Pozo UD-779 Calculos para bajada Csg 9 5/8" * 53.

6 Lb/Ft P-110, BTT

D.Hoyo Pulgadas 12.75 163


D.Interno Csg 13 3/8" Pulgadas 12.38 153
Dens. Del Fluido Lb/gal 9.9
Gel 30 Min Lb/100 Pie2 39
Area de flujo Zapata Pulgadas 3.16
Eficiencia Bomba Bbl/Emb 0.117
D. Ext. Csg Pulgadas 9.625 92.64
D. Int. Csg Pulgadas 8.535 72.85
Prof.Zapata 13 3/8" Pies 6914
Prof. Vertical. Pies 10927

Prof. Volumenes Emboladas Tiempo Emb/Min Presion Bombeo ECD Vel. Bajada Csg.
Pies Anular Interno Despl. Metal Llena Csg F.Arriba Min Inicial Estab. Inicial Estab. Circula Baja Csg Pie/Min Pie/Hr Tubo/Hr Hr
1,000 58.89 89.99 19.23 769.15 1,616.42 22.45 10 72 41.61 358 10.2 10.11 4.67 280.2 6.23 3.57
2,000 117.78 179.98 38.46 1,538.30 3,232.83 44.90 16 72 82.23 376 10.01 10.01 5.01 300.6 6.68 3.33
3,000 176.67 269.97 57.68 2,307.45 4,849.25 67.35 23 72 124.84 398 10.07 9.98 5.17 310.2 6.89 3.22
4,000 235.56 359.96 76.91 3,076.60 6,465.66 89.80 29 72 166.45 420 10.06 9.96 5.17 310.2 6.89 3.22
5,000 294.45 449.95 96.14 3,845.74 8,082.08 112.25 31 72 208.07 442 10.05 9.95 5.17 310.2 6.89 3.22
6,000 353.34 539.94 115.37 4,614.89 9,698.49 134.70 34 72 249.68 465 10.04 9.94 5.17 310.2 6.89 3.22
7,000 412.23 629.93 134.60 5,384.04 11,314.91 157.15 37 72 291.29 487 10.04 9.94 5.11 306.6 6.81 3.26
8,000 471.12 719.92 153.83 6,153.19 12,931.32 179.60 38 72 332.91 508 10.04 9.94 5.09 305.4 6.79 3.27
9,000 530.01 809.91 173.05 6,922.34 14,547.74 202.05 40 72 374.52 531 10.03 9.93 4.78 286.8 6.37 3.49
10,000 588.89 899.90 192.28 7,691.49 16,164.15 224.50 56 72 416.13 553 10.03 9.93 4.49 269.4 5.99 3.71
10,927 643.49 983.33 210.11 8,404.49 17,662.57 245.31 56 72 455.04 574 10.03 9.93 4.01 240.6 5.35 3.85