4:00pm 17 24 15 56 426.

72
5:00pm 15 22 14 51 388.62
6:00pm 16 23 15 54 411.48
6:30pm 17 24 16 57 434.34
7:00pm 20 33 18 71 541.02
7:30pm 21 30 16 67 510.54
8:00pm 23 34 17 74 563.88
9:00pm 21 27 19 67 510.54
74 563.88
demand 563.88
kwh loss=2848.2
4:00pm 17 24 15 56 426.72
5:00pm 15 22 14 51 388.62
6:00pm 16 23 15 54 411.48
6:30pm 17 24 16 57 434.34
57
demand 434.34

kwh loss=1029.38
DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC.
KM 100 POBLACION, MONTEVISTA, COMVAL

DATE: MAY 16. 2017

FOR: ENGR. BENEDICTO D. ONGKING


Acting General Manager

SUBJECT: REVENUE LOSS

CAUSE: LINE DAMAGED BY HEAVY EQUIPMENT

LOCATION: P-4 HAGUIMITAN, MONKAYO

DATE ACCIDENT: 27-Apr-17

DURATION: 4:00PM - 9:00PM

SUBSTATION: M8 - SAN JOSE

FEEDER: 81

COMPUTATION:

DEMAND TIME INTERRUPTED


AFFECTED AREA ROUTE (KW) (HRS) KWH LOSS
PASIAN 1075
AWAO 1095 563.88 5.05 2848.2
SAMUAG,BAYLO 1165
SAN JOSE 1080 434.34 2.37 1029.38

NOTE: BASE ON PREVIOUS DAY DEMAND (4/26/2017) FEEDER 81.

PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL BY:

JAYSON C. PLAZA ENGR. JHUNYL CRIS CANONOY ENGR.CELSO C. MAYONILA


AM/FM SYSTEM ENGINEER - CAO TECHNICAL AUDITOR OIC - TSOMD MANAGER
PPROVAL BY: