The Consultant shall perform all activities detailed below (in section 3) to complete the requirements
of the Full HV&L V Switchboard Replacement Project Phase II- Feasibility study.
Appendix 1 - Basis of Design outlines the functional specification which the Consultant
- shall use as
d. Develop a preliminary overall project schedule detailing the phased replacement of the six
switchboards, including Phase II activities. (The schedule shall be in MS Project format.)
e. Develop a preliminary procurement plan in conjunction with the LBA procurement manager.
c. Tabulate all the deviations from the LyondellBasell "ES" standards in a form that satisfies the
LYB Procedures.
Review the LyondellBasell 'ES' standards (ref list in BOD) and recommend aspects of the ES
standards that should be retained for use in conjunction with the Australian Standards
relevant to electrical works.
Determine the appropriate Australian Standards for the defined scope.
e. Assess and detail the current 'best practice' technology for replacement switchgear, including
remote switching of the new HV Feeders and existing Incomers/Feeders/Bus Coupler.