatment units have been set up As per Government Order No: mamae
where in assistance for medical treatment,

Table 13.6 : Progress under Santwana Scheme

Year Expenditure Physical Achievement


(Rs.lakhs) (No.of Centres)

2015-16 550.00 187

2016-17 1162.16 186

2017-18 777.69 196

2018-19 726.08 196

2019-20 (UptoDecember-2019) 521.13 196

Table 13.7 : Details of Special Treatment Units for Women and Children (Gelathi)

Year Expenditure (Rs.lakhs) No of Centres

2015-16 150.00 30

2016-17 186.90 33

2017-18 196.98 33

2018-19 223.24 33

2019-20(uptoDec-2019) 88.00 33
714 Economic Survey of Karnataka 2019-20

/03/mamaa/2018 (Part-1),dated: 13.1.10 Child Population in Karnataka


02.11.2019 the scheme has been stopped.
Though the child population of Karnataka is
13.1.7 One Stop Centre (Sakhi): less than the all India level, when compared
The Ministry of Women and Child to other southern states of India, it is on the
Development has intended to establish One higher side as represented in the Table 13.8
Stop Centre (Sakhi) to support women & Figure13.1.
affected by violence.These centers will 13.1.11 Child Development Programmes:
provide counseling, medical assistance,
legal and Police assistance under one roof.In In Karnataka children (0-6 years) constitute
the1st phase one OSC shall be established 11.72% of the total population (as per 2011
in every state on pilot basis. Based on this Census). The Department of Women and
Government of India has sanctioned grants Child Development is focusing on the
to establish OSC in Karnataka at Udupi implementation of schemes for the overall
district construction of building is development of the children.
completed & functioning in own building. A. Bhagyalakshmi
For remaining 29 districts admin approval
has been given to establish OSC’s and Bhagyalakshmi is a flaghip programme
construction of buildings are in progress. implemented by Government of Karnataka
aimed at improving the sex ratio in the State
13.1.8 Swadhar Gruha-A Rehabilitation by encouraging the birth of girl child in the
Scheme for Women in difficult BPL families. The programme also aims to
circumstances:2016-17(Central Share: eradicate social evils such as child labour,
State Share 60:40). female foeticide, child marriage and child
During 2016-17 Central Government has trafficking. Two girl children born in a BPL
merged Swadhar centres & Short stay family are eligible to enroll under the
homes & revise the schemes has Swadhar scheme.
Gruha. The main objective of this scheme is A fixed amount is deposited with the
to empower women who are in difficult financial partner namely, Life Insurance
circumstances by providing them food, Corporation of India and the maturity
shelter, clothing, training and education.It amount is paid to the girl child on
is implemented through non-governmental completion of 18 years of age only after
Organizations.The Government of India fulfilling the conditions laid down under the
grant is sanctioned to run Shelter Homes, scheme.
Counselling Centre, Training Centre and
Medical Centre.At present 53 Swadhar The period of the 11th Five Year Plan saw an
homes are functioning in the State. expenditure of Rs.1686.85 crores against an
allocation of Rs.1612.38 crores including
13.1.9 Sthairya Scheme additional allocation with benefits accruing
to 11,07,788 girl children. Details of
This is a scheme started at the State Level to
achievements under the Bhagyalakshmi
provide financial relief to women who are
victims of atrocities. Under this scheme an scheme are given in Table 13.9.
amount of Rs.25000/- will be provided During 2019-20 an amount of Rs. 309.42
within 24 hours of the complaint being crore has been earmarked. Due to
lodged and financial assistance will be administrative reason budget has not been
provided up to Rs.2.00 lakhs in case of released till December-2019. Once the
medical emergency.Rs. 1.00 lakh will be budget released, bonds will be distributed to
provided as death relief to the family in case eligible beneficiaries (Table 13.10).
of death of the victim as a result of atrocities
or acid attack. A proposal has been sent for “Child Tracking System” software is being
merger of the scheme with D.L.S.A. (District developed with assistance from NIC to track
Legal Services Authority). Bhagyalakshmi beneficiaries up to the age
of 18 years. All information such as health
Economic Survey of Karnataka 2019-20 715

Table 13.8:-District-Wise Child Population in Karnataka 2001-2011 (0-6 years)


As per 2001 census As per 2011 census
Sl.No. Name of the District
Male Female Male Female
1 Bangalore (Urban) 397648 374892 541656 511181
2 Bangalore (Rural) 116172 109446 54908 52154
3 Ramanagar 0 0 54963 52878
4 Chitradurga 102512 97023 94629 89651
5 Davanagere 123496 116779 111793 105938
6 Kolar 171728 164741 86845 83578
7 Chikballapur 0 0 67734 64552
8 Shimoga 106423 101740 93221 89530
9 Tumkur 158079 150083 135671 130071
10 Chikkamagalur 70779 67865 53493 51835
11 Dakshina Kannada 116854 111206 106985 101312
12 Udupi 58509 56072 52689 50471
13 Hassan 101971 97694 83971 81666
14 Kodagu 35192 34382 27676 27057
15 Mandya 106058 99089 89063 83622
16 Mysore 164934 158621 155807 149754
17 Chamarajanagar 58511 56426 51529 49119
18 Belgaum 324816 299215 323761 302508
19 Vijapura 148750 138081 164856 153550
20 Bagalkote 136564 128308 140551 131357
21 Dharwad 112335 105927 113127 106815
22 Gadag 70627 67208 68025 64417
23 Haveri 104119 99593 100369 94948
24 Uttar Kannada 89149 84354 76794 73321
25 Bellary 163892 155194 175543 168609
26 Bidar 124401 117116 115550 108892
27 Kalaburgy 276843 259611 188076 177296
28 Yadgir 0 0 97522 92757
29 Raichur 144097 138971 145468 138265
30 Koppal 106499 101505 103016 98638
Total 3690958 3491142 3675291 3485742

Source: Men and Women in Karnataka 2016-17,Directorate of Economics and Statistics.


Note: Ramanagar, Chikkaballapur and Yadgiri are new districts.
716 Economic Survey of Karnataka 2019-20

Figure 13.1: Percentage of Child Population in Southern States and All India

Table 13.9: Progress of Bhagyalakshmi Scheme through the 11th Five Year Plan

Financial Percentage of
Physical (Rs.In crore) achievement
year
Target Achievement Target Achievement Physical Financial

2007-08 150000 123789 150.00 132.43 82.53 88.29

2008-09 200000 299764 266.65 316.65 148.91 118.75

2009-10 200000 144999 229.89 229.89 72.50 100.00

2010-11 185493 284763 558.00 521.98 153.51 93.54

2011-12 211316 254473 407.84 485.90 120.42 119.13


Total 946809 1107788 1612.38 1686.85 117.00 104.61

Table 13.10: Progress of Bhagyalakshmi Scheme through the 12th Five Year Plan
Financial Percentage
Physical
Year (Rs.In crore) ofachievement
Target Achievement Target Achievement Physical Financial
2012-13 242575 401370 755.40 755.39 165.46 100.00
2013-14 205403 187982 396.43 359.47 91.52 90.68
2014-15 176223 171892 340.11 339.86 97.54 99.93
2015-16 245258 244573 473.35 467.33 99.72 98.73
2016-17 172879 164611 338.79 338.79 95.22 100.00
Total 1042338 1170428 2304.08 2260.84 112.29 98.12
Economic Survey of Karnataka 2019-20 717

Progress of Bhagya lakshmi Scheme 2017-18 to 2019-20 (upto Dec-2019)


Financial Percentage of
physical
(Rs.In crore) achievement
Year
Target Achievement Target Achievement Physical Financial

2017-18** 166468 154354 321.28 301.90 92.72 93.97

2018-19 160326 150552 309.43 294.43 93.90 95.15


2019-20
160319 -- 309.42 -- -- --
(uptoDec-19)

status, education and migration pertaining protein to 0-6 years children, 600 calories of
to the beneficiaries are tracked through the energy and 18-20 gms of protein to pregnant
software. As per government order dated:24- women/lactating mothers/adolescents
02-2018, eligibility criteria to enroll under girls, 800 calories of energy and 20-25 gms
the scheme is extended upto two years after of protein to severely malnourished children
the birth of the child. as a supplement to their normal intake, as
envisaged in the schematic guidelines.
B. Prohibition of Child Marriage:- Supplementary nutrition is given for 300
Child Marriage is a social evil. To eradicate days in a year.
child marriage from the society, to create II) Ksheera Bhagya:-
awareness among the general public and to
stop child marriages, Child Marriage Under Ksheera Bhagya Scheme, Anganwadi
Prohibition Cell has been established in the children in the State are being given (in the
department of Women and Child form of 15 gm milk powder converted to 150
Development. During the year 2019-20 ml creamy milk and 10 gms sugar since July
(from April-2019 to December-2019) 1303 2017. 2 days a week which has now been
child marriages has been prevented in the enhanced to 5 days, Upto December-2019,
State. there are Rs.35.26 lakhs of beneficiaries
benefitted from this scheme.
C. Integrated Child Development
Services (ICDS): III) Srushti Scheme:
ICDS is a centrally sponsored scheme, All the children in anganwadi centre
which provides a package of six services i.e., between 3 to 6 years are provided eggs 2
supplementary nutrition, immunization, days a week from June 2017. Up to
health check-up, referral services, nutrition December-2019, there are 13.91 lakhs of
and health education for mothers and non- beneficiaries benefited from this scheme.
formal pre-school education for children IV) Supplmentary nutrition for Severely
between the ages of 3-6 years. This scheme
Malnourished Children:
is being implemented since 1975. Under this
scheme, 62580 AWCs and 3331 mini AWCs Under this scheme 6 months to 3 years sam
were functioning. children are given egg for 3 days in a week.
For 3 to 6 years Sam children are given egg
I) Supplementary Nutrition Programme: for 5 days in a week. Those children who are
Supplimentary Nutrition programme: not taking egg, for them milk will be
GOI is reimbursing 50% of the expenditure provided for 6 days (Table 13.11).
incurred by the state government for V) Mathru Poorna Scheme:
SNP. Supplementary nutrition is provided
to the beneficiaries under the ICDS From October 2nd 2017, Mathru Poorna
programme with revised feeding norms of Scheme has been implemented in all
500 calories of energy and 12-15 gms of districts of the State. In this programme has
718 Economic Survey of Karnataka 2019-20

a target of 9.48 lakhs beneficiaries. In this from GOK. Total Rs.243.76 lakhs has been
programme pregnant and nursing mother reallocated to districts, for 1st and 2nd
are provided hot meals in Anganwadi Centre quarters. For Non- nutrition component,
at cost of Rs.21/-. Rs. 11.50/- is shared by 60% share Rs.44.88 lakhs has been
State Government and Rs. 9.50/- is released by GOI and 40% Rs.29.92 from
incurred under Centrally sponsored ICDS GOK, total Rs.74.80 lakhs released and
programmes. Upto December-2019, there reallocated to all districts. Due to less
are 7.48 lakhs of beneficiaries benefited beneficiaries in the districts, the allocated
from this scheme. amount was not completely utilized. In this
context, F.D. has reverted Rs.700.00 lakhs
Health and Nutrition Education uncluding unspent balance from the
All Anganwadi Centres are provided with a districts and fixed allocation amount of
Hand book and Flip Chart on Health and Rs.200.00 lakhs instead of Rs.900.00
Nutrition which is used for educating the lakhs.
pregnant and lactating mothers at the
E. Meeting the medical expenses of
Anganwadi Centres.
Severely Malnourished Children
Pre-school Education This scheme started for the reason of
For effective Pre School Education, an severely malnourished children's
Activity Bank called "Chili Pilli" - a series of treatment. For the children who have
books including 42 subjects in Kannada suffering from severe malnutrition, an
and Urdu language has been developed and amount of Rs.2000/- per head for one year
distributed to all Anganwadi centres to be being given for their medical expenses from
used by the Anganwadi workers during pre- 2016-17. In 2019-20 budget allocation for
school activity time. Meeting of medical expenses of Severely
Malnourished Children Govt. has released
D. Scheme for Adolescent Girls (SAG) an amount of Rs.200.00 lakhs and an
Sabla scheme has been revamped as amount of Rs.149.98 has already
“Scheme for Adolescent Girls” – SAG from distributed to all districts and under Rs.
2018-19, the scheme is being implemented 55.85 lakhs expenditure has been incurred
in all the districts of the State. The objective upto the end of December -2019.
of the scheme is to empower Adolescent F. Mathru Vandana Scheme
Girls in the age group of 11-14 years who are
out of School. The scheme aims at improving Government of India has announced new
nutritional and health status and upgrading scheme under Honorable Prime minister's
various like home skills, life skills and pan India. From 01.01.2017 Rs.5000 is
vocational skills of adolescent girls. Under transferred to beneficiaries account under
this scheme, for nutrition component, 50% direct beneficiary transfer to pregnant &
share Rs. 260.71 lakhs has been released by lactating mothers in 3 installments. This
GOI and 50% share of Rs. 260.71 lakhs is scheme is limited to only first live birth.

Table 13.11: Progress of Supplementary Nutrition programme under ICDS


Year Expenditure (Rs. lakh) No. of beneficiaries
2015-16 116306.73 5524282
2016-17 121787.18 5531028
2017-18 142029.59 5014579
2018-19 156487.68 4506412
2019-20* 87173.02 4274475

*Upto December 2019


Economic Survey of Karnataka 2019-20 719

Under this scheme Rs.15389.00 lakhs 13.1.12 Malnutrition status of children


expenditure has been incurred for 238034 in Karnataka State:
beneficiaries upto the end of December-
2019. As per nutritional status of children in
Karnataka, by end of March 2019 there are
G. Mathrushree Scheme 84.19% (3333733) of children are normal
grade. 15.51% of children are in moderately
To increase nutritional and health status of
malnourished grade and 0.30 (11961) were
pregnant and lactating mothers state
in severely malnourished children. At the
Government has implemented various
end of the December-2019 there are 85.97%
schemes. Women suffer from anemia,
(3322917) of children are normal grade.
usually an under nourished pregnant
13.75% (531384) of children are in
women gives birth to low birth weight
moderately malnourished grade and 0.28%
babies, to support their family women work
(10802) severly malnourished children are
to the last days of their pregnancy and
respectively.
resume working soon after child birth and
also impeding their ability to breastfeed 13.1.13 Way Forward
their young infant for 6 months.
Though the State has taken many initiatives
Government have started new scheme for empowerment of women and protection
called 'Mathrushree'. Wherein BPL of children through the five year plans, the
pregnant/lactating mother child birth. results are muted. The Census of India 2011
Total of Rs.6000/- cash incentive is has shown a marginal improvement in the
provided in 2 installments. This scheme sex ratio (973) from 965 in 2001. Not
restricted for 2 live births. Under withstanding the achievements, Karnataka
Rs.6115.18 lakhs is distributed to 414902 is much behind other southern states. The
beneficiaries upto the end of December- sex ratio at 0-6 years range is 948 which is a
2019. marginal increase from 946 in 2001 (Table
13.12)
H. PoshanAbiyan
The main objectives of Poshan Abiyaan SPECIFIC CHALLENGES AND FUTURE
programme is to improve the nutritional OUTLOOK OF THE DEPARTMENT
status of children, adolescent girls, Integrated Child Development Services:
pregnant and lactating mothers. The
r Restructuring of the programme, team
programme envisages to bring down
management, creation of posts under
malnutrition, stunting among children and
new schemes, upgradation of existing
reduce the prevelance of Anemia among
posts.
young children adolesent girls and women.
r Addressing the nutritional issues-
Out of the budget released during the year eradicating malnutrition in pregnant
2018-19 an amount of Rs.701.12 lakhs has and lactating women and children
been incurred up to the end of December-
2019 and Rs.49473000/- community r Strengthening training and capacity
based events have been organised. building
r Encouraging public- private
New schemes for the year 2019-20: partnership, and sponsorship under
Due to increased population in the urban corporate social responsibility
areas, it was found essential to start new r Strengthening partnership with PRI,
anganwadi centres. Hence during this year NGO and voluntary sector.
100 new anganwadi centres are proposed to
Future Outlook:
start. To implement these anganwadi
centres Rs.300.00 Lakhs of grants is r To give more emphasis to capacity
allocated building of supervisors.
720 Economic Survey of Karnataka 2019-20

Table 13.12: Comparison of sex ratio among South Indian States


2001 2011
Sex Ratio Sex Ratio Sex Ratio Sex Ratio
States
Total 0-6 years Total 0-6 years
Population Population Population Population
Karnataka 965 946 973 948
Andhra Pradesh 978 961 993 939
Tamil Nadu 987 942 996 943
Kerala 1058 960 1084 964
India 933 927 943 919

r For implementation of Early Childhood increasing non-institutional progr-


Care and Education ECCE, action is ammes like Adoption, Sponsorship,
initiated to develop ECCE policy and Foster care and After Care services.
curriculum. This will be implemented r Create mechanism for Child Protection
from the coming year. Management system including MIS
Integrated Child Protection Scheme for effective implementation and
(ICPS) monitoring of child protection services.
ICPS was launched in 2010-11, with an Committees formed under Social
objective of providing a safe and secure Legislations
environment and for comprehensive 33 Child Welfare Committees and 30
development of children who are in need of Juvenile Justice Boards have been formed
care and protection and in conflict with law. and 9837 and 1379 cases have been brought
ICPS provides preventive and statutory care before the committee and board respectively
and rehabilitation services to any up to the end of Dec-2019. 5 New JJB have
vulnerable child in the society. Rs.7831.00 been sanction to Dakshin Kannada, Belgavi,
lakhs has been provided during 2019-20 Kalburgi, Bengaluru (U) and Vijayapura
and an amount of Rs.4789.64 lakhs has District and Notification has been issued by
been incurred up to end of the December - Governmenton06.02.2020, nominating
2019. members for this JJB's.
Main Objectives of Integrated Child Institution Functioning under ICPS
Protection Scheme
1. Children Homes: 59 Government run
To bring all children below the age of 18 children homes are functioning and
years into a safety net and to address 2402 children are housed in these
children in vulnerable situations by homes at the end of December -2019.
providing child protection services. New Children Home for girls has
r To improve the quality of services and been sanction for Chikkamagaluru
efficiency at all levels. district vide Government Order dated:
21.11.2019
r To Create awareness among Public and
Family on child rights and Protection 2. Observation homes: 17 Observation
services children in especially difficult Homes are functioning to house
circumstances children in conflict with law and 116
r Awareness to public on child rights and children remained in these institutions
protection services. at the end of December -2019. One NGO
is functioning as a Special Home in
r Reduce the number of children
Bangalore (Urban) district. 1 Place of
depending on institutional services by
Economic Survey of Karnataka 2019-20 721

safety has been sanctioned during have been registered up to end of December
2017-18 vide Government Order -2019 and totally 1021 CCI's are registered.
dated:25.04.2017.
D. Track the missing child.gov.in / track
3. 32 Specialised Adoption Agencies (SAA) child
are functioning and 177 children were
placed in In - country adoption and 17 The Ministry of Women and Child
placed in Inter-country adoption. Development, Government of India has
developed a portal called Track the missing
A. Child Adoption Resource Information child.gov.in/track child to track the
and Guidance System -- CARINGS progress of children in every Child Care
Institution in the country.
Child Adoption and Guidance System is
GoI's dynamic response for a systematic, E. Open shelters
transparent and friendly adoption process.
CARINGS is an online platform, building 42 open shelters are sanctioned and 38 are
bridges, creating links through a web-based functioning in urban and semi- urban areas
management system which facilitates to provide care and protection to children.
expeditious and smooth adoption and 952 children have been rehabilitated up to
ensures transparency and accountability of the end of December -2019.
the implementing agency with a national F. Vishesha Palana Yojane:
data base. Adoption process in Karnataka is
carried out online using the software- Financial assistance is being given to HIV
CARINGS developed by CARA. New adoption infected and affected children has been
guidelines are being implemented from 16- enhanced from Rs.800 to Rs.1000 from
01-2017. 2017-18. During 2019-20 an amount of
Rs.15.00 crores has been allocated, out of
B. Sponsorship Programme which an amount of Rs.7.00 crores has been
Financial Assistance is provided to children incurred and 17548 beneficiaries are
in the form of Sponsorship to enable the covered.
child to remain in the family to prevent New Scheme for 2019-20
children from becoming destitute or
vulnerable, run away from home, forced into 1. 10 Districts have been identified for
child marriage, child labour etc. The District making the Special Children Court into
Child Protection Unit(DCPU) identifies Child Friendly at an estimated cost of
vulnerable families or children for Rs.3.00 Crores and Government Order
sponsorship support. 3217 children have has been issued on 03.08.2019
been identified under the programme by the 2. Children Home for Chikmagalore
end of December -2019. District has been sanctioned as per the
Juvenile Justice Act envisages an After Care announcement made in the budget
Programme for children who needs support speech of 2019-20.
after attaining the age of 18 years with an 13.1.14 Karnataka State Women's
objective of rehabilitating such children and Development Corporation (KSWDC)
help to bring them to the main stream of the
society. An after care home is functioning in The Karnataka State Women's Development
Belgavi District and Unit has been attached Corporation was established in 1987 for
to Children Home for Bengaluru (U) and social and economic upliftment of
IMHC. vulnerable section of women in the state and
has, since then, been implementing various
C. Registration of Child Care Institutions schemes benefitting women.
(CCI)
A. Udyogini
All the Child Care Institutions (CCI) have to
be registered as per Section 41(1) of the JJ r The scheme envisages helping women
Act, 2015. During the current year 65 CCI's to engage themselves in income
generating activities and to make them
722 Economic Survey of Karnataka 2019-20

self-employed and intends to facilitate income limit. The programme is


to avail loan through banks and other implemented as per the guidelines of the
financial institutions. It also intends to department of Skill Development,
provide subsidy through the Entrepreneurial and Livelihood.
Corporation.
During this year 'Spoorthi' scheme is being
r For women belonging to SC/ST implemented with UNICEF assistance
category maximum loan of Rs.5.00 lakh through Karnataka Health Promotion Trust
whose family income doesn't exceed (KHPT) in all the villages of Koppal taluk of
Rs.2.00 lakh with subsidy of 70% Koppal District. Rs.1.27 crore earmarked as
(Rs.3.50 lakh), which has been per the budget pronouncement 2019-20.
increased from 2019-20. Rs.1.50 crore is allocated for the Skill
r For Women belonging to general and Development of oppressed women during
special category with the project cost of the year 2019-20. Table 13.14 shows
minimum Rs.1.00 lakh to maximum Progress of Women Training Programme.
Rs.3.00 lakh with a subsidy of
C. Devadasi Rehabilitation Programme
30%(maximum subsidy is Rs.90,000/-)
whose family income does not exceed In order to come out of the evil practice of
Rs.1.50 lakh. Devadasi system and with the intention of
r The age limit is 55 years for general as empowering Ex-Devadasis financially and to
well as for SC/ST beneficiaries. make them self reliant, this scheme is being
implemented in 14 districts viz. Belgaum,
r The eligible beneficiaries are trained for Vijayapura, Bagalkote, Raichur, Koppal,
3 days under skill development after Dharwad, Haveri, Gadag, Ballary, Kalburgi,
sanctioning the loan and before Davangere, Yadgir, Chitradurga and
releasing the loan amount. Shivamoga. Financial assistance of Rs.1.00
The main aim of the programme is to make lakh (Rs.50,000/- loan and Rs.50,000/-
the women beneficiaries free from incentive) is provided by the Corporation to
exploitation in availing loan from the private take up income generating activities such
financial institutions at exorbitant rate of as Animal Husbandry, Petty Shop etc.
interest to take up the income generating Awareness is being created through
activities. Progress of Udyogini Scheme is Jagruthi Programmes and Health camps
given in Table 13.13. about the evil practice.
B. Women Training Programme During the year 2019-20 Rs.830.00 lakh
have been provided in the budget to cover
Training programmes aiming to improve the
589 beneficiaries. An amount of Rs.465.00
skills to women belonging to lower income
lakh has been spent to conduct awareness
group, widows, destitute, physically
campaigns, legal, health camps and
challenged and women belonging to SC/ST
administration up to November -2019
categories is being implemented. These
(Table13.15).
programmes intend to develop entrepre-
neurial skills among women. There is no

Table 13.13 : Progress of Udyogini scheme (Financial Rs. in lakh)


Target Achievement
Year
Physical Financial Physical Financial
2017-18 3578 2000.00 3433 1950.00
2018-19 2295 2530.00 2295 2530.00
2019-20* 4557 2530.00 2278 1265.00

*Upto November 2019


Economic Survey of Karnataka 2019-20 723

D. Devadasi Pension Scheme Rs.2,00,000/- in Urban areas (Table


The Corporation also implements the 13.17).
scheme that provides pension to support to During 2019-20 an amount of Rs.1417.00
ex-devadasis. Ex-Devadasis above the age of lakh is provided to cover 796 beneficiaries of
45 years are given a pension of Rs.1500/- which up to November 2019 an amount of
per month to lead normal and respectful life. Rs.708.50 lakh has been spent and 398
This pension amount is credited directly to beneficiaries are covered.
the Bank account of the beneficiaries. As per
the survey conducted during the year 1993- F. Marketing Assistance Scheme
94 & 2007-08, 46,660 Devadasis were To encourage women entrepreneurs,
identified. Among them, those who have exhibitions are organized at District and
crossed 45 years of age numbering to 30288 Taluk levels to sell the products produced by
are proposed to be provided with a monthly women entrepreneurs and women
pension of Rs.1,500/- during 2019-20. organizations. Efficient and upcoming
During 2019-20 a grant of Rs.4772.00 lakh women entrepreneurs are encouraged to
is provided in budget of which an amount of take part in the State and National fairs and
Rs.2386.00 lakh is spent and 3010 exhibitions.
beneficiaries were covered upto the end of During 2019-20 no budget is provided.
November 2019 (Table 13.16) . However, the Government have been
E. Housing to ex-Devadasis requested to provide Rs.100.00 lakh for this
scheme from the scheme of women
A housing scheme for Ex-Devadasis who empowerment comes under Women and
own sites and are houseless in all the Child Development Department.
selected 14 districts of the State is being
implemented through Rajeev Gandhi Rural G. State Resource Centre:
Housing Corporation with a unit cost of The State Resource Centre of functioning in
Rs.1,75,000/- in rural areas and 30 districts to provide information and

Table 13.14 : Progress of Women Training Programme (Financial Rs. in lakh)


Target Achievement
Year
Physical Financial Physical Financial
2017-18 4160 416.00 2846 312.00
2018-19 5000 500.00 1190 119.00
2019-20* 2333 350.00 649 92.50
*Upto November 2019
*Rs.50.00 lakh have been re-appropriated to the programme of Interest Subsidy to Women from Women
Training Programme.

Table 13.15 : Progress under Devadasi Rehabilitation Scheme (Financial Rs.in lakh)
Target Achievement
Year
Physical Financial Physical Financial
2017-18 1063 700.00 1063 700.00
2018-19 1126 700.00 1126 700.00
2019-20* 589 830.00 325 465.00
*Upto November 2019
** excess amount over and above the budget is metout of the balance amount of SCP.
724 Economic Survey of Karnataka 2019-20

Table 13.16 : Progress under Devadasi Pension scheme (Financial Rs. in lakh)

Target Achievement
Year
Physical Financial Phy sical Financial

20 17-18 294 82 5177 .00 29 021 51 77.0 0

20 18-19 298 86 4772 .00 29 767 5358 .00**

201 9-20* 302 88 4772 .00 30 130 23 86.0 0

*Upto November 2019


** excess amount over and above the budget is metout of the balance amount of SCSP.

Table 13.17 : Progress under Housing to ex-Devadasis (Financial Rs. in lakh)


Target Achievement
Year
Physical Financial Physical Financial

2 017-18 1295 2 000.0 0 1295 200 0.00

2 018-19 888 1 585.0 0 666 1188. 75**

20 19-20* 796 1 417.0 0 398 708 .50

* Upto November 2019


** An installment amount of Rs.396.25 lakh has not been credited to the Corporation.

awareness about various schemes and The interest free loan of Rs.1.00 lakh to 2.00
facilities offered by the Government. lakh provided to self help group of SCs/STs
Workshops and trainings are being has been enhanced to Rs.5.00 lakh vide
organized in these centers to provide G.O. No: WDC/ 20/ WCC/ 2019, dated:
information to women about schemes, self 06.11.2019. For the year 2019-20 an
employment marketing assistance and amount of Rs.500.00 lakh has been
economic activities. An amount of Rs.29.00 provided of which it is proposed to provide
lakh has been provided for the year benefits to 250 SHGs (Table 13.19).
2019-20. Government have been requested
to provide Rs.100 lakh to the State Resource I. Rehabilitation of Transgender Scheme:
Centres out of the amount allocated to The scheme is being implemented from
the Women and Child Development 2012-13 by the corporation. With an
Department for the scheme women objective to facilitate Transgender persons
empowerment (Table 13.18). to lead a decent life and to bring them to the
main stream of society.
H. Micro Credit Scheme :
To empower the Transgender economically
The scheme was introduced during 2011-12
an amount of Rs.50,000 (25,000 loan
in order to facilitate the members of the
& 25,000 incentive is being provided) to
Stree Shakthi Self Help Groups (SSSHG),
take up income generating activities.
who are willing to take up income generating
During 2019-20 an amount of Rs.410.00
activities. Loan amount of Rs1.00 lakh was
lakh is provided to cover 808 beneficiaries
provided at 6% interest rate. From 2015-16
(Table 13.20).
Rs.2.00 lakh interest free loan is provided to
each group.
Economic Survey of Karnataka 2019-20 725

Table 13.18: Progress of the State Resource Centre Scheme


(Financial Rs. in lakh)
Target Achievement
Year
Physical Financial Physical Financial
2017-18 10000 100.00 10000 93.75
2018-19 20750 25.00 20750 25.00
2019-20* 20750 29.00 15565 21.75
*Upto November 2019

Table 13.19: Progress under Micro Credit Scheme (Financial Rs. in lakh)
Target Achievement
Year
Physical Financial Physical Financial
2017-18 350 (Groups) 1000.00 291 578.00**
2018-19 250 (Groups) 500.00 208 416.00
2019-20* 250 (Groups) 500.00 67 134.00
*Upto November 2019
**An amount of Rs.300.00 lakh was utilized for the implementation of SaviRuchi Scheme out of Rs.1000.00
lakh earmarked for 2017-18 as per Government order.

Table 13.20 : Progress under Rehabilitation of Transgender


(Financial Rs. in lakh)
Target Achievement
Year
Physical Financial Physical Financial
2017-18 812 410.00 616 311.20
2018-19 808 410.00 650 329.80
2019-20* 808 410.00 267 133.50

*Upto November 2019

J. Chethana Scheme : entrepreneur who avail loan amount of Rs. 5


lakhs to Rs.200 lakhs from KSFC to takeup
Corporation provides Rs. 50,000 (25,000
small scale and medium scale industries
loan & 25,000 incentive is being provided)
and service units. Out of 14% interest
for general category and Rs.1 lakh (50,000
charged by the KSFC towards loan amount
loan and 50,000 incentive) SCs/STs. To
10% of interest subsidy will be provided by
takeup income generating activities by the
the Corporation and it will be repaid for a
female sex worker under the scheme. For
period of 5 years after the loan amount
2019-20 an amount of Rs.205 lakhs has
sanctioned.
been provided and it is programmed to cover
304 beneficiaries (Table 13.21). The 1st 12 months are considered as leisure
period. For 2019-20 an amount of Rs.1000
K. Interest subsidy Scheme to Women lakhs is been provided from which it is
Entrepreneurs (KSFC) : targeted to provide interest subsidy to the
The scheme is being implemented from beneficiaries through KSFC (KSFC fixes the
2015-16. Under the scheme 10% interest target of beneficiaries) (Table 13.22).
subsidy is being provided to the women
726 Economic Survey of Karnataka 2019-20

Table 13.21 : Progress under Chethana scheme (Financial Rs. in lakhs)

Target Achievement
Year
Physical Financial Physical Financial

2017-18 406 205.00 504 254.51

2018-19 404 205.00 404 205.00

2019-20* 304 205.00 90 63.00

*Upto November 2019

Table 13.22 : Progress under Interest subsidy scheme to women entrepreneurs


(Financial Rs.in lakh)

Target Achievement
Year
Phys ical Financial Physical Financial

201 7-18 - 3500. 00 771 35 00.0 0

201 8-19 77 1 3294. 00 771 32 94.0 0

2019 -20* 30 0 1000. 00 300 5 00.00

*Upto November 2019

L. Samrudhi Scheme : Rs.50,000/- (Rs.25,000/- loan &


Rs.25,000/- incentive) is being provided to
It is being implemented by the corporation
each beneficiary under the scheme. For
from 2016-17, for the women street vendors
2019-20 an amount of Rs.500.00 lakh has
who are below poverty line (BPL) and in the
been provided to extend benefits to 985
age group of 18-60 years. The main objective
beneficiaries (Table 13.24).
of the programme is to make the rural and
urban women street vendors free from Interest Subsidy Scheme to Women
exploitation in availing loan at exorbitant through Women Development
rate of interest and to solve the problem of Corporation.
women unemployment. An amount of
Rs.10,000/- is being provided to the women This Scheme is being implemented from
street vendors under this programme. 2018-19 to improve the efficiency of
During 2019-20 an amount of Rs.500 lakh supervisors working in the Women and
is provided in the budget to provide benefits Child Development Department. An amount
to 5000 beneficiaries (Table 13.23). of Rs.50,000/- interest free loan is provided
to buy two-wheeler vehicle. In addition, an
M. Dhanashree Scheme: amount of Rs.1,000/- per month is also
This scheme is being implemented from provided for fuel expenses. During 2019-20
2016-17. The main objective of the an amount of Rs.301.00 lakh has been
programme is to assist the HIV infected earmarked from which it is targeted to
women residing in the state, who are in the provide benefits to 600 supervisors (Table
age group 18-60 years. To take up self 13.25).
employment activities an amount of
Economic Survey of Karnataka 2019-20 727

Table13.23 : Progress under Samrudhi Scheme (Financial Rs. in lakhs)


Target Achievement
Year
Physical Financial Physical Financial

2017-18 10520 1052.00 7890 789.00

2018-19 5000 500.00 4000 400.00

2019-20* 5000 500.00 1400 140.00


*Upto November 2019

Table 13.24 : Progress under Dhanashree Scheme (Financial Rs. in lakhs)


Target Achievement
Year
Physical Financial Physical Financial

2017-18 996 500.00 1088 **549.51

2018-19 985 500.00 985 500.00

*2019-20 985 500.00 - -


*EDP training is being imparted to the beneficiaries selected in the Committee Chaired by Deputy
Commissioners upto November 2019.
**An amount of Rs.49.51 lakh utilized from the scheme of Women Training Programme during 2017-18.

Table 13.25 : Progress under Interest free loan to Women through KSWDC
(Financial Rs.in lakh)
Target A chievement
Year
Physical Financial Phys ical Financial

20 18-19 200 100 .00 30 0 ** 150.0 0

201 9-20* 600 301 .00 13 6. 50

*Upto November 2019


** Rs.50.00 lakh has been re-appropriated from Women Training Programme.

3. Subsidy under Udyogini Scheme.


Unspent grant under SCSP & TSP Act
2013: 4. Housing to Ex-Devadasis.
5. Micro Credit to Sthree Shakthi Self Help
A. Under SCSP and TSP Act 2013, an Groups(SSSHG).
unspent balance under SCSP, an
amount of Rs.6682.54 lakh has been 6. Rehabilitation Scheme for Women Sex
allocated to Corporation for the year Workers.
2019-20 and approved vide GO. No: 7. Incentive to Women Street Vendors
WCD/23/WCD/ 2019, dated: under Samruddhi Scheme.
05.02.2019 to take up the following B. Tribal Sub-Plan : For the year 2019-20
programmes. an amount of Rs.21.58 lakh has been
1. Monthly pension to Ex-Devadasis. provided under the scheme and the
2. Rehabilitation Scheme for Ex- same will be utilized for the
Devadasis. programmes approved by the
Government.
728 Economic Survey of Karnataka 2019-20

13.2 WELFARE PROGRAMMES FOR I. Admission of Meritorious Students in


SCHEDULED CASTES Prestigious Schools
In its endeavor towards ensuring “faster, In order to provide quality education,
sustainable and more inclusive growth”, the meritorious SC students are being
Government of Karnataka has committed admitted to 5th to 10th standards in
itself to improving capabilities and reputed institutions in the State. For
productive endowments among the the year 2019-20, an amount of Rs.
economically disadvantaged and socially 2500.00 lakh has been earmarked
marginalized sections of the State. In this under Scheduled cast various
direction, the welfare departments and development fund & no amount is
development corporations of the State are released from Government upto
implementing several multi-faceted and November 2019. The progress of the
multi-pronged programs for welfare of SCs, scheme during the last three years is
STs, BCs and Minorities and thereby placing given in Table 13.27.
them on the path of mainstream
development. A brief account of progress of ii. Pre-matric Scholarships
the schemes implemented by the Social In order to encourage children
Welfare Departments and Development belonging to SC households, whose
Corporations during the last three years for annual income is less than Rs. 6.00
the benefit of the weaker sections of the lakhs, a Pre-Matric scholarship is being
society is summarized in this section. The sanctioned annually at the rates
SC population which was 0.86 crores during mentioned in Table 13.28. The
2001 census has been increased to 1.05 scholarship for 9th to 10th standard
crores in 2011 census. Similarly The ST students whose annual income is less
population which was 0.35 crores during than Rs.2.00 lakh is sanctioned by
2001 census has been increased to 0.42 Central Government as mentioned in
crores in 2011 census. District wise Table 13.29. The progress of the
population of SC/ST as per the census 2001 scheme during the last 3 years is given
and 2011 is given in Table 13.26. in Table 13.30.
As SCs continue to be deprived of adequate iii. Post-matric Scholarships
access to education, health care facilities,
Post-matric scholarship is sanctioned
housing, sanitation, productive assets like
for children whose parents' household
land, etc., the Department of Social Welfare
annual income is less than Rs. 2.50
and the Development Corporations are
lakhs. Maintenance allowance of day
implementing various schemes for their
scholars will be credited directly to the
socio-economic uplift.
student's bank account. The
Department of Social Welfare maintenance allowance of hostelries
As education is considered to be an engine of will be credited directly to the concerned
inclusive growth, improvement of bank account of the hostel warden. The
educational status among the SC course fee fixed by the competent
community has been effected through authority will be credited to the bank
implementing several schemes like account of the college principal. The
providing admission to meritorious progress of the scheme during the last
students in prestigious schools, pre- matric three years is given in Table 13.31.
and post-matric scholarships, prize money iv. Prize Money to Meritorious
to meritorious students, hostel facilities,
grants-in-aid for hostels, running special Students
schools, etc. The progress of schemes In order to encourage the SC students
implemented during the last three years to to score higher marks and secure
encourage the students of SCs for ranks, various incentive schemes such
continuing their education from school level as prize money to SSLC students, prize
to higher education level is indicated below.
Economic Survey of Karnataka 2019-20 729

Table 13.26: Population of SC/ST (in Lakhs)

2001 2011
SC ST SC ST
Bagalkot 2.51 0.80 3.19 0.97
Bengaluru 8.51 0.86 11.98 1.90
Bengaluru Rural 3.78 0.62 2.14 0.53
Belgaum 4.62 2.43 5.77 2.97
Ballari 3.74 3.65 5.17 4.51
Bidar 2.99 1.82 4.00 2.36
Bijapur 3.34 0.30 4.43 0.39
Chamarajanagar 2.38 1.06 2.59 1.20
Chikkaballapura 0.00 0.00 3.13 1.56
Chikmagalur 2.33 0.41 2.54 0.45
Chitradurga 3.36 2.66 3.89 3.03
Dakshina Kannada 1.31 0.63 1.48 0.82
Davanagere 3.33 2.10 3.93 2.33
Dharwad 1.32 0.70 1.78 0.88
Gadag 1.37 0.54 1.74 0.62
Gulbarga 7.18 1.54 6.49 0.65
Hassan 3.12 0.26 3.45 0.32
Haveri 1.75 1.27 2.20 1.41
Kodagu 0.67 0.46 0.74 0.58
Kolar 6.72 2.06 4.66 0.79
Koppal 1.85 1.39 2.59 1.64
Mandya 2.47 0.17 2.65 0.22
Mysore 4.68 2.71 5.37 3.35
Raichur 3.17 3.03 4.01 3.67
Ramanagara 0.00 0.00 2.04 0.23
Shimoga 2.70 0.56 3.08 0.65
Tumkur 4.74 1.94 5.07 2.10
Udupi 0.68 0.42 0.75 0.53
Uttara Kannada 1.02 0.24 1.16 0.34
Yadgir 0.00 0.00 2.73 1.47
KARNATAKA 85.64 34.64 104.75 42.49
730 Economic Survey of Karnataka 2019-20

Table 13.27: Progress of the Scheme for Admission of Meritorious Students


(Rs. In lakhs)
Physical
Budget Funds % of
Year Expenditure Achievement
Aallocation Rreleased Eexpenditure
(Students)

2016-17 500.00 500.00 500.00 100 2337

2017-18 1500.00 600.00 600.00 100 2297

2018-19 2500.00 2500.00 2500.00 100 3744

2019-20* 2500.00 0 0 0 0
*upto November 2019

Table 13.28: Sanction of Pre-matric Scholarships (Rs. in lakhs)

Sl.No. Class / Standard Boys Girls

1 1-5 1000.00 1100.00


2 6–7 1150.00 1250.00
3 8 1250.00 1350.00

Table 13.29: Scholarship for 9th to 10th standard students sanctioned by Central
Government

Particulars Day Scholars Hostellers

Maintenance Allowance Monthly Rs. 150 for 10 months Monthly Rs. 350 for 10 months

Adhoc Grants Annually Rs. 750 Annually Rs. 1000

Table 13.30: Progress of the Scheme for Pre-Matric Scholarships


Budget Funds Physical
Expenditure % of
Year Allocation released achievement
(Rs. lakhs) expenditure
(Rs. lakhs) (Rs. lakhs) (Students)
2016-17 12312.00 12277.72 9077.10 74 828081

2017-18 12773.63 12773.63 11563.37 91 938719


2018-19 10545.31 10545.31 10537.51 100 726537

2019-20* 11053.65 11053.65 4107.75 37 195983

* Upto November 2019


Economic Survey of Karnataka 2019-20 731

Table 13.31: Progress of Post-Matric Scholarship Scheme


Budget allocation Expenditure % of Physical achievement
Year
(Rs. Lakhs) (Rs. Lakhs) Expenditure (Students)
2016- 17 46624.00 46258.07 99 303115

2017- 18 47496.00 36210.10 76 305769

2018- 19 48207.00 42014.36 87 205632

2019-20* 48400.00 3254.07 7 21962

*upto November 2019

money to college students, one-time viii. Assistance to Grant-in-aid Hostels


financial assistance to students who Providing financial assistance to
secure admission in prestigious voluntary organizations for
institutions like IITs/IIMs & IISc, prize maintenance of 151pre-metric and 41
money to rank holders and financial post metric, in total 192 grant-in-aid
assistance to SC students who study in hostels in the State to meet boarding
foreign universities are sanctioned, as charges of the students is another
per the criteria set by the department. scheme that is being implemented by
The progress of the scheme is given in the department. The detailed progress
Table 13.32. achieved is presented in Table 13.36.
v. Pre-matric Hostels ix. Residential schools
Pre-matric hostel facilities such as (a) Residential schools
boarding and lodging with free
textbooks and notebooks, toothpaste, In order to encourage the SC children
Suchi kits, uniform, bedding, shoes, etc studying from 1st to 5th standards, the
are being provided to the students who social welfare department is running 68
are studying from 5th to 10th residential schools. Food, books, uniforms,
standards. The progress of the scheme beds Suchi kits, medical facility etc., are
is given in Table 13.33. being provided to the children.
vi. Post-Matric Hostels (b) Morarji Desai Residential Schools
In order to encourage SC students to The Department of Social Welfare is running
pursue their higher education in college 204 Morarji Desai Residential schools,10
level, the Government is running 636 Atal Bihari Vajapayi Residential schools,
post-matric hostels by accommodating 100 Dr.Ambedkar Residential schools and
67017 students who are eligible for the 64 Indira Gandhi Residential schools for
Government of India scholarship. For Boys and Girls studying from 6th to 10th
the maintenance of these hostels, the standards. The department is also running
Government has incurred expenditure 110 Kittur Rani Chennamma residential
as shown in Table 13.34. schools exclusively for SC Girls studying
from 6th to 10th standards. Besides that 12
vii. Construction of Hostel Buildings
PU Colleges in science subject were also
Pre-matric and Post-matric hostel started for the welfare of schedule castes.
buildings for students belonging to the The Department is providing basic
SC community are constructed. The requirement to the students such as Food,
progress of the scheme for the last three Uniforms, Beds, Hair oil, Soaps, Medical
years is given in Table 13.35. facility etc. The details of progress of the
Morarji Desai Residential Schools are given
in the Table 13.37.
732 Economic Survey of Karnataka 2019-20

Table 13.32: Progress of the Scheme for Prize Money to Meritorious Students

Bud get allocation Expenditure % of Physical target and


Year
(Rs. Lakhs ) (Rs. L akhs) expenditure achievement

201 6-17 55 00.00 5 500.0 0 100 651 37

201 7-18 75 65.00 7 565.0 0 100 643 61

201 8-19 101 53.81 8 909.9 9 88 423 38

2019- 20* 101 83.23 4 665.0 7 46 200 11

* Upto November 2019

Table 13.33: Progress of Pre-matric Hostel Scheme


Budget Allocatio n Exp end iture % of Physical achievement
Year
(Rs. Lakhs) ( Rs. L akhs) E xpenditure (Student)

201 6-17 2 7580. 00 2432 9.84 88 705 12

201 7-18 3 0665. 11 2947 2.22 96 722 90

201 8-19 3 0233. 00 2925 2.89 97 768 24

2019-2 0* 3 2135. 00 1834 1.87 57 1158 18


* Upto November 2019

Table 13.34: Progress of Post-matric Hostel Scheme


Budget Number of
E xpenditure
Year allocation % of expenditure beneficiaries
(Rs . Lakhs)
(Rs . Lakhs) (Students)
2016- 17 926 3.68 844 7.79 91 55 592

2017- 18 1092 0.88 104 92.49 96 54 500

2018- 19 1029 7.00 977 0.07 95 28 208


2019-2 0* 1612 8.87 807 1.02 50 39 939

* Upto November 2019

Table 13.35: Progress of the Scheme for Construction of Hostel Buildings


(Rs.In Lakhs)
Budget Funds % of Physical Physical
Year Expenditure Target
Allocation released expenditure achievement
2016-17 41800.00 41552.00 41552.00 100 39 42

2017-18 25600.00 25600.00 25600.00 100 50 48

2018-19 20600.00 20600.00 20600.00 100 30 28

2019-20* 19400.00 10450.00 300.00 3 30 8


* Upto November 2019
Economic Survey of Karnataka 2019-20 733

Table 13.36: Progress of the Scheme for Assistance to Grant-in-aid Hostels


(Rs.in Lakhs)
Budget % of Number of
Year Funds released Expenditure
allocation expenditure students
2016-17 1199.00 1152.49 557.65 48 7026

2017-18 1481.29 1481.29 676.84 46 6136

2018-19 900.00 900.00 554.68 62 4545


2019-20* 1144.89 1144.89 124.01 11 1736
* Upto November 2019

Table 13.37: Progress of the Scheme for Morarji Desai Residential Schools
(Rs.in Lakhs)
Year Budget Allocation Expenditure % of expenditure No of Beneficiaries

2016-17 39226.00 39226.00 100 59319


2017-18 32042.00 32042.00 100 55400
2018-19 29531.00 29531.00 100 86497

2019-20* 44199.00 12079.25 27 86200

*upto November 2019

x. Compensation to SC/ST Atrocity Census. The progress of the Scheduled


Victims Caste Sub Plan during the last three years is
Atrocity cases against SC/ST members by illustrated in Table 13.39.
the non-SC/ST members are registered 13.2.1 Dr. B.R. Ambedkar Development
under the Prevention of Atrocity Act 1989. Corporation (BRADC)
The district administrator is in-charge of The Government of Karnataka is
initiating measures for immediate relief implementing several programmes for
under rehabilitation of victims of atrocity economic upliftment of SC communities
apart from giving them security under law through Dr. B.R. Ambedkar Development
and order. The progress of the scheme is Corporation. The Progress of important
presented in Table 13.38. programmes implemented by the
xi. Scheduled Caste Sub-plan (SCSP) Corporation is described below.
In order to ensure overall development of the I. Self-employment Programme:
SC community, the scheduled caste sub- The basic aim of the programme is to enable
plan (SCSP) is being implemented through unemployed, underemployed SC persons to
various departments in the State. A specific take up income generating activities and
budgetary provision under all sectors of the thereby improving their economic status in
State Annual Plan is made by the State the Society. The Corporation provides
Government for socio-economic financial assistance through Banks and
development of SCs. THE KARNATAKA financial institutions for setting up of self-
SCHEDULED CASTES SUB-PLAN AND employment activities.
TRIBAL SUB-PLAN (PLANNING,
ALLOCATION AND UTILISATION OF r For project cost upto Rs.100,000/-, the
FINANCIAL RESOURCES) ACT, 2013 came Corporation sanctioning 50% of the unit
into effect from 20.03.2014. Accordingly, cost (a maximum subsidy of
the funds are earmarked under SCSP as per Rs.50,000/- )and the remaining
SC population percentage (17.15%) of 2011 amount will be the loan from financial
institutions.
734 Economic Survey of Karnataka 2019-20

The details of the subsidy pattern and the scheme, 2 acres of dryland or 1 acre of
progress of the scheme are presented in wetland will be distributed to the
Tables 13.40 & 13.41. beneficiaries. Under this scheme, 50% will
be subsidy and 50% as term loan with 6%
II. Land Purchase Scheme: interest rate which has to be repaid in 10
The scheme has been launched during annual equal instalments. The lands will be
1990-91 to make the landless agricultural registered in the name of women beneficiary
labourers land holders by purchasing lands of the family. The detailed progress of the
from non-SC/ST land holders. Under this programme is presented in Table 13.42.

Table 13.38: Progress of the Scheme for Compensation to SC/ST Victims


(Rs.in lakhs)
Budget % of No of
Year Expenditure
Allocation expenditure beneficiaries

2016-17 1000.00 955.00 96 1355

2017-18 1500.00 1469.98 98 2226

2018-19 4608.00 4558 99 2348

2019-20* 3000.00 1210.00 40 726


* Upto November 2019

Table 13.39: Progress of Scheduled Caste Sub-Plan (Rs.in lakhs)

Allocation Expenditure % of ex penditure


Year
State District All State District All State District All

2016-17 1176671 246441 1423112 1019683 230796 1250479 87 94 88

2017-18 1965058 1839445 94

2018-19 2094079 1995229 94

2019-20 * 2160263 868430 40

* Upto November 2019

Table 13.40: Details of Subsidy of Self-employment Programme

Unit Cost Subsidy Remarks

From Rs.1.00 lakh to Unit Cost 70%, Maximum Remaining amount will be bank
Rs.5.00 lakh Rs.3.50 lakhs loan

From Rs.5.00 lakh to Unit Cost 60%, Maximum Remaining amount will be bank
Rs.10.00 lakh Rs.5.00 lakhs loan

From Rs.10.00 lakh to Unit Cost 50%, Maximum Remaining amount will be bank
Rs.20.00 lakh Rs.5.00 lakhs loan
Economic Survey of Karnataka 2019-20 735

Table 13.41: Progress of Self-employment Programme (Rs. in lakhs)


Expenditure
Budget Funds No. of
Year Subsidy Margin Term Loan
Allocated Released Total beneficiaries
(State) Money (NSCFDC)
2016-17 4500.00 11691.20 7311.96 538.58 - 7850.54 10216

2017-18 16400.00 23400.00 11945.37 561.15 - 12506.52 11477

2018-19 13200.00 46222.89 23505.84 9040.25 - 32546.09 54737

2019-20* 13000.00 - 4827.70 - - 4827.70 1196

* Upto November 2019


Note: Margin Money component spent out of Share Capital funds. Funds released includes SCA funds also.

Table 13.42: Progress of Land Purchase Scheme (Rs. in lakhs)


Expenditure
Funds Land
Budget Term No. of
Year Released Subsidy Purchase
Allocated (Subsidy) Loan Total beneficiaries (Acres)
(State)
(NSCFDC)

2016-17 - 15000.00 3581.45 3581.45 7162.90 1040 1349.12


(SCA) (SCSP)
3000.00
2017-18 - 8988.00 8988.00 17976.00 2086 2611.15
(SCSP)
2018-19 - 500.00 1608.18 1608.18 3216.36 347 402.32
2019-20* 10000.00 3475.00 3751.12 3751.12 7502.24 632 874.18

* Upto November 2019

III. Gangakalyana Scheme Rs.50,000/- will be term loan from


A. Community Irrigation/Lift Irrigation SCSP fund. The Progress details of the
Scheme: scheme are provided in Table 13.43.

Under this scheme, a group of 8 to 15 C. Energisation of Irrigation


acres of land belonging to SC Borewells:
landholders will be provided irrigation Rs.50,000/- for each borewell will be
facility at free of cost by lifting water provided under the SCSP pooled funds
from the perennial rivers, streams, etc. to ESCOMS for energisation of
The unit cost fixed to provide irrigation irrigation borewells drilled by the
for 8 acres and 15 acres of land is Corporation. The status of the scheme
Rs.4.00 lakhs and Rs.6.00 lakhs is provided in Table 13.44.
respectively.
IV. Micro Credit Finance Scheme
B. Individual Irrigation Borewell (Prerana)
Scheme: For the economic and overall empowerment
Individual Irrigation borewells along of unemployed SC women of semi urban or
with pumpsets will be provided to small urban areas, BRADC has started Prerana
and marginal SC farmers. The unit cost scheme in which subsidy and loan is given
of the scheme is Rs.3.50 lakhs, Rs.3.00 to start self employment units with unit cost
lakh will be subsidy and remaining of Rs.2.50 lakh for 10 member group of
736 Economic Survey of Karnataka 2019-20

women thereby facilitating them with Initiative taken by the Corporation:


profitable productive activities. The costing To improve the efficiency in implementation
for each member of the unit is Rs.25,000/-of of its schemes effectively, the Corporation
which Rs.15,000 will be subsidy and has developed online software in
Rs.10,000 is loan. The details of budget collaboration with NIC for all the schemes.
allocation, expenditure and number of The NIC has developed comprehensive
beneficiaries covered are provided in Table software wherein the beneficiary can apply
13.45. for loan on online and even he can visit our
website till disposal of his application.

Table 13.43: Progress of Individual Irrigation Borewell Scheme


(Rs. in lakhs)
Funds Expenditure No. of
Budget
Year Released Subsidy Term Loan benefi
Allocated (Subsidy) Total ciaries
(State) (NSCFDC)
2016-17 22500.00 23720.00 20051.51 1164.47 21215.98 10980

2017-18 30000.00 34618.00 23094.47 1541.35 24635.82 13397


2018-19 21890.00 21886.50 34942.14 3649.51 38591.65 10905

2019-20* 20000.00 - 9496.93 4659.87 14156.80 2212


* Upto November 2019
Note: Budget Allocation and funds released includes Pooled Funds

Table 13.44: Status of Energisation of Irrigation Borewells (Rs. in lakhs)


No. of wells
Year Budget Allocated Funds Released Expenditure energized

2016-17 - - 1383.00 8748

2017-18 - - 8469.01 7071

2018-19 - - 10514.60 6585


2019-20* - - 1975.25 2530

* Upto November 2019

Table 13.45: Progress of Micro Credit Finance Scheme (Rs. in lakhs)


Budget Funds
Year Expenditure No. of beneficiaries
Allocated Released
2016-17 4000.00 4000.00 2620.10 19376

2017-18 2700.00 2700.00 1747.95 11653

2018-19 1924.00 1924.00 1184.50 7890


2019-20* 2925.00 600.00 821.75 3287

* Upto November 2019


Economic Survey of Karnataka 2019-20 737

Best practices and success stories: Spandana, an issue based tracking system
The Corporation has adopted RTGS software has been installed in the office of
payments system to the beneficiary account the managing director of ADCL to track the
directly in all the schemes in order to avoid day to day letters received by the public the
delay and misuse of scheme funds. status of which is send to them through SMS
messages. Also a software has been
The Corporation has taken initiative to
developed to track the progress and
launch its own website wherein the public
energisation details of irrigation borewells &
can avail information about the benefits
pump sets drilled under Gangakalyana
given by the Corporation without
Scheme.
intervention of the middlemen and
instructions given to all district offices to Social Welfare department has introduced a
maintain transparency during the mobile app 'KALYANA' to track development
implementation of the schemes. Thus schemes of the Department and its Boards
importance is given for online system in and Corporations. A 'SAHAYAVANI'
transparent selection and implementation (Kalyana Kendra) was also started to redress
of the schemes. the grievances of the public. The control
room contact number is 080-22634300.
Identifying gaps and constraints: ADCL has introduced online fund tranfer
In all the years the Corporation has not system to speed up the release of funds to
evaluated the outcome of the schemes. the beneficiaries.
Hence the end result is not known to the
Corporation. Now the Corporation has 13.3 WELFARE PROGRAMMES FOR
assigned the work of evaluation of SCHEDULED TRIBES
beneficiaries who have been covered under
In order to improve productive endowments
all the schemes of the Corporation to
and exchange entitlements among the ST
Karnataka Evaluation Authority and the
households, the State Government has been
evaluation report has been submitted by the
implementing various programmes in social
Authority on which, the Government has
and economic domains. It has been
taken several steps to improve the methods
attempted through a) Department of
of implementation of the schemes.
Scheduled Tribes Welfare and b) Karnataka
The corporation is facing staff shortage and Maharshi Valmiki Scheduled Tribes
the available staff will be given professional Development Corporation. The progress of
training to adapt to the new system and to important schemes is summarized as
implement effectively and timely. follows.
Specifying challenges and the future I. Admission of Meritorious ST students
outlook: in Prestigious Schools
All the schemes implementing by the To provide quality education, the
Corporation are funded through the meritorious ST students studying at 5th
budgetary support by Government of standard and above are given admission in
Karnataka. The fund allocated by the reputed residential or non-residential
Government is not adequate compare to the schools. All fees and maintenance charges
SC population in the state. The Corporation are borne by the department. The detailed
on an average giving benefits to 40000 to progress of the scheme is provided in Table
50000 SCs per annum. There is a huge gap 13.46.
when compared to the population. The
Corporation is receiving large number of ii. Pre-metric Scholarships
applications and selection process is a For educational advancement and reduction
difficult task which results in criticism and of dropouts from the schools, pre-matric
opposition from the general public. scholarship for ST boy and girl students will
Corporation is expecting more funds from be provided. An amount of Rs.1000 for ST
the Government to cover major chunk of students studying from 1st to 5th standard,
population which is uncovered. Rs.1150 studying from 6th to 7th Standard
738 Economic Survey of Karnataka 2019-20

and Rs.1250/- for students studying 8th iii. Post-metric Scholarships


standard will be provided annually. Financial assistance is being provided to ST
Rs.1100/- for girl students studying from students whose family income is less then
1st to 5th standard, Rs. 1250/- studying Rs. 2.50 lakhs per anum and are pursuing
from 6th to 7th standard and Rs.1350/- post-matric education including
studying 8th standard is being sanctioned professional courses,. This is a Central
annually. Also an amount of Rs.2250/- for Sector Scheme (CSS) implemented to
both boy and girl sutdents studying 9th & encourage the ST students to pursue college
10th standard is being sanctioned annually. education in the State, the details of which
The detailed progress of the scheme is are given in Table 13.48.
provided in Table 13.47.
Table 13.46: Progress of Admission of Meritorious Students in Prestigious Schools
Rs.in Lakhs
Target Achievement % of achievement
Amount
Year
Financial Physical released Financial Physical Financial Physical

2016-17 520.00 1231 520.00 518.30 1231 100 100

2017-18 650.00 1781 650.00 650.00 1781 100 100

2018-19 1094.92 1917 1094.92 1094.92 2073 100 108

2019-20* 1200.00 2073 300.00 300.00 2495 25 120


* Upto November 2019
Table 13.47: Progress of Pre-metric Scholarship (Rs.in Lakhs)
Target Achievement % of achievement
A mount
Year
Financial Phys ical released Financial Physical Financial Phy sical

2016 -17 58 01.00 378 852 578 2.56 4077. 31 30 1596 70 80

2017 -18 52 96.38 666 646 488 2.99 4256. 25 37 9432 80 57

2018 -19 65 98.53 494 461 633 9.00 5493. 00 43 1485 83 87

2019-20 * 66 69.00 519 187 322 3.84 2209. 00 19 5964 33 38

* Upto November 2019

Table 13.48: Progress of Post-metric Scholarship Scheme (Rs.in Lakhs)


T ar g e t Ac hi e ve m en t % of a c hi e ve m e nt
Am ou n t
Y ea r
F i n an c i al P hy sic a l r e le a se d F i na n c ia l Ph ys ic a l F in a n c ia l P hy sic a l

201 6-17 72 89.0 0 89 172 6 839.5 4 52 63.45 560 90 77 63

201 7-18 12 604. 00 120 000 10 814. 24 106 90.77 117 636 85 98

201 8-19 15 137. 00 120 000 15 137. 00 151 37.00 116 940 100 97

2019 -20* 16 400. 92 126 000 2 800.9 2 18 08.00 432 4 11 3


* Upto November 2019
Economic Survey of Karnataka 2019-20 739

iv. Provision of Cash Incentives vi. Construction of Hostels and


For continuation of the college education, a residential schools (Ashrama Schools)
cash incentive scheme to ST students is For provision of basic amenities to ST
being implemented since 2009-10. A cash inmates of hostels and Ashrama schools,
incentive of Rs.7,000 will be provided to ST buildings are being constructed for the
students who secure more than 60% and institutions which are housed in rented
Rs.15,000 will be awarded to those who buildings. This has been implemented by the
secure more than 75% in the SSLC department and financially assisted by the
examination, the details of which are given Central Government under the Central
in Table 13.49. Sector Scheme (CSS). The detailed progress
of the scheme during the last three years is
v . Construction of Residential School
shown in Table 13.51.
Buildings
Towards providing residential school vii. Maintenance of Morarji Desai
buildings and other infrastructural Residential Schools
facilities, financial assistance is provided for Morarji Desai Residential Schools, which
construction of residential schools such as provide basic school facilities, have been
Morarji Desai residential school and provided maintenance expenditure during
Kittur Rani Chennamma residential school. the first year of their establishment. The
It intends to promote educational detailed progress of the scheme during the
development among the ST community. The last three years is given in Table 13.52.
progress of the scheme during the last three
years is provided in Table 13.50.

Table 13.49: Progress of Provision of Cash incentives Scheme (Rs.in Lakhs)

Achievement
Year
Financial Physical

2016-17 2372.79 23881

2017-18 2450.00 26850

2018-19 2874.00 27945

2019-20* 3581.25 14325

* Upto November 2019

Table 13.50: Progress of the Scheme for Construction of Residential School


Buildings (Rs.in Lakhs)
Target Achievement % of achievement
Amount
Year
Financial Physical released Financial Physical Financial Physical

2016-17 6290.00 25 6290.00 6290.00 25 100 100

2017-18 9105.00 9 9105.00 9105.00 4 100 44

2018-19 21000.00 10 21000.00 21000.00 10 100 100

2019-20* 4000.00 10 2000.00 2000.00 2 50 20


* Upto November 2019
740 Economic Survey of Karnataka 2019-20

Table 13.51: Progress of the Scheme for Construction of Hostels and Residential
Schools (Rs. in Lakhs)

Target Achievement % of achievement


Amount
Year
released
Financial Physical Financial Physical Financial Physical

2016-17 1000.00 5 800.00 800.00 5 80 100

2017-18 2500.00 15 2500.00 2500.00 15 100 100

2018-19 2137.50 11 2137.00 2137.00 11 100 100

2019-20* 2137.00 13 1068.50 1068.50 3 50 23

* Upto November 2019

Table 13.52: Progress of the Scheme for Maintenance of Morarji Desai Residential
Schools (Rs.in Lakhs)
Target Achievement % of achievement
Amount
Year
Financial Physical Released Financial Phys ical Financial Phy sical

201 6-17 5007. 00 71 5 007.0 0 50 07.00 71 100 10 0

201 7-18 7416. 00 143 7 416.0 0 74 16.00 14 3 100 10 0

201 8-19 8156. 00 143 6 117.0 0 61 17.00 14 3 75 10 0

2019-2 0* 14738. 00 145 7 369.0 0 73 69.00 10 3 50 71

* Upto November 2019

viii. Book Banks Scheme village level for the benefit of Scheduled
Book banks for accessing expensive books of Tribe people. The grants for the construction
professional courses such as medical, of the Bhavans at different levels is being
engineering, agriculture, veterinary, law released to the Deputy Commissioners of
etc., are established for the benefit of ST the concerned districts. The details of
students who cannot afford such books Valmiki Bhavans sanctioned for the last
prescribed for their courses. It is three years are shown in Table 13.54.
implemented by the Zilla Panchayat at the x. Financial Incentives to PVTG
district level. The progress of the scheme Students:
during the last three years is given in Table
Financial assistance of Rs.2500 and
13.53.
Rs.5000 will be provided for the PVTG
ix. Construction of Valmiki Bhavans students who completed 7th standard and
The Valmiki Bhavans are being constructed 10th Standard Examination respectively in
at the cost of Rs. 4.00 crores at District level, the first attempt itself. The progress of the
Rs. 2.00 crore at Taluk level and Rs.75.00 scheme during the last three years is given
lakh at Hobli level and Rs.20.00 lakh at in Table 13.55.
Economic Survey of Karnataka 2019-20 741

Table 13.53: Progress of Book Banks Scheme (Rs.in Lakhs)


Target A chievement % of achievement
Amount
Year
Financial Phy sical Released Financial Phys ical Financial Phys ical

201 6-17 118.0 0 0 0.00 0 .00 0 0 0

201 7-18 225.0 0 0 0.00 0 .00 0 0 0

201 8-19 68.0 0 0 0.00 0 .00 0 0 0

2019-2 0* 67.9 0 343 3.00 0 .00 0 0 0


*upto November 2019

Table 13.54: Details of Valmiki Bhavans (Rs.in Lakhs)

Number of Amount Amount


Year Expenditure
Valmiki Bhavans Allocation Released

2016-17 42 2630.00 2630.00 2630.00

2017-18 523 5000.00 5000.00 5000.00

2018-19 672 7644.00 7644.00 7644.00

2019-20* 51 3500.00 1750.00 1003.00


* Upto November 2019

Table 13.55: Progress of financial Incentives to PVTG students (Rs.in Lakhs)

Achievements
Year
Financial Physical

2016-17 13.50 399

2017-18 14.50 408

2018-19 16.00 417

2019-20* 0.00 0
* Upto November 2019

xi. Tribal Sub-Plan Integrated Tribal Development Project is


In an effort to promote overall development functioning in Mysore, Chikkamagaluru,
of STs, the tribal sub-plan (TSP) has been Kodagu, Dakshina Kannada, Udupi and
implemented by the department. As per the Chamarajanagar districts. Since 1992 the
plan, the due share of funds and benefits project has been extended to all districts of
from all developmental sectors in the State's the state. The grant-in-aid under Article 275
annual plans are channelized exclusively (1) is also being provided to take up such
for the welfare of the ST community special development programmes which are
in proportion to their population. otherwise not included in the plan
programmes. The progress of TSP is given in
Table 13.56
742 Economic Survey of Karnataka 2019-20

Table 13.56: Progress of Scheduled Tribal-Sub Plan (Rs.in lakhs)


Year A llo catio n E xpenditure % o f expenditure

2016 -17 55663 6.00 3928 68.00 71

2017 -18 81952 8.00 7671 48.00 94

2018 -19 87507 1.00 8231 81.00 94

2 019-20 * 88423 8.00 4151 16.00 47

* Upto November 2019

13.3.1 Karnataka Maharshi Valmiki employment activities and to improve


Scheduled Tribes Development their financial status, the corporation is
Corporation Ltd. (KMVSTDC) implementing the scheme in co-
A large number of ST households continue ordination with banks in which STs
to be deprived of productive assets and having driving licence will be assisted
income earning avenues. Therefore, with subsidy of 50% of the unit cost or
Karnataka Maharshi Valmiki Scheduled max of Rs.3.00 lakh for the purchase of
Tribes Development Corporation has been tourist taxi. Remaining portion of the
set up by the Government of Karnataka to unit cost will be bank loan. The detailed
implement several developmental schemes progress of the scheme is shown in
such as Self-Employment Scheme, Land Table 13.58.
Purchase Scheme, Ganga Kalyana Scheme c. Self Employment (Career skills)
& Micro Credit Scheme for the economic Scheme:
development of Scheduled Tribe households
in the State. A brief progress of the schemes Under the scheme, the unemployed
implemented by the Corporation is Scheduled Tribe youths who have been
presented below. trained in skill development will be
assisted in coordination with banks for
I. Self Employment Scheme: establishing self employment units per
unit cost of maximum of Rs.5.00 lakh.
a. Self Employment Scheme for
Subsidy at 50% of the unit cost or a
unemployed youths - This scheme is
maximum of Rs.2.50 lakh whichever is
launched mainly to help unemployed,
less will be provided from the
under employed ST's to improve their
Corporation. Remaining portion of the
economic condition by taking up
unit cost will be the bank loan. The
gainful economic activities. The
detailed progress of the scheme is
Corporation is providing subsidy
shown in Table 13.59.
assistance from State Government and
term loans through Commercial Banks d. Direct Loan Scheme:
and Financial Institutions for setting up During 2019-20, financial assistance of
of self employment activities. Though Rs.40000/- will be provided to the
the scheme was ended in 2017-18, the Scheduled tribes to improve their
progress shown for 2018-19 and financial status.Out of tribes for
2019-20 is from the unutilised funds of dairy/Sheep raring purpose and
2017-18. The detailed progress of the thereby the unit cost of Rs.40000/-of
scheme is shown in Table 13.57. which Rs.25000/- will be subsidy and
b. Self Employment (Tourist Taxi) Rs.15000/- will be loan. Loan carries
Scheme: interest at 4% p.a. The detailed progress
of the scheme is shown in Table 13.60.
To facilitate the unemployed Scheduled
Tribes in the state to engage in self
Economic Survey of Karnataka 2019-20 743

Table 13.57: Progress of Self-employment Scheme


No of Subsidy Bank L oan Total
Year
Beneficiaries ( Rs . lakh) (Rs. lakh) (Rs. lakh)

201 6-17 5155 1472. 00 229 4.32 37 66.32

201 7-18 2462 832.8 4 129 8.50 21 31.34

201 8-19 1563 544.1 5 84 4.33 13 88.48

2019 -20* 582 214.2 3 30 4.74 51 8.97

* Upto November 2019

Table 13.58: Progress of Self Employment Scheme (Tourist Taxi)

No of Subs idy Bank lo an To tal


Year
Beneficiaries (Rs. lakh) (Rs. lakh) ( Rs . lakh)

20 17-18 124 6 37 38.0 0 - 373 8.00

20 18-19 671 19 57.2 8 274 7.85 470 5.13

201 9-20 * 154 4 39.95 563 .52 100 3.47

* Upto November 2019

Table 13.59: Progress of Self Employment (Career skills)


No of Subsidy Bank loan Total
Year
Beneficiaries (Rs. lakh) (Rs. lakh) (Rs. lakh)

2017-18 486 1215.00 - 1215.00

2018-19 135 300.70 300.53 601.23

2019-20* 35 84.50 77.50 162.00


* Upto November 2019

Table 13.60: Progress of Direct Loan Scheme

Year No of S ubs idy Bank loan To tal


Beneficiaries (Rs. lak h) ( Rs . lakh) ( Rs . lakh)

2 017-1 8 15 005 375 1.25 2 418.7 5 6 170. 00

2 018-1 9 1 975 49 3.76 296.2 6 790.0 2


20 19-20 * 3 19 79. 76 50.86 130.6 2

* Upto November 2019


744 Economic Survey of Karnataka 2019-20

e. Industries, Service and Business beneficiaries belonging to semi urban or


(ISB): urban areas of the Self Help Groups to
Under the scheme, financial assistance is develop their small business activities. The
provided to the unemployed Scheduled unit cost is Rs.25,000/- per beneficiary out
Tribes to start various self employment of which Rs.15,000/- is subsidy and
activities namely small scale industry, Rs.10,000/- is margin money from the State
purchase of Transport Vehicles, Piggeries, Government. The term loan will carry
Poultry, Goat Farming, Leather Industry, interest @ 4% per annum.The progress of
Establishment of Advocate Office, Beauty the scheme is furnished in Table 13.63.
Parlour, Readymade Garments and DTP g. Land Purchase Scheme:
Centre etc. The subsidy will be based on the
The scheme was launched in the year 1991
unit cost as shown in Table 13.61. Progress
in commemoration of Dr.B.R. Ambedkar's
of the scheme is provided in Table 13.62.
birth centenary in Karnataka. Under this
f. Micro Credit Finance (Small Loan) scheme, financial assistance would be
Scheme: provided to landless agricultural labourers
for purchasing agricultural lands from non-
Under this scheme, term loans are given to
skilled or un skilled Scheduled Tribe

Table 13.61: Subsidy for Self-employment Scheme for Industries Service and
Business

Unit cost Subsidy Remarks

Rs.1.00 lakh upto Unit cost @ 70% , maximum


Remaining Bank Loan amount
Rs.5.00 lakhs Rs.3.50 lakhs

Rs.5.00 lakhs upto Unit cost @ 60% , maximum


Remaining Bank Loan amount
Rs.10.00 lakhs Rs.5.00 lakhs
Rs.10.00 lakhs upto Unit cost @ 50% , maximum
Remaining Bank Loan amount
Rs.20.00 lakhs Rs.5.00 lakhs

Table 13.62: Progress of Self-employment Scheme for Industries Service and


Business

No of Su bsidy Bank Loan Total


Year
Beneficiaries (Rs. lakh) (Rs.Lakh) (Rs. lak h)

2016-17 1050 4460.31 4228.39 8688.70

2017-18 1249 4414.62 3810.63 8225.25

2018-19 743 2667.59 2318.38 4985.97

2019-20* 497 1521.38 1546.82 3068.20

* Upto November 2019


Economic Survey of Karnataka 2019-20 745

Table 13.63: Progress of Micro Credit Finance Scheme


No of S u bsidy Margin m on ey Total
Year
Ben eficiar ies ( Rs . l akh ) (R s . l ak h ) (R s. lak h )

2 016-1 7 1 7768 1782 .38 891. 19 267 3.57


2 017-1 8 5 750 575 .00 234. 37 80 9.37

2 018-1 9 4 482 521 .25 123. 00 64 4.25

2 019-2 0* 2 403 300 .00 200. 00 50 0.00

* Upto November 2019

SC/ST land holders.The land will be assistance in the form of subsidy upto
purchased by paying maximum three times Rs.10.00 lakh will be provided to the
of the guidance value fixed by the beneficiaries to take up income generating
Government, subject to maximum limit of self employment activity in co-ordination
Rs.15.00 lakhs per unit. Out of Rs.15.00 with the renowned branded corporate
lakhs, maximum extent of irrigated /dry companies. This Scheme is being
/farm land will be purchased and registered implemented out of Rs.100.00 crore
in the name of women beneficiaries. Out of allocated to the Corporation by Directorate
unit cost, 50% will be subsidy from State of Scheduled Tribes Welfare under various
Government and 50% will be term loan from development programmes and un-utilised
NSTFDC. The loan carries interest @ 6% per funds of previous year's allocations.
annum which has to be repaid in 10 annual Progress of the Scheme is furnished in Table
equal instalments. Progress of the Scheme 13.66.
is furnished in Table 13.64.
II. Ganga Kalyana Scheme
h. Airawatha Scheme: a. Individual Irrigation Borewell
Under this scheme, the government Scheme:
provides financial assistance in the form of
subsidy up to Rs.5.00 Lakhs to the un- Irrigation facility will be provided to the
employed Scheduled Tribe youths to agricultural lands of the small and marginal
purchase Taxi and to operate through farmers belonging to the Scheduled Tribes
UBER/OLA platforms. The remaining by drilling borewells, installing pumpset
portion of the cost of the vehicle will have to and accessories and energization. The unit
be contributed by the promoter either cost under the Scheme is Rs.3.00 lakh, out
through his own internal resources or of which Rs.2.50 lakh is subsidy which
through bank/financial institutions. This is includes energization cost of Rs.0.50 lakh.
being implemented out of Rs. 50.00 crore The remaining Rs.0.50 lakh will be the
allocated to the Corporation by Directorate NSTFDC term loan at a rate of interest of 6%
of Scheduled Tribes Welfare under various p.a. Further, the unit cost of Rs.4.00 lakhs
development programmes and un-utilised has been fixed for the Districts of Bangalore
funds of previous year's allocations. (Urban), (Rural), Ramanagara, Tumkur,
Progress of the Scheme is furnished in Table Kolar and Chickkaballapur where ground
water level is depleted beyond 1000ft. which
13.65.
includes subsidy of Rs.3.00 lakhs, term loan
i. Samruddhi Scheme: Rs.0.50 lakhs loan at a rate of interest of 6%
Social Welfare Department has introduced and cost of energization of Rs.0.50 lakhs.
entrepreneurship development programme Loan and interest is repayable in 6 years in
called Samruddhi scheme for social and half yearly instalments. The progress of the
economic development of the Scheduled scheme is furnished in Table 13.67.
Tribe youths. Under this scheme, financial
746 Economic Survey of Karnataka 2019-20

Table 13.64: Progress of Land Purchase Scheme


N o of S ubs id y Term loan Tot al
Year
Ben eficiar ies (R s. lak h) (R s. lak h ) ( Rs . l akh )

2016-1 7 3 86 142 6.38 14 26.3 8 2852. 76

2017-1 8 1 25 47 0.22 4 85.93 956. 15

2018-1 9 2 97 180 7.50 18 07.5 0 3615. 00

20 19-20* 3 49 179 0.96 17 90.9 6 3581. 92

* Upto November 2019

Table 13.65: Progress of Airawatha Scheme


Su bs idy Ban k loan Tot al
Year No of B en eficiaries
(R s. lak h ) (R s . l ak h ) (R s . l akh )

2 018-1 9 2 72 102 0.00 544.0 0 1 564. 00

20 19-20 * 4 18 209 0.00 836.0 0 2 126. 00

* Upto November 2019

Table 13.66: Progress of Samruddhi Scheme


No of S ubs idy Ban k loan To tal
Year
Ben eficiar ies (R s. lak h ) ( Rs . l akh ) ( Rs . l akh )

2 018-1 9 0 0.0 0 0.00 0.00

20 19-20 * 1 35 135 0.00 0.00 0.00

* Upto November 2019

Table 13.67: Progress of Ganga Kalyana - Individual Irrigation Borewell Scheme


No of Subsidy Term loan Total
Year
Beneficiaries (Rs. lakh) (Rs. lakh) (Rs. lakh)

2016-17 5583 7584.29 676.43 8260.72

2017-18 7085 9795.38 246.69 10042.07

2018-19 6008 14565.05 1193.25 15758.30

2019-20* 799 4347.76 236.21 4583.97


*upto November 2019

b. Lift Irrigation Scheme: lands upto 15 acres. The minimum number


Under this scheme, irrigation facilities of benificiaries should be 3. The entire
would be provided for 8 to 15 acres of land project cost will be treated as subsidy.
belonging to a group of ST land holders at III.Training Programme:
free of cost. The water would be lifted from
perennial rivers, natural streams and back The corporation is also organizing training
water of reservoirs. The unit cost of the programmes like Computer hardware, light
scheme is fixed at Rs.4.00 lakhs for the motor vehicle driving, and heavy motor
lands upto 8 acres and Rs.6.00 lakhs for the vehicle driving, repair of motor rewinding at
Economic Survey of Karnataka 2019-20 747

free of cost belonging to unemployed pre matric backward classes students


Scheduled Tribes' youths to take up gainful whose annual family income is not more
self employment in coordination with than Rs. 44500. A scholarship will be
NSTFDC. granted for the backward classes students
studying from 5th to 7th and 8th to 10th
13.4 DEVELOPMENTAL PROGRAMMES class,. Similarly students studying in PUC
FOR THE WELFARE OF BACKWARD and degree education, students studying in
CLASSES post-graduation courses and students
The Backward classes (BCs) constitute studying in technical and professional
major chunk of population who are also courses will be sanctioned annually.
deprived of educational and economic The progress of the scheme is presented in
advancement in the state. Therefore, the Table 13.68.
Department of Backward Classes Welfare
2. Maintenance of Morarji Desai
and the D. Devaraj Urs Backward Classes
Residential Schools.
Development Corporation (DBCDC) have
been implementing various developmental In order to provide qualitative education to
programmes for socio-economic welfare of the poor and meritorious students of BC
the Backward Classes in the state. Some of whose annual family income is less than Rs.
them are summarised as follows. 100000/-, 133 Morarji Desai Residential
schools have been established. The
Department of Backward Classes Welfare students of Morarji Schools have been
1. Pre-matric and Post-matric provided with free education from class VI to
scholarships. XII with boarding, lodging facilities. The
progress of the scheme is illustrated in
Pre-matric and post-matric scholarships Table 13.69.
are being sanctioned to the post matric and

Table 13.68: Progress of Pre-matric and Post matric scholarships (Rs. in lakhs)
Targets Achievements % of achievements
Amount
Year
released
Fin Phy Fin Phy Fin Phy

2016-17 46173.24 2654216 46173.24 45419.00 2624783 98 98

2017-18 52772.00 2835000 52772.00 45303.05 2667369 86 94

2018-19 53217.17 2835000 53217.17 53217.17 2482777 100 88

2019-20* 25000.00 1371234 13300.00 0 0 0 0

* Upto November 2019

Table 13.69: Progress of Morarji Desai Residential Schools (Rs. in lakhs)


Targets Achievements % of achievements
Amount
Year released
Fin Phy Fin Phy Fin Phy

2016-17 16275.00 32500 16275.00 16275.00 31000 100 95

2017-18 19409.00 33250 19409.00 19409.00 32133 100 96

2018-19 19698.00 36120 19698.00 19698.00 32781 100 91


2019-20* 13731.00 39700 6865.00 6865.00 38347 100 97

* Upto November 2019


748 Economic Survey of Karnataka 2019-20

3. Ashrama School. 3b is Rs.44,500/-) studying in pre matric


In order to encourage the students of and post matric courses are provided with
Backward Classes especially category – I to free boarding, lodging and academic
avail formal education, 16 Ashrama schools facilities in the hostels run by the
have been established. The students get Department of Backward Classes Welfare.
primary education from class 1st to 4th with The progress of the scheme during the last 3
free boarding and lodging facilities in years is provided in Table 13.71.
ashrama school. The progress of the scheme 5. Fee concession.
during the last 3 years is provided in Table
In order to encourage the poor backward
13.70
classes students to avail higher education,
4. Maintenance of Pre and post matric fee concession is sanctioned. (This facility is
Hostels. being given to the backward classes
Under the scheme, students of backward students whose annual family income of
classes ( with annual family income is for Cat-1 is Rs.2.50 lakh and other Categories is
cat-1 Rs.1.00 lakh and Cat-2a, 2b, 3a and Rs.1.00 lakh). Table 13.72 provides the
detailed progress of the scheme.

Table 13.70: Progress of Ashrama Schools (Rs.in Lakhs)


Targets Achievements % of achiev ements
Amount
Year
releas ed
Fin. Phy. Fin. Phy. Fin. Phy.

2016 -17 4 21.0 0 16 75 4 21.00 40 7.19 153 7 97 92

2017 -18 3 72.7 9 16 75 3 72.79 35 9.27 146 9 96 88

2018 -19 3 89.2 1 16 75 3 98.21 32 7.55 157 0 82 94

2019 -20* 4 13.2 8 16 75 2 39.70 22 7.34 130 0 95 78

* Upto November 2019

Table 13.71: Progress of Pre and post matric Hostels scheme (Rs. in lakhs)
Targets Achievements % of achievements
Amount
Year
released
Fin. Phy . Fin. Phy . Fin. Phy.

2 016- 17 63 871. 96 1838 18 638 71.9 6 63 411. 00 1 7306 5 99 94

2 017- 18 75 422. 00 1852 58 754 22.0 0 75 373. 54 1 7017 2 10 0 92

2 018- 19 73 111. 63 1873 31 762 06.9 5 75 225. 92 1 7276 7 99 92

2 019-2 0* 79 835. 56 1873 31 447 10.4 6 40 756. 59 1 5971 3 91 85

* Upto November 2019


Economic Survey of Karnataka 2019-20 749

Table 13.72: Progress of the Scheme for Fee Concession (Rs. in lakhs)

Targets Achievements % of Achievements


Amount
Year
releas ed
Fin. Phy. Fin. Phy. Fin. Phy.

2016 -17 279 27.00 69 8175 2 7927 .00 2763 1.00 7112 56 99 1 01

2017 -18 349 08.75 70 0000 3 4908 .75 3386 8.95 6303 05 97 90

2018 -19 350 00.00 70 0000 3 5000 .00 3495 6.00 5680 53 10 0 81

2019 -20* 385 00.00 45 2941 2 2330 .00 0 0 0 0


* Upto November 2019

6. Financial Assistance of Foreign reputed and recognised nursing institutes


Studies. getting the opportunity to GNM/ BSc
In order to encourage the students of nursing training with boarding and lodging
backward classes (with annual household facilities.The detailed progress of the
income limit of Rs.1,44,000) to study in scheme is shown in Table 13.76.
foreign universities, financial assistance is 10. Scheme for Nomadic and Semi-
being given . Under the scheme, students of nomadic Tribes.
backward classes are provided with aid for
higher studies like Post-doctoral, Ph.D. and With a view to uplift the socio-economic
Master Degrees in Foreign universities with status of NT/SNTS, a scheme has been
a maximum allowance of Rs.3.5 lakh per launched in the year 2007. The basic
annum to an extent of Rs.10 Lakh for entire objectives of this scheme are-
course. The progress of the scheme is shown r Providing educational facilities and
in Table 13.73. financial assistance for education
7. Stipend to Law Graduates. r Infrastructural development in NT/SNT
colonies
Under the scheme, unemployed law
graduates are provided with monthly r Providing housing facilities
stipend of Rs.4000 till their 4 years training r Providing self employment training and
under a Senior Advocate/Government subsidy.
Pleader. The progress of the scheme is r Irrigational facilities through Ganga
shown in Table 13.74. kalyana.
8. Tailoring Training Centres. The detailed progress of the scheme during
Under this scheme, unemployed women of the last 3 years is shown in Table 13.77.
backward classes are provided with tailoring 13.4.1 D.Devaraj Urs Backward Classes
training in the training centers run by the Development Corporation (DBCDC)
Department and paid stipendiary of Rs.300
for 12 months for each trainee. They are also In order to improve economic status of the
given sewing machines after they complete backward classes, various schemes
the training successfully. The detailed sponsored by the State Government and the
progress of the scheme is illustrated in National Backward Classes Finance and
Table 13.75. Development Corporation (NBCFDC) have
been implemented in the State by D.Devaraj
9. Nursing Training. Urs Backward Classes Development
Under this scheme the students of Corporation (DBCDC). A brief progress of
Backward classes with less than Rs. 1 lakh important schemes being implemented by
family income are provided free education in the Corporation during the last three years
is described below.
750 Economic Survey of Karnataka 2019-20

Table 13.73: Progress of Financial Assistance to Foreign Studies (Rs. in lakhs)


Targets Achievements % of achievements
Amount
Year
Fin. Phy. released Fin. Phy. Fin. Phy.

2016-17 900.00 84 900.00 767.75 92 85 109

2017-18 1000.00 100 750.00 740.00 96 99 96

2018-19 1200.00 250 432.00 432.00 48 100 19

2019-20* 500.00 50 250.00 250.00 31 100 62


* Upto November 2019

Table 13.74: Progress of the Scheme for Stipend to Law Graduates (Rs. in lakhs)
Targets A chievements % of achievements
Amount
Year
released
Fin. Phy. Fin. Phy. Fin. Phy.

20 16-17 1 37.82 1070 13 7.82 126 .29 98 7 92 92

20 17-18 2 18.58 1200 21 8.58 217 .94 10 63 100 89

20 18-19 5 76.00 1200 57 6.00 478 .72 11 32 83 94

201 9-20 * 5 76.00 1200 33 4.08 306 .34 93 4 92 78


* Upto November 2019

Table 13.75: Financial and Physical Progress of Tailoring Training Centers


(Rs. in lakhs)
Targets Amount Achievements % of achievements
Year
Fin. Phy. released Fin. Phy. Fin. Phy .

201 6-17 268. 66 1 206 26 8.66 241 .00 1177 89 98

201 7-18 241. 00 1 206 24 1.00 192 .27 1138 80 94

201 8-19 273. 13 1 206 27 3.13 234 .12 1075 86 89

201 9-20* 269. 13 1 206 15 6.09 108 .17 1002 69 83


* Upto November 2019

Table 13.76: Financial and physical progress of Nursing Training (Rs. in lakhs)
Targets Achievements % of achievements
A mount
Year
released
Fin. Phy. Fin. Phy. Fin. Phy.

2 016-1 7 1030 .00 58 65 600 .00 544 .19 4165 92 71

2 017-1 8 800. 00 60 00 600 .00 583 .00 5617 97 94

2 018-1 9 1459 .00 110 00 151 8.14 1518 .14 8612 100 78

20 19-2 0* 1400 .00 75 00 700 .00 150 .25 6841 21 91


* Upto November 2019
Economic Survey of Karnataka 2019-20 751

Table 13.77: Progress of scheme for Nomadic and Non-nomadic Tribes


(Rs. in lakhs)
Targets Achievements % of achievements
Amo unt
Year
Fin. Phy. released Fin. Phy. Fin. Phy.

201 6-17 10000 .00 45 000 10000 .00 100 00.00 4800 0 100 106

201 7-18 10000 .00 45 000 10000 .00 999 9.70 5145 4 100 114

201 8-19 8000. 00 57 600 8000. 00 799 9.97 10679 5 100 185

2019- 20* 8138. 00 12 7000 4069. 00 306 7.16 3856 7 75 30


* Upto November 2019

1. Chaitanya Subsidy cum Soft Loan 3. Micro Credit Scheme:


Scheme: To take up small economic activities, this
To take up ISB activities like industry, scheme is being implemented by the
service, business, and agriculture and allied Corporation. Loan and subsidy to
activities etc., subsidy and margin money skilled/unskilled backward classes'
starting from Rs.25000/-to Rs.5.00lakh is families, who are below the poverty line are
being sanctioned in collaboration with the being assisted. A financial assistance of
banks to the Backward Classes. The Rs.15000/- which includes Rs.5000/-
Corporation releases 20% subsidy for the subsidy and Rs.10000/- loan at 4% interest
project cost upto Rs.25,000 and remaining rate per annum is being sanctioned per
is banks share of loan. The Corporation beneficiary.
charges interest at 4% p.a. on margin During the year 2019-20, an amount of
money. The Bank charges interest at the Rs.71.85 lakh against the target of
prevailing lending rates for their portion of Rs.500.00 lakh has been spent benefitting
loan. 479 people against the target of 3333 upto
During the year 2019-20, an amount of the end of November 2019. The details of the
Rs.156.80 lakh against the target amount of progress are given in Table 13.80.
Rs.500.00 lakh has been spent benefitting 4. Arivu-Education Loan Scheme: The
1020 people as against the target of 2500 till Corporation extends educational loan to the
the end of November 2019. The details of students who are studying in the field of
the progress are given in Table 13.78. Medical and Engineering and other
2. D.Devaraj Urs Individual Loan professional courses. The corporation
Scheme: releases an amount of Rs.1.00 lakh per year
or actual cost incurred by the student
A financial assistance upto Rs. 2,00,000/- towards admission fees, tuition fee,
per beneficiary to take up self-employment laboratory fee, examination fee etc. for
activities such as petty business, service his/her education. The rate of interest is 2%
and agricultural and allied activities. The per annum. Also the Corporation extends
maximum subsidy under this scheme is interest free loan to students who are
15% to 30%, a maximum of Rs.30000/- of studying in the course for Master's post
the project cost and the rest is loan at 4% Doctoral & Ph.D. in foreign universities. the
interest rate per annum. total loan amount is Rs.3.50 lakh per
During the year 2019-20, an amount of annam or a maximum Rs.10.00 lakh for
Rs.2271.12 lakh against the target of entire course.
Rs.3000.00 lakh has been spent benefitting During the year 2019-20, an amount of
4951 people against the target of 6000 upto Rs.2893.73 lakh against the target of
the end of November 2019. The details of the Rs.5000.00 lakh has been spent benefitting
progress are given in Table 13.79. 4908 students against the target of 9743
upto the end of November 2019. The details
of the progress are given in Table 13.81.
752 Economic Survey of Karnataka 2019-20

Table 13.78: Progress of Chaitanya Subsidy cum Soft Loan Scheme (Rs. in lakhs)
Target Achievement Percentage
Year
Fin. Phy. Fin. Phy. Fin. Phy.

2016-17 1917.00 4300 1151.84 3525 60 82

2017-18 2250.00 5000 1186.50 3102 53 62

2018-19 525.00 3500 610.69 1665 116 48

2019-20* 500.00 2500 156.80 1020 31 41

* Upto November 2019

Table 13.79: Progress of D.Devaraj Urs Individual Loan Scheme (Rs. in lakhs)

Target Achievement Percentage


Year
Fin. Phy. Fin. Phy. Fin. Phy.

2016-17 4209.00 5612 3452.65 8723 82 155

2017-18 8400.00 12700 9732.44 22958 116 181

2018-19 2565.50 4471 2620.32 5638 102 126

2019-20* 3000.00 6000 2271.12 4951 76 83


* Upto November 2019

Table 13.80: Progress of Micro Credit Scheme (Rs. in lakhs)


Target Achiev ement Percentage
Year
Fin. Phy. Fin. Phy. Fin. Phy.

2016-17 450.00 3000 394.65 2596 88 87

2017-18 450.00 3000 780.45 5203 173 173

2018-19 750.00 5000 621.60 4144 83 83

2019-20* 500.00 3333 71.85 479 14 14


* Upto November 2019

Table 13.81: Progress of Arivu-Education Scheme (Rs. in lakhs)

Target Achievement Percentage


Year
Fin. Phy. Fin. Phy. Fin. Phy.

2016-17 2450.00 3780 1951.01 3523 80 93

2017-18 3150.00 4000 2800.66 5819 89 145

2018-19 3540.00 5000 3716.28 6207 105 124

2019-20* 5000.00 9743 2893.73 4908 58 50


* Upto November 2019
Economic Survey of Karnataka 2019-20 753

5. Ganga Kalyana Irrigation Scheme: of Rs.9500.00 lakh has been spent


Individual irrigation: benefitting 790 beneficiaries against the
In order to provide irrigation facilities to the target of 4500 till the end of November 2019
farmers of backward classes this scheme is under Individual and Community Irrigation
being implemented by the Corporation. The schemes.The progress of the scheme during
eligibility conditions are that the farmer the last three years is provided in Table
should belong to small and marginal farmer 13.82.
and his family income should not exceed 6. Assistance to Traditional Artisans &
Rs.40000/- per annum. The maximum unit Occupational Groups:
cost fixed is Rs.2.50 lakh. Out of that
Rs.2.00 lakh is subsidy and Rs.0.50lakh is With a view to upgrade the professional skill
loan at 4% rate of interest. The Corporation and technology of the traditional artisans
is drilling the borewell in the land of eligible and occupational groups belonging to
farmers, supply pump sets and accessories, backward classes, a financial assistance
assist the farmers in getting energisation to upto Rs.2,00,000/- as loan will be provided
the borewells from the Electricity Supply for artisans. The maximum subsidy under
Companies. this scheme is 15% to 30% maximum
Rs.30000/- of the project cost and the rest is
Community Irrigation: A group of small loan at 2% interest rate per annum.
and marginal backward classes' farmers
During the year 2019-20, an amount of
with 8 to 15 acres of land will be provided
Rs.995.05 lakh against the target of
community irrigation facilities. The
Rs.2000.00 lakh has been spent benefitting
eligibility conditions are that the farmers
2310 artisans against the target of 4000
should belongs to small and marginal
upto the end of November 2019. The details
farmers and their family income should not
exceed Rs.40,000/- per annum. The unit of the progress are given in Table 13.83.
cost fixed is Rs. 4.00 lakh to irrigate 8 acres 13.4.2 Karnataka Vishwakarma
and above dry land and Rs.6.00 lakh to Communities Development
irrigate 15 acres and above dry land. The
cost includes drilling of borewells, supply of
Corporation Ltd. (KVCDC)
pumps sets and accessories. The In order to improve the economic Status of
Corporation is releasing Rs.50000/- per Vishwakarma Communities, various
borewell to the Electricity Supply schemes are sponsored by the State
Companies towards energisation of Government and National Backward
borewells. Classes Finance and Development
Corporation (NBCFDC). These schemes are
During the year 2019-20, an amount of implemented in the State by Karnataka
Rs.5732.94 lakh against the target amount

Table 13.82: Progress of Ganga Kalyana Irrigation Scheme (Rs.in lakhs)


Target A chiev ement Percentage
Year
Fin. Phy. Fin. Phy . Fin. Phy.

201 6-17 8 200.0 0 3853 81 40.1 0 68 56 99 178

201 7-18 9 500.0 0 4531 94 52.0 0 58 59 99 129

201 8-19 1 0844. 00 5173 13 950. 68 68 74 129 133

2019 -20* 9 500.0 0 4500 57 32.9 4 79 0 60 18

* Upto November 2019


754 Economic Survey of Karnataka 2019-20

Vishwakarma Communities Development The loan is repayable in 34 equal


Corporation (KVCDC). A brief note on installments with 2 months grace period for
progress of Schemes being implemented by 3 years. The details of the progress under
the Corporation during the last three years this scheme are given in Table 13.84.
is given below.
2. Self-employment scheme (Direct
1.Financial assistance to traditional loan):
artisans (Panchavrutthi): Under this scheme, persons belonging to
To purchase modern tools and equipments Vishwakarma communities who pursue
and upgrade the technological skill, the occupations other than traditional
traditional artisans of Vishwakarma occupations are being provided financial
Communities are provided with financial assistance to the extent of Rs.40,000/- &
assistance by sanctioning loan to the extent 30% subsidy with a maximum of
of Rs.80,000/- at the rate of 4% per annum Rs.10,000/- at the rate of 4% per annum.
& Rs.20,000/- as subsidy. The The loan is repayable in 34 equal
Panchavrutthi scheme includes the installments with 2 months grace period for
following occupations (1) Gold & Silver work, 3 years. The details of the progress under
(2) Sculpture, (3) Blacksmith, (4) this scheme are given in Table 13.85.
Woodwork& Handicrafts, (5) Metallurgy.

Table 13.83: Progress of Assistance to Traditional Artisans & Occupational Groups


(Rs.in lakhs)
Target Achievement Percentage
Year
Fin. Phy. Fin. Phy. Fin. Phy .

2016- 17 321 0.00 32 10 3929. 66 8533 122 26 6

2017- 18 750 .00 10 00 711. 48 1560 95 15 6

2018- 19 713 7.50 10 103 8831. 05 1 9402 124 19 2

20 19-20* 200 0.00 40 00 995. 05 2310 50 58

* Upto November 2019

Table 13.84: Panchavrutthi Scheme (Rs. In Lakhs)


Target Achievem ent Percentage
Year
Fin. P hy . Fin. Phy. Fin. Phy.

2016 -17 840 .00 210 0 900. 20 2248 107 107

2017 -18 800 .00 80 0 835. 00 1576 104 197

2018 -19 600 .00 60 0 543. 82 991 91 165

2019-2 0* 915 .00 91 5 522. 35 1045 57 114

* Upto November 2019


Economic Survey of Karnataka 2019-20 755

Table 13.85: Self-employment Scheme (Rs. In Lakhs)


Target Achievement Percentage
Year
Fin. P hy. Fin. Phy. Fin. P hy.

2016-17 200.00 500 254.50 635 127 127

2017-18 300.00 600 306.95 681 102 114


2018-19 200.00 400 183.80 386 92 97
2019-20* 448.00 224 127.95 284 29 127
* Upto November 2019

3. Self-employment scheme with the annum payable in 3 years is provided.


help of banks: Amount of Rs. 50,000 subsidy is also
Persons belonging to Vishwakarma provided for the energization to the
communities pursuing business, industries borewells which is paid to the Electricity
service sector and agricultural based Supply Companies. The details of the
activities are provided financial assistance progress under this scheme are given in
to the extent of Rs.5,00,000/- as loan. For Table 13.88.
the unit cost of Rs.1,00,000/- 30% subsidy 6. Micro Finance for Women through Self
to the maximum of Rs.10,000/- and 20% as Help Groups:
margin loan Provided. For the unit cost of
Rs.1,00,000/- to a maximum of In this scheme women belonging to
Rs.5,00,000/- a 20% of margin loan or a Vishwakarma Communities are provided
maximum of Rs.1,00,000/- margin loan is with micro credit finance for small and
sanctioned at the rate 4% per annum marginal business through self-help
interest. The details of the progress under groups. This scheme helps the women
this scheme are given in Table 13.86. entrepreneurs to start small business
activities like Flower shop, Vegetable and
4. Educational loan (Arivu): Fruit shop, Fish trade, Coffee-Tea stall and
Students belonging to Vishwakarma for other marginal trading activities. In this
communities who are pursuing scheme financial assistance to the extent of
Engineering, Medicine, Dental Science and Rs.10,000/- Loan at the rate of 4% per
other professional courses through CET are annum & 30% subsidy with a maximum of
provided educational loan at 2% rate of Rs.5,000/- is provided. The loan is
interest per annum for a maximum of repayable in 34 equal installments with 2
Rs.1,00,000/- per year. The family income months grace period for 3 years. The details
should not exceed Rs.3.5 lakh per annum. of the progress under this scheme are given
Under this scheme repayment starts after 4 in Table 13.89.
months of the completion of course which is
7. Loan and training for Goldsmith,
repayable in 36 equal installments within a
Blacksmith and Woodwork
period of 3 years. The details of the progress
entrepreneurs:
under this scheme are given in Table 13.87.
In this scheme, 100 traditional artisans in
5. Gangakalyana scheme (Drilling of the field of Goldsmith, Blacksmith and
Borewell to marginal and small farmers): Woodwork belonging to Vishwakarma
Karnataka Vishwakarma Communities Communities are provided loan to the extent
Development Corporation facilitates small of Rs.1,50,000/-. In this 20% to a maximum
and marginal farmer by providing borewell extent of Rs.25,000/-is provided as subsidy.
to help them improve their agricultural The remaining 80% is provided as loan at
activities. Out of the unit cost of Rs.2.00 the rate of 4% per annum. The loan is
lakh, Rs.1.50 lakh subsidy and a loan of repayable in 34 equal installments with 2
Rs.50,000/- at 4% rate of interest per months grace period for 3 years. The details
of the progress under this scheme are given
in Table 13.90.
756 Economic Survey of Karnataka 2019-20

Table 13.86: Self-employment Scheme with the help of Banks (Rs. In Lakhs)
Target Achievement Percentage
Year
Fin. Phy. Fin. Phy. Fin. Phy.

201 6-17 100.0 0 250 58. 28 193 58 77

201 7-18 50.0 0 100 37. 85 109 76 1 09

201 8-19 25.0 0 50 6.7 5 17 27 34

2019 -20* 64.0 0 256 4.6 0 10 7 4

* Upto November 2019

Table 13.87: Educational loan (Arivu) Scheme (Rs. In Lakhs)


Target Achievement Percentage
Year
Fin. Phy. Fin. Phy. Fin. Phy.

2 016-17 350. 00 700 26 5.75 377 76 54

2 017-18 215. 00 415 41 1.54 561 191 135

2 018-19 258. 50 450 43 2.29 571 167 127

20 19-20* 389. 50 471 23 6.62 297 61 63

* Upto November 2019

Table 13.88: Gangakalyana scheme (Rs. In Lakhs)

Target Achievement Percentage


Year
Fi n. Phy. Fin. Phy. Fin. Phy.

2016-17 410.00 205 70.00 200 17 98


2017-18 400.00 185 256.55 180 64 97
2018-19 446.50 200 435.00 195 97 98
2019-20* 444.00 198 191.50 89 43 45
* Upto November 2019

Table 13.89: Micro Finance for Women through Self Help Groups
(Rs. In Lakhs)
Target Achievem en t Per cen t age
Year
F in . P h y. F in . Ph y. F in . P h y.

20 17-18 1 50.00 1 000 88 .20 588 59 59

20 18-19 45.00 300 51 .90 346 11 5 1 15

201 9-20* 1 20.90 806 40 .80 272 34 34

* Upto November 2019


Economic Survey of Karnataka 2019-20 757

Table 13.90: Goldsmith, Blacksmith and Woodwork entrepreneurs scheme


(Rs. In Lakhs)
Target Achievement Percentage
Year
Fin. Phy . Fin. Phy. Fin. Phy.

2017-1 8 15 0.00 10 0 11 0.00 119 73 1 19

2018-1 9 7 5.00 50 51 .75 61 69 1 22

20 19-20* 4 6.50 31 19 .00 30 41 97

* Upto November 2019

13.5 DEVELOPMENTAL PROGRAMMES course and Rs.1,20,000/- for one Year


FOR THE WELFARE OF MINORITIES course.
In order to promote and uplift Minority b. Students who have taken admission in
Communities of Muslims, Christians, Jains, the recognized universities of IIT, IIM,
Sikhs, Buddhist and Parsis on par with IISC, AIIMS etc. will be sanctioned an
other Communities, Government of amount of Rs.2.00 lakh as Incentive
Karnataka has introduced various only once in the first year upto the end
developmental Schemes. These Schemes of their course period.
are being implemented through Directorate
of Minorities. Brief note of some of the c. Minority students studying B.Ed and
Schemes are noted below. D.Ed courses have been sanctioned
Rs.25,000/- as Incentive from the
1. Incentives Scheme for Minority present academic year under this
Students program.
a. Minority students studying Journalism d. Cash Incentives for securing highest
& Communication courses at Degree marks by students staying in minority
and PG Level are eligible for Post Matric hostels/residential schools and Talent
Scholarships & Incentives during Awards for the residential schools/
Internship, Rs.30,000/- for 3 months colleges securing good results will be
course, Rs.60,000/- for 6 months given on the lines of Backward Class
Welfare Department model as follows.

Sl No Name of the Course Incentive (in RS.)

1 SSLC Students 1,000/-

2 2nd PUC Students 1,500/-

3 Final Year TCH/Diploma Students 1,500/-

4 Final Year Degree Students 2,000/-

5 Final Year Post Graduate Students 3,000/-

6 For Schools 10,000/-


758 Economic Survey of Karnataka 2019-20

During 2019-20, an amount of Rs. 2000.00 Shadimahal/Community halls. A


lakh has been earmarked for this purpose of maximum amount of Rs. 1.00 crore for
which Rs. 1500.00 lakh has been spent District Head Quarters and upto Rs. 50.00
benefiting 4075 students till the end of lakh in other places will be provided.
November 2019. Progress details for the last
As per the Government Order No: MWD 194
3 years are mentioned in Table 13.91.
MDS 2017 Bangalore Dated: 20.05.2017,
2. Skill Development Scheme the scheme of Construction of Shaadi
To enable unemployed boys/girls of Mahal/Community Hall for minorities is
minorities to take up self-employment being implemented for the upliftment of
activities, training programmes are minority community in their social &
conducted from the Government approved cultural programmes and for the
institutions. These trainings will be for a improvement of Minority Properties
period of 1 year and during this period the including Wakf Properties and semi Govt
candidates will be paid Rs. 500 per month Properties. A maximum amount of Rs. 2.00
as stipend. During 2019-20, an amount of Crores at District level and upto Rs. 1.00
Rs. 800.00 lakh has been allocated of which Crore at Taluk level will be provided
a sum of Rs. 24.22 lakh has been spent through the department and constructed
benefitting 230 candidates till the end of buildings will be handed over to the
November-2019. Progress details for 3 years concerned institutions.
are mentioned in Table 13.92. During the year 2019-20, a sum of Rs.
2000.00 lakh has been allocated of which a
3. Shaadimahal/Community Hall
sum of Rs.1110.00 lakh has been spent
In order to promote social and cultural benefitting 51 Institutions till the end of
activities including marriages of minority November-2019. Progress details for the last
communities, a scheme to construct 3 years are mentioned in Table 13.93.
shaadimahal/community hall has been
implemented by the department since 13.5.1 The Karnataka Minorities
2000-01. Development Corporation Ltd.,
Bengaluru (KMDC)
Government of Karnataka vide its order No.
MWD 357 MDC 2013 Bengaluru Dated: Karnataka Minorities Development
06.09.2013 has introduced a scheme of Corporation Ltd., Bangalore was
providing financial assistance for the established on 07.02.1986 by the
construction of Shadimahal/Samudaya Government of Karnataka for the economic,
Bhavan by Minority Communities of social and educational upliftment of
K a r n a ta k a . In te r e s te d Go v e r n m e n t religious minorities of the State viz.
recognized Boards and Corporations/Private Muslims, Christians, Jains, Buddhists,
Institutions/Trusts can apply for financial Sikhs and Parsis. The following schemes are
assistance for the construction of being implemented through the
Corporation.

Table 13.91: Progress of Incentives Scheme for Minority Students (Rs in Lakhs)

Targets Achievements % of achievement


Year
Financial Physical Financial Physical Financial Physical

2016-17 500.00 4166 500.00 2124 100 51

2017-18 1500.00 6500 1449.96 6150 97 95

2018-19 2660.00 10750 2659.12 10125 100 94


2019- 20* 2000.00 8000 1500.00 4075 75 51
Economic Survey of Karnataka 2019-20 759

Table 13.92: Progress of Skill Development Scheme (Rs.in Lakhs)


Targets Achievements % of achievement
Year
Financial Physical Financial Physical Financial Physical

2016-17 1300.00 8125 655.94 2250 50 27

2017-18 2000.00 5000 1948.46 3654 97 73

2018-19 1000.00 2000 486.91 1340 49 67

2019-20* 800.00 1500 24.22 230 3 15

* Upto November 2019

Table 13.93: Progress of the Scheme for Construction of


Shadimahal /Community Hall (Rs.in Lakhs)
Targets Achievements % of achievement
Year
Financial Physical Financial Physical Financial Physical
2016-17 5000.00 250 5000.00 278 100 111
2017-18 5000.00 235 5000.00 229 100 97
2018-19 3006.00 125 2404.00 130 80 104
2019-20* 2000.00 80 1110.00 51 56 64
* Upto November 2019

1.Swavalambana Margin Money Loan the beneficiaries of the religious minorities.


Scheme The financial and physical progress of the
Under the scheme, margin money loan is margin money with Subsidy is given in
provided through various Nationalized Table 13.94.
Banks/Financial Institutions for business, As per Government Order No.MWD/60/
services, industries and agriculture based MDC/2016 dt.27.10.2016, 'Swavalambana'
activities. For a maximum project cost upto Margin Money Loan Scheme and Subsidy
Rs.5,00,000, 20% of the project cost will be Scheme has been modified as 'Subsidy
sanctioned by the Corporation as margin Scheme for Self-Employment'. Under the
money loan @ 6% interest. (The balance is modified Scheme commenced from the year
provided by the Banks/Financial 2017-18, the Corporation has been
Institutions). A subsidy upto Rs.25,000 is sanctioning subsidy component and
also provided by the Corporation and this transmitting to the Nationalised
too is being routed through Nationalised Banks/Financial Corporations.
Banks/Financial Institutions.
The details of subsidy are as under:
2. Subsidy Scheme
Subsidy of 50% or a maximum of
The scheme is linked with the Rs.35,000/- will be sanctioned to undertake
Swavalambana Margin Money Loan economic activities covering the unit cost of
Scheme. Under this scheme, a subsidy Rs.1.00 Lakh. Subsidy of 33% or a
element of 5% of the unit cost or maximum
amount of Rs.25,000/- will be released to
760 Economic Survey of Karnataka 2019-20

Table 13.94: The performance under the Subsidy scheme for Self-Employment
(Rs.in lakhs)
Targets Achievement % of achievements
Year
Financial Phy sical Financial Phy sical Financial Physical

2016-1 7 160 0.00 53 33 16 05.2 2 28 28 100 52

2017-1 8 305 0.00 40 00 27 61.8 0 27 72 91 69

2018-1 9 320 0.00 35 99 31 45.0 0 34 90 98 97

2 019-20 * 150 0.00 20 00 4 64.6 1 3 57 31 18

* Upto November 2019

maximum of Rs.2.00 Lakhs will be and Dental courses. The loan has to be
sanctioned to undertake economic activities repaid after completion of the course. This is
covering the unit cost of Rs.1.00 Lakh and an interest free loan, but the student has to
above. pay a service charge of 2% of the loan
3. Arivu (Education Loan) Scheme availed. The financial and physical progress
of the scheme is shown in Table 13.95.
The Government of Karnataka has
introduced “Arivu” (Education loan) Scheme 4. Ganga Kalyana Scheme (Community
to help the minority students with financial Irrigation Scheme)
assistance of Rs.10,000/- to Rs.75,000/- a.Lift Irrigation Scheme
per year @ 2% service charge till the
completion of professional courses like Irrigation facility is provided to agricultural
Medical, Engineering, Dental, MBA, MCA lands through lift irrigation scheme,
and other Master Degree Courses Ph.D, utilizing the perennial source of water
Diploma Courses, Nursing, Para Medical, (rivers) and lifting water through pipe lines.
B.Ed, D.Ed, ITI. Similarly, education loan b.Individual Borewell or Open Well
upto Rs.1.00 Lakh @ 2% service charge for
BSLP, Audiology, Aeronautics Engineering Under individual borewell scheme, for small
will be sanctioned until they complete the and marginal farmers whose land holding is
course. The Corporation has been from 1.2 to 5 acres, one borewell will be
sanctioning pre-loan @ 2% service charge to drilled and pumpset will be supplied. The
the minority students who appear for CET total cost is Rs. 2.00 lakh which includes
and select seat for professional courses. The energisation charges. However, in respect of
tuition fee payable by the students is being the Districts such as Bangalore Urban,
sanctioned in the form of loan Bangalore Rural, Kolar, Chickballapur,
and transmitted from the Corporation to Ramanagar and Tumkur where the water
the respective Colleges selected after table is very deep, the total cost for drilling of
counselling through Karnataka Examination borewell, supplying of pumpset and
Authority. Similarly, the Corporation has energisation is Rs.3.50 lakh. Wherever the
been sanctioning education loan of 100% of water table is high, open wells are dug and
the tution fee for Government Medical provided with pumpsets and storage tanks.
Colleges or 50% of the tution fee for Private The total expenditure upto Rs.1,50,000/-
Medical Colleges or Rs.3.50 Lakhs @ 2% will be extended as subsidy which includes
service charge per annum (whichever is energisation. This scheme is totally
lower) to the minority students who appear subsidized scheme. The details are given in
for NEET Examination for pursuing Medical Table 13.96.
Economic Survey of Karnataka 2019-20 761

Table 13.95: The financial and physical progress of the Arivu scheme
(Rs.in lakhs)
Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical

2016-17 7600.00 25333 8096.53 22751 107 90

2017-18 10000.00 25000 10517.93 28141 105 113

2018-19 9210.00 24000 9210.00 23400 100 98

2019-20* 10610.00 26000 10405.55 27386 98 105


* Upto November 2019

Table 13.96: The performance under the Individual Borewell/Open well scheme
(Rs.in lakhs)
Targets A chievement % of achievements
Year
Financial Phy sical Financial Physical Financial Phys ical

201 6-17 400 0.50 266 7 2 447.0 0 1931 61 72

201 7-18 480 0.00 231 9 330 0.00 1573 69 68

201 8-19 400 0.00 228 4 836. 00** 15 42 21 68

2019-2 0* 313 8.00 13 00 9 93.8 5 529 32 41

* Upto November 2019


** The tender process has been completed for the year2018-19 and drilling of borewells is under progress.

5. Shramashakthi Scheme The unit cost is limited to Rs.10.00 lakhs


Under this scheme, the artisans belonging including registration expenses, of which 50%
to religious minorities to encourage the is treated as loan @ 6% interest and 50% as
artistic and technical skills, maximum loan subsidy. The land is mortigaged with the
of Rs.50,000 will be provided @ 4% interest Corporation till the recovery of loan. The
rate per annum to improve and setup their progress of the scheme is given in Table
business. Out of the unit cost, 50% is loan 13.98.
and 50% will be considered as back-end 7. Micro Loan and Micro Subsidy
subsidy. The progress of the scheme is Scheme
shown in Table 13.97.
In order to improve the existing petty
6. Land Purchase Scheme business and regular income for their
The basic objective of the scheme is to improve livelihood in city and rural areas, the
the productive assets like land among the religious minorities especially women will
landless minority farmers. Under this scheme, be provided with a micro loan of
the landless farmers belonging to the religious Rs.10,000/- @ 5% interest per annum
minority are eligible for purchase of 2 acres of including Rs.5,000/-subsidy.The details
dry land or 1 acre of wet land in rural areas. are given in Table 13.99.
762 Economic Survey of Karnataka 2019-20

Table 13.97: The progress of the Shramashakthi scheme (Rs.in lakhs)


Targets Achievem ent % of achievem ents
Year
Financial P hysical Financial Phys ical Financial P hysical

20 16-17 3 400. 00 680 0 32 11.00 762 2 94 112

20 17-18 4 000. 00 800 0 38 20.15 121 29 96 152

20 18-19 2 320. 00 464 0 22 75.00 455 0 98 98

Th e pro cess o f sele cti on o f ben efic iar ies b y th e


201 9-20* 1 680. 00 336 0
se lectio n c om mittee is in p ro gre ss.

* Upto November 2019

Table 13.98: The progress of Land Purchase scheme (Rs.in lakhs)

Targets Achievement % of achievements


Year
Financial Physical Financial Physical Financial Physical
2016-17 1000.00 134 300.00 34 30 25
2017-18 1000.00 100 750.00 75 75 75
2018-19 500.00 50 460.00 94 92 188

The process of selection of beneficiaries by the


2019-20* 700.00 70
selection committee is in progress.

* Upto November 2019

Table 13.99: The financial and physical progress of Micro loan and Micro Subsidy
scheme (Rs.in lakhs)

Targets Achievement % of achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 2400.00 24000 2000.00 20000 83 83

2017-18 2400.00 24000 1649.70 16497 69 69

2018-19 1000.00 10000 950.00 9500 95 95

The process of selection of beneficiaries by the


2019-20* 500.00 5000
Selection Committee is in progress.

* Upto November 2019


Economic Survey of Karnataka 2019-20 763

8.Margin Money Loan for housing for modernising the existing staff by
Under the Scheme, the Corporation has covering its front portion with glass screen
been sanctioning margin money loan upto and for purchasing freezer in order to
Rs.1.00 Lakh @ 4% interest per annum to protect the perishable articles. The details
the beneficiaries for remitting beneficiary's are given in Table 13.101.
contribution to the Government owned 10. NMDFC's Term Loan Schemes
Housing Agencies such as Rajiv Gandhi
With a view to uplift the poor religious
Housing Corporation, Karnataka Housing
minorities in the country by providing term
Board, Slum Development Board and other
loans to take up self-employment pursuits,
agencies which are selecting the
the NMDFC (National Minorities
beneficiaries under different housing
Development and Finance Corporation) was
Schemes. The details are given in Table
setup at the national level in 1994. The term
13.100.
loan is provided through the State
9.Profession Encouragement Scheme Channelising Agency viz., KMDC for the
The Corporation has been implementing benefits of religious minorities in the State.
this scheme since 2018-19. Under the The Corporation is releasing 90% of the
scheme, a subsidy of Rs.1.00 Lakh will be project cost as NMDFC share, 05% share of
provided to the minorities for the loan of the project cost will be released from KMDC
Rs.2.00 Lakhs sanctioned from Nationalised and balance 5% of the project cost has to be
Bank/Scheduled Bank/Grameena Bank for borne by the beneficiary, and 6% interest
modernising their shop for the sale of fruit rate per annum is being charged by the
and vegetables, cool drinks, dairy Corporation for the loan released. There are
products/tender coconut/sugarcane juice, different schemes implemented by the
mutton, sweet meat, bakery, fish and also Corporation.The details are given in Table
13.102 & 13.103.

Table 13.100 : The financial and physical progress of Margin Money Loan for
housing scheme (Rs.in lakhs)

Targets Achievement % of achievements


Year
Financial Physical Financial Physical Financial Physical

2017-18 2000.00 2000 1023.00 1403 51 70

2018-19 1000.00 1000 300.00 300 30 30

The process of selection of beneficiaries by


2019-20* 1040.00 1040
the Selection Committee is in progress.

* Upto November 2019

Table 13.101 : The financial and physical progress of Profession Encouragement


Scheme (Rs.in lakhs)
T a r ge t s Ac hie ve m en t % of a c h ie ve m e n ts
Year
F in a n cia l Ph ys ic a l F in a n cia l Ph ys ic a l F in an c ial P hy sic a l

2018-19 3000 .00 300 0 2710 .00 27 10 90 90

20 19-20* 672. 00 67 2 117. 00 11 7 17 17

* Upto November 2019


764 Economic Survey of Karnataka 2019-20

Table 13.102: Progress of NMDFC's Term Loan Schemes (Rs.in lakhs)


Amount Total loan sanctioned and spent under
Received NMDFC schemes
Year
from Beneficiary KMDC NMDFC No.of
Total
NMDFC Amount Amounts Amounts Beneficiaries
2016-17 1048.10 - 1.05 19.85 20.90 5

2017-18 - - 6.56 118.16 124.72 21

2018-19 - - 10.98 208.57 219.55 41

2019-20* - - 1.39 25.02 26.41 6

* Upto November 2019

Table 13.103 : Progress of NMDFC's Education Loan Scheme (Rs.in lakhs)

A mount To tal loan s anctio ned and spent und er


NMDFC schemes
Received
Year
fro m
Beneficiary KM DC NM DFC No . of
NM DFC Total
Amo unt Amo unts A mounts B eneficiaries

2 016-1 7 2 62.00 - 0.60 1 0.80 11 .40 3

2 017-1 8 2 40.00 - 5.18 9 3.24 98 .42 24

2 018-1 9 1 92.00 - 3.15 5 6.70 59 .85 15

20 19-2 0* 2 28.00 - 2.18 3 9.24 41 .42 9

* Upto November 2019

11. Loan for purchase of domestic given in Table13.106.


animals like cows, sheep, goats etc.
14. Minority Farmer Scheme
The scheme is mainly for rural sector and for
Women of minority communities who wish In order to alleviate the poor condition of the
to purchase cows, sheep, goats or to farmers, KMDC has proposed the following
establish/ expand existing poultry farm, scheme meant exclusively for them @ 3%
duck farm, ostrich farm etc. as a means of loan upto Rs.1,00,000/- with 50% backend
sustained income. The unit cost is subsidy for procurement of Modern
Rs.40,000/- at 3% interest per annum with agricultural equipments like Tiller, Steel
a subsidy of 50%. The details are given in plough, Drills, Weedout machines, Pump
Table 13.104. sets and Tractors. The details are given in
Table 13.107.
12. Loan for purchase of taxi / goods
vehicles 15. Training incentives and
infrastructure support for the following
Subsidy of Rs. 3 lakh each will be given to activities
beneficiaries to buy taxies / goods vehicles
and avail the same with the bank loan. The a. Automobile Service:
details are given in Table 13.105. It is an acknowledged fact that a large
13. Self employment scheme for Gulf number of people belonging to minority
returnees community is adept at mechanical works in
automobile field. Also owing to the fact that
A scheme on the 'Kerala Model' is announced most of them have low education
to create self-employment for the levels/illiterates, a scheme to provide
unemployed persons who returned once for livelihood to this group is introduced.
all from the Gulf countries. The details are Mechanics and other semi-literate/illiterate
Economic Survey of Karnataka 2019-20 765

Table 13.104: Progress of Loan for purchase of domestic animals like cows, sheep,
goats etc. (Rs. in lakhs)
Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical

2017-18
1000.00 2500 718.00 1795 72 72
(General)

2017-18
(Christian 400.00 1000 118.00 295 30 30
Community)

2018-19 800.00 2000 760.00 1900 95 95

The process of selection of beneficiaries by the Selection


2019-20* 800.00 2000
Committee is in progress.

* Upto November 2019

Table 13.105: Loan for purchase of taxi / goods vehicles (Rs.in lakhs)
Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical
2017-18
1500.00 500 1032.00 344 69 69
(General)
2017-18
(Christian 600.00 200 186.00 62 31 31
Community)
2018-19 1900.00 633 1620.00 540 85 85

2019-20* 900.00 300 75.00 25 8 8


*upto November 2019
Table 13.106: Self employment scheme for Gulf returnees (Rs.in lakhs)
Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical

2017-18 330.00 33 110.00 13 33 39


2018-19 200.00 20 100.00 10 50 50

The process of selection of beneficiaries by the Selection


2019-20* 200.00 20
Committee is in progress.
* Upto November 2019
Table 13.107: Minority Farmer Scheme (Rs.in lakhs)
Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical
2017-18 1000.00 1000 221.00 221 22 22
2018-19 400.00 400 280.00 280 70 70
The process of selection of beneficiaries by the Selection
2019-20* 200.00 200 Committee is in progress.
* Upto November 2019
766 Economic Survey of Karnataka 2019-20

minority persons having inclination to set c. Channapatana Handicrafts:


up their own mechanic workshop will be With a view to support the craft-persons to
trained in Government recognized Institutes promote their skills with latest technology
and provided with a tool kit as a part of the and to help them with marketing facilities.
training. Loan of Rs.2.00 Lakh to Rs.5.00 The Corporation gives a loan of Rs.1.00 lakh
Lakh will be sanctioned with the co- per artisans @ 3% interest per annum with a
ordination of Banks / Co-operative subsidy of 50%. The details are given in
Societies/ Financial Institution with 35% Table13.110.
subsidy. Subsidy will be a minimum of
Rs.70,000/- and a maximum of Rs.1.25 d. Silk Industry:
lakhs. The training will be provided with the This is a famous traditional activity in
co-ordination of Automobile Service Centres Ramanagar District. Many families are
like Toyota, Volvo, TATA, TAFE etc. The engaged in this activity and the persons are
details are given in Table 13.108. depending upon this activity. This activity
b. Bidri Work: has got more prominance in the local
market. Hence, the youth belonging to
Bidri work art is a metal handicraft from minority communties will be encouraged to
Bidar. Loan of Rs.2.00 Lakhs to Rs.5.00 become self-employed. After providing
Lakhs is sanctioned with the co-ordination training, the Corporation has been
of Banks/Co-operative Societies/ Financial sanctioning loan of Rs.1.00 Lakh @ 3%
Institution with 35% subsidy with a interest per annum which includes 50%
minimum of Rs.70,000/- and a maximum of subsidy. The details are given in Table
Rs.1.25 lakhs. The details are given in 13.111.
Table 13.109.

Table 13.108: Automobile Service (Rs.in lakhs)


Targets Ach ievem en t % o f ach ievem en ts
Year
F in an cial Ph ys ical F in an cial P h ysical F in an cial Ph ysical

The pr oce ss o f se lection o f be ne ficiaries by th e S electio n


201 9-20* 40 .00 32
Co mm ittee is in pr og ress

* Upto November 2019


**For the years 2017-18 & 2018-19, consolidated figures are furnished in Table13.112.

Table 13.109: Bidri Work (Rs.in lakhs)


Targets Achievement % o f achievem ents
Year
Financial Phys ical Financial Physical Financial Physical

The proce ss of se lection of be ne ficiaries by the Selection


201 9-20* 12 .50 10
Comm ittee is in prog ress .

* Upto November 2019


**For the years 2017-18 & 2018-19, consolidated figures are furnished in Table13.112.

Table 13.110: Channapatana Handicrafts (Rs.in lakhs)


Targets Achievement % o f achievem ents
Year
Financial Phys ical Financial P hysical Financial Physical

The pr oce ss of se lection of be ne ficiaries by th e S election


201 9-20* 64 .00 64
Comm ittee is in pr og ress .

* Upto November 2019


**For the years 2017-18 & 2018-19, consolidated figures are furnished in Table13.112.
Economic Survey of Karnataka 2019-20 767

16. “Mane Malige” Scheme (1) The applicants should belong to


During Communal Riots/communal religious minority community as
violence or natural calamities, it is seen that defined in the Government Order.
business establishments and homes of the (2) They should be permanent residents of
minorities get damaged and destroyed. Due Karnataka State.
to this livelihood gets affected. Also youths (3) Annual family income limit is Rs.1.03
who are studying in colleges / working or Lakhs in urban areas andRs.81,000/-
having business are arrested by police in rural areas. In respect of 'Arivu'
under Goonda Act, Anti-terrorist Act or Scheme, the income limit is
other security Acts. After many years they Rs.6,00,000/- and for new schemes,
are released by court without conviction. the income limit is Rs.4.50 Lakhs.
These youths) lose their education and (4) Age limit of the applicants is between 18
become unemployees due to the stigma to 55 years. However, with respect to
attached. In order to help them to integrate new schemes, the age limit is between
in the society and for their livelihood, it is 18 to 45 years.
proposed to give loans under “Mane Malige”
(5) In respect of Ganga Kalyana Scheme
scheme, a loan of Rs.5 lakh with 50%
and Land Purchase Scheme, the
subsidy @ 3% interest per annum for the
applicant should be small and marginal
person belonging to victims of communal
farmer.
violence and who are released by Courts
without conviction. The details are given in (6) They should produce 'Aadhar' Card or
Table 13.113. Voter ID for residence proof.
(7) Applicants should produce Project
Common eligibility criteria for submitting Report.
applications under all Schmes:
(8) Applicant must have Bank Account.

Table 13.111: Silk Industry (Rs.in lakhs)


Targets Achievement % o f achievem ents
Year
Financial Phys ical Financial P hysical Financial Physical

The pr oce ss of se lection of be ne ficiaries by th e S election


2019 -20* 64.0 0 64
Comm ittee is in pr og ress .
* Upto November 2019
**For the years 2017-18 & 2018-19, consolidated figures are furnished in Table13.112.

Table 13.112: Consolidated Figures of above 04 schemes (Rs.in lakhs)


Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical
2017-18 1000.00 680 373.55 506 37 74
2018-19 400.00 630 265.00 400 66 63

Table 13.113: Mane Malige Scheme (Rs.in lakhs)


Targets Achievement % of achievements
Year
Financial Physical Financial Physical Financial Physical
2017-18 500.00 100 - - - -
2018-19 150.00 30 - - - -
The process of selection of beneficiaries by the Selection
2019-20* 100.00 20
Committee is in progress
* Upto November 2019
768 Economic Survey of Karnataka 2019-20

13.6 PROGRAMMES FOR THE 13. Specific Learning Disabilities


EMPOWERMENT OF DIFFERENTLY 14. Multiple Sclerosis
ABLED & SENIOR CITIZENS
15. Speech and Language Disability
13.6.1 Introduction:
16. Thalassemia
The Department for Empowerment of
Differently Abled & Senior Citizens has been 17. Hemophilia
established in the year 1988. Department is 18. Sickle Cell disease
facilitating Disabled Persons to get the
benefits of the different schemes 19. Multiple Disabilities including deaf
implemented by the department in order to blindness
bring them to the mainstream of the society. 20. Acid Attack victim
The disabled persons are categorized as
under: 21. Parkinson's disease
1. Blindness As per 2011 Census, there are 13,24,205
various categories of PwD's details are
2. Low Vision shown in Table 13.114.
3. Leprosy Cured persons A comprehensive Act called the Right of
4. Hearing Impairment (deaf and hard of Persons with Disabilities (Equal
hearing) Opportunities, Protection of Rights & Full
Participation) Act –2016 has came into force
5. Loco-motor Disability from 19.04.2017. The State Govt. has
6. Dwarfism constituted the State Co-ordination
Committee as per the Sec.13 of the Act and
7. Intellectual Disability appointed the Commissioner as per Section
8. Mental Illness 60 of the Act and constituted State
Executive Committee as per the Sec.19 of
9. Autism Spectrum Disorder the Act.
10. Cerebral palsy Departmental Programmes:
11. Muscular Dystrophy The programmes of the department are
12. Chronic Neurological Conditions broadly classifieds into three categories :

Table 13.114 : Details of various categories of PwD's


Various Categories No of Persons

Visually Impaired 2,64,170

Hearing Impaired 2,35,691

Speech 90,741

Movement 2,71,982

Mentally Retarded 93,974

Mentally ill. 20,913

Others 2,46,721

Multiple Disabilities 1,00,013

Total 13,24,205
Economic Survey of Karnataka 2019-20 769

1. Programmes for Development of Person During 2019-20, an amount of


with Disabilities. Rs. 18295.00 lakhs is earmarked and an
amount of Rs.5077.37 lakhs expenditure is
2. Programmes for Development of Senior
incurred up to the end of November 2019.
Citizens.
3. Social Security programmes. Braille Printing Press:
Braille books required for the Visually
Specific challenges and future strategy of
Impaired students are printed and supplied
the Department :
by the Govt. Braille Printing Press at Mysore,
r To undertake survey of Persons with throughout the State. During 2019-20,
Disabilities based on types of 5500 text books have been printed and
disabilities in all Districts of Karnataka. supplied to visually impairment students
r To establish Hostels in all the District upto the end of November 2019.
Headquarters to provide subsidized/ 1. Maintenance Allowance to the
free boarding and lodging facilities for Disabled:
working men & students with
disabilities. PwDs whose family income is less than
Rs.17,000/- per annum in urban and
r To provide Medical Treatment/
Rs.12,000/- per annum in rural areas with
Rehabilitation Services under
disability percentage 40 and above are
NIRAMAYA scheme for all the persons
entitled for maintenance allowance of
with mental retardation.
Rs.600/- per month. As per the Government
r To take action to start District Disabled order dated: 23.9.2013 the sum is enhanced
Rehabilitation Centers (DDRC) in the to Rs.1400/- per month for the beneficiaries
Districts head-quarters, wherever they having disability of 75% and above. The
are not existing. Tahasildar of respective Taluks are the
Funding: sanctioning authorities. During 2019-20
this Scheme is being implemented by
The financial outlay of plan and non-plan of Revenue Department. Past four years
State and District Sector schemes which is detailed progress of the Scheme are shown
implemented by the Department are funded in Table 13.115.
by the secretariate of Women and Child
Development and Empowerment of 2. Aids and Appliances to the Disabled:
Differently Abled and Senior Citizens. Govt. Various Aids & Appliances are provided to
of India also funds NGOs directly for the persons having 40% and above disability
programmes undertaken for the at free of cost up to a maximum of
Welfare/Development of Differently Abled Rs.10,000/- and for Motorized Tricycle 50%
and Senior Citizens, based on the of the cost of Tricycle is subsidized. As per
recommendations of the State Government. the budget speech declaration 2016-17, the

Table 13.115 : Progress of Maintenance Allowance to the Disabled (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2015-16 80405.00 950000 76990.19 771548 95 73

2016-17 90657.00 950000 90657.00 858517 100 90

2017-18 88372.05 950000 87250.11 838821 98 88

2018-19 109779.00 910121 106018.44 934957 97 103


770 Economic Survey of Karnataka 2019-20

amount for Aids and Appliances to given grants to run Special Schools and
physically handicapped has been enhanced vocational training centers. Grants are given
to Rs. 15,000/- and the administrative towards salary to the teaching and non
approval has been accorded from the State teaching staffs as well as Rs.1000/-per
Government. The Progress of the past four month per child as maintenance charges,
years are shown in Table 13.116. The detailed progress for last four years are
shown in Table 13.118.
3. Medical Relief Fund:
Under the scheme financial assistance is 5. Sadhane and Prathibe:
provided to Persons with Disabilities to Under the scheme, persons with disabilities
undergo corrective surgery (Hospitalization, who participate in national and
Bed Charge, Medicines, Therapy) up to international sports events are provided
maximum of Rs.1.00 lakh. During 2019-20, Rs.50,000/- as a token of encouragement.
an amount of Rs.60.00 lakhs is earmarked. Under the Scheme "Prathibe” financial
The detailed progress for the last four years incentive of maximum Rs.20,000/- is
are shown in Table 13.117. provided to encourage persons with
disabilities participating in cultural
4. Financial Assistance to NGO's to run activities and maximum of Rs. 50000/- in
the Special School Under District Sector sports. An amount of Rs.80.00 lakhs have
Scheme.
Under District Sector Scheme NGO's are

Table 13.116: Progress of Aids and Appliances to the Disabled (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 106.00 3546 100.01 2361 94 66

2017-18 145.75 3800 135.66 3776 93 99

2018-19 300.00 7728 177.62 4734 59 79

2019-20* 300.00 6000 38.84 1574 13 26

* Upto November2019.

Table 13.117 : Progress of Medical Relief Fund (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical

2016-17 49.70 80 26.70 39 54 49

2017-18 90.38 192 49.45 148 55 77

2018-19 60.00 60 45.76 72 76 120

2019-20* 50.00 100 17.49 25 35 25


* Upto November 2019.
Economic Survey of Karnataka 2019-20 771

been earmarked for the year 2019-20. During 2019-20, Rs.5650.00 lakhs is
Rs.13.55 lakhs of expenditure was incurred earmarked for this purpose. Out of which
upto the end of September 2019. The Rs. 2103.50 lakhs has been spent. As of now
detailed progress for last four years are 7089 students with disabilities have been
shown in Table 13.119. benefitted till the end of November 2019 is
shown in Table 13.120.
6. Financial Assistance to NGO's
running Special Schools: (Child Centric 7. Scholarship and incentives to the
scheme): disabled:
The Financial Assistance is provided to In order to encourage students with
NGO's running Special Schools for various disabilities for continuation of their
types of Disabled Children under Child education, a Scholarship scheme is
Centric Scheme. An amount of Rs.6200/- implemented for students studying from 1st
per child per month in case of residential Std to Post Graduate Courses. Disable
and Rs.5200/- per child per month in case Student who scores 60% and above is
of Non Residential for the tenure of 10 provided monthly Scholarship. During
months in a financial year is provided. The 2019-20, an amount of Rs.596.00 lakhs is
financial assistance includes teaching and earmarked expenditure of Rs.177.73 lakhs
non teaching staffs honorarium, food, was incurred upto the end of November
uniform, medical expenditure of children, 2019, 8266 beneficiaries were benefitted.
rent and miscellaneous charges. The detailed progress for last four years are
shown in Table 13.121.

Table 13.118: Progress of Financial Assistance to NGO's (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 1108.00 2685 1107.77 3025 100 100

2017-18 1668.00 3000 1668.00 3018 100 83

2018-19 1676.00 2615 1676.00 2856 100 95

2019-20* 2046.00 2700 469.12 901 23 33

* Upto November 2019.

Table 13.119: Progress of Sadhane and Prathibe (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical

2016-17 50.00 600 38.03 561 76 93

2017-18 47.10 436 25.74 90 55 21

2018-19 74.55 305 73.91 90 99 30

2019-20* 80.00 100 13.91 29 17 27

* Upto November 2019.


772 Economic Survey of Karnataka 2019-20

Table 13.120: Financial Assistance to NGO's Running Special Schools:


(Child centric scheme) (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 3983.00 10000 3910.98 9585 98 95

2017-18 6056.00 9585 5751.10 8411 95 88

2018-19 5236.00 8680 5257.55 9500 100 109

2019-20* 5650.00 10000 2103.50 7089 37 71


* Upto November 2019.

Table 13.121: Progress of Scholarship and incentives to the disabled


(Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 596.00 29800 533.74 23703 89 92

2017-18 596.00 30000 526.57 22116 88 74

2018-19 596.00 24300 504.08 21973 85 90

2019-20* 596.00 24300 177.73 8266 24 34


* Upto November 2019.

8. Hostel for female disabled employees: identification, screening, surgical


To encourage female beneficiaries with corrections, speech and hearing and
disability in education and employment, the physiotherapy, therapeutical services and
department is implementing hostel for fitment of needy Aids and Appliances,
disabled female employees, trainees and parental counselling for children with
students. 26 Hostels are run by NGO`s mental retardation, Special Education,
in 23 districts. 50 beneficiaries are Employment and Training and facilitation
accommodated in each hostel. (Table for availing identity cards and Social
Security benefits for Persons with
13.122)
Disabilities in their respective districts. The
9. District Disability Rehabilitation scheme is established and monitored by the
Center Scheme: District Management Team chaired by
The main objective of the programme is to Deputy Commissioner of the district
identify and provide comprehensive total concerned. An amount of Rs.200.00 lakhs
rehabilitation service at the door step has been earmarked for the year 2019-20
of the beneficiaries under single window and an amount of Rs.46.38 lakhs has been
system. The service package consists of spent upto the end of November 2019, 3807
are benefitted. (Table 13.123)
Economic Survey of Karnataka 2019-20 773

Table 13.122: Progress of Hostel for female disabled employees


(Rs.in Lakhs)
Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical

2016-17 458.00 1300 321.54 1046 70 80

2017-18 350.00 1300 101.63 703 29 54

2018-19 350.00 1300 313.32 1009 89 78

2019-20* 350.00 1300 130.76 692 37 53

* Upto November 2019.

Table 13.123: District Disability Rehabilitation Center Scheme (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 769.00 15000 137.37 10130 18 67

2017-18 500.00 15000 185.00 4632 37 31

2018-19 275.00 0 204.57 0 74 0

2019-20* 200.00 0 46.38 0 23 0


* Upto November 2019.

10. Grameena Punarvasathi Yojane: 11. Information and Counseling Centers


Grameena Punarvasathi Yojane is for PwD's:
implemented to provide services like To provide information about programmes
rehabilitation, awareness, Social Security, and schemes of the Department, an
Educational Training and Employment and Information and Counselling Center at the
other Government schemes reserved for Head Office and Helpline / Information
disabled in various departments at the door centers in 30 districts are functioning. In
step of persons with disabilities through these centers information about the
Village Rehabilitation Worker (VRW) and availability of quality aids appliances and
taluk level Multipurpose Rehabilitation other information required by PWD`s like
Worker (MRW) who are PwD's appointed at training institutions, job opportunities etc.
Grama Panchayathi and Taluka level. They are provided. During 2019-20, an amount of
are provided monthly honorarium of Rs.172.00 lakhs is earmarked and an
Rs.3000/- and Rs.6000/- respectively. amount of Rs.59.60 lakhs has been spent
During 2019-20 an amount of Rs.2216.00 upto the end of November 2019.
lakhs is earmarked. The detailed progress
for last 4 years are shown in Table 13.124.
774 Economic Survey of Karnataka 2019-20

12. Self Employment Scheme for the disabilities. The Government has accorded
Disabled (ADHARA): administrative approval to M/S Enable
India, Koramangala, in 2014-15. During
Under this Scheme, Rs.35,000 will be 2019-20, an amount of Rs.40.00 lakhs is
sanctioned to eligible disabled beneficiaries earmarked. The detailed progress at the end
to establish petty shops. Out of Rs.35,000
of September 2019 is shown in Table
an amount of Rs.20,000 is provided
13.126.
towards working capital as loan which is
repayable and Rs.15,000/- worth kiosk is 14. Incentive Scheme for persons with
provided to each beneficiary. Rs.290.00 no disabilities who marry Differently
lakhs has been earmarked during 2019-20 Abled Men and Women:
for this purpose. During 2019-20 Budget
In the prevailing circumstances men or
speech the scheme is revised by enhancing
women are hesitant or reluctant to marry
the unit cost to Rs.1.00 lakh, to be provided
persons with disabilities, as they feel that
as loan through banks and a maximum
they would face difficulties in the married
Rs.50,000/- will be provided as subsidy at
life due to social stigma. It is essential to
the rate of 50% by the Department. The
encourage integrated marriages among
detailed progress of last 4 years are shown in
persons with disabilities and the able bodied
Table 13.125. individuals. In this context under the
13. Job portal: scheme financial incentive of Rs.50,000/- is
paid to such eligible couple. This amount is
Job portal scheme is framed to provide
deposited in Joint Account for 05 years (FD).
employment opportunities to persons with

Table 13.124: Progress of Grameena Punarvasathi Yojane (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 1425.00 6198 1106.95 4660 78 75

2017-18 2362.00 5321 1600.96 4714 68 89

2018-19 1901.00 5047 1756.93 4971 77 98

2019-20* 2216.00 5202 697.10 4666 31 77

* Upto November 2019.

Table 13.125: Progress of Self Employment Scheme for the Disabled (ADHARA)
(Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 392.00 1120 377.72 1117 96 99

2017-18 455.87 1318 455.87 1318 100 100

2018-19 191.45 547 0 0 0 0

2019-20* 290.00 580 0 0 0 0


* Upto November 2019.
Economic Survey of Karnataka 2019-20 775

Interest accrued can be utilized by the in pursuing their Higher/Technical


couple. On completion of lock in period of 05 Education, Vocational Education, Master
years they can withdraw or continue the Degrees and hence the scheme has been
Fixed Deposit. During 2019-20, an amount introduced to reimburse the Exam/Tuition
of Rs.450.00 lakhs is earmarked, year wise / Lab/ Sports and Library fees. In order to
progress achieved are shown in the. avail these benefits no income limit is
Table 13.127. prescribed and those who have availed ID
cards through Medical boards are eligible
15. Reimbursement of fees for under the scheme. During 2019-20, an
Differently Abled students for Higher amount of Rs.175.00 lakhs is earmarked.
and Technical Education: The detailed progress of last 4 years are
Due to economical condition, students with shown in the Table 13.128.
disabilities are unable to bear the high cost

Table 13.126: Progress of Job Portal (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 52.00 1000 0.28 4 1 0
2017-18 50.00 1000 0 0 0 0
2018-19 45.00 500 0 0 0 0
2019-20* 40.00 500 0 0 0 0
* Upto November 2019.

Table 13.127: Progress of Incentive Scheme (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 810.00 1620 668.50 1342 83 83
2017-18 611.00 1222 570.50 1141 93 93
2018-19 275.00 550 463.50 927 98 98
2019-20* 450.00 900 185.50 371 41 41
* Upto November 2019.

Table 13.128: Progress of Reimbursement of fees (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 187.68 2500 151.37 2484 80 99
2017-18 209.17 3800 173.98 2903 83 76
2018-19 175.00 2900 162.50 3062 77 102
2019-20* 175.00 2900 54.30 1229 31 42
* Upto November2019.
776 Economic Survey of Karnataka 2019-20

16. Child Care Allowances towards the cerebral palsy, autism and multiple
Health and Nutritional Care of the new disability requires day care services such as
born baby of Visually Impaired Women: protection, shelter, education and food. The
This Scheme was implemented during parents of these children are usually found
2013-14. It is observed that the women with to be engaged in some occupation for their
visual impairment experiences greater livelihood. In this context under the scheme
hardship in upbringing the newly born 2 Day Care Centers are established to
child. In this context under the scheme a provide such services in the urban areas.
sum of Rs 2,000/- per month for two years During 2019-20, an amount of Rs.50.00
for two deliveries is paid to the beneficiary lakhs is earmarked. The detailed progress at
towards the services of Aaya, health care, the end of November 2019 are shown in the
nutritional food, medical treatments for Table 13.130.
maximum of two children. The detailed 18. NIRAMAYA (Health Insurance
progress till the end of November 2019 are Scheme):
shown in the Table13.129.
NIRAMAYA Health Insurance Scheme for
17. Establishment of Day Care Centers the children belonging to BPL families and
for Children with Autism and Multiple suffering from autism, cerebral palsy,
Disabilities: Mental retardation and multiple disabilities
Children between the age of 6 to 18 years has been launched as per the requirement of
who are suffering from mental retardation, National Trust Act 1999. The scheme

Table 13.129 : Progress of Child Care Allowances (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical

2016-17 35.70 140 26.40 132 73 94

2017-18 30.22 137 25.66 125 85 91

2018-19 30.00 125 25.43 115 85 92

2019-20* 40.00 125 6.19 71 15 57


* Upto November 2019.

Table 13.130: Progress of Establishment of Day Care Centers for Children with
Autism and Multiple Disabilities (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 50.00 50 37.50 50 50 100

2017-18 50.00 50 19.00 50 38 100

2018-19 50.00 50 37.50 50 75 100

2019-20* 50.00 50 12.50 25 25 50


* Upto November 2019
Economic Survey of Karnataka 2019-20 777

provides the beneficiaries with medical 20. Providing Motorized two wheeler for
insurance coverage up to Rs. 1 lakh per year Persons with Disabilities:
based on one time payment of Rs.250 as Persons in the age group of 20-60 years with
premium. During 2019-20, an amount of severe physical disabilities and hailing from
Rs.4.00 lakhs is earmarked. The detailed families with income of Rs. 2 lakhs per
progress at the end of November 2019 are annum will be provided motorized two
shown in the Table 13.131. wheelers with retro fitment. During
19. Laptop to Students with visual 2019-20, an amount of Rs.1330.00 lakhs is
impairment: earmarked. The detailed progress at the end
of November 2019 are shown in the
To enable visually challenged students to
Table 13.133.
pursue higher education using latest
technology, laptops are provided and 21. Unemployment allowance:
Rs.500.00 lakhs has been allocated for this Rs. 1.00 crore has been allocated for
purpose. The Government issued providing Unemployement allowance for
administrative approval for this scheme on about 5000 PwD`s. Who have completed
03-07-2014. During 2019-20, 500 Visually S.S.L.C and above. These persons would be
Impaired Students will be provided Laptops. paid Rs.1000/- per month. Administrative
(Table 13.132). approval for this scheme was accorded
during 2014-15 to provide unemployment

Table 13.131: Progress of NIRAMAYA (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 20.00 6460 8.23 3197 41 49

2017-18 15.84 4761 2.09 863 13 18

2018-19 10.00 4000 0.56 184 6 5

2019-20* 4.00 4000 0.24 96 6 2


* Upto November 2019

Table 13.132: Progress of Laptop to Students with Visual impairment (Rs.in Lakhs)

Targets Achievements % of Achievements


Year
Financial Physical Financial Physical Financial Physical

2016-17 500.00 1000 266.21 609 53 60

2017-18 0 0 170.92 391 0 0

2018-19 230.00 448 0 0 0 0

2019-20* 250.00 500 0 0 0 0


* Upto November 2019
778 Economic Survey of Karnataka 2019-20

Table 13.133: Progress of providing Motorized two wheeler scheme (Rs.in Lakhs)
Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 1417.00 2000 1269.63 2000 90 100
2017-18 2800.00 4000 2619.96 4000 93 100
2018-19 700.00 1000 0 0 0 0
2019-20* 1330.00 2000 0 0 0 0
* Upto November 2019

allowance to PwD`s with the qualification of r To create awareness about Maintenance


SSLC and above. Women and Child of Senior Citizens Act 2007.
Development Department has been r To train and empower the Officers/Staff
authorized to operate this scheme. working for the Senior Citizens.
22. Identity Cards to Persons with I. Programme Formulated for the welfare
Disability: of Senior Citizens
Under this scheme, Identity Cards are According to the census report of 2011,
issued to Persons with disabilities. The ID out of total population of 611 lakhs
cards enable the card holders avail various in Karnataka, approximately 7.72%
services. At present Government of India population is of senior citizens aged above
has implemented Unique Disability ID Card 60 years which is around 47.18 lakhs.
UDID Scheme all over the State. Issuing
The Govt. of Karnataka has formulated State
authority is Medical Authority through
policy for senior citizens from 5-9-2003
Medical Officers. 3,22,297 applications
which has been evolved with the motto of
received and 69,316 UDID cards are issued
ensuring better quality of life.
upto the end of November 2019.
Objective of the State Policy:
Senior Citizen Cell:
1. To ensure safety of Senior Citizen.
Highlighting best Practices and Success 2. To protect Senior Citizens by providing
Stories economic security, health care and by
The Department for the Empowerment of protecting them against exploitation
Differently Abled & Senior Citizens had and ill treatment.
organized Senior Citizens day on 3. To formulate programme for Senior
01-10-2018 at Ravindra Kalakshetra, Citizens living in rural areas to ensure
Bangalore. Several Cultural Programmes that they also get the benefits that their
like light music, Folk songs, Dance Drama, counter parts in urban areas.
Entertainment Programme etc. was 4. To create opportunities for Senior
arranged on this occasion in which the Citizens to lead a constructive and
senior Citizens took part. satisfactory life.
Specific Challenges and the future 5. The policy intents to have an objective of
outlook of the Department: creating a society which includes people
of all ages.
r Distribution of Identity Cards to all the 6. The State recognizes the fact that Senior
Senior Citizens and to create awareness Citizens are also resourceful persons
about these I.D. cards at different levels and are contributing members of the
and society. society.
r Creation of new posts at District and 7. This policy has realized importance of
Taluk levels. allocating budget for the welfare of
r To provide a building for the office of Senior Citizens who belong to
Officers and Staff. economically weaker sections.
Economic Survey of Karnataka 2019-20 779

The State policy aims at providing Health entertainment, medical facility, reading
Care, Social Security, Housing and facility etc. Each NGO is provided Rs.11.20
Protection of property and life. In order to lakhs per year. The detailed progress of the
implement this policy, a Task Force is scheme is shown in Table 13.136.
constituted under the Chairmanship of the
Hon'ble Chief Minister. 4. Distribution of ID Cards to Senior
citizens through online
II. Senior Citizens Welfare Programmes For Senior citizens above 60 years of age
1. Financial Assistance to NGO's to run Identity Cards were distributed through
the Old Age Home: athorized agencies by the Government so
far. To simplify the procedure by involving
For the Welfare of Senior Citizens, Old Age EDCS and E-Governance a software has
Homes are established in 30 districts been developed from 01.10.2018 and cards
through NGOs at the unit cost of Rs.8 Lakhs are issued through online by the following
each per year for 25 beneficiaries where they centers Bangalore-1, CSC Service center,
are availing the benefit of food, medicine, Karnataka-1, Ataljanasneha Kendra and
entertainment and shelter. The detailed Bapuji Kendra. So far 27000 applications
progress of the scheme is shown in Table have been received and 25200 cards have
13.134. been issued as on November 2019.
2. Senior Citizens Helpline 5. Sandhya Suraksha Yojane And Indira
For the welfare of Senior Citizens, 28 Help Gandhi National Old Age Pension :
Lines are established in the State through As per Revenue department, government
NGOs in coordination with District Police order No: RD 47. DSP:2018, dated:
Commissioner /Superintendent of Police. 14.09.2018. Age group between 60-65 are
These Senior citizens' Helplines are provided eligible to receive Rs.600/- per month as
grant in on as of Rs.7.15 lakhs per annum pension and above the age of 65 to receive
including recurring and non recurring Rs.1000/- per month as pension under the
expenditure. The detailed progress of the scheme as social security measure under
scheme is shown in Table 13.135. the scheme 27,17,409 senior citizens are
3. Day Care Centres for Senior Citizen's benefitted.
Senior Citizens to lead healthy and Eligiblity:
comfortable life during day time with their
friends, sanction has been accorded to run 1. Should be above 65 years.
senior citizen's Day Care Centers one in 2. Income certificate to be certified from
each district. At present 22 Day Care local revenue office, that yearly income
Centers are functioning and action is being of Husband or wife is less than
taken to start day care centers in the Rs. 20000/-.
remaining districts. In these day care
centers, approximately 50 senior citizens 3. The children income is not considered
are accommodated with light refreshment, for the parent's annual income

Table 13.134: Progress of Financial Assistance to Old Age Homes (Rs.in Lakhs)
Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 245.00 875 208.55 722 85 82
2017-18 245.00 900 245.00 873 100 97
2018-19 240.00 638 239.70 690 100 92
2019-20* 240.00 750 22.00 357 53 48
* Upto November 2019.
780 Economic Survey of Karnataka 2019-20

Table 13.135: Progress of Senior Citizens Helpline


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 184.90 30 169.76 28 92 93
2017-18 184.80 30 170.58 28 92 93
2018-19 172.48 30 174.11 112 100 100
2019-20* 173.00 0 52.74 78 30 69

* Upto November 2019.

Table 13.136: Progress of Day Care Centres (Rs.in Lakhs)


Targets Achievements % of Achievements
Year
Financial Physical Financial Physical Financial Physical
2016-17 240.17 1500 184.54 965 77 64
2017-18 318.65 1400 225.07 2424 70 173
2018-19 246.24 1500 233.60 1201 95 80
2019-20* 248.00 1500 72.38 629 29 42
* Upto November 2019

4. Joint Saving of husband or wife should avail the benefits, senior citizens have to
not be more than Rs. 10000/-. produce ID cards issued by the dept.,/
Election Voter Card or Driving License/ID
5. It should be certified that pension or cards issued by KSRTC.
other old age benefits are not taken.
8. Geriatric Centers:
6. Below mentioned candidates are
eligible for the benefits. With Assistance of Health and Family
Welfare Dept., Govt. of Karnataka has
Small farmer, Agriculture labourers,
established separate Geriatric Wards in
Fisherman, Mason and workers from
District Hospitals of Kolar, Tumkur,
unorganized sectors working under
Bijapur, Belgaum, Bagalkote, Udupi,
(Regulation of employment and condition of
Shivamogga, Gulbarga, Chikkamagalur and
services Act 1996 are not eligible) . To avail
Dharwad Districts. In these District
this benefit under the scheme citizens may
treatment is given at free of cost.
be contact the concerned taluk thalisadar.
Senior citizen above 80 years is paid Under Central Government scheme called
Rs. 750/- per month. National Health care, 5 separate OPD
centers are opened in Shivamogga, Kolar,
7. Concession in Bus Fare: Udupi, Tumkur and Chikkamagalur
Senior Citizens aged 60 and above are districts and in 3 separate Geriatric centers
provided 25% concession in bus fares. To with 10 beds are provided.
BALANCED REGIONAL CHAPTER 14
DEVELOPMENT

14.1 SPECIAL DEVELOPMENT PLAN Dr. D. M. Nanjundappa who was worked in


Karnataka has always demonstrated State Planning Board was appointed wide
vibrant potential for growth. Despite the Government Order No. PD 637 PM 97, Date:
natural resource constraints and 3rd October 2000 as a Chairman of the High
unfavorable conditions, the State could Powered Committee for Redressal of
maintain above average performance in Regional Imbalance (HPCRRI).
basic development indicators. It is placed at The committee conducted a study and
the median level on most of the development presented the Interim Report to the
indicators. During the last five decades, the Government on 26th March 2001, and
State has made efforts to achieve rapid submitted the final report on 25th June
growth through investments in agriculture, 2002.
industry, infrastructure and other sectors.
On the basis of 35 socio-economic
With the sharp North-South divide existing indicators, assessed the level of
in the State, the regional gap emerged in the development of 175 taluks in the state.
State on the eve of the reorganization of These indicators were spread over various
States in 1956. The new areas that joined sectors such as agriculture, industry,
the State from Hyderabad State and economic infrastructure, social
Bombay State were relatively less developed infrastructure, and financial and technical
than the Old Mysore State. This area formed infrastructure. Taking the State average of
the Northern part of the State. In the development in these indicators as the
absence of focused efforts in the past, the benchmark (equal to 1), the Committee
development gap increased over a period of estimated Comprehensive Composite
time leading to marginalization and Development Index (CCDI) with appropriate
exclusion of the region and its people from weights and identified 114 taluks as
the mainstream development process. backward taluks. These taluks were further
Efforts have been made over a period of time classified into most backward, more
to reduce the un developmental gap. backward and backward based on the value
However, there has been a growing of CCDI. Taluks with CCDI of 0.53 - 0.79
realization that investment and focus on the were classified as most backward, those
area especially on initiatives to improve the with CCDI of 0.80 - 0.89 as more backward
human development indicators must be and, taluks with CCDI of 0.90 – 0.99 as
further accelerated. backward. The distribution of the taluks in
“REPORT OF THE EXPERT GROUP TO these various groups in the State is given in
REVIEW THE METHODOLOGY FOR Table 14.1.
MEASUREMENT OF POVERTY” is Table 14.1 indicates the extent of regional
published by the Planning Commission, imbalances existing in the State which was
Government of India in June-2014, as per identified by the Dr. D.M Nanjundappa
this report during 2011-12 the BPL Committee. Out of the 39 most backward
Population in the state is 20.9%. taluks in the State, 26 taluks are in North
14.1.1 High Power Committee on Karnataka and 13 taluks are in South
Redressal of Regional Imbalances (2000- Karnataka, 21 in Kalburgi Division and out
2002) of the total 61 relatively developed taluks, 40
are in South Karnataka. The Committee has
For preparing a comprehensive report to recommended a policy mix of resource
eliminate regional imbalances in the state, transfer, fiscal incentives and special

781
782 Economic Survey of Karnataka 2019-20

programmes for development of the 114 12) Revolving fund established to support
backward taluks in the State. agricultural pricing.
14.1.2 The following main programmes 13) Hubli-Mumbai flight is open to public
have been implemented, as per the service.
recommended in Dr. D.M. Nanjundappa 14) Karnataka Veterinary and Fisheries
report. Science University at Bidar is
1) Established of a Central University at Established.
Kalaburagi, 15) Dairy Science College at Kalaburagi is
2) A High Court Bench at Dharwad and Established.
Kalaburagi have been implemented. 16) Established Kasturba Gandhi Girls
3) A Women's University has been Schools In all the 39 Most backward
established at Vijayapura. Taluks.
4) Established IT parks in Kalaburagi and 17) Dialysis wards are setup in 23 district
Hubli hospitals and 34 taluks.
5) Establishment of Food Park in 18) Bidar - Kalaburagi railway line, open to
Kalaburagi public service.
6) A Textile Park are in process in 19) Sainik School Established in Kodagu
Kalaburagi. District.
7) Airport has been set up in Kalaburagi. 20) Wide Government Order Number: ITY
124 TTM 84(211), Dated: 26/11/1988
8) 6 new Government Medical colleges are Tourism Department has been declared
established at Hassan, Mandya, as a Industrial Sector.
Shimoga, Raichur, Belagavi and Bidar
21) 49 Farmer Training Centers are
9) In Dharwad mental hospital has been established by the Agriculture
upgraded. Department.
10) 38 Burns and dialysis wards are newly 22) Establishment of 172 new breeding
opened. centers.
11) Horticulture University at Bagalkot and 23) APMC markets capable of operating
Horticulture College at Bidar has been independently in 162 Taluks out of 177
established. Taluks.

Table 14.1 : Regional Development in Karnataka State


Sl. Relatively More Most Total
Division Backward
No. Developed Backward Backward Taluks
1. Bangaluru 18 09 13 11 51
2. Mysuru 22 10 10 02 44
3. Belagavi 18 14 12 05 49
4. Kalaburagi(KK Region) 03 02 05 21 31
Total 61 35 40 39 175

1. North Karnataka 21 16 17 26 80
2. South Karnataka 40 19 23 13 95
Total (State ) 61 35 40 39 175
Economic Survey of Karnataka 2019-20 783

24) 3,71,517 houses built and 86,677 sites regions. The Special Development Plan
were distributed by the Rajiv Gandhi (SDP) is a major recommendation of the Dr.
Rural Housing Corporation. D.M. Nanjundappa Committee. The
Committee has estimated the required
25) There are 53 medical colleges are
resource flow in the 114 backward taluks to
already operating in the state. The
bring them at par with other taluks in the
department has announced that
State, and all relevant departments have
finding a land to setup a Government
been allocated grants according to the CDI
Medical Colleges on priority basis due to
non availability of Private or A) Objectives
Government Hospitals in Haveri,
Yadagiri, Bagalakote, Chitradurga, The objectives of the Special Development
Chikkamagalur, Chikkaballapura and Plan are
Ramanagara districts. r To give a thrust to the development
26) In 2018-19 the department has programmes in the 114 backward
initiated to set-up a government taluks to move towards a more balanced
medical college in Chikkaballapura development in the State as a whole.
taluk, Chikkaballapura district. r To accelerate growth in the backward
taluks through the stimulus of
27) From Mysuru to Chennai Airlines additional investment in various
Service are open to the public. sectors and areas.
28) I n 3 9 M o s t B a c k w a r d T a l u k s r To build infrastructure to make good
constructed Teachers Quarters, Cluster the identified sector backlog in
Complex for Teachers are allowed to live backward taluks.
there and allow education.
r To establish the needed institutions/
A) Additional resource transfer to organizations to redress the imbalances
meet the development requirements in the concerned sectors in backward
taluks.
An Eight-year Special Development Plan
(SDP) has been recommended for r To provide location-specific sectoral
implementation by investing Rs. 31.00 crore schemes in backward taluks in order to
which includes Rs. 15.00 crore from Normal raise the level of services in these
Plan and Rs. 16.00 crore as additionally. In sectors to the level of State average.
2014-15 Eight-years is completed, Further B) Allocations under Special
2015-16 to 2019-20 to resolve the Regional Development Plan
Imbalance with providing of Rs.3,000 crore
The Committee has estimated the financial
of budget, it has been taken the decision in
resources required to promote development
Belagavi Assembly on 15-07-2015. The
in various sectors, The focus of the SDP is on
Committee has also stated that the amount
irrigation, rural development and social
allocated every year should be escalated by a
services. Sectors like energy and agriculture
factor to include rise in prices. The
are also allotted additional financial
recommendations prescribe a participatory
assistance for development. The committee
approach involving the people, voluntary
recommendation in allocation for
organizations and Self Help Groups and
education, health and other social services
adoption of a Decentralized planning
is Rs. 8025 crore, for irrigation is Rs. 8000
approach to promote development and find
crore and for rural development Rs. 7100
long-term solutions to the problems of
crore. This allocation considers the rural
regional development.
character and agrarian conditions of most of
14.1.3 Review of Recent Efforts towards the taluks among the 114 backward taluks.
Promoting Balanced Regional The allocations in SDP across the divisions
Development were based on the Cumulative Deprivation
Index (CDI). This is estimated on the basis of
The State Governments has initiated the distance of the CCDI Value from the
programme for development of backward
784 Economic Survey of Karnataka 2019-20

State average (CDI=1-CCDI). The allocations 14.1.4 Implementation of Special


within the division and among the districts Development Plan
and taluks are again based on the respective
CDI values. an the total additional The programmes under SDP are planned on
investment of Rs. 16000 Crore, the share of the basis of the requirements sent by the
Kalaburagi division is maximum i.e. Rs. concerned departments. The progress of the
6400 crore and the share of North works under SDP is reviewed at the State
Karnataka is 60 % of the total allocation. and district levels in KDP meetings every
This is because the extent of development month and a DSS system has been
deprivation is more in Kalaburagi Division Incorporated for providing on line
i.e. 8.06 (8.06/20.26 =40%) which is just information about the programmes
equal to the total deprivation of entire South undertaken under SDP and the physical
Karnataka. The Government started and financial progress achieved. A special
implementation of Special Development head of account with the object code 133 is
Plan from 2007-08. Budget provision was allotted for schemes under SDP. A Special
made from 2007-08 every year for Cell has been established in the Planning
implementation of these recommendations Department to co-ordinate and monitor the
in the backward taluks by various implementation process. The amount
departments. allocated, releases made and expenditure
incurred so far is given in Table 14.2. These
Table 14.2 : Allocations Releases and Expenditure under Special Development Plan
2007-08 to 2019-20(upto December-19) (Rs.crores)
% of % of
Total Release to exp.to
Year Allocation OB Releases Exp.
Allocation total total
allocation releases

2007-08 1571.50 0.00 1571.50 827.93 804.48 52.68 97.17


2008-09 2547.34 0.00 2547.34 1369.26 1153.94 53.75 84.27
2009-10 2578.83 0.00 2578.83 1731.12 1543.11 67.13 89.14
2010-11 2584.00 0.00 2584.00 1924.47 1762.59 74.48 91.59
2011-12 2984.14 0.00 2984.14 2529.99 2200.16 84.78 86.96
2012-13 2680.00 0.00 2680.00 2464.83 2402.92 91.97 97.49
2013-14 2925.60 0.00 2925.60 2053.65 2067.56 70.20 100.68
2014-15 2267.18 0.00 2267.18 1370.54 1256.57 60.45 91.68
2015-16 2300.02 0.00 2300.02 1967.49 1805.42 85.54 91.76
2016-17 2998.83 0.00 2998.83 2753.04 2492.59 91.80 90.54
2017-18 2977.92 0.00 2977.92 2546.00 2496.77 85.50 98.07
2018-19 * 3007.00 552.77 3532.97 3271.11 2957.20 92.59 90.40

2019-20
(Upto 3010.02 548.05 3558.07 1886.90 1572.43 53.03 83.33
Dec-19)

Total 35506.39 1100.82 35506.39 26696.33 24519.68 75.19 91.85

* An amount of Rs.3007.00 Crore has been earmarked in 2018-19 Budget for SDP. Out of this
Rs.217.81crore allocated to HKRDB Project for implementation through Planning Department. Finance
department has been given Approval for payment of previous year's approved works along with general
amount earmarked for HKRDB.
Economic Survey of Karnataka 2019-20 785

information is furnished by the ii. Health


Implementing Departments. A state level
Construction and up gradation of primary
monitoring committee is constituted under
health centers have been taken up. Action
the chairmanship of Additional Chief
has also been initiated for improvement of
Secretary and Development commissioner
health facilities by establishing Suvarna
by Government Order No. PD 03 SDP 2014,
Aarogya Suraksha Trust. Dialysis wards
Bangalore, Dated: 30.12.2014. A Special 39
have been established in 23 district
Nodel officers as been appointed to
hospitals and 34 taluks hospitals. During
monitoring the 39 most Backward Taluks,
2016-17 established 3 New Medical
Government order is issued No P D 39 PSD
Institutions in. Chamarajnagar, Koppal and
2015 dated 21.11.2015.
Kalaburagi.
As seen in Table 14.3, the amount released
In 2019-20 Rs.294.55 crore has been
is 75.19% of the planned allocations but the
earmarked to Health and Family Welfare
utilization is 91.85%.
Department Under the Special Development
Major Achievements under SDP Plan, Under this for Karnataka State Drug
Logistic & Ware Housing Society – Rs.2.64
A. Major successful works undertaken crore, National Health Mission (NHM) –
under SDP Rs.79.84 crore, Aarogya Karnataka –
The SDP has concentrated on the following Rs.147.07 crore and Hospital Construction
core sectors in which allocations are being / Upgradation – Rs.65.00 crore has been
made on priority basis so that outcomes are allocated.
visible – (i) Agriculture and Allied Sectors; (ii) iii. Education
Health; (iii) Education; (iv) Housing; (v)
Infrastructure; (vi) Irrigation and (vii) Dr. D.M. Nanjundappa Committee had
Tourism. recommended the establishment of top
educational institutions in north
In this sectors, during 2019-20 the following Karnataka, more specifically in the
main programs are implementing Hyderabad - Karnataka region. The major
i. Agriculture and Allied Sectors institutions established in this sector
include the Women's University at
a. Agriculture Vijayapura, Central University at
Agricultural Inputs and Quality Control Kalaburagi, University of Horticulture
programme total budget allocation is Sciences at Bagalkot, Karnataka Veterinary
Rs.108.20 Crores in 2019-20 Budget, under and Fisheries Sciences University at Bidar
this Establishment of Farm Machinery and Dairy Science College at Kalaburagi. To
Centers – Rs.63.20 Crores and For promote education in 39 most backward
Agricultural Budget Scheme – Rs.45.00 taluks, additional programmes have been
Crores has re-allocated. introduced to strengthen the school
infrastructure. Cluster complex is being
b. Horticulture established in 39 most backward taluks
In 2019-20 Budget for Horticulture with a view to provide teachers' quarters in
department total Rs.49.79 Crore has been backward taluks/regions to enable the
sanctioned, under this PMKSY-National teachers to stay in rural areas and provide
Mission on Sustainable Agriculture Scheme quality education to children. Opening of
– Rs.20.37 Crore, Comprehensive residential schools on Kasturba Gandhi
Horiculture Development Scheme – Rs.4.91 Balika Vidyalaya (KGBV) model is also taken
crores and National Horticulture Mission up in these taluks as female literacy rate is
Scheme – Rs.24.51 Crores has been low.
allocated. Infrastructure facilities like School
buildings, drinking water and sanitary
786 Economic Survey of Karnataka 2019-20

Table 14.3 : Department wise Amount Earmarked, Releases and Expenditure


Details 2007-08 to 2019-20(upto December-19) (Rs. Crores)
Amount
released Expenditur
Total
2007-08 e 2007-08 % of
Sl. allocation % of exp.
Sectors to 2019- to 2019-20 Release to
No. 2007-08 to to release
20 (upto allocation
2019-20
(upto Dec-19)
Dec-19)
Agriculture & allied
1 sectors 1773.32 1350.29 1287.74 76.14 95.37
(including forest)
2 PWD 2509.92 2054.50 1720.61 81.86 83.75
3 Rural Development 5238.36 3241.89 3133.05 61.89 96.64
4 Housing 3632.61 3293.18 3263.16 90.66 99.09
Irrigation
5 5678.82 6030.92 5486.79 106.20 90.98
(Major& Minor)
6 Power 1650.99 1498.38 1298.00 90.76 86.63
7 Industries 270.06 133.01 102.05 49.25 76.72
8 Infrastructure 569.88 528.00 528.00 92.65 100.00
9 Transport 1156.94 995.50 891.04 86.05 89.51
10 Home 177.60 168.52 172.90 94.89 102.60
Social Sectors
11 3167.26 2138.31 2049.11 67.51 95.83
(health & education)
Labour & Social
12 1861.13 1183.95 799.88 63.61 67.56
Welfare
Women & Child
13 463.89 401.83 378.77 86.62 94.26
Development
14 Tourism Development 570.67 553.95 553.95 97.07 100.00
15 Urban Development 468.42 246.66 246.65 52.66 100.00

Information &
16 77.73 63.93 56.87 82.25 88.96
Technology

17 Planning 6238.79 2813.48 2551.11 45.10 90.67


Total 35506.39 26696.33 24519.68 75.19 91.85

facilities as provided, to establish Model iv. Housing


high schools amount as been given model
Rural housing is one of the major sectors
under NABARD Scheme.
under SDP. The programmes that are being
A sum of Rs.88.46 crore has been allocated implemented in the backward taluks under
in 2019-20 and is being implemented to SDP include the Ashraya-SDP Rural
fund the establishment of schools and housing scheme. The allocation for these
colleges for creation of assets. scheme during the period 2019-20 is
Rs.180.07 crore for constructing of 15005
Higher Education: Rs.53.89 crore has been
houses.
allocated for First Grade Colleges Building
constructions during 2019-20.
Economic Survey of Karnataka 2019-20 787

v. Infrastructure Development taluks. Assistance is provided under the


programmes of Karnataka Neeravari
One of the prime objectives of SDP is to fill
Nigama Limited (KNNL) and Additional
up the gaps in infrastructure in the
funds are being provided for early
backward taluks and fasten the
completion of major irrigation schemes to
development process in these taluks. Under
KNNL. Works such as promotion and
energy sector, the focus is on provision of
modernization of tanks, rejuvenation of
electricity to villages, hamlets and tandas.
tanks, lift irrigation and construction of
Schemes of Rural Load Management System
barrages are taken up in most backward
(RLMS) are being implemented. The Minor
and more backward taluks. Expenditure for
airports at Bidar, Kalburgi, Vijayapura,
irrigation is around 20.1% of total SDP
Belagavi and Hubballi are provided with
expenditure during the 11th Five Year Plan.
additional funds for completion. The
Assistance is given to complete the existing
Committee had identified 90 taluks (61 in
schemes soon so that benefits reach the
north Karnataka and 29 in south
farmers in time. This may thus help to
Karnataka) out of 175 taluks which have
expand the irrigation facilities and increase
road length less than the State average.
agricultural productivity and output.
Under the Special Development plan, rural
Allocation to major irrigation is Rs.651.15
roads, NABARD-assisted roads and suvarna
crore during 2019-20.
rasthe vikasa yojane and also many road
development schemes were undertaken. vii. Tourism
The Programmes are implemented by Public
Works Department for Development of Road Innovative works have been proposed and
works the allocation during the year 2019- are in the process of implementation in
20 is Rs.302.67 crores. tourism sector which is emerging as a high
growth area in the service sector. Tourist
Under KSAFE project, for construction of 29 infrastructure at various places in
fire stations and 38 officers/ staff Quarters backward taluks has been taken up for
in 2019-20 Rs.1.40 Crores has been development. An amount of Rs. 432.40 crore
earmarked to Home Department. Under has been spent so far as against the
road transport sector, assistance is given to earmarked outlay of Rs. 537.58 crore.
four divisions for construction of new depos, Approach roads to tourist places have also
up gradation of existing bus stands, been constructed at various tourist places
provision of toilet facilities, asphalting such as in Badami taluk Pattadakallu, in
within bus stands and construction of Uttara Kannaada district Siddapura taluk
waiting rooms etc. in 2019-20 Rs.147.27 Idagunji Baligar and Sathodi Falls, in
crore has been earmarked to Transport Saudatti taluk Renuka Yellamma temple, in
Department. Rs.35.51 crore has been Belur Chennakeshava Temple, hill station
provided for the cost sharing of railway in Kemmangundi, in Srirangapatna taluk
schemes under the infrastructure scheme Ganjam Sri Nimishamba temple, Kokkare
from Infrastructure Development Bellur Bird Sanctuary, in Chinthamani
Department. Rs.355.03 crore is allocated for taluk Kaiwara Temple.
rural drinking water supply, Rs.270.88
crore is allocated for Namma Grama Namma Additional Resource Transfer to Most
Rasthe, during 2019-20 to Rural Backward Taluks
Development & Panchayat Raj Department. The allocations under SDP have helped the
vi. Irrigation backward taluks in different categories to
get additional resources to accelerate the
Assistance is provided for development of development process. A comparison of
major irrigation in backward taluks. The Dr. distribution of allocation among three
D.M. Nanjundappa Committee had categories viz., most backward, more
recommended development of irrigation as a backward and backward taluks is presented
major strategy for increasing agricultural in Table 14.4. It is observed that the share
production and productivity in backward of most backward taluks in total allocations
788 Economic Survey of Karnataka 2019-20

Table 14.4: Aggregate Resource Transfer to Backward taluks in Different


Categories 2007-08 to 2018-19 (Rs. crore)

District
Most Backward More Backward Backward Schemes Total
Year
Taluks Taluks Taluks in Backward Allocation
Taluks

376.00 161.66 136.62 897.22 1571.50


2007-08
(23.93%) (10.29%) (8.69%) (57.09%) (100%)

870.09 615.05 406.87 655.34 2547.35


2008-09
(34.16%) (24.14%) (15.97%) (25.73%) (100%)

1270.18 554.57 384.40 369.68 2578.83


2009-10
(49.25%) (21.50%) (14.91%) (14.34%) (100%)

908.89 639.65 382.05 653.41 2584.00


2010-11
(35.17%) (24.75%) (14.79%) (25.29%) (100%)

1204.50 793.39 528.00 458.25 2984.14


2011-12
(40.36%) (26.59%) (17.69%) (15.36%) (100%)

1182.09 748.99 377.30 371.62 2680.00


2012-13
(44.11%) (27.95%) (14.08%) (13.87%) (100%)

1477.18 916.75 531.67 2925.60


2013-14
(50.49%) (31.34%) (18.17%) - (100%)

1174.47 701.54 391.17 2267.18


2014-15
(51.80%) (30.94%) (17.26%) - (100%)

1143.98 678.08 477.95 2300.02


2015-16
(49.74%) (29.48%) (20.78%) - (100%)

1428.64 943.85 627.51 3000.00


2016-17
(47.62%) (31.46%) (20.92%) - (100%)

1598.40 940.06 437.58 1.58 2977.92


2017-18
(53.68%) (31.57%) (14.69%) (0.05%) (100%)

1437.67 884.16 467.36 2789.19


2018-19 -
(51.54%) (31.70%) (16.76%) (100%)

1527.80 1011.16 471.01 3009.98


2019-20 -
(50.76%) (33.59%) (15.65%) (100%)

15599.89 9588.91 5237.44 3407.10 28312.19


Total
(46.10%) (28.34%) (15.48%) (10.07%) (100.00%)

has increased from 23.93% in 2007-08 to Committee. However, this additional


46.10% in 2019-20. These also include the resource transfer has promoted
allocations made under district sector development activities in the backward
schemes. However, this has to increase to areas
60% as per the recommendations of HPCRRI
Economic Survey of Karnataka 2019-20 789

14.2 AREA DEVELOPMENT BOARDS children to come to Anganawadi. This


considerably reduces the number of
Malnad Area Development Board, came children who stays away from the school.
into existence by the Malnad Area This formed the main objective of “Chinnara
Development Act 1991. The main objective Loka” in the Anganawadi. It was
of the board is specifically to achieve overall implemented in the taluks of Channagiri,
development of the Malnad Area. The area H.D.Kote, Chamarajanagar and Joida.
under the jurisdiction of the board extends
over 13 districts of Malnad Area along the Another success story is the construction of
Western Ghats in 61 Taluks extending over 17 hanging bridges incurring a cost of about
65 Assembly Constituencies. Rs.1063.37 lakh. This facilitates the
children and public to cross the streams in
Achievement: the rainy season to have direct access to
The Board covers the aspect of development school and other facilities, which otherwise
of the Malnad region which is a very vast would be circuitous or inaccessible caused
area of operation. Many Government due to streams.
schemes are implemented by various Another success story is the involvement
agencies in the area of development. The of Shri Kshetra Dharmasthala Rural
board depending upon the grants available Development Project ®, in the
and determines the specific requirements developmental programs. They have been
that needs to be made to fill gaps or those involved in many different programs,
that cannot be funded in regular plans. notable as the programme of providing safe
Since inception of the board upto to 2019-20 drinking water in which the board
(upto November-2019), the board has contributes Rs.5.00 lakhs and they
incurred an expenditure of Rs.67198.33 contribute an equal amount. Similarly they
lakh completing 20243 works. have executed the solid waste disposal
system in Kadaba and Ujire villages. The
Initiatives taken up in 2019-20: solid waste was getting into the river system
The Board has taken up many initiatives during the rainy season affecting the
including the formation of concrete roads in drinking water supply during the summer
the areas inhabited by the weaker sections, which is the lean season.
providing of safe drinking water in rural Table 14.6 : Shows the details of
areas, construction of foot bridges and expenditure incurred since inception of
hanging bridges as well as formation of the Board.
roads.
Table 14.7 : Shows the physical
During the year 2019-20 New works achievement made since inception of the
proposal are included in Action Plan Board.
approved by Govt., Presently Spillover
works are under implementation. Bayaluseeme Area Development Board,
Chitradurga
Best practices and success stories
Bayaluseeme Area Development Board was
Some of the success stories are related established under Bayaluseeme Area
to the supply of play articles to the Development Board Act 1994. Bayaluseeme
Anganawadi children in most backward (Maidan Area) comprises 57 Taluks of the
taluks as identified in the report of State which have been recognized as
Dr. D. M. Nanjundappa which was named drought prone taluks, and pose special
“Chinnara Loka” programme. For the all problems of development. This Board was
round development of a child, along with the established to hasten the phase of
academics, even physical activities are given development of this area for bringing it to the
importance. Facilities provided for sports level of other parts of the State. There are 70
would play a major role towards physical assembly constituencies spread over 14
development of the child, which attracts the districts.
790 Economic Survey of Karnataka 2019-20

Table 14.6 : Statement showing Financial Progress of MADB, Shivamoga.


(Since Inception upto Nov-2019) (Rs. in lakh)
Sl. No. Year Allocation Releases Ex penditure

1 1993- 94 3300.00 3300.0 0 1558.740

2 1994- 95 3500.00 2400.0 0 3805.770

3 1995- 96 3000.00 2250.0 0 2022.440

4 1996- 97 3000.00 2100.0 0 1913.940

5 1997- 98 1570.00 1570.0 0 2736.330

6 1998- 99 3850.00 1875.0 0 2022.780

7 1 999-2000 3284.00 2463.0 0 2564.100

8 2000- 01 3400.00 3256.0 0 3010.040

9 2001- 02 1725.00 1135.0 0 1740.470

10 2002- 03 1645.00 1533.7 5 1556.850

11 2003- 04 1250.00 1350.0 0 1382.320

12 2004- 05 707.00 707.0 0 668.3 20

13 2005- 06 1400.00 1400.0 0 1344.880

14 2006- 07 3355.00 3355.0 0 1432.690

15 2007- 08 3450.00 2824.5 0 2712.320

16 2008- 09 2300.00 1057.5 0 2696.570

17 2009- 10 1600.00 1596.5 6 1052.043

18 2010- 11 2000.00 2000.0 0 2158.450

19 2011- 12 3400.00 3360.0 0 3048.062

20 2012- 13 3400.00 3400.0 0 3233.271

21 2013- 14 3430.00 2572.5 0 3111.009

22 2014- 15 3800.00 3800.0 0 3609.103

23 2015- 16 4000.00 4000.0 0 4542.746

24 2016- 17 5000.00 5000.0 0 3859.571

25 2017- 18 6000.00 4600.0 0 4342.887

26 2018- 19 2706.00 2822.8 0 3135.29

27 2019- 20 4242.00 2369.0 0 1937.34

Total 80314.00 68097.61 67198.33

Note: The expenditure incurred in a year includes unspent balance of previous year also.
The expenditure incurred in the year 2019-20 includes administrative expenditure of Rs.114.27 lakh upto
November-2019.
Economic Survey of Karnataka 2019-20 791

Table 14.7 : Statement showing Physical Progress of MADB, Shivamoga


(Since Inception upto Nov-2019) (in.nos)

Approved Works
Total Total
Sl.
Year No. of completed
No. Roads and Social MI & Soil
work work
Bridges Sector GWR Water

1 1993-94 3039 264 0 90 3393 419


2 1994-95 1947 361 93 118 2519 631
3 1995-96 896 99 12 47 1054 1793
4 1996-97 845 196 18 33 1092 1803
5 1997-98 915 295 12 46 1268 1344
6 1998-99 1500 359 15 35 1909 927
7 1999-2000 131 10 1 1 143 618
8 2000-01 605 143 11 4 763 1265
9 2001-02 226 60 0 0 286 862
10 2002-03 50 32 1 0 83 195
11 2003-04 53 9 2 0 64 195
12 2004-05 0 0 0 0 0 1290
13 2005-06 0 0 0 0 0 874
14 2006-07 399 247 63 41 750 658
15 2007-08 304 215 42 25 586 790
16 2008-09 282 210 9 1 502 438
17 2009-10 614 19 0 0 633 406
18 2010-11 316 200 24 9 549 429
19 2011-12 402 267 54 0 723 532
20 2012-13 529 266 12 19 826 575
21 2013-14 690 271 75 0 1036 636
22 2014-15 711 268 59 0 1038 748
23 2015-16 1155 138 63 0 1356 712
24 2016-17 1118 197 66 0 1381 714
25 2017-18 1617 152 50 0 1819 721
26 2018-19 748 280 38 0 1066 555
27 2019-20 237 93 15 0 345 113
Total 19329 4651 735 469 25184 20243
Source : MI: Minor Irrigation, GWR: Ground Water Resources
792 Economic Survey of Karnataka 2019-20

Since from the inception of the Board up to r Preparing of Project Reports of the
2019-20 (upto November-2019), the Board identified potential projects in
has incurred an expenditure of Rs.31473.00 construction with concerned
lakh completing 8511 works. administrative departments.
Objectives: r Identifying projects for conservation
and development of various coastal
r Development and Conservation zones and recommending such works
measures in rain fed agriculture for inclusion in the state level planning.
system.
r Taking measures for effective time
r Adopting soil and water conservation bound supervision of implementation of
measures in rain fed agriculture system projects for coastal conservation and
and Forest Development. development.
r Promoting Horticulture Development. r CDA was empowered to carry-out
r To promote and support activities in the projects such as construction of fish
agriculture and allied sectors. markets, bridges, commercial
r To promote Animal Husbandry. complexes, public amenities etc from
the financial year 2015-16.
Out of total amount allocated to the Board
minimum 60% shall be utilized for water Projects taken up in three Coastal
and soil conservation works and remaining Districts of Karnataka since inception
amount shall be for other developmental 1. Development of Atradi State Road-67
works in Bayaluseeme area.
r The present proposal of Athradi
Achievement: (Manipal) to Bajpe International Airport
Table 14.8 shows the details of allocation, road Costs Rs. 580 crores converting
expenditure incurred since inception of the into four lane. If the project is
Board. Table-14.9 shows the physical successfully implemented, the
achievement made since inception of the travelling time will be reduced and there
Board. will be direct access to Airport. The
proposed D.P.R has been completed
Karavali Development Authority, and has already been submitted to the
Mangaluru Government.
The Project under taken for the welfare of 2. Mangalore-Karwar Fisheries Road
three coastal districts of Karnataka as well Development Project
as economic and social development of the
Coast. r The proposed road will be connected
between Talapady (Mangaluru) to
Coastal Development Authority was Majali (Uttara Kannada District)
established vide G.O NO: £ÀCE 582 C¥Áæ 2008, converting into two lane concrete road
dated: 8.9.2008. The Coastal Development parallel to NH-66. Presently there is
Authority is the Advisory Body/Nodal asphalted road in this area with less
Agency to the Government of Karnataka on connectivity. Thick population of
matters pertaining to the comprehensive fishermen communities reside
development of the three coastal districts of throughout the beach.
Karnataka, namely Dakshina Kannada, r The main purpose of this project is
Udupi and Uttara Kannada. overall development of fishermen
Functions:- communities. This being a parallel road
to N.H 66 connects the fishermen's
r Identification of potential projects for habitations. The traffic congestion of
promotion and development of basic National Highway will be greatly
infrastructure-Roads, Tourism, Ports, reduced.
Industries, Technology Parks, Over-
r The proposed road is on the bank of
Bridges.
Arabian Sea. Hence, the road is
Economic Survey of Karnataka 2019-20 793

Table 14.8: Statement showing Financial Progress of BSDB, Chitradurga


(Since Inception upto Nov-2019) (Rs. in lakh)

Sl. No. Year Allocation Releases Expenditure


1 1995-96 597.00 372.75 4.56
2 1996-97 474.00 418.00 346.20
3 1997-98 740.00 590.00 471.00
4 1998-99 850.00 637.50 704.30
5 1999-2000 1550.00 499.50 497.66
6 2000-01 900.00 660.00 518.25
7 2001-02 380.00 230.00 440.75
8 2002-03 1420.00 1200.00 603.87
9 2003-04 675.50 193.75 1132.50
10 2004-05 500.00 352.50 477.55
11 2005-06 630.00 630.00 373.09
12 2006-07 780.00 780.00 203.94
13 2007-08 1911.00 1669.50 1117.41

14 2008-09 1375.00 610.00 1165.39

15 2009-10 727.50 572.50 1048.91


16 2010-11 700.00 700.00 729.18
17 2011-12 1000.00 800.00 757.57
18 2012-13 1700.00 1275.00 1012.66
19 2013-14 1730.00 1297.50 1140.67
20 2014-15 2000.00 1999.55 1849.26
21 2015-16 3501.00 3501.00 2901.22
22 2016-17 4500.00 4500.00 2918.61
23 2017-18 5000.00 3900.00 6146.46
24 2018-19 2264.00 2264.00 3055.17
25 2019-20 2253.00 1689.75 1856.83
Total 38158.00 31342.80 31473.01
Note: The expenditure incurred in a year includes unspent balance of previous year.
The expenditure incurred in the year 2019-20 includes administrative expenditure of Rs.52.86 lakh upto
November-2019.
Table 14.9 : Statement showing Physical Progress of BSDB, Chitradurga, (in.nos.)
794
(Since Inception upto Nov-2019)

Source : MI: Minor Irrigation, GWR: Ground Water Resources


Economic Survey of Karnataka 2019-20
Economic Survey of Karnataka 2019-20 795

strategically important in the national Dakshina Kannada District has already


interest. The preparation of the D.P.R been completed.
has been completed and has already 4. Construction of Foot Bridges and
been submitted to the Government. Hanging Bridges in three Coastal
(Approx Project Cost Rs.780 crore). Districts.
3. Construction of Modern Hi-Tech Fish
r As per the proposal submitted by the
Markets In Three Coastal Districts of
Coastal Development Authority, the
Karnataka.
Government has released Rs.3.00 Crore
r The work is already taken up by the to Dakshina Kannada and Rs. 2.00
Costal Development Authority and if Crore to Udupi District for the
funded by National Fisheries construction foot bridges and hanging
Development, Government of India bridges. The construction work has
(Providing 90% of the project cost) and been taken up by Panchayath Raj
Department of Fisheries, Government Engineering Division. Coastal
of Karnataka. (Providing 10% of the Development Authority out of its
project cost) The construction work of personal interest got funds sanctioned
Padubidri, Yedthare-Byndoor, for implementing foot-bridges in remote
Katapadi, Uppunda, Kota and Shirva in villages of the three Coastal Districts of
Udupi District and Ankola, Shirali Fish Karnataka. The Proposal submitted to
Markets in Uttara Kannada District and the Government for the construction of
Kinnigoli and Panemangalore in foot bridges in Coastal Districts of
Karnataka are as follows:
Table 14.10 : Construction of Foot Bridges/Hanging Bridges in three Coastal
Districts
Hanging Bridges
Estimated
Name/ Place of Work District Grama Cost
Panchayath (Rs. in
Lakhs)

Kudrugi Sharavati Hanging Bridge. Uttara Kannada Kudrugi 278.00

Dongri Gangavali river Hanging


Uttara Kannada Dongri 165.00
Bridge
Chikkanagoda Hanging Bridge Uttara Kannada Chikkanagoda 135.00

Kuppepadavu Phalguni hanging


Dakshina Kannada Kuppepadavu 147.00
Bridge

Total 725.00

Foot Bridges

Total
Sl. No. District
(in Nos.)

1 Dakshina Kannada 19

2 Udupi 13

3 Uttara Kannada 32

Total 64
796 Economic Survey of Karnataka 2019-20

Table 14.11: Projects under taken by CDA from the financial year 2015-16 to
2018-19

Particu Foot Hanging Fish Sky Drinking Anganvadi/


Year Parks Road Others Total
Lars Bridges Bridges Markets walk water School

2015-16 Phy No 1 2 7 2 0 0 0 0 0 12

2016-17 Phy No 82 2 8 2 1 1 05 01 0 102

2017-18 Phy No 126 0 11 2 0 0 19 90 47 295

2018-19 Phy No 136 0 11 2 0 0 19 90 60 318

The following hanging bridges and jointly organised by Coastal Development


footbridges works have been completed and Authority and Central Marine Fisheries
handed over to the concerned Panchayaths. Research Institute at Karwar on 29.09.2015.
5. Multi Village Water Supply Project. The seminar turned out to be a great
success, with the panel of members of the
r The preparation of Preliminary Scheme seminar coming out with series of
Report/Detailed project report in regard recommendations to improve the fishing
to Multi Village Water Supply Scheme in system by balancing the traditional fishing
Dakshina Kannada (25 Villages) and system with the controlled introduction/
Udupi District (26 Villages) has been adoption of technology for reaping benefits
completed and report submitted to the from nature.
Government. The main objective of this
project is to support the Government's B) Training on Cage Fishing and Allied
effort to increase access to safe drinking Activities.
water for deprived villages in Udupi and The CDA has also carried out training
Dakshina Kannada District. programme on open sea cage farming to
6. The projects under taken by CDA from traditional fishermen and other privilege
the financial year 2015-16 to 2018-19 candidates with the assistance of CMFRI,
are as mentioned below: Karwar and also conducted skill
development training programme to 75
The construction work of fish market at selected fisher women of Uttara Kannada
Karki, Suspension bridges at Kudrugi in district.
U.K District and Kuppepadavu in D.K
District have been completed which were 14.3 KARNATAKA LEGISLATORS' LOCAL
taken up during the year 2015-16 & AREA DEVELOPMENT SCHEME (KLLADS)
2018-19 Table 14.11. Government has introduced the Karnataka
7. Table 14.12 shows the Proposed Legislator's Local Area Development
projects for the financial year 2019-20. Scheme (KLLADS) in 2001-02 with a budget
allocation of Rs. 75 crore under non-plan.
Table 14.13 shows the funds allocated From 2008-09 onwards the scheme was
and expenditure incurred since inception shifted from non-plan to plan.
of the costal development authority
Objectives:
8. Other Aspects.
The investment in development programmes
A) Seminar on Fisheries. based on a sectoral planning process to
One day seminar on Present Status and benefit local area leaves some infrastructure
Future Prospects of Fisheries in Karnataka gaps, despite best planning effort. This
Economic Survey of Karnataka 2019-20 797

Table 14.12: Proposed projects for the financial year 2019-20


Sl. Phy
Particulars (spill over work – 2017-18)
No. No.
1. Road 72

2. Foot Bridge 90

3. Fish Market 08

4. Hanging Bridge 0

5. Park 02

6. Vented Dam 0

School Room Cons/Ground


7. 06
Development

8. Commercial Complex 0

9. School Furniture Purchase 0

10. Samudhaya Bhavan 15

11. Others 07

Total 200

* 2018-19 Spill over works.

Table 14.13: Statement showing the Financial and Physical progress of the Coastal
Development Authority (Since inception to upto November 2019)
Physical
Budget Amount (in Nos.)
Expenditure
Year Allocation Released (in lakh)
(in lakh) (in lakh) Approved Completed
Works Works
2009-10 100.00 100.00 37.10 - -
2010-11 300.00 150.00 126.00 - -
2011-12 300.00 150.00 117.00 - -
2012-13 1000.00 250.00 106.05 - -
2013-14 100.00 50.00 45.60 - -
2014-15 100.00 54.20 40.60 - -
2015-16 1000.00 1000.00 992.78 12 6
2016-17 1500.00 1500.00 1206.61 102 63
2017-18 2000.00 1586.00 1576.66 295 30
2018-19 994.00 1855.70 1376.76 287 63
2019-20 955.00 498.00 626.00 200 69
Total 8389.00 7193.90 6251.20 896 231
798 Economic Survey of Karnataka 2019-20

under-mines the investment, which is not The KLLADS follows a participatory demand
optimally beneficial to the local area. The responsive development approach to
domination of the sectoral planning process address infrastructure development
has limited the potential scope for requirements of the local area within a
participation by people's elected Legislator's Constituency. It also provides
representatives and the user community. flexibility in taking up works which are
There have been occasions where some otherwise not covered by other government
important works have not been undertaken, programmes. Table 14.14 shows the
as they are not covered by any existing plan amount released under KLLADs since
or non-plan scheme. inspection.
In order to accommodate local aspirations 14.4 MEMBER OF PARLIAMENT LOCAL
and needs better, and to ensure responsive AREA DEVELOPMENT SCHEME
planning and delivery of services, the (MPLADS)
Government has taken up schemes for asset
MPLADS is a Grant-in-Aid Plan Scheme
creation, infrastructure development and
started in December 1993 by Government of
employment generation for the benefit of the
India, as a special central assistance to
poor and weaker sections, whose planning
states for expenditure to be incurred for the
and execution can be done at the
creation of community assets based on the
Legislator's Constituency Level.
recommendation of the Hon'ble Members of

Table 14.14 : Statement showing the progress of KLLADS


(Since inception to November 2019) (Rs. in crore)
Year Amount Provided Amount Released
20 01-02 75 .00 75. 00
20 02-03 31 .00 31. 00
20 03-04
Amount not provided due to drought
20 04-05
20 05-06 15 0.00 150. 00
20 06-07 30 0.00 300. 00
20 07-08 30 0.00 183. 25
20 08-09 20 0.00 150. 00
20 09-10 46 0.50 460. 50
20 10-11 39 9.20 399. 20
20 11-12 30 0.00 298. 62
20 12-13 30 0.00 300. 00
20 13-14 60 0.00 581. 53

20 14-15 60 0.00 600. 00

20 15-16 60 0.00 600. 00


20 16-17 60 0.00 590. 00
20 17-18 62 2.50 620. 11
20 18-19 60 0.00 462. 99
20 19-20 60 0.00 150. 00
Economic Survey of Karnataka 2019-20 799

Parliament. The Scheme is governed by a set State. The region,encompassed by the


of guidelines. Under the scheme a sum of Kannada speaking people, was earlier ruled
Rupees 5 crore per annum per Member of by the Nizams of Kalyana (Hyderabad) until
Parliament is released by GOI directly to the 1948. After merging with the Indian
Deputy Commissioners of the Nodal Union, the region was a part of the
Districts for execution of the works of Kalyana(Hyderabad) State until 1956. The
development nature based on the locally felt Kalyana(Hyderabad)-Karnataka region
needs recommended by the Hon'ble Member comprises of Bidar, Yadgir, Raichur,
of Parliament concerned. Karnataka is Koppala, Ballari and Kalaburagi districts.
represented by 28 Members of Lok Sabha,
The Kalyana(Hyderabad)-Karnataka region
12 Members of Rajya Sabha and one
is the second largest arid region in India.
nominated member of Rajya Sabha. The
Article 371J will grant special status to six
MPLADS Cell of the Planning Department is
backward districts of Kalyana(Hyderabad)-
the Nodal Department between GOI and the
Karnataka region to:
Deputy Commissioners. The Parliamentary
Committee of Lok Sabha and Rajya Sabha 1. Establish a separate Development
periodically visit the State for review and Board.
inspection of the MPLADS works. The
2. The Board ensures sufficient funds are
features of the scheme, list of prohibited
allocated for Development of the region.
works and list of permissible works and
works of non-durable nature, detailed 3. Local reservation in education and
guidelines, Government Orders and Government-jobs (Domicile requirement).
circulars are available on the website
The State had constituted a high power
www.mplads.nic.in.
committee under Prof. Nanjundappa to
The MPLADS Cell is responsible for co- study regional imbalances in the State and
ordination with the Ministry of Statistics to recommend strategies to address them.
and Programme Implementation, The committee identified 35 indicators to
Government of India for proper and effective measure the extent of development in
supervision of the implementation of the various sectors and had built a
scheme in the State. The Cell also co- Comprehensive Composite Development
ordinates with the District Authorities for Index (CCDI) and Composite.
timely submission of Utilization Certificates
Deprivation Index (CDI). On the basis of CDI
and Audit Certificates to the Ministry. Table
all taluks are categorised as most backward,
14.15 shows the amount released and spent more backward, backward and relatively
under MPLADS (14th to 17th Lokasabha developed taluks. 21 taluks of HK region are
and Rajyasabha since inspection. categorized as most backward, 5 taluks as
14.5 ARTICLE 371J – SPECIAL STATUS more backward and 2 taluks as backward.
FOR KALYANA (HYDERABAD)- Kalyana(Hyderabad)-Karnataka Regional
KARNATAKA REGION Development Board is renamed as Kalyan
Karnataka Regional Development Board by
Kalyana (Hyderabad)-Karnataka region is Govt. order No. DPAR76 HKC 2018 dated :
located in the north-eastern part of the 07.09.2019.
Table 14.15 Statement showing the financial progress of MPLADS
(Since inception to December 2019) (Rs. in crore)

% of Released % of
Amount Released Expenditure
over Utilisation
Area Sanction by GOI Incurred
sanctioned over released

Lok Sabha 1886.40 1859.37 98.57 1728.64 91.25

Rajya Sabha 779.60 791.38 101.55 717.27 91.67


800 Economic Survey of Karnataka 2019-20

Salient features of Kalyana(Hyderabad) requirements of the State as a


Karnataka Region whole.
r HK region account for 23% of state (2) An order made under sub-clause (1)
geographical area may provide for –
r Uncultivated area of the region is 23% of (a) Reservation of a proportion of seats
state uncultivated area in educational and vocational
r Decadal population growth of the region training institutions in the Kalyana
is 17.73% whereas state growth rate is (Hyderabad) - Karnataka region for
15.60% students who belong to that region
r HKRDB region is having 18% of the by birth or by domicile; and
State population (b) Identification of posts or classes of
r 24% of State SC population is residing posts under the State Government
in the region and in any body or organisation
r 34% of State ST population is residing under the control of the State
in the region Government in the Kalyana
r Literacy rate of the region is 64.45% (Hyderabad)-Karnataka Region
whereas State literacy is 75.36% and reservation of a proportion of
such posts for persons who belong
r Dropout rate in the HKRDB region is
to that region by birth or by
5.77 where as the State Dropout rate is
domicile and for appointment there
2.96
to by direct recruitment or by
r Child Mortality Rate of the region is 59 promotion or in any other manner
where as State Child Mortality rate is 41 as may be specified in the order.
r Infant Mortality Rate of the region is 51
The Constitutional obligation consequent to
where as State Infant Mortality Rate is
Amendment of Article 371(J) by insertion of
35
Article 371(J), binds the State and Central
r Net per capita District domestic product Governments to put forth all out efforts for
of HKRDB region is Rs. 81581 whereas development of the Kalyana (Hyderabad)-
the State average is Rs. 142267. Karnataka region besides ensuring the
Article 371(J) same by way of providing reservation in the
(1) The Hon'ble President may, by order, Education and Public Employment sectors.
made with respect to the State of A Cabinet Sub-Committee was constituted
Karnataka, provide for any special to advise the State Government for effective
responsibility of the Hon'ble implementation of Article 371(J). The
Cabinet Sub-Committee has held wide
Governor for –
range of discussions with all stakeholders of
(a) Establishment of a separate the region and has submitted a report to the
development board for Kalyana Government. In pursuance to the
(Hyderabad)-Karnataka Region implementation of Article 371J the State
with the provision that a report on has issued the following orders:
the working of the board will be
placed each year before the State a. The Kalyana (Hyderabad)-Karnataka
Legislative Assembly; Region Development Board Order, 2013
(b) Equitable allocation of funds for b. The Karnataka Public Employment
developmental expenditure over (Reservation in Appointment for
the said region, subject to the Kalyana(Hyderabad)- Karnataka
requirements of the State as a Region) Order, 2013 – Provides for
whole; and creation of a local cadre and reservation
(c) Equitable opportunities and in the Kalyana (Hyderabad)-Karnataka
facilities for the people belonging to Region as under, besides reservation of
the said region, in matters of public 8% of the posts in the State level offices
employment, education and or institutions or apex institutions
vocational training, subject to the
Economic Survey of Karnataka 2019-20 801

c. The Karnataka Private Un-aided region as par with the relatively developed
Educational Institutions (Regulations regions, vital indicators relating to human
of Admission in the Kalyana development, in particular, of the region
(Hyderabad)-Karnataka Region) Order, depicts that the gaps in the indices still
2013. - provides for reservation of 70% persists. This indicates that the barriers to
of the available seats in every course of development are still strong enough to
study in any regional university or retard the development processes. The focus
educational institution referred to in of the Twelveth Five year plan viz., faster
the First Schedule, besides 8% of the more inclusive and sustainable growth
available seats in every course of study implies that people in all the regions of the
provided in a State wide university or a Country should gain access to development.
State wide educational institution.
In this context, intensive efforts are required
d. T h e K a r n a t a k a E d u c a t i o n a l to bridge the development gap and attain
Institutions (Regulations of Admission equitable distribution of gains from
in the Kalyana(Hyderabad) – Karnataka development across regions and people in
Region) Order, 2013 – provides for State. Therefore to plug the backwardness of
reservation of 70% of available seats. the Kalyana(Hyderabad)-Karnataka region,
To address the issue of backwardness in the State has made a conscious effort by
State, Government has been implementing substantially increasing the allocation
a Special Development programme (SDP) provided to the HKRDB and continuing the
since 2007-08. 40% of budget of SDP is allocation of Rs.1500 crores during 2019-
earmarked for Kalyana(Hyderabad)- 20.The focus, however, needs to be on
Karnataka region. Besides, education, health and nutrition and skill
Kalyana (Hyderabad) Karnataka Development development along with development of
Board was also engaged in the development farm and non-farm activities. Therefore,
of this region till it was repealed on formulation and effective implementation of
22/02/2014. In pursuance to the Article development programmes tailored to the
371(J) Kalyana(Hyderabad) Karnataka needs of the region are required to meet the
Region Development Board was formed on challenges of this region.
06/11/2013. It was constituted with 28 Reservation in Education sector and
members on the 23rd January 2014. Recruitment in Public Employment
HKRDB has earmarked 70% of budget for under Article 371J of the Constitution of
bridging infrastructure gaps and 30% for India.
institutional gaps. Administrative charges Special stress is laid upon for area
continued to be 4% of institutional gap development, reservation in public
allocation. During 2018-19 an amount of employment and reservation in admission
Rs. 1000.00 Cr. Was earmarked & to various courses for the local persons
accordingly entire amount of Rs. 1000.00 belonging to Kalyana(Hyderabad)-
Cr. was released by the Govt. prior to this, Karnataka region under Article 371J of the
the amount earmarked for any year was not Constitution of India conferring special
released completely. During the year status to the Kalyana(Hyderabad)-
Rs. 1193.53 Cr. (120%) was spent. Rs. 1500 Karnataka region. Consequential orders
crore has been budgeted for 2019-20 have been issued for implementation of
against which Rs.750 crore has been Article 371J.
released. The Board has incurred an
expenditure of Rs. 818.41 crore. up to A Cabinet S u b - Committee is reviewing the
November 2019. This expenditure includes implementation of the same from time to
payment made to the works of previous time. The reservation imposed for filling up
years also. of vacant posts consequent upon the
amendment to the Constitution by insertion
Issues And Challenges: of Article 371J has since been relaxed
Despite the interventions to develop the HK permitting the appointing authorities to fill
802 Economic Survey of Karnataka 2019-20

Table 14.16 : HKRDB Progress


Financial ( Rs.in Crore) Physical (works in nos)
Sl.
Year Ex penditure Approved Completed
No Allocation Releases
works works
1 2013-14 153.50 30 107.71 597 597
2 2014-15 600 300 636.84 1857 1816
3 2015-16 1000 750 841.08 3279 3135
4 2016-17 1000 750 830.67 2909 2774
5 2017-18 1000 800 972.75 4413 3819
6 2018-19 1000 1000 413.93 4160 1869
2019-20
(as on
7 1500 750 101.78 3881 93
Nov-2019)
(2 Installment)
6253.5 4380 3904.76 21096 14103

Table 14.17 : Sector wise HKRDB Progress (Rs.in Crore)

Sl. Works under


Sector Allocation Expenditure Completed
No taken

1 Education 1519.30 682.32 6737 3133


2 Health 316.53 182.95 1110 682
3 Social sector 253.35 128.90 835 672

Women and child


4 86.94 50.43 512 355
development sector
5 Roads and bridges 3650.12 2375.36 9216 7268
6 Toilets 43.22 35.99 468 418
7 Water Supply 216.52 102.31 1482 1090
8 Irrigation 15.21 11.30 28 25

Other development
9 484.10 335.21 708 460
works

Total 6585.29 3904.76 21096 14103


Note : The above information is based on the KKRDB Website.

in the vacant posts both in the local and posts in the Government offices located in
parent residual cadres after formation of the Kalyana (Hyderabad)-Karnataka region
local cadre and allotment of the local consequent to the accordal of special status
persons to the respective cadres based on to the Kalyana (Hyderabad)-Karnataka
their option. Clarifications and guidelines in region providing for reservation in Public
the form of Circulars, Official Memorandum Employment and admissions to various
and Government Orders are issued from courses in the educational institutions,
time to time for effective implementation. ample opportunities are made available to
Action is being taken to fill in all the vacant the local persons in the Public Employment
and Educational sectors.
EVALUATION OF GOVERNMENT CHAPTER 15
PROGRAMMES/SCHEMES

15.1 INTRODUCTION Policy of 2011 is to have a transparent,


effective and efficient practice of evaluation
Evaluation is “an assessment, as systematic
of Government's development policies and
and impartial as possible of an activity,
programmes and use it as a tool to
project, programme, strategy, policy, topic,
benchmark the state of affairs, refine its
theme, sector, operational area or
public policies and designing programmes
institutional performance” (UNEG-2019).
and schemes with prudent and optimal use
Evaluations should focus on expected and
of resources for maximizing the intended
achieved accomplishments, critically
and measurable outcomes and citizen
examining the presumed causal chains,
satisfaction.
processes, and attainment of results, as well
as the contextual factors that may enhance Evaluation Mission
or impede the achievement of results.
The following are framed as the principles
Evaluations focus on determining the
and objectives of Evaluation for achieving
relevance, impact of a programme, improve
the set vision:
effectiveness, efficiency, equity and
sustainability of service delivery, outcomes r Prescribing standards of policy and
and impacts (DMEO- NITI) and facilitates program formulation, monitoring,
improved learning from past experience. evaluation and refinement.
r Institutionalizing enabled machinery
Karnataka was one of the first States in the backed by adequate financial resources
Country to evolve an Evaluation Policy in and informed procedures to facilitate,
2000. The policy envisaged evaluation of supervise and enforce timely, useful
every scheme/ programme with an outlay of and accountable evaluation.
Rs. One Crore and above during the plan
period and 1% of scheme outlay to be set r Enhancing technical capacities within
aside for evaluation. Later, for facilitating the departments of the Government and
independent evaluation of Schemes/ by the independent evaluation agencies
programmes, Karnataka Evaluation to undertake and effectively utilize
Authority (KEA) was set up vide Government evaluation outputs for informed
of Karnataka order no. PD/8/EVN (2)/2011 decision-making.
dated 11th July 2011and registered as a r Enhancing Stakeholders' satisfaction
Society vide registration number DRB- through participation, transparency
C/SOR/140/2011-12 on 19th September and accountability.
2011 under the Karnataka Societies 15.3 FUNCTIONS OF THE KARNATAKA
Registration Act, 1960. It functions under EVALUATION AUTHORITY
Planning, Programme Monitoring and a. To supervise, facilitate, build capacity
Statistics Department (PPMS). KEA through and handhold departments for effective
evaluation process supports the line Planning, Monitoring and fine tuning
departments for result oriented and the policies, programmes and schemes.
outcome based implementation of schemes/
programmes. b. To undertake or commission training,
consultancy and advocacy activity to
15.2 SALIENT FEATURES OF further goals of effective and
KARNATAKA EVALUATION POLICY& meaningful scheme formulation,
AUTHORITY 2011 monitoring and evaluation.
Vision c. To keep record of all Terms of Reference
The vision of the Karnataka Evaluation (ToR) of evaluation studies, data

803
804 Economic Survey of Karnataka 2019-20

collection tools, evaluation reports, to funds from UNDP for preparation of Human
disseminate the findings of evaluation Development Reports and other line
studies and to follow up utilization of Departments for preparation of various
evaluation outputs. study reports. The total receipts till date are
Rs. 3807.95Lakhs, the expenditure is
d. KEA shall take a target to conduct at
Rs.3183.02 Lakhs and the balance is
least 20-30 very important evaluations
Rs. 624.93 Lakhs.
of government Schemes/Programmes
every year. 15.7 CALENDAR OF ACTIVITIES FOR
2018-19
15.4 PROGRESS OF KEA SINCE
INCEPTION r Internship is taken up as per
requirements of the KEA and Students.
KEA has completed 137 evaluation studies
till November 2019 through Evaluation r Appointment of Staff is done as and
Consultant Organizations (ECO). when required. Now the posts of eight
research Fellows and Associate
The studies have focused on livelihood, Directors and Directors are filled up
natural resources and women issues, which has strengthened KEA to
Evaluation of schemes promoting human enhance its efficiency and quality.
development are getting focus in recent
years. Women and Child development 15.8 NEW INITIATIVES
Department has a relatively greater number Quality initiatives
of studies.
Karnataka Evaluation authority has a
15.5 ONGOING STUDIES IN KEA 2019-20 mandate to support the Government to
Seventy two studies are ongoing during make informed choices and evidence-based
2019-20 and are at different stages of policy decisions. KEA is to be designed as a
completion. The studies in Agriculture think tank by building up the capacity to
Department are focused on evaluation of provide policy inputs to the Government
works undertaken under RKVY in the State. based on a holistic analysis of issues for
planning and budgeting new schemes,
15.6 FINANCIAL PROGRESS ACHIEVED restructuring the existing schemes, effective
Apart from the grant for evaluation studies beneficiary-oriented designs and innovative
from the Government, KEA also receives implementation tools to maximize the
welfare outcomes through optimal use of

Year No. of Studies

2011-12 03

2012-13 17

2013-14 16

2014-15 14

2015-16 10

2016-17 30

2017-18 23

2018-19 13

2019-20* 11

Total 137

* (Up to November 2019)


Economic Survey of Karnataka 2019-20 805

Department wise distribution of Evaluation Studies

No. of
Sl. No. Name of the Department
Studies
Women and Child Development Empowerment of Differently Abled &
1 18
Senior Citizens
2 Agriculture 14
3 Forest 12
4 Rural Development and Panchayath Raj (RDPR) 11
5 Animal Husbandry and Veterinary Services & Fisheries 10
6 Public Enterprises 10
7 Health and Family Welfare 7
8 Horticulture and Sericulture 6
9 Commerce and Industries 5
10 Planning, Programme Monitoring and Statistics 5
11 Social Welfare 5
Backward Classes Welfare (D. Devaraj Urs Backward Classes
12 4
Development Corporation Ltd)
13 Personnel Administrative Reforms 4
14 Home 3
15 Urban Development 3
16 Co - Operation 3
17 Energy 3
18 Transport 2
19 Housing 2
20 Youth Services and Sports 1
21 Tourism 1
22 Primary & Secondary Education 1
23 Medical Education 1
24 Karnataka Public Works, Ports & Inland Water Transport 1
25 Archaeology 1
26 Labour 1
27 Finance 1
28 Revenue 1
29 Skill Development 1
Total 137
806 Economic Survey of Karnataka 2019-20

Distribution of studies across Departments

Department wise distribution of ongoing studies

Sl.
Department Study name
No.

Evaluation of the utilization of funds provided to


Kannada and Culture
1 societies and NGOs for the propagation of
Department
Kannada and Culture in Karnataka

Evaluation of Impact of wage and material


Rural Development payments to the beneficiaries (Labourers &
2
Commissionerate, RDPR Suppliers) through e-FMS since inception of the
system under MGNREGA in Karnataka

Evaluation of Suchi Sambhrama Kit for SC/ST


3 Social Welfare Department
Boys and Girls in Karnataka
Economic Survey of Karnataka 2019-20 807

Department wise distribution of ongoing studies

Sl.
Department Study nam e
No.

Women and Child Deve lopm ent Ev al uation of Beti B ach ao B eti P adhao Scheme in
4
Dep artment Vi jayapura Distric t

Study on Functioning of Nutri tional Rehabilitation


Dep artment of Health and
5 Centres (NRC) – A Comp arative Study Across the
Family welfare
R egions in Karnataka

Study of the Status and Performance of Dire ct


6 Fi nance Dep artment
Benefit Transfe r (DBT) Scheme in K arnataka

Study on Usage of the e-Hospital Software


7 National He al th Mis sion
De veloped by NIC, Karnatak a

Imp ac t Evaluation of Inte rventions by the State in


Dep artment of Sports and
8 respe ct of Se lect Sports in Karnatak a (2011- 12 to
Youth Empowerment
2 016-1 7)

Ev al uation of Krishi Yantr a Dhare ( Farm


9 Dep artment of Horticul ture,
M achinery Custom Hire Se rvice Centres) Scheme
Agriculture and Se riculture
i n K arnataka State

Karnatak a State Rural


Study of the Status of Self He lp Groups under
Livel ihood Mission and Rural
10 State Rural Livelihood Mis sion (SRLM) in
Dev elop ment and Panchayat K arnataka
Raj De partment

Karnatak a State Rural


11 Livel ihood Mission and Rural Ev al uation of the Cattle She ds constructed Under
Dev elop ment and Panchayat M GNREG A from 2 013-1 4 To 201 6-17
Raj De partment
Ev al uation of the performance of SC/ST colony
12 Soc ial Welfare De partment i nfras tructural facilities scheme unde r SCSA/TSA
for the period of 201 4-15, 2015-1 6 and 201 6-17

Primary and Se condary Ev al uation of the Imp act of Mid-Day Me als


13
Education De partment Scheme in Karnataka State -2016 -17

Education De partment Ev al uation of infrastructure facilities and


14 (Primary and Se condary e ligibility conditions of priv ate schools as per Right
Education) to Educ ation Ac t 2009 in Karnataka State

Karnatak a State Rural


Livel ihood Mission and Rural Ev al uation of Rajiv Gandhi Chaitanya Yojane
15
Dev elop ment and Panchayat ( RGCY) in Karnataka
Raj De partment

Karnatak a State Rural


Livel ihood Mission and Rural Ev al uation of Deen Dayal Upadhyaya Grameena
16
Dev elop ment and Panchayat K aus hlya Yojana (DDU_GJY) in Karnataka State
Raj De partment

Dep artment of Health and Study on Out of Poc ket Expe nd iture Incurred for
17 M ate rnal He alth Care by BPL Women in
Family Welfare
K arnataka in Public He alth Facilitie s
808 Economic Survey of Karnataka 2019-20

Department wise distribution of ongoing studies

Sl.
Department Study name
No.

Directorate of Welfare of
Disabled and Senior Citizens & Study of the Status of Senior Citizens in
18
Directorate of Social Karnataka
Security and Pension

Evaluation of Arivu- Educational Loan Scheme


D. Devaraj Urs Backward
implemented by D.DevrajUrs Backward Classes
19 Classes Development
Development Corporation in Karnataka State
Corporation Ltd
(2011-12 to 2015-16)

Primary and Secondary Evaluation of Free supply of Bicycles to 8 th


20
Education Department Standard Students

Labour Department (Karnataka Study of Welfare Impact of Usage of the


21 Building & Other Construction Construction Workers Welfare Board Cess in
Workers’ Welfare Board) Karnataka

Evaluation of Forestry works under Special


22 Forest Department Component Plan (SCP) & Tribal Sub Plan(TSP) for
the period 2013-14 to 2016-17.
Evaluation of Forestry works under Compensatory
Afforestation Fund Management and Planning
Authority (CAMPA), 2013-14 to 2015-16, 13th
23 Forest Department Finance Commission (TFC) 2013-14 to 2014-15,
National Afforestation Program (NAP) 2013-14 to
2016-17 and National Bamboo Mission (NBM)
2013-14 to 2016-17.
Evaluation of Nirantara Jyoti Yojana (NJY) of
24 GESCOM, Gulbarga Gulbarga Electricity Supply Company Ltd
(GESCOM).
Planning, Programme Study on Understanding and Reducing
25 Monitoring and Statistics Absenteeism in the Indian Civil Service with
Department Special Reference to Karnataka
Karnataka Multi Sectoral Nutrition Project in
Karnataka Comprehensive
26 Raichur and Kalaburagi Districts -Household level
Nutrition Mission
Data Analysis and Policy recommendations
Impact Assessment of works undertaken under
KLLADS and other Area Development Boards –
Planning Department, ADB
27 Malnad Area Development Board, ByaluSeeme
Division
Development Board, Costal Development
Authority and HKRDB in Karnataka State.
Concurrent Evaluation of the Implementation
Department of State
Processes and Achievement of the Technology
28 Educational Research and
Assisted Learning Programme (TALP) in Karnataka
Training (DSERT)
State
Economic Survey of Karnataka 2019-20 809

Department wise distribution of ongoing studies

Sl.
Department Study name
No.
Evaluation Study on Utilization pattern of
institutional loan availed by Self Help Groups
Department of Co-Operation & (SHGs) at concessional interest rates through co-
29 Karnataka State Cooperative operative institutions from 2014-15 to 2018-19
Apex Bank Limited. and its impact on Employment, Assets and
Income of the members and attainment of targets
under SDG-5

Impact of Per Drop More Crop component of


Department of Agriculture, PMKSY on coverage of area under MI,
Horticulture and Sericulture, incentivization of suitable Crop Pattern, crop
30
Government of Karnataka productivity, cost savings and water use efficiency
(2016-17 -2018-19) for achieving targets under
SDG Goal-6

Concurrent Monitoring and Evaluation of


Department of Agriculture, Agriculture Technology Management Agency
31
Government of Karnataka (ATMA) Scheme in Karnataka State during
2018-19

The study “Human Elephant conflict -The


mitigation methods employed and its impact on
32 Forest Department conflict resolution (covering issues like reasons for
conflict, effectiveness of barrier, conflict spots, ex-
gratia payments, spatial and temporal dispersal)

Evaluation of Functioning and Effectiveness of


Department of Industries &
industry related service modules of major
Commerce & Karnataka Udyog
33 Government Departments in promoting investor
Mitra
friendly business environment for industries (Ease
of Doing Business)in Karnataka State (2018-19)

Impact Evaluation of Pashu Bhagya Scheme


Department of Animal (2015-16 to 2018-19) on livelihood security of
34 Husbandry and Veterinary marginal and small farmers, agricultural
Services (AH & VS), Karnataka labourers, Widows, Devadasis and Distressed
Women

Evaluation of Functioning of Bio Energy Research


Karnataka State Bioenergy Information and Demonstration Centres and its
35
Development Board impact on Information and Spread of Biofuel
activities, and use of Biofuel

Evaluation of functioning of Grievance


e-Janaspandana Government
36 Management System, Hassan District, (Spandana)
of Karnataka
in Karnataka State

Evaluating the performance of Tiger Foundations


37
in Karnataka
Forest, Environment and
Ecology Department Evaluating of Induction Training Programme for
38 the Uniformed Cadres in Karnataka Forest
Department
810 Economic Survey of Karnataka 2019-20

Department wise distribution of ongoing studies

Sl.
Department Study name
No.
Evaluation of Pilot Sustainable model seed
National Seed Project, UAS,
39 platform implemented during the period 2017 to
Bengaluru
2020

Evaluation of the scheme Recycling and Utilization


Department of Agriculture of Biodegradable Urban and Municipal Waste in
40 College of Agriculture, Agriculture implemented during the period 2012
Bengaluru to 2015 at four centers – Bengaluru, Madya,
Chintamani and Hiriyur.
Impact Assessment of Integrated Farming System
Department of Agriculture
Demonstrations implemented during the period
41 University of Agricultural
2011-12 to 2015-16 in 15 southern districtsin
Sciences, Bengaluru
Karnataka
Evaluation of Water Technology Center for
Department of Agriculture
Cauvery Command implemented during the period
42 University of Agricultural
2013-2019 by University of Agricultural Sciences,
Sciences, Bengaluru
at Mandya.
Department of Agriculture,
College of Sericulture, Evaluation of the scheme of Productivity
43 Chintamani, University of Enhancement in Sericulture through Community
Agricultural Sciences, Cluster Approach.
Bengaluru
Department of Agriculture Impact Assessment of Organic farming research
44 Research Institute on Organic undertaken in Research institute on promotion of
Farming, UAS, Bengaluru organic farming in the State (2016-17).

Utilisation and Impact Assessment of Design and


45 development of low-cost agricultural tools and
Department of Agriculture equipment for small and marginal farmers
University of Agricultural
Sciences, Raichur Climate Change and its effect on important
46
agricultural crops of Kalyan Karnataka Region

Impact of Application of Nanotechnology in


47
enhancing quality of agri. produce

Evaluation of Development, evaluation and


48 demonstration of solar and other renewable
energy
Assessment of Processing and value addition
49 technology for millets for nutritional security in
Hyderabad Karnataka Region

Evaluation of the project e-Pest surveillance in


50
selected crop ecosystems through e-SAP

Impact assessment of the project Establishment of


51 pesticide residues analysis laboratory in
Hyderabad Karnataka Region
Economic Survey of Karnataka 2019-20 811

Department wise distribution of ongoing studies


Sl.
Department Study name
No.

Impact of Highthrouput functional


52 characterization of insecticidal/ Nematicidal
molecules to control Insects and Nematodes.

Impact Evaluation of Precision farming techniques


53
for selected field crops.

Impact of Centre for Nano Science and Technology


54 on enhancing the quality of agricultural produce

Evaluation of the project Establishment of


55 ResearchInstitute on Organic Farming in
Hyderabad-Karnataka

Evaluation of the project -Research Institute on


56
Department of Agriculture Organic Farming
University of Agricultural
Sciences, Dharwad Evaluation of the project -Establishment of
Institute for Agril. Research on climate change at
57
UAS

Evaluation of the project Enhancing Water


58 Productivity in Command Areas of Karnataka
under RKVY.

Evaluation of the proj ect Establishment of Farm


59
machinery Testing Centre under RKVY

Impact Evaluation of Production, value addition


60 marketing and populari zation of organic jaggery
through established jaggery park

Impact Analysis Establishment of Crop


61 Biodiversity Centre for important Agricultural
Crops

Evaluation of Interventions through nano science


62 and technology in crop improvement and crop
husbandry practices

Impact Analysis of the project Breeding for bi otic


stress and drought tolerance in major field crops
63
for increasing productivity under changing climate
conditions through molecular assisted selection
812 Economic Survey of Karnataka 2019-20

Department wise distribution of ongoing studies

Sl.
Department Study name
No.

Evaluation of Genomics approaches for drought


64
stress and disease management in crop plants

Impact Evaluation of Agro-forestry based value


65 chain systems in rural areas of Uttar Kannada
district

Evaluation of Introgression breeding for foliar


disease resistance using cultivated and wild
66 species in groundnut and disease/drought
tolerance in major field crops through marker
assisted selection.

Evaluation of the project Increasing productivity in


67 Groundnut, Sorghum, Pigeonpea, Rice through
molecular breeding

Impact Assessment of Development of an


68 innovative biotic tool in the management of
parasitic weeds

Impact Exploration of Halophytes and salt


69 resistance genes for Bio-amelioration of salt
affected soils

Impact of Molecular breeding and genetic


70
enhancement on breaking yield barriers in Pulses

Financial Progress Achieved


Particulars 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Total

Total receipts (Gr ants,


UNDP, Interest & 498.63 566.12 346.06 354.57 463.34 488.69 535.23 335.08 220.23 3807.95
other receipts)

Expendi ture 47.16 279.96 245.61 327.48 322.09 492.69 357.47 635.00 475.56 3183.02

Balance 451.47 286.16 100.45 27.09 141.25 -4.00 177.76 -299.92 -255.33 624.93

Apart from the grant for evaluation studies from the Government, KEA also receives funds from UNDP for
preparation of Human Development Reports and other line Departments for preparation of various study
reports. The total receipts till date are Rs. 3807.95 lakhs, the expenditure is Rs. 3183.02lakhs and the balance is
Rs. 624.93lakhs.
Economic Survey of Karnataka 2019-20 813

Calendar of Activities for 2018-19

Sl. Month (April – March)


KEA Activities
No 4 5 6 7 8 9 10 11 12 1 2 3

1 To request all the Departments


and obtain proposals
2 Go verning Body meeting
3 Statutory Audit
4 Technical Committee meeting
5 Preparation of TOR's
6 General Body Meeting
7 Training and Wo rkshop
8 Invite RFP, Tender Evaluation

9 Advertisement for appointment


of staff

Monitoring monthly
performance of ECO on
10
Inception Report, Field Visits,
Draft Evaluation Report and
Final Report

Internship is taken up as per requirements of the KEA and Students.


Appointment of Staff is done as and when required. Now the posts of eight research Fellows and Associate
Directors and Directors are filled up which has strengthened KEA to enhance its efficiency and quality.

resources. In this context it was decided to commencement of the study to provide


form the sub committees of experts in the guidance to the Evaluation Consultant
field as per the requirements. Organizations at various stages of the
study.
r KEA is collaborating with Haas School
of Business, University of California r KEA has organised a training pro-
Berkeley for the research study on gramme for Consultant Organizations
“Understanding and reducing on Recent Trends in Evaluation
absenteeism in the Indian Civil Service Methodology on 19th August 2019.
with special reference to Karnataka”. It r A committee has been constituted vide
is planned that such research studies to G.O. No. PD 102 PSD 2015, Bangalore
be taken up internally by KEA in dated 04.01.2016 to frame the
association with Research Institutions/ appropriate sampling design in the
domain experts in the field. ToRs of various evaluation studies. The
r To enhance the quality of evaluation random sample for a study is drawn by
reports and to provide policy the Committee at KEA. This Committee
recommendations with accurate also prepares/scrutinizes the
analysis of data by application of questionnaires prepared by the
appropriate statistical methods and Consultant Evaluation Organization.
techniques and for interpretation of the The Committee was involved in
data some expert advice is required. A sampling design for the evaluation
domain expert is identified at the studies during 2018-19.
814 Economic Survey of Karnataka 2019-20

r Review meetings are conducted every implementing the Internship


month to oversee the progress and to Programme.
give necessary guidance. The inception r The concerned Department Secretary is
report is presented before the the nodal officer of the internship
Committee in KEA and suggestions are program in the respective department.
given to improve it and to provide
quality evaluation. An interim report is r This programme seeks to engagePost
presented before KEA after 50% of the Graduate students or Research
work is completed and required Scholars enrolled in recognized
suggestions are given at this level also. University / Institution within India or
The draft evaluation report is presented abroad, as 'Interns' in various
before KEA and suggestions are given Departments of the Government and
on analytical issues, interpretations the offices of Deputy Commissioners
and recommendations. After the and Zilla Panchayats at district level.
revision it is assessed by an r These 'Interns' are given exposure to
Independent Assessor/ Subject Expert various Departments within
and is also sent to the Department for Government of Karnataka and would be
their comments/ suggestions. The expected to supplement the process of
report is revised as per the analysis within Departments through
comments/suggetions given by all and empirical collection and collation of in-
then it is placed before the Technical house and other information.
Committee for the quality inputs from r Under Internship Programme in KEA,
experts. The final revised report is Internship assignments are completed
accepted for submission after approval. by students from National Law School of
r The Request for Proposal (RFP) is India University, Institute for Social and
revised to catch the quality issues in the Economic Change and Bangalore
CV of the study Team members and the University, Bangalore, PESIT etc. Four
weightage given to CV of study Team is students completed their Internship
now reduced to 75% from 100%. The during 2019-20.
organizational profile is now given a Research and EvaluationCapacity
weightage of 25%. The move is to get a Building of State Universities
good organization for the Evaluation
study. Further, an ECO is not eligible to r As per the directions given by general
participate in the tender (Request for Body, KEA is engaging with State
Proposal/Call for Expression of Universities in Evaluation studies to
Interest) if two or more evaluation enhance their capacities in research
studies are pending with the Evaluation and evaluation. The evaluation of the
Consultant Organization. This is to Scheme Beti Bachao Beti Padhao
ensure timely completion of studies scheme in Vijayapura district is taken
with good quality. through Akkamahadevi Women's
University Vijayapura. Further, out of
r Restructuring of Governing Body and
50 evaluation studies to be taken up in
Technical Committee is done to involve
next coming year, 25 will be done
more experts in evaluation field in these
through Universities. Guidelines are
committees.
prepared to take up various studies
Internship Programme in Government through Universities.
Departments
Other Initiatives
r The Programme is implemented in the
Sustainable Development Goals and
Line Departments, Corporations,
Boards, Bodies and Authorities of other projects
Government of Karnataka. r As per the 70th Session of the United
r Karnataka Evaluation Authority (KEA) Nations (UN) General Assembly held on
is the nodal agency for coordinating and 25th September 2015 adopted the
Economic Survey of Karnataka 2019-20 815

document titled “Transforming Our the evaluation reports are shared with the
World: the 2030 Agenda for Sustainable Department and they are persuaded to send
Development” consisting of 17 the Action Taken Reports (ATR). The
Sustainable Development Goals (SDGs) Departments have sent ATRs for 81 studies.
and associated 169 targets. The SDGs Some of the changes in the scheme
seek to address not only the root causes recommended in the evaluation studies
of poverty but also the universal need have been implemented by the Government.
for development to provide a life of As per the decision of the 19th Governing
dignity, peace and prosperity to all. The Body meeting held on 03-08-2019, a
2030 Agenda for Sustainable Committee has been constituted under the
Development embodies a roadmap for Chairpersonship of Principal Secretary to
progress that is sustainable and leaves Government, to review ATRs on Evaluation
no one behind. Karnataka State has Studies vide G.O.No. PD 66 PSD 2019,
taken up the implementation and dated:06-09-2019.
monitoring of SDG goals and targets.
The first meeting of the committee was held
KEA is supporting Planning,
on 13-09-2019 and the action taken by the
Programme Monitoring and Statistics
Departments was reviewed. The
Department (PPMS) in preparation of
departments who have not submitted the
status report and formulating strategies
ATRs have been instructed to submit report
for attainment of Sustainable
on the action taken on recommendations of
Development Goals (SDGs) in
the Evaluation studies.
Karnataka by 2030.
r KEA also has provided support to Many suggestions on quality interventions
Planning Department for establishing a and transparency are incorporated in the
Sustainable Development Goals implementation of the programme on
Coordination Centre for localization of Evaluation of Green House farming under
SDG goals and for designing the protected cultivation structure under NHM
strategy and action plans for achieving & RKVY (2010-11 to 2013-14). Pilot
SDGs by 2030 schemes are taken up in soil less cultivation
for coco peat and hydroponics. Single village
r KEA is coordinating on Transformation clusters are being developed and tunnel
of Raichur and Yadgir Aspirational cultivation techniques are under consi-
Districts in Karnataka. KEA supported deration. A study report has been initiated
Planning Department and UNDP Team from University of Horticultural Sciences,
to prepare an Innovative Action Plan on Bagalkote on creating value chain and cold
development of these districts. chain for horticulture crop structures. A
r KEA has supported the other Initiatives new software Horticulure Benefit
of NITI Aayog like India Innovation Management System is introduced for
Index, Ease of Doing Business Index, online registration, sanction and release of
Ease of Living Index. subsidy to the beneficiaries.
r KEA has supported Planning Based on the recommendation of a Study on
Department in establishing knowledge evaluation of fodder Development
Partnership with International Institute Programme, the Government has taken the
of Information Technology Bangalore initiative to formulate a fodder policy for the
and Public Affairs Centre through State. Similarly a study on Malnutrition has
Centre for Open data Research for data suggested for formulation of a
analytics and predictive modelling for Comprehensive Nutrition Policy for
informed choices in Governance and Karnataka which is also an agenda before
evidence-based policy decisions. the Government.
15.9 IMPACT OF EVALUATION- ACTION
The evaluation of Bhagyalakshmi scheme
TAKEN ON RECOMMENDATIONS has helped the Government to know about
For effective utilization of evaluation output, the impact of the incentives given under the
816 Economic Survey of Karnataka 2019-20

scheme. This has helped to improve the Government on the same platform for
attitude towards girl child. Further, to mutual benefit.
promote the education of the girl child, it is
KEA will also focus more on improving the
suggested that Minimum educational
quality of the evaluation studies through
criteria must be raised up to SSLC/matric or
workshops and training programmes for
some additional incentives can be
capacity building of the line Departments as
introduced for successful completion of
well as Evaluation Consultant
SSLC, PUC and Higher education. Bhagya
Organizations. KEA will collaborate with
Lakshmi beneficiaries should be given
Centre for Open Data Research to provide
priority under various skill development as
data analytics for the data collected in
well as self-employment schemes funded by
evaluation studies to draw more meaningful
Karnataka state government. Sufficient
inferences based on evidence.
allotment of funds for awareness drive as
most of the problems the scheme would like KEA will take up in-house studies to build
to address are deeply entrenched in the capacity of young research staff. It will
patriarchal social structure which validates also develop a real time data collection and
unequal treatment of women. Action is monitoring system for ensuring that field
being taken to revise the guidelines realities are captured in evaluation reports.
accordingly.
KEA is actively, supporting the Government
15.10 FUTURE PLANS departments to promote effective implemen-
tation of development programmes and
KEA proposes to focus on evaluation of policies through assessing their outcomes
major schemes and programmes having and providing feedback to bring about
large outlays above Rs. 100 Crores per necessary changes in framework as well as
annum and broader coverage of implementation designs. KEA will support
beneficiaries to provide adequate inputs to the new initiatives of Planning Department
the Government for effective outcomes of to introduce innovative programmes for
flagship programmes. development of aspirational districts. It will
KEA is identified as a nodal agency to initiate the process of preparation of Output
facilitate a comprehensive internship - Outcome analysis document for Different
programme in Government Departments for Central and State Government Schemes
capacity building of young students and and support the Sustainable Development
research scholars on large scale. It will Goals coordination Centre in designing the
collaborate with State Universities and strategies, action plans and localization of
Academic institutions to take evaluation SDGs to achieve the set targets of SDGs
studies and thus bring Academics, and 2030.
SKILL DEVELOPMENT, CHAPTER 16
ENTREPRENEURSHIP AND
LIVELIHOOD

16.1 ENHANCING SKILL EMPOWERING 16.1.3 Mission


YOUTH
Youth Empowerment, Inclusive
Karnataka has a projected population of Development, International Quality,
6.95 crores wherein 55% are youth. The Encourage Innovation & Effective
demographic advantage provides a window Convergence.
of opportunity for the next 25 years. It gives
16.1.4 Objectives
the State a developmental edge with a
potential to leverage as a global leader, r Overarching role of the SDEL
provided this large youth population is Department is Promoting, Planning,
channelized, skilled and equipped Implementing, Standardising,
adequately. “Youth are the light of hope of Monitoring, Regulating skill
our future, they should be equipped with development in the state for achieving
necessary skill and capabilities to enable excellence and international quality.
them in availing the employment r Converging the resources, institutional
opportunities.” With this announcement by strengths and skilling programmes of
the Hon'ble Chief Minister, the Government various other departments, industry
of Karnataka has set up the Department of and civil society for better coordination,
Skill Development, Entrepreneurship and avoid duplication and under funding.
Livelihood (SDEL) in 2016 to enable the
state's youth to acquire necessary skills for r Functioning as a nodal agency to
decent employment, and to promote provide industry interface, quality
sustainable livelihood. Simultaneously, benchmarks, national/international
industry's need for skilled manpower will be best practices, and impact evaluations.
satisfactorily met resulting in enhanced r Primarily focussing on skilling youth in
productivity and growth in all the three the age group of 18 to 35 years and
sectors of economy. ensuring equality and equity.
16.1.1 Vision r Building conducive environment for
motivating youth to acquire quality
Internationally acceptable skilling to enable skills as per industry demand
decent employment and sustainable mitigating skill gap.
livelihood opportunity for all the citizens
16.1.5 Special Initiatives
thereby reap optimum demographic
dividend. r Generating awareness & creating
aspiration for skill
16.1.2 Goal
r Improving training infrastructure
r Provide skills to needy existing r Building trainer's capacity
workforce and new entrants to the
labour market every year who yearn to r Enhancing training quality
achieve sustainable livelihood either r Utilising apprenticeship potential
through wage employment or self- r Up-skilling, re-skilling & recognition of
employment options. prior learning (RPL)
r Make skill inspirational and compliant r Providing career guidance and
to National Skill Qualification placement
Framework.
r Generating overseas employment
opportunity

817
818 Economic Survey of Karnataka 2019-20

r Promoting entrepreneurship Entrepreneurship and Livelihood activities


r Supporting start-up companies through Mission Mode.
16.1.6 Koushalya Mission Structure 16.1.8 Medium Term Target
State, District and Taluka Kaushalya The Skill Development, Entrepreneurship
Missions have been constituted under Skill and Livelihood department has following
Development, Entrepreneurship and medium term targets. (Table 16.2)
Livelihood Department to undertake Skill
16.1.9 Registration of Job Seekers under
Development on Mission Mode. The
kaushalya.karnataka.gov.in
constitution of these missions in brief is
given in the Table 16.1. Job seekers are provided opportunity
to get direct employment, selecting
16.1.7 Skill Mission Unit and District
apprenticeship training and skill
Skill Development Offices development training by registering under
Skill Mission Unit at the State level and kaushalya.karnataka.gov.in which was
District Skill Development offices at district inaugurated on 15.5.2017 by the Hon'ble
level have been created to achieve Chief Minister at state level and by the
output and outcomes by undertaking district in charge ministers at district level.
implementation of Skill Development, The information of district wise aspirants
registered is given in the Appendix 16.1.

Table 16.1: Koushalya Mission Structure


Vice-chairman/
Missions Chairman Member Secretary
Co-chairman
Secretary, SDEL
State Koushalya Mission Chief Minister Skill Minister Dept.
Deputy District Skill
District Koushalya Mission CEO, ZP
Commissioner Development Officer

Taluka Koushalya Mission Assistant - EO Taluka


Commissioner Panchayat

Table 16.2: Medium Term Target


Sl. 2017-18 2018-19 2019-20 2020-21
Target Description
No. Achievement Target Target Target

Skill Development
1 2,34,935 2,50,000 2,50,000 2,50,000
(3 to 6 months)

Apprenticeship
2 50,000 50,000 30,000 50,000
Training

Livelihood
3 Training 55,743 50,000 20,000 20,000
(Local to Global)

Placement Services through


4 Job Mela and Employment 76,920 1,00,000 25,000 25,000
Exchanges

Entrepreneurship
5 38,580 25,000 25,000 25,000
Development Training
Economic Survey of Karnataka 2019-20 819

16.1.10 Skill Training r Ensuring all children Complete 10


years of schooling by 2025 compared to
The candidates registered under
the present ratio of only 80.64% (KJA
kaushalya.karnataka.gov.in for various job
report 2016).
roles of the sectors having potential job
opportunities will be imparted skill training r Completely availing existing capacity of
as per their aspirations. Skill trainings will Formal Vocational Training
be conducted mainly in the following infrastructures in the State and make
sectors. Textiles & Garments, Leather & sure that the proportion of children
Footwear, Gems & Jewellery, Food availing training to increase from
Processing Industries, Handlooms & present 14.62% to at least 60%.
Handicrafts, IT&ITES, Health Care Services, r Extensively utilizing and amplify
Education, Building, Construction & Real existing capacity of higher education in
Estate, Tourism, Travel, Hospitality & the state and ensuring increase of Gross
Trade, Transportation, logistics, Enrolment Ratio (GER) from present
warehousing & packaging, and Agriculture 29% (KJA report, 2016) to 70% by 2030.
& allied activities r Provide equal opportunity for
16.1.11 Selection of Beneficiary Vocational Education &Training (3-6
months) to every child in the State who
Any aspiring trainee is self selected if is unable to pursue Formal Vocational
registered in the website - kaushalya. Training or Higher education.
karnataka.gov.in. If more trainees register
than the available training slots, priority will 16.1.14 Organisations Coming under the
be based on reservation, Education Department
qualification and age. The organisations undertaking Skill
16.1.12 Target Segment Development, Entrepreneurship and
Livelihood activities are brought under this
The target segments and priority social department and given in Table 16.4
groups are given in Table 16.3.
16.2 CHIEF MINISTER's KAUSHALYA
16.1.13 Long Term Targets: By 2030 KARNATAKA YOJANE
Skill Development, Entrepreneurship and (I) Objectives
Livelihood department has following long
term targets. Chief Ministers Kaushalya Karnataka

Table 16.3: Target Segments and Priority Social Groups

Target Segment Priority social groups and reservation (%)

School dropout SC- 20%

Under employed workers ST-7%

Out of workforce Minority-15%

Women Women-33%

Workers without technical skills Physically challenged-3%


820 Economic Survey of Karnataka 2019-20

Yojane has been launched in 2017-18 with r Institutionalize effective monitoring.


the following objectives. (ii) Streams
r Market driven skilling, re-skilling and Skill development programmes under Chief
up-skilling of youth in the age group of Minister's Koushalya Karnataka Yojane will
18-35 years, recognizing their prior be implemented on a mission mode. skill
learning and provide them higher skills training and placement of 5 lakh candidates
and make them capable of getting is targeted under this programme and is
decent employment. being implemented in following two
r Impart quality training by building streams.
capacity of the training institutions and
trainers and providing effective Stream 1: Programmes directly implemented
incentives. by Skill Development, Entrepreneurship
and Livelihood Department - With a training
r Issue certificates by evaluating on par target of 2.5 lakh candidates and the
with international standards programmes will directly be implemented by
r Imparting training to eligible the SDEL Department.
beneficiaries in the trade of their choice
at least once by avoiding duplication in Stream 2: Programmes implemented by
the selection of beneficiaries various departments by themselves- With a
training target of 2.5 lakh candidates and
r Providing training by enforcing uniform the Programmes implemented by various
curriculum, standards and certification departments that have domain specific
etc., by aligning with National knowledge.
Skill Qualification Framework and
consolidating training programmes of (iii) Progress
all the departments. The Progress under Stream 1 of Chief
r To provide career counselling and Minister's Kaushalya Karnataka Yojane for
placement services to all. 2019-20 up to the end of November 2019 is
r To ensure every trainee has a gainful presented in Tables 16.5.
wage or self employment with decent
work.
Table 16.4: Organisations Coming under the Skill Development, Entrepreneurship
and Livelihood Department

Sl. No. Nam e of Organisations


1 Entrepreneurship Development and Incubation Centres
2 Industrial Training Institutes and Multi Skill Development Centres
3 Karnataka Skill Development Authority
4 Commi ssionerate of Industrial Training and Employment
5 Rural Development and Sel f Employment Training Institute
6 Centre for Entrepreneurship Development of Karnataka
7 G overnment Tool Room & Training Centre.
Karnataka German Multi Skill Development Corporation, Sir. M. Vi svesvaraya
8 National Construction Academy, Bharat Ratna Mokshagundam Visvesvaraya National
Traini ng Facility for ski ll for All Society.
9 National Rural Livelihood Mission
10 National Urban Livelihood Mission
11 Karnataka Skill Development Corporation
Economic Survey of Karnataka 2019-20 821

16.2.1 Chief Minister's Karnataka focus on placements. 34 employment


Livelihood Scheme exchanges will be upgraded by providing
“Chief Minister's Karnataka Livelihood necessary infrastructure and human
resources for training persons as per the
Scheme”, a “Local to Global” initiative will
industry demand. The annual target fixed to
provide skill training with support in design
and marketing to 50,000 local artisans, Centre of Excellence is given in Table 16.7.
especially women, in local handicrafts, 16.5 “SANJEEVINI” – KARNATAKA
handloom and other informal sectors for STATE RURAL LIVELIHOOD
their sustained livelihood. This scheme is PROMOTION SOCIETY
being implemented under Chief Minister's
The Government of India, Ministry of Rural
Kaushalya Karnataka Yojane under
Development has restructured SGSY as
Stream-3 from 2017-18. The progress under
“Aajeevika”- National Rural Livelihoods
stream-3 for the year 2019-20 up to the end
Mission (NRLM) and being implemented
of November 2019 is given in Table 16.6.
from 2010-2011. The State Government is
16.3 KARNATAKA APPRENTICESHIP implementing this scheme in the phased
SCHEME manner through Karnataka State Rural
To encourage apprentice training programme Livelihoods Promotion Society which was
under Karnataka Apprenticeship Scheme, established on 11.12.2011 and the society
State Government will reimburse stipend of was named as “Sanjeevini”.
Rs.1,000 per month to each apprentice. As In the first phase twenty taluks spread over
against target of 30,000 candidates 12000 five districts namely Mysore (H D Kote,
candidates were trained up to end of Hunasur, Nanjangud, T Narasipura),
November 2019. Tumkur(Pavagada, Chikkanayakanahalli,
Madhugiri, Sira), Gadag(Shirahatti,
16.4 CENTRES OF EXCELLENCE
Naragund,Gadag, Mundargi, Ron)Koppal
“Centres of Excellence” have been (Yelburga, Kushtagi, Koppal) and Uttar
established for ensuring sustainability, Kannada (Ankola, Joida, Kumta, Yellapura)
accessibility, and industry linkages with were approved by the Government and were
brought under intensive strategy during the

Table 16.5: Progress under Chief Minister's Kaushalya Karnataka Yojane-Stream 1


2019-20 (up to November 2019)
No. of Candidates
Department Training
Annual Target Placement
Completed

Skill Development,
Entrepreneurship and 2,50,000 31,361 9,182
Livelihood

Table 16.6: Progress under Chief Minister's Kaushalya Karnataka Yojane - Stream-3
for 2019-20 (up to November 2019)
Training Self Employment/
Sl. No. Department Annual Target Entrepreneurship
Completed
1 NRLM 33,300 34,114 11,403

2 NULM 10,300 7,210 340

Total 43,600 41,324 11,743


822 Economic Survey of Karnataka 2019-20

Table 16.7: Targets Fixed to Centres of Excellence under Various Activities for the
Year 2019-20
Sl.
Activity Target Details
No.

Registration-
1 Assistance in 9,80,000 Registration in kaushalya.karnataka.gov.in
employment

Training and Entrepreneurship development to


2 Training 1,50,000 candidates before attending to Job Melas

For only to the candidates having qualification


Evaluation and
3 1,00,000 more than SSLC and interested in taking
consultation
Assessment Test.

Pre examination Training programme for the


candidates who have taken recruitment
4 Study Circle 10,000
examinations-116 Pre examination Training
programme have to be conducted

Providing employment opportunities to 40000


5 Placement 40,000 candidates through job melas and other activities.

Providing information regarding job melas, Public


Dissemination of recruitment and recruitment training to the
6 10,00,000
information candidates registered under
kaushalya.karnataka.gov.in through SMS gateway.

year 2014-15. Based on the Backwardness institutions' is the most important


of the talukas as per Dr. Nanjundappa prerequisite and the core investment for
Committee report, additional 64 taluks are large scale poverty reduction. NRLM would
covered under intensive strategy during organize all poor households (women) in to
2015-16. Remaining districts and talukas aggregate institutions of the poor that
will be brought into intensive fold in a provide them with voice, space and
phased manner, approval has been resources. These platforms 'of the poor' and
obtained for this in the 5th Sanjeevini 'for the poor' would partner with local self-
Executive committee meeting and first governments, public service providers,
General Body meeting held on 05.09.2015 banks, private sector and other mainstream
and 19.10.2015 respectively. The phase institutions to facilitate delivery of social
wise districts and blocks covered under and economic services to the poor. Building
intensive strategy are provided in and sustaining institutions of the poor at
Table 16.8. various levels would be for collective action,
greater solidarity, bargaining power,
16.5.1 The details of Progress of Sanjeevini- economies of scale and larger linkages.
KSRLPS against the action plan for the year
2019-20 is given in Table 16.9 (Upto The Gram Panchayat Level Federation will
November 2019) select a local CRP, to carry the social
mobilization and capacity building process.
16.5.2 Institution Building and Capacity The federations will then analyze training
Building: requirements and conduct training to the
Mobilization of poor to form their 'own existing SHGs & new SHGs formed.
Economic Survey of Karnataka 2019-20 823

Table 16.8 : Districts and Blocks covered Under Intensive Strategy Phasing Plan

Phase Year Districts Taluks

I 2014-15 5 20

II 2015-16 20 64

III 2016-17 17 47

IV 2018-19 8 16

V 2019-20 4 22

Total 54 169

Table 16.9 : Details of Progress of Sanjeevini- KSRLPS during the year 2019-20
(Rs.in Crore)

Sl. Component wise Available


Budget O.B Releases Expenditure
No. details Fund

National Rural
1 50.00 13.09 124.24 137.32 118.59
Livelihood Mission
National Rural
Economic
2 0.00 0.00 0.00 0.00 0.00
Transformation Project
(NRETP)
Rural Self Employment
3 Training Institute 9.00 4.35 0.00 4.35 4.29

Deen Dayal Upadhyay


4 Grameena Kaushalya 61.00 137.57 0.00 137.58 20.79
Yojane

Rajiv Gandhi
5 25.00 20.24 6.25 26.49 0.00
Chaitanya Yojane

MKSP (Mahila Kisan


6 Sashaktikaran 5.00 0.00 0.00 0.00 0.00
Pariyojana)
Total 150.00 175.25 130.49 305.74 143.67

In addition the GPLF will facilitate up convergence activities with Gram


preparation of MIP which will be used to Panchayat.
release CIF to the SHGs.
16.5.3 Mahila Kisan Shashaktikaran
The federation will also facilitate bank Pariyojane (MKSP):
linkage and identification of left out women
to be mobilized into SHGs and federations. To improve the condition of women
As a part of rural livelihood programme in agriculture and to increase the
Gram Panchayat level federation will take opportunities for women empowerment,
Government of India is implementing MKSP
824 Economic Survey of Karnataka 2019-20

as a sub component of NRLM. The primary provided by trained MECs on business


objective of the MKSP is to empower women development. To assist the community in
in agriculture by making systematic this process, two master mentors from NRO
investments to enhance their participation -Kudumbashree will be placed in each target
and productivity, also create and sustain Districts to guide and support newly
agriculture based livelihoods of rural developed MECs to provide inputs to Micro
women. Enterprises for business development.
16.5.4 Micro Enterprise Consultant 16.5.5 Financial Inclusion:
Project (Community Based Resource
The Financial Inclusion process envisages
Support for Micro Enterprise access of the poor to appropriate financial
Development) services at an affordable cost. The vision of
Promotion of self-employment through KSRLPS is to act as a catalyst/facilitator for
Micro Enterprises is an integral aspect of the SHGs to borrow large amount from formal
livelihood strategy of Government of India. financial institutions for the livelihoods and
One of the key constraints faced is the consumption.
availability of local business development Funding the poor is considered to be a risky
services that will support the entrepreneurs proposition by the banks; one of the reasons
to set up and grow their businesses. Keeping for the situation is the lack of effective credit
in view the said constraints, KSRLPS has delivery mechanism for the poor, besides
entered into MoU with National Resource limited outreach & coverage.
Organization - Kudumbashree for three
years period to implement the Micro It is in this context that KSRLPS has taken
Enterprise Consultant (MEC) pilot at up the task of promoting Financial Inclusion
Mysore, Hassan and Gadag Districts. In this of the rural poor. That is, delivery of
process, the local men and women involved financial services to the rural poor at an
in micro enterprise activities are identified affordable cost for poverty reduction and
and trained on the intricacies of Micro sustainable development. SHG Bank
enterprise business and management, after linkage programme is taken as the key
which they will be placed at target Districts – strategy for delivery of financial services to
cluster/zone wise to provide wide range of the poor in sustainable manner. During
services to micro enterprises. 2019-20, nearly 338162 SHGs have been
credit linked with banks, with loan amount
The key strategy that is adopted by NRO – of Rs.284989.00 lakh.
Kudumbashree in this initiative is to
develop 135 Micro Enterprise Consultants 16.5.6 Revolving Fund (RF):
(@ of 45 per target District) through Revolving fund is a grant to the SHGs which
intensive capacity building that includes is provided to eligible SHGs as an incentive
general orientation and entrepreneurship to inculcate the habit of thrift and
development programs. Of the 135 MECs, accumulate their own funds towards
36 will be the main mentors who would meeting their credit needs and also to obtain
undergo six rounds of training program (@ 5 bank credit in multiple measures of corpus.
days per month each round) on Rural Target was allocated to the districts to get
Enterprise administration and management the list of eligible SHGs. The list of eligible
facilitated by experienced resource persons SHGs will be scrutinized according to the
engaged by NRO - Kudumbashree. Once guidelines and RF will be released.
the entire target MECs undergoes proposed
training programs, they will be involved in 16.5.7 Community Investment Fund
mapping the Micro enterprises that are (CIF)
currently existing and collect data on the
CIF is provided as a resource in perpetuity to
business/other issues associated with it.
capitalize the institutions of the poor. SHGs
Based on the analysis of micro enterprise
will prepare micro investment/micro credit
business and possibilities of starting new
plan to pursue income generating activities
enterprise, necessary inputs will be
Economic Survey of Karnataka 2019-20 825

by poorest of the poor women in the SHGs. RUDSETI / RSETIs have been established in
During 2019-20 as many as 5014 Groups 29 districts with well established
have been given financial assistance to tune infrastructure and human resource through
of Rs.4456.00 Lakh upto November 2019. which training on 112 different trades are
(Table 16.10). imparted to the selected candidates.
Progress achieved in providing training to
16.5.8 Rajiv Gandhi Chaitanya Yojane rural youths is given in Table 16.11.
(RGCY):
Rajiv Gandhi Chaitanya Yojane was not 16.5.10 Deen Dayal Upadyaya Grameena
implemented during 2019-20. The Koushalya Yojane (DDU GKY):
guidelines are being revised to cover the DDUGKY a skill programme of MORD earlier
beneficiaries of urban areas also. known as Aajeevika Skills Yojane renamed
as a Deen Dayal Upadyaya Grameena
16.5.9 Rural Self Employment Training Koushalya Yojane and notification has been
Institutes (RSETIs): circulated on 24.02.2015 envisages
RSETI's is the nodal agency for providing providing jobs after training by training
training to rural youths on self employment partners.
on different trades. In Karnataka State, 33

Table 16.10 : Progress under Financial Inclusion 2019-20 (up to Nov 2019 )

(Rs. in Lakhs)

COMPONENT Target Achieved

Physical Financial Physical Financial

Revolving Fund (RF) 25000 3,750.00 - -

Community Investment Fund (CIF) 15000 15,000.00 5014 4,456.00

SHG Bank Linkage 455654 10,42,374.00 338162 2,84,989.56

Table 16.11: RSETI progress: 2019-20 (up to November 2019)

Total Target 24388

No. of candidates trained 10276

No. of BPL candidates trained 9107

No. of SC candidates trained 2197

No. of ST candidates trained 1001

No. of Minority candidates trained 5175

No. of Women candidates trained 6818

No. of candidates settled with bank finance 431

No. of candidates settled with own finance 608

No. of candidates settled with wage employment 57


826 Economic Survey of Karnataka 2019-20

16.5.11 Progress: r Formation of City level women self help


groups, city/area level federations and
State has developed action plan which
empowerment of its members.
envisaged involvement of community based
operations to ensure smooth execution of r To provide urban unemployed youth
the program. So far in DDU GKY project, with free employment oriented skill
MoU has been signed with 35 PIAs and training
target has been fixed as per their plan. r For the urban poor for starting
1,00,000 Candidates training in skill individual and group enterprises
development have been approved initially by arrange loan through banks and
the Central Empowered Committee of provide interest subsidy
MORD and the cost was approved for r To identify urban street vendors, issue
Rs. 456.00 crores including support cost. ID cards and to arrange for their linkage
Later on the same was revised in accordance with other social security schemes.
with Cost Norms Notification from the r For urban homeless provide 24x7
MORD in July 2016 as per revised CNN shelter facilties.
notification. The Annual Action Plan of
16.6.3 Target Group of Scheme:
Karnataka has been approved. The revised
project cost for 1,00,000 candidates The primary target of NULM is the urban
including support cost for 3 years is poor, including the urban homeless families
Rs.926.22 crore. The physical progress for of disadvantaged groups like SCs, STs,
this amount is given in (Table 16.12). women, minorities, disabled etc.
16.6 DEENDAYAL ANTHYODAYA 16.6.4 Selected Cities for
YOJANA-NATIONAL URBAN Implementation:
LIVELIHOODS MISSION (DAY-NULM) r 11 city corporations, 57 city Municipal
16.6.1 Scheme Background: council, 115 Town municipal council
MoHUPA GoI has renamed the SJSRY and 94 Town Panchayats, totally 277
scheme as National Urban Livelihoods cities are selected for implementation of
mission NULM in the year 2014-15. This DAY-NULM scheme.
scheme was implemented in selected 35 16.6.5 Details of Component:
urban local bodies and State NULM scheme DAY-NULM has 5 following components.
was implemented in remaining 179 urban
local bodies in NULM manner.During 2016- 1. Social Mobilization & Institution
17 NULM scheme is renamed as DAY-NULM Development
and it is implementing in 271 urban local
Under this component women SHGs,
bodies. Govt of Karnataka has approved this
Area Level Federation and City Level
scheme on 1.10.2016 for implementation.
Federation will be formed. RF Support :
16.6.2 Objectives: Rs. 10000 per SHG (SHG Bank Linkage
Universal Financial Inclusion), RF
r To uplift the urban poor above poverty
Support Rs:50000 per ALF SHGs will be
line

Table 16.12 : 2017-18 to 2019-20 DDUGKY Progress

Trained and Placed as on November 2019


PIAs
Target Training Training Placement
(35)
Commenced completed Achieved
2017-18
to 2019-20 1,00,000 45166 37871 18780

FY 2019-20 30,450 2173 1946 3023


Economic Survey of Karnataka 2019-20 827

linked with banks maximum of Rs. 16.7 CENTRE FOR ENTREPRENEURSHIP


1,00,000 for loans (subsidized loans @ DEVELOPMENT OF KARNATAKA
7% subject to timely repayment with (CEDOK)
provision of additional 3% interest
subvention for Women SHGs), Various 16.7.1 Background :
capacity building trainings are Centre for Entrepreneurship Development
imparted for SHGs/ALF/CLF members of Karnataka (CEDOK), Dharwad, is a
2. Employment Through Skill Training Government of Karnataka promoted
and Placements: organisation created by Department of
Industries and Commerce. The centre was
Under this component Training cost is registered under Karnataka Society Act
Rs. 15000 per candidate is given, Job 1960 No. 2/92-93 on 15th May, 1992. Now
oriented Training is provided for urban it is transferred to Department of Skill
unemployed youth, Training is Development, Entrepreneurship and
imparting through various Govt agency, Livelihood, Government of Karnataka.
duration of training is 3-4 months. Self
Employment or Wage employment 16.7.2 Objectives :
linkage is mandatory. Assessment and CEDOK is widely recognised that education
Certification will be done by DG&ET can be a very effective instrument to bring-
3. Self Employment Programme: out latent resources and capabilities of
people. Based on this belief, the main
Under this component assistance objective of CEDOK is :
will be provided for establishment r To augment the supply of entrepre-
Individual and Group Entrepreneurship. neurs through education and training.
Maximum of Rs.2 lakhs loan will be
r To produce multiplier effect on
provided for individual entrepreneurship
opportunities for self employment.
and Maximum 10 lakhs loan will be
provided for Group entrepreneurship. r To improve the managerial capabilities
Interest subsidy will be given for of stake holders.
sanctioned loan @ 7% and Entrepre- r To contribute to the dispersal of
neurship Development Programme will entrepreneurship and thus expand the
be provided social base of the entrepreneurial class
in urban and rural areas.
4. Support to Urban Street Vendor:
16.7.3 Target Group :
Under this components Identification of
Street Vendor and issuing the ID card, r Entrepreneurship Development Pro-
Assistance to Establishment micro grammes covering target groups of
enterprises, town vending plan and skill unemployed youths, women, SHG
training, Basic infrastructure development members and beneficiaries of various
at market place, Financial assistance for Government sponsored schemes.
preparation of vending plan is under taken r Trainers Training Programmes covering
target group of trainers & motivators
5. Support to Urban Homeless in the field of entrepreneurship
Under this Identification of Urban Home less development.
through rapid survey,to provide 24x7 r Target group for Management
shelter facility, to provide basic facilities , Development Programmes are different
link with Social Security Scheme, Financial stake-holders of the programmes
Assistance to construction of new shelter,
Operational and Maintenance & 16.7.4 Area of Operation :
Refurbishment. CEDOK is imparting training programmes
in entire Karnataka State.
828 Economic Survey of Karnataka 2019-20

16.7.5 Details of Components: Department, GOK, and PSEs, GOK,


Bangalore. Eminent Faculties were
1. Entrepreneurship Awareness invited to take sessions in these
Camps/ Programmes : programmes, so as to motivate the
r Main objective of these programmes officers for better performance.
is to create awareness on r The duration of these programmes
entrepreneurship among the students, varies from three to five days.
SHG members, unemployed youths,
5. DISHA Guidance Cell:
women etc.,
r The durations of Awareness Programmes r As a part of Entrepreneurship
are from one day to three days based on Development, Government of Karnataka
the requirement. has approved establishment of “DISHA
Guidance Cell” in district Head
2. Entrepreneurship Development Quarters under the sponsorship of
Programmes : Department of Skill Development,
r Main objectives of these programmes Entrepreneurship and Livelihood,
are; Department of Industries and
Commerce and UNDP.
r To motivate
r Disha Guidance Cells are started at 16
r To inculcate entrepreneurial qualities
District Head Quarters (Bangalore (U),
r To facilitate to identify and select self Bangalore (R), Davanagere, Tumkur,
employment activities Kolar, Mangalore, Mysore, Hassan,
r To create awareness on different self Mandya, Karwar, Kalburgi, Bellary,
employment schemes of various Raichur, Belagavi, Dharwad and
departments Vijayapur) where Joint Directors of
r To prepare project plans and CEDOK are located.
formulation r Remaining 14 districts will be covered
r To get awareness on managerial, under 2nd phase of “DISHA” Scheme
accounting, banking, legal and other and Disha Guidance Cell are started in
aspects of self employment. all 30 districts.
r The durations of Entrepreneurship Objectives of the Project:
Development Programmes are from r To compile and explain schemes of
three days to twelve days based on the Department of Skill Development,
requirement of target groups. In special Entrepreneurship and Livelihood.
cases clubbed with skill trainings, the
r To motivate students of Government
duration will be extended up to 45 days.
Colleges to undertake self-employment
3. Training of Trainers Programmes : ventures.
r Main objective of these programmes is r To disseminate information on
to equip the trainers to conduct various self-employment schemes of
entrepreneurship related programmes Government.
effectively. r To impart Residential Training to
r The duration of Training of Trainers interested persons in preparing
Programmes are from three days to one Business Plan.
week based on the requirements of r To prepare Videos for encouraging self-
target groups. employment.
4. Management Development r To incorporate interactive web portal in
Programmes : kaushalya.karnataka.gov.in.
r Management Development Programmes r To guide prospective entrepreneurs
were organized for the Officers and with successful Resource Persons.
Staff of Industries and Commerce r To compile information on available
natural local resources.
Economic Survey of Karnataka 2019-20 829

r To make it a Nodal Centre for be conducted to prepare the candidates in


disseminating information on all preparing Business Plan and at the end of
aspects of self-employment. the training candidates Business Plan will
Proposed Strategy: be vetted by experts and will be certified.
r Compile information from all the 6. Kaushalya Udyog Programme :
Developmental Departments, Boards
During 2019-20 the following programmes
and Corporations.
are conducted :
r Update all the self-employment
schemes of Government. A. Outreach and Motivation Training
r Develop skills of IEC (Information, Programme :
Education and Communication) and This programme is conducted to the
Outreach Trainer in Training latest Applicants applied for fresh loan to the
aspects of self-employment. banks for taking up Self-Employment not
r Utilise local resources for better use. under any Government Scheme, candidates
r To create financial literacy to the registered in the Employment Exchanges
youths. and also to the interested un-employed
youth.
A. DISHA REACH : In DISHA Reach
following are the Components of the Kaushalya Udyog Ready and Steady
Programme : Programme :
r To motivate college students in self- These programmes are conducted to the
employment and briefly explain selected participants from Outreach and
schemes of Skill Development, NULM, Motivation Training Programme.
NRLM and other self-employment
6 days Residential and Non Residential
schemes.
Kaushalya Udyog Entrepreneurship
r Providing of information through Development Programme :
Blog and FAQ on Registration and
Career Guidance to the interested These programmes are conducted to the
queries in kaushalya.karnataka.gov.in. selected participants from Kaushalya
Udyog Ready and Steady Training
r Providing of information through Programme. These programmes sharpen
Telephone. the entrepreneurial and managerial
r Auto E-mail Response competencies that contribute to
B. DISHA READY: top performance, clarity about their
project ideas, sales and marketing
1. Face to Face Training and Motivation : strategies/techniques, and importance of
4 days training programme at 2 hours financial aspects and repayment. It enhance
per day will be conducted to the the most important competencies such as
interested participants per batch of 20 creativity, innovation, risk taking ability,
participants in the centre. decision making, time management and
communication skills which are the most
C. DISHA STEADY : essential requirement for successful
For Online Registered Dishaites : running of an enterprise. Another impact of
an EDP is scientific approach towards cost
4 days training programme at 2 hours per reduction techniques, management of
day will be conducted to the interested accounts, personnel and marketing
participants per batch of 20 participants in management. It will inculcate sincere,
the centre. honest, intelligent and smart working
environment among the trainees which
D. DISHA GO :
leads to overall growth and development.
Project Evaluation and Certification
6 days Residential Kaushalya Udyog
5 days residential training programme will Entrepreneurship Development Programmes
830 Economic Survey of Karnataka 2019-20

are purely conducted to Scheduled caste No of persons trained from 2016-17 to


and Schedule Tribe candidates. 2019-20 up to November under above
programmes are shown in Table 16.13.
These programmes will help to enhance the
Personal Entrepreneurial Competencies. It 16.8 GOVERNMENT TOOL ROOM AND
facilitates procedures and formalities TRAINING CENTRE (GTTC)
required to set up a small enterprise,
16.8.1 Background
acquisition of information, knowledge and
skills required to identify a business Government Tool Room and Training Centre
opportunity, prepare a business plan for the (GTTC) Bangalore, was established in the
implementation. EDP will equip the year 1972 with Danish assistance on a
participants with an understanding of the modest scale has today grown into major
intricacies involved in managing a small Tool Room in the country. The performance
enterprise and help the trainees to change of GTTC in training and tooling support to
their identity for growth, expansion, industries in state has been exemplary and
modernization and diversification. the objectives have been met with

Table 16.13: Trained for Self Employment from 2016-17 to 2019-20


(up to 30 th November 2019)

Achievement Target Achievement


Sl. Programmes/
No. Scheme Upto
2016-17 2017-18 2018-19 2019-20
30.11.2019

Entrepreneurship Awareness Programmes/Disha Outreach, Ready & Steady


programme /Kaushalya Udyog Outreach, Ready & Steady programmes

a. No of Persons 9648 35573 97599 45,000 32,745


01. Trained
b. No. of
120 668 1279 1125 852
Programmes
c. Expenditure (Rs.
88.23 449.67 90.97 75.00 62.44
in lakh)

Entrepreneurship Development Programmes /Disha Go / Kaushalya Udyog EDPs

a. No of Persons 11336 2738 12660 6600 3023


02. Trained
b. No of Programmes 216 63 239 165 71
c. Expenditure 180.55 46.28 252.55 215.05 98.52
(Rs. in lakh)

Training of Trainers Programmes

a. No of Persons
23 - 97 - -
Trained
03.
b. No of Programmes 1 - 2 - -
c. Expenditure(Rs.
4.00 - 1.85 - -
in lakh)
Economic Survey of Karnataka 2019-20 831

Table 16.13: Trained for Self Employment from 2016-17 to 2019-20


(up to 30 th November 2019)

Achievement Target Achievement


Sl. Programmes/
No. Scheme Upto
2016-17 2017-18 2018-19 2019-20
30.11.2019

Management Development Programmes

a. No of Persons
99 269 66 40 40
Trained
04.
b. No of Programmes 4 10 3 1 1
c. Expenditure(Rs.
23.27 56.70 13.48 11.50 11.50
in lakh)

a. Total No. of 21,106 38,580 1,10,422 51,640 35,808


Persons Trained

b. Total No. of
Total 341 741 1,523 1,291 924
Programmes
c. Total
Expenditure 296.05 552.65 358.85 301.55 172.46
(Rs. in lakh)

tremendous success, particularly in the moulds, dies and special purpose tools.
state of Karnataka.GTTC offers training r GTTC has the most advanced and
programmes at various levels with a view to sophisticated facilities for varieties of
address the ever growing requirement of manufacturing activities and has also
qualitative technical manpower for diverse been recognized as SIRO (Scientific &
manufacturing environments. Industrial Research Organization) by
16.8.2 Objectives: Government of India, Ministry of
Science & Technology for carrying out
r Conducting Skill Development Courses research activities in Tooling, Design &
to youth with employable skills to make Manufacturing.
them industry ready.
r Considering the importance of the
r Focus on guiding trainees especially training offered by GTTC in creating a
from backward, rural and economically pool of highly skilled technicians for the
weaker sections of the society for tooling and manufacturing sector in the
improving employment potential State and to create employment
including self-employment. opportunities in the expanding
r To conduct short-term and part-time industrial sector, the proactive policies
courses for technical staff of small-scale of the GOK resulted in establishing 22
industries putting emphasis on more centres in the various districts of
advanced technologies such as CNC the state. Karnataka is now recognized
Programming & Machining with as an important player at the national
CAD/CAM applications. level in providing high quality training
r To manufacture small and medium-size in the field of Tool & Die making and
tools such as press tools, jigs & fixtures, Precision Manufacturing.
832 Economic Survey of Karnataka 2019-20

16.8.3 Courses GTTC is providing skill training programmes


to the youth with industry ready skills to
The centre is conducting following courses; cater the manpower requirements of
The Diploma courses are approved by industries.
Government of Karnataka and All India
Council for Technical Education (AICTE) GTTC trained candidates are well accepted
by the industry. GTTC candidates are
r Diploma in Tool & Die Making, working in various industries from local to
r Diploma in Precision Manufacturing, Global Industries. Some of the students
r Diploma in Mechatronics, become entrepreneurs. The passed out
trainees are eligible for higher education.
r Diploma in Electronics &
Communication (only for girls) 16.9 KARNATAKA GERMAN MULTI
r Post Diploma in Tool Design Training SKILL DEVELOPMENT CENTRE
course (KGMSDC):
r M.Tech in Tool Engineering and Govt. KGMSDC has established Two Multi Skill
sponsored (SCP/TSP) and CMKKY Development Centres (MSDCS) in
training programmes will be provided Bangalore & Gulbarga of International
to the educated unemployed youths. Standards for training in Advanced
r During 4th year training period Technology areas with the Technical
students are deputed to various Collaboration of the German Technical
industries across the country to Corporation (GIZ-IS), Germany. The MSDCs
undergo one year mandatory In-Plant are Government own Registered Society
Training. During this period the with full operational autonomy. The
trainees will get Rs.7000/- to Society is having Governing Council
Rs.10000/- pm. under the Chairmanship of the Chief
Secretary to GoK, Secretary, Labour
r Successful trainees get employment Department, representatives from GoI,
immediately after completion of training plus representatives from the Industry
without any waiting period. Associations, Industry and leading
r Under the assistance of Govt. of technical training Institutes for managing
Karnataka, established 22 GTTC the Affairs.
centres across Karnataka to cater the
emerging industrial requirements to The objective of these centres is to offer
provide skilled manpower and technical specialised skills training programme on
services to the existing and emerging par with international standards and in
industrial sectors. alignment with the Industry requirement.
These Centres are well equipped with latest
r The centres are established at below equipment, machinery, tools with good
mentioned places: Bengaluru, Mysuru, infrastructure, flexible market driven short
Gundlupete, Maddur, Hassan, Kadur, and long-term courses, strong interface with
Humnabad, Kalburgi, Kudalasangama, industry and trained faculty. It also aims to
Belagavi, Dharwad, Hubballi, Dandeli, provide training in high-end technology,
Mangaluru, Hosapete, Lingasagur, self-sustenance after 5 years and linking
Harihara,Kanakapura,Tumkur, international placement.
Kolara, Shivamogga, Gowribidanuru
and chikodi. For the first time in the country GoK with
GoI assistance has established Multi Skill
16.8.4 Social Impact
Development Centres (MSDCS) at
GTTC has 22 training centres across the Bangalore & Gulbarga with the Technical
state of Karnataka. This facilitates the Collaboration with GIZ-IS, Germany. With
candidates (both urban and rural) to get the the Success of two MSDCs at Bengaluru and
industrial skill training. Kalaburagi, three more Multi Skill
Development Centres (MSDCs) has already
Economic Survey of Karnataka 2019-20 833

been set up at Belagavi, Mangaluru and 16.10 KARNATAKA VOCATIONAL


Hubballi and training was commenced from TRAINING AND SKILL DEVELOPMENT
February 2015. CORPORATION LIMITED
Courses: Training Programmes like IT 16.10.1 Skill Development:
ESSENTIALS, Cisco Certified CCNA,
Advanced Welding, CAD/CAM/CNC, The Karnataka Vocational Training and
Embedded Systems, Industrial Automation, Skill Development Corporation was
Electrical Maintenance and Refrigeration established on 12.09.2008 through the
and Air-Conditioning are implemented. Government Order No: LD 142 ETI 2007
Dated 02.04.2008 with an intention to
Progress implement the recommendations of the
27250 trainees have been trained since National and State Skill Mission
inception till end of November 2019. Out of Recommendations. As per the Action Plan
which 9302 SC, 1393 ST, 5120 Women and 2019-20, the corporation has set a physical
2891 Minority Candidates have been target of 15,000 candidates under the Chief
trained. A placement is provided for 15263 Minister's Kaushalya Karnataka Yojane
for all category candidates. (CMKKY) and a financial target of Rs.15.00
Crore for implementation of the program.
Budget: The Corporation has already issued office
orders to the vocational training partners to
Phase-I train 12,699 candidates; VTP's have already
The total project cost for establishing of two formed the batches and commenced the
MSDC is Rs.40.00 crores for each. KGTTI training for 5,875 candidates and 2,016
Bangalore and Gulbarga centres candidates have completed the training and
established in the year 2011 with financial remaining 3,859 candidates are in the verge
assistance from Government of India and of completing the training.
Government of Karnataka on pilot basis. Apart from the above, the corporation have
50% project cost excluding the consultancy also taken up the responsibility of training
charges were agreed by Govt. of India and 1000 members of Self-Help Group on behalf
released Rs. 28.35 Crores out of Rs.32.33 of the Department of Women and Child
crores. Development under the Chief Minister's
Phase–II Kaushalya Karnataka Yojane (CMKKY) at
the cost of Rs.2.50 Crore and work orders to
Establishment of KGTTI Centres at VTP's already been issued and the training
Belagavi, Mangaluru and Hubballi are fully is under progress.
funded by Government of Karnataka. The
total project cost of three centres 16.10.2 IMC-K (International Migration
establishment is 120 Crores and 100% Centre – Karnataka):
share shall be borne by the State
With an intention to encash the Global
Government. As per the directions of
Demand for skilled manpower particularly
DGE&T, GoI, New Delhi, transparent
European countries, Middle East, Gulf
bidding procedure and as per KTPP Act was
countries, Australia, Japan and Southeast
followed in selection of technical
Asian Countries. Government of Karnataka
consultancy Services and GIZ-IS, Germany
set up separate centre called International
has been awarded contract from 1st Nov
Migration Centre (IMC-K) to skill the Human
2013 for three MSDCs. The contract is
Recourses of the state as per the
further extended for 29 Months with effect
requirements of the countries and to send
from 01 July 2018 after following due
them abroad for suitable job. And this centre
approval procedures.
is already operationalised with budgetary
Total Revenue earned so far from KGTTIs is allocation of Rs. 5.15 Crore and Rs.2.50
INR 1977 lakhs. Crore is already spent on this project. The
first batch of candidates will be sent abroad
by the end of this financial year.
834 Economic Survey of Karnataka 2019-20

16.10.3 Skill and Job Fairs: Rs.1800.00 lakhs for the scheme. The
selections of about 7 lakh person in the
In order to enhance the employability of
website kaushalya.karnataka.gov.in. The
unemployed/un-trained professionals
Vocational Training Partners are proposed
through proper skill Training followed by
to be selected who have applied through
placement through “Skill and Job Fairs” by
website kaushalya.karnataka.gov.in. And
creating common platform for Employers &
are cleared by the high-power committee
Job Seekers. Skill and Job Fairs are being
headed by Additional Chief Secretary and
organized since October 2008, in a larger
Development Commissioner. The process of
scale at State level and mini job fairs will be
selection of candidates is underway. The
conducted at district level. As many as
Physical and financial target for district wise
176524 persons have been procured the job
and category wise has been fixed as per
through melas up to 2018-19. The details
norms.
are given in the below Table 16.14.
16.12 CONCISE REPORT ON TRAINING
16.11 FINANCIAL & PHYSICAL TARGET
SECTION OF DEPARTMENT OF
FOR 2019-20 KSDC
EMPLOYMENT AND TRAINING
During 2019-20 the Government has fixed a
The Department of Employment and
physical target of 17,500 candidates under
Training is conducting on-line admissions
CMKKY to training under various schemes
in the State for 258+11+1 Govt and 196 GIA
for candidates belong into SC, ST, Minority,
industrial training institutions since 2012.
Women & General categories. The
As per the DGT, New Delhi, norms.
Corporation has earmarked an amount

Table 16.14 : Details of Mega Job Fairs Conducted by KVT & SDC

Sl. No. Year No. of Job melas Selected Candidates

1 2008-09 5 28919

2 2009-10 9 36280

3 2010-11 13 19093

4 2011-12 6 11507

5 2012-13 2 1805

6 2013-14 3 12473

7 2014-15 1 1479

8 2015-16 3 9297

9 2016-17 7 22334

10 2017-18 11 27744

11 2018-19 11 5593

Total 71 176524
Economic Survey of Karnataka 2019-20 835

Candidates can apply for 45 Technical & apprenticeship training. STC


non-technical courses. Of the 45 Courses, certificates are issued for SCVT
Qualification for 03 Courses are SSLC trainees.
failed/8th passed for remaining 42 courses
16.12.2 Apprenticeship Training
SSLC passed are eligible to apply. The Govt
& GIA candidates selected as such are Apprenticeship training is imparted in
required to pay the tuition fees as fixed by Public Sector and Private sector
the government from time to time. Classes establishments as per the Apprenticeship
Commence in the month of August every act 1961. As per the Act it is mandatory to
year under semester system. Aug-2018 engage 2.5% to 10% of their total employees,
Admission details of Govt., and Private ITI's if the manpower strength is more than 40.
are provided in Table 16.15. Apprenticeship activities are being done in
16.12.1 Apprenticeship and www.apprenticeship.gov.in portal. i.e.
Examination Registration of establishments, registration
of candidates, examination etc.
1. CTS exams are conducted twice a year
in the month of January and July. National apprenticeship promotion scheme
(NAPS) was introduced on 19-08.2016 by
2. ATS exams are conducted twice a year Govt., of India, under this scheme a target of
in the month of May and November. 50 lakh apprentices to be trained by 2016-
3. Trade tests are being conducted at the 2020. For Karnataka State the target for
end of each semester from Aug 2013. Apprenticeship is 30,000, of which 12000 is
i.e. 4 semester for 1 Year trades. the achievement upto November 2019.

4. Admission, Attendance, examination To encourage apprenticeship, Govt. of India


and issue of certificates are being done will reimburse 25% or Rs.1500 per month
in NCVTMIS portal from August 2014. per apprentice to the establishments.

5. State level SCVT exams are conducted State Government has also taken initiative
in the month of August-September to support and encourage apprenticeship
every year. scheme.

6. State level skill competition are held in A. Under Karnataka apprenticeship


the month December every year in 15 training scheme Rs.1,000 per month
trades, selected candidates are being per apprentice will be reimbursed to
encouraged to participate in national establishments, in addition to Rs. 1,500
level skill competition. per month per candidate as per NAPS
from 01.04.2017.
7. Candidates completing NCVT course
under ITI training will be issued NTC B. A cell has been formed in Karnataka for
certificates and also NAC certificates of monitoring apprenticeship.

Table 16.15 : Admission Details of Govt., and Private ITI's

Available Vacant Percentage of


ITI Type No Of ITI’s Admitted
Seats Seats Admissions (%)

Govt (NCVT) 270 29480 24329 5151 83.53


Govt (SCVT) 0 0 0 0 0
GIA(NCVT) 196 13080 10604 2476 81.07
Private (NCVT) 1120 47650 42634 5016 89.47
Private (SCVT) 85 2344 1308 1036 55.80
Total 1671 92554 78875 13679 85.22
836 Economic Survey of Karnataka 2019-20
SUSTAINABLE CHAPTER 17
DEVELOPMENT GOALS

17.1 SUSTAINABLE DEVELOPMENT Agenda and so is the commitment "to leave


GOALS 2030 no-one behind". This necessitates engaging
with local Governments, social institutions,
United Nations in 2015 presented 17 goals
NGOs and SHGs to frame and implement
and 169 targets of the Sustainable
programs and policies that envisage 'Sab ka
Development Goals (SDGs) to be achieved by
saath, Sab ka Vikas'. Meeting these
2030 built on the Millennium Development
ambitious SDG targets set for 2030 calls for
Goals adding new areas such as climate
a new and innovative way of governance
change, economic inequality, innovation,
instead of the business as-usual approach.
sustainable consumption, peace and
Vertical coherence is crucial in implemen-
justice, among other priorities. Although
tation of SDGs and district administration
these goals are interconnected, each has a
play a crucial role in advancing sustainable
separate list of targets to achieve. The SDGs
development. While it is important for State
were a result of complex consultation
government to set State-level goals and
process involving UN member States, civil
targets and the mandates to support them,
society, the corporate sector and many other
local governments are responsible for
stakeholders and individuals from around
implementation on the ground.
the world (United Nations General
Assembly, 2015). The SDGs aim to initiate The SDGs will stimulate action in areas of :
action, while guiding policymaking and People, Planet, Prosperity, Peace and
accountability for the elimination of poverty, Partnership
promotion of prosperity, furthering of peace
and justice, and conservation of the planet's r People: To end poverty and hunger, in
resources for future generations. To achieve all their forms and dimensions, and to
these Sustainable Development Goals and ensure that all human beings can fulfill
targets, the nation had frame 306 national their potential in dignity and equality
indicators. and in a healthy environment.
r Planet: To protect the planet from
Sustainable Development Encompasses
degradation, through susta-inable
r Promotion of sustainable, inclusive and consumption and production,
equitable economic growth sustainably managing its natural
r Creating greater opportunities for all resources and taking urgent action on
climate change, so that it can support
r Reducing inequalities the needs of the present and future
r Raising basic standards of living generations.
r Fostering equitable social development r Prosperity: To ensure that all human
and inclusion beings can enjoy prosperous and
r Promoting integrated and sustainable fulfilling lives and that economic, social
management of natural resources and and technological progress occurs in
ecosystems harmony with nature.
SDGs are not for implemental change they r Peace: To foster peaceful, just and
are for transformative change. SDGs inclusive societies which are free from
address the root causes of poverty and fear and violence. There can be no
initiate efforts to make a positive change sustainable development without peace
both for people and planet. Poverty and no peace without sustainable
eradication is at the heart of the 2030 development.

837
838 Economic Survey of Karnataka 2019-20

r Partnership: To mobilize the means and remove gender disparity in accessing


required to implement this Agenda school education
through a revitalised Global Partner-
Goal 5. Achieve gender equality and
ship for Sustainable Development,
empower all women and girls
based on a spirit of strengthened global
solidarity, focused in particular on the Focus Areas: Ensure a safe, secure and
needs of the poorest and most positive environment for women, provide
vulnerable and with the participation of economic empowerment and achieve parity
all countries, all stakeholders and all in infant and child sex ratios
people.
Goal 6. Ensure availability and sustainable
In nutshell it is the universal, inclusive and management of water and sanitation for all
indivisible Agenda which calls for action by
all participating countries to improve the Focus Areas: Provide safe and adequate
lives of the people and the planet. While the drinking water for all, sewerage system in all
SDGs and targets set at a global context, villages of over 10,000 persons and achieve
they have been designed in a way so that 100% coverage of urban areas with
they can be adapted locally to meet the sewerage systems, as well as sewage
specific challenges. SDGs address all three treatment plants
Multi dimensions of development viz;
Goal 7. Ensure access to affordable,
Economic, Social and Environmental
reliable, sustainable and modern energy for
aspects of development.
all
The 17 Goals are as follows:
Focus Areas: Provide universal access to
Goal 1. End poverty in all its forms 24X7 affordable, reliable and modern energy
everywhere and substantially increase the share of
clean energy
Focus Areas: Ensure livelihoods to all
vulnerable people, provide easy access to Goal 8. Promote sustained, inclusive and
health, education, housing and basic sustainable economic growth, full and
services and enable social protection and productive employment and decent work for
risk mitigation all
Goal 2. End hunger, achieve food security Focus Areas: Facilitate and sustain a
and improved nutrition and promote higher GSDP growth rate, strengthen and
sustainable agriculture increase the competitiveness of Micro Small
and Medium Enterprises in the State
Focus Areas: Eliminate malnutrition,
providing access to safe and nutritious food Goal 9. Build resilient infrastructure,
for all and increase agricultural productivity promote inclusive and sustainable
industrialization and foster innovation
Goal 3. Ensure healthy lives and promote
well-being for all at all ages Focus Areas: Resilient and reliable
infrastructure including roads, airports, IT,
Focus Areas: Reduce Infant Mortality Rate, green technology and innovation
Maternal Mortality Rate, deaths due to
noncommunicable diseases and reducing Goal 10. Reduce inequality within and
the burden of communicable diseases, among countries
particularly AIDS and tuberculosis
Focus Areas: Ensure equal opportunity and
Goal 4. Ensure inclusive and equitable reduce inequalities by educating,
quality education and promote lifelong empowering, protecting and promoting the
learning opportunities for all social and economic inclusion of all
Focus Areas: Increase learning outcomes Goal 11. Make cities and human
through quality education/skills training settlements inclusive, safe, resilient and
sustainable
Economic Survey of Karnataka 2019-20 839

Focus Areas: Provide affordable houses, Goal 16. Promote peaceful and inclusive
access to safe and sustainable transport societies for sustainable development,
systems and develop smart cities provide access to justice for all and build
effective, accountable and inclusive
Goal 12. Ensure sustainable consumption
institutions at all levels
and production patterns
Focus Areas: Ensure access to justice,
Focus Areas: Efficient management of
reduce all forms of violence and promote
waste and efficient use of natural resources
peace
Goal 13. Take urgent action to combat
Goal 17. Strengthen the means of
climate change and its impacts
implementation and revitalize the Global
Focus Areas: Integrate climate change Partnership for Sustainable Development
interventions in a systematic way across all
Focus Areas: Strive to reduce fiscal and
State government departments
revenue deficits and increase capital
Goal 14. Conserve and sustainably use the expenditure.
oceans, seas and marine resources for The Government of Karnataka is keen to
sustainable development ensure that the implementation of SDGs in
Focus Area: Adoption of Micro Irrigation to the State is judiciously prioritized and
avoid floods adopted in accordance with local challenges,
capacities and resources available.
Goal 15. Protect, restore and promote
sustainable use of terrestrial ecosystems, The State has formed the Monitoring and
sustainably manage forests, combat Coordination Committees (headed by the
desertification, and halt and reverse land department officials) and the State level
degradation and halt biodiversity loss Steering Committee (headed by Chief
Secretary) for formulation of effective and
Focus Areas: Protect land by combating efficient action plans for achieving the
degradation and enhance biodiversity SDGs. In order to monitor the progress of

Fig. 17.1 : Classification of SDGs under different Themes

Human Development :
SDG 3,4,6
(Education, Health, water ,
Sanitation)

Sustainable Social
Livelihood: Development:
SDG 1,2,8,9,17 SDG
(End Poverty, No 5,10,16(Gender
Hunger & Food People equality,
Security, Decent Women
Growth, Empowerment,
Industrialisation Reducing
& partnership)
inequality)

Environmental Sustainability:
SDG 7,11,12,13,14,15(Energy,
Cities, Consumption &
production, Climate Change, Life
Below Water and forest)
840 Economic Survey of Karnataka 2019-20

Table 17.1 : Performance of SDGs: Karnataka & India (Compiled from SDG India Index
reports 2018 & 2019)
Karnataka India Best Performing State
SDGs
2018 2019 2018 2019 2018 2019

Tamil Tamil
SDG 1 No Poverty 52 49 54 50
Nadu(76) Nadu(72)

SDG 2 Zero Hunger 54 37 48 35 Kerala(72) Kerala(74)

SDG 3 Good Health & Well-Being 69 72 52 61 Kerala(92) Kerala(82)


SDG 4 Quality Education 76 67 58 58 Kerala(87) Kerala(74)

SDG 5 Gender Equality 43 42 36 42 Kerala(50) Kerala(51)

Gujarat Andhra
SDG 6 Clean Water & Sanitation 62 88 63 88
( 100) Pradesh(96)

Tamil Telangana
SDG 7 Affordable & Clean Energy 77 86 51 70
Nadu(89) (93)

SDG 8 Decent work & economic Andhra Telangana


72 78 65 64
growth Pradesh(81) (82)

SDG 9 Industry, innovation and Kerala


infrastructure 57 40 44 65 Kerala(68) (88)
Tamil Telangana
SDG 10 Reduced inequalities 68 70 71 64
Nadu(85) (94)
SDG 11 Sustainable cities & Gujarat
36 48 39 53 Gujarat(52)
communities (77)

SDG 12 Responsible consumption


NE 72 NE 55 NE Karnataka(72)
& producti on
Karnataka
SDG 13 Climate Action NE 71 NE 60 NE
(71)
Karnataka
SDG 14 Life below water NE 65 NE - NE
(65)
Madhya
SDG 15 Life on land 88 89 90 66 Kerala (98)
pradesh(91)

SDG 16 Peace, Justice & Strong Andhra Andhra


74 75 71 72
Institutions Pradesh(90) Pradesh (86)

Composite Score 64 66 57 60 Kerala(69) Kerala (70)

NE: Not Estimated; Values are in scores.


Economic Survey of Karnataka 2019-20 841

Table 17.2 : Relative Ranking of States & India in over all performance

State 2018 2019 % Change

Kerala 69 70 1.45

Himachal Pradesh 69 69 0.00

Andhra Pradesh 64 67 4.69

Tamil Nadu 66 67 1.52


Telangana 61 67 9.84

Karnataka 64 66 3.13

Goa 64 65 1.56

Sikkim 58 65 12.07

Gujarat 64 64 0.00

Maharashtra 64 64 0.00

Uttarakhand 60 64 6.67

Punjab 60 62 3.33

Manipur 59 60 1.69

West Bengal 56 60 7.14

Madhya Pradesh 52 58 11.54

Odisha 51 58 13.73
Tripura 55 58 5.45

Haryana 55 57 3.64

Nagaland 51 57 11.76

Rajasthan 59 57 -3.39

Chhattisgarh 58 56 -3.45

Mizoram 59 56 -5.08
Assam 49 55 12.24

Uttar Pradesh 42 55 30.95

Meghalaya 52 54 3.85

Arunachal Pradesh 64 53 -17.19

Jharkhand 50 53 6.00

Bihar 48 50 4.17
India 57 60 5.26
842 Economic Survey of Karnataka 2019-20

various SDGs, a separate technical cell has Action Plans for all the 16 Goals. Monitoring
been established and goal specific mechanisms will be in place keeping the
committees have been formed to provide strategies recommended. Action will be
technical support, through departments taken to constitute implementing themes
and experts that contribute to the Goal as through respective departments for effective
members implementation of the strategies.
The Goal-wise Committees have identified Karnataka Evaluation Authority is
around 600 indicators which contains some supporting Planning, Programme
of the national indicators and additional Monitoring and Statistics Department
State indicators. A monthly review of NITI (PPMS) in preparation of status report and
Aayog's 62 priority indicators is part of the formulating strategies for attainment of
Karnataka Development Programme (KDP) SDGs in Karnataka by 2030. A Sustainable
Review at the District and State level. Development Goals Coordination Centre for
Baseline data has been prepared by Goal localization of SDG goals and for designing
Committees with all relevant information. the strategy and action plans for achieving
Karnataka has been actively working SDGs by 2030 is established in the Planning
towards spreading awareness about Department in partnership with UNDP.
SDGs.This involves disaggregated data from
Karnataka being one of the progressive
the districts and district specific targets are
States in the country is highly sensitive to
set to ensure the effective and efficient
universal developmental programmes
implementation of SDGs by District
initiated by international institutions such
Planning Committees (DPC). It is planned to
as United Nations Development Programme
develop new dashboard to ensure effective
(UNDP), World Bank, UN and other
monitoring and evaluation of development
organisations. The State has been the front-
programmes. State is in Partnership with
runner in formulating action plan, vision
Public Affairs Centre (PAC) and IIITB for
and targets of sustainable development
open data analysis of SDG indicators
goals and it is proactive in formulation and
specifically focussed on building data
implementation of programmes, to achieve
science applications to help in mid course
the targets of SDGs
corrections as well as evidence based policy
interventions. Among the goals in terms of progress as per
2018 SDG India Index Report, (Fig. 17.2)
SDGs Monitoring: Karnataka has
front runners (65-99) are Goal 3 - Good
completed the preparation of the draft State

Fig. 17.2 : Performance of Karnataka in Sustainable Development Goals

100
90 88 89
86
80 78
72 75 72
70 70 71
66 67 65
60
50 49 48
40 42 88
37 76 77 40 74
69 72 68
30 64 62 57
52 54
20 43 36
10
0

2018 2019
Economic Survey of Karnataka 2019-20 843

Table 17.3: National and State SDG Indicators

Number of
Number of National
State Data Sources
Indicators
Indicators
Goal As per As per
Number Covered
National State Admi-
under
Indicators Indicators Surveys nstrative Census
State
Frame Frame Reports
Matrix
work work*

Goal 1 19 19 32 4 26 2

Goal 2 19 15 59 8 50 1

Goal 3 41 34 64 30 34

Goal 4 20 15 45 43 2

Goal 5 29 29 57 11 42 4

Goal 6 19 14 49 3 46

Goal 7 05 04 14 14

Goal 8 40 16 34 32 2

Goal 9 18 13 44 3 41

Goal 10 07 04 72 36 35 1

Goal 11 16 16 73 69 4

Goal 12 17 07 18 17 1

Goal 13 04 02 29 29

Goal 14 13 13 26 26

Goal 15 21 17 26 26

Goal 16 18 17 37 1 36

Total 306 235 679 128 536 15

*inclusive of national indicators

Health and Well-being(69), Goal 4 - Quality Strong Institutions (74). Performers (50-64)
Education (76), Goal 7 - Affordable and are Goal 1 - No Poverty (52), Goal 2 - Zero
Clean Energy (77), Goal 8 - Decent work Hunger (54), Goal 6 - Clean Water and
and Economic Growth (72), Goal 10 - Sanitation (62) and Goal 9 - Industry,
Reduced Inequalities (68), Goal 15 - Life on Innovation and Infrastructure (57).
Land(88) and Goal 16 - Peace, Justice and Aspirant(0-49) goals are Goal 5 - Gender
844 Economic Survey of Karnataka 2019-20

Table 17.4 : Budget Proposed by the SDG Coal Committees for 2020-21 (Rs. crore)

Number of Schemes 2019-20 2020-21


Goal Number
mapped* Budget Estimates Proposed

Goal 1 154 18575.86 19504.91

Goal 2 24 10133.91 10943.80

Goal 3 35 1016.79 1270.23

Goal 4 32 4846.68 5772.84

Goal 5 06 44.95 56.10

Goal 6 17 4520.32 4838.88

Goal 7 03 11255.01 11770.00

Goal 9 30 2607.78 2834.99

Goal 10 90 7873.79 8800.56

Goal 11 13 1910.60 2119.17

Goal 12 05 2064.37 2399.63

Goal 13 03 160.00 168.00

Goal 14 08 7.60 7.98

Goal 15 04 191.40 381.00

Goal 16 40 569.27 901.59

Total 391 65778.33 71769.68

*Totals can't addup because some schemes appear in multiple goals

Equality (43) and Goal 11 - Sustainable Way Forward


Cities and Communities (36). It can be
clearly seen from the (Fig. 17.2) that we need Government of Karnataka has crafted
to focus a lot on Goal 5 on 'Gender Equality' relevant policies, many of them innovative in
and Goal 11 on 'Sustainable Cities and nature, to ensure that all sectors work in an
Communities'. As per 2019 India Index integrated manner to achieve SDG targets
Report, Goal 1, Goal 2 and Goal 9 have been and improve State's ranking. Karnataka is
slipped from performers to aspirants. Goal 6 following a comprehensive holistic path
improved from performer (62) to front with–
runner (88) and all other goals are in same r Effective implementation strategies
group both as per 2018 and 2019 reports. In considering the multidimensional
composite score the State moved from nature (Social, Economic and
performer (64) to front runner (66). Environment) of SDGs.
Economic Survey of Karnataka 2019-20 845

r The major weakness in the fulfilment of development goals through conver-


MDGs was inadequacy of funding. gence and modifications
Hence targeted financial investments r Creating awareness (Information,
and outcomes have been budgeted for Education and Communication) about
each year till 2030.The government is all governmental programs of all
ensuring adequate investments across departments and distribution of
sectors to target achieving SDGs governmental benefits through
through scheme mapping. establishment of single window agency
r Resource use efficiency approach and r Special focus on promoting skill
governance strategy form the base for development across sectors in a bigger
development pathway for achieving way through vertical and horizontal
SDGs was considered in developing coordination
strategies and action plans for
achieving SDG targets. r Higher emphasis on data collection and
analytics related to SDG indicators -
r Integration of all programs and policies Targeted approach for development
to measurable indicators of sustainable through spatial mapping (GIS)
846 Economic Survey of Karnataka 2019-20
Economic Survey of
Karnataka 2019-20

GEO-SPATIAL MAPS
GEO-SPATIAL MAPS

Sl. Page
Title
No No

1 District Map of Karnataka State …… M1

2 LandUse LandCover Map of Karnataka State …… M2

3 Soil Map of Karnataka State …… M3

4 Ground Water Status as on March 2017 …… M4

5 Sex ratio …… M5

6 Literacy Rate …… M6

Percentage of SC Population to Total Population


7 (2011 Census) …… M7

Percentage of ST Population to Total Population


8 (2011 Census) …… M8

Percentage of SC & ST Population to Total


9 Population (2011 Census) …… M9

i
Economic Survey of Karnataka 2019-20 M-1
M-2 Economic Survey of Karnataka 2019-20
Soil Map of Karnataka State

1:2,850,000

Texture
Sand
Loamy Sand
Sandy Loam
Loam
Sandy Clay Loam
Silty Clay Loam
Clay Loam
Sandy Clay
Clay
Others
Dyke / Ridges
Rock Outcrops
Habitation
Waterbodies
District Boundary

Source: KSRSAC

Economic Survey of Karnataka 2019-20 M-3


Ground Water Status as on March 2017

Aurad 0 15 30 60
Km
Bhalki 1 cm = 26.63 Km
Bidar
Bidar
Basavakalyan
Homnabad

Aland
Chincholi

Kalburgi

Afzalpur Kalburgi
Indi
Chitapur
Sedam

Jevargi
Sindgi

Vijayapura
Athni Vijayapura Yadgir
Shahpur
Yadgir
Jamkhandi Basavana Bagevadi
Shorapur
Chikodi Raybag

Muddebihal
Devadurga
Bilgi
Mudhol

Hukeri Gokak Bagalkot Raichur


Bagalkot
Belagavi Lingsugur Raichur
Hungund
Ramdurg Manvi
Badami

Belgaum
Parasgad
Kushtagi
Sindhnur
Sampgaon Nargund
Ron

Khanapur
Navalgund Yelbarga Koppal
Dharwad Gadag Gangawati
Siruguppa
Dharwad Gadag
Hubli Hubli Koppal
Hospet
Haliyal
Supa Kundgol Bellary
Kalghatgi Mundargi

Shirhatti

Shiggaon
Hagaribommanahalli Ballari Sandur
Mundgod Savanur Hadagalli
Yellapur
Karwar
Haveri
Legend
Uttara Kannada Hangal
Kudligi
Ankola
Haveri Harapanahalli Molakalmuru
District Boundary
Byadgi
Sirsi
Ranibennur
Jagalur
Over Exploited
Kumta
Sorab
Hirekerur
Harihar
Critical Taluks
Siddapur Davanagere
Challakere
Davanagere
Semi Critical Taluks
Honavar Shikarpur Chitradurga
Honnali Safe Taluks
Chitradurga Pavagada
Sagar
Holalkere
Bhatkal Shivamogga Channagiri
Shimoga Hiriyur

Hosanagara Bhadravati

Hosdurga Sira Bagepalli


Kundapura Tirthahalli Madhugiri
Tarikere Gudibanda

Gauribidanur
Narasimharajapura Chikkaballapura
Koppa Kadur Chiknayakanhalli Chikkaballapura
Koratagere
Udupi Chikkamagaluru Tumakuru Sidlaghatta Chintamani
Srinivaspur
Sringeri
Udupi Chikmagalur Gubbi
Arsikere Tumkur Dod Ballapur
Karkal
Tiptur Devanahalli Mulbagal

Mudigere
Belur
Nelamangala Kolar Kolara
Turuvekere
Bangalore North Hosakote
Hassan
Magadi Bangalore East
Mangalore Beltangadi Hassan Channarayapatna Kunigal
Malur Bangarapet
Bantval Alur
Sakleshpur Bangalore South
Dakshina Kannada Nagamangala
Puttur Ramanagara Anekal
Hole Narsipur
Arkalgud Krishnarajpet Ramanagara
Sulya
Somvarpet
Mandya Maddur Channapatna
Pandavapura Mandya
Krishnarajanagara Kanakapura

Piriyapatna Shrirangapattana
Madikeri Malavalli
Kodagu Hunsur
Mysore
Map Description: Tirumakudal - Narsipur
"This map shows the Ground Water Status as on March Virajpet Mysuru
2017" Nanjangud Yelandur Kollegal
Heggadadevankote
Note: Over Exploited : Ground water development is more Chamarajanagara
Chamarajanagar
than100% of Annual Recharge.
Gundlupet
Critical: between 90-100%,
Semi Critical: Between 70-90%,
Safe: Less than 70% of annual recharge. Generated from : K-GIS,KSRSAC

M-4 Economic Survey of Karnataka 2019-20


Udupi

Economic Survey of Karnataka 2019-20 M-5


M-6 Economic Survey of Karnataka 2019-20
Percentage of Schedule Castes Population to the Total Population of
the District (2011 Census)

0 15
±
30 60
Km
1 cm = 27 Km
BIDAR
23.47

KALBURGI
25.28

VIJAYAPURA
20.34
YADGIR
23.28

BAGALKOT
BELAGAVI RAICHUR
16.89
12.08 20.79

KOPPAL
GADAG 18.61 Legend
DHARWAD 16.36
9.63 District Boundary
6 - 10 %

BALLARI 11 - 15 %
UTTARA KANNADA 21.1 16 - 19 %
HAVERI
8.1 20 - 23 %
13.77
24 - 30 %
G ERE
ANA
DAV
20.18 Ä
CHITRADURGA
KURU
23.45 TUMA 2
SHIVAMOGGA 18.9
17.58

RA
LAPU
KABAL
UDUPI CHIK
CHIKKAMAGALURU TUMAKURU 24.9
6.41 22.29
18.92
BENGALURU
RURAL KOLAR
21.57
HASSAN 30.32
DAKSHINA BENGALURU
KANNADA 19.42 URBAN
12.46
7.09
MANDYA
RAMANAGARA
14.69 18.83
KODAGU
13.27 MYSURU

Map Description: 17.88


CHAMARAJANAGAR
"This map shows the Districtwise percentage of SC Population to the
total Population of District" 25.42
Formula: SC Population / Total Population of the District * 100

Generated from : K-GIS,KSRSAC

Economic Survey of Karnataka 2019-20 M-7


Percentage of Scheduled Tribes Population to the
Total Population of the District(2011 Census)

0 15
±
30 60
Km
1 cm = 27 Km
BIDAR
13.85

KALBURGI
2.54

VIJAYAPURA
1.81
YADGIR
12.51

BAGALKOT
BELAGAVI 5.14 RAICHUR
6.22 19.03

KOPPAL
11.82 Legend
GADAG
DHARWAD
4.74 5.79 District Boundary
1-3%

BALLARI 4-6%
18.41 7-9%
UTTARA KANNADA
2.38 HAVERI
8.85 10 - 14 %
15 - 19 %

DAVANAGERE
11.98 CHITRADURGA TUMAKURU
Î 18.23 7.82
SHIVAMOGGA
3.73

CHIKKABALLAPURA
UDUPI 12.47
CHIKKAMAGALURU TUMAKURU
4.49 7.82
3.95 BENGALURU
RURAL 5.34
KOLAR
HASSAN BENGALURU 5.13
DAKSHINA 1.82 URBAN
KANNADA 1.98
3.94
RAMANAGARA
MANDYA 2.12
1.24
KODAGU
10.47 MYSURU
Map Description: 11.15
CHAMARAJANAGAR
"This map shows the Districtwise percentage of ST Population to the
total Population of District" 11.78
Formula: ST Population / Total Population of the District * 100

Generated from : K-GIS,KSRSAC

M-8 Economic Survey of Karnataka 2019-20


Percentage of Schedule Castes and Schedule Tribes Population to
the Total Population of the District (2011 Census)

0 15
±
30 60
Km
1 cm = 26.63 Km
BIDAR
37.32

KALBURGI
27.82

VIJAYAPURA
22.14
YADGIR
35.78

BAGALKOT
BELAGAVI 22.03 RAICHUR
18.3 39.82

KOPPAL
30.42
DHARWAD GADAG
14.37 22.15 Legend
District Boundary
BALLARI
UTTARA
KANNADA
10 - 16 %
39.5
HAVERI 17 - 24 %
10.48
22.62 25 - 28 %
E 29 - 32 %
GER
ANA 33 - 42 %
DAV
32.16 CHITRADURGA Ä
TUMAKURU
41.68 26.74
SHIVAMOGGA
21.31

UDUPI CHIKKABALLAPURA
CHIKKAMAGALURU TUMAKURU 37.37
10.9 26.24 26.74
BENGALURU
RURAL 26.9 KOLAR
HASSAN 35.46
DAKSHINA BENGALURU
21.24 URBAN
KANNADA 14.43
11.03
MANDYA
RAMANAGARA
15.93
20.95
KODAGU
23.74 MYSURU
Map Description: 29.03
"This map shows the Districtwise percentage of SC ST Population to
the total Population of District" CHAMARAJANAGAR
Formula: SC and ST Population / Total Population of the District * 37.19
100

Generated from : K-GIS,KSRSAC

Economic Survey of Karnataka 2019-20 M-9


Economic Survey of
Karnataka 2019-20

STATISTICAL APPENDIX
List of Appendix
Appendix
No.
Title Page No

CHAPTER 1: STATE OF KARNATAKA'S ECONOMY - AN OVERVIEW

1.1 Selected Socio- Economic indicators of States in India … A1-A5

CHAPTER 2: STATE INCOME AND PRICES

2.1 Gross State Domestic Product - at Current Prices … A6

2.2 Gross State Domestic Product - at Constant (2011-12) Prices … A7

2.3 Net State Domestic Product - at Current Prices … A8

2.4 Net State Domestic Product - at Constant (2011-12) Prices … A9

2.5 Gross / Net State Domestic Product and Per Capita Income … A10

Gross / Net District Domestic Product and Per Capita Net District Income
2.6 … A11
for the Year 2017-18
Net District Income in Karnataka at Current and Constant (2011-12) Prices -
2.7 … A12
2017-18
2.8 Index Numbers of Wholesale Prices in India … A13

2.9 All - India Wholesale Prices Index Numbers … A13

2.10 Wholesale Price Index Numbers of Agricultural Commodities in Karnataka … A14

Groupwise Index Numbers of Wholesale Prices of Agricultural Commodities


2.11 … A14
in Karnataka
2.12 Consumer Price Index Numbers for Industrial Workers at All India and Karnataka … A15

2.13 Consumer Price Index Numbers for Industrial Workers in Karnataka … A15

Consumer Price Index Numbers for Industrial Workers at selected centres


2.13(a) … A16
in Karnataka State (Central Series)

Consumer Price Index Numbers for Industrial Workers at selected centres


2.13(b) … A17
in Karnataka State (State Series)

Consumer Price Index Numbers for Agricultural Labourers at All India


2.14 … A18
and Karnataka

Consumer Price Index Numbers for Agricultural Labourers at All India


2.15 … A18
and Karnataka

2.16 Rural Retail Price Index Numbers in Karnataka … A19

2.17 Urban Retail Price Index Numbers in Karnataka … A19

CHAPTER 3: FISCAL DEVELOPMENT AND STATE FINANCES

3.1 Allocation of Plan Outlay to Panchayat Raj Institutions (PRI) in Karnataka … A20

3.2 Trends in revenue and capital receipts in Karnataka … A20

3.3 Trends in developmental and non-developmental expenditure in Karnataka … A20


Developmental and non-developmental expenditure, Karnataka 2017-18 to 2019-
3.4 … A21-A23
20 revenue, capital and loans
3.5 Developmental outlays by Major sectors and programmes … A24

i
List of Appendix
Appendix
No.
Title Page No

Expenditure on annual plans, centrally sponsored & central plan schemes :


3.6 irrigation projects pending approval and western ghats development for 2003-04 … A25
to 2019-20
Expenditure in Karnataka by Economic Classification of the budget 2003-04 to
3.7 … A25
2019-20
3.8 Capital formation by the Government of Karnataka 2003-04 to 2018-19 … A26

CHAPTER 5: RURAL DEVELOPMENT


Districtwise Houseless Rural households as per Socio Economic Caste Census -
5.1 … A27
2011 (SECC)
Districtwise/yearwise Houses Constructed under Basava vasathi yojane from
5.2 … A28
2016-17 to 2019-20
Districtwise/yearwise Houses Constructed (Rural) under Dr.B.R.Ambedkar Nivas
5.3 … A29
Scheme from 2016-17 to 2019-20
Districtwise/yearwise Houses Constructed under PMAY(G) from 2016-17 to
5.4 … A30
2019-20
Districtwise/yearwise Houses Constructed under Rural Devaraj Urs Housing
5.5 … A31
Scheme from 2016-17 to 2019-20
5.6 Rural House sites distributed from 2016-17 to 2019-20 … A32

CHAPTER 6: URBAN DEVELOPMENT


6.1 District- wise Urbanisation in Karnataka 2011 … A33

6.2 Vajapayee Urban Housing Scheme – Financial Year wise achievement … A34

6.3 Devaraj Urs Housing Scheme – Financial Year wise achievement … A35

6.4 Dr.B.R.Ambedkar Nivas Scheme(Urban) – Financial Year wise achievement … A36

6.5 Vajpayee Urban House Sites Scheme – Financial Year wise achievement … A37

CHAPTER 7: AGRICULTURAL AND ALLIED SECTORS AND FOOD SECURITY


Statement showing District-wise & Month-wise Normal and Actual Rainfall with
7.1(a) … A38
percentage Departure from normal from January to May 2019
Statement showing District-wise & Month-wise Normal and Actual Rainfall with
7.1(b) … A39
percentage Departure from normal during Southwest monsoon 2019
Statement showing District-wise & Month-wise Normal and Actual Rainfall with
7.1(c) … A40
percentage Departure from normal during Northeast monsoon 2019
Statement showing Number of District/Taluks/Hoblies under different rainfall
7.1(d) … A41
category from January to May 2019
7.2 Production of Principal Crops in Karnataka State 2018-19 & 2019-20 … A42

7.3 Area of Principal Crops in Karnataka State 2018-19 & 2019-20 … A42

7.4 Index Numbers of Area, Production and Yield of Agricultural Crops … A43

7.5 Area under Principal Crops in Karnataka … A44

7.6 Production of Principal Crops in Karnataka … A44


Average Yield of Selected Crops of India and Karnataka 2015-16, 2016-17,
7.7 … A45
2017-18 & 2018-19
7.8 Area Irrigated by various sources in Karnataka State … A45

7.9(a) Land use classification in Karnataka … A45

7.9(b) Land utilisation Statistics … A45

7.10 Cropping Pattern in Karnataka … A46

7.11 Fertilizer Consumption and HYV/HB Coverage in Karnataka … A46

ii
List of Appendix
Appendix
No.
Title Page No

7.12 MSP announced by GOI for the year 2019-20 … A47

7.13 Area and Production of Selected Fruit Crops … A48

7.14 Financial progress achieved under NHM … A48

7.15 Year wise Livestock Population … A49

Target and Estimate of Milk, Egg, Wool and Meat Production


7.16 … A49
from 2017-18 to 2019-20

CHAPTER 8: NATURAL RESOURCES AND ENVIRONMENT

8.1 Trends in Irrigation in Karnataka Cumulative Potential Created … A50

CHAPTER 9: INDUSTRY
9.1 Sector-wise Growth in Index of Industrial Production (IIP):2007-08 to 2018-19 … A51
Index of industrial production in the manufacturing sector in Karnataka by use-
9.2 … A51
based groups : 2007-08 to 2018-19
Annual indices of industrial production in Karnataka manufacturing division by
9.3 … A52
groups : 2006-07 to 2018-19
9.4 Two Digit Level (NIC-2008) Industrial Composition based on ASI 2016-17 … A53

9.5 Registration of Small-Scale Industrial units in Karnataka (Cumulative) … A53


On-going Schemes of the Plan Monitoring Wing of the Department of Mines &
9.6 … A53
Geology
9.7 Departmental Target and Achievements … A54

9.8 Achievements made by KIADB … A54

9.9 Registered Factories by Industries … A55

9.10 Assistance sanctioned and disbursed by Karnataka State Financial Corporation … A56

9.11 Departmental Target and Achievements … A57

CHAPTER 10: EMPLOYMENT AND LABOUR WELFARE

10.1(a) Financial Performance Under MGNREGA during the Financial Year 2019-20 … A58

10.1(b) Financial Performance Under MGNREGA during the Financial Year 2019-20 … A59

10.1(c) Employment Generated during the year 2019-20 … A60

10.2 District wise Progress Under MGNREGA 2019-20 … A61

CHAPTER 11: ECONOMIC INFRASTRUCTURE


Installed Capacity, Power Generation, Imports, T&D Losses and Power
11.1 … A62
Consumption in Karnataka
11.2 Investment in Power Development in Karnataka … A62

11.3 Progress in Energisation of IP Sets in Karnataka … A62

11.4 Road Length in Karnataka … A63

11.5 Operational Performance Statistics of KSRTC … A63

11.6 Financial Performance Statistics of KSRTC … A63

11.7 Operational Performance Statistics of BMTC … A64

11.8 Financial Performance Statistics of BMTC … A64

iii
List of Appendix
Appendix
No.
Title Page No

11.9 Operational Performance Statistics of NWKRTC … A64

11.10 Financial Performance Statistics of NWKRTC … A65

11.11 Operational Performance Statistics of NEKRTC … A65

11.12 Financial Performance Statistics of NEKRTC … A65

11.13 Number of post offices as on 31-03-2019 … A66

11.14 Number of Telephone Exchanges as on 31-03-2019 … A66

11.15 Number of Telephones as on 31-03-2019 … A67


District And Bank Group-Wise Distribution of the Number of Reporting Offices,
11.16 Aggregate Deposits and Gross Bank Credit of All Scheduled Commercial Banks – … A68
Sept 2019
Statement showing No. of Projects sanctioned, Project Cost, RIDF Loan and
11.17 … A69
Disbursement under RIDF - XVIII to XXIII, as of 31.12.2019
CHAPTER 12: HUMAN DEVELOPMENT

12.1 Management, Class And Gender - Wise Enrollment [2019-20] … A70


Management, Class Wise / Category Wise / Sex Wise Enrollment - All
12.2 … A70
Management [2019-20]
12.3 Incentives for Children in Schools … A71

12.4 Plan and Non-plan Expenditure on Education … A72

12.5 Catergorywise Wholesale Godowns and Fair Price Shops … A73

12.6 Kerosene Card Count & Willingness Registered Cards … A74

12.7 Godown Details of the State … A75

12.8 Health Institutions in Karnataka … A76


CHAPTER 16: SKILL DEVELOPMENT, ENTREPRENEURSHIP AND
LIVELIHOOD
16.1 Details of Aspirant registrations on kaushalya.karnataka.gov.in … A77
Deen Dayal Antyodaya Yojana – National Urban Livelihood Mission (Day-NULM)- A78
16.2 …
2019-20
Details of Funds Released and Expenditure Towards Procurement of Land,
16.3 Building and Machinery for The Year 2015-16, 2016-17,2017-18,2018-19 and … A79
2019-20 Under Different Schemes SDP, SDP- NABARD
Details of Progress for the Year 2015-16, 2016-17, 2017-18, 2018-19 and 2019-
16.4 … A80
20 Under NABARD
Details of Progress for the Year 2015-16, 2016-17, 2017-18, 2018-19 and 2019-
16.5 … A80
20 Under SCP /TSP
16.6 Progress Under Kaigarike Vikas Yojana(KVY) … A81

16.7 Progress Under Specialised Skill Development Institutions (SSDI) … A81

16.8 Assistance to Institutions for Technology Training (AITT) … A82

16.9 Cadre Strength at GTTC Centre … A82

16.10 Training Programmes … A82

16.11 Details of Diploma Passed Out Trainees from 2015 To 2019 … A82

16.12 Consolidated Skill Development Training Provided … A83

iv
Appendix 1.1 Selected Socio- Economic Indicators of States in India
Decennial
% of Urban % of State
Geographical Area Density of growth rate
Population Population Population Sex Ratio
State (in Lakh Sq. Km.) Population of
(in lakh) to total to all India *
* (per Sq Km) Population %
* Population* Population*
* *
Reference 2011 2011 2011 2011 2011 2001-2011 2011
Year/Date Census Census Census Census Census Census Census

1 2 3 4 5 6 7 8

Andhra Pradesh 1.63 495.77 304 29.47 4.10 9.21 997

Telangana 1.12 350.04 312 38.87 2.89 13.58 988

Arunachal Pradesh 0.84 13.84 17 22.94 0.11 26.0 938

Assam 0.78 312.06 398 14.10 2.58 17.1 958

Bihar 0.94 1040.99 1106 11.29 8.60 25.4 918

Jharkhand 0.80 329.88 414 24.05 2.73 22.4 949

Delhi 0.01 167.88 11320 97.50 1.39 21.2 868

Goa 0.04 14.58 394 62.17 0.12 8.2 973

Gujarat 1.96 604.39 308 42.60 4.99 19.3 919

Haryana 0.44 253.51 573 34.88 2.09 19.9 879

Himachal Pradesh 0.56 68.65 123 10.03 0.57 12.9 972

Jammu & Kashmir 2.22 125.41 124 27.38 1.04 23.6 889

Karnataka 1.92 610.95 319 38.67 5.05 15.6 973

Kerala 0.39 334.06 860 47.70 2.76 4.9 1084

Madhya Pradesh 3.08 726.27 236 27.63 6.00 20.3 931

Chattisgarh 1.35 255.45 189 23.24 2.11 22.6 991

Maharashtra 3.08 1123.74 365 45.22 9.28 16.0 929

Manipur 0.22 25.70 115 32.45 0.21 18.6 992

Meghalaya 0.22 29.67 132 20.07 0.25 27.9 989

Mizoram 0.21 10.97 52 52.11 0.09 23.5 976

Nagaland 0.17 19.79 119 28.86 0.16 -0.6 931

Odisha 1.56 419.74 270 16.69 3.47 14.0 979

Punjab 0.50 277.43 551 37.48 2.29 13.9 895

Rajasthan 3.42 685.48 200 24.87 5.66 21.3 928

Sikkim 0.07 6.10 86 25.15 0.05 12.9 890

Tamil Nadu 1.30 721.47 555 48.40 5.96 15.6 996

Tripura 0.10 36.74 350 26.17 0.30 14.8 960

Uttar Pradesh 2.41 1998.12 829 22.27 16.51 20.2 912

Uttarakhand 0.53 100.86 189 30.23 0.83 18.8 963

West Bengal 0.89 912.76 1028 31.87 7.54 13.8 950

India * 32.87 12105.93 382 31.15 100.00 17.7 943

* excludes Union Territories (Contd.......... )

Economic Survey of Karnataka 2019-20 A-1


Appendix 1.1 Selected Socio- Economic Indicators of States in India
Percentage of Percentage of Percentage Female
SC & ST main of Agricultural work Literacy Percentage
State Population to workers to Total Labourers to participation
total population Workers Total Workers rate Total Male Female
* * * * * * *
2011 2011 2011 2011 2011 2011 2011
Reference Year
Census Census Census Census Census Census Census

1 9 10 11 12 13 14 15

Andhra Pradesh 22.61 83.69 47.89 67.02 74.88 59.15


36.2
Telangana 24.53 83.95 33.45 66.46 74.95 57.92

Arunachal Pradesh 68.9 81.5 6.2 35.4 65.38 72.55 57.70

Assam 19.6 72.6 15.4 22.5 72.19 77.85 66.27

Bihar 17.2 61.5 52.8 19.1 61.80 71.20 51.50

Jharkhand 38.3 52.1 33.9 29.1 66.41 76.84 55.42

Delhi 16.8 95.0 0.7 10.6 86.21 90.94 80.76

Goa 11.9 82.5 4.6 21.9 88.70 92.65 84.66

Gujarat 21.5 82.2 27.6 23.4 78.03 85.75 69.68

Haryana 20.2 78.7 17.1 17.8 75.55 84.06 65.94

Himachal Pradesh 30.9 57.9 4.9 44.8 82.80 89.53 75.93

Jammu & Kashmir 19.3 61.2 12.7 19.1 67.16 76.75 56.43

Karnataka 24.1 83.9 25.7 31.9 75.36 82.47 68.08

Kerala 10.6 80.3 11.4 18.2 94.00 96.11 92.07

Madhya Pradesh 36.7 71.9 38.6 32.6 69.32 78.73 59.24

Chattisgarh 43.4 67.7 41.8 39.7 70.28 80.27 60.24

Maharashtra 21.2 88.5 27.3 31.1 82.34 88.38 75.87

Manipur 38.9 73.8 9.6 38.6 76.94 83.58 70.26

Meghalaya 86.7 77.7 16.7 32.7 74.43 75.95 70.89

Mizoram 94.5 85.3 8.6 36.2 91.33 93.35 89.27

Nagaland 86.5 76.1 6.5 44.7 79.55 82.75 76.11

Odisha 39.9 61.0 38.4 27.2 72.87 81.59 64.01

Punjab 31.9 85.4 16.0 13.9 75.84 80.44 70.73

Rajasthan 31.3 70.5 16.5 35.1 66.11 79.19 52.12

Sikkim 38.4 74.8 8.4 39.6 81.42 86.55 75.61

Tamil Nadu 21.1 85.0 29.2 31.8 80.09 86.77 73.44

Tripura 49.6 73.3 24.1 23.6 87.22 91.53 82.73

Uttar Pradesh 21.3 67.8 30.3 16.7 67.68 77.28 57.18

Uttarakhand 21.7 74.1 10.4 26.7 78.82 87.40 70.01

West Bengal 29.3 73.9 29.3 18.1 76.26 81.69 70.54

India * 25.2 75.2 30.0 25.5 73.0 80.9 64.6

* excludes Union Territories (Contd.......... )

A-2 Economic Survey of Karnataka 2019-20


Appendix 1.1 Selected Socio- Economic Indicators of States in India
Per capita No. of Students in Average Yield
Infant
Income at Primary and Secondary (qntls/Ha )
Birth Death Mortality
State Current Schools per000'
Rate** Rate** Rate** Total Total
Prices Population
(Rs) ( I - VIII ) Cereals Pulses#
Reference
Year/ Date 2017 2017 2017 2017-18 2015-16 2015-16 2016-17

1 16 17 18 19 20 21 22

Andhra Pradesh 16.2 7.2 32 143935 113 35.25 6.59

Telangana 17.2 6.6 29 180697 142 27.66 7.71

Arunachal Pradesh 18.3 6.1 42 127748 233 - 10.11

Assam 21.2 6.5 44 74204 174 22.33 7.35

Bihar 26.4 5.8 35 38631 225 15.11 9.36

Jharkhand 22.7 5.5 29 69265 198 12.68 10.02

Delhi 15.2 3.7 16 328985 179 - 21.2

Goa 12.5 6.2 9 422149 135 - 10.04

Gujarat 19.9 6.2 30 174652 150 - 8.68

Haryana 20.5 5.8 30 203340 147 17.81 8.97

Himachal Pradesh 15.8 6.6 22 167044 139 21.94 20.19

Jammu & Kashmir 15.4 4.8 23 83717 148 14.55 5.47

Karnataka 17.4 6.5 25 188765 137 18.14 5.86

Kerala 14.2 6.8 10 184000 120 9.76 9.84

Madhya Pradesh 24.8 6.8 47 82941 176 19.94 9.44

Chattisgarh 22.7 7.5 38 89813 174 9.64 8.58

Maharashtra 15.7 5.7 19 176102 143 7.10 8.65

Manipur 14.6 5.3 12 65411 196 - 9.73

Meghalaya 22.8 6.1 39 81098 261 - 14.46

Mizoram 15.0 4.0 15 141210 195 - 13.52

Nagaland 13.5 3.6 7 102581 177 - 11.51

Odisha 18.3 7.4 41 84854 151 11.63 5.48

Punjab 14.9 7.0 21 142644 143 36.78 8.87

Rajasthan 24.1 6.0 38 99487 180 10.14 6.04

Sikkim 16.4 4.5 12 317134 172 - 9.61

Tamil Nadu 14.9 6.7 16 171583 128 37.59 5.44

Tripura 13.0 5.2 29 105044 155 - 9.52

Uttar Pradesh 25.9 6.7 41 55456 182 17.56 8.71

Uttarakhand 17.3 6.7 32 182320 170 13.61 8.69

West Bengal 15.2 5.8 24 93711 141 43.05 9.68

India * 20.2 6.3 33 115293 162 15.96 7.86

N A: Not Available(Contd.......... ) Source:#-Agriculture at a Glance,GOI-2018, **-CNL division DES.


* excludes Union Territories

Economic Survey of Karnataka 2019-20 A-3


Appendix 1.1 Selected Socio- Economic Indicators of States in India
Percentage
Average Yield (qntls/ha)# Per- Consumption of Net Area Percentage of
capitaFood of fertilizers irrigated to Net Area Factory
State Total grains per ha. of total sown to total Employment
Sugar- production cropped area cropped cropped area per lakh popn.
Food Cotton@
cane@ (Kgs) (Kg. per ha.) area
Grains

Reference
2016-17 2016-17 2016-17 2016-17 2017-18 2014-15 2014-15 2016-17
Year/Date
1
23 24 25 26 27 28 29 30

Andhra Pradesh 26.11 5.63 760.19 209 171.08 38.06 81.09 1138

Telangana 25.76 4.16 710.69 241 264.65 32.47 82.35 2070

Arunachal Pradesh 16.87 - - - - 18.73 75.25 242

Assam 18.57 - - - 80.87 7.25 69.24 699

Bihar 24.73 - 544.15 157 212.93 38.93 68.79 112

Jharkhand 18.56 - - - 50.58 13.32 89.12 573

Delhi 36.52 - - - 76.82 62.86 62.86 663

Goa 25.51 - - - 38.91 24.68 81.65 4412

Gujarat 19.52 6.12 707.1 - 144.73 33.14 80.65 2704

Haryana 37.36 6.09 806.18 677 212.85 45.50 53.89 3262

Himachal Pradesh 22.49 - - - 64.15 12.31 59.91 2882

Jammu & Kashmir 17.49 - - - 72.16 28.10 64.35 600

Karnataka 13.33 3.37 689.62 160 164.46 29.31 82.01 1743

Kerala 25.32 - - - 46.97 15.77 77.83 957

Madhya Pradesh 19.47 5.82 514.13 457 81.99 40.25 64.47 513

Chattisgarh 18.46 - - - 86.76 25.59 81.72 734

Maharashtra 12.39 4.75 825.24 136 123.94 13.82 73.89 1714

Manipur 17.26 - - - 58.04 18.02 100.00 316

Meghalaya 18.46 - - - - 23.62 83.38 417

Mizoram 16.29 - - - 36.83 11.03 100.00 0

Nagaland 16.29 - - - 34.66 19.40 76.80 298

Odisha 18.55 - - - 68.5 24.34 86.49 649

Punjab 43.53 6.15 812.73 1029 213.31 52.41 52.42 2365

Rajasthan 13.59 5.06 - 282 48.1 32.52 72.30 778

Sikkim 16.16 - - - - 8.82 56.62 2825

Tamil Nadu 14.06 - 869.95 57 144.53 45.47 80.38 3338

Tripura 27.09 - - - 28.23 16.36 52.80 742

Uttar Pradesh 24.75 - 648.93 250 168.22 55.03 63.48 507

Uttarakhand 21.36 - 696.45 - 151.73 30.08 63.81 4220

West Bengal 27.38 - - 188 163.82 32.01 54.06 702

India * 21.29 5.12 690.01 227 128.02 34.47 70.64 1232

* excludes Union Territories (Contd.......... ), @: (Blank States) Since area/production is low in individual State, Yield rate is not worked out
Source:#-Agriculture at a Glance,GOI-2018,

A-4 Economic Survey of Karnataka 2019-20


Appendix 1.1 Selected Socio- Economic Indicators of States in India
No.of
Percapita Total
Percapita Banking
value No.of. Motor Road
gross Offices Percapita
added in Vehicles Length Percapita
State Outputin per lakh Deposits
industries per lakh per 100 Sq. Bank Credit
Industries of (Rs.)
(Rs.in of Population Km.of (Rs.)
(Rs.in lakhs) Population
lakhs) Area * *

Reference Year/Date 2016-17 2016-17 2017 2017 31.03.2019 31.03.2019 31.03.2019

1 31 32 33 34 35 36 37

Andhra Pradesh # 2031.75 270.61 19417 108


14 89818 100271
Telangana 1601.71 331.64 28124 113

Arunachal Pradesh 970 193 12996 44 11 120765 27694

Assam 1564.02 369.45 9705 431 8 47172 20852

Bihar 1640.05 220.56 6000 223 7 33937 11555

Jharkhand 5031.75 1100.12 10262 88 9 66238 18248

Delhi 2488.1 253.58 61115 1206 21 708883 766647

Goa 7030.71 2408.99 84955 450 46 487513 128615

Gujarat 6439.41 1049.58 36461 92 13 111632 87922

Haryana 7300.66 1152.03 36962 184 19 161696 97566

Himachal Pradesh 4863.12 1438.48 19750 113 23 139152 42863

Jammu & Kashmir 3235.32 834.44 12047 29 14 94189 42829

Karnataka 4667.35 905.21 29252 188 17 152998 106209

Kerala 2121.92 331.39 33835 619 19 148399 97371

Madhya Pradesh 5149 998.15 18174 111 9 50742 34325

Chattisgarh 3781.1 594.17 20521 72 10 55803 35163

Maharashtra 5095.85 1147.91 26890 203 11 226915 241586

Manipur 200.52 49.67 13238 124 7 35711 18239

Meghalaya 3377.33 705.88 19653 102 12 80796 21834

Mizoram - - 17049 52 16 82148 29935

Nagaland 284.32 76.91 20727 219 8 56436 20225

Odisha 5608.47 1144.61 15623 195 12 73764 28372

Punjab 1767.54 272.24 35479 277 23 136791 80400

Rajasthan 3274.18 607.82 21737 78 11 55236 44805

Sikkim 24307.48 14897.36 8870 160 23 157589 44687

Tamil Nadu 2421.47 452.47 36189 201 15 110713 121479

Tripura 240.76 67.99 10416 409 12 67535 28208

Uttar Pradesh 3843.05 723.36 13145 178 9 52087 22006

Uttarakhand 8221.32 2138.3 21191 130 20 135854 51133

West Bengal 3350.02 431.12 8157 363 9 85171 41612

India * 3737.79 703.8 20925 152 12 103717 81086


Note-NA:Not Available.* Excludes Union Territories, * * Excluding JRY Roads
#=Andhra Pradesh contains the details of both A.P and Telangana States as population of Telangana State is not available from census
2011. Number of Offices, Deposit and Credit data is taken from the Basic Statistical Returns of SCB’s in India of Data Base on Indian
Economy, RBI.

Economic Survey of Karnataka 2019-20 A-5


Appendix 2.1
GROSS STATE DOMESTIC PRODUCT - AT CURRENT PRICES
(Rs. Crore)
Sl. 2017-18 2018-19 2019-20
Industry 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
NO SRE FRE AE

1 Crops 53395 57495 69885 78620 79738 82099 106499 107912 113048

2 Livestock 13497 15070 16341 18717 19763 22873 26310 31107 36333

3 Forestry and Logging 5935 6049 6586 6618 8401 11202 10195 10810 11322

4 Fishing 2723 3192 3849 5004 4501 4380 6195 4868 5869

5 Mining and Quarrying 4503 4073 6172 8516 6102 6791 9391 8159 8347

6 Manufacturing 97139 108505 117943 120085 142661 182184 197493 219693 232708

Electricity, Gas, Water supply and


7 10829 11478 12756 14463 16697 15213 17824 19692 22115
Remediation Services
8 Construction 50331 52339 59401 61375 61106 64311 72573 79907 83620

9 Trade and Repair Services 49570 57749 70078 80593 85874 99617 116403 131131 144352

10 Hotel and Restaurants 10873 11905 13013 13689 14832 16267 18884 21179 22614

11 Railways 2021 2296 2293 2660 3448 3130 2909 3110 3346

12 Road Transport 21957 25330 28701 32728 37106 40567 42822 51892 55238

13 Water Transport 269 253 225 229 202 297 276 295 311

14 Air Transport 374 678 563 1008 1891 2076 2195 1654 1780

15 Services Incidental to Transport 472 398 446 563 579 1000 903 977 1099

16 Storage 276 315 350 391 410 417 485 524 564

17 Communication 8140 9123 11478 13386 15543 15557 15064 16706 18048

18 Financial Services 28794 32119 36110 41932 48989 51536 58584 66083 70973

Real estate,Ownership of Dwellings and


19 143668 176957 218561 254544 309751 369000 408459 475827 536219
Professional Services

a) Computer related Services 84242 106797 135411 158240 204397 249370 273118 325313 371960

b) Other Professional Services 23073 27880 32910 40027 45307 53983 63113 70523 75738

c) Owenership of Dwellings 36353 42280 50240 56277 60047 65647 72227 79991 88522

20 Public Administration 14888 17856 20607 22872 24441 25875 27569 34684 38692

21 Other Services 32561 38374 45016 53322 60632 70531 81133 97368 111955

Total GSVA at Basic Prices 552214 631558 740373 831316 942669 1084923 1222163 1383578 1518554

Product Taxes 70192 81830 97044 107453 126376 146461 161034 189193 211064

Product Subsidies 16396 17974 20752 24845 23877 22248 25618 28372 30502

GSDP at Market Prices 606010 695413 816666 913923 1045168 1209136 1357579 1544399 1699115

Population ('000) 61482 62151 62827 63510 64201 64900 65606 66319 67041

Per Capita GSDP (Rs.) 98567 111891 129986 143902 162796 186308 206929 232874 253444

Primary Sector 80051 85880 102833 117475 118506 127345 158590 162856 174920

Secondary Sector 158299 172323 190100 195923 220464 261708 287889 319292 338443

Tertiary Sector 313863 373355 447440 517918 603698 695871 775684 901430 1005191

Total GSVA at Basic Prices 552214 631558 740373 831316 942669 1084923 1222163 1383578 1518554

I.Agriculture 75549 81806 96661 108959 112404 120553 149199 154697 166573

II.Industry 162802 176396 196272 204439 226567 268499 297280 327452 346790

III.Services 313863 373355 447440 517918 603698 695871 775684 901430 1005191

Total GSVA at Basic Prices 552214 631558 740373 831316 942669 1084923 1222163 1383578 1518554
AE : Advance Estimates, FRE : First Revised Estimates, SRE : Second Revised Estimates,TRE : Third Revised Estimates

A-6 Economic Survey of Karnataka 2019-20


Appendix - 2.2
GROSS STATE DOMESTIC PRODUCT - AT CONSTANT (2011-12) PRICES
(Rs. Crore)
Sl. 2017-18 2018-19 2019-20
Industry 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
No SRE FRE AE

1 Crops 53395 49195 53980 56518 48271 49251 62118 58664 59401

2 Livestock 13497 14078 14515 15175 15727 16360 17569 20120 22430

3 Forestry and Logging 5935 5764 5606 5381 5324 6923 6936 6776 6748

4 Fishing 2723 2659 2777 3107 2955 2812 3441 3029 3426

5 Mining and Quarrying 4503 3920 5596 7373 9048 8500 8746 7403 7513

6 Manufacturing 97139 102786 107901 107376 130093 166451 174828 186006 196505
Electricity, Gas, Water supply and
7 10829 10580 11168 12364 13666 11730 13274 13958 14939
Remediation Services
8 Construction 50331 47724 53820 54002 55492 55789 59245 63006 64504

9 Trade and Repair Services 49570 53405 59830 64650 65980 73599 84028 90015 95827

10 Hotel and Restaurants 10873 11011 11109 10951 11361 11967 13587 14478 14940

11 Railways 2021 2197 2146 2322 2933 2060 2475 2598 2752

12 Road Transport 21957 23957 25746 28783 33198 35871 38442 41380 43529

13 Water Transport 269 240 196 190 169 242 227 236 245

14 Air Transport 374 641 492 838 1583 1695 1807 1319 1403

15 Services Incidental to Transport 472 377 390 468 484 816 743 779 866

16 Storage 276 292 299 314 317 311 352 362 376

17 Communication 8140 8610 10023 11174 13037 12704 12241 13081 13839

18 Financial Services 28794 31699 34819 39767 45380 47887 50564 52940 56328
Real estate,Ownership of Dwellings and
19 143668 163846 185684 202838 236212 270890 291245 322690 350490
Professional Services
a) Computer related Services 84242 98940 115964 127516 157850 185492 198230 224864 248895

b) Other Professional Services 23073 25870 28273 32373 35045 40356 46037 49014 50874

c) Owenership of Dwellings 36353 39036 41447 42949 43318 45043 46977 48813 50721

20 Public Administration 14888 16661 17962 18879 19522 19930 20799 24925 26921

21 Other Services 32561 35484 37950 41473 44560 49856 55829 63556 70665

Total GSVA at Basic Prices 552214 585124 642007 683944 755314 845647 918493 987321 1053647

Product Taxes 70192 74562 80453 84926 95147 113916 144293 157348 168548

Product Subsidies 16396 16653 17995 20441 19131 17341 19252 20247 21164

GSDP at Market Prices 606010 643033 704466 748429 831330 942221 1043533 1124423 1201031

Population ('000) 61482 62151 62827 63510 64201 64900 65606 66319 67041

Per Capita GSDP (Rs.) 98567 103463 112128 117844 129489 145180 159061 169548 179149

Primary Sector 80051 75615 82474 87553 81326 83846 98810 95993 99518

Secondary Sector 158299 161089 172888 173743 199252 233971 247347 262970 275948

Tertiary Sector 313863 348419 386645 422649 474737 527830 572336 628359 678181

Total GSVA at Basic Prices 552214 585124 642007 683944 755314 845647 918493 987321 1053647

I.Agriculture 75549 71695 76878 80180 72278 75346 90064 88590 92005

II.Industry 162802 165009 178484 181116 208300 242471 256092 270372 283461

III.Services 313863 348419 386645 422649 474737 527830 572336 628359 678181

Total GSVA at Basic Prices 552214 585124 642007 683944 755314 845647 918493 987321 1053647
AE : Advance Estimates, FRE : First Revised Estimates, SRE : Second Revised Estimates,TRE : Third Revised Estimates

Economic Survey of Karnataka 2019-20 A-7


Appendix 2.3
NET STATE DOMESTIC PRODUCT -- AT CURRENT PRICES
(Rs. Crore)
Sl. 2017-18 2018-19 2019-20
Industry 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
NO SRE FRE AE

1 Crops 48074 51435 62932 71443 72027 73775 97655 98951 103660

2 Livestock 13297 14841 16088 18442 19505 22595 26006 30749 35915

3 Forestry and Logging 5870 5981 6512 6553 8323 11114 10107 10716 11224

4 Fishing 2403 2845 3444 4538 4098 4023 5744 4514 5442

5 Mining and Quarrying 3959 3579 5285 7238 5106 5703 7939 6898 7057

6 Manufacturing 83435 92926 99713 100984 123583 162562 175839 195605 207193
Electricity, Gas, Water supply and
7 7194 7505 8376 9373 11173 10133 12151 13425 15077
Remediation Services
8 Construction 48016 49654 55792 57765 57473 60367 67958 74825 78302

9 Trade and Repair Services 47521 55326 67370 77378 82840 96167 112328 125978 138679

10 Hotel and Restaurants 10424 11405 12329 12910 13824 15188 17642 20347 21725

11 Railways 1577 1797 1676 1894 2510 2176 1894 2024 2178

12 Road Transport 19967 23181 26488 30425 34486 37449 39120 47117 50155

13 Water Transport 245 232 125 145 123 206 185 268 282

14 Air Transport 340 621 275 674 1558 1749 1857 1502 1616

15 Services Incidental to Transport 429 364 386 496 507 869 783 887 998

16 Storage 237 273 297 329 345 351 412 446 480

17 Communication 6609 7479 9692 10223 12041 11680 10729 11899 12855

18 Financial Services 28339 31551 35426 41177 47991 50399 57293 64627 69409
Real estate,Ownership of Dwellings and
19 133598 163530 202073 225387 275715 327627 359786 419126 472322
Professional Services
a) Computer related Services 78337 98694 125196 140114 181938 221410 240573 286548 327636

b) Other Professional Services 21456 25764 30428 35442 40328 47930 55592 62119 66712

c) Owenership of Dwellings 33805 39072 46450 49831 53449 58287 63620 70459 77973

20 Public Administration 11487 13885 16125 18079 19583 20936 22601 28434 31720

21 Other Services 28136 33658 39873 47722 55556 64883 74966 89967 103445

Total NSVA at Basic Prices 501156 572069 670276 743175 848367 979952 1102996 1248305 1369735

Product Taxes 70192 81830 97044 107453 126376 146461 161034 189193 211064

Product Subsidies 16396 17974 20752 24845 23877 22248 25618 28372 30502

NSDP at Market Prices 554952 635924 746569 825782 950866 1104165 1238412 1409126 1550297

Population ('000) 61482 62151 62827 63510 64201 64900 65606 66319 67041

Per Capita NSDP (Rs.) 90263 102319 118829 130024 148108 170133 188765 212477 231246

Primary Sector 73603 78682 94262 108214 109059 117210 147452 151827 163298

Secondary Sector 138645 150086 163881 168122 192229 233062 255947 283855 300572

Tertiary Sector 288908 343301 412133 466839 547079 629680 699596 812622 905865

Total NSVA at Basic Prices 501156 572069 670276 743175 848367 979952 1102996 1248305 1369735

I.Agriculture 69644 75103 88977 100976 103953 111507 139513 144929 156241

II.Industry 142604 153665 169166 175360 197335 238765 263887 290754 307629

III.Services 288908 343301 412133 466839 547079 629680 699596 812622 905865

Total NSVA at Basic Prices 501156 572069 670276 743175 848367 979952 1102996 1248305 1369735
AE : Advance Estimates, FRE : First Revised Estimates, SRE : Second Revised Estimates, TRE : Third Revised Estimates

A-8 Economic Survey of Karnataka 2019-20


Appendix 2.4
NET STATE DOMESTIC PRODUCT - AT CONSTANT (2011-12) PRICES
(Rs. Crore)
Sl. 2017-18 2018-19 2019-20
Industry 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
NO SRE FRE AE

1 Crops 48074 43582 48075 50693 42281 43018 55653 52558 53218

2 Livestock 13297 13866 14291 14938 15496 16116 17319 19834 22111

3 Forestry and Logging 5870 5701 5540 5325 5255 6847 6864 6706 6678

4 Fishing 2403 2332 2422 2695 2603 2495 3039 2675 3026

5 Mining and Quarrying 3959 3449 4784 6272 8215 7603 7582 6418 6514

6 Manufacturing 83435 87782 90818 90195 113021 148863 155842 165806 175165
Electricity, Gas, Water supply and
7 7194 6945 7060 7815 8718 7178 8309 8737 9351
Remediation Services
8 Construction 48016 45162 50424 50654 52105 52026 54891 58375 59763

9 Trade and Repair Services 47521 51121 57367 61828 63266 70542 80571 85860 91404

10 Hotel and Restaurants 10424 10540 10482 10267 10461 11013 12537 13809 14250

11 Railways 1577 1728 1583 1656 2117 1241 1631 1713 1814

12 Road Transport 19967 21898 23698 26638 30753 33012 35133 37575 39525

13 Water Transport 245 219 103 112 95 159 145 214 222

14 Air Transport 340 586 224 526 1276 1398 1507 1198 1274

15 Services Incidental to Transport 429 344 333 409 421 702 642 707 786

16 Storage 237 252 251 261 258 252 291 299 311

17 Communication 6609 7005 8304 8422 10070 9394 8601 9191 9723

18 Financial Services 28339 31147 34166 39097 44514 46892 49463 51788 55102
Real estate,Ownership of Dwellings and
19 133598 151146 170563 177897 207834 236177 251509 278665 302672
Professional Services
a) Computer related Services 78337 91271 106520 111837 138886 161722 171185 194185 214938

b) Other Professional Services 21456 23865 25971 28392 30835 35185 39756 42327 43933

c) Owenership of Dwellings 33805 36010 38072 37668 38113 39271 40568 42153 43801

20 Public Administration 11487 12845 13781 14544 15098 15443 16417 19674 21250

21 Other Services 28136 30991 33212 36556 40079 44894 50605 57610 64053

Total NSVA at Basic Prices 501156 528642 577482 606799 673936 755267 818553 879413 938215

Product Taxes 70192 74562 80453 84926 95147 113916 144293 157348 168548

Product Subsidies 16396 16653 17995 20441 19131 17341 19252 20247 21164

NSDP at Market Prices 554952 586552 639940 671283 749952 851841 943594 1016514 1085599

Population ('000) 61482 62151 62827 63510 64201 64900 65606 66319 67041

Per Capita NSDP (Rs.) 90263 94375 101858 105697 116813 131254 143827 153276 161931

Primary Sector 73603 68930 75112 79923 73850 76079 90457 88191 91546

Secondary Sector 138645 139889 148302 148664 173844 208068 219042 232919 244280

Tertiary Sector 288908 319823 354068 378212 426242 471120 509055 558303 602389

Total NSVA at Basic Prices 501156 528642 577482 606799 673936 755267 818553 879413 938215

I.Agriculture 69644 65481 70328 73651 65636 68475 82875 81773 85033

II.Industry 142604 143339 153086 154936 182059 215671 226624 239337 250794

III.Services 288908 319823 354068 378212 426242 471120 509055 558303 602389

Total NSVA at Basic Prices 501156 528642 577482 606799 673936 755267 818553 879413 938215
AE : Advance Estimates, FRE : First Revised Estimates, SRE : Second Revised Estimates, TRE : Third Revised Estimates

Economic Survey of Karnataka 2019-20 A-9


Appendix 2.5 Gross / Net State Domestic Product and Per Capita Income
Per Captia
Gross State Gross State Net State Net State
Income (Per
Domestic Domestic Domestic Domestic
Capita Net State
Product Product Product Product
Sl. Domestic
Year (GSDP) at (GSDP) at (NSDP) at (NSDP) at
No Product (NSDP)
Current Constant Current Constant
at Current
Prices Prices Prices Prices
Prices)
(Rs. Lakhs) (Rs. Lakhs) (Rs. Lakhs) (Rs. Lakhs)
(in Rs.)
1 1960-61a 69164 69164 296
2 1961-62a 76445 74095 320
3 1962-63a 81180 78174 333
4 1963-64a 94137 81348 378
5 1964-65a 108609 81084 427
6 1965-66a 116372 75647 448
7 1966-67a 142621 85711 537
8 1967-68a 152521 85644 562
9 1968-69a 163106 93338 588
10 1969-70a 176316 99881 622
11 1970-71b 185811 185811 641
12 1971-72b 191564 188522 646
13 1972-73b 201243 176970 664
14 1973-74b 281535 204113 907
15 1974-75b 317771 203296 1000
16 1975-76b 309240 216477 951
17 1976-77b 328291 207012 986
18 1977-78b 381307 244450 1117
19 1978-79b 399507 253858 1142
20 1979-80b 482171 261228 1345
21 1980-81c 621032 621032 558736 558736 1520
22 1981-82c 716860 661709 642344 595740 1707
23 1982-83c 801276 680456 713722 610171 1855
24 1983-94c 961003 727767 861717 653582 2192
25 1984-85c 1083088 780809 969723 702315 2416
26 1985-86c 1157468 756897 1021834 673330 2495
27 1986-87c 1327121 824469 1173306 736513 2810
28 1987-88c 1515827 881547 1343482 788292 3159
29 1988-89c 1770911 956698 1567132 856321 3620
30 1989-90c 2021422 1013026 1779770 904572 4044
31 1990-91c 2330040 1025982 2055120 911210 4598
32 1991-92c 3009173 1149444 2673762 1026985 5889
33 1992-93c 3303585 1181049 2916231 1050758 6321
34 1993-94d 4107905 4107906 3698228 3698229 7838
35 1994-95d 4791516 4338693 4306510 3891705 8960
36 1995-96d 5621456 4616681 5002819 4097390 10217
37 1996-97d 6517572 5030220 5807078 4473655 11670
38 1997-98d 7304576 5377782 6475689 4751682 12832
39 1998-99d 8784091 6061964 7875624 5396093 15396
40 1999-00e 10124741 10124741 9053192 9053192 17502
41 2000-01e 10836170 10268651 9634777 9113592 18344
42 2001-02e 11284650 10555966 9889675 9278843 18547
43 2002-03e 12088876 11035977 10589474 9776504 19621
44 2003-04e 13098974 11417352 11423011 9966856 20901
45 2004-05f 16674713 16674713 14872897 14872898 26882
46 2005-06f 19590407 18427703 17491121 16403065 31239
47 2006-07f 22723706 20266010 20381918 18108596 35981
48 2007-08f 27062879 22820215 24302840 20380990 42419
49 2008-09f 31031233 24442138 27853414 21830924 48084
50 2009-10f 33755850 24759029 30074742 21836349 51364
51 2010-11f 41070316 27272131 36833840 24081677 62251
52 2011-12g 60600981 60600981 55495220 55495220 90263
53 2012-13g 69541305 64303302 63592383 58655161 102319
54 2013-14g 81666615 70446604 74656904 63994016 118829
55 2014-15g 91392303 74842911 82578249 67128350 130024
56 2015-16g 104516810 83132991 95086639 74995161 148108
57 2016-17g 120913635 94222105 110416492 85184099 170133
58 2017-18g SRE 135757905 104353337 123841195 94359409 188765
59 2018-19g FRE 154439882 112442289 140912572 101651431 212477
60 2019-20g AE 169911533 120103127 155029689 108559889 231246

Note: Estimates of Net State Domestic Product only were computed from 1960-61 to 1979-80.
a) Computed with base year as 1960-61
b) Computed with base year as 1970-71
c) Computed with base year as 1980-81
d) Computed with base year as 1993-94
e) Computed with base year as 1999-2000
f) Computed with base year as 2004-05
g) Computed with base year as 2011-12
AE : Advance Estimates, FRE : First Revised Estimates, SRE : Second Revised Estimates,
Source: Directorate of Economics and Statistics, Government of Karnataka.

A-10 Economic Survey of Karnataka 2019-20


Appendix 2.6
Gross / Net District Domestic Product and Per Capita Net District Income for the year 2017-18
(Provisional) (Rs. Crore)
Gross State Domestic Net State Domestic Per Captia
Product (GSDP) Product (NSDP) Income (Per
Sl.
District Capita NSDP at
No Current Constant Current Constant Current Prices)
Prices Prices Prices Prices (in Rs.)
1 Bagalkote 34093 26100 30657 23235 151071
2 Bengaluru Urban 489077 378713 463371 357125 448485
3 Bengaluru Rural 21799 16862 19544 14975 183672
4 Belagavi 61432 45335 54083 39268 105372
5 Ballari 44720 35255 39589 30913 150319
6 Bidar 20421 15498 18063 13519 98754
7 Vijayapura 25010 19139 21845 16459 93430
8 Chamarajanagar 15634 12168 13811 10634 125998
9 Chickballapur 19265 14343 17051 12494 126512
10 Chikkamagaluru 30290 23750 27410 21358 224312
11 Chitradurga 22075 15822 19391 13617 108818
12 Dakshina Kannada 79585 64257 72931 58561 325014
13 Davangere 27599 19631 24354 16988 116573
14 Dharwad 32717 25612 29615 22977 149316
15 Gadag 14924 11533 13216 10089 115608
16 Kalaburagi 29060 22336 25380 19222 92098
17 Hassan 30695 23436 27470 20743 144004
18 Haveri 21641 16384 19186 14306 111833
19 Kodagu 7831 6063 6909 5275 116032
20 Kolar 24079 18138 21249 15775 128797
21 Koppal 16265 12229 14334 10598 96036
22 Mandya 34072 26076 30651 23230 158067
23 Mysuru 46599 35915 41465 31552 128666
24 Raichur 22526 17332 19770 14991 95451
25 Ramnagara 21630 16568 19305 14625 166056
26 Shivamogga 37714 27964 33970 24884 180486
27 Tumakuru 51213 38922 45467 34167 158047
28 Udupi 36629 28751 33624 26206 265955
29 Uttara Kannada 24214 18314 21628 16145 140145
30 Yadagiri 14768 11090 13073 9662 103677
State 1357579 1043533 1238412 943594 188765
Source: Directorate of Economics and Statistics, Government of Karnataka.

Economic Survey of Karnataka 2019-20 A-11


Appendix 2.7
Net District Income in Karnataka at current and constant (2011-12) prices - 2017-18
(Provisional) (Rs. Crore)
NSDP Current Prices NSDP Constant Prices

A-12
Sl.
District
No Primary Secondary Tertiary Total Primary Secondary Tertiary Total
1 Bagalkote 5805 8093 13407 27304 3406 6924 9826 20156
2 Bengaluru Urban 3281 74804 334618 412703 2134 63955 243711 309800
3 Bengaluru Rural 2580 6075 8752 17407 1455 5248 6288 12991
4 Belagavi 13776 11418 22975 48169 7849 9719 16497 34065
5 Ballari 9211 7263 18786 35260 6992 6126 13698 26817
6 Bidar 3628 2923 9536 16088 2327 2500 6901 11727
7 Vijayapura 4826 4300 10330 19456 3150 3623 7506 14278
8 Chamarajanagar 2519 2883 6899 12301 1655 2477 5093 9225
9 Chickballapur 3907 3545 7735 15186 2300 3033 5505 10838
10 Chikkamagaluru 3649 8631 12133 24413 1987 7471 9070 18527
11 Chitradurga 5267 3045 8959 17271 2894 2575 6344 11813
12 Dakshina Kannada 6053 27761 31142 64956 3670 24116 23014 50801
13 Davangere 7143 5125 9422 21691 3733 4352 6652 14737
14 Dharwad 2493 7104 16780 26377 1715 6004 12213 19932
15 Gadag 2236 2526 7008 11771 1488 2178 5086 8752
16 Kalaburagi 7446 3660 11499 22605 5337 3137 8201 16675
17 Hassan 4517 4518 15431 24466 2740 3805 11449 17994
18 Haveri 4829 3038 9222 17088 3195 2584 6631 12411
19 Kodagu 1377 1303 3473 6154 1001 1116 2458 4576
20 Kolar 4710 4914 9301 18926 2805 4245 6635 13684
21 Koppal 3836 2592 6339 12766 2473 2196 4525 9194
22 Mandya 5029 6545 15725 27299 2767 5568 11817 20152
23 Mysuru 5736 7617 23578 36931 3895 6540 16936 27371
24 Raichur 4611 2986 10012 17608 3289 2508 7208 13005
25 Ramnagara 3070 6044 8080 17194 1662 5230 5795 12687
26 Shivamogga 6313 7852 16091 30256 3301 6599 11686 21586
27 Tumakuru 7331 13734 19430 40495 3791 11784 14064 29639
28 Udupi 4390 9250 16307 29948 2651 7998 12085 22734
29 Uttara Kannada 3868 4326 11070 19263 2231 3669 8105 14006
30 Yadagiri 4017 2073 5555 11644 2565 1761 4056 8382
State 147452 255947 699596 1102996 90457 219042 509055 818553
Source: Directorate of Economics and Statistics, Government of Karnataka.

Economic Survey of Karnataka 2019-20


Appendix 2.8 Index Numbers of Wholesale Prices in India
Base Year : 2011-12=100
Percentage variation in
2017 2018 2019
November over April
Sl.No. Item group Weight
April November April November April November 2017 2018 2019

1 Primary Articles 22.62 127.4 135.6 130.7 137.2 139.3 147.3 6.44 4.97 5.74

2 Fuel & Power 13.15 91.7 95.0 99.0 110.0 102.8 101.3 3.60 11.11 -1.46

Manufactured
3 64.23 112.6 113.9 116.3 118.8 118.5 117.8 1.15 2.15 -0.59
Products

All Commodities 100.00 113.2 116.3 117.3 121.8 121.1 122.3 2.74 3.84 0.99

Source: Office of the Economic Adviser, Ministry of Commerce and Industry, GOI.

Appendix 2.9 All - India Wholesale Price Index Numbers


Percentage variation over previous
year/month
Year Primary Articles All Commodities
Primary Articles All Commodities
Base year: 1993-94=100
2000-01 162.5 155.7 2.85 7.16
2001-02 168.4 161.3 3.63 3.60
2002-03 174.0 166.8 3.33 3.41
2003-04 181.5 175.9 4.31 5.46
2004-05 188.1 187.3 3.64 6.48
Base year: 2004-05=100
2005-06 104.3 104.4 4.30 4.40
2006-07 114.3 111.2 9.59 6.51
2007-08 123.9 116.5 8.40 4.77
2008-09 137.5 125.9 10.98 8.07
2009-10 154.9 130.4 12.65 3.57
2010-11 182.0 143.0 17.50 9.66
2011-12 200.3 156.1 10.05 9.16
2012-13 220.0 167.6 9.84 7.37
2013-14 241.6 177.6 9.82 5.99
2014-15 248.8 181.2 2.98 2.00
2015-16 249.5 176.6 0.28 -2.53
New Base year: 2011-12=100
2015-16 124.6 109.7 -0.38 -3.65
2016-17 128.9 111.6 3.43 1.73
2017-18 130.6 114.9 1.38 2.92
2018-19 134.2 119.8 2.74 4.27
(January 2019 to November 2019)
January 2019 133.8 119.2 0.22 -0.42
February 2019 134.1 119.5 0.22 0.25
March 2019 134.5 119.9 0.30 0.33
April 2019 139.3 121.1 3.57 1.00
May 2019 140.3 121.6 0.72 0.41
June 2019 141.0 121.5 0.50 -0.08
July 2019 142.8 121.3 1.28 -0.16
August 2019 144.0 121.5 0.84 0.16
September 2019 143.0 121.3 -0.69 -0.16
October 2019 146.0 122.2 2.10 0.74
November 2019 147.3 122.3 0.89 0.08
Source: Office of the Economic Adviser, Ministry of Commerce and Industry, GOI.

Economic Survey of Karnataka 2019-20 A-13


Appendix 2.10 Wholesale Price Index Numbers of Agricultural Commodities in Karnataka
Base year : 1981-82=100
Year Index Percentage variation over previous year/month
2000-01 402 -6.29
2001-02 387 -3.73
2002-03 397 2.58
2003-04 428 7.81
2004-05 439 2.57
2005-06 461 5.01
2006-07 501 8.68
2007-08 546 8.98
2008-09 671 22.89
2009-10 754 12.37
2010-11 794 5.31
2011-12 891 12.22
2012-13 978 9.76
2013-14 1042 6.54
2014-15 1151 10.46
2015-16 1201 4.34
2016-17 1198 -0.25
2017-18 1205 0.58
2018-19 1257 4.32
(January 2019 to November 2019)
January 2019 1283 0.94
February 2019 1268 -1.17
March 2019 1261 -0.47
April 2019 1262 0.00
May 2019 1265 0.24
June 2019 1291 2.06
July 2019 1311 1.55
August 2019 1320 0.69
September 2019 1397 5.83
October 2019 1397 0.00
November 2019 1338 -4.22
Source : Directorate of Economics and Statistics, GOK.

Appendix 2.11 Groupwise Index Numbers of Wholesale Prices of Agricultural Commodities in Karnataka
Base Year 1981-82=100
Percentage variation in
Commodity 2017 2018 2019
Sl.No Weight November over April
Group
April November April November April November 2017 2018 2019
1 Cereals 29.89 1291 1232 1260 1643 1437 1462 -4.57 30.40 1.74
2 Pulses 4.92 1417 1190 1177 1268 1345 1434 -16.02 7.73 6.62
3 Oilseeds 17.31 1170 994 957 1141 1165 1309 -15.04 19.23 12.36
4 Gur & Sugar 14.56 719 699 752 732 723 696 -2.78 -2.66 -3.73
5 Fiber 9.64 895 790 812 768 792 591 -11.73 -5.42 -25.38
Condiments
6 2.27 1005 1005 921 1055 868 1462 0.00 14.55 68.43
and Spices
Miscellaneous
7 21.41 1690 1800 1905 1734 1696 1928 6.51 -8.98 13.68
*
All Commodities 100.00 1234 1185 1217 1327 1262 1338 -3.97 9.04 6.02
Note: * Miscellaneous items include coffee, onion, potato, tobacco, tamarind, coconut and arecanut.
Source: Directorate of Economics and Statistics, GOK.

A-14 Economic Survey of Karnataka 2019-20


Appendix 2.12 Consumer Price Index Numbers for Industrial Workers at All India and Karnataka

All India Karnataka*

Month Base year : 2001=100 Base year : 1987-88=100

2017-18 2018-19 2019-20 2017-18 2018-19 2019-20

April 277 288 312 826 846 886

May 278 289 314 829 848 891

June 280 291 316 835 852 897

July 285 301 319 845 858 899

August 285 301 320 849 859 901

September 285 301 322 845 862 904

October 287 302 325 849 864 908

November 288 302 328 856 867 917

December 286 301 846 869

January 288 307 845 875

February 287 307 844 874

March 287 309 842 879

Note : * Average of 16 centres (11 State series + 5 Central series)


Source : 1) Labour Bureau, Shimla, GOI. 2) Directorate of Economics and Statistics, GOK.

Appendix 2.13 Consumer Price Index Numbers for Industrial Workers in Karnataka
Percentage variation in
2017 2018 2019
Sl. November over April
Centres
No.
April November April November April November 2017 2018 2019

Central Series (Base year: 2001=100)

1 Bengaluru 284 292 288 292 295 305 2.82 1.39 3.39

2 Belagavvi 284 299 295 298 306 315 5.28 1.02 2.94
Hubballi-
3 294 307 312 318 326 348 4.42 1.92 6.75
Dharwad
4 Madikere 295 305 297 306 306 320 3.39 3.03 4.58

5 Mysuru 291 301 297 306 308 321 3.44 3.03 4.22

State Series (Base year:1987-88=100)

6 Ballari 754 788 777 811 834 879 4.51 4.38 5.40

7 Bhadravathi 790 827 816 845 865 905 4.68 3.55 4.62

8 Davanagere 864 898 885 918 942 986 3.94 3.73 4.67

9 Dandeli 795 824 818 850 871 907 3.65 3.91 4.13

10 Kalaburagi 735 768 760 794 811 853 4.49 4.47 5.18

11 Harihar 751 789 779 813 840 888 5.06 4.36 5.71

12 Hassan 805 844 835 844 891 931 4.84 1.08 4.49

13 Mandya 848 883 868 898 919 955 4.13 3.46 3.92

14 Mangaluru 729 764 754 784 807 846 4.80 3.98 4.83

15 Raichur 852 884 879 910 932 974 3.76 3.53 4.51

16 Tumakuru 692 731 717 747 766 801 5.64 4.18 4.57
Source: 1. Labour Bureau, Shimla, GOI.
2. Directorate of Economics & Statistics, GOK.

Economic Survey of Karnataka 2019-20 A-15


Appendix 2.13(a) Consumer Price Index Numbers for Industrial Workers at selected centres in Karnataka State

A-16
CENTRAL SERIES Base Year: 2001=100
HUBBALAI-
BENGALURU BELAGAVI MADIKERI MYSURU
Year/ Month DHARWAD
Food General Food General Food General Food General Food General
Weight 45.53 100.00 51.76 100.00 49.51 100.00 55.41 100.00 48.05 100.00
2006-07 128 128 126 127 126 125 118 116 125 125
2007-08 140 138 140 135 138 135 128 122 135 132
2008-09 163 154 156 147 159 151 153 139 156 146
2009-10 185 171 183 167 181 169 176 160 180 165
2010-11 198 185 201 184 196 185 191 176 193 177
2011-12 206 197 226 204 217 204 202 191 204 191
2012-13 235 217 247 222 245 225 228 216 231 212
2013-14 279 242 281 246 268 252 269 244 286 248
2014-15 295 258 289 256 279 270 284 259 293 260
2015-16 312 271 305 270 297 285 301 273 305 271
2016-17 322 281 315 282 306 293 309 284 321 284
2017-18 325 296 326 293 310 304 323 299 336 298
2018-19 320 291 326 299 313 318 326 304 328 305
(January 2019 to November 2019)
January 2019 322 294 330 304 313 323 333 309 332 311
February 2019 319 292 328 303 314 324 330 307 326 309
March 2019 323 295 331 306 317 326 328 306 327 308
April 2019 328 297 332 307 323 329 331 308 337 314
May 2019 330 298 335 308 329 332 337 311 342 317
June 2019 336 300 337 309 334 335 339 312 346 319
July 2019 331 299 340 312 341 342 317 313 333 318
August 2019 331 299 335 309 347 345 338 312 337 316
September 2019 333 300 334 309 349 346 339 312 340 317
October 2019 335 301 334 310 349 346 348 318 340 317
November 2019 343 305 347 315 354 348 352 320 348 321
Source: Directorate of Economics & Statistics, GOK.

Economic Survey of Karnataka 2019-20


Appendix 2.13(b) Consumer Price Index Numbers for Industrial Workers at selected centres in Karnataka State
STATE SEREIES Base Year: 1987-88=100
BALLARI BADRAVATHI DAVANAGERE DANDELI KALABURAGI HARIHARA HASSAN MANDYA MANGALURU RAICHUR TUMAKURU

Year/ Month

Food
General
Food
General
Food
General
Food
General
Food
General
Food
General
Food
General
Food
General
Food
General
Food
General
Food
General

Weight 54.73 100.00 48.53 100.00 52.53 100.00 49.22 100.00 49.23 100.00 49.58 100.00 56.02 100.00 53.48 100.00 58.11 100.00 52.71 100.00 41.29 100.00

2006-07 340 315 382 330 390 328 381 353 337 308 343 304 342 315 363 328 348 312 335 339 349 279

2007-08 381 341 406 349 434 355 415 371 390 330 387 328 366 328 405 351 375 332 384 371 393 300

2008-09 452 387 464 388 498 405 475 408 452 373 439 362 419 368 473 393 444 373 457 423 456 335

2009-10 530 429 547 436 574 461 538 449 485 398 491 388 490 415 543 438 494 408 550 482 527 373

2010-11 560 457 557 451 615 495 580 474 527 425 525 407 538 453 583 481 548 444 578 510 564 395

2011-12 583 479 619 508 674 549 656 524 606 478 583 457 583 497 637 538 584 479 654 563 576 421

2012-13 669 539 718 586 785 629 736 575 658 524 674 534 670 561 740 621 592 501 738 626 649 463

2013-14 755 612 825 665 916 718 828 654 744 587 781 616 795 648 871 716 688 575 833 708 796 542

Economic Survey of Karnataka 2019-20


2014-15 797 652 868 706 961 767 859 710 789 637 809 657 845 707 923 764 753 633 875 756 855 586

2015-16 844 694 922 739 1001 803 891 747 850 679 847 696 892 749 964 798 823 679 923 800 914 634

2016-17 901 739 978 775 1047 837 925 783 905 714 892 729 933 781 1005 829 870 713 947 830 957 672

2017-18 935 772 1013 811 1093 883 935 811 928 753 936 772 979 827 1050 868 902 750 980 871 1008 714

2018-19 954 805 1007 840 1096 912 953 843 936 787 952 806 996 861 1063 892 913 779 997 903 1010 741

(January 2019 to November 2019)

January 2019 980 821 1011 853 1115 927 971 859 948 802 975 823 1008 876 1070 906 924 792 1013 918 1027 755

February 2019 972 825 1004 857 1121 933 972 862 946 805 978 829 1010 881 1067 910 920 796 1016 922 1023 757

March 2019 977 829 999 861 1123 936 976 866 949 807 987 834 1015 885 1073 913 927 801 1022 926 1034 761

April 2019 987 834 1006 865 1135 942 986 871 957 811 999 840 1026 891 1084 919 936 807 1034 932 1042 766

May 2019 996 840 1019 871 1145 948 995 875 964 815 1016 847 1034 896 1093 924 945 813 1039 936 1052 770

June 2019 1001 845 1032 877 1156 955 1003 880 977 821 1030 855 1040 902 1102 930 953 818 1050 941 1063 774

July 2019 1008 852 1039 883 1155 960 1008 885 986 827 1037 862 1050 908 1109 935 958 823 1060 948 1067 780

August 2019 1016 858 1034 889 1170 967 1018 890 999 834 1052 869 1056 913 1115 940 967 829 1073 955 1078 785

September 2019 1025 864 1045 895 1180 973 1021 896 1012 841 1063 875 1065 919 1122 945 973 834 1081 961 1086 790

October 2019 1038 872 1053 900 1176 979 1032 902 1022 847 1070 882 1076 925 1133 950 978 840 1088 967 1095 795

A-17
November 2019 1050 879 1063 905 1190 986 1041 907 1031 853 1083 888 1083 931 1144 955 983 846 1102 974 1108 801

Source: Directorate of Economics & Statistics, GOK.


Appendix 2.14 Consumer Price Index Numbers for Agricultural Labourers at All India and Karnataka
Base Year: 1986-87=100

Percentage variation in
2017 2018 2019
November over April
Item
April November April November April November 2017 2018 2019

Karnataka

i) Food 1055 1103 1034 997 1015 1105 4.55 -3.58 8.87

ii) General 1040 1076 1039 1023 1040 1107 3.46 -1.54 6.44

All-India

i) Food 831 866 831 856 874 959 4.21 3.01 9.73

ii) General 870 905 888 914 932 1000 4.02 2.93 7.30
Source: Labour Bureau, Shimla, GOI.

Appendix 2.15 Consumer Price Index Numbers for Agricultural Labourers at All India and Karnataka
Base Year : 1986-87=100
All India Karnataka
Year/Month
Food General Food General
2000-01 303 305 311 306
2001-02 302 309 303 306
2002-03 312 319 319 320
2003-04 325 331 340 338
2004-05 333 340 343 343
2005-06 345 353 332 339
2006-07 376 380 349 358
2007-08 406 409 394 397
2008-09 452 450 451 445
2009-10 522 513 536 517
2010-11 572 564 595 575
2011-12 602 611 657 649
2012-13 658 672 737 724
2013-14 737 750 836 815
2014-15 778 800 860 863
2015-16 807 835 931 928
2016-17 841 870 1015 1001
2017-18 846 889 1075 1057
2018-19 850 907 1011 1029
(January 2019 to November 2019)
January 2019 855 915 1007 1028
February 2019 857 917 1011 1034
March 2019 865 924 1016 1040
April 2019 874 932 1015 1040
May 2019 885 940 1027 1049
June 2019 898 950 1036 1055
July 2019 907 958 1047 1062
August 2019 915 965 1056 1069
September 2019 928 976 1071 1081
October 2019 942 987 1092 1098
November 2019 959 1000 1105 1107
Source : Labour Bureau, Shimla, GOI.

A-18 Economic Survey of Karnataka 2019-20


Appendix 2.16 Rural Retail Price Index Numbers in Karnataka
Base Year : 1970=100
Percentage variation over
Year Index
previous year/month
2001-02 1445 3.58
2002-03 1458 0.90
2003-04 1528 4.80
2004-05 1606 5.10
2005-06 1669 3.92
2006-07 1825 9.35
2007-08 1922 5.32
2008-09 2171 12.96
2009-10 2641 21.65
2010-11 2911 10.22
2011-12 3231 10.99
2012-13 3565 10.34
2013-14 3923 10.05
2014-15 4189 6.78
2015-16 4671 11.50
2016-17 4877 4.41
2017-18 5042 3.38
2018-19 5017 -0.49
(January 2019 to November 2019)
January 2019 5084 0.53
February 2019 4990 -1.85
March 2019 4855 -2.71
April 2019 4843 -0.25
May 2019 4941 2.02
June 2019 4984 0.87
July 2019 5022 0.76
August 2019 5057 0.70
September 2019 5153 1.90
October 2019 5185 0.62
November 2019 5402 7.57
Source: Directorate of Economics and Statistics, GOK.

Appendix 2.17 Urban Retail Price Index Numbers in Karnataka


Base Year : 1970=100
Percentage variation over previous
Year Index
year/month
2001-02 1045 3.26
2002-03 1087 4.02
2003-04 1193 9.75
2004-05 1257 5.36
2005-06 1296 3.10
2006-07 1347 3.94
2007-08 1425 5.79
2008-09 1589 11.51
2009-10 1878 18.19
2010-11 1982 5.54
2011-12 2161 9.03
2012-13 2441 12.96
2013-14 2810 15.12
2014-15 2996 6.62
2015-16 3263 8.91
2016-17 3207 -1.71
2017-18 3382 5.45
2018-19 3353 -0.85
(January 2019 to November 2019)
January 2019 3369 0.06
February 2019 3337 -0.95
March 2019 3331 -0.18
April 2019 3348 0.51
May 2019 3396 1.43
June 2019 3441 1.33
July 2019 3468 0.78
August 2019 3564 2.77
September 2019 3708 4.04
October 2019 3760 1.40
November 2019 3971 14.50
Source: Directorate of Economics and Statistics, GOK.

Economic Survey of Karnataka 2019-20 A-19


Appendix 3.1 Allocation of Plan Outlay to Panchayat Raj Institutions (PRI) in Karnataka
(Rs. Crore)
Total Plan Outlay Out of which Allocation of % of PRI Plan to
Year
(State+Center) Plan Outlay to PRIs State Plan Outlays
1996-97 5311 1273 24
1997-98 5635 1420 25
1998-99 6513 1447 22
1999-00 7087 1528 22
2000-01 8506 1697 20
2001-02 9605 1834 20
2002-03 9522 1241 13
2003-04 10670 1302 12
2004-05 13311 1668 13
2005-06 14609 2869 20
2006-07 17806 3432 19
2007-08 20532 3571 17
2008-09 28199 4417 16
2009-10 32431 4737 15
2010-11 33764 4870 14
2011-12 40872 6042 15
2012-13 42972 7809 16
2013-14 55693 8921 15
2014-15 62987 10480 17
2015-16 72720 11328 16
2016-17 88385 13119 15
2017-18# 186510 31049 17
2018-19(RE) 217451 36793 17
2019-20(BE) 234153 39135 17
# 2017-18 onwards Plan and Nonplan distinction has been removed and the amount shown is budget of that year

Appendix 3.2 Trends in revenue and capital receipts in Karnataka


(Rs. Crore)
State's Own Share in Total Tax Total Non- Total Revenue Total Capital Aggregate
Year
Tax Revenues Central Taxes Receipts Tax Receipts Receipts Receipts Receipts
2008-09 27645.66 7153.77 34799.43 3158.99 43290.68 9466.32 52757.00
2009-10 30578.61 7359.97 37938.58 3333.80 49155.70 13012.46 62168.16
2010-11 38473.13 9506.30 47979.43 3358.28 58206.23 12215.64 70421.86
2011-12 46476.01 11074.99 57551.00 4086.86 69806.27 15317.53 85123.80
2012-13 53753.56 12647.14 66400.70 3966.11 78176.22 16878.51 95054.73
2013-14 62603.54 13808.27 76411.81 4031.89 89542.52 19533.42 109075.94
2014-15 70180.30 14654.14 84834.44 4688.24 104142.13 21994.02 126136.15
2015-16 75566.45 23967.07 99533.52 5355.04 118817.31 22337.72 141155.03
2016-17 82956.21 28759.86 111716.07 5794.53 133213.79 32405.92 165619.71
2017-18 93376.34 31751.98 125128.32 6476.53 146999.63 35384.55 182384.18
2018-19(RE) 106312.41 36215.29 142527.70 7287.08 165896.95 43239.58 209136.53
2019-20(BE) 118992.98 39806.26 158799.24 8055.41 181862.96 45776.84 227639.80
RE=Revised Estimates, BE=Budget Estimates
Source : Annual Financial Statements-2019-20, Finance Department GoK., Economic Survey 2018-19,Planning Department, GoK

Appendix 3.3 Trends in developmental and non-developmental expenditure in Karnataka


(Rs. Crores)
Developmental Non-Developmental
Developmental Non-Developmental Aggregate
Year Expenditure as % of Expenditure as % of
Expenditure Expenditure Expenditure
Total Expenditure Total Expenditure
2008-09 37133.30 69.79 16072.05 30.21 53205.35
2009-10 44923.87 72.55 16993.52 27.44 61917.39
2010-11 51626.38 72.74 19344.94 27.26 70971.32
2011-12 60929.69 72.14 23533.97 27.86 84463.66
2012-13 68067.53 71.66 26922.26 28.34 94989.79
2013-14 76328.45 69.99 32729.25 30.01 109057.70
2014-15 88904.73 70.44 37312.82 29.56 126217.55
2015-16 100440.69 71.12 40794.06 28.88 141234.75
2016-17 123989.38 74.94 41455.39 25.06 165444.77
2017-18 136285.13 73.09 50177.82 26.91 186462.95
2018-19(RE) 154957.43 71.29 62419.40 28.71 217376.83
2019-20(BE) 165826.18 70.84 68266.77 29.16 234092.95
RE=Revised Estimates, BE=Budget Estimates
Source : Annual Financial Statements-2019-20, Finance Department GoK.
Economic Survey 2018-19, Planning Department, GoK

A-20 Economic Survey of Karnataka 2019-20


Appendix 3.4 Developmental and non-developmental expenditure, Karnataka 2017-18 to 2019-20 revenue,
capital and loans
(Rs. Crore)
2017-18 (Accounts)
Category of Expenditure
Revenue Capital Loan Total
I. Developmental Expenditure (A+B) 101508.13 29689.31 5087.70 136285.14

A. Economic Services of which 42855.78 21012.56 3909.91 67778.24

1 Agriculture & Allied Activities 14521.28 1258.97 3405.67 19185.92

2 Rural Development 5209.49 5209.49

3 Special Areas Program 506.38 506.38

4 Irrigation & Flood Control& Power 11248.05 11218.83 12.95 22479.83

5 Industries & Minerals 1254.48 732.83 489.29 2476.60

6 Transport & Communications 4969.53 7378.51 12348.04

7 Science & Technology 95.81 95.81

8 General Economic Services 5050.76 423.41 2.00 5476.17

B. Social Services of which 58652.35 8676.76 1177.79 68506.90

1 Education, Sports and art & Culture 21306.81 1143.12 22449.92

2 Health & Water Supply 11740.52 1675.94 341.51 13757.97

3 Housing & Urban Development 6956.00 2582.40 826.28 10364.67

4 Information & Publicity 355.19 33.29 388.48

5 Social Security & Social Welfare 14713.61 3158.58 17872.19

6 Labour & Employment 566.56 566.56

7 Nutrition 1376.42 1376.42

8 Natural Calamities 1245.09 1245.09

9 Other Social Services 357.77 83.43 10.00 451.20

10 Sec Social Services 34.39 34.39

II. Non-Developmental Expenditure(a+b+c) 40974.20 977.45 8273.68 50225.33

a. Revenue Expenditure under General Services 34484.44 34484.44

1 Organs of State 1150.81 1150.81

2 Fiscal Services 1170.19 1170.19

3 Interest Payment & Servicing of Debt 13929.58 13929.58

4 Administrative Services 6416.57 6416.57

2 Pensions & Misc. General Services 11817.28 11817.28

b. Devolution to ULBs 6489.76 6489.76

c. Capital Expenditure 977.45 8273.68 9251.13

1 General Services 977.45 977.45

2 Discharge of Internal Debt (Net) 7039.49 7039.49

3 Repayment of loans to Government of India 1182.17 1182.17


Loans and Advance to Govt. Servant & Miscellaneous 4.52 4.52
4
loans
5 Market borrowings and ways & means 47.50 47.50

Consolidated Fund of Expenditure : (I + II) 142482.33 30666.76 13361.38 186510.47

Economic Survey of Karnataka 2019-20 A-21


Appendix 3.4 (Contd..) Developmental and non-developmental expenditure, Karnataka 2017-18 to 2019-20
revenue, capital and loans
(Rs. Crore)
2018-19 (RE)
Category of Expenditure
Revenue Capital Loan Total

I. Developmental Expenditure (A+B) 115280.09 35052.46 4624.87 154957.43

A. Economic Services of which 45732.90 25921.77 3296.63 74951.29

1 Agriculture & Allied Activities 17866.05 1886.33 2869.77 22622.15

2 Rural Development 6917.80 6917.80

3 Special Areas Program 306.48 306.48

4 Irrigation & Flood Control& Power 12237.81 12872.75 25110.56

5 Industries & Minerals 1196.90 1258.37 426.36 2881.63

6 Transport & Communications 3626.91 9469.89 13096.80

7 Science & Technology 92.54 92.54

8 General Economic Services 3488.40 434.43 0.50 3923.33

B. Social Services of which 69547.20 9130.69 1328.24 80006.13

1 Education, Sports and art & Culture 25086.97 1189.48 26276.45

2 Health & Water Supply 11799.30 2774.54 350.00 14923.84

3 Housing & Urban Development 5472.78 1991.61 973.24 8437.63

4 Information & Publicity 177.97 47.30 225.27

5 Social Security & Social Welfare 23204.53 3093.55 5.00 26303.09

6 Labour & Employment 643.09 643.09

7 Nutrition 2155.84 2155.84

8 Natural Calamities 795.38 795.38

9 Other Social Services 171.08 34.21 205.29

10 Sec Social Services 40.26 40.26

II. Non-Developmental Expenditure(a+b+c) 50422.80 868.47 11202.30 62493.57

a. Revenue Expenditure under General Services 44511.07 44511.07

1 Organs of State 2151.94 2151.94

2 Fiscal Services 1305.17 1305.17

3 Interest Payment & Servicing of Debt 15945.98 15945.98

4 Administrative Services 7470.10 7470.10

2 Pensions & Misc. General Services 17637.88 17637.88

b. Devolution to ULBs 5911.73 5911.73

c. Capital Expenditure 868.47 11202.30 12070.77

1 General Services 868.47 868.47

2 Discharge of Internal Debt (Net) 9667.24 9667.24

3 Repayment of loans to Government of India 1441.29 1441.29


Loans and Advance to Govt. Servant & Miscellaneous 19.60 19.60
4
loans
5 Market borrowings and ways & means 74.17 74.17

Consolidated Fund of Expenditure : (I + II) 165702.89 35920.93 15827.17 217450.99

A-22 Economic Survey of Karnataka 2019-20


Appendix 3.4 (Contd..) Developmental and non-developmental expenditure, Karnataka 2017-18 to 2019-20
revenue, capital and loans
(Rs. Crore)
2019-20(BE)
Category of Expenditure
Revenue Capital Loan Total

I. Developmental Expenditure (A+B) 124257.22 39089.26 2479.71 165826.19

A. Economic Services of which 52906.81 26780.47 412.50 80099.78

1 Agriculture & Allied Activities 21608.94 2560.70 10.00 24179.64

2 Rural Development 7776.21 7776.21

3 Special Areas Program 303.73 303.73

4 Irrigation & Flood Control & Power 14830.17 14072.56 28902.73

5 Industries & Minerals 1493.01 968.11 402.00 2863.12

6 Transport & Communications 3773.51 8705.58 12479.10

7 Science & Technology 75.05 75.05

8 General Economic Services 3046.18 473.52 0.50 3520.19

B. Social Services of which 71350.41 12308.79 2067.21 85726.42

1 Education, Sports and art & Culture 26522.30 1420.63 27942.93

2 Health & Water Supply 11018.06 3539.34 1157.00 15714.39

3 Housing & Urban Development 4881.21 4267.86 905.21 10054.29

4 Information & Publicity 154.46 5.00 159.46

5 Social Security & Social Welfare 25176.66 2948.67 5.00 28130.33

6 Labour & Employment 655.81 655.81

7 Nutrition 2150.42 2150.42

8 Natural Calamities 556.37 556.37

9 Other Social Services 188.95 127.29 316.24

10 Sec Social Services 46.17 46.17

II. Non-Developmental Expenditure(a+b+c) 57347.77 990.87 9988.12 68326.76

a. Revenue Expenditure under General Services 50491.61 50491.61

1 Organs of State 1825.57 1825.57

2 Fiscal Services 1645.55 1645.55

3 Interest Payment & Servicing of Debt 19410.31 19410.31

4 Administrative Services 8239.21 8239.21

2 Pensions & Misc. General Services 19370.98 19370.98

b. Devolution to ULBs 6856.16 6856.16

c. Capital Expenditure 990.87 9988.12 10978.99

1 General Services 990.87 990.87

2 Discharge of Internal Debt (Net) 8386.45 8386.45

3 Repayment of loans to Government of India 1517.91 1517.91


Loans and Advance to Govt. Servant & Miscellaneous 23.76 23.76
4
loans
5 Market borrowings and ways & means 60.00 60.00

Consolidated Fund of Expenditure : (I + II) 181605.00 40080.13 12467.83 234152.96


Source : 1. Annual Financial Statement 209-20,Finance Department, GoK
2. Volume I of Budget Documents 2019-20, Finance Department, GoK

Economic Survey of Karnataka 2019-20 A-23


Appendix 3.5 Developmental outlays by Major sectors and programmes
(Rs.Crore)

2014-15 2015-16 2016-17 2017-18 2018-19 2019-20


Sectors
(Accts) (Accts) (Accts) (Accts) (RE) (BE)
I
Economic Services
Agriculture & Allied
1 Activities (Including Co- 11644.62 12238.02 13416.95 15780.25 19752.38 24169.64
operation)
2
Rural Development 4988.13 5222.36 5546.74 5209.49 6917.80 7776.21

3 Special Area Programme 147.8 558.33 456.57 506.38 306.48 303.73

Irrigation and Flood 11085.19


4 8964.66 8262.47 13064.27 15040.50 16633.13
Control

5 Energy 6746.48 9169.87 9237.01 9402.61 10070.06 12269.60

6 Industry and Minerals 1260.39 1808.7 1665.70 1987.31 2455.27 2461.12

7 Transport 8378.47 8951.16 12467.79 12348.04 13096.80 12479.09

Science, Technology & 78.83


8 82.55 88.05 95.81 92.54 75.05
Environment
General Economic 6659.79
9 2581.14 1954.85 5474.17 3922.83 3519.70
Services
Total - I: Economic 60614.57
44794.24 48253.81 63868.33 71654.66 79687.27
Services

II Social Services

Education, Sports, Art &


10 18380.02 19442.34 21192.51 22449.93 26276.45 27942.93
Culture

11 Health 5848.53 5829.44 6882.88 8116.94 9856.28 9693.12

12 Water Supply, Housing & Urban Development

12a Water Supply 2623.25 3159.16 4751.90 5299.52 4717.56 4864.27

12b Housing 2118.96 3978.64 3882.17 4431.71 3190.65 2780.79

12c (c) Urban Development 868.28 1875.98 4412.71 5106.69 4273.74 6368.28

13 Information and Publicity 83.2 91.46 152.56 388.48 225.27 159.46

Welfare of SCs, STs,


14 6363.92 7576.61 9023.05 11539.40 11541.17 11114.18
OBCs & Minorities

15 Labour & Labour Welfare 380.54 579.63 496.01 566.56 643.09 655.81

Social Security & 7301.65


16 5923.86 6780.41 7709.21 16912.76 19161.57
welfare(incl. Nutrition)
Relief on Account of
17 740.52 2084.15 3037.26 1245.09 795.38 556.37
Natural Calamities

18 Other Social Services 185.19 191.96 280.39 441.20 205.29 316.24

Secretariat Social 33.00


19 30.87 31.1 34.39 40.26 46.17
Services
Total - II: Social
43547.14 51620.88 61446.09 67329.12 78677.90 83659.19
Services

III General Services 28883.73 31790.69 32324.94 35461.89 45379.54 51482.48

Grant-in-aid and 5685.58


IV 6011.46 6076.04 6489.76 5911.73 6856.16
Contribution

V Public Debt 4812.23 4110.19 7420.24 8269.16 11182.70 9964.36

VI Loans and Advances 576.15 656.4 1934.38 5092.22 4644.47 2503.47

Total : State Budget 128624.95 142508.01 169425.80 186510.48 217451.00 234152.93

Accts: Accounts, RE: Revised Estimates, BE: Budget Estimates


Source : Annual Financial Statements-2019-20, Finance Department GoK.
Economic Survey 2018-19, Planning Department, GoK

A-24 Economic Survey of Karnataka 2019-20


Appendix 3.6 Expenditure on annual plans, centrally sponsored & central plan schemes : irrigation
projects pending approval and western ghats development for 2003-04 to 2019-20
(Rs. Crore)
Centrally Total
Irrigation
Sponsored &
Projects Western Ghats
Year State Plan Central Plan Per Capita
Pending Development Outlay
Schemes (GOI) Outlay(Rs.)
Approval
Share
2003-04 8619.45 737.56 82.02 15.43 9454.46 1732.27
2004-05 11888.72 766.32 7.83 16.50 12679.37 2296.99

2005-06 12678.29 941.53 3.44 13.81 13637.07 2413.64


2006-07 18308.69 1122.53 3.55 14.89 19449.66 3406.25

2007-08 17226.91 1487.05 928.51 23.01 19665.48 3402.33


2008-09 22576.74 1829.19 317.30 31.49 24754.72 4238.82
2009-10 26944.10 1477.68 540.83 26.30 28988.91 4921.72
2010-11 31154.44 1572.35 560.72 28.82 33316.33 5452.75

2011-12 38450.00 1620.50 429.35 31.02 40530.87 6537.24


2012-13 39764.00 3208.00 276.79 32.10 43280.89 6980.79

2013-14 48038.88 4234.16 264.39 31.83 52569.26 8357.59


2014-15 61844.28 1142.99 101.69 2.43 63091.39 9888.93
2015-16 71951.14 769.15 102.37 6.12 72828.78 11239.01
2016-17 87588.49 796.01 192.57 4.84 88577.06# 13400.46
2017-18 186510.46 11617.25 349.61 4.46 186510.46## 27795.90
2018-19(RE) 217450.99 11857.86 1158.06 3.00 217450.99## 31931.13
2019-20(BE) 234152.95 10099.76 1023.57 234152.95## 33837.13
* State Budget. RE: Revised Estimates, BE: Budget Estimates
#Does not include Western Ghats as it is already included in State Plan
## State Budget includes all other items
Note: Per Capita is calculated based on projected population of 2017, 2018 and 2019
Source: (i) Economic Survey 2018-19, Planning Department, GoK
(ii) Budget Documents 2019-20, Finance Department, GoK

Appendix 3.7 Expenditure in Karnataka by Economic Classification of the budget 2003-04 to 2019-20
(Rs. Crore)
Final Outlays Transfers Payments Financial
Investments
Govt’s Gross Acquisition and Loans Total
Year Current Capital
Consumption Capital of Fixed Total Total to the Rest Expenditure
Transfers Transfers of the
Expenditure Formation Assets
Economy
2003-04 5818.99 2107.48 1.28 7927.75 13302.34 164.49 13466.83 2713.95 24108.53
2004-05 5512.64 3380.89 -0.06 8893.47 15320.36 146.71 15467.07 3258.99 27619.53
2005-06 6724.23 3815.51 -0.12 10539.62 18208.83 33.53 18242.36 3414.12 32196.10

2006-07 8499.05 5822.44 -0.21 14321.28 20923.85 234.30 21158.15 5364.81 40844.24

2007-08 7676.82 6400.08 -244.41 13832.49 25374.63 654.42 26029.05 4176.83 44038.37

2008-09 9714.64 8441.81 -180.56 17975.89 22760.72 475.35 28236.07 4196.17 50408.13
2009-10 10218.46 9570.80 -67.46 19721.80 30747.02 509.49 31256.51 5854.19 56832.50

2010-11 11810.47 11416.37 -66.57 23160.27 35627.21 193.96 35821.17 7258.61 66240.05

2011-12 14705.97 13036.50 -81.13 27661.34 31925.53 185.59 32111.12 7064.97 66837.43
2012-13 18759.46 13849.88 -27.06 32582.28 39582.93 936.67 40519.60 6086.81 79188.69
2013-14 22942.50 15629.56 -80.56 38491.5 46131.35 856.39 46987.74 6662.55 92141.79
2014-15 27392.68 19080.00 -1.9 46470.78 51911.51 1269.36 53180.87 7543.98 107195.63

2015-16 30438.44 22379.52 -348.67 52469.29 51668.30 2043.24 53711.54 9345.55 115526.38
2016-17 32469.36 27667.44 -3.01 60133.79 66830.70 1679.48 68510.18 11630.93 140274.90
2017-18 38135.73 31872.64 84.12 70092.49 86983.43 1590.00 88573.43 16111.16 174777.08

2018-19(RE) 45160.02 33007.42 -76.42 78091.02 106508.62 1306.09 107814.71 18103.34 204009.07

2019-20(BE) 46900.83 34361.93 -80.93 81181.83 122924.76 1354.59 124279.35 18231.17 223692.35

RE: Revised Estimates, BE: Budget Estimates


Source (i)An Economic-cum-Purpose Classification of the Karnataka Government Budget –2019-20, and earlier Issues, Directorate of
Economics & Statistics
(ii) Economic Survey 2018-19, Planning Department, GoK

Economic Survey of Karnataka 2019-20 A-25


Appendix 3.8 Capital formation by the Government of Karnataka 2003-04 to 2018-19

A-26
(Rs. Crore)
Value of Assets Created by
Departmental Gross Capital
Year Government Total Changes in Stock
Commercial Formation
Administration
Undertakings
2003-04 1641.49 445.99 2107.48 1.40 2108.83
2004-05 835.30 2545.19 3380.49 -2.80 3377.69
2005-06 889.69 2959.23 3851.46 2.54 3851.46
2006-07 922.80 5133.73 6056.53 16.22 6072.75
2007-08 1012.93 5797.16 6810.09 -4.45 6805.64
2008-09 1318.61 7417.99 8736.60 -8.09 8728.51
2009-10 2048.07 7964.76 10012.83 -0.93 10011.90
2010-11 9392.06 2151.70 11543.76 -4.57 11539.19
2011-12 2519.58 10518.28 13037.86 -1.36 13036.50
2012-13 2463.90 11386.77 13850.67 -0.79 13849.88
2013-14 2723.03 12906.70 15629.73 -0.17 15629.56
2014-15 3572.64 15507.42 19080.06 -0.06 19080.00
2015-16 2865.08 19514.53 22379.61 -0.09 22379.52
2016-17 2719.33 24948.11 27667.44 0.00 27667.44
2017-18 3823.03 28049.65 31872.68 -0.04 31872.64
2018-19(RE) 3598.11 29409.31 33007.42 0.00 33007.42
2019-20(BE) 3149.68 31212.25 34361.93 0.00 34361.93
RE: Revised Estimates, BE: Budget Estimates
Source : (i) Reports on An Economic-cum-Purpose Classification of the Karnataka Government Budget –2019-20 and earlier Issues,
Directorate of Economics and Statistics.
(ii) Economic Survey 2018-19, Planning Department, GoK

Economic Survey of Karnataka 2019-20


Appendix 5.1 Districtwise Houseless Rural households as per Socio Economic Caste Census - 2011 (SECC)
Housesless
Total Grass/
District Plastic/ Mud/Unbu Stone not packed Houseless
Households Thatch/ Wood Rented TOTAL
Polythene rnt bricks with mortar families
Bamboo
Bagalkot 240555 14073 1169 6804 8995 70342 16552 157 118092
Bangalore 269172 1157 761 21906 662 2343 131825 299 158953
Bangalore Rural 158426 694 399 30525 834 3665 19145 108 55370
Belgaum 735630 50395 6052 183795 17785 134607 45088 589 438311
Bellary 290257 12690 1111 39163 5878 46686 23378 113 129019
Bidar 240566 6986 4109 29087 6302 69929 5661 32 122106
Bijapur 292629 16812 1570 6865 4596 90761 17802 130 138536
Chamarajanagar 203466 5089 782 71801 5164 6815 6431 24 96106
Chikkaballapura 218901 4106 471 25362 758 8306 10270 272 49545
Chikkamagalur 206997 1404 734 72968 2214 9838 11373 229 98760
Chitradurga 282921 16074 753 50912 2861 35019 12856 194 118669

Economic Survey of Karnataka 2019-20


Dakshina Kannada 276202 864 640 111652 1723 34867 13689 130 163565
Davanagere 278261 6496 1210 77185 2873 27397 15082 147 130390
Dharwad 160538 3445 310 73979 3867 17297 7713 76 106687
Gadag 134976 10129 776 40580 1821 27310 9563 47 90226
Kalaburagi 314651 15479 2797 22758 4845 105350 14990 79 166298
Hassan 348175 1558 907 170573 2519 20784 15877 156 212374
Haveri 257562 12914 1717 108016 2404 41592 14458 115 181216
Kodagu 114715 1001 664 49189 618 2956 11690 180 66298
Kolar 226042 2272 733 41107 2363 9557 9574 164 65770
Koppal 222255 10460 1991 43626 4572 46549 17394 72 124664
Mandya 351462 3191 808 104609 1961 30530 15165 288 156552
Mysore 416354 4014 2334 186903 3369 5441 19598 72 221731
Raichur 267156 52385 6316 51539 4623 39501 12080 151 166595
Ramanagara 195562 2675 2095 49476 1219 4998 13440 59 73962
Shimoga 257688 8929 1221 107671 3660 8087 13241 121 142930
Tumkur 488277 15032 1541 88452 4419 35681 24581 376 170082
Udupi 200232 738 453 52429 798 16673 8501 161 79753
Uttara Kannada 240456 6042 370 81820 2553 27108 11015 54 128962
Yadgir 158580 13702 2324 15334 2194 48551 7817 128 90050

A-27
Grand Total 8048664 300806 47118 2016086 108450 1028540 555849 4723 4061572
Appendix 5.2 Districtwise/yearwise Houses Constructed under Basava vasathi yojane from 2016-17 to 2019-20
2016-17 2017-18 2018-19 Total 2019-20

A-28
Sl. No District Name Completed
Target Completed Target completed Target Completed Target Completed Target Upto Nov
2019
1 2 3 4 5 6 7 8 9 10 11 12
1 Bagalkot 5518 4133 6161 4621 5408 4513 17087 13267 1848 1922
2 Ballari 5882 4925 6315 3384 3583 2720 15780 11029 2174 1582
3 Belagavi 11938 11882 13063 9222 15702 18897 40703 40001 3540 5022
4 Bengaluru Rural 2714 2211 2687 2887 2612 2857 8013 7955 753 707
5 Bengaluru Urban 2532 2017 3114 3001 2224 2026 7870 7044 693 443
6 Bidar 3005 2826 5264 4057 4713 4212 12982 11095 1558 1646
7 Chamarajanagar 3821 3169 3985 2359 3741 3402 11547 8930 1372 1449
8 Chikkaballapur 5630 3408 5037 2861 5239 3229 15906 9498 1575 914
9 Chikkamagaluru 4003 2823 3913 3372 3304 2877 11220 9072 1095 874
10 Chitradurga 4989 3997 5745 3715 4711 3725 15445 11437 1872 1599
11 DakshinaKannada 3980 3951 4718 5002 4175 3986 12873 12939 1231 1269
12 Davanagere 8068 5312 7108 4409 6257 4179 21433 13900 2345 1851
13 Dharwad 2305 2815 3300 3023 3013 2923 8618 8761 1014 1774
14 Gadag 4427 3506 4211 3225 3762 3007 12400 9738 1093 1095
15 Hassan 6830 5020 7981 5907 6886 7112 21697 18039 2220 2409
16 Haveri 5864 4259 7288 4928 6038 5073 19190 14260 2066 2500
17 Kalaburagi 4833 4242 8494 5954 6893 6359 20220 16555 2185 2005
18 Kodagu 1675 1161 2023 1882 1701 1447 5399 4490 457 438
19 Kolar 5224 4531 6346 4688 4024 3670 15594 12889 1782 1804
20 Koppal 2377 3299 5073 2946 4164 3662 11614 9907 1580 1881
21 Mandya 5273 4775 5673 6349 7593 7773 18539 18897 1803 2219
22 Mysuru 6564 6255 8990 6601 10816 7730 26370 20586 2872 2602
23 Raichur 6521 4701 7013 4305 5224 4315 18758 13321 1840 1312
24 Ramanagara 4567 3444 4929 3686 5351 5265 14847 12395 1347 1305
25 Shivamogga 5359 4183 5359 4236 6042 4427 16760 12846 1778 1493
26 Tumakuru 7645 7075 7969 5887 8740 9267 24354 22229 2673 4377
27 Udupi 2377 2425 2888 2830 2844 2718 8109 7973 862 590
28 UttaraKannada 3533 3584 4639 3549 4642 4143 12814 11276 1311 1779
29 Vijayapura 4998 4937 6357 5649 7891 8059 19246 18645 2154 2697

Economic Survey of Karnataka 2019-20


30 Yadgiri 2548 2669 4357 3436 2707 3552 9612 9657 907 1144
Total 145000 123535 170000 127971 160000 147125 475000 398631 50000 52702
Appendix 5.3 Districtwise/yearwise Houses Constructed (Rural) under Dr.B.R.Ambedkar Nivas Scheme from 2016-17 to 2019-20
2016-17 2017-18 2018-19 Total 2019-20
Sl. No District Name Completed
Target Completed Target Completed Target Completed Target Completed Target Upto Nov
2019
1 2 3 4 5 6 7 8 9 10 11 12
1 Bagalkot 1202 442 2152 2176 2733 1400 6087 4018 993 553
2 Ballari 2305 554 4358 4505 3460 1881 10123 6940 947 705
3 Belagavi 3449 896 6623 8559 7767 5114 17839 14569 2368 1219
4 Bengaluru Rural 693 196 1318 1432 1702 1056 3713 2684 416 315
5 Bengaluru Urban 740 514 1623 1504 1819 721 4182 2739 329 209
6 Bidar 1858 338 3651 5177 6108 3327 11617 8842 2794 1735
7 Chamarajanagar 1539 555 2988 3151 2575 1391 7102 5097 704 469
8 Chikkaballapur 1032 248 1991 1924 4163 1278 7186 3450 2076 616
9 Chikkamagaluru 1142 144 2234 1682 1752 694 5128 2520 366 227
10 Chitradurga 2229 504 4427 5380 5206 2181 11862 8065 2031 1166

Economic Survey of Karnataka 2019-20


11 DakshinaKannada 1263 197 1749 1019 844 401 3856 1617 188 110
12 Davanagere 2314 665 4365 4355 5109 2117 11788 7137 2047 1063
13 Dharwad 662 66 1321 1677 1158 669 3141 2412 330 291
14 Gadag 970 202 1845 1971 3334 1263 6149 3436 1435 744
15 Hassan 2373 485 4189 3542 4424 1789 10986 5816 1095 573
16 Haveri 2119 422 3984 3489 3988 2036 10091 5947 1117 742
17 Kalaburagi 2206 236 4099 5395 9203 6954 15508 12585 3589 2597
18 Kodagu 789 182 1253 754 393 225 2435 1161 149 65
19 Kolar 2627 1948 3961 4766 2570 1677 9158 8391 1028 463
20 Koppal 1521 678 2804 3884 3056 2106 7381 6668 1271 1037
21 Mandya 1053 234 1747 1429 2109 686 4909 2349 578 289
22 Mysuru 3267 725 6507 6070 5605 2769 15379 9564 1417 787
23 Raichur 2625 513 5389 6153 5765 4362 13779 11028 1983 1471
24 Ramanagara 962 196 1823 1227 1482 664 4267 2087 298 197
25 Shivamogga 1383 250 2827 1895 2106 868 6316 3013 426 241
26 Tumakuru 1835 768 3998 4330 5370 2343 11203 7441 1677 1172
27 Udupi 552 80 669 324 448 209 1669 613 85 41
28 UttaraKannada 542 62 961 734 830 424 2333 1220 250 174
29 Vijayapura 1339 335 2406 3374 4975 5532 8720 9241 2320 1620
30 Yadgiri 1409 178 2738 3782 1946 2746 6093 6706 693 872

A-29
Total 48000 12813 90000 95660 102000 58883 240000 167356 35000 21763
Appendix 5.4 Districtwise/yearwise Houses Constructed under PMAY(G) from 2016-17 to 2019-20
2016-17 2017-18 2018-19 Total 2019-20

A-30
Sl. Completed
District Name
No Target completed Target Completed Target Completed Target completed Target Upto Nov-
2019
1 2 3 4 5 6 7 8 9 10 11 12
1 Bagalkot 4227 3176 2133 1432 934 1187 7294 5795 1336 232
2 Ballari 7818 5701 4187 2956 1702 1954 13707 10611 2276 657
3 Belagavi 8093 7671 8061 5701 4725 6283 20879 19655 3245 1095
4 Bengaluru Rural 2111 1457 1005 754 205 356 3321 2567 383 76
5 Bengaluru Urban 2061 1325 427 320 43 113 2531 1758 239 25
6 Bidar 5900 5271 2477 2651 789 1568 9166 9490 948 294
7 Chamarajanagar 3318 2487 3981 2743 3583 3603 10882 8833 2160 919
8 Chikkaballapur 4279 2931 3087 2263 1402 1525 8768 6719 1567 338
9 Chikkamagaluru 2517 1883 1075 1006 58 275 3650 3164 446 46
10 Chitradurga 6357 5068 4825 3383 3565 3195 14747 11646 2970 981
11 DakshinaKannada 2076 1931 698 750 34 238 2808 2919 216 24
12 Davanagere 4794 3985 2333 1731 857 988 7984 6704 1362 292
13 Dharwad 1592 1808 1538 1271 978 1327 4108 4406 664 231
14 Gadag 1887 1698 2374 1700 1317 1388 5578 4786 1100 349
15 Hassan 3784 2914 2111 1626 360 737 6255 5277 835 116
16 Haveri 3414 3158 3818 2641 1831 1914 9063 7713 1733 535
17 Kalaburagi 4936 4042 3325 3103 1231 2551 9492 9696 1451 415
18 Kodagu 1074 896 546 269 18 87 1638 1252 171 28
19 Kolar 4062 3018 2703 2271 1041 1413 7806 6702 1317 336
20 Koppal 2443 3413 3218 2279 1146 1570 6807 7262 1571 413
21 Mandya 2165 2053 1612 1437 383 415 4160 3905 525 71
22 Mysuru 5314 5128 5757 3946 3617 3475 14688 12549 2642 894
23 Raichur 9615 7061 8166 6129 6364 8350 24145 21540 5666 1977
24 Ramanagara 1642 1212 1553 1004 542 711 3737 2927 550 112
25 Shivamogga 3112 2190 1863 1279 380 611 5355 4080 793 132
26 Tumakuru 5225 4934 4210 3040 2327 2668 11762 10642 1810 733
27 Udupi 962 853 369 403 28 139 1359 1395 148 14
28 UttaraKannada 1635 1364 851 654 208 343 2694 2361 341 87
29 Vijayapura 4015 4080 2290 1719 845 1373 7150 7172 1478 264
30 Yadgiri 4572 3322 4407 4229 3487 5779 12466 13330 2057 1249

Economic Survey of Karnataka 2019-20


Total 115000 96030 85000 64690 44000 56136 244000 216856 42000 12935
Appendix 5.5 Districtwise/yearwise Houses Constructed (Rural) under Devaraj Urs Housing Scheme from 2016-17 to 2019-20
2016-17 2017-18 2018-19 Total 2019-20
Sl. Completed
District Name
No Target Completed Target Completed Target Completed Target completed Target Upto Nov
2019
1 2 3 4 5 6 7 8 9 10 11 12
1 Bagalkot 287 261 64 125 168 150 519 536 135 94
2 Ballari 1402 1230 446 601 509 200 2357 2031 179 61
3 Belagavi 1781 3330 3338 4216 2012 1190 7131 8736 768 374
4 BengaluruRural 2113 1384 1358 1047 1612 495 5083 2926 283 120
5 BengaluruUrban 88 16 94 9 110 8 292 33 6 5
6 Bidar 832 546 329 139 431 105 1592 790 211 75
7 Chamarajanagar 764 607 401 291 297 103 1462 1001 81 21
8 Chikkaballapur 562 570 237 191 229 150 1028 911 86 43
9 Chikkamagaluru 194 127 79 88 75 29 348 244 15 9
10 Chitradurga 818 729 500 629 649 363 1967 1721 221 184

Economic Survey of Karnataka 2019-20


11 DakshinaKannada 17 3 5 14 4 2 26 19 1 2
12 Davanagere 224 294 595 458 400 145 1219 897 101 66
13 Dharwad 16 36 16 42 34 34 66 112 28 42
14 Gadag 118 39 65 59 71 55 254 153 37 30
15 Hassan 684 499 309 363 408 187 1401 1049 74 45
16 Haveri 1534 1250 923 619 737 370 3194 2239 178 158
17 Kalaburagi 304 457 2165 2835 1066 901 3535 4193 221 180
18 Kodagu 3 -4 4 19 6 15 13 30 3 2
19 Kolar 42 40 38 58 25 41 105 139 7 13
20 Koppal 92 80 148 203 136 110 376 393 58 81
21 Mandya 20 9 14 30 49 53 83 92 50 64
22 Mysuru 306 385 765 681 394 203 1465 1269 82 52
23 Raichur 384 230 477 436 486 302 1347 968 138 80
24 Ramanagara 302 282 334 198 246 162 882 642 62 44
25 Shivamogga 21 12 5 15 13 12 39 39 4 2
26 Tumakuru 965 1278 1669 1580 1013 705 3647 3563 238 156
27 Udupi 225 172 81 68 229 126 535 366 48 29
28 UttaraKannada 24 29 56 63 56 48 136 140 40 55
29 Vijayapura 148 200 368 409 414 385 930 994 110 143
30 Yadgiri 178 92 117 148 121 134 416 374 35 54

A-31
Total 14448 14183 15000 15634 12000 6783 41448 36600 3500 2284
Appendix 5.6 Rural Housesites distributed from 2016-17 to 2019-20
2016-17 2017-18 2018-19 Total 2019-20
Sites

A-32
Sl.
District Sites Sites Sites Sites Distributed
No. Target Target Target Target Target
Distributed Distributed Distributed Distributed Upto Nov
2019
1 2 3 4 5 6 7 8 9 10 11 12
1 Bagalkot 330 135 327 47 156 0 813 182 156 0
2 Ballari 324 0 332 0 154 0 810 0 182 0
3 Belagavi 877 0 890 0 525 0 2292 0 525 0
4 Bengaluru Rural 147 89 157 287 81 162 385 538 81 190
5 Bengaluru Urban 203 0 205 145 104 154 512 299 104 0
6 Bidar 289 0 298 60 136 0 723 60 136 0
7 Chamarajanagar 223 103 220 0 100 47 543 150 100 0
8 Chikkaballapura 231 211 243 91 114 1631 588 1933 114 345
9 Chikkamagaluru 376 356 381 516 212 0 969 872 212 0
10 Chitradurga 297 80 301 1544 140 164 738 1788 140 0
11 DakshinaKannada 404 982 403 293 226 247 1033 1522 226 98
12 Davanagere 397 258 396 817 209 10 1002 1085 181 2
13 Dharwad 219 0 224 227 113 1 556 228 113 67
14 Gadag 173 212 182 1260 91 133 446 1605 91 199
15 Hassan 451 1 434 0 211 0 1096 1 211 0
16 Haveri 366 106 356 89 165 0 887 195 165 0
17 Kalaburagi 456 137 438 0 210 0 1104 137 210 0
18 Kodagu 174 763 166 0 79 0 419 763 79 0
19 Kolar 228 0 251 0 117 0 596 0 117 173
20 Koppal 277 459 258 432 127 0 662 891 127 0
21 Mandya 388 139 378 78 184 209 950 426 184 7
22 Mysuru 450 122 437 112 208 0 1095 234 208 18
23 Raichur 299 277 295 320 135 0 729 597 135 0
24 Ramanagara 204 522 211 854 105 4 520 1380 105 63
25 Shivamogga 478 136 451 140 212 141 1141 417 212 58
26 Tumakuru 524 42 530 1276 247 34 1301 1352 247 95
27 Udupi 263 1072 273 216 159 40 695 1328 159 13
28 UttaraKannada 348 0 393 0 169 0 910 0 169 0
29 Vijayapura 377 0 362 84 204 25 943 109 204 0

Economic Survey of Karnataka 2019-20


30 Yadgiri 227 0 208 159 107 0 542 159 107 0
Grand Total 10000 6202 10000 9047 5000 3002 25000 18251 5000 1328
Appendix 6.1 District- wise Urbanisation in Karnataka 2011
Sl.
Districts % of Urbanisation
No
1 Bagalkote 32
2 Bangaluru 91
3 Bangaluru (Rural) 27
4 Belagavi 25
5 Ballari 38
6 Bidar 25
7 Vijayapura 23
8 Chamarajanagar 17
9 Chikkaballapura 22
10 Chikkmagaluru 21
11 Chitradurga 20
12 Dakshina Kannada 48
13 Davanagere 32
14 Dharawad 57
15 Gadag 36
16 Kalaburgi 33
17 Hassan 21
18 Haveri 22
19 Kodagu 15
20 Kolar 31
21 Koppal 17
22 Mandya 17
23 Mysuru 41
24 Raichur 25
25 Ramanagara 25
26 Shivamogga 36
27 Tumkuru 22
28 Udupi 28
29 Uttara Kannada 29
30 Yadagiri 19
Karnataka 39
Source : 2011 Census

Economic Survey of Karnataka 2019-20 A-33


Annexure 6.2 Vajapayee Urban Housing Scheme - Financial yearwise achievement
Sl. 2016-17 2017-18 2018-19 Total 2019-20
District Name

A-34
No Target Completed Target Completed Target Completed Target Completed Target Completed *
1 Bagalkot 1573 967 1490 1270 2159 1212 5222 3449 302 359
2 Ballari 792 380 1729 1191 2092 780 4613 2351 418 396
3 Belagavi 1490 528 2332 1350 2633 1662 6455 3540 387 555
4 BengaluruRural 233 117 246 214 387 381 866 712 76 124
5 BengaluruUrban 20 3 69 6 401 37 490 46 19 24
6 Bidar 776 248 481 226 677 559 1934 1033 135 122
7 Chamarajanagar 392 221 433 290 560 355 1385 866 85 120
8 Chikkaballapur 1089 164 687 129 619 163 2395 456 141 126
9 Chikkamagaluru 328 68 258 62 397 102 983 232 46 56
10 Chitradurga 622 226 956 529 681 411 2259 1166 114 79
11 DakshinaKannada 359 223 349 340 587 458 1295 1021 81 124
12 Davanagere 799 442 785 425 1045 623 2629 1490 122 155
13 Dharwad 421 225 352 206 605 157 1378 588 106 125
14 Gadag 2251 555 2223 663 2074 739 6548 1957 364 178
15 Hassan 492 130 391 207 639 184 1522 521 68 62
16 Haveri 1313 401 1034 775 918 659 3265 1835 153 243
17 Kalaburagi 2615 1270 1567 621 1168 605 5350 2496 309 213
18 Kodagu 96 52 85 23 87 40 268 115 19 13
19 Kolar 146 108 137 90 369 142 652 340 71 103
20 Koppal 294 125 596 276 1083 477 1973 878 190 313
21 Mandya 767 227 420 116 292 150 1479 493 57 47
22 Mysuru 807 400 755 522 1233 889 2795 1811 225 303
23 Raichur 4230 842 3208 1631 1242 1082 8680 3555 498 231
24 Ramanagara 244 64 132 56 312 92 688 212 66 99
25 Shivamogga 729 383 705 484 1079 440 2513 1307 137 153
26 Tumakuru 456 259 444 213 675 270 1575 742 115 204
27 Udupi 43 28 177 184 336 184 556 396 51 90
28 UttaraKannada 145 128 694 262 778 461 1617 851 85 131
29 Vijayapura 1167 599 1504 1006 2019 1170 4690 2775 427 779
30 Yadgiri 311 135 761 504 853 501 1925 1140 133 178

Economic Survey of Karnataka 2019-20


Total 25000 9518 25000 13871 28000 14985 78000 38374 5000 5705
* Upto Nov-2019
Annexure 6.3 Devaraj Urs Housing Scheme - Financial year wise achievement
2016-17 2017-18 2018-19 Total 2019-20
Sl. No District Name
Target Completed Target Completed Target Completed Target Completed Target Completed *
1 Bagalkot 22 0 0 5 0 7 22 12 29 12
2 Ballari 168 2 0 3 0 6 168 11 46 3
3 Belagavi 15 1 0 3 0 9 15 13 90 30
4 BengaluruRural 0 0 0 4 0 3 0 7 7 1
5 BengaluruUrban 0 0 0 0 0 0 0 0 1 0
6 Bidar 61 1 0 0 0 1 61 2 12 0
7 Chamarajanagar 2 0 0 0 0 0 2 0 1 0
8 Chikkaballapur 2 0 0 2 0 3 2 5 1 0
9 Chikkamagaluru 0 0 0 1 0 3 0 4 15 19
10 Chitradurga 0 0 0 0 0 2 0 2 7 0
11 DakshinaKannada 2 0 0 2 0 1 2 3 1 0
12 Davanagere 1 0 0 1 0 3 1 4 37 3

Economic Survey of Karnataka 2019-20


13 Dharwad 4 1 0 2 0 0 4 3 5 1
14 Gadag 41 2 0 1 0 2 41 5 34 8
15 Hassan 0 0 0 0 0 1 0 1 7 0
16 Haveri 9 1 0 0 0 1 9 2 2 1
17 Kalaburagi 18 1 0 0 0 5 18 6 4 6
18 Kodagu 1 0 0 0 0 0 1 0 0 0
19 Kolar 0 0 0 2 0 0 0 2 1 0
20 Koppal 28 1 0 0 0 8 28 9 9 3
21 Mandya 1 1 0 0 0 0 1 1 0 0
22 Mysuru 8 1 0 1 0 3 8 5 12 8
23 Raichur 71 1 0 2 0 6 71 9 12 4
24 Ramanagara 1 1 0 0 0 0 1 1 0 0
25 Shivamogga 0 0 0 0 0 0 0 0 0
26 Tumakuru 15 1 0 0 0 6 15 7 12 5
27 Udupi 0 0 0 0 0 0 0 0 0 0
28 UttaraKannada 1 1 0 0 0 0 1 1 0 0
29 Vijayapura 18 6 0 1 0 114 18 121 134 124
30 Yadgiri 63 1 0 2 0 5 63 8 21 5
552 23 0 32 0 189 552 244 500 233

A-35
Total
* Upto Nov-2019
Annexure 6.4 Dr.B.R.Ambedkar Nivas Scheme Urban - Financial year wise achievement
Sl. 2016-17 2017-18 2018-19 Total 2019-20
District Name
No Target Completed Target Completed Target Completed Target Completed Target Completed*

A-36
1 Bagalkot 33 49 312 740 590 717 935 1506 283 198
2 Ballari 108 114 1039 2192 828 708 1975 3014 909 449
3 Belagavi 100 60 943 1826 805 970 1848 2856 438 293
4 Bengaluru Rural 20 49 166 431 209 196 395 676 136 59
5 Bengaluru Urban 899 5 4688 151 128 82 5715 238 83 23
6 Bidar 18 26 182 534 453 581 653 1141 269 185
7 Chamarajanagar 28 136 278 872 292 320 598 1328 201 98
8 Chikkaballapur 23 5 228 360 211 195 462 560 144 65
9 Chikkamagaluru 18 8 141 91 58 56 217 155 40 23
10 Chitradurga 40 45 424 526 413 266 877 837 310 55
11 DakshinaKannada 16 21 132 155 72 84 220 260 70 23
12 Davanagere 66 13 475 366 409 234 950 613 273 49
13 Dharwad 58 10 402 320 119 95 579 425 109 53
14 Gadag 20 93 373 278 321 161 714 532 219 37
15 Hassan 23 22 259 259 251 127 533 408 158 34
16 Haveri 25 31 259 462 188 184 472 677 114 40
17 Kalaburagi 43 32 443 558 439 433 925 1023 356 85
18 Kodagu 6 34 54 58 62 35 122 127 37 16
19 Kolar 81 6 551 489 141 101 773 596 78 18
20 Koppal 28 10 290 547 457 456 775 1013 269 153
21 Mandya 21 13 150 111 89 55 260 179 49 21
22 Mysuru 89 13 900 1064 1082 811 2071 1888 748 264
23 Raichur 46 38 463 895 462 412 971 1345 333 98
24 Ramanagara 22 13 313 424 236 120 571 557 163 53
25 Shivamogga 49 7 370 266 282 147 701 420 173 29
26 Tumakuru 58 18 467 515 249 335 774 868 198 98
27 Udupi 2 2 30 71 16 14 48 87 22 8
28 UttaraKannada 13 0 148 138 157 141 318 279 87 34
29 Vijayapura 30 99 289 1356 721 1166 1040 2621 502 329
30 Yadgiri 17 1 231 444 260 403 508 848 229 115
2000 973 15000 16499 10000 9605 27000 27077 7000 3005

Economic Survey of Karnataka 2019-20


Total
Upto Nov-2019
Annexure 6.5 Vajpayee Urban House Sites Scheme
2016-17 2017-18 2018-19 Total 2019-20
Sl.
District Sites Sites Sites Sites
No. Target Target Target Target Target Completed *
Distributed Distributed Distributed Distributed
1 Bagalkot 465 1063 0 2483 0 390 465 3936 0 0
2 Ballari 492 231 0 154 0 257 492 642 0 0
3 Belagavi 752 60 0 140 0 130 752 330 0 0
4 Bengaluru Rural 202 0 0 450 0 0 202 450 0 0
5 Bengaluru Urban 599 118 0 373 0 0 599 491 0 12
6 Bidar 278 0 0 0 0 0 278 0 0 0
7 Chamarajanagar 233 0 0 422 0 1 233 423 0 0
8 Chikkaballapura 278 0 0 62 0 213 278 275 0 72
9 Chikkamagaluru 211 0 0 18 0 0 211 18 0 0
10 Chitradurga 201 68 0 98 0 0 201 166 0 0
11 DakshinaKannada 334 0 0 0 0 100 334 100 0 2

Economic Survey of Karnataka 2019-20


12 Davanagere 373 4031 0 44 0 2 373 4077 0 29
13 Dharwad 684 0 0 730 0 0 684 730 0 466
14 Gadag 238 989 0 789 0 0 238 1778 0 0
15 Hassan 248 0 0 257 0 23 248 280 0 12
16 Haveri 323 0 0 0 0 0 323 0 0 0
17 Kalaburagi 458 0 0 113 0 0 458 113 0 0
18 Kodagu 121 0 0 0 0 0 121 0 0 0
19 Kolar 296 0 0 566 0 54 296 620 0 0
20 Koppal 288 439 0 185 0 0 288 624 0 0
21 Mandya 221 0 0 0 0 36 221 36 0 0
22 Mysuru 348 0 0 0 0 0 348 0 0 0
23 Raichur 336 0 0 1096 0 0 336 1096 0 350
24 Ramanagara 247 0 0 742 0 0 247 742 0 0
25 Shivamogga 351 50 0 1049 0 122 351 1221 0 19
26 Tumakuru 331 100 0 118 0 101 331 319 0 42
27 Udupi 182 60 0 0 0 0 182 60 0 0
28 UttaraKannada 397 0 0 0 0 0 397 0 0 0
29 Vijayapura 287 0 0 186 0 63 287 249 0 186

A-37
30 Yadgiri 226 42 0 106 0 24 226 172 0 13
Grand Total 10000 7251 0 10181 0 1516 10000 18948 0 1203
Upto Nov-2019
Appendix 7.1(a) Statement showing District-wise & Month-wise Normal and Actual Rainfall with percentage Departure from normal from January to May 2019

Pre Monsoon 2019

A-38
January 2019 February 2019 March 2019 April 2019 May 2019
(1st March to 31st May)
Region /Districts

Normal Actual % Normal Actual % Normal Actual % Normal Actual % Normal Actual % Normal Actual %
(mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP
South Interior Karnataka 1.8 4.2 133 3.5 6.3 81 8 1 -89 41 34 -17 96 85 -12 145 120 -17
BENGALURU URBAN 2.1 1.8 -12 7.3 5.9 -20 9 0 -99 38 40 7 105 134 27 151 174 15
BENGALURU RURAL 1.5 3.5 133 5.1 5.5 7 7 0 -97 35 35 1 92 119 29 133 154 16
RAMANAGARA 0.9 5.1 467 4.8 3.0 -38 10 1 -94 48 44 -7 120 93 -23 177 138 -22
KOLARA 2.7 12.2 353 4.8 7.1 48 10 0 -97 29 50 71 76 78 3 116 128 11
CHIKKABALLAPURA 2.2 9.2 319 4.6 3.9 -16 8 0 -100 27 26 -1 69 63 -7 103 90 -13
TUMAKURU 2.1 2.3 9 3.2 9.6 200 7 0 -94 33 24 -28 87 73 -15 127 98 -23
CHITRADURGA 1.2 4.5 278 1.2 7.6 533 4 1 -79 26 12 -52 67 57 -15 97 70 -28
DAVANAGERE 0.9 0.3 -69 1.0 3.0 202 4 2 -52 36 18 -51 75 34 -55 115 53 -54
CHAMARAJANAGARA 2.3 8.5 268 5.7 1.9 -67 13 3 -79 67 57 -15 142 132 -7 222 192 -13
MYSURU 2.1 1.3 -37 4.5 9.4 108 13 1 -91 62 59 -5 128 118 -8 203 178 -12
MANDYA 2.0 1.1 -46 4.6 7.1 54 9 0 -96 50 35 -29 119 104 -12 177 139 -21
North Interior Karnataka 2.1 0.5 -75 1.8 0.2 -89 5 3 -48 25 17 -34 55 19 -66 85 38 -55
BALLARI 1.3 0.9 -29 1.3 1.6 22 3 1 -53 25 15 -41 65 27 -59 93 43 -54
KOPPALA 1.0 1.8 84 0.5 0.3 -36 3 0 -88 23 23 2 55 20 -63 80 44 -45
RAICHUR 1.5 0.7 -54 1.5 0.1 -97 4 1 -88 19 8 -55 42 19 -54 64 28 -56
KALABURAGI 4.1 0.6 -86 3.6 0.1 -98 7 3 -58 19 12 -36 38 13 -66 64 28 -56
YADGIR 4.0 0.1 -98 2.8 0.0 -100 5 1 -85 20 15 -27 37 19 -50 62 34 -45
BIDAR 5.9 0.9 -84 6.1 0.1 -98 11 0 -96 20 11 -45 31 7 -78 62 18 -70
BELAGAVI 0.8 0.2 -81 0.6 0.1 -78 5 5 -2 28 11 -63 72 15 -79 106 31 -71
BAGALKOTE 1.3 0.2 -86 1.4 0.1 -96 4 1 -71 23 14 -41 56 22 -61 84 37 -56
VIJAYAPURA 2.5 0.2 -94 2.7 0.0 -100 5 1 -72 20 21 3 46 16 -65 70 38 -46
GADAG 1.1 0.3 -72 1.3 0.2 -86 4 3 -32 34 22 -34 72 31 -57 110 56 -49
HAVERI 0.3 0.3 -13 0.5 0.2 -56 4 5 27 43 22 -49 80 20 -74 126 47 -63
DHARWADA 1.9 0.2 -91 2.9 0.0 -99 7 10 42 44 53 18 85 34 -60 136 96 -29
Malnad 2.0 0.3 -84 2.0 3.6 81 11 4 -66 56 39 -31 112 46 -58 178 89 -50
SHIVAMOGGA 0.7 0.6 -16 0.7 0.9 23 6 3 -52 40 23 -42 100 6 -94 145 32 -78
HASSAN 2.2 0.2 -90 2.7 4.2 55 11 3 -70 55 33 -40 106 75 -30 171 111 -35
CHIKKAMAGALURU 1.7 0.2 -86 2.4 5.4 123 12 3 -72 58 41 -29 105 55 -47 176 100 -43
KODAGU 3.3 0.3 -90 4.0 5.4 34 20 7 -64 87 78 -11 156 68 -56 263 153 -42
Coastal 1.0 0.7 -26 0.1 0.6 480 5 4 -16 31 23 -23 135 17 -87 170 45 -74
DAKSHINA KANNADA 2.5 0.3 -88 0.7 0.9 23 10 1 -89 50 41 -18 169 43 -75 229 85 -63
UDUPI 1.0 0.3 -75 0.4 0.2 -53 4 1 -71 28 16 -44 168 11 -93 200 29 -86
UTTARA KANNADA 0.3 1.1 257 0.1 0.6 490 3 6 135 22 18 -20 107 7 -93 132 31 -76
STATE 1.7 1.7 -1 2.5 2.6 3 7 2 -66 35 26 -26 83 43 -49 125 71 -43

Economic Survey of Karnataka 2019-20


Source: KSNDMC, Bengaluru.
Appendix 7.1(b) Statement showing District-wise & Month-wise Normal and Actual Rainfall with percentage Departure from normal during Southwest monsoon 2019

South West Monsoon 2019


June 2019 July 2019 August 2019 September 2019 (1st June to 30th
September)
Region /Districts
Normal Actual % Normal Actual % Normal Actual % Normal Actual % Normal Actual %
(mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP
South Interior Karnataka 64 67 4 85 55 -36 85.5 146 71 136 143 5 375 411 10
BENGALURU URBAN 71 59 -18 95 53 -44 120 136 13 174 137 -21 460 384 -16
BENGALURU RURAL 68 104 54 91 49 -46 115 103 -10 167 154 -8 441 411 -7
RAMANAGARA 70 69 -1 81 54 -33 101 145 44 178 164 -8 430 433 1
KOLARA 63 66 4 76 46 -40 94 98 4 154 142 -8 387 351 -9
CHIKKABALLAPURA 63 84 35 86 58 -32 100 65 -35 150 159 6 399 366 -8
TUMAKURU 62 84 36 70 43 -39 81 103 28 148 159 7 361 389 8
CHITRADURGA 50 62 25 57 47 -18 60 98 62 109 154 42 276 361 31
DAVANAGERE 76 60 -21 116 89 -23 91 196 116 109 123 12 398 467 17
CHAMARAJANAGARA 52 45 -14 56 38 -33 66 174 166 131 125 -4 305 382 25
MYSURU 89 59 -34 124 81 -34 80 302 277 102 120 17 395 562 42
MANDYA 54 54 0 53 44 -17 63 161 156 134 130 -3 304 389 28

Economic Survey of Karnataka 2019-20


North Interior Karnataka 101 91 -10 148 116 -22 125.6 161 28 142 140 -2 525 508 -3
BALLARI 69 64 -8 79 65 -18 85 92 8 129 166 28 366 387 6
KOPPALA 73 70 -4 72 69 -5 87 75 -13 145 138 -5 376 352 -6
RAICHUR 81 61 -25 103 75 -28 115 50 -57 151 191 26 450 376 -16
KALABURAGI 113 97 -14 152 91 -40 161 138 -14 189 155 -18 614 481 -22
YADGIR 111 86 -22 148 121 -18 158 96 -39 176 141 -20 592 444 -25
BIDAR 128 91 -29 187 98 -47 196 175 -11 174 146 -16 684 510 -25
BELAGAVI 138 131 -5 223 256 15 137 384 181 115 135 17 612 906 48
BAGALKOTE 78 104 34 72 70 -4 70 69 -1 130 120 -8 350 364 4
VIJAYAPURA 93 90 -4 90 60 -34 90 41 -55 155 122 -21 428 312 -27
GADAG 86 79 -8 76 91 20 82 133 62 138 98 -29 382 401 5
HAVERI 111 73 -34 165 164 -1 109 324 198 100 91 -8 485 652 35
DHARWADA 114 117 3 157 198 26 105 364 247 122 124 2 498 804 61
Malnad 358 203 -43 598 446 -25 382.0 844 121 165 345 109 1504 1839 22
SHIVAMOGGA 450 250 -44 781 653 -16 478 1011 112 180 396 120 1889 2310 22
HASSAN 144 125 -13 248 205 -17 159 499 214 124 219 77 673 1048 56
CHIKKAMAGALURU 302 186 -38 537 364 -32 355 768 116 155 321 107 1349 1639 22
KODAGU 622 267 -57 905 562 -38 598 1205 102 220 492 124 2345 2526 8
Coastal 813 525 -35 1156 1185 3 760.0 1384 82 290 646 123 3019 3740 24
DAKSHINA KANNADA 940 425 -55 1281 927 -28 895 1291 44 325 691 112 3441 3334 -3
UDUPI 1127 634 -44 1457 1437 -1 1048 1569 50 439 825 88 4071 4466 10
UTTARA KANNADA 646 536 -17 992 1218 23 597 1362 128 222 562 154 2457 3678 50
STATE 195 142 -27 280 247 -12 206 370 80 159 219 38 839 977 16

A-39
Source: KSNDMC, Bengaluru.
Appendix 7.1(c) Statement showing District-wise & Month-wise Normal and Actual Rainfall with percentage Departure from normal during Northeast monsoon 2019

North East Monsoon 2019


October 2019 November 2019 December - 2019
(1st Oct. to 31st Dec.)

A-40
Region /Districts
Normal Actual % Normal Actual % Normal Actual % Normal Actual %
(mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP (mm) (mm) DEP
South Interior Karnataka 147 237 61 50 33 -34 14 17 21 212 287 36
BENGALURU URBAN 160 231 45 57 24 -59 17 10 -38 234 265 14
BENGALURU RURAL 161 247 53 54 18 -66 14 13 -7 229 278 21
RAMANAGARA 169 232 37 53 59 10 16 9 -43 238 299 26
KOLARA 151 164 9 62 21 -66 23 21 -10 236 206 -13
CHIKKABALLAPURA 155 217 40 53 20 -61 15 15 0 222 252 14
TUMAKURU 147 238 62 47 26 -44 10 21 110 204 286 40
CHITRADURGA 117 285 143 34 23 -34 9 27 214 160 335 109
DAVANAGERE 120 288 140 44 28 -37 8 10 20 172 326 89
CHAMARAJANAGARA 166 244 47 67 50 -26 24 21 -12 257 316 23
MYSURU 146 187 28 51 52 3 14 14 -4 211 253 20
MANDYA 165 238 44 51 42 -17 17 10 -42 233 290 24
North Interior Karnataka 111 177 59 29 20 -31 7 4 -44 148 201 36
BALLARI 110 208 90 33 16 -52 10 9 -11 154 234 52
KOPPALA 108 207 92 27 11 -58 8 4 -48 142 223 56
RAICHUR 114 98 -14 23 6 -73 6 2 -58 143 107 -25
KALABURAGI 101 131 30 21 11 -48 5 4 -25 127 145 15
YADGIR 121 68 -44 23 11 -52 6 2 -69 150 81 -46
BIDAR 91 113 24 19 29 54 6 2 -74 116 144 24
BELAGAVI 116 245 110 31 26 -16 6 5 -21 153 275 80
BAGALKOTE 111 183 64 26 27 6 7 3 -54 144 213 48
VIJAYAPURA 110 140 27 25 28 15 6 2 -65 141 170 21
GADAG 121 206 71 34 31 -8 8 4 -47 162 241 49
HAVERI 118 278 135 43 16 -62 7 2 -66 168 297 77
DHARWADA 114 288 153 39 37 -4 6 4 -43 159 329 107
Malnad 161 319 98 55 31 -43 13 26 108 228 376 65
SHIVAMOGGA 146 343 135 46 24 -48 10 10 4 202 377 87
HASSAN 159 248 56 54 27 -49 12 31 148 225 306 36
CHIKKAMAGALURU 159 366 131 56 36 -37 13 36 173 228 438 92
KODAGU 201 304 51 70 44 -38 18 35 100 288 383 33
Coastal 187 512 174 61 56 -8 13 12 -9 261 580 122
DAKSHINA KANNADA 261 510 95 89 101 13 16 26 60 367 638 74
UDUPI 213 623 193 70 64 -8 16 18 15 299 705 136
UTTARA KANNADA 143 474 231 44 32 -27 10 3 -72 198 509 157

Economic Survey of Karnataka 2019-20


STATE 136 247 82 41 29 -30 10 12 14 188 288 54
Source: KSNDMC, Bengaluru.
Appendix 7.1(d) Statement showing Number of District/Taluks/Hoblies under different rainfall category from January to May 2019
Cumulative Rainfall
Pattern
January February March April May
Category (1st Jan.- 31st May
2019)
Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli
Excess 8 42 157 13 53 196 3 23 65 1 15 96 2 9 52 0 3 34
Normal 4 12 24 2 12 44 1 8 32 11 42 171 7 37 154 6 35 146
Deficit 4 14 57 5 17 79 5 25 94 17 92 317 9 54 242 17 81 325
Scanty 14 99 353 10 78 261 21 116 455 1 27 163 12 76 298 7 57 242
Nil Rainfall 0 9 156 0 16 166 0 4 101 0 0 0 0 0 1 0 0 0

Statement showing Number of District/Taluks/Hoblies under different rainfall category during Southwest monsoon period 2019
South west Monsoon 2019

Economic Survey of Karnataka 2019-20


June July August September Rainfall
Category (1st June To 30th Sept.)
Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli
Excess 5 41 160 3 20 85 18 114 454 10 63 295 11 70 290
Normal 14 59 254 11 62 207 8 27 116 16 82 295 15 84 331
Deficit 11 71 294 16 93 401 4 29 137 4 31 157 4 22 126
Scanty 0 5 39 0 1 54 0 6 40 0 0 0 0 0 0
Nil Rainfall 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Statement showing Number of District/Taluks/Hoblies under different rainfall category during Northeast monsoon period 2019

North East Monsoon 2019


October November December
Category (1st Oct. to 31st Dec.)
Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli Dist. Taluk Hobli
Excess 27 142 576 1 19 93 7 49 223 24 124 485
Normal 2 29 130 10 38 125 8 27 104 4 44 197
Deficit 1 4 36 14 70 261 10 55 225 2 7 57
Scanty 0 1 5 5 49 268 5 45 193 0 1 8
Nil Rainfall 0 0 0 0 0 0 0 0 2 0 0 0

A-41
Source: KSNDMC, Bengaluru.
Appendix 7.2 Production of Principal Crops in Karnataka State 2018-19 & 2019-20
Unit: Lakh Tonnes, Cotton in Lakh bales
KHARIF RABI SUMMER ANNUAL
Crops
2018-19 2019-20 2018-19 2019-20 2018-19 2019-20 2018-19 2019-20
Rice 29.45 27.08 0.28 0.12 4.84 7.43 34.58 34.63
Jowar 1.57 2.02 7.71 6.09 0.03 0.11 9.31 8.22
Ragi 6.20 10.69 0.50 0.33 0.08 0.17 6.78 11.19
Maize 33.92 40.58 3.17 1.85 0.68 1.05 37.77 43.48
Bajra 1.75 2.73 - - 0.01 0.07 1.77 2.80
Wheat - - 1.63 1.43 - - 1.63 1.43
Minor Millets 0.16 0.28 - 0.005 - - 0.16 0.28
Total Cereals 73.05 83.38 13.29 9.82 5.64 8.83 92.00 102.03
Tur (Red gram) 9.47 8.65 - - - - 9.47 8.65
Bengal gram - - 5.75 6.18 - - 5.75 6.18
Horse gram 0.16 0.46 0.74 0.40 - - 0.90 0.86
Black gram 0.41 0.26 0.01 0.005 0.005 0.01 0.43 0.27
Green gram 1.41 0.87 0.01 0.002 0.0006 0.01 1.43 0.88
Avare 0.16 0.26 0.10 0.05 - 0.01 0.25 0.32
Cowpea 0.17 0.14 0.03 0.03 0.005 0.03 0.21 0.20
Other pulses 0.02 0.001 0.003 - - - 0.02 0.001
Total Pulses 11.80 10.64 6.64 6.67 0.0106 0.06 18.46 17.37
Total Food grains 84.85 94.02 19.93 16.49 5.651 8.89 110.46 119.40
Groundnut 2.72 3.25 0.06 1.05 1.19 1.80 3.97 6.10
Sesamum 0.16 0.17 - - - - 0.16 0.17
Sunflower 0.81 0.61 0.24 0.26 0.02 0.26 1.08 1.13
Castor 0.02 0.04 - - - - 0.02 0.04
Niger seed 0.002 0.01 - - - - 0.002 0.01
Mustard 0.01 0.002 - - - - 0.01 0.002
Soyabean 2.57 3.14 - - - - 2.57 3.14
Safflower - - 0.10 0.13 - - 0.10 0.13
Linseed - - 0.003 0.004 - - 0.003 0.004
Total Oilseeds 6.29 7.22 0.40 1.44 1.21 2.06 7.92 10.73
Cotton 13.98 14.53 0.02 0.20 - 0.02 14.00 14.75
Sugarcane (Harvested) 424.11 396.00 - - - - 424.11 396.00
Tobacco 0.52 0.77 - - - - 0.52 0.77
Source: 2018-19 Final Estimates by DE&S, 2019-20 2nd Advance Estimates of DE&S.

Appendix 7.3 Area of Principal Crops in Karnataka State 2018-19 & 2019-20 Unit: Area in Lakh Hectares
KHARIF RABI SUMMER ANNUAL
Crops
2018-19 2019-20 2018-19 2019-20 2018-19 2019-20 2018-19 2019-20
Rice 10.37 9.50 0.11 0.05 1.51 2.30 11.99 11.85
Jowar 1.14 1.25 8.77 6.75 0.02 0.06 9.94 8.06
Ragi 5.15 6.25 0.36 0.24 0.04 0.10 5.55 6.59
Maize 12.96 12.75 0.94 0.60 0.20 0.32 14.09 13.67
Bajra 1.93 2.50 - - 0.01 0.07 1.94 2.57
Wheat - - 1.58 1.25 - - 1.58 1.25
Minor Millets 0.19 0.45 - 0.01 - - 0.19 0.46
Total Cereals 31.74 32.70 11.76 8.90 1.78 2.85 45.28 44.45
Tur (Red gram) 15.61 13.00 - - - - 15.61 13.00
Bengal gram - - 11.88 10.00 - - 11.88 10.00
Horse gram 0.38 0.75 1.47 0.85 - - 1.84 1.60
Black gram 0.85 0.65 0.03 0.01 0.01 0.02 0.90 0.68
Green gram 4.37 3.05 0.06 0.01 0.002 0.03 4.43 3.09
Avare 0.26 0.45 0.13 0.08 - 0.01 0.38 0.54
Cowpea 0.46 0.50 0.12 0.10 0.04 0.13 0.62 0.73
Other pulses 0.03 0.01 0.01 - - - 0.04 0.01
Total Pulses 21.96 18.41 13.70 11.05 0.052 0.19 35.70 29.65
Total Food grains 53.70 51.11 25.46 19.95 1.832 3.04 80.98 74.10
Groundnut 3.98 3.80 0.03 0.85 1.41 1.72 5.41 6.37
Sesamum 0.25 0.23 - - - - 0.25 0.23
Sunflower 0.95 0.85 0.46 0.60 0.03 0.30 1.45 1.75
Castor 0.03 0.05 - - - - 0.03 0.05
Niger seed 0.01 0.04 - - - - 0.01 0.04
Mustard 0.03 0.01 - - - - 0.03 0.01
Soyabean 2.62 3.00 - - - - 2.62 3.00
Safflower - - 0.17 0.20 - - 0.17 0.20
Linseed - - 0.02 0.02 - - 0.02 0.02
Total Oilseeds 7.87 7.98 0.68 1.67 1.44 2.02 9.99 11.67
Cotton 7.14 6.50 0.05 0.20 - 0.01 7.18 6.71
Sugarcane (Harvested) 4.96 - - 4.96
6.00 0.43 0.41 6.84
Sugarcane (Planted) 2.11 0.65 0.22 2.98
Tobacco 0.64 0.90 - - - - 0.64 0.90
Source: 2018-19 Final Estimates by DE&S, 2019-20 2nd Advance Estimates of DE&S.

A-42 Economic Survey of Karnataka 2019-20


Appendix 7.4 Index numbers of Area, Production and Yield of Agricultural Crops

Base Triennium ending 2007-08 = 100


2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
Sl.
Crops
No.
Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield

1 Total Cereals 99.60 101.96 102.59 101.52 97.37 96.15 100.97 123.02 122.13 94.81 107.47 113.63 93.25 92.87 99.84 93.36 115.34 123.84

2 Total Pulses 93.77 96.84 103.22 111.32 109.41 98.18 125.31 152.18 121.26 103.25 102.24 99.02 101.68 129.89 127.61 112.11 176.30 157.13

3 Total Foodgrains 97.90 101.49 103.88 104.39 98.48 94.56 108.08 125.70 116.51 97.28 106.99 110.23 95.72 96.27 100.78 98.84 120.94 122.59

4 Total Oilseeds 87.20 79.23 90.91 80.12 69.39 86.52 64.96 84.27 129.70 56.58 68.15 120.37 55.72 61.77 110.84 56.73 86.47 152.38

5 Cotton 102.91 135.50 131.91 114.94 115.80 100.85 137.63 188.87 137.39 143.35 197.50 138.12 125.06 184.96 147.99 166.50 278.32 167.36

Sugarcane
6 105.80 105.02 99.64 126.66 139.73 110.58 164.47 182.97 111.68 162.37 170.82 105.45 160.11 154.46 96.35 158.27 169.40 107.30
(Harvested)
Sugarcane
7 88.14 79.15 102.75 106.48 110.75 123.52
(Planted)

Economic Survey of Karnataka 2019-20


8 Tobacco 102.02 104.24 101.45 111.48 172.60 153.60 117.93 259.96 218.08 108.08 199.18 182.90 100.45 124.48 123.07 102.64 166.67 161.19

2014-15 2015-16 2016-17 2017-18 2018-19


Sl.
Crops
No.
Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield Area Prodn. Yield

1 Total Cereals 90.38 112.00 124.25 83.57 83.72 100.43 81.23 79.87 98.57 85.73 120.04 140.38 83.95 92.34 110.28

2 Total Pulses 104.27 134.99 129.23 126.98 100.64 79.09 133.17 202.56 151.89 135.77 219.51 161.54 160.28 183.21 114.13

3 Total Foodgrains 94.44 114.11 121.07 96.25 85.27 88.80 96.41 91.14 94.75 100.36 129.17 129.01 106.26 100.68 94.95

4 Total Oilseeds 55.03 69.35 126.04 51.61 54.34 105.18 51.76 62.07 119.82 44.00 98.62 224.09 39.99 61.03 152.56

5 Cotton 220.57 373.23 169.55 161.50 182.05 112.91 128.32 168.17 131.55 137.63 302.84 220.34 180.66 229.92 127.53

Sugarcane
6 180.74 189.73 105.11 169.21 157.16 93.07 149.42 118.49 79.93 150.55 162.13 108.39 186.68 183.55 98.54
(Harvested)
Sugarcane
7 104.06 75.41 44.95 65.70 147.21
(Planted)

8 Tobacco 88.95 124.97 139.38 79.14 132.30 165.93 84.91 123.34 145.45 89.63 168.88 186.60 60.38 98.67 164.03

Source: Directorate of Economics & Statistics, Bengaluru.

A-43
Appendix 7.5 Area under Principal Crops in Karnataka
Unit: Lakh Hectares
CROP 2016-17 2017-18 2018-19
Rice 10.34 9.93 11.99
Jowar 9.48 10.88 9.94
Ragi 5.98 7.78 5.55
Maize 13.70 13.07 14.09
Bajra 2.42 2.31 1.94
Wheat 1.68 1.93 1.58
Minor millets 0.21 0.34 0.19
Total cereals and Minor Millets 43.81 46.24 45.28
Tur 12.14 8.85 15.61
Total pulses 29.66 30.24 35.70
Total food grains 73.47 76.48 80.98
Groundnut 6.66 5.64 5.41
Total oilseeds 12.93 10.99 9.99
Cotton 5.10 5.47 7.18
Sugarcane 3.97+0.91 4.00+1.33 4.96+2.98
Tobacco 0.90 0.95 0.64
Areca nut (processed) 2.55 2.79 4.76
Coconut 4.37 4.47 6.10
Dry chillies 1.28 1.00 1.58
Pepper 0.38 0.41 1.48
Cardamom 0.17 0.15 0.02
Source: Directorate of Economics & Statistics.

Appendix 7.6 Production of Principal Crops in Karnataka


(Unit: Lakh Tonnes, Cotton in Lakh bales of 170 Kg in Lint form)
Crop 2016-17 2017-18 2018-19
Rice 28.74 29.07 34.58
Jowar 8.46 12.64 9.31
Ragi 4.91 15.68 6.78
Maize 33.14 56.10 37.77
Bajra 2.55 3.67 1.77
Wheat 1.71 2.19 1.63
Minor millets 0.07 0.25 0.16
Total cereals and Minor Millets 79.58 119.60 92.00
Tur 12.12 8.40 9.47
Total pulses 20.41 22.12 18.46
Total food grains 99.99 141.72 110.46
Groundnut 4.19 6.37 3.97
Total oilseeds 8.05 12.79 7.92
Cotton 10.24 18.44 14.00
Sugarcane 273.78 374.61 424.11
Tobacco 0.65 0.89 0.52
Areca nut (processed) 5.17 6.06 8.51
Coconut (Million Nuts) 3.41 3.53 4.32
Dry chillies 2.60 1.91 1.95
Pepper (Lakh Quintals) 2.29 2.72 9.41
Cardamom 0.02 0.02 0.002
Source: Directorate of Economics & Statistics, Bengaluru.

A-44 Economic Survey of Karnataka 2019-20


Appendix 7.7 Average Yield of Selected Crops of India and Karnataka 2015-16, 2016-17, 2017-18 & 2018-19
Kg/Hectare.
2015-16 2016-17 2017-18 2018-19
Crop India Karnataka India Karnataka India Karnataka India Karnataka
Rice 2400 2912 2494 2924 2578 3082 3034
Ragi 1347 1698 1363 864 1649 2122 1285
Jowar 697 731 812 939 998 1223 987
Wheat 3034 745 3200 1073 3371 1193 1090
Maize 2563 2701 2689 2546 3032 4519 2821

Not finalized
Bajra 1132 635 1305 1111 1237 1670 957
Tur 646 364 913 1051 960 999 639
Bengal gram 840 393 974 622 1063 812 509
Groundnut 1465 777 1398 662 1868 1186 772
Sunflower 609 318 660 470 738 917 785
Soyabean 738 529 1177 786 1049 1611 1034
Cotton(lint) 415 309 512 360 477 603 349
Sugarcane* 70.72 85 69 73 79.65 99 90
* Tonnes per hectare.
India: Agricultural Statistics at a Glance-2017, 2018, MAFW, GoI., Karnataka: 2015-16 FRE, 2016-17 to 2018-19 Final Estimates of DE&S.
Source: Directorate of Economics and Statistics, Bengaluru.

Appendix 7.8 Area Irrigated by various sources in Karnataka State


Area 000’hectares
Total Irrigated Percentage of
Net Area irrigated Net area
Area Intensity of No. of Gross gross
Year irrigated
irrigated irrigation cropped irrigated area
Other per well
Wells* Net Gross cropping wells* ('000) area to gross
sources ** (ha.)
cropped area
1 2 3 4 5 6 7 8 9 10
2015-16 1775 1468 3243 3742 115.4 1324 1.3 12009 31.2
2016-17 1697 1407 3104 3548 114.3 1323 1.3 11779 30.1
2017-18 1414 1452 3155 3639 115.3 1391 1.2 11994 30.3
Note:* including bore wells, ** Including Canals, Tanks, Lift irrigation and Other sources.
Source: Directorate of Economics and Statistics, Bengaluru.

Appendix 7.9(a) Land use classification in Karnataka


Area ‘000 hectares
and other grazing land
Barren & Uncultivable

Area sown more than


cultivable waste land

Permanent pastures

Gross cropped area

Cropping Intensity
Geographical Area

Land put to non-

included under net


agriculture use

Miscellaneous tree

Current fallow

Net area sown


Other fallow
crops, groves not
Forest

once
land

Year

2015-16 19050 3073 1476 793 409 907 276 1453 656 10006 2002 12009 120.01
2016-17 19050 3073 1495 793 400 905 275 1561 692 9855 1924 11779 119.52
2017-18 19050 3073 1501 793 400 905 274 1521 686 9895 2098 11994 121.21
Source: Directorate of Economics and Statistics, Bengaluru.

Appendix 7.9(b) Land utilization Statistics


(Lakh hectares)
Classification 2015-16 2016-17 2017-18
Total Geographical Area 190.5 190.50 190.50
1. Forest 30.73 30.73 30.73
2.Not available for cultivation
a. Land put to non-agriculture use 14.76 14.95 15.01
b Barren and uncultivable land 7.93 7.93 7.93
3.Cultivable waste 4.09 4.00 4.00
4.Uncultivated land excluding fallow land
a. Permanent Pastures and other grazing land 9.07 9.05 9.05
b. Miscellaneous tree crops, groves not included under net area sown 2.76 2.75 2.74
5.Fallow land
a. Current fallow 14.53 15.61 15.21
b. Other fallow 6.56 6.92 6.86
6.Net area sown 100.06 98.55 98.95
7.Total cropped Area 120.09 117.79 119.94
8.Area sown more than once 20.02 19.24 20.98
Cropping Intensity (%) 120.01 119.52 121.21
Source: Directorate of Economics and Statistics, Bengaluru.

Economic Survey of Karnataka 2019-20 A-45


Appendix 7.10 Cropping Pattern in Karnataka
Area in Lakh Hectares
Year
Sl. No. Crops
2017-18 2018-19 2019-20 (P)
1 Rice 9.93 11.99 11.85
2 Jowar 10.88 9.94 8.06
3 Ragi 7.78 5.55 6.59
4 Maize 13.07 14.09 13.67
5 Bajra 2.31 1.94 2.57
6 Wheat 1.93 1.58 1.25
7 Minor Millets 0.34 0.19 0.46
Total Cereals: 46.24 45.28 44.45
1 Tur 8.85 15.61 13.00
2 Bengal gram 12.65 11.88 10.00
3 Horse gram 1.73 1.84 1.60
4 Black gram 1.36 0.90 0.68
5 Green gram 3.97 4.43 3.09
6 Avare 0.67 0.38 0.54
7 Cowpea 0.99 0.62 0.73
8 Other pulses 0.02 0.04 0.01
Total Pulses: 30.24 35.70 29.65
Total Food grains: 76.48 80.98 74.10
1 Groundnut 5.64 5.41 6.37
2 Sesamum 0.36 0.25 0.23
3 Sunflower 1.73 1.45 1.75
4 Castor 0.07 0.03 0.05
5 Niger 0.04 0.01 0.04
6 Mustard 0.02 0.03 0.01
7 Soyabean 2.77 2.62 3.00
8 Safflower 0.34 0.17 0.20
9 Linseed 0.02 0.02 0.02
Total Oilseeds: 10.99 9.99 11.67
Annual Crops:
1 Cotton 5.47 7.18 6.71
2 Sugarcane 5.33 7.94 6.84
3 Tobacco 0.95 0.64 0.90
Total of above 99.22 106.73 100.22
Source: 2017-18 & 2018-19 Final Estimates, 2019-20 - 2nd Advance Estimate of DE&S Bengaluru.

Appendix 7.11 Fertilizer Consumption and HYV/HB Coverage in Karnataka

Year Area under HYV/HB Fertilizer Consumption (Lakh Tonnes)


(Lakh hectares) Nitrogen Phosphorous Potash TOTAL
1970-71 5.30 0.92 0.37 0.24 1.53
1980-81 24.00 2.04 0.86 0.75 3.65
1990-91 31.56 4.12 2.56 1.65 8.33
2000-01 41.28 7.31 3.83 2.32 13.46
2001-02 39.34 6.71 3.60 2.18 12.49
2002-03 38.41 6.01 3.03 1.95 10.99
2003-04 38.74 4.93 2.40 1.86 9.19
2004-05 45.45 6.55 3.63 2.73 12.91
2005-06 47.99 7.54 4.35 3.35 15.24
2006-07 43.53 7.56 4.38 2.91 14.85
2007-08 48.52 7.92 3.93 3.43 15.28
2008-09 47.73 8.64 5.59 4.09 18.32
2009-10 49.06 9.63 6.30 4.66 20.59
2010-11 49.66 10.16 6.96 3.98 21.10
2011-12 46.84 11.04 7.87 3.33 22.24
2012-13 45.33 8.92 3.89 2.49 15.30
2013-14 46.43 9.63 4.91 3.01 17.55
2014-15 45.20 10.01 4.98 3.32 18.31
2015-16 41.49 9.81 5.31 2.66 17.78
2016-17 40.70# 8.76 5.10 2.41 16.27
2017-18 42.56# 8.78 4.59 2.58 15.95
2018-19 41.85# 9.36 5.36 3.07 17.79
2019-20 41.14 # 7.04 3.71 2.09 12.84 @
# Provisional, @ up to end of Nov.2019
Source: Department of Agriculture.

A-46 Economic Survey of Karnataka 2019-20


Appendix 7.12 MSP announced by GOI for the year 2019-20
(Minimum Support Price for different Kharif & Rabi Crops for the year 2019-20)
(Rs. per quintal)
Commodity 2019-20

KHARIF:

Paddy Common 1815

Paddy (F)Grade' A # 1835

Jowar-Hybrid 2550

Jowar-Maldandi 2570

Bajra 2000

Ragi 3150

Maize 1760

Tur (Arhar) 5800

Moong 7050

Urad 5700

Groundnut 5090

Sunflower Seed 5650

Soyabean 3710

Sesamum 6485

Niger seed 5940

Medium Staple Cotton (24.5-25.5 mm) 5255

Long Staple Cotton (29.5-30.5 mm) 5550

RABI

Wheat 1925

Barley 1525

Bengal Gram 4875

Rapeseed/Mustard 4425

Safflower 5215
Source: Agriculture Department. CACP Website

Economic Survey of Karnataka 2019-20 A-47


Appendix 7.13 Area and Production of Selected Fruit Crops
(Area in Hectares, Production in Metric Tonnes)
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Crops
Area Production Area Production Area Production Area Production Area Production Area Production

A-48
Mango 170308 1656191 173080 1641165 174032 1686209 181697 1725930 180593 1732281 183228 1760598
Banana 97823 2548223 101532 2581752 99610 2464233 96627 2367325 100670 2452011 92546 2329163
Citrus Fruits 15208 343660 17564 389797 18944 430918 18307 415657 18400 408218 18510 413805
Gauva 6395 116853 6558 139770 6542 129964 6612 128105 7024 137247 7183 140226
Sapota 28140 335331 29373 360805 28783 342634 28293 330502 25747 302658 25309 315378
Grapes 19764 292653 20353 391155 21733 417742 23350 445517 24431 458021 26614 524255
Pineapple 2662 154169 2452 153516 2471 156264 2477 155410 2705 164803 2623 163728
Pomogranate 16137 130270 18488 198676 23545 272816 27232 319338 26693 287537 25967 268228
Jack 4705 164586 5368 200748 5410 203221 5202 193470 5052 185755 5004 192735
Papaya 6379 448380 7225 504016 7295 511838 7394 507559 7963 528654 8751 590873
Ber 663 19014 638 18129 580 16423 476 12746 457 12180 641 17206
Fig 1262 8551 1247 14044 1444 15916 1516 11375 1453 12827 1580 13122
Seetaphal 1426 11931 1426 10976 1782 14756 1742 14451 1977 16220 1779 14608
Others 2230 23636 2052 21542 2087 22017 2027 20692 2160 23562 1994 21467
Total 373102 6253448 387356 6626091 394258 6684951 402952 6648077 405325 6721974 401729 6765392
Source : Department of Horticulture

Appendix 7.14 Financial progress achieved under NHM


(Rs.in lakhs)
Releases
Accrued Total available
Sl. No. Year Opening Balance GOI GOK Grants utilized Closing Balance
Total Interest Grants (3+6+7)
85% 15%
1 2 3 4 5 6 7 8 9 10
1 2005-06 - 4455.17 0 4455.17 - 4455.17 56.49 4398.68
2 2006-07 4398.68 8448.25 0 8448.25 75.76 12922.69 4450.59 8472.1
3 2007-08 8472.10 8571.04 1499.90 10070.94 413.43 18956.47 17064.13 1892.34
4 2008-09 1892.34 12536.90 1000.00 13536.88 218.49 15647.71 10953.65 4694.06
5 2009-10 4694.06 8001.67 1499.00 9500.67 228.47 14423.20 13117.09 1306.11
6 2010-11 1306.11 9325.00 2611.38 11936.38 168.00 13410.49 12522.02 888.47
7 2011-12 888.47 9970.85 1954.58 11925.43 246.36 13060.26 12574.46 485.8
8 2012-13 485.80 11303.80 2026.20 13330.01 246.31 14062.12 10556.14 3505.98
9 2013-14 4283.33 6974.00 1868.85 8842.85 - 13126.18 11351.18 1769.23
10 2014-15 1899.66 9608.13 1692.59 11300.72 13200.38 12400.02 800.15
GOI 60% GOK 40%
11 2015-16 1299.45 6769.29 4434.63 11203.92 12503.37 12176.52 326.9
12 2016-17 248.19 6717.00 4478.01 11195.01 99.13 11542.33 11300.36 241.97
13 2017-18 516.37 6850.00 4555.25 11936.19 14.57 12467.13 11687.97 779.16
14 2018-19 36.82 11558.00 7305.06 18899.88 17578.59 1321.29
15 2019-20 1321.29 4379.32 2919.55 7298.86 5685.74 1613.12
Total 32099.15 136064.52 44666.96 155100.40 2100.52 213746.96 176174.32 37572.67
*Programme and progress for 2019-20 up to the end of November– 2019 and out of total Opening Balance not released from the Government.

Economic Survey of Karnataka 2019-20


**2017-18 closing balance of Rs.779.16 out of which Rs.180.48 lakhs is treasury lapse and Rs.409.29 lakhs was not released by GOK
Appendix 7.15 Year wise Livestock Population
(in number)
Year Cattle Buffalo Sheep Goat Pig * Others Total livestock Poultry

1951 8815269 2565959 4192078 2676408 161889 134580 18546183 5705132

1956 8965693 2668713 4059473 2583995 185493 102851 18566218 7667845

1961 9673001 3025890 4764972 2894355 206513 103456 20668187 8840927

1966 9685581 2946027 4747964 2813682 207078 115160 20485462 8276797

1972 10018717 3036873 4662420 3726016 261125 82211 21965362 10163177

1977 10221960 3278128 4536481 3388139 296368 79128 21800204 9696012

1983 11300223 3647967 4791650 4546928 318862 1542755 26148385 12096535

1990 10175501 4037193 4727238 3888799 303969 1835301 24968021 15693580

Economic Survey of Karnataka 2019-20


1997 10831134 4367184 8003078 4874759 405444 2206468 30688067 21398756

2003 9595930 4023832 7272241 4491473 320433 2654625 28358534 24450809

2007 10507325 4329076 9565696 6157134 279763 2044257 32883251 42433692

2012 9516484 3470505 9583761 4796147 304798 1329089 29000784 53442030


%Variation over previous census
-9.43 -19.83 0.19 -22.10 8.95 -34.98 -11.81 25.94
(2007)
* Others includes Horse, Donkey, Mules, Camels, Domestic Dogs, Rabbits and Elephants

Appendix 7.16 Target and Estimate of Milk, Egg, Wool and Meat Production from 2017-18 to 2019-20

Milk (in’000 tonnes) Egg ( in lakhs) % of Wool (in tonnes) Meat (in tonnes)
% of % of % of
Sl.No. Year Achievements Target Production Achievements Target Production
Target Production Achievements Target Production Achievements
Production

1 2017-18 6892 7137 103.60 51172 55661 108.77 4392 4304 98.00 224000 228032 101.80

2 2018-19 7494 7901 105.43 58548 59994 102.47 3460 3058 88.38 246000 253604 103.09

3 2019-20 8308 2789 33.57 63121 21552 34.14 2035 643 31.60 274000 107186 39.11

A-49
* upto November.2019
Appendix 8.1 Trends in Irrigation in Karnataka Cumulative Potential Created
(Lakh hectares)
Major and
End of Plan/year Minor (surface) Total
Medium Projects
VII Plan (1985-1990)
1985-86 12.27 8.59 20.86
1986-87 12.75 8.65 21.40
1987-88 12.87 8.71 21.58
1988-89 12.97 8.82 21.79
1989-90 13.09 8.92 22.01
Annual Plan
1990-91 13.36 8.95 22.31
1991-92 13.80 9.00 22.80
VIII Plan
1992-93 14.25 9.06 23.31
1993-94 14.94 9.13 24.07
1994-95 15.28 9.18 24.46
1995-96 15.77 9.25 25.02
1996-97 16.13 9.30 25.43
IX Plan
1997-98 16.58 9.35 25.93
1998-99 16.93 9.38 26.31
1999-00 17.41 9.43 26.84
2000-01 18.12 9.51 27.63
2001-02 19.05 9.58 28.63
X Plan
2002-03 19.70 9.65 29.35
2003-04 20.38 9.71 30.09
2004-05 21.17 9.75 30.92
2005-06 21.97 9.82 31.79
2006-07 23.21 9.61 32.82
XI Plan
2007-08 23.64 9.69 33.33
2008-09 24.28 9.81 34.09
2009-10 24.56 9.87 34.43
2010-11 25.06 10.06 35.12
2011-12 25.56 10.28 35.84
XII Plan
2012-13 26.03 10.51 36.54
2013-14 26.97 10.89 37.86
2014-15 27.85 10.97 38.82
2015-16 28.68 11.31 38.82
2016-17 28.86 11.56 39.99
2017-18 28.97 11.81 40.42
2018-19 29.19 11.98 40.78
2019-20 * 29.64 12.07 41.17
*(Anticipated)

A-50 Economic Survey of Karnataka 2019-20


Appendix 9.1 Sector-wise Growth in Index of Industrial Production (IIP): 2007-08 to 2018-19
Base year: 2004-05
Sector Weight 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 CAGR**

119.90 128.77 117.02 118.29 44.98 36.42 53.05 57.94 69.38 78.11 79.52 84.2
Mining 69.83 -1.22
(17.81) (7.40) (-9.12) (1.09) (-61.97) (-26.85) (45.66) (9.22) (19.74) (12.59) (1.81) (5.89)
123.05 129.83 146.90 161.18 165.05 179.19 184.44 189.85 194.29 199.08 204.34 210.49
Manufacturing* 811.36 5.46
(7.77) (5.51) (13.15) (9.72) (2.40) (8.56) (2.92) (2.93) (2.34) (2.47) (2.64) (3.01)
126.24 126.33 146.27 147.96 170.85 180.59 201.34 205.19 196.14 180.52 184.24 205.10
Electricity 118.81 5.26
(6.64) (0.08) (15.79) (1.15) (15.47) (5.70) (11.49) (1.91) (-4.41) (-7.96) (2.06) (11.32)
123.18 129.28 145.08 156.62 157.35 169.38 177.49 182.46 185.79 188.43 193.24 201.03
General 1000.00 5.11
(7.93) (4.95) (12.22) (7.96) (0.47) (7.41) (4.79) (2.80) (1.83) (1.42) (2.55) (4.03)
* Provisional, **CARG = Compound Average Rate of Growth
Note: Figures in brackets are percentage growth compared to the previous year, Source: Directorate of Economics and Statistics

Appendix 9.2 Index of industrial production in the manufacturing sector in Karnataka by use-based groups : 2007-08 to 2018-19
Base year: 2004-05

Economic Survey of Karnataka 2019-20


Sl.
Industry Group Weight 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14* 2014-15* 2015-16* 2016-17* 2017-18* 2018-19* CAGR*
No
150.99 154.60 156.49 164.71 153.76 178.14 184.64 188.17 191.30 194.65 199.75 205.91
1 Basic goods 219.8377 5.29
(13.57) (2.39) (1.23) (5.25) (-6.64) (15.86) (3.65) (1.91) (1.66) (1.75) (2.62) (3.08)
120.75 113.69 131.29 137.93 192.03 194.69 200.95 204.37 209.69 215.04 220.44 226.38
2 Capital goods 132.8699 6.01
(6.60) (-5.85) (15.47) (5.06) (39.22) (1.39) (3.22) (1.70) (2.60) (2.55) (2.51) (2.69)

Intermediate 111.06 115.31 133.50 146.16 187.68 211.07 219.67 223.05 228.58 234.75 240.78 248.03
3 173.5747 6.70
goods (4.72) (3.83) (15.77) (9.48) (28.40) (12.46) (4.07) (1.54) (2.48) (2.70) (2.57) (3.01)

Consumer 122.39 131.45 150.12 165.59 147.40 153.37 155.13 164.17 168.54 173.34 178.18 183.76
4 285.0769 4.44
goods (7.88) (7.41) (14.20) (10.31) (-10.98) (4.05) (1.15) (5.83) (2.66) (2.85) (2.80) (3.13)

a) Consumer 119.90 143.37 146.16 155.69 183.85 116.51 120.36 122.14 124.29 127.04 130.11 133.76
37.4330 2.10
durables (7.65) (19.57) (1.94) (6.52) (18.08) (-36.63) (3.30) (1.48) (1.76) (2.21) (2.41) (2.81)

b) Consumer 123.25 127.39 150.90 163.62 141.89 156.70 165.20 170.53 175.23 180.34 185.45 191.31
247.6439 4.74
non-durables (7.96) (3.36) (18.45) (8.43) (-13.28) (10.44) (5.42) (3.22) (2.76) (2.91) (2.84) (3.16)

Manufacturing 123.05 129.83 146.90 161.18 165.15 179.19 184.44 189.85 194.29 199.08 204.34 210.49
811.3591 5.46
Index* (7.77) (5.51) (13.15) (9.72) (2.40) (8.57) (2.93) (2.93) (2.34) (2.47) (2.64) (3.01)
* Provisional, **CARG = Compound Average Rate of Growth
Figures in the brackets indicate percentage change over the previous year, Source: Directorate of Economics and Statistics.

A-51
Appendix 9.3
Annual indices of industrial production in Karnataka manufacturing division by groups : 2006-07 to 2018-19
Base Year: 2004-05

A-52
Weight
Sl. NIC
Name of the Industry Group within 2006-07 2007 – 08 2008-09 2009 –10 2010 – 11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
No Code
dvn.
Manufacture of Food Products &
1 15 71.2978 115.03 125.66 152.40 181.07 206.87 163.81 179.92 188.48 196.55 202.27 208.50 214.96 222.59
Beverages
2 16 Manufacture of Tobacco Products 50.1473 101.72 109.60 89.97 128.38 153.33 130.00 142.44 148.32 153.74 156.33 159.16 162.42 165.68

3 17 Manufacture of Textiles 20.4432 93.39 96.36 112.51 119.70 128.78 150.88 167.95 175.76 182.79 188.57 195.17 200.60 207.43

4 18 Manufacture of Wearing Apparel 51.7851 103.67 109.94 96.00 122.95 137.30 136.61 150.29 158.45 165.61 172.38 179.60 185.42 192.34

5 19 Manufacture of Leather Goods 1.6970 80.95 86.73 124.45 133.95 139.00 134.84 145.24 149.24 152.54 157.39 162.10 165.95 170.53

6 20 Manufacture of Wood & Wood Products 0.9559 93.09 96.11 100.86 102.30 106.99 205.84 221.48 231.38 240.02 247.57 254.84 260.82 267.62

7 21 Manufacture of Paper & Paper products 13.4892 114.35 123.01 153.13 161.86 170.51 171.29 190.56 197.67 205.54 212.08 219.09 225.00 231.41
Manufacture of Publishing & Printing
8 22 8.4155 103.30 109.04 211.50 219.71 241.83 200.12 307.06 315.23 328.99 334.36 342.18 352.33 364.14
Materials
Manufacture of Coke, Refined
9 23 68.0032 108.08 114.96 144.64 157.50 167.83 148.61 162.26 169.10 175.24 179.10 183.01 187.41 192.83
Petroleum Products & Nuclear fuel
Manufacture of Chemical & Chemical
10 24 107.8921 123.34 133.36 106.14 113.59 119.93 137.42 153.31 156.61 162.37 167.25 171.86 176.41 181.53
Products
Manufacture of Rubber & Plastic
11 25 12.4670 115.66 124.09 173.11 179.34 195.95 177.92 196.53 200.38 205.40 209.59 214.32 218.90 224.86
Products
Manufacture of other Non-metallic
12 26 37.0224 140.34 160.54 144.56 149.30 155.41 183.35 193.03 196.25 201.01 203.70 206.97 212.46 218.43
Mineral products
13 27 Manufacture of Basic Metals 119.9261 138.09 157.43 157.82 166.64 179.03 153.45 173.24 176.33 179.91 182.28 185.03 190.03 196.20
Manufacture of Fabricated metal
14 28 13.0763 98.52 102.62 120.46 126.71 131.72 183.22 203.81 208.14 212.95 217.18 221.20 225.55 232.24
products
15 29 Manufacture of Machinery Equipments 50.4417 103.15 110.22 110.00 116.17 120.32 196.39 213.73 218.76 227.10 236.69 244.50 250.64 257.59
Manufacture of Office, Accounting &
16 30 7.1733 115.66 124.09 171.71 181.52 197.51 187.20 189.46 196.97 201.75 205.73 211.58 217.56 224.79
Computing Machinery
Manufacture of Electrical Machinery &
17 31 33.4176 119.49 128.71 117.19 125.15 130.30 209.24 209.75 214.17 216.45 218.38 221.75 226.83 232.79
Apparatus
Manufacture of Television and other
18 32 25.2076 132.13 147.41 144.99 163.62 182.61 194.96 198.43 203.04 206.40 211.85 217.82 222.88 228.91
Communication Equipments
Manufacture of Medical, Optical 181.11 184.45
19 33 36.0535 139.22 158.99 123.40 127.70 130.77 164.91 173.75 177.41 188.98 193.79 199.39
Instruments & Watches
Manufacture of Motor Vehicles, Trailers
20 34 54.2817 97.40 98.91 101.34 119.44 136.45 228.64 232.42 238.45 241.59 245.58 251.27 258.41 265.96
and Semi-Trailers
Manufacture of Other Transport
21 35 8.2089 106.27 111.15 59.04 61.59 71.02 201.39 204.58 213.05 219.26 223.83 229.49 235.21 242.60
Equipment
22 36 Manufacture of Furniture 19.9570 87.40 92.95 135.64 148.60 151.74 161.56 163.39 167.25 169.74 173.94 177.63 181.97 187.58

114.18 123.05 129.83 146.90 161.18 165.05 179.19 184.44 189.85 194.29 199.08 204.34 210.49
Manufacturing Index* 811.3591
(7.83) (7.77) (5.51) (13.15) (9.72) (2.40) (8.56) (2.93) (2.93) (2.34) (2.47) (2.64) (3.01)
* Provisional figures, Note: Figures in brackets indicate percentage change over the previous year,

Economic Survey of Karnataka 2019-20


Source: Directorate of Economics and Statistics
Appendix 9.4 Two Digit Level (NIC-2008) Industrial Composition based on ASI 2016-17
Sl. Value of Output
Industrial Group (NIC-2008) Percentage
No. (Rs. lakh)
1. Agriculture and related activities (01) 499553 1.00
2. Manufacture of Food Products (10) 7903090 15.75
3. Manufacture of Beverages (11) 559452 1.12
4. Manufacture of Tobacco Products (12) 632316 1.26
5. Manufacture of Textiles (13) 707685 1.41
6. Manufacture of Wearing Apparels (14) 2001959 3.99
7. Manufacture of Leather and Related Products (15) 190796 .38
8. Manufacture of Wood & Wood Products (16) 107548 .21
9. Manufacture of paper & Paper Products (17) 520810 1.04
10. Manufacture of Printing &Reproduction of Recorded Media (18) 358053 .71
11. Manufacture of Coke & Refined Petroleum Products (19) 5648435 11.26
12. Manufacture of Chemical & Chemical Products (20) 1419647 2.83
13. Manufacture of Pharmaceutical, medicinal chemical and Botanical products (21) 1532880 3.06
14. Manufacture of Rubber products (22) 1250601 2.49
15. Manufacture of other non metallic mineral products (23) 1308966 2.61
16. Manufacture of basic metals (24) 5565072 11.09
17. Manufacture of Fabricated metal products (25) 999232 1.99
18. Manufacture of Computer, electronic & optical products (26) 1597544 3.18
19. Manufacture of electrical equipment (27) 1963674 3.91
20. Manufacture of machinery & equipment (28) 3517454 7.01
21. Manufacture of motor vehicle, trailers & semi trailers (29) 4173883 8.32
22. Manufacture of other transport equipment (30) 1446851 2.88
23. Manufacture of furniture (31) 274506 .55
24. Manufacture of other manufacturing materials (32) 4117160 8.21
25. Manufacture of repair & installation of machinery (33) 42444 .08
26. Manufacture of waste collection treatment of disposal activities (38) 54886 .11
27. Others 1770193 3.53
State Total 50164690 100.00
Source: Central Statistics Office (IS Wing), Kolkata
Appendix 9.5 Registration of Small-Scale Industrial units in Karnataka (Cumulative)
Item No. of SSI Units Investment (Rs. in lakh) Employment in (`000s)
2004-05 321606 691969 1830
2005-06 334386 735616 1888
2006-07 346966 782158 1946
2007-08 361950 894817 2069
2008-09 377655 996434 2174
2009-10 394850 1119250 2285
2010-11 413284 1239873 2396
2011-12 434305 1399514 2524
2012-13 458511 1616365 2680
2013-14 484549 1901082 2846
2014-15 513291 2180373 3022
2015-16 538947 2674965 3243
2016-17 578117 3941379 3752
2017-18 626599 5099954 4193
2018-19 695877 6587652 4776
Source: Directorate of Industries and Commerce

Appendix 9.6 On-going Schemes of the Plan Monitoring Wing of the Department of Mines & Geology
(in lakhs)
Budget
Name of the Scheme Budgetary Expenditure Budgetary Expenditure
Released
Sl. No & outlay for upto end of outlay for upto end of
upto Nov-
Head of Account 2018-19 March-2018 2019-20 Nov-2019
2019
Training of officers and staff of the Department
1. 25.00 10.26 25.00 12.50 7.83
2853-02-102-0-10
Publication Wing in the Department
2. 5.00 3.23 5.00 1.25 .51
2853-02-102-0-11
Mineral Conservation cell in the Department
3. 200.00 56.57 200.00 50.00 0.00
2853-02-102-0-14

SCP (422) 100.00 0.00 100.00 0.00 0.00

TSP (423) 100.00 0.00 100.00 0.00 0.00


Environmental Geological Wing of the
4. Department 3120.00 1172.99 4228.00 1057.00 54.1
2853-02-102-0-15
Sand Mining Policy
5. 500.00 500.00 200.00 50.00 50.00
2853-02-102-0-16
Filling up of Stone Quarry Pits
6. 700.00 219.92 200.00 50.00 0.0
2853-02-102-0-17
Modernization
7. 2853-02-001-0-01 1372.00 833.04 1000.00 500.00 243.60
sub head 125
Total 6122.00 2796.01 6058.00 1720.75 356.04
Source: Planning section, Department of Mines and Geology

Economic Survey of Karnataka 2019-20 A-53


Appendix 9.7 Departmental Target and Achievements (XI five year plan)

1- Iron & Steel


Targets Achievement
Sl.
Year Sales Value Sales Value
No
(MTs) (Rs Lakhs) (MTs) (Rs Lakhs)
1 2010-11 25000 10000 20502 8924
2 2011-12 27500 12600 19095 8671
3 2012-13 18500 8982 13795 6452
4 2013-14 15000 7283 11664 5396
5 2014-15 13800 6624 11267 4852
6 2015-16 12000 5650 8429 3256
7 2016-17 12000 4560 10078 4131
8 2017-18 12000 5556 2879 1277
9 2018-19 12500 5812 3025 1486
3025 1484
10 2019-20 12500 5188
Upto Dec.2019 Upto Dec.2019
Source: KSSIDC

2 – Coal
Targets Achievement Remarks
Sl.
Year Sales Value Sales Value
No
(MTs) (Rs Lakhs) (MTs) (Rs Lakhs)
1 2010-11 36582 685 36582 685
2 2011-12 40000 985 32404 759 Coal is an allocation material
3 2012-13 40000 985 39021 1056 by M/s Coal India Ltd, due
to change in Transportation
4 2013-14 40000 1150 35415 969 system by M/s.WCL,
5 2014-15 27340 714 25872 707 Nagpur, coal transaction has
6 2015-16 27300 737 0 0 not taken place from 2015-
16 and onwards.
7 2016-17 0 0 0 0
8 2017-18 40000 1120 0 0
9 2018-19 - - - -
10 2019-20 - - - -
Source: KSSIDC.
3-Others Paraffin Wax
Targets Achievement
Sl.
Year Sales Value Sales Value
No
(MTs) (Rs Lakhs) (MTs) (Rs Lakhs)
1 2010-11 38 34 38 34
2 2011-12 200 200 125 134
3 2012-13 200 210 98 105
4 2013-14 200 210 69 76
5 2014-15 200 210 58 62
6 2015-16 70 80 07 08
7 2016-17 50 57 01 01
8 2017-18 0 0 17 13
9 2018-19 0 0 0 0
10 2019-20 0 0 0 0
Source: KSSIDC.

Appendix 9.8 Achievements made by KIADB in XI five year plan

2019-20
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 (Upto Nov
Particulars Unit 2019)
Achievements
Land acquired Acres 10012.20 5497.47 5922.50 1733.80 1192.95 2618.00 2423.00 885.00
Expenditure
Rs. in
incurred on 1731,00.00 118,021.00 140,919.92 150,576.65 176259.59 21475.08 255485.72 17547.89
lakhs
acquisition
Expenditure
Rs. in
incurred on 31,260.00 52,894.00 36,758.08 54,644.57 45655.23 57972.66 61531.83 48150.29
lakhs
development
Rs. in
Total Expenditure 204,360.00 170,915.00 177,678.00 205,221.22 221914.82 279447.74 317017.55 223608.18
lakhs
No. of
Nos. 481 369 241 451 517 938 750 193
Entrepreneurs
Source: Karnataka State Industrial Areas Development Board, Bangalore

A-54 Economic Survey of Karnataka 2019-20


Appendix 9.9 Registered Factories by Industries
NIC GROUP
Description 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
2008
01 Cotton Ginning, Cleaning & Baling 320 445 505 470 449 473

11 Manufacture of Food Products and Beverages 1800 1952 2144 2362 2208 2351

12 Manufacture of Tobacco Products 45 47 50 55 62 66

13 Manufacture of Textiles 191 208 281 271 271 276

14 Manufacture of Wearing Apparel; Dressing and Dyeing of Fur 849 1018 1021 1077 1013 1137
Tanning and dressing of Leather; Manufacture of Luggage, Handbags, Saddlery, Harness
15 60 77 143 165 146 161
and Footwear
Manufacture wood and of Products of wood & cork, Except Furniture; Manufacture of
16 998 1025 875 341 334 328
articles of straw and plaiting materials
17 Manufacture of Paper & Paper Products 275 289 231 336 295 338

18 Printing, Publishing & allied Industries 410 432 304 408 402 437

19 Manufacture of Coke, Refined Petroleum Products & Nuclear Fuel 275 277 295 80 68 107

20 Manufacture of Chemicals & Chemical Products 597 616 625 708 668 678

Economic Survey of Karnataka 2019-20


22 Manufacture of Rubber and Plastic Products 600 632 644 715 719 751

23 Manufacture of other Non Metallic Mineral Products 350 387 601 889 715 831

24 Basic Metal metals 550 576 850 726 693 713


Manufacture of Fabricated Metal Products & Parts, Except machinery & Transport
25 1950 1985 1665 2108 2348 2359
Equipments
28 Manufacturing of Machinery and Equipment NEC* 190 307 368 690 774 832

27 Manufacture of Electrical, Machinery & Apparatus NEC 570 595 463 600 617 675

26 Manufacture of Radio, Television and Communication Equipment and Apparatus 190 192 143 276 373 420

29 Manufacture of Motor Vehicles Trailers & Semi Trailers 130 132 141 163 147 124

30 Manufacture of other Transport Equipments 50 56 63 95 57 89

31 Manufacture of Furniture Manufacturing NEC 110 124 144 161 164 179

35 Electricity Gas Steam and Hot Water Supply 50 58 141 183 202 255

36 Collection Purification and Distribution of Water 35 48 91 42 30 25


Sale Maintenance and Repair of Motor Vehicles, Motor Cycles; retail sale of Automotive
45 697 788 900 1066 1092 1128
Fuel
46 Wholesale Trade and Commission Trade, Except of Motor Vehicles and Motor Cycles; 5 5 7 18 37 45

49 Land Transport; transport Via pipelines 6 7 3 4 2 2

OTHERS 2600 3150 3499 3031 2450 2134

Total 13903 15428 16197 17040 16,336 16,914

A-55
Source: Department of Factories, Boilers, Industrial Safety & Health
A-56
Appendix 9.10 Assistance sanctioned and disbursed by Karnataka State Financial Corporation
(Rs. in Lakh)

2003 - 04 2004 - 05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

Item

cases
cases
cases
cases
cases
cases
cases
cases

No. of
No. of
No. of
No. of
No. of
No. of
No. of
No. of

Amount
Amount
Amount
Amount
Amount
Amount
Amount
Amount

Sanction 1309 30277 1244 24287 1161 31620 1326 42453 1195 36815 1420 56524 1461 63149 1537 73163

Disbursements - 24879 - 24034 - 19986 - 31039 - 30313 - 38392 - 43439 - 58041

2019-20
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
(April to Nov.19)

Item

cases
cases
cases
cases
cases
cases
cases
cases

No. of
No. of
No. of
No. of
No. of
No. of
No. of
No. of
No. of
cases

Amount
Amount
Amount
Amount
Amount
Amount
Amount
Amount
Amount

Sanction 1485 81732 1598 94406 1426 90926 1092 67515 1111 73194 1059 73343 1037 84213 1056 529
109873 47514

Disbursements - 59708 - 73470 - 70747 - 55362 - 56636 - 61438 - 56121 - 66590


- 49622

Source: Karnataka State Financial Corporation.

Economic Survey of Karnataka 2019-20


Appendix 9.11 Departmental Target and Achievements (XI Five year plan)
Rs. In Lakhs

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19

PARTI-CULARS TARGET ACHVMT TARGET ACHVMT TARGET ACHVMT ACHVMT ACHVMT TARGET ACHVMT TARGET ACHVMT TARGET ACHVMT

SOURCES:

Opening Balance of Cash/Bank 18945.32 18945.32 12353.33 12353.33 13457.60 26069 26069 18701.45 15660.93 15643.10 21274.63 21274.63 26069 26069

Structured Obligation to GOK(HUDCO) 1090.32 1090.32 1090.32 1090.32 1090.32 0 2756 511.89 0.00 0.00 0.00 0.00 0 2756
Government of Karnataka/BIAP
25.00 6034.61 25.00 300.00 1645.34 2781 25 10882.00 25.00 491.05 25.00 25.18 2781 25
cell/Equity support
Bank loans/Int.accrued but not due 402.42 411.30 0.00 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0 0

Projects/Others 7848.82 431.02 6410.26 1844.64 890.00 5735 3522 525.32 1295.00 1647.25 1310.00 288.55 5735 3522

KITVEN fund 37.50 37.50 0.00 100.00 0.00 36 414.46 0.00 216.65 0.00 205.00 36

Government of India-Interest Arrears 13.73 13.73 13.73 13.73 13.73 0 0 0.00 0.00 0.00 0.00 0.00 0 0

Recovery from Staff Advance 50.00 45.87 40.00 39.08 35.00 20 17 37.50 35.00 20.41 30.00 18.81 20 17

Recovery from Operations 3276.50 2185.99 1786.91 5148.95 1375.05 1984 1777 759.17 2081.28 2290.18 2675.69 1680.07 1984 1777

Economic Survey of Karnataka 2019-20


Revenue Receipts 4954.21 4523.61 5645.50 6283.10 5363.76 7620 8175 5484.56 6115.39 6677.87 7232.15 7142.98 7620 8175
Income tax refund/Lease Rent
0.00 0.00 0.00 0.00 0.00 1562 2132 0.00 1332.67 1334.48 1372.59 1958.34 1562 2132
Payable/Others
Total 36643.82 33719.27 27365.05 27173.15 23870.80 45771 44509 37316.35 26545.27 28320.99 33920.06 32593.56 45771 44509

APPLICATIONS:

Investments 0.00 0.00 0.00 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0 0

KITVEN fund 125.00 125.00 325.00 424.00 0.00 300 53 331.10 500.00 150.00 150.00 160.00 300 53
Repayments to HUDCO/CRPS
1090.32 1090.32 1090.32 1090.32 1090.32 0 0 8548.01 0.00 0.00 0.00 0.00 0 0
Redemption
Redemption of Bonds 9550.00 9550.00 5940.00 5940.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0 0

Staff Advances 35.00 27.37 30.00 19.97 1060.00 65 30 29.30 20.00 17.27 60.35 16.72 65 30
Discharge of other liabilites/BIAL Lease
2115.00 1589.74 1075.34 2981.30 2291.34 1414 2451 8248.53 3557.67 3572.94 3122.59 3695.89 1414 2451
Rent
Capital Expenditure 20.00 5504.86 20.00 2.32 20.00 160 6 47.55 125.00 47.90 190.22 66.73 160 6

Project expenditure/Deployment 9909.78 702.29 5804.92 195.09 2963.55 8536 5284 610.29 1095.00 888.84 1085.00 254.50 8536 5284

Current Assets 200.00 354.83 400.00 900.43 400.00 0 769 43.54 450.00 186.41 450.00 214.00 0 769

Income Tax/Sales Tax/FBT/Others 184.00 353.18 300.00 863.34 300.00 1056 2464 720.47 380.00 879.38 900.00 852.06 1056 2464

Revenue payments 2478.77 2068.35 1208.99 1298.78 1116.52 1427 1534 3094.46 1306.13 1303.62 1311.97 1264.50 1427 1534

Closing Balance of Cash/Bank 10935.95 12353.33 11170.48 13457.60 14629.07 32813 31919 15643.10 19111.47 21274.63 26649.93 26069.16 32813 31919

Total 36643.82 33719.27 27365.05 27173.15 23870.80 45771 44509 37316.35 26545.27 28320.99 33920.06 32593.56 45771 44509

A-57
Source: Karnataka State Industrial & Infrastructure Development Corporation Limited
Appendix 10.1(a) : Financial Performance Under MGNREGA during the Financial Year 2019-20 (Upto November-19)
(Rs. in Lakhs)

Release of Last FY but


Opening Balance(OB) Received during the Current Borrowed Fund Inter-district fund transfer
FY Release from

A-58
Sl. Authorisation Total
District State Fund(*) Misc Reciept
No of EFMS From other Availabilty
to districts Fund transfer Fund received
district or Refunded to
CB as OB Entered OB Centre State to other from other
Revolving district/state
district districts
Fund
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 BAGALKOTE -854.17 0 0 0 10458.72 0 0 0 0 0 9604.55
2 BALLARI -1723.66 0 0 0 25003.72 0 0 0 0 0 23280.06
3 BELAGAVI -1025.55 0 0 0 26959.74 0 0 0 0 0 25934.19
4 BENGALURU -27.91 0 0 0 255.33 0 0 0 0 0 227.42
5 BENGALURU RURAL -321.26 0 0 0 4001.39 0 0 0 0 0 3680.13
6 BIDAR -470.29 0 0 0 10005.41 0 0 0 0 0 9535.12
7 CHAMARAJA NAGARA -283.09 0 0 0 10045.37 0 0 0 0 0 9762.29
8 CHIKKABALLAPURA -232.99 0 0 0 9488.49 0 0 0 0 0 9255.50
9 CHIKKAMAGALURU -865.71 0 0 0 9119.81 0 0 0 0 0 8254.10
10 CHITRADURGA -1314.18 0 0 0 22774.25 0 0 0 0 0 21460.07
11 DAKSHINA KANNADA -245.72 0 0 0 4069.47 0 0 0 0 0 3823.75
12 DAVANAGERE -1464.27 0 0 0 13620.83 0 0 0 0 0 12156.57
13 DHARWAR -143.56 0 0 0 5686.19 0 0 0 0 0 5542.62
14 GADAG -814.38 0 0 0 11352.42 0.01 0 0 0 0 10538.05
15 HASSAN -1933.88 0 0 0 18186.73 0 0 0 0 0 16252.84
16 HAVERI -788.96 0 0 0 11501.62 0 0 0 0 0 10712.66
17 KALABURAGI 89.72 0 0 0 11923.59 0 0 0 0 0 12013.30
18 KODAGU -125.53 0 0 0 1617.06 0 0 0 0 0 1491.53
19 KOLAR -606.38 0 0 0 16107.17 0 0 0 0 0 15500.79
20 KOPPAL -170.84 0 0 0 17660.20 0 0 0 0 0 17489.36
21 MANDYA -1080.68 0 0 0 10316.64 0 0 0 0 0 9235.96
22 MYSURU -778.48 0 0 0 7518.63 0 0 0 0 0 6740.15
23 RAICHUR -159.9 0 0 0 33433.57 0 0 0 0 0 33273.67
24 RAMANAGARA -1959.99 0 0 0 24427.22 0 0 0 0 0 22467.23
25 SHIVAMOGGA -493.21 0 0 0 10481.87 0 0 0 0 0 9988.66
26 TUMAKURU -764.14 0 0 0 18486.71 0 0 0 0 0 17722.58
27 UDUPI -31.59 0 0 0 1167.26 0 0 0 0 0 1135.67
28 UTTARA KANNADA -569.99 0 0 0 4382.29 0 0 0 0 0 3812.30
29 VIJAYPURA -327.3 0 0 0 14586.28 0 0 0 0 0 14258.99
30 YADAGIRI 139.84 0 0 0 7300.92 0 0 0 0 0 7440.76
All District Total -19348.05 0 0 0 371938.90 0.01 0 0 0 0 352590.87

Economic Survey of Karnataka 2019-20


State Fund 2648.38 0 1960.15 256.54 0 -190691.92
Grand Total of State -16699.67 0 0 0 373899.05 256.55 0 0 0 0 161898.95
Appendex-10.1(b) Financial Performance Under MGNREGA during the Financial Year 2019-2020 (Up to Nov-19 End)
(Rs. in Lakhs)
Cumulative Expenditure Payment due**
Cumulative LB Actual Expenditure Adm.Exp On
Estimation of %age Semi-
S.No District Expenditure Semi- Utiliza Balance On
skilled On
upto Reporting Non- Total tion Unskilled Tax Total
Unskilled skilled and Total and Material
months (Nov) Material Tax Rec Exp Rec Wage
Wage Skilled Adm. Exp Skilled
Exp
Wage Wage

1 2 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 BAGALKOTE 0 7024.33 19.30 3203.22 11.96 155.00 0.00 155.00 10413.81 108.43 -809.26 220.13 0.00 1639.14 4.10 1863.37
2 BALLARI 0 17196.35 26.87 7512.72 57.53 172.50 2.50 175.00 24968.47 107.25 -1688.41 112.69 0.00 1056.38 2.41 1171.48
3 BELAGAVI 0 15025.80 1144.35 10179.67 79.26 480.00 0.00 480.00 26909.08 103.76 -974.88 259.35 25.83 3739.48 33.50 4058.16
4 BENGALURU 0 192.94 0.00 46.10 0.00 15.00 0.00 15.00 254.04 111.71 -26.62 12.95 0.00 16.59 0.02 29.56
5 BENGALURU RURAL 0 2314.44 0.00 1681.75 1.24 0.00 0.00 0.00 3997.43 108.62 -317.30 26.44 0.00 776.38 0.10 802.92
6 BIDAR 0 6515.35 13.50 3080.13 228.90 121.99 25.00 146.99 9984.88 104.72 -449.76 117.43 0.00 1311.99 106.54 1535.96
7 CHAMARAJA NAGARA 0 5762.71 20.80 4237.82 0.00 0.00 0.00 0.00 10021.33 102.65 -259.05 132.13 0.00 1465.28 0.00 1597.41
8 CHIKKABALLAPURA 0 6088.60 11.90 3076.72 145.81 140.00 0.00 140.00 9463.04 102.24 -207.54 237.85 0.00 1355.87 54.37 1648.09
9 CHIKKAMAGALURU 0 5481.11 17.00 3465.52 0.06 130.00 0.00 130.00 9093.69 110.17 -839.58 40.49 0.00 2106.39 0.00 2146.88

Economic Survey of Karnataka 2019-20


10 CHITRADURGA 0 11847.34 21.80 10260.19 1.44 564.17 21.50 585.67 22716.44 105.85 -1256.37 232.44 0.00 4287.37 0.00 4519.81
11 DAKSHINA KANNADA 0 2242.74 63.15 1677.20 0.00 78.88 0.00 78.88 4061.97 106.23 -238.22 31.77 5.93 746.84 0.27 784.81
12 DAVANAGERE 0 6325.32 25.41 6945.00 0.35 309.00 0.00 309.00 13605.09 111.92 -1448.52 99.11 0.00 2606.43 0.80 2706.34
13 DHARWAR 0 3331.36 19.99 2171.86 63.49 68.88 0.00 68.88 5655.58 102.04 -112.96 72.29 5.47 929.46 24.34 1031.56
14 GADAG 0 6923.46 0.00 4298.19 2.80 92.50 7.50 100.00 11324.45 107.46 -786.41 106.04 0.00 1106.43 0.04 1212.51
15 HASSAN 0 9333.75 43.92 8588.79 3.85 180.00 0.00 180.00 18150.30 111.67 -1897.46 183.14 1.11 5301.59 4.49 5490.33
16 HAVERI 0 6304.17 21.82 4904.75 34.04 129.34 0.00 129.34 11394.12 106.36 -681.46 98.31 0.00 1837.61 13.21 1949.13
17 KALABURAGI 0 9068.49 80.79 2451.02 21.15 242.50 7.50 250.00 11871.45 98.82 141.85 127.73 0.02 486.93 4.88 619.56
18 KODAGU 0 833.62 0.21 676.39 25.26 80.00 0.00 80.00 1615.47 108.31 -123.94 32.41 0.00 234.71 7.58 274.70
19 KOLAR 0 8419.81 12.40 7097.14 239.86 296.63 0.00 296.63 16065.84 103.65 -565.05 106.75 0.00 3012.38 139.98 3259.11
20 KOPPAL 0 10758.27 68.09 6395.88 213.89 197.50 2.50 200.00 17636.13 100.84 -146.77 211.38 11.76 4238.64 91.31 4553.09
21 MANDYA 0 5926.43 14.69 4210.18 0.23 100.00 0.00 100.00 10251.54 111.00 -1015.58 97.38 0.45 2112.53 0.21 2210.57
22 MYSURU 0 4181.57 40.94 3053.27 0.60 205.66 0.00 205.66 7482.03 111.01 -741.88 210.44 0.00 1992.34 0.00 2202.78
23 RAICHUR 0 24247.61 23.40 8587.79 508.20 0.00 0.00 0.00 33366.99 100.28 -93.33 254.71 1.81 1564.43 93.48 1914.43
24 RAMANAGARA 0 12442.78 11.22 11838.93 0.01 0.00 0.00 0.00 24292.94 108.13 -1825.71 85.15 0.00 5522.53 0.00 5607.68
25 SHIVAMOGGA 0 6788.52 351.32 3177.68 0.07 151.00 0.00 151.00 10468.59 104.80 -479.94 83.60 36.09 719.17 0.00 838.86
26 TUMAKURU 0 10620.47 84.93 7211.33 2.00 300.00 0.00 300.00 18218.72 102.80 -496.14 118.37 2.68 2804.41 0.37 2925.83
27 UDUPI 0 733.09 2.82 380.26 0.21 50.00 0.00 50.00 1166.38 102.70 -30.72 3.49 0.05 80.90 0.00 84.44
28 UTTARA KANNADA 0 2782.84 15.94 1453.47 1.42 100.00 5.00 105.00 4358.67 114.33 -546.36 39.73 0.10 235.43 0.01 275.27
29 VIJAYPURA 0 9267.36 120.54 4974.21 7.49 139.00 0.00 139.00 14508.59 101.75 -249.60 198.54 0.15 3143.73 1.02 3343.44
30 Yadgir 0 4846.01 0.00 1942.39 115.09 200.00 0.00 200.00 7103.49 95.47 337.27 88.98 0.00 393.39 26.91 509.28
All District Total 0 222826.64 2277.10 138779.57 1766.21 4699.55 71.50 4771.05 370420.55 97.43 -17829.70 3641.22 91.45 56824.75 609.94 61167.36
State Fund 1960.15 1960.15 1960.15 -192652.07

A-59
Grand Total of State 0 222826.64 2277.10 138779.57 1766.21 6659.70 71.50 6731.20 372380.70 91.96 -210481.77 3641.22 91.45 56824.75 609.94 61167.36
Appendix 10.1(c) Employment Generated during the year 2019-2020 (Up to Nov-19 End)
No. of Jobcard
No. of Jobcard Employment No. of No. of HH
No. of Registered included in current Cumulative No. of HH issued jobcards Employment offered Employment Provided No. of
deleted in current YR demanded Families which are
YR Disabled
S No. Districts Complete beneficiary
beneficiary
d 100 of land
Household Persons Household Persons Household Persons SCs STs Others Total Household Persons Household Persons Household Persons Persondays individuals
days reform/IAY

A-60
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

1 BAGALKOTE 192197 390025 648 2644 12951 27574 34300 12669 144588 191557 80356 139960 77555 132598 68044 114002 2677213 1570 646 287

2 BALLARI 325829 907217 874 8158 13824 41752 67663 64906 193033 325602 153232 336710 151854 329658 139681 292525 6763654 3000 3008 757

3 BELAGAVI 603517 1300907 1974 5802 18714 34768 56247 36990 509690 602927 187918 303427 184648 292980 165750 257150 5478155 1444 6938 1487

4 BENGALURU 44145 109483 137 367 610 1399 13688 1398 28527 43613 2110 4441 2002 4093 1849 3770 72640 2 51 10

5 BENGALURU RURAL 82353 194994 378 1238 2531 5136 15552 4184 62243 81979 24414 49035 23445 46006 21286 40975 900153 228 71 287

6 BIDAR 158202 309010 1748 5675 14904 28431 38572 22180 92825 153577 68177 119128 66856 114886 60029 101880 2404077 199 676 171

7 CHAMARAJA NAGARA 167048 402717 622 2470 7031 14867 31855 13067 117981 162903 54418 103188 53192 98579 49690 91127 2140382 331 87 228

8 CHIKKABALLAPURA 183479 457858 677 3284 4390 11956 39727 23885 118044 181656 60944 122924 59128 115666 52492 100338 2353968 478 358 173

9 CHIKKAMAGALURU 144974 333765 440 1938 4031 10389 31293 6365 107002 144660 48688 97640 47643 94123 45120 88329 2031403 696 1767 199

10 CHITRADURGA 280880 683717 699 5257 7163 18282 55672 51654 170741 278067 108101 202255 105703 192211 99103 178304 4195377 420 5175 235

11 DAKSHINA KANNADA 127140 274107 374 1168 4346 10126 17566 12011 93259 122836 21512 38592 21158 37617 19966 35150 836399 376 281 47

12 DAVANAGERE 192465 433890 114 528 2420 6375 38235 25882 124980 189097 57141 120423 56053 117099 47879 93457 2107466 632 458 113

13 DHARWAR 137669 346126 120 774 1923 5519 9498 6145 121104 136747 40104 78949 38954 74325 35711 66664 1272085 578 283 114

14 GADAG 142489 347110 514 2540 5167 16127 18777 7710 110954 137441 79103 165234 77932 159609 71213 141245 2610225 451 2004 442

15 HASSAN 247744 589255 894 3649 4217 10292 41809 4286 199340 245435 86120 175801 83056 164821 75842 148365 3429840 1323 428 186

16 HAVERI 212112 497024 430 2320 5234 13099 27838 19672 161586 209096 70253 139388 68382 133582 59746 113873 2277123 599 1410 216

17 KALABURAGI 269555 588982 1597 5856 19551 35003 59593 3481 201165 264239 103268 183069 100179 171759 87082 146213 2997248 360 460 245

18 KODAGU 66141 152251 307 994 1088 2408 6581 4190 54472 65243 9219 16605 8887 15738 7947 13970 313508 82 135 23

19 KOLAR 208655 521506 1040 5368 5396 16166 52122 11903 140256 204281 79360 143468 76354 132663 70331 120045 3180752 323 200 342

20 KOPPAL 236823 669059 939 8211 11003 33412 31948 23902 172842 228692 102026 210365 100804 204643 92332 182451 3953865 545 2289 779

21 MANDYA 279043 613202 625 2008 6936 15301 30632 2177 243913 276722 64821 113289 63266 107846 57831 97412 2093304 557 122 136

22 MYSURU 262460 687134 423 1739 8880 20286 47506 29744 172318 249568 50282 101211 49062 96459 43866 84924 1559722 397 806 71

23 RAICHUR 267681 641067 1685 8259 22919 58298 45372 55814 165177 266363 184556 385610 183111 378218 172998 350164 9198538 2489 4825 465

24 RAMANAGARA 167311 383217 407 2397 4090 9538 26414 3449 135497 165360 80799 158081 79073 152028 72606 137453 3966962 1034 2936 160

25 SHIVAMOGGA 213302 481164 192 1344 3162 10637 39759 9045 162486 211290 89853 163555 89037 159055 78590 134213 2464821 558 1155 381

26 TUMAKURU 378858 925785 1850 7542 24570 51281 59898 27755 289701 377354 102587 202613 98890 187847 90005 168263 3868888 763 791 318

27 UDUPI 68279 142465 104 332 1600 3804 4602 4238 58359 67199 8729 15989 8635 15654 7683 13802 247641 51 291 17

28 UTTARA KANNADA 162169 371424 155 556 1470 3944 11215 4735 145275 161225 35098 59512 34884 58793 30019 49785 871649 124 454 94

29 VIJAYPURA 238350 576322 3595 18855 21783 40282 38025 2561 197122 237708 92982 173788 88840 162041 77923 138561 3430163 1289 756 213

30 Yadgir 170874 323682 3332 8942 9851 18923 32258 16191 118395 166844 51666 75946 50452 73371 44082 63185 1542737 342 230 64

Total 6231744 14654465 26894 120215 251755 575375 1024217 512189 4612875 6149281 2197837 4200196 2149035 4023968 1946696 3567595 81239958 21241 39091 8260

Economic Survey of Karnataka 2019-20


Appendex-10.2 District wise Progress Under MGNREGA 2019-20 (Up to Nov-19 End)
Works (No)
Total Cumulative Cumulative No. of HH
Sl. Persondays Generated
District Expenditure Provided Employment No. of Works Under
No (No) Completed Under Progress
(Rs. in Lakhs) (No) taken

1 2 3 4 5 6 7 8
1 BAGALKOTE 10413.81 2677213 68044 22609 5848 16761
2 BALLARI 24968.47 6763654 139681 35374 11686 23688
3 BELAGAVI 26909.08 5478155 165750 61096 11959 49137
4 BENGALURU 254.04 72640 1849 3644 622 3022
5 BENGALURU RURAL 3997.43 900153 21286 15386 5062 10324
6 BIDAR 9984.88 2404077 60029 29767 7281 22486
7 CHAMARAJA NAGARA 10021.33 2140382 49690 25349 7769 17580
8 CHIKKABALLAPURA 9463.04 2353968 52492 26509 6595 19914
9 CHIKKAMAGALURU 9093.69 2031403 45120 21537 4823 16714
10 CHITRADURGA 22716.44 4195377 99103 45524 10059 35465
11 DAKSHINA KANNADA 4061.97 836399 19966 23153 9024 14129
12 DAVANAGERE 13605.09 2107466 47879 19339 4244 15095

Economic Survey of Karnataka 2019-20


13 DHARWAR 5655.58 1272085 35711 21618 3251 18367
14 GADAG 11324.45 2610225 71213 25412 6231 19181
15 HASSAN 18150.3 3429840 75842 36110 15199 20911
16 HAVERI 11394.12 2277123 59746 30248 5989 24259
17 KALABURAGI 11871.45 2997248 87082 28938 5770 23168
18 KODAGU 1615.47 313508 7947 3837 893 2944
19 KOLAR 16065.84 3180752 70331 35968 8800 27168
20 KOPPAL 17636.13 3953865 92332 22845 4022 18823
21 MANDYA 10251.54 2093304 57831 31427 8016 23411
22 MYSURU 7482.03 1559722 43866 42775 6946 35829
23 RAICHUR 33366.99 9198538 172998 39421 20377 19044
24 RAMANAGARA 24292.94 3966962 72606 38371 14010 24361
25 SHIVAMOGGA 10468.59 2464821 78590 26234 5350 20884
26 TUMAKURU 18218.72 3868888 90005 52797 20089 32708
27 UDUPI 1166.38 247641 7683 8188 1867 6321
28 UTTARA KANNADA 4358.67 871649 30019 17835 5401 12434
29 VIJAYPURA 14508.59 3430163 77923 31652 7392 24260
30 Yadgir 7103.49 1542737 44082 14075 5454 8621
All District Total 370420.55 81239958 1946696 837038 230029 607009
State Fund 1960.15

A-61
Grand Total of State 372380.7 81239958 1946696 837038 230029 607009
Appendix 11.1 Installed Capacity, Power Generation, Imports, T&D Losses and Power Consumption in
Karnataka

Power Transmission &


Installed capacity Import Power Consumption
Year Generation Distribution Loss
(in MW) (in MU) (in MU)
(in MU) (%)
2014-15 14821.31 46204.19 14340.31 18.52 49400.57
2015-16 15778.44 46398.25 15203.77 16.34 51070.85
2016-17 19380.20 37245.28 28147.26 17.30 54183.47
2017-18 26035.13 43546.30 29077.96 17.02 54133.86
2018-19 28740.67 51184.31 24170.84 16.16 58609.31
2019-20
29884.50 33496.45 13307.70 - 38,081.16
(Upto Nov-19)
Source: KPCL, KPTCL, KREDL, PCKL & ESCOMs

Appendix 11.2 Investment in Power Development in Karnataka


(Rs. in crore)
Power
Power Power Transmission Total
Year Distribution
Corporation Corporation Investment
Companies
2014-15 3064.53 526.00 1025.61 4616.14
2015-16 2766.76 617.00 1059.31 4443.07
2016-17 1535.32 810.93 2590.16 4936.41
2017-18 1194.12 1629.08 3705.33 6528.53
2018-19 1258.56 1945.64 4638.10 7842.30
2019-20
369.08 1144.24 3362.09 4875.41
(Upto Nov-19)
Source: KPTCL, KPCL & ESCOMs

Appendix 11.3 Progress in Energisation of IP Sets in Karnataka

Pump sets energised


End of Year
(cumulative no. in Lakhs)
2000-01 12.64
2001-02 13.16
2002-03 14.02
2003-04 14.16
2004-05 14.34
2005-06 15.09
2006-07 17.05
2007-08 17.23
2008-09 17.53
2009-10 17.91
2010-11 18.23
2011-12 19.49
2012-13 20.52
2013-14 21.49
2014-15 22.03
2015-16 23.33
2016-17 25.06
2017-18 26.30
2018-19 29.68
2019-20(A)
30.28
(Upto Nov-19)
(A) : Anticipated, Source: 1. Energy Department., 2. KERC’s estimates for 2019-20

A-62 Economic Survey of Karnataka 2019-20


Appendix 11.4 Road Length in Karnataka

(in Kms)
Major Other District
National State Municipal All Roads
Year District Roads including
Highways Highways Roads (2 to 6)
Roads Village Roads
1 2 3 4 5 6 7
2001-02 3728 9829 28247 104034 145838
2002-03 3728 9829 28247 104034 145838
2003-04 3967 9590 28247 94034 135838
2004-05 3973 17228 30760 115574 167535
2005-06 3958 17405 32572 146713 200648
2006-07 3958 18642 37671 147212$ 207483
2007-08 3958 20739 47763 147212$ 219672
2008-09 3982 20905 47836 147212$ 219935
2009-10 4490 20528 50436 147212$ 222666
2010-11 4490 20528 50436 147212$ 222666
2011-12 4490 20770 49959 148412$ 223631
2012-13 4490 20770 49959 148412$ 223631
2013-14 4688 20773 49683 155545$ 230689
2014-15 6572 19720 49928 155545$ 231765
2015-16 6572 19578 49909 177542$ 253601
2016-17 6572 19578 49909 40108.71* 177542$ 293709.71
2017-18 6572 19578 49909 40108.71* 190862$ 307029.71
2018-19 7257.63 19445.98 49552.75 40108.71* 190862$ 307227.07
Note: 1) Source: Information Provided from CE, PRAMC office,
2) Directorate of Municipal Administration *(As on Mar-2017)
3) RDPR Department, $ includes ODR and village roads

Appendix 11.5 Operational Performance Statistics of KSRTC

% Change
2017-18 2017-18 2018-19 2019-20
Sl. 2018-19 In 2019-20 to
Particulars (upto (upto (upto (upto
No. (upto 2018-19
31-03-18) 30-11-17) 30-11-18) 30-11-19)
31-03-19) (upto Nov.)
1 No. of buses at the end of the year 8784 8695 8680 8713 8535 -2.0
2 % of over aged buses 33.4 37.5 32.0 28.8 42.5 --
3 Routes operated at the end of the year (No.) 5774 5495 5658 6106 5495 -10.0
4 Route length at the end of the year.(in kms) 96.8 95.82 95.39 96.8 78.4 -19.01
5 Avg. eff. Kms. operated /day ( in lakh) 28.73 29.04 28.52 28.86 29.26 1.4
6 Avg. pass. carried/day( in lakh) 29.68 30.12 27.91 28.89 29.65 2.6
7 Avg. number of buses held 8563.4 8778.1 8500.0 8764.5 8617.4 -1.7
8 Avg. number of buses on road 7915.2 7915.1 7845.5 8030.1 8016.4 -0.2
9 Percentage of Fleet utilization 92.6 92.1 92.3 91.6 93.0 --
10 Avg. vehicle utilization (in kms.) 363 361 364 360 365 1.4
11 Crew duty (in kms.) 101 101 100 101 101 --
12 Total Gross receipts(Rs. in crores) 3488.29 3724.35 1988.88 2182.47 2312.71 6.0
13 Avg. seating capacity 50.7 52.9 50.7 51.5 51.4 --
14 Percentage of Load factor 69.9 71.4 69.1 71.8 77.4 --
15 Bus staff ratio (on sch.) 4.69 4.70 4.75 4.66 4.77 2.4
16 Total vehicles (including scrapped vehicles) 9825 9174 9349 9383 8839 -5.8
Source: Karnataka State Road Transport Corporation

Appendix 11.6 Financial Performance Statistics of KSRTC


(Rs. in crores)

% Change
2017-18 2018-19 2017-18 2018-19 2019-20
Sl. In 2019-20 to
Particulars (upto (upto (upto (upto (upto
No. 2018-19
31-03-18) 31-03-19) 30-11-17) 30-11-18) 30-11-19)
(upto Nov.)
1 Total receipts 3488.29 3724.35 2143.08 2364.34 2500.09 5.7
Total expenses (Ex. Taxes)
2 a) Operating expenses 3238.29 3597.16 2138.26 2386.42 2456.855 3.0
b) Non-operating expenses 78.67 86.77 36.70 54.49 58.41 7.2
3 Profit/loss before taxes --- -- -- -- -- --
Total taxes
4 a) Passenger / other taxes -- -- -- -- -- --
b) Motor vehicle & other taxes 166.83 175.35 110.80 116.27 122.22 5.1
5 Total expenses 3483.79 3859.28 2285.76 2557.18 2637.48 3.1
6 Net profit/loss 4.50 -134.93 -142.68 -192.84 -137.40 --
7 Prior period adjustment (profit/loss) -- -- -- -- -- --
8 Total profit/loss (Rs. Crore) 4.50 -134.93 -142.68 -192.84 -137.40 --
Source: Karnataka State Road Transport Corporation

Economic Survey of Karnataka 2019-20 A-63


Appendix 11.7 Operational Performance Statistics of BMTC

2018-19 2019-20
Sl. % age
Particulars 2017-18 2018-19 (April to (April to Nov-
No. variation
Nov.18) 19.)
1 Routes operated at the end of the year (No.) 2250 2263 2225 2259 1.5
2 Route length at the end of the year (Lakh Kms.) 0.55 0.56 0.55 0.56 1.8
3 Average Effective kms. Operated per day (Lakhs) 14.41 11.38 11.28 11.38 0.9
4 Avg. number of passengers carried/day ( in lakhs) 44.37 35.00 35.00 35.00 -
5 Avg. number of buses held 6394.3 6674.5 6717.4 6501.3 -3.2
6 Avg. number of buses on road 5597.6 5614.7 5560.8 5686.7 2.3
7 % of Fleet utilization 87.5 84.1 82.8 87.5 5.7
8 Avg. Vehicle utilization (in kms.) 203.8 202.6 202.8 200.1 -1.3
9 Total traffic receipts(Rs. in crore) 1764.71 1838.84 1238.82 1252.08 1.1
10 Avg. seating capacity. 41.6 41.3 41.3 41.6 0.7
11 Average seat capacity utilization (Rs. in crore) 673.71 527.61 352.70 355.76 0.9
12 Bus staff ratio 5.55 5.47 5.52 5.41 -2.0
13 Total vehicles (including scrapped vehicle) (Nos.) 7557 6961 6956 6523 -6.2
Source: Bengaluru Metropoliton Transport Corporation

Appendix 11.8 Financial Performance Statistics of BMTC


(Rs. in crore)
Percentage
Sl. 2018-19 2019-20
Particulars 2017-18 2018-19 variation/
No. (April to Nov-18) (April to Nov-19)
Difference
a. Traffic revenue 1764.71 1838.84 1238.82 1252.08 1.1
1
b. Non Traffic revenue 462.29 454.45 205.63 205.42 -0.1
Total Revenue (a+b) 2227.00 2293.29 1444.45 1457.50 0.9
2 Total expenses 2444.61 2642.78 1666.28 1700.15 2.0
Taxes
a. Passenger tax 0.50 0.46 -- --
3
b. Motor vehicle & other taxes 97.94 102.05 68.75 69.49 1.1

Total Taxes (a+b) 98.44 102.51 68.75 69.49 1.1


a. Operating expenses 2357.55 2583.22 1632.49 1670.33 2.3
4
b. Non-Operating expenses 87.06 59.56 33.79 29.82 -11.7
5 Total expenses (Ex. Taxes) 2346.17 2642.78 1597.53 1630.66 2.1
6 Margin excluding taxes -119.17 - 246.98 -153.08 -173.16 20.08
7 Prior period adjustment (profit/loss) -- -- -- -- --

8 Total Profit/loss - 217.61 - 349.49 -221.83 -242.65 20.82

Source: Bengaluru Metropoliton Transport Corporation

Appendix 11.9 Operational Performance Statistics of NWKRTC

Sl. 2018-19 2019-20


Particulars 2017-18 2018-19 (up to (up to % Variation
No.
30-11-2018) 30-11-2019)
1 No. of buses at the end of the period 5048 5013 4886 4899 0.3
2 % of over aged buses (7.50 lakh Kms) 34.4 44.8 40.6 49.1
3 Routes operated at the end of the year (No.) 4126 4067 4095 4031 -1.6
4 Route length at the end of the year (in lakhs) 3.68 3.62 3.80 3.58 -5.8
5 Avg. Eff. Kms operated/ day (in lakhs) 16.56 16.14 16.18 15.82 -2.2
6 Avg. passengers carried / day (in lakhs) 22.50 22.46 22.45 22.46 0.0
7 Avg. number of buses held 4999.8 4990.1 5002.5 4940.9 -1.2
8 Avg. number of buses on road 4757.7 4710.6 4737.4 4579.5 -3.3
9 % of Fleet utilisation 95.2 94.4 94.7 92.7
10 Avg. Vehicle Utilisation (in Kms.) 348 343 347 345 -0.6
11 Total Traffic receipts (Rs. in Crores) 1589.59 1664.98 1120.41 1138.02 1.6
12 Avg. Seating capacity. 51.4 51.5 51.0 51.3 0.6
13 % of Load Factor 60.8 65.2 66.1 68.3
14 Bus Staff Ratio 4.70 4.72 4.76 4.73
15 Total vehicles (including scrapped vehicles held) 5618 5285 5142 5076 -1.3
Source: North Western Karnataka Road Transport Corporation

A-64 Economic Survey of Karnataka 2019-20


Appendix 11.10 Financial Performance Statistics of NWKRTC
(Rs. in crore)
2018-19 2019-20
Sl. No. Particulars 2017-18 2018-19 (up to (up to % Variation
30-11-2018) 30-11-2019)
1 Total Receipts 1884.45 2027.60 1251.18 1358.12 8.5
2 Total Expenses (Excl. Taxes)
a) Operating Expenses 1845.84 1998.47 1348.99 1367.69 1.4
b) Non Operating expenses 33.78 37.43 24.26 35.04 44.4
3 Profit before taxes 4.83 -8.30 -122.07 -44.61
4 Total Taxes
a) Passenger tax 0.00 0.00 0.00 0.00
b) Motor vehicle & other taxes 76.80 80.77 58.19 60.47 3.9
5 Total expenses 1956.42 2116.67 1431.44 1463.20 2.2
6 Net profit/ loss -71.97 -89.07 -180.26 -105.08
7 Prior period adjustment (profit / loss) --- --- --- ---
8 Total profit / loss -71.97 -89.07 -180.26 -105.08
Source: North Western Karnataka Road Transport Corporation

Appendix 11.11 Operational Performance Statistics of NEKRTC

2017-18 2018-19 2019-20


Sl %
Item 2016-17 2017-18 up to up to up to
No Variation
30-11-17 30-11-18 30-11-19
1 Routes operated at the end of the year (No.) 3948 4159 3948 3973 4030 1.4

2 Routes length at the end of the year (Lakh Kms.) 3.93 3.98 3.96 3.87 3.94 1.8

3 Average Effective Kms. operated per day (Lakh) 13.30 13.83 13.69 14.05 14.17 0.9

4 Average Number of passengers carried per day (Lakh) 13.50 13.52 13.52 13.55 13.55 0.0

5 Average number of buses held per day (No.) 4384.8 4501.1 4465.4 4746.3 4747.4 0.02

6 Average number of buses on-road per day (No.) 3969.0 4071.4 4036.5 4112.0 4134.9 0.6

7 Average Fleet utilization (% age) 90.5 90.5 90.4 86.6 87.1 0.6

8 Avg. Vehicle Utilization (in Kms) 335 340 339 342 343 0.3

9 Total traffic receipts (Rs. in Crore) 1324.71 1415.50 949.17 1022.60 1061.59 3.8

10 Average seating capacity 50.6 51.1 51.0 51.3 50.7 -1.2


Average seating capacity utilization in buses on road 64.1 65.8 64.1 69.6 72.1 3.6
11
(Load factor) (% age)
12 *Schedule-Staff ratio (on schedule as on 31st March) 4.94 4.67 4.79 4.74 4.81 1.4

13 Total vehicles (including scrapped vehicles as on 31st March) (No.) 4879 5538 4999 5218 4867 -6.7
Source: North Eastern Karnataka Road Transport Corporation

Appendix 11.12 Financial Performance Statistics of NEKRTC

(Rs. in crore)

2017-18 2018-19 2019-20


Sl No Item 2016-17 2017-18 up to up to up to % Var.
30-11-17 30-11-18 30-11-19
1 Total receipts 1519.42 1635.45 1028.50 1112.54 1197.66 7.7
a) Operating Revenue 1324.70 1415.50 949.17 1022.60 1061.59 3.8
b) Non-Operating Revenue 194.72 219.95 79.33 89.94 136.07 51.3
2 Total expenses (Excl. taxes) 1504.44 1594.62 1037.01 1183.97 1235.26 4.3
a) Operating expenses 1127.97 1189.90 776.69 923.39 947.63 2.6
b) Non-Operating expenses 376.47 404.72 260.32 260.58 287.63 10.3
3 Profit before taxes 14.98 40.83 -8.51 -71.43 -37.60 -47.4
4 Total taxes 69.44 74.13 49.62 52.24 54.68 4.7
a) Passenger tax 0.00 0.00 0.00 0.00 0.00 0.00
b) Motor vehicle & other taxes 69.44 74.13 49.62 52.24 54.68 4.7

5 Total expenses 1573.88 1668.75 1086.63 1236.21 1289.94 4.3

6 Net profit /loss -54.46 -33.30 -58.13 -123.67 -92.29 -25.4

7 Prior period adjustment (Profit /Loss) 0.00 0.00 0.00 0.00 0.00 0.00

8 Total Profit /Loss -54.46 -33.30 -58.13 -123.67 -92.29 -25.4


Source: North Eastern Karnataka Road Transport Corporation

Economic Survey of Karnataka 2019-20 A-65


Appendix 11.13 Number of post offices as on 31-03-2019

District/Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19*
Bangalore(Urban) 289 251 184 289 222 275 271 271 272 272
Bangalore(Rural) 171 203 133 201 142 142 142 143 134
180
Ramanagara 290 172 181 181 180 181 181 181 181
Chitradurga 293 308 317 317 317 317 317 317 317
320
Davanagere 172 152 262 325 202 261 324 324 261
Kolar 223 401 218 269 218 218 220 220 209
274
Chikkaballapura 198 210 198 147 198 198 198 198 198
Shivamogga 475 357 471 355 355 355 355 355 355 357
Tumakuru 559 562 560 559 558 558 558 558 558
566
Chikkamagaluru 310 300 302 302 301 301 301 301 301
Dakshina Kannada 562 424 473 472 471 471 471 471 471
549
Udupi 254 286 334 334 334 334 332 331 325
Hassan 420 418 419 418 414 415 415 415 414
421
Kodagu 220 212 216 216 216 213 216 216 211
Mandya 364 364 350 352 352 352 351 352 353 353
Mysuru 285 436 392 388 183 384 387 387 388
282
Chamarajanagar 320 161 205 204 204 205 205 206 206
South Karnataka 5405 5250 5206 5262 4920 5175 5245 5248 5156
5264
Belagavi 541 719 727 728 730 732 732 732 730
Vijayapur 419 410 401 405 405 405 405 404 401
419
Bagalakote 430 327 339 335 335 335 334 334 331
Dharawad 218 217 210 213 213 213 213 211 210 210
Gadag 171 169 170 171 170 170 170 170 168
171
Haveri 260 257 259 259 259 260 259 259 259
Uttara kannada 490 489 491 491 491 491 489 488 485
496
Bellary 454 444 446 384 384 447 384 385 447
Bidar 304 304 305 305 304 304 304 304 304
305
Kalaburagi 620 411 333 428 429 427 624 428 428
Yadagiri 202 210 291 195 195 197 196 196
Rayachuru 290 286 287 286 287 287 287 287 287
290
Koppala 218 217 218 219 218 218 218 218 218
North Karnataka 4415 4508 4453 4480 4419 4420 4486 4417 4415 4464
STATE 9820 9772 9703 9686 9681 9340 9661 9662 9663 9620
Source: Chief Post Master General Karnataka Circle,* Karnataka at Glance- Statistical Report- FY 2018-19

Appendix 11.14 Number of Telephone Exchanges as on 31-03-2019

District/Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19*

Bangalore(Urban) 169 183 183 196 199 212 327


Bangalore(Rural) 93 102 92 92 93 311 325 325 41
103
Ramanagara 12 12 12 10 37
Chitradurga 82 81 82 82 81 72
129 130 129 129
Davanagere 48 48 49 87 72
Kolar 143 73 73 73 73 73
143 143 137 137
Chikkaballapura 70 70 70 68 40
Shivamogga 117 140 140 140 140 140 140 139 139 113
Tumakuru 112 112 112 112 112 112 109 109 107
112
Chikkamagaluru 148 148 148 148 148 146 146 146 146
Dakshina Kannada 148 147 147 146 145 155
250 249 249 250
Udupi 103 103 103 103 104 93
Hassan 104 104 103 103 103 103 103 102 95
104
Kodagu 76 76 76 76 76 76 76 76 76
Mandya 65 64 64 63 63 63 63 63 63 64
Mysuru 100 100 98 99 100 100
141 141 141 141
Chamarajanagar 41 41 41 41 41 38
South Karnataka 1501 1604 1604 1608 1656 1614 1617 1617 1649
1593
Belagavi 189 189 189 190 190 190 190 190 182
Vijayapur 110 192 109 108 108 90
192 183 183 176
Bagalakote 82 81 82 82 82 64
Dharawad 50 171 53 55 55 64 66
Gadag 63 64 63 63 48 173 173 173 50
Haveri 56 55 55 55 59 56
Uttara kannada 152 152 152 152 152 152 152 151 151
152
Bellary 116 117 117 117 117 114 113 113 112
Bidar 81 81 81 81 81 80 80 81 81
81
Kalaburagi 160 148 125 125 119 110
158 156 157
Yadagiri 13 35 35 39 29
Rayachuru 72 72 72 72 66 55
135 129 129 129
Koppala 62 63 63 63 63 65
North Karnataka 1193 1196 1280 1198 1198 1188 1179 1176 1170 1111
STATE 2694 2789 2884 2802 2806 2844 2793 2793 2787 2760
Source: General Manager, Karnataka Telecom Circle,* Karnataka at Glance- Statistical Report- FY 2018-19

A-66 Economic Survey of Karnataka 2019-20


Appendix 11.15 Number of Telephones as on 31-03-2019

District/Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19*

Bangalore(Urban) 917290 872095 868968 713963 666476 626909 601406 505580

Bangalore(Rural) 47953 54610 22692 19455 10126 7651 595476 557621 6684
57541
Ramanagara 8000 2413 1397 1200 1596 5262 3622

Chitradurga 28130 19890 18802 22088 13561 11097 7563


53640 25214 23082
Davanagere 37719 24651 23472 16080 22944 19912 14241

Kolar 52437 26187 24229 19371 15979 14033 10061


56402 19854 18709
Chikkaballapura 6722 14153 13044 10259 8378 7762 5338

Shivamogga 54816 55715 53000 49367 43619 37400 32995 30089 30486 22093

Tumakuru 42784 39420 36292 31358 29750 24791 22460 20640 17917 16696

Chikkamagaluru 44659 42336 41780 37400 31800 27706 24179 19742 17412 14934

Dakshina Kannada 144095 130194 123868 115608 105320 97693 73498


210797 139496 129079
Udupi 82480 70152 65745 62250 54094 47580 31312

Hassan 40962 38958 38046 32973 24918 21005 19117 17633 16677 13817

Kodagu 37160 36069 35450 31948 27932 25059 21330 18967 17094 14714

Mandya 22873 17314 18017 17148 15946 12593 10726 9825 9518 8366

Mysuru 87875 76996 72567 65282 61062 57470 55309


86578 62534 59450
Chamarajanagar 11274 10574 7932 8068 5821 5073 3322

South Karnataka 1667229 1566865 1521373 1287905 1180102 1074344 1005746 959470 897045 807150

Belagavi 108483 99921 83387 77075 73477 63865 57039 54499 49283 43535

Vijayapur 29045 24944 22059 21567 17284 16273 10437


48669 27143 24363
Bagalakote 24977 22451 18290 13567 14364 13167 8358

Dharawad 62875 61197 59686 62705 56116 53927 44673

Gadag 41938 100232 19187 17130 13961 11876 10424 70440 64680 7782

Haveri 18896 14268 13241 10454 11487 10044 6928

Uttara kannada 76758 74094 68580 61274 56853 52093 47586 43698 42712 35323

Bellary 40143 38032 37641 32327 29279 26461 23946 23982 23119 18889

Bidar 23200 22389 21937 18435 16777 12774 11484 10266 9163 9021

Kalaburagi 51156 40438 29358 27816 22404 21822 3696


49527 22151 20677
Yadagiri 7631 4468 3793 3831 3085 2258

Rayachuru 24086 13081 15691 14069 12425 11687 7472


40727 18164 16378
Koppala 19016 15763 13439 11511 9868 8496 5237

North Karnataka 520573 473591 430505 382473 355829 314848 288980 270343 250375 203609

STATE 2187802 2040456 1951878 1670378 1535931 1389192 1294726 1229813 1147420 1010759

Source: General Manager, Karnataka Telecom Circle, * Karnataka at Glance- Statistical Report- FY 2018-19

Economic Survey of Karnataka 2019-20 A-67


Appendix 11.16 District and Bank Group Wise Distribution of the Number of
Reporting Offices, Aggregate Deposits and Gross Bank Credit of All Scheduled
Commercial Banks- Sep 2019
(Amount in Rs. Crore)
Sl. District Total Banks
No
Offices Deposits Credits

1 BAGALKOTE 260 8613 8003


2 BANGALORE RURAL 224 12610 7416
3 BANGALORE URBAN 2512 635537 424808
4 BELGAUM 627 27739 18304
5 BELLARY 330 14834 12164
6 BIDAR 169 4989 3638
7 BIJAPUR 243 8841 7481
8 CHAMARAJANAGAR 131 2765 2524
9 CHIKKABALLAPURA 159 4373 3679
10 CHIKKAMAGALUR 261 8246 6520
11 CHITRADURGA 221 6063 5540
12 DAKSHINA KANNADA 583 44532 22983
13 DAVANAGERE 231 7873 8786
14 DHARWAD 353 23484 14507
15 GADAG 157 4853 3941
16 GULBARGA 265 12071 8342
17 HASSAN 323 9591 8093
18 HAVERI 210 5446 5705
19 KODAGU 154 5277 3722
20 KOLAR 188 6921 5220
21 KOPPAL 164 4331 4146
22 MANDYA 255 6485 5419
23 MYSORE 548 35300 20772
24 RAICHUR 237 6634 7335
25 RAMANAGARA 177 7800 6715
26 SHIMOGA 305 14743 8704
27 TUMKUR 333 11221 9335
28 UDUPI 370 24192 11048
29 UTTARA KANNADA 267 13201 3776
30 YADGIR 115 2696 2902
Total 10372 981260 661527

A-68 Economic Survey of Karnataka 2019-20


Appendix 11.17: Statement showing No. of Projects Sanctioned, Project Cost, RIDF loan & Disbursement under RIDF-XVIII to XXIII, as of 31-12-2019
(Rs.in crore)
No. of Expenditure Disbursement
No. of
Total No. of PCRs to made on made on Budget
Sl. PCRs Project RIDF Balance
Departments & Particulars of Projects No. of Projects be Projects as Projects as Estimate
No submitted Cost Loan 7-9
Projects Completed Submitted on on 2019-20
to NABARD
to NABARD 31-12-2019 31-12-2019
1 2 3 4 5 6 7 8 9 10 11 12

1 Agriculture 232 130 126 4 307.64 287.26 219.45 203.38 88.19 77.36

2 Animal Husbandry 916 421 404 17 329.93 313.45 172.20 163.43 157.73 44.62

3 Department of Skill Development GTTC 21 7 5 2 173.98 147.88 77.97 66.27 96.01 71.76

4 Department of Higher Education 89 27 24 3 325.32 276.52 219.79 183.05 105.53 65.5

5 Department of Horticulture 27 9 9 0 83.44 76.77 58.38 52.69 25.06 4.79

6 Department of Sericulture 23 9 9 0 32.50 30.88 13.79 13.10 18.71 10.63

Economic Survey of Karnataka 2019-20


7 DPU-Department of Pre University College 686 279 93 186 426.65 362.65 221.10 186.68 205.55 73.46

8 Fisheries 73 37 37 0 114.79 105.27 56.88 51.10 57.91 19.21

9 Health and Family Welfare 137 67 60 7 446.84 379.82 322.73 263.47 124.11 54.75

10 DAM- Agriculture Marketing 244 91 90 1 245.63 212.22 136.62 113.22 109.01 80.19

11 KSWC- Ware Housing Corporation 206 39 30 9 346.24 294.76 250.51 213.41 95.73 0

12 Department of Skill Development- ITI 108 30 21 9 261.24 222.05 166.15 141.21 95.09 96.92

13 Public Works Department- Rural Roads & Bridges 1819 1235 1211 24 1857.10 1485.68 1452.64 1156.22 404.46 248.37

14 Rural Development And Panchayat Raj 1746 1468 1416 52 848.86 693.71 619.91 504.01 228.95 76.83

15 Department of Tourism 205 142 124 18 328.32 262.65 278.95 222.96 49.37 38.39

16 WCDD- Women & Child Development Department 1770 1308 1300 8 158.62 134.83 122.99 103.90 35.63 1

17 WRD(MM)- Major & Medium Irrigation 372 304 294 10 645.28 553.87 494.32 416.28 150.96 83.41

18 WRD(MI)- Minor Irrigation 1182 967 945 22 638.71 606.77 509.99 481.69 128.72 65.02

19 BCWD- Backward Class Welfare Department 8 0 0 0 24.80 21.08 0.00 0.00 24.8 2.48

A-69
TOTAL 9864 6570 6198 372 7595.89 6468.12 5394.37 4536.07 2201.52 1114.69
Appendix 12.1 Management, Class and Gender - Wise Enrollment [2019-20]
EDUCATION PRIVATE AIDED PRIVATE UNAIDED OTHERS ALL
CLASS
BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL

A-70
I 205884 225310 431194 38229 37152 75381 306108 249127 555235 3553 3386 6939 553774 514975 1068749
II 218457 238702 457159 38834 37494 76328 319390 252792 572182 4297 4000 8297 580978 532988 1113966
III 215130 227199 442329 38552 35749 74301 300179 239169 539348 4634 4156 8790 558495 506273 1064768
IV 235795 258682 494477 42614 40379 82993 283194 221320 504514 5118 4568 9686 566721 524949 1091670
V 244364 269620 513984 46899 43486 90385 269369 211064 480433 4979 4251 9230 565611 528421 1094032
VI 230518 250422 480940 51360 47041 98401 241103 190655 431758 26588 31672 58260 549569 519790 1069359
VII 232433 252825 485258 53714 47751 101465 224256 175746 400002 28285 31510 59795 538688 507832 1046520
VIII 180249 196177 376426 113938 105609 219547 196975 160134 357109 25826 29587 55413 516988 491507 1008495
IX 164151 157862 322013 136488 122297 258785 186615 151935 338550 17224 19575 36799 504478 451669 956147
X 138707 146239 284946 122605 117388 239993 176688 145651 322339 14892 17500 32392 452892 426778 879670
I to V 1119630 1219513 2339143 205128 194260 399388 1478240 1173472 2651712 22581 20361 42942 2825579 2607606 5433185
VI to VII 462951 503247 966198 105074 94792 199866 465359 366401 831760 54873 63182 118055 1088257 1027622 2115879
I to VII 1582581 1722760 3305341 310202 289052 599254 1943599 1539873 3483472 77454 83543 160997 3913836 3635228 7549064
I to VIII 1762830 1918937 3681767 424140 394661 818801 2140574 1700007 3840581 103280 113130 216410 4430824 4126735 8557559
VIII to X 483107 500278 983385 373031 345294 718325 560278 457720 1017998 57942 66662 124604 1474358 1369954 2844312
I to X 2065688 2223038 4288726 683233 634346 1317579 2503877 1997593 4501470 135396 150205 285601 5388194 5005182 10393376
Source: SATS 2019-20 (SSK)

Appendix 12.2 Management, Class Wise / Category Wise / Sex Wise Enrollment - All Management [2019-20]
OBC [MUSLIMS AND
CLASS GENERAL SC ST ALL
MINORITIES INCLUDED]
BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL BOYS GIRLS TOTAL
I 61008 53829 114837 103023 97691 200714 42018 39923 81941 347725 323532 671257 553774 514975 1068749
II 62124 55467 117591 105992 99869 205861 45468 42097 87565 367394 335555 702949 580978 532988 1113966
III 71098 62649 133747 104803 95830 200633 44116 39971 84087 338478 307823 646301 558495 506273 1064768
IV 72803 63971 136774 107721 101805 209526 43792 40952 84744 342405 318221 660626 566721 524949 1091670
V 67505 59102 126607 106907 102443 209350 43288 41057 84345 347911 325819 673730 565611 528421 1094032
VI 69673 62128 131801 104878 101139 206017 41474 39990 81464 333544 316533 650077 549569 519790 1069359
VII 69717 60695 130412 102548 98447 200995 41212 39336 80548 325211 309354 634565 538688 507832 1046520
VIII 61880 54550 116430 99869 95375 195244 39516 38074 77590 315723 303508 619231 516988 491507 1008495
IX 59725 51929 111654 97206 85652 182858 37864 32819 70683 309683 281269 590952 504478 451669 956147
X 39851 34430 74281 85140 78807 163947 32122 29881 62003 295779 283660 579439 452892 426778 879670
I to V 334538 295018 629556 528446 497638 1026084 218682 204000 422682 1743913 1610950 3354863 2825579 2607606 5433185
VI to VII 139390 122823 262213 207426 199586 407012 82686 79326 162012 658755 625887 1284642 1088257 1027622 2115879
I to VII 473928 417841 891769 735872 697224 1433096 301368 283326 584694 2402668 2236837 4639505 3913836 3635228 7549064
I to VIII 535808 472391 1008199 835741 792599 1628340 340884 321400 662284 2718391 2540345 5258736 4430824 4126735 8557559
VIII to X 161456 140909 302365 282215 259834 542049 109502 100774 210276 921185 868437 1789622 1474358 1369954 2844312
I to X 635384 558750 1194134 1018087 957058 1975145 410870 384100 794970 3323853 3105274 6429127 5388194 5005182 10393376

Economic Survey of Karnataka 2019-20


Source: SATS 2019-20 (SSK)
Appendix: 12.3 Incentives for children in schools

A. PRIMARY EDUCATION
Sl.
Particulars 2018-19 2019-20
No.
1 Free Uniforms, Text Books and Shoe & Socks (Number in lakhs)
a)No. of students provided with Free Uniforms (I to X std.) 44.57 43.79
b)No. of students provided with Shoe and socks (I to X std.) - 43.79
c)No. of students provided with Free Text Books (I to VII std.)
i) Boys 19.45 18.94
ii) Girls 20.75 20.12
iii) Total 40.20 39.07
2 Akshara Dasoha
No. of children provided with mid-day meal in school - I to X standard
a
(Number in lakhs)
i) Government 44.67 46.04
ii) Aided 13.49 11.14
No. of Non-Government organisations involved 68 66
3 Distribution of Bicycles to student for VIII standard(Number in lakhs)
a) No. of Boys 2.20 2.64
b) No. of Girls 2.07 2.35

B. SECONDARY EDUCATION
Sl.
Particulars 2018-19 2019-20
No.
1 a) No. of Secondary Schools 15867 16808
b) Enrolment in IX to X
i) Boys 928275 957370
ii) Girls 855217 878447
iii) Total 1783492 1835817
2 Free Text Books provided (Number in lakhs)
No. of students provided with Free Text Books (VIII
to X std.)
i) Boys 8.62 8.59
ii) Girls 8.37 8.49
iii) Total 16.99 17.08
Reimbursement of Examination Fees studying in Xth Standard
3
(Number in lakhs)
a) No. of Girls Benefited 1.05 1.00
b) No. of SCs Benefited 2.22 2.76
c) No. of STs Benefited 0.79 0.97
d) Amount (Rs. in Lakhs) 1441.11 2068.39
Source: Department of Public Instructions, GOK

Economic Survey of Karnataka 2019-20 A-71


Appendix 12.4 Plan and Non-plan Expenditure on Education
(Rs. in Lakhs)
Year Plan Non- Plan
Primary Education
2009-2010 83151.11 365686.04
2010-2011 127541.13 407479.56
2011-2012 123872.83 481372.82
2012-2013 192439.23 555524.02
2013-2014 241961.73 605087.05
2014-2015 378012.97 690084.21
2015-16 295492.00 652127.00
2016-17 384105.72 657861.96
2017-18 941069.00
2018-19 1465653.00
2018-19(RE) 1461332.86
2019-20(BE) 1508265.17
Secondary Education
2009-2010 52923.64 214898.75
2010-2011 59930.77 249766.93
2011-2012 86632.84 278237.75
2012-2013 97088.21 326672.63
2013-2014 74283.39 390618.90
2014-2015 181505.57 362247.06
2015-16 194457.30 384365.00
2016-17 126124.33 377762.37
2017-18 500178.00
2018-19 612867.00
2018-19RE) 612720.67
2019-20(BE) 704952.48
Higher Education
2009-2010 14142.80 61079.13
2010-2011 36110.78 107945.45
2011-2012 30636.10 129759.96
2012-2013 38154.47 147539.47
2013-2014 55701.01 187467.75
2014-2015 78081.93 174775.54
2015-2016 146154.05 208467.65
2016-17 165214.35 278966.67
2017-18 422505.50
2018-19(RE) 426269.21
2019-20(BE) 549076.97
RE- Revised Estimate
BE- Budget Estimate.

A-72 Economic Survey of Karnataka 2019-20


Appendix 12.5
CATERGORYWISE WHOLESALE GODOWNS AND FAIR PRICE SHOPS
WHOLESALE GODOWNS FAIR PRICE SHOPS
Co-operative Co-operative
Sl. No District KFCSC Total %ge KFCSC Others Total %ge
Society Society
1 2 3 4 5 6 7 8 9 10 11
1 Bagalkote 8 3 11 3.83 0 298 401 699 3.52
2 Bengaluru Rural 0 5 5 1.74 0 253 116 369 1.86
3 Bengaluru Urban 3 5 8 2.79 0 182 368 550 2.77
4 Belagavi 9 10 19 6.62 2 874 841 1717 8.63
5 Ballari 13 0 13 4.53 2 254 440 696 3.50
6 Bidar 6 0 6 2.09 0 158 574 732 3.68
7 Vijayapura 11 0 11 3.83 0 175 659 834 4.19
8 Chamarajnagar 7 1 8 2.79 0 92 387 479 2.41
9 Chikkaballapura 5 1 6 2.09 0 182 358 540 2.72
10 Chikmagalur 7 4 11 3.83 4 325 197 526 2.65
11 Chitradurga 6 4 10 3.48 3 188 390 581 2.92

Economic Survey of Karnataka 2019-20


12 Dakshina Kannada 5 3 8 2.79 2 317 121 440 2.21
13 Davangere 9 1 10 3.48 0 239 443 682 3.43
14 Dharwad 7 1 8 2.79 0 161 347 508 2.55
15 Gadag 6 1 7 2.44 0 289 74 363 1.83
16 Kalaburagi 9 0 9 3.14 0 76 907 983 4.94
17 Hassan 15 0 15 5.23 0 354 519 873 4.39
18 Haveri 4 3 7 2.44 0 365 92 457 2.30
19 Kodagu 2 4 6 2.09 6 166 110 282 1.42
20 Kolar 6 1 7 2.44 0 241 361 602 3.03
21 Koppal 4 0 4 1.39 0 142 315 457 2.3
22 Mandya 4 7 11 3.83 0 327 399 726 3.65
23 Mysuru 10 7 17 5.92 0 352 658 1010 5.08
24 Raichur 5 0 5 1.74 0 94 619 713 3.59
25 Ramanagar 4 4 8 2.79 0 148 408 556 2.80
26 Shivamogga 10 1 11 3.83 0 221 347 568 2.86
27 Tumkur 8 4 12 4.18 3 414 679 1096 5.51
28 Udupi 0 3 3 1.05 0 277 15 292 1.47
29 Uttara Kannada 5 8 13 4.53 1 262 145 408 2.05
30 Yadgir 2 1 3 1.05 0 59 340 399 2.01
31 Bengaluru IRA 12 3 15 5.23 33 378 336 747 3.76
TOTAL 202 85 287 100 56 7863 11966 19885 100
Source: District Deputy Director Office, Food and Civil Suplies Department,

A-73
KFCSC : Karnataka Food and Civil Supplies Corporation
Appendix 12.6
KEROSENE CARD COUNT AND WILLINGNESS REGISTERED CARDS
Kerosene Card
Willing ness regd
Count (Non-gas
Sl No District cards (Gas cards
cards in urban and
in rural areas)
rural areas)
1 BAGALKOTE 59000 25921
2 BENGALURU URBAN 0 0
3 BENGALURU RURAL 14 40821
4 BELAGAVI 138285 244514
5 BALLARI 18090 14082
6 BIDAR 47245 4420
7 VIJAYAPURA 72227 4958
8 CHAMARAJANAGARA 22976 80420
9 CHIKKAMAGALURU 22158 62020
10 CHITRADURGA 28362 8307
11 DAKSHINA KANNADA 17490 103999
12 DAVANAGERE 1445 236
13 DHARWAR 19931 41630
14 GADAG 38069 3179
15 KALABURAGI 91877 71
16 HASSAN 258 149711
17 HAVERI 40359 69252
18 KODAGU 10178 39857
19 KOLAR 18466 39813
20 KOPPAL 59022 3184
21 MANDYA 254 228218
22 MYSURU 6048 361450
23 RAICHUR 45890 6094
24 SHIVAMOGGA 0 151162
25 TUMAKURU 44113 160066
26 UDUPI 10112 90334
27 UTTARA KANNADA 43975 106307
28 CHIKKABALLAPURA 23319 46004
29 RAMANAGARA 12632 65147
30 YADGIR 46179 126
31 BENGALURU IRA 0 0
Total 937974 2151303
Source: District Deputy Director Office, Food and Civil Suplies Department

A-74 Economic Survey of Karnataka 2019-20


Appendix 12.7
GODOWN DETAILS OF THE STATE
Sl. Co-operative Capacity
District KFCSC
No Society (in MTs)

1 Bagalkote 8 3 17875
2 Bangalore Urban 0 5 24200
3 Bangalore Rural 3 5 7900
4 Belagavi 9 10 32430
5 Bellary 13 0 23687
6 Bidar 6 0 5400
7 Bijapur 11 0 14230
8 Chamrajnagar 7 1 7106
9 Chikkamagalur 5 1 11910
10 Chikkaballapur 7 4 9714
11 Chitradurga 6 4 13910
12 Dakshina kannada 5 3 10305
13 Davangere 9 1 14300
14 Dharwad 7 1 10477
15 Gadag 6 1 10890
16 Gulbarga 9 0 18000
17 Haveri 4 3 12660
18 Hassan 15 0 115750
19 Kodagu 2 4 10100
20 Kolar 6 1 14140
21 Koppal 4 0 10042
22 Mandya 4 7 20400
23 Mysore 10 7 27980
24 Ramnagar 4 4 27574
25 Raichur 5 0 183.97
26 Shimogga 10 1 12600
27 Tumkur 8 4 17050
28 Udupi 0 3 5400
29 Uttara Kannada 5 8 9225
30 Yadgir 2 1 9650
31 Bangalore IRA 12 3 14030
TOTAL 202 85 539118.97
Source: District Deputy Director Offices.

Economic Survey of Karnataka 2019-20 A-75


Appendix 12.8 Health Instutions in Karnataka

Autonomous & Indian System of


Other Hospitals Total Total Sub
Sl. Taluk Hospitals District Hospitals Teaching CHC PHC Medicine
Districts under HFW Hospitals Beds Center
No. Hospitals Hospitals

A-76
No's Beds No's Beds No's Beds No's Beds No's Beds No's Beds No's Beds No's Beds No's
1 Bagalkote 5 500 1 300 0 0 0 0 8 280 49 290 6 56 69 1426 234
2 Bangalore (R) 4 400 0 0 0 0 0 0 2 60 48 321 3 26 57 807 167
3 Bangalore (U) 3 300 0 0 6 1475 16 6728 5 150 96 688 10 616 136 9957 195
4 Belgaum 9 900 0 0 0 0 1 740 16 500 148 848 7 54 181 3042 549
5 Bellary 6 600 1 300 1 288 2 1315 11 350 73 502 11 229 105 3584 272
6 Bidar 4 400 0 0 0 0 1 750 8 240 58 334 4 41 75 1765 280
7 Bijapur 4 400 1 400 0 0 0 0 9 270 68 366 5 90 87 1526 309
8 Chamarajanagar 3 350 0 0 0 0 1 300 3 90 64 434 4 36 75 1210 245
9 Chikkaballapura 5 510 1 100 0 0 0 0 2 60 60 393 2 16 70 1079 199
10 Chikmagalur 6 600 1 400 0 0 0 0 5 170 90 624 4 32 106 1826 375
11 Chitradurga 5 500 1 450 0 0 0 0 11 330 82 510 5 42 104 1832 283
12 Dakshina Kannada 4 400 1 965 1 100 0 0 8 240 72 416 4 41 90 2162 440
13 Davanagere 5 500 1 1030 0 0 0 0 6 180 101 686 3 26 116 2422 301
14 Dharwad 3 300 1 250 0 0 2 1575 0 0 45 214 3 45 54 2384 194
15 Gadag 4 400 0 0 0 0 1 350 2 60 39 244 4 36 50 1090 168
16 Gulbarga 6 600 0 0 0 0 1 750 16 480 136 894 10 133 169 2857 347
17 Hassan 7 950 0 0 0 0 0 0 15 450 69 414 8 87 99 1901 456
18 Haveri 6 600 1 250 0 0 1 650 5 150 93 518 3 22 109 2190 303
19 Kodagu 2 360 0 0 0 0 1 410 7 310 29 275 6 50 45 1405 206
20 Kolar 4 400 1 400 2 305 0 0 2 60 69 458 3 30 81 1653 230
21 Koppal 3 300 0 0 0 0 1 340 9 270 49 296 4 32 66 1238 185
22 Mandya 6 600 0 0 0 0 1 650 10 300 115 871 7 63 139 2484 385
23 Mysore 6 600 0 0 1 50 3 1940 10 300 147 905 13 364 180 4159 438
24 Raichur 4 400 0 0 0 0 2 870 6 180 52 330 5 51 69 1831 223
25 Ramanagar 3 300 1 100 0 0 0 0 4 120 63 429 4 36 75 985 275
26 Shimoga 6 650 0 0 0 0 1 950 7 210 110 654 4 130 128 2594 305
27 Tumkur 9 900 1 400 0 0 0 0 4 120 147 998 6 56 167 2474 487
28 Udupi 2 200 1 350 0 0 0 0 6 180 62 458 3 30 74 1218 301
29 Uttara Kannada 10 1000 0 0 0 0 1 300 3 110 83 538 4 36 101 1984 343

Economic Survey of Karnataka 2019-20


30 Yadgir 2 200 1 100 0 0 0 0 6 180 42 284 4 28 55 792 176
Total 146 15120 15 5795 11 2218 36 18618 206 6400 2359 15192 159 2534 2932 65877 8871
Appendix 16.1 Details of Aspirant registrations on kaushalya.karnataka.gov.in, as on Nov 2019
Age (18 to 50 Years)
Sl No District Registrations Female Male Other Minority General SC ST Specially Abled

1 BAGALKOTE 30184 1194 27405 15 433 669 353 109 6

2 BENGALURU RURAL 10673 624 8986 4 140 582 270 64 3

3 BELAGAVI 45054 2806 37097 35 1183 2451 1078 378 26

4 BALLARI 43129 1531 39115 9 516 631 819 498 10

5 BENGALURU URBAN 39883 2487 31049 14 1668 3326 1126 164 49

6 BIDAR 26747 1612 21472 15 1132 1103 868 537 8

7 VIJAYAPURA 25867 2145 19922 8 1203 1333 1107 131 18

8 CHAMARAJANAGAR 10499 1846 6532 262 586 1024 242 7

9 CHIKBALLAPUR 15770 1207 12899 4 262 519 620 243 16

10 CHIKMAGALUR 15333 1538 11942 8 353 743 640 101 8

11 CHITRADURGA 21400 3333 13901 9 794 1812 1062 482 7

12 DAKSHIN KANNADA 13464 1263 10049 10 793 882 295 158 14

Economic Survey of Karnataka 2019-20


13 DAVANGERE 17226 2437 11526 7 765 1387 754 336 14

14 DHARWAD 28645 3033 20794 9 1563 2116 796 315 19

15 GADAG 24848 1839 20594 48 611 1073 483 187 13

16 KALBURAGI 46548 3275 39132 44 1330 923 1650 150 44

17 HASSAN 20168 2293 14612 6 634 1333 1146 136 8

18 HAVERI 20705 2055 15546 18 865 1363 529 320 9

19 KODAGU 4711 970 2617 1 282 437 329 73 2

20 KOLAR 17937 1177 14745 3 519 657 701 127 8

21 KOPPAL 18822 1813 14524 13 616 1097 541 213 5

22 MANDYA 13895 1542 10463 5 385 615 785 88 12

23 MYSORE 31469 2469 25505 26 588 1216 1128 521 16

24 RAICHUR 58083 2419 52416 30 791 1028 982 404 13

25 RAMANAGARA 10075 696 7945 1 444 708 226 42 13

26 SHIVAMOGA 15843 1315 12601 6 440 839 516 113 13

27 TUMKUR 32324 3997 21259 11 2289 3241 1126 384 17

28 UDUPI 5889 404 5093 2 64 196 65 62 3

29 UTTAR KANNADA 11263 656 9552 9 388 456 159 43 0

A-77
30 YADGIRI 11778 567 10167 8 291 507 162 69 7

TOTAL 688232 54543 549460 378 21604 33829 21340 6690 388
Appendix 16.2 Deen Dayal Antyodaya Yojana – National Urban Livelihood Mission (DAY-NULM)-2019-20
(Physical & Financial Target Achievement) As on November-2019
Financial

A-78
Physical Remarks
Sl. Name of the (Rs. in Lakhs)
No Component
% of
Target Achievement Target Achievement Achievement (%)
Achievement
SHG-4400 (52800
692 16 1436.00 258.73 18 1. 692 SHGs are formed with 6813 Members
members)
SHG Revolving 2. 283 ALF are formed with 3814 members, Revolving
360 10
Fund-3520 fund issued to 12 ALF
Social
Mobilization & ALF (RF)-220 12 5 3. Revolving fund given to 360 SHGs
1
Institutional
Development 1 6.25 4. Training has been conducted for 703 beneficiaries.
CLF-16

Capacity Building - 703 5 5. 2967 Basic Service Bank Deposit Accounts are opened
13200 SHG members
1. Total trained candidates -4632 & Total No of
Employment
candidates under going training - 2102
through Skill
2 24520 4779 19 3646.86 650.59 18 2. Total Placement - 185 (Wage employment - 101 and
Training &
Self employment-84) under various sector, Total
Placement
Certificates issued -2231
SEP Individual-3200 278 9 20944 beneficiaries are provided subsidy through bank.
Self Employment The training has given to the all district level Lead
Programme SEP Group-300 63 21
3 555.80 298.15 0.54 bankers about SEP.
(Individual &
Group) SHG Credit Linkage-
343 11
1200
The various capacity building & training has been
conducted to the Urban local bodies officers such as
SMMU-6 MTOs-2
Commissioner, Municipal Commissioner, Chief Officers,
CMMU-MIS & F&I , CO-
Capacity Building Mission Managers, Community Affairs Officers,
4 325, MTOs-21, Training 1217.5 89.34 7
and Training Community Organizers, & Elected Members. The training
740, training equipment
mainly focused on about DAY-NULM, Shelter for Urban
materials - 67 cities
Homeless, Street Vendor Act-2014, About CRP Concept,
MIS Data & etc
5 Shelter for Urban Homeless

New Construction 8 0 0

Operational & 1387.25 89.68 6 9th PSC has been conducted on 05-07-2019
Maintenance – 60 0 0
O&M
Total 22926 Street Vendors are identified. 16001 Street
Vendors have received ID Cards. Total 8870 basic saving
Support to Urban
6 200000 16001 8 766.00 190.44 25 accounts have opened for street vendors . Total 25
Street Vendor
financial literacy camps organized for street vendors.
Total no of training programs conducted 1666.
7 A&OE 368.00 185.70 50

8 IEC 288.60 0.40 0%

Economic Survey of Karnataka 2019-20


Total 9666.01 1763.03 18
Appendix 16.3 Details of Funds Released And Expenditure Towards Procurement of Land, Building and Machinery for the Year 2015-16, 2016-17, 2017-18, 2018-19 and 2019-20 (Till
Date) Under Different Schemes SDP, SDP- NABARD, Rs. in Lakhs
Estimated
Sl No. Centres Project Name 2015-16 2016-17 2017-18 2018-19 2019-20* Total Expenditure Progress
Cost
SDP
1 Humnabad Workshop 393.92 98.92 - - - - 136.42 136.42 Work Completed
2 Humnabad Training Block 293.00 - - - - - 293.00 293.00 Work Completed
3 Humnabad Civil (Canteen) 125.00 125.00 - - - - 125.00 125.00 Work Completed
4 Gulbarga Training Block 490.00 70.00 188.63 390.00 390.00 Work Completed
5 Gulbarga Civil Work (Canteen) and Developmental works 181.08 181.08 - - - - 181.08 181.08 Work Completed
6 Gulbarga CFC 210.00 30.00 - - - - 60.00 60.00 Work Completed
7 Kanakapura Civil, Additional Class Room, Furniture & Lab 200.00 25.00 - - - - 100.00 100.00 Work Completed
8 Kanakapura Hostel Building 174.00 - - - - - 44.00 44.00 Work Completed
9 Lingasaguru Hostel Building 184.84 - - - - - 74.84 74.84 Work Completed
10 Gokak Canteen & Development works 190.62 190.62 - 190.62 128.00 Work under progress
11 Gouribidanuru Civil & Development works 231.00 - - - - - 231.00 231.00 Work Completed
12 Gouribidanuru Machinery 700.00 225.00 375.00 - 25.00 - 625.00 625.00 Work completed
13 Gouribidanuru Canteen 125.00 125.00 - - - - 125.00 93.76 Work Completed
14 Gundlupet Workshop 344.00 112.60 - - - - 337.60 337.60 Work Completed
15 Gundlupet Training Block 681.59 106.00 225.00 278.00 - 609.00 609.00 Work completed
16 Hunsur Procurement of Machinery 490.00 150.00 - - - 150.00 150.00 Work completed
17 Koppal Procurement of land 60.00 59.98 - - - 59.28 57.25 Land procured
18 Kudalasangama Electronic Lab 150.00 150.00 0 - - - 150.00 150.00 Work completed
19 Kudalasangama Training Block 350.00 40.63 0 - - - 162.50 162.50 Work Completed
20 Kudalasangama Hostel Building 178.12 178.12 109.38 - - - 287.50 102.0 Work under progress

Economic Survey of Karnataka 2019-20


21 Lingasaguru Canteen 125.00 125.00 - - - - 125.00 123.83 Work Completed
22 Yadgir Land & Development works 201.37 - - - - - 201.37 119.66 Work Completed
23 Kalburgi SIEMENS-COE Centre 5233.00 - - 1000.00 - 1000.00 1000.00 Work completed
24 Kalburgi Hostel 342.97 - - 85.75 - 85.75 85.75 Work under progress
25 Humnabad Additional Class Room & Development work 155.00 - - - 155.00 - 155.00 3.75 Work under Progress
26 Lingasugur Development work 83.00 - - - 83.00 - 83.00 3.80 Work under Progress
27 Koppal Development work 250.00 - - - 250.00 - 250.00 33.24 Work under Progress
28 Gokak Boys Hostel 300.00 - - - 300.00 - 300.00 38.74 Work under Progress
29 Gokak Machinery & Equipment 154.00 - - - 154.00 - 154.00 154.00 Procurement Process Completed
30 Kudalasangama Workshop & Devp work 290.00 - - - 290.00 - 290.00 65.88 Work under Progress
31 Kanakapura Canteen & Develop work 330.00 - - - 330.00 - 330.00 63.41 Work under Progress
32 Gowribidnur Machinery 600.00 - - - 600.00 - 600.00 369.50 Procurement under progress
33 Kadur Canteen & Develop work 141.00 - - - 141.00 - 141.00 1.23 Work under progress
34 Maddur Canteen & Develop work 141.00 - - - 141.00 - 141.00 46.31 Work under progress
35 Yadgir Boys and Girls hostel 450.00 - - - - 337.50 337.50 2.84 Work under progress
36 Yadgir Machinery & equipments 200.00 - - - - 150.00 150.00 150.00 Completed
37 Kalburgi Addl Training class rooms and labs 188.80 - - - - 141.60 141.60 8.48 Work under progress
38 Koppal Boys and Girls hostel 450.00 - - - - 337.50 337.50 2.84 Work under progress
39 Koppal Machinery & equipments 200.00 - - - - 150.00 - - Tender under progress
40 Gokak Girls hostel 300.00 - - - - 225.00 - - Work under progress
41 Gokak Machinery & equipments 444.40 - - - - 333.30 - 100.00 Procurement under progress
42 Kanakapura Staff quarters 300.00 - - - - 225.00 - 2.50 Work under progress
43 Gowribidanur Staff quarters 300.00 - - - - 225.00 - 2.50 Work under progress
44 Gowribidanur Machinery & equipments 330.50 - - - - 247.88 - 130.00 Procurement under progress
45 Maddur Boys canteen and hostel 258.30 - - - - 193.73 - 1.63 Work under progress
46 Gundlupet Boys canteen and hostel 300.00 - - - - 225.00 - 1.90 Work under progress
SDP NABARD -
1 Gokak Workshop & Training Block 1052.00 - - 975.00 - - 975.00 788.90 Work under progress
2 Hunsur Training block 847.00 - - 825.00 - 16.50 825.00 293.00 Work under progress
3 Koppal Workshop 433.00 - - 403.00 - - 403.00 371.04 Work under progress
4 Koppal Training block 801.00 - 30.00 205.00 200.00 - 235.00 335.36 work under progress

A-79
5 Yadgir Workshop 417.00 - 30.00 387.00 - - 417.00 416.92 work under progress
6 Yadgir Training block 841.00 - - 205.00 - - 205.00 295.75 work under progress
*(Upto Nov-2019)
Appendix 16.4 Details of Progress for the Year 2015-16, 2016-17, 2017-18, 2018-19 and 2019-20 (Up to November-2019) under NABARD
Rs. in Lakhs

A-80
Estimated
Sl No. Centres Project Name 2015-16 2016-17 2017-18 2018-19 2019-20 * TOTAL Expenditure Status
Cost
1 Belgaum Training block 742.00 - 36.08 213.00 492.92 - 742.00 649.80 Work under Progress
2 Chitradurga Workshop & Training Block 998.00 - 30.00 - 300.00 - 330.00 407.35 work under progress
3 Dandeli Training block 787.00 - 36.08 213.00 537.96 - 787.04 692.38 work under progress
4 Gouribidanuru Workshop & Training Block 1001.00 200.00 611.16 189.84 - - 1001.00 986.65 Work Completed
5 Gouribidanuru Boys and Girls hostel 591.00 265.88 4.74 Work under progress
6 Harihara Workshop & Training Block 750.00 100.00 201.49 167.26 - - 750.00 613.29 Work Completed
7 Mangalore Workshop 221.00 100.00 66.20 54.90 - - 221.10 173.01 Work Completed
8 Udupi Work Shop & Training Block 1100.00 - 30.00 450.00 620.00 - 635.00 1100.00 Work Completed
9 Udupi Boys and Girls hostel and Developmental works 647.00 - - - - 145.58 - 4.09 Work under progress
10 Kadur Training block 723.00 - - 150.00 212.12 231.75 203.03 130.73 work under progress
11 Maddur Training block 992.00 - - 150.00 214.00 203.50 768.24 work under progress
12 Tumkur Training block 758.00 - - 150.00 214.00 295.00 203.50 - Work under progress
13 Yadgir Training block 841.00 - - - 200.00 327.00 50.00 - Work under progress
14 Koppal Training block 801.00 - - - 200.00 297.00 50.00 - Work under progress
15 Harihar Multi Skill Training block and Boys hostel 750.00 - - - - 168.75 168.75 4.74 Work under progress
16 Haveri Training block 725.00 - - - - 163.13 163.13 4.58 Wrok under progress
17 Haveri Workshop and Developmental works 740.00 - - - - 277.50 277.50 47.47 Work under progress
18 Dandeli Girls hostel and Developmental works 343.00 - - - - 77.18 77.18 2.17 Work under progress
19 Vijayapura Land procument, construction of Workshop and Developmental works 740.00 - - - - 166.50 166.50 -
20 Challakere Campus - Training 2564.00 - - - - 1345.50 1345.50 554.95 Work under progress
21 Madakebeedu Workshop and Developmental works 740.00 - - - - 277.50 277.50 41.18 Work under progress
22 Humnabad Boys hostel 300.00 - - - - 225.00 225.00 26.94 Work under progress
Total 17854.00 400.00 1011.01 1738.00 2991.12 4262.55 7877.23 6212.31
*(Up to Nov-2019)

Appendix 16.5 Details of Progress for the Year 2015-16, 2016-17, 2017-18, 2018-19 and 2019-20 (till date) under SCP/TSP
Rs. in Lakhs
2019-20 TOTAL
Sl No. Centres Project Name Estimated Cost 2015-16 2016-17 2017-18 2018-19
(Up to Nov-019) Expenditure
1 Bangalore Machinery & Equipments 272.70 - 392.8 - - - 392.8
2 Hubballi Machinery & Equipments 143.30 - 143.3 - - - 143.3
3 Chitradurga Workshop & Training Block 998.00 - - 154.96 - - 154.96
4 Gundlupet Training Block 681.59 - - 71.56 - - 71.56
5 Gundlupet Development works 112.00 - - - 112.00 - 112.0
6 Belgaum(TSP) Development works 75.00 - - - 75.00 - 75.00
7 GTTC centres Machinery & equipments(SCP) 113.00 - - - - 84.75 46.96
8 GTTC centres Machinery & equipments(TSP) 76.00 - - - - 57.00 22.98

Economic Survey of Karnataka 2019-20


Total 2471.59 -- 536.10 226.52 187.00 141.75 1019.56
Appendix 16.6 Progress under Kaigarike Vikas Yojana(KVY)
Rs. in Lakhs
2019-20
Sl No. Centres Project Name Estimated Cost 2015-16 2016-17 2017-18 2018-19 TOTAL Expenditure
(Up to Nov-19)
1 Kanakapura Canteen block with furniture 125.00 - 25.00 - - - 25.00 25.00
TOTAL 125.00 - 25.00 - - - 25.00 25.00

Appendix 16.7 Progress under Specialised Skill Development Institutions (SSDI)


Rs. in Lakhs
Estimated
Sl No. Centres Project Name 2015-16 2016-17 2017-18 2018-19 2019-20* TOTAL Expenditure Status
Cost
SSDI
1 Bangalore Hostel, Civil & Elec. 45.00 - - - - - 45.00 45.00 Work Completed
2 Bangalore Procurement of Computers 350.00 - 100.00 250.00 - - 350.00 - Work completed
3 Bangalore Lift facility & renovation works 80.00 - 80.00 - - - 80.00 4.69 Work order issued
4 Bangalore Additional training block 500.00 - 50.00 300.00 37.50 112.50 387.50 0.59 Work is under progress
5 Bangalore Electrical [Power Distribution works] 50.00 - - - - 50.00 50.00 Work Completed
6 Bangalore GTTC, Centres Library books 200.00 - - 200.00 - - 200.00 - Work completed
7 Chitradurga Procurement of land 55.52 - - 55.52 - - 55.52 55.52 Land procured
8 Dandeli Canteen and Furniture & Fixtures for Training Block 207.00 207.00 - - - 207.00 119.49 Work completed,
9 Harihara Land & Machinery 195.00 195.00 - - - 195.00 195.00 Work completed

Economic Survey of Karnataka 2019-20


10 Hassan Canteen & Development works 150.00 150.00 - - - 150.00 150.00 Work Completed
11 Mangalore Procurement of machinery 200.00 100.00 - - - 100.00 8.46 Tender to be called
12 Shivamoga Compound Wall and Developmental works 135.00 - - -- - - 135.00 135.00 Work Completed
13 Shivamoga Hostel with dining hall 300.00 - - - - 225.00 225.00 1.82 Work under progress
14 Hubli Multi skill 650.00 - - 200.00 112.50 337.50 312.50 75.69 Work is under progress
15 Kolar Training block 600.00 - - 220.00 95.00 285.50 315.00 142.00 Work is under progress
16 Naragund Land and work shop 750.00 - - 300.00 112.50 - 412.50 - Land Procurement Under progress
17 Harihara Development works 100.00 - - 100.00 - - 100.00 73.48 Work completed
18 Harihara Additional class rooms 150.00 112.50 112.50 1.91 Work under progress
19 GTTC Centres ISO Certification 30.00 - - 30.00 - - 30.00 - Work under progress
20 COE Mysore SIEMENS COE Centre 5230.00 - - 4000.00 - - 4000.00 4000.00 Work completed
21 CoE Dandeli SIEMENS COE Centre 5230.00 2000.00 - 2000.00 2000.00 Work completed
22 4 COE Centres Infrastructures Dev. Works for 4 COE 1000.00 - - 1000.00 - - 1000.00 1000.00 Work completed
23 4 COE Centres SIEMENS COE 4 Centres 4000.00 - - - 4000.00 - 4000.00 4000.00 Work completed
24 Hassan Training block & Hostel building 614.00 187.90 116.90 - - - 429.80 312.90 Work Completed
25 Hosapete Civil works & Machinery 1000.00 200.00 100.00 - 50.00 75.00 550.00 500.00 Work Completed
26 Chikkodi Civil works & Machinery 2865.00 - 350.00 800.00 266.25 - 1766.25 1120.31 Work Completed
27 Udupi Developmental works and Hostel with dining hall 450.00 - - - 37.50 337.50 37.50 - Work under progress
28 Dandeli Developmental works 121.00 - - - 30.25 - 30.25 - Work under progress
29 Maddur Developmental works 150.00 - - - 37.50 - 37.50 - Work under progress
30 Tumkur Developmental works 150.00 - - - 37.50 75.00 37.50 - Work under progress
31 Kadur Developmental works 100.00 - - - 25.00 - 25.00 - Work under progress
32 Hospete DS-Computers and Hardware 50.00 - - - 50.00 - - 50.00 Completed
33 Lingasugur Computers and Hardware 50.00 - - - 50.00 - - 50.00 Completed
34 Humnabad Computers and Hardware 50.00 - - - 50.00 - - 50.00 Completed
35 Yadgiri Computers and Hardware 50.00 - - - 50.00 - - 50.00 Completed
36 8 GTTC Centre Machinery & Equipment 1,166.00 - - - 1,166.00 - - 591.52 Procurement under progress
37 Hangal Machinery & equipments 113.00 - - - - 84.75 - - Tender under process
38 GTTC centres Furniture and fixtures 100.00 - - - - 75.00 - - Tender under progress
39 Bangalore C-Block hostel renovation work[Girls hostel) 93.00 - - - - 69.75 - - Work under progress

A-81
*(Up to Nov-2019)
Appendix 16.8 Assistance to Institutions for Technology Training (AITT)
Amount Rs. in lakhs

Sl. No. Centres Description 2015-16 2016-17 2017-18 2018-19 2019-20 * TOTAL Expenditure Remarks

A-82
1 All GTTC centres Special Component Plan[SCP] - - 455.50 350.00 175.00 980.50 819.09 Skill training to SC candidates

2 All GTTC centres Tribal Sub Plan [TSP] - - 186.00 191.00 95.00 472.00 379.12 Skill training to ST candidates

3 All GTTC centres Other Expenditures 500.00 500.00 775.15 960.00 750.00 3485.15 3485.15 Skill training
*(Up to Nov-2019)

Appendix 16.9 Cadre strength at GTTC centre

Sl. No. Cadre Strength No. of Employees working Vacancy available

1. 617 302 315

Appendix 16.10 Training programmes

Sl.
Training programmes 2015-16 2016-17 2017-18 2018-19 2019-20*
No
1 Diploma in Tool & Die Making
(1st Semester to 8th Semester ) 3555 3688 3521 3654 3845

Diploma in Precision Manufacturing (1st Semester to 8th Semester )


607 602 501 511 555

Diploma in Mechatronics
(1st Semester to 8th Semester ) 153 175 215 281 296

Diploma in Electronics & Communication Engineering (1st Semester to 6th Semester)


120 132 115 91 95

TOTAL
4435 4597 4352 4537 4791

2 Govt. Sponsored Training Programmes

Skill Development training for educated unemployed candidates of SC/ST and other category
candidates will be given under SCP, TSP CMKKY. 1256 1667 5308 1082 3499

*(upto Nov-2019)
Appendix 16.11 Details of Diploma passed out Trainees from 2015 to 2019

Sl. No Training programmes 2015-16 2016-17 2017-18 2018-19

1 Diploma in Tool & Die Making 611 674 698 653

2 Diploma in Precision Manufacturing 98 117 106 73

3 Diploma in Mechatronics 23 45 46 21

4 Diploma in Electronics & Communication Engineering 38 38 35 25

Economic Survey of Karnataka 2019-20


TOTAL 770 874 885 772
Appendix 16.12 Consolidated Skill Development Training Provided
Sl.
Skill initiative through 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 TOTAL
No
1 Mes training through ATP’s 9698 35088 26577 4583 306 - - - - - - 76252

2 Sahayog programe in 219 colleges - - 14675 - - - - - - - - 14675

3 E-learning lab-50 hostels - 1600 6812 8340 - - - - - - - 16752

4 Human resources development centre - - 1037 645 2276 7575 1081 - - - - 12614

5 Karnataka employment center - - 1130 1380 473 - - - - - - 2983

6 Through minority department - - 1440 10820 - - - - - - - 12260

7 Elip training at govt ITI’s - - 13887 12884 11906 - - - - - - 38677

8 Training for engineering candidates - - 3347 6055 - - - - - - - 9402

9 Training – SDP - - 439 15380 - - - - - - - 15819

10 Pre training for airman selection - 793 - - - - - - - - 793

11 Special category training (for disabled) - - - 887 - - - - - - - 887

Economic Survey of Karnataka 2019-20


12 Sabala program - - - 4390 - - - - - - - 4390

13 Through Bharathi Walmart - - - - 1277 990 - - - - - 2267

14 NCVT & SCVT (CTS and MDTS) 68438 74676 71275 58675 86821 - - - - - - 359885

15 Apprenticeship training (ATS) 8776 8567 9415 8752 20865 - - - - - - 56375

16 MSDCS - - - 510 990 - - - - - - 1500

17 Urban development – DET - - 4100 - - - - - - - - 4100

18 Other line department 29089 25660 - - 124858 - - - - - - 179607

19 Through VTP’s (MES) 13402 20374 4425 22179 57215 - - - - - - 117595

20 Through KGTTI - - - - - 282 108 - - - - 390


Special Component plan Training Programme for SC
21 - - - - - - - - 2600 - - 2600
candidates
22 Tribal Area sub plan Training Programme for ST candidates - `- - - - - - - 2330 - - 2330
Special Development Programme. Training Programme for
23 candidates in backward areas (As per Dr. D.M - - - - - - - - 8860 - - 8860
Nanjunadappa’s report)
Training Programme for candidates belonging to minority
24 - - - - - - - - 140 - - 140
community
Skill Training Programme for women only in collaboration
25 with. Karnataka State Women Development Corporation - - - - - - - - 1360 - - 1360
(KSWDC)-
26 Banjara Training Programme - - - - - - - - 75 - - 75

A-83
TOTAL 129403 165965 159352 155480 306987 8847 1189 - 15365 - - 942588
A-84 Economic Survey of Karnataka 2019-20
& Statistics Department
Planning, Programme Monitoring
ECONOMIC SURVEY OF KARNATAKA
2019-20

ECONOMIC SURVEY OF KARNATAKA


2019-20
M.S. Building,
Planning, Dr. B.R. Ambedkar Veedhi,
Programme Monitoring Bengaluru - 560 001
and Statistics Department website: http://planning.karnataka.gov.in
http://des.karnataka.gov.in

Department of Printing, Stationery and Publications, Bengaluru

Vous aimerez peut-être aussi