PLANNED ACTUAL

Activity Total Total Activity Total Total


Sl Activity Depth Sl Activity Depth
Hours Hours Days Hours Hours Days
0 30 0 30
Drill 17 1/2" hole from 30 m to 400 m with totco Drill 17 1/2" hole from 30 m to 400 m with totco
1 44 44 1.8 400.0 1 48.25 48.25 2.0 400.0
@ 250m. Circulation, POOH @ 250m. Circulation, POOH
3 R/I 13 3/8" casing,Cementing 14 58 2.4 400.0 3 R/I 13 3/8" casing,Cementing 50.75 99 4.1 400.0
4 WOC, meanwhile Remove landing joint, Nipple 22 80 3.3 400.0 4 WOC, meanwhile Remove landing joint, Nipple 28 127 5.3 400.0
up Casing head. N/U BOP and test BOP up Casing head. N/U BOP and test BOP
Pickup Directional BHA (Motor & MWD) with 12 Pickup Directional BHA (Motor & MWD) with 12
1/4" PDC bit and test at surface. R/I down to 1/4" PDC bit and test at surface. R/I down to
6 13 93 3.9 400.0 6 19.25 146.25 6.1 400.0
Float collar, drill cement, float shoe & collar and Float collar, drill cement, float shoe & collar and
3 m formation & Conduct LOT 3 m formation & Conduct LOT

Drilling 12 1/4" hole up from 400 m to 1490 Drilling 12 1/4" hole up from 400 m to 1499
8 144 237 9.9 1490.0 8 213 359.25 15.0 1499.0
Meters. Wiper trips at 750,1100m Meters. Wiper trips at 750,1100m
Circulation, wiper trip up to 400 m, circulation, Circulation, wiper trip up to 400 m, circulation,
9 14 251 10.5 1490.0 9 18.25 377.5 15.7 1499.0
drop totco & POOH for logging drop totco & POOH for logging
10 Logging 12 263 11.0 1490.0 10 Logging 0 377.5 15.7 1499.0
11 Round trip break & lay down 8" DC 18 281 11.7 1490.0 11 Round trip break & lay down 8" DC 0 377.5 15.7 1499.0
12 R/I 9 5/8" Casing,Cementing 18 299 12.5 1490.0 12 R/I 9 5/8" Casing,Cementing 17.25 394.75 16.4 1499.0
WOC (meanwhile hang BOP, drop slips, rough WOC (meanwhile hang BOP, drop slips, rough
13 cut casing, install & test casing head spool. 24 323 13.5 1490.0 13 cut casing, install & test casing head spool. 16.25 411 17.1 1499.0
N/U & test BOP N/U & test BOP

Pickup Directional BHA (Motor, MWD/ LWD) Pickup Directional BHA (Motor, MWD/ LWD)
with 8 1/2" PDC bit and test at surface. RIH with 8 1/2" PDC bit and test at surface. RIH
15 down to float collar and tag cement & Change 19 342 14.3 1490.0 15 down to float collar and tag cement & Change 21.75 432.75 18.0 1499.0
to SOBM. Drilling cement, float shoe & collar, to SOBM. Drilling cement, float shoe & collar,
test shoe, drill 3 m formation & carry out LOT test shoe, drill 3 m formation & carry out LOT

Drilling 8 1/2" hole from 1490 m to 1750 m, Drilling 8 1/2" hole from 1490 m to 1750 m,
18 34 376 15.7 1750.0 18 27.75 460.5 19.2 1750.0
Circulation, totco survey & wiper trip Circulation, totco survey & wiper trip
Drilling 8 1/2" hole from 1750 m to 2050 m. Drilling 8 1/2" hole from 1750 m to 2050 m.
20 40 416 17.3 2050.0 20 41.5 502 20.9 2050.0
Circulation, totco survey & wiper trip Circulation, totco survey & wiper trip
22 Drilling 8 1/2" hole from 2050 m to 2350 m 38 454 18.9 2350.0 22 Drilling 8 1/2" hole from 2050 m to 2270 m 64.5 566.5 23.6 2270.0
Circulation, wiper trip up to shoe, circulation, Circulation, wiper trip up to shoe, circulation,
23 18 472 19.7 2350.0 23 11.75 578.25 24.1 2270.0
drop totco & POOH drop totco & POOH
24 Logging 120 592 24.7 2350.0 24 Logging 64.25 642.5 26.8 2270.0
25 Round wiper trip & soft P/O 22 614 25.6 2350.0 25 Round wiper trip & soft P/O 24.5 667 27.8 2270.0

26 R/I casing & circulation.Cementing 34 648 27.0 2350.0 26 R/I casing & circulation.Cementing 24 691 28.8 2270.0

WOC (Meanwhile install slip, N/D BOP, N/U WOC (Meanwhile install slip, N/D BOP, N/U
28 tubing head spool and X mas tree & Rig 24 672 28.0 2350.0 28 tubing head spool and X mas tree & Rig 24 715 29.8 2270.0
Release) Release)
Total hours 672 Total hours 715
Planned Days v/s Depth CB10B-

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
0
Drilling 17 1/2" hole from 30m down to 400 m
Circulation, POOH
100
R/I 13 3/8" casing and Cementing

WOC, meanwhile Remove landing


200 joint, Nipple up Casing head. N/U BOP
and test BOP

300 Pick up directional BHA, R/I 12 1/4" bit, Drill cement,


shoe and collar, drill 3 m formation & LOT

400

500

600

700

800

900

1000

1100
Depth (m, TVDRT)

1200

1300

1400

1500

1600

1700
Depth (
1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700 Cumulative Planned Days


Depth CB10B-A1

7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Drilling 12 1/4" hole till 1490 m

Circulation, wiper trip up to 400 m,


circulation, drop totco & POOH

R/I 9 5/8" Casing,Cementing

WOC (meanwhile hang BOP, drop slips,


rough cut casing, install & test casing head
spool. N/U & test BOP

Pickup Directional BHA and test at surface. RIH


to float collar, tag cement, change to SBM,
Drilling cement, float shoe & collar, drill 3 m
formation & carry out LOT
Pickup Directional BHA and test at surface. RIH
to float collar, tag cement, change to SBM,
Drilling cement, float shoe & collar, drill 3 m
formation & carry out LOT

Drilling 8 1/2" hole from 1490 m to 1750 m,


Circulation, totco survey & wiper trip

Drilling 8 1/2" hole from 1750 m to


2050 m. Circulation, totco survey &
wiper trip

Drilling 8 1/2" hole from 2050 m


to 2270 m

Circulation, wiper trip up to


shoe, circulation, drop totco &
POOH

Logging

Round wiper trip & soft P/O

R/I casing & circulation


Cementing

WOC (Meanwhile install slip, N/D


BOP, N/U tubing head spool and X
mas tree & Rig Release)