Académique Documents
Professionnel Documents
Culture Documents
LOADING DIAGRAM
A D
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location INTERNAL PANEL, from grids A to D Taha 19-Dec-19 67
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
BENDING MOMENT DIAGRAMS (kNm)
250 250
200 200
150 150
100 100
50 50
0 0
-50 -50
-100 -100
-150 -150
-200 -200
-5 0 5 10 15 20 25 -5 0 5 10 15 20 25
SUPPORT No 1 2 3 4 5 6
Elastic M 92.2 158.4 130.5 183.0 11.3 ~
Redistributed M 92.2 158.4 130.5 183.0 11.3 ~
ßb 1.000 1.000 1.000 1.000 1.000 1.000 ~
Redistribution
End support reinf. Ø mm 16
*
SPAN No 1 2 3 4 5
Elastic M 76.2 131.4 47.5 177.3 ~
Redistributed M 76.2 131.4 47.5 177.3 ~
ßb 1.000 1.000 1.000 1.000 1.000 ~
SHEARS FORCE DIAGRAMS (kN)
300 300
250 250
200 200
150 150
100 100
50 50
0 0
-50 -50
-100 -100
-150 -150
-200 -200
-250 -250
0 5 10 15 20 25 0 5 10 15 20 25
SPAN No 4 5
Elastic V 154.2 177.1 239.3 174.6 ~ ~
Redistributed V 154.2 177.1 239.3 174.6 ~ ~
REACTIONS (kN)
SUPPORT 1 2 3 4 5 6
ALL SPANS LOADED 85.1 270.4 391.1 350.3 416.4 265.9
ODD SPANS LOADED 85.1 213.9 321.6 291.2 348.4 269.9
EVEN SPANS LOADED 60.8 224.2 312.0 276.4 326.0 169.2
Veff for punching 270.4 391.1 350.3 416.4 337.4
Characteristic Dead 60.8 167.7 242.5 217.3 257.9 173.2
Characteristic Imposed 22.3 32.2 28.7 34.6 15.7
CHECKS % As ok ok ok
Singly reinforced ok ok ok
max S ok ok ok
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location INTERNAL PANEL, from grids A to D Taha Dec-2019 69
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
CHECKS % As ok ok ok
Singly reinforced ok ok ok
max S ok ok ok
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location INTERNAL PANEL, from grids A to D Taha 19-Dec-19 72
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
No
WEIGHT of REINFORCEMENT
Mid Strip Col Strip Type Dia Length Unit wt Weight
TOP STEEL Support 1 12 X 12 1125 0.888 12.0
2 X 12 1125 0.888 2.0
Span 1 10 X 12 1425 0.888 12.7
5 X 12 1625 0.888 7.2
Support 2 7 X 12 1375 0.888 8.5
12 X 12 1375 0.888 14.6
Span 2 7 X 12 3500 0.888 21.8
5 X 12 3500 0.888 15.5
Support 3 6 X 12 2250 0.888 12.0
23 X 12 2250 0.888 45.9
Span 3 6 X 12 4000 0.888 21.3
6 X 12 4000 0.888 21.3
Support 4 6 X 12 2250 0.888 12.0
17 X 12 2250 0.888 34.0
Span 4 7 X 12 3500 0.888 21.8
7 X 12 3500 0.888 21.8
Support 5 7 X 12 2250 0.888 14.0
23 X 12 2250 0.888 45.9
Span 5 6 X 12 4000 0.888 21.3
6 X 12 4000 0.888 21.3
Support 6 11 X 12 2000 0.888 19.5
3 X 16 2250 1.578 10.7
SUMMARY Rebar for single direction only. All figures approximate - see User Guide.
TOTAL REINFORCEMENT IN BAY (kg) 724 REINFORCEMENT DENSITY (kg/m3) 41.0
REINFORCEMENT DESIGN SPAN 1 Span = 1.500 m BS8110
Top Steel Ref
LEFT SPAN RIGHT 0.25L
Total Design M kNm 0.0 0.0 92.2 51.9
ßb 1.000 1.000 1.000 1.000 3.4.4.3
Be mm 0 2000 Fig 3.13
Mt max kNm 0.0 214.2 3.7.4.2
MIDDLE STRIP
b mm 4500 3750 2500 3750 Fig 3.12
M kNm 0.0 0.0 23.1 18.2 Table 3.18
Bar dia mm 12 12 12 12
d mm 169.0 169.0 169.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0000 0.0000 0.0129 0.0068 3.4.4.4
z mm 160.6 160.6 160.6 160.6 3.4.4.4
As mm²/m 0 0 144 75 3.4.4.4
As enhancement deflection control 0.00% 0.00%
As final mm²/m 260 260 260 260 3.12.5.3
S mm 400 400 400 400
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 507 ok 507 ok 3.12.11.2.7
As prov mm²/m 283 283 283 283
=% % 0.167 0.167 0.167 0.167
fs N/mm² 1.0 1.0 155.8 81.8 Eqn 8
Deflection Base ratio 7 k tens 2.000 k comp 1.000 Allowed 12.600 > 8.88
COLUMN STRIP
b mm 0 750 2000 750 Fig 3.12
M kNm 0.0 0.0 69.2 33.7 Table 3.18
Bar dia mm 12 12 12 12
d mm 169.0 169.0 169.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0000 0.0000 0.0484 0.0630 3.4.4.4
z mm 160.6 160.6 159.4 156.2 3.4.4.4
As mm²/m 0 0 543 720 3.4.4.4
As enhancement deflection control 0.00% 18.21%
As final mm²/m 260 260 641 720 3.12.5.3
S mm 400 400 125 150
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 507 ok 507 ok 3.12.11.2.7
As prov mm²/m 283 283 679 754
=% % 0.167 0.167 0.402 0.446
fs N/mm² 1.0 1.0 245.2 292.7 Eqn 8
Deflection Base ratio 7 k tens 1.465 k comp 1.000 Allowed 9.229 > 8.88
REINFORCEMENT DESIGN SPAN 3 Span = 5.000 m BS8110
Top Steel Ref
LEFT SPAN RIGHT 0.25L
Total Design M kNm 158.4 131.4 130.5 0.0
ßb 1.000 1.000 1.000 1.000 3.4.4.3
Be mm 2250 2250 Fig 3.13
Mt max kNm 241.0 241.0 3.7.4.2
MIDDLE STRIP
b mm 2250 2250 2250 2250 Fig 3.12
M kNm 39.6 59.1 32.6 0.0 Table 3.18
Bar dia mm 12 12 12 12
d mm 169.0 169.0 169.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0247 0.0368 0.0203 0.0000 3.4.4.4
z mm 160.6 160.6 160.6 160.6 3.4.4.4
As mm²/m 274 409 226 0 3.4.4.4
As enhancement deflection control 0.00% 0.00%
As final mm²/m 274 409 260 260 3.12.5.3
S mm 400 275 400 400
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 507 ok 507 ok 3.12.11.2.7
As prov mm²/m 283 411 283 283
=% % 0.167 0.243 0.167 0.167
fs N/mm² 297.3 305.1 245.0 1.0 Eqn 8
Deflection Base ratio 26 k tens 1.337 k comp 1.053 Allowed 32.940 > 29.59
COLUMN STRIP
b mm 2250 2250 2250 2250 Fig 3.12
M kNm 118.8 72.3 97.9 0.0 Table 3.18
Bar dia mm 12 12 12 12
d mm 169.0 169.0 169.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0740 0.0450 0.0609 0.0000 3.4.4.4
z mm 153.7 160.1 156.7 160.6 3.4.4.4
As mm²/m 859 502 694 0 3.4.4.4
As enhancement deflection control 0.00% 0.00%
As final mm²/m 859 502 694 260 3.12.5.3
S mm 75 225 100 400
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 507 ok 507 ok 3.12.11.2.7
As prov mm²/m 1131 503 848 283
=% % 0.669 0.297 0.502 0.167
fs N/mm² 232.8 306.0 251.1 1.0 Eqn 8
Deflection Base ratio 26 k tens 1.254 k comp 1.053 Allowed 30.892 > 29.59
REINFORCEMENT DESIGN SPAN 5 Span = 5.000 m BS8110
Top Steel Ref
LEFT SPAN RIGHT 0.25L
Total Design M kNm 183.0 177.3 11.3 0.0
ßb 1.000 1.000 1.000 1.000 3.4.4.3
Be mm 2250 125 Fig 3.13
Mt max kNm 241.0 13.1 3.7.4.2
MIDDLE STRIP
b mm 2250 2250 4375 2250 Fig 3.12
M kNm 45.8 79.8 2.9 0.0 Table 3.18
Bar dia mm 12 12 12 12
d mm 169.0 169.0 169.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0285 0.0497 0.0009 0.0000 3.4.4.4
z mm 160.6 159.1 160.6 160.6 3.4.4.4
As mm²/m 317 557 10 0 3.4.4.4
As enhancement deflection control 0.00% 0.00%
As final mm²/m 317 557 260 260 3.12.5.3
S mm 350 200 400 400
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 507 ok 507 ok 3.12.11.2.7
As prov mm²/m 323 565 283 283
=% % 0.191 0.335 0.167 0.167
fs N/mm² 300.6 302.2 11.3 1.0 Eqn 8
Deflection Base ratio 26 k tens 1.230 k comp 1.053 Allowed 30.303 > 29.59
COLUMN STRIP
b mm 2250 2250 125 2250 Fig 3.12
M kNm 137.3 97.5 11.3 0.0 Table 3.18
Bar dia mm 12 12 16 12
d mm 169.0 169.0 167.0 169.0
K' 0.156 0.156 0.156 0.156 3.4.4.4
K 0.0855 0.0607 0.1293 0.0000 3.4.4.4
z mm 151.0 156.7 137.9 160.6 3.4.4.4
As mm²/m 1010 692 1634 0 3.4.4.4
As enhancement deflection control 0.00% 6.42%
As final mm²/m 1010 736 1634 260 3.12.5.3
S mm 75 150 100 400
Clause b ? No No No No 3.12.11.2.7
S max mm 507 ok 507 ok 501 ok 507 ok 3.12.11.2.7
As prov mm²/m 1131 754 2011 283
=% % 0.669 0.446 1.204 0.167
fs N/mm² 273.8 281.3 249.3 1.0 Eqn 8
Deflection Base ratio 26 k tens 1.225 k comp 1.053 Allowed 30.171 > 29.59
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location EDGE PANEL from grids A to D Taha 19-Dec-19 66
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
LOADING DIAGRAM
A D
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location EDGE PANEL, from grids A to D Taha 19-Dec-19 67
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
BENDING MOMENT DIAGRAMS (kNm)
150 150
100 100
50 50
0 0
-50 -50
-100 -100
-5 0 5 10 15 20 25 -5 0 5 10 15 20 25
SUPPORT No 1 2 3 4 5 6
Elastic M 46.1 79.2 65.3 91.5 5.6 ~
Redistributed M 46.1 79.2 65.3 91.5 5.6 ~
ßb 1.000 1.000 1.000 1.000 1.000 1.000 ~
Redistribution
End support reinf. Ø mm 16
*
SPAN No 1 2 3 4 5
Elastic M 38.1 65.7 23.8 88.7 ~
Redistributed M 38.1 65.7 23.8 88.7 ~
ßb 1.000 1.000 1.000 1.000 1.000 ~
SHEARS FORCE DIAGRAMS (kN)
150 150
100 100
50 50
0 0
-50 -50
-100 -100
-150 -150
0 5 10 15 20 25 0 5 10 15 20 25
SPAN No 4 5
Elastic V 77.1 88.6 119.7 87.3 ~ ~
Redistributed V 77.1 88.6 119.7 87.3 ~ ~
REACTIONS (kN)
SUPPORT 1 2 3 4 5 6
ALL SPANS LOADED 42.5 135.2 195.5 175.1 208.2 133.0
ODD SPANS LOADED 42.5 107.0 160.8 145.6 174.2 135.0
EVEN SPANS LOADED 30.4 112.1 156.0 138.2 163.0 84.6
Veff for punching 169.0 244.4 218.9 260.3 168.7
Characteristic Dead 30.4 83.9 121.3 108.7 129.0 86.6
Characteristic Imposed 11.1 16.1 14.4 17.3 7.8
CHECKS % As ok ok ok
Singly reinforced ok ok ok
max S ok ok ok
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location EDGE PANEL, from grids A to D Taha Dec-2019 70
FLAT SLAB ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC33.xls v4.1 on CD © 2006 TCC Taha C.E./529 R68
SUPPORTS ABOVE (m) H (mm) B (mm) End Cond BELOW (m) H (mm) B (mm) End Cond
Support 1 4.00 300 600 F 4.00 300 600 F
Support 2 4.00 1000 300 F 4.00 1000 300 F
Support 3 4.00 1000 300 F 4.00 1000 300 F
Support 4
Support 5
Support 6
Support 7
LOADING DIAGRAM
EDGE EDGE
REACTIONS (kN)
SUPPORT 1 2 3
ALL SPANS LOADED 238.9 502.8 197.9 0.0 0.0 0.0 0.0
ODD SPANS LOADED 239.1 380.1 86.9 0.0 0.0 0.0 0.0
EVEN SPANS LOADED 99.9 347.9 199.8 0.0 0.0 0.0 0.0
Characteristic Dead 103.0 221.1 89.9 0.0 0.0 0.0 0.0
Max characteristic Imposed 44.2 132.1 50.0 0.0 0.0 0.0 0.0
Min characteristic Imposed -0.2 50.2 -1.1 0.0 0.0 0.0 0.0
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location D&D: Main beam Grids C to H, from grid EDGE to EDGE rmw 19-Dec-19 75
CONTINUOUS BEAM (Analysis & Design) to BS 8110:2005 Checked Revision Job No
Originated from RCC41.xls v4.0 on CD © 2006 TCC chg - R68
BENDING MOMENT DIAGRAMS (kNm)
300 300
250 250
200 200
150 150
100 100
50 50
0 0
0 2 4 6 8 10 0 2 4 6 8 10
-50 -50
-100 -100
-150 -150
-200 -200
SUPPORT No 1 2 3
Elastic M 125.0 260.7 132.9 ~ ~ ~ kNm/m
Redistributed M 125.0 234.6 119.6 ~ ~ ~ kNm/m
ßb 1.000 0.900 0.900 ~ ~ ~ ~
Redistribution 10.0% 10.0% 10.0%
SPAN No 1 2
Elastic M 138.18 71.66 ~ ~ ~ ~
Redistributed M 149.23 71.60 ~ ~ ~ ~
ßb 1.080 0.999 ~ ~ ~ ~
SHEARS (kN)
300 300
200 200
100 100
0 0
-100 -100
-200 -200
-300 -300
-400 -400
0 2 4 6 8 10 0 2 4 6 8 10
SPAN No 1 2
Elastic V 234.4 288.3 213.5 206.7 ~ ~
Redistributed V 239.1 283.1 219.7 199.8 ~ ~
Elastic V ~ ~ ~ ~ ~ ~
Redistributed V ~ ~ ~ ~ ~ ~
COLUMN MOMENTS
(kNm) 1 2 3
ALL SPANS Above 62.0 -56.1 -64.8
LOADED Below 62.0 -56.1 -64.8
ODD SPANS Above 62.5 -92.8 -26.9
LOADED Below 62.5 -92.8 -26.9
EVEN SPANS Above 26.9 11.9 -66.4
LOADED Below 26.9 11.9 -66.4
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location D&D: Main beam Grids C to H, from grid EDGE to EDGE rmw 19-Dec-19 76
CONTINUOUS BEAM (Analysis & Design) to BS 8110:2005 Checked Revision Job No
Originated from RCC41.xls v4.0 on CD © 2006 TCC chg - R68
CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok
CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok
Project & location Khartoum Al-Azhari Blk No. (6), Plt No. (97) : D&D: Main beam Grids C to H : from grid EDGE
SPAN
to EDGE
1
CONTINUOUS BEAM (Analysis & Design) to BS 8110:2005 Originated from RCC41.xls v4.0 on CD © 2006 TCC
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 Plan
0 0 0
Project Reem Mohamed Sayed
Location Blk (6), Plot (97) INTERNAL COLUMN
PUNCHING SHEAR to BS8110:2005 Made by rmw Job No R68
Originated from RCC13.xls v4.2 on CD © 2006 TCC Date 19-Dec-19
DETAILED CALCULATIONS
Veff/Vt 1.1500 (enhancement factor) link leg area 78.5
Hole deduction ? NO
CRITICAL PERIMETERS ENCLOSED AREAS
Per No a Internal deduct Final Per No Internal
1 238.5 3408 0 3408 1 0.710
2 357.75 4362 0 4362 2 1.174
3 477 5316 0 5316 3 1.751
4 596.25 6270 0 6270 4 2.441
5 715.5 7224 0 7224 5 3.246
6 834.75 8178 0 8178 6 4.164
7 954 9132 0 9132 7 5.196
8 1073.25 10086 0 10086 8 6.342
Hole face 0 1500 0 1500 Hole face 0.125
Col face 0 1500 0 1500 Col face 0.125
LINK PERIMETERS
Per No a Internal deduct Final No Spacing
1 79.5 2136 0 2136 12 175
2 198.75 3090 0 3090 16 190
3 318 4044 0 4044 20 200
4 437.25 4998 0 4998 24 205
5 556.5 5952 0 5952 28 210
6 675.75 6906 0 6906 32 215
7 795 7860 0 7860 36 215
8 914.25 8814 0 8814 40 220
9 1033.5 9768 0 9768 44 220
Project Reem Mohamed Sayed The Concrete Centre
2
SLAB h mm 200 dx mm 159 Asx mm /m 1340
dy mm 159 Asy mm2/m 1340
ave d mm 159 ave As % 0.843
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 Plan
0 0 0
Project Reem Mohamed Sayed
Location Column B2 EDGE COLUMN
PUNCHING SHEAR to BS8110:2005 Made by rmw Job No R68
Originated from RCC13.xls v4.2 on CD © 2006 TCC Date 19-Dec-19
DETAILED CALCULATIONS
Veff/Vt 1.4000 (enhancement factor) link leg area 50.3
Hole deduction ? NO
CRITICAL PERIMETERS ENCLOSED AREAS
Per No a Internal Choose deduct Final Per No Edge D
1 238.5 3408 1954 0 1954 1 0.477
2 357.75 4362 2431 0 2431 2 0.739
3 477 5316 2908 0 2908 3 1.057
4 596.25 6270 3385 0 3385 4 1.432
5 715.5 7224 3862 0 3862 5 1.864
6 834.75 8178 4339 0 4339 6 2.353
7 954 9132 4816 0 4816 7 2.899
8 1073.25 10086 5293 0 5293 8 3.502
Hole face 0 1500 1000 0 1000 Hole face 0.125
Col face 0 1500 1000 0 1000 Col face 0.125
LINK PERIMETERS
Per No a Internal Choose deduct Final No Spacing
1 79.5 2136 1318 0 1318 8 185
2 198.75 3090 1795 0 1795 10 195
3 318 4044 2272 0 2272 12 205
4 437.25 4998 2749 0 2749 14 210
5 556.5 5952 3226 0 3226 16 215
6 675.75 6906 3703 0 3703 18 215
7 795 7860 4180 0 4180 20 220
8 914.25 8814 4657 0 4657 22 220
9 1033.5 9768 5134 0 5134 24 220
Project Reem Mohamed Sayed The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location Columns A1, D1, A5 & D5 rmw 19-Dec-2019 31
PUNCHING SHEAR to BS8110:2005 CORNER Checked Revision Job No
Originated from RCC13.xls v4.2 on CD © 2006 TCC COLUMN chg - R68
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 Plan
0 0 0
Project Reem Mohamed Sayed
Location Columns A1, D1, A5 & D5 CORNER COLUMN
PUNCHING SHEAR to BS8110:2005 Made by rmw Job No R68
Originated from RCC13.xls v4.2 on CD © 2006 TCC Date 19-Dec-19
DETAILED CALCULATIONS
Veff/Vt 1.2500 (enhancement factor) link leg area 50.3
Hole deduction ? NO
CRITICAL PERIMETERS
Per No a Internal Edge C Edge D Corner Choose deduct Final
1 238.5 3408 2204 1954 1227 1227 0 1227
2 357.75 4362 2681 2431 1465.5 1465.5 0 1466
3 477 5316 3158 2908 1704 1704 0 1704
4 596.25 6270 3635 3385 1942.5 1942.5 0 1943
5 715.5 7224 4112 3862 2181 2181 0 2181
6 834.75 8178 4589 4339 2419.5 2419.5 0 2420
7 954 9132 5066 4816 2658 2658 0 2658
8 1073.3 10086 5543 5293 2896.5 2896.5 0 2897
Hole face 0 1500 1250 1000 750 750 0 750
Col face 0 1500 1250 1000 750 750 0 750
LINK PERIMETERS
Per No a Internal Edge C Edge D Corner Choose deduct Final No Spacing
1 79.5 2136 1568 1318 909 909 0 909 5 225
2 198.75 3090 2045 1795 1147.5 1147.5 0 1148 6 225
3 318 4044 2522 2272 1386 1386 0 1386 7 230
4 437.25 4998 2999 2749 1624.5 1624.5 0 1625 8 230
5 556.5 5952 3476 3226 1863 1863 0 1863 9 230
6 675.75 6906 3953 3703 2101.5 2101.5 0 2102 10 230
7 795 7860 4430 4180 2340 2340 0 2340 11 230
8 914.25 8814 4907 4657 2578.5 2578.5 0 2579 12 230
9 1033.5 9768 5384 5134 2817 2817 0 2817 13 230
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client Reem Mohamed Sayed Made by Date Page
Location FOUNDATION F3 Single column RMW 19-Dec-19 147
PAD FOUNDATION DESIGN to BS 8110:2005 base Checked Revision Job No
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC chg - R68
DIMENSIONS mm
BASE COLUMN
L = 3000 h = 600
B = 3000 b = 300
depth H = 600
ex = 0 ey =
PUNCHING SHEAR . .
d ave = 533 mm u crit = 8196 mm
As prov = 0.206 % v max = 2.577 N/mm² at col face
v = 0.328 N/mm² vc = 0.348 N/mm²
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F3 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 1 of 3
CALCULATIONS - SINGLE BASE
YY MOMENTS
from top m 1.650 1.350 3.11.2.2
from btm m 1.350 1.650 3.11.2.2
to zero press m 3.150 3.150 3.150 3.150 3.150 3.150
local press kN/m 839.81 839.81 719.84 719.84 599.87 599.87
M1 kNm 765.3 765.3 656.0 656.0 546.6 546.6
M2 kNm -377.9 -377.9 -323.9 -323.9 -269.9 -269.9
choose M kNm 710.2 710.2 608.7 608.7 507.3 507.3
Design Myy kNm 710.2
YY SHEARS @ d from col face
from top m 2.176 0.824 3.4.5.10
from btm m 0.824 2.176 3.4.5.8
to zero press m 3.676 3.676 3.676 3.676 3.676 3.676
local press kN/m 839.81 839.81 719.84 719.84 599.87 599.87
V1 kN 692.0 692.0 593.1 593.1 494.3 494.3
V2 kN 1543.6 975.9 1323.1 836.5 1102.6 697.0
choose V kN 642.2 642.2 550.4 550.4 458.7 458.7
Design Vyy kN 642.2
@ 2d from col face
from top m 2.702 0.298 3.4.5.10
from btm m 0.298 2.702 3.4.5.8
to zero press m 4.202 4.202 4.202 4.202 4.202 4.202
local press kN/m 839.81 839.81 719.84 719.84 599.87 599.87
V1 kN 250.3 250.3 214.5 214.5 178.8 178.8
V2 kN 1764.4 755.0 1512.4 647.1 1260.3 539.3
choose V kN 232.2 232.2 199.1 199.1 165.9 165.9
Design Vyy kN 232.2
PUNCHING SHEAR
d ave mm 533 1.5 x d ave 799.5 534
L R B T 801
to edges mm 1500 1500 1500 1500 1899
to 1.5d per mm 1099.5 1099.5 949.5 949.5 2199
No of sides 4 1101 1101
U mm 1899 1899 2199 2199 951 951
within base? Y,N 1 1 1 1 1 1 1 1 1
perimeter falls within base and on 4 sides
U crit mm 8196 8208
Area m² 4.176 4.188
As prov % 0.206
vc N/mm² 0.3477
1.4G+1.6Q 1.2(G+Q+W) 1.0G+1.4W
N kN 2519.4 2159.5 1799.6
v max N/mm² 2.577 OK 2.209 OK 1.841 OK 3 2 2
ave press kN/m² 259.78 222.67 185.56
V kN 1434.6 1229.7 1024.7 1431.4 1226.9 1022.5
v N/mm² 0.3284 OK 0.2815 OK 0.2346 OK 0.3266 0.2799 0.2333
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F3 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 3 of 3
DIMENSIONS mm
BASE COLUMN
L = 2800 h = 600
B = 2800 b = 300
depth H = 600
ex = 0 ey =
REINFORCEMENT . .
Mxx = 438.6 kNm Myy = 566.4 kNm
b = 2800 mm b = 2800 mm
d = 542 mm d = 526 mm
As = 2130 mm² As = 2834 mm²
PROVIDE 11 X16 @ 275 B1 PROVIDE 15 X16 @ 200 B2
As prov = 2212 mm² As prov = 3016 mm²
. .
BEAM SHEAR . .
Vxx = 404.6 kN at d from col face Vyy = 524.9 kN at d from col face
v = 0.267 N/mm² v= 0.356 N/mm²
or Vxx = 11.6 kN at 2d from col face or Vyy = 143.6 kN at 2d from col face
v = 0.008 N/mm² v= 0.097 N/mm²
vc = 0.308 N/mm² vc = 0.348 N/mm²
PUNCHING SHEAR . .
d ave = 534 mm u crit = 8208 mm
As prov = 0.175 % v max = 2.228 N/mm² at col face
v = 0.252 N/mm² vc = 0.329 N/mm²
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F2 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 1 of 3
CALCULATIONS - SINGLE BASE
YY MOMENTS
from top m 1.550 1.250 3.11.2.2
from btm m 1.250 1.550 3.11.2.2
to zero press m 2.950 2.950 2.950 2.950 2.950 2.950
local press kN/m 781.45 781.45 669.81 669.81 558.18 558.18
M1 kNm 610.5 610.5 523.3 523.3 436.1 436.1
M2 kNm -328.2 -328.2 -281.3 -281.3 -234.4 -234.4
choose M kNm 566.4 566.4 485.5 485.5 404.6 404.6
Design Myy kNm 566.4
YY SHEARS @ d from col face
from top m 2.076 0.724 3.4.5.10
from btm m 0.724 2.076 3.4.5.8
to zero press m 3.476 3.476 3.476 3.476 3.476 3.476
local press kN/m 781.45 781.45 669.81 669.81 558.18 558.18
V1 kN 565.8 565.8 484.9 484.9 404.1 404.1
V2 kN 1358.2 829.9 1164.1 711.3 970.1 592.8
choose V kN 524.9 524.9 449.9 449.9 374.9 374.9
Design Vyy kN 524.9
@ 2d from col face
from top m 2.602 0.198 3.4.5.10
from btm m 0.198 2.602 3.4.5.8
to zero press m 4.002 4.002 4.002 4.002 4.002 4.002
local press kN/m 781.45 781.45 669.81 669.81 558.18 558.18
V1 kN 154.7 154.7 132.6 132.6 110.5 110.5
V2 kN 1563.7 624.4 1340.3 535.2 1116.9 446.0
choose V kN 143.6 143.6 123.0 123.0 102.5 102.5
Design Vyy kN 143.6
PUNCHING SHEAR
d ave mm 534 1.5 x d ave 801 534
L R B T 801
to edges mm 1400 1400 1400 1400 1902
to 1.5d per mm 1101 1101 951 951 2202
No of sides 4 1101 1101
U mm 1902 1902 2202 2202 951 951
within base? Y,N 1 1 1 1 1 1 1 1 1
perimeter falls within base and on 4 sides
U crit mm 8208 8208
Area m² 4.188 4.188
As prov % 0.175
vc N/mm² 0.3290
1.4G+1.6Q 1.2(G+Q+W) 1.0G+1.4W
N kN 2188.1 1875.5 1562.9
v max N/mm² 2.228 OK 1.910 OK 1.591 OK 2 2 2
ave press kN/m² 258.93 221.94 184.95
V kN 1103.6 946.0 788.3 1103.6 946.0 788.3
v N/mm² 0.2518 OK 0.2158 OK 0.1798 OK 0.2518 0.2158 0.1798
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F2 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 3 of 3
DIMENSIONS mm
BASE COLUMN
L = 2200 h = 600
B = 2200 b = 300
depth H = 600
ex = 0 ey =
REINFORCEMENT . .
Mxx = 179.2 kNm Myy = 252.7 kNm
b = 2200 mm b = 2200 mm
d = 542 mm d = 526 mm
As = 870 mm² As = 1264 mm²
PROVIDE 9 X16 @ 275 B1 PROVIDE 9 X16 @ 275 B2
As prov = 1810 mm² As prov = 1810 mm²
. .
BEAM SHEAR . .
Vxx = 144.5 kN at d from col face Vyy = 237.4 kN at d from col face
v = 0.121 N/mm² v= 0.205 N/mm²
or Vxx = 0.0 kN at 2d from col face or Vyy = 0.0 kN at 2d from col face
v = 0.000 N/mm² v= 0.000 N/mm²
vc = 0.312 N/mm² vc = 0.318 N/mm²
PUNCHING SHEAR . .
d ave = 534 mm u crit = 4400 mm
As prov = 0.154 % v max = 1.336 N/mm² at col face
v = 0.042 N/mm² vc = 0.315 N/mm²
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F1 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 1 of 3
CALCULATIONS - SINGLE BASE
YY MOMENTS
from top m 1.250 0.950 3.11.2.2
from btm m 0.950 1.250 3.11.2.2
to zero press m 2.350 2.350 2.350 2.350 2.350 2.350
local press kN/m 604.35 604.35 518.02 518.02 431.68 431.68
M1 kNm 272.7 272.7 233.8 233.8 194.8 194.8
M2 kNm -199.4 -199.4 -170.9 -170.9 -142.5 -142.5
choose M kNm 252.7 252.7 216.6 216.6 180.5 180.5
Design Myy kNm 252.7
YY SHEARS @ d from col face
from top m 1.776 0.424 3.4.5.10
from btm m 0.424 1.776 3.4.5.8
to zero press m 2.876 2.876 2.876 2.876 2.876 2.876
local press kN/m 604.35 604.35 518.02 518.02 431.68 431.68
V1 kN 256.2 256.2 219.6 219.6 183.0 183.0
V2 kN 869.1 460.5 744.9 394.7 620.8 328.9
choose V kN 237.4 237.4 203.5 203.5 169.6 169.6
Design Vyy kN 237.4
@ 2d from col face
from top m 2.200 0.000 3.4.5.10
from btm m 0.000 2.200 3.4.5.8
to zero press m 3.300 3.300 3.300 3.300 3.300 3.300
local press kN/m 604.35 604.35 518.02 518.02 431.68 431.68
V1 kN 0.0 0.0 0.0 0.0 0.0 0.0
V2 kN 997.2 332.4 854.7 284.9 712.3 237.4
choose V kN 0.0 0.0 0.0 0.0 0.0 0.0
Design Vyy kN 0.0
PUNCHING SHEAR
d ave mm 534 1.5 x d ave 801 534
L R B T 801
to edges mm 1100 1100 1100 1100 2200
to 1.5d per mm 1100 1100 951 951 2200
No of sides 2 1100 1100
U mm 0 0 2200 2200 951 951
within base? Y,N 0 0 1 1 1 0 0 1 1
perimeter falls within base and on 2 sides
U crit mm 4400 4400
Area m² 4.840 4.184
As prov % 0.154
vc N/mm² 0.3152
1.4G+1.6Q 1.2(G+Q+W) 1.0G+1.4W
N kN 1329.6 1139.6 949.7
v max N/mm² 1.336 OK 1.145 OK 0.954 OK 1 1 1
ave press kN/m² 254.55 218.18 181.82
V kN 97.6 83.6 69.7 264.5 226.7 188.9
v N/mm² 0.0415 OK 0.0356 OK 0.0297 OK 0.1126 0.0965 0.0804
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97)
Location FOUNDATION F1 Made by RMW Job No R68
PAD FOUNDATION DESIGN to BS 8110:2005 Single column base Date 8-Jan-99
Originated from RCC81.xls v4.1 on CD © 2006-9 TCC sheet 3 of 3
vc = 0.356 vc = 0.344
-600
N/mm²
-800
COLUMN 2 L R B T
to edges mm 1629 3771 1400 1400 1902
to 1.5d per mm 1101 1101 951 951 2202
No of sides 4
U mm 1902 1902 2202 2202
within base? Y,N 1 1 1 1 1
perimeter falls within base
U crit mm 8208
Area m² 4.188
1.4G+1.6Q 1.2(G+Q+W) 1.0G+1.4W
N kN 2240.0 1920.0 1600.0
v max N/mm² 2.282 OK 1.956 OK 1.630 OK
ave press kN/m² 259.23 222.20 185.17
V kN 1154.3 989.4 824.5
v N/mm² 0.2633 OK 0.2257 OK 0.1881 OK 0.090
COMBINED L R B T
to edges mm 1629 1271 1400 1400 2052
to 1.5d per mm 1101 951 951 1101 4552
No of sides 4
U mm 2052 2052 4552 4552
within base? Y,N 1 1 1 1 1
perimeter falls within base
U crit mm 13208
Area m² 9.341
1.4G+1.6Q 1.2(G+Q+W) 1.0G+1.4W
N kN 3920.0 3360.0 2800.0
ave press kN/m² 259.26 222.23 185.19
V kN 1498.3 1284.3 1070.2
v N/mm² 0.2124 OK 0.1821 OK 0.1517 OK 0.047
INPUT 1-2
Location CRITICAL COLUMN y concrete density, kN/m3 24.0
γfgk 1.40
Orientation A-B x x B-C H γfqk 1.60
y
n/a
Level 4 3 2 1 G SUS
Dimensions
Spans Cl to Cl A-B m 4.00 4.00 4.00 4.00 4.00 4.00
B-C m 5.00 5.00 5.00 5.00 5.00 5.00
1-2 m 4.00 4.00 4.00 4.00 4.00 4.00
n/a m 5.00 5.00 5.00 5.00 5.00 5.00
Level 4 3 2 1 G SUS 0 0 0 0
Loads (characteristic uno)
Slab (inc swt.) gk kN/m2 12.00 12.00 12.00 12.00 12.00 12.00 10.00 10.00
qk kN/m2 1.50 1.50 1.50 1.50 1.50 1.50 5.00 5.00
Beams (swt.) gk kN/m included included included included included included included included included included
line loads (-extra over slab loads and beam self weight)
A-B gk kN/m 0.0
qk kN/m 0.0
B-C gk kN/m 0.0
qk kN/m 0.0
1-2 gk kN/m 0.0
qk kN/m 0.0
n/a gk kN/m 0.0
qk kN/m 0.0
0.00120
0.00103 240
Notes
Stresses in N/mm2
Compression +ve
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client REEM MOAHED SAYED AND OTHERS Made by Date Page
Location CRITICAL COLUMN rmw 19-Dec-19 117
COLUMN LOAD TAKE DOWN & DESIGN FOR SYMMETRICALLY REINFORCED
RECT. COLUMNS BENT ABOUT TWO AXES TO BS 8110:2005 Checked Revision Job No
Originated from RCC51.xls v4.0 © 2006 TCC chg - R68
Notes
0.00048
Stresses in N/mm2
97
0.00026 Compression +ve
Project Khartoum Al-Azhari Blk No. (6), Plt No. (97) The Concrete Centre
Client REEM MOAHED SAYED AND OTHERS Made by Date Page
Location CRITICAL COLUMN rmw 19-Dec-19 117
COLUMN LOAD TAKE DOWN & DESIGN FOR SYMMETRICALLY REINFORCED
RECT. COLUMNS BENT ABOUT TWO AXES TO BS 8110:2005 Checked Revision Job No
Originated from RCC51.xls v4.0 © 2006 TCC chg - R68
0.00058 Notes
117 Stresses in N/mm2
0.00032
Compression +ve