AUSTRALIAN WAR MEMORIAL

AWM REDEVELOPMENT PROJECT


POPPY'S CARPARK EXTENSION
STRUCTURAL
0269-AFC
STRUCTURAL DRAWING LIST
PROJECT DRG NO.
No. SHEET DRAWING TITLE
2. STRUCTURAL
0269-AFC S-001 STRUCTURAL DRAWING INDEX
0269-AFC S-002 STRUCTURAL NOTES SHEET 1
0269-AFC S-003 STRUCTURAL NOTES SHEET 2
0269-AFC S-004 STRUCTURAL NOTES SHEET 3
0269-AFC S-101 FOOTING KEY PLAN
0269-AFC S-102 FOOTING PLAN ZONE 1
0269-AFC S-103 FOOTING PLAN ZONE 2
0269-AFC S-104 LEVEL 1 GENERAL ARRANGEMENT PLAN
0269-AFC S-105 LEVEL 1 GENERAL ARRANGEMENT PLAN ZONE 1
0269-AFC S-106 LEVEL 1 GENERAL ARRANGEMENT PLAN ZONE 2
0269-AFC S-107 LEVEL 2 - CONCRETE PLAN
0269-AFC S-108 LEVEL 2 - WEARING SLAB GENERAL ARRANGEMENT PLAN
0269-AFC S-201 LEVEL 2 - DESIGN LOAD CASES FOR PT SLAB
0269-AFC S-301 BUILDING SECTIONS - SHEET 1
0269-AFC S-302 BUILDING SECTIONS - SHEET 2
0269-AFC S-501 CONCRETE DETAILS SHEET 1
0269-AFC S-502 CONCRETE DETAILS SHEET 2
0269-AFC S-503 CONCRETE DETAILS SHEET 3
0269-AFC S-504 CONCRETE DETAILS SHEET 4
0269-AFC S-505 CONCRETE DETAILS SHEET 5
0269-AFC S-506 CONCRETE DETAILS SHEET 6
0269-AFC S-507 CONCRETE DETAILS SHEET 7
0269-AFC S-508 CONCRETE DETAILS SHEET 8
0269-AFC S-510 TYPICAL MASONRY BLOCKWORK DETAILS
0269-AFC S-520 PRECAST PANEL DETAILS
0269-AFC S-601 STEEL DETAILS SHEET 1
0269-AFC S-602 STEEL DETAILS SHEET 2
0269-AFC S-603 STEEL DETAILS SHEET 3

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STRUCTURAL DRAWING INDEX
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-001
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-001 A
GENERAL EARTHWORKS, FOUNDATIONS AND FOOTINGS
1. READ THESE NOTES IN CONJUNCTION WITH ARCHITECTURAL AND OTHER ENGINEERING DRAWINGS AND SPECIFICATIONS, AND WITH SUCH OTHER 39. STRUCTURAL ELEMENTS HAVE BEEN DESIGNED FOR FOLLOWING FIRE RESISTANCE LEVELS (EXPRESSED IN MINUTES): EARTHWORKS
WRITTEN INSTRUCTIONS ISSUED. REFER TO ARCHITECTURAL DRAWINGS FOR SETTING OUT AND DETAIL DIMENSIONS. IN CASE OF DISCREPANCY, 1. EARTHWORKS TO BE TO AS3798 AND AS2870. 49. PEG POSITION OF EACH PILE AND ESTABLISH GRID OF RECOVERY PEGS TO ENABLE SETTING OUT TO BE CHECKED.
PRECEDENCE IS GIVEN TO DRAWINGS, THEN NOTES, THEN SPECIFICATION. ELEMENT FIRE RESISTENCE PERIOD 2. REMOVE TOPSOIL, MATERIAL CONTAINING GRASS ROOTS OR OTHER ORGANIC MATTER, RUBBLE AND / OR DEBRIS AND ALL 50. PILE LEVELS SHOWN ARE CONTRACT LEVELS. FINAL LEVELS TO BE AS REQUIRED TO ACHIEVE SPECIFIED PILE
2. CARRY OUT WORK IN A SAFE MANNER IN ACCORDANCE WITH APPLICABLE LEGISLATION, STATUTORY REGULATIONS, BY-LAWS OR RULES. CONTRACTOR STRUCTURAL ADEQUACY / INTEGRITY / INSULATION UNSUITABLE MATERIAL BELOW FOUNDATIONS AND WHERE SHOWN ON DRAWINGS. CAPACITY. DO NOT FOUND PILES HIGHER THAN LEVELS SHOWN.
IS RESPONSIBLE FOR OCCUPATIONAL HEALTH AND SAFETY OF SITE PERSONNEL AND GENERAL PUBLIC IN ACCORDANCE WITH ALL CURRENT WORK 3. STOCKPILE SUITABLE TOPSOIL FOR RE-USE TO 1500 mm MAXIMUM HEIGHT. 51. IF DAMAGE IS CAUSED TO ADJOINING PROPERTY, STOP PILING OPERATIONS AND ADVISE SUPERINTENDENT.
HEALTH AND SAFETY ACTS, LEGISLATIVE REQUIREMENTS, ASSOCIATED REGULATIONS AND CODES OF PRACTICE, INDUSTRIAL AGREEMENTS AND COLUMNS 90 / 90 / 90 4. DO NOT STOCKPILE MATERIAL AGAINST RETAINING WALLS, BUILDINGS, FENCES OR TREES etc. DO NOT OBSTRUCT THE FREE FLOW 52. PILE SETTING OUT DIMENSIONS ARE TO CENTRELINE OF PILE AT UNDERSIDE OF PILECAP. TOLERANCE ON POSITION
ACCEPTED INDUSTRY PRACTICE. OF WATER. OF PILES ± 50 mm. MAXIMUM DEVIATION OF PILE FROM SPECIFIED INCLINATION 1 in 50.
3. REFER DISCREPANCIES TO SUPERINTENDENT BEFORE PROCEEDING WITH WORK. FLOOR 90 / 90 / 90 5. SITE IS CLASSIFIED AS CLASS S TO AS2870.
4. SUBMIT DETAILS OF PROPOSED CHANGES TO SCOPE, WORK METHODS OR MATERIALS etc FOR APPROVAL BEFORE PROCEEDING. APPROVAL DOES NOT DELIVERABLES 6. REFER TO GEOTECHNICAL INVESTIGATION REPORT No. 23-SO1-2138191141 PREPARED BY GHD PTY. LTD. DATED PILING DELIVERABLES
AUTHORISE A VARIATION TO THE CONTRACT. 40. RECORD ADOPTED CHANGES TO WORKING DRAWINGS AND SHOP DRAWINGS. ON COMPLETION OF WORKS SUBMIT A JULY 2019 NOTIFY SUPERINTENDENT IF CONDITIONS ENCOUNTERED DIFFER FROM THOSE DESCRIBED IN THE REPORT AND SEEK 53. SURVEY AS CONSTRUCTED PILE POSITIONS, GROUND LEVEL AT TIME OF PILE INSTALLATION AND PILE CUT-OFF
5. CHECK STRUCTURAL DRAWINGS AGAINST ARCHITECTURAL, MECHANICAL, ELECTRICAL SERVICES AND OTHER DRAWINGS FOR REQUIREMENTS FOR FULL SET OF “AS CONSTRUCTED” DRAWINGS. DIRECTIONS. LEVELS, AND SUBMIT RECORDS OF SUCH TO SUPERINTENDENT WITHIN ONE WEEK OF COMPLETION OF PILING.
PENETRATIONS, CONDUITS, DUCTS, PIPES, etc. 41. PREPARE WORKSHOP DRAWINGS, CALCULATIONS etc FOR PREFABRICATED COMPONENTS, INCLUDING STRUCTURAL 7. NOTIFY SUPERINTENDENT IF GROUND WATER ENCOUNTERED.
6. NOMINATION OF PROPRIETARY ITEMS DOES NOT INDICATE EXCLUSIVE PREFERENCE, BUT INDICATES REQUIRED PROPERTIES OF ITEM. SIMILAR STEELWORK, LIGHTWEIGHT STEELWORK, PRECAST CONCRETE, PRESTRESSING, FABRICATED TIMBER FRAMES etc AND 8. DESIGN IS BASED ON DATA FROM DISCRETE LOCATIONS AS RECORDED IN GEOTECHNICAL INVESTIGATION REPORT. SUBSURFACE UNDERPINNING
ALTERNATIVES HAVING REQUIRED PROPERTIES MAY BE OFFERED FOR APPROVAL. APPROVAL DOES NOT AUTHORISE A VARIATION TO THE CONTRACT. SUBMIT ELECTRONIC PDF’S OR THREE PAPER COPIES OF EACH FOR SUPERINTENDENT’S REVIEW OF GENERAL CONDITIONS SHOWN ON DRAWINGS IS INFERRED FROM DATA IN GEOTECHNICAL INVESTIGATION REPORT AND IS GIVEN AS A GUIDE 54. LENGTH AND HEIGHT OF PINS SHOWN IS APPROXIMATE AND FOR TENDERING PURPOSES ONLY. POSITION OF
INSTALL PROPRIETARY ITEMS IN ACCORDANCE WITH MANUFACTURER’S REQUIREMENTS AND RECOMMENDATIONS. COMPLIANCE WITH DESIGN CONCEPT. DO NOT COMMENCE FABRICATION UNTIL SHOP DRAWINGS AND CALCULATIONS ONLY. ACTUAL GROUND CONDITIONS MAY VARY FROM THOSE SHOWN. ADJACENT BUILDING FOOTINGS SHOWN IS ASSUMED. CONFIRM ON SITE.
7. OBTAIN NECESSARY PERMITS AND APPROVALS FROM RELEVANT AUTHORITIES BEFORE COMMENCING WORK ON SITE. NOTIFY RELEVANT SERVICE HAVE BEEN REVIEWED. ALLOW 14 DAYS FOR SUPERINTENDENT’S REVIEW. SUPERINTENDENT’S REVIEW OF SHOP 9. PROVIDE TEMPORARY SUPPORT TO FACES OF EXCAVATIONS AS REQUIRED. 55. OBTAIN APPROVALS FROM ADJACENT OWNER AND LOCAL AUTHORITY BEFORE COMMENCING UNDERPINNING.
AUTHORITIES BEFORE COMMENCING WORK ON SITE. DRAWINGS AND CALCULATIONS IS OF GENERAL CONFORMANCE WITH DESIGN CONCEPT AND GENERAL COMPLIANCE 10. HAVE SAFETY OF PROPOSED EXCAVATIONS INCLUDING ANY TEMPORARY WORKS ASSESSED BY SUITABLY QUALIFIED 56. BEFORE EXCAVATING INSTALL DATUMS AND RECORD DAILY ALL HORIZONTAL AND VERTICAL MOVEMENT DURING THE
8. GIVE TWO WORKING DAYS’ (48 HOURS) NOTICE SO THAT INSPECTION MAY BE MADE OF CRITICAL STAGES OF WORK. WITH CONTRACT DOCUMENTS ONLY, AND DOES NOT INCLUDE CHECKING OF DIMENSIONS. SUPERINTENDENT’S GEOTECHNICAL / STRUCTURAL ENGINEER. UNDERPINNING WORKS. DATUM LOCATIONS TO BE AGREED WITH SUPERINTENDENT.
9. INSPECTIONS AND REVIEWS UNDERTAKEN BY SUPERINTENDENT OR OTHERS DO NOT RELIEVE CONTRACTOR OF RESPONSIBILITY FOR COMPLIANCE REVIEW DOES NOT INCLUDE CHECKING OF DIMENSIONS AND CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND 11. GENERAL FILL TO BE WELL GRADED MATERIAL, INORGANIC, LESS THAN 0.5% SULPHUR, MAXIMUM PARTICLE SIZE 75 mm, PLASTICITY 57. PINS TO BE EXCAVATED AND CONCRETED THE SAME WORKING DAY.
WITH DRAWINGS AND SPECIFICATIONS. CORRELATING QUANTITIES AND DIMENSIONS, SELECTING FABRICATION PROCEDURES AND CONSTRUCTION INDEX < 55%. 58. PROVIDE TEMPORARY SUPPORT TO EXISTING STRUCTURE AND FOOTING BEING UNDERPINNED AS REQUIRED TO
10. DO NOT OBTAIN DIMENSIONS BY SCALING FROM DRAWINGS. TECHNIQUES, AND PERFORMING WORK IN A SAFE MANNER. CORRECTIONS OR COMMENTS MADE ON SHOP DRAWINGS 12. SELECTED FILL MATERIAL SHALL COMPLY WITH THE FOLLOWING: PREVENT MOVEMENT AND/OR DAMAGE.
11. DIMENSIONS ARE IN MILLIMETRES, LEVELS ARE IN METRES UNO, CHAINAGES ARE IN METRES UNO. AND CALCULATIONS DO NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FOR COMPLIANCE WITH REQUIREMENTS • INORGANIC, LESS THAN 0.5% SULPHUR 59. EXCAVATE EACH PIN CAREFULLY IN TURN WITHOUT OVER EXCAVATING. SHORE UP ANY OVER-EXCAVATION INTO
12. DATUM FOR LEVELS IS AHD (AUSTRALIAN HEIGHT DATUM). CO-ORDINATES ARE TO MGA94 (MAP GRID OF AUSTRALIA) AMG (AUSTRALIAN MAP GRID). OF CONTRACT DRAWINGS AND SPECIFICATION. • MAXIMUM PARTICLE SIZE 75 mm NEXT PIN, AS DIRECTED BY SUPERINTENDENT. PINS TO BE 1200 mm MAXIMUM WIDE. DO NOT EXPOSE EXISTING
13. HAVE SURVEY AND SETTING OUT UNDERTAKEN BY A REGISTERED SURVEYOR. • PROPORTION PASSING 0.075 mm SIEVE: 25% MAXIMUM FOOTING FOR MORE THAN WIDTH OF SECTION BEING UNDERPINNED.
14. VERIFY ON SITE SETTING OUT DIMENSIONS AND EXISTING MEMBER SIZES SHOWN ON DRAWINGS BEFORE SHOP DRAWINGS, CONSTRUCTION AND • PLASTICITY INDEX: >2%, <15% 60. UNDERPINS TO BE FOUNDED ON UNDISTURBED NATURAL MATERIAL WITH ALLOWABLE BEARING CAPACITY OF AT
FABRICATION IS COMMENCED. EXISTING STRUCTURES SHOWN ON DRAWINGS ARE IN APPROXIMATE LOCATIONS ONLY. SAFETY IN DESIGN • PROPORTION EXCEEDING PARTICLE SIZE OF 50 mm: 75% MINIMUM LEAST 300 kPa.
15. USE STANDARD BOLT PATTERNS etc. THROUGHOUT THE WORKS TO AVOID CONFUSION OR AMBIGUITY. 13. PLACE FILL MATERIAL UNDER BUILDINGS AND OTHER FOOTINGS IN LAYERS NOT EXCEEDING 150 mm THICK AND COMPACT TO AT 61. AFTER EXCAVATION AND BEFORE CONCRETING, DETERMINE THE IN-SITU COMPACTION REQUIRED AT THE PIN
16. TAKE CARE OF HAZARDS ASSOCIATED WITH BURIED, CONCEALED OR OVERHEAD SERVICES. TAKE PRECAUTIONS AND WORKMANSHIP UNDERTAKE 1. THE SAFETY RISK MITIGATION ITEMS BELOW ARE BASED ON GHD’S DESIGN OFFICE EXPERIENCE AND DO NOT NECESSARILY ACCOUNT FOR ALL CONSTRUCTION, LEAST 95% MAXIMUM DRY DENSITY (STANDARD COMPACTION) TO AS1289. FOUNDING DEPTH. OBTAIN APPROVAL OF PROPOSED COMPACTION WORK FROM SUPERINTENDENT. NOTE; USE OF
EXPLORATION TO ESTABLISH LOCATION OF AND PROTECT EXISTING SERVICES AT SITE. SERVICES SHOWN ON DRAWINGS ARE IN APPROXIMATE OPERATION, MAINTENANCE AND DEMOLITION SAFETY RISKS. BASED ON INFORMATION AVAILABLE WHEN THIS DRAWING WAS MADE, IN ITS CAPACITY AS DESIGNER 14. ADJUST MOISTURE CONTENT OF FILL AT TIME OF COMPACTION WITHIN THE RANGE OF 85-115% OF OPTIMUM MOISTURE CONTENT CERTAIN COMPACTION TECHNIQUES MAY CAUSE SETTLEMENT OF ADJACENT BUILDINGS.
LOCATIONS ONLY. SERVICES OTHER THAN THOSE SHOWN MAY EXIST ON SITE. MARK LOCATIONS OF SERVICES CLEARLY ON SITE, AND ON AS-BUILT ONLY, GHD HAS TRIED TO IDENTIFY SAFETY RISKS PERTAINING TO CONSTRUCTION, OPERATION, MAINTENANCE AND DEMOLITION PHASES OF THE ASSET. INCLUSION DETERMINED BY AS1289 TO ACHIEVE REQUIRED DENSITY. 62. FILL VOIDS BEHIND UNDERPINNING AS CONCRETE IS PLACED.
DRAWINGS. HAND EXCAVATE WITHIN ONE METRE OF IN-GROUND SERVICES. (OR NOT) OF ANY ITEM DOES NOT REDUCE OR LIMIT OBLIGATIONS OF CONSTRUCTOR, USER, MAINTAINER AND DEMOLISHER TO UNDERTAKE APPROPRIATE RISK 15. SAMPLE AND TEST COMPACTION AS PER SPECIFICATION. 63. RAM GROUT INTO POSITION WITHOUT VOIDS.
17. DISPOSE OF SURPLUS MATERIAL OFF SITE IN ACCORDANCE WITH LOCAL AUTHORITY WASTE REGULATIONS. MANAGEMENT ACTIVITIES TO REDUCE RISK AND IS NOT AN ADMISSION BY GHD THAT INCLUSION OF ANY ITEM IS DESIGNER'S RESPONSIBILITY. 64. UNDERPINNING SEQUENCE:
18. IMPLEMENT SOIL AND WATER MANAGEMENT PROCEDURES TO AVOID EROSION, CONTAMINATION AND SEDIMENTATION OF SITE, SURROUNDING AREAS 2. CONSTRUCT BUILDING ELEMENTS THAT CONTRIBUTE TO SAFETY, SUCH AS HANDRAILS AND TOE BOARDS, FALL ARREST SYSTEMS, ACCESS STAIRS, etc AS EARLY AS FOUNDATIONS • FOLLOW THE NUMBERED SEQUENCE AS SHOWN ON DRAWINGS.
AND DRAINAGE SYSTEMS. POSSIBLE. 16. FOUNDATION LEVELS SHOWN ARE CONTRACT LEVELS. FINAL LEVELS TO BE AS DIRECTED BY SUPERINTENDENT. • FOR SIMILAR NUMBERED PINS, DIG SETS TO LEVELS AND DIMENSIONS SHOWN, FORM UP AND FIX
19. WORKMANSHIP AND MATERIALS TO COMPLY WITH REQUIREMENTS OF AUSTRALIAN STANDARDS, NATIONAL CONSTRUCTION CODE (NCC) AND BY-LAWS 3. PROVIDE SAFETY BARRIERS AT EDGES OF OPENINGS AND ELEVATED AREAS. 17. HARDCORE (BASE) SHALL BE APPROVED WELL GRADED NATURAL GRAVEL OR CRUSHED ROCK (MAX. SIZE 40mm0) SPREAD AND REINFORCEMENT.
AND ORDINANCES OF RELEVANT BUILDING AUTHORITIES. ALL STANDARDS REFERRED TO ARE THOSE CURRENT (AS AMENDED) AT COMMENCEMENT OF 4. REVIEW ADEQUACY OF WORKING SPACE AVAILABLE FOR CONSTRUCTION ACTIVITIES. ENSURE SEPARATION OF PLANT AND PERSONNEL ON SITE, INCLUDING COMPACTED TO 98% MAXIMUM DRY DENSITY DETERMINED BY TEST AS-1289-E2.1 OR 80% MINIMUM DENSITY INDEX FOR • CONCRETE SIMILAR NUMBERED PINS AND SECTION OF STRIP FOOTINGS. PROVIDE REINFORCEMENT LAPS
CONTRACT. MOVEMENTS OF BOTH. COHESIONLESS SOILS. FOR STRIP FOOTINGS AS SHOWN. COMPACT CONCRETE AND FILL ALL VOIDS BEHIND UNDERPINNING AS
20. OBTAIN REQUIREMENTS FOR SERVICES, ADJOINING ELEMENTS etc TO BE EMBEDDED IN, FIXED TO OR SUPPORTED ON WORK AND PROVIDE FOR 5. LOCATE LIFTING SLEW AND LAY DOWN AREAS AWAY FROM REGULAR CONSTRUCTION TRAFFIC. 18. “CONTROLLED FILL” IS: SAND FILL UP TO 800 mm DEEP, WELL COMPACTED IN LAYERS < 300 mm THICK BY VIBRATING PLATE OR CONCRETE IS PLACED.
REQUIRED FIXINGS. PROVIDE FOR TEMPORARY SUPPORT OF ADJOINING ELEMENTS DURING CONSTRUCTION. DRAWINGS DO NOT SHOW DETAILS OF 6. PROVIDE PROTECTION TO PERSONNEL FROM PLANT AND EQUIPMENT, INCLUDING POST-TENSIONED GROUND ANCHOR INSTALLATION WORKS. VIBRATING ROLLER, OR NON-SAND FILL UP TO 400 mm DEEP, WELL COMPACTED IN LAYERS <150 mm THICK BY MECHANICAL ROLLER • PLACE CONCRETE TO WITHIN 100 mm OF UNDERSIDE OF FOOTING TO BE SUPPORTED.
ALL FIXTURES, INSERTS, SLEEVES, RECESSES OR OPENINGS etc REQUIRED. 7. ENSURE ISOLATION SAFE SYSTEMS OF WORK OR PROTECTIVE MEASURES ARE INSTALLED BEFORE WORKING NEAR LIVE ELECTRICAL INFRASTRUCTURE. PROVIDE (CLAY FILL TO BE MOIST DURING COMPACTION), OR OTHER MATERIAL PLACED AND COMPACTED IN ACCORDANCE WITH • GROUT BETWEEN FOOTING AND UNDERPINNING USING AN APPROVED EXPANDING GROUT SUCH AS
21. PROTECT EXISTING STRUCTURES FROM DAMAGE OR CRACKING. MAKE GOOD ANY DAMAGE TO EXISTING ELEMENTS AT COMPLETION OF WORKS. PROTECTION OF ELECTRICAL OVERHEAD WIRING SYSTEMS DURING CONSTRUCTION. SPECIFICATION. ‘CONBEX B’ OR SIMILAR MIXED TO A RAMMABLE CONSISTENCY BEFORE NEXT SEQUENCE OF UNDERPINNING
22. WHERE NEW WORK ABUTS EXISTING, PROVIDE SMOOTH TRANSITION FREE OF ABRUPT CHANGES. 8. WRITTEN RISK ASSESSMENTS ARE ADVISED FOR ACCESS TO OPEN EXCAVATIONS. 19. “ROLLED FILL” IS: SAND FILL UP TO 600 mm DEEP COMPACTED IN LAYERS < 300 mm THICK, OR NON-SAND FILL UP TO 300 mm DEEP IS EXCAVATED.
23. NEATLY CUT BACK CONCRETE TO BE REMOVED TO A CLEAN TRUE FACE USING A DIAMOND SAW. 9. PROVIDE ACCESS AND EGRESS TO EXCAVATIONS APPROPRIATE IN CASE OF INUNDATION, COLLAPSE OR ENGULFMENT. COMPACTED IN LAYERS < 150 mm THICK (CLAY FILL TO BE MOIST DURING COMPACTION). • DO NOT EXCAVATE NEXT PIN SEQUENCE UNTIL 2 DAYS AFTER CONCRETING.
24. HAVE TESTING PERFORMED BY AN INDEPENDENT NATA (NATIONAL ASSOCIATION OF TESTING AUTHORITIES) ACCREDITED AUTHORITY, AND PROVIDE 10. LOCATE STOCKPILES AND HEAVY EQUIPMENT INCLUDING CRANES AWAY FROM BURIED SERVICES AND BUILDING BOUNDARIES WHERE ADJACENT BASEMENTS ARE 20. AVOID OVER EXCAVATION. BACKFILL OVER EXCAVATION WITH GRADE N7 BLINDING CONCRETE. • REPEAT FOR ALL NUMBER SEQUENCES.
TEST REPORTS TO SUPERINTENDENT. PRESENT. 21. KEEP EXCAVATIONS FREE OF WATER. PROVIDE ADEQUATE DRAINAGE TO ENSURE FORMATION IS NOT AFFECTED BY MOISTURE.
25. SEPARATE METALS FROM INCOMPATIBLE MATERIALS (eg STAINLESS STEEL, GALVANIZED STEEL, UNGALVANIZED STEEL AND TREATED TIMBER etc) BY 11. SEEK ADVICE FROM SUITABLY QUALIFIED GEOTECHNICAL OR STRUCTURAL ENGINEER PRIOR TO OPERATION OF HEAVY SURFACE PLANT AND EQUIPMENT OR PREVENT FOUNDATION DRYING OUT DUE TO EXPOSURE. PLACE BLINDING, FOOTINGS, PILES AND BACKFILL AS SOON AS
CONCEALED LAYERS OF SUITABLE INERT MATERIALS OF SUITABLE THICKNESSES. USE PLASTIC SLEEVES AND WASHERS FOR BOLTS, etc. STOCKPILING MATERIAL NEAR OPEN EXCAVATIONS OR EXISTING RETAINING STRUCTURES. PRACTICABLE AFTER EXCAVATION.
26. EXTERNAL ELEMENTS ARE THOSE EXPOSED TO WEATHER, RAIN AND WATER PENETRATION IN FINAL WORKS. 12. DO NOT STOCKPILE MATERIALS BEHIND OR EXCAVATE IN FRONT OF EXISTING RETAINING WALLS UNTIL WALL STABILITY HAS BEEN REVIEWED BY SUITABLY QUALIFIED 22. ENSURE EXCAVATIONS ARE STABLE AND PROTECT SURROUNDING PROPERTY AND SERVICES FROM ADVERSE EFFECTS OF
27. SUPPLY RELEVANT NOTES, DRAWINGS AND SPECIFICATIONS etc TO SUB-CONTRACTORS. STRUCTURAL ENGINEER. GROUND WORKS. PROVIDE TEMPORARY WORKS AS REQUIRED. PROVIDE SHORING CERTIFIED BY SUITABLY QUALIFIED
28. UNO=UNLESS NOTED OTHERWISE, SLS=SERVICEABILITY LIMIT STATE, ULS=ULTIMATE LIMIT STATE, NSL=NATURAL SURFACE LEVEL, FSL=FINISHED 13. SEEK ADVICE FROM SUITABLY QUALIFIED STRUCTURAL ENGINEER BEFORE LAYING SERVICES BELOW EXISTING FOOTING LEVELS. STRUCTURAL ENGINEER TO ALL DEEP EXCAVATIONS WHERE REQUIRED.
SURFACE LEVEL. 14. HAVE LOAD CAPACITY OF STRUCTURES VERIFIED BY SUITABLY QUALIFIED STRUCTURAL ENGINEER BEFORE LOADING OR STORING MATERIALS ON EXISTING OR 23. DO NOT UNDERMINE EXISTING FOOTINGS.
29. SUPERINTENDENT=SUPERINTENDENT NOMINATED IN CONTRACT. PARTIALLY COMPLETED STRUCTURAL ELEMENTS. 24. DEEPEN FOOTINGS BY THICKENING BLINDING CONCRETE AS REQUIRED NEAR EXISTING SERVICE TRENCHES (EVEN IF BACKFILLED),
30. BUILD, FABRICATE AND PROCURE ONLY FROM DRAWINGS ‘ISSUED FOR CONSTRUCTION’. 15. SEEK ADVICE FROM SUITABLY QUALIFIED STRUCTURAL ENGINEER IF PLANNING CRANE LIFTS OR HOIST INSTALLATION ON PARTIALLY ERECTED OR SUSPENDED EXCAVATIONS, BATTERS etc, SO INFLUENCE LINE (AT 30° TO HORIZONTAL) FROM FOOTING IS BELOW ADJACENT EXCAVATION.
31. KEEP ON SITE A COMPLETE SET OF CONTRACT DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS) AND SITE INSTRUCTIONS. STRUCTURES. 25. PROVIDE SAFETY MESH AND OTHER PROTECTION TO PREVENT EXPOSURE OF PERSONNEL TO EXCAVATIONS DURING FOUNDATION
16. SEEK ADVICE FROM SUITABLY QUALIFIED STRUCTURAL ENGINEER BEFORE CORING, CHASING, CUTTING OR REMOVAL OF EXISTING CONCRETE AND REINFORCEMENT. CONSTRUCTION.
TEMPORARY WORKS 17. HAVE SUITABLY QUALIFIED STRUCTURAL ENGINEER UNDERTAKE STRUCTURAL CHECK OF EXISTING CONCRETE, MASONRY AND STUD WALLS WHERE FIXINGS OR 26. USE SUITABLE CONSTRUCTION TECHNIQUES AND EQUIPMENT FOR BACKFILLING ADJACENT TO STRUCTURES TO PREVENT
32. THESE DRAWINGS DO NOT DETAIL TEMPORARY WORKS. CONSTRUCTION METHODS AND TEMPORARY WORKS ARE RESPONSIBILITY OF THE EQUIPMENT IS TO BE ATTACHED. OVERSTRESS AND DAMAGE. PROVIDE SUPPORT TO RETAINING WALLS IF CONSTRUCTION METHODS IMPOSE COMPACTION LOADS
CONTRACTOR. 18. INSTRUCT SERVICES CONTRACTORS UNDER NO CIRCUMSTANCES CAN STRUCTURAL MEMBERS BE CUT, NOTCHED OR DRILLED TO ACCOMMODATE NEW SERVICES. GREATER THAN ALLOWED (SEE DESIGN LOADS IN GENERAL NOTES). BACKFILL EVENLY TO AVOID DIFFERENTIAL SOIL PRESSURES
33. PROVIDE SCAFFOLDING, BARRIERS, FALL RESTRAINT, HAND-MID RAILS AND TOE BOARDS FOR WORK AT HEIGHT. ERECT ACCESS STAIRS AT EARLIEST 19. ESTABLISH LOCATIONS OF LIVE EMBEDDED SERVICES BEFORE CUTTING THROUGH SLABS, etc. ON STRUCTURES. BACKFILL AGAINST RETAINING WALLS ONLY AFTER SPECIFIED CONCRETE STRENGTH IS ACHIEVED, AND
OPPORTUNITY TO REDUCE OPEN SHAFT HAZARDS AND FACILITATE ACCESS. MAINTAIN SAFETY MESH AND BARRIERS TO ALL OPENINGS AND ELEVATED 20. DEVELOP STEELWORK / PRECAST / TILT UP INSTALLATION SAFE WORK METHOD STATEMENT TO ELIMINATE AND MINIMISE INSTALLATION RISKS, AND HAVE REVIEWED PERMANENT SUPPORT INSTALLED WHERE APPLICABLE.
EDGES. BY SUITABLY QUALIFIED STRUCTURAL ENGINEER PRIOR TO ERECTION. 27. BACKFILL FOR RETAINING WALLS TO BE FREE DRAINING GRANULAR MATERIAL. PROVIDE DRAINAGE BEHIND RETAINING WALLS
34. MAINTAIN STRUCTURE IN A STABLE CONDITION DURING CONSTRUCTION AND PROVIDE TEMPORARY BRACING AND/OR SUPPORT AS REQUIRED. SHOW 21. DO NOT CUT OR UNBOLT ANY STRUCTURAL MEMBERS WITHOUT SEEKING REVIEW BY SUITABLY QUALIFIED STRUCTURAL ENGINEER. COMPRISING CONTINUOUS SLOTTED DRAIN WITH GRANULAR SURROUND, OR NYLEX “COREDRAIN” CONNECTED TO RETICULATED
TEMPORARY MEMBERS ON SHOP DRAWINGS. PROVIDE SPREADERS AT LOADS AND/OR LIFTING POINTS WHERE REQUIRED. ENSURE NO PART IS 22. PROVIDE BUCKLING STABILITY TO LONG SPAN BEAMS, TRUSSES etc DURING ERECTION. IF UNSURE, CHECK WITH SUITABLY QUALIFIED STRUCTURAL ENGINEER PRIOR STORMWATER DRAINAGE SYSTEM. PROVIDE 50 mm DIAMETER WEEPHOLES AT 1500 MAXIMUM CENTRES AT BASE OF WALL.
OVERSTRESSED. DO NOT PLACE OR STORE BUILDING MATERIALS ON, SUPPORT FORMWORK OR PROP FROM STRUCTURAL MEMBERS WITHOUT TO LIFTING AND INSTALLATION. 28. SLOPE SERVICES TRENCHES AWAY FROM BUILDING. BED SERVICES ON COMPACTED MATERIAL COMPATIBLE WITH NATURAL
SUPERINTENDENT’S APPROVAL. PROVIDE CALCULATIONS BY SUITABLY QUALIFIED STRUCTURAL ENGINEER TO PROVE ADEQUACY OF STRUCTURE FOR 23. MINIMIZE SITE BASED TREATMENTS (eg WELDING, CUTTING, SPRAY PAINTING, GRIT BLASTING, etc). PROVIDE ADEQUATE PROTECTION, SCREENING AND VENTILATION MATERIAL ON SITE. BACKFILL TOP 300 mm OF TRENCHES WITH HAND COMPACTED CLAY WITHIN 1500 mm OF BUILDING. WHERE
PROPOSED CONSTRUCTION SEQUENCE, METHODS AND LOADS INCLUDING PROPPING, CRANE LIFTS etc. TO MINIMIZE HAZARDS TO PERSONNEL IF SITE BASED TREATMENT IS UNAVOIDABLE. SERVICES PASS THROUGH MIDDLE THIRD OF FOOTING, SLEEVE SERVICES OR PROVIDE 40 mm THICK CLOSED-CELL POLYETHYLENE
35. PROVIDE TEMPORARY BRACING WHERE REQUIRED FOR STRUCTURAL ELEMENTS OR FRAMES STABILIZED BY MASONRY, PRECAST CONCRETE OR 24. TRY TO AVOID WORKING IN CONFINED SPACES. IF CONFINED SPACES WORK CAN’T BE AVOIDED, PROVIDE SAFE WORK METHOD STATEMENT ADDRESSING MITIGATION LAGGING.
OTHER ELEMENTS CONSTRUCTED AFTER ERECTION OF THE STRUCTURAL ELEMENT OR FRAME, AND SHOW ON SHOP DRAWINGS. OF RISKS. PROVIDE ADEQUATE SIGNAGE TO TEMPORARY AND PERMANENT CONFINED SPACES TO AS2865. 29. FOR SITES CLASSIFIED M OR GREATER REACTIVITY; WHERE SERVICES PASS UNDER FOOTINGS BACKFILL TRENCHES WITH HAND
25. AVOID HOT WORKS ON SITE PARTICULARLY IN TIMBER FRAMED STRUCTURES. HOT WORKS TO COMPLY WITH CLIENT PROCEDURES FOR APPLICABLE “HOT WORKS COMPACTED CLAY OR BLINDING CONCRETE FOR 1500 mm EACH SIDE OF FOOTING AGAINST CLEAN, DRY, UNDISTURBED NATURAL
DESIGN ASSUMPTIONS PERMITS”. MATERIAL. BACKFILL TRENCHES WITH HAND COMPACTED CLAY WITHIN 1500 mm OF BUILDING. PROVIDE FLEXIBLE JOINTS IN
36. ALL STRUCTURES TO HAVE A DESIGN WORKING LIFE OF 50 YEARS 26. SOME SITES IN AUSTRALIA AND EXTENSIVE REGIONS OF SE ASIA CONTAIN UNEXPLODED ORDNANCE (UXO) IN THE GROUND. UNDERTAKE DESKTOP REVIEWS FOR THE STORMWATER AND WASTEWATER SERVICES AT EXTERIOR OF BUILDING.
37. STRUCTURAL WORK HAS BEEN DESIGNED FOR FOLLOWING LOADS: LIKELIHOOD OF UXOS BEFORE COMMENCING ANY GROUND INVESTIGATION OR EXCAVATION IN THESE AREAS. SHOULD EVIDENCE INDICATE POTENTIAL UXO 30. FOLLOWING CONSTRUCTION, FOUNDATION MAINTENANCE TO BE IN ACCORDANCE WITH CSIRO BUILDING TECHNOLOGY FILE 18
• PERMANENT DEAD LOAD OF STRUCTURE AS SHOWN ON DRAWINGS PRESENCE DO NOT COMMENCE GROUND WORKS UNTIL ENGAGING A SPECIALIST CONSULTANT WHO CAN HELP DEFINE ANY FUTURE CLEARANCE TASKS. “FOUNDATION MAINTENANCE AND FOOTING PERFORMANCE: A HOMEOWNER’S GUIDE”, INCLUDING CONSTRAINTS ON TREE
• SUPERIMPOSED PERMANENT LOAD: 3 kPa - 125mm WEARING SLAB 27. DETERMINE APPROPRIATE METHOD OF PAINT REMOVAL AND DISPOSAL BEFORE STRIPPING PAINT, PARTICULARLY ON HISTORIC STRUCTURES. COATINGS CONTAINING LOCATIONS.
• LIVE LOADS TO AS/NZS1170.1: 35 kPa - 1.5mOF FILL + 5 kPa LIVE LOAD COAL TAR EPOXIES, BITUMENS AND ASPHALTS, ZINC CHROMATE AND LEAD PRESENT A HEALTH RISK. PROVIDE SCREENING TO PUBLIC AND ENVIRONMENT FOR PAINT
• SERVICES LOAD: 0.5 kPa REMOVAL AND CLEANING OPERATIONS. USE ENVIRONMENTALLY APPROPRIATE RESTORATION METHODS DURING MAINTENANCE AND REPAIR WORK. SLABS AND FOOTINGS
• IMPOSED “SURCHARGE” LOAD ON GROUND 10 kPa 28. MAKE WORK AREAS SAFE WHERE STRUCTURAL ELEMENTS ARE DAMAGED, CRACKED OR HAVE SUFFERED SIGNIFICANT SECTION LOSS BEFORE ALLOWING GENERAL 31. FOOTINGS HAVE BEEN DESIGNED FOR AN ULTIMATE END BEARING PRESSURE OF 6500 kPa IN UNDISTURBED NATURAL ROCK. PILES
• COMPACTION LOADS: 10 kPa CONSTRUCTION OR REPAIR ACCESS. HAVE BEEN DESIGNED ASSUMING AN ULTIMATE END BEARING PRESSURE OF 6500 kPa. GEOTECHNICAL REDUCTION FACTOR OF 0.5
• SOIL DENSITY: 18 kN/m3 29. REPORT SIGNIFICANT SECTION LOSS OR CORROSION FLAKING BEFORE STARTING PAINTING OR REPAIRS. CONSULT SUITABLY QUALIFIED STRUCTURAL ENGINEER IF HAS BEEN ADOPTED IN DESIGN.
• ACTIVE LATERAL EARTH PRESSURE COEFFICIENT ka: 0.4 FOR XM ROCK, 0.36 FOR HW ROCK, 0.33 FOR ENGINEERED FILL SECTION LOSS OR EXTENSIVE CORROSION FLAKING PRESENT BEFORE PROCEEDING WITH WORK. 32. CONSTRUCT FOOTINGS FOUNDED IN SPECIFIED MATERIALS (AS ABOVE, AND IN GEOTECHNICAL REPORT). REMOVE SOFTENED OR
• AT REST LATERAL EARTH PRESSURE COEFFICIENT ko: 0.5 FOR XM AND HW ROCK AND FOR ENGINEERED FILL 30. DEVELOP AND IMPLEMENT RISK MITIGATION STRATEGIES BEFORE ALLOWING ACCESS OVER SUSPENDED CLADDING FINISHES THAT MAY BECOME BRITTLE OVER TIME. LOOSE MATERIAL AND MATERIAL THAT DOES NOT ACHIEVE THESE PRESSURES. ENSURE FORMATION IS CLEAN AND LEVEL.
• BUILDING DESIGN WORKING LIFE 50 years 31. REPORT LOOSE OR MISSING BOLTS etc IN CONNECTIONS ENCOUNTERED DURING DAY TO DAY OPERATIONS. PROVIDE FORMWORK WHERE SIDES OF EXCAVATIONS NOT STABLE UNO.
• BUILDING IMPORTANCE LEVEL 2 32. REMOVE MATERIAL FROM STORAGE STRUCTURES BEFORE UNDERTAKING MAINTENANCE WORK. 33. PROOF ROLL FORMATION WITH HEAVY DUTY ROLLER.
• WIND LOADS TO AS/NZS1170.2: 34. OBTAIN APPROVAL OF FOUNDATION MATERIAL FOR THE DESIGN PRESSURES FROM SUITABLY QUALIFIED GEOTECHNICAL
• REGION A3 ENGINEER/SUPERINTENDENT/BUILDING AUTHORITY BEFORE FIXING REINFORCEMENT OR PLACING CONCRETE.
• AVERAGE RECURRENCE INTERVAL, R 500 years 35. SLAB PANELS TO BE FOUNDED ON UNDISTURBED NATURAL SOIL WITH ALLOWABLE BEARING CAPACITY OF NOT LESS THAN 100 kPa.
• ULTIMATE REGIONAL WIND SPEED VR (3 sec GUST) 45 m/s DEMOLITION REMOVE ANY SOFT SPOTS AND REPLACE WITH COMPACTED CRUSHED ROCK. WHERE SLAB PANELS AND INTERNAL BEAMS ARE
• SERVICEABILITY REGIONAL WIND SPEED V25 (3 sec) 37 m/s FOUNDED ON CONTROLLED FILL, CONTROLLED FILL MUST CONTINUE AT LEAST ONE METRE PAST BUILDING.
• DIRECTIONAL MULTIPLIER 1.0 1. DEMOLITION WORK TO BE TO AS2601. TAKE PRECAUTIONS NECESSARY FOR PROTECTION OF PERSONS AND PROPERTY. 36. LOCATE FOOTINGS CENTRALLY UNDER WALLS AND COLUMNS UNO.
• TERRAIN CATEGORY 2.5 2. OBTAIN NECESSARY PERMITS AND APPROVALS FROM RELEVANT AUTHORITIES BEFORE COMMENCING WORK ON SITE. DO NOT COMMENCE DEMOLITION WORK BEFORE 37. PROVIDE 0.2 mm HIGH IMPACT RESISTANT VIRGIN POLYETHYLENE FILM DAMP PROOF MEMBRANE TO AS2870 ON 50 mm SAND
• DESIGN BUILDING HEIGHT AS PER BUILDING ELEVATION, 5 m max. DEMOLITION PERMIT/SCAFFOLD PERMIT OBTAINED. BLINDING WHERE SHOWN ON DRAWINGS. LAP 200 mm AND SEAL DAMP PROOF MEMBRANES, TAPE AT PENETRATIONS, etc TO
• TERRAIN/HEIGHT MULTIPLIER (Mz,cat) 1.0 3. SEEK ADVICE FROM SUITABLY QUALIFIED STRUCTURAL ENGINEER TO ESTABLISH CRITICAL STABILITY ELEMENTS AND ASSIST DEVELOPMENT OF DEMOLITION METHOD ENSURE A COMPLETE VAPOUR BARRIER IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS AND AS2870. PREVENT
• SHIELDING MULTIPLIER (Ms) 1.0 STATEMENT. PUNCTURING OR DAMAGE BY PLACING A PLASTIC PLATE UNDER REINFORCEMENT SUPPORTS.
• TOPOGRAPHIC MULTIPLIER (Mt) 1.0 4. MAKE ALLOWANCE FOR CONDITION OF STRUCTURAL AND OTHER ELEMENTS (eg WALL TIES), INCLUDING LOSS OF CAPACITY DUE TO DETERIORATION OR AGE. 38. TOP OF CONCRETE SLAB TO BE AT LEAST 150 mm ABOVE ADJACENT GROUND LEVELS.
• EARTHQUAKE LOADS TO AS1170.4: 5. CONSIDER PROVIDING LOCAL EMERGENCY SERVICES WITH COPY OF DEMOLITION METHOD STATEMENT BEFORE COMMENCING WORK. 39. SLOPE GROUND SURROUNDING BUILDING SO WATER WILL DRAIN AWAY FROM BUILDING TO SUITABLE DISCHARGE POINTS WITHOUT
• ANNUAL PROBABILITY OF EXCEEDANCE 1/500 6. HAVE ADJACENT STRUCTURES REVIEWED BY SUITABLY QUALIFIED STRUCTURAL ENGINEER TO ASSESS IMPACT OF PROPOSED DEMOLITION WORK. PONDING. WHERE ACHIEVED BY FILLING, FILL TO BE LESS PERMEABLE THAN UNDERLYING MATERIAL.
• PROBABILITY FACTOR, (kp) 1.0 7. PROVIDE TEMPORARY SUPPORT TO ADJOINING STRUCTURES BY SHORING, UNDERPINNING, PROPPING OR AS REQUIRED DESIGNED BY A SUITABLY QUALIFIED
• HAZARD FACTOR (Z) 0.08 CHARTERED ENGINEER REGISTERED WITH BUILDING PRACTITIONERS BOARD OF VICTORIA (RBP), REGISTERED PROFESSIONAL ENGINEER OF QUEENSLAND (RPEQ), PILES
• SITE SUB-SOIL CLASS Be CERTIFYING STRUCTURAL ENGINEER (BUILDING PRACTITIONERS BOARD) NORTHERN TERRITORY, OR NATIONAL ENGINEERING REGISTER (NER) OF ENGINEERS 40. INSPECTION MAY BE MADE OF THE FOLLOWING: SETTING OUT, PILES AND PILING MATERIAL AFTER DELIVERY TO THE SITE AND
• EARTHQUAKE DESIGN CATEGORY (EDC) I AUSTRALIA. BEFORE INSTALLATION, REINFORCEMENT CAGES AFTER ASSEMBLY AND BEFORE INSTALLATION, EXCAVATED SHAFTS, INCLUDING
• STRUCTURE HEIGHT, (hn) 4 metres 8. DO NOT BUILD UP MATERIAL AGAINST MASONRY OR OTHER WALLS OR RETAINING WALLS. CASINGS AND SOCKETS BEFORE PLACING REINFORCEMENT, REINFORCEMENT IN EXCAVATED SHAFTS BEFORE CONCRETING AND
• NUMBER OF STOREYS 1 9. NOTIFY OWNERS AND OCCUPANTS OF ADJOINING PROPERTIES OF PROPOSED DEMOLITION WORKS, INCLUDING DETAILS AND TIMING OF WORKS. CONCRETING OF PILES.
• STRUCTURE DUCTILITY FACTOR (m) 2 10. DO NOT USE EXPLOSIVES. 41. FOR BORED PILES USE TEMPORARY CASING TO SUPPORT LOOSE OR WEAK MATERIAL AS REQUIRED.
• STRUCTURAL PERFORMANCE FACTOR, (SP) 0.77 11. USE DEMOLITION METHODS TO MINIMISE INTERFERENCE WITH AND PROTECT OCCUPANTS AND THEIR ACTIVITIES, INCLUDING FROM NOISE, NOXIOUS EFFECTS OF DUST, 42. EXCAVATE PILE SOCKETS TO ENSURE SURFACES ARE FREE OF DEBRIS, CRUSHED ROCK AND SMEARED MATERIAL. USE CLEANING
38. FOR ELEMENTS FIXED TO OR CONSTRUCTED UP TO UNDERSIDE OF SUSPENDED SLABS AND BEAMS, ALLOW FOR DEFLECTIONS OF 0.4% SPAN. FUMES, LIQUIDS, GASES, INFECTION, FIRE, EXPLOSION, RADIATION OR OTHER HAZARDS, ETC. BUCKETS AND SIDE CLEANING TOOLS SUITABLE FOR THE PILE DIAMETER.
12. ADVISE SUPERINTENDENT IMMEDIATELY IF HAZARDOUS MATERIALS ARE FOUND ON SITE, INCLUDING ASBESTOS, FLAMMABLE OR EXPLOSIVE LIQUIDS OR GASES, TOXIC, 43. ENSURE SIDE WALLS OF PILE SOCKETS ARE FREE OF SOIL AND CRUSHED ROCK OVER AT LEAST 80% OF SIDE WALL AREA.
INFECTED OR CONTAMINATED MATERIALS, RADIATION OR RADIOACTIVE MATERIALS, NOXIOUS OR EXPLOSIVE CHEMICALS, TANKS OR OTHER CONTAINERS THAT HAVE 44. ENSURE BASE OF PILE SOCKETS ARE FREE OF DEBRIS, SOFT MATERIAL etc. EXPOSE NATURAL ROCK OVER AT LEAST 80% OF
BEEN USED FOR STORAGE OF ABOVE. SOCKET BASE. PREVENT LOOSE MATERIAL FALLING INTO HOLE.
13. GIVE NOTICE FOR INSPECTION AT THE FOLLOWING STAGES: 45. SOCKET INSPECTIONS ARE TO BE UNDERTAKEN BY SUITABLY QUALIFIED GEOTECHNICAL ENGINEER TO VERIFY SOCKET IS
• ADJOINING STRUCTURES BEFORE COMMENCEMENT OF DEMOLITION. FOUNDED WHOLLY WITHIN CLASS OF ROCK SPECIFIED, MATERIAL UNDERLYING SOCKET BASE IS EQUIVALENT OR BETTER THAN
• BEFORE DISCONNECTION OR DIVERSION OF SERVICES. ASSUMED BY DESIGN, SOCKET DIMENSIONS ARE AS SPECIFIED, SIDE WALL AND BASE CLEANLINESS IS AS SPECIFIED.
• TREES SPECIFIED TO BE RETAINED BEFORE COMMENCEMENT OF DEMOLITION. 46. PILE SOCKET LENGTH/DEPTH MEASURED FROM BASE OF EXCAVATION. NO OVER EXCAVATION OF SOCKETED PILES IS PERMITTED.
• UNDERGROUND STRUCTURES AFTER DEMOLITION OF WORK ABOVE SUCH STRUCTURE. 47. WHERE PILE CUT OFF LEVEL IS ABOVE ADJACENT GROUND, FORM PILE ABOVE GROUND LEVEL.
• EXCAVATION REMAINING AFTER REMOVAL OF UNDERGROUND WORK. 48. PILES TO PROJECT INTO 50 mm INTO ABUTMENT/PILECAP UNO.
• SITE AFTER REMOVAL OF DEMOLISHED MATERIALS.
• SERVICES AFTER RECONNECTION OR DIVERSION.
ON COMPLETION OF DEMOLITION GIVE NOT LESS THAN SEVEN WORKING DAYS NOTICE SO ADJOINING STRUCTURES CAN BE INSPECTED.
14. REMOVE FROM SITE ALL DEMOLISHED MATERIALS NOT REQUIRED IN FINAL WORKS.

DELIVERABLES
15. SUBMIT NAMES AND CONTACT DETAILS OF PROPOSED DEMOLITION SUBCONTRACTORS.
16. SUBMIT ELECTRONIC PDF’S OR THREE PAPER COPIES OF PROPOSED DEMOLITION METHOD STATEMENT AT LEAST 14 DAYS PRIOR TO DEMOLITION WORK. DO NOT
PROCEED WITH DEMOLITION UNTIL WRITTEN APPROVAL ISSUED. METHOD STATEMENT TO INCLUDE PROPOSED SEQUENCE OF WORKS, TIMES FOR DISCONNECTION AND
RECONNECTION OF SERVICES, SITE SECURITY, HOT WORKS, SPLINTERS AND EXPOSED ELEMENTS, DEBRIS, TRANSPORT AND DISPOSAL, ACCESS EQUIPMENT,
TEMPORARY BATTERS, AIR QUALITY AND POLLUTION CONTROL MEASURES.
17. HAVE CHARTERED STRUCTURAL ENGINEER REVIEW PROPOSED DEMOLITION LOADS THAT MAY AFFECT STRUCTURES AND SUBMIT REPORT TO SUPERINTENDENT PRIOR
TO COMMENCEMENT OF DEMOLITION.

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STRUCTURAL NOTES SHEET 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1:1 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-002
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-002 A
CONCRETE REINFORCEMENT
CONCRETE MIX 34. SEAL JOINTS BETWEEN FORMWORK PANELS, AND TO HARDENED CONCRETE WITH A FLEXIBLE RUBBER STRIP. SET OUT 68. DO NOT MAKE HOLES, PENETRATIONS, RECESSES, CHASES, NOR EMBED PIPES (OTHER THAN THOSE SHOWN ON 1. SYMBOLS ON DRAWINGS FOR GRADE AND TYPE OF REINFORCEMENT ARE AS FOLLOWS: 43. USE ONLY N12 QUENCHED AND SELF-TEMPERED REINFORCEMENT FOR PULLOUT BARS OR BARS TO BE BENT ON SITE
1. WORKMANSHIP AND MATERIALS TO COMPLY WITH AS3600, AS2870, AS3610, AS1379, AS1478, AS3582, AS3799, AS2758.1, FORMWORK TO GIVE A REGULAR ARRANGEMENT OF PANELS, JOINTS, BOLT HOLES AND SIMILAR VISIBLE ELEMENTS IN FORMED STRUCTURAL DRAWINGS) WITHOUT APPROVAL OF SUPERINTENDENT. DO NOT PLACE CONDUITS, PIPES etc WITHIN • R: STRUCTURAL GRADE 250 PLAIN ROUND BAR TO AS/NZS4671 (eg TEMPCORE BY ONESTEEL). DO NOT USE MICROALLOY REINFORCEMENT FOR PULLOUT BARS AND BARS TO BE
AS5100.5 AND AS3972. FOR LIQUID RETAINING STRUCTURES ALSO COMPLY WITH AS3735. SURFACE. COVER CONCRETE. LOCATE CONDUITS, PIPES etc ONLY IN MIDDLE THIRD OF SLAB OR BEAM DEPTH AND BETWEEN • N: HOT ROLLED GRADE 500 DEFORMED (RIBBED) BAR DUCTILITY CLASS N TO AS/NZS4671 BENT ON SITE. CAST IN PULLOUT BARS WITH BEND CLEAR OF CONCRETE. USE PROPRIETARY POWERED BENDING
2. WET CONCRETE TO BE UNIFORM, HOMOGENEOUS, COHESIVE AND ABLE TO WORK READILY INTO CORNERS AND 35. DO NOT USE FORMWORK HARDWARE THAT FORMS A COMPLETE HOLE THROUGH CONCRETE ELEMENTS. DO NOT USE REINFORCEMENT LAYERS, AND SPACED AT 3 x DIAMETER CENTRES MINIMUM. DO NOT CUT REINFORCEMENT AT • L: HOT ROLLED GRADE 500 DEFORMED BAR DUCTILITY CLASS L TO AS/NZS4671 TOOLS WITH PIN DIAMETERS TO AS3600 AT AMBIENT TEMPERATURE FOR SITE BENDING OF PULLOUT BARS, USING A
AROUND REINFORCEMENT COMPLETELY FILLING FORMWORK WITHOUT SEGREGATION, EXCESS FREE WATER ON REINFORCEMENT TO SUPPORT FORMWORK. PENETRATIONS WITHOUT APPROVAL • SL: HARD DRAWN WIRE GRADE 500 SQUARE MESH DUCTILITY CLASS L TO AS/NZS4671 SINGLE SMOOTH BENDING ACTION. DO NOT USE IMPACT BLOWS OR HAMMER BARS, OR BEND BARS USING A PIPE.
SURFACE, LOSS OF MATERIAL OR CONTAMINATION. 36. PROVIDE HOLES IN REBATE FORMERS, etc, AS REQUIRED TO PREVENT AIR ENTRAPMENT. 69. PROVIDE DRIP GROOVES IN SOFFIT OF BEAMS AND SLABS AT EXTERNAL PERIMETER OF STRUCTURES. ENSURE • RL: HARD DRAWN WIRE GRADE 500 RECTANGULAR MESH DUCTILITY CLASS L TO AS/NZS4671 TAKE CARE TO MINIMISE SURFACE DAMAGE, AND INSPECT REBENT BARS FOR CRACKS. REPORT CRACKS TO
CONCRETE TO HAVE GOOD DIMENSIONAL STABILITY AND ABLE TO RESIST PLASTIC SETTLEMENT CRACKING, 37. CARDBOARD VOID FORMER: USE VOID FORMER THAT WILL NOT DEFLECT DURING CONCRETE PLACING AND COMPACTION OR COVER TO REINFORCEMENT IS ACHIEVED. • TM: HARD DRAWN STEEL GRADE 500 TRENCH MESH DUCTILITY CLASS L TO AS/NZS4671 SUPERINTENDENT.
THERMAL CRACKING AND SHRINKAGE CRACKING. DURING SETTING PERIOD, BUT WILL COLLAPSE RESULTING IN LOSS OF LOAD CARRYING CAPACITY NOT MORE THAN 48 HOURS 70. REMOVE PROPS AND FORMWORK FOR BEAMS AND SLABS AND ENSURE CONCRETE HAS GAINED ADEQUATE • W: GRADE 500 STEEL REINFORCING WIRE TO AS/NZS4671 44. DO NOT CUT, BEND NOR HEAT REINFORCEMENT ON SITE WITHOUT SUPERINTENDENTS PRIOR WRITTEN APPROVAL.
3. FINISHED CONCRETE TO BE A DURABLE, DENSE, HOMOGENEOUS MASS COMPLETELY FILLING FORMWORK, AFTER FLOODING WITH WATER. KEEP VOID FORMERS DRY UNTIL CONCRETE IS PLACED. STRENGTH BEFORE CONSTRUCTING WALLS OR PLACING OTHER PERMANENT LOADING ON WORK. 2. MANUFACTURERS AND PROCESSORS OF STEEL REINFORCING AND PRE-STRESSING MATERIALS MUST HOLD A VALID 45. ENSURE HOT BENDING OF REINFORCEMENT COMPLIES WITH AS3600 CLAUSE 17.2.3.1. DO NOT HEAT D500N
EMBEDDING REINFORCEMENT AND TENDONS, AND FREE OF STONE POCKETS OR HONEYCOMBS, OF UNIFORM 38. DO NOT STRIP FORMWORK PRIOR TO 36 HOURS AFTER PLACEMENT. 71. WHERE CONCRETE BEARS ON LOAD BEARING MASONRY AND BRICKWORK, TROWEL SMOOTH AND FLAT A 5 mm THICK CERTIFICATE OF APPROVAL ISSUED BY ACRS (AUSTRALASIAN CERTIFICATION AUTHORITY FOR REINFORCING AND REINFORCEMENT. USE TEMPERATURE INDICATOR PAINTS AND/OR CRAYONS TO ENSURE REINFORCEMENT
COLOUR AND TEXTURE, WITH LOW PERMEABILITY AND ADEQUATE BUT NOT EXCESSIVE STRENGTH FOR GRADE. 39. DO NOT STRIP FORMWORK UNTIL CONCRETE IS HARDENED SUFFICIENTLY TO WITHSTAND MOVEMENT AND FORM REMOVAL LAYER OF MORTAR AND SEPARATE CONCRETE THERE FROM WITH TWO LAYERS OF “SUPER ALCOR”. STRUCTURAL STEELS). PROVIDE ACRS CERTIFICATION OF COMPLIANCE WITH AS/NZS4671, PRODUCT TAGS AND TEMPERATURE DOES NOT EXCEED MANUFACTURERS RECOMMENDED LIMITS, 450 DEGREES MAXIMUM.
4. CONCRETE BLEED TO BE LESS THAN 3% FOR FLOOR AND ROOF SLABS, LESS THAN 2% FOR WALLS. WITHOUT DAMAGE. MINIMUM STRIPPING TIMES TO BE AS PER AS3610 TABLE 5.4.1. SUPPORTING DOCUMENTATION FOR ALL REINFORCEMENT. PROVIDE CERTIFICATION OF COMPLIANCE WITH AS/NZS4672.1 REINFORCEMENT THAT CHANGED COLOUR DURING HEATING MUST BE DISCARDED.
5. AIR ENTRAINMENT IS NOT PERMITTED UNLESS APPROVED IN WRITING BY SUPERINTENDENT. 40. STRIP FORMWORK TO AS3600 CLAUSE 17.6. REMOVE FORM TIE BOLTS WITHOUT DAMAGING CONCRETE. PARTS OF BOLTS JOINTS FOR ALL PRESTRESSING TENDONS. 46. DO NOT BEND REINFORCEMENT AFTER GALVANISING OR APPLICATION OF OTHER COATINGS.
6. REVIEW LOCATION OF EMBEDDED ITEMS TO MINIMIZE POSSIBLE ZONES OF POOR COMPACTION THAT MAY LEFT IN CONCRETE MUST NOT INTRUDE INTO COVER CONCRETE. FLUSH FILL HOLES USING PRE-MIXED NON-SHRINK 72. FORM CONSTRUCTION JOINTS AND USE ONLY WHERE SHOWN OR WHERE APPROVED BY SUPERINTENDENT. 3. PROVIDE DOCUMENTATION TO SHOW THAT REINFORCEMENT SUPPLIER AND MILL COMPLIES WITH AS/NZS4671. 47. USE STRAIGHT, SMOOTH HOT DIPPED GALVANIZED DOWELS SAWN TO LENGTH WITH SQUARE CUT ENDS FREE OF
COMPROMISE STRUCTURAL INTEGRITY. CEMENTITIOUS REPAIR MORTAR MATCHING CONCRETE SURFACE COLOUR, STRENGTH AND DURABILITY AND ADEQUATE BOND. CONSTRUCTION JOINTS IN SLABS TO BE VERTICAL, STRAIGHT AND TRUE. TO ACHIEVE ADEQUATE BOND ENSURE 4. REINFORCEMENT MUST HAVE UNIQUE MARKS TO IDENTIFY SUPPLIER. BURRS. INSTALL DOWELS PARALLEL TO SURFACE OF SLAB AND PERPENDICULAR TO PLANE OF JOINT. MAINTAIN
7. EXTERNALLY EXPOSED CONCRETE TO BE CLASSIFICATION B1 UNO. ENTIRE SURFACE IS CLEAN, FREE OF LAITANCE AND BLEMISHES, AND INTENTIONALLY ROUGHENED TO A FULL 5. DO NOT USE LOW DUCTILITY REINFORCEMENT (GRADE L) UNO. DOWEL ALIGNMENT BY USE OF A SUITABLE SUPPORT ASSEMBLY TO ENSURE HORIZONTAL AND VERTICAL ALIGNMENT
8. QUALITY OF CONCRETE ELEMENTS TO BE AS FOLLOWS: PLACING OF CONCRETE AMPLITUDE OF NOT LESS THAN 5 mm WITH COARSE AGGREGATE EXPOSED. PRIME EXISTING CONCRETE WITH 6. USE MESH SUPPLIED IN FLAT SHEETS UNLESS APPROVED OTHERWISE. TOLERANCE OF 2 IN 300. DO NOT INSERT DOWELS DURING PLACEMENT OF CONCRETE.
41. CONSTRUCTION TOLERANCES TO BE TO AS3610. MASTER BUILDERS’ “CONCRESIVE 2525” (IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS) AND PLACE 7. REINFORCEMENT TO BE CLEAN, FREE OF LOOSE MILL SCALE, RUST, OIL, GREASE, MUD OR OTHER MATERIAL THAT MIGHT 48. USE 10 mm HOT DIPPED GALVANIZED DANLEY DIAMOND DOWELS (TEL: 07 3899 3466). INSTALL DOWELS PARALLEL TO
COLUMNS/FOOTING/
STRUCTURAL ELEMENT BLINDING GROUND SLAB SUSPENDED SLAB 42. FORMWORK, REINFORCEMENT AND COVER, DOWELS, WATERSTOPS,CAST-IN ITEMS etc TO BE INSPECTED AND APPROVED BY ADJACENT FRESH CONCRETE WITHIN 30 MINUTES OF PRIMING. DAMPEN EXISTING CONCRETE PRIOR TO PLACING REDUCE BOND BETWEEN REINFORCEMENT AND CONCRETE. SURFACE OF SLAB. MAINTAIN DOWEL ALIGNMENT BY USE OF A SUITABLE SUPPORT ASSEMBLY TO ENSURE
WEARING SLAB
SUITABLY QUALIFIED GEOTECHNICAL ENGINEER /SUPERINTENDENT/BUILDING SURVEYOR BEFORE CONCRETE IS PLACED. ADJACENT FRESH CONCRETE. COAT EXISTING CONCRETE WITH NEAT CEMENT SLURRY PRIOR TO PLACING 8. SUBMIT PROPOSAL FOR CUTTING OR DISPLACING REINFORCEMENT. CLEAN AND PROTECT EXPOSED CUT ENDS OF HORIZONTAL AND VERTICAL ALIGNMENT TOLERANCE OF 2 IN 300. DO NOT INSERT DOWELS DURING PLACEMENT OF
EXPOSURE CLASSIFICATION B1 A1 A2 43. REMOVE FREE WATER, DUST AND DEBRIS, STAINS etc FROM FORMS, EXCAVATIONS etc BEFORE PLACING CONCRETE. IN HOT ADJACENT FRESH CONCRETE. REINFORCEMENT USING 6 mm APPROVED EPOXY. CONCRETE.
CONDITIONS DAMPEN FORMWORK AND/OR SUB-GRADE BEFORE PLACING CONCRETE. 73. IF CONSTRUCTION JOINTS PROPOSED OTHER THAN WHERE SHOWN, PROVIDE PROPOSED LOCATIONS FOR 9. DESIGNATION OF REINFORCEMENT BARS IS AS SHOWN: 49. PERCUSSION ROTARY DRILL HOLES FOR GROUTED BARS AND THREADED RODS (NOTE: CORED HOLES MUST BE
STRENGTH GRADE (MPa) N7 N32 N40 44. INSTALL 0.2 mm HIGH IMPACT RESISTANT VIRGIN POLYETHYLENE FILM DAMP PROOF MEMBRANE TO AS2870 TO BASE TO SUPERINTENDENT’S APPROVAL PRIOR TO CONSTRUCTION. eg. 17 N20 - 350 EF ROUGHENED). HOLE DIAMETER AND INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER’S
RETAIN WATER IN FRESH CONCRETE. 74. PROVIDE JOINTING MATERIALS COMPATIBLE WHEN USED TOGETHER, AND NON-STAINING TO CONCRETE IN VISIBLE • 17: DENOTES No OF BARS AND TYPE IN GROUP RECOMMENDATIONS. EMBEDMENT LENGTHS AS PER DRAWINGS.
MINIMUM DENSITY (kg/m³) - 2350 2350 45. PLACE CONCRETE IN LAYERS LESS THAN 300 mm THICK FOR FIRST LAYER AND 75% OF IMMERSION VIBRATOR LENGTH FOR LOCATIONS. • N: DENOTES BAR GRADE AND DUCTILITY CLASS 50. ENSURE HOLES FOR GROUTED BARS AND THREADED RODS ARE DRY AND CLEANED THOROUGHLY BEFORE
MAX AGGREGATE SIZE (mm) - 20 20 SUBSEQUENT LAYERS, AND VIBRATE EACH LAYER BEFORE PLACING NEXT. 75. PROVIDE DETAILS OF CONSTRUCTION JOINTS FOR SUPERINTENDENT’S APPROVAL PRIOR TO CONSTRUCTION. • 20: DENOTES NOMINAL BAR DIAMETER IN mm INSTALLING ANCHORS. WIRE BRUSH HOLES AND BLOW OUT WITH COMPRESSED AIR TO REMOVE DUST. FILL HOLE
46. ELAPSED TIME BETWEEN WETTING OF MIX AND DISCHARGE OF CONCRETE AT SITE MUST BE AS SHORT AS POSSIBLE, AND 76. INSTALL WATERSTOPS ONTO SMOOTH CONCRETE SURFACE. DO NOT SCABBLE CONCRETE BENEATH WATERSTOPS. • 350: DENOTES SPACING IN mm WITH ADHESIVE USING A CAULKING GUN FROM BOTTOM OF HOLE OUTWARDS. DISCARD ADHESIVE FROM FIRST
BY CONTRACTOR's PT DESIGNER
MAXIMUM / PEAK INSITU - 65°C 65°C MUST NOT EXCEED LIMITS GIVEN WITHOUT SUPERINTENDENT’S PRIOR WRITTEN CONSENT: 77. SUBMIT PROPOSALS FOR CUTTING OR CORING HARDENED CONCRETE OR SAW CUT JOINTS, INCLUDING METHODS, • EF: DENOTES LOCATION TRIGGER PULL. PROVIDE BARS/THREADED RODS WITH CHAMFERED (CHISELLED) ENDS. BARS TO BE DEGREASED,
CONCRETE TEMPERATURE CONCRETE TEMPERATURE AT TIME OF DISCHARGE (°C) : MAXIMUM ELAPSED TIME (HOURS) TIMING AND SEQUENCE. 10. TO MINIMIZE TRIP HAZARDS CONSIDER MAXIMUM REINFORCEMENT BAR SPACING FOR TRAFFICABLE AREAS PRIOR TO AND FLAKY RUST REMOVED. ROTATE WHILE INSERTING TO ENSURE FULLY COATED AND PUSH FULLY INTO HOLE.
CEMENT TYPE GB GP 10-24°C : 2 HOURS 78. SAW CUT CRACK CONTROL JOINTS AS SOON AFTER CASTING AS PRACTICABLE TO AVOID SPALLING OR RAVELLING OF CASTING CONCRETE OF 200 mm. ALTERNATIVELY PROVIDE SL82 ADDITIONAL IF MAIN REINFORCEMENT SPACING IS PROTECT FROM DISTURBANCE DURING CURING. FOLLOW MANUFACTURER’S RECOMMENDATIONS.
24-27°C : 1 HOUR 30 MINUTES JOINT EDGES, AND WITHIN 16 HOURS OF CASTING TO PREVENT THERMAL AND/OR SHRINKAGE CRACKING OF SLAB. GREATER THAN 200 mm. 51. USE HILTI-HY20R OR HILTI HIT-RE500v3 ADHESIVE IN ACCORDANCE MANUFACTURER’S RECOMMENDATIONS UNO.
MINIMUM CEMENTITIOUS 100 270 270 27-30°C : 1 HOUR IMMEDIATELY AFTER SAW CUTTING FLUSH OUT JOINTS TO REMOVE SAWING RESIDUE AND INSERT A TEMPORARY 11. FOLLOWING ABBREVIATIONS APPLY TO LOCATION OF REINFORCEMENT:
CONTENT (kg/m³) 30-32°C : 45 MINUTES FOAMED PLASTIC BEAD TO KEEP JOINT CLEAN PRIOR TO FILLING OR SEALING. PROTECT SAW CUTS FROM WHEEL EW: EACH WAY FF: FAR FACE BB: BOTTOM BOTTOM (LAID FIRST)
MAXIMUM - 0.5 0.5
47. ELAPSED TIME LIMITS MAY BE VARIED IF TRIALS DEMONSTRATE USE OF SET RETARDERS (TYPE Re OR WRRe TO AS1478)
PROVIDE ADEQUATE RETENTION OF WORKABILITY FOR LONGER PERIODS AT REQUIRED TEMPERATURE. SLUMP LIMITS STILL
LOADS FOR AT LEAST ONE WEEK AFTER CUTTING.
79. DO NOT INSTALL SEALANTS IF EXPECTED MAXIMUM DAILY TEMPERATURE EXCEEDS 30 DEGREES C. ENSURE
EF: EACH FACE
NF: NEAR FACE
B: BOTTOM
T: TOP
TT: TOP TOP (LAID LAST)
C OR CP: CENTRALLY PLACED
POST-TENSIONING
WATER/CEMENTITIOUS RATIO APPLY. RETEMPERING BEYOND MAXIMUM ALLOWED DISCHARGE TIME USING WATER OR ADMIXTURES IS NOT ALLOWED. RECESSES ARE CLEAN AND DRY PRIOR TO INSTALLING FILLERS OR SEALANTS, AND PREPARE IN ACCORDANCE WITH 12. PROVIDE STANDARD COGS AND HOOKS TO AS3600. TERMINATE ENDS OF COLUMN AND BEAM LIGATURES IN A HOOK OF AT
1. WORKMANSHIP, MATERIALS, PROCEDURES AND EQUIPMENT TO COMPLY WITH AS3600.
MAX. 56 DAY DRYING - 650 650 48. USE PLACEMENT METHODS THAT WILL MINIMISE PLASTIC SETTLEMENT AND SHRINKAGE CRACKING. LIMIT VERTICAL FREE MANUFACTURER’S RECOMMENDATIONS. TOLERANCE ON SEALANT WIDTHS +5, -0 mm. LEAST 135 DEGREES. PROVIDE FIRST LIGATURE WITHIN 50 mm OF FACE OF SUPPORT.
2. PT REINFORCEMENT/RATIOS SHOWN FOR INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING
SHRINKAGE (MICROSTRAIN) FALL BY USE OF CHUTES, etc. KEEP CHUTES VERTICAL, FULL AND IMMERSED IN CONCRETE. PLACE CONCRETE IN LAYERS AND 13. COG HALF OF SLAB BOTTOM REINFORCEMENT AT EDGES TO ACHIEVE ANCHORAGE.
PRESTRESSING REINFORCEMENT REQUIRED. CONTRACTOR TO EMPLOY SPECIALIST SUB-CONTRACTOR FOR THIS
REQUIRED ADDITIVES SUPERPLASTICISER SUPERPLASTICISER BLEND SUCCEEDING LAYERS BY COMPACTION. MAINTAIN CONCRETE EDGE IN A PLASTIC STATE. PROPERLY COMPACT REINFORCEMENT COVER 14. PROVIDE ONE CONTINUOUS BAR PARALLEL TO (WITHIN 75 mm OF) CONCRETE EDGES, INCLUDING CONSTRUCTION JOINTS
WORK.
CONCRETE USING MECHANICAL VIBRATORS (AND HAND METHODS IF REQUIRED) TO REMOVE AIR BUBBLES AND GIVE MAXIMUM 80. COVER IS CLEAR DISTANCE BETWEEN ANY REINFORCEMENT (INCLUDING LIGATURES, TIE WIRE etc) AND OUTSIDE UNO.
PROJECT ASSESSMENT YES YES 3. LONG TERM DESIGN DEFLECTION LIMIT: SPAN ON 360 UNO.
COMPACTION WITHOUT SEGREGATION OF CONCRETE. TAKE CARE TO AVOID CONTACT BETWEEN VIBRATORS AND PARTIALLY SURFACE OF STRUCTURAL CONCRETE. 15. PROVIDE N12 DIAGONAL TRIMMER BARS BY 1000 mm LONG AT EACH LAYER OF REINFORCEMENT AT RE-ENTRANT
REQUIRED • INCREMENTAL DESIGN DEFLECTION LIMIT: SPAN ON 500 UNO. (max 20mm)
HARDENED CONCRETE, FORMWORK OR REINFORCEMENT. DO NOT USE VIBRATORS TO MOVE CONCRETE ALONG FORMS. 81. COVER MUST NOT BE LESS THAN SPECIFIED. PROVIDE MINIMUM CLEAR COVER TO REINFORCEMENT AS SHOWN CORNERS, OPENINGS, SERVICE PENETRATIONS etc UNO.
• LONG TERM DESIGN DEFLECTION LIMIT FOR TRANSFER BEAMS / SLABS: SPAN ON 750.
9. SUPPLEMENTARY CEMENTITIOUS MATERIALS INCLUDE AMORPHOUS SILICA FUME, FLY ASH, AND GROUND 49. DO NOT DISTURB CONCRETE ONCE INITIAL SET OCURRED. BELOW, EXCEPT WHERE SPECIFIED OTHERWISE 16. PROVIDE N12-300 DISTRIBUTION BARS LAPPED 500 WHERE NONE SHOWN ON DRAWINGS.
• INCREMENTAL DESIGN DEFLECTION LIMIT FOR TRANSFER BEAMS / SLABS: SPAN ON 750.
GRANULATED BLAST FURNACE SLAG (GGBFS OR SLAG) COMPLYING WITH AS3582. 50. OBTAIN SUPERINTENDENT’S WRITTEN APPROVAL OF PLACEMENT METHODS FOR CONCRETE ELEMENTS GREATER THAN 1500 17. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND IS NOT NECESSARILY IN TRUE PROJECTION. SET
4. TENDONS TO BE 12.7 / 15.2 mm DIAMETER RELAX 2 STRAND TO AS/NZS4672.1 WITH MINIMUM BREAKING LOAD OF 175 /
10. RHEOLOGY, WORKABILITY AND SLUMP TO BE AS REQUIRED FOR PLACEMENT (eg PUMPING, CHUTE etc), COMPACTION mm HEIGHT. LOCATION COVER (mm) REINFORCEMENT OUT AT EQUAL CENTRES IF SPACING IS NOT NOMINATED.
250 kN, MODULUS OF ELASTICITY (E) OF 195,000 MPa.
AND FINISHING. USE SUPERPLASTICISERS AND HIGH RANGE WATER REDUCERS TO AS1478 TO ACHIEVE ADEQUATE 51. KEEP ON SITE A LOG BOOK RECORDING EACH PLACEMENT OF CONCRETE INCLUDING DATE, CLIMATIC CONDITIONS, PORTION 18. CAP STARTER BARS AND OTHER REINFORCEMENT TO REDUCE RISK OF IMPALEMENT AND LACERATIONS.
5. SUPPLY STRAND IN COILS SUFFICIENTLY LARGE SO STRAND RETAINS ITS PHYSICAL PROPERTIES AND IS STRAIGHT
WORKABILITY. OF WORK, SPECIFIED GRADE AND SOURCE OF CONCRETE, DELIVERY DOCKET DATA, METHODS OF PLACEMENT AND BORED PIERS/PILES 75 19. ENSURE ALL LAID REINFORCING BARS ARE RESTRAINED BEFORE STOPPING WORK TO PREVENT BARS ROLLING
WHEN UNWOUND. PROVIDE MANUFACTURER’S TEST CERTIFICATES FOR EACH COIL. MARK STRANDS TO IDENTIFY
11. MAXIMUM SULPHATE CONTENT OF CONCRETE TO BE LESS THAN 5% BY MASS OF ACID SOLUBLE SO3 AS A COMPACTION, PROJECT ASSESSMENT CARRIED OUT, SLUMP MEASUREMENTS, VOLUME AND OTHER NOTABLE MATTERS. UNDERFOOT.
COIL NUMBER.
PERCENTAGE OF CEMENTITIOUS MATERIAL. 52. IN COLD WEATHER MAINTAIN TEMPERATURE OF FRESHLY MIXED CONCRETE WITHIN LIMITS SHOWN BELOW. “OUTDOOR” AIR 20. REINFORCEMENT TO BE SUPPLIED TO SITE PRE-BENT TO REQUIRED SHAPES. REINFORCEMENT CAGES TO BE PRE-
6. STRAND LENGTHS TO INCLUDE STRESSING ALLOWANCE AT EACH END.
12. TOTAL REACTIVE ALKALI CONTENT IN CONCRETE TO BE LESS THAN 2.8 kg/m3 Na2Oe (EQUIVALENT). TEMPERATURE IS AIR TEMPERATURE AT TIME OF MIXING, OR PREDICTED OR LIKELY AIR TEMPERATURE DURING NEXT 48 FOOTINGS, UNDERSIDE SLABS ON GROUND, etc CAST AGAINST GROUND 30 FABRICATED OFF-SITE AS FAR AS PRACTICABLE.
7. TENDON PROFILE DIMENSIONS ARE FROM SLAB SOFFIT TO UNDERSIDE OF DUCT UNO. TENDON DRAPES TO BE
13. USE CEMENTITIOUS MATERIALS LESS THAN SIX MONTHS OLD. USE BAGGED CEMENT IN ORDER OF RECEIPT. HOURS. BEFORE AND WHILE PLACING CONCRETE MAINTAIN TEMPERATURE OF FORMWORK AND REINFORCEMENT AT > 5 C. DO ON MEMBRANE 21. SECURE REINFORCEMENT IN POSITION AGAINST DISPLACEMENT AND MAINTAIN SPECIFIED CLEAR CONCRETE COVER TO
PARABOLIC UNO.
14. FOR GENERAL BLENDED CEMENT (GB) CONTAINING ORDINARY PORTLAND CEMENT PLUS AT LEAST 5% NOT USE CALCIUM CHLORIDE TO ACCELERATE SETTING TIME. DO NOT USE SALTS, CHEMICALS OR OTHER MATERIAL IN MIX TO REINFORCEMENT (INCLUDING FITMENTS) BY APPROVED CHAIRS, SPACERS, LIGATURES OR TIES AT 800 mm MAXIMUM
8. USE 19 mm RIGID GALVANIZED CORRUGATED STEEL DUCTS UNO. TAPE DUCT JOINTS TO PREVENT SLURRY INGRESS
SUPPLEMENTARY CEMENTITIOUS MATERIALS: LOWER THE FREEZING POINT OF CONCRETE. DO NOT ALLOW FROZEN MATERIALS TO ENTER MIXER. EVALUATE THE NEED FOR FOOTINGS, UNDERSIDE SLABS ON GROUND, etc CAST AGAINST 40 CENTRES EACH WAY UNO. PROVIDE ADEQUATE SUPPORT TO PREVENT DISPLACEMENT OF REINFORCEMENT BY
DURING CONCRETING.
• SILICA FUME TO BE LESS THAN 10%, OR INSULATION OF CONCRETE SURFACES. DO NOT USE HIGH ALUMINA CEMENT. FORMWORK OR BLINDING WORKMEN OR EQUIPMENT DURING CONCRETE PLACEMENT.
9. DO NOT USE GREASE TO DEBOND TENDONS.
• FLYASH TO BE LESS THAN 25%, OR 53. KEEP FORMS, MATERIALS, EQUIPMENT IN CONTACT WITH CONCRETE FREE OF FROST AND ICE. HEAT CONCRETE MATERIALS 22. SECURELY TIE REINFORCEMENT WITH WIRE TIES. TURN ENDS OF TIE WIRES INTO CONCRETE, CLEAR OF COVER ZONE.
BEAMS, SLABS - EXTERIOR 40 10. SUPPORT AND SECURE TENDONS/DUCTS AT 1000 mm MAXIMUM CENTRES. TOLERANCE ON VERTICAL POSITION OF
• GROUND GRANULATED BLAST FURNACE SLAG TO BE LESS THAN 40%. (OTHER THAN CEMENT) TO MINIMUM TEMPERATURE NECESSARY TO ENSURE TEMPERATURE OF PLACED CONCRETE IS WITHIN 23. TIE BUNDLED BARS TOGETHER SO THEY ARE IN CLOSEST POSSIBLE CONTACT WITH 2.5 mm DIAMETER WIRE AT CENTRES
TENDONS/DUCTS +/-5 mm.
FOR DOUBLE BLENDED CEMENT TOTAL SUPPLEMENTARY CEMENTITIOUS MATERIAL MUST BE LESS THAN SMALLER OF LIMITS SPECIFIED. MAXIMUM WATER TEMPERATURE: 60°C WHEN PLACED IN MIXER BEAMS, SLABS - INTERIOR 30 LESS THAN 24 TIMES DIAMETER OF SMALLEST BAR IN BUNDLE.
11. PROTECT TENDONS AND PREVENT DAMAGE. PROVIDE ACCESS PLANKS ACROSS SLAB BANDS. SUPPORT CONCRETE
PERCENTAGES GIVEN ABOVE FOR CONSTITUENTS INCLUDED. OUTDOOR AIR TEMPERATURE : TEMPERATURE OF CONCRETE 24. FOR BEAMS, TIE STIRRUPS TO BARS IN EACH CORNER OF EACH STIRRUP. FIX OTHER LONGITUDINAL BARS TO STIRRUPS AT
TOP OF SLAB - INTERIOR 20 PUMP-LINES ABOVE TENDONS/DUCTS.
FOR TRIPLE BLENDED CEMENT TOTAL SUPPLEMENTARY CEMENTITIOUS MATERIAL MUST BE LESS THAN 40%. > 5°C : 10°C MIN - 32°C MAX 1000 MAXIMUM CENTRES.
12. CONFIRM CONCRETE TRANSFER STRENGTH BY TESTING SITE-CURED CYLINDERS PRIOR TO EACH STRESSING STAGE.
15. TEST FINE AND COARSE AGGREGATES FOR POTENTIAL AGGREGATE ALKALI REACTIVITY (AAR) USING CSIRO < 5°C : 18°C MIN - 32°C MAX COLUMNS - INTERIOR 30 25. FOR EXTERNAL OR CORROSIVE APPLICATIONS USE HOT DIP GALVANIZED TIE WIRES
13. MINIMISE ECCENTRICITIES AND LATERAL EFFECTS WHEN TRANSFERRING PRESTRESS FORCES FROM TENDONS TO
ACCELERATED MORTAR BAR TEST (REFER SAA HANDBOOK HB-69 APPENDIX B3.2). ALTERNATIVELY USE ASTM C1293 54. IN HOT WEATHER PREVENT PREMATURE STIFFENING OF FRESH CONCRETE; REDUCE WATER ABSORPTION AND VAPORATION 26. SUPPORT REINFORCEMENT ON PROPRIETARY CONCRETE, METAL OR PLASTIC SUPPORTS ADEQUATE TO WITHSTAND
WALLS - INTERIOR 40 CONCRETE.
CONCRETE PRISM TEST. PETROGRAPHIC TESTING CAN PROVIDE ADDITIONAL AGGREGATE AAR RISK INFORMATION. LOSSES. MIX, TRANSPORT, PLACE AND COMPACT CONCRETE AS QUICKLY AS POSSIBLE. DURING PLACEMENT TEMPERATURE CONSTRUCTION AND TRAFFIC LOADS AND MAINTAIN DURABILITY OF FINISHED CONCRETE STRUCTURE. FOR CONCRETE
MAXIMUM JACKING FORCE TO BE 85% OF MINIMUM BREAKING LOAD.
TESTS MUST USE SAME CEMENT TYPE AS PROPOSED IN THE WORKS. OF CONCRETE MUST NOT EXCEED TEMPERATURES BELOW: WALLS - EXTERIOR 40 SURFACES WITH B2 EXPOSURE CLASSIFICATION OR GREATER, ONLY USE PROPRIETARY HIGH STRENGTH FIBRE
14. CUT ENDS OF PRESTRESSING STRAND FLUSH WITH CONCRETE, CLEAN AND PROTECT EXPOSED STRAND WITH 6 mm
16. ADMIXTURES TO COMPLY WITH AS1478. ADMIXTURES MUST NOT REDUCE STRENGTH OF CONCRETE BELOW CONCRETE ELEMENT : TEMPERATURE LIMIT ELSEWHERE 50 REINFORCED CEMENT SPACER BLOCKS OR SUPPORTS.
APPROVED EPOXY.
SPECIFIED VALUE. ADMIXTURES MUST NOT CONTAIN CALCIUM CHLORIDE UNREINFORCED CONCRETE IN SECTIONS ≥1 METRE EACH DIMENSION : 27°C 27. ENSURE REINFORCEMENT CAGES ARE ELECTRICALLY CONTINUOUS UNO.
15. PRESSURE GROUT DUCTS AS SOON AS PRACTICABLE AFTER STRESSING RECORDS APPROVED.
USE ADMIXTURES IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. CONCRETE ADMIXTURES SHALL CONCRETE f'c ≥ 40 MPa IN SECTIONS ≥ 500mm THICKNESS : 27°C 28. DO NOT PLACE OR MOVE REINFORCEMENT DURING OR AFTER CONCRETE PLACEMENT.
16. GROUT FOR DUCTS TO HAVE WATER:CEMENT RATIO ≤ 0.5 TO AS3600 CLAUSE 19.1.8.
NOT ENHANCE CORROSION OF REINFORCEMENT, NOR BE DETRIMENTAL TO CONCRETE OR STEEL DURING EXPECTED CONCRETE IN FOOTINGS, BEAMS, COLUMNS, WALLS AND SLABS f'C ≤ 32 MPA : 32°C 82. PROVIDE 50 mm BLINDING CONCRETE UNDER STRUCTURAL REINFORCED CONCRETE CAST ON GROUND UNO. 29. ENSURE EMBEDDED ITEMS (INSERTS, THREADED SOCKETS, FERRULES, BOLTS, DISSIMILAR METAL ITEMS, etc) IN COVER
17. AFTER GROUTING DUCTS REMOVE TEMPORARY SEALS AND FILL STRESSING RECESSES AND POCKETS WITH WELL
LIFE OF STRUCTURE. DO NOT USE CHEMICAL ADMIXTURES OR OTHER MATERIALS WITHOUT SUPERINTENDENT’S ELSEWHERE : 32°C CONCRETE OR EXPOSED TO AIR ARE NOT IN CONTACT WITH REINFORCEMENT. PROVIDE ISOLATION BETWEEN DISSIMILAR
VIBRATED STIFF CONCRETE; f’C=40 MPa, 40 mm SLUMP.
WRITTEN APPROVAL. DO NOT MIX CONCRETE WHEN SURROUNDING OUTDOOR SHADE TEMPERATURE ≥ 38°C. DURABILITY & PROTECTIVE COATINGS METALS, AND BETWEEN REINFORCEMENT AND EXPOSED ITEMS.
18. PROVIDE VISUAL INDICATING STRIPS TO ALL POST-TENSIONED SLAB STRUCTURE SOFFITS SHOWING PLAN LOCATION
17. MAXIMUM ACID SOLUBLE CHLORIDE ION CONTENT IS 0.4 kg/m3 OF CONCRETE. DO NOT USE STRONGLY IONIZED SALTS. MAINTAIN TEMPERATURE OF FORMWORK AND REINFORCEMENT AT ≤ 32°C BEFORE AND DURING PLACING. COOL 83. APPLY TWO COATS OF DECORATIVE / ANTI-CARBONATION COATING TO ALL EXPOSED CONCRETE SURFACES IN 30. OBTAIN SUPERINTENDENT’S APPROVAL OF INSERTS, FIXINGS AND OTHER ITEMS EMBEDDED IN COVER CONCRETE.
OF POST-TENSIONED DUCTS.
18. DO NOT ADD WATER TO CONCRETE AFTER TRUCK HAS LEFT BATCHING PLANT. REINFORCEMENT AND FORMWORK AS REQUIRED. MAINTAIN SPECIFIED TEMPERATURE OF PLACED CONCRETE BY: ACCORDANCE WITH MANUFACTURER’S REQUIREMENTS TO ACHIEVE UNIFORM COLOUR AND TEXTURE AND A 31. DO NOT WELD REINFORCEMENT, CAST-IN ITEMS etc UNLESS APPROVED UNO.
EMBEDDED FIXTURES (INSERTS, THREADED SOCKETS, FERRULES, BOLTS, STAINLESS REINFORCING etc) WITHIN
19. MIX CONCRETE TO ENSURE UNIFORM DISTRIBUTION OF CONSTITUENTS. • PLACING CONCRETE WHEN AMBIENT TEMPERATURE IS LOW (AT NIGHT) CONSISTENT OVERALL APPEARANCE. COATING TO SATISFY THE FOLLOWING: 32. SPLICE REINFORCEMENT ONLY AT LOCATIONS SHOWN ON DRAWINGS OR AS APPROVED BY SUPERINTENDENT. STAGGER
COVER CONCRETE OR EXPOSED TO AIR MUST NOT BE IN CONTACT WITH REINFORCING STEEL. PROVIDE ISOLATING
20. SPRAYED CONCRETE TO COMPLY WITH CONCRETE INSTITUTE OF AUSTRALIA’S REFERENCE SPECIFICATION (REFER • COOL CONCRETE USING LIQUID NITROGEN INJECTION BEFORE PLACING, OR • EQUIVALENT AIR LAYER THICKNESS (R) OF 150 m LAPS WHERE POSSIBLE. LAPPED SPLICE LENGTHS TO COMPLY WITH AS3600. CLEAR SPACING BETWEEN LAPPED BARS TO
STRIPS BETWEEN DISSIMILAR STEELS AND TO SEPARATE EXPOSED FIXTURES.
APPENDIX A OF “RECOMMENDED PRACTICE SPRAYED CONCRETE”). • COVER CONTAINER IN WHICH CONCRETE IS TRANSPORTED TO FORMS, OR • EQUIVALENT THICKNESS OF CONCRETE (SC) OF 450 mm BE LESS THAN THREE TIMES BAR DIAMETER. WHERE BAR SIZES VARY USE LAPPED SPLICE LENGTH FOR SMALLER BAR
• SHADING AND SPRAYING COARSE AGGREGATE USING COLD WATER, OR • CO2 DIFFUSION COEFFICIENT OF 2 x 10-7 cm²/s DIAMETER.
DELIVERABLES
CONCRETE TESTING • USE CHILLED MIXING WATER. • WATER VAPOUR EQUIVALENT AIR LAYER THICKNESS OF LESS THAN 4 m 33. LAPPED SPLICE LENGTHS FOR HORIZONTAL BARS WITH MORE THAN 300 mm CONCRETE CAST BELOW THE BAR AND
19. PRESTRESSING TO BE DESIGNED TO AS3600 BY A SUITABLY QUALIFIED CHARTERED ENGINEER REGISTERED WITH
21. TEST SLUMP OF EACH BATCH OF CONCRETE DELIVERED BEFORE PLACING CONCRETE FROM THAT DELIVERY. SLUMP 55. FOR CONCRETE ELEMENTS GREATER THAN 500 mm THICK THAT MAY EXCEED THE MAXIMUM PEAK TEMPERATURE, OR • WATER ACRYLIC BASED, SOLVENT FREE SPACED AT ≥ 150 mm CENTRES TO COMPLY WITH THE FOLLOWING UNO:
NATIONAL ENGINEERING REGISTER (NER) OF ENGINEERS AUSTRALIA. PROVIDE WORKSHOP DRAWINGS AND DESIGN
MEASURED TO BE NO GREATER THAN TARGET SLUMP WITHIN TOLERANCES GIVEN IN AS1379 CLAUSE 5.2.3. MAXIMUM TEMPERATURE DIFFERENTIAL, OR ARE LIQUID RETAINING OR LIQUID EXCLUDING: UNDERTAKE A CONCRETE EARLY • DRY FILM THICKNESS OF AT LEAST 150 µm
CALCULATIONS.
CONCRETE OUTSIDE SLUMP TOLERANCE LIMITS IS LIABLE TO REJECTION. AGE THERMAL / RESTRAINT AND SHRINKAGE CRACK RISK ASSESSMENT (ie WILL CRACKS FORM AND WHAT WIDTH), AND SUBMIT • COLOUR TO VICROADS APPROVAL COVER f'c N12 N16 N20 N24 N28 N32 20. SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS; REFER GENERAL–DELIVERABLES NOTES. DESIGN
22. REGISTER PROJECT FOR DISSEMINATION OF CONCRETE PRODUCTION ASSESSMENT INFORMATION. MANUFACTURER TO SUPERINTENDENT FOR APPROVAL AT LEAST FOUR WEEKS PRIOR TO DELIVERY OF CONCRETE. ASSESSMENT TO ALLOW PREPARE SURFACES TO SECTION 686.06 OF VICROADS STANDARD SPECIFICATION FOR ROADWORKS AND
CALCULATIONS/SHOP DRAWINGS TO SHOW: MARKING PLAN, ARRANGEMENT OF MEMBERS, LOCATION OF MEMBERS IN
TO CARRY OUT PRODUCTION ASSESSMENT OF CONCRETE FOR COMPLIANCE WITH REQUIREMENTS OF AS1379. FOR: CEMENT TYPE AND CONTENT, METHOD OF CONSTRUCTION, ELEMENT TYPE (PILE CAP, PIER, BEAM, FLOOR, ROOF etc), BRIDGEWORKS. ≥ 25 ≥ 20 770 1150 1570 - - - BUILDING, LOADING PARAMETERS ASSUMED, MATERIAL PROPERTIES AND DESIGN STRESSES, SIZE OF EACH MEMBER,
23. CARRY OUT PROJECT ASSESSMENT OF CONCRETE TO AS1379 CLAUSE 6.4 AND 6.5. TAKE SAMPLES AT PROJECT SITE RESTRAINT BY PRIOR CAST CONCRETE, CONCRETE SHRINKAGE AND STRAIN, REINFORCEMENT RATIOS, BAR DIAMETER AND 84. APPLY ANTI-GRAFFITI COATING TO ALL EXPOSED CONCRETE SURFACES IN ACCORDANCE WITH MANUFACTURER’S
≥ 40 ≥ 25 630 980 1350 1740 - - PRESTRESSING STRAND NUMBERS AND DRAPE DIMENSIONS, TOLERANCES, STRESSING FORCES, STAGES AND
AT POINT OF DISCHARGE FROM AGITATOR. SPREAD SAMPLING EVENLY THROUGH POUR. SAMPLE CONCRETE FOR SPACING, CONCRETE THICKNESS, WIDTH AND LENGTH, TEMPERATURE OF ADJACENT CONCRETE, ENVIRONMENTAL REQUIREMENTS, SYSTEM PSL1 OF AS/NZS2312 TABLE 6.3 USING AN EPOXY PRIMER CONFORMING WITH AS/NZS3750.9
PROCEDURES, ASSUMED LOSSES FOR SHRINKAGE, CREEP, RELAXATION AND DRAW-IN, EXPECTED DEFORMATIONS,
PROJECT ASSESSMENT CONCURRENTLY WITH EACH SAMPLE TAKEN FOR PRODUCTION ASSESSMENT AT PROJECT CONDITIONS, TIME OF YEAR, TIME OF DAY, CONCRETE CASTING TEMPERATURE, CONCRETE SURFACE INSULATION, FORMWORK AND RECOMMENDED FOR APPLICATION OVER CONCRETE BY THE MANUFACTURER. ≥ 40 ≥ 32 510 770 1100 1440 1810 2220 ANCHORAGE DETAILS etc.
SITE. FOR EACH CONCRETE DESIGN MIX TAKE ONE SAMPLE FROM EACH 25 CUBIC METRES OF CONCRETE DELIVERED STRIPPING TIME, AND ALL OTHER MATTERS INFLUENCING CONCRETE TEMPERATURE AND RESTRAINT. 85. SUBMIT DETAILS OF ALL PROPOSED CONCRETE COATINGS TO SUPERINTENDENT FOR REVIEW.
≥ 50 ≥ 40 460 630 890 1200 1530 1890 21. PROVIDE CERTIFICATION OF COMPLIANCE WITH AS/NZS4672.1 FOR ALL PRESTRESSING TENDONS.
PER DAY, NOT LESS THAN FIVE SAMPLES TOTAL FOR EACH MIX DESIGN. EACH SAMPLE TO COMPRISE FOUR 56. PROTECT FRESH CONCRETE FROM PREMATURE DRYING - PARTICULARLY IN HOT, WINDY OR DRY (LOW HUMIDITY) CONDITIONS,
22. PROVIDE SAMPLES OF PRESTRESSING STRAND FOR TESTING IF REQUESTED.
CYLINDERS: TEST TWO AT 7 DAYS AND TWO AT 28 DAYS. NOTIFY SUPERINTENDENT WITHIN 2 WORKING DAYS IF 7 DAY EXCESSIVELY HOT OR COLD TEMPERATURES, RAIN, etc. PROVIDE WIND BREAKS. MAINTAIN CONCRETE AT A REASONABLY DELIVERABLES
23. PROVIDE RESULTS OF STRESSING EXTENSIONS TO SUPERINTENDENT FOR APPROVAL IMMEDIATELY AFTER
CONCRETE TEST RESULTS INDICATE 28 DAY STRENGTHS ARE LIKELY TO BE BELOW SPECIFIED STRENGTH. CONSTANT TEMPERATURE WITH MINIMUM MOISTURE LOSS FOR CURING PERIOD. 86. SUBMIT NAMES AND CONTACT DETAILS OF PROPOSED CONCRETE SUBCONTRACTORS. DO NOT INTERPOLATE INTERMEDIATE VALUES OF SPLICE LENGTHS.
STRESSING. OBTAIN SUPERINTENDENT’S APPROVAL OF FINAL STRESSING BEFORE GROUTING DUCTS.
24. FOR TYPE LH CEMENT EACH SAMPLE TO COMPRISE FOUR CYLINDERS: TEST ONE AT 7 DAYS AND TWO AT 28 DAS AND 57. FOR CONCRETE WITH WATER:CEMENT RATIO LESS THAN 0.5, IN HOT, WINDY OR DRY (LOW HUMIDITY) CONDITIONS SPRAY 87. AT LEAST ONE WEEK PRIOR TO CONCRETE PLACEMENT SUBMIT DETAILS OF PROPOSED READY MIXED CONCRETE LAPPED SPLICE LENGTHS FOR BARS IN COLUMNS REFER TO DETAILS OR SUPERINTENDENT.
ONE AT 56 DAYS. EXPOSED SURFACES OF FRESH CONCRETE WITH FOG SPRAY APPLICATION OF ALIPHATIC ALCOHOL RETARDANT IMMEDIATELY SUPPLIER, NAME OF CONCRETE DELIVERY SUPERVISOR, LOCATION OF BATCHING PLANT, CONCRETE MIX DESIGNS, EPOXY COATED BARS, BARS IN LIGHTWEIGHT CONCRETE AND SLIP FORMED CONCRETE WILL REQUIRE LONGER SPLICE
25. CARRY OUT DRYING SHRINKAGE TESTING TO AS1012.13. FOR EACH CONCRETE DESIGN MIX TAKE ONE SAMPLE EVERY AFTER PLACEMENT TO REDUCE RISK OF PLASTIC SHRINKAGE CRACKING. IN SEVERE CLIMATIC CONDITIONS CONSIDER METHOD OF CONCRETE TEMPERATURE CONTROL, MIXING, HANDLING, TRANSPORT, PUMPING, PLACEMENT, LENGTHS. REFER TO AS3600 OR SUPERINTENDENT
THREE MONTHS, OR FOR EVERY 1000 m3 OF CONCRETE PLACED, A MINIMUM OF ONE SAMPLE. EACH SAMPLE TO REVIBRATING CONCRETE BEFORE IT REACHES INITIAL SET. COMPACTION, FINISHING, PROTECTION AND CURING, SEQUENCE AND TIMES FOR CONCRETE POURS, CONSTRUCTION 34. LAPPED SPLICE LENGTHS FOR VERTICAL BARS (AND HORIZONTAL BARS WITH LESS THAN 300 mm CONCRETE CAST BELOW
COMPRISE THREE SPECIMENS. SAMPLE CONCRETE AT PROJECT SITE, DIRECTLY FROM DELIVERY VEHICLE. BASE 58. COMMENCE CURING OF CONCRETE TO AS3600 AS SOON AS POSSIBLE AFTER PLACING AND FINISHING OR STRIPPING, AND JOINT LOCATIONS AT LEAST ONE WEEK PRIOR TO DELIVERY OF CONCRETE FOR SUPERINTENDENT’S APPROVAL. THE BAR) AND SPACED AT ≥ 150 mm CENTRES TO COMPLY WITH THE FOLLOWING UNO:
ASSESSMENT ON AVERAGE OF THREE TEST RESULTS. WITHIN ONE HOUR. ENSURE EXPOSED SURFACES ARE NOT STAINED. ACCEPTABLE METHODS OF CURING INCLUDE: NOMINATE FOR EACH MIX DESIGN THE SOURCE, TYPE AND PROPORTIONS OF CONSTITUENTS, AGGREGATE
26. CONCRETE SAMPLING AND TESTING TO BE BY AN APPROVED INDEPENDENT NATA REGISTERED LABORATORY. • RETENTION OF FORMWORK GRADINGS AND SATURATED SURFACE-DRY DENSITIES, ADDITIVES AND ADMIXTURES, MAXIMUM WATER CONTENT AND COVER f'c N12 N16 N20 N24 N28 N32
• PONDING OR CONTINUOUS SPRINKLING WITH WATER (MOIST CURING) MAXIMUM WATER:CEMENT RATIO, TARGET SLUMP, TARGET CHARACTERISTIC STRENGTH (f’c), AND TARGET DRYING
FORMWORK • AN IMPERMEABLE MEMBRANE (USE CLEAR, WHITE OR LIGHT COLOURED PLASTIC IN HOT CONDITIONS) SEALED AROUND SHRINKAGE. ≥ 25 ≥ 20 590 890 1210 - - -
27. RESPONSIBILITY FOR DESIGN, CERTIFICATION, CONSTRUCTION AND PERFORMANCE OF FORMWORK AND FALSEWORK EDGES 88. PROVIDE DOCUMENTARY EVIDENCE OF PREVIOUS PERFORMANCE AND RELEVANT TEST RESULTS OF MIX DESIGN
LIES WITH CONTRACTOR. • AN ABSORPTIVE COVER KEPT CONTINUOUSLY WET AND COVERED BY IMPERMEABLE MEMBRANE TARGETS, INCLUDING 3, 7 AND 28 DAY COMPRESSIVE STRENGTHS, CHARACTERISTIC STRENGTH, TEMPERATURE RISE, ≥ 40 ≥ 25 490 750 1040 1340 - -
28. FORMWORK TO BE DESIGNED BY A SUITABLY QUALIFIED CHARTERED ENGINEER REGISTERED WITH BUILDING • STEAM CURING DRYING SHRINKAGE, LIMITS OF SOLUBLE SALTS AND ALKALI AGGREGATE REACTIVITY etc, BEING CERTIFIED TEST ≥ 40 ≥ 32 390 600 840 1110 1400 1710
PRACTITIONERS BOARD OF VICTORIA (RBP), REGISTERED PROFESSIONAL ENGINEER OF QUEENSLAND (RPEQ), • AN APPROVED CURING COMPOUND. PROVIDE: RESULTS MADE ON AT LEAST TWO SEPARATE SAMPLES FROM A NATA REGISTERED LABORATORY EITHER:
≥ 50 ≥ 40 350 480 690 920 1180 1450
CERTIFYING STRUCTURAL ENGINEER (BUILDING PRACTITIONERS BOARD) NORTHERN TERRITORY, OR NATIONAL • EFFICIENCY INDEX • ON CONCRETE OF SAME MIX DESIGN (IN RESPECT OF ALL DETAILS TO BE NOMINATED ABOVE) OF SIMILAR GRADE
ENGINEERING REGISTER (NER) OF ENGINEERS AUSTRALIA TO AS3610, AND INDEPENDENTLY CERTIFIED BY A • CERTIFIED TEST RESULTS FOR WATER RETENTION TO AS3799 APPENDIX B MADE UNDER PRODUCTION CONDITIONS IN SIMILAR PLANT WITHIN LAST SIX MONTHS, OR NOT APPLICABLE FOR BARS IN COLUMNS.
CHARTERED ENGINEER EXPERIENCED IN FORMWORK DESIGN AND REGISTERED WITH BUILDING PRACTITIONERS • EVIDENCE THAT AN ACCEPTABLE FINAL SURFACE COLOUR WILL BE OBTAINED • ON PRELIMINARY TESTS FROM LABORATORY OR PLANT TRIALS OF PROPOSED MIX. DO NOT INTERPOLATE INTERMEDIATE VALUES OF SPLICE LENGTHS.
BOARD OF VICTORIA (RBP), REGISTERED PROFESSIONAL ENGINEER OF QUEENSLAND (RPEQ), CERTIFYING • EVIDENCE OF COMPATIBILITY WITH CONCRETE AND APPLIED FINISHES (IF ANY) 89. USE READY MIXED CONCRETE MIXED BY BATCH PRODUCTION PROCESS DELIVERED IN AGITATING TRUCKS. FOR LAPPED SPLICE LENGTHS FOR BARS IN COLUMNS REFER TO DETAILS OR SUPERINTENDENT.
STRUCTURAL ENGINEER (BUILDING PRACTITIONERS BOARD) NORTHERN TERRITORY, OR NATIONAL ENGINEERING • METHODS OF OBTAINING REQUIRED ADHESION FOR TOPPINGS, RENDER etc. EACH BATCH SUPPLY A DOCKET LISTING INFORMATION REQUIRED BY AS1379 CLAUSE 1.7.3 AND FOLLOWING: EPOXY COATED BARS, BARS IN LIGHTWEIGHT CONCRETE AND SLIP FORMED CONCRETE WILL REQUIRE LONGER SPLICE
REGISTER (NER) OF ENGINEERS AUSTRALIA. PROVIDE COPY OF DESIGN CALCULATIONS AND CERTIFICATION TO • UNIFORM CONTINUOUS FLEXIBLE COATING WITHOUT VISIBLE BREAKS OR PINHOLES, WHICH REMAINS UNBROKEN FOR • SERIAL NUMBER OF IDENTIFICATION CERTIFICATES OF EACH BATCH LENGTHS. REFER TO AS3600 OR SUPERINTENDENT.
SUPERINTENDENT. DESIGN FORMWORK TO ACCOMMODATE DIMENSIONAL CHANGES AND MOVEMENTS RESULTING AT LEAST THE CURING PERIOD AFTER APPLICATION. • TIME OF BATCHING 35. REINFORCEMENT SPLICES IN TENSION MEMBERS MUST BE WELDED OR MECHANICAL SPLICES.
FROM IMPOSED ACTIONS, CONCRETE SHRINKAGE AND CREEP, TEMPERATURE CHANGES, PRESTRESSING FORCES, 59. DO NOT USE WAX-BASED OR CHLORINATED RUBBER-BASED CURING COMPOUNDS ON SURFACES FORMING SUBSTRATES TO • NAME OF CONCRETE DELIVERY SUPERVISOR 36. ENSURE REINFORCEMENT COUPLERS PROVIDE FULL TENSION CAPACITY OF REINFORCEMENT.
etc.. APPLIED FINISHES, CONCRETE TOPPINGS AND CEMENT BASED RENDER. • ELEMENT FOR WHICH CONCRETE WAS ORDERED AND WHERE IT WAS PLACED 37. LAY MESH REINFORCEMENT SO THAT MINIMUM COVER IS TO MAIN WIRES UNO.
29. PROVIDE BEAMS WITH AN UPWARDS PRECAMBER AS SHOWN ON DRAWINGS. 60. CURE CONTINUOUSLY UNTIL NUMBER OF DAYS DURING WHICH AIR TEMPERATURE IS ABOVE 10°C TOTALS: • METHOD OF PLACEMENT AND CLIMATIC CONDITIONS DURING POUR 38. PROVIDE MINIMUM MESH LAPS TO CROSS WIRES OF REINFORCING MESH, SO TWO OUTERMOST WIRES OF ONE SHEET
30. DO NOT SUPPORT OR RESTRAIN FORMWORK ON PERMANENT WORKS WITHOUT SUPERINTENDENT’S WRITTEN • 3 DAYS FOR EXPOSURES CLASSIFICATION A1 AND A2 • PROJECT ASSESSMENT CARRIED OUT OVERLAP TWO OUTERMOST WIRES OF ADJACENT SHEET BY AT LEAST 25 mm, THUS:
APPROVAL. • 7 DAYS FOR EXPOSURE CLASSIFICATION B1, B2 AND C. • TOTAL AMOUNT OF WATER REQUIRED BY MIX DESIGN RECTANGULAR MESHES 225 END LAP 125 SIDE LAP
31. CONSTRUCT FORMWORK TO COMPLY WITH AS3610 AND CLAUSE 17.6 OF AS3600 WHERE THIS IS MORE STRINGENT SO 61. PREVENT RAPID DRYING OUT AT END OF CURING PERIOD. • ADMIXTURES TYPE AND QUANTITY SQUARE MESHES SL102 TO SL42 225 END LAP 225 SIDE LAP
CONCRETE WILL HAVE DIMENSIONS, SHAPE, LOCATION AND FINISH SPECIFIED. 62. FINISH CONCRETE SURFACES TO AS3610 AND AS SHOWN BELOW: • TOTAL AMOUNT OF WATER ADDED AT PLANT SL81 125 END LAP 125 SIDE LAP
32. PROVIDE OPENINGS OR REMOVABLE PANELS IN FORMWORK FOR INSPECTION AND CLEANING. • FORMED SURFACES: • TOTAL FREE WATER IN CONCRETE, INCLUDING THAT ADDED AT SLUMP STAND. TRENCH MESH 500 END LAP N/A
33. APPLY RELEASE AGENT COMPATIBLE WITH CONTACT SURFACES TO INTERIOR OF FORMWORK (EXCEPT WHERE • EXPOSED SURFACES - CLASS 2 SUPERINTENDENT MAY NOT REQUIRE CONCRETE TRIAL MIX TESTS SUBJECT TO REVIEW OF PRODUCTION TEST USE LAP LENGTHS BASED ON LARGEST WIRE SPACING. DO NOT LAP MORE THAN THREE SHEETS AT ANY ONE POINT.
CONCRETE IS TO RECEIVE AN APPLIED FINISH FOR WHICH THERE IS NO COMPATIBLE RELEASE AGENT). WHERE • HIDDEN SURFACES - CLASS 3 RESULTS. 39. ALTERNATIVELY USE N12 SPLICE BARS TO LAP ADJACENT SHEETS OF MESH, SPACING OF SPLICE BARS TO MATCH
NECESSARY CLEAN REINFORCEMENT TO REMOVE TRACES OF RELEASE AGENT. • FINISHES AS LAID: 90. SUBMIT DETAILS OF ALL PROPOSED CONCRETE COATINGS TO SUPERINTENDENT FOR REVIEW. SPACING OF BARS IN MESH, SPLICE BARS TO OVERLAP MESH BY 750 mm MINIMUM UNO.
• EXPOSED SURFACES STEEL TROWEL UNO 91. PROVIDE RECORD OF SLUMP TESTING TO SUPERINTENDENT. REFER CONCRETE TESTING NOTES. 40. SPLICE TRENCH MESH BY A LAP OF 750 mm MINIMUM UNO. AT T- AND L-INTERSECTIONS, CONTINUE TRENCH MESH FULL
• HIDDEN SURFACES WOOD FLOAT 92. FORWARD CONCRETE PRODUCTION ASSESSMENT INFORMATION TO SUPERINTENDENT AS PER AS1379 CLAUSE 6.4 WIDTH OF INTERSECTION. AT L-INTERSECTIONS PROVIDE AN N12 L BAR TO LAP 750 mm WITH OUTSIDE BARS UNO.
63. STEEL TROWEL FINISH: AFTER MACHINE FLOATING, USE POWER TROWELS TO PRODUCE SMOOTH SURFACES FREE OF WHEN PRODUCTION ASSESSMENT IS UNDERTAKEN. REFER CONCRETE TESTING NOTES. 41. DO NOT WELD REINFORCEMENT UNLESS SHOWN ON DRAWINGS OR OTHERWISE APPROVED BY SUPERINTENDENT. WHERE
DEFECTS. WHEN SURFACE HAS HARDENED SUFFICIENTLY, USE STEEL HAND TROWELS TO PRODUCE FINAL CONSOLIDATED 93. FORWARD CONCRETE PROJECT ASSESSMENT INFORMATION TO SUPERINTENDENT AS PER AS1379 CLAUSE 6.3 WHEN ALLOWED, WELDING OF REINFORCEMENT (INCLUDING TACK-WELDING FOR FIXING PURPOSES) TO COMPLY WITH AS3600
FINISH FREE OF TROWEL MARKS, OF UNIFORM IN TEXTURE AND APPEARANCE, MAXIMUM DEVIATION FROM 3 m STRAIGHT EDGE PROJECT ASSESSMENT IS UNDERTAKEN. REFER CONCRETE TESTING NOTES. AND AS/NZS1554.3. DO NOT WELD REINFORCEMENT WITHIN 75 mm OF A SECTION THAT HAS BEEN BENT (100 mm FOR N28
IS LESS THAN 3 mm. 94. REPORT DRYING SHRINKAGE TESTING RESULTS TO SUPERINTENDENT. REFER CONCRETE TESTING NOTES. AND N32 BARS, 125 mm FOR N36 BARS).
64. INSTALL BRITTLE FINISHES (eg TILES etc), JOINT FILLERS AND SEALANTS A MINIMUM OF 2 MONTHS AFTER CASTING CONCRETE. 95. PROVIDE CONCRETE TEST RESULTS TO SUPERINTENDENT PROMPTLY, WITHIN SEVEN DAYS OF TESTING. EXTENT OF WELD INSPECTION/TESTING TO BE:
USE A FLEXIBLE TILE GROUT AND WEAK TILE MORTAR. 96. SUBMIT DETAILS OF PROPOSED COATINGS AND RELEVANT TEST CERTIFICATES FOR SUPERINTENDENT’S REVIEW 28 • VISUAL SCANNING 100% OF WELDS
65. BEAM SIZES ARE DESIGNATED DEPTH (INCLUDING SLAB, IF ANY) x WIDTH. PLACE CONCRETE IN SLABS AT SAME TIME AS BEAMS DAYS PRIOR TO APPLICATION. TESTING TO BE BASED ON KLOPFER CRITERIA FOR ANTI-CARBONATION COATINGS AND • VISUAL EXAMINATION 50% OF WELDS
INTEGRAL WITH THEM. SIZES OF CONCRETE ELEMENTS DO NOT INCLUDE THICKNESS OF APPLIED FINISHES OR BLINDING. FICK’S LAW OF DIFFUSION. • RADIOGRAPHIC OR ULTRASONIC 5% OF FILLET WELDS AND 100% OF BUTT WELDS.
66. PROVIDE EXPOSED EDGES AND RE-ENTRANT CORNERS WITH 45 DEGREES x 25 mm CHAMFERS OR FILLETS UNO 42. DO NOT BEND OR STRAIN REINFORCEMENT IN A WAY THAT MAY CAUSE DAMAGE. BEND DIAMETERS TO BE TO AS3600.
67. PROVIDE AN UPWARDS PRECAMBER AS SHOWN ON DRAWINGS. BARS TO BE BENT COLD UNO. GRADE 250 BARS MAY BE BENT AT TEMPERATURES UP TO 850°C. DO NOT COOL HEATED
BARS BY QUENCHING.
DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE
ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STRUCTURAL NOTES SHEET 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1:1 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-003
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-003 A
STEEL MASONRY PRECAST CONCRETE
1. WORKMANSHIP AND MATERIALS TO COMPLY WITH AS4100, AS/NZS4600, AS/NZS1554 AND AS4673 FOR STAINLESS STEEL. DURABILITY & PROTECTIVE COATINGS 1. MASONRY WORK TO BE TO AS3700 AND AS/NZS4455. 1. COMPLY WITH REQUIREMENTS OF AS3850 PREFABRICATED CONCRETE ELEMENTS CODE, NATIONAL CONSTRUCTION
2. PROVIDE STEEL IN ACCORDANCE WITH: 41. HOT DIP GALVANIZE HANDRAILS, LADDERS AND STEP IRONS etc TO AS/NZS4680. PROVIDE STAIRS, LADDERS, PLATFORMS, 2. CONSTRUCT MASONRY COMPLETE WITH BED JOINT REINFORCEMENT, FLEXIBLE MASONRY ANCHORS, WALL TIES, FIXING STRAPS etc TO CODE (NCC), CONCRETE NOTES AND SPECIFICATION.
• AS1163 GRADE C350 OR C450 FOR RECTANGULAR AND SQUARE HOLLOW SECTIONS, WALKWAYS AND HANDRAILS, etc TO AS1657. AS/NZS2699. USE ONLY R4 GRADE 316 OR 316L STAINLESS STEEL, OR R3 HOT DIP GALVANIZED TO AS/NZS4680 WITH MINIMUM COATING 2. PRECAST CONCRETE UNITS HAVE BEEN DESIGNED FOR INSTALLED CONDITIONS ONLY.
• AS1163 GRADE C250 OR C350 FOR CIRCULAR HOLLOW SECTIONS, AS NOTED ON DRAWINGS| 42. PRIME CONCRETE ENCASED STEELWORK IN ACCORDANCE WITH SPECIFICATION AND WRAP WITH FGW 41 MESH WITH 20 mm MASS OF 470 g/m2 EACH FACE 3. PRECAST UNITS AND CONNECTIONS HAVE NOT BEEN DESIGNED FOR VEHICLE IMPACT.
• AS1397 GRADE G450 FOR PURLINS AND GIRTS, MINIMUM COVER. ENCASEMENT TO BE 50 mm MINIMUM. THICKNESS OF ENCASEMENT FOR FIRE PROTECTION TO BE AS 3. ENSURE WALLS WHICH RELY ON FLOORS FOR STABILITY ATTAIN SUFFICIENT STRENGTH BEFORE NEXT LEVEL IS COMMENCED. 4. PRECAST UNITS TO BE SUPPLIED BY A SPECIALIST SUB-CONTRACTOR.
• AS1443 COLD-FINISHED BARS, DETAILED. PROVIDE 75 mm ENCASEMENT FOR STEEL IN GROUND. WHERE PAINTED STEELWORK IS PARTLY ENCASED IN 4. USE GRADE 20 CONCRETE BLOCKS ie MINIMUM CHARACTERISTIC UNCONFINED COMPRESSIVE STRENGTH (Cu)= 20 MPa TO AS/NZS4455 5. SUPPLIER TO DESIGN PRECAST CONCRETE UNITS, PROPS, CONNECTIONS, FIXING DETAILS AND JOINTS etc TO
• AS/NZS1594 GRADE 250 HOT-ROLLED STEEL FLAT PRODUCTS, CONCRETE EXTEND WHOLE PAINT SYSTEM 50 mm INTO CONCRETE. UNO AND OF DIMENSIONAL CATEGORY DW4 TO AS/NZS4455. PROVIDE SATISFACTORY PERFORMANCE FOR STABILITY, FIRE RESISTANCE (WHERE REQUIRED AS NOTED IN
• AS/NZS3678 FOR PLATES AND FLOOR PLATE, 43. AFTER COMPLETION OF FABRICATION, PREPARATION FOR SURFACE TREATMENT TO BE: ROUND OFF ROUGH WELDS, SHARP 5. USE SOLID BRICKS WITH MINIMUM CHARACTERISTIC COMPRESSIVE STRENGTH OF 30 MPa AND DIMENSIONAL CATEGORY DW1 TO DRAWINGS), SERVICEABILITY AND STRENGTH REQUIREMENTS DURING MANUFACTURE, STRIPPING, HANDLING,
• AS/NZS3679 PART 2, GRADE 300 FOR WELDED BEAMS AND WELDED COLUMNS, AS/NZS3679 PART 1 GRADE 300 OR BHP EDGES (2 mm RADIUS) etc. SURFACE TO BE FREE OF WELDING SPATTER, SLAG, UNDERCUTS, VISIBLE PORES PITS AND CRATERS, AS/NZS4455 AND AS/NZS4456. DO NOT LAY CLAY BRICKS UNTIL THEY HAVE BEEN OUT OF KILN FOR AT LEAST 14 DAYS. LIFTING, STACKING, TRANSPORT, ERECTION AND INSTALLATION OPERATIONS. PROVIDE TEMPORARY PROPPING AND
GRADE 300 PLUS FOR UNIVERSAL BEAMS, UNIVERSAL COLUMNS, PARALLEL FLANGE CHANNELS, ANGLES, FLATS, BARS VISIBLE SLIVERS, ROLL-OVERS, LAMINATIONS, ROLLED-IN EXTRANEOUS MATTER, GROOVES (RADIUS OF GOUGES TO BE LESS 6. COLOUR AND TEXTURE OF MASONRY UNITS TO BE WITHIN AN AGREED RANGE. MASONRY UNITS TO BE RESISTANT TO SALT ATTACK. ADDITIONAL REINFORCEMENT AS REQUIRED.
AND RODS, THAN 4 mm), INDENTATIONS, ROLL MARKS, BURRS, ARISES, CRACKS, etc. PREPARE WELDS, EDGES AND OTHER AREAS WITH MAXIMUM PERMEABILITY OF MASONRY UNITS TO BE 2 mm/minute. EFFLORESCENCE POTENTIAL OF MASONRY UNITS TO BE NIL OR 6. USE FORMWORK BOND BREAKERS AND STRONG BACKS AS REQUIRED.
• OTHERWISE TO COMPLY WITH AS/NZS3678 OR AS/NZS3679 GRADE 250 UNO. SURFACE IMPERFECTIONS TO ISO 8501-3 PREPARATION GRADE P3. SLIGHT. CHARACTERISTIC LATERAL MODULUS OF RUPTURE OF MASONRY UNITS TO BE 0.8 MPa. 7. DO NOT USE VENEERED CONSTRUCTION UNO.
3. MANUFACTURERS AND PROCESSORS OF STRUCTURAL STEEL MUST HOLD A VALID CERTIFICATE OF APPROVAL ISSUED BY ACRS 44. SURFACE PREPARATION: REMOVE OIL, GREASE AND OTHER CONTAMINANTS TO AS1627.1. ABRASIVE BLAST CLEAN TO AS1627.4 7. FOR CONCRETE BLOCKWORK AND UNREINFORCED BRICKWORK USE CLASS M3 MORTAR MADE WITH 1 PART CEMENT: 5 PARTS SAND 8. DO NOT APPLY ACID TREATMENTS TO PRECAST CONCRETE SURFACES UNO.
(AUSTRALASIAN CERTIFICATION AUTHORITY FOR REINFORCING AND STRUCTURAL STEELS). PROVIDE ACRS CERTIFICATION OF CLASS SA 2½ WITH SURFACE PROFILE 40 TO 70 MICRONS OR AS SPECIFIED BY COATINGS MANUFACTURER FOR THE SERVICE AND A METHYL CELLULOSE WATER THICKENER (eg: `DYNEX’ AS PRODUCED BY A.V. SYNTEC) TO AS3700. FOR REINFORCED BRICKWORK 9. LOCATE CONNECTIONS TO FACILITATE CONCRETE PLACEMENT, EASE OF ACCESS DURING INSTALLATION AND FINAL
COMPLIANCE WITH RELEVANT STANDARDS, PRODUCT TAGS AND SUPPORTING DOCUMENTATION FOR ALL STRUCTURAL CONDITIONS. ASSESS ABRASIVE BLAST CLEANED SURFACE TO AS1627.9 AND SURFACE PROFILE TO AS3894.5. FOR SMALL AND OTHER MASONRY IN INDUSTRIAL ENVIRONMENTS USE CLASS M4 MORTAR MADE WITH 1 PART CEMENT, 0 TO 0.25 PARTS LIME AND 3 AESTHETICS.
STEELWORK. AREAS WHERE ABRASIVE BLAST CLEANING IS NOT POSSIBLE OBTAIN APPROVAL FROM SUPERVISOR TO USE POWER TOOL PARTS SAND, OR 1 PART CEMENT AND 4 PARTS SAND PLUS A METHYL CELLULOSE WATER THICKENER (eg: `DYNEX’ AS PRODUCED BY 10. USE CAST IN FERRULES FOR STRUCTURAL FIXINGS, NOT MECHANICAL OR CHEMICAL ANCHORS.
4. MARK STEEL GRADES ON STRUCTURAL MEMBERS IN NON-CRITICAL AREAS. USE IDENTIFICATION MARKS COMPATIBLE WITH AND CLEANING TO AS1627.2 CLASS ST 3/PST 3 AS DEFINED IN ISO 8501.1 FOR STEEL CLEANED TO A METALLIC FINISH WITH MINIMUM A.V. SYNTEC) TO AS3700. SUBMIT DETAILS OF PROPOSED ADDITIVES FOR SUPERINTENDENT’S WRITTEN APPROVAL. USE WHITE CEMENT 11. DO NOT USE REBARS OR STRESSING TENDONS AS LIFTING LOOPS. DO NOT USE FIXINGS FOR LIFTING. USE
VISIBLE THROUGH PAINT SYSTEM. 25 MICRON SURFACE PROFILE. REMOVE DUST BY BRUSHING OR VACUUM CLEANING. TO AS3972 TYPE GP OR GB, WITH IRON SALTS NOT EXCEEDING 1%. USE WELL GRADED CLEAN SAND WITH LOW CLAY CONTENT PROPRIETARY LIFTING INSERTS WITH PUBLISHED LOAD RATINGS. LIFT OR SUPPORT PRECAST UNITS ONLY AT
5. ENSURE METAL DECKING, FLOOR PLATE AND FLOOR GRATING SECURELY FIXED IN POSITION BEFORE ALLOWING GENERAL 45. APPLY PROTECTIVE COATINGS AS SOON AS PRACTICABLE AFTER PREPARATION, WITHIN FOUR HOURS AND BEFORE FLASH (MAXIMUM 10% PASSING THE 75 MICRON SIEVE) AND FREE FROM EFFLORESCING SALTS, ORGANIC MATTER AND OTHER IMPURITIES. SPECIFIED POINTS. LOCATE LIFTING POINTS TO SUIT CENTRE OF GRAVITY OF UNIT.
CONSTRUCTION ACCESS. RUST OR RUST BLOOM APPEARS. APPLICATION OF PROTECTIVE COATINGS TO COMPLY WITH MANUFACTURER’S USE HYDRATED BUILDING LIME TO AS1672.1 COLOUR AND TEXTURE OF FACE OR POINTING MORTAR TO MATCH APPROVED SAMPLE. 12. PROVIDE THIN-WALLED GALVANIZED GROUT TUBES FOR TIE BARS AS SHOWN ON DRAWINGS.
6. PROVIDE 3 mm CAP PLATES SEAL WELDED TO HOLLOW SECTIONS UNO. RECOMMENDATIONS. USE APPROVED REFRACTORY MORTAR FOR REFRACTORY BRICKWORK, AS RECOMMENDED BY MANUFACTURER. 13. SUBMIT NAME, CONTACT DETAILS AND CREDENTIALS OF PROPOSED MANUFACTURER OF PRECAST UNITS.
7. CARRY OUT ERECTION OF STEELWORK IN ACCORDANCE WITH AS3828 GUIDELINES FOR THE ERECTION OF BUILDING 46. UNLESS NOTED OTHERWISE ON DRAWINGS OR IN SPECIFICATION, SURFACE TREATMENT OF STEELWORK FOR ATMOSPHERIC 8. DO NOT CHASE HOLLOW BLOCKWORK. DO NOT CHASE MASONRY WITHOUT PRIOR APPROVAL. 14. PROVIDE TEMPORARY BRACING TO AS3850 AND AS/NZS1170.2 AS REQUIRED TO ENSURE STABILITY DURING
STEELWORK. CORROSION PROTECTION TO BE HOT DIP GALVANISED. APPLY PROTECTIVE COATINGS AS PER APPROVED SYSTEM/SYSTEMS 9. ENSURE THAT PERPENDS AND BEDS ARE COMPLETELY FILLED WITH MORTAR. LAY FROGGED MASONRY UNITS FROG UP, EXCEPT LAY CONSTRUCTION. IN PARTICULAR ENSURE STABILITY OF SUPER TEE’S PRIOR TO AND DURING CASTING OF DECK
8. PROTECT STEELWORK FROM DAMAGE DURING HANDLING, TRANSPORT, STORAGE AND ERECTION. SUBMIT PROPOSED METHOD OF AS/NZS2312 TABLE 6.3 IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. REPORT QA RECORDS IN A FORMAT TOP COURSE FROG DOWN. SLABS.
TO REPAIR DAMAGE FOR APPROVAL. PROTECT STEELWORK STORED ON SITE FROM CORROSION OR DETERIORATION OF SIMILAR TO AS3894 PARTS 10 TO 14. NON-SPECIFIED COLOURS WILL BE SELECTED BY SUPERINTENDENT. 10. MORTAR BED JOINTS AND PERPENDS TO BE FULLY BEDDED, AND 10 mm MAXIMUM 15. DO NOT PLACE LIFTING ATTACHMENTS, HOLES, OTHER TEMPORARY FIXINGS etc ON VISIBLE FACES OF UNITS.
COATINGS. 47. COATING REPAIRS: REINSTATE COATING TO DAMAGED AREAS TO PROTECTIVE COATINGS SPECIFICATION. 11. BED JOINTS AND PERPENDS IN CONCRETE BLOCKWORK MAY HAVE SHALLOW TOOLING. DO NOT RAKE OUT JOINTS UNLESS REQUIRED 16. ENSURE THAT PRECAST UNITS REMAIN UNCRACKED AND UNDAMAGED DURING MANUFACTURE, HANDLING, ERECTION
9. PLUMB COLUMNS WITH METAL PACKERS OR SHIMS. FIELD WELD REPAIRS: DO NOT WELD THROUGH EXISTING GALVANISING OR COATINGS. REMOVE WELD SPLATTER, RESIDUAL BY SPECIFICATION. WORK FACE JOINTS WITH A JOINTING TOOL TO A DENSE SMOOTH SURFACE. AND INSTALLATION OPERATIONS. PROVIDE PROTECTION TO AVOID CRUSHING AND/OR CHAFING. PROTECT UNITS
10. SEQUENCE ERECTION WORKS TO AVOID PINCH POINTS AND SITE CONGESTION. FLUX etc BY CHIPPING, GRINDING OR ABRASIVE BLAST CLEANING. GRIND FLUSH ROUGH WELD BEADS. PREPARE SURFACE FOR 12. SET OUT MASONRY TO MAINTAIN SPECIFIED ROD AND BOND WITH BED JOINTS AND VERTICAL JOINTS OF UNIFORM WIDTH AND WITH FROM STAINING, DISCOLOURATION AND OTHER DAMAGE.
11. INSTALL BEAMS WITH NATURAL CAMBER UPWARD. PROVIDE BEAMS WITH AN UPWARDS PRECAMBER AS SHOWN ON DRAWINGS. PAINTING AS PER COATING SPECIFICATION. REMOVE RUST, LOOSE AND BURNT PAINT AND SUFFICIENT SOUND COATING SO MINIMUM CUTTING OF MASONRY UNITS. USE STRETCHER BOND GENERALLY IN SINGLE LEAF CONSTRUCTION. KEEP PERPENDS IN 17. HOT DIP GALVANIZE CAST IN STEELWORK INCLUDING LIFTING INSERTS, FERRULES, DOWEL BARS, ANGLE CLEATS,
12. WHERE STEEL BEARS ON LOAD BEARING MASONRY AND BRICKWORK, PROVIDE 150 mm MINIMUM BEARING ON 20 mm NOMINAL PAINT EDGE IS FEATHERED AND SMOOTH. STRIPE COAT ALL WELDS, EDGES AND ROUGH SURFACES USING A BRUSH. ALTERNATE COURSES VERTICALLY ALIGNED. DISTRIBUTE APPROVED COLOUR RANGE OF FACE UNITS EVENLY THROUGHOUT FACE BOLTS, NUTS WASHERS AND PACKERS etc. MINIMUM GALVANIZED COATING THICKNESS 600 g/m2.
THICK LEVELLING GROUT UNO. REINSTATE COATING AS PER PROTECTIVE COATINGS SPECIFICATION. WORK TO PREVENT COLOUR CONCENTRATIONS AND BANDING. SELECT MASONRY UNITS FOR UNIFORM WIDTH AND DOUBLE-FACE 18. PROVIDE FERRULES WITH FULL CAPACITY OF BOLT. PROVIDE 10 mm CROSS BARS IN FERRULES. FERRULES TO
13. PROVIDE STEEL MEMBERS MADE FROM WHOLE LENGTHS WHEREVER POSSIBLE. SEEK APPROVAL TO MAKE LENGTHS UP OF 48. WHERE NOMINATED AS GALVANIZED ON DRAWINGS, STEELWORK IS TO BE HOT DIPPED GALVANIZED TO AS/NZS4680 AND AS QUALITIES IN SINGLE LEAF MASONRY WITH FACE WORK BOTH SIDES. ACCOMMODATE M20 BOLTS UNO.
SECTIONS JOINED BY COMPLETE PENETRATION FULL STRENGTH BUTT WELDS GROUND FLUSH WHERE REQUIRED. WHERE 1214 FOR FASTENERS. THICKNESS OF GALVANIZED COATINGS TO AS/NZS4680. ZINC IN GALVANISING BATH TO BE NOT LESS 13. WALLS TO BE BONDED AT INTERSECTIONS UNO. 19. RECESS FERRULES TO REMAIN EXPOSED BY 30 mm INTO CONCRETE. APPLY BONDING AGENT AND GROUT UP
PROPOSED, SHOW JOINTS ON SHOP DRAWINGS. ENSURE MEMBERS ARE CONCENTRIC AT CONNECTIONS (GRAVITY- OR GAUGE- THAN 98% PURE. BATH TEMPERATURE, TIME OF IMMERSION AND WITHDRAWAL SPEED TO BE AS REQUIRED TO ACHIEVE 14. CLEAN MASONRY PROGRESSIVELY AS WORK PROCEEDS. CLEAN FACE WORK TO REMOVE MORTAR SMEARS, STAINS, DISCOLOURATION, RECESS WITH 40 MPa NON-SHRINK GROUT.
LINES TO INTERSECT) UNO. ACCURATELY PRE-FORM PARTS TO AVOID FORCE AND/OR RESTRAINT DURING JOINING. SPECIFIED COATING THICKNESS AND FINISH. ZINC COATING TO BE CONTINUOUS, ADHERENT, FREE FROM LUMPS, SPIKES, etc. USE CAVITY BATTEN (AND LIFT PROGRESSIVELY) TO KEEP CAVITIES CLEAR OF MORTAR FINS, DROPPINGS, etc. 20. USE RIGID FORMWORK AND INTENSE COMPACTION, SUCH AS VIBRATING TABLES OR FORM VIBRATORS, TO AS3600.
14. DRILL HOLES FULL SIZE OR REAM TO FULL SIZE AFTER SUB-DRILLING OR SUB-PUNCHING. SUB-DRILLED OR SUB-PUNCHED HOLES DAGS, RUNS, BLISTERS, ROUGHNESS, GRITTY AREAS, UNCOATED SPOTS, ACID AND BLACK SPOTS, DROSS, FLUX AND OTHER 15. USE “HEAVY DUTY” RIGID WALL TIES TO AS/NZS2699 eg. “MFA ANCHOR-TIES” (FOR CAVITY BETWEEN 90 AND 140 mm) OR “MFA POSI-TIES” 21. PRECAST UNIT TOLERANCES TO BE TO AS3600 EXCEPT WHERE VARIED BY SPECIFICATION.
TO BE AT LEAST 3 mm UNDERSIZE. “OXY” OR FLAME CUTTING OF HOLES IS NOT PERMITTED. BOLT HOLE SIZE TO BE: IMPERFECTIONS. (FOR CAVITY LESS THAN 90 mm) AS PRODUCED BY BRUNSWICK SALES PTY LTD. TIES TO BE EMBEDDED 50 mm MINIMUM INTO MORTAR 22. CAST UNITS WITH OUTER FACE OFF FORM.
• BOLT DIAMETER PLUS 2 mm FOR STEEL TO STEEL CONNECTIONS, 49. BUTT WELD END PLATES ON HOLLOW SECTIONS TO BE HOT DIPPED GALVANIZED IN LIEU OF FILLET WELD TO AVOID RISK OF JOINTS. ENSURE 15 mm MINIMUM MORTAR COVER TO EXPOSED FACES. IN HOLLOW BLOCK WORK INSTALL TIES IN LINE WITH 23. FINISH SURFACE OF PRECAST UNITS IN ACCORDANCE WITH SPECIFICATION.
• BOLT DIAMETER PLUS 4 mm FOR STEEL TO CONCRETE CONNECTIONS, CREVICE CORROSION. DO NOT USE A BACKING PLATE. PERPENDS/BLOCK WEBS, AND PROVIDE MORTAR BEDDING FULL WIDTH OF BLOCK. INSTALL WALL TIES AT SPACING NOT MORE THAN 600 24. PROVIDE 15 mm x 45 DEGREES CHAMFERS OR FILLETS AT EDGES AND CORNERS OF PRECAST UNITS.
• BOLT DIAMETER PLUS 4 mm FOR HOLDING DOWN BOLTS UP TO M20, 50. PASSIVATE GALVANIZED STEEL TO BE IN CONTACT WITH CONCRETE BY DIPPING IN 0.2% SODIUM DICHROMATE SOLUTION. mm CENTRES IN EACH DIRECTION UNO. ADJACENT TO LATERAL SUPPORTS AND CONTROL JOINTS AND AROUND OPENINGS IN MASONRY 25. EACH UNIT TO HAVE LEGIBLE MARKING (HIDDEN IN COMPLETED STRUCTURE) INCLUDING UNIT THICKNESS,
• BOLT DIAMETER PLUS 6 mm FOR HOLDING DOWN BOLTS M24 OR LARGER. 51. STRAIGHTEN MEMBERS DISTORTED DURING FABRICATION AND/OR GALVANISING PROCESS USING AN APPROVED METHOD. AND AT TOPS OF UNRESTRAINED WALLS, SPACING OF WALL TIES TO BE NOT MORE THAN 300 mm AVERAGE AND 400 mm MAXIMUM AND REINFORCING SIZES AND SPACING, NUMBER OF STRANDS AND STRAND DIAMETER, CONCRETE COVER, DATE OF
52. ANNEAL COLD WORKED ITEMS TO 650°C PRIOR TO GALVANISING. LOCATED WITHIN 300 mm OF THAT LINE OF SUPPORT, etc. FIX TIES TO MANUFACTURER’S RECOMMENDATIONS. ONLY USE TIES WITH CASTING, CORRECT ORIENTATION OF UNIT AND WEIGHT, POSITION FOR TEMPORARY BEARING DURING STORAGE etc.
WELDING 53. REPAIR DAMAGE TO GALVANIZED COATING TO AS/NZS 4680 SECTION 8 –REPAIR AFTER GALVANIZING. USE ORGANIC TWO-PACK ROUNDED EXTERNAL CORNERS. 26. SET ASIDE DAMAGED UNITS (CRACKED, SPALLED, INADEQUATE COVER) FOR INSPECTION BY SUPERINTENDENT.
15. DEVELOP WELD PROCEDURES TO SUIT JOINT DETAILS AND SHOW ON SHOP DRAWINGS. USE PREQUALIFIED WELD PROCEDURES ZINC RICH EPOXY COATING COMPLYING WITH AS/NZS 3750.9 APPLIED IN TWO COATS EACH 50 MICRON, MINIMUM TOTAL DRY FILM 16. CONTROL JOINTS TO BE 20 mm WIDE WITH 25 mm DIAMETER CLOSED CELL POLYETHYLENE FOAM BACKING ROD AND APPROVED REPAIR OR RE-CAST AS INSTRUCTED.
AND CONSUMABLES TO AS/NZS1554.1 CLAUSE 4.3 OR DEVELOP QUALIFICATION OF WELD PROCEDURE AND CONSUMABLES BY THICKNESS 100 MICRONS. DO NOT USE SPRAY CANS OF “COLD GALV” OR ZINC ALLOY SOLDER “STICKS”. SURFACE POLYSULPHIDE SEALANT AT EXTERNAL FACE UNO. FINISH SEALANT IN LINE WITH MORTAR JOINTS. TOLERANCE ON WIDTH +5, -0 mm. 27. ALLOW FOR DEPARTMENT OF LABOUR OR OTHER REQUIREMENTS GOVERNING HANDLING, LIFTING, ROTATION OR
TESTING TO AS/NZS1554.1 CLAUSE 4.2. LIST APPLICABLE PARAMETERS ON WELDING PROCEDURE QUALIFICATION RECORD AND PREPARATION OF EXPOSED BARE STEEL TO BE ABRASIVE BLAST CLEANED TO AS 1627.4, CLASS 2½ (PREFERRED) OR POWER REINFORCEMENT TO BE DISCONTINUOUS AT CONTROL JOINTS. PROVIDE JOINTS IN WALL FINISHES AT CONTROL JOINTS IN MASONRY. TRANSPORT OF PRECAST UNITS.
MAKE RECORD AVAILABLE FOR INSPECTION. TOOL CLEANED TO AS 1627.2 CLASS ST 3. LIGHTLY SWEEP BLAST GALVANIZED SURFACES. PLACE POLYSTYRENE IN VERTICAL JOINTS DURING CONSTRUCTION TO ENSURE THAT MORTAR DROPPINGS AND OTHER HARD 28. WHERE PRECAST UNITS ARE TO BE SUPPORTED BY CONCRETE MEMBERS, DO NOT ERECT UNITS UNTIL 28 DAY
16. WELDING TO BE UNDERTAKEN BY SUITABLY QUALIFIED EXPERIENCED WELDER UNDER SUPERVISION OF QUALIFIED WELDING 54. PROVIDE DRILLED VENT/DRAIN HOLES AT TOP AND BOTTOM EXTREMITIES FOR HOLLOW SECTIONS TO BE HOT DIPPED MATERIALS DO NOT FALL INTO OR REMAIN IN CONTROL JOINTS. REMOVE POLYSTYRENE AT COMPLETION. STRENGTH HAS BEEN ACHIEVED.
SUPERVISOR. GALVANIZED. PROVIDE RUBBER SEALS OR PLUG WELD VENT/DRAIN HOLES THAT REMAIN EXPOSED. REPAIR DAMAGE TO 17. INSTALL CONTROL JOINTS IN MASONRY AT 6 METRES MAXIMUM CENTRES (3 METRES MAXIMUM FROM CORNERS, AND AS SHOWN ON 29. USE 20 mm THICK HIGH-STRENGTH PVC OR FIBROUS CEMENT SHEET LEVELLING PADS x 150 mm LONG (MIN) AND
17. CARRY OUT WELDING TO AS/NZS1554: ALL INTERFACES BETWEEN STEEL SECTIONS TO BE CONNECTED WITH 6 mm CONTINUOUS GALVANIZING. DRAWINGS. PLACE CENTRAL UNDER WALL PANEL AND 300 mm FROM ENDS OF PRECAST UNITS. CHECK WITH SUITABLY QUALIFIED
FILLET WELDS ALL ROUND, BOTH SIDES UNO. 55. PROVIDE DRILLED SUSPENSION HOLES IN END PLATES, ETC FOR ITEMS TO BE HOT DIPPED GALVANIZED. 18. SOLIDLY BED MASONRY SILLS AND THRESHOLDS AND LAY THEM SO THAT TOP SURFACES DRAIN AWAY FROM BUILDING. SET OUT SO STRUCTURAL ENGINEER BEFORE USING ADDITIONAL SUPPORT POINTS. USE TWO LEVELLING PADS FOR EACH UNIT.
• WELDS TO BE SHOP WELDED UNO, 56. PRIOR TO DIPPING ADVISE SUPERINTENDENT OF ANY DESIGN FEATURES THAT MAY LEAD TO DIFFICULTIES DURING THAT NO UNIT IS CUT LESS THAN ¾ OF FULL WIDTH. DO NOT USE STEEL LEVELLING PADS. USE PACKERS OF SUITABLE THICKNESS SUCH THAT NOT MORE THAN THREE
• WELDS TO BE CATEGORY SP, GALVANISING AND SUBMIT DETAILS FOR IMPROVEMENT. 19. WHEN BUILDING IN STEEL DOOR FRAMES etc, FILL BACKS OF JAMBS AND HEADS SOLID WITH MORTAR AS WORK PROCEEDS. PACKERS ARE REQUIRED. PACKERS CAN REMAIN IN PLACE IF PROVIDED WITH 50 mm GROUT COVER UNO.
• BUTT WELDS TO BE FULL (COMPLETE) PENETRATION UNO, 57. DO NOT PAINT GALVANIZED STEELWORK UNLESS SPECIFIED ON THE ENGINEERING DRAWINGS. PREPARE GALVANIZED 20. BUILD DAMP-PROOF COURSES TO AS/NZS2904 INTO FOLLOWING LOCATIONS WHERE APPLICABLE: 30. PROVIDE COMPONENTS, MATERIALS, FASTENERS, BRACES, STRONGBACKS, SHIMS, JOINTING STRIPS, SEALANTS,
• ELECTRODES TO BE LOW CARBON WITH TENSILE STRENGTH OF fuw=490 MPa, PRE-APPROVED TO AS/NZS1554, eg SURFACES TO BE PAINTED AS PER AS/NZS4680 APPENDIX I AND APPLY PAINT IN THE WORKSHOP. COATING MANUFACTURER TO • WALLS ADJOINING INFILL FLOOR SLABS ON MEMBRANES: IN COURSE ABOVE UNDERSIDE OF SLAB IN INTERNAL WALLS AND INNER FLASHING, GROUT AND MORTAR, BEARING PADS AND STRIPS, TIES, DOWELS, CLIPS, FIXINGS etc AS REQUIRED.
CLASSIFICATION B-E49XX. PROVIDE A 10 YEAR WARRANTY OF COATING SYSTEM. LEAVES OF CAVITY WALLS. PROJECT 40 mm AND DRESS DOWN OVER MEMBRANE TURNED UP AGAINST WALLS. 31. RECESS LIFTING INSERTS, REMOVE TEMPORARY ATTACHMENTS AFTER ERECTION, MAKE GOOD AND SEAL.
18. EXTENT OF WELD INSPECTION/TESTING TO BE: 58. PROTECTIVE COATINGS ARE TO BE SHOP APPLIED AND CURED IN WORKSHOP IN ACCORDANCE WITH MANUFACTURER’S • CAVITY WALLS BUILT OFF SLABS ON GROUND: IN BOTTOM COURSE OF OUTER LEAF, CONTINUOUS ACROSS CAVITY AND UP INNER 32. SEAL GAPS BEFORE GROUTING. USE NON-SHRINK NON-STAINING GROUT WITH 28 DAY CHARACTERISTIC STRENGTH
• VISUAL SCANNING: 100% OF WELDS, RECOMMENDATIONS UNLESS APPROVED OTHERWISE IN WRITING BY SUPERINTENDENT. PROTECTIVE COATINGS ARE TO BE FACE, TURNED 30 mm INTO FIRST COURSE OF INNER LEAF ABOVE SLAB. OF 40 MPa. SUBMIT DETAILS FOR APPROVAL.
• VISUAL EXAMINATION: 100% OF BUTT WELDS IN TENSION MEMBERS AND 50% OF OTHER WELDS, SMOOTH, UNIFORM AND WITHOUT RUNS, BEADS, PINHOLES, SURFACE CRAZING OR OTHER IMPERFECTIONS. • INTERNAL WALLS BUILT OFF SLABS ON GROUND: IN FIRST COURSE ABOVE FLOOR LEVEL. 33. JOINTS BETWEEN UNITS TO BE AS SPECIFIED ON DRAWINGS. TOLERANCE ON WIDTH +5, -0 mm. PROVIDE JOINTS IN
• RADIOGRAPHIC OR ULTRASONIC: 10% OF BUTT WELDS IN TENSION MEMBERS AND 5% OF OTHER WELDS. 59. PROTECT COATINGS FROM DAMAGE AND DETERIORATION DURING HANDLING, TRANSPORT, STORAGE AND ERECTION. REPAIR • PAINTED EXTERNAL WALLS: IN SECOND COURSE ABOVE GROUND LEVEL IN OUTER LEAF. WALL FINISHES AT JOINTS BETWEEN UNITS UNO. PLACE POLYSTYRENE IN JOINTS DURING CONSTRUCTION TO
19. GRIND WELDS SMOOTH AND FLUSH WITH PARENT METAL WHERE NOMINATED ON DRAWINGS. GRIND ONLY IN LONGITUDINAL DAMAGE TO PROTECTIVE COATINGS TO REINSTATE INTEGRITY OF NOMINATED COATING IN ACCORDANCE WITH 21. BUILD FLASHINGS AND WEATHERINGS TO AS/NZS2904 INTO FOLLOWING LOCATIONS WHERE APPLICABLE: ENSURE HARD MATERIALS AND OTHER DEBRIS DOES NOT FALL INTO OR REMAIN IN JOINTS. REMOVE POLYSTYRENE
DIRECTION OF MEMBER. MANUFACTURERS’ RECOMMENDATIONS AND SPECIFICATION. EDGES OF PATCH REPAIRS TO BE FEATHERED. • UNDER SILLS: 50 mm INTO FIRST JOINT BELOW SILL, EXTENDING UP ACROSS CAVITY AND UNDER SILL. PRIOR TO FILLING JOINTS, OR AT COMPLETION. MAINTAIN JOINTS FOR UNIFORM PLACEMENT OF SEALANTS.
20. REPAIR FAULTY WELDS AND DEFECTS REVEALED BY WELD INSPECTION/TESTING AND REPEAT THE EXAMINATION. 60. REFER SPECIFICATION FOR DECORATIVE COATINGS. • OVER LINTELS TO OPENINGS: FULL WIDTH OF OUTER LEAF IMMEDIATELY ABOVE LINTEL, CONTINUOUS ACROSS CAVITY, 50 mm INTO 34. PROTECT, CLEAN AND MAINTAIN PERMANENT BEARINGS DURING CONSTRUCTION.
21. WELDS TO BE INSPECTED BY INDEPENDENT NATA ACCREDITED QUALIFIED WELDING INSPECTOR TO AS2214. PROVIDE WELDING 61. HOT DIP GALVANIZE FLOOR GRATING AND SUPPLY WITH EDGE TRIMMING BARS ALL ROUND UNO. SECURE GRATINGS TO INNER LEAF, TWO COURSES ABOVE. 35. CAST SUPER TEES AND OTHER PRESTRESSED BEAMS UPRIGHT, HORIZONTAL AND IN ONE SINGLE POUR. KEEP TOP
INSPECTOR’S REPORT TO SUPERINTENDENT. STEELWORK WITH A PROPRIETARY CLAMPING SYSTEM INSTALLED IN ACCORDANCE WITH MANUFACTURER’S • OVER ROOFS: FULL WIDTH OF EXTERNAL MASONRY, STEPPED TO ROOF SLOPE. TURN DOWN NOT LESS THAN 50 mm OVER BASE SURFACE UPPERMOST. SUPPORT AT SPECIFIED BEARING LOCATION. ENSURE VOID FORMER IS SECURELY FIXED,
22. WELDING SYMBOLS ARE TO AS1101.3. “CFW” INDICATES CONTINUOUS FILLET WELD. “FSBW” INDICATES FULL STRENGTH BUTT RECOMMENDATIONS. FLASHING. TURN UP WITHIN CAVITY, SLOPING INWARD ACROSS CAVITY AND FIXED TO OR BUILT INTO INNER LEAF AT LEAST 75 mm AND CONCRETE BELOW VOID FORMER IS PROPERLY COMPACTED. SCABBLE OR BROOM FINISH (TRANSVERSELY) TOP
WELD WHICH IS EQUIVALENT TO CPBW. “CPBW" INDICATES COMPLETE PENETRATION BUTT WELD. ABOVE. SURFACE. ROUGHEN TOP SURFACE BY GREEN CUTTING TO 3 mm AMPLITUDE WITHOUT LOOSENING COARSE
DELIVERABLES • AT ABUTMENTS WITH STRUCTURAL FRAMES OR SUPPORTS: VERTICAL FLASHING IN CAVITY FROM 150 mm WIDE MATERIAL, WEDGED AGGREGATE. LENGTH SPECIFIED IS REQUIRED LENGTH AFTER RELEASE OF TENDONS - MAKE ALLOWANCE FOR
BOLTS 62. SUBMIT NAMES AND CONTACT DETAILS OF PROPOSED FABRICATION AND INSTALLATION SUBCONTRACTORS. AND GROUTED INTO A GROOVE IN FRAME OPPOSITE CAVITY. ELASTIC SHORTENING AT TRANSFER. AFTER TRANSFER CUT TENDONS FLUSH WITH END, CLEAN EXPOSED ENDS AND
23. M16 AND LARGER BOLTS TO BE HIGH STRENGTH STRUCTURAL BOLTS, 8.8/S PROCEDURE AND M12 SIZE BOLTS SHALL BE 63. SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS; REFER GENERAL–DELIVERABLES NOTES. SHOP DRAWINGS AND DESIGN • AT STILES WHERE CAVITIES ARE CLOSED: FULL HEIGHT FLASHING EXTENDING 75 mm BEYOND CLOSURE INTO CAVITY, INTERLEAVED SEAL WITH 6 mm APPROVED EPOXY.
COMMERCIAL BOLTS, 4.6/S PROCEDURE UNO. CALCULATIONS TO SHOW: ARRANGEMENT OF MEMBERS, MARKING PLAN, MEMBER SCHEDULE, LOCATION AND ORIENTATION OF WITH SILL AND HEAD FLASHING AT EACH END. FIX TO FRAME STILES.
24. FOR BOLTS MANUFACTURED OUTSIDE AUSTRALIA, PROVIDE LOCAL INDEPENDENT NATA-ACCREDITED LABORATORY MEMBERS IN BUILDING, REQUIRED CAMBER (WHERE APPLICABLE), RELEVANT DETAILS OF EACH ASSEMBLY, COMPONENT AND 22. PROVIDE WEEP HOLES IN THE FORM OF OPEN PERPENDS TO EXTERNAL LEAVES OF CAVITY WALLS IN COURSE ABOVE DAMP-PROOF DELIVERABLES
COMPLIANCE CERTIFICATE BASED ON APPROPRIATE TESTING AND VERIFICATION. CONNECTION, DIMENSIONS OF ITEMS, LOADING PARAMETERS AND BRACING LENGTHS ASSUMED IN DESIGN, DESIGN STRESSES, COURSES, FLASHINGS AND CAVITY FILL, AND AT BOTTOMS OF UNFILLED CAVITIES. SPACING 750 mm MAXIMUM CENTRES. 36. SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS (PREPARED BY A SUITABLY QUALIFIED CHARTERED ENGINEER
25. USE BOLTS WITH THREADS IN COMPLIANCE WITH AS1275. BOLTS OF STRENGTH GRADE 4.6 TO BE COMMERCIAL GRADE BOLTS TO STRENGTH OF MATERIALS, SIZE OF EACH MEMBER, TOLERANCES ON MEMBER SIZES, JOINT DETAILS, TRIMMERS, NOGGINGS etc, 23. KEEP NON-LOAD BEARING WALLS CLEAR OF UNDERSIDES SLABS AND BEAMS BY 20 mm. FILL GAP WITH APPROVED COMPRESSIBLE REGISTERED WITH NATIONAL ENGINEERING REGISTER (NER) OF ENGINEERS AUSTRALIA); REFER GENERAL–
AS1111 AND 1112. BOLTS OF STRENGTH GRADE 8.8 TO BE HIGH STRENGTH STRUCTURAL BOLTS, NUTS AND WASHERS TO LIFTING POINTS, METHOD OF FIXING AND BRACING, DESIGN DEFLECTION, METHOD OF FABRICATION, SIZE AND SPECIFICATION MATERIAL. DO NOT LAY MASONRY ON CONCRETE BEAMS OR SLABS UNTIL AFTER FORMWORK HAS BEEN REMOVED AND CONCRETE DELIVERABLES NOTES. DRAWINGS TO SHOW PROPOSED DETAILS FOR DESIGN, MANUFACTURE, ASSEMBLY,
AS/NZS1252. MECHANICAL PROPERTIES OF BOLTS, NUTS, SCREWS AND STUDS TO COMPLY WITH AS /NZS4291. WASHERS TO OF CLEATS, BOLTS, SCREWS, WELDS, WELD CATEGORIES AND BOLTING CATEGORIES, WELD PROCEDURES (INCLUDING POST HAS GAINED ADEQUATE STRENGTH. TRANSPORT AND INSTALLATION OF PRECAST CONCRETE ELEMENTS, INCLUDING FOLLOWING: INFORMATION
COMPLY WITH AS1237. TIGHTENING PROCEDURES TO COMPLY WITH AS4100: WELD HEAT TREATMENT), SURFACE PREPARATION METHODS AND PROTECTIVE COATING SYSTEM, VENT/DRAIN HOLES FOR HOT 24. FILL CORES OF HOLLOW BLOCKWORK WHERE CAST IN ITEMS, TIES TO STRUCTURAL FRAMING OR MASONRY ANCHORS ARE TO BE SPECIFIED IN AS3850.2 CLAUSE 2.10 AND APPENDIX A, PROJECT TITLE AND MANUFACTURER’S NAME, MARKING PLANS
• S SNUG TIGHT, DIP GALVANISING, PROPOSED JOINTS IN MEMBERS, TEMPORARY MEMBERS, BRACES AND FIXINGS, LOCATION OF FALL ARREST LOCATED, OR USE SOLID BLOCKS. AND ELEVATIONS WITH BUILDING GRID AND FLOORS LOCATING EACH UNIT, SHAPE AND PROFILE DRAWINGS
• TB BEARING MODE JOINT, BOLTS FULLY TENSIONED, CONNECTIONS, FIXINGS FOR ADJOINING BUILDING ELEMENTS, BASE PLATE DETAILS, FIXINGS FOR PURLINS, GIRTS, LOCATION OF 25. HAVE SUITABLY QUALIFIED STRUCTURAL ENGINEER UNDERTAKE STRUCTURAL CHECK OF MASONRY WALLS WHERE FIXINGS, INCLUDING WEIGHT OF UNITS, REINFORCEMENT AND TENDON DETAILS INCLUDING LOCATIONS, SIZES, MATERIALS,
• TF FRICTION MODE JOINT, BOLTS FULL TENSIONED. (CONTACT SURFACES OF FRICTION CONNECTIONS TO BE UNCOATED AND AND PREPARATION FOR SITE WELDS AND BRACING, METHOD OF HANDLING, TEMPORARY WORKS, ASSEMBLY, TRANSPORT AND EQUIPMENT OR ACCESS PLATFORMS ARE TO BE ATTACHED. DUCTILITY AND STRESS GRADES, CAST IN ITEMS INCLUDING LOCATIONS, SIZES, DETAILS, MATERIALS, CORROSION
FREE OF MILL SCALE.) ERECTION (INCLUDING TEMPORARY BRACING IF REQUIRED), PRECAMBER, etc. 26. PROTECT FRESHLY LAID MORTAR FROM RAIN, etc. PROTECTION AND GRADE OF FERRULES, PLATES, CUT-OUTS AND OPENINGS, ANCHORS, LIFTING DEVICES, PLUGS FOR
26. BOLT TYPE AND TIGHTENING PROCEDURE ARE DESIGNATED: NUMBER, SIZE STRENGTH GRADE/TIGHTENING PROCEDURES. 64. PROVIDE DOCUMENTARY EVIDENCE (INCLUDING TEST RESULTS) OF COMPLIANCE WITH RELEVANT AUSTRALIAN STANDARDS SEALING RECESSES etc, CAULKING, MASTICS, BAFFLES, WATERPROOFING, ACOUSTIC INSULATION AND FIRE-
eg. 4-M24 8.8/TB = 4 OFF 24 DIAMETER METRIC HIGH STRENGTH STRUCTURAL BOLTS FULLY TENSIONED IN BEARING MODE. ISSUED BY MANUFACTURER FOR ALL STEELWORK AND EACH BATCH OF FASTENERS USED. EVIDENCE MUST PROVIDE CLEAR REINFORCED MASONRY PROOFING, CAST IN SERVICES, EQUIPMENT AND METHODS OF HANDLING. LIFTING, TRANSPORT INCLUDING LOCATION
27. USE BOLT LENGTHS SO THAT PROJECTION BEYOND NUT IS AT LEAST TWO THREADS, AND NOT MORE THAN 10 mm. VERIFICATION THAT PRODUCT MEETS RELEVANT AUSTRALIAN STANDARDS AND BE WRITTEN IN ENGLISH ALPHANUMERIC 27. FOR REINFORCED MASONRY USE “HEAVILY GALVANIZED” BED JOINT REINFORCEMENT AT 600 mm MAXIMUM CENTRES, COMMENCING 200 OF LIFTING POINTS, MAXIMUM LOADS ON LIFTING AND BRACING POINTS, EVIDENCE OF LOAD CAPACITY OF LIFTING
28. PROVIDE A COLOUR FLASH AT LOCATIONS OF TF AND TB BOLTS. DEGREASE AND LIGHTLY OIL TF AND TB BOLTS PRIOR TO CHARACTERS. EVIDENCE TO INCLUDE: NAMES AND ADDRESSES OF MANUFACTURER, SUPPLIER AND TESTING AUTHORITY; TEST mm MAXIMUM ABOVE BASE LEVEL AND LOCATED ABOVE AND BELOW OPENINGS. TERMINATE BED JOINT REINFORCEMENT 200 mm FROM AND BRACING INSERTS AND ATTACHMENTS IN FORM OF TEST REPORTS OR CALCULATIONS, CONCRETE MIX DESIGN,
INSTALLATION. TENSION TF AND TB BOLTS USING PART-TURN METHOD (OR TAMPER PROOF LOAD INDICATING WASHERS FOR TF CERTIFICATE NUMBER AND DATE WITH PAGE NUMBER ON EACH PAGE; PRODUCT TESTING SPECIFICATION AND GRADE OF EDGES OF WALL PANELS AND CONTROL JOINTS etc. LAP BED JOINT REINFORCEMENT BY 450 mm. LOCATE WALL TIES IN UNREINFORCED FORMWORK TYPE, SURFACE FINISH CLASS AND SURFACE TREATMENT, CURING AND PROTECTION METHODS,
BOLTS) TO AS4100. DO NOT USE CALIBRATED TORQUE WRENCHES. PROVIDE WITNESS MARKS ON BOLT AND NUT. PROVIDE A STEEL; PRODUCT DESIGNATION AND RELEVANT DIMENSIONS; PRODUCT STEEL MAKING PROCESS; LENGTH, BUNDLE, PACK OR COURSES/BED JOINTS. IDENTIFICATION MARKS, EQUIPMENT AND METHODS FOR HANDLING, TRANSPORT AND INSTALLATION, ERECTION AND
HARDENED WASHER UNDER BOLT HEAD OR NUT, WHICHEVER IS ROTATED. DO NOT REUSE TB OR TF BOLTS ONCE TENSIONED. UNIQUE IDENTIFIER TO WHICH CERTIFICATE APPLIES; HEAT NUMBER (FROM CASTING); MECHANICAL PROPERTIES FROM TENSILE 28. USE CONCRETE GROUT FOR FILLING CORES WITH: INSTALLATION CONDITIONS.
29. SLIP FACTOR ASSUMED FOR FRICTION TYPE BOLTS = 0.35. TREAT CONTACT SURFACES BY WIRE BRUSHING OR LIGHT BLASTING TEST (ALL VALUES CITED IN AS/NZS STANDARD); WHETHER EACH MEASURED MECHANICAL PROPERTY COMPLIES WITH AS/NZS • MINIMUM f’c = 20 MPa TO AS3600. 37. SUBMIT DETAILS OF PROPOSED METHODS TO ACHIEVE SELECTED COLOUR INCLUDING TYPE AND COLOUR OF
TO CLASS 3 (SURFACE PROFILE 35 TO 65 MICRONS) AS REQUIRED TO ACHIEVE ASSUMED SLIP FACTOR. STANDARD; CHEMICAL ANALYSIS RESULTS AND TYPE OF ANALYSIS UNDERTAKEN; CUSTOMER PURCHASE ORDER TO MATCH • MINIMUM CEMENT CONTENT = 300 kg/m3. CEMENT, SAND, AGGREGATES AND COLOURING OXIDE PIGMENTS AND STAINS.
30. USE BOLTS, SCREWS, NUTS AND WASHERS HOT DIP GALVANIZED BY MANUFACTURER TO AS1214. TAP GALVANIZED NUTS 0.4 mm BATCH NUMBER; ANY OTHER SYSTEM REFERENCE NUMBERS AND SIGNATURE OF AUTHENTICITY. • MAXIMUM AGGREGATE SIZE = 10 mm. 38. SUBMIT SAFE WORK METHOD STATEMENT SPECIFIC TO PROJECT FOR MANUFACTURE AND INSTALLATION OF UNITS.
OVERSIZE TO SUIT GALVANIZED THREADS TO AS1214 AND OIL FOR PROTECTION. INSTALL WASHERS UNDER BOLT HEAD OR NUT, WET CORES BEFORE GROUTING. CARRY OUT WORK ONLY UNDER WIND AND TEMPERATURE CONDITIONS CONSISTENT WITH SAFE WORK METHOD
WHICHEVER PART IS ROTATED. USE HARDENED OR PLATE WASHERS UNDER BOTH HEAD AND NUT FOR OVERSIZED AND 29. FOR REINFORCED MASONRY FILL ALL REINFORCED CORES AND BOND BEAMS USING CONCRETE WITH f’c = 20 MPa TO AS3600, SLUMP = STATEMENT AND STRUCTURAL CAPABILITY OF UNIT.
SLOTTED HOLES TO AS4100. USE TAPERED WASHERS AS REQUIRED UNDER NON-ROTATING PART. 80 +/-15 mm TO AS1012.3 UNO.
31. SLOTTED HOLES TO BE 2.5 x BOLT DIAMETER LONG UNO. BOLTS TO BE SET CENTRAL IN SLOT UNO. USE 8 mm PLATE WASHERS 30. USE 2N16 CONTINUOUS BARS FOR BOND BEAMS UNO. LAP 600 UNO.
UNDER BOLT HEAD AND NUT TO COMPLETELY COVER HOLE. 31. FOR REINFORCED BLOCKWORK PROVIDE N16 BAR ADJACENT TO WALL ENDS, OPENINGS, CONTROL JOINTS AND AT 1200 mm MAX
CENTRES UNO. LOCATE REINFORCEMENT CENTRALLY IN CORES UNO.
CONNECTIONS 32. CARRY OUT PROJECT ASSESSMENT OF CONCRETE AND GROUT TO AS3600.
32. STEEL CONNECTION DETAILS TO BE IN ACCORDANCE WITH AS4100 AND AUSTRALIAN STEEL INSTITUTE (ASI) STRUCTURAL STEEL 33. PROVIDE 15 mm MINIMUM COVER TO REINFORCEMENT TO AS3700 CLAUSE 6.8 FROM INSIDE FACE AND BASE OF BLOCKS, AND 50 mm
CONNECTION SERIES OF MANUALS AND GUIDES UNO. MINIMUM COVER INCLUDING BLOCK THICKNESS. MAINTAIN COVER BY USE OF “KNOCK-OUT” BLOCKS AND SPACERS AT INTERSECTIONS
33. MAKE BOLTED STRUCTURAL CONNECTIONS WITH 10 mm THICK CLEAT PLATES AND 2 M16 8.8/S BOLTS UNO. USE M12 4.6/S BOLTS OF VERTICAL AND HORIZONTAL BARS, eg BLOCK AID BAR CHAIRS BY ONESTEEL OR BY OTHER APPROVED MEANS. SET OUT STARTER
FOR PURLINS UP TO 250 DEEP UNO. STIFFENERS, PURLIN AND GIRT CLEATS AND FLY BRACE CLEATS TO BE 8 mm THICK UNO. BARS USING A TEMPLATE.
ROD BRACING TO HAVE TURNBUCKLES WITH FULL CAPACITY OF ROD UNO. 34. REMOVE MORTAR DROPPINGS FROM BOTTOM OF CORES BY USE OF CLEANOUT BLOCKS BEFORE PLACING CONCRETE AND AT
34. PROVIDE CLEATS AND DRILL HOLES NECESSARY FOR FIXING OTHER ELEMENTS TO STEELWORK. SHOW ON SHOP DRAWINGS. HORIZONTAL BREAKS IN CONSTRUCTION. REMOVE MORTAR FINS PROTRUDING FROM JOINTS BEFORE PLACING CONCRETE.
35. PROVIDE RADIUSED CORNERS ON EXPOSED CLEATS TO REDUCE RISK OF IMPALEMENT AND LACERATIONS. 35. DO NOT PROCEED WITH BLOCKWORK CONSTRUCTION MORE THAN SIX COURSES OR 1500 mm AHEAD OF CONCRETE PLACEMENT.
36. PROVIDE BOLTED CLEAT CONNECTIONS TO SITE WELDED CONNECTIONS CAPABLE OF BEING LOADED BEFORE OR WHILE PLACE CONCRETE INFILL IN LIFTS NOT EXCEEDING 400 mm.
CONNECTIONS ARE WELDED TOGETHER. 36. STOP CONCRETE 50 mm BELOW TOP OF BLOCKS TO PROVIDE KEY FOR FOLLOWING CONCRETE. ENSURE PROPER COMPACTION OF
37. CROP INTERNAL CORNERS OF CLEATS AND STIFFENERS, etc TO FACILITATE DRAINAGE. PROVIDE DRAINAGE HOLES TO PREVENT CONCRETE BY “RODDING” OR OTHER APPROVED MEANS.
WATER PONDING ON STRUCTURAL ELEMENTS DURING CONSTRUCTION. SHOW PROPOSED HOLES ON SHOP DRAWINGS.
38. CLEARLY MARK CONNECTIONS SUBJECT TO VIBRATION. USE LOCK NUTS FOR BOLTS SUBJECT TO VIBRATION. DELIVERABLES
37. FORWARD CONCRETE AND GROUT PROJECT ASSESSMENT INFORMATION TO SUPERINTENDENT AS PER AS1379 CLAUSE 6.3 WHEN
BASEPLATES AND HOLDING DOWN BOLTS PROJECT ASSESSMENT IS UNDERTAKEN.
39. HOLDING DOWN BOLTS TO BE GRADE 4.6 UNO. SUPPLY HOLDING DOWN BOLTS WITH TWO CLASS 5 HEXAGONAL HEAD NUTS AND
EXTRA LARGE HARDENED OR 4 mm PLATE WASHER. HOT DIP GALVANIZE HOLDING DOWN BOLTS, NUTS AND WASHERS TO
AS1214. TIE HOLDING DOWN BOLT GROUPS RIGIDLY TOGETHER PRIOR TO INSTALLATION (eg. TACK WELD WITH 10 mm DIAMETER
REINFORCING BAR TO FORM A RIGID CAGE) TO ENSURE CORRECT BOLT LOCATIONS, AND SET OUT USING A 3 mm MILD STEEL
TEMPLATE SUPPLIED BY STEELWORK FABRICATOR. PROVIDE 4 N12 LIGATURES TO FIX HOLDING DOWN BOLT CAGE SECURELY TO
SLAB/FOOTING REINFORCEMENT.
40. GROUT BASE PLATES, HOLDING-DOWN BOLTS, REBATES etc BEFORE LOADING COLUMNS OR ERECTING WALLS. USE APPROVED
HIGH-STRENGTH (40MPa AT 7 DAYS) NON-SHRINK PRE-MIXED RAMMED GROUT. GROUT THICKNESS 15 mm MINIMUM, 40 mm
MAXIMUM UNO. CHAMFER GROUT EDGES AT 45 DEGREES UNO. DO NOT LOAD GROUT UNTIL FULL STRENGTH ACHIEVED.

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STRUCTURAL NOTES SHEET 3
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1:1 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-004
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-004 A
NOTES:
1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.

LEGENDS:
BH7
BH4 HW - RL 589.8 DENOTES APPROXIMATE LOCATIONS
OF GEOTECHNICAL INVESTIGATION BORE HOLES
HW - RL 591 MW - RL C.O.S.
BH1 HW DENOTES HIGHLY WEATHERED ROCK
MW - RL 590 MW DENOTES MODERATELY WEATHERED ROCK
HW - RL 589 SW DENOTES SLIGHTLY WEATHERED ROCK
SW - RL 589 RL590 DENOTES ESTIMATED
MW - RL 586 BP
TOP LEVEL OF THE ROCK PROFILE
DENOTES BORED PIER
C.O.S. DENOTES CONFIRM ON SITE
S T1 T V W X Y Z A1 B1 C1 F
D1 C
X Q S-503 S-302
BUILD NEW REINFORCED BLOCKWORK S-508 S-508 600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.
BEFORE DEMOLISHING THE EXISTING SHOTCRETE + 150mm REINFORCED SHOTCRETE
FOOTING SCHEDULE

3
3

3
BP
BP

BP

BP

BP

BP

BP

BP

BP

3
MARK DEPTH LENGTH WIDTH REMARKS

BP

BP

BP

6
BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
PF1 850 1400 1400

3
BP
EXISTING SHOTCRETE WALL
PF2 650 1400 1400
A

6
1

3
BH8

BP BP
C2

BP
C1
S-301
PF3 300 800 800

6
Y 2 HW - RL 590

2
W
PF

PF

6
S-507

BP BP BP
S-502 MW - RL C.O.S.

6
PIER SCHEDULE

C1
C1

C1

C1

C1

C1

C1

C1

C1
2
C1

600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.


893

7
MARK PILE DIAMETER

1
EXISTING REMNANT TREE TO BE

BP

BP

BP
1

1
PF

PF

PF

PF

PF
1
PF

7
RETAINED. CONTRACTOR TO BP1 1350

+ 150mm REINFORCED SHOTCRETE


2

BP
PF

ALLOW FOR PROTECTION BP2 900

7
MEASURES DURING

BP
EXISTING SUSPENDED SLAB TO BE PROPPED 1400 Z CONSTRUCTION AND

7
APPROPRIATE CONSTRUCTION

BP
PRIOR TO DEMOLITION. REFER TO DRAWING NO. S-507 FOR DETAILS S-502
METHODOLOGY

7
RETAINING WALL PIERS

BP
C1

B
C1

C1

C1

C1

C1

C1

C1

C1

C1
3

1400

7
BP
S-301 MIN. MIN.

1
1

BH5 SOCKET ULTIMATE

BP

BP

BP
MAX.
PF

8
1
PF

PF

PF

PF

BP
2

PF
PF

PIER RETAINED INTO ROCK LATERAL


HW - RL 589

8
BP
MARK DIAMETER HEIGHT (H) (L) CAPACITY REINFORCEMENT COMMENTS
MW - RL 587.8

8
BP
BP3 Ø600 3.8m 3.6m 1600 kPa 15-N28 FOUNDED ON MW ROCK
BP4 Ø600 2.1m 2.0m 1600 kPa 10-N20 FOUNDED ON MW ROCK

8
BP
BP5 Ø600 2.1m 4.9m 450 kPa 10-N20 FOUNDED ON HW ROCK

8
BP6 Ø600 5.0m 7.8m 450 kPa 12-N28 FOUNDED ON HW ROCK
C1

BP
C1

C1

C1

C1

C1

C1

C1

C1

C1
4 BP7 Ø600 4.5m 6.6m 450 kPa 12-N24 FOUNDED ON HW ROCK

8
1

BP
BP

BP

BP

BP
1

1
BP8 Ø600 4.0m 5.5m 450 kPa 10-N20 FOUNDED ON HW ROCK
2

PF

PF

PF

PF

PF
PF

ZONE 1 PF1 AND PF2 TO BE

8
BP
FOUNDED ON MW ROCK REFER TO PIER EMBEDMENT TYPICAL DETAILS ON S-502
ZONE 2 WITH 6500 kPa
ULTIMATE END
BEARING CAPACITY
TYP. G

C1
S-503
E
C1

1
C1

C1

C1

C1

C1

C1

C1

C1

BP
S-504 5
1

1
1
BP

BP

BP

BP

BP
1

BP
PF

PF
2
PF

1400 BH2 BP1 AND BP2 TO BE


FOUNDED ON MW ROCK
BH9
HW - RL 589 WITH 6500 kPa

3.2m HIGH RC RETAINING WALL


ULTIMATE END
HW - RL 590
C1

C1
1400

MW - RL 588.5 BEARING CAPACITY

C1
MW - RL C.O.S.
1

TYP.
PF
2

1
PF

BP
C3

C3

AB
C1

C1

C1

C1

C1

C1

C1
S-501
6

RW1
3

3
PF

PF

1
1

BP

BP

BP

BP

BP

BP
1500

PF

BH6
PF C1
C1

EXISTING WALL TO BE CUT


2

1500x2100 HIGH
C2

HW - RL 586.8
2
PF

2 2

NO OVERCUTTING AT CORNERS.
BP C

EPOXY COAT ALL CUT BARS.


MW - RL C.O.S.

C1
2
PF

1
BP
C1

C1

C1

C1
1 1

C1

7
BP C

J
RW3.

1
BP

BP

BP

BP

BP
S-504
BP 2

C2

C2
C2

C2
C

C2

C2

D
2

2
2

2
2

BP
BP

BP

BP

BP
BP

S-302

RW3. .
RW2

BH3 RW4
H
S-504 HW - RL 585.8
MW - C.O.S.

GENERAL ARRANGEMENT - FOOTING PLAN


SCALE 1 : 200

0 2000 4000 6000 8000 10000mm

SCALE 1:200 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA FOOTING KEY PLAN
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-101
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-101 A
S T1 T V W X Y Z A1 B1 C1 D1

F C
BH4 S-503 S-302
X Q
BUILD NEW REINFORCED BLOCKWORK S-508 S-508
HW - RL 591
BEFORE DEMOLISHING THE EXISTING SHOTCRETE
600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.
MW - RL 590
EXISTING SHOTCRETE WALL + 150mm REINFORCED SHOTCRETE SW - RL 589

3
BP

BP

BP

BP

BP

BP

BP

BP

BP
3

3
BP

BP

BP

BP

6
4

5
3

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
BP
1
A

C2

C1
S-301

6
BP
2

2
PF

PF
Y

6
1400 W

BP
S-507 S-502

6
BP
C1

C1

C1

C1

C1

C1

C1

C1
C1
2

1400

7
BP
C1

1
BP

BP

BP
1

1
PF

PF

PF

PF

PF
1
PF

7
2

BP
PF

600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.

7
BP
EXISTING SUSPENDED SLAB TO BE PROPPED
PRIOR TO DEMOLITION.

+ 150mm REINFORCED SHOTCRETE


REFER TO DRAWING NO. S-507 FOR DETAILS Z
S-502

7
BP

7
BP
3
C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

7
B

BP
S-301

1
PF
BH5

BP

BP

BP
1

1
PF

PF

1
2

PF

PF
PF
PF

8
BP
HW - RL 589
MW - RL 587.8

8
BP
8
BP
8
BP
8
BP
C1

C1

C1

C1

C1

C1

C1

C1

C1

C1
4

8
1
1

BP
BP
BP

BP

BP
1
1

1
2

PF
PF

PF

PF
PF

PF

PF1 FOUNDED
ON MW ROCK
WITH 6500 kPa

8
BP
ULTIMATE END
BEARING CAPACITY
TYP.
MATCH LINE

S T1 T V W X Y Z A1 B1 C1 D1

GENERAL ARRANGEMENT - FOOTING PLAN ZONE 1 1


NOTES:
SCALE 1 : 100
2 1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
ZONE 1 2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.
3

0 1000 2000 3000 4000 5000 mm

KEY PLAN SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA FOOTING PLAN ZONE 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-102
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-102 A
S T1 T V W X Y Z A1 B1 C1 D1

MATCH LINE

C1
1
BP
C1

C1

C1

C1

C1

C1

C1

C1

C1
5

1
1
BP

BP
BP

1
1
1

BP

BP
BP
PF

PF
2
PF

BH2
EXISTING WALL TO BE DEMOLISHED HW - RL 589
MW - RL 588.5
C1

C1

C1
1
PF
2
PF

1
BP
C3

C3

C1

C1

C1

C1

C1

C1

C1
EXISTING WALL TO BE CUT
1500x2100 HIGH 6
3

3
PF

PF
NO OVERCUTTING AT CORNERS.

1
BP

BP

BP

BP

BP

1
1
EPOXY COAT ALL CUT BARS.

BP
PF

RW1
1500

BH6
C1
C1

HW - RL 586.8
MW - RL C.O.S.
2

C2
PF

2
BP
2
PF

2
PF

C1
1
EXISTING FOOTING TO BE

BP
UNDERPINNED GATE POST
AS REQUIRED. FOOTING

C1
C1

C1

C1
C1

C1
7

1
BP
RW3

1
.

1
1

BP
BP

BP

BP
BP
C2

C2

C2

C2

C2
C2
2

2
BP

BP

BP

BP

BP

BP

BP
1400

1500
1800
.
RW3 .
RW2
BH3
HW - RL 585.8
MW - C.O.S. RW4

GENERAL ARRANGEMENT - FOOTING PLAN ZONE 2


SCALE 1 : 100

S T1 T V W X Y Z A1 B1 C1 D1
NOTES:
1
1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
2
2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.

ZONE 2
7

0 1000 2000 3000 4000 5000 mm

KEY PLAN SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA FOOTING PLAN ZONE 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-103
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-103 A
NOTES:
1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.

LEGEND
IJ - DENOTES ISOLATION JOINT
SJ - DENOTES SAWN CUT JOINT
EJ - DENOTES EXPANSION JOINT
DEJ - DENOTES DOWELLED EXPANSION JOINT
KEJ - DENOTES KEY JOINT
IT - DENOTES SLAB INTERNAL THICKENING
120 - DENOTES THICKNESS OF THE SLAB

S T1 T V W X Y Z A1 B1 C1 F
D1 C
X Q S-503 S-302
S-508 S-508
600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.
+ 150mm REINFORCED SHOTCRETE

3
BP

BP

BP

BP

BP

BP

BP

BP

BP

3
P3
BP

RW5 BP
B
150

6
B1

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
3
3

BP
C1 BP
M
A
1

C2
S-505
UP S-301

6
BP BP BP BP
RW5.
R Y W

6
S-507 S-507 150 UP S-502

6
C1

C1

C1

C1

C1

C1

C1

C1
2

600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.


7
S.J.

C1
EXISTING REMNANT TREE TO BE

7
BP
RETAINED. CONTRACTOR TO

+ 150mm REINFORCED SHOTCRETE


C1
ALLOW FOR PROTECTION

7
BP
MEASURES DURING
120
CONSTRUCTION AND

7
BP
APPROPRIATE CONSTRUCTION
EXISTING SLAB EDGE METHODOLOGY

7
BP
B

7
C1

C1

C1

C1

C1

C1

C1

C1
C1

C1
3

BP BP BP BP BP
S-301
S.J.

8 8
D.E.J.

8
S.J.

S.J.

K.J.

S.J.

S.J.

K.J.

S.J.

S.J.

K.J.

S.J.
AA

8
S-501

8
BP
C1

C1

C1

C1

C1

C1

C1

C1

C1

C1
4

8
BP
S.J.

8
ZONE 1

BP
ZONE 2 1:30 FALL 1:40 FALL

120
G

C1
S-503
E
C1

C1

C1

C1

C1

C1

C1

C1

C1
S-504 5
S.J.

3.2m HIGH RC RETAINING WALL


REFER TO TYPICAL
P
C1

C1

ISLAND SLAB DETAIL TYPICAL COLUMN CONCRETE JOINTS

C1
S-506 ON DRG S-501 TYP.
U
C3

C3

C1

C1

C1

C1

C1

C1
6 1-N16 TYP.

C1
S-506
AB

RW1

COG
300
S.J.
SJ

SJ

150 S-501
C1

N
C2
C1

S-505

C1

TYP.
600
C1

C1

C1

C1
C1

C1
7
S.J.
RW3

C2

CONCRETE EDGE CONCRETE JOINTS


C2

C2

C2

C2

C2

C2
D
2 S-302
S-602
RW3. .
RW2

J
H
NOTES: S-504
S-504 TYPICAL SLAB ON GROUND TRIMMER DETAILS
FOR RAMP DETAILS SCALE 1 : 50
1. BASEMENT SLAB TO BE 120mm GROUND SLAB REINFORCED WITH SL82 MESH, REFER TO CIVIL AT ALL COLUMNS, WALLS PITS, FLOOR WASTES, ETC THAT CAUSE A PENETRATION THROUGH THE SLAB.
30 TOP COVER ON VAPOUR BARRIER ON 50mm SAND BLINDING DRAWINGS
ON 100mm HARDCORE. FINISH TO MATCH EXISTING.

2. PLANTROOM SLAB TO BE 150mm GROUND SLAB REINFORCED WITH SL82 MESH,


30 TOP COVER ON VAPOUR BARRIER ON 50mm SAND BLINDING
ON 100mm HARDCORE. FINISH TO MATCH EXISTING.

3. SAWN JOINTS AT 8.6 m MAX. CRS, KEYED JOINTS AT 24m MAX. CRS. GENERAL ARRANGEMENT - LEVEL 1
SCALE 1 : 200
0 2000 4000 6000 8000 10000mm
4. XYPEX TO BE ADDED TO ALL GROUND SLABS.
SCALE 1:200 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 1 GENERAL ARRANGEMENT PLAN
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-104
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-104 A
S T1 T V W X Y Z A1 B1 C1 D1

X
S-508
120mm THICK RC 600mm DIAMETER BORED PIERS AT 1.6 m CRS.
SLOPING SLAB
FROM EXISTING LEVEL + 150mm REINFORCED SHOTCRETE
TO PLANTROOM LEVEL F
S-503

150
120

RW5
B1
M

C2

C1
S-505 A
S-301
UP

RW5. PROVIDE HOLES/GAP AT THE BOTTOM OF THE


BLOCKWORK WALL
FOR DRAINAGE. PROVIDE MESH COVER W
600x600x300 TO PREVENT VERMIN ACCESS.
UP S-502
SLAB THICKENING TYPICAL TO BOTH STAIR LOCATIONS
AT BOLLARD LOCATIONS
Q TYP.

C1
C1

C1

C1
C1

C1

C1
S-508

C1
2
C1

S.J.
C1

600mm DIAMETER BORED PIERS AT 1.6 m CRS.


R Y 120

+ 150mm REINFORCED SHOTCRETE


S-507 S-507

C1
C1

C1

C1

C1

C1
C1

C1
C1

C1
B
S-301
S.J.

1:30 FALL 1:40 FALL


E.J.

S.J.

S.J.

K.J.

S.J.

S.J.

K.J.

S.J.

S.J.

K.J.

S.J.
C1

C1
C1
C1
C1

C1

C1

C1
C1

C1
4
S.J.

MATCH LINE

C
NOTES: S-302
S T1 T V W X Y Z A1 B1 C1 D1

1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.


GENERAL ARRANGEMENT - LEVEL 1 ZONE 1 1 2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.
SCALE 1 : 100 2

ZONE 1
3
LEGEND
4
IJ - DENOTES ISOLATION JOINT
SJ - DENOTES SAWN CUT JOINT
5
EJ - DENOTES EXPANSION JOINT
DEJ - DENOTES DOWELLED EXPANSION JOINT
6
KEJ - DENOTES KEY JOINT
IT - DENOTES SLAB INTERNAL THICKENING
7 120 - DENOTES THICKNESS OF THE SLAB

0 1000 2000 3000 4000 5000 mm

KEY PLAN SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 1 GENERAL ARRANGEMENT PLAN ZONE 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-105
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-105 A
S T1 T V W X Y Z A1 B1 C1 D1

MATCH LINE

1:30 FALL 1:40 FALL

S.J.

S.J.

K.J.

S.J.

S.J.

K.J.

S.J.
E.J.

S.J.

S.J.

K.J.

C1
G
S-503
C1

C1

C1

C1

C1

C1

C1

C1

C1
E
S-504 5
S.J.
C1

C1

C1

3.2m HIGH RC RETAINING WALL


U

RW1
C3

C3

C1

C1

C1

C1

C1

C1
C1
S-506
6
S.J.
150
SJ

SJ
AB
C1

S-501

N
C1

150
S-505
C2

C2

C1
P
S-506

C1

C1

C1

C1
C1

C1
7
RW3

S.J.
.

600x600x300 EDGE THICKENING


AT BOLLARDS LOCATION
TYP.

C2
C2

C2

C2

C2

C2
C2

D
S-302

.
RW3 RW2
.

J C
H S-504 S-302
S-504

GENERAL ARRANGEMENT - LEVEL 1 - ZONE 2 S T1 T V W X Y Z A1 B1 C1 D1


SCALE 1 : 100
1
NOTES:
2

1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.


3 2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.

4
LEGEND
5
IJ - DENOTES ISOLATION JOINT
SJ - DENOTES SAWN CUT JOINT
6
EJ - DENOTES EXPANSION JOINT
ZONE 2 DEJ - DENOTES DOWELLED EXPANSION JOINT
7
KEJ - DENOTES KEY JOINT
IT - DENOTES SLAB INTERNAL THICKENING
120 - DENOTES THICKNESS OF THE SLAB
0 1000 2000 3000 4000 5000 mm

KEY PLAN SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 1 GENERAL ARRANGEMENT PLAN ZONE 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-106
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-106 A
R S T1 T V W X Y Z A1 B1 C1 D1
X Q 150mm THICK FALSE SLAB F
S-508 S-508 ON TOP OF PT SLAB S-503
600mm DIAMETER BORED PIERS @ MAX. 1.6 m CRS.
+ 150mm REINFORCED SHOTCRETE
RW6 ABOVE CAPPING BEAM

800
A
S S-301 1
S-508
1610 W
S-502

1250
D.E.J.
2

600mm DIAMETER BORED PIERS AT MAX. 1.6 m CRS.


700mm X 600mm DEEP BEAM
D.E.J.

+ 150mm REINFORCED SHOTCRETE


Z
S-502
NEW BEAM TO RE-SUPPORT

CONSTRUCTION JOINT - ALLOW FOR 120 DAYS POUR BREAK


THE EXISTING LOADING DOCK
Y B
S-507
S-301
3

2000
R
S-507 2400 1800

4
D.E.J.

600 600 600 600 600 600 550 550 550 525

NOTES: DENOTES MAXIMUM DEPTH OF BAND BEAM


TO MEET THE 2.5m HEIGHT CLEARANCE
1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
IN THE BASEMENT. TYP.
2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.
6
400 600x400 DEEP EDGE BEAM
NOTE:
1. FOR TENDER PURPOSES ONLY:
ALLOW FOR POST-TENSIONED BANDED SLAB
280 mm THICK SLAB INTERNAL SPAN
350 mm THICK SLAB END SPAN
2400x600mm BAND BEAM AT GRID LINES
DEPTH VARIES TO MEET THE 2.5m HEIGHT CLEARANCE IN THE BASEMENT
REO RATE - 110 kg/m3
PT RATE - 16 kg/m2 7
2. CONTRACTOR TO ENGAGE SPECIALIST SUB-CONTRACTOR 600x650 DEEP EDGE BEAM
TO DESIGN THE POST TENSIONED LEVEL 2 SLAB FOR THE FOLLOWING LOADINGS:

LOAD CASE 1: LANDSCAPE D


DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT S-302
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB + 1.5m OF FILL
LIVE LOAD - 5 kPa
C

4
RW
LOAD CASE 2: MAINTENANCE VEHICLE S-302
DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT
K

2000
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB + 0.5m OF PAVEMENT
LIVE LOAD - 5 kPa + 26t GVM S-504
RC RETAINING WALL
LOAD CASE 3: 2 STOREY BUILDING
DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB CONCRETE RAMP ON GRADE.
OTHER LOADS - 35 kPa EQUIVALENT LIVE LOAD DISTRIBUTED TO TWO FLOORS REFER TO CIVIL DRAWINGS
FOR DETAILS

3. COLUMNS AND FOOTINGS ARE DESIGNED FOR THE LOADINGS DESCRIBED ABOVE.
IF THE OVERALL WEIGHT OF THE BANDED SLAB IS GREATER THAN WHAT IS ALLOWED
ABOVE, SEEK FURTHER STRUCTURAL ADVICE.

4. MAXIMUM ALLOWED COLUMN MOMENTS (SERVICE) AT CONNECTION TO SLAB BEAMS ARE:


MAJOR MINOR
GENERAL ARANGEMENT PLAN - LEVEL 2 SLAB
DEAD LOAD 220 kN-m 35 kN-m SCALE 1 : 200
LIVE LOAD 50 kN-m 10 kN-m
SOIL LOAD 410 kN-m 65 kN-m
COLUMNS ARE "PINNED" AT FOOTING LEVEL. 0 2000 4000 6000 8000 10000mm

SCALE 1:200 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 2 - CONCRETE PLAN
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-107
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-107 A
NOTES:
1. FOR GENERAL NOTES REFER DRG No. S-002 TO S-004.
2. FOR CONCRETE DETAILS REFER DRG. S-501-S-508.

LEGEND
IJ - DENOTES ISOLATION JOINT
R S T1 T V W X Y Z A1 B1 C1 D1 SJ - DENOTES SAWN CUT JOINT
EJ - DENOTES EXPANSION JOINT
X DEJ - DENOTES DOWELLED EXPANSION JOINT
S-508 KEJ - DENOTES KEY JOINT
IT - DENOTES SLAB INTERNAL THICKENING
120 - DENOTES THICKNESS OF THE SLAB

IJ
S 1

4342
S-508
W
S-502
SJ

IJ

IJ
2

4670
IJ SJ
Z

5890
S-502
Y
S-507

EJ
3

5910
R
S-507

SJ

5910
SJ

SJ

SJ

SJ

EJ

SJ

SJ

SJ

EJ

SJ

SJ

SJ
IJ

IJ
SJ

5910
5
EJ

5910
200 mm WIDE
CONCRETE HOB
T HEIGHT TO MATCH
S-506 SJ WEARING SLAB THICKNESS

6
4215 4525 5355 5600 5480 5500 6080 6070 6040 6030 5485 6450 6120

6060
SJ

4585
150x100x10 UA

7
SJ

4160
150x100x10 UA

FOR RAMP SLAB REFER TO CIVIL DRAWINGS

NOTE:
1. 125mm WEARING SLAB REINFORCED WITH SL82 MESH,
30 TOP COVER ON WATERPROOFING MEMBRANE. BROOM FINISH.

2. REFER TO S-501 FOR DETAILS OF CONCRETE JOINTS

3. PROVIDE 2-N16x1200 LONG TO ALL RE-ENTRANT CORNERS, REFER TO S-104 FOR TRIMMER BARS DETAILS.

4. XYPEX TO BE ADDED TO WEARING SLAB


0 2000 4000 6000 8000 10000mm

SCALE 1:200 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 2 - WEARING SLAB GENERAL
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET ARRANGEMENT PLAN
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-108
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-108 A
NOTE:
1. FOR TENDER PURPOSES ONLY:
ALLOW FOR POST-TENSIONED BANDED SLAB
280 mm THICK SLAB INTERNAL SPAN
350 mm THICK SLAB END SPAN
2400x600mm BAND BEAM AT GRID LINES
DEPTH VARIES TO MEET THE 2.5m HEIGHT CLEARANCE IN THE BASEMENT
REO RATE - 110 kg/m3
PT RATE - 16 kg/m2

2. CONTRACTOR TO ENGAGE SPECIALIST SUB-CONTRACTOR


TO DESIGN THE POST TENSIONED LEVEL 2 SLAB FOR THE FOLLOWING LOADINGS:

LOAD CASE 1: LANDSCAPE


DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB + 1.5m OF FILL
LIVE LOAD - 5 kPa
FUTURE ROOF LEVEL WITH 0.5 kPa LIVE LOAD
LOAD CASE 2: MAINTENANCE VEHICLE STEEL FRAMED METAL DECK ROOFING
DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB + 0.5m OF PAVEMENT
LIVE LOAD - 5 kPa + 26t GVM

LOAD CASE 3: 2 STOREY BUILDING


DEAD LOAD - SELFWEIGHT + MEMBRANE WEIGHT
SUPERIMPOSED DEAD LOAD - 125mm WEARING SLAB
OTHER LOADS - 35 kPa EQUIVALENT LIVE LOAD DISTRIBUTED TO TWO FLOORS

3. COLUMNS AND FOOTINGS ARE DESIGNED FOR THE LOADINGS DESCRIBED ABOVE.
IF THE OVERALL WEIGHT OF THE BANDED SLAB IS GREATER THAN WHAT IS ALLOWED
ABOVE, SEEK FURTHER STRUCTURAL ADVICE.

4. MAXIMUM ALLOWED COLUMN MOMENTS (SERVICE) AT CONNECTION TO SLAB BEAMS ARE: FUTURE LEVEL 3 WITH 5 kPa LIVE LOAD
WATERPROOFING MEMBRANE
MAJOR MINOR CONCRETE FLOOR - 5 kPa DEAD LOAD
REFER TO ARCHITECTS DETAILS
DEAD LOAD 220 kN-m 35 kN-m
LIVE LOAD 50 kN-m 10 kN-m
SOIL LOAD 410 kN-m 65 kN-m 125mm WEARING SLAB WATERPROOFING MEMBRANE
COLUMNS ARE "PINNED" AT FOOTING LEVEL. REFER TO ARCHITECTS DETAILS

125mm WEARING SLAB

LEVEL 2 - REDUCED LIVE LOAD OF 20 kPa

FOR LANDSCAPE
1500 mm OF FILL
100mm THICK LEVELLING SCREED - 2.4 kPa

WATERPROOFING MEMBRANE
REFER TO ARCHITECTS DETAILS

PAVEMENT
500 mm
125mm WEARING SLAB

0 200 400 600 800 1000 mm

LOAD CASE 1 - 1.5m OF FILL + 5 kPa LIVE LOAD LOAD CASE 2 - 0.5m OF PAVEMENT + 26t GVM ALLOWANCE FOR FUTURE TWO-STOREY BUILDING - EQUIVALENT 35 kPa LIVE LOAD SCALE 1:20 AT ORIGINAL SIZE
SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20
DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE
ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA LEVEL 2 - DESIGN LOAD CASES FOR PT SLAB
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 20 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-201
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-201 A
RETAINING WALL - RW6 (BEHIND)
STEP AT EVERY 5 PRECAST PANELS
2.0m MAX. RETAINED HEIGHT

T V W X Y Z A1 B1 C1 D1
WALL JOINTS C
AT STEP LOCATIONS F S-302
TYP. S-503

WEJ

CC

CC
TOP OF OCI

CC
WEJ
V X Q

CC
CC

CC

CC
S-508 S-508

WEJ
S-508

WEJ

CC
300x500
RC TIE BEAM
TO EXISTING
STRUCTURE

BP5
BP4

BP5
BP4

BP4
BP4

BP4

BP5

BP5

BP5

BP5
BP4

BP4
BP4
BP4

BP4

BP5

BP5

BP5

BP5
BP4
BP4
BP4
BP4

BP5

BP5

BP5
BP4
BP4

BP5

BP6
BP3
BP3

BP3

BP3

BP3

BP3

BP3

BP3

BP3

BP3

BP3
BP3
A SECTION
S-101 SCALE 1 : 100

S T1 T V W X Y Z A1 B1 C1 D1 C
1 S-302
S-507
R Y
S-507 S-507

525L
C
550L
C
550L
C
550L
C
600 L
C
600 L
C
600 L
C
600 L
C

2.5m MIN.
600 L
C

2518
C1
C1
2.5m MIN.

C1
C1
2515
C1
C1
C1
C1
C1
C1

PF1
PF1

BP7
PF1

BP1
PF1

BP1
PF1

BP1
PF2 PF1

B SECTION
S-101 SCALE 1 : 100

0 1000 2000 3000 4000 5000 mm

SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA BUILDING SECTIONS - SHEET 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 100 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-301
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-301 A
1 2 3 4 5 6 7
TOP RL OF OCI
A W Z
S-301 S-502 S-502
B
NATURAL GROUND LINE S-301
G D
RL 594.000 S-503 S-302

RL 592.053

WEJ
CC

CC
BP8
BP8
BP8
BP8
BP8
BP7

BP8

BP8
BP7
BP7
BP7
BP7
BP7
BP6

BP6

BP6
BP6
BP6

C SECTION
S-101 SCALE 1 : 100

D1 C1 B1 A1 Z Y X

H
J S-504
S-504
CC

CC

WEJ

CC

CC

WEJ

CC

CC
D SECTION
S-101 SCALE 1 : 100

0 1000 2000 3000 4000 5000 mm

SCALE 1:100 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA BUILDING SECTIONS - SHEET 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 100 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-302
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-302 A
50 DIA. PVC PIPE (CLASS 9)
REFER TO SLAB PLAN PAINT FIRST CAST FACE 20 x 20 RECESS WITH APPROVED SEALANT. WATERPROOF MEMBRANE WITH CAPPED TOP TIED TO
FOR DETAILS WITH BONDBREAKER BONDBREAKER TO BASE OF RECESS, REFER TYPICAL SAW SAWN JOINT 3mm WIDE. CUT WOLFIN SYSTEM OR SIMILAR REINFORCEMENT
TOOLED EDGES. CUT SEALANT DETAIL TO BE MADE BETWEEN 6 AND 125 WEARING SLAB TO ARCHITECTS DETAIL PROVIDE PIPE FROM TOP OF FOOTING

D/3 (30 MIN)


FLEXIBLE JOINT FILLER AND STOP FABRIC 50
24 HOURS OF WITHIN 200mm OF TOP OF WALL
REFER TO SLAB PLAN WATERPROOFING 'EMER SEAL PU 40' SEALANT OR EACH SIDE OF JOINT
SLAB POUR.
STOP FABRIC 50 FOR DETAILS APPROVED EQUIVALENT
MEMBRANE REFER TO
EACH SIDE OF JOINT
ARCHITECTS DETAIL
REFER TO
PLAN

≤ 150
3

250
=
=
PT SLAB
CUT AND REMOVE 1-N12 TRIMMER BAR, TYP
NOTE: EVERY SECOND BAR
50 EITHER SIDE OF JOINT
1. METAL FORMED KEYS NOT PERMITTED 30 KEY
WITHOUT ENGINEERS APPROVAL.
SEALANT REFER TO DETAIL REINFORCEMENT AT THIS FACE
TO STOP 30mm EITHER SIDE
TYPICAL KEY JOINT (KJ) DETAIL TYPICAL SAWCUT JOINT DETAIL (SJ) UP TO 150mm SLAB THICKNESS EXPANSION JOINT (EJ) CRACK CONTROL (CC) OF JOINT
SCALE 1 : 10 SCALE 1 : 10
SCALE 1 : 10 SCALE 1 : 10
FOOTING
REINFORCEMENT 300 TYP
DRILL AND EPOXY GROUT 20 DIA DOWELS 450 LONG AT
DOWEL INTO EXISTING 300 CRS. GREASE ONE END.
CONCRETE, 150mm MIN. DOWELS TO BE SAW CUT
EMBEDMENT
REFER TO SLAB PLAN
FOR DETAILS 12x12 EMER-SEAL PU40 R24 GAL. DOWELS (600 LONG)
OR APPROVED EQUIVALENT AT 400 CENTRES
WATERPROOFING
WITH APPROVED BOND BREAKING WITH PVC SLEEVE AND CAP
MEMBRANE, REFER TO
TAPE UNDER
ARCHITECTS DETAIL

REFER
PLAN
EXISTING CONCRETE HOB 12mm THICK FLEXICOR RESIN

200
BONDED CORK FILLER 125 WEARING SLAB
OR APPROVED EQUIVALENT.
400 MAX.

THICKNESS
TO MATCH FINAL
LEVEL OF

.
300 WEARING SLAB
FOOTING PLASTIC CAP WITH 20 GAP AT
Z-BARS TO MATCH DOWEL END
FOOTING REINFORCEMENT
REINFORCEMENT
200
DOWELED EXPANSION JOINT DETAIL AT EXISTING CONCRETE PT SLAB POURED SECOND 10mm JOINTEX GROOVE REFER TO DETAIL POURED FIRST

AA SECTION TYPICAL ISOLATION JOINT (IJ) WALL EXPANSION JOINT (WEJ)


S-104 SCALE 1 : 10 SCALE 1 : 10
SCALE 1 : 10

1.5D REFER TO SLAB PLAN


TYPICAL FOOTING STEP DETAIL 6mm WIDE AND 14mm
DEEP SAWCUT
FOR DETAILS DRAIN COVER TO REFER TO SLAB PLAN
FOR DETAILS
HYDRAULIC ENGINEER'S

THICKNESS 'D'
SCALE 1 : 10
DETAIL

SLAB
150 300
'EMER SEAL PU4O' SEALANT RAMP

100

REFER
PLAN
N12-300

MAX
8mm BACKING ROD

600
THICKNESS 'D'
100
TYPICAL SEALANT DETAIL

SLAB
SCALE 1 : 1 N12-300
REFER TO SLAB PLAN MASONRY WALL N12-300
FOR DETAILS

150
N12 - 300
C.J LAP - 400
N12-300
REFER
PLAN

150
DOWEL JOINT

TYPICAL EDGE GRATED DRAIN DETAIL


300

N12-300 EW.
TYP. U.N.O.

300 AB SECTION
SCALE 1 : 20
150 MIN

TYP S-101

300 3L11TM
TYPICAL LARGE SLAB STEP DETAIL

REFER PLAN 150 MAX


N12-300 Z BARS SCALE 1 : 10
R10-450 TIES
TYPICAL SLAB INTERNAL THICKENING DETAIL (IT)

SETDOWN
L11TM3 BOTTOM MESH
SCALE 1 : 10 2-N12 T&B REFER TO SLAB PLAN 300
FOR DETAILS
CONSTRUCTION JOINT (CJ): THOROUGHLY ROUGHEN HARD ISOLATION JOINT TYP.
CONCRETE JOINT SURFACES. REMOVE LOOSE OR SOFT
MATERIAL AND LAITANCE. DAMPEN JOINT SURFACE USING

REFER
PLAN
CLEAN WATER AND COAT WITH NEAT CEMENT SLURRY
REFER TO SLAB PLAN SL82 MESH UNO
OR BONDING AGENT. TYP.
FOR DETAILS

REFER
PLAN
MAX
150

C.J.
REFER
PLAN

TYPICAL SLAB SETDOWN DETAIL


TYPICAL STAIR ON GRADE DETAIL SCALE 1 : 10
TYPICAL ISLAND SLAB DETAIL SCALE 1 : 10
0 100 200 300 400 500 mm

SCALE 1 : 10 SCALE 1:10 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-501
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-501 A
800WIDTH x 600DEPTH CAPPING BEAM
600 DIAMETER MAX. 1600 TYP. REFER TO TYPICAL PANEL
REFER TO TYPICAL PANEL REFER TO CIVIL DRAWINGS
BORED PIER DETAILS ON S-520
DETAILS ON S-520 FOR DRAIN DETAILS
BELOW
RETAINING WALL PIERS REFER TO CIVIL DRAWINGS
4-N20 TOP BARS
FOR DRAIN DETAILS
MIN. MIN. N12-200 LIGS
MAX. SOCKET ULTIMATE 800 WIDE X
PIER RETAINED INTO ROCK LATERAL 300 DEEP

800
MARK DIAMETER HEIGHT (H) (L) CAPACITY REINFORCEMENT COMMENTS N12-150 'U'-BARS
(MINIMUM)
CAPPING BEAM
BP3 Ø600 3.8m 3.6m 1600 kPa 15-N28 FOUNDED ON MW ROCK
BP4 Ø600 2.1m 2.0m 1600 kPa 10-N20 FOUNDED ON MW ROCK 4-N20 BOT BARS
BP5 Ø600 2.1m 4.9m 450 kPa 10-N20 FOUNDED ON HW ROCK N16-200 HORIZONTAL BARS E.F.
BP6 Ø600 5.0m 7.8m 450 kPa 12-N28 FOUNDED ON HW ROCK TOW
BP7 Ø600 4.5m 6.6m 450 kPa 12-N24 FOUNDED ON HW ROCK RL 593.000 m

2000mm MAX RETAINED SOIL


UPON COMPLETION OF THE PT SLAB
BP8 Ø600 4.0m 5.5m 450 kPa 10-N20 FOUNDED ON HW ROCK
N16-150 VERTICAL BARS E.F.
CONCRETE SOLDIER PILE SHORING - SHOTCRETE WITHIN PILES AT CAPPING BEAM (PLAN) NOTE: MINIMUM SOCKET AND CAPACITY OF THE ROCK TO BE CONFIRMED
GALVANISED

TO BE BACKFILLED
BY THE CONTRACTOR's GEOTECHNICAL ENGINEER PRIOR TO PLACING OF
SCALE 1 : 20 SL81 MESH
REINFORCEMENT AND CONCRETE.
FROM GROUND TO
15 CAPPING BEAM LEVEL
600 DIAMETER
GAP TYP.
BORED PIER STARTER BARS
TO PT DESIGNER DETAIL. I.J. 15 700

RW6
DRILL AND EPOXY GROUT PT CONTRACTOR TO 4-N24 TOP BARS 4-N24 TOP BARS
N12 GALVANISED AT 200 C/C 200 MIN. EMBEDMENT ALLOW FOR INITIAL SLAB N20-150 STARTER BARS E.F.
MAX. 1600 TYP. CENTRAL I.J.
MOVEMENT BEFORE N12-200 LIGS N12-200 LIGS
LOCKING IN THE
200 STARTER BARS,
STARTER BARS AA
TO PT DESIGNER DETAIL. S-502
500 TYP.
PT CONTRACTOR TO
150

600
C.J. 2-N24 SIDE BARS E.F. ALLOW FOR INITIAL SLAB 2-N24 SIDE BARS E.F.
LAP

MIN.
400

LAP
800
MOVEMENT BEFORE
4-N24 BOTTOM BARS LOCKING IN THE 4-N24 BOTTOM BARS
STARTER BARS,
TYP.
SCABBLE AND 150mm MIN. SHOTCRETE STEEL STAIR STRIP DRAIN EQUAL TO
CLEAN CONTACT GALVANISED SL81 MESH 4-N24 TOP BARS STRINGER PRODRAIN (PD20)
AREA OF PILE INFRONT OF N12 DRILLED 700 150 CONNECT TO
STRIP DRAIN PRODRAIN 2-N24 SIDE BARS E.F. STORMWATER SYSTEM
BARS, TYP.
OR APPROVED SIMILAR COMPRESSIBLE MATERIAL
N12-200 LIGS

Z SECTION 800 WIDE X 600 DEEP


(MINIMUM)

50
S-101 SCALE 1 : 20 CAPPING BEAM 450 75 150

N16-150 HORIZONTAL, GALV.


CONCRETE SOLDIER PILE SHORING - SHOTCRETE WITHIN PILES (PLAN)

BELOW CAPPING BEAM


N12-150 VERTICAL
50
SCALE 1 : 20

50
4-N24 BOT BARS
Ø 1350
Ø 900
190mm REINFORCED BLOCKWORK
75 75 SCABBLE SURFACE 300x900 CONCRETE COLUMN
COVER COVER CONSTRUCTION JOINT

H (MAX. RETAINED HEIGHT)


DURING EARLY WORKS
150mm REINFORCED
1200mm DIAMETER BORED PIER SHOTCRETE FIXED
TO BORED PIERS

NOMINAL
'150mm
N12-200 TIES N12-200 TIES

75
24-N20 VERTICAL BARS
11-N20 VERTICAL BARS

6 LIGS AT 150mm CRS.

850 MIN.
SL72 MESH

PIER BP1 REINFORCEMENT DETAIL PIER BP2 REINFORCEMENT DETAIL W SECTION


SCALE 1 : 20 SCALE 1 : 20

UNSUITABLE MATERIAL
S-101 SCALE 1 : 20
15
700 150
Ø 600

VARIES
75
COVER

LIGS.
SHOTCRETE

L (MINIMUM SOCKET INTO ROCK)


WALER BEAM

HW / MW ROCK
TOP LEVEL OF MW ROCK
S-502
MIN. SOCKET INTO MW ROCK

BORED PIER
N12-200 TIES BARS TO BE DRILLED
AND EPOXIED INTO PIERS
REFER TO SCHEDULE USING HILTI-HIT RE500v3
FOR VERTICAL BARS 200mm MIN. EMBEDMENT
600

DETAIL TYP.

100
SECTION
100

S-502 SCALE 1 : 10
0 100 200 300 400 500 mm
FOUNDED ON MW ROCK

TYPICAL BP3/BP4/BP5/BP6/BP7/BP8 WITH 6500kPa MINIMUM


PIER DIAMETER
AA SECTION SCALE 1:10 AT ORIGINAL SIZE
ULTIMATE END BEARING SCALE 1 : 20
S-502
BORED PIER DETAILS CAPACITY 0 200 400 600 800 1000 mm

TYPICAL PIER DETAIL TYPICAL WALL PIER EMBEDMENT DETAIL SCALE 1:20 AT ORIGINAL SIZE
SCALE 1 : 20 SCALE 1 : 20
DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE
ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-502
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-502 A
1 D1 R10-300 U-BARS
STARTER BARS 1-N12 500 LAP AS RE'D.
TO PT DESIGNER DETAIL. TYP.
REFER TO CIVIL DRAWINGS PT CONTRACTOR TO
FOR DRAIN DETAILS ALLOW FOR INITIAL SLAB
REFER TO TYPICAL PANEL MOVEMENT BEFORE
DETAILS ON S-520 LOCKING IN THE STARTER BARS, 200
300 TYP.

COG HOLD
RETAINED SOIL
TO BE BACKFILLED
AFTER THE SUSPENDED
SLAB IS COMPLETED.

COVER
80
TBC
525
COMPRESSIBLE MATERIAL
8-N20 x 800 mm LONG STARTER BARS TYP.
ALLOWANCE FOR THE

MAX.
FUTURE TWO-STOREY BUILDING

50

80
ASSUMED 400x400 mm COLUMN

3 SETS OF TIES AT 80mm CRS.


190mm BLOCKWORK 250
TYP.
N12-400 VERTICAL N16-150 VERTICAL BARS E.F.
N12-400 HORIZONTAL

RW1
HALF SPACING REQUIREMENT
I.J.
AT LAP LOCATIONS, TYP.
N16-200 HORIZONTAL BARS E.F.

375

STAGGERED 50% OF BARS


250

800 MIN. LAP


335 CRUSHED ROCK 300mm

C1
WIDE AROUND AG DRAIN
600

SPOON DRAIN TO
200 CIVIL DETAILS
10mm JOINTEX TYP. WATERPROOFING MEMBRANE
68

400 N16-200 LONGITUDINAL


BARS, TOP & BOTTOM N16-150 STARTER BARS E.F.

STAGGERED 50% OF BARS (TYP.)


COMPRESSIBLE MATERIAL
ON 20x200 CONCRETE REBATE 600 800 WIDE X 600 DEEP (MINIMUM) N16-150 TRANSVERSE

625 MIN. LAP


CAPPING BEAM JOINTED BASEMENT SLAB
10mm JOINTEX AROUND BARS, TOP
800
50mm⌀ WEEP HOLE

800 MIN. LAP


COLUMNS TYP. N16-150 TRANSVERSE
BARS, BOTTOM

SSD
C.J.
1250 STRIP DRAIN EQUAL TO PRODRAIN (PD20)
CONNECT TO STORMWATER SYSTEM

250
SLOTTED AG DRAIN
1475 WRAPPED IN GEOTEXTILE
150mm REINFORCED SHOTCRETE
50mm BLINDING
1075 FIXED TO BORED PIERS
LOCAL THICKENING CONCRETE
1500 300
190mm REINFORCED BLOCKWORK
1800

1/2 ROUND PIPE DRAIN TO SUMP 3-01 CONTINUE VAPOUR BARRIER


REFER CIVIL DRAWING C-301 TO DEBOND THE GROUND SLAB
TO THE RETAINING WALL FOOTING

RETAINING WALL 1
10mm JOINTEX, TYP.

G SECTION
300

S-101 SCALE 1 : 20
100 MIN.

800

BORED PIERS AT MAX. 1.6m CRS.


SL72 MESH FOR EMBEDMENT REFER TO PLAN AND SCHEDULE
ON DRG S-101-S103.
REFER DETAILS ON DRG S-502 & S-503

900 600 400

16 -N20 VERTICAL BARS


18-N24 VERTICAL BARS
6-N16 VERTICAL BARS
2 SETS-N12 TIES @ 300 CRS

300
300
2 SETS-N12 TIES @ 300 CRS

250
N12-300 TIES

0 100 200 300 400 500 mm

C1 - TYPICAL COLUMN DETAILS C2 - TYPICAL COLUMN DETAILS C3 - TYPICAL COLUMN DETAILS


F SECTION SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 10
0
SCALE 1:10

200 400
AT ORIGINAL SIZE

600 800 1000 mm


S-101 SCALE 1 : 20
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 3
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-503
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-503 A
V T1

FOR COLUMN REINFORCEMENT


REFER TO DRG S-503
FOR COLUMN REINFORCEMENT
REFER TO DRG S-503
FOR COLUMN REINFORCEMENT

C1
REFER TO DRG S-503

C1
150 NOM.
800

C3
N16 STARTER BARS

N16-175 TOP BARS

150 NOM.
800
BOTH WAYS
N12-200 BOTTOM BARS
BOTH WAYS
N20 STARTER BARS N16-175 BOTTOM BARS

300
BOTH WAYS

N20 STARTER BARS

850
N20-175 BOTTOM BARS
BOTH WAYS
N20-175 BOTTOM BARS

650
BOTH WAYS MASS CONCRETE DOWN TO
800 MW ROCK WITH MINIMUM
PF1 ULTIMATE END BEARING
CAPACITY OF 6500 kPa
MASS CONCRETE DOWN TO
TYP.
MW ROCK WITH MINIMUM
ULTIMATE END BEARING MASS CONCRETE DOWN TO
CAPACITY OF 6500 kPa MW ROCK WITH MINIMUM
MAX 1m DEPTH 1400 TYP. ULTIMATE END BEARING
BEFORE CHANGING CAPACITY OF 6500 kPa
TO BP1 MAX 1m DEPTH 1400 TYP.
BEFORE CHANGING
TYPICAL PAD FOOTING PF1 DETAIL TO BP2 TYPICAL PAD FOOTING PF2 DETAIL TYPICAL PAD FOOTING PF3 DETAIL
SCALE 1 : 20

E SECTION STARTER BARS


S-101 SCALE 1 : 20 TO PT DESIGNER DETAIL.
PT CONTRACTOR TO
ALLOW FOR INITIAL SLAB
MOVEMENT BEFORE
CONCRETE PAVEMENT N16-300 DOWEL BAR
LOCKING IN THE
REFER TO CIVIL 230 250
70mm MIN. TO EDGE STARTER BARS,
OF BEARING STRIP TYP.

REFER TO S-602 FOR DETAILS AND CONNECTIONS

150
300 THRIEBEAM BARRIER
FIXED IN ACCORDANCE
WITH MANUFACTURER's
RECOMMENDATIONS

193
HOLD 20mm COMPRESSIBLE FILLER
RETAINED SOIL
TO BE BACKFILLED HSS/3/230 HERCUSLIP SHEARSTRIP
AFTER THE SUSPENDED N12-300 U-BARS
2-N12 OR APPROVED EQUIVALENT

850
SLAB IS COMPLETED.
10mm COMPRESSIBLE FILLER

150 mm
BEND AROUND 4d PIN

NOM.
N12-300 WATERPROOFING FOR RAMP SLAB DETAIL
N16-200 VERTICAL BARS E.F. MEMBRANE REFER TO CIVIL DRAWINGS
2 SETS OF R10-300 LIGS.

N16-200 HORIZONTAL BARS E.F.


NOTE: CORBEL DETAIL AT RAMP
SLAB SECTION ONLY

250
N12-300 U-BARS

N12-150 HORIZONTAL BARS E.F.

(RETAINED SOIL)
CRUSHED ROCK 300mm

1850 MAX
WIDE AROUND AG DRAIN WATERPROOFING MEMBRANE
N16-150 VERTICAL BARS E.F.
CRUSHED ROCK 300mm
WIDE AROUND AG DRAIN N16-150 STARTER BARS E.F.
190 BLOCKWORK
N16-200 HORIZONTAL BARS E.F. NOT SUPPORTING GRILLS CRUSHED ROCK 300mm
1750 mm MAX. RETAINED SOIL

190 BLOCKWORK N12-400 VERTICAL, CENTRAL WIDE AROUND AG DRAIN


N16-200 STARTER BARS E.F.
N16-200 VERTICAL, CENTRAL N12-400 HORIZONTAL EXISTING GROUND
WATERPROOFING MEMBRANE 50mm⌀ WEEP HOLE
N12-200 HORIZONTAL SURFACE
N12-150 VERTICAL BARS E.F. SSD (SUB SOIL DRAIN) SSD (SUB SOIL DRAIN)

N16-200 STARTER BARS E.F.

250
50mm⌀ WEEP HOLE N16-200 TRANSVERSE

625 MIN
BARS, BOTTOM

LAP
N12-150 TRANSVERSE
SSD (SUB SOIL DRAIN) N16-200 TRANSVERSE TOP & BOTTOM BARS
BARS, TOP 2000
N16-150 LONGITUDINAL
TOP & BOTTOM BARS
250

250
MASS CONCRETE
FOUNDED ON EW ROCK DOWN TO THE SAME LEVEL
1400 50mm BLINDING
MINIMUM 900 kPa ULTIMATE BASE LEVEL OF AS UNDERSIDE OF THE
1500 CONCRETE ADJACENT FOOTING
END BEARING CAPACITY ADJACENT FOOTING
TYP. N12-150 TOP & N16-200 TOP & BOTTOM
BOTTOM BARS BARS FOUNDED ON EW ROCK
N12-150 LONGITUDINAL
MINIMUM 900 kPa ULTIMATE FOUNDED ON EW ROCK
BARS, TOP & BOTTOM
END BEARING CAPACITY MINIMUM 900 kPa ULTIMATE
RETAINING WALL 3 TYP. RETAINING WALL 2 RETAINING WALL 4 END BEARING CAPACITY
TYP.

H SECTION J SECTION K SECTION 0 200 400 600 800 1000 mm


S-101 SCALE 1 : 20 S-101 SCALE 1 : 20 S-107 SCALE 1 : 20
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 4
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 20 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-504
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-504 A
V T

C.J.

N16-200
N12-200

COMPRESSIBLE DEJ
MATERIAL
STARTER BARS FROM PT SLAB 100 140mm THK
0 BLOCKWORK WALL

REFER TO DETAIL 1
ON S-507 FOR DETAILS
N12-200 N12-400
VERTICAL BARS
TYP

200
N12-400
HORIZONTAL
BARS, TYP
N16-200
N12-400
N12-200 STARTER BARS,
TYP
N12-200 R10-150 CTS
SHEAR LINKS

400
4-N16 TOP BARS
N12-200

100

300
0

200
B1
450 4-N16 BOTTOM BARS
602 N16-200

REFER TO TYPICAL DOWEL JOINT


DETAILS

EXISTING SLAB
N12-200 L-BAR

C2
2101
LEVEL 1_+510mm
190mm THICK RL 586.610 m
BLOCKWORK WALL
150mm THICK PLANTROOM SLAB
REINFORCED WITH SL82, N12-400 STARTER BAR TO
30mm TOP COVER MATCH BLOCKWORK WALL

890
TYP. VERTICAL REINFORCEMENT

150

300
600

M SECTION
S-104 SCALE 1 : 20

W
PF2

190mm THICK 140mm THICK 140mm THICK REFER TO DRG. AWM-0269-IFT-S-507


BLOCKWORK WALL BLOCKWORK WALL BLOCKWORK WALL FOR TYPICAL LARGE SLAB STEP
DETAIL

C2
REFER TO SLAB PLAN
FOR DETAILS

RL 587.970 10mm BASE PLATE


4-M16 H/D BOLTS
150mm MIN. EMEBEDMENT
CONCRETE ISLAND

N12-300 Z BARS
REFER TO TYPICAL PLANTROOM BASESLAB
L11TM3 BOTTOM MESH INTERNAL BEAM DETAIL BEHIND
ON DRG No. S-501

REFER TO TYPICAL STAIR


N12-300 Z BARS
ON GRADE DETAIL
ON DRG No. S-501 N SECTION PF2
400 0 200 400 600 800 1000 mm
L11TM3 BOTTOM MESH SCALE 1 : 20
S-104
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 5
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 20 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-505
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-505 A
T P
6 S-506
N12-200 TOP & BOTTOM BARS
T V S-506 W
BOTH WAYS
150 950 13080
RL 591.698
2152 2493 3000 2457 2978

150
N12-200 'L' BARS

N12 N12-200 'L' BAR

U N12-200 HORIZONTAL BAR


S-506 N12-200
WEARING SLAB
N12-200 VERTICAL BAR T
N12-200 'L' BARS S-506
I.J. I.J.

U 150 140 BLOCKWORK WALL BELOW

C3
C3
S-506

C1

340
600 600 6
PT SLAB BY OTHERS
COMPRESSIBLE 140mm THICK
MATERIAL 150 THICK SLAB BLOCKWORK WALL
140mm THICK
DENOTES SPAN
BLOCKWORK WALL 140 BLOCKWORK WALL BELOW

2368
DIRECTION OF THE
N12-200 VERTICAL 120
BONDEK SLAB
N12-200 HORIZONTAL

150
N12-200 L-BARS 600

4858
MECHANICAL DUCT SPACE N12-300

N12-200
140 BLOCKWORK WALL BELOW
150 PFC

C1
3-N16 2-N16 @ 50mm 120mm BONDEK SLAB
TRIMMER BARS SL82 MESH TOP, 30mm TOP COVER

2150
PROP THIS EDGE OF SLAB UNTIL PROPPING AS PER
THE BLOCKWORK WALL ABOVE MANUFACTURER's RECOMMENDATIONS
HAS GAINED ITS DESIGN STRENGTH

C2
PAVEMENT 10mm JOINTEX TYP. 190mm THICK 190mm THICK
BY CIVIL BLOCKWORK WALL BLOCKWORK WALL
N12-200 VERTICAL N12-200 VERTICAL
N12-400 HORIZONTAL N12-400 HORIZONTAL
PLAN AT RL 589.770 - MECHANICAL DUCT SPACE
SCALE 1 : 50
180 120

N16-200 STARTER BARS

120
230
150 150

300

P SECTION
S-104 SCALE 1 : 20

N12-200 TOP BARS


150 150THICK SLAB N12-200 TRANSVERSE BARS
TOP & BOTTOM BARS
150

N12-200 'L' BAR

N12-200 HORIZONTAL BAR

N12-200 VERTICAL BAR

200 3000 200


N12-200 HORIZONTAL BAR WEARING SLAB

N12-200 VERTICAL BAR

COMPRESSIBLE MATERIAL LEVEL 2_-380mm LEVEL 2_-380mm


RL 590.620 m RL 590.620 m

PT SLAB BY OTHERS
COMPRESSIBLE
2-N16 TOP BARS MATERIAL 2-N16 TOP BARS
150THICK SLAB N12-200 TOP & BOTTOM BARS 150THICK SLAB N12-200 TOP & BOTTOM BARS
BOTHWAYS
N12-SIDE BARS E.F. N12-SIDE BARS E.F.
N12-200 LIGS N12-200 LIGS

N12-300 TOP & BOTTOM BARS 2-N16 BOT BARS 2-N16 BOT BARS
200 3000 200
C3

C3

T SECTION U SECTION 0 200 400 600 800 1000 mm


S-108 SCALE 1 : 20 S-104 SCALE 1 : 20
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 6
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-506
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-506 A
EXISTING WALL SUPPORTING
THE EDGE OF THE EXISTING
LOADING DOCK SLAB.

3 TO BE DEMOLISHED ONCE THE SLAB IS PROPPED.


2
2000
INDICATIVE LOCATION OF EXISTING PT STRAND

B EXISTING PT SLAB TO BE PROPPED


S-301 10mm GAP CONSTRUCTION UNTIL NEW BEAM IS CONSTRUCTED

+/- 10mm MOVEMENT


50mm COMPRESSIBLE MATERIAL
D.E.J. BETWEEN EXISTING SLAB AND NEW BEAM
300
850

FOR WATERPROOF MEMBRANE


S AND COVER PLATE DETAILS

550
REFER TO ARCHITECTURAL DRAWINGS
250

ANCON ESDQ10300
SHEAR DOWELS 2-N12x1200 LONG
AT 600 mm CRS. ABOVE AND BELOW
HILTI-HY 200-R SHEAR CONNECTOR
1200
150mm MIN. EMBEDMENT
NEW EDGE BEAM 4-N12-100 U-BARS EACH SIDE
I.J. OF SHEAR CONNECTOR
450 20
500

I.J.

150
EXISTING WALLS AND STAIR
TO BE DEMOLISHED DEJ 20mm JOINTEX
TYP.
C1

C1
20 AT CONSTRUCTION
+/-20 mm MOVEMENT

EXISTING PT BANDED SLAB

PT SLAB BY OTHERS

1 DETAIL
S-301 SCALE 1 : 20

PF2
R SECTION
SCALE 1 : 20 PF2
S-104
2
INDICATIVE LOCATION OF EXISTING PT STRAND

EXISTING PT BAND BEAM TO BE PROPPED


10mm GAP CONSTRUCTION UNTIL NEW BEAM IS CONSTRUCTED

+/- 10mm MOVEMENT


D.E.J.
300

2-ANCON DSD 100


SHEAR CONNECTOR
SPACED AT 800mm CRS

3-N12 x 2200 LONG


1200 T&B OF SHEAR CONNECTOR
NEW EDGE BEAM
6-N12 AT 100 CRS U-BARS
EACH SIDE OF SHEAR CONNECTOR

Y SECTION 0 200 400 600 800 1000 mm


S-101 SCALE 1 : 20
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 7
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 20 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-507
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-507 A
N12-200 TOP AND BOTTOM T REFER TO DETAIL 1 V 1
S507
150 160THICK SLAB N12-300 TRANSVERSE BARS
D.E.J.

N12-300 STARTER BARS

200
N12-200 STARTER BARS

120mm BONDEK SLAB


REINFORCED WITH SL82 MESH
150THK RC WALL 150THK RC WALL 200 30mm TOP COVER

N16-200 HORIZONTAL BAR N16-200 HORIZONTAL BAR


100x10 EA GALV.
FIXED WITH M16-500 CRS.

WEJ
HILTI-HITRE500v3
N16-200 VERTICAL BAR

N12-200 EACH FACE


BOTH WAYS

RW6
N16-200 VERTICAL BARS
DRILL AND EPOXY USING
800

200mm MIN. EMBEDMENT


WEARING SLAB

PT SLAB BY OTHERS COMPRESSIBLE MATERIAL

EXISTING SLAB
EXISTING BEAM

S SECTION 140mm THK


SCALE 1 : 20 BLOCK WALL
S-107

200
1
160mm THK SLAB N12-150 'U'-BARS
600 N16-200
PRECASE PANEL 1-N12
N12-200
REFER S-502 FOR DETAILS N12-300

REFER TO CIVIL DRAWINGS

200
FOR DRAIN DETAILS
N12-200
500
N12-200 'L' BARS
N12-200 N12-300 SL82 BOTTOM MESH, 190mm THK B1 CONNECTED
1200mm WIDE BLOCK WALL TO BLOCK WALL
150mm THK RC WALL N12-200 30 COVER

200
EXISTING RC WALL N16-200 HORIZONTAL BARS E.F.

200
RW6
N12-200
N16-150 VERTICAL BARS E.F. VERTICAL BARS
N16-200 HORIZONTAL BAR

BP3
2-N20 T&B CRUSHED ROCK 300mm
DRILLED AND EPOXIED WIDE AROUND AG DRAIN N12-400
N16-200 VERTICAL BAR
USING HILTI-HIT RE500v3 HORIZONTAL
200mm MIN. EMBEDMENT WATERPROOFING BARS
MEMBRANE

N16-200 STARTER BAR 300X500 DEEP BEAM N20-150 STARTER BARS E.F. SLOTTED AG DRAIN N12-200
DRILL AND EPOXY USING REINFORCED WITH WRAPPED IN GEOTEXTILE STARTER BARS
HILTI-HY 200-R 2-N20 TOP AND BOTTOM
200mm MIN. EMBEDMENT R10-300 LIGS.
TYP. N12-150 TOP &

400
4-N24 TOP BARS SSD (SUB SOIL DRAIN) BOTTOM BARS

2-N24 SIDE BARS E.F.

250
N12-200 LIGS
NOTE: UNDERTAKE A REBAR SCAN PRIOR TO ANY DRILLING
TO COMPLETELY MISS THE EXISTING PT STRANDS 50mm BLINDING N12-200 TOP &
CONCRETE 500 BOTTOM BARS
800 WIDTH x 1200
VARYING DEPTH
CAPPING BEAM
4-N24 BOT BARS RETAINING WALL 5
V SECTION RETAINING WALL 6
S-301 SCALE 1 : 20
X SECTION Q SECTION 0 200 400 600 800 1000 mm

S-101 SCALE 1 : 20 S-101 SCALE 1 : 20


SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA CONCRETE DETAILS SHEET 8
A APPROVED FOR CONSTRUCTION AFC 10.10.19 BP3
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 20 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-508
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-508 A
BLOCKWALL
400
TYPICAL
BLOCKWALL

R12 GALV. DOWELS 400 FLEXIBLE JOINT FILLER AND CONTROL JOINT RAKE JOINT AND FILL WITH
LONG AT 400 CRS. 10 x 10 APPROVED JOINT HALF BLOCK APPROVED JOINT SEALANT
GREASE AND WRAP ONE SEALANT EACH FACE

STD LAP
END. DOWELS TO BE SAW
CUT. BLOCKWALL

TYPICAL
BLOCKWALL

400
CORNER BARS TO MATCH
400
WALL REINFORCEMENT

SUSPENDED SLAB

BLOCKWALL
CONTROL JOINT BLOCK

CONTROL JOINT DETAIL (TYPE 2)


CONTROL JOINT DETAIL (TYPE 1) SCALE 1 : 10
SCALE 1 : 10

400
'L' BAR TO MATCH VERTICAL
REINFORCEMENT

CORNER INTERSECTION DETAIL


SCALE 1 : 10
BLOCKWALL

BLOCKWALL
BLOCKWALL
KNOCKOUT 1-N20 EACH
BLOCK COURSE
KNOCKOUT BLOCK R10-200
BLOCKWALL TO SLAB JOINT DETAIL R10-200
SCALE 1 : 10 VERTICAL BAR 1-N16 EACH
KNOCKOUT BLOCK

300 CRS
COURSE

200 CRS
LINTEL BLOCK VERTICAL BAR
CLEAR COVER TO VERTICAL BAR
1-N20
REINFORCEMENT CLEAR COVER TO CLEAR COVER TO

110
LINTEL BLOCK LINTEL BLOCK
FITMENT FITMENT

100

100
LINTEL DETAIL (0 - 900 OPENING) LINTEL DETAIL (900 - 2400 OPENING) LINTEL DETAIL (2400 - 3000 OPENING)
SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 10

ALTERNATE COG 400


DIRECTION TYPICAL BLOCKWALL TOP BAR/S COGGED N10 FITMENTS AT 200 CRS
DOWN INTO CORE

'L' BARS TO MATCH WALL


REINFORCEMENT
TYPICAL
400

BOTTOM BAR/S CRANKED UP TO


SUIT KNOCK-OUT BLOCK BEFORE
BLOCKWALL

COGGED DOWN INTO CORE

TEE INTERSECTION DETAIL


SCALE 1 : 10

WALL BAR IN GROUTED CORE


BLOCKWALL

LINTEL SUPPORT DETAIL 0 200 400 600 800 1000 mm


SCALE 1 : 10
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA TYPICAL MASONRY BLOCKWORK DETAILS
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1 : 10 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-510
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-510 A
450 CL CL CL CL

200 900 900

25
BACKING ROD
INTERNAL
PROVIDE 170x50x75 LONG 16 DIA PVC GROUTING VENT.
BLOCKOUT IN PRECAST PANEL GROUT POCKET AFTER ERECTING 2N16 CORNER BARS

640 MIN. LAP


REINFORCEMENT AS PER PANEL. ALL FLUID GROUTS TO BE 4N16 U-BARS PER

TYPICAL
ELEVATION EMBERCON 6.36 PREMIXED NON- PANEL TYPICAL U.N.O.
SHRINK GROUT OR EQUAL 150
N20 GALV DOWEL 400 LONG. 450 450
VOID FORMER
REFER PANEL ELEVATIONS APPROVED NON METALLIC MAINTAIN
FOR LOCATION. (2 N MIN PER PACKERS & NON-SHRINK GROUT A MINIMUM 150mm THICK
PANEL) BETWEEN PANEL & EXTERNAL SEALANT AS SPECIFIED

VARIES

VARIES

SL1
20 180
FOOTING/SLAB SL102 MESH EACH BY ARCHITECT PANEL

02
CONNECTION TO

SH
FACE TYPICAL.

ME
HEIGHT TO BE CONFIRM BY ARCHITECT

HEIGHT TO BE CONFIRM BY ARCHITECT


RL

2 ME
MATCH EXISTING

SH
SL10
DRILL & EPOXY INTO FOOTING/SLAB 2N16 CORNER BARS
200

USING "EPIREZ 133" OR EQUAL 4N16 Z-BARS PER PANEL


WATERPROOF MEMBRANE
1N16
EACH SIDE
1N16
EACH SIDE TYPICAL PANEL JOINT DETAIL (PLAN)
TYPICAL U.N.O. SCALE 1 : 20
TO ARCHITECTS DETAILS EACH FACE EACH FACE

PANEL CONNECTION DETAIL 1 NOTE:


SCALE 1 : 10 SL102 MESH 1. PANEL ELEVATIONS ARE ALL SCHEMATIC. FOR REINFORCEMENT

VARIES

VARIES
AND CONNECTION INFORMATION ONLY. REFER TO
ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS,
200 200
PENETRATIONS, REBATES ETC.
1N16 BAR TYPICAL 2. ALL PANELS BELOW GROUND LEVEL TO BE BITUMEN COATED
(TO EARTH FACE).
20mm BAR WELDED TO PLATE, 3. REFER TO GENERAL NOTES FOR PRECAST REQUIREMENTS.
CAST INTO PRECAST PANEL
1M20 CHEMICAL ANCHOR
250 MIN. EMBEDMENT
1N16 TYPICAL 1N16 TYPICAL
20mm BASE PLATE
200

200
"BANDAID"
WATERPROOFING
DETAIL

TYPICAL PANEL DETAILS TYPICAL PANEL FRONT ELEVATION TYPICAL PANEL REAR ELEVATION
SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20

PANEL TYPE CONNECTION DETAIL 2


SCALE 1 : 10

0 100 200 300 400 500 mm

SCALE 1:10 AT ORIGINAL SIZE

0 200 400 600 800 1000 mm

SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA PRECAST PANEL DETAILS
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 B. MOLINA B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-520
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-520 A
2 1 2 1

1
SB1

1
NOSING LINE S-601

SC

1
SB
2
SB1 S-601
UP

LANDING TO BE
WEBFORGE
A253/MPG

SB1
SB 3
1

SB1

SB1
S-601
LEVEL 2_-380mm
SB1 SB1
RL 590.620 m
1
SC

SC1
SB1

SB1

1
4
SB1

SB

SB
5
S-601 S-601 SB1 TO SC1
CONNECTION
SIM
A 1
S-601 1 S-601

SC1
SB
1
SC

1
SB1 SB1

SC
STEEL STAIR FRAMING PLAN
SCALE 1 : 20
2
12 THICK PLATE FULLY WELDED
2-M16 8.8/S BOLTS A SECTION
S-601 SCALE 1 : 20
1
SB

FRAMING SCHEDULE
SB1 MARK SIZE REMARKS
1
SB

10 THICK PLATE SB1 230PFC


2-M16 8.8/S BOLTS ALL STAIR THREADS TO SC1 150x100x6.0 RHS
BE WEBFORGE
PT SLAB T6/A325 MPG
FIXED IN ACCORDANCE
SC1

WITH MANUFACTURER's
RECOMMENDATIONS
100x10 EA WELDED TO SC1
200 LONG
2-M16 CHEMICAL ANCHORS 1 DETAIL
TO BLOCKWORK S-601 SCALE 1 : 10
FOR STABILITY, TYP.
SB
1
NOSING LINE
SC1

10mm BASE PLATE


2 DETAIL 12 THICK CLEAT PLATE
SB
1
SCALE 1 : 10 2-M12 8.8/S BOLTS
2-M16 HILTI-HY200R S-601
150 MIN. EMBEDMENT

25mm GROUT 10mm BASE PLATE TOP OF CONCRETE


25mm NON-SHRINK
GROUT

STRINGER

1
SB
1-M16 HILTI-HY200R
ANCHOR 150 MIN.
FULLY WELDED EMBEDMENT, 100 MIN 0 100 200 300 400 500 mm
EDGE DISTANCE
SCALE 1:10 AT ORIGINAL SIZE
REFE TO TYPICAL SLAB
5 DETAIL 3 DETAIL 4 DETAIL INTERNAL THICKENING 0 200 400 600 800 1000 mm
SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 10 DETAIL ON DRG No. S-501
S-601 S-601 S-601
SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STEEL DETAILS SHEET 1
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-601
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-601 A
X Y
PROVIDE 100x10mm PLATE
TOP AND BOTTOM 1210mm NOMINAL
TYP. PANEL

100x10 TOP PLATE


100x10 PLATE AT 100mm CLEAR SPACING TYP. 90 100x10 PLATE
VERTICAL AT 100mm CRS., TYP

150x100x10 UA GALVANISED
CAST-IN N12-500 LUGS. GALV.
300mm LONG
100x10 BACK PLATE
MASTIC SEALANT WITH OVERSIZED HOLES
100x10 BACKPLATE 2-M12 REID CAST-IN FERRULES
LEVEL 2 TYP.
AT PANEL SPAN PER PANEL
PARKING

WEARING SLAB BEHIND 200 45


2-M12 S/S + 8mm THICK OVERSIZED WASHER 150x100x10 UA CAST-IN
PER 1.2m WIDE STEEL GRILLS PANEL TYP.
PROVIDE ISOLATION WASHER
BETWEEN WASHER AND BACKING PLATE
MEMBRANE SYSTEM
600
N12 CROSS ROD - REFER SECTION LEVEL 2_-380mm
500 RL 590.620 m
M12x55 LONG REID CAST-IN FERRULES
GRADE 316 STAINLESS STEEL

1-N12 x 600 LONG HORIZONTAL BARS


+ R10-200 U-BARS

LEVEL 2_-380mm
RL 590.620 m

2-M16 PER PANEL


150x100x10 UA

190 THICK CORE FILLED


BLOCKWALL

CONCRETE WALL

40 mm THICK CAPPING
CUT TO SUIT 100x10 PLATE

TYPICAL VERTICAL GRILL ELEVATION


SCALE 1 : 20

NOTE: FABRICATION OF THE GRILLS TO BE BASED ON SITE DIMENSIONS

100x10 BACK PLATE


200x100x10 UA x 100mm LONG
WELDED TO 100x10 BACK PLATE
ON 10mm NON-SHRINK GROUT
1-M16 COUNTERSUNK BOLT
DRILLED AND EPOXIED
USING HILTI HIT RE500v3
300

300mm MIN. EMBEDMENT


CENTRALLY.

PROVIDE 100x10mm PLATE


190mm THK CORE FILLED
BLOCKWALL

STEEL GRATED DRAIN

75x6 EA GALVANISED
M12-500 DRILLED AND EPOXIED
USING HILTI-HY200R
125mm MIN. EMBEDMENT
0 50 100 150 200 250 mm

SCALE 1:5 AT ORIGINAL SIZE

0 200 400 600 800 1000 mm


TYPICAL VERTICAL GRILL SECTION
SCALE 1 : 5 SCALE 1:20 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STEEL DETAILS SHEET 2
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 As indicated A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-602
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-602 A
POST

2-M20x100 LONG BOLTS (GRADE 4.6)


TO AS 111, THREAD LENGTH 50, SHANK OF BOLTS
SHALL BE TURNED DOWN TO ⌀19 TO ENSURE
A DESIGN FAILURE LOAD
6

20mm BASE PLATE

DRY PACK CEMENT MORTAR

25
HILTI HIS/HIS-R M20x170 INTERNALLY
THREADED SLEEVE OR SIMILAR
145

PRODUCT ACHORED CHEMICALLY

175
⌀30 HOLE

POST
RAMP RETAINIGN WALL
(TO SUIT INSTALLATION HEIGHT SPECIFIED)
260

TYPICAL BASEPLATE DETAIL


VARIABLE

RETAINING WALL
⌀18

EXTERNAL SIDE

45 190 45 45 190 45

M20x100 LONG BOLT

60
6
⌀20 GALV WASHER ⌀20 GALV WASHER

200
80
M20x100 LONG BOLT

60
20

NO WASHER TO BE USED
280 UNDER BOLT HEAD
TRAFFIC SIDE
20mm BASE PLATE

4 SLOTS
45x24
TYPICAL POST ELEVATION PLAN THRIE BEAM RAIL

THRIEBEAM SUPPORT DETAIL BASE PLATE INSTALLATION DETAIL


SCALE 1 : 5

0 50 100 150 200 250 mm

SCALE 1:5 AT ORIGINAL SIZE

DWG DWG LOCATION PLAN CLIENT CONSULTANT DRAWING TITLE


ISSUE DESCRIPTION STATUS DATE ISSUE DESCRIPTION STATUS DATE
TRUE NORTH TRELOAR CRESCENT SITE NORTH AUSTRALIAN WAR MEMORIAL GHD CANBERRA STEEL DETAILS SHEET 3
A APPROVED FOR CONSTRUCTION AFC 10.10.19
20 TRELOAR CRESCENT LEVEL 7, 16 MARCUS CLARKE STREET
CAMPBELL ACT 2612 CANBERRA ACT 2601 AUSTRALIA
DRAWN CHECKED APPROVED SCALE SIZE
GPO BOX 1877 CANBERRA ACT 2601 M. CRUZ B. REMEDIOS F. EDIBAM
BLOCK 3 SECTION 39 T: 61 2 6113 3200 F: 61 2 6113 3299 1:5 A1
DATE 04.10.19 DATE 04.10.19 DATE 04.10.19
CAMPBELL ACT E: cbrmail@ghd.com W: www.ghdwoodhead.com STATUS REVISION DATE
DRAWING NO. 23-16682- S-603
NOTES: ABBREVIATIONS: PROJECT APPROVED FOR CONSTRUCTION 10.10.19
LIM E
ALL DIMENSIONS ARE IN MILLIMETRES
LEVELS ARE IN METRES
I INFORMATION ONLY - (UNCONTROLLED)
AWM REDEVELOPMENT PROJECT DISCIPLINE
EST NU C CONTROLLED ISSUE
ON AVE DO NOT SCALE OFF DRAWING
POPPY'S CARPARK EXTENSION STRUCTURAL
EA IRN USE FIGURED DIMENSIONS ONLY P PRELIMINARY
VEN
I RBA CHECK DIMENSIONS ON SITE
UE FA DRAWING NO. REVISION
HATCHED AREA INDICATES SCALEBAR:
LOCATION OF WORKS AWM-0269-AFC-S-603 A