Vous êtes sur la page 1sur 1
VOLTAS Letter no.: DPG/ISR/BHILAT 0784/EREC/O28 21.41.2017 GM Project Utility Steel Authority OF India Limited, Bhilai Steel Plant Bhilai, Chattisgarh Kind Atta: Mr, Aniruddha Guha Through : Mr. Mr. PK Sutaone Suv: Detall Network Schedule for Balance Work of Makeup Water and Drinking Water system Package 078A, BSP 7.0 MT MODEX Ref: LOT letter No.DGM/PCC/Tk/5(578)R1/2017/1593 dt. 22.05.2017, Contract No. DGM/PCC/TK/2017/432, dt 23.06.2017, Our earlier letter no. DPG/JSR/BHILAL 078A/EREC/00S dt, 14.08.2017 SAIL DGM (Project- Utility) Email dated 14.08.2017 Our earlier letter no. DPG/JSR/BHILAI 076A/EREC/008 dt, 11,09,2017 SAIL DGM (Project- Utility) Email dated 13.09.2017 Our earlier Email dated 18.09.2017 SAIL GM (Project- Utility) Email dated 23.10.2017 Our earlier Email dated 23.10.2017 Our earlier Email dated 14.11.2017 Our earlier Email dated 15.11.2017 SAIL DGM (Project- Utility) Email dated 17.13.2017 Dear Sir, This has re'erence to the above correspondences, subsequent to our discussion and BSP's emai dated 17th Nov't7, please find attached herewith revised detail Network base line Schedule for Balancé work of Makeup Water and Drinking Water system under Package 078A, BSP 7.0 MT MODEX for your reference and necessary approval, In this connection once again wo reiterate that during finalization of contract we were ot agreeing to accept commercial contract without GST inclusion. However immediately after Contract sigr dated 21" Jun'17 we submitted a letter to the concerned pertaining to Inclusion of GST in the commercial contract (refer leter cated 29" Jun'17 address to GM Projects) end {through varius correspondences we also communicated to BSP/MECON that without the amendment of Commercial contract we were uneble to lock the jab in aur SAP system and vis- vs placement of bought out items / site rervces arders et, However as discussed we have been removed the said activity i.e, “Amendment of contract ‘with GST" fram the schedule but during monthly updating of the schedule necessary impact of project completion for the above mentioned activity wil be captured suitably for better clarity ofall. This for your information, ie: 8 Rigas fav Ranjen Operations Manager ~ Infrastructure Projects Domestic Projects Group Voltas Limited VOLTAS LIMITED ii eae REREA Erervise

Vous aimerez peut-être aussi