Engineering Check List

1 Electricity HT Voltage 11 KV Every 30 min.


LT Voltage 400 to 440 Volts 30 minutes
Transformer tapping
Automatic 30 minutes
Maximum Demand 500 KVA Daily
2 Power Factor Capacitor Panel 0.9 & Above 30 minutes

3 L T Panel ACBs & Cable condition Monthly

4 DG Sets A - Check Battery condition Daily


Radiator Water
Radiator condition
Belts
Trial run for 5 minutes
Voltage
Water Temperature
Oil Temperature
Oil Pressure
AMF Panel
Auto start
Diesel Level
B - Check Gmmco as per AMC 250 Hrs or
6 Months
AMC Service Bi-monthly
Power-on 5 Sec. to On Automatic
5 Sec. to connect
Fuel consumption 70 to 75 Ltrs/hr.

5 A/C Plants Suction Pressure 50-70 psi Daily


Discharge Pressure200-275 psi
Oil Pressure 100-110 psi
Current 140 to 145 amps.
Switch-on 18 deg. C
Switch-off 8 deg. C
Cooling Towers Condition of Fans
Gas piping
Chilled water pressure
1.5 to 2 kg/sq.cm
Cooling Tower Cleaning Monthly

6 Boilers Water Level Make up tank Daily


Diesel consumption22 Ltrs/hrs. average
Cut-off temp. 60 deg.C
AMC Service Taurus Engineers Bi-monthly
7 Hot Water TemperatureMixing Tank 38 deg. To 55 deg.C30 minutes
8 Domestic Water Pressure
Hydropneumatic tank
3 to 5 Kg/sq.cm 30 minutes
9 Water Sump/Tank Storage
BWSSB/Tankers Hourly
10 Plate Heat Exchanger Heat transfer to Mixing tank Monthly

11 Guest Elevators - 2 nos Landing position Daily


& Service Elevator-1 Noise during operation
Doors condition
Vibration
Service as per AMC KONE Elevators Bi-monthly

12 Service Elevator No.2 Landing position Daily


Noise during operation
Doors condition
Vibration
Service as per AMC Bharath Lifts Bi-monthly

13 Deep Freezer/Cold Storage


Temperatures Deep: -10 to -16 Deg.C
Every 2 Hrs.
Cold : + 4 to + 8 Deg.C
Every 2 Hrs.
Ice formation Defrosting Weekly
Fans condition
Doors,Locks,Gaskets
Servicing Monthly

14 Refrigerators, Water Coolers,


Cooling Temperature Every 2 Hrs.
Ice Cube Machines Formation of cubes

15 TV Cable Transmission Each Shift

16 EPABX Each Shift

17 Room Inspection 5 Rooms/Day Condition of A/C, FCU


Daily
Lighting
TV & Decoder
Telephones
Mirrors
Furniture
Switches & Sockets
Kettle & Drier
Plumbing fittigs
Bathtub
Doors & Locks
Painting

18 Banquet Halls & Restaurents


Lighting & UPS In the Night Shift Daily
Aircondition
Doors & Locks
19 Lobby & Public Areas Lighting & UPS In the Night Shift Daily
Aircondition
Doors & Locks

20 Toilets Lobby 8.30 hrs & 15.30 hrsDaily


Business Centre
Lavelle
Khayal
Health Club

21 Back Areas Lighting Each Shift


Painting
Civil works

22 Exhaust Main Kitchen Each Shift


Veg. Kitchen
Khayal
Rooms
Toilets

23 Aircondition Executive Offices Each Shift


Administration
Health Club
EPABX
Server Room

24 U P S of Emergency Lighting
Lobby Daily
South Parade
Guest Floors
Basement

25 Water Softener Regeneration Weekly

26 LPG Supply Leak test of pipelines Weekly


LPG Pressure 1 to 2 kg/sq.cm Hourly
Condition Possible leakage 30 minutes
Hot water is being used to increase the pressure
during cold condition
Weighing the empty cylinders while sending out
and full cylinders while receiving
AMC Service Star Commercials Aternate Day
27 All Electrical Panels Checking for loose connections, Daily
condition of switchgear,
Load as per rating

28 Fire Alarm Panels Zone wise Each Shift


Extinguishers Location & condtionDaily

29 Door Closures/Floor springs


Condition Daily
AMC Service Supreme Agencies Monthly
30 H T Readings Noting down from 00.00hrs to 24.00 hrsEach shift
31 A/C Plants Reading During each operation Each shift
32 Boiler reading During each operation Each shift
33 LT Readings Midnight At 24.00 hrs
34 Water received BWSSB Open & Close Readings
Each shift
Tankers Each Tanker received
Each shift
35 LPG status Stock & Empty Each shift
36 Diesel status Consumption & storage Each shift
37 Pumps & Motors Runnig condition Daily
Noise
38 Water Quality By Pollution Control Board Monthly
ery 30 min.
ery 2 Hrs.
ery 2 Hrs.

ery 2 Hrs.
rnate Day
24.00 hrs