2. TEST PROCEDURE
2.1 Physical Inspection
2.1.1 PLC System Configuration Check
2.1.2 General Inspection
2.1.3 Cabinet Accessories
2.2 Functional Inspection
2.2.1 Digital Input
2.2.2 Digital Output
2.2.3 Analog Input
2.3 Application Program Test
2.3.1 HMI
2.3.2 Alarm and Shutdown Logic
3. TEST COMPLETION
4. PUNCH LIST
5. ATTACHMENTS
1. INTRODUCTION
This document describes the test and inspection procedures for the system under test. Site
Acceptance Test (SAT) will be carried out the presence of representatives from Client.
This SAT Procedure covers all vital system functionally test. They are demonstrative rather
than exhaustive test.
In some instances, when mutually agreed by the representative of Pertamina and Milway at
testing during SAT is impractical and/or impossible, the project quality assurance records of
MILWAY and/or equipment manufacturer shall be provided as evidence of compliance
instead of testing during SAT.
Test results and data shall be recorded in the Test Result Box with both Representatives
initials. There will be two lists attached to the SAT Report:
Punch List Any deviations from the design requirements shall be recorded on the Punch
List. Corrective action shall be taken by Milway to make good any defects or
problems. Where mutually agreed, corrective action for certain punch list
items may be deferred to a later date.
Upon successful completion of SAT, the Client is expected to sign Systems Acceptance
Certificate.
Agung Dwi.P QA / QC
Eko Satriyo.W Project
Engineer
In the course of testing care shall be exercised to ensure personnel safety and also to
ensure equipment is not at risk of being damaged.
YES NO REMARK
2. Check all installed components against the approved
drawings for model number and making.
YES NO REMARK
YES NO REMARK
4. Verify the digital input point is de-energized when the
field is used to de-energized the point
YES NO REMARK
YES NO REMARK
2.3.1. HMI
YES NO REMARK
1. Set all inputs to normal state.
YES NO REMARK
2. Simulate Analog Inputs and observe the expected
outputs value.
YES NO REMARK
3. Simulate inputs and observe the expected outputs based
on the sequence logic diagrams. Simulation of inputs and
outputs will be done using a programming
terminal/operator station. Refer to the Safe Chart. YES NO REMARK
YES NO REMARK
3. Simulate Alarm & Shutdown signal.
YES NO REMARK
4. Monitor all alarm and shutdown effect on HMI screen.
YES NO REMARK
5. Restore all inputs/output and logic simulate back to
normal.
Ensure that the documentation such as ladder logic, I/O list etc. are updated wherever
modification are made.
YES NO REMARK
YES NO REMARK
2. Verify that retentive variables if use, are at their desired
state.
YES NO REMARK
Witnessed By : _______________________
Date : _______________________
A. BILL OF MATERIALS
F. SAFE CHART
H. P&ID DRAWING