JOB TITLE / AIM: JSA for TIE in on Chiller piping south of general office.
JSA DATE: 7/3/2007 JSA NO./ REVISION: 00
SUPERVISOR/ JSA LEADER: Zahid Masood SCRIBE: Muhammad Ali Anjum
PARTICIPANTS: Arshad imam, Sajjad
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of worker, tools & Equipment.
2. Shut down of chiller
3. Cutting of existing pipes and welded connections with new pipes
4. Deisolation
5. Repair work of existing HVAC trench
6. Demobilization

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of tools, workers and Unauthorized equipment/tools brought out to Before mobilization any tools make sure that the
equipments. site inspection is completed by E&P personnel and job
supervisor
Ensure that all the tools shall be color coded prior
to mobilization to site.
BHPB operations are required to inspect, approve
and tag all equipments to be used in hot work.
Checklist for welding unit to be maintained with
the equipment..
Performing welding grinding activities in All work to be performed under HWP.
operating gas plant.
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the job they
the job have been inducted by Descon and BHPB projects.
All persons to be oriented about the hazards in the
job by going through JSA at prestart tool box
meeting.
All persons are required to wear their Id,s visible.
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site.

Hand Injury Ensure proper hauling of materials/get help if


required/Wear hand gloves.
2 Cutting of existing pipes and welded Fire Ensure available fire extinguisher and fire blanket
connections with new pipes in the area.
Ensure no flammable or combustible materials
present in the area.
Ensure workers know how to extinguish the fire .
Area to be kept clear at all debris and good house
keeping completed prior to start the cutting and
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
welding job.
Skin burn Ensure that welder are wearing leather gloves and
aware about the hazard.
Hi vis vest shall not be worn during cutting and
welding job .No scarves shall be allowed.
Eye injury Safety glasses and BHPB approved face shield
with polycarbonate to be worn at all times for
welding activities.
Safety glasses shall be worn under face shield for
grinding activity.
Area to be fully vacated and line off site barricaded
off while welding in progress.
Ignition source All work to be done under BHPB operations HWP.

Electrocution Full ppe to be worn by welder including leather-


welding gloves.
Ensure positive contact earth clamping is complete.
Earthing clamp to be positioned as close as
practicable to welding point.
Ensure welding unit is fitted with RCD and tagged
by DEL E&P and approved / tagged by BHPB
operations.
Ensure all electrical cables shall be tagged by
BHPB operations and DEL E&P and inspected for
defeats prior to use .HWP shall be attached with
JSA.

3 Repair work of existing HVAC Eye Injury Ensure that all the workers are using safety galsses.
trench
Skin injury MSDS of cement should be on site
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
No direct contact with cement. Use hand gloves.
4 Demobilization Area left untidy Ensure proper housekeeping after completion of
job.
Ensure there is no leakage of joint.