Académique Documents
Professionnel Documents
Culture Documents
Legend: * Records, indentified with “Tick” () SHALL be essentially included by Doc. No.:
Contractor in QA documentation. Rev. No.:
# Column 4: Please refer ‘Instructions’ for Witnessing & Accepting Authority for
Sub-Contractor Main ‘A’, ‘B’, ‘C’ and ‘G’ category checks. (A, B & G checks shall be FWPL CHP stages)
Contractor
Signatures Reviewed by Approved by Approval
Category
FONTUS WATER PVT.LTD.
Erection Sub-Contractor’s Name and
Address
Field Quality Plan Project:
Erection Sub- Item: Sub-System Package:
Contractor’s
Logo FQP No.: Contract No.:
Rev. No.: Date: Main Contractor:
Legend: * Records, indentified with “Tick” () SHALL be essentially included by Doc. No.:
Contractor in QA documentation. Rev. No.:
# Column 4: Please refer ‘Instructions’ for Witnessing & Accepting Authority for
Sub-Contractor Main ‘A’, ‘B’, ‘C’ and ‘G’ category checks. (A, B & G checks shall be FWPL CHP stages)
Contractor
Signatures Reviewed by Approved by Approval
Category