PERDIDAS DE DIFERENTES ACCESORIOS Y SU EQUIVALENCIA EN TUBERIA

RECTA

1
CURSO DE BOMBAS CENTRIFUGAS

TABLA DE
PERDIDAS EN
ACCESORIOS

2
CURSO DE BOMBAS CENTRIFUGAS

TABLA DE
PERDIDAS EN
ACCESORIOS

3
CURSO DE BOMBAS CENTRIFUGAS

TABLAS DE PERDIDAS EN TUBERIAS DE ACERO NUEVA SCH


40 Y AGUA LIMPIA
3/4" (0,824" I.D.) 1" (1,049" I.D.) 1,1/4" (1,3880" I.D.) 1,1/2" (1,610" I.D.)
Q l/s
V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V2/2g (m) Hf (%)
2 2 2

0.2 0.58 0.017 2.76 0.36 0.007 0.85


0.3 0.87 0.039 5.76 0.54 0.015 1.76
0.4 1.16 0.069 9.78 0.72 0.026 2.96 0.41 0.009 0.75
0.5 1.45 0.107 14.81 0.90 0.041 4.45 0.51 0.013 1.13 0.38 0.007 0.55
0.6 1.74 0.155 20.84 1.07 0.059 6.23 0.61 0.019 1.57 0.46 0.011 0.76
0.8 2.32 0.275 35.88 1.43 0.105 10.64 0.82 0.034 2.65 0.61 0.019 1.28
1 2.90 0.430 54.88 1.79 0.164 16.17 1.02 0.053 3.99 0.76 0.029 1.92
1.2 3.48 0.618 77.84 2.15 0.235 22.81 1.23 0.077 5.60 0.91 0.042 2.68
1.5 2.69 0.368 34.86 1.53 0.120 8.49 1.14 0.066 4.05
1.8 3.22 0.530 49.41 1.84 0.173 11.97 1.37 0.095 5.69
2.1 3.76 0.721 66.46 2.15 0.235 16.02 1.60 0.130 7.60
2.4 4.30 0.942 85.99 2.45 0.307 20.64 1.82 0.170 9.77
2.7 2.76 0.389 25.84 2.05 0.215 12.20
3 3.07 0.480 31.61 2.28 0.265 14.90
3.5 3.58 0.654 42.51 2.66 0.361 19.99
4 4.09 0.854 54.99 3.04 0.472 25.80
4.5 4.60 1.080 69.05 3.42 0.597 32.35
5 5.11 1.334 84.71 3.80 0.737 39.63
5.5 4.18 0.891 47.63
6 4.56 1.061 56.37
6.5 4.94 1.245 65.83
7 5.32 1.444 76.02
7.5 5.70 1.658 86.93

4
2" (2,067" I.D.) 2,1/2" (2,469" I.D.) 3" (3,068" I.D.) 3,1/2" (3,548" I.D.)
Q l/s
5 5.11 1.334 84.71 3.80 0.737 39.63
5.5 4.18 0.891 47.63

CURSO DE BOMBAS CENTRIFUGAS


6 4.56 1.061 56.37
6.5 4.94 1.245 65.83
7 5.32 1.444 76.02
TABLAS DE PERDIDAS EN TUBERIAS DE ACERO NUEVA
7.5 5.70 1.658 86.93

SCH 40 Y AGUA LIMPIA


2" (2,067" I.D.) 2,1/2" (2,469" I.D.) 3" (3,068" I.D.) 3,1/2" (3,548" I.D.)
Q l/s
V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V2/2g (m) Hf (%)
2 2 2

1.5 0.69 0.024 1.18 0.48 0.012 0.49


2 0.92 0.043 2.00 0.65 0.021 0.83 0.42 0.009 0.29
2.5 1.15 0.068 3.03 0.81 0.033 1.26 0.52 0.014 0.43
3 1.38 0.098 4.25 0.97 0.048 1.76 0.63 0.020 0.60 0.47 0.011 0.30
4 1.84 0.174 7.30 1.29 0.085 3.00 0.84 0.036 1.02 0.63 0.020 0.50
5 2.31 0.271 11.15 1.62 0.133 4.56 1.05 0.056 1.55 0.78 0.031 0.76
6 2.77 0.390 15.78 1.94 0.192 6.44 1.26 0.800 2.17 0.94 0.045 1.06
7 3.23 0.532 21.21 2.26 0.261 8.63 1.47 0.110 2.90 1.10 0.061 1.41
8 3.69 0.694 27.42 2.59 0.341 11.12 1.67 0.143 3.37 1.25 0.080 1.81
10 4.61 1.085 42.20 3.23 0.533 17.06 2.09 0.223 5.69 1.56 0.125 2.75
12 5.53 1.562 60.13 3.88 0.767 24.23 2.51 0.322 8.05 1.88 0.180 3.87
14 6.46 2.126 81.20 4.52 1.044 32.65 2.93 0.438 10.81 2.19 0.245 5.19
15 6.92 2.44 92.91 4.85 1.199 37.32 3.14 0.503 12.34 2.35 0.281 5.92
16 5.17 1.364 42.30 3.35 0.572 13.97 2.50 0.320 6.69
17 5.49 1.540 47.59 3.56 0.646 15.70 2.66 0.361 7.52
18 5.82 1.726 53.19 3.77 0.724 17.53 2.82 0.405 8.39
20 6.46 2.131 65.33 4.19 0.894 21.49 3.13 0.500 10.26
25 8.08 3.330 101.10 5.23 1.397 33.12 3.91 0.781 15.77
30 6.28 2.011 47.24 1.69 1.125 22.45
35 7.33 2.738 63.84 5.48 1.531 30.29
40 8.37 3.576 82.93 6.26 1.999 39.29
45 7.04 2.530 49.45
50 7.82 3.124 60.78
60 9.39 4.498 86.91

5
CURSO DE BOMBAS CENTRIFUGAS

TABLAS DE PERDIDAS EN TUBERIAS DE ACERO NUEVA


SCH 40 Y AGUA LIMPIA
4" (4,026" I.D.) 5" (5,047" I.D.) 6" (6,065" I.D.) 8" (7,981" I.D.)
Q l/s
V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V /2g (m) Hf (%) V (m/s) V2/2g (m) Hf (%)
2 2 2

8 0.97 0.048 0.97 0.62 0.020 0.32 0.43 0.009 0.25 0.003
10 1.22 0.075 1.46 0.77 0.030 0.48 0.54 0.015 0.31 0.005
12 1.46 0.108 2.06 0.93 0.044 0.67 0.64 0.021 0.27 0.37 0.007
14 1.70 0.148 2.75 1.08 0.060 0.89 0.75 0.029 0.36 0.43 0.010
16 1.94 0.193 3.54 1.24 0.078 1.15 0.86 0.037 0.46 0.49 0.012
20 2.43 0.301 5.42 1.55 0.122 1.74 1.07 0.058 0.70 0.62 0.020
25 3.04 0.471 8.30 1.93 0.191 2.66 1.34 0.091 1.06 0.77 0.030 0.27
30 3.65 0.678 11.79 2.32 0.274 3.76 1.61 0.132 1.50 0.93 0.044 0.38
35 4.25 0.922 15.88 2.71 0.373 5.05 1.87 0.179 2.00 1.08 0.060 0.51
40 4.86 1.205 20.58 3.09 0.488 6.52 2.14 0.234 2.58 1.24 0.078 0.66
45 5.47 1.525 25.87 3.48 0.617 8.18 2.41 0.296 3.23 1.39 0.099 0.82
50 6.08 1.882 31.77 3.87 0.762 10.03 2.68 0.365 3.95 1.55 0.122 1.00
55 6.68 2.278 38.26 4.25 0.922 12.05 2.95 0.442 4.75 1.70 0.147 1.20
60 7.29 2.710 45.36 4.64 1.097 14.27 3.21 0.526 5.61 1.86 0.176 1.41
70 8.50 3.689 61.35 5.41 1.494 19.25 3.75 0.716 7.55 2.16 0.239 1.89
80 9.72 4.819 79.75 6.19 1.951 24.97 4.28 0.936 9.78 2.47 0.312 2.44
90 10.94 6.099 100.55 6.96 2.469 31.43 4.82 1.184 12.29 2.78 0.395 3.05
100 12.15 7.529 7.73 3.049 38.63 5.36 1.462 15.08 3.09 0.488 3.74
120 14.58 10.842 9.28 4.390 55.24 6.43 2.105 21.51 3.71 0.702 5.31
140 17.02 14.757 10.83 5.975 74.81 7.50 2.865 29.08 4.33 0.956 7.16
160 19.45 19.274 12.37 7.804 97.33 8.57 3.742 37.78 4.95 1.248 9.28
180 21.88 24.394 13.92 9.877 9.64 4.736 47.62 5.57 1.580 11.66
200 24.31 30.116 15.47 12.194 10.71 5.847 58.59 6.19 1.950 14.32
250 30.38 47.056 19.33 19.054 13.39 9.137 90.96 7.73 3.047 22.16

6
TABLAS DE PERDIDAS EN TUBERIAS DE ACERO NUEVA SCH
40 Y AGUA LIMPIA
Acero
F 10 " Nominal
SCH 40
Q V V2/2g Hf
lt/seg (m/s) (m) %
30 0.590 0.0177 0.16
35 0.688 0.0241 0.21
40 0.787 0.0315 0.26
45 0.885 0.0399 0.32
50 0.983 0.0493 0.39
60 1.180 0.0709 0.55
70 1.376 0.0966 0.73
80 1.573 0.1261 0.94
90 1.770 0.1596 1.17
100 1.966 0.1971 1.43
120 2.360 0.2838 2.03
140 2.753 0.3863 2.74
160 3.146 0.5045 3.42
180 3.540 0.6385 4.20
200 3.933 0.7883 5.06
250 4.916 1.2317 7.76
300 5.899 1.7737 11.01
350 6.882 2.4142 14.80
400 7.866 3.1533 19.12
450 8.849 3.9909 23.79
500 9.832 4.9270 28.99
550 10.815 5.9617 34.70
600 11.798 7.0949 40.96
650 12.782 8.3266 47.71
700 13.765 9.6569 54.99 7