2 PRELIMINARY WORKS 1 ls
2.1Packing and Material Delivery 1 ls included
2.2Site Preparation 1 ls included
2.3Survey, Measurement& shop drawing 1 ls included
2.4Tools & Special Equipment 1 ls included
2.5Site Clean up and Securiry 1 ls included
3.15 Interconnecting Pipe 1 lot Mat'l : PVC, clas AW (wet area) included
GI Pipe medium class (dry area)
Acessories : fitting, clamp, support, gasket
TECHNICAL SPECIFICATION & RINCIAN HARGA
SEWAGE TREATMENT PLANT (STP) PALMA HOTEL PROJECT
UNIT PRICE TOTAL PRICE
No DESCRIPTION UNIT QTY SPECIFICATION REMARKS
(Rp) (Rp)
3.16 Water Meter 1 lot Brand : ONDA or equal included
Size : 2 inch
6. FINISHING 1 ls