Estimated Timeline
- 8 to 10 months ( for design & development )
- 3 months
- Design & validation
- Sensor testing
- 2 months
- EE Fabrication
- ME Fabrication
- 2 months
- Vision
- Control system
- 1 month design changes & re-validation
- 2 months testing
Irrigation and Offshore Monitoring
- NDT Inspection of Surge Pools, above ground reservoirs
- NDT Inspection of Irrigation tunnels and canals
- Inspection of Oil & Gas Pipelines
- Inspection of Ship hulls and Offshore structures
- Port monitoring
-
NDT involves:
- Visual testing method
- Ultrasonic thickness gauging
- NDT metal thickness gauging
- Magnetic particle inspection
- Laser inspection
Estimated Timeline
- 10 to 13 months ( for design & development )
- 3 months
- Design & validation
- 5 months
- Development of inspection technology
- Fabrication
- 2 months
- Control system
- 1 month design changes & re-validation
- 2 months testing
Defense and Marine Applications
Estimated Timeline
- 15 to 24 months (design & dev)
Estimated Timeline
- 8 to 10 months ( for design & development )
- 3 months
- Design & validation
- 2 months
- Fabrication
- 2 months
- Control system
- Vision system
- Gripper
- 1 month design changes & re-validation
- 2 months testing
Robotic assistance for fisherman
- Fishing using nets
- Creating a 3D map based on behavioural study of fishes
Estimated Timeline
- 10 to 15 months ( for design & development )
- 3 months
- Design & validation
- 2 months
- Fabrication
- 2 months
- Control system
- Vision system
- Gripper
- 2 months Torpedo launching mechanism
- 1 month design changes & re-validation
- 3 months testing
Target sector w/ Preference
Underwater Pollution 2 3 1
Monitoring and
Mapping
Irrigation and 1 3 2
Offshore Monitoring
Cleaning & 2 1 -
Monitoring of still
water storage tanks /
wells / pools
Robotic assistance 2 1 -
for fisherman