In lieu of IAFW-2159 (Revised 1947)
SCHEDULE 'A' PART - I
(BUILDINGS/ STRUCTURES )
Sl Brief Description of items Drg Unit Rate No of units Amount Period of Remarks
No. Nos (in figures) Required. completion
No Rs Ps Rs Ps
1 2 3 4 5 6 7 8
1 Construction of Single living accommodation for JCO's/ORs in (G+4) 0.00 1.00 0.00
storey complete all as specified as shown on drawings and as directed. Block
2 Construction of one RCC terrace water tankof capacity 25000 Ltrs 163750.00 1.00 163750.00
complete all as specified as shown on drawings and as directed. Block
Sl Brief Description of items Drg Unit Rate No of units Amount Period of Remarks
No. Nos (in figures) Required completion
No Rs Ps Rs Ps
1 2 3 4 5 6 7 8
1 Rough excavation n exc 1.5m deep and getting out in hard/dense soil 101.30 2000.00 202600.00
within MD land complete all as specified and directed. Cubic Metre
2 Rough excavation n exc 1.5m deep and getting out in soft/disintegrated 230.30 2475.00 569992.50
rock within MD land complete all as specified and directed. Cubic Metre
3 Surface excavation not exc 30 cm deep and averaging 15 cm deep and 41.80 600.00 25080.00
getting out in hardd/dense soil Square Metre
4 Excavation in trenches not exceeding 1.50m wide and not exceeding 202.50 174.09 35253.23
1.50m in depth for foundation etc or n exc 10 sqm on plan and not exc 1.5 Cubic Metre
m in depth and getting out in hard/dense soil complete all as specified
and directed.
5 Returning, filling in including spreading, levelling, watering and well 41.70 100.22 4179.17
ramming in layers not exceeding 25cm complete all as specified and Cubic Metre
directed.
837104.90
6 Removing excavated material not exc. 50m and depositing where 96.10 253.87 24396.91
directed at a level not.exc.1.5m above the starting point complete all as Cubic Metre
specified and directed.
7 Removal of excavated soil exc 1.50 km but not exc 5.00 km deposited 208.30 2000.00 416600.00
where directed at a level at a level not.exc.1.5m above the starting point Cubic Metre
complete all as specified and directed.
8 Removal of excavated materials (soft rock) exc 1.50 km but not exc 5.00 235.80 2475.00 583605.00
km deposited where directed at a level at a level not.exc.1.5m above the Cubic Metre
starting point complete all as specified and directed.
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
No. No Rs Ps Rs Ps completion
1 2 3 4 5 6 7 8
1 Modular switch,one way,10/6 Amp,one module,AC, 230 volts,ISI marked 130.10 181.00 23548.10
Each
2 Modular switch,one way,16 Amp with indicator lamp,one module,AC, 230 194.90 5.00 974.50
volts,ISI marked Each
3 Socket modular, 6A-2/3 pin combined 2 module 230 volts,ISI marked 203.60 38.00 7736.80
Each
4 Socket modular, 6A/16A-2/3 pin combined ,2 module 230 volts,ISI marked 279.10 5.00 1395.50
Each
5 Ceiling rose, PVC/Polycarbonate three terminals,230 V (ISI marked) 22.80 10.00 228.00
Isolated body complete all as specified and as directed. Each
6 Sheet metal enclosure, distribution board SPN DB, 230V, AC, 8 way with 1232.90 9.00 11096.10
200 Amps rated busbar, double door, AC, 230V, ISI Marked complete all Each
as specified and as directed.
7 Sheet metal enclosure, distribution board TPN DB, 415V, AC, 4 way with 2564.90 1.00 2564.90
200 Amps rated busbar in 25 KA suitable for MCB four pole as incomer Each
and MCB SP/TP as outgoing having protection IP 43, double door type
complete all as specified and as directed.
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
No. No Rs Ps Rs Ps completion
1 2 3 4 5 6 7 8
47543.90
8 Sheet metal enclosure,distribution board SPN DB, 230V, AC, 4 way with 1053.60 4.00 4214.40
200 Amps rated busbar, double door, AC, 230V, ISI Marked complete all Each
as specified and as directed.
9 Earthing complete with galvanised steel earth plate electrode 60cm x 2536.80 2.00 5073.60
60cm x 6mm thick burried directly in ground (earth pit not less than 2.25 Each
mtr deep below ground level) with the top edge of the plate not less than
1.5 mtrs below normal ground level, connected to galvanised earth lead
wire 4.0mm dia by means of bolts, nuts check nuts and washer of
galvanised iron or steel incl protection pipe, necessry excavation, earth
work in any type of soil,1:3:6 type C1 PCC chamber, RCC chamber cover,
watering pipe, funnel etc all as shown in electrical plate No 3 of SSR part I
connected to earthing test point all as indicated including testing on
completion all as specified and directed.
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
No. No Rs Ps Rs Ps completion
1 2 3 4 5 6 7 8
1 CPVC ball valve, screwed both ends forCPVC pipes and fixed of size 50 1249.70 1.00 1249.70
mm dia complete all as specified and directed. Each
2 CPVC ball valve, screwed both ends forCPVC pipes and fixed of size 25 325.10 1.00 325.10
mm dia complete all as specified and directed. Each
3 Stop valves, cast copper alloy,screwed down,high pressure, 416.60 3.00 1249.80
with crutch or butterfly handle,fancy type, chromium plated,screwed both Each
ends for CPVC pipe or for unions 25 mm dia with long shank and cup
(concealed type) for pressure reducing valve complete all as specified and
directed.
4 Stop valves, cast copper alloy,screwed down,high pressure, 344.50 5.00 1722.50
with crutch or butterfly handle,fancy type, chromium plated,screwed both Each
ends for CPVC pipe or for unions 20 mm dia with long shank and cup
(concealed type) for pressure reducing valve complete all as specified and
directed.
5 Low density ploythene pipe 16 mm dia (outer), metallic baided, 450 mm 73.90 24.00 1773.60
long suitable for cold/Hot water application complete with brass union on Each
both sides.
Sl Brief Description of items Drg Unit Rate No of units Amount Period of Remarks
No. Nos (in figures) Required completion
No Rs Ps Rs Ps
1 2 3 4 5 6 7 8
1 PCC 1:4:8 Type D-2 using 40mm graded stone aggregate as sub base for 230.10 600.00 138060.00
road complete all as specified and directed. Square Metre
2 Sand filling under floors including spreading in layers, watering and 678.20 30.00 20346.00
consolidation complete all as specified and directed. Cubic metre
3 Polyethelene film black,50 micro thickness laid on floors below flexural 14.20 600.00 8520.00
conc. complete all as specified and directed. Square Metre
5 Finishing concrete.surfaces of road using broom finish complete all as 44.70 60.00 2682.00
specified and directed.. Ten Square
Metre
Total C/O to next page 508116.00
Sl Brief Description of items Drg Unit Rate No of units Amount Period of Remarks
No. Nos (in figures) Required completion
No Rs Ps Rs Ps
1 2 3 4 5 6 7 8
508116.00
6 Forming expansion joints 12mm thick filled with pre-formed bitumious filler 928.00 1.20 1113.60
and top 30mm primed and sealed with sealing compound grade' A' for Ten Running
thickness of conc slab of 150mm thick complete all as specified and Metre
directed.
7 Forming construction joints 30mm deep x 10mm wide filled with sealing 238.20 14.40 3430.08
compound grade 'A '. complete all as specified and directed. Ten Running
Metre
8 Forming Contraction (Dummy) joints 25mm to 35mm deep x 10mm wide 474.30 1.20 569.16
filled with sealing compound Grade 'A'. Ten Running
Metre
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
No No Rs Ps Rs Ps completion
1 2 3 4 5 6 7 8
Rs 31310.29
7 CRS/CRM/HCRM TMT bars 10mm dia and over, cut to length, bent to 48.60 55.00 2673.00
shape required, including cranking, bending spirally for hooping for Kilogram
columns, hooking ends and binding with and including mild steel wire
(annealed) not less than 0.9mm dia or securing with clips , all as specifed
and as directed.
8 Rendering 10mm thick on fair faces of brick work or concrete surfaces 103.60 15.00 1554.00
finshed even and smooth in CM 1:4, all as specifed and as directed. Square metre
9 Concrete 1:3:6 Yype C-2 using 40mm graded stone aggregate as in bed to 194.40 50.00 9720.00
drain pipes including packing under, and hunching against the sides of Running metre
pipes after they are laid and tested for 150mm bore pipe all as specifed
and as directed.
10 Reinforced concrete pipes 150mm dia , class NP2, laid and jointed 283.30 50.00 14165.00
complete with collars all as specifed and as directed. Running metre
11 Cutting into existing manholes for connecting new drains, making good to 640.50 1.00 640.50
pipe and rendering, cutting out existing benching for and forming branch Cubic metre
channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1
smooth finished, and reforming benching as required all as specifed and
as directed.
Total C/O to BOQ Rs 60062.79
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
completion
No No Rs Ps
Rs Ps
1 2 3 4 5 6 7 8
1 Cement concrete 1:3:6 type C2 (using 40mm graded stone aggreagte) as 2579.00 9.65 24887.35
in foundations,filling and mass concrete complete all as specified and as Cubic metre
directed.
2 Walling random rubble, uncorsed,well bonded bedded and solidly hearted 2106.70 22.23 46831.94
,built in CM 1:4.complete all as specified and as directed. Cubic metre
3 Cement concrete (1:2:4) type B1 (using 20mm graded stone aggregate) 4144.40 2.47 10236.67
as in coping cills, steps, seismic and other similar bands, plint courses, Cubic Metre
string courses, string courses, lacing courses, parapets and railings upto
60 cm in height, copings, kneelers, apex stones including necessary form
work complete all as specified and directed.
4 50 mm thick in PCC 1:2:4 type B -1 (using 20mm graded aggregate), as in 3136.50 0.98 3073.77
bed of drain complete all as specified and directed. Cubic Metre
5 Extra over stone walling for hammer dressing to face stone and dressing 116.30 52.00 6047.60
of face beds and joints with maximum depression on face from straight Suare metre
edge held against the surface n exe 40 mm as specified of random rubble
walling uncoarsed or brought upto coarse in granite trap stone complete all
as specified and directed.
Total c/o to next page 91077.33
Sl Brief description of items Drg Rate per Unit Quantity Amount Period of Remarks
completion
No No Rs Ps
Rs Ps
1 2 3 4 5 6 7 8
91077.33
6 Flush pointing to random rubble masonary uncoarsed or brought upto 5.20 371.00 1929.20
coarse in cement mortar 1:4 complete all as specified and directed. Cubic metre
7 CRS/CRM/HCRM TMT bars 10mm dia and over, cut to length, bent to 48.60 520.00 25272.00
shape required, including cranking, bending spirally for hooping for Kilogram
columns, hooking ends and binding with and including mild steel wire
(annealed) not less than 0.9mm dia or securing with clips.
8 Precast cement concrete (1:2:4) type B1 using 20mm graded stone 4817.60 3.77 18162.35
aggregate in landings, cover slabs (for manholes) set in cement mortar 1: Cubic metre
6 complete all as specified and as directed.
1 Single pointed aluminium rod 12 mm dia and 300 mm long fixed on the 136.80 6.00 820.80
roof including all fittings, fixtures and PCC 1:2:4 type B-1 blocks 100mm Each
x 100 mm x 100 mm complete all as specified and shown on drawing.
2 Test point terminal block made of gun metal or phosphorous bronze size 582.60 4.00 2330.40
75 x 75 x 25 mm, drilled and screwed including 3 Nos, 8mm dia 25mm Each
long hex, head screw complete all as specified and directed.
3 Aluminium roof and down conductor of size 25mmx3.15mm thick complete 55.00 160.00 8800.00
with saddles epoxy base and fixing screws for fitting the strip complete all Running metre
as specified and directed.
6 100 mm bore butter fly valve, double flanged complete with jointing 8294.00 4.00 33176.00
materials such as rubber gasket, nuts, bolts etc complete all as specified, Each