BRIDGE
ABUT. A ABUT. B
8b
3 8a 1 2 1 2 4
7a
7b
SEVILLA 2 BRIDGE
5 6
1 GENERAL PLAN
ABUT. A SEVILLA 2
ABUT. B
BRIDGE
SEVILLA 2 BRIDGE
1 ELEVATION
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 01 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2
BRIDGE
ABUT. A ABUT. B
SEVILLA 2
BRIDGE
ABUT. A ABUT. B
A-A B-B
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 02 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
DETAIL 1
A SECTION THRU "A - A" FORMWORK
1 STEEL DECK DETAIL
REINFORCEMENT SCHEME
ASSEMBLY AS3 AND AS4
REINFORCEMENT SCHEME
ASSEMBLY AS1
DETAIL 2
B SECTION THRU "B - B"
REINFORCEMENT SCHEME
ASSEMBLY AS2
FORMWORK
C TYPICAL CROSS-SECTION
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 03 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
ABUT. A
3a 3b
DETAIL 1
3a SECTION ELEVATION
DETAIL 2
CORNICE @ABUT. A
3b SECTION ELEVATION
3 CORNICE REINFOCEMENT PLAN
ABUT. B
4b 4a
DETAIL 3
4a SECTION ELEVATION
CORNICE @ABUT. B
4 CORNICE REINFORCEMENT PLAN DETAIL 4
4b SECTION ELEVATION
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 04 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
ABUT. A
ABUT. B
5a
6a
DETAIL 5 DETAIL 6
5a SECTION ELEVATION 6a SECTION ELEVATION
DETAIL 8
DETAIL 7 7b SECTION THRU "B - B"
7a SECTION THRU "A - A"
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 05 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2
BRIDGE
ABUT. A ABUT. B
REINFORCEMENT SCHEME
ASSEMBLY AS5 AND AS6
REINFORCEMENT SCHEME
ASSEMBLY AS7 AND AS8
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 06 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
CORNICEES REINFORCEMENT
BAR BENDING DIAGRAM
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 07 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
A-A SEVILLA 2
BRIDGE
ABUT. A ABUT. B
A-A
1b 1c
1c
SEVILLA 2
BRIDGE
ABUT. A ABUT. B
A-A
2c
B-B
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 08 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SECTION ELEVATION
1c COLD JOINT DETAIL
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 09 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
EXPANSION JOINT
8a SECTION THRU ABUT. A
PLAN SECTION
EXPANSION JOINT
A DETAIL "A"
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 10 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
EXPANSION JOINT
8b SECTION THRU ABUT. B
PLAN SECTION
EXPANSION JOINT
A DETAIL "A"
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 11 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2
BRIDGE
ABUT. A ABUT. B
A-A
A-A
PLAN
STRAINER DETAIL
B-B
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 12 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
BAR DIMENSIONS (MM) CONCRETE BAR DIMENSIONS (MM) CONCRETE
SPACING QUANTITY BAR SIZE LENGTH/BAR TOTAL LENGTH UNIT WEIGHT TOTAL WEIGHT SPACING QUANTITY BAR SIZE LENGTH/BAR TOTAL LENGTH UNIT WEIGHT TOTAL WEIGHT
BAR CODE BAR SHAPE VOLUME BAR CODE BAR SHAPE VOLUME
(mm) (pcs) (mm) (mm) (m) (kg/m) (kg) (mm) (pcs) (mm) (mm) (m) (kg/m) (kg)
a b c d e f g h i (cu.m) a b c d e f g h i (cu.m)
01 AS SHOWN 270 16 9641 9,641 2603.07 0.888 2,311.53 01 AS SHOWN 404 10 125 1390 190 1390 135 125 3,355 1355.42 0.617 836.29
INNER & OUTER EDGE REINFORCEMENT FOOTPATH JOINT & INNER CORNICE LONGITUDINAL REINFORCEMENT (AS5 & AS6)
02A AS SHOWN 270 12 560 85 560 1,205 325.35 0.888 288.91 02a AS SHOWN 121 10 15000 15,000 1815.00 0.617 1,119.86
02B AS SHOWN 508 12 560 85 560 1,205 612.14 0.888 543.58 02b AS SHOWN 26 10 14200 14,200 369.20 0.617 227.80
MAIN TRANSVERSE REINFORCEMENT (ASSEMBLY - AS2) 02c AS SHOWN 49 10 12000 12,000 588.00 0.617 362.80
03 AS SHOWN 254 12 9641 9,641 2448.81 0.888 2,174.55 02d-1 AS SHOWN 23 10 3199 3,199 73.58 0.617 45.40
INNER CORNICE REINFORCEMENT - STIRRUPS 02d-2 AS SHOWN 26 10 3990 3,990 103.74 0.617 64.01
DECKSLAB LONGITUDINAL REINFORCEMENT (AS3 & AS4) 03b AS SHOWN 4 10 790 790 3.16 0.617 1.95
05A AS SHOWN 256 20 9485 350 9835 2517.76 2.466 6,208.80
03c AS SHOWN 4 10 230 230 0.92 0.617 0.57
05B AS SHOWN 256 20 10421 350 10771 2757.38 2.466 6,799.69 FOOTPATH JOINT ANCHORING DEVICE LONGITUDINAL REINFORCEMENT (AS7 & AS8)
06 AS SHOWN 256 20 12000 12000 3072.00 2.466 7,575.55 04a AS SHOWN 5 10 15000 15,000 75.00 0.617 46.28
07 AS SHOWN 128 20 12000 12000 1536.00 2.466 3,787.78
04b AS SHOWN 1 10 14200 14,200 14.20 0.617 8.76
08 AS SHOWN 128 20 7000 7000 896.00 2.466 2,209.54
DRAIN BOX ADDITIONAL REBAR 04c AS SHOWN 2 10 12000 12,000 24.00 0.617 14.81
05 AS SHOWN 390 10 125 390 140 390 140 125 1,310 510.90 0.617 315.23
06a AS SHOWN 7 10 125 900 185 900 185 125 2,420 16.94 0.617 10.45
06b AS SHOWN 7 10 125 900 185 900 185 125 2,420 16.94 0.617 10.45
11a AS SHOWN 12 10 125 430 185 430 185 125 1,480 17.76 0.617 10.96
11b AS SHOWN 12 10 125 430 185 430 185 125 1,480 17.76 0.617 10.96
13 INCLUDED IN SEVILLA 1
15 INCLUDED IN SEVILLA 1
16 INCLUDED IN SEVILLA 1
17 INCLUDED IN SEVILLA 1
SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE
PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 13 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR