INTRODUCTION

(For Entire Hydro-Test Section)


...go to Air Volume Calculation Prepared by Md.Zafar
...go to Strength & Leak Test

Joint No. KM170 AM 05 KM 193 TF 60B


From to
Chainage CH. 170.060 CH. 193.898

Length Volume
Outer Dia Wall Thick Inner Dia
Sr. No.
(mm) (mm) (mm)
(mtr) (cubic mtr)
1 0.00 0.000
2 0.00 0.000
3 0.00 0.000
4 0.00 0.000
5 0.00 0.000
6 0.00 0.000
7 0.00 0.000

Avg. Wall Thickness t = #DIV/0! mm


Avg. Inner Radius Ri = #DIV/0! mm
Avg. Volume (per mtr) Vavg = #DIV/0! m3
Total Length of the Section Lt = 0.000 mtr
Total Volume of the Section Vt = 0.000 m3

The Ratio Ri /Ti = #DIV/0!


A Value Calculation For Less Than 30 Deg. Celcius

Enter Pressure (P) 60.00 Bar For Less Than 30 deg. C

Temprature A Value for Pipe


(Deg. Celcius) Formula A Value Temp. (T Deg. C) = {(A2-A1)/2}*(T-T1)+A1
2 49.45-(2.81*P/300) 48.888
4 48.79-(2.79*P/300) 48.232
6 48.23-(2.83*P/300) 47.664 A1 A2 T1 T
8 47.71-(2.78*P/300) 47.154 0 0 0.000 0.000
10 47.27-(2.83*P/300) 46.704
12 46.88-(2.89*P/300) 46.302 A Value = 0
14 46.48-(2.96*P/300) 45.888
16 46.10-(2.93*P/300) 45.514 0 0 32
18 45.82-(3.05*P/300) 45.210 0 0 32
20 45.49-(2.96*P/300) 44.898 0 0 32.000
22 45.25-(3.03*P/300) 44.644

45.06-(3.08*P/300) 44.444
24
26 44.87-(3.12*P/300) 44.246
28 44.70-(3.15*P/300) 44.070
43.57452

Enter Pressure (P) 60.000 Bar For More Than 30 deg.C

Temprature
(Deg. Formula A Value A Value for Pipe {(A2-A1)/2}*(T-T2)+A2
Celceius) Temp. (T Deg. C) =
2 49.45-(2.81*P/300) 48.888 T= 28.500
4 48.79-(2.79*P/300) 48.790 A Value = 44.0355
6 48.23-(2.83*P/300) 47.664
8 47.71-(2.78*P/300) 47.154
10 47.27-(2.83*P/300) 46.704
12 46.88-(2.89*P/300) 46.302
14 46.48-(2.96*P/300) 45.888
16 46.10-(2.93*P/300) 45.514
18 45.82-(3.05*P/300) 45.210
20 45.49-(2.96*P/300) 44.898
22 45.25-(3.03*P/300) 44.644
24 45.06-(3.08*P/300) 44.444
26 44.87-(3.12*P/300) 44.246
28 44.70-(3.15*P/300) 44.070 A1
30 44.58-(3.24*P/300) 43.932 A2
Enter Pressure (P) 30.00 Bar For Less Than 30 deg. C
0 Temp. (T Deg. C)
= {(A2-A1)/2}*(T-T1)+A1

Tempr
ature Formula A Value
(Deg.
Celcei
us)
2 49.45-(2.81*P/300) 49.169
4 48.79-(2.79*P/300) 48.790 A1 A2 T1 T
6 48.23-(2.83*P/300) 48.230 0 0 0.000 0.000
8 47.71-(2.78*P/300) 47.710
10 47.27-(2.83*P/300) 47.270 A Value = 0
12 46.88-(2.89*P/300) 46.880
14 46.48-(2.96*P/300) 46.480
16 46.10-(2.93*P/300) 46.100
18 45.82-(3.05*P/300) 45.820
20 45.49-(2.96*P/300) 45.490
22 45.25-(3.03*P/300) 45.250
24 45.06-(3.08*P/300) 45.060
26 44.87-(3.12*P/300) 44.870
28 44.70-(3.15*P/300) 44.700
30 44.58-(3.24*P/300) 44.580
Enter Pressure (P) 0.000 Bar For More Than 30 deg.C
A Value for Pipe
Temp. (T Deg. C) = {(A2-A1)/2}*(T-T2)+A2
T= 28.500
STRENGTH & LEAK TEST
...return to Air Volume Calculation Prepared by Md.Zafar
...return to HT Sec. Intro

Initial Pipe Wall Temp. Ti = 27.600 oC Initial Test Pressure Pi = 79.520 Bar
Final Pipe Wall Temp. Tf = 27.400 oC Final Test Pressure Pf = 79.420 Bar
Change of Temperature ∆T = 0.200 oC Change of Pressure ∆P = 0.100 Bar

Isothermal Compressibility A = 43.919

"B" the value of the difference between the thermal expansion of water & Steel at the pressure temperature at the end of the
test
T1 T T2
B
27 27.400 28
P1 70 250.080 253.644 258.990
P 79.420 250.881 254.422 259.734
P2 80 250.930 254.470 259.780

Accountable Pressure Change Due to Change of Temperature ∆P t = B*∆T/ ((0.884 Ri / t) + A)


= #DIV/0! bar

Unaccountable Pressure Loss = ∆P - ∆Pt


= #DIV/0!
#DIV/0!

#DIV/0!