Vous êtes sur la page 1sur 1
How to-read Go to Facility’s List of inspection’ Printing Goto Facility Gitation’s occurrence Instructions asbectlons- and Regulation Fesuite Occurrences 1s COLORADO Soto. DepattmentofPubtic — Citation’s RiiinoEmcnmest Text ZX lina aU elected (oly Please use links and tabs above to navigate this search tool. Do not use browser back button Facility ID: 020317 Facility Name: CENTENNIAL HEALTH CARE CENTER Inspection ID: SOPE11 Inspection Exit Date: 2/13/2020 Citation Code: 0880 Citation Title: Infection Prevention & Control Scope and Severity (S/S): D Notes: Citation code "0000" and "9999" are initial and final Comments of an inspection. Facility Plan of Correction Preparation and/or execution of ths plan of correction does not constitute admission or agreement by the provider of the truth of facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it's required by the provisions of federal and State law. Corrective Action: Director of Nursing provided education to RN#1 on 2/18/20 about the Infection Contra Practices related to wound care. The WCP (Wound Care Provider) was also educated on 2/18/20 by the Director of Nursing about the Infection Control Practices related to wound care Identiticaton of Others:All residents receiving wound care have the potential to be affected by ths deficient practice. systemic Changes: DON /éesignee provided education to licensed nursing staff on/or before date of compliance related to Infection Contral Practices. Monitoring: DON/designee wil observe Wound treatments at a minimum of ence/week for three manths to ensure appropriate infection control practices are maintained until substantial compliance I achieved. DON/ designee will rack and trend results of the findings from the observations completed. DON/cesignee will report findings back to the QAPI committee. The QAP! committee will evaluate the effectiveness of the plan based on trends identified and implement additional interventions as needed to fensure compliance monthly for three months and then reassess the neec far continued monitoring based on comaliance

Vous aimerez peut-être aussi