Project Name Project Duration Project Start Date Project End Date

SNAPCHAT FERTILIZER October 01-07, 2018

October 01-07, 2018


October 08-15, 2018
Task ID Objectives Task Duration Start Date End Date

1 Research Title 45 1-Oct-18 15-Nov-18


2 Introduction 1 16-Nov-18 17-Nov-18
3 Statement of the Problem 1 18-Nov-18 19-Nov-18
4 Hypothesis of the Study 1 20-Nov-18 21-Nov-18
5 Significance of the Study 1 22-Nov-18 23-Nov-18
6 Scope and Delimitation 1 24-Nov-18 25-Nov-18
7 Definition of Terms 1 26-Nov 27-Nov
8 Theoretical Framework 1 28-Nov 29-Nov
9 Conceptual Framework 1 30-Nov 1-Dec
10 Related Literatures and Studies 3 2-Dec 5-Dec
11 Research Methodology 2 6-Dec 8-Dec
12 Research Design 2 9-Dec 11-Dec
13 Respondent of the Study 2 12-Dec 14-Dec
14 Sampling Technique Used 2 15-Dec 17-Dec
15 Statistical Treatment of Data 5 18-Dec 23-Dec
16 Interpretation of Correlation Value 2 24-Dec 26-Dec
17 Research Instruments 2 27-Dec 29-Dec
18 Scaling Qualification 2 30-Dec 1-Jan
19 Reliability of the Research Instrument 2 2-Jan 4-Jan
20 Data Gathering Procedure 2 5-Jan 7-Jan
21 Presentation, Analysis, and Interpretation of Data 2 8-Jan 10-Jan
22 Summary, Conclusion, and Recommendation 2 11-Jan 13-Jan
23 Bibliography 1 14-Jan 15-Jan
24 Acknowledgement 1 16-Jan 17-Jan
25 Dedication 1 18-Jan 19-Jan
October 16-23 2018
October 23-30, 2018
October 31-November 07, 2018
November 08-15, 2018
November 16-23, 2018
November 24- December 01, 2018
December 02-09, 2018
December 10-17, 2018
December 18-25, 2018
December 26 - January 02, 2018
January 03-10, 2018
January 11-19, 2018