Contents
Features 4 Installation 17
Rating 10 Dimensions 18
Ordering Information 11 Power Fuse 20
External View 12 Coordination Graph 21
Accessories 14 Power Fuse Selection Tables 22
Operation Principle 16
3
Applied by new mechanism
General features
In application of new concept mechanism of bendable type blade structure LG Tri-MEC Air Insulited Load
Break Switch (LBS) has been equipped with further advanced technology and in a system switching the
circuits when checking, measuring, testing and repairing the instruments. at branch point with 3 phase
load break switch designed customer-orientedly and considerably.
In particular, a bendable type blade structure is significantly small in operation radius in contrast with
existing direct line one and an arc discharge angle at the time of breaking operation is under 50°,
thereby reducing the danger of accident by an arc remarkably.
And it is suitable for a metal Enclosed, Pad-Mounted Switchgear and Package Substation thanks to
higher insulation-resistant power and is equipped with durability, stability and economical efficiency. E2
class mechanical strength based on new standard application.
4
Operation conditions
•Standard ambient temperature: under+ 35℃ (24hrs in average)
•Standard temperature: -20℃~+40℃
•Standard storage: -25℃~+60℃
•Humidity: +40℃/85% below
+20℃/90% below
•Place : Indoor place with clean ambient air not being contaminated with dust, smoke,
corrosion substance or combustible substance, salty materials, etc. Never use,
store or leave alone this product in the place with sulfuric gas, ammonia gas and
corrosive gas. (HS≤0.01ppm, SO2≤0.01ppm, NH3≤a few ppm)
•Altitude: above sea level 1000m below
Applied standards
IEC 62271-105, 60265-1, 60694, 60282-1
5
Performance Up-Grade by New Standard
Reliable Technology
This product has been verified for its excellency in quality through passing
the development test strictly in accordance with New Standard
IEC 62271-105 (Switch Fuse) and 60265-1 (Load Break Switch)
Design Characteristics
•KERI type test in application of IEC New Standard
Power Testing &
Technology Institute - Approved by KOLAS
Global key technology accumulation through self
development test and analysis by PT & T of public test
institute.
•Compact & space saving design
•3 phase collective operation
•Application with combustion-resistant and high strength
engineering
•Compressed air mode arch extinction
•Break switch-fuse combination (24kV 25kA switching, 40kA max)
•Fuse striker automatic trip (DIN 43625)
6
The Highest Performance
in Domestic Market
This product has succeeded in attaining the highest performance
in Korea through passing electrical performance test with
New Standard E2 test grade.
Verification of the most duration times Comparison of development test major items.
of load break in the country
Test class
The performance of this new standard product has been improved by 300% in E1 class E2 class
Test item
comparison with old standard one through passing the load break test in
application of IEC 60265-1, and an excellent performance has been verified
successfully by completing the load break test in application of E2 grade Rated load current break 10 times 30 times
intensified further than new standard E1 grade.
•Load break 100 times
•No load break 1000 times Short current imput (52kA) 2 times 3 times
Passed in transfer current test Note) E2 grade : test condition requiring the performance higher by
of fuse combination type maximum 300% than E1 grade in accordance with IEC standard.
Having been passed recently in the transition current test in accordance with
modern international standard 62271-105, this product has increased the
reliability sufficiently in application of self developed power-fuse.
7
Reliability and Stability for User
300mm
8
Metal Screen Test
Through passing the Metal Screen Test for the verification of
insulation resistance conducted at the distance of 300mm from
a panel door, the stability and reliability has been
attained to the full satisfaction.
°
50°
panel
door
Arc
300mm
9
Rating
630A 30
Load current
31.5A 20
current 9.45A 10
10
Ordering Information
LG Load break Kind of break Control method Rated Rated Control Number Composition Manual operation
switch switch voltage (kA) current (A) power of circuits cable
Motor S LBS single type
M powered
Air LBS 24 24kV 6 630A D1 DC 110V 1 1 circuit 20 2.0mm
F Fuse
L (Vacuum B Manual D2 DC 220V interlocked type 10 1.0mm
load type)
A1 AC 110V 15 1.5mm
A2 AC 220V 18 1.8mm
None 26 2.6mm
00
(manual) 35 3.5mm
00 None
Note) 1. Left attaching type of drive mechanism is separate order product (See page 13)
2. A power fuse is only available in DIN product.
Power Fuse
11
External View
➏ ➐
➊
➋
➎
➍
➌
➐ ➒
➊ ➓
12
Left & right drive mechanism
Easy input operation and trip operation through employing independently
developed mechanism and capable of left & right drive mechanism.
Manual operation
cable
Vertical mounted
position
Horizontal mounted
position
Mechanism
Note) Manual operation cable is standard and in case of horizontal installation the use is possible through
installation by changing cable kit with simple operation (See manual)
13
Accessories
14
Counter
A device displaying the operating times of a break switch in application of 5 Digits
Aux. switch
As a contact to be operated through interlocking mechanically according to ON/OFF
condition of main contact of a load break switch it is used in the display or control of
condition of a load break switch.
Control circuits
Auxiliary Switch *
Fuse Check
ON OFF 4a 4b Limit Switch
3 1 5 34 36 38 50 22 24 26 28 F9 M : Charging Motor
TC : Trip Coil
RY : Motor Operation Relay
12 9 30 AUX : Auxiliary Switch
RY-a RY-a AUX-a **
A B
8 5 31
1 2
14 1 1 3 4
34 36 38 50 22 24 26 28 COM
5 6
RY M TC LS-a
13 2 2 35 37 39 51 23 25 27 29 NO F9 F10
6
AUX-b 10 33
34 35 38 39
6' RY-a AUX-a 36 37 50 51
20
6 32
AUX-b 22 23 26 27
21 24 25 28 29
4 2 6 35 37 39 51 23 25 27 29 F10
15
Operation Principle
the arc with a proper operation of Puffer by Air Piston the damage of an
instrument and system can be blocked off early.
Manual type
Through turning clockwisely and continuously in application of an
exclusive handle supplied together with a break switch the input is made,
and an opening operation is made by LATCH instrument part through
turning the exclusive handle clockwisely and continuously.
Inputting condition
CONTAC
OPENING
PRESURE
50% AT NO-LOAD
0 TIME IN Ms
CURRENT
Blocking operation
WINDOW FOR
ARC EXTINCTION
16
Installation
Installation method
Panel frame
Panel frame
Note) 1. The length of the cable for remote manual operation is mounted on 2.0m basis.
2. Fix the cable attaching key on to the distribution board frame with bolt & nut. Maintain the
cable curve radius above R150 and fix it on to the panel pole and etc solidly so that the
insulation distance from the earth may be spaced.
3. In case of manual type others than a motor and a trip coil are same as those of electric one.
Attaching key Manual handle
17
Dimensions (Motor powered type)
Attaching dimension
Attaching dimension
18
Dimensions (Manual type)
Attaching dimension
Attaching dimension
19
Power Fuse
Transformer Circuit
Rated
Phase rated capacity voltage
fuse
(kVA) (kV)
36~75 LFL-20G-5B
75~157 LFL-20G-10B
172~358 LFL-20G-20B
258~538 LFL-20G-30B
464~965 LFL-20G-40B
598~1246 LFL-20G-50B
3Ø 22.9
745~1554 LFL-20G-60B
1000~1983 LFL-20G-75B
1600~2645 LFL-20G-100B
2362~3304 LFL-20G-125B
3680~4232 LFL-20G-160B
4593~5287 LFL-20G-200B
Selection condition
Agreed current (effective value : A) →
1. A transformer incoming current was selected on the assumption that it is 10 times
as full load of transformer for 0.1 sec.
2. A fuse rated current was selected so that 1.5 times as a transformer rated current
may be flowed continuously.
3. A transformer fuse was selected on the assumption that it is broken within 2 secs
in 25 times as a transformer rated current when the secondary current is short.
20
Coordination Graph
[5]
[4] [2]
[3]
[1]
[6] Characteristic curve of a secondary
circuit breaker or low voltage fuse
(Converted into the primary values)
Fuse
Permissible overload
characteristic curve of a transformer
Time/Current characteristic curve of a Fuse
21
Power Fuse Selection Tables
Model (kV) (A) (kA) (kA) Single phase Three phase Three phase
LFL - 3/6G - 5B 5 4 ~ 8 ※( 8 ~ 16 ) 6.7 ~ 14 ※( 13 ~ 28 ) 9.8up to ※( 9.8up to )
LFL - 3/6G - 10B 10 6 ~ 13 ( 13 ~ 25 ) 11 ~ 22 ( 21 ~ 44 ) 9.8 ~ 12 ( 19 ~ 24 )
LFL - 3/6G - 20B 20 15 ~ 31 ( 30 ~ 62 ) 25 ~ 53 ( 51 ~ 107 ) 12 ~ 31 ( 24 ~ 61 )
LFL - 3/6G - 30B 30 21 ~ 42 ( 40 ~ 84 ) 35 ~ 73 ( 70 ~ 145 ) 31 ~ 46 ( 61 ~ 92 )
LFL - 3/6G - 40B 3.6 40 40 ~ 82 ( 80 ~ 165) 69 ~ 143 (137 ~ 286) 46 ~ 64 ( 92 ~ 128)
LFL - 3/6G - 50B 50 49 ~ 102 ( 98 ~ 204) 85 ~ 117 (170 ~ 354 ) 64 ~ 81 (128 ~ 163 )
(7.2)
LFL - 3/6G - 60B 63 66 ~ 137 (132 ~ 275) 114 ~ 238 (229 ~ 476 ) 181 ~ 105 (163 ~ 210 )
4In
LFL - 3/6G - 75B 75 68 ~ 165 (134 ~ 330) 117 ~ 285 (233 ~ 571 ) 105 ~ 150 (210 ~ 300 )
LFL - 3/6G - 100B 100 128 ~ 220 (256 ~ 440) 222 ~ 381 (443 ~ 762 ) 150 ~ 222 (300 ~ 445 )
LFL - 3/6G - 125B 125 151 ~ 275 (302 ~ 550) 261 ~ 476 (522 ~ 952 ) 222 ~ 275 (445 ~ 550 )
LFL - 3G - 160B 160 40 211 ~ 352 ( - ) 365 ~ 610 ( - ) 275 ~ 370 ( - )
3.6
LFL - 3G - 200B 200 265 ~ 440 ( - ) 495 ~ 762 ( - ) 370 ~ 550 ( - )
LFL - 6G - 160B 160 - (425 ~ 704) - (735~1,220 ) - (550~742 )
7.2 200 - (437 ~ 880) - ※ (755~1,520 ) - (742~1,000 )
LFL - 6G - 200B
LFL - 20G - 5B 5 20 ~ 43 36 ~ 75 46up to
LFL - 20G - 10B 10 43 ~ 90 75 ~ 157 46 ~ 83
LFL - 20G - 20B 20 99 ~ 206 172 ~ 358 83 ~ 203
LFL - 20G - 30B 30 149 ~ 310 258 ~ 538 203 ~ 317
LFL - 20G - 40B 40 267 ~ 557 464 ~ 965 317 ~ 425
LFL - 20G - 50B 24 50 345 ~ 719 598 ~ 1,246 425 ~ 564
5In
LFL - 20G - 60B 60 430 ~ 897 745 ~ 1,554 564 ~ 710
LFL - 20G - 75C 75 580 ~ 1,145 1,000 ~ 1,983 710 ~ 1,021
LFL - 20G - 100C 100 923 ~ 1,527 1,600 ~ 2,645 1,021 ~ 1,655
LFL - 20G - 125B 125 25 1,364 ~ 1,908 2,362 ~ 3,304 1,655 ~ 2,370
LFL - 20G - 160B 160 2,125 ~ 2,443 3,680 ~ 4,232 2,370 ~ 3,170
LFL - 20G - 200B 200 2,650 ~ 3,050 4,593 ~ 5,287 3,170 ~ 4,000
Model (kV) (A) (kA) (kA) Single phase Three phase Three phase
G(General use) type LFL - 3/6G - 5 5 - ※ ( 5up to ) 5up to ※( 15up to ) - ※( - )
LFL - 3/6G - 10 10 10up to ( 15up to ) 15up to ( 30up to ) 10up to ( 25up to )
LFL - 3/6G - 20 20 20up to ( 50up to ) 30up to ( 75up to ) 30up to ( 50up to )
LFL - 3/6G - 30 3.6 30 30up to ( 75up to ) 75up to ( 150up to ) 50up to ( 100up to )
LFL - 3/6G - 40 (7.2) 40 50up to ( 100up to ) 100up to ( 200up to ) 75up to ( 150up to )
LFL - 3/6G - 50 50 75up to ( 150up to ) 150up to ( 300up to ) 100up to ( 200up to )
LFL - 3/6G - 60 63 - ( - ) - ( - ) - ( - )
LFL - 3/6G - 75 75 150up to ( 200up to ) 200up to ( 400up to ) 200up to ( 400up to )
LFL - 3/6G - 100 100 40 5In 200up to ( 400up to ) 375up to ( 750up to ) 300up to ( 600up to )
LFL - 3G - 150 150 300up to ( - ) 500up to ( - ) 400up to ( - )
LFL - 3G - 200 200 400up to ( - ) 750up to ( - ) 600up to ( - )
LFL - 3G - 300 3.6 300 625up to ( - ) 1,000up to ( - ) 1,000up to ( - )
LFL - 3G - 400 400 750up to ( - ) 1,500up to ( - ) - ( - )
LFL - 6G - 150 150 - ( 500up to ) - (1,000up to) - ( 800up to )
LFL - 6G - 200 200 - ( 750up to ) - (1,500up to) - (1,200up to)
LFL - 6G - 300 7.2 300 - (1,250up to) - (2,000up to) - ( - )
LFL - 6G - 400 400 - ( - ) - (2,500up to) - ( - )
M(Motor protection) type LFL - 3M - 20 20 - 50up to ※( - )
LFL - 3M - 50 50 - 150up to ( - )
LFL - 3M - 100 100 - 300up to ( - )
LFL - 3M - 150 3.6 150 - 400up to ( - )
LFL - 3M - 200 200 - 800up to ( - )
LFL - 3M - 300 300 - 1,000up to ( - )
LFL - 3M - 400 400 - - ( - )
40 7In
LFL - 6M - 20 20 - - ( 100up to )
LFL - 6M - 50 50 - - ( 300up to )
LFL - 6M - 100 100 - - ( 600up to )
LFL - 6M - 150 7.2 150 - - ( 800up to )
LFL - 6M - 200 200 - - ( - )
LFL - 6M - 300 300 - - ( - )
LFL - 6M - 400 400 - - ( - )
Note) Above condition table is used only for reference. LG Tri-MEC Air Insulated Load Break Switch can be equipped only with 24kV DIN standard products.
22
Fuse selection by load Dimensions(mm) Selecting conditions and warning
Applicable holder 1. ※ The values in ( ) apply to the loads of 7.2kV.
Motor load (kVA)
A B C D 2. It is assumed that the inrush current of a transformer is 10
Three phase times of the full load current of a motor for 0.1 second.
6.5 ~10.7 ※( 13 ~ 22 ) - The rated current of a fuse is selected to carry
10.7 ~ 28 ( 22 ~ 36 )
continuously the current of 1.5 times of rated current of a
28 ~ 57 ( 36 ~ 86 )
50 ~ 85 ( 86 ~ 117 ) 195 55 - - transformer.(1.3 times in the case of ※)
85 ~ 115 (117 ~ 230) LFH-6G-D1HB - In the transformer load table it is assumed that the
115 ~ 142 (230 ~ 284 )
interruption will be made at 25 times of rated current
138 ~ 191 (276 ~ 382 )
181 ~ 252 (362 ~ 503 ) 192 77 - - within 2 seconds.
253 ~ 369 (469 ~ 739 ) 3. It is assumed that the inrush current of a motor is 5 times of
293 ~ 435 (556 ~ 870 )
full load current for 10 seconds.
343 ~ 572 ( - )
375 ~ 630 ( - ) 292 77 - - LFH-6G-D2HB 4. In the case of using the M(motor protection) type fuses for
- (751~1,223 ) the purpose of the short-circuit protection of a motor or a
- (1,154~1,760 )
starter select the proper rating in addition refer to the
-
- 442 55 - - characteristic curves on the catalog to make the device
- protected from overload by a circuit breaker or a
-
contactor.
-
442 77 - - 5. It is assumed that the inrush current of a capacitor is 71
- LFH-20G-D2HB
- times of its rated current for 0.002 second.
-
- The rated current of a fuse is selected to carry
-
- 442 87 - - continuously the current of 1.43 times of rated current of a
- capacitor.
-
- In case service life of more than 1000 operations is
required select in the M( motor protection) type fuse
table.
Fuse selection by load Dimensions(mm)
6. The above mentioned comments are according to
Motor load (kVA) Applicable holder KS(Korean Industrial Standard) and subject to the real
A B C D
situation.
Three phase
-
-
-
- 261 50 47 25 LFH-6G-D60
-
-
-
-
-
- 311 60 57 30 LFH-6G-D1H
-
-
-
311 77 73 43 LFH-6G-D2H
-
-
-
- 350 110 108 55 LFH-6G-D4H
37 ~ 75 ※( - )
90 ~ 200 ( - ) 200 60 58 30 LFH-3M-100
220 ~ 400 ( - )
450 ~ 630 ( - )
200 77 73 43 LFH-3M-200
710 ~ 800 ( - )
900 ~1250 ( - )
250 87 84 50 LFH-3M-400
1,500 ( - )
- ( 75 ~ 160 )
311 60 58 30 LFH-6M-50
- (185 ~ 400 )
- (450 ~ 800 )
- (900 ~ 1,250) 350 77 73 43 LFH-6M-200
- ( 1,500 )
- ( 2,500 )
- ( 3,000 ) 450 87 84 50 LFH-6M-400
23
Leader in Electrics & Automation
• For your safety, please read user's manual thoroughly before operating.
• Contact the nearest authorized service facility for examination, repair, or adjustment.
• Please contact a qualified service technician when you need maintenance.
Do not disassemble or repair by yourself!
Safety Instructions • Any maintenance and inspection shall be performed by the personnel having expertise concerned.
www.lgis.com
2004. 11 Load Break Switch 2004. 11/(01) 2004. 11 Printed in Korea STAFF