Académique Documents
Professionnel Documents
Culture Documents
TIANG TM 1
A PEMASANGAN TIANG BETON
1 TIANG BETON 13 METER 350 dAN 1 set
B ACCESSORIES
1 Cross arm 2000 (type tumpu) 1 Pcs
2 Arm tie type 750 pipe Ø ¾” 1 Pcs
3 Bolt & nut M 16x400+washer (double arm) 2 Pcs
4 Bolt & nut M 16x50 / M16x120+washer 1 Pcs
5 20 KV pin (pin post) insulator +steel pin 3 Pcs
6 Alluminium binding wire 3,2 mm 2 mtr
7 Aluminium tape 4,0 mm 2 mtr
8 Pre formed top tie 240/150/70/35 3 Pcs
TOTAL
TIANG TM 3
A PEMASANGAN TIANG BETON
1 TIANG BETON 13 METER 350 dAN 1 set
B ACCESSORIES
1 Strain Insulator 20 KV 3 Set
2 Cross arm 2000 (type tarik) 1 Pcs
3 Arm tie type 750 pipe Ø ¾” 1 Pcs
4 Bolt & nut M 16x400+washer (double arm) 2 Pcs
5 Ball Clevis/Socket Eye 3 set
6 HV. Band Strap 3 Pcs
7 Bolt & nut M 16x50 / M16x120+washer 1 Pcs
8 Dead End Clamp (strain clamp) 3 set
9 U Strap 3 pcs
10 single Arm Band/ Arm Tie Band 1 Pcs
TOTAL
TIANG TM 10
A PEMASANGAN TIANG BETON
1 TIANG BETON 13 METER 350 dAN 1 set
B ACCESSORIES
1 20 KV pin / pin post insulator +steel pin 2 pcs
2 Tension disc / string insulator 20 Kv 6 Pcs
3 Bolt & nut M 16/500+washer (double arm) 4 Pcs
4 Arm tie type 750 pipe Ø ¾” 4 Pcs
5 ARm tie Band. Nut M16 + washer 1 Pcs
6 U Strap 1 Pcs
7 cross arm type . 2000 ( tarik) 4 Pcs
8 Ball Clevis/Socket Eye 6 Pcs
9 Band strap / cross Arm Clevis / sups. VEE 6 Pcs
10 Bolt & Nut M16x140 + waster 6 Pcs
11 Double Arm Band + Bolt & Nuts + waster 1 set
12 Dead End strain clamp,performed Termation 6 set
13 Aluminium binding wire 3,2 mm X mtr
14 Aluminium tape 4,0 mm Y mtr
15 Pre formed top tie 150/70/35 Sqmm 2 pcs
16 Line Top Connector / HH Connector 3 pcs
TOTAL
TIANG GTT 2T
A PEMASANGAN TIANG BETON
1 TIANG BETON 13 METER 350 dAN 1 set
B ACCESSORIES
1 ARM TIE BAND 8" 2 bh
2 CROSS ARM NP..10 - 1800 MM 2 bh
3 BOLT & NUT M.16 x 50 MM 2 bh
4 ARM TIE TYPE 750 MM 2 bh
5 ISOLATOR TUMPU 20KV MDU 6 bh
6 ALL BINDING WIRE 3,2 MM 9 mtr
7 ALL TAP 4mm 6 mtr
8 BOLT & NUT M.16 x 400 MM 4 bh
C CONDUKTOR + PROTECTION
1 CROSS ARM NP. 10 - 2500 MM 2 bh
2 DOUBLE ARM BAND 8" 2 bh
3 LINE TAP/H.TYPE CONNECTOR 70-150MM2 3 bh
4 LIGHTNING ARRESTER 24 KV 5 kA MDU 3 bh
5 CUT OUT 20KV 12,5 kA+FUSE LINK 6A MDU 3 bh
6 N Y A 25 MM2 DRAAD U/ JAMPER + ARRESTER 25 mtr
7 GROUNDING TRAFO
8 BC DRAAD 50 MM2 12 mtr
9 AARDINGSPIJPEN 1,5" - 5,50 MT 1 bh
10 GROUND ROD 16 MM 2,5 MT 1 bh
11 GASPIJP 1"-1,5 MT U/ PELINDUNG AARDE 1 bh
12 COPPER TUBE 50 mm + CLAMP (spt kabel) 7 bh
13 RANGKA TEMPAT DUDUK
14 RANGKA TEMPAT DUDUK TRAFO LENGKAP 1 set
15 JATIHOUTEN PLANKEN 50X200X2500 MM 2 bh
16 JATIHOUTEN BESCHERMLAT 2000 MM 1 bh
17 LV. PANEL
18 LV PANEL 2GRP 630A (UML/43,43A,43B/PJ/93) 1 set
19 CROSS ARM NP. 6,5-2500 MM u/ LV.PANEL 2 bh
20 N Y Y 1 CORE 150 MM2 40 mtr
21 N Y Y 4 x 70 MM2 u/SALURAN KELUAR 20 mtr
22 COPER TUBE / KABEL SCHOEN 150 MM2 8 bh
23 GEGALV GASPIJ 2" - 6 METER 2 bh
24 L BOUW 2" u/SALURAN KELUARAN BAWAH 2 bh
25 L BOUW 3" u/SALURAN MASUK BAWAH 1 bh
26 L BOUW PVC 2" u/SALURAN KELUARAN ATAS 4 bh
27 L BOUW PVC 3" u/SALURAN MASUK ATAS 2 bh
28 GEGALV GASPIJ 3" - 6 METER 1 bh
29 COPER TUBE / KABEL SCHOEN 70 MM2 8 bh
30 COPER TUBE / KABEL SCHOEN 50 MM2 2 bh
31 BESI KANAL NP.6,5-750 MM 4 bh
32 KLEMBEUGEL 2" U/GASPIJ 4 bh
33 KLEMBEUGEL 3" U/GASPIJ 2 bh
34 KLEMBEUGEL 10" 4 bh
35 BOLT & NUT M.16X50 MM 20 bh
36 BC DRAAD 50 MM2 2 mtr
37 GROUND ROD 16 MM 2,5 MT 1 bh
38 GASPIJP 1"-1,5 MT U/ PELINDUNG AARDE 1 bh
39 COPPER TUBE 50 mm + CLAMP 2 bh
D TRANSFORMER SETTING
1 TRANSFORMATOR 3PHS 200 KVA 20000/220-380V. 1 pcs
Total
Volume Total Harga Satuan Biaya Pasang Jumlah Harga Per Satuan Nilai Tunai
(Rp)
TIANG TR 4A
A PEMASANGAN TIANG BETON
1 TIANG BETON 9 METER 200 dAN 1 set 2
B ACCESSORIES
1 Tension bracket 1 Set 2
2 Strain Clamp 2 Set 4
3 Stainless Steel Strip 0,75 Mtr 4 Pcs 8
4 Stopping Buckie 4 Pcs 8
plastic strap 6 Pcs 12
5 Bendled Cond. Connector 7D 26/70 25 8 Pcs 16
6 Suspension Clamp Bracket 1 Pcs 2
7 Suspension Clamp 1 Set 2
8 Protectif Plastic Strap 0,5 Mtr 4 Pcs 4
TOTAL
TIANG
1 GTT dan LV panel
2 TR4
3 TR5
Total Keseluruhan GTT, TR dan LV panel
JUMLAH TOTAL
Daftar Kebutuhan Perumahan
AR KEBUTUHAN TIANG TR PERUMAHAN
Jumlah Harga Satuan (Rp) Total (Rp)
6 48,481,904 290,891,424
2 Rp1,099,890 2,199,780
15 Rp924,700 13,870,500
an LV panel 306,961,704
PPN
2041159.2879
UMLAH TOTAL Rp 206,157,088
NO JENIS JENIS, MERK, TYPE JUMLAH SATUAN
1 1.1 LAMPU SILKON URBAN Type SR80 AC (80W) 8 buah
3 SILKON URBAN Type SRN80 AC - SS (80W) 90 buah
4 1.2 KABEL kabel NFA2X (2 X 10 mm²) 1880 meter
8 1.3 AKSESORIS Sensor LDR ( light depended resistor) 11 buah
9 Tiang PJU 98 buah
10 konektor 10 buah
11 geretan kabel 109 buah
12 kotak sambung 87 lonjor
16 MCB 1 phasa Schneider DOM 11341 SNI 4,5 KA 1POLE 2A 4 buah
17 MCB 1 phasa Schneider DOM 11340 SNI 4,5 KA 1POLE 6A 1 buah
18 MCB 1 phasa Schneider DOM 12252 SNI 4,5 KA 1POLE 4A 6 buah
20 Box panel PJU 11 buah
23 Isolasi national 1 buah
HARGA SATUAN TOKO BIAYA TRANSPORTASI BIAYA PASANG BIAYA ASURANSI
Rp 64,800 Rp 13,265 Rp 52,500 Rp 2,592
Rp 122,000 Rp 24,974 Rp 52,500 Rp 4,880
Rp 4,350 Rp 890 Rp 4,500 Rp 174
Rp 13,000 Rp 2,661 Rp 15,000 Rp 520
Rp 18,000 Rp 3,685 Rp 15,000 Rp 720
Rp 20,900 Rp 4,278 Rp 15,000 Rp 836
Rp 20,900 Rp 4,278 Rp 15,000 Rp 836
Rp 6,500 Rp 1,331 Rp 15,000 Rp 260
Rp 59,400 Rp 12,160 Rp 15,000 Rp 2,376
Rp 59,400 Rp 12,160 Rp 15,000 Rp 2,376
Rp 68,750 Rp 14,074 Rp 15,000 Rp 2,750
Rp 25,500 Rp 5,220 Rp 15,000 Rp 1,020
Rp 5,000 Rp 1,024 Rp 15,000 Rp 200
Rp 488,500 Rp 100,000 Rp 259,500 Rp 19,540
BIAYA KOMISIONING PROFIT PERUSAHAAN
HARGA SATUAN RAB/BOQ PENAWARAN
TOTAL HARGA
Rp 2,592 Rp 25,920 Rp 161,669 Rp 1,293,353
Rp 4,880 Rp 48,800 Rp 258,034 Rp 23,223,097
Rp 174 Rp 1,740 Rp 11,828 Rp 22,237,544
Rp 520 Rp 5,200 Rp 36,901 Rp 405,913
Rp 720 Rp 7,200 Rp 45,325 Rp 4,441,825
Rp 836 Rp 8,360 Rp 50,210 Rp 502,104
Rp 836 Rp 8,360 Rp 50,210 Rp 5,472,934
Rp 260 Rp 2,600 Rp 25,951 Rp 2,257,703
Rp 2,376 Rp 23,760 Rp 115,072 Rp 460,287
Rp 2,376 Rp 23,760 Rp 115,072 Rp 115,072
Rp 2,750 Rp 27,500 Rp 130,824 Rp 784,942
Rp 1,020 Rp 10,200 Rp 57,960 Rp 637,561
Rp 200 Rp 2,000 Rp 23,424 Rp 23,424
Rp 19,540 Rp 195,400 Rp 1,082,480 Rp 61,855,758
PERHITUNGAN BIAYA KEPENGURUSAN KE PLN UNTUK PERUMAHAN DAN FASILITASNYA
LOKASI PEKERJAAN : Derma Regency
JENIS PEKERJAAN : PASANG BARU
TAHUN : 2019
10 10 10 15
10 10 10 15
10 10 10 15
10 10 10 15
10 10 10 15
BIAYA TAMBAHAN PPn JUMLAH