Académique Documents
Professionnel Documents
Culture Documents
Company Profile
THE MISSION…
To deliver high quality projects and innovative design solutions.
2
THE STUDIO…
Bank Institution/References:
DTI Registration No.: (National) 1033675 Banco De Oro (Savings Account)
Mayor’s Permit No.: 00428-2020 Branch: Bocobo/Ermita
Barangay Business Clearance OR No.: 4854517
Environmental Management Clearance OR No.: 6119122 Bank of the Philipine Islands (Savings Account)
Fire Safety Inspection Certificate No.: 03-613-1076-S2019 Branch: Angeles/Friendship
Sanitary Permit No.: 022-20
Bureau of Internal Revenue No.: 237-107-296-000 Chinabank (Savings & Checking Account)
Branch: SM City Pampanga 4
THE TEAM
is composed of dynamic, young & energetic individuals that works
through collaboration & synergistic approach to provide an architectural design &
construction solutions for every client’s needs & wants. This is the heart & soul of the firm.
Skilled Skilled
CAD/3D CAD/3D CAD/3D CAD/3D Workers/Laborers/ Workers/Laborers/
Visualizer Visualizer Visualizer Visualizer Helpers Helpers
5
MAJOR PROJECT INVOLVEMENTS…
6
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
Special Features:
- Energy efficient design
- Professional building management system
- Superior infrastructure with 100% site-wide underground utilities
- Clark Freeport Zone economic incentives
- Ideal BPO location; close to skilled labor pool and major
transportation hub.
Project Involvement:
Plan/Drawing Evaluation, Site Supervision, Project Management,
Preparation of Technical Documents for Bidding 7
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
Project Involvement:
Plan/Drawing Evaluation & Site Coordination, Site Supervision,
Project Management
8
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
Insular Life Corporate Center, Cebu Services Rendered: University of the East Elementary and High School Project Involvement:
Conceptual Planning Design Building Conceptual Design, Detailed
No. of Storeys: Phase 1 - 6 Storeys Architectural and Engineering Design
Phase 2 - 14 Storeys Total Floor Area: 11,400 sq. m. Drawings, Contract Documents, Pre-
No. of Storeys 9 Storeys Qualification, Project Coordination,
Mindanao Avenue cor. Biliran Road, Ayala Construction Supervision, Warranty
Center, Cebu City University of the East Caloocan Campus,105 Inspection
August 2001 Samson Road, Caloocan City
May 2011 - September 2012
with
Mohri Architect & Associates Inc. (Japan) and with
Mohri & P.A. Associates, Inc. (Philippines) Mohri & P.A. Associates, Inc. (Philippines)
10
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
with
Mohri & P.A. Associates, Inc. (Philippines)
11
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
with
Mohri & P.A. Associates, Inc. (Philippines)
Project Involvement:
Checking of Conceptual Engineering Design for Compliance
with the DepEd MPSS, Inspection of Construction
and Fabrication Activities, Project Monitoring, Evaluation and
Construction Supervision
12
MAJOR PROJECT INVOLVEMENTS…
Principal Architect’s experiences during its early years…
Third Elementary Education Project (TEEP) Batch 2 - Region V (Regionwide) - Luzon Project Involvement:
Region VI & VII (Regionwide) - Visayas Preparation of School Building Design, Detailed
A large scale intervention in elementary schools in these poor provinces was funded Region IX & ARMM (Regionwide) - Mindanao Architectural and Engineering Design, Assist the
under the TEEP project. Izuru Kimura of the Japan Bank for International Batch 3 - CAR & Region IV (Regionwide) - Luzon LGU Led and Principal Led in Programming and
Cooperation, which funded about 40% of the project, wrote the following to describe Regions VI & VIII (Regionwide) - Visayas Implementation, Assists in Tender, Pilot Checking,
TEEP: TEEP’s approach was to improve comprehensively the educational ARMM (Regionwide) – Mindanao Implementation Procedures, Guidelines for
environment in the target provinces by providing various inputs. Aiming to improve
Maintenance, Over-all Construction
quality, access, and management of elementary education, TEEP’s inputs were September 16, 2001 - June 2006 Management, Procurement of Services and Finance
categorized into three major components: (i) education development; (ii) civil works; Total Floor Area: 6,796.27 sq.m.
and (iii) finance and administration. No. of Storeys: 2 Storeys
14
PROJECT PORTFOLIO…
Every design project is UNIQUE…Every space built has its own story…
Two (2) Storey Four (4) Bedroom One (1) Storey Three (3) Bedroom Two (2) Storey Four (4) Bedroom
Residence Residence Residence
with Water Refilling Station Client: Mr. Samboy Franco Client: Engr. Aurelio Ortiz
Client: Mr. & Mrs. Fernando Bolus Location: Sta. Ana, Pampanga Location: Marilao, Bulacan
Location: Mabalacat City, Pampanga
Two (2) Storey Four (4) Bedroom One (1) Storey Three (3) Bedroom Two (2) Storey Four (4) Bedroom
Residence Residence Residence
Client: Mr. & Mrs. Anders Moe Client: Mr. & Mrs. Henry Domingo Client: Mr. & Mrs. Cyril Baltazar
Location: South Forbes, Silang, Cavite Location: Ideal Subdivision, Location: United Hills, Parañaque City
Commonwealth, Quezon City
15
PROJECT PORTFOLIO…
Every design project is UNIQUE…Every space built has its own story…
Two (2) Storey Three (3) Bedroom Two (2) Storey Three (3) Bedroom Extension/Addition of One (1) Storey Two (2) Bedroom
Residence Residence Kitchen , Masters Bedroom & Terrace Residence
Client: Engr. & Mrs. Joselito Pionilla Client: Mr. Jan Neils Gomez of a Two (2) Storey Two (2) Bedroom Client: Dr. William Lupango, Ph.D.
Location: Brentwood Subdivision, Location: Tungkong Mangga, City of San Residence Location: Progress Homes
Pagbilao, Quezon Jose Del Monte Client: Mr. & Mrs. Alain De Leon Subdivision, San Vicente, Canaman,
Location: Alta Tierra Homes, Camarines Sur
Olaes, GMA, Cavite
Two (2) Storey Two (2) Bedroom Duplex Two (2) Storey Three (3) Bedroom Three (3) Storey Five (5) Bedroom
Residence Residence with Attic & Roof Deck Residence with Roof Deck Client: Mr.
Client: Engr. & Mrs. Eric Mendoza Client: Mr. & Mrs. Marte Capul Nico Peñaredondo
Location: South Forbes, Silang, Cavite Location: Grand Tierra Homes, Sto. Location: Multinational Village, Parañaque
Domingo 1, Capas, Tarlac City
16
PROJECT PORTFOLIO…
Every design project is UNIQUE…Every space built has its own story…
Three (3) Storey Nine (9) Bedroom Two (2) Storey Five (5) Bedroom Private Two (2) Storey Five (5) Bedroom Private
Residence with Roof Deck Villa Villa
Client: Mr. & Mrs. Jinggo Villamor Client: Engr. & Mrs. Marco Merza Client: Mr. Marjun De Ocampo
Location: Multinational Village, Parañaque Location: Tower Grotto Ville Subdivision, Location: J.C. Payumo, Dinalupihan,
City City of San Jose Del Monte, Bulacan Bataan
Three (3) Storey Three (3) Unit Apartment Two (2) Storey Document Storage Two (2) Storey Employees Canteen
Client: Ms. Grace Dondiz Building Building
Location: Project 4, Quezon City Client: Food & Drug Client: Food & Drug
Administration/Filinvest/ASDEC Builders Administration/Filinvest/ASDEC Builders
Corporation Corporation
Location: FDA Compound, Filinvest City, Location: FDA Compound, Filinvest City,
Alabang, Muntinlupa City Alabang, Muntinlupa City
17
PROJECT PORTFOLIO…
Every design project is UNIQUE…Every space built has its own story…
18
PROJECT PORTFOLIO…
Every design project is UNIQUE…Every space built has its own story…
20
THE FIRM’S SERVICES…
ROLES/RESPONSIBILITY:
MCRkitects AD Coordination of all
1.) LEAD CONSULTANT: Architectural Design Engineering Systems of
the Project
(Lead Consultant)
22
PROJECT METHODOLOGY
Improving quality of life with an integrated unified approach…
PHASE I. INITIAL CLIENT CONSULTATION 2.) Prepares the initial line drawings representing design
When a Client calls upon the Architect to give oral or studies leading to a recommended solution, including a
written advice and direction, to attend conferences, to general description of the project for approval by the
make evaluations and appraisals regarding a Owner.
contemplated project and similar activities, the Architect 3.) Submits to the Owner a Statement of the Probable
renders valuable inputs whether or not the Client pursues Project Construction Cost (SPPCC) based on current cost
the project. This phase involves the definition of the parameters.
requirements of the project by the Owner. The Architect in
turn informs the Owner of the technical requirements of the PHASE III. DESIGN DEVELOPMENT PHASE
project and the concomitant professional fees. In this Based on approved schematics and conceptual plans, the
phase, the Architect: Architect prepares:
1.) Consults with the Owner to ascertain the conceptual 1.) The Design Development documents consisting of
framework and related requirements of the project and plans, elevations, sections and other drawings,
confirms such requirements with him. 2.) Outline specifications to fix and illustrate the size and
2.) Gathers relevant information and data leading to the character of the entire project as to type of materials, type
definition of the requirements of the project, including the of structural, electrical, mechanical, sanitary, electronic and
scope of the Architect’s services. communications systems.
3.) Reviews and refines the owner’s space requirements 3.) Diagrammatic layout of construction systems, and
and translates them into an architectural program. 4.) An updated SPPCC for submission to the Owner.
4.) Prepares an initial statement of probable construction
cost. PHASE IV. CONTRACT DOCUMENT PHASE
Based on the approved Design Development Documents,
PHASE II. SCHEMATIC DESIGN PHASE the Architect:
This phase consists of the preparation of schematic design
studies derived from the Project Definition Phase, leading 1.) Prepares the complete Contract Documents consisting
to conceptual plans. The Architect: of detailed designs and construction drawings, setting forth
in detail the work required for the architectural, structural,
1.) Evaluates the Owner’s program, schedule, budget, electrical, plumbing/ sanitary, mechanical, electronic and
project site and proposes methods of project deliveries. communication works prepared by the Architect and the
respective professionals involved. 23
PROJECT METHODOLOGY
Improving quality of life with an integrated unified approach…
2.) Prepares Technical Specifications describing type and The Architect shall not be required to make exhaustive or
quality of materials, finish, manner of construction and the continuous 8-hour on-site supervision to check on the
general conditions under which the project is to be quality of the work involved and shall not be held
constructed. responsible for the Contractor's failure to carry out the
3.) Submits to the Owner seven (7) sets of all construction Construction work in accordance with the Contract
drawings and technical specifications for purposes of Documents. During such project site visits and on the basis
obtaining a building permit. of his observations, he shall report to the Client defects and
4.) Updates the SPPCC based on changes in scope, deficiencies noted in the work of Contractors, and shall
requirements or market conditions. condemn work found failing to conform to the Contract
5.) Assists the Owner in filing the required documents to Documents.
secure approval of government authorities having 4.) Determines the amount owing and due to the
jurisdiction over the design of the Project. Contractor and issues corresponding Certificates for
Payment for such amounts based on his observations and
PHASE V. CONSTRUCTION PHASE the Contractor's Applications for Payment. These
In this phase, the Architect performs the following: Certificates will constitute a certification to the Client that
the work has progressed to the state indicated and that to
1.) Makes decisions on all claims of the Owner and his best knowledge, the quality of work performed by the
Contractors on all matters relating to the execution and Contractor is in accordance with the Contract Documents.
progress of work or the interpretation of the Contract The Architect shall conduct the necessary inspection to
Documents. determine the date of substantial and final completion and
2.) Prepares change orders, gathers and turns over to the issue the final Certificate of Payment to the Contractor.
Owner written guarantees required of the Contractor and 5.) Should more extensive inspection or full-time (8-hour)
Sub-Contractors. construction supervision be required by the Client, a
3.) Makes periodic visits to the project site to familiarize separate full-time supervisor shall be hired and agreed
himself with the general progress and quality of work and upon by the Owner and the Architect subject to the
to ascertain that the work is proceeding in accordance with conditions of a contract. When the Architect is requested
the Contract Documents. The Architect shall not be by the Owner to do the full time supervision, his services
required to make exhaustive or continuous 8-hour on-site and fees shall be covered separately.
supervision to check on the quality of the work involved
and shall not be held responsible for the Contractor's failure
to carry out the Construction work in accordance with the 24
Contract Documents.
MCRkitects AD
Architectural Design Studio
© 2019 Copyright | All Rights Reserved | 2019
25
All background images on the profile are royalty free.