R&bDivision : Valsad
Clearing & Grubbing , , WMM 150mm , Prime coat, BBC 37.50 mm .Carpet 25.00 mm , Sealcoat 0.18 Cum/10 Sqmt, Asphalt painting, Side
shoulder, Road furniture etc.
Work is completed
Whether
Whether Field Laboraory Whether Necessary
Sr.No Establishment ( Y/ NO ) EquipmentsAvailable (Y/N)
Equipmentshave been
At Plant Site At Paver Site Used(Y/N)
Garding : - S
Based on executed quantities whether all mandatory tests WhetherQCRegisterpart|maintained as per provisions
Sr No
conducts (YES/PARTLY/NO) (YES/PARTLY/NO)
1 Yes Yes
NA NA NA NA
Grading :- NA
3.0GEOMETRICS:TheQMShouldTakeatleasttwomeasurementsin1KMlengthandiffoundthat
theRoadwayandCarriagewayisinadequate QMmaytakemoreobservation.
Observation -item 3 a:Roadway width & Carriageway.
Carriageway
Sr No Chainage Camber Super Elevation Junction Improvement Remarks
Width(m)
4.0 EARTHWORK :
OBSERVATION -item 4 a:Quality of Material for Embankment/Sub Grade:
NA NA
Grading : - NA
NA NA NA NA NA NA NA
Grading : - NA
OBSERVATION -item 4 c:Side,Slope And Profile:
YES NO N.A
Grading :- NA
Sub-Base(GSB II)
Observation-QualityofmaterialandWorkmanship: IfMixmaterialisused(MixDesignisdoneornot)NO
N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A
Grading : - N.A
Volume of
Filler material is
Aggregate filler material Whether Adequate
Location Thickness of each Thickness is non- plasic to
confirms percent of compactionis done Remarks
(Km) layer of WBM(MM) Adequate(Y/N) desired extent
Grading (Y/N ) coarse (Y/N)
(Y/N)
aggregate
NA NA NA NA NA NA NA
Grading :- NA
Observation - item No 6.(b) Quality of material and Workmanship of WMM;
IfMixmaterialisused(MixDesignisdoneornot)NO
Volume of
Filler material is
Aggregate filler material Whether Adequate
Location Thickness of each Thickness is non- plasic to
confirms percent of compactionis done Remarks
(Km) layer of WMM Adequate(Y/N) desired extent
Grading (Y/N ) coarse (Y/N)
(Y/N)
aggregate
Grading :- N.A
7.0.BituminousCourse:PremixCarpet/SurfaceDressing/BM/BUSG/SealCoat/MSS;
QualityofMaterialAndWorkmanshipofBTLayer(InCaseofongoingWorks):
Whether Coarse
Write Mixing Temperature and Whether it
Sr No Location Aggregate confirm to WhethertheBinderisof approvedgrade(Y/N)
is in Permissible limits.(Y/N)
( Y/N)
Yes NO N/A
Yes NO N/A
7.0 C : Bitumen Extraction Tests Performed at Plant Site at the time inspection:
Wt of Mix % % Asphalt
Wt of Mix Without % Asphalt w.r.t
with Asphalt Wt.ofAsphalt(gm) Asphalt w.r.t Mix reqd.asper Remarks Pass/Fail
Asphalt(gm) Aggregate
(gm) Specification
Thickness
Whether Surface Write laying
evennessis within andwhether it is in
Sr No Location (Km) acceptable limit permissible limit Remarks
Whether
Thickness in (Y/N) (Y/N)
Thickness is
mm
adequate(Y/N)
Grading :- NA
8.0. B Observations - Workmanship of BT layer(In case of completed works):(Paver Site) FOR : Carpet
Thickness
Whether Surface Write laying
evennessis within andwhether it is in
Sr No Location (Km) acceptable limit permissible limit Remarks
Whether
Thickness in (Y/N) (Y/N)
Thickness is
mm
adequate(Y/N)
Grading :- NA
8.0 C Observations-WorkmanshipofBTlayer(Incaseofcompletedworks):(PaverSite)FOR:Sealcoat
Thickness
Whether Surface Write laying
evennessis within andwhether it is in
Sr No Location (Km) acceptable limit permissible limit Remarks
Whether
Thickness in (Y/N) (Y/N)
Thickness is
mm
adequate(Y/N)
Grading :- NA
9.0 Observations - item No.8,Quality of Shoulders(In Case of completed Works.)
NA NA NA NA NA
Grading :- NA
11.0 CC Pavements
Thickness
NA NA NA NA NA NA
Grading :- NA
Junction Board No
15.0 GeneralObservationofSQL(Including the observations made during the interaction with PIU Staff and
contractor's/Consultant's Engineers):
15.1 Observation about deficiency in project preparation (Give details observation about deficiencies in generalanditems
whichhavebeenleftbutarerequiredaspersitecondition)
-> NA
15.2 Whether thework has been complete or is in progress as perwork program or delay has occurred.if delay has occurred,whether the
liquidated damages have beenwithhold or recovered
-> Yes
15.3Whethertheworkhasbeencompletedwithinthesanctioncost,ifnotwhatistheactiontakenbythe PIU(incaseofcompleteworks).
-> Yes
15.4Observation about the action taken by PIU on the inspecting officers including SQMs and NQMs.(Clearly offer comments about the
action on the observation f Department officers,State Quality Monitors)
-> NA
15.5 CommentaboutdifferenceinobservationmadebyNQMs/SQMsinearlierinspection(theNQMShall
StudyearlierinspectionreportofNOMs/SQMs.ifAnyadnhisClearCommentsaboutthedifferencesin observation,if any)
-> NA
Grading :- S
Agency Rating : A
Signature: Signature:
The overall grading calculated on the basis of item and sub item wise grading is given below:
(c) Workmanship NA
Quality of Material NA
(c)Bituminous Course C NA
Overall Grading S