Vous êtes sur la page 1sur 5

Documents Required

 Pump Documents Required

Weg Document.

1) Performance Guarantee.
2) Shipment Inspection Report.

 FEDCO Document

1) Performance Guarantee.
2) Shipment Inspection Report.

HBP-130

1) Super Duplex Construction.


2) Hydrostatic Test Report.
3) Performance Test Report.
4) Vibration Test.
5) Certificate of Conformance.
6) Material Certificates.

MSD-130

1) Super Duplex Construction.


2) Motor Frame: IEC 315.
3) Inlet Orientation: Position F1. (90° CW)
4) Hydrostatic Test Report.
5) Performance Test Report.
6) Vibration Test.
7) Certificate of Conformance.
8) Material Certificates.

Grundfos

1) All Standard Certificate Including certificate of origin.


2) Integrity Test Certificate.
3) Hydro test Report.
4) MTCs and FAT OF Pumps and Motors.
5) O&M Manual.
6) 5 Year Spear part List.
7) Shipment Inspection Report.

Dosing Pump (Jesco)

1) End-use-certificate is required.
2) Technical Datasheet.
3) O&M Manual.
4) Instruction Manual.
5) Certificate of Declaration to American Standards or Equivalent

Pressure Vessel (Protec)

1) All Standard Documents, Certificate of Origin.


2) Integrity Test Certificate.
3) O & M Manual with drawings and part detail.
4) Material Inspection Report.
5) Shipment Inspection Report.

Coupling (Zhejiang Parkson)


1) Catalogue.
2) Datasheet
3) Brochures With Range and Application Mentioned.
4) Material Test Certificate

Riko Floatation
1) Certificate of Origin.
2) Supported Photograph of Package.
3) Calibration Certificate
4) Installation and Operation Manual
5) Product Data Sheet.
Membrane (LG Chem)

1) All Standard Certificate including Certificate of Origin.


2) Integrity Test Certificate.
3) Material Test Certificate.
4) Shipment Inspection Report.

Sensors (George Fisher GF)


1) All Standard Certificate including Certificate of Origin.
2) Catalogue.
3) O&M Manual.
4) Instruction Manual.
5) Certificate of Declaration.
6) Valid Calibration Certificate.
7) Datasheets.

Actuator Valves (George Fisher GF)


1) Catalogue & Brochure with range marking.
2) Hydro Test Report.
3) Material Test Certificate.
4) Technical Datasheet.
5) O & M Manual.

Piping (George Fisher GF)

1) Catalogue & Brochure with PN Rating and Size Marking


2) Material Test Certificate.
3) Hydro Test Report.

Filter Housing & Self Cleaning Filter

1) All Standard Certificate including Certificate of Origin.


2) Integrity Test Certificate.
3) 3 Set of O & M Manual with Drawings and part number detail.
4) Material Inspection Report.
5) Shipment Inspection Report.
6) 5 Year Spare Part List.
Conduit

1) Datasheet
2) Material Test Certificate.
3) O&M Material.
4) Instruction Manual.
5) Catalogues.
6) Certificate of Compliance.

Pressure Switch / Pressure Gauge / Thermometer (Dorian Drake)

1) Certificate of origin.
2) Supported photographs required at the time of delivery.
3) Datasheets
4) Calibration certificate.
5) Installation and O&M manuals with calibration procedure mentioned.
6) General assembly / or exploded views of all products required.
Containers (Dong Fang)
1) Material Test Certificate.

Compressor (Dalgakiran)

1) Certificate of origin.
2) FAT Report.
3) Technical Datasheet.
4) General Arrangement Drawing.
5) Operation & Maintenance and Installation Manual.
6) Spare Part List.
7) Electrical Drawings.

Nut & Bolts (Asia Bolts)

1) Certificate of Origin.
2) Material Test Report
3) Datasheet.
Super Duplex Piping (Special Piping)

1) Certificate of Origin.
2) Material Test Certificates.