PLASTER: Approved Suppliers: Dubai plaster, Jupitar chemicals
Subcontractor to supply all Labour, Material, equipment and
Accessories to complete the Plaster works including but not limited
to items mentioned below.
MEP clearance required after conduit fixing
Surface preparation including hacking, concrete surface chipping, fixing guide points.
With clearance of surface preparation & MEP from consultant Contractor can proceed for plastering
Material stacking to be done in such a manner that there should be clear access to villa/workplace
Regular House keeping to be done and required safety to be adopted as per Jafza regulation,
Surfaces to be accepted as is. Responsibility of the subcontractor to visit site and be familiar
with existing site conditions,No variations whatsoever will be entertained at later stage.
All required plant&equipment to accomplish the plastering work including material handling must be mobilized
including its periodic maintenance.
by the subcontractor. The plant and equipment must include the following
Door subframes made of 18mm thk.marine plywood to be fixed around the door openings before plaster work.
Layout for the villa as per drawing to be done with one layer of AAC blocks
GI wire mesh to be laid after the 1st layer and then every 3rd layer fixed with GI hold fast
Gap between Blocks and soffit to be closed by approved filler board and cement mortar as required .
Regular House keeping to be done and required safety to be adopted as per Jafza regulation,
Material stacking to be done in such a manner that there should be clear access to villa/workplace
Plant and equipmnet for the proper material handling, mixing mortar etc. must be mobilized by the Subcontractor
including its periodic maintenance.
Boom loaders for Block shifting
Dumpers
Wall Tiles
Wall tiles must be fixed using approved tile adhesive on a pre-plastered wall surfaces.
Both horizontal and vertical joints must be at right angles to each other and uniform in size.
SCOPE SHEET
Border tiles if any shall be fixed at height approved in the shop drawings.
Proper jointing and grouting must be done as per approved sample and color.
The adhesive must be spread to required thickness on the back of the tile and
wall surface as per manufacturer's recommendations and any hollow tile must be
Plant and equipmnet for the proper material handling, mixing mortar etc. must be
mobilized by the Subcontractor including its periodic maintenance.