Académique Documents
Professionnel Documents
Culture Documents
Objective:
Shop boards provide continuous advertising around the clock at purchase point
where consumers come with buying frame of mind and seeing advertisement there
will trigger positive disposition towards our Brand.
Millions of commuters see shop boards advertisements on a daily basis.
Best advantage is that we can control our market area, choosing locations as per our
specific target audience.
Brand Manager sends mail to Sales Vertical Head for Shop Board
requirement
Retailer list comes from Sales Vertical Head within 5 working days
Vendor does recee & sends photographs of site area for approval of site
area
Brand Manager deletes the sites which are not good ones & drops mail to
Vertical Head for the same
Brand Manager makes PO & get it Signed from HOD Marketing & Business
head, and ask vendor to initiate work
Boards Specification : Star Flex: 9 ounce GSM, 1 inch iron pipe(MS Pipe) frame
Approx Costing :
Retailer List: Brand Manager Coordinate with concerned sale vertical head for retailer list for shop
boards.
Retailer list format from sales
Job Allocation: After getting retailer list from Brand Manager allocates this job to registered vendor
on approved cost. The delivery timings needs to be mentioned after having discussion internally &
with vendor . Generally from recce to execution takes 1 month . However it can be squeezed as per
need .
Racee by Vendor:-Vendor should start recee within 5 working days from date of receiving purchase
order along with concerned sales person. During recee size of board must be exact to shop face and
vendor must cross check retailer name to avoid mistake in printing & get it signed from him.
Estimate follow up: Marketing Admin ask to vendor for estimate in proper format.
Once estimate comes from vendor, Marketing Admin makes PO and get it signed from GM-
Marketing & NCH.
After signature process , Marketing admin emails this PO to the vendor to initiate work and
keep signed photocopy of PO for record & handover original PO copy in the accounts and
marketing admin does entry of this PO in MIS
If recee had been done by vendor and due to any condition company cancels the work,
recee charges will be paid to the vendor as actual.
Design brief to agency: According to objective & category Brand Manager gives brief to agency to
develop artwork for the Shop board. Standard ratios for shop board design are
Artwork correction & follow up: Brand Manager asks creative agency for corrections in layouts if
required, give approval to release artwork . Once artwork is released, Brand manager mails it to
execution agency for adaptation. Standard time taken to complete this process is 2-3 days.
Layout Approval: Vendor adapts board design as per particular shop board size, After adaptation
vendor mail it to Brand Manager for approval, if Brand manager find its ok than he/she approves
otherwise ask vendor for required correction for approval. In approval mail Brand manager mark Cc
to HOD marketing & concerned sales head if required
Execution PPT: Once execution is done, agency will send in execution PPT, this PPT to be sent to
Concerned vertical Head, Business Head & HOD Marketing .
Mystery Audit of Shop boards: After execution Brand Manager coordinates with BTL Manger to
allocate 1 ME to cross check board sites. ME give his Audit report to Brand Manager in the following
format, he will choose a sample size in consultation with Brand Manager
Audit Format:
Board
size Board Board Board Printing
Any
Retailer matching fixed alignment Placement quality
S.No. Date Location other
Name to shop properly is proper is Proper is good
Remarks
face or or not or not or not or not
not
1
2
3
Invoice process:
After completion of campaign, Vendor submits bills to Marketing admin along with
execution photograph and Installation sheet signed by concern sales officer & ASM. ASM not
sign on SO verification sign, ASm will personally check the sites.
Marketing Admin check bill & M.E. report & do required correction
After this Brand Manger signs invoice and get signature of GM- Marketing & NCH.
Once all Authorized signatory signed the invoice, Marketing Admin takes photocopy of
invoice than submit it to accounts with receiving on photocopy & in Register.
From the desk of Marketing Admin Invoice should reach in accounts within 3 days from the
date of receiving.
Mandatory: