Vous êtes sur la page 1sur 3

WORK METHOD STATEMENT (WMS)

TRANSIT ACCOMMODATION AT MAZGAON FOR SBUP

METHOD STATEMENT NO. : WMS - REV :

ORIGINATING DEPT : CONSTRUCTION DISCIPLINE :

Titl
: METHOD STATEMENT FOR ROOF REPLACEMENT
e

REV DATE STATUS REVISION DETAILS PREPARED BY APPROVED BY

00 25.02.19 FI -

Status Code:
D : Draft FI : For Information FC : For Construction
FA : For Engineer Approval

Construction Department Health and Safety Representative


Distribution :
Design Department

1.0 SCOPE AND OBJECTIVES

This Work Method Statement describes the activities required for REPLACEMENT OF EXISTING
ASBESTOS SHEET with NON-ASBESTOS CEMENT SHEET

2.0 REFERENCES

Project Technical Specification: Drawing no:-____________

Revision : 00 Page 1 of 5
3.0 WORK LOCATION/ACCESS REQUIREMENTS

_______________

4.0 METHODOLOGY/PROCEDURE

1. Checking all area from inside the status of corrosion of trusses and purlins.
2. Covering of all machineries with Tarpoline.
3. Safety net provision at truss bottom level.
4. Removing and replacement of existing roof.
5. Removing and Cleaning corrosion of trusses and purlins.
6. Painting of trusses and purlins.

5.0 MANPOWER RESOURCE REQUIREMENT/SUPERVISION

6.0 MATERIAL REQUIREMENTS

7.0 EQUIPMENT REQUIREMENT

8.0 QC DOCUMENTATION REQUIRED/ATTACHED

 Approved Method Statement


 Checklist

9.0 HEALTH AND SAFETY HAZARD ASSESSMENT

The safety hazards assessed for RAFT are as follows:-


 Provide Proper PPE
 Provide illumination

Safety Officer’s Approval

Approved

10.0 OTHER INFORMATION

______________

11.0 DISTRIBUTION

Revision : 00 Page 2 of 5
Copies of this Work Method Statement have also been issued to the following personnel for
action:-
 Client/owner
 Project Manager/Senior Site Engineer
 Structural Consultant

Signed: ____________ Date: __________

Revision : 00 Page 3 of 5