SEVILLA 2

BRIDGE
ABUT. A ABUT. B

8b
3 8a 1 2 1 2 4
7a

7b

SEVILLA 2 BRIDGE
5 6
1 GENERAL PLAN

ABUT. A SEVILLA 2
ABUT. B
BRIDGE

SEVILLA 2 BRIDGE
1 ELEVATION

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-A 1 : 100M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 01 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2

BRIDGE
ABUT. A ABUT. B

DECK SLAB PLAN VIEW - ASSEMBLY AS1 & AS2


1 TOP & BOTTOM MAIN TRANSVERSE BARS

SEVILLA 2

BRIDGE
ABUT. A ABUT. B

A-A B-B

DECK SLAB PLAN VIEW - ASSEMBLY AS1 & AS2


2 TOP & BOTTOM LONGITUDINAL REINFORCEMENT

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-B 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 02 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
DETAIL 1
A SECTION THRU "A - A" FORMWORK
1 STEEL DECK DETAIL

REINFORCEMENT SCHEME
ASSEMBLY AS3 AND AS4
REINFORCEMENT SCHEME
ASSEMBLY AS1

DETAIL 2
B SECTION THRU "B - B"

REINFORCEMENT SCHEME
ASSEMBLY AS2

FORMWORK
C TYPICAL CROSS-SECTION

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-C 1 : 100M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 03 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
ABUT. A

3a 3b

DETAIL 1
3a SECTION ELEVATION

DETAIL 2
CORNICE @ABUT. A
3b SECTION ELEVATION
3 CORNICE REINFOCEMENT PLAN

ABUT. B

4b 4a

DETAIL 3
4a SECTION ELEVATION
CORNICE @ABUT. B
4 CORNICE REINFORCEMENT PLAN DETAIL 4
4b SECTION ELEVATION

STAGE 3 SEVILLA BRIDGE 1 : 15M


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-D
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS 1 : 10M
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 04 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
ABUT. A

ABUT. B

5a

6a

DETAIL 5 DETAIL 6
5a SECTION ELEVATION 6a SECTION ELEVATION

SEVILLA 1 BRIDGE ABUT. A - MEDIAN SEVILLA 1 BRIDGE ABUT. B - MEDIAN


5 CORNICE REINFORCEMENT PLAN 6 CORNICE REINFORCEMENT PLAN

DETAIL 8
DETAIL 7 7b SECTION THRU "B - B"
7a SECTION THRU "A - A"

STAGE 3 SEVILLA BRIDGE 1 : 15M


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-E
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS 1 : 10M
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 05 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2

BRIDGE
ABUT. A ABUT. B

FOOTPATH & MEDIAN CORNICES


7 GENERAL PLAN - REINFORCEMENT

REINFORCEMENT SCHEME
ASSEMBLY AS5 AND AS6

REINFORCEMENT SCHEME
ASSEMBLY AS7 AND AS8

STAGE 3 SEVILLA BRIDGE 1 : 15M


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-F
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS 1 : 10M
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 06 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
CORNICEES REINFORCEMENT
BAR BENDING DIAGRAM

STAGE 3 SEVILLA BRIDGE 1 : 15M


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-G
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS 1 : 10M
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 07 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
A-A SEVILLA 2

BRIDGE
ABUT. A ABUT. B

A-A

1b 1c

1c

CORNICE ANCHOR & COLD JOINT


1 G E N E R A L P L A N

SEVILLA 2

BRIDGE
ABUT. A ABUT. B

A-A

2c

B-B

RAILING, CRASH BARRIER & EXPANSION JOINT


2 G E N E R A L P L A N

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-H 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 08 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SECTION ELEVATION
1c COLD JOINT DETAIL

PLAN SECTION PLAN

PLAN & SECTION 2c RAILING POST HOLE DETAIL


CORNICE ANCHOR & CRASH BARRIER SUPPORT DETAIL 1b CORNICE ANCHOR DETAIL
1a SECTION THRU "A-A"

CORNICE ANCHOR & CRASH BARRIER SUPPORT DETAIL


2a SECTION THRU "A - A"

SECTION THRU "B-B"


2b RAILING POST & RAILING DETAIL RAILING EXTREMITIES ON ABUT. "A" TYPICAL SEGMENT RAILING IN MID-SPAN RAILING EXTREMITIES ON ABUT. "B"

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-I 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 09 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
EXPANSION JOINT
8a SECTION THRU ABUT. A

PLAN SECTION
EXPANSION JOINT
A DETAIL "A"

PLAN SECTION EXPANSION JOINT


EXPANSION JOINT
D DETAIL "D"
C DETAIL "C"
EXPANSION JOINT
B DETAIL "B"

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-J 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 10 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
EXPANSION JOINT
8b SECTION THRU ABUT. B

PLAN SECTION
EXPANSION JOINT
A DETAIL "A"

PLAN SECTION EXPANSION JOINT


EXPANSION JOINT
D DETAIL "D"
C DETAIL "C"
EXPANSION JOINT
B DETAIL "B"

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-K 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 11 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
SEVILLA 2

BRIDGE
ABUT. A ABUT. B

DECK SLAB PLAN VIEW


2 GENERAL PLAN - DECK DRAIN

A-A

B-B B-B B-B

A-A

PLAN
STRAINER DETAIL

B-B

SECTION A-A SECTION B-B


DETAIL 1

1a DRAINAGE DRAIN PLAN DETAIL 1


DETAIL 1
1c DRAIN BOX DETAIL
1b SECTION THRU " B - B "

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-L 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 12 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
BAR DIMENSIONS (MM) CONCRETE BAR DIMENSIONS (MM) CONCRETE
SPACING QUANTITY BAR SIZE LENGTH/BAR TOTAL LENGTH UNIT WEIGHT TOTAL WEIGHT SPACING QUANTITY BAR SIZE LENGTH/BAR TOTAL LENGTH UNIT WEIGHT TOTAL WEIGHT
BAR CODE BAR SHAPE VOLUME BAR CODE BAR SHAPE VOLUME
(mm) (pcs) (mm) (mm) (m) (kg/m) (kg) (mm) (pcs) (mm) (mm) (m) (kg/m) (kg)
a b c d e f g h i (cu.m) a b c d e f g h i (cu.m)

I. DECKSLAB REINFORCEMENT II. CORNICES (FOOTPATH JOINT & INNER MEDIAN)


MAIN TRANSVERSE REINFORCEMENT (ASSEMBLY - AS1) FOOTPATH JOINT REINFORCEMENT - STIRRUPS

01 AS SHOWN 270 16 9641 9,641 2603.07 0.888 2,311.53 01 AS SHOWN 404 10 125 1390 190 1390 135 125 3,355 1355.42 0.617 836.29

INNER & OUTER EDGE REINFORCEMENT FOOTPATH JOINT & INNER CORNICE LONGITUDINAL REINFORCEMENT (AS5 & AS6)

02A AS SHOWN 270 12 560 85 560 1,205 325.35 0.888 288.91 02a AS SHOWN 121 10 15000 15,000 1815.00 0.617 1,119.86

02B AS SHOWN 508 12 560 85 560 1,205 612.14 0.888 543.58 02b AS SHOWN 26 10 14200 14,200 369.20 0.617 227.80

MAIN TRANSVERSE REINFORCEMENT (ASSEMBLY - AS2) 02c AS SHOWN 49 10 12000 12,000 588.00 0.617 362.80

03 AS SHOWN 254 12 9641 9,641 2448.81 0.888 2,174.55 02d-1 AS SHOWN 23 10 3199 3,199 73.58 0.617 45.40

INNER CORNICE REINFORCEMENT - STIRRUPS 02d-2 AS SHOWN 26 10 3990 3,990 103.74 0.617 64.01

DECK RAILING REINFORCEMENT (SUPERSTRUCTURE SECTION)


04 AS SHOWN 195 12 150 390 345 390 345 150 1770 345.15 0.888 306.49
03a AS SHOWN 74 10 1290 1,290 95.46 0.617 58.90

DECKSLAB LONGITUDINAL REINFORCEMENT (AS3 & AS4) 03b AS SHOWN 4 10 790 790 3.16 0.617 1.95
05A AS SHOWN 256 20 9485 350 9835 2517.76 2.466 6,208.80
03c AS SHOWN 4 10 230 230 0.92 0.617 0.57
05B AS SHOWN 256 20 10421 350 10771 2757.38 2.466 6,799.69 FOOTPATH JOINT ANCHORING DEVICE LONGITUDINAL REINFORCEMENT (AS7 & AS8)
06 AS SHOWN 256 20 12000 12000 3072.00 2.466 7,575.55 04a AS SHOWN 5 10 15000 15,000 75.00 0.617 46.28
07 AS SHOWN 128 20 12000 12000 1536.00 2.466 3,787.78
04b AS SHOWN 1 10 14200 14,200 14.20 0.617 8.76
08 AS SHOWN 128 20 7000 7000 896.00 2.466 2,209.54
DRAIN BOX ADDITIONAL REBAR 04c AS SHOWN 2 10 12000 12,000 24.00 0.617 14.81

04d-1 AS SHOWN 1 10 3199 3,199 3.20 0.617 1.97


09 AS SHOWN 96 16 1800 1.800 172.80 0.888 153.45

04d-2 AS SHOWN 1 10 3990 3,990 3.99 0.617 2.46


SUB-TOTAL - DECKSLAB REINFORCEMENT 32,359.85 132.497 INNER CORNICE REINFORCEMENT - STIRRUPS

05 AS SHOWN 390 10 125 390 140 390 140 125 1,310 510.90 0.617 315.23

OUTER CORNICE REINFORCEMENT - ABUTMENT

06a AS SHOWN 7 10 125 900 185 900 185 125 2,420 16.94 0.617 10.45

06b AS SHOWN 7 10 125 900 185 900 185 125 2,420 16.94 0.617 10.45

07a INCLUDED IN SEVILLA 1

07b INCLUDED IN SEVILLA 1

07c AS SHOWN 4 10 400 400 1.60 0.617 0.99

08 AS SHOWN 38 10 990 990 37.62 0.617 23.21

09 AS SHOWN 4 10 990 990 3.96 0.617 2.44

10 AS SHOWN 15 10 2430 2,430 36.45 0.617 22.49

OUTER CORNICE REINFORCEMENT - STIRRUPS

11a AS SHOWN 12 10 125 430 185 430 185 125 1,480 17.76 0.617 10.96

11b AS SHOWN 12 10 125 430 185 430 185 125 1,480 17.76 0.617 10.96

INNER CORNICE REINFORCEMENT - ABUTMENT

12a INCLUDED IN SEVILLA 1

12b INCLUDED IN SEVILLA 1

13 INCLUDED IN SEVILLA 1

OUTER CORNICE REINFORCEMENT - STIRRUPS

14a INCLUDED IN SEVILLA 1

14b INCLUDED IN SEVILLA 1

OUTER CORNICE REINFORCEMENT - ABUTMENT

15 INCLUDED IN SEVILLA 1

16 INCLUDED IN SEVILLA 1

17 INCLUDED IN SEVILLA 1

OUTER CORNICE REINFORCEMENT - STIRRUPS

18a INCLUDED IN SEVILLA 1

18b INCLUDED IN SEVILLA 1

OUTER CORNICE REINFORCEMENT - ABUTMENT

19 AS SHOWN 4 10 361 361 1.44 0.617 0.89

20 AS SHOWN 38 10 940 940 35.72 0.617 22.04

21 AS SHOWN 4 20 940 940 3.76 2.466 9.27

22 INCLUDED IN SEVILLA 1 0.00

23 AS SHOWN 15 10 2730 2,730 40.95 0.617

SUB-TOTAL - CORNICE REINFORCEMENT 3,231.22 58.337


GRAND-TOTAL REINFORCEMENT
@SEVILLA 2 BRIDGE
35,591.07 190.833

STAGE 3 SEVILLA BRIDGE


RENARDET S.A. CONSULTING METRO MANILA SKYWAY SD-DRD-SV2-M 1 : 75M
CITRA CENTRAL COMPOSITE UNIBRIDGE STEEL GIRDERS
ENGINEERS EXPRESSWAY CORP.

SHOP DRAWING
STAGE 3 PROJECT
SMC INFRASTRUCTURE

PERTCONSULT I NTERNATIONAL
DESTRA MANAGEMENT INC.
PHILIPPE GOUVARY CONSULTANCY SERVICES INC. (SECTION 2B)
RESIDENT MANAGER
Sta. 4+723.713 TO Sta. 8+655.910
DECKSLAB REINFORCEMENT
JEAN EDUARD S. MANALO AZELIO BEANO NORBERTO A. CONTI BANISTER B. BAGNAS JOSE ANTOLIN O. NEGRU JULIET B. TURINGAN ABRAHAM P. SALES SEVILLA 2 BRIDGE 13 OF 13 A1
SR. STRUCTURAL ENGINEER PROJECT MANAGER, PMCS SR. STRUCTURAL ENGINEER PROJECT MANAGER / TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR