Académique Documents
Professionnel Documents
Culture Documents
ALCOA_WGP has been constrained to 0MW from 12:30 in order to maintain Power System Security and Reliability as a res
Turbine control limitations
ID fan capacity
FO
FO
FO
FO
FO
FO
FO
POP
An unplanned load increase (?behind-the-fence?) led to a reduction in available capacity
CG 1,2& 3 maintenance
ODOM
ODOM
Refinery Issues - Steam/Power Imbalance
Steam turbine rotor maintenance
Commissioning and testing activities
FO
FO
FO
Deviation from resource plan
Deviation from resource plan
Deviation from resource plan
deviation from resource plan
Deviation from resource plan
Deviation from resource plan
Deviation from resource plan
Plant Trip
Plant Trip
Plant Trip
Plant Trip
Deviation from resource plan
Deviation from resource plan
deviation from resource plan
Deviation from resource plan
FO
FO
FO
FO
FO
Output reduced due to ambient conditions
Output reduced due to ambient conditions
Output reduced due to ambient conditions
Output reduced due to ambient conditions
Output reduced due to ambient conditions
FO
FO
FO
FO
FO
ODOM
Unit unable to reach tartget due to ambient conditions
Unit unable to reach tartget due to ambient conditions
Unit unable to reach tartget due to ambient conditions
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
Unit unable to reach target due to ambient conditions.
FO
FO
FO
11 KV supply Protection Activated
Partial FO
Partial FO
Deviation from resource plan
Deviation
Deviation from
from resource
resource plan
plan
Dispatch
DeviationAdvisory ID:17388
from dispatch
Deviation
Due to thefrom dispatch
loss of the SNR-APJ/WGP line at 15:07, ALCOA_WGP is on radial and has been constrained to 0MW from 17:00
FO
FO
FO
FO
FO
ODOM
Unit tripped after being returned-to-service following a planned outage.
FO
transformer trip
transformer trip
PD testing
An unplanned load increase (?behind-the-fence?) led to a reduction in available capacity.
An unplanned load increase (?behind-the-fence?) led to a reduction in available capacity.
slow to ramp up
general maintenance
general maintenance
general maintenance
general maintenance
general maintenance
general maintenance
general maintenance
general maintenance
Refinery Steam and Power Imbalance.
FO
Refinery Steam Power Imbalance.
Refinery Steam Power Imbalance.
FO
FO
FO
Unit slow to ramp up.
System Management IT Issues
Deviation from dispatch
Deviation from dispatch
Exh Insp
Safety Issues
Safety Issues
Safety Issues
Safety Issues
Governor testing
Governor edits and testing
Governor testing
Governor edits and testing
Major Annual Outage (B Inspection)
Major Annual Outage (B Inspection)
Major Annual Outage (B Inspection)
Enable signal was removed by Western Power. Site cannot operate without enable signal. Will request conversion to conse
ODOM
Unit slow to ramp up.
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage- Unit available on Diesel only
DBP Outage
DBP Outage
Maintenance of Circuit Breakers and works on the 33kV incomer cable - coincided with WP Forced Outage.
CG 2 - Failed HV termination on Pole N47 - Repair Works
CG 1 - Failed HV termination on Pole N47
CG 2 - Failed HV termination on Pole N47
CG 3 - Bird
Western StrikeOutage. ENAR: 315356 MPI: 235728.
Power
Requested by David Willey
Safety Issues
Safety Issues
Safety Issues
Safety Issues
Pre Summer Outage
Pre Summer Outage
Unit overhaul - Includes dual outage with M5
FO
FO
FO
FO
Western Power is carrying Landwehr Terminal Maintenance which will result in unavailability
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
11MVar cap bank fault
11MVar cap
Western bank
Power fault312727
Enar#
Supply power outage
FO
FO
FO
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Deviation during ramp up from outage
Deviation during ramp up from outage
Deviation during ramp up from outage
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Return to service from outage delayed
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
PNJ U1 max output reduced due to ambient conditions.
FO
FO
FO
FO
FO
Steam turbine and gas turbine outage
DAOM
Safety Issues
Safety Issues
Safety Issues
Safety Issues
Energy Safe WA - Gas Inspector - Isolation Valves.
Energy Safe WA - Gas Inspector - Isolation Valves.
Partial forced outage - Unit load restricted to 270MW.
Full outage for boiler inspection and maintenance
Boiler #1 Trip.
Boiler #1 Trip.
Boiler #1 Trip.
Derailed box cart
forced outage due to unit trip
Pro rata forced outage due to unit trip
Boiler #1 Trip.
Boiler #1 Trip.
Boiler #1 Trip.
Boiler #1 Trip.
Boiler #1 Trip.
Unit slow to ramp down before outage.
Partial forced outage - Unit load restricted to 270MW.
Pro-rata partial forced outage - Unit load restricted to 270MW from 18:52.
Gt2 Fire panel fault
Safety Issues
Safety Issues
Safety Issues
Safety Issues
Boiler Repairs
TES Report - constrained off MW's.
ID fan capacity
PA fan capacity
Deviation from dispatch
Load Derate
Load Derate
Software upgrade of GT
Software upgrade of GT
Boiler capacity
Boiler capacity
PA fan capacity
PA fan capacity
PA fan capacity
PA fan capacity
PA fan capacity
PA fan capacity
ID fan capacity
ID fan capacity
ID fan capacity
ID fan capacity
Unit Outage
Unit Outage
Unit Outage
Unit Outage
Boiler Repairs
Shutdown for software upgrade
Commission GT after software upgrade
Exh Insp
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
Boiler Repairs
Upgrade of Collgar PPC Software
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
PD testing
PD testing
ODOM
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational issues caused unit trip.
Unit available on Diesel
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
ODOM
ID fan capacity
ID fan capacity
ID fan capacity
West Boiler feed pump Outage
ID fan capacity
Centre CW pump outage
Centre CW pump outage
Centre CW pump outage
Centre CW pump outage
North Boiler feed pump oil leak
Annual plus Generator Rotor Changeout
Load Derate
Maintenance
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
ODOM
ODOM
Unit failed to start
Failed to start
Operational issues caused real time forced outage.
Pre accepted with planning engineer , 10 MW TA isolated for 7 days
Turbine alternator outage 7 days 10 mw - 0.02 MW site export
Routine Maintenance
GT Tripped during start up
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
GT1 logic issue
ODOM
ODOM
FO
FO
FO
Annual plus Generator Rotor Changeout
Kemerton_GT12 tripped
Kemerton_GT12 tripped on
on start
start
Kemerton_GT12 tripped on start
Unit tripped
Unit tripped
Unit tripped
Unit tripped
Main step up transformers found with Earth cables removed by Theft/Forced Entry to site.
Load Derate
Centre CW pump outage
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
Stage AB 3.3kV Station Switchboard Maintenance
FO
FO
FO
FO
ODOM
An unplanned load increase (?behind-the-fence?) led to a reduction in available capacity
Pinjarra Unit 2 ramping up from an outage
Pinjarra Unit 2 ramping up from an outage
Pinjarra Unit 2 ramping up from an outage
Pinjarra Unit 2 ramping up from an outage
Pinjarra Unit 2 ramping up from an outage
Pinjarra Unit 2 ramping up from an outage
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Planned outage to replace Mill feeder belt.
Pinjarra Unit 2 tripped due to blade path temperature deviation
Pinjarra Unit 2 tripped due to blade path temperature deviation
Pinjarra Unit 2 tripped due to blade path temperature deviation
FO
FO
Water wash
Load Derate
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
ODOM
Steam Turbine & Gas Turbine Outage
Steam Turbine & Gas Turbine Outage
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Unexpected behind-the-fence load demand, which reduced the available export capacity.
Main Cooling Water Debris Filter gearbox repair.
Major Annual Outage (B Inspection)
BW1 annual statutory outage.
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
FO
FO
Lube clean
Lube clean
CG3 Forced Outage
BW1 annual statutory outage
Condenser and cooling tower performance
West Boiler feed pump Outage
Centre CW pump outage
Centre CW pump outage
TES Report - constrained off MW's.
Consequential outage due to MTU failure in Regans Substation. Generator main switch tripped by Western Power.
Consequential outage due to MTU failure in Regans Substation
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Main Cooling Water Debris Filter gearbox repair.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Pinjarra Unit 2 tripped due to blade path temperature deviation
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Main Cooling Water Debris Filter gearbox repair.
Unit failed to start
Unit failed to start
Unit failed to start
Reduced Load
ODOM
Load Derate
Load Derate
Control Card failure forced early re-sync against
market nominations
Islanded due to serve weather
Taphole blow and repack, Furnace 1. For further information contact Simcoa Furnace Control on 9780 6670
EMDB Outage
TES Report - constrained off MW's.
EI+SUT
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 delayed return to service after outage
PNJ U1 delayed return to service after outage
PNJ U1 delayed return to service after outage
FO
Operational Issues caused real time forced outage.
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Boiler combustion plant capacity
Spring pack leak
Spring pack leak
Condenser and cooling tower performance
Condenser and cooling tower performance
Operational Issues caused real time forced outage.
Condenser and cooling tower performance
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Boiler combustion plant capacity
Operational Issues caused real time forced outage.
Boiler combustion plant capacity
Boiler combustion plant capacity
Boiler combustion plant capacity
Boiler combustion plant capacity
Condenser and cooling tower performance
EI+SUT
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Both GT's to be in LOCAL control while external contractor uploads updated BOP software.
FO
FO
Fire Protection Fault
Hydraulic leak
Precipitator repairs
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
ODOM
Reduced Load for Mill Maintenance
Flow meter problem on Line 35
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
FO
FO
Pro-rata partial forced outage due to PF leak on mill. Unit reduced to three mill operation.
Partial forced outage due to PF leak on mill. Unit reduced to three mill operation.
Pro-rata partial forced outage due to CW pump trip.
Partial forced outage due to CW pump trip.
Pro-rata partial forced outage due to CW pump trip.
Operational Issues caused real time forced outage.
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
FO
ODOM
PAMO
Hydraulic oil leak Phase 1 Contact Pad Lines
Hydraulic oil leak Phase 1 Contact Pad Lines
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
Condenser and cooling tower performance
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
Water Wash
Oil leak on Ph1
Oil leak on Ph1
Oil leak on Ph1
ODOM
Delayed synch due to breaker fault
Delayed synch due to breaker fault
FO
FO
FO
FO
Hydraulic hose failure
Hydraulic hose failure
Hydraulic hose failure
Late return-to-service after planned outage
Turbine LH ESV opening fault
PNJ U1 max output reduced due to ambient conditions.
FO
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Refinery Issues Steam /Power Imbalance
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Deviation from dispatch
TES Report - constrained off MW's.
Deviation from dispatch
PFO
PFO
Broken electrode. Kibble changeout. Furnace 1. For further information contact Simcoa Furnace Control on 9780 6670
Water leak on phase 1 pressure ring. For further information contact Simcoa Furnace Control on 9780 6670
Refinery steam power imbalance.
Forced reduction of load- combustion instability
Forced reduction of load - combustion instability
Forced reduction of load- combustion instability
Reduced load
Software checks/inspection by external contractor for Bentley Nevada system.
Boiler 5 Boiler Turbine minor Shutdown
Blackstart testing for the powerstation in conjunction with AEMO and Western Power - WP form S7V5YM
FO
FO
WGP U2 delayed ramp-up due to start failure.
WGP U2 delayed ramp-up due to start failure.
Load Derate
Unexpected
Consequential behind-the-fence
Outage load demand, which reduced the available export capacity
Western Power works
Consequential Outage on 220kv CB (ENAR 309085)
Western Power works on 220kv CB (ENAR 309085)
CG 1/2
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
FO
FO
Ladle car derailed, Furnace 1. For further information contact Simcoa Furnace Control on 9780 6670
FO
FO
FO
EI+SUT
Deviation from dispatch
EI
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
BOP HMI software patches, updates, and checks by external contractor.
Requested by NOCC to constrain to 0MW due to emergency line works on the distribution feeder.
forced outage due to western power ENAR309085
Condenser and cooling tower performance
Condenser and cooling tower performance
Condenser and cooling tower performance
Furnace 1 water leak ? Transformer line 2. For further information contact Simcoa Furnace Control on 9780 6670
Consequential Outage
Consequential Outage
Consequential Outage
comp wash
FO
ODOM
Furnace 1 unplanned outage
Furnace 1 unplanned outage
Furnace 1 unplanned outage
Furnace 1 unplanned outage
Furnace 1 unplanned outage
Furnace 1 unplanned outage
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Lube Oil and Control Oil filter changout, oil samples for analysis, run on diesel to FSNL for testing.
FO
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
PO
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
G03 OOS For Generator Rotor Adaptors
G02 OOS For Generator Rotor Adaptors
Unit's output was constrained due to ventilation fan issues.
Deviation from dispatch
PNJ U1 max output reduced due to ambient conditions.
Deviation from dispatch
PNJ U1 max output reduced due to ambient conditions.
Deviation from dispatch
Deviation from dispatch
PNJ U1 max output reduced due to ambient conditions.
Deviation from dispatch
PNJ U1 max output reduced due to ambient conditions.
Limited output due to ambient conditions
Limited output due to ambient conditions
Limited output due to ambient conditions
Limited output due to ambient conditions
Pro-rata partial forced outage due to mill failure. Reduced to three mill operation for 15 minutes.
Partial forced outage due to mill failure. Reduced to three mill operation.
BW1 annual statutory outage
G01 OOS For Compressor Wash
G01 OOS For Compressor Wash
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
FO due to unit trip
FO due to unit trip
FO due to unit trip
FO due to unit trip
FO due to unit trip
Unit trip on start
FO
Pre accepted Outage
FO
FO
FO
FO
FO
FO
FO
FO
ODOM
Unit slow to ramp from previous dispatch due to power augmentation issues.
Unit slow to ramp from previous dispatch due to power augmentation issues.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
PNJ U1 max output reduced due to ambient conditions.
WGP GT delayed ramp-up due to start failure.
WGP GT delayed ramp-up due to start failure.
Gas Turbine Major Overhaul
Gas Turbine Major Overhaul
FO
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Unit slow to ramp on start up
Output limited due to ambient conditions
Output limited due to ambient conditions
Output limited due to ambient conditions
Output limited due to ambient conditions
Output limited due to ambient conditions
Output limited due to ambient conditions
Major Annual Outage (B Inspection)
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Unit 11 trip on gas detector failure
22KV Switchboard Maintenance, Requires #2 Steam Turbine Generator Breaker to be Open.
Unit slow to ramp up from start up.
Unit slow to ramp up from start up.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
ODOM
GT1 Starter diesel failure to start.
FO
FO
Gas Turbine 4 Year Major Overhaul
Gas Turbine 4 year Major Overhaul
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
Deviation from dispatch
FO
FO
FO
FO
GT Power Oil Changeover
GT Power Oil Changeover
GT Power Oil Changeover
TES Report - constrained off MW's.
Gas Turbine Major Overhaul
Gas Turbine Major Overhaul
Routine Maintenance
G01 OOS For Compressor Wash
G01 OOS For Compressor Wash
PO
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
ST outage
FO
FO
FO
FO
FO
Condenser and cooling tower performance
G03 tripped on T48 temperature.
FO
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
ODOM
Slow ramp up from outage
Slow ramp up from outage
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Turbine Ancillary Equipment Outage
Unplanned outage of MGA-GTN line due to damaged insulators, WWF curtailed to 0 MW
Load Derate
Turbine inspection and repairs
Enable Signal removed by Western Power during Switching works. Site cannot operate without enable signal. Advised by W
Turbine inspection and repair Outage extension.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Slow ramp up.
FO
FO
FO
Turbine inspection and repair Outage extension.
Turbine Ancillary Equipment Outage
Turbine Ancillary Equipment Outage
Turbine Ancillary Equipment Outage
Repairs turbine MCV
Output limited due to ambient condition.
Output limited due to ambient condition.
Routine Maintenance
KNO delayed coming on after planned maintenance.
Unit MFT/MTR
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Derating due to Ambient condition
Partial outage for mill maintenance
TES Report - constrained off MW's.
TES Report - constrained off MW's.
FO
Unit trip due to high combustion pulsation
fuel gas control valve issue
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Weekend Outage
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
FO
Partial outage (70MW) for mill maintenance
CG1/2 - North pole outage
CG 8/9 - WTG063 RMU SF6 Gas Top Up
CG 1/2 - WTG002 RMU SF6 Gas Top Up
CG 1 - WTG002 RMU SF6 Gas Top Up
CG 1/2 - WTG002 RMU SF6 Gas Top Up
CG 4 - WTG042 RMU SF6 Gas Top Up
CG 4 - WTG042 RMU SF6 Gas Top Up
CG 7 - WTG074 RMU SF6 Gas Top Up
Unit slow to ramp to dispatch target following unexpected direction to commit from System Management
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Unit output below dispatch target due to ambient
Load Derate
Load Derate
Unit MFT/MTR.
FO
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Unit output below dispatch target due to ambient conditions.
Running the engines to Full Speed No Load for periodic testing - no maintenance is planned.
Operational Issues caused real time forced outage.
Water Wash
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Mill A and Mill C starting faults
FO
RAH Blockage limiting load
RAH Blockage limiting load
Condenser and cooling tower performance
Drum level indication and control fault
Unit trip due to high combustion pulsation
FO
power steam imbalance
Plant power steam imbalance
Plant power steam imbalance
Master Fuel Trip, loss of fuel to feeder
Master Fuel Trip, loss of fuel to feeder
Master Fuel Trip, loss of fuel to feeder
Master Fuel Trip, loss of fuel to feeder
FO
Operational Issues caused real time forced outage.
Unknown reason for Failure to Comply with Dispatch Obligation
Unknown reason for Failure to Comply with Dispatch Obligation
Unknown reason for Failure to Comply with Dispatch Obligation
Unit slow to ramp up.
Unit MTR
WMK OOS For Compressor Wash
WMK OOS For Compressor Wash
KNO GT Trip due to vibration alarm
Emergency stop of G01 due to turbine oil leak inside package.
CI requiring GT1B offline
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
WMK OOS For Compressor Wash
WMK OOS For Compressor Wash
WMK OOS For Compressor Wash
HV switching
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
One unit On the day outage request
One unit On the day outage request
U2 Liquor leak on 28 live steam heater and low 25A tank densities, low steam flows
U2 Liquor leak on 28 live steam heater and low 25A tank densities, low steam flows
U2 Liquor leak on 28 live steam heater and low 25A tank densities, low steam flows
U2 Liquor leak on 28 live steam heater and low 25A tank densities, low steam flows
U2 Liquor leak on 28 live steam heater and low 25A tank densities, low refinery steam demand
Main cooling water pump outage
BI+HSE+IC+UT
Partial load reduction for minor maintenance
Manual operation due to high Generator vibration - MVAR's adjusted
Manual operation due to high Generator vibration
Enable signal was removed due to an outage on the Western Power network. Site cannot operate without enable signal. W
Manual operation due to high Generator vibration
Manual operation due to high Generator vibration
Manual operation due to high Generator vibration
Refinery Issues - Steam/Power Imbalance
DBP Pressure control maintenance
DBP Pressure control maintenance
DBP Pressure control maintenance
FO
FO
Unit available on distillate only
FO
Periodic Running GT1 and GT2 on Diesel Fuel Test Run
BI+HSE+IC+UT
Power steam imbalance
Inlet temperature issues.
Maintenance
Due to WP works ENAR 303320 the windfarm was required to be curtailed to 0MW for the duration of the works. The win
Inspection of D mill
Unit slow to ramp up.
Unit slow to ramp up.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
GT1 tripped on Secondary Air Fan issue on start sequence
TES Report - constrained off MW's.
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Water Wash
Water Wash
Water Wash
Water wash
Water wash
Unit slow to ramp up.
Unit slow to ramp up.
Unit slow to ramp up
Unit slow to ramp up.
Unit slow to ramp up
ODOM
G01 was ramped up to take the required load as the priority engine and G03 was stopped as planned. G01 then ramped do
Maintenance
Maintenance
Maintenance
Maintenance
Maintenance
repair sample line
BI+HSE+IC+UT
22KV Switchboard Maintenance, Requires #1 Steam Turbine Generator Breaker to be Open.
Unit slow to ramp up.
GT1 unavailable with Bentley Nevada and SIL computer issues, with external contractors supplying parts and services to as
SM unintentionally applied a 0 MW constraint to WWF while troubleshooting dispatch system issues from earlier in the da
GSU1 oil temp transducer replacement, GSU2 inspected at the same opportunity.
WWF facility constrained to 0 MW due to System Management issue with PI servers
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
GT Control Malfunction
Boiler Maintenance Outage
Load Derate
Issue with feeder
Issue with feeder
Issue with feeder
Issue with feeder
Issue with the feeder
Issue with the feeder
Load Derate
Load Derate
Load Derate
Load Derate
Delay in unit ramp-up
WP work
WP work
unit slow to ramp up
Unit slow to ramp up
Load Derate
Load Derate
Load Derate
GT Muscle Air Compressor receiver inspection by external contractor. Taking the Muscle Air Compressors out of service ta
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
WMK OOS For Compressor Wash
WMS OOS For Compressor Wash
Planned maintenance at Collgar's T111 - Day 2/2
Planned maintenance at Collgar's T111 - Day 1/2
Planned maintenance at Collgar's T211 - Day 2/2
Planned maintenance at Collgar's T211 - Day 1/2
Unplanned increase in loads behind-the-fence led to reduction in available capacity to the market
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
Blade wash
Blade wash
GT1 requires additional work to be completed for the next six month planned run - lube oil line leak, wiring loom replacem
GT1 unavailable to run due to Bentley Nevada rack backplane issue, and card failures.
GT2 vibration sensor VT002 failed while generating, replaced and tested, all OK.
GT1 Main Step Transformer temperature transducer lost signal making the TX unavailable.
Unit offline for WP switching
Unit offline for WP switching
Unit offline for WP switching
Not enough time between Acknowledge Time to Response Time. Discrepancy between SMITTS and KMK generation amou
ABC Maximum set at 31MW and ABC did not respond. Operator failed to notice 42MW dispatch.
FO
Load Derate
Refinery steam power imbalance.
Steam Plant imbalance.
Issue with oil guns
Issue with oil guns
Western Power Trip
WP work
Boiler 2 MOH
Load Derate
Boiler Inspection and repairs
Boiler Inspection and repairs
WP work
Coal issue
ODOM
Western Power Requested Outage- ENAR302629. Enable Signal to be removed during work on feeder.
FO
FO
Unit slow to ramp from previous dispatch.
1 Day Outage
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
Bunker conveyor concrete repairs
APLD trip from Western Power
APLD trip from Western Power
Enable signal was removed due to outage on Western Power transmission line. Site cannot operate without enable signal.
Furnace 2 outage
Furnace 2 outage
Furnace 2 outage
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Plant pulsation alarm issue
Plant pulsation alarm issue
Operational Issues caused real time forced outage.
Due to WP works (ENAR 300185) Denmark Windfarm was curtailed to 0MW for the duration of the works
TES Report - constrained off MW's. GT1 issues with Bentley Nevada requiring reset.
Inspection and software upgrade on Bentley Nevada (vibration) system by external Tech.
Slow ramp rate due to power augmentation limitations
Unit slow to ramp from previous dispatch
Unit slow to ramp from previous dispatch
WGP1 gas control valve erratic, unit offline to reset/restart
WGP1 gas control valve erratic, unit offline to reset/restart
Outage
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Enable signal was removed due to power outage on Western Power network. Site cannot operate during a power outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Boiler Inspection and repairs
Load Derate
Partial forced outage during turbine valve testing
Partial forced outage during turbine valve testing
Partial forced outage during turbine valve testing
Partial forced outage during turbine valve testing
Black Start Test
Black Start Test
Black Start Test
Operational Issues caused real time forced outage.
No water flow line 37 contact pad phase 2. For further information contact Simcoa Furnace Control on 9780 6670
CG 3
CG 3
CG 10 & 11
CG 3
CG 10 & 11
CG 3
CG 10 & 11
Units to be inspected by Pratt and Whitney OEM Tech's - 5 year major inspection. Back end alighment checks, boroscopes,
Minor repairs to oil lines, air lines, internal inspections, generator heat exchangers, control transformer upgrades.
Periodic test for FSNL on diesel fuel - no maintenanc is being planned.
Western Power Networks outage on the WWF-GTN81 Transmission Line
Western Power Networks outage on the WWF-GTN81 Transmission Line
Mill trip
Mill trip
Mill trip
Planned Western Power Networks outage on the MGA-TS81 Transmission Line
Planned Western Power Networks outage on the MGA_TS81 Transmission Line
day ahead maintenance
blr 3 attemperator repairs
Exh Insp
HP Bypass valve positioner replacement
HV maint
Transfer of Experion control system from Alcoa to Alinta
Transfer of the Experion control system from Alcoa to Alinta
Western Power planned line outage on the MGA_TS81 line limiting WWF output
FO
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Due to WP works (ENAR 296687) the Denmark Wind Farm was curtailed to 0MW on the 31st of March, between approxim
Due to WP works (ENAR 296687) the Denmark Wind Farm was curtailed to 0MW on the 30th of March, between approxim
Due to WP works (ENAR 296687), the Denmark Wind farm was curtailed to 0MW on the 29th of March between 7:40am a
Generator Vibration Testing - Delayed - Behind planned schedule
Generator Vibration Testing - Delayed - Behind planned schedule
Generator Vibration Testing - Delayed - Behind planned schedule
Generator Vibration Testing - Delayed - Behind planned schedule
Generator Vibration Testing - Delayed - Behind planned schedule
Repairs to Feedwater Pipe
Generator Vibration Testing - Delayed - Behind planned schedule
Repairs to Feedwater Pipe
Loss of Telemtery from SOCC
Due to WP works (ENAR 296687) the windfarm output was curtailed to 0 MW for the duration of the works on 28th of Ma
Transformer 2 offline for HV maintenance
Transformer 1 and 2 offline for HV maintenance
ODOM
Repair turbine MCV.
Transformer 1 offline for HV maintenance
Transformer 1 and Collector groups 1 to 3 offline for HV maintenance
Maintenance
Unit 12 minor works
Unit 12 minor works
FO
Transformer 1 offline for HV maintenance
Transformer 1 and Collector groups 1 to 3 offline for HV maintenance
DAOM
Steam Turbine & Gas Turbine Outage
Blown fume duct to ph1 electrode cooling
Operational Issues caused real time forced outage.
FO
emergency shutdown for MGA-TS81
emergency shutdown for MGA-TS81
MGA TS81 line planned outage WWF curtailed
MGA TS81 line planned outage WWF curtailed
MGA TS81 line planned outage WWF curtailed
MGA TS81 line planned outage WWF curtailed
Maintenance
Maintenance
Maintenance
Maintenance
Maintenance
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Load Derate
ODOM
ODOM
Due to a network disturbance on windfarm feeder, the windfarm was tripped at full output on Sunday 26th of March arou
Place units in LOCAl control, run to Full Speed No Load for periodic testing - no maintenance is planned.
Operational Issues caused real time forced outage.
Partial outage for full stroke turbine valve testing
Unit was partially de-rated to perform protection testing.
Casting crane failure. For further information contact Simcoa Furnace Control on 9780 6670
Maintenance
Water Wash
Maintenance
Maintenance
Maintenance
Maintenance
Maintenance
TES Report - constrained off MW's.
Operational Issues caused real time forced outage.
ODOM
Box overflowed, burnt tracks
FO
FO
FO
Boiler 6 PSV Statutory Outage
Attemperator repair boiler 3.
Operational Issues caused real time forced outage.
Units periodic test run to FSNL - no maintenance is planned.
Gas Flow Maintenance
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
DBP Pinjar PS 12M Outage Requests
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Routine Maintenance
Partial outage to perform full stroke valve testing
Turbine 3 blade wash.
Load Reduction
Boiler Maintenance
Unit tripped due to high bearing temperature
high current, incoming breaker faul
ODOM
ODOM
ODOM
Operational Issues caused real time forced outage.
Repair major water leak from pressure ring
Forced reduction of load
Operational Issues caused real time forced outage.
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
Islanded at Tronox Request
Islanded at Tronox Request
WMK OOS For Compressor Wash
WMK OOS For Compressor Wash
Boiler Outage
FO
Refinery Issues - Steam/Power Imbalance
Refinery Issues - Steam/Power Imbalance
Refinery Issues - Steam/Power Imbalance
Blown hydraulic hose, Furnace 1. For further information contact Simcoa Furnace Control on 9780 6670
Forced Outage - combustion instability
Forced Outage - combustion instability
Forced Outage - combustion instability
Forced reduction of load
Forced reduction of load
Stack C Emission testing
Stack C emission testing
Unit will be partially de-rated to perform protection testing.
Stack C emission testing
Unit will be partially de-rated to perform protection testing.
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
unit maximum output was restricted to 100 MW as-generated due to high rotor temperature alarm for safety purposes
Unit issues ramping up to dispatch target due to safety concern when high rotor temperature alarm got activated
Unit issues ramping up to dispatch target due to safety concern when high rotor temperature alarm got activated
Unit ramp-up
Delay in unit ramp up
Unit had problems ramping up to dispatch target
Unit had problems ramping up and staying to min load
Unit had problems ramping up and staying to min load
Repairs to EMDA and EMDB 132/22kV transformers.
Consequential Outage
Consequential Outage
GT1A offline for HGPI
FO
FO
Operational Issues caused real time forced outage.
3 Day Outage
A fault on a Western Power module box led to communication issues requiring the islanding of PRK_AG from the grid.
1 Day Outage
ODOM
Half station only - GT2 unavailable while replacing water fogging filters.
Operational Issues caused real time forced outage.
Fit displacement probes to Generator Rotor
Islanded due to Thunder Storm Activity
Islanded due to Thunder Storm Activity
The windfarm tripped around 7:25 am due to a fault at the Albany substation. The windfarm was put back into operation a
Windfarm was curtailed to 0MW due to WP works starting 7 am; windfarm was restarted approx. 6:45 pm
Due to a trip at Albany substation, the Denmark windfarm triped around 7:28 am and was restarted around 11:29 after the
Due to network outage in Denmark, the windfarm tripped around 6:20 pm and was restarted by an operator around 7:20
WP maintenance between starting 7 am, return to service approx. 18:45
Investigate rotor temperature alarm
Output limited due to ambient condition.
Output limited due to ambient condition.
Unit slow to ramp up.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Output limited due to ambient condition.
Unit slow to ramp up.
Maximum output limited due to ambient conditions
1 Day Outage
Boiler 6 PSV Statutory Outage
Gas control valve fluctuation, combustion instability, normalise plant.
Gas control valve fluctuation, combustion instability initiated GT trip
Boiler Maintenance
A lightning strike on the Western Power 132kV line on the A side caused a trip on EDWF first on side A and subsequently le
Repair HP heater SRV.
G03 OOS For Compressor Wash
TES Report - constrained off MW's.
TES Report - constrained off MW's.
Turbine inspection
EMDB outage associated with shutdown of the CTB-EMD/ENB82 132kV Line
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Refinery Issues Steam/Power Imbalance
Refinery Issues Steam/Power Imbalance
Refinery Issues Steam/Power Imbalance
Refinery Issues Steam/Power Imbalance
Refinery Issues Steam/Power Imbalance
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
MBA TS81 line trip WWF curtailed
FO
FO
FO
FO
FO
FO
Minor Control System modifications
Western Power to complete busbar isolator maintenance at Mt Barker substation
Western Power to complete busbar isolator maintenance at Mt Barker substation
ODOM
WMK OOS
WMK OOS
WMK OOS
WMK OOS
Operational Issues
Refinery issues caused
power/ realimbalance
steam time forced outage.
Refinery issues power/ steam imbalance
Refinery issues power/ steam imbalance
Enable
Enable Signal
Signal removed
removed by
by Western
Western Power
Power for
for switching
switching work
work (ENAR
(ENAR 284542).
284542). Site
Site cannot
cannot operate
operate without
without enable
enable signal.
signal. O
Will request conversion to consequential.
Refinery Issues - Steam/Power Imbalance
Delayed RTS due to operational issues
Delayed RTS due to operational issues
Delayed RTS due to operational issues
Delayed RTS due to operational issues
Delayed RTS due to operational issues
Delayed RTS due to operational issues
Routine Maintenance
Routine Maintenance
Major Inspection
Combustion inspection
Blade wash
Blade wash
PNJ U2 start up profile on return to service
PNJ U2 start up profile on return to service
PNJ U2 start up profile on return to service
PNJ U2 delayed return from Blade Wash Outage due to Steam Leak
Refer to Dispatch Advisory 16868
Refer to Dispatch Advisory 16868
Refer to Dispatch Advisory 16868
Refinery Issues steam power imbalance.
Refinery Issues steam power imbalance.
Refinery Issues steam power imbalance.
Refinery Issues causing steam and power imbalance.
Refinery Issues causing steam and power imbalance.
Refinery issues. Power steam imbalance
Refer to Dispatch Advisory 16868
Additional partial outage (on top of #231444) for precipitator internal work.
Partial outage for mill maintenance work
Forced partial outage due to mill trip
MGA MBA81 TL outage, WWF curtailed
MGA MBA81 TL outage, WWF curtailed
MGA MBA81 TL outage, WWF curtailed
Reduced Capacity for Cooling Tower Maintenance
ODOM
FO
FO
FO
rolled back to 17.3 MW
Wagerup Boiler #1 Inspection
FSNL
FSNL
compliance testing
gas compliance testing
Unit slow to ramp from previous setpoint
Unit slow to ramp from previous setpoint
Limited output due to ambient conditions
Unit slow to ramp from previous setpoint
Unit slow to ramp from previous setpoint
Unit slow to ramp from previous setpoint
Western Power islanded Goldfields Power from the SWIS.
Western Power islanded Southern Cross Energy from the SWIS.
Routine Maintenance
Routine Maintenance
GT1 went unavailable due to Fire System fault again, John from AEMO rang me at 1402 on Saturday 03 December.
GT1 went unavailable due to Fire System fault.
Constrained to zero (ENAR#289695 and #275957)
Gas compliance work
Gas compliance work
Pre Summer Outage
Pre Summer Outage
Delayed RTS due to operational issues
Furnace 1 Outage
Power Steam imbalance
Due to WP works on the feeder line (ENAR 288079), the windfarm was required to be isolated for the duration of the work
FO
Merredin powerstation unavailable due to CB failure at Muju terminal disrupting the 220KV line to eastern goldfields.
Dispatch Advisory ID 16868
Pre Summer Outage
Exh Work
FSNL
FSNL
Maintenance
Maintenance
Transformer testing
Transformer testing
FO
Due to issues with the high fogging system
GT1B outage
Slow ramp up due to Blade Path Temperature control limit
Slow ramp up due to Blade Path Temperature control limit
Slow ramp up due to Blade Path Temperature control limit
Slow ramp up due to Blade Path Temperature control limit
Loss of a mill
FO
FO Due to network disturbance fault tripping both unit protection systems
FO Due to network disturbance fault tripping both unit protection systems
FO
FO
FO
Water leak Ph2 Fu1. For further information contact Simcoa Furnace Control on 9780 6670
Due to issues with the high fogging system
Unit testing
Unit testing
Unit testing
Unit unavailable for dispatch
Unit unavailable for dispatch
Refinery steam / power imbalance
Refinery power / steam imbalance
Refinery power / steam imbalance
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
DBP Outage
Outage
ODOM
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Operational issues caused real time forced outage.
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Output limited due to high ambient temperature
Unit ramping limited on return to service
Operational Issues caused real time forced outage.
Operational Issues
Investigate and caused
conduct real time
reports on aforced outage.
turbine
FO
Consequential Outage - Dispatch Advisory ID: 16828
Consequential Outage - Dispatch Advisory ID: 16828
GT1B outage
Station in SCADA
GSU2 found control
to have and loading,
malicious damageGT1
withTRIP on Grid
Earthing Disturbance
cables removedonbySafety Integrated
unknown System Trip.
persons.
Cables replaced with external contractor.
GT2B ramping in SOCC control, FCV1101 position error trip resulting in TRIP of unit.
Enable Signal was removed by Western Power due to switching on feeder. Site cannot operate without enable signal. Will
ODOM
FO
FO
Boiler 2 Tube Repair Outage
HGPI & CD Casing Change out
Routine Maintenance
Routine Maintenance
Routine Maintenance
Blade wash
Blade wash
Enable signal was removed due to Western Power network issues. Site cannot operate without enable signal. Will request
Pre Summer Outage
Steam Power Imbalance - Refinery Issues.
Steam Power Imbalance - Refinery Issues.
Steam Power Imbalance - Refinery Issues.
Steam Power Imbalance - Refinery Issues.
GT2B FCV1101 (gas fuel control valve) motor replacement
GT1 and GT2 Boroscope with GE personnel in attendance.
Boiler 2 tube repair outage
Partial FO
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Limited output due to ambient conditions (High temperature)
Over speed Test
G03 OOS For Compressor Wash
G02 OOS For Compressor Wash
G01 OOS For Compressor Wash
WMK OOS For Compressor Wash
WMK OOS Compressor Wash
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Cooling Tower Maintenance
PO
PO
PO
Consequential Outage - Dispatch Advisory ID: 16810
Consequential Outage - Dispatch Advisory ID: 16810
FO
Outage to enable PA Duct repairs
Cooling Tower Cell maintenance.
Cooling Tower Cell maintenance.
FO
Failure of Damper Door controls
Enable signal was removed due to Western Power network issues. Site cannot operate without enable signal. Will request
Collector group 1 de-energised to allow turbine repairs
Unit ramping limited on return to service
Unit ramping limited on return to service
Unit ramping limited on return to service
Unit trip on loss of 330 kV line due to bushfire
Unit trip on loss of 330kV line due to bushfire
Delayed end to planned outage
ODOM
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Due to Western Power works (ENAR Ref ? 284868 / 284874) the windfarm output was curtailed to 0 on November 2nd be
Due to Western Power works (ENAR Ref ? 284863 / 284871) the windfarm output was curtailed to 0 on November 1st bet
Delay in RTS
Partial FO
Enable signal was removed due to Western Power network issues. Site cannot operate without enable signal. Will request
Curtailment shutdown
Curtailment shutdown
Curtailment shutdown
Furnace repairs
Furnace repairs
slow to ramp up
Slow to ramp
Units placed into LOCAL control, engines run to FSNL only - no maintenance is planned.
Delay during synchronization
Delay during synchronization
Delay during synchronization
Governor Control Fault
Slow ramp up
Slow ramp up
Slow ramp up
Slow ramp up
Slow ramp up
Slow ramp up
Slow ramp up
Slow ramp up
Unit tripped due to blown fuse on blade pass temperature element
Slow ramp up
Unit tripped due to blown fuse on blade pass temperature element
Unit start-up profile operational requirement
Unit start-up profile operational requirement
Outage Extension
FO
FO
HGP + EI + SUT + PROT + ROTOR + GI
Fume duct issue
Temperature related issues on ramp up
Temperature related issues on ramp up
Temperature related issues on ramp up
WMS OOS For Engine Change
WMS OOS Engine Change
Outage due to Western Power network issues. (Request to be made to convert to Consequential)
Loss of a cooling tower fan
Under Voltage Relay Trip
Under Voltage Relay Trip
Cooldown
Cooldown
Cooldown
Cooldown
Cooldown
Partial outage - load reduction from 270MW to 180MW
Pre-accepted outage for mill maintenance
Western Power Network fault led to the islanding of Goldfields Power from the grid.
Western Power Network fault led to the islanding of Southern Cross Energy from the grid.
Internal fault
Unit slow to ramp up
Unit slow to ramp up.
Blade wash
Cooling Tower Fan Repairs
Cooling Tower Fan Repairs
Outage
BI + PI + SUT + PROT
Unit start-up profile operational requirement
Unit tripped due to blown fuse on blade pass temperature element
Cable Termination Failures
loss of a cooling tower fan
Mungarra PS Maintenance
Mungarra PS Maintenance
Mungarra PS Maintenance
Mungarra PS Maintenance
Mungarra PS Maintenance
Mungarra PS Maintenance
Mungarra PS Maintenance
loss of a cooling tower fan
Cable Termination Failures
Cable Termination Failures
Cable Termination Failures
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Western Power Networks outages on the MGA-MBA81 Transmission Line
Temperature related issues on ramp up
Repair leak in plant HRSG to ensure full plant availability during hot season
Temperature related issues on ramp up
Temperature related issues on ramp up
Temperature related issues on ramp up
B2 Major Outage and SH Tube Replacement
Boiler 6 PSV Statutory Outage
Boiler 2 Tube Repair
Gas metering maintenance
Gas metering maintenance
Gas metering maintenance
WGP U2 start fail due to fuel drain valve limit switch fault
Synchronisation delay due to temperature related issues
Brush Gear repairs
Low furnace pressure due to loss of fuel supply
Low furnace pressure due to loss of fuel supply
Low furnace pressure due to loss of fuel supply
LP Differential Expansion issue
LP Differential Expansion issue
LP Differential Expansion issue
Boiler Tube Leak Repairs
ST Taken oos due to high bearing temperature.
ST Taken oos due to high bearing temperature.
ST Taken oos due to high bearing temperature.
GT Taken oos due to combustion instability.
ODOM
Master fuel trip
High differential pressure in the baghouse
Outage
Hydraulic oil leak Phase 2 contact clamp
BI + PI + SUT + PROT
Common Gas yard outage works
Failure of Hydraulic Unit on Damper Door
Compliance testing
Unit ramp up following delayed RTS due to unit trip
Unit ramping up following delayed RTS due to unit trip
DBP Outage
DBP Outage
DBP Outage
Unit ramping up following RTS delay due to unit trip
Unit trip during RTS from blade wash outage
Western Power maintenance works on the MGA-GTN81 line
SCADA issue causing outage of 14 turbines
Pro rata partial forced outage after unit runback caused by CW Pump trip
Partial forced outage after unit runback caused by CW Pump trip
Pro-rata partial forced outage after unit runback caused by CW Pump trip
Pro rata outage due to air compressor issues
Forced full outage due to Air Compressor issues
Due to planned WP works in the MB substation on 13 October 2016(REF ? ENAR 282428) the windfarm was curtailed to 0
Failure of Damper Door Hydraulic System
Gas Turbine breakdown
HP Cylinder metal stress
HP Cylinder metal stress
HP Cylinder metal stress
WMK OOS For Engine Change
Unit overhaul - Extension
WMK OOS Compressor Wash
Repair fuel oil lines
ODOM
MFC Unit 5 Major Outage
Internal Boiler Inspection
Internal Boiler Inspection
Wagerup Boiler #1 Inspection.
Isolation valve drop test
Isolation valve drop test
Outage to install new fuel selection software
Dynamic Model Validation Tests
Gas Turbine torque convertor failure.
Gas Turbine torque convertor failure.
Gas Turbine break down
GT1 Bentley Nevada power supply issue.
GT1 VT001 inspection
Blade wash
Blade Wash
Outage
Outage
Refinery Steam/Power Imbalance
G03 OOS For Compressor Wash
G03 OOS For Maintenance
Oil Leak on Phase 2 . For further information contact Simcoa Furnace Control on 9780 6670
Refinery/Steam imbalance
Refinery/Steam imbalance
Refinery/Steam imbalance
Refinery/Steam imbalance
Refinery/Steam imbalance
Refinery/Steam imbalance
Outage requested by Western Power to perform maintenance on MSR-KMK81 - Plant will be Islanded
Plant Islanded due to severe weather
Enable signal was removed due to switching on feeder. Site cannot operate without enable signal. Will request conversion
The windfarm was tripped due to an outage of the feeder in the storm at 4:22pm. The windfarm was restarted the next da
WGP U2 not started due to uneconomic short run.
The DCWL windfarm was tripped at 11:14 am due to a disturbance on the feeder during the storm. The windfarm was res
ID fan bearing failure - output reduced to 160MW (pro-rata)
ID fan bearing failure - output reduced to 160MW
ID fan bearing failure - Pro-rata load reduction to 160MW
Unit tripped - LP heater level
Pro-rata forced outage after unit trip
Delay in RTS from planned outage
GT2B IGV Dual Servo Valve replacement.
Periodic maintenance - run to Crank speed only for the engines.
Routine maintenance
Routine maintenance
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Delay to unit synchronization
Unit trip
Unit trip
DAOM
Control System Card failure
Engine trip due to vibration sensor fault
Cooling fan issue led to protection trip of the GT
Unit failed to start.
Refinery Steam/power Imballance
Refinery Steam/Power Imbalance
Refinery Steam/Power Imbalance
Refinery Steam/Power Imbalance
Refinery Steam/Power Imbalance
Unit unavailable for dispatch
Refinery flow issues causing steam and power imbalance.
Refinery flow issues causing steam and power imbalance.
Refinery flow issues causing steam and power imbalance.
Refinery flow issues causing steam and power imbalance.
Refinery flow issues causing steam and power imbalance.
Refinery flow issues causing steam and power imbalance.
Wagerup Gas Turbine requires maintenance on gas splitter valve.
Wagerup Gas Turbine requires maintenance on gas splitter valve.
WMS OOS For Engine Change
WMS OOS For Engine Change
WMS OOS Engine Change
Compulsory work required by the regulator to upgrade the common gas skid on site.
Compulsory work required by the regulator to upgrade the common gas skid on site.
Routine maintenance
Routine maintenance
Blade wash
External contractor on site to check over Bentley Nevada software on GT1.
DBP Outage
DBP Outage
Unit available on Distillate only
Unit available on Distillate only
Unit available on Distillate only
Unit available on Distillate only
Unit
Issuesavailable on Distillate
with ramping up only
Baghouse Issues
Mill Issuefailed to start.
The unit
Linknet Failure
Gas Valve position fault
Engine vibration sensor fault
Engine vibration sensor fault
Engine vibration sensor fault
Engine vibration
Evaporative sensor
cooler pumpfault
issues
Evaporative cooler pump issues
Refinery
Unit slowSteam / Power
to ramp down Imbalance
Unit slow to ramp up
Unit slow to ramp up
GT/HRSG Trip
Annual Statutory Outage. Boiler and GAH works.
Unable to fire the boiler on coal.
Unit delay RTS
Maintenance
FO
FO
Unable to fire on coal.
Unit delay RTS
FO
FO
FO
FO
ODOM
FO
Master fuel trip
Master fuel trip
Master fuel trip
Extension to air heater wash outage (#227046)
Outage Ref. ENAR 267482
EI
Major GT C inspection and plant outage
Steam / Power Imbalance
B Class Outage
B Class Outage
Boiler Outage
Boiler Outage
Issue with Variable Speed Drive on Pulveriser A/B
Issue with Variable Speed Drive on Pulveriser A/B
Issue with Variable Speed Drive on Pulveriser A/B
Rotary air heater wash
Turbine temperature and vibration issues during ramp up
Gas Turbine muscle air compressor annual service by external contractor.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
UNIT OOS
Unit OOS
Refinery Issues - Steam/Power Imbalance
Dispatch Advisory 15998 - Due to a scheduled outage at Merredin Terminal, INVESTEC_COLLGAR_WF1 will be curtailed to
Mill Maintenance
GI + PROT
FO
FO
Opportune work
A-Inspection, Gen Robotic Inspection and Filter change
A-Inspection, Gen Robotic Inspection and Filter change
A-Inspection, Gen Robotic Inspection and Filter change
A-Inspection, Gen Robotic Inspection and Filter change
Islanded due to Severe Weather Warning on instruction from Tronox
Boiler inspection
Unit out of service for Western Power ENAR268968
Unit out of service for Western Power ENAR268961
Opportune work
Opportune work
FO
FO
FO
Rotor temperature issue.
Rotor temperature issue.
Refinery Issues - Steam/power imbalance.
Refinery Issues - Steam/power imbalance.
Power/Steam imbalance
Power/Steam imbalance
Load reduction
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
Operational Issues caused real time forced outage.
GTG1 and GTG2 turbine inspections and fuel heater pre-winter inspection and test.
Refinery Issues - Steam,/Power Imbalance
Outage for EMDA transformer tests
Western Power outage 225990 will result in the 132kV to KND being switched off
Inspection and test of the HV switchyard equipment. Partial discharge test of the generators and step up transformers.
Combustion inspection
Islanded due to Servere Weather Warning on instrcutions from Tronox
Islanded due to Servere
Refinery issues. Power / Weather Warning.
Steam imbalance
Refinery issues. Power / Steam imbalance
Refinery issues.
Notification PowerENAR
of outage / Steam imbalance
267957 (Western Power Fault Reference 3596490-g) was received 22/3/16 13:31, too late to
Enable removed 9:22, power removed 9:35, power restored 15:31, enable restored 15:39.
Will request conversion to consequential.
Inspection and test of the HV switchyard equipment. Partial discharge test of the generators and step up transformers.
Operational issues caused real time forced outage.
Unit unavailable for dispatch
Outage due to enable signal being removed by Western Power as a result of issues on 2 other HV feeders fed from the Ger
Merredin PowerStation constrained to 0MW due to issues in WP switchyard.
Governor Control Issues.
due to ambient condition
due to ambient condition
due to ambient condition
due to ambient condition
Outage due to Western Power network issues. (Request to be made to convert to Consequential).
Governor Control Issues.
B Class Outage
B Class Outage
B Class Outage
Weekend Outage
Western
BW1 Power
annual Worksoutage.
statutory IslandedFull
GPPLC-Inspection, Boiler Chemical Clean, Blade Feathering.
FO
Slow to ramp. Output limited due to ambient conditions.
Load Restriction
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Site could not operate due to outage on feeder. Will request conversion to consequential.
Cooling Tower Tie in
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Gas Supply Contraint
Deviation on ramp up from outage
Routine Water Wash
Deviation on ramp up from outage
FO
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Boiler inspection
Outage to repair leak in plant HRSG (Heat Recovery Steam Generator to ensure plant is availabe for remainder of hot seaso
Furnace 2 OOS
HP steam drain line repair
FO
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Operational issues caused real time forced outage.
Unit derate following load rejection event.
Unit derate following load rejection event.
Unit derate following load rejection event.
Unit derate following load rejection event.
Unit derate following load rejection event.
Unit derate following load rejection event.
Remove isolation plates on fan 12. Plant affected, Furnace 1 and 2.
Unit derate following load rejection event.
For further information contact Simcoa Furnace Control on 9780 6670.
HP steam drain line repair
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
Ambient temperature, capacity limit
System management request to manually dispatch to 120 MW to facilitate circuit breaker re-gas work
System Management
power steam request to manually dispatch to 120 MW to facilitate circuit breaker re-gas work
imbalance
power steam imbalance
power steam imbalance
power steam imbalance
power steam imbalance
power steam imbalance
Erratic governor
Power Steam control system
Imbalance. Refinery issues
Power Steam Imbalance. Refinery issues
Power
Power Steam
Steam Imbalance.
Imbalance. Refinery
Refinery issues
issues
Power Steam Imbalance. Refinery issues
Deviation
Deviation from
from commissioning
commissioning test
test plan.
plan. Contractor
Contractor tuning
tuning requirement.
requirement
urity and Reliability as a result of anti-islanding issues. Some Out of Merit generation may occur.
WP restored Scada and windfarm was restarted around 5.55 pm
elow.
rained to 0MW from 17:00 in order to maintain Power System Security and Reliability. Some Out of Merit generation may occur. Resto
9780 6670
9780 6670
9780 6670
021). Site cannot operate without the enable signal. Will request conversion to consequential.
9780 6670
9780 6670
9780 6670
ced Outage.
by Western Power.
n 9780 6670
e Control on 9780 6670
n 9780 6670
trol on 9780 6670
enable signal. Advised by Wai at NOCC after signal removed. Will request conversion to consequential.
ate without enable signal. Will request for conversion to consequential.
ation of the works. The windfarm was curtailed at 7:02am and returned to operation at 3:17pm.
anned. G01 then ramped down to approximately 6 MW after receiving a ?Control System Alarm? , had to take offline to rectify
as put back into operation after the fault was cleared, around 10:55am
ox. 6:45 pm
arted around 11:29 after the fault had been cleared
y an operator around 7:20 pm
n side A and subsequently lead to side B tripping leading to full unit being offline.
cannot operate without enable signal. Will request conversion to consequential.
could not restore it due to comms issues experienced over the Telstra network in Northam. Will request conversion to consequential.
tation. Site cannot operate without enable signal. Will request conversion to consequential.
Site cannot operate without enable signal. Will request conversion to consequential.
outage was cleared, windfarm cms was closed by operator approx. 4:20pm
kV feeder. An outage at the same time was reported in the town as well.
ignal. Will request conversion to consequential.
nversion to consequential.
ate
ate without
without enable
enable signal.
signal. Outage 231530 had wrong end time.
rday 03 December.
or the duration of the works between 7:30am and 2 pm on 19/11/2016. The turbines were curtailed to 0 MV output around 7:20 am a
e to eastern goldfields.
without enable signal. Will request conversion to consequential.
enable signal. Will request conversion to consequential.
orm. The windfarm was restored to operation after the line was restored.
ol on 9780 6670
ol on 9780 6670
n 9780 6670
nal. Will request conversion to consequential.
The windfarm was restarted after the faults were cleared at 5:40pm.
6:40 am. Power to the town was restored by approx. 2.30pm and the windfarm switched on shortly after 3pm.
nsequential)
rsion to consequential.
e Control on 9780 6670
ontrol
hing onIntertrip
and 9780 6670was not disabled by Western Power.
with the 220kV line between Muja and Kalgoorlie during WP Switching.
ersion to consequential.
d for SCADA - transmission and generation.
tripped due to storms and lightning strikes in the North Country region. Information based on Dispatch Advisory 16400 and 16401 from
d for SCADA - transmission and generation.
tripped due to storms and lightning strikes in the North Country region. Information based on Dispatch Advisory 16400 and 16401 from
tripped due to storms and lightning strikes in the North Country region. Information based on Dispatch Advisory 16400 from Western
d for SCADA - transmission and generation.
d for SCADA - transmission and generation.
15 May 2016.
Will request conversion to consequential.
:30. Site could not operate while enable signal was removed.
to SOCC control.
NAR 227042 and ENAR 257245
nd step up transformers.
HV feeders fed from the Geraldton substation. (Request to be made to convert to Consequential)
oa Furnace Control on 9780 6670
e for remainder of hot season. Closing out- specialised welding and post weld heat treatment.
e for remainder of hot season. Closing out- specialised welding and post weld heat treatment.
conversion to consequential.
ning storm in the area. To be converted to a Consequential Outage.
tage 225609.
outage 225607.
outage 225603 to 225606.
outage 225603 to 225605.
outage 225603 and 225604
outage 225603.