CONTENTS
Sheet
1.0 DOCUMENT REVISION HISTORY 3
2.0 INTRODUCTION 4
2.0 INTRODUCTION
This calculation covers the design of the bracket to support a platform camera at Ickenham
station. The new bracket will be fixed to the existing drop-pole on the existing camera post.
The bracket comprises a pair of "L" shaped welded tubes as shown on figure 1.
The upper leg comprises a 475mm long 48.3 x 3 CHS vertical member welded at the top to a
horizontal 48.3 x 3 CHS member and fixed to the existing drop-pole via a split cylindical upper
clamp.
The upper clamp comprises a 115mm Ø OD x 77.5mm Ø ID split tube with 4 x M8 screws.
The lower leg comprises a 48.3 x 3 CHS vertical member welded at the top to a horizontal 48.3
x 3 CHS member and fixed to the vertical member of the upper leg via a split cylindical
lower clamp.
The lower clamp comprises a 90mm Ø OD x 49mm Ø ID split tube with 4 x M8 screws.
The design of the bracket will consider the following loading conditions:
3) Wind load of ±0.50kN/m2 arising from the aerodynamic effects of passing trains. Transient
4) Vandal loading of 1kN horizontal @ camera level acting longitudinally or laterally. Transient
230
Lower leg
475
130
120
Ph = 1kN
vandal load
200 475
Pv = 1kN
vandal load all dimensions are approximate and scaled from drawing
Figure 1 - Elevations on new camera bracket
115mm Ø OD x 77.5mm Ø ID
Upper clamp 44.500 0.100 0.044
split tube
90mm Ø OD x 49mm Ø ID
Lower clamp 35.100 0.100 0.034
split tube
assume
camera Assume 475mm x 200 x 120 30.000 0.294
0.407
CALCULATION SHEET
Prepared By Date Checked By Date Page
vertical horizontal
= 0.027 m2
vertical horizontal
Projected cross sectional area of lower = 48.3 * 230 + 130 scaled dims
leg
= 17388
= 0.017 m2
= 475 * 120
Projected cross sectional area of CCTV
= 57000
= 0.102 m2
Wind load W = ω * A
= 0.500 * 0.127
= 0.064 kN
= 0.035 kN/m
CALCULATION SHEET
Prepared By Date Checked By Date Page
= 0.200 kNm
= 0.550 kNm
From the table above the vandal loads govern over wind loads.
For a conservative design, the design vertical load will be taken as the sum of the design loads
for self-weight and Vertical vandal load. Similar for design horizontal loads and design moment.
= 1.550 kN
= 0.802 kNm
CALCULATION SHEET
Prepared By Date Checked By Date Page
s a d D Lw = πd y = D/2
mm mm mm mm mm mm
FW Area FW Inertia
d2 D2 d4 D4 Aw Iw
2 2 4
mm mm mm mm4 mm2 mm4
= 1.095
0.473 sheet 8
= 1095
483 sheet 8
= 2.265 N/mm2
= 0.002 kN/mm2
= 1.550
0.579 sheet 8
= 1550
483 sheet 8
= 3.206 N/mm2
= 0.003 kN/mm2
CALCULATION SHEET
Prepared By Date Checked By Date Page
= 802427 Nmm
= 802.4 kNmm
τz = Mz * y
Bending stress weld
Iw
= 136.508 N/mm2
= 0.137 kN/mm2
63.5%
utilisation
CALCULATION SHEET
Prepared By Date Checked By Date Page
= 0.802
0.05
= 16.049 kN
= 3859.2 N